HomeMy WebLinkAbout1970-06-01Monday - June 1, 1970
Regular Meeting
The PLANNIMG BOARD held their regular meeting on Monday evening, June 1, 1970 at
7:30 P.M. in the Town Office Building with the following members present and voting:
William Chepulis, Jr., Chairman; John J. Monteiro, Secretary; and Robert J. Burke.
Mr. Keirstead was out-of-town and Mr. Trombly's wife is ill.
There were 5 people present for the meeting.
ARTHL~ KENT SUBDMSION:
Mr. C~11shan, engineer and surveyor; and Mr. James Champy the proposed developer
of the Kent property appeared before the Board with additional plans showing more
information as requested by the Board at the previous meeting. They stated that they
have contacted the Dept. of Natural Resources so that they would be aware of what is
being done and it is not necessary as yet to file . The subdivision comprises 8 lots
sa~d the new plans showed a more defined entrance from Johnson Street.
Mr. Nonteiro made a motion to set the hearing date for July 6, 1970 at 7:30 P.M.
Mr. Burke seconded the motion and the vote was unanimous.
PRELIMINARY DISCUSSION:
Mrs. Janet Ward appeared before the Board with a rough preliminary plan of a
subdivision of her property on Essex Street, near Great Pond Road. The discussion
of the subdivision of her property was quite lengthy. She would like to co~mect the
roadway to Woodcrest Drive of an adjo4~-g subdivision. There is quite a slope to
the roadway which would also have to be worked out. She should try to get access as
to the Simpson land in order to join the roadways and also more complete information
and more definitive plans sand return to discuss it with a /~,ll board.
BEN OSGOOD: Raleigh Tavern Estates Subdivision.
Ben Osgood appeared before the Board to discuss the requirements of Raleigh
Tavern Lane. Letters were received from the Highway Dept and Board of Public Works.
The Board of Public Works gave an estimated cost for the extension of the water main
~on Carlton Lane off Raleigh Tavern Lane as had been requested by Mr. Osgood.
The letter from the Highway Surveyor reported on inspections he had made on Raleigh
Tavern Estates and noted several conditions that should be corrected by Mr. Osgood.
Mr. Osgood said he is tryin__g to comply with the requirements of the Playtime Board
but he doesn't like being yelled at by the Highway Surveyor. He said he had not
received a copy of the Highway Surveyor's letter and upon reading the letter he
expl~1~ed the conditions and he says that everything is being done ~11 right. The
Board felt they would like to make a personal inspection with Mr. Nicetta and Mr.
Osgood at a time that would be convenient for all.
Mr. Osgood wants to reduce the $20,000 now being held to $10,000. He has 1n_~talled
700 feet of l 1-e and 7 catch basins. They have laid 900 feet of road and want to
place a new amount for 300 feet of what the Highway Surveyor says has to be done on
carlton Way. He says that within the next month he will have the entire roadway done.
The Board felt that Mr. Nicetta should probably have stated an amount of how much
would be required to make corrections.
June 1, 1970- cont.
Mr. Osgood wants to put up a bond for Carlton Lane plus the extension of Raleigh
Tavern North to the endlug point. On Raleigh Tavern South the water lines and every-
thiug is already in. On Raleigh Tavern North from station 2000 to station 2300 and
Carlton Lane he would like to put up a bond for whatever amount the Highway Surveyor
and Board of Public Works say is necessary.
Mr. Monteiro made a motion to release $10,000 of the $20,000 being held. Mr. Burke
seconded the motion and the v~te was unanimous.
A letter will be sent to the Highway Surveyor requesting an estimate as to the amount
of a bond that would be necessary to cover the work to be done to complete the
roadway on Raleigh Tavern North from station 2000 to station 2300 amd on Carlton
La~e.
Mr. Menteiro made a motion to accept the bond as stated. Mr. Burke seconded the
motion and the vote was unanimous.
The meeting adjournedat 10:30 P.M.