Loading...
HomeMy WebLinkAboutNORTH ANDOVER LAND CORPORATION pORTH 3? ' �.9SSar�o C 5��,�9 HU CONSERVATION DEPARTMENT Community Development Division Modification to the Order of Conditions The NORTH ANDOVER CONSERVATION COMMISSION agreed to accept Applicant: North Andover Land Corporation 1503 Turnpike Street North Andover,MA 01845 the modifications outlined in a letter prepared by New England Engineering Services,Inc., dated February 5, 2007 relative to lots 43C and 44C, Thistle Road, and shown on the as- built plan, prepared by New England Engineering Services, Inc.,dated February 5,2007. as modifications to the Order of Conditions issued in DEP File#242-1301, dated May 2005and recorded in Book 4248 and Page 4. Issued by the NORT DOVER CONSERVATION COMMISSION: r. L2 . L4r - fiaL-yl 4�-Wj. On this Sf of before me personally appeared Scott Day MoAth Year Masse to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed the same as his/her free act and deed. B-71,0 ec-' );'l �2�2 0A Oo Notary Public My Commission Ex fres DONNA K WEDGE NOTARY PUBLIC 'MONWEALTH OF MAS cn^'"SETTS J. Comm.Exoi;_s 1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845 Phone 978.688.9530 Fax 978.688.9542 Weh- httn•//www tnwnnfnnrthantinver rnm/PnaPQMAn(1nVPYMA f nncPrvatinn/index �ORTM Town of North Andover R E Vp Office of the Planning Department 'JOYCE RADS AW Community Development and Services Division fiCLERc o 9ssCHWU 400 Osgood Street North Andover,Massachusetts 01845 '"'�S JUN -8 P 2: 21 Lincoln Daley hM://www.townofnorU=dover.com ``'` Town Planner P(978)688-9535 F(978)688-9542 June 7, 2005 Mr. Benjamin Osgood North Andover Land Corp. 60 Beechwood Drive North Andover, MA 01845 Dear Mr. Osgood, As you are aware, the Planning Department received a Form A plan on May 23, 2005 proposing a lot line change for property located at Thistle Road,North Andover, MA. Map 38, Parcel 314 and Map 38,Parcel 313 by relocating the common lot line between these two parcels. Said parcels are located in the R-3 zoning district in North Andover, MA. The process will allow for the proposed re-subdivided lots to be divided. Parcel 313-1, and Parcel 314-1. Parcel 313-1 has an area of 40,510.8. s.f. and Parcel 314-1 has an area of 37,103.7 s.f. Reference Plan of Land dated May 17,2005,as revised on May 25,2005 and June 2, 2005 by David Alves, Professional Land Surveyor#45454,as drawn by New England Engineering Services, Inc., 60 Beechwood Drive,North Andover, MA 01845. At the regularly scheduled Planning Board meeting of June 7,2005 the Board voted unanimously in favor. Sincerely, Lincoln Daley, Town Planner cc: Planning Board Engineer BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 RE.Up FORM A 1 yCE.8RA0S.HAW f � CLPRIK APPLICATION FOR APPROVAL NOT REQUIRED :. NO U'�'�r Y 23 P DATE: (Stamp two (2) forms with the Town Clerk. File one (1) form with the Town Clerk and one (1) form with the Planning Board.) To the Planning Board: The undersigned,believing that the accompanying plan of property in the Town of North Andover,Massachusetts, does not constitute a subdivision within the meaning of the Subdivision Control Law,herewith submits said plan for a determination and endorsement that the Planning Board approval under the Subdivision Control Law is not required. 1.Name of Applicant: R(o Rr1 r klu pay" �D Address: 60 '-woo P Pi41 vE 2.Location and Description of Property[include Assessor'Mnn andLot and ZoningDistrict(s)]: AVTS G "C19z' 31343 ge 93 3.Deed Reference: Book �Z'1a page—A or Certificate of Title: ' 4.Name of Surveyor: Pef n Address: Signature of Owner(s): Address: Please indicate the grounds(either A,B,C or D,not a combination)on which you believe your plan not to be a subdivision. A. Each lot on the plan meets one of the following criteria: 1, Has the frontage,lot area,and lot width required under the Zoning By-law on' a) a public way,or b) a way which the Town Clerk certifies is maintained&used as a public way,or X c) a way shown on a plan approved and endorsed by the Planning Board under the Subdivision Control Law,recorded in Plan Book Plan !/,_ �6,or d) a way in existence before the adoption of the Subdivision Control Law by the Town and which the Board finds adequate for'the way's proposed use,or e) a way shown on a plan of a subdivision recorded at the Registry of Deeds or the Land Court prior to the adoption of the Subdivision Control Law. B. Each Lot has been dearly marked on the plan to be either: a) joined to and made part of an adjacent lot,or b) labeled"Not A Building Lot". C. Each lot on the plan contains a building which existed prior to the adoption of the Subdivision Control Law. D. The plan shows an existing parcel with no new lot division(s) and has frontage on a way described above. Received- Town of North Andover Town Clerk(date stamp): Signature of Town Official receiving this application: jQYTU;OR-A,H.-BAW Notice to APPLICAW/TOWN CLERK of action of Planning Board on accompanying plan: 1, has determined that said plan does not require approval under the The North Andover Planning Board Subdivision Control Law,and the appropriate endorsement has been made upon the same. sion dened by 2. The North Andover Planning Board has determined that said Plan shows hoal.under ue�Subdivision1Control G.L.c.41,s.81-L and must therefore be re-submitted to it for appy Law. 31 3 very truly yours, . North Andover Planning Board By Date. �id� r t Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands WPA Form 5 - Order of Conditions 242-1301 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: North Andover When filling From: t.Conservation Commission out forms on the computer, 2. This issuance is for(check one): ® Order of Conditions ❑ Amended Order of Conditions use only the tab key to 3. To: Applicant: move your cursor-do not North Andover Land Corporation use the return a.First Name b.Last Name c.Company key. 60 Beechwood Drive d.Mailing Address North Andover MA. 01845 e.City/Town f.State g.Zip Code 4. Property Owner(if different from applicant): Same a.First Name b.Last Name c.Company d.Mailing Address e.City/Town f.State g.Zip Code 5. Project Location: Lots 43C&44C Thistle Road North Andover a.Street Address b.City/Town Map 38 Parcel 313, 314 c.Assessors Map/Plat Number d.Parcel/Lot Number Latitude and Longitude, if known (note: electronic filers will click for GIS locator): e.Latitude f.Longitude 6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): Essex North a.County b.Certificate(if registered land) 4248 164 c.Book d.Page 7. Dates: 3/11/05 3 V5- a.Date Notice of Intent Filed b.DatWPublic Hearing Closed c.bati of Issuance 8. Final Approved Plans and Other Documents(attach additional plan or document references as needed): Site Plan Lots 43C &44C a.Plan Title New England Engineering Services, Inc. Benjamin C. Osgood, Jr., P. E. b.Prepared By c.Signed and Stamped by 3/11/05, revised 3/22/05, revised 3/28/05, 1"=20' revised 4/7/05 e.Scale f.Additional Plan or Document Title g.Date s. Total WPA Fee Paid: $ 1,000 $487.50 $ 512.50 a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid wpaform5.doc• rev.3/1/05 Page 1 of 9 i L1Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands 1 WPA Form 5 - Order of Conditions 242-1301 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings t. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on.the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution d. ® Private Water Supply e. ❑ Fisheries f. ® Protection of Wildlife Habitat g. ® Groundwater Supply h. Storm Damage Prevention i. ® Flood Control 2. This Commission hereby finds the project,as proposed, is: (check one of the following boxes) Approved subject to: ® the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet is attached to this Order. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Acta Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.06(6)(c). Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and wetland boundary (if available) linear feet Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 3. ❑ Bank a.linear feet b.linear feet c.linear feet d.linear feet 4. ❑ Bordering Vegetated Wetland a.square feet b.square feet c.square feet d.square feet 5. ❑ Land Under a.square feet b.square feet c.square feet d.square feet Waterbodies and Waterways e.cu.yd dredged f.cu.yd dredged wpaform5.doc• rev.311/05 Page 2 of 9 t i Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands WPA Form 5 - Order of Conditions 242-1301 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 6. ❑ Bordering Land Subject to Flooding a.square feet b.square feet c.square feet d.square feet Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet 7. ❑ Isolated Land Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet 8. ❑ Riverfront area a.total sq.feet b.total sq.feet Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet Sq ft between 100-200 ft e.square feet f.square feet e.square feet f.square feet Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) s. ❑ Designated Port Indicate size under Land Under the Ocean, below Areas 1o. ❑ Land Under the Ocean a.square feet b.square feet c.cu.yd dredged d.cu.yd dredged 11. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 12. ❑ Coastal Beaches a.square feet b.square feet C.c!y nourishmt. d.ciy nourishmt. 13. ❑ Coastal Dunes a.square feet b.square feet c.cty nourishmt. d.cty nourishmt 14. ❑ Coastal Banks a.linear feet b.linear feet 15. ❑ Rocky Intertidal Shores a.square feet b.square feet 16. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet 17. ❑ Land Under Salt Ponds a.square feet b.square feet c.cu.yd dredged d.cu.yd dredged 18. ❑ Land Containing Shellfish a.square feet b.square feet c.square feet d.square feet 19. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above a.cu.yd dredged b.cu.yd dredged 20. ❑ Land Subject to Coastal Storm Flowage a.square feet b.square feet Page 3 of 9 wpaform5.doc• rev.311/05 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands WPA Form 5 - Order of Conditions 242-1301 I Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. General Conditions Under Massachusetts Wetlands Protection Act (only applicable to approved projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster,wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land,the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to this Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection"[or, "MA DEP"] "File Number 242-1301 " i Page 4 of 9 wpaform5.doc• rev.311/05 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands WPA Form 5 Order of Conditions 242-1301 Massachusetts Wetlands Protection Act M.G.L. c: 131, §40 C. General Conditions Under Massachusetts Wetlands Protection Act 10. Where the Department of Environmental Protection is requested Jo issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A)to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. 18. All work associated with this Order is required to comply with the Massachusetts Stormwater Policy Standards. Special Conditions: If you need more See attached space for additional conditions, select box to attach a text document Page 5 of 9 wpaform5.doc• rev.3/1/05 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands WPA Form 5 - Order of Conditions 242-1301 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Findings Under Municipal Wetlands Bylaw or Ordinance 1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No 2. The North Andover hereby finds(check one that applies): Conservation Commission 3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: b.Citation a.Municipal Ordinance or Bylaw Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. 4. ® that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: Chapter 178 North Andover Wetland Protection Bylaw b.Citation a.Municipal Ordinance or Bylaw The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above.To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent,the conditions shall control. If you need more C. The special conditions relating to municipal ordinance or bylaw are as follows: space for additional See attached conditions, select box to attach a text document Page 6of9 wpaform5.doc• rev.311/05 5 i DEP FILE#242 - 1301 Therefore, the North Andover Conservation Commission(hereafter the"NACU) hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the State Regulations, the local Bylaw and Regulations, to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced below. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control GENERAL CONDITIONS 18. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 19. This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of property rights. However, the NACC, agent of the NACC or the Department of Environmental Protection(DEP) reserves the right to enter and inspect the property at all reasonable times until a Certificate of Compliance is issued, to evaluate compliance with this Order of Conditions, the Act (310 CMR 10.00), the North Andover Wetland Bylaw and Regulations, and may require any information,measurements, photographs, observations, and/or materials, or may require the submittal of any data or information deemed necessary by the NACC for that evaluation. Further, work shall be halted on the site if the NACC, agent or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the NACC is satisfied that the work will comply and has so notified the applicant in writing. 20. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances,by-laws or regulations. 21. The work authorized hereunder shall be completed within three years from the date of this order. 22. This Order may be extended by the issuing authority for one or more periods of up to one year each upon application to the issuing authority at least thirty days (30) prior to the expiration date of the Order (Refer to Section 8.3 (p.37) of the North Andover Wetland Regulations). 23. The NACC reserves the right to amend this Order of Conditions after a legally advertised public hearing if plans or circumstances are changed or if new conditions or information so warrant. C:\word\OOC\43C&44CThistleRd.doc 1 NACC 512105 1 DEP FILE #242 - 1301 24. Where the Department of Environmental Protection(DEP) is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 25. This Order of Conditions is issued under File No. 242-1301 as a substitution for the Order of Conditions issued under 242-784(Abbott Village Subdivision) for these lots. 26. The conditions of this decision shall apply to, and be binding upon, the applicant, owner, its employees and all successors and assigns in interest or control. These obligations shall be expressed in covenants in all deeds to succeeding owners of portions of the property. 27. The term"Applicant" as used in this Order of Conditions shall refer to the owner, any successor in interest or successor in control of the property referenced in the Notice of Intent, supporting documents and this Order of Conditions. The NACC shall be notified in writing within 30 days of all transfers of title of any portion of property that takes place prior to the issuance of a Certificate of Compliance. 28. The proposed work includes: Construction of two(2) single-family dwellings (one per lot) with associated driveways,installation of a segmental block retaining wall, utilities and associated site grading activities in the buffer zone to a bordering vegetated wetland and off property isolated vegetated wetland (jurisdictional under the Bylaw only). 29. The work shall conform to the following(except as noted in the remainder of this document where revisions may be required): Notice of Intent filed by: North Andover Land Corporation(applicant) 60 Beechwood Drive North Andover,MA 01845 Received March 11,2005 NOI &Site Plans Prepared by: New England Engineering Services,Inc. 60 Beechwood Drive North Andover, MA 01845 Dated March 11,2005,last Rev. dated 4-7-05. Plans signed &stamped by Benjamin C. Osgood, Jr., P.E. 30. The following wetland resource areas are affected by the proposed work: Buffer Zone to a Bordering Vegetated Wetland (BVW) and Isolated Vegetated Wetland (IVW); (BLSF elevation noted in 242-784 filing as 196.8). These resource areas are significant to the interests of the Act an I� d Town Bylaw as noted above and therein. The applicant C:\word\OOC\43C&44CThistleRd.doc 2 NACC 5/2/05 i t DEP FILE #242 - 1301 has not attempted to overcome the presumption of significance of these resource areas to the identified interests. 31. The NACC agrees with the applicant's delineation of the wetland resource areas on the site as approved pp owed and as shown on the plans dated referenced herein. 32. The NACC finds that the intensive use of the upland areas and buffer zone proposed on this site will cause further alteration of the wetland resource areas. In order to prevent any alteration of wetland resource areas a twenty-five foot (25') No- Disturbance Zone and a fifty foot(50')No-Construction Zone shall be established from the edge of the adjacent wetland resource area. Further, a 50-foot No- Disturbance Zone and a 75-foot No-Construction Zone shall be established from the edge of the isolated vegetated wetland resource area,as this area showed characteristics of an ephemeral pool as defined in the bylaw regulations,but could not be determined at the time of approval. The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local bylaw. No disturbance of existing grade, soils or vegetation is permitted in the No-Disturbance zone. (See Section 3.4 &Appendix F of the local Regulations). 33. This document shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors,subcontractors, and other personnel performing the permitting work are fully aware of the permits terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order resulting from failure to comply with its conditions. 34. The owners of the project and their successors in title, in the event they proceed to alter areas subject to the Commissions jurisdiction under the order, agree that the Order does not in itself impose upon the Town any responsibility to maintain the proposed drainage system and that said Town shall not be liable for any damage in the event of failure. By acceptance of this Order, the owners agree to indemnify and hold harmless to the Town and its residents for any damage attributable to alterations undertaken on this property pursuant to the Order. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding, storm damage or any other form of water damage. Maintenance of the drainage system, if accepted by the Town as part of a public way,becomes the responsibility of the Town. PRIOR TO CONSTRUCTION I 35. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department or Court have been completed. C:\word\OOC\43C&44CThistleRd.doc 3 NACC 5/2/05 DEP FILE #242 - 1301 36. This Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work. Any Order not recorded by the applicant before work commences may be recorded by the NACC at the applicant's expense. 37. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words "Massachusetts DEP,File Number 242-1301." 38. Any changes in the submitted plans caused by the applicant,another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing (at the expense of the applicant). Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes. The proposed project may be still under review by other local or state boards or agencies. This may result in changes to the project plans or wetland impacts. If any such changes occur a revised plan and an explanation of the revisions shall be submitted to the NACC for review and approval prior to the start of construction. No work shall begin on a project until written approval has been granted by the NACC. 39. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all conditions of this Order of Conditions are complied with. The project engineer and contractors are to be provided with a copy of this Order of Conditions and referenced documents before commencement of construction. 40. Prior to any work commencing on-site, the applicant shall submit to the NACC for approval, a detailed sequence of construction, including the construction of compensation and retention areas, installation of sedimentation/erosion control devices and re-vegetation to be completed before other work begins on-site. I, 41. Wetland flagging shall be checked prior to start of construction and shall be re- established where missing. All wetland flagging shall remain visible and enumerated per the approved plan(s) throughout the life of the project and until a Certificate of Compliance is issued so that erosion control measures can be properly placed and wetland impacts can be monitored. The proposed limit of work shall be shall be clearly C:\word\OOC\43C&44CThistleRd.doc 4 NACC 5/2/05 DEP FILE #242 - 1301 marked with stakes or flags and shall be confirmed by the NACC. Such markers shall be checked and replaced as necessary and shall be maintained until all construction is complete. Workers should be informed that no use of machinery, storage of machinery or materials, stockpiling of soil, or construction activity is to occur beyond this line at any time. All flags used for the above purposes shall be of a color different from other flagging used on the site. 42. A row of staked hay bales backed by trenched siltation fence shall be placed between all construction areas and wetlands. The erosion control barrier will be properly installed and placed as shown on the plans approved and referenced herein and shall be inspected and approved by the NACC prior to the start of construction and shall remain intact until all disturbed areas have been permanently stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction of the NACC. The NACC reserves the right to impose additional conditions on portions of this project to mitigate any impacts which could result from site erosion, or any noticeable degradation of surface water quality discharging from the site. For example, installation of erosion control measures may be required in areas not shown on the plan(s) referenced in this Order of Conditions. Should such installation be required by the NACC, they shall be installed within 48 hours of the Commission's request. 43. The applicant shall have on hand at the start of any soil disturbance,removal or stockpiling, a minimum of 40 hay bales and sufficient stakes for staking these bales(or an equivalent amount of silt fence). Said bales shall be used only for the control of emergency erosion problems and shall not be used for the normal control of erosion. 44. A check payable to the Town of North Andover shall be provided in the amount of $6,000,which shall be in all respects satisfactory to Town Counsel,Town Treasurer, and the NACC, and shall be posted with the North Andover Town Treasurer through the NACC before commencement of work. Said deposit of money shall be conditioned on the completion of all conditions hereof, shall be signed by a party or parties satisfactory to the NACC, and Town Counsel, and shall be released after completion of the project, provided that provisions, satisfactory to the NACC have been made for performance of any conditions which are of continuing nature. The applicant may propose a monetary release schedule keyed to completion of specific portions of the project for the NACC's review and approval. This condition is issued under the authority of the local Bylaw. 45. The applicant shall designate a Professional Wetland Scientist as the project's "Erosion Control Monitor" (ECM) to oversee any emergency placement of controls and regular inspection or replacement of sedimentation control devices. The name and phone number of the erosion control monitor must be provided to the NACC in the event that this person has to be contacted, due to an emergency at the site, during any 24-hour period, including weekends. This professional must submit a letter to the C:\word\OOC\43C&44CThistleRd.doc 5 NACC 5/2/05 a DEP FILE #242 - 1301 Conservation Department,on company letterhead stating they have been retained as the project's Erosion Control Monitor. The designated Erosion Control Monitor is subject to approval by the NACC. This person shall also be given the authority to stop construction for erosion control purposes. The ECM will be required to inspect all such devices and oversee cleaning and the proper disposal of waste products. Cleaning shall include removal of any entrapped silt. 46. At least ONCE during each week, or otherwise arranged by the NACC, in which construction activities occurs on-site and for as long thereafter as ground remains unstable, it is the applicant's responsibility that the Environmental/Erosion Control Monitor(EMC) monitor the site and submit written reports to the NACC. The EMC shall certify that,to the best of his/her knowledge and belief based on a careful site inspection, all work is being performed in compliance with this Order of Conditions and that approved setbacks are being adhered to. The EMC must visually inspect all sedimentation/ erosion control measures and assume responsibility for their maintenance on a weekly basis and that they are functioning as intended. In addition, all wetland resource areas must be visually inspected for siltation, turbidity, and/or other water quality impacts. The reports shall also include current condition of erosion and sedimentation controls; describe any erosion or sedimentation repair and / or replacement; and describe any erosion or sedimentation problems and mitigation measures implemented. Such reports shall continue until the applicant requests a less frequent reporting schedule or an end to reports. This request must be submitted in writing and is subject to approval by the Conservation Administrator. 47. Prior to construction, the applicant shall permanently mark the edge of the "25' No- Disturbance Zone" with seven (12) signs or markers spaced evenly every 40-feet incorporating the following text: "Protected Wetland Resource Area". In addition, four (4) of the same wetland protection markers shall be installed along the "50' No- Build Zone" upgradient to the off property isolated wetland resource area.This will designate their sensitivity and assure no further inadvertent encroachment into the wetland. These permanent markers are subject to review and approval by the NACC. The applicant shall instruct all agents to explain these markers to buyers/lessees/landscapers and all persons taking over the property from the applicant. 48. Prior to the commencement of any work on site, a Registered Land Surveyor (R.L.S.) shall stake the foundation corners of the proposed single-family home and deck on lot 43C. The Conservation agent shall verify these measurements during the pre- construction meeting. 49. The applicant and/or the legal owner of that portion of land upon which these Orders of Conditions have been placed shall provide to the NACC prior to transferring,or assigning any portion of said land to another party,subject to said Orders of Conditions,the "Compliance Certification Form Affidavit" attached via"Appendix A" signed under the pains and penalties of perjury,stating that said applicant and/or CAword\00C\43C&44CThistleRd.doc 6 NACC 5!2105 DEP FILE #242 - 1301 owner has read these Orders of Conditions and is in with each and every condition. This document shall apply to each of the conditions referenced herein and shall be provided to the Conservation Department at least five (5) business days after to the closing of said land transaction. 50. Once these above mentioned pre-construction requirements are complete,the applicant shall contact the Conservation Office prior to site preparation or construction and shall arrange an on-site conference with an NACC representative, the contractor,the engineer,wetland scientist and the applicant to ensure that all of the Conditions of this Order are understood. This Order shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors and other personnel performing the permitted work are fully aware of the permit's terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order of Conditions resulting from failure to comply with its conditions. The applicant or contractor shall notify the NACC in writing of the identity of the on-site construction supervisor hired to coordinate construction and to ensure compliance with this Order. A reasonable period of time shall be provided as notice of the pre-construction meeting(e.g. 72 hours). STORMWATER MANAGEMENT CONDITIONS 51. All catch basins shall contain oil/gasoline traps, and it shall be a continuing condition of this order, even after a Certificate of Compliance is issued, that the oil/gasoline traps in the catch basins be maintained. All catch basins shall be free of all accumulated silt and debris before Compliance is issued and the owner or his/her agent shall so specify in the request for Compliance.This condition will remain in perpetuity. 52. All roof runoff shall be directed to the infiltrators to provide groundwater recharge, as shown on the approved plans referenced herein 53. There shall be no increase in the post development discharges from the storm drainage system or any other changes in post development conditions that alter the post development watershed boundaries as currently depicted in the Notice of Intent and approved by this Order of Conditions,unless specifically approved in writing by the Commission. 54. Water quality down gradient of BVWs shall not differ significantly following completion of the project from the pre-development conditions. There shall be no sedimentation into wetlands or water bodies from discharge pipes or surface runoff leaving the site. C:\word\OOC\43C&44CThistleRd.doc 7 NACC 5/2/05 DEP FILE #242 - 1301 DURING CONSTRUCTION _J 55. The NACC shall be notified in writing of any lot line or number changes with a copy of a plan showing these changes prior to any work on these lots. 56. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. 57. The contractor will take all steps necessary to control dust onsite so that adverse effects on adjacent resource areas and / or habitat do not occur. 58. IMPORTANT: Immediately upon completion of the dwelling foundation,and prior to further construction activities associated with the site,the applicant shall submit an interim as-built plan prepared by a Registered Professional Land Surveyor of the Commonwealth (R.P.L.S.) which accurately depicts the foundation location and it's proximity to wetland resource areas as approved under this Order of Conditions. Said plan shall be submitted to the Conservation Administrator for approval 59. A crushed stone construction entrance shall be installed to minimize soil/material tracking onto Thistle Road. This entrance shall be reinforced as necessary. 60. Upon beginning work, the applicant shall submit a written progress report every month detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence. 61. The Erosion Control Monitor shall be on site during and/or following a major storm event of 1 inch of rain or greater to ensure that soils remain stable,erosion controls are adequate and secure,and that all BMP's are adequately functioning. 62. The sewer lines on the site shall be tested for water tightness in accordance with North Andover DPW standards. 63. De-watering activities anticipated shall be supervised and witnessed by the Environmental Monitor or a representative from the Conservation Department. This person must be on-site while work specific to de-watering activities are occurring and until complete. Activities shall be monitored daily by the Environmental Monitor to ensure that sediment laden water is appropriately settled prior to discharge toward the wetland resource areas. No discharge of water is allowed directly into an area subject to jurisdiction under the MA Wetlands Protection Act and / or the North Andover Wetlands Bylaw. If emergency de-watering requirements arise, the applicant shall submit a contingency plan to the Commission for approval, which provides for the C:\word\OOC\43C&44CThistleRd.doc 8 NACC 5/2/05 DEP FILE #242 - 1301 pumped water to be contained in a settling tank or basin, to reduce turbidity prior to discharge into a resource area. 64. Any fill used in connection with this project shall be clean fill,containing no trash, refuse, rubbish or debris, including but not limited to lumber, bricks,plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators,motor vehicles or parts on any of the foregoing. 65. No exposed area shall remain unfinished for more than thirty(30) days, unless approved by the NACC. 66. No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical). Slopes of steeper grade shall be permanently stabilized using clean, stone rip- rap or a bio-degradable jute matting or equivalent. 67. There shall be no stockpiling of soil or other materials within twenty-five (25) feet of any resource area. 68. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage system, or wetland resource area. 69. All waste generated by, or associated with, the construction activity shall be contained within the construction area,and away from any wetland resource area. There shall be no burying of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain dumpsters (or other suitable means) at the site for the storage and removal of such spent construction materials off-site. However, no trash dumpsters will be allowed within 50' of areas subject to protection under the Act or local Bylaw. 70. Equipment shall not be staged overnight within 50-feet of a wetland resource area. 71. During and after work on this project, there shall be no discharge or spillage of fuel, or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant within one (1) business day. No construction vehicles are to be stored within 100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance is to be done within 100 feet of a resource area. C:\word\OOC\43C&44CThistleRd.doc 9 NACC 5/2/05 DEP FILE #242 - 1301 AFTER CONSTRUCTION 72. No underground storage of fuel oils shall be allowed on any lot within one hundred (100)feet of any wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Town's Wetland protection Bylaw. 73. Fertilizers utilized for landscaping and lawn care shall be slow release, low-nitrogen types (< 5%), and shall not be used within 25 feet of a resource area. Pesticides and herbicides shall not be used within 100 feet of a wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Town's Wetland Protection Bylaw and shall remain in perpetuity. 74. Upon completion of construction and grading,all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done either by loaming and seeding according to SCS standards. If the latter course is chosen, stabilization will be considered complete once vegetative cover has been achieved. 75. Upon approved site stabilization by Conservation staff,the erosion controls shall be removed and properly disposed of and all exposed unvegetated areas shall be seeded. 76. Upon completion of the project the applicant shall submit the following to the Conservation Commission as part of a request for a Certificate of Compliance: a. WPA Form 8A - "Request for a Certificate of Compliance." b. A letter from the applicant requesting a Certificate of Compliance. c. The name and address of the current landowner. d. Signed statements from the individual property owners shall be submitted with the request for a Certificate of Compliance indicating that they read and understood the recorded Order of Conditions prior to purchasing their property. e. The name and address of the individual/trust or corporation to whom the compliance is to be granted. f. The street address and assessor's map/parcel number for the project. g. The DEP file number. h. A written statement from a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor) of the Commonwealth certifying that the work has been conducted as shown on the plan(s) and documents referenced above, and as conditioned by the Commission. i� C 4ord100043C&44CThistleRd.doc 10 NACC 512105 DEP FILE #242 - 1301 i. An "As-Built" plan prepared and signed and stamped by a Registered Professional Civil Engineer(and/or Registered Professional Land Surveyor) of the Commonwealth, for the public record. This plan will include: ➢ "As-Built" post-development elo pment eleva i ons of all drainage & g stormwater management structures constructed within 100 feet of any wetland resource area. NOTE: If portions of the stormwater systems exist partially within the Buffer Zone than the entire structure must be depicted to accurately verify compliance. ➢ "As-Built" post-development elevations and grades of all filled or altered wetland resource areas including the encompassing buffer zone,which is regulated as a resource area under the local Wetland Protection Bylaw. ➢ Distances from structures to wetland resource areas. Structures include, but are not limited to,septic systems,additions,fences, sheds, stonewalls, pools, retaining walls, subsurface utilities and decks. ➢ A line showing the limit of work and the extent of existing erosion control devices. "Work" includes gpy disturbance of soils or vegetation. ➢ Location of all subsurface utilities entering the property. 77. The following special conditions shall survive the issuance of a Certificate of Compliance (COC) for this project: ➢ 25' No-Disturbance Zone and a 50' No-Construction Zone shall be established from the edge of adjacent wetland resource areas except in those locations approved under this filing. Future work within 100' of existing wetland resource areas will require a separate filing with the NACC. The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local Bylaw (Condition#32); ➢ Maintenance of catch basins (Condition #51); ➢ Discharge or spillage of pollutants (Condition#71); ➢ Prohibition of underground fuels (Condition#72); ➢ Limitations on the use of fertilizers,herbicides, and pesticides (Condition #73). C:\word\OOC\43C&44CThistleRd.doc 11 NACC 5/2/05 DEP FILE #242 - 1301 APPENDIX A-AFFIDAVIT I� on oath do hereby depose and state: (authorized agent of applicant and/ or owner) (PLEASE CHECK AT LEAST ONE BLOCK) 1) I am the of (position with applicant) (applicant's name) the applicant upon whom the Order of Conditions have been (DEP or NACC File#) placed upon by the North Andover Conservation Commission (NACC). and / or 2) I am the of (position with owner) (owner) the owner upon whose land Order of Conditions have been (DEP or NACC File#) placed upon by the NACC. ♦ I hereby affirm and acknowledge that I have received said Order of Conditions and have read the same and understand each and every condition, which has been set forth in said Order of Conditions. ♦ I hereby affirm and acknowledge that on this - day of .20--___, I inspected said property together with any and all improvements, which have been made to the same and hereby certify that each and every condition set forth in the Order of Conditions are presently in compliance. ♦ I hereby affirm and acknowledge that this document will be relied upon by the NACC, as well as any potential buyers of said property,which is subject to the Order of Conditions. Signed under the pain and penalties of perjury this day of .20 (Authorized agent of applicant or owner) C:\word\00C\43C&44CThistleRd.doc 12 NACC 5/2/05 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 242-1301 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 E. Issuance This Order is valid for three years, unless otherwise specified as a special s 3 condition pursuant to General Conditions#4,from the date of issuance. i.Date 6f i nuance Please indicate the number of members who will sign this form: y This Order must be signed by a majority of the Conservation Commission. 2. Number of signers The Order must be mailed by certified mail(return receipt requested)or hand delivered to the applicant. A copy also must be mailed or hand deliv at the same time to the appropriate Department of Environmental Protection Region trice, if not filing electronically, and the property owner, if different from applicant. Signatures: �t✓L�-f" Notary Acknowledgement Commonwealth of Massachusetts County of Essex North On this 7A orI f 0 Day Montill Year 005 Before me, the undersigned Notary Public, S C d g—I S--e— personally appeared Name of Document signer proved to me through satisfactory evidence of identification, which was/were Massachusetts License Description of evidence of identification to be the person whose name is signed on the preceding or attached document, and acknowledged to me that he/she signed it voluntarily for its stated purpose. As member of North Andover City/Town Conservation Commission NIMIMPUNIX zzz"'J2-- OONINAIi1.YYEDt� CNAOWANCFWMKWAM Signature of Notary Public AM t? b Pri ed Name of ota Public Place notary seal and/or any stamp above a? o My Commissi n tv6ires(Date) This Order is issued to the applicant as follows: ❑ by hand delivery on dby certified mail, return receipt requested,on Da /as Date te wpaform5.dm• rev.311/05 Page 7 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: 1 WPA Form 5 - Order of Conditions 242-1301 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department,with the appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order or Determination, or providing written information to the Department prior to issuance of a Superseding Order or Determination. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L. c. 131, §40)and is inconsistent with the wetlands regulations(310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. Section G,Recording Information is available on the following page. wpaform5.doc• rev.3/1/05 Page 8 of 9 aE Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File.Number: WPA Form 5 - Order of Conditions 242-1301 t Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on Page 7 of this form shall be submitted to the Conservation Commission listed below. North Andover Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. ---------------------- - ---------------------------------------------- North Andover Conservation Commission Please be advised that the Order of Conditions for the Project at: 242-1301 Project Location DEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: I Document Number Signature of Applicant wpaform5.doc• rev.3/1/o5 Page 9 of 9