Loading...
HomeMy WebLinkAbout2011-07-05 Planning Board Supplemental Materials (6) PLANNING DEPARTMENT Community Development Division 1600 Osgood Street North Andover, Massachusetts, 01845 PRELIMINARY SUBDIVISION DECISION Date: July 5, 2011 Date of Public Meetings: June 21, 2011 and July 5, 2011 Date of Decision: July 5, 2011 Petition of: George Haseltine 66 Gilchrist Road Londonderry, NH 03053 Premises Affected: 2009 Salem St. North Andover, MA, Assessors Map 108.A, Lot 2. The Planning Board herein approves a three (3) lot Preliminary Subdivision located on Salem Street in the R-2 Zoning District. The application was submitted by applicant George Haseltine for the owners of the property Guy and Carol Richards, prepared by Merrimack Engineering Services, dated April 7, 2011, updated June 16, 2011. Findings of Fact The Planning Board makes the following findings as required by Section 5B Review Standards for Preliminary Plans as set forth in the Rules and Regulations Governing the Subdivision of Land, North Andover, Massachusetts, Revised February 1989: A. The applicant submitted a complete application for a Preliminary Subdivision, on April 20, 2011, according to the Town of North Andover’s Rules and Regulations Governing PROCEDURE FOR the Subdivision of Land in North Andover, section IV, SUBMISSION AND APPROVAL OF A PRELIMINARY SUBDIVISION. B. The applicant submitted a preliminary plan on April 20, 2011, showing conformance with design criteria for the street plan and profile, as set out in section 5.2.5.4 and section 6.8 in the town of North Andover Subdivision Regulations, but with waivers for street width (16 feet proposed, 26 feet required) and creation of a cul-de-sac (a common driveway for the two new lots) is proposed. C. The applicant requests a waiver from Section 6.15.5 to provide an alternative water supply and will provide sprinkler systems in each of the dwelling units. D. The proposed development includes an open space area, containing endangered species habitat as well as wetlands. E. The applicant has performed soil testing in the area in preparation for placement and installation of septic systems for the two additional lots. F. The Preliminary Plan adheres to the requirements of section 4.1, and in particular section 4.3.12, in that they have provided information regarding drainage systems, sewer and water pipes and other utilities. The drainage system will be reviewed by the town’s outside consultant, when the Definitive Subdivision is filed to determine if the plan meets the stormwater requirements for subdivisions. Any decisions made by the Planning Board regarding this Preliminary Subdivision Application are not binding upon the Planning Board and are not to be considered as an approval or denial of any future Definitive Subdivision filing. Any Definitive Plan filed at a future date may contain more detailed information than that provided with this Preliminary Plan. This information will be presented and discussed at a formal Public Hearing. Upon a motion made by T. Seibert and a second by C. LaVolpicelo, the Planning Board herein APPROVES this application for a Preliminary Subdivision Plan. The vote was 3 – 0 in favor of the application. On behalf of the North Andover Planning Board John Simons, Chair Timothy Seibert Courtney LaVolpicelo The following plans are included as part of this decision: Plan titled: Preliminary Subdivision Plan in North Andover, MA Prepared for: George Haseltine 66 Gilchrist Road Londonderry, NH 03053 Date: April 7,2011, revised to June 16, 2011 Scale: 1”=40’ Sheets 1 Prepared by: Merrimack Engineering Services 66 Park St. Andover, MA 01432 cc: Applicant Planning Board