Loading...
HomeMy WebLinkAbout2011-12-20 Planning Board Supplemental Materials (2) Special Permit - Wireless 5 Boston Road, Sprint Town of North Andover Office of the Planning Department Community Development and Services Division 1600 Osgood Street North Andover, Massachusetts 01845 NOTICE OF DECISION Any appeal shall be filed within (20) days after the date of filing this notice in the office of the Town Clerk. Date: December 20, 2011 Date of Hearings: December 6, 2011, December 20, 2011 Date of Decision: December 20, 2011 Application of: Eric Kallio, As Agent on Behalf of Sprint Spectrum LP Premises Affected: 5 Boston Road (5 Boston Street) Map 107C Parcel 11 Referring to the above petition for a Wireless Service Facility Special Permit and modification to a pre-existing facility, in accordance with the requirements of the North Andover Zoning Bylaw, Sections 8.9 Wireless Service Facilities and Section 2.65 Special Permit Granting Authority, in order to modify the pre-existing wireless services facility located at roof top level, on three sides of the building located at 5 Boston Road. Modification consists of removal of six (6) CDMA antennas and replacement with seven (7) network vision antennas & nine (9) Radio Head units, plus removal of two (2) existing cabinets and replacing with three (3) cabinets located in a room on the second floor of the building. nd , the Planning BoardAPPROVES Upon a motionby X and a 2 by X hereby the Wireless Service Facilities Special PermitModify issuance of a and to the pre-existing , wireless service facility including the removal of six (6) CDMA antennas and replacement with seven (7) network vision antennas & nine (9) Radio Head units and related equipment on an existing structure by a vote of X in favor and 0 against. ___________ ___________ On behalf of the North Andover Planning Board John Simons, Chairman Timothy Seibert Michael Colantoni Richard Rowen Rickey Glover 1 Special Permit - Wireless 5 Boston Road, Sprint The Planning Board herein approves the Special Permit to continue operation of the Wireless Facility, and the modification of that facility, by the replacement of six (6) CDMA antenna with seven (7) network vision antennas & nine (9) Radio Head antenna, plus removal of two (2) existing cabinets replacement with three (3) cabinets located in a room on the second floor of the building. Eric Kallio, As Agent on Behalf of Sprint Spectrum LP, requested the Special Permit. This application and additional documentation as cited herein were filed with the Planning Board on November 2, 2011, with subsequent submittals on file. The applicant submitted a complete application which was noticed and reviewed in accordance with Sections 8.3, 10.3, and 10.3.1 of the Town of North Andover Zoning Bylaw and MGL c.40A, Sec. 9. The Planning Board finds that the applicant has met the following requirements as required by the North Andover Zoning Bylaw Section 8.9: FINDINGS OF FACT: 1.The Special Permit application meets the filing requirements of the Wireless Service Facilities By-law Section 8.9.12. The applicant has demonstrated that the existing wireless facility, with the addition of the LTE antennas is in compliance with FCC regulations regarding Maximum Permissible Exposure (MPE) limits, as indicated by the report provided by the applicant dated December 6, 2011 authored by EBI Consulting. The conclusion stated in the reports is that the applicant’s Wireless Facility installation contributes a maximum RF exposure of less than six-tenths of one percent of the current State and Federal permissible exposure guidelines. The Telecommunications Act of 1996 prohibits this Board from taking health effects of RF transmissions into account beyond FCC requirements. 2.The town’s consultant has reviewed the RF Reports and has found that the applicant has shown a clear gap in coverage without the activation of the proposed Network Vision antennas’ advanced broadband capability at data speeds competitive with cable/wireless services. He also concludes that the location and distance of neighboring sites rule out their use to cover this gap. 3.The applicant will also demonstrate that the site is in compliance with the Noise Standards as set forth in section 8.9.8(b). Finally the Planning Board finds that this project generally complies with the Town of North Andover Zoning Bylaw requirements as listed in Section 8.9 but requires conditions in order to be fully in compliance. The Planning Board hereby grants an approval to the applicant providedthe following conditions are met: 2 Special Permit - Wireless 5 Boston Road, Sprint SPECIAL CONDITIONS: 1)Discontinuance Abandonment a)At such time that a licensed carrier plans to abandon or discontinue operation of wireless service equipment, such carrier will notify the Town by certified US mail of the proposed date of abandonmentor discontinuation of operations. Such notice shall be given no less than 30 days prior to abandonment or discontinuation of operations. In the event that a licensed carrier fails to give such notice, the wireless service equipment shall be considered abandoned upon discontinuation of operations. b)Upon abandonment or discontinuation of use, the carrier shall physically remove the wireless service equipment placed on the site by the carrier within 90 days from the date of abandonment or discontinuation of use. “Physically remove" shall include, but not be limited to: i)Removal of antennas, mount, equipment shelters and security barriers installed by the carrier (unless the same will continue to be used by the owner) from the subject property. ii)Proper disposal of the waste materials generated by the carrier fromthe site in accordance with local and state solid waste disposal regulations. iii)Restoring the location of the wireless service facility in its condition before the installation, except that any landscaping and grading shall remain the after-condition. c)The equipment shall be deemed to be abandoned or discontinued if it has not been used for the purpose for which it was originally constructed for a period of six (6) months or more. Once abandonment or discontinuance has occurred, the carrier shall remove the equipment from the subject property within ninety days. 2)Waivers: The installation will be constructed according to the Plans, with the following waivers granted by the Town of North Andover Planning Board, according to the provisions of the Town of North Zoning Bylaw. These waivers are hereby granted in consideration of the installation as a pre-existent installation and a co-location: Section 8.4.f.ii) Structural Report. Section 8.9.5.d) Application Filing Requirements, ii) Location Filing Requirements sections (4), and (5), iii) Siting Filing Requirements sections (1), (3, (4), (9), (10), and (12), iv) Site lines and photographs as described below: sections (1), (3), (4), (4a), (4b), (4c), (4d), and (4e), v) Design Filing Requirements sections (2), (3) (4), (6), and (7). 3)Annual Certification: 3 Special Permit - Wireless 5 Boston Road, Sprint a)Annual certification demonstrating continuing compliance with the standards of the Federal Communications Commission, Federal Aviation Administration and the American National Standards Institute shall be filed with the SPGA by the Special Permit holder. 4)Term of Special Permit: a)Pursuant to Section 8.9.12.a of the Town of North Andover Zoning Bylaw, a three (3) SpecialPermit issued for this wireless service facility shall be valid for years from the date of the decision for the Special Permit renewal. The special permit may be renewed under the same criteria as the original special permit, as modified herein, provided that the application for renewal of the special permit is made prior to the expiration dateof the original or any renewed special permit. Additional measures governing the administration of the special permit are found in Section 10.3 of the Zoning Bylaw. b)Pursuant to Section 8.9.8.a of the Town of North Andover Zoning Bylaw, the applicant shall submit to the SPGA at annual intervals from the date of the decision for the Special Permit renewal, preexistent and current RFE measurements. Such measurements shall be signed and certified by an RF engineer, stating that RFE measurements are accurate and are in compliance or why the measurements fail to comply with all applicable FCC Guidelines as specified in Section 8.9(5)(d)(vii) RFE Filing Requirements of this Bylaw. The measurements shall be submitted for both the applicant and all co-locators. If the applicant fails to comply with this requirement, the Special Permit will be revoked, until such time that the installation is brought into compliance with FCC Guidelines. c)Pursuant to Section 8.9.8.b of the Town of North Andover Zoning Bylaw, the applicant shall submit to the SPGA at annual intervals from the date of decision of the Special Permit renewal, preexistent and current measurements of acoustic noise from the wireless service facility. Such measurements shall be certified and signed by an acoustical engineer, stating that noise measurements are accurate . and meet the Noise Standards sub-section 8.9.(5)(d)(vi) of this BylawThe applicant shall forward to a separate consulting engineer, selected by the Town, the above materials for review. The applicant shall pay for such review. d) The applicant and co-applicant or their successor in interest shall maintain the wireless service equipment in good condition. Such maintenance shall include, but shall not be limited to, painting and structural integrity of the antennas. 5)Prior to the endorsement of the plans by the Planning Board, the applicant must comply with the following conditions: 4 Special Permit - Wireless 5 Boston Road, Sprint five thousand dollars5,000) a)A bond in the amount of ($ shall be posted for the purpose of insuring that the applicant will file with the Planning Staff a final as-built plan showing the location of all on-site structures. The bond is also in place to insure that the site is constructed in accordance with the approved plan. This bond shall be in the form of a check made out to the Town of North Andover. This check will then be deposited into an interest bearing bond account. b)A Noise Report shall be submitted to the Planning Department for review. The Town Planner will determine if the report meets the requirements of the Town’s Bylaw as set forth in Section 8.9.5.vi). c)The applicant shall provide the necessary certification as required in the above sections 3a. 6)Prior to the start of construction: a)A construction schedule shall be submitted to the Planning Staff for the purpose of tracking the construction and informing the public of anticipated activities on the site. 7)Prior to FORM U verification (Building Permit Issuance): a) The final site plan mylars must be endorsed and three (3) copies of the signed and recorded plans must be delivered to the Planning Department. b) A certified copy of the recorded decision must be submitted to the Planning Department. 8)Prior to the final release of security: a)A final as-built plan showing final construction and location of the wireless hardware shall be submitted to and reviewed by the Planning Staff. 9) In an effort to reduce noise levels, the applicant shall keep in optimum working order, through regular maintenance, any and all equipment that shall emanate sounds from the structures or site. 10) The provisions of this conditional approval shall apply to and be binding upon the applicant, its employees and all successors and assigns in interest or control. 5 Special Permit - Wireless 5 Boston Road, Sprint 11) The following information shall be deemed part of the decision: Application Titled a): Application for Special Permit Eric Kallio, As Agent on Behalf of Sprint Spectrum LP PO Box 73 154 Glenallen St. Winchendon, MA 01477 Prepared for : Sprint Spectrum LP b)Documentation Submitted: 1Town of North Andover Planning Board Application for Special Permit- Modification to Existing Wireless Communication; 2 Site Plans for Proposed Modification of Facility, prepared by Hudson Design Group, Site Number BSO3XC188 and Site Address 5 Boston Hill Road, North Andover, MA 01845, dated 8/9/2011, and revised 9/7/2011 and 10/18/2011, including Sheet T-1, C-1, A-1, A-2, A-3; 3Radio Frequency Emission Survey, dated December 6, 2011, prepared by EBI Consulting; 4Certified Abutters’ List; 5RF Engineering Affidavit, prepared by Ryan Monte de Ramos, RF Engineer, Alcatel-Lucent, dated October 18, 2011; 6Product Data Sheets; 7Building Lease Agreement, between Benjamin G. Farnum, as Lesser, and Sprint Spectrum L. P., as Lessee dated September 23, 1996, including Exhibit A and Exhibit B; 8Letter of Authorization from Benjamin G. Farnum, dated August 15, 2011 9Copy of FCC license, Expiration date November 13, 2025; 10Existing/Proposed Conditions, dated October 20, 2011; 11Existing and Proposed Indoor Reliable Coverage for BSO3XC188 12Review Report, dated December 2, 2011, Prepared by Mark F. Hutchins. 6 Special Permit - Wireless 5 Boston Road, Sprint Cc: Applicant Abutters 7