Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Decision - 0 NORTH MAIN STREET 9/15/2017
i f I Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:242.1710 WPA Form 5-Order of Conditions eDEP Transaction#:954138 Massachusetts Wetlands Protection Act M.G.L. e. 131, §40 City/Town:NORTH ANDOVER A. General Information 1.Conservation Commission NORTH ANDOVER 2.Issuance a. r OOC b.F Amended OOC 3.Applicant Details a.First Name JOHN b.Last Name BORGESI c.Organization TOWN OF NORTH ANDOVER DPW d.Mailing Address 384 OSGOOD STREET c.City/Town NORTH ANDOVER f State MA g.Zip Code 4.Property Owner - a.First Name b.Last Name c.Organization TOWN OF NORTH ANDOVER d,Mailing Address 120 MAIN STREET e.City/Town NORTHANDOVER f. State MA g.Zip Code 01845 5.Project Location - a.Street Address 0 NORTH MAIN STREET b.City/Town NORTH ANDOVER c.Zip Code 01845 d.Assessors 28 e. Parcel/Lot# BETWEEN LOT 4&22 Map/Plat# f.Latitude 42.70844N g.Longitude 71.13416W 6.Property recorded at:the Registry of Deed for- a.County b.Certificate c.Boob d.Page NORTHERN ESSEX 7.Dates a.Date NOI Filed: 6/19/2017 b.Date Public Hearing Closed: 9/t 3/2017 c.Date Of Issuance: 9/15/2017 8.Final Approved Plans and.O.ther Documents a.Plan Title: b.Plan Prepared by: c.PIan Signed/Stamped by: d.Revised Final Date. e.Scale: 0 NORTH MAIN SULLIVAN STREET BANK ENGINEERING JOHN SULLIVAN III,P.E. Aug. 15,2017 1"-20' STABILIZATION GROUP,LLC B. Findings I Findings pursuant.to:the Massachusetts Wetlands Protection Act Following the review of the the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing,this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: a. P Public Water Supply b. r Land Containing Shellfish c.lv Prevention of Pollution d. Fv Private Water Supply e. P Fisheries f. 17 Protection of Wildlife Habitat g. lv Ground Water Supply h.ry Stoim Damage Prevention i. 1W Flood Control Page 1 of 11 *ELECTRONIC COPY Massachusetts Departinent of Environmental Provided by MassDEP: Protection rotection MassDEP File#:242-1710 ., Bureau of Resource Protection-Wetlands eDEP Transaction#:954138 WPA Form 5- Order of Conditions City/Town:NORTH ANDOVER Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 2. Commission hereby finds the project,;as.proposed,is: Approved subject to: a.Iv The following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations,This Commission orders that all work shal l be performed in accordance with the Notice of Intent referenced above,the following General Conditions,and any other special conditions attached to this Order.To the extent that the following conditions modify or differ from the plans,specifications,or other proposals submitted with the Notice of Intent,these conditions shall control. Denied because: b.r The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore,work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect interests of the Act,and a final Order of Conditions is issued.A description of the performance standards which the proposed work cannot meet is attached to this ` Order. c.r-The information submitted by the applicant is not sufficient to describe the site,the work or the effect of the work on the interests identified in the Wetlands Protection Act.Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the interests of the Act,and a final Order of Conditions is issued.A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6){c}. 3.l" Buffer.Zone Impacts:Shortest distance between limit of project disturbance and the wetland resource area specified in 310CMR10,02(1)(a)• a, linear feet Inland Resource.Area Impacts;{For Approvals Only): Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4. Bank.. 32 ' 32 32 32 a. linear.feet b.linear feet c:.linear feet d.linear feet 5.r Bordering Vegetated Wetland a.square feet b.square feet c. square feet d.square feet b.:iv Land under Waterbodies and Waterways :498 498 498 498 a.square feet b.`.square feet c.square feet d.square feet C.c1y dredged f.'c/y dredged 7.r Bordering Land Subject to Flooding a.square feet b. square feet c. square feet d. square feet Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet 8.r Isolated Land Subject to Flood a.square feet b'square.feet Cubic Feet Flood Storage e. cubic feet d.cubic feet. e.Cubic feet f,cubic feet Page 2 of I I *ELECTRONIC COPY i f Massachusetts Department of Environmental Provided by MassDEP: L711 ProtectionMassDEPFile#:242-[710 Bureau of Resource Protection-Wetlands eDEP Transaction#:954138 WPA Form 5-Order of Conditions city/rown:NORTx ANDOVER Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 9.PRiverfront Area 540 540 a.total sq. feet b. total sq. feet Sq ft within 100 ft 540 540 540 540 s c,square feet d.square feet e. square feet f. square feet i Sq ft between 100-200 ft g. square feet h.square feet i.square feet j.square feet i Coastal Resource Area Impacts: E Proposed Permitted Proposed Permitted Resource Area Alteration Alteration Replacement Replacement i 10.1"Designated Port Areas Indicate size under Land Under the Ocean,below. . 1.1.1•"Land Under the Ocean a. square feet b.square feet c.Uy dredged d.c/y dredged 12..1-Barrier Beaches. Indicate size under Coastal.Beaches and/or Coastal Dunes below': 13.1-'Coastal Beaches [ a, square feet b.square feet c.c/y nourishment d.c/y nourishment 141"Coastal Dunes a.square.feet b::square feet.c.'.clynouiislunent d.c/y nourislunent. 15,r Coastal Banks a. linear feet b.linear feet 16.1`Rocky Intertidal Shores R a.square.feet..b.square-feet 17.1"Salt Marshes a.square feet b.square feet c. square feet d.square feet 18.F Land Under Salt Ponds a.squarefeet b;;square feet c.cly dredged.d`c/y dredged 19.r Land Containing Shellfish a. square feet b.square feet c. square feet d. square feet Indicate size under Coastal Banks,inland Bank,Land Under the 20.r Fish Runs Qcean,and/or inland Land Undez'Waterbodies and Watervyays, above C.cly dredged d.c/y dredged 21.r Land Subject to Coastal Storm Flowage a.square feet b.square feet 22: Page 3 of I 1 *ELECTRONIC COPY E E LlMassachusetts Department of Environmental Provided by MassDEP: Protection MassDEP Bile#:242-1710 Bureau of Resource Protection-Wetlands eDEP Transaction#1:954138 WPA Form5-Order of Conditions CityCfown:NORTH ANDOVER Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 F Restoration/Enhancement(For Approvals Only) If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.5.c&d or B.I Te&d above,please entered the additional atxraunt here. I a.square feet of BVW b.square feet of Salt Marsh 23. . r Streams Crossing(s) If the project involves Stream Crossings,please enter the number of new stream crossings/number of replacement E stream crossings. a. number of new stream crossings b. number of replacement stream crossings C.General Conditions Cinder Massachusetts Wetlands Protection.Act The following conditions are only applicable to Approved projects t. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges;it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal,state,or local statutes,ordinances,bylaws,or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a.the work is a maintenance dredging project as provided for in the Act;or b. the time for completion has been extended to a specified date more than three years,but less than five years,from the date of issuance.If this Order is intended to be valid for more than three years,the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. (, 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. b. If this Order constitutes an Amended Order of Conditions,this Amended Order of Conditions does not exceed €' the issuance date of the original Final Order of Conditions. i'. 7. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash,refuse,rubbish, or debris,including but not limited to lumber,bricks,plaster,wire,lath,paper,cardboard,pipe,tires,ashes, refrigerators,motor vehicles,or parts of any of the foregoing. [' 8. This Order is not final until all administrative appeal periods from this Order have elapsed,or if such an appeal has been taken,until all proceedings before the Department have been completed. 9. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the band Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land,the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done.In the case of the registered land,the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done.The recording information shall be submitted to the Conservation Commission on the form at the end of this Order,which form must be stamped by the Registry of Deeds,prior to the commencement of work.. 10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, Page 4 of l l ELECTRONIC COPY Massachusetts Department of Environmental Provided by MassDEP: Protection MassDEP File#:242-1710 .� Bureau of Resource Protection-Wetlands eDEP Transaction#:954138 WPA Form 5- Order of Conditions City/Town:NORTHANDOVER Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 "Massachusetts Department of Environmental Protection" [or'MassDEP"] File Number:"242.17I 0" It. Where the Department of Environmental Protection is requested to issue a Superseding Order,the Conservation Commission shall be a party to all agency proceedings and hearings before Mass DEP. 12. Upon completion of the work described herein,the applicant shall submit a Request for Certificate of Compliance(WPA Form 8A)to the Conservation Commission. 13. The work shall conform to the plans and special conditions referenced in this order, 14. Any change to the plans identified in Condition#13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order,and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 17. Prior to the start of work,and if the project involves work adjacent to a Bordering Vegetated Wetland,the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place,the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. [ 18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means.At no time shall sediments be deposited in a wetland or water body.During construction,the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall [ remove accumulated sediments as needed.The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission,which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS 19. The work associated with this Order(the"Project")is(I) r is not(2)l— subject to the Massachusetts Stormwater Standards.If the work is subject to Stormwater Standards,then the project is subject to the following conditions; a) All work,including site preparation,land disturbance,construction and redevelopment,shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and,if applicable,the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General Permit as required by Stormwater Standard 8. Construction period erosion,sedimentation and pollution control measures and best management practices(BMPs)shall remain in place until the site is fully stabilized. b) No starmwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification.For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation,recharge,andlor treatment,the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation,including removal of all construction period sediment trapped in inlet and outlet control structures; ii..as-built final construction BMP plans are included,signed and stamped by a Registered Professional Engineer,certifying the site is Page 5 of 1 I *ELECTRONIC COPY is i LIMassachusetts Department of Environmental Provided by MassDEP: Protection MassDEP File 1042-17 Lia Bureau of Resource Protection-Wetlands eDEP°Transaction 4:954138 WPA Form. 5- Order of Conditions City/Town:NORTIJ ANDOVER Massachusetts Wetlands Protection Act M.G.I .c. 131, §40 ` fully stabilized;iii. any illicit discharges to the stormwater management system have been removed,as per the requirements of Stormwater Standard 10;iv. all past-construction stormwater BMPs are installed in accordance with the plans(including all planting plans)approved by the issuing authority,and have been inspected to ensure that they are not damaged and that they are in proper working condition;v. any vegetation associated with post-construction BMPs is suitably established to withstand erosion. c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance.Prior to requesting a Certificate of Compliance,or Partial Certificate of Compliance,the responsible party(defined in General Condition 19(e))shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement("O&M Statement") for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan("O&M Plan")and certifying the following: i.)the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance,and ii.}the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d) Post-construction pollution prevention and source control shall be implemented in accordance with the long- term pollution prevention plan section of the approved Stormwater Report and,if applicable,the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Multi-Sector General Permit. e) Unless and until another party accepts responsibility,the landowner,or owner of any drainage easement, assumes responsibility for maintaining each BMP.To overcome this presumption,the landowner of the property must submit to the issuing authority a legally binding agreement of record,acceptable to the issuing authority,evidencing that another entity has accepted responsibility for maintaining the BMP,and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 19(f)through 19(k)with respect to that BMP.Any failure of the proposed responsible party to implement the requirements of Conditions 19(f)through 19(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more than one lot,the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs.A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan,and the requirements of the Massachusetts Stormwater Handbook. g) The responsible party shall: 1.Maintain an operation and maintenance log for the last three(3)consecutive calendar years of inspections,repairs,maintenance and/or replacement of the stormwater management system or any part thereof,and disposal(for disposal the log shall indicate the type of material and the disposal location); 2.Make the maintenance log available to MassDEP and the Conservation Commission("Commission"} upon request;and 3.Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Pian approved by the issuing authority, li) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal,state,and local laws and regulations. i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j} The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. Page 6 of I 1 *ELECTRONIC COPY 4 I` k{ t f Massachusetts Department of Environmental Provided by MassDEP: LI ProtectionMassDEPFile4:242-1710 Bureau of Resource Protection-WetlandseDEP Transaction#:954138 City/rown:NORTH ANDOVER WPA Form 5-Order of Conditions _ Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as defined in the MassDEP Stormwater Handbook,Volurne 3,Chapter 1,Low Impact Development Site Design Credits)shall not be altered without the prior written approval of the issuing authority. 1) Access for maintenance,repair,and/or replacement of 13MPs shall not be withheld.Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. i Special.Conditions: SEE,ATTACHED I i F i i i E Page 7 of I 1 *ELECTRONIC COPY i I. Massachusetts Department of Environmental Provided by MassDEP: Protection MassDEP File#:242-1710 L711 Bureau of Resource Protection-Wetlands cDEP Transaction 4:954138 WPA Form 5-Order of Conditions City/Town:NORTH ANDOVER Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 D.Findings Under Municipal Wetlands Bylaw or Ordinance 1.Is a municipal wetlands bylaw or ordinance applicable?r'/' Yes r" No 2.The Conservation Commission hereby(cheek one that applies): a.F DENIES the proposed work which cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: 1.Municipal Ordinance or Bylaw 2. Citation Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards,and a final Order or Conditions is issued.Which are necessary to comply with a municipal ordinance or bylaw: b. APPROVES the proposed work,subject to the following additional conditions. NORTH ANDOVER I.Municipal Ordinance or Bylaw WETLANDS 2, Citation CHAPTER 178 PROTECTION BYLAW 3 The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above.To the extent that the following conditions modify or differ from the plans, specifications,or other proposals submitted with the Notice of Intent,the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows: SEE ATTACHED Page 8 of 11 *ELECTRONIC COPY Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 242-171'0-r- Mas,sDEP File# WPA Form 5 — Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# North Andover City/Town E. Signatures This Order is valid for three years, unless otherwise specified as a special --- condition pursuant to General Conditions#4,from the date of issuance. 1. Date of Issuance Please indicate the number of members who will sign this form. 2. Number of Signers— This Order must be signed by a majority of the Conservation Commission. The Order must be mailed by certified mail (return receipt requested)or hand delivered to the applicant.A copy also must be mafled or hand delivered at the same time t the appropriate Department of Environmental Protection Regional Office, if not filing electroni ally, a dth roperty owner, if different from applicant. El by hand delivery on F-1 by certified mail, return receipt requested, on Date Date F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to, request the appropriate MassDEP Regional, Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act(M.G.L. c. 131, § 40), and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. wriaform5.doc• rev.031212010 Page 11 of 12 Massachusetts Department of Environmental Provided by MassDEP; Protection MassDEP File#:242-1710 Bureau of Resource Protection-Wetlands eDEP Transaction;':954138 1` WPA Forzn 5- Order of Conditions City/Town:NORTH ANDOVER Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 (M.G.L. c. 131,§40),and is inconsistent with the wetlands regulations(3 10 CMR 10.00).To the extent that the Order is based on a municipal ordinance or bylaw,and not on the Massachusetts Wetlands Protection Act or regulations,the Department has no appellate jurisdiction. G.Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property.In the case of.recorded land,the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order.In the case of registered land,this Order shall also be noted on the Hand Court Certificate of Title of the owner of the land subject to the Order of Conditions.The recording information on this page shall be submitted to the Conservation Commission listed below. NORTH ANDOVER Conservation Commission Detach on dotted line,have stamped by the Registry of Deeds and submit to the Conservation Commission. --------- -------------------------------------------------------------------------------------------------------,. To: NORTH ANDOVER Conservation Commission Please be advised that the Order of Conditions for the Project at: 0 NORTH MAIN STREET 242-1710 Project Location MassDEP File Number Has been recorded at the Registry of Deeds of.- County fCounty Book Page for: i [ Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date E If recorded land,the instrument number identifying this transaction is: Instrument Number If registered land,the document number identifying this transaction is: Document Number Page 10 of 11 *ELECTRONIC COPY 'E f Massachusetts Department of Environmental Provided by MassDEP: L7 Protection MassDEP File#:242-1710 Bureau of Resource Protection-Wetlands eDEP Transaction#:954138 city/ own:rrbRTl1 ANDOVER PA Form- Order of Conditions Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 Signature of Applicant 8-41112010 '.. Page l l of 11 *ELECTRONIC COPY is E' DEP FILE #242 - 1710 Therefore, the North Andover Conservation Commission (hereafter the "NACC") hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the State Regulations, the local ByLaw and Regulations, to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced below. To the extent that the following conditions modify or differ from the plans, s ecifications or other proposals submitted with the Notice of Intent the conditions shall control. GENERAL CONDITIONS 20. The proposed work includes: removal of a boulder embankment and replacement with a Duragreen paver ramp (14' x 32') for emergency access to the Merrimack River. Pavers will be filled with loam and seed or turf plugs. The work is within Riverfront Area, Bordering Land Subject to Flooding and on Inland Bank. All impacts are temporary and the finished grades will match the existing site grades. 21. The work shall conform to the following (except as noted in the remainder of this E document where revisions may be required): i Applicants: Town of North Andover - Division of Public Works c/o John Borgesi, P.E. -Town Engineer 384 Osgood Street North Andover, MA 01845 Property Owner: Town of North Andover 120 Main Street E North Andover, MA 01845 E Representative: Jack Sullivan Sullivan Engineering Group, LLC P.O. Box 2004 Woburn, MA 01888 Notice of Intent: WPA Form 3 Including: NOI Application Checklist, Certified Abutters List, FIRM Map, NHESP Map, Notification to Abutters, USGS Map, Tax Map, & Site Photos Received: June 15, 2017 Prepared by: Sullivan Engineering, LLC Site Plans prepared by: Sullivan Engineering Group, LLC Titled: 0 North Main Street, Bank Stabilization Date: March 15, 2017 Revised: Aug. 15, 2017 242-1710,North Main Street Emergency Access Spec Cond l NACC 9/14/2017 DEP FILE #242— 171.0 Stamped and Signed by John.D. Sullivan III, P.E. Scale: 1"=20' Other Record Documents: Stormwater Report &Checklist for Stormwater Report Dated: 6/20/2017 Stamped by: John D. Sullivan Ill, P.E. Letter from Division of Fisheries &Wildlife Date: July 18, 2017 NHESP File No.: 17-36890 22. The term"Applicant" as used in this Order of Conditions shall refer to the owner, any successor in interest or successor in control of the property referenced in the Notice of Intent, supporting documents and this Order of Conditions. The NACC shall be notified in writing within 30 days of all transfers of title of any portion of property that takes place prior to the issuance of a Certificate of Compliance. 23. The conditions of this decision shall apply to, and be binding upon, the applicant, owner, its employees and all successors and assigns in interest or control. These obligations shall be expressed in covenants in all deeds to succeeding owners of portions of the property. 24. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 25. This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of property rights. However, the NACC, agent of the NACC or the Department of Environmental Protection (DEP) reserves the right to enter and inspect the property at all reasonable times until a Certificate of Compliance is issued, to evaluate compliance with this Order of Conditions, the Act (310 CMR 10.00), the North Andover Wetland Bylaw and Regulations, and may require any information, measurements, photographs, observations, and/or materials, or may require the submittal of any data or E information deemed necessary by the NACC for that evaluation. Further,work shall be halted on the site if the NACC, agent or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the NACC is satisfied that the work will comply and has so notified the applicant in writing. 26. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. The Conservation Department will be copied on any permits or approvals from the Army Corp of Engineers as part of the General Permit process. 27. The work authorized hereunder shall be completed within three years from the date of this order. f 242-1710,North Main Street Emergency Access Spec Cond2 NACC 9/14/2017 DEP FILE #242— 1710 28. This Order may be extended by the issuing authority for one but not more than two periods of up to one year each upon application to the issuing authority at least third days (30) prior to the expiration date of the Order (Refer to Section 8.3 of the North Andover Wetland Regulations). 29. The NACC reserves the right to amend this Order of Conditions after a legally advertised public hearing if plans or circumstances are changed or if new conditions or information so warrant, 30. Where the Department of Environmental Protection (DEP) is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 31, The following wetland resource areas are affected by the proposed work: Riverfront [ Area, Bordering Land Subject to Flooding (BLSF) and Inland Bank associated with Merrimack River. These resource areas are significant to the interests of the Act and Town Bylaw as noted above and therein. The applicant has not attempted to overcome the presumption of significance of these resource areas to the identified interests. E 32. The NACC confirms the delineation of the resource areas as shown on the herein referenced plan. 33. In order to prevent any alteration of wetland resource areas a twenty five foot 25` No-Disturbance Zone and a fifty foot 50` No-Construction Zone is established from the edge of the adjacent wetland resource area as shown on the herein referenced plan. The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local Bylaw. 34. This document shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors, and other personnel performing the permitted work are fully aware of the permits terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order resulting from failure to comply with its conditions. 35. The owners of the project and their successors in title agree that the Order does not in itself impose upon the Town any responsibility to maintain the proposed drainage system and that said Town shall not be liable for any damage in the event of failure. his Order, the owners agree to indemnify and hold harmless to the By acceptance of t Town and its residents for any damage attributable to alterations undertaken on this property pursuant to the Order. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding, storm damage or any other form of water damage. 242-1710,North Main Street Emergency Access Spec Cond3 NACC 9/14/2017 DEP FILE #242— 1710 PRIOR TO CONSTRUCTION 36. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department or Court have been completed. 37. This Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be { done. The recording information shall be submitted to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work. Any Order not recorded by the applicant before work commences may be recorded by the NACC at the applicant's expense. 38. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words "Massachusetts DEP, File Number 242-7.710." This sign shall remain visible throughout the life of the project until a Certificate of Compliance is issued. 39. Any changes in the submitted plans caused by the applicant, another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing (at the expense of the applicant). Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes. No work shall begin on a project until written approval has been granted by the NACC. E' 40. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all conditions of this Order of Conditions are complied with. The project engineer and contractors are to be provided with a copy of this Order of Conditions and referenced documents before commencement of construction. 41. Prior to any work commencing on-site, the applicant shall submit to the NACC for approval, a detailed and dated sequence of construction, including the installation of sedimentation/erosion control devices, excavation, paver installation, and all other work planned through final stabilization. Work shall be conducted when the flows in the Merrimac River are below the work area (early fall or summer or as approved by 242-1710,North Main Street Emergency Access Spec Cond4 NACC 9/14/2017 DEP FILE # 242— 17X0 the Conservation Commission or its Administrator). Work shall not be conducted when a storm event is predicted. 42. Wetland flagging shall be checked prior to start of construction and shall be re-- established where missing. All wetland flagging shall remain visible and enumerated per the approved plan(s) throughout the life of the project and until a Certificate of Compliance is issued so that erosion control measures can be properly placed and wetland impacts can be monitored. The proposed limit of work shall be shall be clearly marked with erosion controls or temporary fencing and shall be confirmed by the NACC. Such barriers shall be checked and replaced as necessary and shall be maintained until all construction is complete. Workers should be informed that no use of machinery, storage of machinery or materials, stockpiling of soil, or construction activity is to occur beyond this line at any time. 43. Straw wattles (min 12",biodegradable, no plastic netting, or compost filter sock) and trenched siltation fence shall be installed as shown on the herein referenced plan and as determined necessary by the NACC or its agent. The erosion controls will be properly installed and placed as shown on the plans approved and referenced herein and shall be inspected and approved by the NACC or its agent prior to the start of construction and shall remain intact until all disturbed areas have been permanently stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction [ of the NACC or its agent. The NACC reserves the right to impose additional conditions on portions of this project to mitigate any impacts which could result from site erosion, or any noticeable degradation of surface water quality discharging from the site. For example, installation of erosion control measures may be required in areas not shown on the plan(s) referenced in this Order of Conditions. Should such installation be required by the NACC,they shall be installed within 48 hours of the Commission's request. 44. The applicant shall have on hand at the start of any soil disturbance, removal or stockpiling, 50 feet of additional silt fence and 10 hay bales (or an equivalent amount of wattle or filter sock). Said erosion controls shall be used only for the control of emergency erosion problems and shall not be used for the normal control of erosion. 45. A check payable to the Town of North Andover shall be provided in the amount of $2,000 which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the NACC, and shall be posted with the North Andover Town Treasurer through the NACC before commencement of work. Said deposit of money shall be conditioned on the completion of all conditions hereof, shall be signed by a party or parties satisfactory to the NACC, and Town Counsel, and shall be released after completion of the project, provided that provisions, satisfactory to the NACC, have been made for performance of any conditions which are of continuing nature. The applicant may propose a monetary release schedule keyed to completion of specific 242-1710,North Main Street Emergency Access Spec Cond5 NACC 9/14/2017 DEP FILE #242— 1710 portions of the project for the NACC's review and approval. This condition is issued under the authority of the local Bylaw. 46. The applicant shall designate a Wetland Scientist (or other environmental professional as approved by the NACC or its agent) as an"Erosion Control Monitor" to oversee any emergency placement of controls and regular inspection or replacement of sedimentation control devices. The name and phone number of the erosion control monitor must be provided to the NACC in the event that this person has to be contacted, due to an emergency at the site, during any 24-hour period, including weekends. Proof of the retained monitor must be submitted to the Conservation Department on letterhead by the retained consulting firm. This person shall be given the authority to stop construction for erosion control purposes. The Environmental Professional will immediately notify the Conservation agent of any matter that requires attention by the Commission or the agent. The erosion control monitor will be required to inspect all such devices and oversee cleaning and the proper disposal of waste products. Cleaning shall include removal of any entrapped silt. 47. At least once during each week in which construction activities occurs on-site and for as long thereafter as ground remains unstabilized, the applicant shall submit a written report with photos from the "Erosion Control Monitor" to the NACC certifying that, to the best of his/her knowledge and belief based on a careful site inspection, all work E is being performed in compliance with this Order of Conditions and that approved setbacks are being adhered to. The erosion control monitor must visually inspect all sedimentation/erosion control measures and assume responsibility for their maintenance on a weekly basis and that they are functioning as intended. In addition, j all wetland resource areas must be visually inspected for siltation, turbidity, and/or other water quality impacts. The Erosion Control Monitor shall be on site during and/or following a major storm events of 1/2" inch of rain or greater (24 hour event) to ensure that soils remain stable, and erosion controls are adequate and secure. 4$. The applicant and/or the legal owner of that portion of land upon which these Orders of Conditions have been placed shall provide to the NACC.prior to transferring, or assigning any portion of said land to another party, subject to said Orders of Conditions, the "Compliance Certification Form Affidavit" attached via "Appendix A" signed under the pains and penalties of perjury, stating that said applicant and/or ower has read these Orders of Conditions and is in compliance with each and every condition. This document shall apply to each of the conditions referenced herein and shall be provided to the Conservation Department at least five (5) business days prior to the closing of said land transaction. 49, Once these above mentioned pre-construction requirements are complete, the applicant shall contact the Conservation Office prior to site preparation or construction and shall arrange an on-site conference with an NACC representative, the contractor, the engineer, wetland scientist/monitor and the applicant to ensure that all of the Conditions of this Order are understood. This Order shall be included in all 242-1710,North Main Street Emergency Access Spec Cond6 NACC 9/14/2017 DEP FILE #242— 1.710 construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors and other personnel performing the permitted work are fully aware of the permit's terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order of Conditions resulting from failure to comply with its conditions. The applicant or contractor shall notify the NACC in writing of the identity of the on-site construction supervisor hired to coordinate construction and to ensure compliance with this Order. A reasonable period of time shall be provided as notice of the pre-construction meeting (e.g. 72 hours). STORMWATER MANAGEMENT CONDITIONS 50. There shall be no increase in the post development discharges from the storm drainage system or any other changes in post development conditions that alter the post development watershed boundaries as currently depicted in the Notice of Intent and approved by this Order of Conditions, unless specifically approved in writing by the Commission. 51. Water quality in down gradient BVW's shall not differ significantly following completion of the project from the pre-development conditions. There shall be no sedimentation into wetlands or water bodies from discharge pipes or surface runoff leaving the site. DURING CONSTRUCTION 52. Upon beginning work, the applicant shall submit written weekly progress reports detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence. Reports shall be submitted in as part of the weekly environmental monitoring report (Condition #47). 53. All existing catch basins within 100' of the work shall be protected by Silt Sacks to prevent sediment from entering the drainage system. Silt Sacks or other catch basin protection shall be maintained and regularly cleaned of sediments until all areas associated with the work permitted by this Order have been permanently stabilized and the NACC and/or Conservation Department has formally approved their removal. 54. Dewatering activities are not anticipated or approved. No discharge of water is allowed directly into an area subject to jurisdiction of the Wetlands Protection Act and/or the North Andover Wetland Bylaw (including the Buffer Zone). If emergency E de-watering requirements arise,the applicant shall submit a contingency plan to the i [ 242-171©,North Main Street Emergency Access Spec Cond7 NACC 9/14/2017 E DEP FILE ##242— 1710 Commission for approval, which provides for the pumped water to be contained in a settling basin, to reduce turbidity prior to discharge into a resource area. 55. Associated pavement and roadways shall be swept daily or as directed by the Erosion Control monitor, the Site Supervisor, Project Manager, or Conservation staff for as long as the site remains exposed and un--stabilized. 56. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris, including but not limited to lumber, bricks, plaster,wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the foregoing. 57. All exposed soil finish grade surfaces shall be immediately landscaped and stabilized, or loamed, seeded and mulched, with a layer of mulch hay. All disturbed areas must be graded, loamed and seeded prior to November 1st of each year. Outside of the growing season, exposed soil finish grade surfaces shall be stabilized with a layer of mulch hay until climate conditions allow for seeding. During construction, any area of exposed soils that will be left idle for more than 30 days shall be stabilized with a layer of mulch hay or other means approved by the NACC. 58. No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical). Slopes of steeper grade shall be rip-rapped to provide permanent stabilization. 59. There shall be no stockpiling of soil or other materials outside of the proposed erosion controls. Stockpile locations for all erodible materials (stone/soil) shall be confirmed at the pre-construction meeting. Excavated material not suitable for re-use shall be trucked off-site. 60. Washings from concrete trucks, or surplus concrete, is prohibited on-site. if truck washing is to be done an area shall be designated and approved by the Conservation Department. 61. All waste generated by, or associated with, the construction activity shall be contained within the limit of work, and away from any wetland resource area. There shall be no burying of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain dumpsters (or other suitable means) at the site for the storage and removal of such spent construction materials of£-site. However, no trash dumpsters will be allowed within 50' of areas subject to protection under the Act or local Bylaw unless on a paved area within the approved erosion controls. 62. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. f 242-1710,North Main Street Emergency Access Spec Cond$ NACC 9/14/2017 DEP FILE #242 -1710 63. During and after work on this project, there shall be no discharge or spillage of fuel, or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant within one (1) business day. No construction vehicles are to be stored within 100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance is to be done within 100 feet of a resource area. AFTER CONSTRUCTION 64. There shall be no dumping of leaves, grass clippings,brush, or other debris into a wetland resource area or beyond the 25-foot No-Disturbance Zone. This condition shall survive the issuance of a Certificate of Compliance. 65. Upon completion of construction and grading, all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done by loaming and seeding according to NRCS standards. Stabilization will be considered complete once full vegetative cover has been achieved. nservation staff, the erosion controls shall be 66. Upon approved site stabilization by Co removed and properly disposed of and all exposed unvegetated areas shall be seeded. 67. Upon completion of the project the applicant shall submit the following to the Conservation Commission as part of a request for a Certificate of Compliance: a. WPA Form 8A - "Request for a Certificate of Compliance." b. A letter from the applicant requesting a Certificate of Compliance. c. The name and address of the current landowner. d. Signed statements from the individual property owners shall be submitted with the request for a Certificate of Compliance indicating that they read and understood the recorded Order of Conditions prior to purchasing their property. e. The name and address of the individual/trust or corporation to whom the compliance is to be granted. f. The street address and assessor's map/parcel number for the project. g. The DEP file number. h. A written statement from a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor) of the Commonwealth certifying that the work has been conducted as shown on the plan(s) and documents referenced above, and as conditioned by the Commission. i. An' -Built" plan prepared, signed and stamped by a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor) of the Commonwealth, for the public record. This plan will include: ➢ "As-Built" post-development elevations of all drainage & stormwater management structures constructed within 100 feet of any wetland resource area. Specifically, "As-Built" plans should include inverts of all drainage 242-1710,North Main Street Emergency Access Spec Cond9 NACC 9/14/2017 DEP FILE #242— 1710 structures above and below grade (also to be provided in table format), and an engineer's certification that the drainage system has been constructed and is functioning in accordance with the approved design. NOTE: If portions of the stormwater systems exist partially within the Buffer Zone then the entire structure must be depicted to accurately verify compliance. ➢ "As-Built" post-development elevations and grades of all filled or altered wetland resource areas including the encompassing buffer zone which is regulated as a resource area under the local Wetland Protection Bylaw. ➢ Distances from structures to wetland resource areas. Structures include (but are not limited to) septic systems, additions, fences, sheds, stone walls, pools, retaining walls, subsurface utilities and decks. ➢ A line showing the limit of work and the extent of existing erosion control devices. "Work" includes anv disturbance of soils or vegetation. ! ➢ Location of all subsurface utilities entering the property. 68. The following special conditions shall survive the issuance of a Certificate of Compliance (COC) for this project: i ➢ 25' No-Disturbance Zone and a 50' No-Construction Zone shall be established from the edge of adjacent wetland resource areas as approved under DEP # 242-1710 except as shown on the herein referenced plans. Future work within 100' of existing wetland resource areas will require a separate filing with the NACC (3.3 &3.4 of the Regulations for performance standards within these zones) The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local Bylaw. ➢ Discharge or spillage of pollutants (Condition #63); ➢ Prohibition of dumping of leaves, grass clippings, brush, or other debris (Condition#64). E €f 242-1710,North Main Street Emergency Access Spec Cond 10 NACC 9/14/2017 k 4 I` DEP FILE#242— 1.710 APPENDIX A- AFFIDAVIT on oath do hereby depose and state: (authorized agent applicant and/or current owner) (PLEASE CHECK AT LEAST ONE BLOCK) T. I am the of (position with applicant) (applicant name or company name) the applicant upon whom Order of Conditions have been placed upon by (DEP or NACC manber) the North Andover Conservation Commission. &/or 2. 1 am the _of (position with owner) (owner name) the owner upon whose land Order of Conditions have been placed up by (DEP or NACC number) the North Andover Conservation Commission. 3. 1 hereby affirm and acknowledge that I have received said Order of Conditions and have read the same and understand each (DEP File#) and every condition which has been set forth in said Order of Conditions. 4. 1 hereby affirm and acknowledge that on this day of 20-- I inspected said property together with any and all improvements which have been made to the same and hereby certify that each and every condition set forth in Order of Conditions are presently in compliance. (DEP File #) 5. 1 hereby affirm and acknowledge that this document will be relied upon by the North Andover Conservation Commission as well as any potential buyers of said property which is subject to said Order of Conditions_ (DEP File#) Signed under the pains and penalties of perjury this—_ day of -20— (Signature �. (Signature-authorized agent of applicant or owner) 242-1710,North Main Street Emergency Access Spec CondI I NACC 9/14/2017