HomeMy WebLinkAboutTIMBERLAND BUILDERS a� Mice of die i'1anatint, l��al���rl��a�x��t r ; , � Nlol h .1.ndw or, 01,83-45 :a rt3ia•�K' MGL CHAPTER 41: SECTION 81 U NOTICE OF INCOMPLETE CONSTRUCTION SENT USPS VIA CERTIFIED MAIL SENT USPS VIA CERTIFIED MAIL RETURN RECEIPT REQUESTED RETURN RECEIPT REQUESTED # V1Q -A �Gv - aoo�, - ���7 3S� # yoo 3- e - eao(. - *0647- 35 �► Bob Janusz Joyce Bradshaw Timberland Builders North Andover Town Clerk P.O. Box 223 120 Main Street East Orleans, MA 02643 North Andover,MA 01845 RE: Jared Place-Phase IV Notice of Incomplete Construction and Installation of Sherwood Drive and other facilities. Dear Mr. Janusz and Clerk Bradshaw: At their regularly scheduled meeting on March 7,2006 by a vote of 4 to 0,the Planning Board determined that the construction and installation of Sherwood Drive and related facilities has not been completed in accordance with the approved plans prepared by Thomas Neve Associates,Inc.,titled"Planned Residential Development of Jared Place-Phase IV,"and dated September 1, 1995. Enclosed with this notice is a copy of former Engineering Director Bob Beshara's July 23, 2002 memorandum to file,which is incorporated herein by reference. Mr. Beshara's memorandum outlines the issues that need to be addressed prior to and during final paving. In accordance with MGL Chapter 41: Section 81 U,Timberland Builders has forty-five days to comply with the Planning Board's rules and regulations by(a)completing Sherwood Drive and related facilities in accordance with the approved plans noted above and(b)resolving the issues outlined in Mr. Beshara's memorandum. If Timberland Builders fails to comply with the above within forty-five days after the receipt this notice the Planning Board will exercise its right to enforce the bond for completing such construction. Respectfully, t Lincoln Daley CA=..� Town Planner ca ,w x cn r roRrM O� ,SSACNUSt MEMORANDUM DATE: July 23, 2002 TO: File FROM: Bob Beshara RE; Sherwood Drive—Jerad IV—Site Visit 07-22-02 The following issues should be addressed before final paving:. 11) Install 5' sidewalk with 18" grass strip B) Install sloped granite edging around cul-de-sac area and other facilities as required. C) Clean-up Open Space lot, install drive,parking The following roadway issues have been identified and should be reviewed anddresd vsed prior to or during final paving. The locations are identified from Boxford Street into (E/R--edge of road): (We have received a resident complaint regarding issues 9, 10 & 11 below- these items need the Developer's immediate attention): 1) Pave around CB right side at Boxford Street 2) Repair pavement at E/R right side opposite tree with wail around it 3) 1' DMH—jack hammer old pavement and CBl's left and right side of just after 1 A Dh1H all patch 4 Remove old pavement and pave around 5) Repair E/R pavement and pothole before#33 driveway II 6) Remove damaged pavement and patchat#33 driveway 7) Patch E/R at #44 driveway 8) Adjust curb box at #55 driveway 9) Adjust curb box at #67 driveway 10)Adjust CB at 467 driveway 1.1)Repair pavement around CB opposite#67 driveway 1 Z)Repair E/R pavement between DMH and#86 driveway 13)DMH opposite 486—jack hammer old pavement and install patch 14)Adjust CB and install pavement around CB (g#86 driveway 15)Adjust CB and install pavement around CB opposite#86 driveway 7-23-02 Shenvood Drive Punch Liss Before Fina!Paving Y Page 2 09/04/02 /�,, l pothole at #93 driveway air E/R pavement opposite house# 104 ) epair damaged pavement at E/R at centerline of house #10 1 19)Adjust curb box at #101 driveway 20)Repair pavement at E/R about 10' long before driveway at #115 21)Repair pothole at E/R across street from#115 driveway 22)Pave around CB past#116 driveway 23)Adjust curb box at #125 24)Remove oil/gas damaged pavement and patch opposite centerline of house #125 25)Repair E/R pothole on left side at cul-de-sac entrance 26)Repair pothole at 3 o'clock in cul-de-sac 27)Repair pavement at DMH at E/R at 2 o'clock in cul-de-sac 28)Repair pavement at CB at 12 o'clock in cul-de-sac 29)Remove pile of stone at CB at 12 o'clock in cul-de-sac