Loading...
HomeMy WebLinkAboutTOWN OF NORTH ANDOVER (2) SEWER, SUTTON STREET 310 CMR 10.99 AW Form 2 a� DEP Fits No. -►+. (To be provided by DEP) OCTT l 35 AM 's! - ..- Commonwealth cdyfrown North Andover N ON of Massachusetts ADphcant Town of North Andover MIT .� 09-14-94 = Date Request Filed Sutton Street Sewer Determination of Applicability Massachusetts Wetlands Protection Act, G.L. c. 131 , §40 From NORTH ANDOVER CONSERVATION COMMISSION Issuing Authority LEA GROUP, INC. To 75 Kneeland Street _ Town of North Andover (Name of person making request) (Name of property owner) 120 Main Street Address Boston, MA 02111 Address North Andover, MA 01845 This determination is issued and delivered as follows: by hand delivery to person making request on (date) XZX by certified mail, return receipt requested on 10-13-94 P354 489 692 (date) Pursuant to the authority of G.L. c. 131, §40, the _,.North Andover Conservation Commission has considered your request for a Determination of Applicability and its supporting documentation, and has made the following determination(check whichever is applicable): Sutton Street Sewer Improvement, Main Street to Charles Street. Location: Street Address Sutton Street. Sewer will be installed within the R.O.W. ot Sutton Street, ''and will cross the culvert located approx. Lot Number: 130' E of the intersection of No Main & Snttnn St 1. O The area described below,which includes all/part of the area described in your request, is an Area Subject to Protection Under the Act.Therefore, any removing,filling, dredging or altering of that area requires the filing of a Notice of Intent. The work described below, which includes all;pari of the work described in your reauest. is within an Area Subject to Protection Under the Act and will remove, fill, dredge or alter that area.There- fore, said work requires the filing of a Notice of Intent. Effective 11/10/89 2-t 3. 1Xx The work described below, which inciudes all;part of the work oescrlbedin your reauest. is within the Butter Zone as defined In the reaulations. and will alter an Area Suolect to Protection Under the Act.Therefore,said work reoufres the filing of a Notice of Intent See Emer.jgency Certification dated October 5, 1994 ATTACHED HERETO AND MADE A PART HEREOF. This Determination is neoative: 1, p The area described In your request is not an Area Subject to Protection Under the Act 2. p The work described in your reauest is within an Area Subject to Protection Under the Act. but will not remove, fill. dredge, or alter that area. Therefore, said work does not reoulre the filfno of a Notice of Intent. 3. p The work described in your reauest is within the Buffer Zone, as defined in the reoulatlons. but will not alter an Area Subject to Protection Under the Act. Therefore, said work does not reoulre the filing of a Notice of intent. Q, p The area described in your reauest Is Subject to Protection Under the Ac!. but since the work described therein meets the reoulrements for the foliowino exemptfon.as specified in the Act and the regulations,no Notice of Intent is refaufred Issued by NORTIP ANDD ER Conservation Commission Signature(s) "Ll 4L . , / V - This Determination must be signed by a majority of the Conservation Commission. On this 5th day of October 19 94 before me personally appeared Kevin Foley . to me known to be the person described in, and who executed. the foregoing instrument. and acknowledged that,he°shE, executed the same as his/her tree act and deed. l zz9 hrte Yii, i>+y7 Notary Public My commission expires This Determination does not relieve the aDDhcant trorn cDmDlying with alt otner 2_Dl:canle federal state or IOca!statutes.croinances. by-laws or reputations This Determination shall be valid for three years form the cafe of issuance The apDlreant.the owner.any person aggrieved by this Determination,any owner o'land abutting the fano upon wni:h the DroDosed work it to be done,or any ten residents of ins city or town in wnicn such land Is located,are nereby notified o'tneir hent to reouest the DeDartmenl of Environmental Protection to Issue a Superseding Determination of ADDiiCaDihty.Drovioing the reouest is made Dy certified maii or nand delrvery to the Department.with the appropriate filing fee and Fee Transmittal Form as provioed in 310 CMA 10.03(71 within ten oays from Via date of Issuance of this Determination.A copy of the request shall at the same time be sent by certihed mad or nano oetivery to the Conservation Commission and the applicant. SEWER, SUTTON STREET COMMONWEALTH OF MASSACHUSETTS WETLANDS PROTECTION ACT AND REGULATIONS, G.L. 131, 540, 310 CMR 10. 00 EMERGENCY CERTIFICATION FROM: North Andover Conservation Commission TO: LEA GROUP, INC. Town of North Andover (Name of Applicant) (Name of Property Owner ) 75 Kneeland Street 120 Main Street Boston, MA 02111 North Andover, MA 01845 (address ) (address) DATE: October 5, 1994 c� LOCATION • Sutton Street FINDINGS : ;a w 1 ) The North Andover Conservation Commission hereby cti �i. s pursuant to 310 CMR 10 . 06 that the work described below is aecvsory for the protection of the health and safety of the Citizenr' of the Commonwealth and will be performed by or has been ordered to be performed by an agency of the Commonwealth or a subdivision thereof . 2) A site inspect-ion was performed on October 5, 1994 3 ) The agency ordering or performing the emergency work is the LEA GROUP, INC. (name of agency) . (Not the commission unless work is on land owned or controlled by them. ) 4 ) Describe below, the work which is allowed to proceed under this certification. No work beyond that necessary to abate the emergency may be so certified. The work will involve the installation of 654 linear feet of a new 27" diameter RCP relief sewer adjacent to an existing 15" diameter sewer in Sutton Street. The existing 15" sewer is inadequate for current sewage flows. Approximately 175 linear feet of the sewer will be constructed within 100 feet of the culvert crossing Sutton Street. The 27" RCP sewer will be installed through the top of the culvert, parallel to the existing 15" pipe. (See Note #8 on Sheet 1 attached.) There will be no change in flow conditions within the culvert as a result of the construction. Excavated soil material will be stockpiled within dump trucks. Sediment control measures will be installed around catch basins to minimize the potential for sediment entering the storm drains. All disturbed areas will be repaved following construction- 5 ) onstruction.5 ) The above described work shall be completed by Nov. 4, 1994 (date) . (Work performed under on Emergency Certification shall not exceed 30 days from the date of certification unless the Commissioner of DEQE sp approves . ) Issued by North' do a Conservation Commission. Signature rw, ' AI A