Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract #: 731 - From: 04-01-2014 To: 03-31-2015 - PJ Keating Co - Town of North Andover
L3 R:�, Certificate of Insurance THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON YOU THE CERTIFICATE HOLDER. THIS CERTIFICATE IS NOT AN INSURANCE POLICY AND DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES LISTED BELOW. POLICY LIMITS ARE NO LESS THAN THOSE LISTED ALTHOUGH POLICIES MAY INCLUDE ADDPPIOI`lAL SUBLIMIT/LIMiTS NOT LISTED BELOW. This is to Certify that PJ Keating Co 998 Reservoir Rd. NAME AND • Lunenburg, MA 01462 ADDRESS 1 „ tuga OF INSURED L INSURANCE is, at the issue date of this certificate, insured by the Company under the policy(ies) listed below. The insurance afforded by the listed policy(ies) is subject to all their terms, exclusions and Conditions and is not altered by any requirement, term or condition of any contract or other document with respect to which this certificate maybe issued TYPE OF POLICY EXP DATE OCONTINUOUS NDED POLICY NUMBER LIMIT OF LIABILITY 121 POLICY TERM WORKERS COMPENSATION 9/1/2016 WA7-C8D-004095-025 WC7-C81-004095-015 COVERAGE AFFORDED UNDER WC LAW OF THE FOLLOWING STATES: WA '>;States except OH, ND, EMPLOYERS LIABILITY Bodily In' by Accident 1 000 00011ach Aecidem Bodily Injury By Disease -015: WI $1,000,000 Bodily Injury By Disease $1,000,000 Per,,, COMMERCIAL GENERAL LIABILITY m OCCURRENCE 9/1/2016 T62 -C81-004095-115 -Per Project Aggregate included. General Aggregate $2,000,000 Products / Completed Operations Aggregate ❑ CLAIMS MADE$2,000,000 Each Occurrence $2,000,000 RETRO DATE Personal & Advertising Injury $2,000,000 Per PersonJOrganization Other 10ther Damage to Premises Rented to You: $250,000 Medical Exp: $5,000 AUTOMOBILE LIABILITY 9/1/2016 AS2-C81-004095-125$2,000,000 Each Accident—Single Limit $2, 000, 000 13.1. And P.D. Combined Each Person OWNED Each Accident or Occurrence NON -OWNED HIRED Each Accident or Occurrence OTHER Automobile policy 9/1/2015 - 9/1/2016 AS2-C81-054502-525 Physical Damage only -$10,000 Comp -$10,000 Coll ADDITIONAL COMMENTS The Town Of North Andover is listed as an additional insured as required under written contract for work performed - Contract #731 If the certificate expiration date is continuous or extended term, you will be notified if coverage is terminated or reduced before the certificate expiration date. NOTICE OF CANCELLATION: (NOT APPLICABLE UNLESS A NUMBER OF DAYS IS ENTERED BELOW.) BEFORE THE STATED EXPIRATION DATE THE COMPANY WILL NOT CANCEL OR REDUCE THE INSURANCE AFFORDED UNDER THE ABOVE POLICIES UNTIL AT LEAST 30 DAYS NOTICE OF SUCH CANCELLATION HAS BEEN MAILED TO: Town Of North Andover 120 MainSt North Andover, MA 01845 U Liberty Mutual Insurance Group Stan Esposito Pittsburgh / 0387 AUTHORIZED REPRESENTATIVE 12 Federal Street, Ste. 310 Pittsburgh PA 15212-5706 412-231-1331 J OFFICE PHONE DATE ISSUED This certificate is executed by LIBERTY MUTUAL INSURANCE GROUP as respects such insurance as is afforded by those Companies NM 772 07-10 7<t1ilt I /.M — I O/1 C_e/1G - -...i-1 T.i– 1/� I mi—I" mi—i 1A/le/7l11S 11—.1, \M I!`I I Dane , of t PAYMENT BOND RENEWAL OF Bond No. 14-066-153 KNOW ALL MEN BY THESE PRESENTS, that we P.J. KEATING COMPANY with a place Of business at 998 RESERVOIR ROAD, LUNENBURG, MA 01462 as. Principal (tile "Principal"), and LIBERTY MUTUAL INSURANCE COMPANY a corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at 175 BERKELEY ST., BOSTON, MA 02116 as Surety (the "Surety"), are held and firmly bound, unto the Town of North Andover, Massachusetts as Obligee THREE HUNDRED FORTY THOUSAND TWO HUNDRED FIFTY AND 001100 (the "Obligee"), in the sum of ($340,260.00) lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a contract with the obligee, bearing the date of FEBRUARY 24, 2014 for the construction of FURNISHING AND INSTALLING BITUMINOUS CONCRETE PAVING FOR THE PERIOD OF April 1, 2016 to March 31, 2017 NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but not be limited to, any other purposes or items set out in, and to be subject to, the provisions of Massachusetts General Laws, Chapter 30, Section 39K and Chapter 149, Section 29, as amended then this obligation shall become null and void; otherwise, it shall remain in full force and virtue. IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this day of i 9th February, 2016. _ ___ _ .PRINCIPAL P.J. KEAT GCOMP� [Name and ] r2 C asst . afftfou [Title) Attest: ION06 i7 SURETY LIBERTY MUTUAL INSURANCE COMPANY 15 W. SOUTH TEMPLE, STE. 700, SALT LAKE CITY, UT 84101 [Address] 801-533-3624 [Phone] Attest: THIS'POWFR.OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This PoYAbr of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Certificate No. 7110333 ' American Fire and Casualty Company Liberty Mutual Insurance Company _ - The Ohio Casualty Insurance Company West American Insurance Company " .POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS:, That American Fire & Casualty Company and The Ohio Casualty Insurance Company are corporations duly organized under'the laws of the State"of New Hampshire, that Liberty Mutual Isurance Company is a corporation duly organized under the laws of the State of Massachusetts; and WestAmerican Insurance Company, is a corporation duly organized under the laws of the State of.lndiana (herein collectively called the ),.pursuant to and by authority, herein set forth, does hereby name, constitute and appoint, Linda Lee Nipper; Lindsey Plattner; Lisa Hall; Tina Davis - all of the city of Salt Lake City , state of UT: each individually if there be more than one named, its true andaawful-attorney m fact to make, execute, seal, acknowledge µ and deliver; for and on its behalf as surety and as its act and deed any and all undertakings, bonds recognizances and othersurety:ob6gations, in pursuance of these presents and shall be as binding upon the Companies as if they havebeen dulyysigned by thepresident and attestedby the secretary of the Companies in their own proper persons., IN WITNESS WHEREOF, this Power of Attomey tias been subscribed by an authorized officer of official of the Companies and the cgrporate seals of the Companies have been affixed-. thereto this 1 Oth day of September, 2015_ - >+ INs, P t�suk, P� iNsuR - _ American Fire and Casualty Company �R\��v��,TFGq�� The Ohio Casualty Insurance Company _rn a n M = n o Liberty Mutual Insurance Company dAa y c�ao�F/n rd `ew D ,, ? 4)190 o 1919 . 1991 Vest merican Insurance Companya W rye. • _ # ' 1 * _* * By. >+ STATE OF PENNSYLVANIA ss David M. Care ;Assistant Secretary M. COUNTY OF MONTGOMERY- _ C- d On this •10th day of `September 2015 before me personally appeared David M: Carey, who acknowledged himself to be the Assistant Secretary of American Fire and v t— v N ..Casualty Company, Liberty Mutual Insurance Company, The Ohio Casualty Insurance Company, and West American Insurance Company, and that he, as such, -being authorized so to do, >,W 0.2 ,execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. _ 4)-> IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written. O a d P PAS COMMONWEALTH OF PENNSYLVANIA .a - Q��µoNw�TF�� _ Notarial Seal \ �� M o° - ex v Teresa Pastella, Notary Public B O 1 d a Or " Plymouth Twp.; Montgomery County. y i O - . _ _ Teresa Pastella, Notary Public' — `• - - arc - My Commrssion Expires March 28 2017 _ vim+ O_ Member, -Pennsylvania Association of Notaries 0 O (L e to .This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of American Fire and Casualty Company, The Ohio Casualty Insurance w p "Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions -are now in full force and effect reading as follows: = c 4. M 4) ARTICLE IV- OFFICERS - Section 12. Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject O C 4; to such limitation as the Chairman or the- President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal;+ O ,_ acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective E'- powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so %G� O executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney-in-fact under > the provisions of this article may be revoked at any by the Board, the Chairman, the President or by the officer or officers granting such power or authority. ARTICLE XIII - Execution of Contracts - SECTION 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or thepresident, o0 > L and subject to such limitations as the chairman or the president may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, ` M O seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their a? Z respective powers of attorney, shall have full power. to bind the Company by their signature and execution of any such instruments and to attach thereto -the seal of the Company. When so v o executed such instruments shall be as Binding as ifsigned by.the president and attested by the secretary. Certificate'bf Designation - The President of.the Company,:actmg pursuantto the Bylaws of the Company authorizes David -M. Carey, Asslstanl Secretary to appoint such attorneys -in - fact as may be necessary to act on behalf of the Companyao make, execute, seal, acknowledge and deliver as surety any: and all undertakings; bonds, recognizances and other surety obligations: Authorization - By unanimous consent of the Company s Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any:power of attorney issued by the Compa.riy.n connection with surety bonds, shall be valid and binding upon the Company with - the same force and effect as though manually affixed. ' r I, Gregory W. Davenport, the undersigned Assistant Secretary of Amerlean Fire. and Casualty: Company, The Ohio Casualty Insurance Company;'Liberty Mutual Insurance Company, and rtify West American Insurance Company do hereby cethat the original power 0f attorney of which the foregoing:.is a full, true:arid correct copy of the Dower of Attorney executed by said "Companies, is in full force and effect and has not been'revoked. - - - IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 9TH day of FEBRUARY 20 '16 Q4.�,�nVnR�SG9 JPl1KvcN2:,�-9 - Ipo URA'v.- fq 4,. _ a 1906 0 1919 n > 1912 _-1991 n- By: ° ? a Gregory W. Davenport, Assistant Secretary 0; `N 170 of 500 LMS 12873_122013. Linda Nipper Marsh USA, Inc. 15 West SouthTemple MARSH. Suite 700 Salt Lake City, UT 84101 Linda.L.Nipper@marsh.com www.marsh.com February 08, 2016 COURTNEY LAMOUREUX P.J. KEATING COMPANY 998 RESERVOIR RD LUNENBURG, MA 01462 Subject: Renewal Bond Principal: P.J. Keating Company Obligee: Town of North Andover, Massachusetts Bond Description: Furnishing and Installing Bituminous Concrete Paving for the Periof of April 1, 2016 through March 31, 2017 Bond Amount: $680,500.00 Bond Number: 14-066-.153 Surety Name: Liberty Mutual Insurance Company Dear Courtney: Enclosed is the April 1, 2016 to March 31, 2017 renewal for the above -referenced bond. Please recheck the bond for accuracy, and have it signed, sealed, and forwarded to the Town of North Andover, Massachusetts for acceptance and filing. In the event this bond is no longer required, please return the enclosed documents to Marsh so we may advise the surety company and obtain a flat cancellation on this bond on your behalf. If you have any questions, please feel free to contact me. Thank you for allowing Marsh to service your surety needs. Sincerely, in Nipper Enclosure SOLUTIONS... DEFINED, DESIGNED, AND DELIVERED. MARSH & MCLENNAN COMPANIES Andrew W. Maylor Town Manager Mr. Andy Brewer, Ass't Secretary P.J. Keating Company 998 Reservoir Street Lunenburg, MA 01462 Dear Mr. Brewer: Town of North Andover Office of the Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 amaylor@townofnorthandover.com January 27, 2017 Telephone (978)688-9510 Fax (978)688-9556 In accordance with the provisions of the contract between the Town of North Andover and P.J. Keating Company (Contract #731), the contract and the respective unit prices ($0 per ton, with price adjustment if applicable) for bituminous concrete paving is extended one last additional option year (April 1, 2016 through March 31, 2017). Please provide updated insurance certificates including listing the Town of North Andover as `Additional Insured' in accordance with the contract document. The insurance certificates are to be sent to the attention of Ray Santilli, Assistant Town Manager. In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work performed under this contract. An updated prevailing wage report is enclosed. For each week work is performed, you are required to submit certified weekly payroll records. The certified weekly payroll records are to be sent to: Mr. Bruce Thibodeau Division of Public Works 384 Osgood Street North Andover, MA 01845 If you have any questions and/or concerns, please call Mr. Santilli at 978-688-9516. Since ely, Andrew W. Maylor Town Manager cc., Ray Santilli, Assistant Town Manager Bruce Thibodeau, Public Works Contract File Request Official Wage Schedule Confirmation Page 1 of 2 Your request for an Annual update to Prevailing Wage Schedule has been successfully received and is being processed by DOS. The schedule will be emailed to the email address provided in your request. Please note the wage request number 20160127-014U for future inquires. Request another official Wage Schedule © 2009 Commonwealth of Massachusetts Site Policies Contact Us Help Site Map http://prevailingwage.detma.org/WageRequest.aspx?wr=125&AspxAutoDetectCookieSup... 1/27/2016 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates CHARLES D. BAKER As determined by the Director under the provisions of the RONALD L. WALKER, n Governor Secretary Massachusetts General Laws, Chapter 149, Sections 26 to 27H WILLIAM DMcxINNEY KARYN E. POLITO Director Lt. Govemor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: MULTI-YEAR ANNUAL UPDATE TO JOB ID: 20150305-061 Bituminous Concrete Paving Job Location: Throughout Town Information about Prevailing Wage Schedules for Awarding Authorities and Contractors • This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage Request Number" on all pages of this schedule. • An Awarding Authority must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects (bid pursuant to G.L. c. 149A), the earlier of (a) the execution date of the GMP Amendment, or (b) the bid for the first construction scope of work must be within 90 -days of the wage schedule issuance date. • The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor, a filed sub -bidder, or any sub -contractor. • All apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Standards (DAS). Apprentice must keep his/her apprentice identification card on his/her person during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. If an apprentice rate is not listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAS, the apprentice must be paid the journeyworker's rate for the trade. • The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, awarding authority must request an annual update no later than two weeks before the anniversary date, determined as the earlier of. (a) the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of construction services. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F "rental of equipment" contracts. • Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years. Each weekly payroll report must contain: the employee's name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/pw. • Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617) 626-6953. • Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor Division of the office of the Attomey General at (617) 727-3465. • Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties. Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Construction (2 AXLE) DRIVER - EQUIPMENT 12/01/2015 $31.65 $10.41 $10.08 $0.00 $52.14 TEAMSTERS JOINT COUNCIL N0, 10 ZONE B 06/01/2016 $32.15 $10.41 $10.08 $0.00 $52.64 08/01/2016 $32.15 $10.91 $10.08 $0.00 $53.14 12/01/2016 $32.15 $10.91 $10.89 $0.00 $53.95 (3 AXLE) DRIVER - EQUIPMENT 12/01/2015 $31.72 $10.41 $10.08 $0.00 $52.21 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2016 $32.22 $10.41 $10.08 $0.00 $52.71 08/01/2016 $32.22 $10.91 $10.08 $0.00 $53.21 12/01/2016 $32.22 $10.91 $10.89 $0.00 $54.02 (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2015 $31.84 $10.41 $10.08 $0.00 $52.33 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2016 $32.34 $10.41 $10.08 $0.00 $52.83 08/01/2016 $32.34 $10.91 $10.08 $0.00 $53.33 12/01/2016 $32.34 $10.91 $10.89 $0.00 $54.14 ADS/SUBMERSIBLE PILOT 08/01/2015 $88.29 $9.80 $19.23 $0.00 $117.32 PILE DRIVER LOCAL 56 (ZONE 1) AIR TRACK OPERATOR 12/01/2015 $31.90 $7.45 $12.65 $0.00 $52.00 LABORERS - ZONE 2 06/01/2016 $32.40 $7.45 $12.65 $0.00 $52.50 12/01/2016 $33.15 $7.45 $12.65 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 12/01/2015 $34.38 $10.40 $5.95 $0.00 $50.73 HEAT & FROST INSULATORS LOCAL 6 (BOSTON) ASPHALT RAKER 12/01/2015 $31.40 $7.45 $12.65 $0.00 $51.50 LABORERS - ZONE 2 06/01/2016 $31.90 $7.45 $12.65 $0.00 $52.00 12/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2015 $43.73 $10.00 $14.90 $0.00 $68.63 OPERATING ENGINEERS LOCAL 4 06/01/2016 $44.48 $10.00 $14.90 $0.00 $69.38 12/01/2016 $45.73 $10.00 $14.90 $0.00 $70.63 06/01/2017 $46.73 $10.00 $14.90 $0.00 $71.63 12/01/2017 $47.73 $10.00 $14.90 $0.00 $72.63 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BACKHOENRONT-END LOADER 12/01/2015 $43.73 $10.00 $14.90 $0.00 $68.63 OPERATING ENGINEERS LOCAL 4 06/01/2016 $44.48 $10.00 $14.90 $0.00 $69.38 12/01/2016 $45.73 $10.00 $14.90 $0.00 $70.63 06/01/2017 $46.73 $10.00 $14.90 $0.00 $71.63 12/01/2017 $47.73 $10.00 $14.90 $0.00 $72.63 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BARCO-TYPE JUMPING TAMPER 12/01/2015 $31.40 $7.45 $12.65 $0.00 $51.50 LABORERS - ZONE 2 06/01/2016 $31.90 $7.45 $12.65 $0.00 $52.00 12/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" BLOCK PAVER, RAMMER / CURB SETTER 12/01/2015 $31.90 $7.45 $12.65 $0.00 $52.00 LABORERS - ZONE 2 06/01/2016 $32.40 $7.45 $12.65 $0.00 $52.50 12/01/2016 $33.15 $7.45 $12.65 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" BOILER MAKER 01/01/2016 $41.62 $6.97 $16.21 $0.00 $64.80 BOILERMAKERS LOCAL 29 01/01/2017 $42.92 $6.97 $16.21 $0.00 $66.10 -------------------------------------------------------------- - ----------------------------------------------------------------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 2 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice - BOILERMAKER - Local 29 Effective Date - 01/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $27.05 $6.97 $10.54 $0.00 $44.56 2 65 $27.05 $6.97 $10.54 $0.00 $44.56 3 70 $29.13 $6.97 $11.35 $0.00 $47.45 4 75 $31.22 $6.97 $12.16 $0.00 $50.35 5 80 $33.30 $6.97 $12.97 $0.00 $53.24 6 85 $35.38 $6.97 $13.78 $0.00 $56.13 7 90 $37.46 $6.97 $14.59 $0.00 $59.02 8 95 $39.54 $6.97 $15.40 $0.00 $61.91 Effective Date - 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $27.90 $6.97 $10.54 $0.00 $45.41 2 65 $27.90 $6.97 $10.54 $0.00 $45.41 3 70 $30.04 $6.97 $11.35 $0.00 $48.36 4 75 $32.19 $6.97 $12.16 $0.00 $51.32 5 80 $34.34 $6.97 $12.97 $0.00 $54.28 6 85 $36.48 $6.97 $13.78 $0.00 $57.23 7 90 $38.63 $6.97 $14.59 $0.00 $60.19 8 95 $40.77 $6.97 $15.40 $0.00 $63.14 ---------------------------------. Notes: I I *-- - --------------------- Apprentice to Journeyworker Ratio:1:5 BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING) BRICKLAYERS LOCAL 3 (LYNN) 08/01/2015 $49.86 $10.18 $18.57 $0.00 02/01/2016 $49.86 $10.18 $19.14 $0.00 08/01/2016 $50.76 $10.18 $19.22 $0.00 02/01/2017 $51.33 $10.18 $19.22 $0.00 $78.61 $79.18 $80.16 $80.73 --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 3 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- BRICK/PLASTERICEMENT MASON- Local 3 Lynn Effective Date - 08/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.93 $10.18 $18.57 $0.00 $53.68 2 60 $29.92 $10.18 $18.57 $0.00 $58.67 3 70 $34.90 $10.18 $18.57 $0.00 $63.65 4 80 $39.89 $10.18 $18.57 $0.00 $68.64 5 90 $44.87 $10.18 $18.57 $0.00 $73.62 Effective Date - 02/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.93 $10.18 $19.14 $0.00 $54.25 2 60 $29.92 $10.18 $19.14 $0.00 $59.24 3 70 $34.90 $10.18 $19.14 $0.00 $64.22 4 80 $39.89 $10.18 $19.14 $0.00 $69.21 5 90 $44.87 $10.18 $19.14 $0.00 $74.19 ------._.--------._....^._.,.._.----------- (Notes: I --- - -._._.._.-----------._..,.- - - - Apprentice to Journeyworker Ratio:1:5 BULLDOZER/GRADER/SCRAPER 12/01/2015 $43.31 $10.00 $14.90 $0.00 $68.21 OPERATING ENGINEERS LOCAL 4 06/01/2016 $44.06 $10.00 $14.90 $0.00 $68.96 12/01/2016 $45.29 $10.00 $14.90 $0.00 $70.19 06/01/2017 $46.28 $10.00 $14.90 $0.00 $71.18 12/01/2017 $47.27 $10.00 $14.90 $0.00 $72.17 For apprentice rates see "Apprentice- OPERATING ENGINEERS" CAISSON & UNDERPINNING BOTTOM MAN 12/01/2015 $36.45 $7.45 $13.75 $0.00 $57.65 LABORERS - FOUNDATIONAND MARINE 06/01/2016 $37.20 $7.45 $13.75 $0.00 $58.40 12/01/2016 $38.20 $7.45 $13.75 $0.00 $59.40 For apprentice rates see "Apprentice- LABORER" CAISSON & UNDERPINNING LABORER 12/01/2015 $35.30 $7.45 $13.75 $0.00 $56.50 LABORERS - FOUNDATIONAND MARINE 06/01/2016 $36.05 $7.45 $13.75 $0.00 $57.25 12/01/2016 $37.05 $7.45 $13.75 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" CAISSON & UNDERPINNING TOP MAN 12/01/2015 $35.30 $7.45 $13.75 $0.00 $56.50 LABORERS - FOUNDATION AND MARINE 06/01/2016 $36.05 $7.45 $13.75 $0.00 $57.25 12/01/2016 $37.05 $7.45 $13.75 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" CARBIDE CORE DRILL OPERATOR 12/01/2015 $31.40 $7.45 $12.65 $0.00 $51.50 LABORERS - ZONE 2 06/01/2016 $31.90 $7.45 $12.65 $0.00 $52.00 12/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" CARPENTER 03/01/2015 $35.75 $9.80 $16.48 $0.00 $62.03 CARPENTERS -ZONE 2 (Eastern Massachusetts) --------- - ---------------------------------------------------------------------------------------------------------------------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 4 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - CARPENTER - Zone 2 Eastern MA 12/01/2015 06/01/2016 12/01/2016 $31.40 $31.90 $32.65 $7.45 $7.45 $7.45 Effective Date - 01/01/2016 Effective Date - 03/01/2015 $51.50 $52.00 $52.75 CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES Supplemental Supplemental Step percent Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.88 $9.80 $1.63 $0.00 $29.31 2 60 $21.45 $9.80 $1.63 $0.00 $32.88 3 70 $25.03 $9.80 $11.59 $0.00 $46.42 4 75 $26.81 $9.80 $11.59 $0.00 $48.20 5 80 $28.60 $9.80 $13.22 $0.00 $51.62 6 80 $28.60 $9.80 $13.22 $0.00 $51.62 7 90 $32.18 $9.80 $14.85 $0.00 $56.83 8 90 $32.18 $9.80 $14.85 $0.00 $56.83 .,....----_.._----_. Notes: -----------------_, . - - - - - - - '-- --- Apprentice to Journeyworker Ratio:1:5 ------------------- - - - - - - - Apprentice to Journeyworker Ratio: 1:3 I CEMENT MASONRY/PLASTERING 01/01/2016 $46.44 $10.90 $18.71 $1.30 $77.35 BRICKLAYERS LOCAL 3 (LYNN) Apprentice- CEMENT MASONRY/PLASTERING -Eastern Mass (Lynn) 12/01/2015 06/01/2016 12/01/2016 $31.40 $31.90 $32.65 $7.45 $7.45 $7.45 Effective Date - 01/01/2016 $0.00 $0.00 $0.00 $51.50 $52.00 $52.75 CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES Supplemental $44.73 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.22 $10.90 $12.21 $0.00 $46.33 2 60 $27.86 $10.90 $13.71 $1.30 $53.77 3 65 $30.19 $10.90 $14.71 $1.30 $57.10 4 70 $32.51 $10.90 $15.71 $1.30 $60.42 5 75 $34.83 $10.90 $16.71 $1.30 $63.74 6 80 $37.15 $10.90 $17.71 $1.30 $67.06 7 90 $41.80 $10.90 $18.71 $1.30 $72.71 ---------__._-------------------._, (Notes: Page 5 of 34 I Steps 3,4 are 500 hrs. All other steps are 1,000 hrs. . - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:3 CHAIN SAW OPERATOR LABORERS-ZONE2 For apprentice rates see "Apprentice- LABORER" 12/01/2015 06/01/2016 12/01/2016 $31.40 $31.90 $32.65 $7.45 $7.45 $7.45 $12.65 $12.65 $12.65 $0.00 $0.00 $0.00 $51.50 $52.00 $52.75 CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES 12/01/2015 $44.73 $10.00 $14.90 $0.00 $69.63 OPERATING ENGINEERS LOCAL 4 06/01/2016 $45.48 $10.00 $14.90 $0.00 $70.38 12/01/2016 $46.73 $10.00 $14.90 $0.00 $71.63 06/01/2017 $47.73 $10.00 $14.90 $0.00 $72.63 12/01/2017 $48.73 $10.00 $14.90 $0.00 $73.63 For apprentice rates see "Apprentice- OPERATING ENGINEERS" - ------------------------------ - ------------------------------------------------------------------------------------------------------------ Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 5 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 07/01/2016 $50.46 $7.85 $16.10 Unemoloyment $74.41 COMPRESSOR OPERATOR 12/01/2015 $30.13 $10.00 $14.90 $0.00 $55.03 OPERATING ENGINEERS LOCAL 4 06/01/2016 $30.65 $10.00 $14.90 $0.00 $55.55 12/01/2016 $31.52 $10.00 $14.90 $0.00 $56.42 06/01/2017 $32.21 $10.00 $14.90 $0.00 $57.11 12/01/2017 $32.90 $10.00 $14.90 $0.00 $57.80 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DELEADER (BRIDGE) PAINTERS LOCAL 35 - ZONE 2 Apprentice - PAINTER Local 35 - BRIDGES/TANKS 01/01/2016 $49.51 $7.85 $16.10 $0.00 $73.46 07/01/2016 $50.46 $7.85 $16.10 $0.00 $74.41 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 Effective Date - 01/01/2016 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $24.76 $7.85 $0.00 $0.00 $32.61 2 55 $27.23 $7.85 $3.66 $0.00 $38.74 3 60 $29.71 $7.85 $3.99 $0.00 $41.55 4 65 $32.18 $7.85 $4.32 $0.00 $44.35 5 70 $34.66 $7.85 $14.11 $0.00 $56.62 6 75 $37.13 $7.85 $14.44 $0.00 $59.42 7 80 $39.61 $7.85 $14.77 $0.00 $62.23 8 90 $44.56 $7.85 $15.44 $0.00 $67.85 Effective Date - 07/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $25.23 $7.85 $0.00 $0.00 $33.08 2 55 $27.75 $7.85 $3.66 $0.00 $39.26 3 60 $30.28 $7.85 $3.99 $0.00 $42.12 4 65 $32.80 $7.85 $4.32 $0.00 $44.97 5 70 $35.32 $7.85 $14.11 $0.00 $57.28 6 75 $37.85 $7.85 $14.44 $0.00 $60.14 7 80 $40.37 $7.85 $14.77 $0.00 $62.99 8 90 $45.41 $7.85 $15.44 $0.00 $68.70 (Notes: I Steps are 750 hrs. I _____.._....___._---_-_.-........... Apprentice to Journeyworker Ratio: 1:1 -----.�_.___ DEMO: ADZEMAN 12/01/2015 $35.50 $7.45 $13.55 $0.00 $56.50 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2015 $36.50 $7.45 $13.55 $0.00 $57.50 LABORERS-ZONE2 For apprentice rates see "Apprentice- LABORER" DEMO: BURNERS 12/01/2015 $36.25 $7.45 $13.55 $0.00 $57.25 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 6 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment DEMO: CONCRETE CUTTER/SAWYER 12/01/2015 $36.50 $7.45 $13.55 $0.00 $57.50 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" DEMO: JACKHAMMER OPERATOR 12/01/2015 $36.25 $7.45 $13.55 $0.00 $57.25 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" DEMO: WRECKING LABORER 12/01/2015 $35.50 $7.45 $13.55 $0.00 $56.50 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2015 $43.31 $10.00 $14.90 $0.00 $68.21 OPERATING ENGINEERS LOCAL 4 06/01/2016 $44.06 $10.00 $14.90 $0.00 $68.96 12/01/2016 $45.29 $10.00 $14.90 $0.00 $70.19 06/01/2017 $46.28 $10.00 $14.90 $0.00 $71.18 12/01/2017 $47.27 $10.00 $14.90 $0.00 $72.17 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DIVER 08/01/2015 $58.86 $9.80 $19.23 $0.00 $87.89 PILE DRIVER LOCAL 56 (ZONE 1) DIVER TENDER 08/01/2015 $42.04 $9.80 $19.23 $0.00 $71.07 PILE DRIVER LOCAL 56 (ZONE 1) DIVER TENDER (EFFLUENT) 08/01/2015 $63.06 $9.80 $19.23 $0.00 $92.09 PILE DRIVER LOCAL 56 (ZONE 1) DIVER/SLURRY (EFFLUENT) 08/01/2015 $88.23 $9.80 $19.23 $0.00 $117.26 PILE DRIVER LOCAL 56 (ZONE I) DRAWBRIDGE OPERATOR (Construction) 09/01/2015 $45.67 $13.00 $15.89 $0.00 $74.56 ELECTRICIANS LOCAL 103 03/01/2016 $46.17 $13.00 $16.39 $0.00 $75.56 For apprentice rates see "Apprentice- ELECTRICIAN" ELECTRICIAN 09/01/2015 $45.67 $13.00 $15.89 $0.00 $74.56 ELECTRICIANS LOCAL 103 03/01/2016 $46.17 $13.00 $16.39 $0.00 $75.56 ----- ------------------------------------------------------------------------------------------------------- - ------------------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 7 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELECTRICIAN- Local 103 Effective Date - 09/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.27 $13.00 $0.55 $0.00 $31.82 2 40 $18.27 $13.00 $0.55 $0.00 $31.82 3 45 $20.55 $13.00 $11.86 $0.00 $45.41 4 45 $20.55 $13.00 $11.86 $0.00 $45.41 5 50 $22.84 $13.00 $12.23 $0.00 $48.07 6 55 $25.12 $13.00 $12.58 $0.00 $50.70 7 60 $27.40 $13.00 $12.95 $0.00 $53.35 8 65 $29.69 $13.00 $13.32 $0.00 $56.01 9 70 $31.97 $13.00 $13.69 $0.00 $58.66 10 75 $34.25 $13.00 $14.06 $0.00 $61.31 Effective Date - 03/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.47 $13.00 $0.55 $0.00 $32.02 2 40 $18.47 $13.00 $0.55 $0.00 $32.02 3 45 $20.78 $13.00 $11.84 $0.00 $45.62 4 45 $20.78 $13.00 $11.84 $0.00 $45.62 5 50 $23.09 $13.00 $12.71 $0.00 $48.80 6 55 $25.39 $13.00 $13.07 $0.00 $51.46 7 60 $27.70 $13.00 $13.39 $0.00 $54.09 8 65 $30.01 $13.00 $13.81 $0.00 $56.82 9 70 $32.32 $13.00 $14.18 $0.00 $59.50 10 75 $34.63 $13.00 $14.55 $0.00 $62.18 ---------_.^..___-----_.---------_.__-, INotes:: I App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80 --- - Apprentice to Journeyworker Ratio:2:3*** --_..._-----------.___.--- ELEVATOR CONSTRUCTOR ELEVATOR CONSTRUCTORS LOCAL 4 01/01/2016 $54.53 $14.43 $14.96 $0.00 $83.92 01/01/2017 $55.86 $15.28 $15.71 $0.00 $86.85 --- - - --------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 8 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELEVATOR CONSTRUCTOR -Local 4 Effective Date - 01/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $27.27 $14.43 $0.00 $0.00 $41.70 2. 55 $29.99 $14.43 $14.96 $0.00 $59.38 3 65 $35.44 $14.43 $14.96 $0.00 $64.83 4 70 $38.17 $14.43 $14.96 $0.00 $67.56 5 80 $43.62 $14.43 $14.96 $0.00 $73.01 Effective Date - 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $27.93 $15.28 $0.00 $0.00 $43.21 2 55 $30.72 $15.28 $15.71 $0.00 $61.71 3 65 $36.31 $15.28 $15.71 $0.00 $67.30 4 70 $39.10 $15.28 $15.71 $0.00 $70.09 5 80 $44.69 $15.28 $15.71 $0.00 $75.68 ----._--_.---------------------- ,Notes: ISteps 1-2 are 6 mos.; Steps 3-5 are 1 year 1 _ _ _ _ _ _ _ Apprentice to Journeyworker Ratio: 1:1 ELEVATOR CONSTRUCTOR HELPER 01/01/2016 $38.17 $14.43 $14.96 $0.00 $67.56 ELEVATOR CONSTRUCTORS LOCAL 4 01/01/2017 $39.10 $15.28 $15.71 $0.00 $70.09 For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR" FENCE & GUARD RAIL ERECTOR 12/01/2015 $31.40 $7.45 $12.65 $0.00 $51.50 LABORERS - ZONE 2 06/01/2016 $31.90 $7.45 $12.65 $0.00 $52.00 12/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2015 $40.49 $10.00 $14.55 $0.00 $65.04 OPERATING ENGINEERS LOCAL 4 05/01/2016 $41.38 $10.00 $14.55 $0.00 $65.93 11/01/2016 $41.97 $10.00 $14.55 $0.00 $66.52 05/01/2017 $42.85 $10.00 $14.55 $0.00 $67.40 11/01/2017 $43.58 $10.00 $14.55 $0.00 $68.13 05/01/2018 $44.29 $10.00 $14.55 $0.00 $68.84 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENGYARTY CHIEF-BLDG,SITE,HVY/HWY 11/01/2015 $41.93 $10.00 $14.55 $0.00 $66.48 OPERATING ENGINEERS LOCAL 4 05/01/2016 $42.82 $10.00 $14.55 $0.00 $67.37 11/01/2016 $43.42 $10.00 $14.55 $0.00 $67.97 05/01/2017 $44.31 $10.00 $14.55 $0.00 $68.86 11/01/2017 $45.04 $10.00 $14.55 $0.00 $69.59 05/01/2018 $45.76 $10.00 $14.55 $0.00 $70.31 For apprentice rates see "Apprentice- OPERATING ENGINEERS" --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 9 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate ELECTRICIANS LOCAL 103 03/01/2016 $46.17 $13.00 $16.39 Unemployment $75.56 FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY 11/01/2015 $21.71 $10.00 $14.55 $0.00 $46.26 OPERATING ENGINEERS LOCAL 4 05/01/2016 $22.23 $10.00 $14.55 $0.00 $46.78 I COMMISSIONINGELECTRICIANS 11/01/2016 $22.58 $10.00 $14.55 $0.00 $47.13 LOCAL 103 05/01/2017 $23.11 $10.00 $14.55 $0.00 $47.66 For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHMCIAN" 11/01/2017 $23.53 $10.00 $14.55 $0.00 $48.08 FIREMAN (ASST. ENGINEER) 05/01/2018 $23.96 $10.00 $14.55 $0.00 $48.51 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 06/01/2016 $36.96 $10.00 $14.90 $0.00 $61.86 FIRE ALARM INSTALLER 09/01/2015 $45.67 $13.00 $15.89 $0.00 $74.56 ELECTRICIANS LOCAL 103 03/01/2016 $46.17 $13.00 $16.39 $0.00 $75.56 For apprentice rates see "Apprentice- ELECTRICIAN" $12.65 $0.00 $40.60 4 65 $27.03 $9.80 FIRE ALARM REPAIR / MAINTENANCE 09/01/2015 $34.25 $13.00 $14.06 $0.00 $61.31 I COMMISSIONINGELECTRICIANS 03/01/2016 $34.63 $13.00 $14.55 $0.00 $62.18 LOCAL 103 7 80 $33.27 $9.80 $15.74 $0.00 $58.81 For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHMCIAN" $35.35 $9.80 $15.74 $0.00 $60.89 _--------------.--------.------, Notes: FIREMAN (ASST. ENGINEER) 12/01/2015 $36.34 $10.00 $14.90 $0.00 $61.24 OPERATING ENGINEERS LOCAL 4 06/01/2016 $36.96 $10.00 $14.90 $0.00 $61.86 12/01/2016 $38.00 $10.00 $14.90 $0.00 $62.90 06/01/2017 $38.84 $10.00 $14.90 $0.00 $63.74 12/01/2017 $39.67 $10.00 $14.90 $0.00 $64.57 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FLAGGER & SIGNALER LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" 12/01/2015 $20.50 $7.45 $12.65 $0.00 $40.60 06/01/2016 $20.50 $7.45 $12.65 $0.00 $40.60 12/01/2016 $20.50 $7.45 $12.65 $0.00 $40.60 FLOORCOVERER 09/01/2015 $41.59 $9.80 $17.53 $0.00 $68.92 FLOORCOVERERS LOCAL 2168 ZONE I Apprentice- FLOORCOVERER -Local 2168 Zone I Effective Date - 09/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.80 $9.80 $1.79 $0.00 $32.39 2 55 $22.87 $9.80 $1.79 $0.00 $34.46 3 60 $24.95 $9.80 $12.16 $0.00 $46.91 4 65 $27.03 $9.80 $12.16 $0.00 $48.99 5 70 $29.11 $9.80 $13.95 $0.00 $52.86 6 75 $31.19 $9.80 $13.95 $0.00 $54.94 7 80 $33.27 $9.80 $15.74 $0.00 $58.81 8 85 $35.35 $9.80 $15.74 $0.00 $60.89 _--------------.--------.------, Notes: I Steps are 750 hrs. I _-,___-------r.-----_...--- Apprentice to Journeyworker Ratio:l:l - -------------------------------- ---------------------------------------- --------------------------------------------------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 10 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $55.03 OPERATING ENGINEERS LOCAL 4 Unemployment FORK LIFT/CHERRY PICKER 12/01/2015 $43.73 $10.00 $14.90 $0.00 $68.63 OPERATING ENGINEERS LOCAL 4 $10.00 $14.90 $0.00 $55.55 06/01/2016 $44.48 $10.00 $14.90 $0.00 $69.38 12/01/2016 $45.73 $10.00 $14.90 $0.00 $70.63 06/01/2017 $46.73 $10.00 $14.90 $0.00 $71.63 12/01/2017 $47.73 $10.00 $14.90 $0.00 $72.63 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GENERATOR/LIGHTINGPLANT/BEATERS 12/01/2015 $30.13 $10.00 $14.90 $0.00 $55.03 OPERATING ENGINEERS LOCAL 4 06/01/2016 $30.65 $10.00 $14.90 $0.00 $55.55 12/01/2016 $31.52 $10.00 $14.90 $0.00 $56.42 06/01/2017 $32.21 $10.00 $14.90 $0.00 $57.11 12/01/2017 $32.90 $10.00 $14.90 $0.00 $57.80 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GLAZIER (GLASS PLANK/AIR BARRIERMIUERIOR 01/01/2016 $39.01 $7.85 $16.10 $0.00 $62.96 SYSTEMS) GLAZIERS LOCAL 35 (ZONE 2) 07/01/2016 $39.96 $7.85 $16.10 $0.00 $63.91 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86 Apprentice - GLAZIER - Local 35 Zone 2 Effective Date - 01/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.51 $7.85 $0.00 $0.00 $27.36 2 55 $21.46 $7.85 $3.66 $0.00 $32.97 3 60 $23.41 $7.85 $3.99 $0.00 $35.25 4 65 $25.36 $7.85 $4.32 $0.00 $37.53 5 70 $27.31 $7.85 $14.11 $0.00 $49.27 6 75 $29.26 $7.85 $14.44 $0.00 $51.55 7 80 $31.21 $7.85 $14.77 $0.00 $53.83 8 90 $35.11 $7.85 $15.44 $0.00 $58.40 Effective Date - 07/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.98 $7.85 $0.00 $0.00 $27.83 2 55 $21.98 $7.85 $3.66 $0.00 $33.49 3 60 $23.98 $7.85 $3.99 $0.00 $35.82 4 65 $25.97 $7.85 $4.32 $0.00 $38.14 5 70 $27.97 $7.85 $14.11 $0.00 $49.93 6 75 $29.97 $7.85 $14.44 $0.00 $52.26 7 80 $31.97 $7.85 $14.77 $0.00 $54.59 8 90 $35.96 $7.85 $15.44 $0.00 $59.25 - - - - - - - - - - - - - - - - - - - - - - - - - - - - (Notes: Steps are 750 hrs. `.,.,._ _,.. ------------------- Apprentice to Journeyworker Ratio: 1:1 ---------------------------------------------------------------------------------------------------- - - - ------------------------------------ Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 11 of 34 Classification HOISTING ENGINEER/CRANES/GRADALLS OPERATING ENGINEERS LOCAL 4 Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate 12/01/2015 $43.73 $10.00 $14.90 $0.00 $68.63 06/01/2016 $44.48 $10.00 $14.90 $0.00 $69.38 12/01/2016 $45.73 $10.00 $14.90 $0.00 $70.63 06/01/2017 $46.73 $10.00 $14.90 $0.00 $71.63 12/01/2017 $47.73 $10.00 $14.90 $0.00 $72.63 Apprentice- OPERATING ENGINEERS- Local 4 Effective Date - 12/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $24.05 $10.00 $0.00 $0.00 $34.05 2 60 $26.24 $10.00 $14.90 $0.00 $51.14 3 65 $28.42 $10.00 $14.90 $0.00 $53.32 4 70 $30.61 $10.00 $14.90 $0.00 $55.51 5 75 $32.80 $10.00 $14.90 $0.00 $57.70 6 80 $34.98 $10.00 $14.90 $0.00 $59.88 7 85 $37.17 $10.00 $14.90 $0.00 $62.07 8 90 $39.36 $10.00 $14.90 $0.00 $64.26 Effective Date - 06/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $24.46 $10.00 $0.00 $0.00 $34.46 2 60 $26.69 $10.00 $14.90 $0.00 $51.59 3 65 $28.91 $10.00 $14.90 $0.00 $53.81 4 70 $31.14 $10.00 $14.90 $0.00 $56.04 5 75 $33.36 $10.00 $14.90 $0.00 $58.26 6 80 $35.58 $10.00 $14.90 $0.00 $60.48 7 85 $37.81 $10.00 $14.90 $0.00 $62.71 8 90 $40.03 $10.00 $14.90 $0.00 $64.93 ---_._..-----------..._ Notes: HVAC (ELECTRICAL CONTROLS) --------_--_ $45.67 $13.00 -- I �- - - - Apprentice to Journeyworker Ratio:1:6 - - - - - - - - - - - - - - - - - - HVAC (DUCTWORK) 08/01/2015 $43.31 $10.20 $21.48 $2.25 $77.24 SHEETMETAL WORKERS LOCAL 17 -A 02/01/2016 $43.31 $10.70 $21.95 $2.28 $78.24 08/01/2016 $44.46 $10.70 $21.95 $2.28 $79.39 02/01/2017 $45.56 $10.70 $21.95 $2.28 $80.49 08/01/2017 $46.66 $10.70 $21.95 $2.28 $81.59 02/01/2018 $47.81 $10.70 $21.95 $2.28 $82.74 For apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (ELECTRICAL CONTROLS) 09/01/2015 $45.67 $13.00 $15.89 $0.00 $74.56 ELECTRICIANS LOCAL 103 03/01/2016 $46.17 $13.00 $16.39 $0.00 $75.56 For apprentice rates see "Apprentice- ELECTRICIAN' --------------------------------------------------------------------------------------------- --------- ---------------------------------- - -- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 12 of 34 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate HVAC (TESTING AND BALANCING - AIR) 08/01/2015 $43.31 $10.20 $21.48 $2.25 $77.24 SHEETMETAL WORKERS LOCAL 17 -A $49.36 $9.70 $14.89 $0.00 $73.95 02/01/2016 $43.31 $10.70 $21.95 $2.28 $78.24 08/01/2016 $44.46 $10.70 $21.95 $2.28 $79.39 02/01/2017 $45.56 $10.70 $21.95 $2.28 $80.49 08/01/2017 $46.66 $10.70 $21.95 $2.28 $81.59 02/01/2018 $47.81 $10.70 $21.95 $2.28 $82.74 For apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (TESTING AND BALANCING -WATER) PIPEFITTERS LOCAL 537 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" HVAC MECHANIC PIPEFITTERS LOCAL 537 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" HYDRAULIC DRILLS LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" INSULATOR (PIPES & TANKS) HEAT & FROST INSULATORS LOCAL 6 (BOSTON) 09/01/2015 $47.36 $9.70 $14.89 $0.00 $71.95 03/01/2016 $48.36 $9.70 $14.89 $0.00 $72.95 09/01/2016 $49.36 $9.70 $14.89 $0.00 $73.95 03/01/2017 $50.36 $9.70 $14.89 $0.00 $74.95 09/01/2015 $47.36 $9.70 $14.89 $0.00 $71.95 03/01/2016 $48.36 $9.70 $14.89 $0.00 $72.95 09/01/2016 $49.36 $9.70 $14.89 $0.00 $73.95 03/01/2017 $50.36 $9.70 $14.89 $0.00 $74.95 12/01/2015 $31.90 $7.45 $12.65 $0.00 $52.00 06/01/2016 $32.40 $7.45 $12.65 $0.00 $52.50 12/01/2016 $33.15 $7.45 $12.65 $0.00 $53.25 09/01/2015 $43.81 $11.50 $13.80 $0.00 $69.11 09/01/2016 $45.81 $11.50 $13.80 $0.00 $71.11 09/01/2017 $47.81 $11.50 $13.80 $0.00 $73.11 09/01/2018 $50.06 $11.50 $13.80 $0.00 $75.36 09/01/2019 $52.56 $11.50 $13.80 $0.00 $77.86 Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston Effective Date - 09/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.91 $11.50 $10.05 $0.00 $43.46 2 60 $26.29 Pension $11.50 $10.80 $0.00 $48.59 3 70 $30.67 $0.00 $11.50 $11.55 $0.00 $53.72 4 80 $35.05 $49.79 $11.50 $12.30 $0.00 $58.85 Effective Date - 09/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.91 $11.50 $10.05 $0.00 $44.46 2 60 $27.49 $11.50 $10.80 $0.00 $49.79 3 70 $32.07 $11.50 $11.55 $0.00 $55.12 4 80 $36.65 $11.50 $12.30 $0.00 $60.45 ....._-_.--_._.------_.-----_.--_.._------+ (Notes: ISteps are 1 year Apprentice to Journeyworker Ratio:1:4 ---------------------------------------------------------------------------------------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U ------ - - ----------- ----------------- - Page 13 of 34 Classification IRONWORKER/WELDER IRONWORKERS LOCAL 7 (LAWRENCE AREA) Effective Date Base Wage Health 09/16/2015 $37.99 $7.80 03/16/2016 $38.99 $7.80 09/16/2016 $39.64 $7.80 03/16/2017 $40.24 $7.80 Pension Supplemental Unemployment Total Rate $20.85 $0.00 $66.64 $20.85 $0.00 $67.64 $20.85 $0.00 $68.29 $20.85 $0.00 $68.89 Apprentice- IRONWORKER -Local 7 Lawrence Effective Date - 09/16/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $22.79 $7.80 $20.85 $0.00 $51.44 2 70 $26.59 $7.80 $20.85 $0.00 $55.24 3 75 $28.49 $7.80 $20.85 $0.00 $57.14 4 80 $30.39 $7.80 $20.85 $0.00 $59.04 5 85 $32.29 $7.80 $20.85 $0.00 $60.94 6 90 $34.19 $7.80 $20.85 $0.00 $62.84 Effective Date - 03/16/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $23.39 $7.80 $20.85 $0.00 $52.04 2 70 $27.29 $7.80 $20.85 $0.00 $55.94 3 75 $29.24 $7.80 $20.85 $0.00 $57.89 4 80 $31.19 $7.80 $20.85 $0.00 $59.84 5 85 $33.14 $7.80 $20.85 $0.00 $61.79 6 90 $35.09 $7.80 $20.85 $0.00 $63.74 ------_.-._ ----_.-_.-._ (Notes: -----------+ ' Structural 1:6; Ornamental 1:4 ' `- - ----------------------- Apprentice to Journeyworker Ratio: JACKHAMMER & PAVING BREAKER OPERATOR 12/01/2015 $31.40 $7.45 $12.65 $0.00 $51.50 LABORERS - ZONE 2 06/01/2016 $31.90 $7.45 $12.65 $0.00 $52.00 12/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" LABORER 12/01/2015 $31.15 $7.45 $12.65 $0.00 $51.25 LABORERS - ZONE 2 06/01/2016 $31.65 $7.45 $12.65 $0.00 $51.75 12/01/2016 $32.40 $7.45 $12.65 $0.00 $52.50 -------------------------------------------------------------------------------------------------------------------------- -------- - -------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 14 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice - LABORER - Zone 2 Effective Date - 12/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.69 $7.45 $12.65 $0.00 $38.79 2 70 $21.81 $7.45 $12.65 $0.00 $41.91 3 80 $24.92 $7.45 $12.65 $0.00 $45.02 4 90 $28.04 $7.45 $12.65 $0.00 $48.14 Effective Date - 06/01/2016 $12.65 $0.00 --------, Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.99 $7.45 $12.65 $0.00 $39.09 2 70 $22.16 $7.45 $12.65 $0.00 $42.26 3 80 $25.32 $7.45 $12.65 $0.00 $45.42 4 90 $28.49 $7.45 $12.65 $0.00 $48.59 --.__.._._ ----._._----------_.._... 'Notes: $12.65 $0.00 --------, For apprentice rates see "Apprentice- LABORER" A_ Apprentice to Journeyworker Ratio:l:5 ------------ ....._._ -- _. -- LABORER: CARPENTER TENDER 12/01/2015 $31.15 $7.45 $12.65 $0.00 $51.25 LABORERS - ZONE 2 06/01/2016 $31.65 $7.45 $12.65 $0.00 $51.75 12/01/2016 $32.40 $7.45 $12.65 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: CEMENT FINISHER TENDER 12/01/2015 $31.15 $7.45 $12.65 $0.00 $51.25 LABORERS - ZONE 2 06/01/2016 $31.65 $7.45 $12.65 $0.00 $51.75 12/01/2016 $32.40 $7.45 $12.65 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2015 $31.35 $7.45 $12.60 $0.00 $51.40 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" LABORER: MASON TENDER 12/01/2015 $31.40 $7.45 $12.65 $0.00 $51.50 LABORERS - ZONE 2 06/01/2016 $31.90 $7.45 $12.65 $0.00 $52.00 12/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" LABORER: MULTI -TRADE TENDER 12/01/2015 $31.15 $7.45 $12.65 $0.00 $51.25 LABORERS - ZONE 2 06/01/2016 $31.65 $7.45 $12.65 $0.00 $51.75 12/01/2016 $32.40 $7.45 $12.65 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: TREE REMOVER 12/01/2015 $31.15 $7.45 $12.65 $0.00 $51.25 LABORERS - ZONE 2 06/01/2016 $31.65 $7.45 $12.65 $0.00 $51.75 12/01/2016 $32.40 $7.45 $12.65 $0.00 $52.50 This classification applies to all tree work associated with the removal of standing trees, and trimming and removal of branches and limbs when the work is not done for a utility company for the purpose of operation, maintenance or repair of utility company equipment. For apprentice rates see "Apprentice- LABORER" LASER BEAM OPERATOR 12/01/2015 $31.40 $7.45 $12.65 $0.00 $51.50 LABORERS - ZONE 2 06/01/2016 $31.90 $7.45 $12.65 $0.00 $52.00 12/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ---------------------------------------------------------------------------------- Issue Date: 01/27/2016 Wage Request Number: ----------------------------------------------------------- 20160127-014U Page 15 of 34 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate MARBLE & TILE FINISHERS 08/01/2015 $38.08 $10.18 $17.25 $0.00 $65.51 BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2016 $38.08 $10.18 $17.70 $0.00 $65.96 08/01/2016 $38.78 $10.18 $17.78 $0.00 $66.74 02/01/2017 $39.24 $10.18 $17.78 $0.00 $67.20 Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile Effective Date - 08/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.04 $10.18 $17.25 $0.00 $46.47 2 60 $22.85 $10.18 $17.25 $0.00 $50.28 3 70 $26.66 $10.18 $17.25 $0.00 $54.09 4 80 $30.46 $10.18 $17.25 $0.00 $57.89 5 90 $34.27 $10.18 $17.25 $0.00 $61.70 Effective Date - 02/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.04 $10.18 $17.70 $0.00 $46.92 2 60 $22.85 $10.18 $17.70 $0.00 $50.73 3 70 $26.66 $10.18 $17.70 $0.00 $54.54 4 80 $30.46 $10.18 $17.70 $0.00 $58.34 5 90 $34.27 $10.18 $17.70 $0.00 $62.15 --._..,.----- ---_._...._.__.. (Notes: -------...,...-------- - - - Apprentice to Journeyworker Ratio:1:3 - - - - - - - - - - - - - - - - - - MARBLE MASONSJILELAYERS & TERRAZZO MECH 08/01/2015 $49.90 $10.18 $18.57 $0.00 $78.65 BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2016 $49.90 $10.18 $19.14 $0.00 $79.22 08/01/2016 $50.80 $10.18 $19.22 $0.00 $80.20 02/01/2017 $51.37 $10.18 $19.22 $0.00 $80.77 ---------------- -----------------------------------------------------------------------------------------------------------------------..... Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 16 of 34 Classification Effective Date Base Wage Health Pension Supplemental - Total Rate Unemplovment Apprentice- MARBLE -TILE -TERRAZZO MECHANIC- Local 3 Marble & Tile Effective Date - 08/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.95 $10.18 $18.57 $0.00 $53.70 2 60 $29.94 $10.18 $18.57 $0.00 $58.69 3 70 $34.93 $10.18 $18.57 $0.00 $63.68 4 80 $39.92 $10.18 $18.57 $0.00 $68.67 5 90 $44.91 $10.18 $18.57 $0.00 $73.66 Effective Date - 02/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.95 $10.18 $19.14 $0.00 $54.27 2 60 $29.94 $10.18 $19.14 $0.00 $59.26 3 70 $34.93 $10.18 $19.14 $0.00 $64.25 4 80 $39.92 $10.18 $19.14 $0.00 $69.24 5 90 $44.91 $10.18 $19.14 $0.00 $74.23 ------ --- _.__._.--------------------- Notes: '-- - Apprentice to Journeyworker Ratio:1:5 --_.__--------.-------___ MECH. SWEEPER OPERATOR (ON CONST. SITES) 12/01/2015 $43.31 $10.00 $14.90 $0.00 $68.21 OPERATING ENGINEERS LOCAL 4 06/01/2016 $44.06 $10.00 $14.90 $0.00 $68.96 12/01/2016 $45.29 $10.00 $14.90 $0.00 $70.19 06/01/2017 $46.28 $10.00 $14.90 $0.00 $71.18 12/01/2017 $47.27 $10.00 $14.90 $0.00 $72.17 For apprentice rates see "Apprentice- OPERATING ENGINEERS" MECHANICS MAINTENANCE 12/01/2015 $43.31 $10.00 $14.90 $0.00 $68.21 OPERATING ENGINEERS LOCAL 4 06/01/2016 $44.06 $10.00 $14.90 $0.00 $68.96 12/01/2016 $45.29 $10.00 $14.90 $0.00 $70.19 06/01/2017 $46.28 $10.00 $14.90 $0.00 $71.18 12/01/2017 $47.27 $10.00 $14.90 $0.00 $72.17 For apprentice rates see "Apprentice- OPERATING ENGINEERS" MILLWRIGHT (Zone 2) 04/01/2015 $34.69 $9.80 $16.21 $0.00 $60.70 MILLWRIGHTS LOCAL 1121 -Zone 2 --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 17 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemnlovment Apprentice- MILLWRIGHT- Local 1121 Zone 2 Effective Date - 04/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $19.08 $9.80 $4.48 $0.00 $33.36 2 65 $22.55 $9.80 $13.36 $0.00 $45.71 3 75 $26.02 $9.80 $14.18 $0.00 $50.00 4 85 $29.49 $9.80 $14.99 $0.00 $54.28 ------____,.-._._._.,.--------------_,.--- (Notes: $14.90 $0.00 $48.72 I ISteps are 2,000 hours $24.34 $10.00 $14.90 $0.00 $49.24 For apprentice rates see "Apprentice- OPERATING ENGINEERS" Apprentice to Journeyworker Rallo:1:5 OILER (TRUCK CRANES, GRADALLS) 12/01/2015 $26.08 $1.0.00 $14.90 MORTAR MIXER 12/01/2015 $31.40 $7.45 $12.65 $0.00 LABORERS-ZONE2 $0.00 $51.44 12/01/2016 $27.29 06/01/2016 $31.90 $7.45 $12.65 $0.00 12/01/2016 $32.65 $7.45 $12.65 $0.00 For apprentice rates see "Apprentice- LABORER" $51.50 $52.00 $52.75 OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2015 $22.27 $10.00 $14.90 $0.00 $47.17 OPERATING ENGINEERS LOCAL 4 06/01/2016 $22.66 $10.00 $14.90 $0.00 $47.56 12/01/2016 $23.31 $10.00 $14.90 $0.00 $48.21 06/01/2017 $23.82 $10.00 $14.90 $0.00 $48.72 12/01/2017 $24.34 $10.00 $14.90 $0.00 $49.24 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OILER (TRUCK CRANES, GRADALLS) 12/01/2015 $26.08 $1.0.00 $14.90 $0.00 $50.98 OPERATING ENGINEERS LOCAL 4 06/01/2016 $26.54 $10.00 $14.90 $0.00 $51.44 12/01/2016 $27.29 $10.00 $14.90 $0.00 $52.19 06/01/2017 $27.89 $10.00 $14.90 $0.00 $52.79 12/01/2017 $28.50 $10.00 $14.90 $0.00 $53.40 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT - CLASS 11 12/01/2015 $43.31 $10.00 $14.90 $0.00 $68.21 OPERATING ENGINEERS LOCAL 4 06/01/2016 $44.06 $10.00 $14.90 $0.00 $68.96 12/01/2016 $45.29 $10.00 $14.90 $0.00 $70.19 06/01/2017 $46.28 $10.00 $14.90 $0.00 $71.18 12/01/2017 $47.27 $10.00 $14.90 $0.00 $72.17 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PAINTER (BRIDGES/TANKS) 01/01/2016 $49.51 $7.85 $16.10 $0.00 $73.46 PAINTERS LOCAL 35 - ZONE 2 07/01/2016 $50.46 $7.85 $16.10 $0.00 $74.41 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 ---------------------------------------------------------- ---------------------------------------------------------------------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 18 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.76 $7.85 $0.00 $0.00 $32.61 2 55 $27.23 $7.85 $3.66 $0.00 $38.74 3 60 $29.71 $7.85 $3.99 $0.00 $41.55 4 65 $32.18 $7.85 $4.32 $0.00 $44.35 5 70 $34.66 $7.85 $14.11 $0.00 $56.62 6 75 $37.13 $7.85 $14.44 $0.00 $59.42 7 80 $39.61 $7.85 $14.77 $0.00 $62.23 8 90 $44.56 $7.85 $15.44 $0.00 $67.85 Effective Date - 07/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $25.23 $7.85 $0.00 $0.00 $33.08 2 55 $27.75 $7.85 $3.66 $0.00 $39.26 3 60 $30.28 $7.85 $3.99 $0.00 $42.12 4 65 $32.80 $7.85 $4.32 $0.00 $44.97 5 70 $35.32 $7.85 $14.11 $0.00 $57.28 6 75 $37.85 $7.85 $14.44 $0.00 $60.14 7 80 $40.37 $7.85 $14.77 $0.00 $62.99 8 90 $45.41 $7.85 $15.44 $0.00 $68.70 ----------------------------_. (Notes: ---- Steps are 750 hrs. ___ _ _ Apprentice to Journeyworker Ratio:1:1 PAINTER (SPRAY OR SANDBLAST, NEW) * 01/01/2016 $40.41 $7.85 $16.10 $0.00 $64.36 * If 30% or more of surfaces to be painted are new construction, 07/01/2016 $41.36 $7.85 $16.10 $0.00 $65.31 NEW paint rate shall be used.PA1NTERS LOCAL 35 - ZONE 2 01/01/2017 $42.31 $7.85 $16.10 $0.00 $66.26 ----------------- ----------- -- ------------------------------------------------ --- -------------- - ----------------------- - ----------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 19 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - New Effective Date - 01/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.21 $7.85 $0.00 $0.00 $28.06 2 55 $22.23 $7.85 $3.66 $0.00 $33.74 3 60 $24.25 $7.85 $3.99 $0.00 $36.09 4 65 $26.27 $7.85 $4.32 $0.00 $38.44 5 70 $28.29 $7.85 $14.11 $0.00 $50.25 6 75 $30.31 $7.85 $14.44 $0.00 $52.60 7 80 $32.33 $7.85 $14.77 $0.00 $54.95 8 90 $36.37 $7.85 $15.44 $0.00 $59.66 Effective Date - 07/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.68 $7.85 $0.00 $0.00 $28.53 2 55 $22.75 $7.85 $3.66 $0.00 $34.26 3 60 $24.82 $7.85 $3.99 $0.00 $36.66 4 65 $26.88 $7.85 $4.32 $0.00 $39.05 5 70 $28.95 $7.85 $14.11 $0.00 $50.91 6 75 $31.02 $7.85 $14.44 $0.00 $53.31 7 80 $33.09 $7.85 $14.77 $0.00 $55.71 8 90 $37.22 $7.85 $15.44 $0.00 $60.51 ----------------------------- INotes: I Steps are 750 hrs. I ---- - Apprentice to Journeyworker Ratio: 1:1 ------------------- PAINTER (SPRAY OR SANDBLAST, REPAINT) 01/01/2016 $38.47 $7.85 $16.10 $0.00 $62.42 PAINTERS LOCAL 35 - ZONE 2 07/01/2016 $39.42 $7.85 $16.10 $0.00 $63.37 01/01/2017 $40.37 $7.85 $16.10 $0.00 $64.32 ---------- - --------------------------- ---------------------------------------------------------------------- ------- - ---------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 20 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemi)lovment Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - Repaint Effective Date - 01/01/2016 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $19.24 $7.85 $0.00 $0.00 $27.09 2 55 $21.16 $7.85 $3.66 $0.00 $32.67 3 60 $23.08 $7.85 $3.99 $0.00 $34.92 4 65 $25.01 $7.85 $4.32 $0.00 $37.18 5 70 $26.93 $7.85 $14.11 $0.00 $48.89 6 75 $28.85 $7.85 $14.44 $0.00 $51.14 7 80 $30.78 $7.85 $14.77 $0.00 $53.40 8 90 $34.62 $7.85 $15.44 $0.00 $57.91 Effective Date - 07/01/2016 $31.15 $7.45 $12.65 Supplemental $51.25 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.71 $7.85 $0.00 $0.00 $27.56 2 55 $21.68 $7.85 $3.66 $0.00 $33.19 3 60 $23.65 $7.85 $3.99 $0.00 $35.49 4 65 $25.62 $7.85 $4.32 $0.00 $37.79 5 70 $27.59 $7.85 $14.11 $0.00 $49.55 6 75 $29.57 $7.85 $14.44 $0.00 $51.86 7 s0 $31.54 $7.85 $14.77 $0.00 $54.16 8 90 $35.48 $7.85 $15.44 $0.00 $58.77 ------------------------------+ (Notes: Steps are 750 hrs. _ _ _ _ _ _ _ Apprentice to Journeyworker Ratio: 1:1 PAINTER (TRAFFIC MARKINGS) LABORERS - ZONE 2 For Apprentice rates see "Apprentice- LABORER" PAINTER / TAPER (BRUSH, NEW) * * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PA7NTERSLOCAL 35 - ZONE 2 12/01/2015 $31.15 $7.45 $12.65 $0.00 $51.25 06/01/2016 $31.65 $7.45 $12.65 $0.00 $51.75 12/01/2016 $32.40 $7.45 $12.65 $0.00 $52.50 01/01/2016 $39.01 $7.85 $16.10 $0.00 $62.96 07/01/2016 $39.96 $7.85 $16.10 $0.00 $63.91 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86 ----------------------------------------------------------------------------------------------------------- - ---------------------- - --------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 21 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW Effective Date - 01/01/2016 Step percent Apprentice Base Wage Health 1 50 $19.51 $7.85 2 55 $21.46 $7.85 3 60 $23.41 $7.85 4 65 $25.36 $7.85 5 70 $27.31 $7.85 6 75 $29.26 $7.85 7 80 $31.21 $7.85 8 90 $35.11 $7.85 Effective Date - 07/01/2016 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate $0.00 $0.00 $27.36 $3.66 $0.00 $32.97 $3.99 $0.00 $35.25 $4.32 $0.00 $37.53 $14.11 $0.00 $49.27 $14.44 $0.00 $51.55 $14.77 $0.00 $53.83 $15.44 $0.00 $58.40 Supplemental Pension Unemployment Total Rate 1 50 $19.98 $7.85 $0.00 $0.00 $27.83 2 55 $21.98 $7.85 $3.66 $0.00 $33.49 3 60 $23.98 $7.85 $3.99 $0.00 $35.82 4 65 $25.97 $7.85 $4.32 $0.00 $38.14 5 70 $27.97 $7.85 $14.11 $0.00 $49.93 6 75 $29.97 $7.85 $14.44 $0.00 $52.26 7 80 $31.97 $7.85 $14.77 $0.00 $54.59 8 90 $35.96 $7.85 $15.44 $0.00 $59.25 - - - - - - - - - -- Notes: - - - - - -- - - - - - - - - - --- I Steps are 750 hrs. -._ - --------------------- Apprentice to Journeyworker Ratio:1:1 PAINTER / TAPER (BRUSH, REPAINT) 01/01/201.6 $37.07 $7.85 $16.10 $0.00 $61.02 PAINTERS LOCAL 35 - ZONE 1 07/01/2016 $38.02 $7.85 $16.10 $0.00 $61.97 01/01/2017 $38.97 $7.85 $16.10 $0.00 $62.92 - -------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 22 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date - 01/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.54 $7.85 $0.00 $0.00 $26.39 2 55 $20.39 $7.85 $3.66 $0.00 $31.90 3 60 $22.24 $7.85 $3.99 $0.00 $34.08 4 65 $24.10 $7.85 $4.32 $0.00 $36.27 5 70 $25.95 $7.85 $14.11 $0.00 $47.91 6 75 $27.80 $7.85 $14.44 $0.00 $50.09 7 80 $29.66 $7.85 $14.77 $0.00 $52.28 8 90 $33.36 $7.85 $15.44 $0.00 $56.65 Effective Date - 07/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.01 $7.85 $0.00 $0.00 $26.86 2 55 t $20.91 $7.85 $3.66 $0.00 $32.42 3 60 $22.81 $7.85 $3.99 $0.00 $34.65 4 65 $24.71 $7.85 $4.32 $0.00 $36.88 5 70 $26.61 $7.85 $14.11 $0.00 $48.57 6 75 $28.52 $7.85 $14.44 $0.00 $50.81 7 80 $30.42 $7.85 $14.77 $0.00 $53.04 8 90 $34.22 $7.85 $15.44 $0.00 $57.51 (Notes: ----- _._._. --- _._.-- ._.._ --------------+ I Steps are 750 hrs. i- I - --------------_._.._.._-- Apprentice to Jon rneywo rker Ratio: 1:1 PANEL & PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2015 $42.04 $9.80 $19.23 $0.00 $71.07 DECK) PILE DRIVER LOCAL 56 (ZONE 1) PILE DRIVER PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2015 $42.04 $9.80 $19.23 $0.00 $71.07 ------------------------------------------------------------------------------------- - ------------------------------------ - --------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 23 of 34 n Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemolovment Apprentice- PILE DRIVER -Local 56 Zone 1 Effective Date - 08/01/2015 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $21.02 $9.80 $19.23 $0.00 $50.05 2 60 $25.22 $9.80 $19.23 $0.00 $54.25 3 70 $29.43 $9.80 $19.23 $0.00 $58.46 4 75 $31.53 $9.80 $19.23 $0.00 $60.56 5 80 $33.63 $9.80 $19.23 $0.00 $62.66 6 80 $33.63 $9.80 $19.23 $0.00 $62.66 7 90 $37.84 $9.80 $19.23 $0.00 $66.87 8 90 $37.84 $9.80 $19.23 $0.00 $66.87 -_...--_.._--_._.-----__..------__._-----,----+ (Notes: percent Apprentice Base Wage Health Pension Unemployment ,___. - Apprentice to Journeyworker Ratio:1:3 ------_._..--------_,-- 40 $19.34 $9.70 .._ PIPEFITTER & STEAMFITTER PIPEF17TERS LOCAL 537 (Local 138) Apprentice- PIPEFITTER Local 537 (Local 138) 09/01/2015 $47.36 $9.70 $14.89 $0.00 $71.95 03/01/2016 $48.36 $9.70 $14.89 $0.00 $72.95 09/01/2016 $49.36 $9.70 $14.89 $0.00 $73.95 03/01/2017 $50.36 $9.70 $14.89 $0.00 $74.95 Effective Date - 09/01/2015 - Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.94 $9.70 $5.50 $0.00 $34.14 2 45 $21.31 $9.70 $14.89 $0.00 $45.90 3 60 $28.42 $9.70 $14.89 $0.00 $53.01 4 70 $33.15 $9.70 $14.89 $0.00 $57.74 5 80 $37.89 $9.70 $14.89 $0.00 $62.48 Effective Date - 03/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $19.34 $9.70 $5.50 $0.00 $34.54 2 45 $21.76 $9.70 $14.89 $0.00 $46.35 3 60 $29.02 $9.70 $14.89 $0.00 $53.61 4 70 $33.85 $9.70 $14.89 $0.00 $58.44 5 80 $38.69 $9.70 $14.89 $0.00 $63.28 --- Notes: -- - - -- -------.,_.------------- * * 1:3; 3:15; 1:10 thereafter / Steps are 1 yr. Refrig/AC Mechanic **1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14; 8:17;9:20;10:23(Max) rr __ .�. Apprentice to Journeyworker Ratio:** -------.------------ ------------------------------------------------- - ----------------------------------------------------------------------------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 24 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate PLUMBERS& GASFIT7ERSLOCAL 12 (Local 138) 40 $18.55 $10.82 $6.37 Unemployment $35.74 PIPELAYER 12/01/2015 $31.40 $7.45 $12.65 $0.00 $51.50 LABORERS - ZONE 2 09/01/2016 $48.58 $10.82 $15.14 $0.00 $74.54 5 06/01/2016 $31.90 $7.45 $12.65 $0.00 $52.00 Apprentice- PLUMBERIGASFITTER 12/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" Health Pension Unemployment Total Rate 1 35 PLUMBER 09/01/2015 $46.38 $10.82 $15.14 $0.00 $72.34 PLUMBERS& GASFIT7ERSLOCAL 12 (Local 138) 40 $18.55 $10.82 $6.37 $0.00 $35.74 3 03/01/2016 $47.53 $10.82 $15.14 $0.00 $73.49 4 09/01/2016 $48.58 $10.82 $15.14 $0.00 $74.54 5 03/01/2017 $49.58 $10.82 $15.14 $0.00 $75.54 Apprentice- PLUMBERIGASFITTER -Local 12 (Local 138) $32.15 $7.45 Supplemental $0.00 Step Effective Date - 09/01/2015 Health Pension Unemployment Total Rate 1 35 $16.64 $10.82 $5.61 $0.00 Supplemental 2 40 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 55 1 35 $16.23 $10.82 $5.63 $0.00 $32.68 2 40 $18.55 $10.82 $6.37 $0.00 $35.74 3 55 $25.51 $10.82 $8.56 $0.00 $44.89 4 65 $30.15 $10.82 $10.03 $0.00 $51.00 5 75 $34.79 $10.82 $11.48 $0.00 $57.09 Effective Date - 03/01/2016 12/01/2015 $32.15 $7.45 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.64 $10.82 $5.61 $0.00 $33.07 2 40 $19.01 $10.82 $6.36 $0.00 $36.19 3 55 $26.14 $10.82 $8.56 $0.00 $45.52 4 65 $30.89 $10.82 $10.02 $0.00 $51.73 5 75 $35.65 $10.82 $11.48 $0.00 $57.95 ------ (Notes: ---- ---------------_.--_, i Steps are 1 yr 1 1 Step 4 with lic$54.05 Step5 with lic$60.13 -- - --------------_,_.,.---- Apprentice to Journeyworker Ratio:1:5 PNEUMATIC CONTROLS (TEMP.) 09/01/2015 $47.36 $9.70 $14.89 $0.00 $71.95 PIPEFIITERSLOCAL 537 (Local 138) LABORERS - ZONE 2 03/01/2016 $48.36 $9.70 $14.89 $0.00 $72.95 09/01/2016 $49.36 $9.70 $14.89 $0.00 $73.95 03/01/2017 $50.36 $9.70 $14.89 $0.00 $74.95 For apprentice rates see "Apprentice- PIPEFITTER" or' PLUNIBER/PIPEFITTER" POWDERMAN & BLASTER PNEUMATIC DRILL/TOOL OPERATOR 12/01/2015 $31.40 $7.45 $12.65 $0.00 $51.50 LABORERS - ZONE 2 06/01/2016 $31.90 $7.45 $12.65 $0.00 $52.00 12/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" POWDERMAN & BLASTER 12/01/2015 $32.15 $7.45 $12.65 $0.00 $52.25 LABORERS - ZONE 2 06/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75 12/01/2016 $33.40 $7.45 $12.65 $0.00 $53.50 For apprentice rates see "Apprentice- LABORER" -- - - -- - ------------------------------------------------------------------------------------------------------------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 25 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 06/01/2016 $44.48 $10.00 $14.90 Unemployment $69.38 POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2015 $43.73 $10.00 $14.90 $0.00 $68.63 OPERATING ENGINEERS LOCAL 4 06/01/2016 $44.48 $10.00 $14.90 $0.00 $69.38 12/01/2016 $45.73 $10.00 $14.90 $0.00 $70.63 06/01/2017 $46.73 $10.00 $14.90 $0.00 $71.63 12/01/2017 $47.73 $10.00 $14.90 $0.00 $72.63 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (CONCRETE) OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (DEWATERING, OTHER) OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" READY -MIX CONCRETE DRIVER TEAMSTERS LOCAL 42 RECLAIMERS OPERATING ENGINEERS LOCAL 4 12/01/2015 $43.73 $10.00 $14.90 $0.00 $68.63 06/01/2016 $44.48 $10.00 $14.90 $0.00 $69.38 12/01/2016 $45.73 $10.00 $14.90 $0.00 $70.63 06/01/2017 $46.73 $10.00 $14.90 $0.00 $71.63 12/01/2017 $47.73 $10.00 $14.90 $0.00 $72.63 12/01/2015 $30.13 $10.00 $14.90 $0.00 $55.03 06/01/2016 $30.65 $10.00 $14.90 $0.00 $55.55 12/01/2016 $31.52 $10.00 $14.90 $0.00 $56.42 06/01/2017 $32.21 $10.00 $14.90 $0.00 $57.11 12/01/2017 $32.90 $10.00 $14.90 $0.00 $57.80 11/01/2015 $22.78 $8.49 $9.89 $0.00 $41.16 04/30/2016 $22.78 $8.49 $10.25 $0.00 $41.52 05/01/2016 $24.15 $8.49 $10.68 $0.00 $43.32 04/30/2017 $24.15 $8.49 $11.07 $0.00 $43.71 05/01/2017 $24.21 $8.49 $11.54 $0.00 $44.24 04/30/2018 $24.21 $8.49 $11.96 $0.00 $44.66 05/01/2018 $24.24 $8.49 $12.46 $0.00 $45.19 04/30/2019 $24.24 $8.49 $12.92 $0.00 $45.65 12/01/2015 $43.31 $10.00 $14.90 $0.00 $68.21 06/01/2016 $44.06 $10.00 $14.90 $0.00 $68.96 12/01/2016 $45.29 $10.00 $14.90 $0.00 $70.19 06/01/2017 $46.28 $10.00 $14.90 $0.00 $71.18 12/01/2017 $47.27 $10.00 $14.90 $0.00 $72.17 For apprentice rates see "Apprentice- OPERATING ENGINEERS" RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42 CARPENTERS -ZONE 2 (Residential Wood) RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81 ** The Residential Wood Frame Carpenter classification applies only to the construction of new, wood frame residences that do not exceed four stories including the basement. CARPENTERS -ZONE 2 (Residential Wood) As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. ------------------------------------------------- --------------------------------------- - ------------------------------- ------------------ Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 26 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovinent Apprentice- CARPENTER (Residential Wood Frame) -Zone 2 12/01/2015 $31.40 $7.45 $12.65 Effective Date - 05/01/2011 $51.50 LABORERS - ZONE 2 Supplemental $31.90 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $14.54 $6.34 $0.00 $0.00 $20.88 2 60 $14.54 $6.34 $6.23 $0.00 $27.11 3 65 $15.76 $6.34 $6.23 $0.00 $28.33 4 70 $16.97 $6.34 $6.23 $0.00 $29.54 5 75 $18.18 $6.34 $6.23 $0.00 $30.75 6 80 $19.39 $6.34 $6.23 $0.00 $31.96 7 85 $20.60 $6.34 $6.23 $0.00 $33.17 8 90 $21.82 $6.34 $6.23 $0.00 $34.39 - -- - - -------------------------+ Notes: - - - - - -- - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:5 ROOFER (Inc.Roofer Waterprooffig &Roofer Damproofg) 08/01/2015 $40.11 $11.00 $12.00 RIDE -ON MOTORIZED BUGGY OPERATOR 12/01/2015 $31.40 $7.45 $12.65 $0.00 $51.50 LABORERS - ZONE 2 06/01/2016 $31.90 $7.45 $12.65 $0.00 $52.00 12/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ROLLER/SPREADER/MULCHING MACHINE 12/01/2015 $43.31 $10.00 $14.90 $0.00 $68.21 OPERATING ENGINEERS LOCAL 4 06/01/2016 $44.06 $10.00 $14.90 $0.00 $68.96 12/01/2016 $45.29 $10.00 $14.90 $0.00 $70.19 06/01/2017 $46.28 s10.00 $14-90 $0.00 $71.18 12/01/2017 $47.27 $10.00 $14.90 $0.00 $72.17 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ROOFER (Inc.Roofer Waterprooffig &Roofer Damproofg) 08/01/2015 $40.11 $11.00 $12.00 $0.00 $63.11 ROOFERS LOCAL 33 02/01/2016 $40.11 $11.00 $12.90 $0.00 $64.01 -------------------------------------------------------------------------------- ----------------------------- ------------------------------ Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 27 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ROOFER - Local 33 Effective Date - 08/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.06 $11.00 $3.38 $0.00 $34.44 2 60 $24.07 $11.00 $12.00 $0.00 $47.07 3 65 $26.07 $11.00 $12.00 $0.00 $49.07 4 75 $30.08 $11.00 $12.00 $0.00 $53.08 5 85 $34.09 $11.00 $12.00 $0.00 $57.09 Effective Date - 02/01/2016 $47.81 $10.70 $21.95 Supplemental $82.74 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.06 $11.00 $3.39 $0.00 $34.45 2 60 $24.07 $11.00 $12.90 $0.00 $47.97 3 65 $26.07 $11.00 $12.90 $0.00 $49.97 4 75 $30.08 $11.00 $12.90 $0.00 $53.98 5 85 $34.09 $11.00 $12.90 $0.00 $57.99 ---------------------------------� (Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1 Step 1 is 2000 his.; Steps 2-5 are 1000 hrs. ,_- ----__._--------------_ Apprentice to Journeyworker Ratio:** ROOFER SLATE / TILE / PRECAST CONCRETE 08/01/2015 $40.36 $11.00 $12.00 $0.00 $63.36 ROOFERS LOCAL 33 02/01/2016 $40.36 $11.00 $12.90 $0.00 $64.26 For apprentice rates see "Apprentice- ROOFER" SHEETMETAL WORKER 08/01/2015 $43.31 $10.20 $21.48 $2.25 $77.24 SHEETMETAL WORKERS LOCAL 17 -A 02/01/2016 $43.31 $1.0.70 $21..95 $2.28 $78.24 08/01/2016 $44.46 $10.70 $21.95 $2.28 $79.39 02/01/2017 $45.56 $10.70 $21.95 $2.28 $80.49 08/01/2017 $46.66 $10.70 $21.95 $2.28 $81.59 02/01/2018 $47.81 $10.70 $21.95 $2.28 $82.74 .... I --------- -------------------------- ----------------- ------------ ------------------------------------------------------------------------ Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 28 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SHEET METAL WORKER -Local 17-A Effective Date - 08/01/2015 Step percent Apprentice Base Wage Health 1 40 $17.32 $10.20 2 40 $17.32 $10.20 3 45 $19.49 $10.20 4 45 $19.49 $10.20 5 50 $21.66 $10.20 6 50 $21.66 $10.20 7 60 $25.99 $10.20 8 65 $28.15 $10.20 9 75 $32.48 $10.20 10 85 $36.81 $10.20 Effective Date - 02/01/2016 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate $4.90 $0.00 $32.42 $4.90 $0.00 $32.42 $9.59 $1.18 $40.46 $9.59 $1.18 $40.46 $10.45 $1.27 $43.58 $10.70 $1.28 $43.84 $12.17 $1.45 $49.81 $13.04 $1.54. $52.93 $14.76 $1.72 $59.16 $15.98 $1.89 $64.88 Supplemental Pension Unemployment Total Rate 1 40 $17.32 $10.70 $4.90 $0.00 $32.92 2 40 $17.32 $10.70 $4.90 $0.00 $32.92 3 45 $19.49 $10.70 $9.79 $1.20 $41.18 4 45 $19.49 $10.70 $9.79 $1.20 $41.18 5 50 $21.66 $10.70 $10.65 $1.29 $44.30 6 50 $21.66 $10.70 $10.90 $1.30 $44.56 7 60 $25.99 $10.70 $12.37 $1.47 $50.53 8 65 $28.15 $10.70 $13.24 $1.56 $53.65 9 75 $32.48 $10.70 $14.97 $1.74 $59.89 10 85 $36.81 $10.70 $16.18 $1.91 $65.60 Notes: - �._.._--_e-----_-- ___.._ _.,`__.. _ - _._._ ----, Steps are 6 mos. Apprentice to Journeyworker Ratio:1:4 SIGN ERECTOR PATNTERS LOCAL 35 -ZONE 2 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93 -------------------- ------------- --------------------------------------------- - ------------------------------ - ----- - --------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 29 of 34 Classification I Effective Date Base Wage Health Pension supplemental Total Rate Unemployment Apprentice- SIGN ERECTOR -Local 35 Zone 2 Effective Date - 06/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $12.91 $7.07 $0.00 $0.00 $19.98 2 55 $14.20 $7.07 $2.45 $0.00 $23.72 3 60 $15.49 $7.07 $2.45 $0.00 $25.01 4 65 $16.78 $7.07 $2.45 $0.00 $26.30 5 70 $18.07 $7.07 $7.05 $0.00 $32.19 6 75 $19.36 $7.07 $7.05 $0.00 $33.48 7 80 $20.65 $7.07 $7.05 $0.00 $34.77 8 85 $21.94 $7.07 $7.05 $0.00 $36.06 9 90 $23.23 $7.07 $7.05 $0.00 $37.35 - - - - --- - - - Notes: -- - -- - - - - - - - - - - -- - -- I Steps are 4 mos. - - - -- - - -- - Apprentice to Journeyworker Ratio: 1: 1 - - - - - - - - - - - - - - - - - - SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2015 $31.94 $10.41 $10-08 $0.00 $52.43 TEAMSTERS JOINT COUNCIL NO 10ZONE B 06/01/2016 $32.44 $10.41 $10.08 $0.00 $52.93 08/01/2016 $32.44 $10.91 $10-08 $0.00 $53.43 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24 SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2015 $32.23 $10.41 $10.08 $0.00 $52.72 TEAMSTERS JOINT COUNCIL NO 10ZONE B 06/01/2016 $32.73 $10.41 $10-08 $0.00 $53.22 08/01/2016 $32.73 $10.91 $10-08 $0.00 $53.72 12/01/2016 $32.73 $10.91 $10.89 $0.00 $54.53 SPRINKLER FITTER 01/01/2016 $48.99 $8.67 $15.80 $0.00 $73.46 SPRINKLER FITTERS LOCAL 550 - (Section B) Zone 2 03/01/2016 $49.89 $8.67 $15.80 $0.00 $74.36 10/01/2016 $50.93 $8.67 $15.80 $0.00 $75.40 03/01/2017 $51.83 $8.67 $15.80 $0.00 $76.30 ----------- --------------- --------------------------------------- ------------------------------------------ ------------------ --------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 30 of 34 a Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice - SPRINKLER FITTER - Local SSO (Section B) Zone 2 Effective Date - 01/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $17.15 $8.67 $8.55 $0.00 $34.37 2 40 $19.60 $8.67 $8.55 $0.00 $36.82 3 45 $22.05 $8.67 $8.55 $0.00 $39.27 4 50 $24.50 $8.67 $8.55 $0.00 $41.72 5 55 $26.94 $8.67 $8.55 $0.00 $44.16 6 60 $29.39 $8.67 $8.55 $0.00 $46.61 7 65 $31.84 $8.67 $8.55 $0.00 $49.06 8 70 $34.29 $8.67 $8.55 $0.00 $51.51 9 75 $36.74 $8.67 $8.55 $0.00 $53.96 10 80 $39.19 $8.67 $8.55 $0.00 $56.41 Effective Date - 03/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $17.46 $8.67 $8.55 $0.00 $34.68 2 40 $19.96 $8.67 $8.55 $0.00 $37.18 3 45 $22.45 $8.67 $8.55 $0.00 $39.67 4 50 $24.95 $8.67 $8.55 $0.00 $42.17 5 55 $27.44 $8.67 $8.55 $0.00 $44.66 6 60 $29.93 $8.67 $8.55 $0.00 $47.15 7 65 $32.43 $8.67 $8.55 $0.00 $49.65 8 70 $34.92 $8.67 $8.55 $0.00 $52.14 9 75 $37.42 $8.67 $8.55 $0.00 $54.64 10 80 $39.91 $8.67 $8.55 $0.00 $57.13 _------------------, (Notes: Apprentice entered prior 9/30/10: 06/01/2016 $44.06 40/45/50/55/60/65/70/75/80/85 $14.90 $0.00 $68.96 12/01/2016 Steps are 850 hours $10.00 $14.90 $0.00 $70.19 06/01/2017 $46.28 $10.00 $14.90 $0.00 $71.18 Apprentice to Journeyworker Ratio:1:3 12/01/2017 $47.27 $10.00 $14.90 $0.00 STEAM BOILER OPERATOR 12/01/2015 $43.31 $10.00 $14.90 $0.00 $68.21 OPERATING ENGINEERS LOCAL 4 06/01/2016 $44.06 $10.00 $14.90 $0.00 $68.96 12/01/2016 $45.29 $10.00 $14.90 $0.00 $70.19 06/01/2017 $46.28 $10.00 $14.90 $0.00 $71.18 12/01/2017 $47.27 $10.00 $14.90 $0.00 $72.17 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 12/01/2015 $43.31 $10.00 $14.90 $0.00 $68.21 OPERATING ENGINEERS LOCAL 4 06/01/2016 $44.06 $10.00 $14.90 $0.00 $68.96 12/01/2016 $45.29 $10.00 $14.90 $0.00 $70.19 06/01/2017 $46.28 $10.00 $14.90 $0.00 $71.18 12/01/2017 $47.27 $10.00 $14.90 $0.00 $72.17 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TELECOMMUNICATION TECHNICIAN 09/01/2015 $34.25 $13.00 $14.06 $0.00 $61.31 ELECTRICIANS LOCAL 103 03/01/2016 $34.63 $13.00 $14.55 $0.00 $62.18 --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 31 of 34 Classification Effective Date Base Wage Health Apprentice- TELECOMMUNICATION TECHNICIAN - Local 103 S Pension Supplemental Total Rate Unemployment Effective Date - 09/01/2015 - Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $13.70 $13.00 $0.41 $0.00 $27.11 2 40 $13.70 $13.00 $0.41 $0.00 $27.11 3 45 $15.41 $13.00 $11.03 $0.00 $39.44 4 45 $15.41 $13.00 $11.03 $0.00 $39.44 5 50 $17.13 $13.00 $11.30 $0.00 $41.43 6 55 $18.84 $13.00 $11.58 $0.00 $43.42 7 60 $20.55 $13.00 $11.86 $0.00 $45.41 8 65 $22.26 $13.00 $12.13 $0.00 $47.39 9 70 $23.98 $13.00 $12.41 $0.00 $49.39 10 75 $25.69 $13.00 $12.68 $0.00 $51.37 Effective Date - 03/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $13.85 $13.00 $0.42 $0.00 $27.27 2 40 $13.85 $13.00 $0.42 $0.00 $27.27 3 45 $15.58 $13.00 $11.52 $0.00 $40.10 4 45 $15.58 $13.00 $11.52 $0.00 $40.10 5 50 $17.32 $13.00 $11.79 $0.00 $42.11 6 55 $19.05 $13.00 $12.06 $0.00 $44.11 7 60 $20.78 $13.00 $12.34 $0.00 $46.12 8 65 $22.51 $13.00 $12.62 $0.00 $48.13 9 70 $24.24 $13.00 $12.90 $0.00 $50.14 10 75 $25.97 $13.00 $13.17 $0.00 $52.14 Notes: --- L-- ._ Apprentice to Journeyworker Ratio: 1:1 o ---_._.._..r-_..,.._..._--_._--____ TERRAZZO FINISHERS 08/01/2015 $48.80 $10.18 $18.57 $0.00 $77.55 BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2016 $48.80 $10.18 $19.14 $0.00 $78.12 08/01/2016 $49.70 $10.18 $19.22 $0.00 $79.10 02/01/2017 $50.27 $10.18 $19.22 $0.00 $79.67 ------------------ ---------------- ----------- -------------------------------------------------------------------------- - ------------------ Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 32 of 34 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- TERRAZZO FINISHER -Local 3 Marble & Tile Effective Date - 08/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.40 $10.18 $18.57 $0.00 $53.15 2 60 $29.28 $10.18 $18.57 $0.00 $58.03 3 70 $34.16 $10.18 $18.57 $0.00 $62.91 4 80 $39.04 $10.18 $18.57 $0.00 $67.79 5 90 $43.92 $10.18 $18.57 $0.00 $72.67 Effective Date - 02/01/2016 '-- - --------- $35.42 ---------- $13.75 $0.00 $56.62 Apprentice to Journeyworker Ratio:1:3 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.40 $10.18 $19.14 $0.00 $53.72 2 60 $29.28 $10.18 $19.14 $0.00 $58.60 3 70 $34.16 $10.18 $19.14 $0.00 $63.48 4 80 $39.04 $10.18 $19.14 $0.00 $68.36 5 90 $43.92 $10.18 $19.14 $0.00 $73.24 ( --- s......_ - _..,- Notes:, _._._._-- -.------ _. -----_ I '-- - --------- $35.42 ---------- $13.75 $0.00 $56.62 Apprentice to Journeyworker Ratio:1:3 TEST BORING DRILLER 12/01/2015 $36.70 $7.45 $13.75 $0.00 $57.90 LABORERS - FOUNDATIONAND MARINE 06/01/2016 $37.45 $7.45 $13.75 $0.00 $58.65 12/01/2016 $38.45 $7.45 $13.75 $0.00 $59.65 For apprentice rates see "Apprentice- LABORER" TEST BORING DRILLER HELPER 12/01/2015 $35.42 $7.45 $13.75 $0.00 $56.62 LABORERS - FOUNDATIONAND MARINE 06/01/2016 $36.17 $7.45 $13.75 $0.00 $57.37 12/01/2016 $37.17 $7.45 $13.75 $0.00 $58.37 For apprentice rates see "Apprentice- LABORER" TEST BORING LABORER 12/01/2015 $35.30 $7.45 $13.75 $0.00 $56.50 LABORERS - FOUNDATIONAND MARINE 06/01/2016 $36.05 $7.45 $13.75 $0.00 $57.25 12/01/2016 $37.05 $7.45 $13.75 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" TRACTORS/PORTABLE STEAM GENERATORS 12/01/2015 $43.31 $10.00 $14.90 $0.00 $68.21 OPERATING ENGINEERS LOCAL 4 06/01/2016 $44.06 $10.00 $14.90 $0.00 $68.96 12/01/2016 $45.29 $10.00 $14.90 $0.00 $70.19 06/01/2017 $46.28 $10.00 $14.90 $0.00 $71.18 12/01/2017 $47.27 $10.00 $14.90 $0.00 $72.17 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2015 $32.52 $10.41 $10.08 $0.00 $53.01 TEAMSTERS JOINT CO UNCIL NO. 10 ZONE B 06/01/2016 $33.02 $10.41 $10.08 $0.00 $53.51 08/01/2016 $33.02 $10.91 $10.08 $0.00 $54.01 12/01/2016 $33.02 $10.91 $10.89 $0.00 $54.82 ---------------------------------------------------------------------------------------------------------------------------- - --------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 33 of 34 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate TUNNEL WORK - COMPRESSED AIR 12/01/2015 $47.58 $7.45 $14.15 $0.00 $69.18 LABORERS (COMPRESSED AIR) 06/01/2016 $48.33 $7.45 $14.15 $0.00 $69.93 12/01/2016 $49.33 $7.45 $14.15 $0.00 $70.93 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) 12/01/2015 $49.58 $7.45 $14.15 $0.00 $71.18 LABORERS (COMPRESSED AIR) 06/01/2016 $50.33 $7.45 $14.15 $0.00 $71.93 12/01/2016 $51.33 $7.45 $14.15 $0.00 $72.93 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - FREE AIR 12/01/2015 $39.65 $7.45 $14.15 $0.00 $61.25 LABORERS (FREE AIR TUNNEL) 06/01/2016 $40.40 $7.45 $1.4.15 $0.00 $62.00 12/01/2016 $41.40 $7.45 $14.15 $0.00 $63.00 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - FREE AIR (HAZ. WASTE) 12/01/2015 $41.65 $7.45 $14.15 $0.00 $63.25 LABORERS (FREE AIR TUNNEL) 06/01/2016 $42.40 $7.45 $14.15 $0.00 $64.00 12/01/2016 $43.40 $7.45 $14.15 $0.00 $65.00 For apprentice rates see "Apprentice- LABORER" VAC -HAUL 12/01/2015 $31.94 $10.41 $10.08 $0.00 $52.43 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2016 $32.44 $10.41 $10.08 $0.00 $52.93 08/01/2016 $32.44 $10.91 $10.08 $0.00 $53.43 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24 WAGON DRILL OPERATOR 12/01/2015 $31.40 $7.45 $12.65 $0.00 $51.50 LABORERS - ZONE 2 06/01/2016 $31.90 $7.45 $12.65 $0.00 $52.00 12/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" WASTE WATER PUMP OPERATOR 12/01/2015 $43.73 $10.00 $14.90 $0.00 $68.63 OPERATING ENGINEERS LOCAL 4 06/01/2016 $44.48 $10.00 $14.90 $0.00 $69.38 12/01/2016 $45.73 $10.00 $14.90 $0.00 $70.63 06/01/2017 $46.73 $10.00 $14.90 $0.00 $71.63 12/01/2017 $47.73 $10.00 $14.90 $0.00 $72.63 For apprentice rates see "Apprentice- OPERATING ENGINEERS" WATER METER INSTALLER 09/01/2015 $46.38 $10.82 $15.14 $0.00 $72.34 PLUMBERS & GASFITTERS LOCAL 12 (Local 138) 03/01/2016 $47.53 $10.82 $15.14 $0.00 $73.49 09/01/2016 $48.58 $10.82 $15.14 $0.00 $74.54 03/01/2017 $49.58 $10.82 $15.14 $0.00 $75.54 For apprentice rates see "Apprentice- PLUMBER/PIPEFITTER" or "PLUMBER/GASFITTER" Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L. c. 23, ss. I IE -11L. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. I IE -I 1L. All steps are six months (1000 hours.) Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof, unless otherwise specified. ** Multiple ratios are listed in the comment field. *** APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. **** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. ---------------------------------------- --------------------------------------------------------------------- - - --------- ---------------- Issue Date: 01/27/2016 Wage Request Number: 20160127-014U Page 34 of 34 Andrew W. Maylor Town Manager Mr. Andy Brewer, Ass't Secretary P.J. Keating Company 998 Reservoir Street Lunenburg, MA 01462 Dear Mr. Brewer: Town of North Andover Office of the Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 amaylor@townofnorthandover.com March 6, 2015 Telephone (978)688-9510 Fax (978)688-9556 In accordance with the provisions of the contract between the Town of North Andover and P.J. Keating Company (Contract #731), the contract and the respective unit price ($70 per ton, with price adjustment if applicable) for bituminous concrete paving is extended an additional option year (April 1, 2015 through March 31, 2016). Please provide updated insurance certificates including listing the Town of North Andover as `Additional Insured' in accordance with the contract document. The insurance certificates are to be sent to the attention of Ray Santilli, Assistant Town Manager. In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work performed under this contract. An updated prevailing wage report is enclosed. For each week work is performed, you are required to submit certified weekly payroll records. The certified weekly payroll records are to be sent to: Mr. Bruce Thibodeau Division of Public Works 384 Osgood Street North Andover, MA 01845 If you have any questions and/or concerns, please call Mr. Santilli at 978-688-9516. Sincerel , Andrew W. Maylor Town Manager cc., Ray Santilli, Assistant Town Manager Bruce Thibodeau, DPW Contract File CHARLES D. BAKER G--., KARYN E. POLITO Lt. Govemor Awarding Authority: Contract Number: Description of Work: Job Location: THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the RONALD L. WALKER, n Massachusetts General Laws, Chapter 149, Sections 26 to 27H JEANSecrelery retary ZEILER Acting Director Town of North Andover City/Town: NORTH ANDOVER Furnish and install bituminous concrete paving (which may include leveling, spill berms or top courses) for locations throughout Town Throughout Town J Information about Prevailing Wage Schedules for Awarding Authorities and Contractors • This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage Request Number" on all pages of this schedule. • An Awarding Authority must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects (bid pursuant to G.L. c. 149A), the earlier of. (a) the execution date of the GMP Amendment, or (b) the bid for the first construction scope of work must be within 90 -days of the wage schedule issuance date. • The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor, a filed sub -bidder, or any sub -contractor. • All apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Standards (DAS). Apprentice must keep his/her apprentice identification card on his/her person during all work hours on the project. An apprentice registered with DAS maybe paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. If an apprentice rate is not listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAS, the apprentice must be paid the journeyworker's rate for the trade. • The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, awarding authority must request an annual update no later than two weeks before the anniversary date, determined as the earlier of: (a) the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of construction services. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F "rental of equipment" contracts. • Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years. Each weekly payroll report must contain: the employee's name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/pw. • Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617) 626-6953. • Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor Division of the office of the Attorney General at (617) 727-3465. • Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties. Issue Date: 03/05/2015 Wage Request Number: 20150305-061 4 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Construction (2 AXLE) DRIVER - EQUIPMENT 12/01/2014 $31.30 $9.91 $9.33 $0.00 $50.54 TEAMST ERS JOINT COUNCIL NO. 10 ZONE B 06/01/2015 $31.65 $9.91 $9.33 $0.00 $50.89 08/01/2015 $31.65 $10.41 $9.33 $0.00 $51.39 12/01/2015 $31.65 $10.41 $10.08 $0.00 $52.14 06/01/2016 $32.15 $10.41 $10.08 $0.00 $52.64 08/01/2016 $32.15 $10.91 $10.08 $0.00 $53.14 12/01/2016 $32.15 $10.91 $10.89 $0.00 $53.95 (3 AXLE) DRIVER - EQUIPMENT 12/01/2014 $31.37 $9.91 $9.33 $0.00 $50.61 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2015 $31.72 $9.91 $9.33 $0.00 $50.96 08/01/2015 $31.72 $10.41 $9.33 $0.00 $51.46 12/01/2015 $31.72 $10.41 $10.08 $0.00 $52.21 06/01/2016 $32.22 $10.41 $10.08 $0.00 $52.71 08/01/2016 $32.22 $10.91 $10.08 $0.00 $53.21 12/01/2016 $32.22 $10.91 $10.89 $0.00 $54.02 (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2014 $31.49 $9.91 $9.33 $0.00 $50.73 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2015 $31.84 $9.91 $9.33 $0.00 $51.08 08/01/2015 $31.84 $10.41 $9.33 $0.00 $51.58 12/01/2015 $31.84 $10.41 $10.08 $0.00 $52.33 06/01/2016 $32.34 $10.41 $10.08 $0.00 $52.83 08/01/2016 $32.34 $10.91 $10.08 $0.00 $53.33 12/01/2016 $32.34 $10.91 $10.89 $0.00 $54.14 ADS/SUBMERSIBLE PILOT 08/01/2014 $87.36 $9.80 $18.17 $0.00 $115.33 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2015 $90.51 $9.80 $18.17 $0.00 $118.48 AIR TRACK OPERATOR 12/01/2014 $31.40 $7.30 $12.30 $0.00 $51.00 LABORERS-7.ONE2 06/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 12/01/2015 $32.40 $7.30 $12.30 $0.00 $52.00 06/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 12/01/2016 $33.65 $7.30 $12.30 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 12/01/2014 $32.48 $10.40 $5.95 $0.00 $48.83 HEAT & FROST INSULATORS LOCAL 6 (BOSTON) 06/01/2015 $33.43 $10.40 $5.95 $0.00 $49.78 12/01/2015 $34.38 $10.40 $5.95 $0.00 $50.73 ASPHALT RAKER 12/01/2014 $30.90 $7.30 $12.30 $0.00 $50.50 LABORERS - ZONE: 2 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30.. $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2014 $42.39 $10.00 $14.30 $0.00 $66.69 OPERA77NG ENGINEERS LOCAL 4 06/01/2015 $43.14 $10.00 $14430 $0.00 $67.44 12/01/2015 $44.39 $10.00 $14.30 $0.00 $68.69 06/01/2016 $45.14 $10.00 $14.30 $0.00 $69.44 12/01/2016 $46.39 $10.00 $14.30 $0.00 $70.69 06/01/2017 $47.39 $10.00 $14.30 $0.00 $71.69 12/01/2017 $48.39 $10.00 $14.30 $0.00 $72.69 ---------------------------------------------------------------------- Issue Date: 03/05/2015 Wage Request Number: -- ----- 20150305-061 ---- ------ - ---------------------------------- - Page ------ 2 of 38 Classification For apprentice rates see "Apprentice- OPERATING ENGINEERS" Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment BACKHOE/FRONT-END LOADER 12/01/2014 $42.39 $10.00 $14.30 $0.00 $66.69 OPERATING ENGINEERS LOCAL 4 2 65 $24.51 $6.97 $11.18 06/01/2015 $31.90 $7.30 06/01/2015 $43.14 $10.00 $14.30 $0.00 $67.44 $12.30 12/01/2015 $44.39 $10.00 $14.30 $0.00 $68.69 $0.00 06/01/2016 $45.14 $10.00 $14.30 $0.00 $69.44 $53.25 12/01/2016 $46.39 $10.00 $14.30 $0.00 $70.69 $6.97 06/01/2017 $47.39 $10.00 $14.30 $0.00 $71.69 $33.93 12/01/2017 $48.39 $10.00 $14.30 $0.00 $72.69 For apprentice rates see "Apprentice- OPERATING ENGINEERS" $35.82 $6.97 $11.18 $0.00 $53.97 BARCO-TYPE JUMPING TAMPER 12/01/2014 $30.90 $7.30 $12.30 $0.00 $50.50 LABORERS - ZONE' 2 Apprentice to Journeyworker Ratio:1:5 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 $18.50 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 $49.86 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" $50.43 $10.18 $18.57 $0.00 $79.18 BLOCK PAVER, RAMMER / CURB SETTER 12/01/2014 $31.40 $7.30 $12.30 $0.00 $51.00 LABORERS - ZONE 2 2 65 $24.51 $6.97 $11.18 06/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 12/01/2015 $32.40 $7.30 $12.30 $0.00 $52.00 06/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 12/01/2016 $33.65 $7.30 $12.30 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" $48.31 6 85 $32.05 BOILER MAKER BOILERMAKERS LOCAL 29 01/01/2010 $37.70 $6.97 $11.18 $0.00 $55.85 Apprentice - BOILERMAKER - Local 29 Effective Date - 01/01/2010 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $24.51 $6.97 $11.18 $0.00 $42.66 2 65 $24.51 $6.97 $11.18 $0.00 $42.66 3 70 $26.39 $6.97 $11.18 $0.00 $44.54 4 75 $28.28 $6.97 $11.18 $0.00 $46.43 5 80 $30.16 $6.97 $11.18 $0.00 $48.31 6 85 $32.05 $6.97 $11.18 $0.00 $50.20 7 90 $33.93 $6.97 $11.18 $0.00 $52.08 8 95 $35.82 $6.97 $11.18 $0.00 $53.97 (Notes: ^----- ___________-^- ______---_-- _.__ _-__- _.... - - i Apprentice to Journeyworker Ratio:1:5 BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 02/01/2015 $48.96 $10.18 $18.50 $0.00 $77.64 WATERPROOFING) BItICK1,AYERSLOCAL 3 (LYNN) 08/01/2015 $49.86 $10.18 $18.57 $0.00 $78.61 02/01/2016 $50.43 $10.18 $18.57 $0.00 $79.18 08/01/2016 $51.33 $10.18 $18.65 $0.00 $80.16 02/01/2017 $51.90 $10.18 $18.65 $0.00 $80.73 -------------------- -- - - - -------------------------------------------------------------------------------------------------------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 3 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- BRICK/PLASTER/CEMENT MASON -Local 3 Lynn Effective Date - 02/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.48 $10.18 $18.50 $0.00 $53.16 2 60 $29.38 $10.18 $18.50 $0.00. $58.06 3 70 $34.27 $10.18 $18.50 $0.00 $62.95 4 80 $39.17 $10.18 $18.50 $0.00 $67.85 5 90 $44.06 $10.18 $18.50 $0.00 $72.74 Effective Date - 08/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.93 $10.18 $18.57 $0.00 $53.68 2 60 $29.92 $10.18 $18.57 $0.00 $58.67 3 .70 $34.90 $10.18 $18.57 $0.00 $63.65 4 80 $39.89 $10.18 $18.57 $0.00 $68.64 5 90 $44.87 $10.18 $18.57 $0.00 $73.62 Notes: f 1 Apprentice to Journeyworker Ratio:1:5 BULLDOZER/GRADER/SCRAPER 12/01/2014 $41.99 $10.00 $14.30 $0.00 $66.29 OPERATING ENGINEERS LOCAL 4 06/01/2015 $42.73 $10.00 $14.30 $0.00 $67.03 12/01/2015 $43.97 $10.00 $14.30 $0.00 $68.27 06/01/2016 $44.72 $10.00 $14.30 $0.00 $69.02 12/01/2016 $45.95 $10.00 $14.30 $0.00 $70.25 06/01/2017 $46.94 $10.00 $14.30 $0.00 $71.24 12/01/2017 $47.93 $10.00 $14.30 $0.00 $72.23 For apprentice rates see "Apprentice- OPERATING ENGINEERS" CAISSON & UNDERPINNING BOTTOM MAN 12/01/2014 $35.70 $7.30 $13.15 $0.00 $56.15 I,ABORL'RS- FOUNDATIONAND MARINE 06/01/2015 $36.45 $7.30 $13.15 $0.00 $56.90 12/01/2015 $37.20 $7.30 $13.15 $0.00 $57.65 06/01/2016 $37.95 $7.30 $13.15 $0.00 $58.40 12/01/2016 $38.95 $7.30 $13.15 $0.00 $59.40 For apprentice rates see "Apprentice- LABORER" CAISSON & UNDERPINNING LABORER 12/01/2014 $34.55 $7.30 $13.15 $0.00 $55.00 LABORERS - FOUNDATIONAND MARINE 06/01/201.5 $35.30 $7.30 $13.15 $0.00 $55.75 12/01/2015 $36.05 $7.30 $13.15 $0.00 $56.50 06/01/2016. $36.80 $7.30 $13.15 $0.00 $57.25 12/01/2016 $37.80 $7.30 $13.15 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" ---------------- -- ------------ ----------------- --- ------------- --- - -- -- -- -- -- -- - ----- -- - --- -- ---------------------------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 4 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment CAISSON & UNDERPINNING TOP MAN 12/01/2014 $34.55 $7.30 $13.15 $0.00 $55.00 LABORERS - FOUNDATIONAND MARINE 06/01/2015 $35.30 $7.30 $13.15 $0.00 $55.75 12/01/2015 $36.05 $7.30 $13.15 $0.00 $56.50 06/01/2016 $36.80 $7.30 $13.15 $0.00 $57.25 12/01/2016 $37.80 $7.30 $13.15 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" CARBIDE CORE DRILL OPERATOR 12/01/2014 $30.90 $7.30 $12.30 $0.00 $50.50 LABORERS -7_ONE2 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" CARPENTER 03/01/2015 $35.75 $9.80 $16.48 $0.00 $62.03 CARPENTERS -ZONE 2 (Eastern Massachusetts) Apprentice renti e - CARPENTER - Zone 2 Eastern MA Effective Date - 03/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.88 $9.80 $1.63 $0.00 $29.31 2 60 $21.45 $9.80 $1.63 $0.00 $32.88 3 70 $25.03 $9.80 $11.59 $0.00 $46.42 4 75 $26.81 $9.80 $11.59 $0.00 $48.20 5 80 $28.60 $9.80 $13.22 $0.00 $51.62 6 80 $28.60 $9.80 $13.22 $0.00 $51.62 7 90 $32.18 $9.80 $14.85 $0.00 $56.83 8 90 $32.18 $9.80 $14.85 $0.00 $56.83 - ---- --- - _ - - - Notes: - e - - - ---- - - _.__ ____ - _ _.- - - - - ...... __-....... - - -- ___. - __-_ Apprentice to Journeyworker Ratio:1:5 - - - - - - - - ____ - - - - __._ - ...... CEMENT MASONRY/PLASTERING 01/01/2015 $44.90 $10.90 $18.71 $1.30 $75.81 BRICKLAYERS LOCAL 3(LYNN) 07/01/2015 $45.82 $10.90 $18.71 $1.30 $76.73 01/01/2016 $46.44 $10.90 $18.71 $1.30 $77.35 -------- ----------------------- ----------------------------- - -------- ---------------------------------------------------------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 5 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- CEMENT MASONRY/PLASTERING -Eastern Mass (Lynn) Effective Date - 01/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.45 $10.90 $12.21 $1.30 $46.86 2 60 $26.94 $10.90 $13.71 $1.30 $52.85 3 65 $29.19 $10.90 $14.71 $1.30 $56.10 4 70 $31.43 $10.90 $15.71 $1.30 $59.34 5 75 $33.68 $10.90 $16.71 $1.30 $62.59 6 80 $35.92 $10.90 $17.71 $1.30 $65.83 7 90 $40.41 $10.90 $18.71 $1.30 $71.32 Effective Date - 07/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.91 $10.90 $12.21 $1.30 $47.32 2 60 $27.49 $10.90 $13.71 $1.30 $53.40 3 65 $29.78 $10.90 $14.71 $1.30 $56.69 4 70 $32.07 $10.90 $15.71 $1.30 $59.98 5 75 $34.37 $10.90 $16.71 $1.30 $63.28 6 80 $36.66 $10.90 $17.71 $1.30 $66.57 7 90 $41.24 $10.90 $18.71 $1.30 $72.15 _ - - - - - ®____ - - (Notes: ___...-......._ r.._......_ _.._....._. - - - _ __.. _ - - _.__ ..._, Steps 3,4 are 500 Ins. All other steps are 1,000 hrs. Apprentice to Journeyworker Ratio:1:3 CHAIN SAW OPERATOR 12/01/2014 $30.90 $7.30 $12.30 $0.00 $50.50 LABORERS - ZONE 2 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES 12/01/2014 $43.39 $10.00 $14.30 $0.00 $67.69 OPERATING ENGINEERS LOCAL 4 06/01/2015 $44.14 $10.00 $14.30 $0.00 $68.44 12/01/2015 $45.39 $10.00 $14.30 $0.00 $69.69 06/01/2016 $46.14 $10.00 $14.30 $0.00 $70.44 12/01/2016 $47.39 $10.00 $14.30 $0.00 $71.69 06/01/2017 $48.39 $10.00 $14.30 $0.00 $72.69 12/01/2017 $49.39 $10.00 $14.30 $0.00 $73.69 For apprentice rates see "Apprentice- OPERATING ENGINEERS" -------------------------- -------- ---------------------------------------------------------------- ------------------------------------ Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 6 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment COMPRESSOR OPERATOR 12/01/2014 $29.40 $10.00 $14.30 $0.00 $53.70 OPERATING ENGINEERS LOCAL 4 06/01/2015 $29.92 $10.00 $14.30 $0.00 $54.22 12/01/2015 $30.79 $10.00 $14.30 $0.00 $55.09 06/01/2016 $31.31 $10.00 $14.30 $0.00 $55.61 12/01/2016 $32.18 $10.00 $14.30 $0.00 $56.48 06/01/2017 $32.87 $10.00 $14.30 $0.00 $57.17 12/01/2017 $33.56 $10.00 $14.30 $0.00 $57.86 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DELEADER (BRIDGE) 01/01/2015 $47.66 $7.85 $16.10 $0.00 $71.61 PAINTERS LOCAL 35 - 70NE 2 07/01/2015 $48.56 $7.85 $16.10 $0.00 $72.51 01/01/2016 $49.51 $7.85 $16.10 $0.00 $73.46 07/01/2016 $50.46 $7.85 $16.10 $0.00 $74.41 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective -Date - 01/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.83 $7.85 $0.00 $0.00 $31.68 2 55 $26.21 $7.85 $3.66 $0.00 $37.72 3 60 $28.60 $7.85 $3.99 $0.00 $40.44 4 65 $30.98 $7.85 $4.32 $0.00 $43.15 5 70 $33.36 $7.85 $14.11 $0.00 $55.32 6 75 $35.75 $7.85 $14.44 $0.00 $58.04 7 80 $38.13 $7.85 $14.77 $0.00 $60.75 8 90 $42.89 $7.85 $15.44 $0.00 $66.18 Effective Date - 07/01/2015 Supplemental. Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.28 $7.85 $0.00 $0.00 $32.13 2 55 $26.71 $7.85 $3.66 $0.00 $38.22 3 60 $29.14 $7.85 $3.99 $0.00 $40.98 4 65 $31.56 $7.85 $4.32 $0.00 $43.73 5 70 $33.99 $7.85 $14.11 $0.00 $55.95 6 75 $36.42 $7.85 $14.44 $0.00 $58.71 7 80 $38.85 $7.85 $14.77 $0.00 $61.47 8 90 $43.70 $7.85 $15.44 $0.00 $66.99 (Notes: Steps are 750 hrs. ApprenTice to Journeyworker Ratioa a DEMO: ADZEMAN 12/01/2014 $34.75 $7.30 $12.95 $0.00 $55.00 LABORERS - 7.ONE 1 06/01/2015 $35.50 $7.30 $12.95 $0.00 $55.75 12/01/2015 $36.25 $7.30 $12.95 $0.00 $56.50 For apprentice rates see "Apprentice- LABORER" ------------------------------------------------------------------------------------------ Issue Date: 03/05/2015 Wage Request Number: 20150305-061 ------------- ------------------------------------ Page 7 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate LABORERS - 70NE 2 Unemployment DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2014 $35.75 $7.30 $12.95 $0.00 $56.00 LABORERS -7.ONE2 12/01/2015 $37.00 $7.30 $12.95 $0.00 $57.25 For apprentice rates see "Apprentice- LABORER" 06/01/2015 $36.50 $7.30 $12.95 $0.00 $56.75 DEMO: CONCRETE CUTTER/SAWYER 12/01/2015 $37.25 $7.30 $12.95 $0.00 $57.50 For apprentice rates see "Apprentice- LABORER" DEMO: BURNERS 12/01/2014 $35.50 $7.30 $12.95 $0.00 $55.75 LABORERS - 70NE 2 06/01/2015 $36.25 $7.30 $12.95 $0.00 $56.50 12/01/2015 $37.00 $7.30 $12.95 $0.00 $57.25 For apprentice rates see "Apprentice- LABORER" DEMO: CONCRETE CUTTER/SAWYER 12/01/2014 $35.75 $7.30 $12.95 $0.00 $56.00 LABORERS - 70NE 2 06/01/2015 $36.50 $7.30 $12.95 $0.00 $56.75 12/01/2015 $37.25 $7.30 $12.95 $0.00 $57.50 For apprentice rates see "Apprentice- LABORER" DEMO: JACKHAMMER OPERATOR 12/01/2014 $35.50 $7.30 $12.95 $0.00 $55.75 LABORERS -7_ONE2 06/01/2015 $36.25 $7.30 $12.95 $0.00 $56.50 12/01/2015 $37.00 $7.30 $12.95 $0.00 $57.25 For apprentice rates see "Apprentice- LABORER" DEMO: WRECKING LABORER 12/01/2014 $34.75 $7.30 $12.95 $0.00 $55.00 LABORERS -7ONT:2 06/01/2015 $35.50 $7.30 $12.95 $0.00 $55.75 12/01/2015 $36.25 $7.30 $12.95 $0.00 $56.50 For apprentice rates see "Apprentice- LABORER" DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2014 $41.99 $10.00 $14.30 $0.00 $66.29 OPERATING ENGINEERS LOCAL 4 06/01/2015 $42.73 $10.00 $14.30 $0.00 $67.03 12/01/2015 $43.97 $10.00 $14.30 $0.00 $68.27 06/01/2016 $44.72 $10.00 $14.30 $0.00 $69.02 12/01/2016 $45.95 $10.00 $14.30 $0.00 $70.25 06/01/2017 $46.94 $10.00 $14.30 $0.00 $71.24 12/01/2017 $47.93 $10.00 $14.30 $0.00 $72.23 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DIVER 08/01/2014 $58.24. $9.80 $18.17 $0.00 $86.21 PILE DRIVER LOCAL 56 (70NE 1) .08/01/2015 $60.34 $9.80 $18.17 $0.00 $88.31 DIVER TENDER 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 PILE DRI VER LOCAL 56 (ZONE 1) 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 DIVER TENDER (EFFLUENT) 08/01/2014 $62.40 $9.80 $18.17 $0.00 $90.37 PILE DRIVER /,OCAI, 56 (70NE 1) 08/01/2015 $64.65 $9.80 $18.17 $0.00 $92.62 DIVER/SLURRY (EFFLUENT) 08/01/2014 $87.36 $9.80 $18.17 $0.00 $115.33 P»r: DRIVER LOCAL 56 (70NE I) 08/01/2015 $90.51 $9.80 $18.17 $0.00 $118.48 DRAWBRIDGE OPERATOR (Construction) 03/01/2015 $45.17 $13.00 $15.40 $0.00 $73.57 ELECTRICIANS LOCAL 103 09/01/2015 $46.13 $13.00 $15.43 $0.00 $74.56 03/01/2016 $47.08 $13.00 $15.46 $0.00 $75.54 For apprentice rates see "Apprentice- ELECTRICIAN" ELECTRICIAN 03/01/2015 $45.17 $13.00 $15.40 $0.00 $73.57 ELECTRICIANS LOCAL 103 09/01/2015 $46.13 $13.00 $15.43 $0.00 $74.56 03/01/2016 $47.08 $13.00 $15.46 $0.00 $75.54 ------------------------------------------------------ - - ------.-..-..---------------------------------- - - - - -- ................ Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 8 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELECTRICIAN- Local 103 Effective Date - 03/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.07 $13.00 $0.54 $0.00 $31.61 2 40 $18.07 $13.00 $0.54 $0.00 $31.61 3 45 $20.33 $13.00 $11.64 $0.00 $44.97 4 45 $20.33 $13.00 $11.64 $0.00 $44.97 5 50 $22.59 $13.00 $11.98 $0.00 $47.57 6 55 $24.84 $13.00 $12.33 $0.00 $50.17 7 60 $27.10 $13.00 $12.66 $0.00 $52.76 8 - 65 $29.36 $13.00 $13.01 $0.00 $55.37 9 70 $31.62 $13.00 $13.35 $0.00 $57.97 10 75 $33.88 $13.00 $13.70 $0.00 $60.58 Effective Date - 09/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.45 $13.00 $0.55 $0.00 $32.00 2 40 $18.45 $13.00 $0.55 $0.00 $32.00 3 45 $20.76 $13.00 $11.65 $0.00 $45.41 4 45 $20.76 $13.00 $11.65 $0.00 $45.41 5 50 $23.07 $13.00 $11.99 $0.00 $48.06 6 55 $25.37 $13.00 $12.34 $0.00 $50.71 7 60 $27.68 $13.00 $12.68 $0.00 $53.36 8 65 $29.98 $13.00 $13.03 $0.00 $56.01 9 70 $32.29 $13.00 $13.37 $0.00 $58.66 10 75 $34.60 $13.00 $13.72 $0.00 $61.32 _ - ..-. - ____ - - - - - - Notes:: - _.,,_ .._.._..._..,. - - - - - - - -.......- - - g App Prior 1/1/03;30/35/40/45/50/55/65/70/75/80 Apprentice to Journeyworker Ratio:2:3*** ELEVATOR CONSTRUCTOR 01/01/2012 $52.45 $8.78 $6.96 $0.00 $68.19 ELEVATOR CONSTRUCTORS LOCAL 4 -----------------------------------------------------------------I------------------------------------------------------------------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 9 of 38 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate Apprentice- ELEVATOR CONSTRUCTOR - Local 4 11/01/2014 $39.59 $10.00 $14.18 Effective Date - 01/01/2012 $63.77 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.23 $8.78 $0.00 $0.00 $35.01 2 55 $28.85 $8.78 $6.96 $0.00 $44.59 11/01/2015 3 65 $34.09 $8.78 $6.96 $0.00 $49.83 4 70 $36.72 $8.78 $6.96 $0.00 $52.46 5 80 $41.96 $8.78 $6.96 $0.00 $57.70 11/01/2016 - - - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - Steps 1-2 are 6 mos.; Steps 3-5 are I year 05/01/2017 $43.26 $10.00 - - - - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:1 - - - - - - - - - - - - - - 11/01/2017 ELEVATOR CONSTRUCTOR HELPER 01/01/2012 $38.59 $8.78 $6.96 $0.00 $0.00 $54.33 ELEVATOR CONSTRUCTORS LOCAL 4 05/01/2018 $44.70 $10.00 For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR" $0.00 $68.88 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FENCE & GUARD RAIL ERECTOR 12/01/2014 $30.90 $7.30 $12.30 $0.00 $50.50 LABORERS - ZONE 2 FIELD ENGYARTY CHIEF-BLDG,SITE,HVY/HWY 11/01/2014 $41.02 $10.00 $14.18 06/01/2015 $31.40 $7.30 $12.30 $0.00 OPERATING ENGINEERS LOCAL 4 $51.00 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $10.00 $52.00 $14.18 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" $10.00 $14.18 $0.00 FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2014 $39.59 $10.00 $14.18 $0.00 $63.77 OPERATING ENGINEERS LOCAL 4 05/01/2015 $40.32 $10.00 $14.18 $0.00 $64.50 11/01/2015 $40.90 $10.00 $14.18 $0.00 $65.08 05/01/2016 $41.79 $10.00 $14.18 $0.00 $65.97 11/01/2016 $42.38 $10.00 $14.18 $0.00 $66.56 05/01/2017 $43.26 $10.00 $14.18 $0.00 $67.44 11/01/2017 $43.99 $10.00 $14.18 $0.00 $68.17 05/01/2018 $44.70 $10.00 $14.18 $0.00 $68.88 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENGYARTY CHIEF-BLDG,SITE,HVY/HWY 11/01/2014 $41.02 $10.00 $14.18 $0.00 $65.20 OPERATING ENGINEERS LOCAL 4 05/01/2015 $41.75 $10.00 $14.18 $0.00 $65.93 11/01/2015 $42.34 $10.00 $14.18 $0.00 $66.52 05/01/2016 $43.23 $10.00 $14.18 $0.00 $67.41 11/01/2016 $43.83 $10.00 $14.18 $0.00 $68.01 05/01/2017 $44.72, $10.00 $14.18 $0.00 $68.90 11/01/2017 $45.45 $10.00 $14.18 $0.00 $69.63 05/01/2018 $46.17 $10.00 $14.18 $0.00 $70.35 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ----- ------------- ---------- --------------- ----------------- ----------------------------------------------- I --------- -- ......----- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 10 of 38 Classification FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" Effective Date Base Wage Health Pension Supplemental Total Rate $73.57 ELECTRICIANS LOCAL 103 Unemployment 11/01/2014 $21.35 $10.00 $14.18 $0.00 $45.53 05/01/2015 $21.78 $10.00 $14.18 $0.00 $45.96 11/01/2015 $22.12 $10.00 $14.18 $0.00 $46.30 05/01/2016 $22.64 $10.00 $14.18 $0.00 $46.82 11/01/2016 $22.99 $10.00 $14.18 $0.00 $47.17 05/01/2017 $23.52 $10.00 $14.18 $0.00 $47.70 11/01/2017 $23.94 $10.00 $14.18 $0.00 $48.12 05/01/2018 $24.37 $10.00 $14.18 $0.00 $48.55 FIRE ALARM INSTALLER 03/01/2015 $45.17 $13.00 $15.40 $0.00 $73.57 ELECTRICIANS LOCAL 103 09/01/2015 $46.13 $13.00 $15.43 $0.00 $74.56 03/01/2016 $47.08 $13.00 $15.46 $0.00 $75.54 For apprentice rates see "Apprentice- ELECTRICIAN' FIRE ALARM REPAIR / MAINTENANCE 03/01/2015 $33.88 $13.00 $13.70 $0.00 $60.58 /COMMISSIONINGEiECmcmNs LOCAL 103 09/01/2015 $34.60 $13.00 $13.72 $0.00 $61.32 03/01/2016 $35.31 $13.00 $13.74 $0.00 $62.05 For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN' FIREMAN (ASST. ENGINEER) 12/01/2014 $35.33 $10.00 $14.30 $0.00 $59.63. OPERATING ENGINEERS LOCAL 4 06/01/2015 $35.95 $10.00 $14.30 $0.00 $60.25 12/01/2015 $37.00 $10.00 $14.30 $0.00 $61.30 06/01/2016 $37.62 $10.00 $14.30 $0.00 $61.92 12/01/2016 $38.66 $10.00 $14.30 $0.00 $62.96 06/01/2017 $39.50 $10.00 $14.30 $0.00 $63.80 12/01/2017 $40.33 $10.00 $14.30 $0.00 $64.63 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FLAGGER & SIGNALER 12/01/2014 $20.50 $7.30 $12.30 $0.00 $40.10 LABORERS - ZONE 2 06/01/2015 $20.50 $7.30 $12.30 $0.00 $40.10 12/01/2015 $20.50 $7.30 $12.30 $0.00 $40.10 06/01/2016 $20.50 $7.30 $12.30 $0.00 $40.10 12/01/2016 $20.50 $7.30 $12.30 $0.00 $40.10 For apprentice rates see "Apprentice- LABORER" FLOORCOVERER 09/01/2014 $40.40 $9.80 $17.21 $0.00 $67.41 FLOORCOVERERS LOCAL 2168 TONE I -------- ------------------- -------------- ----- ---------------------------------------------------------------- ----------------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page l l of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- FLOORCOVERER -Local 2168 Zone 1 $29.40 $10.00 $14.30 $0.00 $53.70 OPERATING ENGINEERS LOCAL 4 06/01/2015 $29.92 $10.00 Effective Date - 09/01/2014 $0.00 $54.22 12/01/2015 $30.79 Supplemental $14.30 $0.00 $55.09 Step percent Apprentice Base Wage Health $14.30 Pension Unemployment Total Rate $32.18 1 50 $20.20 $9.80 $56.48 $1.79 $0.00 $10.00 $14.30 $31.79 $57.17 2 55 $22.22 $9.80 $10.00 $14.30 $1.79 $0.00 For apprentice rates see "Apprentice- OPERATING ENGINEERS" $33.81 3 60 $24.24 $9.80 GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR 01/01/2015 $11.84 $0.00 $16.10 $0.00 $45.88 SYSTEMS) 4 65 $26.26 $9.80 $16.10 $0.00 $11.84 $0.00 $47.90 5 70 $28.28 $9.80 01/01/2016 $39.01 $13.63 $0.00 $0.00 $62.96 $51.71 07/01/2016 6 75 $30.30 $9.80 $0.00 $63.91 $13.63 $0.00 $40.91 $7.85 $53.73 $0.00 7 80 $32.32 $9.80 $15.42 $0.00 $57.54 8 85 $34.34 $9.80 $15.42 $0.00 $59.56 . ---_........__._-.-.,.. (Notes: -.__-----_._._.__--._.._---®--s-_.,, Steps are 750 hrs. - - _... ____ - - ___. ___..-..... - - ____ - - ____ Apprentice to Journeyworker Ratio: 1:1 - ._-. __._ ____ _.-. - - - _.._ - _ FORK LIFT/CHERRY PICKER 12/01/2014 $42.39 $10.00 $14.30 $0.00 $66.69 OPERAHNG ENGINEERS LOCAL 4 06/01/2015 $43.14 $10.00 $14.30 $0.00 $67.44 12/01/2015 $44.39 $10.00 $14.30 $0.00 $68.69 06/01/2016 $45.14 $10.00 $14.30 $0.00 $69.44 12/01/2016 $46.39 $10.00 $14.30 $0.00 $70.69 06/01/2017 $47.39 $10.00 $14.30 $0.00 $71.69 12/01/2017 $48.39 $10.00 $14.30 $0.00 $72.69 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GENERATORILIGHTING PLANT/HEATERS 12/01/2014 $29.40 $10.00 $14.30 $0.00 $53.70 OPERATING ENGINEERS LOCAL 4 06/01/2015 $29.92 $10.00 $14.30 $0.00 $54.22 12/01/2015 $30.79 $10.00 $14.30 $0.00 $55.09 06/01/2016 $31.31 $10.00 $14.30 $0.00 $55.61 12/01/2016 $32.18 $10.00 $14.30 $0.00 $56.48 06/01/2017 $32.87 $10.00 $14.30 $0.00 $57.17 12/01/2017 $33.56 $10.00 $14.30 $0.00 $57.86 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR 01/01/2015 $37.16 $7.85 $16.10 $0.00 $61.11 SYSTEMS) 07/01/2015 $38.06 - $7.85 $16.10 $0.00 $62.01 GLAMRSLOCAL 35(7,ONE2) 01/01/2016 $39.01 $7.85 $16.10 $0.00 $62.96 07/01/2016 $39.96 $7.85 $16.10 $0.00 $63.91 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86 -------------------------------------------- - - ----- ------------------------------------------------------------------------------------ Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 12 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - GLAZIER - Local 35 Zone 2 Effective Date - 01/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.58 $7.85 $0.00 $0.00 $26.43 2 55 $20.44 $7.85 $3.66 $0.00 $31.95 3 60 $22.30 $7.85 $3.99 $0.00 $34.14 4 65 $24.15 $7.85 $4.32 $0.00 $36.32 5 70 $26.01 $7.85 $14.11 $0.00 $47.97 6 75 $27.87 $7.85 $14.44 $0.00 $50.16 7 80 $29.73 $7.85 $14.77 $0.00 $52.35 8 90 $33.44 $7.85 $15.44 $0.00 $56.73 Effective Date - 07/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.03 $7.85 $0.00 $0.00 $26.88 2 55 $20.93 $7.85 $3.66 $0.00 $32.44 3 60 $22.84 $7.85 $3.99 $0.00 $34.68 4 65 $24.74 $7.85 $4.32 $0.00 $36.91 5 70 $26.64 $7.85 $14.11 $0.00 $48.60 6 75 $28.55 $7.85 $14.44 $0.00 $50.84 7 80 $30.45 $7.85 $14.77 $0.00 $53.07 8 90. $34.25 $7.85 $15.44 $0.00 $57.54 ------®---------------.-------_._..-- (Notes: Steps are 750 hrs. ---...------------..®..._ Apprentice to Journeyworker Ratio:I:1 -------- HOISTING ENGINEER/CRANES/GRADALLS 12/01/2014 $42.39 $10.00 $14.30 $0.00 $66.69 OPERATING ENGINEERS LOCAL 4 06/01/2015 $43.14 $10.00 $14.30 $0.00 $67.44 12/01/2015 $44.39 $10.00 $14.30 $0.00 $68.69 06/01/2016 $45.14 $10.00 $14.30 $0.00 $69.44 12/01/2016 $46.39 $10.00 $14.30 $0.00 $70.69 06/01/2017 $47.39 $10.00 $14.30 $0.00 $71.69 12/01/2017 $48.39 $10.00 $14.30 $0.00 $72.69 ---------------------- ---------------------------- ---------------- ---- - -------------------------------------------------- .. Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 13 of 38 Classification $43.28 Effective Date Base Wage Health Pension Supplemental Total Rate $44.28 $10.20 $20.54 $2.22 $77.24 02/01/2016 $45.28 Unemplovment $20.54 Apprentice- OPERATING ENGINEERS -Local 4 $46.43 $10.20 $20.54 $2.22 $79.39 02/01/2017 $47.53 Effective Date - 12/01/2014 $2.22 $80.49 08/01/2017 $48.63 $10.20 Supplemental $2.22 $81.59 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $23.31 $10.00 $0.00 $0.00 $33.31 2 60 $25.43 $10.00 $14.30 $0.00 $49.73 3 65 $27.55 $10.00 $14.30 $0.00 $51.85 4 70 $29.67 $10.00 $14.30 $0.00 $53.97 5 75 $31.79 $10.00 $14.30 $0.00 $56.09 6 80 $33.91 $10.00 $14.30 $0.00 $58.21 7 85 $36.03 $10.00 $14.30 $0.00 $60.33 8 90 $38.15 $10.00 $14.30 $0.00 $62.45 Effective Date - 06/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $23.73 $10.00 $0.00 $0.00 $33.73 2 60 $25.88 $10.00 $14.30 $0.00 $50.18 3 65 $28.04 $10.00 $14.30 $0.00 $52.34 4 70 $30.20 $10.00 $14.30 $0.00 $54.50 5 75 $32.36 $10.00 $14.30 $0.00 $56.66 6 80 $34.51 $10.00 $14.30 $0.00 $58.81 7 85 $36.67 $10.00 $14.30 $0.00 $60.97 8 90 $38.83 $10.00 $14.30 $0.00 $63.13 Notes: Apprentice to Journeyworker Ratio:1:6 HVAC (DUCTWORK) SHFFTMFTAL WOItKF.RS LOCAL 17 -A For apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (ELECTRICAL CONTROLS) FLFCTRICIANS LOCAL 103 For apprentice rates see "Apprentice- ELECTRICIAN' 02/01/2015 $43.28 $10.20 $20.54 $2.22 $76.24 08/01/2015 $44.28 $10.20 $20.54 $2.22 $77.24 02/01/2016 $45.28 $10.20 $20.54 $2.22 $78.24 08/01/2016 $46.43 $10.20 $20.54 $2.22 $79.39 02/01/2017 $47.53 $10.20 $20:54 $2.22 $80.49 08/01/2017 $48.63 $10.20 $20.54 $2.22 $81.59 02/01/2018 $49.78 $10.20 $20.54 $2.22 $82.74 03/01/2015 $45.17 $13.00 $15.40 $0.00 $73.57 09/01/2015 $46.13 $13.00 $15.43 $0.00 $74.56 03/01/2016 $47.08 $13.00 $15.46 $0.00 $75.54 ------I------------------------------------------------------------------------------------------------------------------------------------ Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 14 of 38 Classification HVAC (TESTING AND BALANCING - AIR) SHEETMETAL WORKERS LOCAL 17-A For apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (TESTING AND BALANCING -WATER) PIPEFITTERS LOCAL 537 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" Effective Date Base Wage Health Pension Supplemental Total Rate $71.20 PIPEFITTERS LOCAL 537 (Local 138) $11.25 $10.00 Unemployment $47.24 02/01/2015 $43.28 $10.20 $20.54 $2.22 $76.24 08/01/2015 $44.28 $10.20 $20.54 $2.22 $77.24 02/01/2016 $45.28 $10.20 $20.54 $2.22 $78.24 08/01/2016 $46.43 $10.20 $20.54 $2.22 $79.39 02/01/2017 $47.53 $10.20 $20.54 $2.22 $80.49 08/01/2017 $48.63 $10.20 $20.54 $2.22 $81.59 02/01/2018 $49.78 $10.20 $20.54 $2.22 $82.74 $0.00 $51.00 LABORERS -70NE2 03/01/2015 $47.36 $9.20 $14.64 $0.00 $71.20 . 09/01/2015 $48.36 $9.20 $14.64 $0.00 $72.20 03/01/2016 $49.36 $9.20 $14.64 $0.00 $73.20 09/01/2016 $50.36 $9.20 $14.64 $0.00 $74.20 03/01/2017 $51.36 $9.20 $14.64 $0.00 $75.20 HVAC MECHANIC 03/01/2015 $47.36 $9.20 $14.64 $0.00 $71.20 PIPEFITTERS LOCAL 537 (Local 138) $11.25 $10.00 $0.00 $47.24 3 70 $30.32 $11.25 09/01/2015 $48.36 $9.20 $14.64 $0.00 $72.20 $11.30 03/01/2016 $49.36 $9.20 $14.64 $0.00 $73.20 ...- - _._.._._ 09/01/2016 $50.36 $9.20 $14.64 $0.00 $74.20 03/01/2017 $51.36 $9.20 $14.64 $0.00 $75.20 For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" HYDRAULIC DRILLS 12/01/2014 $31.40 $7.30 $12.30 $0.00 $51.00 LABORERS -70NE2 06/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 12/01/2015 $32.40 $7.30 $12.30 $0.00 $52.00 06/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 12/01/2016 $33.65 $7.30 $12.30 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" INSULATOR (PIPES & TANKS) HEAT & FROST INSULATORS LOCAL 6 (BOSTON) 09/01/2014 $43.31 $11.25 $12.60 $0.00 $67.16 Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston Effective Date - 09/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.66 $11.25 $9.35 $0.00 $42.26 2 60 $25.99 $11.25 $10.00 $0.00 $47.24 3 70 $30.32 $11.25 $10.65 $0.00 $52.22 4 80 $34.65 $11.25 $11.30 $0.00 $57.20 ___ - ____ ._.-.- ._ _. - - - Notes: .__ - _ _. _-_.- - ...- - _._.._._ - _..., Steps are 1 year Apprentice to Journeyworker Ratio: 1:4 IRONWORKER/WELDER IRONWORKERS LOCAL 7 (LAWRENCEAREA) 03/16/2014 $36.78 $7.70 $19.25 $0.00 $63.73 ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 15 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- IRONWORKER -Local 7 Lawrence $30.65 $7.30 $12.30 $0.00 $50.25 06/01/2015 Effective Date - 03/16/2014 $7.30 $12.30 $0.00 Supplemental 12/01/2015 $31.65 $7.30 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate $12.30 1 60 $22.07 $7.70 $19.25 $0.00 $12.30 $49.02 $52.50 2 70 $25.75 $7.70 $19.25 $0.00 Total Rate $52.70 3 75 $27.59 $7.70 $19.25 $0.00 $54.54 4 80 $29.42 $7.70 $19.25 $0.00 $56.37 5 85 $31.26 $7.70 $19.25 $0.00 $58.21 6 90 $33.10 $7.70 $19.25 $0.00 $60.05 -, - ,.-._.- - - _._. - ..- - (Notes: _ -- ---- - m.-...._....._.... -m.,._._...-p....,..-...-....-.._._....M...w..., i Structural 1:6; Ornamental 1:4 Apprentice to Journeyworker Ratio: JACKHAMMER & PAVING BREAKER OPERATOR 12/01/2014 $30.90 $7.30 $12.30 $0.00 $50.50 LABORF,RS-ZONE 2 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12:30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" LABORER LABORERS-ZONE2 Apprentice- LABORER - Zone 2 Effective Date - 12/01/2014 Step percent 12/01/2014 $30.65 $7.30 $12.30 $0.00 $50.25 06/01/2015 $31.15 $7.30 $12.30 $0.00 $50.75 12/01/2015 $31.65 $7.30 $12.30 $0.00 $51.25 06/01/2016 $32.15 $7.30 $12.30 $0.00 $51.75 12/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 Apprentice Base Wage Health Supplemental Pension Unemployment Total Rate 1 60 $18.39 $7.30 $12.30 $0.00 $37.99 2 70 $21.46 $7.30 $12.30 $0.00 $41.06 3 80 $24.52 $7.30 $12.30 $0.00 $44.12 4 90 $27.59 $7.30 $12.30 $0.00 $47.19 Effective Date - 06/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.69 $7.30 $12.30 $0.00 $38.29 2 70 $21.81 $7.30 $12.30 $0.00 $41.41 3 80 $24.92 $7.30 $12.30 $0.00 $44.52 4 90 $28.04 $7.30 $12.30 $0.00 $47.64 (Notes: Apprentice to Journeyworker Ratio: 1:5 Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 16 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment LABORER: CARPENTER TENDER 12/01/2014 $30.65 $7.30 $12.30 $0.00 $50.25 LABORERS - 70NE 2 06/01/2015 $31.15 $7.30 $12.30 $0.00 $50.75 12/01/2015 $31.65 $7.30 $12.30 $0.00 $51.25 06/01/2016 $32.15 $7.30 $12.30 $0.00 $51.75 12/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: CEMENT FINISHER TENDER 12/01/2014 $30.65 $7.30 $12.30 $0.00 $50.25 LABORERS-ZONE2 06/01/2015 $31.15 $7.30 $12.30 $0.00 $50.75 12/01/2015 $31.65 $7.30 $12.30 $0.00 $51.25 06/01/2016 $32.15 $7.30 $12.30 $0.00 $51.75 12/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2014 $30.85 $7.30 $12.25 $0.00 $50.40 LABORERS =7.ONE2 06/01/2015 $31.35 $7.30 $12.25 $0.00 $50.90 12/01/2015 $31.85 $7.30 $12.25 $0.00 $51.40 For apprentice rates see "Apprentice- LABORER" LABORER: MASON TENDER 12/01/2014 $30.90 $7.30 $12.30 $0.00 $50.50 LABORERS - ZONE 2 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" LABORER: MULTI -TRADE TENDER 12/01/2014 $30.65 $7.30 $12.30 $0.00 $50.25 LABORERS -7ONE2 06/01/2015 $31.15 $7.30 $12.30 $0.00 $50.75 12/01/2015 $31.65 $7.30 $12.30 $0.00 $51.25 06/01/2016 $32.15 $7.30 $12.30 $0.00 $51.75 12/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: TREE REMOVER 12/01/2014 $30.65 $7.30 $12.30 $0.00 $50.25 LABORERS -70NE2 06/01/2015 $31.15 $7.30 $12.30 $0.00 $50.75 12/01/2015 $31.65 $7.30 $12.30 $0.00 $51.25 06/01/2016 $32.15 $7.30 $12.30 $0.00 $51.75 12/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 This classification applies to all tree work associated with the removal of standing trees, and trimming and removal of branches and limbs when the work is not done for a utility company for the purpose of operation, maintenance or repair of utility company equipment. For apprentice rates see "Apprentice- LABORER" LASER BEAM OPERATOR 12/01/2014 $30.90 $7.30 $12.30 $0.00 $50.50 LABORERS - ZONE 2 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" MARBLE & TILE FINISHERS 02/01/2015 $37.37 $10.18 $17.18 $0.00 $64.73 BRICKLAYERS LOCAL 3 - MARBLE & TILE 08/01/2015 $38.08 $10.18 $17.25 $0.00 $65.51 02/01/2016 $38.53 $10.18 $17.25 $0.00 $65.96 08/01/2016 $39.23 $10.18 $17.33 $0.00 $66.74 02/01/2017 $39.69 $10.18 $17.33 $0.00 $67.20 ------------------------------------------------------------------------- Issue Date: 03/05/2015 Wage Request Number: ----------------------------------- 20150305-061 -- -- -------------------- Page 17 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile Effective Date - 02/01/2015 Step percent Apprentice Base Wage Health 1 50 $18.69 $10.18 2 60 $22.42 $10.18 3 70 $26.16 $10.18 4 80 $29.90 $10.18 5 90 $33.63 $10.18 Pension Supplemental Unemployment Total Rate $17.18 $0.00 $46.05 $17.18 $0.00 $49.78 $17.18 $0.00 $53.52 $17.18 $0.00 $57.26 $17.18 $0.00 $60.99 Effective Date - 08/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.04 $10.18 $17.25 $0.00 $46.47 2 60 $22.85 $10.18 $17.25 $0.00 $50.28 3 70 $26.66 $10.18 $17.25 $0.00 $54.09 4 80 $30.46 $10.18 $17.25 $0.00 $57.89 5 90 $34.27 $10.18 $17.25 $0.00 $61.70 Notes: Apprentice to Journeyworker Ratio: 1:3 MARBLE MASONS,TILELAYERS & TERRAZZO MECH 02/01/201.5 $49.00 $10.18 $18.50 $0.00 $77.68 BRICKLAYERS LOCAL 3 - MARBLE & TILE. 08/01/2015 $49.90 $10.18 $18.57 $0.00 $78.65 02/01/2016 $50.47 $10.18 $18.57 $0.00 $79.22 08/01/2016 $51.37 $10.18 $18.65 $0.00 $80.20 02/01/2017 $51.94 $10.18 $18.65 $0.00 $80.77 ----------------------------------------- --------------------------- - --- - - - ------------------------------ - ---------------------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 18 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble & Tile Effective Date - 02/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.50 $10.18 $18.50 $0.00 $53.18 2 60 $29.40 $10.18 $18.50 $0.00 $58.08 3 70 $34.30 $10.18 $18.50 $0.00 $62.98 4 80 $39.20 $10.18 $18.50 $0.00 $67.88 5 90 $44.10 $10.18 $18.50 $0.00 $72.78 Effective Date - 08/01/2015 $45.95 $10.00 $14.30 $0.00 $70.25 06/01/2017 $46.94 $10.00 $14.30 Supplemental $71.24 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.95 $10.18 $18.57 $0.00 $53.70 2 60 $29.94 $10.18 $18.57 $0.00 $58.69 3 70 $34.93 $10.18 $18.57 $0.00 $63.68 4 80 $39.92 $10.18 $18.57 $0.00 $68.67 5 90 $44.91 $10.18 $18.57 $0.00 $73.66 Notes:. $10.00 $14.30 $0.00 $69.02 i Apprentice to 3ourneyworker Ratio:1:5 $45.95 $10.00 $14.30 $0.00 $70.25 MECH. SWEEPER OPERATOR (ON CONST. SITES) 12/01/2014 $41.99 $10.00 $14.30 $0.00 $66.29 OPERATING ENGINEERS LOCAL 4 06/01/2015 $42.73 $10.00 $14.30 $0.00 $67.03 12/01/2015 $43.97 $10.00 $14.30 $0.00 $68.27 06/01/2016 $44.72 $10.00 $14.30 $0.00 $69.02 12/01/2016 $45.95 $10.00 $14.30 $0.00 $70.25 06/01/2017 $46.94 $10.00 $14.30 $0.00 $71.24 12/01/2017 $47.93 $10.00 $14.30 $0.00 $72.23 For apprentice rates see "Apprentice- OPERATING ENGINEERS" MECHANICS MAINTENANCE 12/01/2014 $41.99 $10.00 $14.30 $0.00 $66.29 OPERATING ENGINEERS LOCAL 4 06/01/2015 $42.73 $10.00 $14.30 $0.00 $67.03 12/01/2015 $43.97 $10.00 $14.30 $0.00 $68.27 06/01/2016 $44.72 $10.00 $14.30 $0.00 $69.02 12/01/2016 $45.95 $10.00 $14.30 $0.00 $70.25 06/01/2017 $46.94 $10.00 $14.30 $0.00 $71.24 12/01/2017 $47.93 $10.00 $14.30 $0.00 $72.23 For apprentice rates see "Apprentice- OPERATING ENGINEERS" . MILLWRIGHT (Zone 2) 10/01/2014 $33.92 $9.80 $16.21 $0.00 $59.93 MILLWRIGHTS LOCAL 1121 - Zone 2 04/01/2015 $34.69 $9.80 $16.21 $0.00 $60.70 ---------------------------------------------------------------------- - - ----------------------- ---- - ------ Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 19 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MILLWRIGHT- Local 1121 Zone 2 $19.08 $9.80 $4.48 $0.00 Effective Date - 10/01/2014 2 .65 $22.55 $9.80 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $18.66 $9.80 $4.48 $0.00 $32.94 2 65 $22.05 $9.80 $13.36 $0.00 $45.21 3 75 $25.44 $9.80 $14.18 $0.00 $49.42 4 85 $28.83 $9.80 $14.99 $0.00 $53.62 Effective Date - 04/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $19.08 $9.80 $4.48 $0.00 $33.36 2 .65 $22.55 $9.80 $13.36 $0.00 $45.71 3 75 $26.02 $9.80 $14.18 $0.00 $50.00 4 85 $29.49 $9.80 $14.99 $0.00 $54.28 (Notes: $12.30 $0.00 $52.00 12/01/2016 Steps are 2,000 hours $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" Apprentice to Journeyworker Ratio -i.5 MORTAR MIXER 12/01/2014 $30.90 $7.30 $12.30 $0.00 $50.50 LABORERS - ZONE 2 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2014 $21.90 $10.00 $14.30 $0.00 $46.20 OPERATING ENGINEERS LOCAL 4 06/01/2015 $22.28 $10.00 $14.30 $0.00 $46.58 12/01/2015 $22.93 $10.00 $14.30 $0.00 $47.23 06/01/2016 $23.32 $10.00 $14.30 $0.00 $47.62 12/01/2016 $23.97 $10.00 $14.30 $0.00 $48.27 06/01/2017 $24.48 $10.00 $14.30 $0.00 $48.78 12/01/2017 $25.00 $10.00 $14.30 $0.00 $49.30 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OILER (TRUCK CRANES, GRADALLS) 12/01/2014 $25.54 $10.00 $14.30 $0.00 $49.84 OPERATING ENGINEERS LOCAL 4 06/01/2015 $25.99 $10.00 $14.30 $0.00 $50.29 12/01/2015 $26.74 $10.00 $14.30 $0.00 $51.04 06/01/2016 $27.20 $10.00 $14.30 $0.00 $51.50 12/01/2016 $27.95 $10.00 $14.30 $0.00 $52.25 06/01/2017 $28.55 $10.00 $14.30 $0.00 $52.85 12/01/2017 $29.16 $10.00 $14.30 $0.00 $53.46 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 20 of 38 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate OTHER POWER DRIVEN EQUIPMENT - CLASS II 12/01/2014 $41.99 $10.00 $14.30 $0.00 $66.29 OPERATING ENGINEERS LOCAL 4 $0.00 $37.72 3 60 $28.60 $7.85 $3.99 $0.00 06/01/2015 $42.73 $10.00 $14.30 $0.00 $67.03 $43.15 12/01/2015 $43.97 $10.00 $14.30 $0.00 $68.27 6 75 06/01/2016 $44.72 $10.00 $14.30 $0.00 $69.02 $38.13 12/01/2016 $45.95 $10.00 $14.30 $0.00 $70.25 $7.85 06/01/2017 $46.94 $10.00 $14.30 $0.00 $71.24 8 90 12/01/2017 $47.93 $10.00 $14.30 $0.00 $72.23 For apprentice rates see "Apprentice- OPERATING ENGINEERS" Total Rate T_...._........ -®-, PAINTER (BRIDGES/TANKS) 01/01/2015 $47.66 $7.85 $16.10 $0.00 $71.61 PAINTERS LOCAL 35 - ZONE 2 1 _ _ _ _ _ Apprentice to Journeyworker Ratio: 1:1 07/01/2015 $48.56 $7.85 $16.10 $0.00 $72.51 $7.85 01/01/2016 $49.51 $7.85 $16.10 $0.00 $73.46 07/01/2016 $50.46 $7.85 $16.10 $0.00 $74.41 07/01/2015 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2015 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $23.83 $7.85 $0.00 $0.00 $31.68 2 55 $26.21 $7.85 $3.66 $0.00 $37.72 3 60 $28.60 $7.85 $3.99 $0.00 $40.44 4 65 $30.98 $7.85 $4.32 $0.00 $43.15 5 70 $33.36 $7.85 $14.11 $0.00 $55.32 6 75 $35.75 $7.85 $14.44 $0.00 $58.04 7 80 $38.13 $7.85 $14.77 $0.00 $60.75 8 90 $42.89 $7.85 $15.44 $0.00 $66.18 Effective Date - 07/01/2015 $61.47 8 90 Supplemental $7.85 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.28 $7.85 $0.00 $0.00 $32.13 2 55 $26.71 $7.85 $3.66 $0.00 $38.22 3 60 $29.14 $7.85 $3.99 $0.00 $40.98 4 65 $31.56 $7.85 $4.32 $0.00 $43.73 5 70 $33.99 $7.85 $14.11 $0.00 $55.95 6 75 $36.42 $7.85 $14.44 $0.00 $58.71 7 80 $38.85 $7.85 $14.77 $0.00 $61.47 8 90 $43.70 $7.85 $15.44 $0.00 $66.99 -----_...___..__.- _._._..--_--,.._..,.._--_... Notes: T_...._........ -®-, j Steps are 750 hrs. 1 _ _ _ _ _ Apprentice to Journeyworker Ratio: 1:1 PAINTER (SPRAY OR SANDBLAST, NEW) * 01/01/2015 $38.56 $7.85 $16.10 $0.00 $62.51 * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PAINTLm LOCAL 35 - ZONE 2 07/01/2015 $39.46 $7.85 $16.10 $0.00 $63.41 01/01/2016 $40.41 $7.85 $16.10 $0.00 $64.36 07/01/2016 $41.36 $7.85 $16.10 $0.00 $65.31 01/01/2017 $42.31 $7.85 $16.10 $0.00 $66.26 ----------------------------------------------------------------------------------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 --------------- ------------------------- Page 21 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - New Effective Date - 01/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.28 $7.85 $0.00 $0.00 $27.13 2 55 $21.21 $7.85 $3.66 $0.00 $32.72 3 60 $23.14 $7.85 $3.99 $0.00 $34.98 4 65 $25.06 $7.85 $4.32 $0.00 $37.23 5 70 $26.99 $7.85 $14.11 $0.00 $48.95 6 75 $28.92 $7.85 $14.44 $0.00 $51.21 7 80 $30.85 $7.85 $14.77 $0.00 $53.47 8 90 $34.70 $7.85 $15.44 $0.00 $57.99 Effective Date - 07/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.73 $7.85 $0.00 $0.00 $27.58 2 55 $21.70 $7.85 $3.66 $0.00 $33.21 3 60 $23.68 $7.85 $3.99 $0.00 $35.52 4 65 $25.65 $7.85 $4.32 $0.00 $37.82 5 70 $27.62 $7.85 $14.11 $0.00 $49.58 6 75 $29.60 $7.85 $14.44 $0.00 $51.89 7 80 $31.57 $7.85 $14.77 $0.00 $54.19 8 90 $35.51 $7.85 $15.44 $0.00 $58.80 Notes: I Steps are 750 hrs. I _ _ _ Apprentice to Journeyworker Ratio:1:l s _ PAINTER (SPRAY OR SANDBLAST, REPAINT) 01/01/2015 $36.62 $7.85 $16.10 $0.00 $60.57 PAINTF,RS FOCAL 35 - ZONE 2 07/01/2015 $37.52 $7.85 - $16.10 $0.00 $61.47 01/01/2016 $38.47 $7.85 $16.10 $0.00 $62.42 07/01/2016 $39.42 $7.85 $16.10 $0.00 $63.37 01/01/2017 $40.37 $7.85 $16.10 $0.00 $64.32 ------------- -- - --- - --------------------------------------------------------------------- -- ---- ---- ---------------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 22 of 38 • Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -Repaint Effective Date - 01/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.31 $7.85 $0.00 $0.00 $26.16 2 55 $20.14 $7.85 $3.66 $0.00 $31.65 3 60 $21.97 $7.85 $3.99 $0.00 $33.81 4. 65 $23.80 $7.85 $4.32 $0.00 $35.97 5 70 $25.63 $7.85 $14.11 $0.00 $47.59 6 75 $27.47 $7.85 $14.44 $0.00. $49.76 7 80 $29.30 $7.85 $14.77 $0.00 $51.92 8 90 $32.96 $7.85 $15.44 $0.00 $56.25 Effective Date - 07/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.76 $7.85 $0.00 $0.00 $26.61 2 55 $20.64 $7.85 $3.66 $0.00 $32.15 3 60 $22.51 $7.85 $3.99 $0.00 $34.35 4 65 $24.39 $7.85 $4.32 $0.00 $36.56 5 70 $26.26 $7.85 $14.11 $0.00 $48.22 6 75 $28.14 $7.85 $14.44 $0.00 $50.43 7 80 $30.02 $7.85 $14.77 $0.00 $52.64 8 90 $33.77 $7.85 $15.44 $0.00 $57.06 ------ ---------___.-------------- (Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio:l:l PAINTER (TRAFFIC MARKINGS) 12/01/2014 $30.65 $7.30 $12.30 $0.00 $50.25 LABORERS -ZONE2 06/01/2015 $31.15 $7.30 $12.30 $0.00 $50.75 12/01/2015 $31.65 $7.30 $12.30 $0.00 $51.25 06/01/2016 $32.15 $7.30 $12.30 $0.00 $51.75 12/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 For Apprentice rates see "Apprentice- LABORER" PAINTER / TAPER (BRUSH, NEW) * 01/01/2015 $37.16 $7.85 $16.10 $0.00 $61.11 * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PAINTERS LOCAL 35 - ZONE 2 07/01/2015 $38.06 $7.85 $16.10 $0.00 $62.01 01/01/2016 $39.01 $7.85 $16.10 $0.00 $62.96 07/01/2016 $39.96 $7.85 $16.10 $0.00 $63.91 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86 --- ---------- --------------------------------------------------------------------------------------------------------------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 23 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER -Local 35 Zone 2 - BRUSH NEW Effective Date - 01/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.58 $7.85 $0.00 $0.00 $26.43 2 55 $20.44 $7.85 $3.66 $0.00 $31.95 3 60 $22.30 $7.85 $3.99 $0.00 $34.14 4 65 $24.15 $7.85 $4.32 $0.00 $36.32 5 70 $26.01 $7.85 $14.11 $0.00 $47.97 6 75 $27.87 $7.85 $14.44 $0.00 $50.16 7 80 $29.73 $7.85 $14.77 $0.00 $52.35 8 90 $33.44 $7.85 $15.44 $0.00 $56.73 Effective Date - 07/01/2015 Supplemental Step . percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.03 $7.85 $0.00 $0.00 $26.88 2 55 $20.93 $7.85 $3.66 $0.00 $32.44 3 60 $22.84 $7.85 $3.99 $0.00 $34.68 4 65 $24.74 $7.85 $4.32 $0.00 $36.91 5 70 $26.64 $7.85 $14.11 $0.00 $48.60 6 75 $28.55 $7.85 $14.44 $0.00 $50.84 7 80 $30.45 $7.85 $14.77 $0.00 $53.07 8 90 $34.25 $7.85 $15.44 $0.00 $57.54 'Notes: Steps are 750 hrs. pp 1 Apprentice to Journeyworker Ratio:l:l PAINTER / TAPER (BRUSH, REPAINT) 01/01/2015 $35.22 $7.85 $16.10 $0.00 $59.17 PAINTERS LOCAL 35 - ZONE 2 07/01/2015 $36.12 $7.85 $16.10 $0.00 $60.07 01/01/2016 $37.07 $7.85 $16.10 1 $0.00 $61.02 07/01/2016 $38.02 $7.85 $16.10 $0.00 $61.97 01/01/2017 $38.97 $7.85 $16.10 $0.00 $62.92 ----------------------- - - -------------------------------- ------ ----- ---------- ----------- - --------------- ---------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 24 of 38 • Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date - 01/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.61 $7.85 $0.00 $0.00 $25.46 2 55 $19.37 $7.85 $3.66 $0.00 $30.88 3 60 $21.13 $7.85 $3.99 $0.00 $32.97 4 65 $22.89 $7.85 $4.32 $0.00 $35.06 5 70 $24.65 $7.85 $14.11 $0.00 $46.61 6 75 $26.42 $7.85 $14.44 $0.00 $48.71 7 80 $28.18 $7.85 $14.77 $0.00. $50.80 8 90 $31.70 $7.85 $15.44 $0.00 $54.99 Effective Date - 07/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.06 $7.85 $0.00 $0.00 $25.91 2 55 $19.87 $7.85 $3.66 $0.00 $31.38 3 60 $21.67 $7.85 $3.99 $0.00 $33.51 4 65 $23.48 $7.85 $4.32 $0.00 $35.65 5 70 $25.28 $7.85 $14.11 $0.00 $47.24 6 75 $27.09 $7.85 $14.44 $0.00 $49.38 7 80 $28.90 $7.85 $14.77 $0.00 $51.52 8 90 $32.51 $7.85 $15.44 $0.00 $55.80 _._...,.,....�..v.---®.._._---..._..----------------_, (Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 PANEL & PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 TEAMSTERS JOINT COUNCIL NO. l 0 ZONE B PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 DECK) 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 PILE DRIVER LOCAL 56 (ZONE 1) PILE DRIVER 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 PILE DRIVER LOCAL 56 (7.0NE 1) 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 --------------------- ----------------------- ------- - -------------------------- ------ ----------------------------------------- - -- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 25 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PILEDRIVER - Loca156 Zone I Effective Date - 08/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.80 $9.80 $18.17 $0.00 $48.77 2 60 $24.96 $9.80 $18.17 $0.00 $52.93 3 70 $29.12 $9.80 $18.17 $0.00 $57.09 4 75 $31.20 $9.80 $18.17 $0.00 $59.17 5 80 $33.28 $9.80 $18.17 $0.00 $61.25 6 80 $33.28 $9.80 $18.17 $0.00 $61.25 7 90 $37.44 $9.80 $18.17 $0.00 $65.41 8 90 $37.44 $9.80 $18.17 $0.00 $65.41 Effective Date - 08/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.55 $9.80 $18.17 $0.00 $49.52 2 60 $25.86 $9.80 $18.17 $0.00 $53.83 3 70 $30.17 $9.80 $18.17 $0.00 $58.14 4 75 $32.33 $9.80 $18.17 $0.00 $60.30 5 80 $34.48 $9.80 $18.17 $0.00 $62.45 6 80 $34.48 $9.80 $18.17 $0.00 $62.45 7 90 $38.79 $9.80 $18.17 $0.00 $66.76 8 90 $38.79 $9.80 $18.17 $0.00 $66.76 ---.....,.®_.._-...__.._..._...®®.-- Notes: ------------------ Tice Apprentice to Journeyworker Ratioa:3 ---a._,.---.__..---____--_�- PIPEFITTER & STEAMFITTER 03/01/2015 $47.36 $9.20 $14.64 $0.00 $71.20 PIPEFITTF.RSLOCAL 537 (Local 138) 09/01/2015 $48.36 $9.20 $14.64 03/01/2016 $49.36 $9.20 $14.64 09/01/2016 $50.36 $9.20 $14.64 03/01/2017 $51.36 $9.20 $14.64 $0.00 $72.20 $0.00 $73.20 $0.00 $74.20 $0.00 $75.20 ---------- ----------------- - -------------------------------------------------------------------------------------------------------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 26 of 38 • Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PIPEFITTER Local 537 (Local 138) $46.58 $10.32 $14.54 $0.00 09/01/2015 $47.58 Effective Date - 03/01/2015 $14.54 $0.00 03/01/2016 Supplemental $10.32 $14.54 $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate $50.78 1 40 $18.94 $9.20 $5.50 $0.00 $33.64 2 45 $21.31 $9.20 $14.64 $0.00 $45.15 3 60 $28.42 $9.20 $14.64 $0.00 $52.26 .4 70 $33.15 $9.20 $14.64 $0.00 $56.99 5 80 $37.89 $9.20 $14.64 $0.00 $61.73 Effective Date- 09/01/2015 Supplemental Step percent Apprentice Base Wage Health, Pension Unemployment Total Rate 1 40 $19.34 $9.20 $5.50 $0.00 $34.04 2 45 $21.76 $9.20 $14.64 $0.00 $45.60 3 60 $29.02 $9.20 $14.64 $0.00 $52.86 4 70 $33.85 $9.20 $14.64 $0.00 $57.69 5 80 $38.69 $9.20 $14.64 $0.00 $62.53 Notes: ** 1:3; 3:15; 1:10 thereafter / Steps are 1 yr. Refrig/AC Mechanic **1:1;1:2;2:4;3:6;4:8;5:10; 6:12; 7:14;8:17;9:20;10:23(Max) �- ._ - ._,......_. _ _ - - - - - --- - - - - - - -- Apprentice to Journeyworker Ratio:** ._....,..... PIPELAYER 12/01/2014 $30.90 $7.30 $12.30 $0.00 $50.50 LABORERS - ZONE 2 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" PLUMBER. PLUMBERS & GASFITTERS LOCAL 12 (Local 138) 03/01/2015 $46.58 $10.32 $14.54 $0.00 09/01/2015 $47.58 $10.32 $14.54 $0.00 03/01/2016 $48.73 $10.32 $14.54 $0.00 09/01/2016 $49.78 $10.32 $14.54 $0.00 03/01/2017 $50.78 $10.32 $14.54 $0.00 $71.44 $72.44 $73.59 $74.64 $75.64 -------------------------------------- ------ ----------- --- ----------------- -- ----------------------------------------------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 27 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PLUMBERIGASFJTTER -Local 12 (Local 138) Effective Date - 03/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.30 $10.32 $5.42 $0.00 $32.04 2 40 $18.63 $10.32 $6.11 $0.00 $35.06 3 55 $25.62 $10.32 $8.22 $0.00 $44.16 4 65 $30.28 $10.32 $9.62 $0.00 $50.22 5 75 $34.94 $10.32 $11.03 $0.00 $56.29 Effective Date - 09/01/2015 _ $0.00 $57.05 Supplemental 'Notes: Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 - $16.65 $10.32 $5.42 $0.00 $32.39 2 40 $19.03 $10.32 $6.12 $0.00 $35.47 3 55 $26.17 $10.32 $8.22 $0.00 $44.71 4 65 $30.93 $10.32 $9.63 $0.00 $50.88 5 75 $35.69 $10.32 $11.04 $0.00 $57.05 'Notes: Steps are 1 yr ' Step 4 with lic$53.27 Step5 with lic$59.32 Apprentice to Journeyworker Ratio:1:5 PNEUMATIC CONTROLS (TEMP.) 03/01/2015 $47.36 $9.20 $14.64 $0.00 $71.20 PIPE ,1TTERS LOCAL 537 (Local 138) 09/01/2015 $48.36 $9.20 $14.64 $0.00 $72.20 03/01/2016 $49.36 $9.20 $14.64 $0.00 $73.20 09/01/2016 $50.36 $9.20 $14.64 $0.00 $74.20 03/01/2017 $51.36 $9.20 $14.64 $0.00 $75.20 For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" PNEUMATIC DRILL/TOOL OPERATOR 12/01/2014 $30.90 $7.30 $12.30 $0.00 $50.50 LABORERS - 7ONr; 2 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" POWDERMAN & BLASTER 12/01/2014 $31.65 $7.30 $12.30 $0.00 $51.25 LABORFRS - ZONE 2 06/01/2015 $32.15 $7.30 $12.30 $0.00 $51.75 12/01/2015 $32.65 $7.30 $12.30 $0.00 $52.25 06/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 12/01/2016 $33.90 $7.30 $12.30 $0.00 $53.50 For apprentice rates see "Apprentice- LABORER" ------------------------------------------------------------------------------------------------------------------------------------------ Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 28 of 38 .Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $66.69 OPERATING ENGINEERS LOCAL 4 Unemployment POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2014 $42.39 $10.00 $14.30 $0.00 $66.69 OPERATING ENGINEERS LOCAL 4 06/01/2015 $43.14 $10.00 $14.30 06/01/2015 $43.14 $10.00 $14.30 $0.00 $67.44 $44.39 12/01/2015 $44.39 $10.00 $14.30 $0.00 $68.69 $68.69 06/01/2016 $45.14 $10.00 $14.30 $0.00 $69.44 $14.30 12/01/2016 $46.39 $10.00 $14.30 $0.00 $70.69 12/01/2016 06/01/2017 $47.39 $10.00 $14.30 $0.00 $71.69 12/01/2017 $48.39 $10.00 $14.30 $0.00 $72.69 For apprentice rates see "Apprentice- OPERATING ENGINEERS" $14.30 $0.00 $71.69 PUMP OPERATOR (CONCRETE) 12/01/2014 $42.39 $10.00 $14.30 $0.00 $66.69 OPERATING ENGINEERS LOCAL 4 06/01/2015 $43.14 $10.00 $14.30 $0.00 $67.44 12/01/2015 $44.39 $10.00 $14.30 $0.00 $68.69 06/01/2016 $45.14 $10.00 $14.30 $0.00 $69.44 12/01/2016 $46.39 $10.00 $14.30 $0.00 $70.69 06/01/2017 $47.39 $10.00 $14.30 $0.00 $71.69 12/01/2017 $48.39 $10.00 $14.30 $0.00 $72.69 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (DEWATERING, OTHER) 12/01/2014. $29.40 $10.00 $14.30 $0.00 $53.70 OPERATING ENGINEERS LOCAL 4 06/01/2015 $29.92 $10.00 $14.30 $0.00 $54.22 12/01/2015 $30.79 $10.00 $14.30 $0.00 $55.09 06/01/2016 $31.31 $10.00 $14.30 $0.00 $55.61 12/01/2016 $32.18 $10.00 $14.30 $0.00 $56.48 06/01/2017 $32.87 $10.00 $14.30 $0.00 $57.17 12/01/2017 $33.56 $10.00 $14.30 $0.00 $57.86 For apprentice rates see "Apprentice- OPERATING ENGINEERS" READY -MIX CONCRETE DRIVER 11/01/2014 $21.92 $8.49 $9.24 $0.00 $39.65 TEAMSTERS LOCAL 42 04/30/2015 $21.92 $8.49 $9.49 $0.00 $39.90 05/01/2015 $22.66 $8.49 $9.89 $0.00 $41.04 11/01/2015 $22.78 $8.49 $9.89 $0.00 $41.16 04/30/2016 $22.78 $8.49 $10.25 $0.00 $41.52 05/01/2016 $24.15 $8.49 $10.68 $0.00 $43.32 04/30/2017 $24.15 $8.49 $11.07 $0.00. $43.71 05/01/2017 $24.21 $8.49 $11.54 $0.00 $44.24 04/30/2018 $24.21 $8.49 $11.96 $0.00 $44.66 05/01/2018 $24.24 $8.49 $12.46 $0.00 $45.19 04/30/2019 $24.24 $8.49 $12.92 $0.00 $45.65 RECLAIMERS 12/01/2014 $41.99 $10.00 $14.30 $0.00 $66.29 OPERATING ENGINEERS LOCAL 4 06/01/2015 $42.73 $10.00 $14.30 $0.00 $67.03 12/01/2015 $43.97 $10.00 $14.30 $0.00. $68.27 06/01/2016 $44.72 $10.00 $14.30 $0.00 $69.02 12/01/2016 $45.95 $10.00 $14.30 $0.00 $70.25 06/01/2017 $46.94 $10.00 $14.30 $0.00 $71.24 12/01/2017 $47.93 $10.00 $14.30 $0.00 $72.23 For apprentice rates see "Apprentice- OPERATING ENGINEERS" RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42 CARPENTERS -70NE 2 (Residential Wood) ----------------------------------------------------- ----------------------------------------- ---------------- - --- ------------------ Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 29 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81 ** The Residential Wood Frame Carpenter classification applies only to the construction of new, wood frame residences that do not exceed four stories including the basement. cARPENTERs-zoNE 2 (Residential Wood) As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. Apprentice- CARPENTER (Residential Wood Frame) -Zone 2 Effective Date - 05/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $14.54 $6.34 $0.00 $0.00 $20.88 2 60 $14.54 $6.34 $6.23 $0.00 $27.11 3 65 $15.76 $6.34 $6.23 $0.00 $28.33 4 70 $16.97 $6.34 $6.23 $0.00 $29.54 5 75 $18.18 $6.34 $6.23 $0.00 $30.75 6 80 $19.39 $6.34 $6.23 $0.00 $31.96 7 85 $20.60 $6.34 $6.23 $0.00 $33.17 8 90 $21.82 $6.34 $6.23 $0.00 $34.39 .:...:._.._ ----.,.._--_.._------------------- Notes: .Tic Apprrenentice to Journeyworker- Ratio:l:5 - ----- -- -�---- - - - -- - RIDE-ON MOTORIZED BUGGY OPERATOR LABORERS -7_0NE2 For apprentice rates see "Apprentice- LABORER" ROLLER/SPREADER/MULCHING MACHINE OPERATING ENGINEERS LOCAL, 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ROOFER (Inc.Roofer Waterproofing &Roofer Damproofg) ROOFERS LOCAL 33 12/01/2014 $30.90 $7.30 $12.30 $0.00 $50.50 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 12/01/2014 $41.99 $10.00 $14.30 $0.00 $66.29 06/01/2015 $42.73 $10.00 $14.30 $0.00 $67.03 12/01/2015 $43.97 $10.00 $14.30 $0.00 $68.27 06/01/2016 $44.72 $10.00 $14.30 $0.00 $69.02 12/01/2016 $45.95 $10.00 $14.30 $0.00 $70.25 06/01/2017 $46.94 $10.00 $14.30 $0.00 $71.24 12/01/2017 $47.93 $10.00 $14.30 $0.00 $72.23 02/01/2015 $40.11 $10.50 $11.60 $0.00 $62.21 08/01/2015 $41.01 $10.50 $11.60 $0.00 $63.11 02/01/2016 $41.91 $10.50 $11.60 $0.00 $64.01 ----------------------------------------- - - ------ ------------------- - -- --- - --- ---- --- ------------------ --------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 30 of 38 • Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - ROOFER - Local 33 Effective Date - 02/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.06 $10.50 $3.38 $0.00 $33.94 2 60 $24.07 $10.50 $11.60 $0.00 $46.17 3 65 $26.07 $10.50 $11.60 $0.00 $48.17 4 75 $30.08 $10.50 $11.60 $0.00 $52.18 5 85 $34.09 $10.50 $11.60 $0.00 $56.19 Effective Date - 08/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.51 $10.50 $3.38 $0.00 $34.39 2 60 $24.61 $10.50 $11.60 $0.00 $46.71 3 65 $26.66 $10.50 $11.60 $0.00 $48.76 4 75 $30.76 $10.50 $11.60 $0.00 $52.86 5 85 $34.86 $10.50 $11.60 $0.00 $56.96 Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1 Step 1 is 2000 hrs.; Steps 2-5 are 1000 hrs. -._.- -- Apprentice to Journeyworker Ratio:** ......,...._._ - - - - _._ __._ - - - - - _._...-.,-....�. _ ._.... ROOFER SLATE / TILE / PRECAST CONCRETE 02/01/2015 $40.36 $10.50 $11.60 $0.00 $62.46 ROOFERS LOCAL 33 08/01/2015 $41.26 $10.50 $11.60 $0.00 $63.36 02/01/2016 $42.16 $10.50 $11.60 $0.00 $64.26 For apprentice rates see "Apprentice- ROOFER" SHEETMETAL WORKER 02/01/2015 $43.28 $10.20 $20.54 $2.22 $76.24 SHEF.TMF:TAL WORKERS LOCAL 17 -A 08/01/2015 $44.28 $10.20 $20.54 $2.22 $77.24 02/01/2016 $45.28 $10.20 $20.54 $2.22 $78.24 08/01/2016 $46.43 $10.20 $20.54 $2.22 $79.39 02/01/2017 $47.53 $10.20 $20.54 $2.22 $80.49 08/01/2017 $48.63 $10.20 $20.54 $2.22 $81.59 02/01/2018 $49.78 $10.20 $20.54 $2.22 $82.74 -------- - ------------ ---- ---- --------- ----------------------------------------------- --- ------------------------------------------ Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 31 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SHEET METAL WORKER -Local 17-A Effective Date - 02/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.31 $10.20 $4.58 $0.00 $32.09 2 40 $17.31 $10.20 $4.58 $0.00 $32.09 3 45 $19.48 $10.20 $9.09 $1.16 $39.93 4 45 $19.48 $10.20 $9.09 $1.16 $39.93 5 50 $21.64 $10.20 $9.91 $1.25 $43.00 6 50 $21.64 $10.20 $10.16 $1.26 $43.26 7 60 $25.97 $10.20 $11.55 $1.43 $49.15 8 65 $28.13 $10.20 $12.38 $1.52 $52.23 9 75 $32.46 $10.20 $14.02 $1.70 $58.38 10 85 $36.79 $10.20 $15.16 $1.96 $64.01 Effective Date - 08/01/2015. - - - - - - - - - - - - -- - - - - Supplemental - - - Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.71 $10.20 $4.58 $0.00 $32.49 2 40 $17.71 $10.20 $4.58 $0.00 $32.49 3 45 $19.93 $10.20 $9.09 $1.18 $40.40 4 45 $19.93 $10.20 $9.09 $1.18 $40.40 5 50 $22.14 $10.20 $9.91 $1.27 $43.52 6 50 $22.14 $10.20 $10.16 $1.28 $43.78 7 60 $26.57 $10.20 $11.55 $1.45 $49.77 8 65 $28.78 $10.20 $12.38 $1.54 $52.90 9 75 $33.21 $10.20 $14.02 $1.72 $59.15 10 85 $37.64 $10.20 $15.16 $1.89 $64.89 - - Notes:.Steps - - - - - - - - - - - - -- - - - - - - - - - - - - - are 6 mos. -- - Apprentice in Journeyworker Ra Tio.i.4 - - - - - - - - - --- - - - - - SIGN ERECTOR 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93 PAINTERS LOCAL 35 - ZONE 2 ---------------------------------------------------------------- ---------------- ..... --------------------------------------- ------ Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 32 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SIGN ERECTOR - Loca135 Zone 2 Effective Date - 06/01/2013 . Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $12.91 $7.07 $0.00 $0.00 $19.98 2 55 $14.20 $7.07 $2.45 $0.00 $23.72 3 60 $15.49 $7.07 $2.45 $0.00 $25.01 4 65 $16.78 $7.07 $2.45 $0.00 $26.30 5 70 $18.07 $7.07 $7.05 $0.00 $32.19 6 75 $19.36 $7.07 $7.05 $0.00 $33.48 7 80 $20.65 $7.07 $7.05 $0.00 $34.77 8 85 $21.94 $7.07 $7.05 $0.00 $36.06 9 90 $23.23 $7.07 $7.05 $0.00 $37.35 Notes: . _ _... - - - - ..._.. _.._ - - - , _ - - - _ ....� - _ ,_... _.._ - Steps are 4 mos. $32.23 $9.91 $9.33 $0.00 $51.47 Apprentice to Journeyworker RatioA :1 08/01/2015 $32.23 $10.41 $9.33 $0.00. SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2014 $31.59 $9.91 $9.33 $0.00 $50.83 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2015 $31.94 $9.91 $9.33 $0.00 $51.18 08/01/2015 $31.94 $10.41 $9.33 $0.00 $51.68 12/01/2015 $31.94 $10.41 $10.08 $0.00 $52.43 06/01/2016 $32.44 $10.41 $10.08 $0.00 $52.93 08/01/2016 $32.44 $10.91 $10.08 $0.00.. $53.43 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24 SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2014 $31.88 $9.91 $9.33 $0.00 $51.12 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2015 $32.23 $9.91 $9.33 $0.00 $51.47 08/01/2015 $32.23 $10.41 $9.33 $0.00. $51.97 12/01/2015 $32.23 $10.41 $10.08 $0.00 $52.72 06/01/2016 $32.73 $10.41 $10.08 $0.00 $53.22 08/01/2016 $32.73 $10.91 $10.08 $0.00 $53.72 12/01/2016 $32.73 $10.91 $10.89 $0.00 $54.53 SPRINKLER FITTER 03/01/2015 $48.99 $8.42 $14.90 $0.00 $72.31 SPRINKLER FITTERS LOCAL 550 - (Section RJ Zone 2 10/01/2015 $50.03 $8.42 $14.90 $0.00 $73.35 01/01/2016 $50.03 $8.67 $15.05 $0.00 $73.75 03/01/2016 $50.93 $8.67 $15.05 $0.00 $74.65 10/01/2016 $51.97 $8.67 $15.05 $0.00 $75.69 03/01/2017 $52.87 $8.67 $15.05 $0.00 $76.59 ---------------------- --------------------------------- - - ------------------------ --- ------------------------------------------ - Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 33 of 38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SPRINKLER FITTER Effective Date - 03/01/2015 Step percent -Local 550 (Section B) Zone 2 Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 35 $17.15 $8.42 $8.40 $0.00 $33.97 2 40 $19.60 $8.42 $8.40 $0.00 $36.42 3 45 $22.05 $8.42 $8.40 $0.00 $38.87 4 50 $24.50 $8.42 $8.40 $0.00 $41.32 5 55 $26.94 $8.42 $8.40 $0.00 $43.76 6 60 $29.39 $8.42 $8.40 $0.00 $46.21 7 65 $31.84 $8.42 $8.40. $0.00 $48.66 8 70 $34.29 $8.42 $8.40 $0.00 $51.11 9 75 $36.74 $8.42 $8.40 $0.00 $53.56 10 80 $39.19 $8.42 $8.40 $0.00 $56.01 Effective Date - 10/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $17.51 $8.42 $8.40 $0.00 $34.33 2 40 $20.01 $8.42 $8.40 $0.00 $36.83 3 45 $22.51 $8.42 $8.40 $0.00 $39.33 4 50 $25.02 $8.42 $8.40 $0.00 $41.84 5 55 $27.52 $8.42 $8.40 $0.00 $44.34 6 60 $30.02 $8.42 $8.40 $0.00 $46.84 7 65 $32.52 $8.42 $8.40 $0.00 $49.34 8 70 $35.02 $8.42 $8.40 $0.00 $51.84 9 75 $37.52 $8.42 $8.40 $0.00 $54.34 10 80 $40.02 $8.42 $8.40 $0.00 $56.84 - .._ - ----- ---- - _ - ,..._ ---- - �Notes: Apprentice entered prior 9/30/10: - - __._ ...�.- -.-.-.. ___..,.,_ - - - - ..... - -- - I 40/45/50/55/60/65/70/75/80/85 I Steps are 850 hours Apprentice to Journeyworker Ratio -i-3 STEAM BOILER OPERATOR 12/01/2014 $41.99 $10.00 $14.30 $0.00 OPERATING ENGINEERS LOCAL 4 06/01/2015 $42.73 $10.00 $14.30 $0.00 12/01/2015 $43.97 $10.00 $14.30 $0.00 06/01/2016 $44.72 $10.00 $14.30 $0.00 12/01/2016 $45.95 $10.00 $14.30 $0.00 06/01/2017 $46.94 $10.00 $14.30 $0.00 12/01/2017 $47.93 $10.00 $14.30 $0.00 For apprentice rates see "Apprentice- OPERATING ENGINEERS" $66.29 $67.03 $68.27 $69.02 $70.25 $71.24 $72.23 ---------------- ------------------------- ------- ----------------------- --------------------------------- ------ ----- ---------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 34 of 38 • Classification Effective Date Base Wage Health Pension supplemental Unemployment Total Rate TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 12/01/2014 $41.99 $10.00 $14.30 $0.00 $66.29 OPERATING ENGINEERS LOCAL 4 09/01/2015 $34.60 $13.00 $13.72 $0.00 $61.32 06/01/2015 $42.73 $10.00 $14.30 $0.00 $67.03 12/01/2015 I'F $43.97 $10.00 $14.30 $0.00 $68.27 06/01/2016 $44.72 $10.00 $14.30 $0.00 $69.02 12/01/2016 $45.95 $10.00 $14.30 $0.00 $70.25 06/01/2017 $46.94 $10.00 $14.30 $0.00 $71.24 12/01/2017 $47.93 $10.00 $14.30 $0.00 $72.23 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TELECOMMUNICATION TECHNICIAN 03/01/2015 $33.88 $13.00 $13.70 $0.00 $60.58 ELECTRICIANS LOCAL 103 2 40 $13.55 $13.00 $0.41 $0.00 09/01/2015 $34.60 $13.00 $13.72 $0.00 $61.32 $10.87 03/01/2016 $35.31 $13.00 $13.74 $0.00 $62.05 Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 $10.87 $0.00 $39.12 5 Effective Date - 03/01/2015 $16.94 $13.00 $11.11 Supplemental $41.05 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $13.55 $13.00 $0.41 $0.00 $26.96 2 40 $13.55 $13.00 $0.41 $0.00 $26.96 3 45 $15.25 $13.00 $10.87 $0.00 $39.12 4 45 $15.25 $13.00 $10.87 $0.00 $39.12 5 50 $16.94 $13.00 $11.11 $0.00 $41.05 6 55 $18.63 $13.00 $11.38 $0.00 $43.01 7 60 $20.33 $13.00 $11.64 $0.00 $44.97 8 65 $22.02 $13.00 $11.89 $0.00 $46.91 9 70 $23.72 $13.00 $12.15 $0.00 $48.87 10 75 $25.41 $13.00 $12.41 $0.00 $50.82 Effective Date - 09/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $13.84 $13.00 $0.42 $0.00 $27.26 2 40 $13.84 $13.00 $0.42 $0.00 $27.26 3 45 $15.57 $13.00 $10.88 $0.00 $39.45 4 45 $15.57 $13.00 $10.88 $0.00 $39.45 5 50 $17.30 $13.00 $11.14 $0.00 $41.44 6 55 $19.03 $13.00 $11.39 $0.00 $43.42 7 60 $20.76 $13.00 $11.65 $0.00 $45.41 8 65 $22.49 $13.00 $11.90 $0.00 $47.39 9 70 $24.22 $13.00 $12.17 $0.00 $49.39 10 75 $25.95 $13.00 $12.43 $0.00 $51.38 Notes: Apprentice to Journeyworker Ratio:l:l --- - --------------------------------------------------------------------------------------------------------- ---------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 35 of 38 Classification Effective Date Base Wage Health Pension Supplemental Unemnlovment Total Rate TERRAZZO FINISHERS 02/01/2015 $47.90 $10.18 $18.50 $0.00 $76.58 BRICKLAYF;RS LOCAL 3 -MARBLE & TILE 08/01/2015 $48.80 $10.18 $18.57 $0.00 $77.55 02/01/2016 $49.37 $10.18 $18.57 $0.00 $78.12 08/01/2016 $50.27 $10.18 $18.65 $0.00 $79.10 02/01/2017 $50.84 $10.18 $18.65 $0.00 $79.67 Apprentice- TERRAZZO FINISHER -Local 3 Marble & Tile Effective Date - 02/01/2015 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $23.95 $10.18 $18.50 $0.00 $52.63 2 60 $28.74 $10.18 $18.50 $0.00 $57.42 3 70 $33.53 $10.18 $18.50 $0.00 $62.21 4 80 $38.32 $10.18 $18.50 $0.00 $67.00 5 90 $43.11 $10.18 $18.50 $0.00 $71.79 Effective Date - 08/01/2015 1 Supplemental Step percent Apprentice Base Wage Health Pension. Unemployment Total Rate 1 50 $24.40 $10.18 $18.57 $0.00 $53.15 2 60 $29.28 $10.18 $18.57 $0.00 $58.03 3 70. $34.16 $10.18 $18.57 $0.00 $62.91 4 80 $39.04 $10.18 $18.57 $0.00 $67.79 5 90 $43.92 $10.18 $18.57 $0.00 $72.67 - _.__ -._-.........-.._ -- - -- - Notes: s. --- -- -- - ._.,. _ - - -....... - - --, - -_..-____-- - Apprentice to Journeyworker Ratio:1:3 - - _-_. --- ---_.______----_- TEST BORING DRILLER 12/01/2014 $35.95 $7.30 $13.15 $0.00 $56.40 LABOIUMS - FOUNDATIONAND MARINE 06/01/2015 $36.70 $7.30 $13.15 $0.00 $57.15 12/01/2015 $37.45 $7.30 $13.15 $0.00 $57.90 06/01/2016 $38.20 $7.30 $13.15 $0.00 $58.65 12/01/2016 $39.20 $7.30 $13.15 $0.00 $59.65 For apprentice rates see "Apprentice- LABORER" TEST BORING DRILLER HELPER 12/01/2014 $34.67 $7.30 $13.15 $0.00 $55.12 LABORERS - FOUNDATIONAND MARINE 06/01/201.5 $35.42 $7.30 $1.3.15 $0.00 $55.87 12/01/2015 $36.17 $7.30 $13.15 $0.00 $56.62 06/01/2016 $36.92 $7.30 $13.15 $0.00 $57.37 12/01/2016 $37.92 $7.30 $13.15 $0.00 $58.37 For apprentice rates see "Apprentice- LABORER" TEST BORING LABORER 12/01/2014 $34.55 $7.30 $13.15 $0.00 $55.00 LABORERS - FOUNDATION AND MARINE 06/01/2015 $35.30 $7.30 $13.15 $0.00 $55.75 12/01/2015 $36.05 $7.30 $13.15 $0.00 $56.50 06/01/2016 $36.80 $7.30 $13.15 $0.00 $57.25 12/01/2016 $37.80 $7.30 $13.15 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" ------------------- ---------------------------------------------------------------------------------------------------------------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 36 of 38 • Classification TRACTORS/PORTABLESTEAM GENERATORS. OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TRAILERS FOR EARTH MOVING EQUIPMENT TEAMSTERS JOINT COUNCIL NO. 10 ZONE B Effective Date Base Wage Health Pension Supplemental Total Rate $67.68 LABORERS (COMPRESSED AIR) Unemployment 12/01/2014 $41.99 $10.00 $14.30 $0.00 $66.29 06/01/2015 $42.73 $10.00 $14.30 $0.00 $67.03 12/01/2015 $43.97 $10.00 $14.30 $0.00 $68.27 06/01/2016 $44.72 $10.00 $14.30 $0.00 $69.02 12/01/2016 $45.95 $10.00 $14.30 $0.00 $70.25 06/01/2017 $46.94 $10.00 $14.30 $0.00 $71.24 12/01/2017 $47.93 $10.00 $14.30 $0.00 02.23 $0.00 $69.68 LABORERS (COMPRESSED AIR) 12/01/2014 $32.17 $9.91 $9.33 $0.00 $51.41 06/01/2015 $32.52 $9.91 $9.33 $0.00 $51.76 08/01/2015 $32.52 $10.41 $9.33 $0.00 $52.26 12/01/2015 $32.52 $10.41 $10.08 $0.00 $53.01 06/01/2016 $33.02 $10.41 $10.08 $0.00 $53.51 08/01/2016 $33.02 $10.91 $10.08 $0.00 $54.01 12/01/2016 $33.02 $10.91 $10.89 $0.00 $54.82 TUNNEL WORK - COMPRESSED AIR 12/01/2014 $46.83 $7.30 $13.55 $0.00 $67.68 LABORERS (COMPRESSED AIR) 06/01/2015 $47.58 $7.30 $13.55 $0.00 $68.43 12/01/2015 $48.33 $7.30 $13.55 $0.00 $69.18 06/01/2016 $49.08 $7.30 $13.55 $0.00 $69.93 12/01/2016 $50.08 $7.30 $13.55 $0.00 $70.93 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) 12/01/2014 $48.83 $7.30 $13.55 $0.00 $69.68 LABORERS (COMPRESSED AIR) 06/01/2015 $49.58 $7.30 $13.55 $0.00 $70.43 12/01/2015 $50.33 $7.30 $13.55 $0.00 $71.18 06/01/2016 $51.08 $7.30 $13.55 $0.00 $71.93 12/01/2016 $52.08 $7.30 $13.55 $0.00 $72.93 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - FREE AIR 12/01/2014 $38.90 $7.30 $13.55 $0.00 $59.75 LABORERS (FREE All? TUNNEL) 06/01/2015 $39.65 $7.30 $13.55 $0.00 $60.50 12/01/2015 $40.40 $7.30 $13.55 $0.00 $61.25 06/01/2016 $41.15 $7.30 $13.55 $0.00 $62.00 12/01/2016 $42.15 $7.30 $13.55 $0.00 $63.00 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - FREE AIR (HAZ. WASTE) 12/01/2014 $40.90 $7.30 $13.55 $0.00 $61.75 LABORERS (FREE AIR TUNNEL) 06/01/2015 $41.65 $7.30 $13.55 $0.00 $62.50 12/01/2015 $42.40 $7.30 $13.55 $0.00 $63.25 06/01/2016 $43.15 $7.30 $13.55 $0.00 $64.00 12/01/2016 $44.15 $7.30 $13.55 $0.00 $65.00 For apprentice rates see "Apprentice- LABORER" VAC -HAUL 12/01/2014 $31.59 $9.91 $9.33 $0.00 $50.83 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2015 $31.94 $9.91 $9.33 $0.00 $51.18 08/01/2015 $31.94 $10.41 $9.33 $0.00 $51.68 12/01/2015 $31.94 $10.41 $10.08 $0.00 $52.43 06/01/2016 $32.44 $10.41 $10.08 $0.00 $52.93 08/01/2016 $32.44 $10.91 $10.08 $0.00 $53.43 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24 -------------------- ---------------------------------------------------------- Issue Date: 03/05/2015 Wage Request Number: ----- 20150305-061 ------------------------------ -------------------- Page 37 of 38 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate WAGON DRILL OPERATOR 12/01/2014 $30.90 $7.30 $12.30 $0.00 $50.50 LABORERS - ZONE 2 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51..00 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" WASTE WATER PUMP OPERATOR 12/01/2014 $42.39 $10.00 $14.30 $0.00 $66.69 OPERATING ENGINEERS LOCAL 4 06/01/2015 $43.14 $10.00 $14.30 $0.00 $67.44 12/01/2015 $44.39 $10.00 $14.30 $0.00 $68.69 06/01/2016 $45.14 $10.00 $14.30 $0.00 $69.44 12/01/2016 $46.39 $10.00 $14.30 $0.00 $70.69 06/01/2017 $47.39 $10.00 $14.30 $0.00 $71.69 12/01/2017 $48.39 $10.00 $14.30 $0.00 $72.69 For apprentice rates see "Apprentice- OPERATING ENGINEERS" WATER METER INSTALLER 03/01/2015 $46.58 $10.32 $14.54 $0.00 $71.44 PI UMBERS GASTI7TERSLOCAL 12 (Local 138) 09/01/2015 $47.58 $10.32 $14.54 $0.00 $72.44 03/01/2016 $48.73 $10.32 $14.54 $0.00 $73.59 09/01/2016 $49.78 $10.32 $14.54 $0.00 $74.64 03/01/2017 $50.78 $10.32 $14.54 $0.00 $75.64 For apprentice rates see "Apprentice- PLUMBER/PIPEFITTER" or "PLUMBER/GASFITTER" Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L. c. 23, ss. IIE-11L. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. 1 IE -I 1L. All steps are six months (1000 hours.) Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof, unless otherwise specified. ** Multiple ratios are listed in the comment field. *** APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. **** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. -------------------------------- ------------------------------------------------------------------------------------ - --------------- Issue Date: 03/05/2015 Wage Request Number: 20150305-061 Page 38 of 38 TOWN OF NORTH ANDOVER CONTRACT CONTRACT#r)fn) DATE: 03-06- aO / y This Contract is entered into on, or as of, this date by and between the Town of North Andover (the "Town"), and Contractor: P.J. Keating Company Address: 998 Reservoir Road Lunenburg, MA 01462 Telephone Number: 978-582-5200 Fax Number: 978-582-7027 1. This is a Contract for the procurement of the following: Bituminous concrete paving in accordance with the Invitation for Bids dated January 29, 2014 for the period of April 1, 2014 to March 31, 2015 with the option of two additional one-year renewals, solely at the discretion of the Town 2. The Contract price to be paid to the Contractor by the Town of North Andover is: $68.05 per town, with price adjustment if applicable 3. Payment will be made as follows: Upon acceptance of work and receipt of invoice, net 30 4. Definitions 4.1 Acceptance: All Contracts require proper acceptance of the described goods or services by the Town of North Andover. Proper acceptance shall be understood to include inspection of goods and certification of acceptable performance for services by authorized representatives of the Town to insure that the goods or services are complete and are as specified in the Contract. (Rev 5-2007) Contract by and between Town of North Andover and P.J. Keating Company Page 1 a t� 1 J 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both. 5. Term of Contract and Time for Performance This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before March 31, 2015, unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation Notwithstanding anything in the Contract documents to the contrary, any and all payments which the Town is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be immediately terminated without liability for damages, penalties or other charges. 7. Permits and Approvals Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. (Rev 5-2007) Contract by and between Town of North Andover and P.J. Keating Company Page 2 8. Termination and Default 8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days notice when in the best interests of the Town by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. Upon termination without cause, Contractor will be paid for services rendered to the date of termination. 8.2 For Cause. If the Contractor is determined by the Town to be in default of any term or condition of this Contract, the Town may terminate this Contract on seven (7) days notice by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. 8.3 Default. The following shall constitute events of a default under the Contract: 1) any material misrepresentation made by the Contractor to the Town; 2) any failure to perform any of its obligations under this Contract including, but not limited to the following: (i) failure to commence performance of this Contract at the time specified in this Contract due to a reason or circumstance within the Contractor's reasonable control, (ii) failure to perform this Contract with sufficient personnel and equipment or with sufficient material to ensure the completion of this Contract within the specified time due to a reason or circumstance within the Contractor's reasonable control, (iii) failure to perform this Contract in a manner reasonably satisfactory to the Town, (iv) failure to promptly re -perform within a reasonable time the services that were rejected by the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a material term of this Contract, including, but not limited to, the provision of insurance and non-discrimination, (vii) any other acts specifically and expressly stated in this Contract as constituting a basis for termination of this Contact, and (viii) failure to comply with any and all requirements of state law and/or regulations, and Town bylaw and/or regulations. 9. The Contractor's Breach and the Town's Remedies Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be deemed a material breach of this Contract, and the Town of North Andover shall have all the rights and remedies provided in the Contract documents, the right to cancel, terminate, or suspend the Contract in whole or in part, the right to maintain any and all actions at law or in equity or other proceedings with respect to a breach of this Contract, including damages and specific performance, and the right to select among the remedies available to it by all of the above. (Rev 5-2007) Contract by and between Town of North Andover and P.J. Keating Company Page 3 From any sums due to the Contractor for services, the Town may keep the whole or any part of the amount for expenses, losses and damages incurred by the Town as a consequence of procuring services as a result of any failure, omission or mistake of the Contractor in providing services as provided in this Contract. 10. Statutory Compliance 10.1 This Contract will be construed and governed by the provisions of applicable federal, state and local laws and regulations; and wherever any provision of the Contract or Contract documents shall conflict with any provision or requirement of federal, state or local law or regulation, then the provisions of law and regulation shall control. Where applicable to the Contract, the provisions of the General Laws are incorporated by reference into this Contract, including, but not limited to, the following: General Laws Chapter 30B — Procurement of Goods and Services. General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts. General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts. 10.2 Wherever applicable law mandates the inclusion of any term and provision into a municipal contract, this Section shall be understood to import such term or provision into this Contract. To whatever extent any provision of this Contract shall be inconsistent with any law or regulation limiting the power or liability of cities and towns, such law or regulation shall control. 10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on the performance of the Contract. If the Contractor performs the Contract in violation of any applicable law or regulation, the Contractor shall bear all costs arising therefrom. 10.4 The Contractor shall keep itself fully informed of all existing and future State and National Laws and Municipal By-laws and Regulations and of all orders and decrees of any bodies or tribunals having jurisdiction in any manner affecting those engaged or employed in the work, of the materials used in the work or in any way affecting the conduct of the work. If any discrepancy or inconsistency is discovered in the Drawings, Specifications or Contract for this work in violation of any such law, by-law, regulation, order or decree, it shall forthwith report the same in writing to the Town. It shall, at all times, itself observe and comply with all such existing and future laws, by-laws, regulations, orders and decrees; and shall protect and indemnify the Town of North Andover, and its duly appointed agents against any claim or liability arising from or based on any violation whether by him or its agents, employees or subcontractors of any such law, by-law, regulation or decree. 11. Conflict of Interest Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which shall constitute a violation of that law. The Contractor shall be deemed to have investigated the (Rev 5-2007) Contract by and between Town of North Andover and P.J. Keating Company Page 4 application of M.G.L. c. 268A to the performance of this Contract; and by executing the Contract documents the Contractor certifies to the Town that neither it nor its agents, employees, or subcontractors are thereby in violation of General Laws Chapter 268A. 12. Certification of Tax Compliance This Contract must include a certification of tax compliance by the Contractor, as required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors Providing Goods, Services, or Real Estate Space to the Commonwealth or Subdivision). 13. Discrimination The Contractor will carry out the obligations of this Contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151B (Law Against Discrimination) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. 14. Assimnent Assignment of this Contract is prohibited, unless and only to the extent that assignment is provided for expressly in the Contract documents. 15. Condition of Enforceability Against the Town This Contract is only binding upon, and enforceable against, the Town if. (1) the Contract is signed by the Town Manager or its designee; and (2) endorsed with approval by the Town Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the Town Counsel as to form. 16. Corporate Contractor If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's Certificate certifying the corporate capacity and authority of the party signing this Contract for the corporation. Such certificate shall be accompanied by a letter or other instrument stating that such authority continues in full force and effect as of the date the Contract is executed by the Contractor. This Contract shall not be enforceable against the Town of North Andover unless and until the Contractor complies with this section. The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto, relating to the appointment of the Commissioner of Corporations as its attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the Commonwealth. (Rev 5-2007) Contract by and between Town of North Andover and P.J. Keating Company Page 5 17. Liabilitv of Public Officials To the full extent permitted by law, no official, employee, agent or representative of the Town of North Andover shall be individually or personally liable on any obligation of the Town under this Contract. 18. Indemnificati The Contractor shall indemnify, defend and save harmless the Town, the Town's officers, agents and employees, from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by the Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective, or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this contract. 19. Workers Compensation Insurance The Contractor shall provide by insurance for the payment of compensation and the furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's Compensation Act) to all employees of the Contractor who are subject to the provisions of Chapter 152 of the General Laws of Massachusetts. Failure to provide and continue in force such insurance during the period of this Contract shall be deemed a material breach of this Contract, shall operate as an immediate termination thereof, and Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article. The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this Contract before the same shall be binding on the parties thereto, except if specifically waived by the Town. 20. Documents, Materials, Etc. Any materials, reports, information, data, etc. given to or prepared or assembled by the Contractor under this Contract are to be kept confidential and shall not be made available to any individual or organization by the Contractor (except agents, servants, or employees of the Contractor) without the prior written approval of the Town, except as otherwise required by law. The Contractor shall comply with the provisions Chapter 66A of the General Laws of (Rev 5-2007) Contract by and between Town of North Andover and P.J. Keating Company Page 6 Massachusetts as it relates to public documents, and all other state and federal laws and regulations relating to confidentiality, security, privacy and use of confidential data. Any materials produced in whole or in part under this Contract shall not be subject to copyright, except by the Town, in the United States or any other country. The Town shall have unrestricted authority to, without payment of any royalty, commission, or additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole or in part, any reports, data or other materials prepared under this Contract. All data, reports, programs, software, equipment, furnishings, and any other documentation or product paid for by the Town shall vest in the Town at the termination of this Contract. The Contractor shall at all times, during or after termination of this Contract, obtain the prior written approval of the Town before making any statement bearing on the work performed or data collected under this Contract to the press or issues any material for publication through any medium. 21. Audit, Inspection and Recordkeeping At any time during normal business hours, and as often as the Town may deem it reasonably necessary, there shall be available in the office of the Contractor for the purpose of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. 22. Payment The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work completed and acceptance from the Town of the work completed. 23. Waiver and Amendment Amendments, or waivers of any additional term, condition, covenant, duty or obligation contained in this Contract may be made only by written amendment executed by all signatories to the original Agreement, prior to the effective date of the amendment. To the extent allowed by law, any conditions, duties, and obligations contained in this Contract may be waived only by written Agreement by both parties. Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver, nor in any manner limit the legal or equitable remedies available to that party. No waiver by either party of any default or breach shall constitute a waiver of any subsequent default or breach of a similar or different matter. 24. Forum and Choice of Law This Contract and any performance herein shall be governed by and be construed in accordance with the laws of the Commonwealth. Any and all proceedings or actions relating to subject (Rev 5-2007) Contract by and between Town of North Andover and P.J. Keating Company Page 7 25 26. 27 28. matter herein shall be brought and maintained in the courts of the Commonwealth or the federal district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any other legal rights of the parties. Notices Any notice permitted or required under the provisions of this Contract to be given or served by either of the parties hereto upon the other party hereto shall be in writing and signed in the name or on the behalf of the party giving or serving the same. Notice shall be deemed to have been received at the time of actual service or three (3) business days after the date of a certified or registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to the Town of North Andover by being sent to the Town Manager, Town Hall, 120 Main Street, North Andover, Massachusetts 01845. Binding on Successors This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in interest (and where not corporate, the heirs and estate of the Contractor). Complete Contract This instrument, together with its endorsed supplements, and the other components of the contract documents, constitutes the entire contract between the parties, with no agreements other than those incorporated herein. Supplemental Conditions The foregoing provisions apply to all contracts to which the Town of North Andover shall be a party. One of the following "Supplements" must be "checked" as applicable to this Contract, shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The Supplement contains additional terms governing the Contract: [ ] GOODS SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods (governed by the provisions of General Laws Chapter 30B) [ ] SERVICES SUPPLEMENT "S" - Applicable to Contracts for the procurement of Services (governed by the provisions of General Laws Chapter 30B) [ X ] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for Construction (Rev 5-2007) Contract by and between Town of North Andover and P.J. Keating Company Page 8 I IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set forth their hands the day and year first above written. THE TOWN Di5i on/Department Head Contract Manager Town Manager Date APPROVED AS TO FORM: Town Counsel Date THE CONTRACTOR Company Name N areww, 4sst- Print Name & Title �Secfe J CERTIFICATION AS TO AVAILABILITY OF FUNDS: mp t-" a a5 0 Town countant o Date (Rev 5-2007) Contract by and between Town of North Andover and P.J. Keating Company Page 9 SUPPLEMENT "C" [] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for the construction of: (1) Public Buildings and Public Works (governed by the provisions of General Laws Chapter 30B); (2) Public Buildings (governed by the provisions of General Laws Chapter 149,§ 44A, et seq.); and (3) Public Works (governed by the provisions of General Laws Chapter 30, §39M, et seq) 1. This form supplements the Town of North Andover "Contract and General Conditions" and applies only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works or public buildings. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be understood to be a term and condition of this Contract. The Contractor agrees to secure such bond (where required) in the form required by the Town and provide an original thereof to the Town prior to the commencement of performance. E uali : 3.1. In the case of a closed Specification written for a specific item or items to be furnished under the Base Bid, such specifications shall, as applicable, be in compliance with the Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq. 3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or on the Drawings, except as above noted, the intent is to establish a standard and in no way should be construed to exclude any item or manufacturer not mentioned by name, but whose product meets the Specifications as to design, utility and quality. Final decision shall rest with the Project Representative as to its acceptability. 4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of Chapter 30B. The Contractor will carry out the obligations of this contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. The Contractor will at all times comply with the wage rates as determined by the Commissioner of the Department of Labor and Industries, under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall be in force and as amended. 6. The Contractor shall continuously maintain adequate protection of all work from damage and shall protect the property of the Town and others, including adjacent property, from injury or loss arising (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 1 and P.J. Keating Company V. in connection with the Contract. The Contractor shall make good any such damage, injury or loss, except as may be directly due to errors in the Contract Documents or caused by agents or employees of the Town, or due to causes beyond the Contractor's control and not the Contractor's fault or negligence. 7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents or injury to persons on, about or adjacent to the premises where the work is being performed. The Contractor will erect and properly maintain at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and the public, shall post danger signs warning against the hazards created by such features of construction such as pits, protruding nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling materials; and shall designate a responsible member of its organization on the work, whose duty shall be the prevention of accidents. The Town shall at all times have access to the work wherever it is in preparation or progress and the Contractor shall provide suitable accommodations for such access. 9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants, all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the construction superintendent, foreman, or assistants are unacceptable to the Town, then upon seven days notice from the Town, the Contractor shall replace such person or persons with people acceptable to the Town. 10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The Contractor shall carefully study and compare the drawings, specifications and other instructions and shall at once report to the Town any error, inconsistency or omission which shall be discovered. Included in this responsibility shall be supervision of all work performed by subcontractors on the work. 11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any of its provisions, the Town, upon three days written notice, may, without prejudice to any other remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor. 12. Inspection by the Town's Project Representative 12.1. The Town shall have the right to designate a Project Representative who may make periodic visits to the site to familiarize the Town generally with the progress and quality of the work, and to determine in general if the work is proceeding in accordance with the Contract Documents. The Project Representative will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the work, and will not be responsible for the Contractor's failure to carry out the construction work in accordance with the Contract Documents. During such visits and on the basis of these observations while at the site, the Project Representative will keep the Town informed on the progress of the work, will endeavor to guard the Town against defects and deficiencies in the work of contractors, and may condemn structural work as failing to conform to the Contract Documents. The Project Representative shall have authority to act on behalf of the Town only to the extent expressly delegated by the Town, which shall be shown to the Contractor, and shall have authority to stop the work whenever such stoppage may reasonably be necessary to insure the proper execution of the Contract. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 2 and P.J. Keating Company * . . 12.2. In connection with the work, the Project Representative shall not be responsible for construction methods, means, techniques, sequences or procedures employed by the Contractor or the Contractor's safety programs, requirements, regulations, or precautions. 13. Decisions of the Project Representative 13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of the Town or the Contractor and on all other matters relating to the execution and progress of the structural work or the interpretation of the Contract Documents. 13.2. The Project Representative's decision, in matters relating to the project, shall be final, if within the terms of the Contract Documents. 13.3. If, however, the Project Representative fails to render a decision within ten days after the parties have presented their evidence, either party may then avail itself of the remedies provided in this contract or available to it by law. If the Project Representative renders a decision after such remedies have commenced, such decision may be entered as evidence but shall not disturb or interrupt such proceedings except where such decision is acceptable to the parties concerned. 14.1 Use of Premises by the Contractor: 14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of its workmen to limits indicated by law, by-laws, permits or directions of the Town and shall not unreasonably encumber the premises with its materials. 14.2. The Contractor shall not load or permit any part of the structure to be loaded with a weight that will endanger its safety. 15. Maintenance of Premises: The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its employees or work, and at the completion of the work it shall remove all its rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute, the Town may remove the rubbish and charge the cost to the several contractors, as the Town shall determine to be just. 16. Right to Terminate If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently disregard laws and regulations or lawful directives of the Town, or (7) be guilty of a substantial violation of any provision of the Contract, then the Town may, without prejudice to any other right or remedy and after giving the Contractor (or any surety) seven days written notice, terminate the contract and the employment of the Contractor and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method it deems appropriate. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover and P.J. Keating Company Page 3 In such cases, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid amount owed to the Contractor for work already completed shall exceed the expense of finishing the work, including compensation for additional architectural, managerial, legal and administrative services, such excess shall be paid to the Contractor. If such expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the Town. The Contractor shall not be relieved of liability to the Town by virtue of any termination of this contract, and any claim for damages against the Contractor relating to the Contractor's performance under this contract shall survive any termination hereunder. Notwithstanding any other provision of this Agreement, the Town reserves the right at any time in its absolute discretion to suspend or terminate this Agreement in whole or in part for its convenience upon seven days written notice to the Contractor. The Town shall incur no liability by reason of such termination except for the obligation to pay compensation for all work performed by the Contractor and accepted by the Town to the termination date. 17. Progress Payments: 17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported to the extent required by the Town by invoices or other vouchers, showing payments for materials and labor, payments to Subcontractors and such other evidence of the Contractor's right to payment. 17.2. The Contractor shall, before the first application, submit to the Town a schedule of values of the various parts of the work, including quantities aggregating the total sum of the Contract, divided so as to facilitate payments to Subcontractors, made out in such form as the Town and the Contractor may agree upon, and, if required, supported by such evidence as to its correctness. This schedule, when approved by the Town, shall be used as a basis for payment, unless it is found to be in error. If applying for payments, the Contractor shall submit a statement based upon this schedule. 18. Withholding of Payments 18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the whole or part of any payment to such extent as may be necessary in its reasonable opinion to protect the Town of North Andover from loss on account of - 18. 1. 1. f: 18.1.1. Defective work not remedied. 18.1.2. Claims filed or reasonable evidence indicating probable filing of claims. 18.1.3. Failure of the Contractor to make payments properly to Subcontractors or for material or labor. 18.1.4. A reasonable doubt that the Contract can be completed for the balance then unpaid. 18.1.5. Damage to another contractor. 18.1.6. Delays resulting in liquidated damages. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 4 and P.J. Keating Company I J • a 18.2. Withholding of payments shall be in strict compliance with statutory requirements. 19. Claims by Contractor and Liability of Town All claims by the Contractor against the Town shall, unless otherwise provided by law, be initiated by a written claim submitted to the Town no later than seven (7) calendar days after the event or the first appearance of the circumstances causing. the claim. The claim shall set forth in detail all known facts and circumstances supporting the claim. The Contractor shall continue its performance under this contract regardless of the submission or existence of any claims. The limit of liability of the Town under this Agreement is limited to the compensation provided herein for work actually performed, and shall in no event include liability for delays or for incidental, special or consequential damages or lost profits or for damages or loss from causes beyond the Town's reasonable control. 20. Liquidated Damages: Because both parties recognize (1) that the time for completion of this Contract is of the essence, (2) that the Town will suffer loss if the work is not completed within the contract time specified, plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the delays, expense and difficulties involved in a legal proceeding to determine the actual loss suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay the Town as liquidated damages representing an estimate of delay damages, not as a penalty, the sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is completed, whether the work is completed by the Contractor or some other person. The Town's right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a legal action for damages in lieu of or in addition to its option to impose liquidated damages. The Town may deduct any liquidated damages from money due the Contractor, and if such payment is insufficient to cover the liquidated damages, then the Contractor shall pay the amount due. 21. The Contractors' Mutual Responsibility: Should the Contractor cause damage to any separate subcontractor on the work, the Contractor agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies provided by law or by the provisions of the contract. If such separate contractor sues the Town on account of any damage alleged to have been sustained, the Town shall notify the Contractor, who shall defend such proceedings at the Town's expense and, if any judgment against the Town arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Town. 22. Separate Contracts: 22.1. The Town reserves the right to let other Contracts in connection with this work under similar General Conditions. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate its work with theirs. 22.2. If any part of the Contractor's work depends, for proper execution or results, upon the work of any other contractor, the Contractor shall inspect and promptly report to the Town any defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover and P.J. Keating Company Page 5 of the other contractor's work as fit and proper for the reception of its work except as to defects which may develop in the other contractor's work after the execution of its work. 22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work already in place and shall at once report to the Town any discrepancy between the executed work and the Drawings. 23. Subcontracts: 23.1. All Subcontracts shall be awarded in conformity with the requirements of the General Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive. 23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and omissions of its Subcontractors and of persons either directly or indirectly employed by them, as it is for the acts and omissions of persons directly employed by it. 23.3. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the Town. 24. Contractor -Subcontractor Relations: The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound by the terms of the Agreement, the General Conditions of the Contract, the Supplementary General Conditions, the Drawings and Specifications, as far as applicable to its work, including the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A, et seq. 25. Indemnification: 25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents and employees from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) brought or recovered against them that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this Contract. 25.2. In any and all claims against the Town or any of their agents or employees by any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under this paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 6 and P.J. Keating Company any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other employee benefit acts. 25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and minimum limits of liability acceptable under the Contract. However, it shall be the Contractor's responsibility to purchase and maintain insurance of such character and in such amounts as will adequately protect it and the Town from and against all claims, damages, losses and expenses resulting from exposure to any casualty liability in the performance of the Work. 26. The Contractor's Insurance: 26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable. 26.1.1. Claims under Worker's Compensation, disability benefit and other similar employee benefit acts; 26.1.2. Claims for damages because of bodily injury, occupational sickness or disease, or death of its employees, and claims insured by usual personal injury liability coverage; 26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of any person other than its employees, and claims insured by usual personal liability coverage; 26.1.4. Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 26.2. The insurance required by the above shall be written for not less than the following minimum limits of liability: 26.2.1. Worker's Compensation Insurance Requirements Workers' Compensation coverage as required by the laws of the Commonwealth of Massachusetts. 26.2.2. Liability Insurance Requirements Liability insurance shall include all major divisions and shall be on a comprehensive general basis including Premises and Operations, Owners and Contractor's Protective, Products and Completed Operations,, and Owned, Non -owned and Hired Motor Vehicles. All such insurance shall be written for not less than any limits of liability required by law, unless otherwise provided in the contract documents, or the following limits, whichever are greater: (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 7 and P.J. Keating Company Comprehensive General Liability Insurance (Broad Form) Bodily Injury Property Damage Automobile Liability Insurance $1,000,000 per person $3,000,000 per occurrence $1,000,000 per occurrence $3,000,000 annual aggregate $500,000 per person $1,000,000 per occurrence 26.3. The above insurance policies shall also be subject to the following requirements: 26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as hereinafter specified under Paragraph entitled "Protective Liability Insurance" shall be written by one and the same insurance company to avoid the expense of duplicate and/or overlapping coverage and to facilitate and expedite the settlement of claims. 26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed with the Town prior to commencement of the work. Renewal certificates shall be addressed to and filed with the Town at least ten (10) days prior to the expiration date of required policies. 26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30) days prior written notice forwarded by registered or certified mail to the Town. The Town shall also be notified of the attachment of any restrictive amendments to the policies. 26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of Insurance form, shall contain true transcripts from the policies, authenticated by the proper officer of the Insurer, evidencing in particular those insured, the extent of coverage, the location and operations to which the insurance applies, the expiration date and the above-mentioned notice clauses. 26.3.5. All premium costs shall be included in the Contractor's bid. 26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be maintained without interruption from date of the Contract until date of final payment and termination of any coverage required to be maintained after payment. 27. Protective Liability Insurance: 27.1. The Contractor shall purchase and maintain such insurance as described in the preceding paragraph as will protect the Town from claims which may arise from operations under the Contract, including operations performed for the named insureds by independent contractors and general inspection thereof by the named insureds. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover and P.J. Keating Company Page 8 27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town against Automobile Non -Ownership Liability in connection with the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them; or by anyone for whose acts any of them may be liable. 27.3. The limits of liability for coverage required under the preceding paragraphs shall be as specified under the provisions hereof governing the Contractor's General Liability Policy. 27.4. The Town shall be named as an additional insured on the above referenced liability Policies, and the Contractor's insurance shall be the primary coverage. The cost of such insurance, including required endorsements and amendments, shall be the sole responsibility of the Contractor. 28. Liens: Neither the Final Payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as it has knowledge or information, the releases and receipts include all the labor and material for which a lien could be filed. The Contractor shall comply with all statutory provisions of the General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149 as amended (as a minimum requirement). 29. Guarantees: 29.1. The Contractor guarantees and warrants to the Town that all labor furnished under this Contract will be competent to perform the tasks undertaken, that the product of such labor will yield only first-class results, that materials and equipment furnished will be of good quality and new unless otherwise permitted by this Contract, and that the Work will be of good quality, free from faults and defects and in strict conformance with this Contract. All Work not conforming to these requirements may be considered defective. 29.2. If at any time any part of the work constructed under the terms of this contract shall in the opinion of the Town Manager require repairing due to defective work or materials furnished by the Contractor, he may notify the Contractor in writing to make the required repairs. If the Contractor shall neglect to start such repairs within ten days of the date of giving it notice thereof and to complete the same to the satisfaction of the Town Manager with reasonable dispatch, then the latter may employ other persons to make such repairs. The Town shall charge the expense thereof to the Contractor and may use any moneys still retained to pay for the same, and if such sum is insufficient, the Contractor shall be obligated to pay the balance thereof. 29.3. All guarantees and warranties required in the various Sections of the Specifications which originate with a Subcontractor or Manufacturer must be delivered to the Town before final payment to the Contractor may be made for the amount of that subtrade or for the phase of work to which the guarantee or warranty relates. The failure to deliver a required guarantee or warranty shall be held to constitute a failure of the Subcontractor to fully complete his work in accordance with the Contract Documents. The Contractor's (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 9 and P.J. Keating Company w "PI. , " obligation to correct work is in addition to, and not in substitution of, such guarantees or warranties as may be required in the various Sections of the Specifications. This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals hereto: Dated: j A e The Town of North Andover by: The Contractor by: Town Manager 4agent/bivision Head 4t�j 1 4 Town countant Certifie as to Appropriation Town Counsel Approved as to Form (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover and P.J. Keating Company Assf , �-�eYftnI Page 10 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK - As -determined by the Director under the provisions of the. JOANNE F. GOLDSTEIN Gov— Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H secretory HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Furnish and install bituminous concrete paving (which may include leveling, spill berms, binder, or top courses) for locations throughout the Town Job Location: Throughout Town Information about Prevailing Wage Schedules for Awarding Authorities and Contractors This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage Request Number" on all pages of this schedule. • Awarding authorities must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. C. 149, § 27. Once a contractor has been selected by the awarding authority, the wage schedule shall be made a part of the contract for that project. The wage schedule must be posted in a conspicuous place at the work site during the life of the project in accordance with M.G.L. c. 149, § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project regardless of whether they are employed by the prime contractor, a filed sub -bidder, or any sub -contractor. • All apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice. Training (DAT). Apprentices must keep his/her apprentice identification card on his/her person during all work hours on the project. If an apprentice rate is listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAT, the apprentice may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. If an apprentice rate is not listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAT, the apprentice must be paid the journeyworker's rate for the trade. The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F "rental of equipment" contracts. Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports directly to the awarding authority and keep them on file for three years. Each weekly payroll report must contain: the employee's name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/pw. • Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617) 626-6953. • Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor. Division of the office of the Attorney General at (617) 727-3465. • Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and -criminal penalties. Issue Date: 01/22/2014 Wage Request Number: 20140122-006 (4 & 5 AXLE) DRIVER - EQUIPMENT TEAMSTERS JOINT COUNCIL NO, 10 70NE B 12/01/2014 $31.37 $9.91 $9.33 $0.00 $50.61 i Classification Effective Date Base Wage Health Pension Supplemental Total Rate $10.41 $9.33 $0.00 $51.46 12/01/2015 Unemployment $10.41 Construction $0.00 $52.21 06/01/2016 $32.22 $10.41 $10.08 (2 AXLE) DRIVER - EQUIPMENT 12/01/2013 $30.95 $9.41 $8.80 $0.00 $49.16 TEAMSTERS JOINT COUNCIL NO. IO ZONE B 12/01/2016 $32.22 $10.91 $10.89 $0.00 $54.02 06/01/2016 06/01/2014 $31.30 $9.41 $8.80 $0.00 $49.51 . $32.34 08/01/2014 $31.30 $9.91. $8.80 $0.00 $50.01 $10.91 12/01/2014 $31.30 $9.91 $9.33 $0.00 $50.54 06/01/2015 $31.65 $9.91 $9.33 $0.00 $50.89 08/01/2015 $31.65 $10.41 $9.33 $0.00 $51.39 12/01/2015 $31.65 $10.41 $10.08 $0.00 $52.14 For apprentice rates see "Apprentice- LABORER" 06/01/2016 $32.15 $10.41 $10.08 $0.00 $52.64 Issue Date: 01/22/2014 08/01/2016 $32.15 $10.91 $10.08 $0.00 $53.14 12/01/2016 $32.15 $10.91 $10.89 $0.00 $53.95 (3 AXLE) DRIVER - EQUIPMENT 12/01/2013 $31.02 $9.41 $8.80 $0.00 $49.23 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2014 $31.37 $9.41 $8.80 $0.00 $49.58 08/01/2014 $31.37 $9.91 $8.80 $0.00 $50.08 (4 & 5 AXLE) DRIVER - EQUIPMENT TEAMSTERS JOINT COUNCIL NO, 10 70NE B 12/01/2014 $31.37 $9.91 $9.33 $0.00 $50.61 06/01/2015 $31.72 $9.91 $9.33 $0.00 $50.96 08/01/2015 $31.72 $10.41 $9.33 $0.00 $51.46 12/01/2015 $31.72 $10.41 $10.08 $0.00 $52.21 06/01/2016 $32.22 $10.41 $10.08 $0.00 $52.71 08/01/2016 $32.22 $10.91 $10.08 $0.00 $53.21 12/01/2016 $32.22 $10.91 $10.89 $0.00 $54.02 12/01/2013 $31.14 $9.41 $8.80 $0.00 $49.35 06/01/2014 $31.49 $9.41 $8.80 $0.00 $49.70 08/01/2014 $31.49 $9.91 $8.80 $0.00 $50.20 12/01/2014 $31.49 $9.91 $9.33 $0.00 $50.73 06/01/2015 $31.84 $9.91 $9.33 $0.00 $51.08 08/01/2015 $31.84 $10.41 $9.33 $0.00 $51.58 12/01/2015 $31.84 $10.41 $10.08 $0.00 $52.33 06/01/2016 $32.34 $10.41 $10.08 $0.00 $52.83 08/01/2016 $32.34 $10.91 $10.08 $0.00 $53.33 12/01/2016 $32.34 $10.91 $10.89 $0.00 $54.14 ADS/SUBMERSIBLE PILOT 08/01/2013 $84.21 $9.80 $18.17 $0.00 $112.18 PILE DRIVER LOCAL 56 (70NE 1) 08/01/2014 $87.36 $9.80 .$18.17 $0.00 $115.33 08/01/2015 $90.51 $9.80 $18.17 $0.00 $118.48. AIR TRACK OPERATOR 12/01/2013 $30.60 $7.30 $12.10 $0.00 $50.00 LABORERS - 70NE 2 06/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 12/01/2014 $31.60 $7.30 $12.10 $0.00 $51.00 06/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50. 12/01/2015 $32.60 $7.30 $12.10 $0.00 $52.00 06/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 12/01/2016 $33.85 $7.30 $12.10 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 2 of 40 Classification ASBESTOS REMOVER - PIPE / MECH. EQUIPT. HEAT & FROST INSULATORS LOCAL G (BOSTON) ASPHALT RAKER LABORERS -ZONE 2 Effective Date Base Wage Health Pension Supplemental Total Rate $64.67 OPERATING ENGINEERS LOCAL 4 Unemployment 12/01/2013 $30.68 $10.40 $5.95 $0.00 $47.03 06/01/2014 $31.58 $10.40 $5.95 $0.00 $47.93 12/01/2014 $32.48 $10.40 $5.95 $0.00 $48.83 06/01/2015 $33.43 $10.40 $5.95 $0.00 $49.78 12/01/2015 $34.38 $10.40 $5.95 $0.00 $50.73 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 0.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BACKHOE&RONT-END LOADER 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BARCO-TYPE JUMPING TAMPER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS -ZONE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 .$12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" BLOCK PAVER, RAMMER / CURB SETTER 12/01/201.3 $30.60 $7.30 $12.10 $0.00 $50.00 LABORERS -ZONE 2. 06/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 12/01/2014 $31.60 $7.30 $12.10 $0.00 $51.00 06/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 12/01/2015 $32.60 $7.30 $12.10 $0.00 $52.00 06/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 12/01/2016 $33.85 $7.30 $12.10 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" BOILERMAKER 01/01/2010 $37.70 $6.97 $11.18 $0.00 $55.85 BOILERMAKERS LOCAL 29 ------------ -------------------------' ------------------ Issue Date: 01/22/2014 Wage Request Number: ----------------------- 20140122-006 -------------- ------------------------------- Page 3 of 40 ClassificationEffective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- BOILERMAKER -Local 29 Effective Date - 01/01/2010 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $24.51 $6.97 $11.18 $0.00 $42.66 2 65 $24.51 $6.97 $11.18 $0.00 $42.66 3 70 $26.39 $6.97 $11.18 $0.00 $44.54 4 75 $28.28 $6.97 $11.18 $0.00 $46.43 5 80 $30.16 $6.97 $11.18 $0.00 $48.31 6 85 $32.05 $6.97 $11.18 $0.00 $50.20 . 7 90 $33.93 $6.97 $11.18 $0.00 $52.08 8 95 $35.82 $6.97 $11.18 $0.00 $53.97 --___.-------_....-_........:-._......._-- Notes: --- - --- -----, _____-_._.___---------._.._-�..--.._._ Apprentice to Journeyworker Ratio:1:5 ----___ BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 08/01/2013 $48.06 $10.18 $18.15 $0.00 $76.39 WATERPROOFING) 02/01/2014 $48.06 $10.18 $18.15 $0.00 $76.39 BRICKLAYERS LOCAL 3 (LYNN) 08/01/2014 $48.96 $10.18 $18.22 $0.00 $77.36 02/01/2015 $49.52 $10.18 $18.22 $0.00 $77.92 08/01/2015 $50.42 $10.18 $18.29 $0.00 $78.89 02/01/2016 $50.99 $10.18 $18.29 $0.00 $79.46 08/01/2016 $51.89 $10.18 $18.37 $0.00 $80.44 02/01/2017 $52.46 $10.18 $18.37 $0.00 $81.01 Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 4 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- BRICKIPLASTERICEMENT MASON -Local 3 Lynn Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.03 $10.18 $18.15 $0.00 $52.36 2 60 $28.84. $10.18 $18.15 $0.00 $57.17 3 70 $33.64 $10.18 $18.15 $0.00 $61.97 4 80 $38.45 $10.18 $18.15 $0.00 $66.78 5 90 $43.25 $10.18 $18.15 $0.00 $71.58 Effective Date - 02/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate. 1 50 .$24.03 $10.18 $18.15 $0.00 $52.36 2 60 $28.84 $10.18 $18.15 $0.00 $57.17 3 70 $33.64 $10.18 $18.15 $0.00 $61.97 4 80 $38.45 $10.18 $18.15 $0.00 $66.78 5 90 $43.25 $10.18 $18.15 $0.00 $71.58 - _ �......-.... - Notes: _..., ,,.,-... _ _ ._._, .._... - _.... - � .,.-. - - __.... - _..... I Apprentice to Journeyworker Ratio:1:5 BULLDOZER/GRADER/SCRAPER 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" CAISSON & UNDERPINNING BOTTOM MAN 12/01/2013 $34.45 $7.30 $12.90 $0.00 $54.65 LABORERS - FO UNDA TION AND MARINE 06/01/2014 $35.20 $7.30 $12.90 $0.00 $55.40 12/01/2014 $35.95 $7.30 $12.90 $0.00 $56.15 06/01/2015 $36.70 $7.30 $12.90 $0.00 $56.90 12/01/2015 $37.45 $7.30 $12.90 $0.00 $57.65 06/01/2016 $38.20 $7.30 $12.90 $0.00 $58.40 12/01/2016 $39.20 $7.30 $12.90 $0.00 $59.40 For apprentice rates see "Apprentice- LABORER" CAISSON & UNDERPINNING LABORER 12/01/2013 $33.30 $7.30 $12.90 $0.00 $53.50 LABORERS - FOUNDATIONAND MARINE 06/01/2014 $34.05 $7.30 $12.90 $0.00 $54.25 12/01/2014 $34.80 $7.30 $12.90 $0.00 $55.00 06/01/2015 $35:55 $7.30 $12.90 $0.00 $55.75 12/01/2015 $36.30 $7.30 $12.90 $0.00 $56.50 06/01/2016 $37.05 $7.30 $12.90 $0.00 $57.25 12/01/2016 $38.05 $7.30 $12.90 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" ---------------------------------------------------- -------------- -----------------------------------------` --------------------- Issue Date: . 01/22/2014 Wage Request Number: 20140122-006 Page 5 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment CAISSON & UNDERPINNING TOP MAN 12/01/2013 $33.30 $7.30 .$12.90 $0.00 $53.50 LABORERS - FOUNDATIONAND MARINE 06/01/2014 $34.05 $7.30 $12.90 $0.00 $54.25 12/01/2014 $34.80 $7.30 $12.90 $0.00 .: $55.00 06/01/2015 $35.55 $7.30 $12.90 $0.00 $55.75 12/01/2015 $36.30 $7.30 $12.90 $0.00 $56.50 06/01/2016 $37.05 $7.30 $12.90 $0.00 $57.25 12/01/2016 $38.05 $7.30 $12.90 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" CARBIDE CORE DRILL OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - ZONE 2 06/01/2014 $30.60 $7.30 $12.10. $0.00 $50.00 .12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" CARPENTER 09/01/2013 $34.53 $9.80 $15.61 $0.00 $59.94 CARPENTERS -ZONE 2 (Eastern Massachusetts) 03/01/2014 $35.13 $9.80 $15.61 $0.00 $60.54 09/01/2014 $35.90 $9.80 $15.61 $0.00 $61.31 03/01/2015 $36.67 $9.80 $15.61 $0.00 $62.08 ------------------------------------------------------------------------------------------------- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 ------------------ ------------------ --- Page 6 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total RateUnemployment Apprentice : CARPENTER - Zone 2 Eastern MA Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.27 $9.80 $1.57 $0.00 $28.64 2 60 $20.72 $9.80 $1.57 $0.00 $32.09 3 70 $24.17 $9.80 $10.90 $0.00 $44.87 4 75 $25.90 $9.80 $10.90 $0.00 $46.60 5 80 $27.62 $9.80 $12.47 $0.00 $49.89 6 80 $27.62 $9.80 $12.47 $0:00 $49.89 7 90 $31.08 $9.80 $14.04 $0.00 $54.92 8 90 $31.08 $9.80 $14.04 $0.00 $54.92 Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.57 $9.80 $1.57 $0.00 $28.94 2 60 $21.08 $9.80 $1.57 $0.00 $32.45 3 70 $24.59 $9.80 $10.90 $0.00 $45.29 4 75 $26.35 $9.80 $10.90 $0.00 $47.05 5 80 $28.10 $9.80 $12.47 $0.00 $50.37 6 80 $28.10 $9.80 $12.47 $0.00 $50.37. 7 90 $31.62 $9.80 $14.04 $0.00 $55.46 8 90 $31.62 $9.80 $14.04 $0.00 $55.46 _ --_-__------------.____--- ---------_....-.,....__._..-- Apprentice to Journeyworker Ratio:1:5 -...__._---_____--- - CEMENT MASONRY/PLASTERING 01/01/2014 $43.60 $10.90 $18.71 $1.30 $74.51 BRICKLAYERSLOCAL 3 (LYNN) 07/01/201.4 $43.77 $10.90 $18.71 $1.30 $74.68 01/01/2015 $44.69 $10.90 $18.71 $1.30 $75.60 07/01/2015 $45.29 $10.90 $18.71 $1.30 $76.20 �I 01/01/2016 $46.21 $10.90 $18.71 $1.30 $77.12 --- --- --------------- --------------------------- ------------ ------- ---------- ---- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 ----------- - - -------- Page 7 of 40 Classification Effective Date Base Wage Health Supplemental Pension Total Rate Unemplovment Apprentice-. CEMENT MASONRY/PLASTERING -Eastern Mass (Lynn) Effective Date - 01/01/2014 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $21.80 $10.90 $12.21 $1.30 $46.21 2 60 $26.16 $10.90 $13.71 $1.30 $52.07 3 65 $28.34 $10.90 $14.71 $1.30 $55.25 4 70 $30.52 $10.90 $15.71 $1.30 $58.43 5 75 $32.70 $10.90 $16.71 $1.30 $61.61 6 80 $34.88 $10.90 $17.71 $1.30 $64.79 7 90 $39.24 $10.90 $18.71 $1.30 $70.15 Effective Date - 07/01/2014 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $21.89 $10.90 $12.21 $1.30 $46.30 2 60 $26.26 $10.90 $13.71 $1.30 $52.17 3 65 $28.45 $10.90 $14.71 $1.30 $55.36 4 70 _$30.64 $10.90 $15.71 $1.30 $58.55 5 75 $32.83 $10.90 $16.71 $1.30 $61.74 6 80 $35.02 $10.90 $17.71 $1.30 $64.93 7 90 $39.39 $10.90 $18.71 $1.30 $70.30 Notes: ..__-_..-- - --- _T _ Steps 3,4 are 500 hrs. All other steps are 1,000 hrs. Apprentice to Journeyworker Ratio:1:3 _ CHAIN SAW OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS-ZONE2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00. $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES 12/01/2013 $41.49 $10.00 $14.18 $0.00 $65.67 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" COMPRESSOR OPERATOR 12/01/2013 $28.11 $10.00 $14.18 $0.00 $52.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DELEADER (BRIDGE) 01/01/2014 $45.91 $7.85 $16.10 $0.00 $69.86 PAINTERS LOCAL 35 - ZONE 2 07/01/2014 $46.76 $7.85 $16.10 $0.00 $70.71 01/01/2015 $47.66 $7.85 $16.10 $0.00 $71.61 07/01/2015 $48.56 $7.85 $16.10 $0..00 $72.51 01/01/2016 $49.51 $7.85 $16.10 $0.00 $73.46 07/01/2016- $50.46 $7.85 $16.10 $0.00 $74.41 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 ---------- ---------- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 - ----- Page 8 of 40 Effective Date - 07/01/2014 12/01/2013 $33.50 $7.30 Supplemental $0.00.. Classification Effective Date Base Wage Health Pension Supplemental Total Rate 1 50 $23.38 $7.85 $0.00 Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS 2 55 $25.72 $7.85 $3.66 Effective Date - 01/01/2014 $37.23 3 60 $28.06 Supplemental $3.99 Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $22.96 $7.85 $0.00 $0.00 $30.81 2 55 $25.25 $7.85 $3.66 $0.00 $36.76 3 60 $27.55 $7.85 $3.99 $0.00 $39.39 4 65 $29.84 $7.85 $4.32 $0.00 $42.01 5 70 $32.14 $7.85 $14.11 $0.00 $54.10 6 75 $34.43 $7.85 $14.44 $0.00 $56.72 7 80 $36.73 $7.85 $14.77 $0.00 $59.35 8 90 $41.32 $7.85 $15.44 $0.00 $64.61 Effective Date - 07/01/2014 12/01/2013 $33.50 $7.30 Supplemental $0.00.. Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $23.38 $7.85 $0.00 $0.00 $31.23 2 55 $25.72 $7.85 $3.66 $0.00 $37.23 3 60 $28.06 $7.85 $3.99 $0.00 $39.90 4 65 $30.39 $7.85 $4.32 $0.00 $42.56 5 70 $32.73 $7.85 $14.11 $0.00 $54.69 6 75 $35.07 $7.85 $14.44 $0.00 $57.36 7 80 $37.41 $7.85 $14.77 $0.00 $60.03 8 90 $42.08 $7.85 $15.44 $0.00 $65.37 ._.A---.._.,.,------------�-------- Notes: $0.00 $56.00 --- --- Steps are 750 hrs. $12.70 $0.00 $56.75 12/01/2015 Tice Apprentice to Journeyworker Ratio:1:1 $7.30 $12.70 $0.00 $57.50 For apprentice rates see "Apprentice- LABORER" DEMO: ADZEMAN 12/01/2013 $33.50 $7.30 $12.70 $0.00.. $53.50 LABORERS - ZONE 2 06/01/2014 $34.25 $7.30 $12.70 $0.00 $54.25 12/01/2014 $35.00 $7.30 $12.70 $0.00 $55.00 06/01/2015 $35.75 $7.30 $12.70 $0.00 $55.75 12/01/2015 $36:50 $7.30 $12.70 $0.00 $56.50 For apprentice rates see "Apprentice- LABORER" DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2013 $34.50 $7.30 $12.70 $0.00 $54.50 LABORERS -ZONE 2 06/01/2014 $35.25 0.30 $12.70 $0.00 $55.25 12/01/2014 $36.00 $7.30 $12.70 $0.00 $56.00 06/01/2015 $36.75 $7.30 $12.70 $0.00 $56.75 12/01/2015 $37.50 $7.30 $12.70 $0.00 $57.50 For apprentice rates see "Apprentice- LABORER" DEMO: BURNERS 12/01/2013 $34.25 $7.30 $12.70 $0.00 $54.25 LABORERS - ZONE 2 06/01/2014 $35.00 $7.30 $12.70 $0.00 $55.00 12/01/2014 $35.75 $7.30 $12.70 $0.00 $55.75 06/01/2015 $36.50 $7.30 $12.70 $0.00 $56.50 12/01/2015 $37.25 $7.30 $12.70 $0.00 $57.25 For apprentice rates see "Apprentice- LABORER" --------------------------------------------------------------- -- Issue Date: 01/22/2014 Wage Request Number: --------------------------- 20140122-006 ---------------------------- --- - -------- Page 9 of 40 DEMO: JACKHAMMER OPERATOR 12/01/2013 $34.25 $7.30 $12.70 $0.00 � f ClassificationEffective Date Base Wage Health Pension Supplemental Total Rate $9.80 06/01/2014 $35.00 $7.30 $12.70 Unemployment $55.00 DEMO: CONCRETE CUTTER/SAWYER 12/01/2013 $34.50 $7.30 $12.70 $0.00 $54.50 LABORERS - ZONE 2 06/01/2015 $36.50 $7.30 $12.70 $0.00 $56.50 $68.07 06/01/2014 $35.25 $7.30 $12.70 $0.00 $55.25 For apprentice rates see "Apprentice- LABORER" 12/01/2014 $36.00 $7.30 $12.70 $0.00 $56.00 DEMO: WRECKING LABORER 06/01/2015 $36.75 $7.30 $12.70 $0.00 $56.75 LABORERS - 70NE 2 12/01/2015 $37.50 $7.30 $12.70 $0.00 $57.50 For apprentice rates see "Apprentice- LABORER" 06/01/2014 $34.25 $7.30 $12.70 $0.00 $54.25 DEMO: JACKHAMMER OPERATOR 12/01/2013 $34.25 $7.30 $12.70 $0.00 $54.25 LABORERS -7_0NE1 08/01/2013 $56.14 $9.80 06/01/2014 $35.00 $7.30 $12.70 $0.00 $55.00 $18.17 12/01/2014 $35.75 $7.30 $12.70 $0.00 $55.75 $0.00 06/01/2015 $36.50 $7.30 $12.70 $0.00 $56.50 $68.07 12/01/2015 $37.25 $7.30 $12.70 $0.00 $57.25 For apprentice rates see "Apprentice- LABORER" $43.10 $9.80 $18.17 $0.00 $71.07 $115.33 DEMO: WRECKING LABORER 12/01/2013 $33.50 $7.30 $12.70 $0.00 $53.50 LABORERS - 70NE 2 $74.55 03/01/2016 $47.75 06/01/2014 $34.25 $7.30 $12.70 $0.00 $54.25 $75.53 12/01/2014 $35.00 $7.30 $12.70 $0.00 $55.00 06/01/2015 $35.75 $7.30 $12.70 $0.00 $55.75 ELECTRICIAN 12/01/2015 $36.50 $7.30 $12.70 $0.00 $56.50 For apprentice rates see "Apprentice- LABORER" DIRECTIONAL DRILL MACHINE OPERATOR OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DIVER PILE DRIVER LOCAL 56 (ZONE 1) DIVER TENDER PILE DRIVER LOCAL 56 (ZONE 1) 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 $88.12 PILI; DRIVER LOCAL 56 (ZONE I) 08/01/2013 $56.14 $9.80 $18.17 $0.00 $84.11 08/01/2014 $58.24 $9.80 $18.17 $0.00 $86.21 08/01/2015 $60.34 $9.80 $18.17 $0.00 $88.31 08/01/2013 $40.10 $9.80 $18.17 $0.00 $68.07 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 DIVER TENDER (EFFLUENT) 08/01/2013 $60.15 $9.80 $18.17 $0.00 $88.12 PILI; DRIVER LOCAL 56 (ZONE I) 03/01/2014 $44.45 08/01/2014 $62.40 $9.80 $18.17 $0.00 $90.37 08/01/2015 $64.65 $9.80 $18.17 $0.00 $92.62 DIVER/SLURRY (EFFLUENT) 08/01/2013 $84.21 $9.80 $18.17 $0.00 $112.18 PILEDRIVER LOCAL 56 (ZONE; I) 03/01/2015 $45.84 $13.00 $14.72 08/01/2014 $87.36 $9.80 $18.17 $0.00 $115.33 09/01/2015 08/01/2015 $90.51 $9.80 $18.17 $0.00 $118.48 ELECTRICIANS LOCAL 103 03/01/2014 $44.45 $13.00 $14.68 $0.00 $72.13 09/01/2014 $45.12 $13.00 $14.70: $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN" ELECTRICIAN 09/01/2013 $43.96 $13.00 $14.42 $0.00 $71.38 ELECTRICIANS LOCAL 103 03/01/2014 $44.45 $13.00 $14.68 $0.00 $72.13 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 Issue Date: 01/22/2014 ----------------------------------------- Wage Request Number: 20140122-006 ----- --------- --------•------ Page 10 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - ELECTRICIAN - Local 103 Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.58 $13.00 $0.53 $0.00 $31.11 2 40 $17.58 $13.00 $0.53 $0.00 $31.11 3 45 $19.78 $13.00 $10.78 $0.00 $43.56 4 45 $19.78 $13.00 $10.78 $0.00 $43.56 5 50 $21.98 $13.00 $11.11 $0.00 $46.09 6 55 $24.18 $13.00 $11.45 $0.00 $48.63 7 60 $26.38 $13.00 $11.77 $0.00 $51.15 8 65 $28.57 $13.00 $12.11 $0.00 $53.68 9 70 $30.77 $13.00 $12.43 $0.00 $56.20 10 75 $32.97 $13.00 $12.77 $0.00 $58.74 Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.78 $13.00 $0.53 $0.00 $31.31 2 40 $17.78 $13.00 $0.53 $0.00 $31.31 45 $20.00 $13.00 $11.04 $0.60 $44.04 4 45 $20.00 $13.00 $11.04 $0.00 $44.04 5 50 $22.23 $13.00 $11.37 $0.00 $46.60 6 55 $24.45 $13.00 $11.70 $0.00 $49.15 7 60 $26.67 $13.00 $12.03 $0.00 $51.70 8 65 $28.89 $13.00 $12.37 $0.00 $54.26 9 70 $31.12 $13.00 $12.69 $0.00 $56.81 10 75 $33.34 $13.00 $13.03 $0.00 $59.37 Notes:: - - App Prior 1/1/03;30/35/40/45/50/55/65/70/75/80 _----_.®._-------------------__ Apprentice to Journeyworker Ratio:2:3*** ELEVATOR CONSTRUCTOR 01/01/2012 $52.45 $8.78 $6.96 $0.00 $68.19 ELEVATOR CONSTRUCTORS LOCAL 4 ---------------------- --- ----------------------------- Issue Date: 01/22/2014 - -------------------- -- ------- Wage Request Number: 20140122-006 ------------------------- ----------------- Page 11 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELEVATOR CONSTRUCTOR -Local 4 01/01/2012 $38.59 $8.78 $6.96 $0.00 Effective Date - . 01/01/2012 ELEVATOR CONSTRICTORS LOCAL 4 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.23 $8.78 $0.00 $0.00 $35.01 2 55 $28.85 $8.78 $6.96 $0.00 $44.59 3 65 $34.09 $8.78 $6.96 $0.00 $49.83 4 70 $36.72 $8.78 $6.96 $0.00 $52.46 5 80 $41.96 $8.78 $6.96 $0.00 $57.70 - ._.,. __...-.._, __._ - __._ - - T - _ __.. Notes: - - - - - .,.... __._ - - _ __.. - --...,_ - I Steps 1-2 are 6 mos.; Steps 3-5 are 1 year $0.00 $5J.50 06/01/2016 I _ - o.-_...._� �.._._�..__....---_�.... Apprentice to Journeyworker Ratio:1:l $12.10 ----_-®-- $52.00 12/01/2016 ELEVATOR CONSTRUCTOR HELPER 01/01/2012 $38.59 $8.78 $6.96 $0.00 $54.33 ELEVATOR CONSTRICTORS LOCAL 4 For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR" FENCE & GUARD RAIL ERECTOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - 70NE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $5J.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2013 $38.73 $10.00 $13.55 $0.00 $62.28 OPERATING ENGINEERS LOCAL 4 05/01/2014 $39.50 $10.00 $13.55 $0.00 $63.05 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENGYARTY CHIEF-BLDG,SITE,HVY/HWY 11/01/2013 $40.15 $10.00 $13.55 $0.00 $63.70 OPERATING ENGINEERS LOCAL 4 05/01/2014 $40.92 $10.00 $13.55 $0.00 $64.47 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY . 11/01/2013 $21.10 $10.00 $13.55 $0.00 $44.65 OPERATING ENGINEERS LOCAL 4 05/01/2014 $21.55 $10.00 $13.55 $0.00 $45.10 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIRE ALARM INSTALLER 09/01/2013 $43.96 $13.00 $14.42 $0.00 $71.38 ELECTRICIANS LOCAL 103 03/01/2014 $44.45 $13.00 $14.68 $0.00 $72.13 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN" FIRE ALARM REPAIR / MAINTENANCE 09/01/2013 $32.97 $13.00 $12.77 $0.00 $58.74 / COMMISSIONINGF.LECTR/C/ANS 03/01/2014 $33.44 $13.00 $13.03 $0.00 $59.47 LOCAL 103 09/01/2014 $33.84 $13.00 $13.05 $0.00 $59.89 03/01/2015 $34.38 $13.00 $13.06 $0.00 $60.44 09/01/2015 $35.10 $13.00. $13.08 $0.00 $61.18 03/01/2016 $35.81 $13.00 $13.10 $0.00 $61.91 Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 12 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN" FIREMAN (ASST. ENGINEER) 12/01/2013 $33.76 $10.00 $14.18 $0.00 $57.94 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FLAGGER & SIGNALER LABORERS-7.0NE2 For apprentice rates see "Apprentice- LABORER" 12/01/2013 $20.50 $7.30 $12.10 $0.00 $39.90 06/01/2014 $20.50 $7.30 $12.10 $0.00 $39.90 12/01/2014 $20.50 $7.30 $12.10 $0.00 $39.90 06/01/2015 $20.50 $7.30 $12.10 $0.00 $39.90 12/01/2015 $20.50 $7.30 $12.10 $0.00 $39.90 06/01/2016 $20.50 $7.30 $12.10 $0.00 $39.90 12/01/2016 $20.50 $7.30 $12.10 $0.00 $39.90 FLOORCOVERER 09/01/2013 $38.61 $9.80 $16.71 $0.00 FLOORCOVERERS LOCAL 2168 70NE 1 03/01/2014 $38.61 $9.80 $16.71 $0.00 Apprentice- FLOORCOVERER -Local 2168 Zone I Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate $65.12 $65.12 1 50 $19.31 $9.80 $1.79 $0.00 $30.90 2 55 $21.24 $9.80 $1.79 $0.00 $32.83 3 60 $23.17 $9.80 $11.34 $0.00 $44.31 4 65 $25.10 $9.80 $11.34 $0.00 $46.24 5 70 $27.03 $9.80 $13.13 $0.00 $49.96 6 75 $28.96 $9.80 .$13.13 $0.00 $51.89 7 80 $30.89 $9.80 $14.92 $0.00 $55.61 8 85 $32.82 $9.80 $14.92 $0.00 $57.54 Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $19.31 $9.80 $1.79 $0.00 $30.90 2 55 $21.24 $9.80 $1.79 $0.00 $32.83 3 60 $23.17 $9.80 $11.34 $0.00 $44.31 4 65 $25.10 $9.80 $11.34 $0.00 $46.24 5 70 $27.03 $9.80 $13.13 $0.00 $49.96 6 75 $28.96 $9.80 $13.13 $0.00 $51.89 7 80 $30.89 $9.80 $14.92 $0.00 $55.61 8 85 $32.82 $9.80 $14.92 $0.00 $57.54 --..�..:--._._---®.._._--------------®..--- lNotes: Steps are 750 hrs. --_....__..------_._---.._.. Apprentice to Journeyworker ___----_.._..--- Ratio:1:1 FORKLIFT/CHERRY PICKER 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GENERATOR/LIGHTING PLANT/BEATERS 12/01/2013 $28.11 $10.00 $14.18 $0.00 $52.29 OPERATING ENGINEERS LOCAL 4 Issue Date: 01/22/2014 --------------------- --------------------- Wage Request Number: 20140122-006 - - -- ------- -- ---------- Paga 13 of 40 HOISTING ENGINEER/CRANES/GRADALLS 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERATING ENGINEERS LOCAL 4 ----- ------------------------------ -------------- - ----------- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 14 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment For apprentice rates see "Apprentice- OPERATING ENGINEERS" GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR 01/01/2014 $35.41 $7.85 $16.10 $0.00 $59.36 SYSTEMS) 07/01/2014 $36.56 $7.85 $16.10 $0.00 $60.51 GLAZIERS LOCAL 35 (ZONE 2) 01/01/2015 $37.16 $7.85 $16.10 $0.00 $61.11 07/01/2015 $38.06 $7.85 $16.10 $0.00 $62.01 01/01/2016 $39.01 $7.85 $16.10 $0.00 $62.96 07/01/2016 $39.96 $7.85 $16.10 $0.00 $63.91 01/01/2017 $40.91 $7.85 $16.10 0.00 $64.86 Apprentice - GLAZIER - Local 35 Zone 2 Effective Date - 01/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.71 $7.85 $0.00 $0.00 $25.56 2 55 $19.48 $7.85 $3.66 $0.00 $30.99 3 60 $21.25 $7.85 $3.99 $0.00 $33.09 4 65 $23.02 $7.85 $4.32 $0.00 $35.19 5 70 $24.79 $7.85 $14.11 $0.00 $46.75 6 75 $26.56 $7.85 $14.44 $0.00 $48.85 7 80 $28.33 $7.85 $14.77 $0.00 $50.95 8 90 $31.87 $7.85 $15.44 $0.00 $55.16 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.28 $7.85 $0.00 $0.00 $26.13 2 55 $20.11 $7.85 $3.66 $0.00 $31.62 3 60 $21.94 $7.85 $3.99 $0.00 $33.78 4 65 $23.76 $7.85 $4.32 $0.00 $35.93 5 70 $25.59 $7.85 $14.11 $0.00 $47.55 6 75 $27.42 $7.85 $14.44 $0.00 $49.71 7 80 $29:25.. $7.85 $14.77 $0.00 $51.87 8 90 $32.90 $7.85 $15.44 $0.00 $56.19 - - - - - ,_._. _. -......_._ Notes: - - __......_,_. _ -..,.e - - e .. - ._........_ _ __....._.. Steps are 750 hrs. Apprentice to Journeyworker Ratio:l:l HOISTING ENGINEER/CRANES/GRADALLS 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERATING ENGINEERS LOCAL 4 ----- ------------------------------ -------------- - ----------- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 14 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- OPERATING ENGINEERS- Local 4 Effective Date - 12/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.27 $10.00 $0.00 $0.00 $32.27 2 60 $24.29 $10.00 $14.18 $0.00 $48.47 3 65 $26.32 $10.00 $14.18 $0.00 $50.50 .4 70 $28.34 $10.00 $14.18 $0.00 $52.52 5 75 $30.37 $10.00 $14.18 $0.00 $54.55 6 80 $32.39 $10.00 $14.18 $0.00 $56.57 7 85 $34.42 $10.00 $14.18 $0.00 $58.60 8 90 $36.44 $10.00 $14.18 $0.00 $60.62 ------^.-_ Notes: ----._.._.-----._._-_---- � -- - --- -_ __ Apprentice to Journeyworker Ratio: 1:6 - _ - _ - _ - - HVAC (DUCTWORK) 12/09/2013 $42.35 $9.82 $19.33 $2.14 $73.64 SHEETMETAL WORKERS LOCAL 17- A 02/01/2014 $42.76 $9.82 $19.74 $2.17 $74.49 08/01/2014 $43.61 $9.82 $19.74 $2.17 $75.34 02/01/2015 $44.51 $9.82 $19.74 $2.17 $76.24 08/01/2015 $45.51 $9.82 $19.74 $2.17 $77.24 02/01/2016 $46.51 $9.82 $19.74 $2.17 $78.24 08/01/2016 $47.66 $9.82 $19.74 $2.17 $79.39 02/01/2017 $48.76 $9.82 $19.74 $2.17 $80.49 08/01/2017 $49.86 $9.82 $19.74 $2.17 $81.59 02/01/2018 $51.01 $9.82 $19.74 $2.17 $82.74 For apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (ELECTRICAL CONTROLS) 09/01/2013 $43.96 $13.00 $14.42 $0.00 $71.38 ELECTRICIANS LOCAL 103 03/01/2014 $44.45 $13.00 .$14.68 $0.00 $72.13 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/201.5 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN' HVAC (TESTING AND BALANCING - AIR) 12/09/2013 $42.35 $9.82 $19.33 $2.14 $73.64 SHEET METAL WORKERS LOCAL 17 -A 02/01/2014 $42.76 $9.82 $19.74 $2.17 $74.49 08/01/2014 $43.61 $9.82 $19.74 $2.17 $75.34 02/01/2015 $44.51 $9.82 $19.74 $2.17 $76.24 08/01/2015 $45.51 $9.82 $19.74 $2.17 $77.24 02/0.1/2016 $46.51 $9.82 $19.74 $2.17 $78.24 08/01/2016 $47.66 $9.82 $19.74 $2.1-7 $79.39 02/01/2017 $48.76 $9.82 $19.74 $2.17 $80.49 08/01/2017 $49.86 $9.82 $19.74 $2.17 $81.59 02/01/2018 $51.01 $9.82 $19.74 $2.17 $82.74 For apprentice rates see "Apprentice- SHEET METAL WORKER" ----------------------------- -------------------------- ----------'---------------- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 -- --- ---------------------- ------------ Page 15 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment HVAC (TESTING AND BALANCING -WATER) 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PIPEFITTERS LOCAL 537 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" HVAC MECHANIC 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PIPEFITTERS LOCAL 537 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" HYDRAULIC DRILLS 12/01/2013 $30.60 $7.30 $12.10 $0.00 $50.00 LABORERS - ZONE 2 06/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 12/01/2014 $31.60 $7.30 $12.10 $0.00 $51.00 06/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 12/01/2015 $32.60 $7.30 $12.10 $0.00 $52.00 06/01/2016. $33.10 $7.30 $12.10 $0.00 $52.50 12/01/2016 $33.85 $7.30 $12.10 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" 09/16/2013 $36.44 $7.70 $18.60 $0.00 $62.74 INSULATOR (PIPES & TANKS) 09/01/2013 $42.11 $10.95 .$12.10 $0.00 $65.16 HEAT &, FROST INSULATORS LOCAL 6 (BOSTON) 09/01/2014 $44.11 $10.95 $12.10 $0.00 $67.16 Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.06 $10.95 $9.00 $0.00 $41.01 2 60 $25.27 $10.95 $9.62 $0.00 $45.84 3 70 $29.48 $10.95 $10.24 $0.00 $50.67 4 80 $33.69 $10.95 $10.86 $0.00 $55.50 Effective Date - 09/01/2014 Supplemental Step percent Apprentice Base.Wage Health Pension Unemployment Total Rate 1 50 $22.06 $10.95 $9.00 $0.00 $42.01 2 60 $26.47 $10.95 $9.62 $0.00 $47.04 3 70 $30.88 $10.95 $10.24 $0.00 $52.07 4 80 $35.29 $10.95 $10.86 $0.00 $57.10 (Notes: - ( Steps are 1 year Apprentice to Journeyworker Ratio:1:4 IRONWORKERIWELDER 09/16/2013 $36.44 $7.70 $18.60 $0.00 $62.74 IRONWORKERS LOCAL 7 (LAWRENCE AREA) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- IRONWORKER Local 7 Lawrence Effective Date - 09/16/2013 Supplemental Step, percent Apprentice Base Wage Health Pension Unemployment Total Rate JACKHAMMER & PAVING BREAKER OPERATOR LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" LABORER LABORERS - 70NE 2 12/01/2013 We -,.✓i .D,.,V .pl V.vV IDV.VV .PJ 1.01 3 75 $27.33 $7.70 $18.60 $0.00 $53:63 4 80 $29.15 $7.70 $18.60 $0.00 $55.45 5 85 $30.97 $7.70 $18.60 $0.00 $57.27 6 90 $32.80 $7.70 $18.60 $0.00 $59.10 - Notes: _.._. .:.a - .e _.._ _.._ ____ ._.,_ .- -. ____ - - _ __._. - - .,._. - __._ --- --: -, Structural 1:6; Ornamental 1:4 $33.35 $7.30 $12.10 $0.00 $52.75 Apprentice to Journeyworker Ratio: JACKHAMMER & PAVING BREAKER OPERATOR LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" LABORER LABORERS - 70NE 2 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 06/01/2014 $30.60. $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32,10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25. 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 ---- - -- - ----------------------------------------------------------- -------------- ------------- - - -- - ------------------------ Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 17 of 40 i Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER - Zone 2 Effective Date - 12/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.91 $7.30 $12.10 $0.00 $37.31 2 70 $20.90 $7.30 $12.10 $0.00 $40.30 3 80 $23.88 $7.30 $12.10 $0.00 $43.28 4 90 $26.87 $7.30 $12.10 $0.00 $46.27 Effective Date - 06/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.21 $7.30 $12.10 $0.00 $37.61 2 70 $21.25 $7.30 $12.10 $0.00 $40.65 3 80 $24.28 $7.30 $12.10 $0.00 $43.68 4 90 $27.32 $7.30 $12.10 $0.00 $46.72 !Notes: ,-- -_...... Apprentice to Journeyworker Ratio:1:5 _ - _ __-..�.-. ,..... _ _ - . - - _.., --.,.... LABORER: CARPENTER TENDER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 LABORERS - ZONE 2 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 .06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: CEMENT FINISHER TENDER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 LABORERS - ZONE 2 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2013 $30.05 $7.30 $12.05 $0.00 $49.40 LABORERS - ZONE 2 06/01/2014 $30.55 $7.30 $12.05 $0.00 $49.90 12/01/2014 $31.05 $7.30 $12.05 $0.00 $50.40 06/01/2015 $31.55 $7.30 $12.05 $0.00 $50.90 12/01/2015 $32.05 $7.30 $12.05 $0.00 $51.40 For apprentice rates see "Apprentice- LABORER" Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 18 of 40 Classification LABORER: MASON TENDER LABORERS -70NE2 For apprentice rates see "Apprentice- LABORER Effective Date Base Wage Health Pension Supplemental Total Rate $49.25 LABORERS-7.ONF2 Unemployment 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 -$50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00. $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 LABORER: MULTI -TRADE TENDER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 LABORERS-7.ONF2 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10. $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 For apprentice rates see."Apprentice- LABORER" LABORER: TREE REMOVER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 LABORERS - 70NE 2 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25. 06/01/2016 $32.35 $7.30: $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 This classification applies to the wholesale removal of standing trees including all associated trimming of branches and limbs, and applies to the removal of branches at locations not on or around utility lines. For apprentice rates see "Apprentice- LABORER" LASER BEAM OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS -ZONE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" MARBLE & TILE FINISHERS 08/01/2013 $36.66 $10.18 $16.83 $0.00 $63.67 . BRICKLAYERS LOCAL 3 - MARBI E X TILE 02/01/2014 $36.66 $10.18 $16.83 $0.00 $63.67. 08/01/2014 $37.37 $10.18 $16.90 $0.00 $64.45 02/01/2015 $37.82 $10.18 $16.90 $0.00 $64.90 08/01/2015 $38.53 $10.18 $16.97 $0.00 $65.68 02/01/2016 $38.98 $10.18 $16.97 $0.00 $6613 08/01/2016 $39.68 $10.18 $17.05 $0.00 $66.91 I 02/01/2017 $40.14 $10.18 $17.05 $0.00 $67.37 Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 19 of 40 1 50 $18.33 $10.18 $16.83 $0.00 $45.34 2 60 $22.00 $10.18 $16.83 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $16.83 $0.00 $52.67 4 .80 Unemployment Apprentice - MARBLE & TILE FINISHER - Local 3 Marble & Tile $0.00 $56.34 5 90 Effective Date - 08/01/2013 $10.18 $16.83 $0.00 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.33 $10.18 $16.83 $0.00 $45.34 2 60 $22.00 $10.18 $16.83 $0.00 $49.01 3 70 $25.66 $10.18 $16.83 $0.00 $52.67 4 80 $29.33 $10.18. $16.83 $0.00 $56.34 5 90 $32.99 $10.18 $16.83 $0.00 $60.00 Fffective Date - 02/01/2014 $0.00 $79.50 1 50 $18.33 $10.18 $16.83 $0.00 $45.34 2 60 $22.00 $10.18 $16.83 $0.00 $49.01 3 70 $25.66 $10.18 $16.83 $0.00 $52.67 4 .80 $29.33 $10.18 $16.83 $0.00 $56.34 5 90 $32.99 $10.18 $16.83 $0.00 $60.00 - -- __... - - Notes: - _ __....._ - __._ - ....... - - L- ._ _ .._...-.... Apprentice to Journeyworker Ratio: 1:3 - _ - - - ® - - - .._.....,.... MARBLE MASONS,TILELAYERS & TERRAZZO MECH 08/01/2013 $48.10 $10.18 $18.15 $0.00 $76.43 BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2014 $48.10 $10.18 .$18.15 $0.00 $76.43 08/01/2014 $49.00 $10.18 518.22 $0.00 $77.40 02/01/2015 $49.56 $10.18 $18.22 $0.00 $77.96 08%01/2015 $50.46 $10.18 $18.29 $0.00 $78.93 02/01/2016 $51.03 $10.18 $18.29 $0.00 $79.50 08/01/2016 $51.93 $10.18 $18.37 $0.00 $80.48 02/01/2017 $52.50 $10.18 $18.37 0.00 $81.05 -------------------------------------------- - ------------------------------------------------------ Issue Date: 01/22/2014 Wage Request Number: 20140122-006 -------------------------- Page 20 of 40 ClassificationSupplemental Effective Date Base Wage Health Pension Total Rate Unemployment Apprentice - MARBLE -TILE -TERRAZZO MECHANIC - Local 3 Marble & Tile Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.05 $10.18 $18.15 $0.00 $52.38 2 60 $28.86 $10.18 $18.15 $0.00 $57.19 3 70 $33.67 $10.18 $18.15 $0.00 $62.00 4 80 $38.48 $10.18 $18.15 $0.00 $66.81 5 90 $43.29 $10.18 $18.15 $0.00 $71.62 Effective Date - 02/01/2014 For apprentice rates see "Apprentice -OPERATING ENGINEERS" Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.05 $10.18 $18.15 $0.00 $52.38 2 60 $28.86 $10.18 $18.15 $0.00 $57.19 3 70 $33.67 $10.18 $18.15 $0.00 $62.00 4 80 $38.48 $10.18 $18.15 $0.00 $66.81 5 90 $43.29 $10.18 $18.15 $0.00 $71.62 - .�._.. __ __ _ Notes: .-.,.... __.. - - - _-__ ..-.... - �. - - - - .._.. I Apprentice to Journeyworker Ratio:1:5 MECH. SWEEPER OPERATOR (ON CONST. SITES) 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINT;ERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" MECHANICS MAINTENANCE 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice -OPERATING ENGINEERS" MILLWRIGHT (Zone 2) 10/01/2013 $32.81 $9.80 $16.01 $0.00 $58.62 MILLWRIGHTS LOCAL 1121 -7.one 2 04/01/2014 $33.41 $9.80 $16.01 $0.00 $59.22 10/01/2014 $34.17 $9.80 $16.01 $0.00 $59.98 04/01/2015 $34.94 $9.80 $16.01 $0.00 $60.75 ----------------------------- Issue Date: 01/22/2014 Wage Request Number: - ----------- 20140122-006 ------------------- -------- --------- - Page 21 of 40 Classification Effective Date Base Wage Health Pension Supplemental Unemplovment Total Rate Apprentice- MILLWRIGHT -Local 1121 Zone 2 Effective Date - 10/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $18.05 $9.80 $4.40 $0.00 $32.25 2 65 $21.33 $9.80 $13.21 $0.00 $44.34 3 75 $24.61 $9.80 $14.01 $0.00 $48.42 4 85 $27.89 $9.80 $14.81 $0.00 $52.50 Effective Date - 04/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $18.38 $9.80 $4.40 $0:00 $32.58 2 65 $21.72 $9.80 $13.21 $0.00 $44.73 3 75 $25.06 $9.80 $14.01 $0.00 $48.87 4 85 $28.40 $9.80 $14.81 $0.00 $53.01 Notes: Steps are 2,000 hours - - - - -- e - - - -......_.... - ._._ - -- tic Apprene to Journeyworker Ratio:LS MORTAR MIXER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - ZONE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2013 $20.96 $10.00 $14.18 $0.00 $45.14 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 01LER (TRUCK CRANES, GRADALLS) 12/01/2013 $24.43 $10:00 $14.18 $0.00 $48.61 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT - CLASS 1I 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PAINTER (BRIDGES/TANKS) 01/01/2014 $45.91 $7.85 $16.10 $0.00 $69.86 PAINTERS LOCAL 35 - ZONE 2 07/01/2014 $46.76 $7.85 $16.10 $0.00 $70.71 01/01/2015 $47.66 $7.85 $16.10 $0.00 $71.61 07/01/2015 $48.56 $7.85 $16.10 $0.00 $72.51 01/01/2016 $49.51 $7.85 $16.10 $0.00 $73.46 07/01/2016 $50.46 $7.85 $16.10 $0.00 $74.41 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 ------------ -------------------------------- - -------------- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 22 of 40 j Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2014 Supplemental Step percent: Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.96 $7.85 $0.00 $0.00 $30.81 2 55 $25.25 $7.85 $3.66 $0.00 $36.76 3: 60 $27.55 $7.85 $3.99 $0.00 $39.39 4 65 $29.84 $7.85 $4.32 $0.00 $42.01 5 70 $32.14 $7.85 $14.11 $0.00 $54.10 6 75 - $34.43 $7.85 $14.44 $0.00 $56.72 7 80 $36.73 $7.85 $14.77 $0.00 $59.35 8 90 $41.32 $7.85 $15.44 $0.00 $64.61 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 - $23.38 $7.85 $0.00 $0.00 $31.23 2 55 $25.72 $7.85 $3.66 $0.00 $37.23 3 60 $28.06 $7.85 $3.99 $0.00 $39.90 4 65 $30.39 $7.85 $4.32 $0.00 $42.56 5 70 $32.73 $7.85 $14.11 $0.00 $54.69 6 75 $35.07 $7.85 $14.44 $0.00 $57.36 7 80 $37.41 $7.85 $14.77 $0.00 $60.03 8 90 $42.08 $7.85 $15.44 $0.00 $65.37 .......------..._---_..�...------------.�...._..._ Notes: --- ....-..._....._, Steps are 750 hrs. `---------_--------------® Apprentice to Journeyworker Ratio: 1:1 PAINTER (SPRAY OR SANDBLAST, NEW) * 01/01/2014 $36.81 $7.85 $16.10 $0.00 $60.76 * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PA1NTERSLOCAL 35 - 70NE 2 07/01/2014 $37.66 $7.85 $16.10 $0.00 $61.61 01/01/2015 $38.56 $7.85 $16.10 $0.00 $62.51 07/01/2015 $39.46 $7.85 $16.10 $0.00 $63.41 01/01/2016 $40.41 $7.85 $16.10 $0.00 $64.36 07/01/2016 $41.36 $7.85 $16.10 $0.00 $65.31 01/01/2017 $42.31 $7.85 $16.10 $0.00 $66.26 Issue Date: 01/22/2014 Wage Request Number: 20140122-006 --- ----------- ------- ------------------------------ Page 23 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -New Effective Date 01/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.41 $7.85 $0.00 $0.00 $26.26 2 55 $20.25 $7.85 $3.66 $0.00 $31.76 3 60 02.09 $7.85 $3.99 $0.00 $33.93 4 65 $23.93 $7.85 $4.32 $0.00 $36.10 5 70 $25.77 $7.85 $14.11 $0.00 $47.73 6 75 $27.61 $7.85 $14.44 $0.00 $49.90 7 80 $29.45 $7.85 $14.77 $0.00 $52.07 8 90 $33.13 $7.85 $15.44 $0.00 $56.42 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.83 $7.85 $0.00 $0.00 $26.68 2 55 $20.71 $7.85 $3.66 $0.00 $32.22 3 60 $22.60 $7.85 $3.99 $0.00 $34.44 4 65 $24.48 $7.85 $4.32 $0.00 $36.65 5 70 $26.36 $7.85 $14.11 $0.00 $48.32 6 75 $28.25 $7.85 $14.44 $0.00 $50.54 7 80 $30.13 $7.85 $14.77 $0.00 $52.75 8 90 $33.89 $7.85 $15.44 $0.00 $57.18 ----___.- --------_._ Notes: ------_--_-- , ' i Steps are 750 hrs. v- Apprentice to Journeyworker Ratio:1:1 - - - - ----__ __..._.-----....._ PAINTER (SPRAY OR SANDBLAST, REPAINT) 01/01/2014 $34.87 $7.85 $16.10 $0.00 $58.82 PAINTERS LOCAL 35 - ZONE 2 07/01/2014 $35.72 $7.85 $16.10 $0.00 $59.67 01/01/2015 $36.62 $7.85 $16.10 $0.00. $60.57 07/01/2015 $37.52 $7.85 $16.10 $0.00: $61.47 01/01/2016 $38.47 $7.85 $16.10 $0.00 $62.42 07/01/2016 $39.42 $7.85 $16.10 $0.00 $63.37 01/01/2017 $40.37 $7.85 $16.10 $0.00 $64.32 Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 24 of 40 PAINTER / TAPER (BRUSH, NEW) * 01/01/2014 $35.41 $7.85 $16.10 $0.00 $59.36 Classification Effective Date Base Wage Health Pension Supplemental Total Rate NEW paint rate shall be used.RA/NTERsLOCAL 35 -70NE 2 07/01/2014 Unemployment $7.85 $16.10 Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast - Repaint 01/01/2015 $37.1.6 $7.85 $16.10 Effective Date - 01/01/2014 $61.11 07/01/2015 $38.06 $7.85 $16.10 $0.00 $62.01 01/01/2016 Supplemental $7.85 $16.10 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate $16.10 1 50 $17.44 $7.85 $0.00 $0.00 $25.29 $16.10 2 55 $19.18 $7.85 $3.66 $0.00 $30.69 -------------- 3 60 $20.92 $7.85 $3.99 $0.00 $32.76 4 65 $22.67 $7.85 $4.32 $0.00 $34.84 5 70 $24.41 $7.85 $14.11 $0.00 $46.37 6 75 $26.15 $7.85 $14.44 $0.00 $48.44 7 80 $27.90 $7.85 $14.77 $0.00 $50.52 8 90 $31.38 $7.85 $15.44 $0.00 $54.67 Effective Date - 07/01/2014 Supplemental Step ., percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.86 $7.85 $0.00 $0.00 $25.71 2 55 $19.65 $7.85 $3.66 $0.00 $31.16 3 60 $21.43 $7.85 $3.99 $0.00 $33.27 4 65 $23.22 $7.85 $4.32 $0.00 $35.39 5 70 $25.00 $7.85 $14.11 $0.00 $46.96 6 75 $26.79 $7.85 $14.44 $0.00 $49.08 7 80 $28.58 $7.85 $14.77 $0.00 $51.20 8 90 $32.15 $7.85 $15.44 $0.00 $55.44 - Notes: _____.._ ----_ -------- _ _-- - -- _ .® _ - ...., Steps are 750 hrs. I Apprentice to Journeyworker Ratio: 1:1 PAINTER (TRAFFIC MARKINGS) 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 LABORERS - 70NE 2 06/01/2014. $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 For Apprentice rates see "Apprentice- LABORER" PAINTER / TAPER (BRUSH, NEW) * 01/01/2014 $35.41 $7.85 $16.10 $0.00 $59.36 * If 30% or more.of surfaces to be painted are new construction, NEW paint rate shall be used.RA/NTERsLOCAL 35 -70NE 2 07/01/2014 $36.26 $7.85 $16.10 $0.00 $60.21 01/01/2015 $37.1.6 $7.85 $16.10 $0.00 $61.11 07/01/2015 $38.06 $7.85 $16.10 $0.00 $62.01 01/01/2016 $39.01 $7.85 $16.10 $0.00 $62.96 07/01/2016 $39.96 $7.85 $16.10 $0.00 $63.91 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86 -------------------- ------------ Issue Dater 01/22/2014 Wage Request Number: ----------------- --------------------- 20140122-006 - -------------- ----------- Page 25 of 40 rAIN I ✓tc i i tart tc �,srcuan, icrr yrry i � 01/01/2014 $33.47 1$10.1v Classification Effective Date Base Wage Health Pension Supplemental Total Rate $7.85 $16.10 Unemployment Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW 01/01/2015 $35.22 $7:85. Effective Date - 01/01/2014 $16.10 $0.00 Supplemental $59.17 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.71 $7.85 $0.00 $0.00 $25.56 2 55 $19.48 $7.85 $3.66 $0.00 $30.99 3 60 $21.25 $7.85 $3.99 $0.00 $33.09 4 65 $23.02 $7.85 $4.32 $0.00 $35.19 5 70 $24.79 $7.85 $14.11 $0.00 $46.75 6 75 $26.56 .$7.85 $14.44 $0.00 $48.85 7 80 $28.33 $7.85 $14.77 $0.00 $50.95 8 90 $31.87 $7.85 $15.44 $0.00 $55.16 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.13 $7.85 $0.00 $0.00 $25.98 2 55 $19.94 $7.85 $3.66 $0.00 $31.45 3 60 $21.76 $7.85 $3.99 $0:00 $33.60 4 65 $23.57 $7.85 $4.32 $0.00 $35.74 5 70 $25.38 $7.85 $14.11 $0.00 $47.34 6 75 $27.20 $7.85 $14.44 $0.00 $49.49 7 80 $29.01 $7.85 $14.77 $0.00 $51.63 8 90 $32.63 $7.85 $15.44 $0.00 $55.92 -----------.....,...-__...-___:----__,.:-®._._----- (Notes: Steps are 750 hrs. __ Tice Apprene to Journeyworker Ratio.1 -�- ----- -------•---- rAIN I ✓tc i i tart tc �,srcuan, icrr yrry i � 01/01/2014 $33.47 1$10.1v au.uu 10 /.4L PAINTERS LOCAL 35 - ZONE 2 07/01/2014 $34.32 $7.85 $16.10 $0.00 $58.27 01/01/2015 $35.22 $7:85. $16.10 $0.00 $59.17 07/01/2015 $36.12 $7.85 $16.10 $0.00: $60.07 01/01/2016 $37.07 $7.85 $16.10 $0.00 $61.02 07/01/2016 $38.02 $7.85 $16.10 $0.00. $61.97 01/01/2017 $38.97 $7.85 $16.10 $0.00 $62.92 - ----------------------- -- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 26 of 40 ClassificationSupplemental Effective Date Base Wage Health Pension Total Rate Unemployment Apprentice - PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date - 01/01/2014 Supplemental Rtpn nprrpnt A,,,, +,*. D..e.. {77....., T_I__1.L---_'-- 1 50 $16.74 $7.85 $0.00 $0.00 $24.59 2 55 $18.41 $7.85 $3.66 $0.00 $29.92 3 60 $20.08 $7.85 $3.99 $0.00 $31.92 4 65 $21.76 $7.85 $4.32 $0.00 $33.93 5 70 $23.43 $7.85 $14.11 $0.00 $45.39 4 75 $25.10 $7.85 $14.44 $0.00 $47.39 7 80 $26.78 $7.85 $14.77 $0.00 $49.40 8 90 $30.12 $7.85 $15.44 $0.00 $53.41 Effective Date - 07/01/2014 I. ren Tice� -- App_rentto Journeyworker Ratioaa -- ---` .... --. -- Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.16 $7.85 $0.00 $0.00 $25.01 2 55 $18.88 $7.85 $3.66 $0.00 $30.39 3 60 $20.59 $7.85 $3.99 $0.00 $32.43 4 65 $22.31 $7.85 $4.32 $0.00 $34.48 5 70 $24.02 $7.85 $14.11 $0.00 $45.98 6 75 $25.74 $7.85 $14.44 $0.00 $48.03 7 80 $27.46 $7.85 $14.77 $0.00 $50.08 8 90 $30.89 $7.85 $15.44 $0.00 $54.18 - ----___ -----_ Notes:--,. - ---_....------ - Steps are 750 hrs. I. ren Tice� -- App_rentto Journeyworker Ratioaa -- ---` .... --. -- PANEL & PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 TEAMSTERSJOINT COUNCIL NO. 107.ONE B PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2013. $40.10 $9.80 $18.17 $0.00 $68.07 DECK) PILE DRIVER LOCAL SG (70NT: !) 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 68/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 - ------------- ------------------------------------------------------- -------------------- ---------------------------- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 27 of 40 Classification I Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment i Apprentice.- PILE DRIVER - Local 56 Zone I Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.05 $9.80 $18.17 $0.00 $48.02 2 60 $24.06 $9.80 $18.17 $0.00 $52.03 3 70 $28.07 $9.80 $18.17 $0.00 $56.04 4 75 $30.08 $9.80 $18.17 $0.00 $58.05 5 80 $32.08 $9.80 $18.17. $0.00 $60.05 6 80 $32.08 $9.80 $18.17 $0.00 $60.05 7 90 $36.09 $9.80 $18.17 $0.00 $64.06 8 90 $36.09 $9.80 $18.17 $0.00 $64.06 Effective Date - 08/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.80 $9.80 $18.17 $0.00 $48.77 2 60 $24.96 $9.80 $18.17 $0.00 $52.93 3 70 $29.12 $9.80 $18.17 $0.00 $57.09 4 75 $31.20 $9.80 $18.17 $0.00 $59.17 5 80 $33.28 $9.80 $18.17 $0.00 $61.25 6 80 $33.28 $9.80 $18.17 $0.00 $61.25 7 90 $37.44 $9.80 $18.17 $0.00 $65.41 8 90 $37.44 $9.80 $18.17 $0.00 $65.41 Notes: Apprentlee to Journeyworker Ratio: 1:3 . PIPEFITTER & STEAMFITTER 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PIPEFITTERS LOCAL 537 (Local 138) Apprentice- PIPEFITTER Local 537 (Local 138) Effective Date - 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.80 $8.75 $4.50 $0.00 $32.05 2 45 $21.15 $8.75 $12.39 $0.00 $42.29 3 60 $28.21 $8.75 $12.39 $0.00 $49.35 4 70 $32.91 $8.75 $12.39 $0.00 $54.05 5 80 $37.61 $8.75 $12.39 $0.00 $58.75 - Notes: u. _...._.... ** 1:3; 3:15; 1`.10 thereafter / Steps are 1 yr. Refrig/AC.Mechanic **1:1;1:2;2:4;3:6;4;8;5:10;6:12;7:14;8:17;9:20;10:23(Max) Apprentice to Journeyworker Ratio:** ----------------------- ------------- ------------- Issue Date: 01/22/2014 ---------------- -- Wage Request Number: 20140122-006 Page 28 of 40 PNEUMATIC CONTROLS (TEMP.) 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PIPEFITTERS LOCAL 53 7 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" ------- ---------------------------------------------------------------------------------------------------------------------------- `-- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 29 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PIPELAYER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS -7,OAT2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" PLUMBER 09/01/2013 $44.98 $9.82 $14.04 $0.00 $68.84 PLUMBERS & GASFITTERS LOCAL 12 (Local 138) 03/01/2014 $45.98 $9.82 $1.4.04 $0.00 $69.84 09/01/2014 $46.98 $9.82 $14.04 $0.00 $70.84 03/01/2015 $47.98 $9.82 $14.04 $0.00 $71.84 09/01/2015 $48.98 $9.82 $14.04 $0.00 $72.84 03/01/2016 $50.13 $9.82 $14.04 $0.00 $73.99 09/01/2016 $51.18 $9.82 $14.04 $0.00 $75.04 03/01/2017 $52.18 $9.82 $14.04 $0.00 $76.04 Apprentice- PL UMBERIGASFITTER -Local 12 (Local 138) Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $15.74 $9.82 $5.26 $0.00 $30.82 2 40 $17.99 $9.82 $5.92 $0.00 $33.73 3 55 $24.74 $9.82 0.95 $0.00 $42.51 4 65 $29.24 $9.82 $9.30 $0.00 $48.36 5 75 $33.74 $9.82 $10.65 $0.00 $54.21 Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.09 $9.82 $5.26 $0.00 $31.17 2 40 $18.39 $9.82 $5.92 $0.00 $34.13 3 55 $25.29. $9.82 $7.95 $0.00 $43.06 4 65 $29.89 $9.82 $9.30 $0.00 $49.01 5 75 $34.49 $9.82 $10.65 $0.00 $54.96 Notes: Steps are 1 yr i Step 4 with lic$51.31 Step5 with lic$57.15 - - ____ _ - _._ - ____ ____ - - _ ._ __._ ___. _____ - _._ --- Apprentice to Journeyworker Ratio:1:5 PNEUMATIC CONTROLS (TEMP.) 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PIPEFITTERS LOCAL 53 7 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" ------- ---------------------------------------------------------------------------------------------------------------------------- `-- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 29 of 40 Classification PNEUMATIC DRILL/TOOL OPERATOR LABORERS -ZONE2 For apprentice rates see "Apprentice- LABORER" POWDERMAN & BLASTER 12/01/2013 $30.85 $7.30 $12.10 $0.00 Effective Date Base.Wage Health Pension Supplemental Total Rate 06/01/2014 Unemployment $7.30 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 533.35 S730 $12.10 80.00 1�5? 75 POWDERMAN & BLASTER 12/01/2013 $30.85 $7.30 $12.10 $0.00 $50.25 LABORERS - 70NE 2 06/01/2014 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2014 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2015 $32.35 $7.30. $12.10 $0.00 $51.75 12/01/2015 $32.85 $7.30 $12.10 $0.00 $52.25 06/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 12/01/2016 $34.10 $7.30 $12.10 $0.00 $53.50 For apprentice rates see "Apprentice- LABORER" POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (CONCRETE) 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (DEWATERING, OTHER) 12/01/2013 $28.11. $10.00 $14.18 $0.00 $52.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" READY -MIX CONCRETE DRIVER 04/30/2009 $25.80 $5.96 $5:34 $0.00 $37.10 TEAMSTERS LOCAL 42 RECLAIMERS 12/01/2013. $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42 CARPENTERS -ZONE 2 (Residential Wood) RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81 *.* The Residential Wood Frame Carpenter classification applies fi PP only to the construction of new, wood frame residences that do not exceed four stories including the basement. CARPENTERS-zoNE 2 (Residential Wood) As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. --------------- --------------..----------------------- - - ------------------------- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 30 of 40 w Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- CARPENTER (Residential Wood Frame) -Zone 2 Effective Date - 05/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $14.54 $6.34 $10.70 $0.00 $0.00 $39.21 $0.00 $10.70 $0.00 $20.88 $40.11 $10.50 $10.70 2 60 $14.54 $6.34 $10.50 $10.70 $6.23 08/01/2015 $0.00 $10.50 $10.70 $27.11 02/01/2016 $42.81 $10.50 3 65 $15.76 $6.34 $6.23 $0.00 $28.33 4 70 $16.97 $6.34 $6.23 $0.00 $29.54 5 75 $18.18 $6.34 $6.23 $0.00 $30.75 6 80 $19.39 $6.34 $6.23 $0.00 $31.96 7 85 $20.60 $6.34 $6.23 $0.00 $33.17 8 90 $21.82 $6.34 $6.23 $0.00 $34.39 ®_.----------- Notes: -- _.._-- ---._..-..-- ---, --_._._._.----- _._------------------ Apprentice to Journeyworker Ratio:1:5 RIDE -ON MOTORIZED BUGGY OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - ZONE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10. $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 .12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ROLLER/SPREADER/MULCHING MACHINE 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg) ROOFERS LOCAL 33 08/01/2013 $38.31 $10.50 $10.70 $0.00 02/01/2014 $39.21 $10.50 $10.70 $0.00 08/01/2014. $40.11 $10.50 $10.70 $0.00 02/01/2015 $41.01 $10.50 $10.70 $0.00 . 08/01/2015 $41.91 $10.50 $10.70 $0.00 02/01/2016 $42.81 $10.50 $10.70 $0.00 $59.51 $60.41 $61.31 $62.21 $63.11 $64.01 Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 31 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - ROOFER - Local 33 Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.16 $10.50 $3.38 $0.00 $33.04 2 60 $22.99 $10.50 $10.70 $0.00 $44.19 3 65 $24.90 $10.50 $10.70 $0.00 $46.10 4 75 $28.73 $10.50 $10.70 $0.00 $49.93 5 85 $32.56 $10.50 $10.70 $0.00 $53.76 Effective Date - 02/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 .50 $19.61 $10.50 $3.38 $0.00 $33.49 2 60 $23.53 $10.50 $10.70 $0.00 $44.73 3 65 $25.49 $10.50 $10.70 $0.00 $46.69 4 75 $29.41 $10.50 $10.70 $0.00 $50.61 5 85 $33.33 $10.50 $10.70 $0.00 $54.53 (Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1 __ Step 1 is 2000 hrs.; Steps 2-5 are 1000 lirs. !I! Apprentice to Journeyworker Ratio:** ROOFER SLATE / TILE /PRECAST CONCRETE 08/01/2013 $38.56 $10.50 $10.70 _$0.00 $59.76 ROOFERS LOCAL 33 02/01/2014 $39.46 $10.50 $10.70 $0.00 $60.66 08/01/2014 $40.36 $10.50 $10.70 $0.00 $61.56 02/01/2015 $41.26 $10.50 $10.70 $0.00 $62.46 08/01/2015 $42.16 $10.50 $10.70 $0.00 $63.36 02/01/2016 $43.06 $10.50 $10.70 $0.00 $64.26 For apprentice rates see "Apprentice- ROOFER" SHEETMETAL WORKER 12/09/2013 $42.35 $9.82 $19.33 $2.14 $73.64 SHEETMETAL WORKERS LOCAL 17 -A 02/01/2014 $42.76 $9.82 $19.74 $2.17. $74.49 08/01/2014 $43.61 $9.82 $19.74 $2.17 $75.34 02/01/2015 $44.51 $9.82 $19.74 $2.17 $76.24 08/01/2015 $45.51 $9.82 $19.74 $2.17 $77.24 02/01/2016 $46.51 $9.82 $19.74 $2.17 $78.24 08/01/2016 $47.66 $9.82 $19.74 $2.17 $79.39 02/01/2017 $48.76 $9.82 $19.74 $2.17 $80.49 08/01/2017 $49.86 $9.82 $19.74 $2.17 $81.5.9 02/01/2018 $51.01 $9.82 $19..74 $2.17 $82.74 -------------- -- ------------------------------------- IssueDate: 01/22/2014 Wage Request Number: 20140122-006 --------------------------------- ------------------------ -Issue Page 32 of 40 R b% Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SHEET METAL WORKER -Local 17-A Effective Date - 12/09/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.94 $9.82 $4.28 $0.00 $31.04 2 40 $16.94 $9.82 $4.28 $0.00 $31.04 3 45 $19.06 $9.82 $8.70 $1.13 $38.71 4 45 $19.06 $9.82 $8.70 $1.13 $38.71 5 50 $21.18 $9.82 $9.49 $1.21 $41.70 6 50 $21.18 $9.82 $9.74 $1.22 $41.96 7 60 $25.41 $9.82 $11.05 $1.39 $47.67 8 65 $27.53 $9.82 $11.84 $1.48 $50.67 9 75 $31.76 $9:82 $13.41 $1.65 $56.64 10 85 $36.00 $9.82 $14.48 $1.81 $62.11 Effective Date - 02/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.10 $9.82 $4.28 $0.00 $31.20 2 40 $17.10 $9:82 $4.28 $0.00 $31.20 3 45 $19.24 $9.82 $8.70 $1.13 $38.89 4 45 $19.24 $9.82 $8.70 $1.13 $38.89 5 50 $21.38 $9.82 $9.49 $1.22 $41.91 6 50 $21.38 $9.82 $9.74 $1.23 $42.17 7 60 $25.66 $9.82 $11.05 $1.40 $47.93 8 65 $27.79 $9.82 $11.84 $1.48 $50.93 9 75 $32.07 $9.82 .$13.41 $1.66 $56.96 10 85 $36.35 $9.82 $14.48 $1.82 $62.47 Notes: Steps are 6 mos. Apprentice to Journeyworker Ratio:I:4 SIGN ERECTOR 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93 PAINTERS LOCAL 35 - 70NE 2 -------------------------------- ------------ -------------------------------------------------- - --------------------------- ---- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 33 of 40 bbb Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SIGN ERECTOR -Local 35 Zone 2 .: . Effective Date - 06/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $12.91 $7.07 $0.00 $0.00 $19.98 2 55:. $14.20 $7.07 $2.45 $0.00 $23.72 3 60 $15.49 $7.07 $2.45 $0.00 $25.01 4 65 $16.78 $7.07 $2.45 $0.00 $26.30 5 70 $18.07 $7.07. $7.05 $0.00 $32.19 6 75 $19.36 $7.07 $7.05 $0.00 $33.48 7 80 $20.65 $7.07 $7.05 $0.00 $34.77 8 85 $21.94 $7.07 $7.05 $0.00 $36.06 9 90 $23.23 $7.07 $7.05 $0.00 $37.35 - - ____ _ - ___. __.. - - _... `Notes: - - ___ _ - ____ ___:. --- - - - - Steps are 4 mos. Apprentice to Journeyworker Ratio: 1:l SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2013 $31.24 $9.41 $8.80 $0.00 $49.45 TEAMSTERS JOINT COUNCIL NO. 10 70NE B 06/01/2014 $31.59 $9.41 $8.80 $0.00 $49.80 08/01/2014 $31.59 $9.91 $8.80 $0.00 $50.30 12/01/2014 $31.59 $9.91 $9.33 $0.00 $50.83 06/01/2015 $31.94 $9.91 $9.33 $0.00 $51.18 08/01/2015 $31.94 $10.41 $9.33 $0.00 $51.68 12/01/2015 $31.94 $10.41 $10.08 $0.00 $52.43 06/01/2016 $32.44 $10.41 $10.08 $0.00 $52.93 08/01/2016 $32.44 $10.91 $10.08 $0.00 $53.43 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24 SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2013 $31.53 $9.41 $8.80 $0.00 $49.74 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2014 $31.88 $9.41 $8.80 $0.00 $50.09 08/01/2014 $31.88 $9.91 $8.80 $0.00 $50.59 12/01/2014 $31.88 $9.91 $9.33 $0.00 $51.12 06/01/2015 $32.23 $9.91 $9.33 $0.00 $51.47 08/01/2015 $32.23 $10.41 $9.33 $0.00 $51.97 12/01/2015 $32.23 $10.41 $10.08 $0.00 $52.72 06/01/2016 $32.73 $10.41 $10.08 $0.00 $53.22 08/01/2016 $32.73 $10.91: $10.08 $0.00 $53.72 12/01/2016 $32.73 $10.91 $10.89. $0.00 $54.53 Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 34 of 40 T I Classification Effective Date Base Wage Health Pension . Supplemental Total Rate -- Unemployment SPRINKLER FITTER 01/01/2014 $48.00 $8.42 $12.85 $0.00 $69.27 SPRINKLER FITTERS LOCAL 550 - (Section B) Zone 2A 03/01/2014 $49.12 $8.42 $12.85 $0.00 $70.39 10/01/2014 $50.16 $8.42 $12.85 $0.00 $71.43 01/01/2015 $50.16 $8.42 $13.00 $0.00. $71.58 03/01/2015 $51.06 $8.42 $13.00 $0.00 $72.48 10/01/2015 $52.10 $8.42 $13.00 $0.00 $73.52 01/01/2016 $52.10 $8.67 $13.15 $0.00 $73.92 03/01/2016 $53.00 $8.67 $13.15 $0.00 $74.82 10/01/2016 $54.04 $8.67 $13.15 $0.00 $75.86 03/01/2017 $54.90 $8.67 $13.15 $0.00 $76.72 Apprentice- SPRINKLER FITTER -Local 550 (Section B) Zone 2A Effective Date - 01/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 35 $16.80 $8.42 $8.25 $0.00 $33.47 2 40 $19.20 $8.42 $8.25 $0.00 $35.87 3 45 $21.60 $8.42 $8.25 $0.00 $38.27 4 50 $24.00 $8.42 $8.25 $0.00 $40.67 5 55 $26.40 $8.42 $8.25 $0.00 $43.07 6 60 $28.80 $8.42 $8.25 $0.00 $45.47 7 65 $31.20 $8.42 $8.25 $0.00 $47.87 8 70 $33.60 $8.42 $8.25 $0.00 $50.27 9 75 $36.00 $8.42 $8.25 $0.00 $52.67 10 80 $38.40 $8.42 $8.25 $0.00 $55.07 Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 35 $17.19 $8.42 $8.25 $0.00 $33.86 2 40 $19.65 $8.42 $8.25 $0.00 $36.32 3 45 $22.10 $8.42 $8.25 $0.00 $38.77 4 50 $24.56 $8.42 $8.25 $0.00 $41.23 5 55 $27.02 $8.42 $8.25 $0.00 $43.69 6 60 $29.47 $8.42 $8.25 $0.00 $46.14 7 65 $31.93 $8.42 $8.25 $0.00 $48.60 8 70 $34.38 $8.42 $8.25 $0.00 $51.05 9 75 $36.84 $8.42 $8.25 $0.00 $53.51 10 80 $39.30 $8.42 $8.25 $0.00 $55.97 Notes: Apprentice entered piior. 9/30/10: __._ ___. - _ _ Via., � - _ _ -�.... � - __ --, 40/45/50/55/60/65/70/75/80/85 Steps are 850 hours _._..._.... - �.._. - _____ _._ - _._ _____ Apprentice to Journeyworker Ratio: 1:3 _ __._ . _.... - � .. �...- _.__ _ __ .s - __ _ _ - STEAM BOILER OPERATOR 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS IIOCAL 4 . For apprentice rates see "Apprentice- OPERATING ENGINEERS" ----------- - --------------- --------------------------- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 --------- -------- ------- --- Page 35 of 40 1 40 $13.19 $13.00 $0.40 $0.00 $26.59 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS LOCAL 4 45 $14.84 $13.00 $10.04 $0.00 $37.88 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 50 $16.49 $13.00 $10.29 $0.00 $39.78 TELECOMMUNICATION TECHNICIAN 09/01/2013 $32.97 $13.00 $12.77 $0.00 $58.74 ELECTRICIANS LOCAL 103 03/01/2014 $33.44 $13.00 $13.03 $0.00 $59.47 8 09/01/2014 $33.84 $13.00 $13.05 $0.00 $59.89 9 03/01/2015 $34.38 $13.00 $13.06 $0.00 $60.44 10 09/01/2015 $35.10 $13.00 $13.08 $0.00 $61.18 Effective 03/01/2016 $35.81 $13.00 $13.10 $0.00 $61.91 Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 percent Apprentice Base Wage Health Pension Unemployment Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 40 $13.19 $13.00 $0.40 $0.00 $26.59 2 40 $13.19 :: $13.00 $0.40: $0.00 $26.59 3 45 $14.84 $13.00 $10.04 $0.00 $37.88 4 45 $14.84 $13.00 $10.04 $0.00 $37.88 5 50 $16.49 $13.00 $10.29 $0.00 $39.78 6 55 $18.13 $13.00 $10.53 $0.00 $41.66 7 60 $19.78 $13.00 $10.78 $0.00 $43.56 8 65 $21.43 $13.00 $11.03 $0.00 $45.46 9 70 $23.08 $13.00 $11.28 $0.00 $47.36 10 75 $24.73 $13.00 $11.53 $0.00 $49.26 Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $13.38 $13.00 $0.40 $0.00 $26.78 2 40 $13.38 $13.00 $0.40 $0.00 $26.78 3 45 $15.05 $13.00 $10.29 $0.00 $38.34 4 45 $15.05 $13.00 $10.29 $0.00 $38.34 5 50 $16.72 $13.00 $10.54 $0.00 $40.26 6 55 $18.39 $13.00 $10.79 $0.00 $42.18 7 60 $20.06 $13.00 $11.04 $0.00 $44.10 8 65 $21.74 $13.00 $11.29 $0.00 $46.03 9 70 $23.41 $13.00 $11.54 $0.00 $47.95 10 75 $25.08 $13.00 $11.79 $0.00 $49.87 Notes: Apprentice to Journeyworker Ratio-. :J ----------------------------------------------------------------------------------------•-------------------- - ------------------- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 36 of 40 TEST BORING DRILLER HELPER 12/01/2013 $33.42 $7.30 $12.90 $0.00 $53.62 I.ABORERS - FOUNDATIONAND MARINE Classification Effective Date Base Wage Health Pension Supplemental Total Rate 06/01/2014 $34.17 Unemployment $12.90 $0.00 $54.37 TERRAZZO FINISHERS 08/01/2013 $47.00 $10.18 $18.15 $0.00 $55.12 $75.33 BRICK/,AVERS LOCAL 3 -MARBLE &TILE $35.67 $7.30 $12.90 $0.00 $55.87 12/01/2015 $36.42 02/01/2014 $47.00 $10.18 $18.15 $0.00 06/01/2016 $75.33 $7.30 08/01/2014 $47.90 $10.18 $18.22 $0.00 $38.17 $76.30 $12.90 02/01/2015 $48.46 $10.18 $18.22 $0.00 $76.86 08/01/2015 $49.36 $10.18 $18.29 $0.00 --- -------------------- $77.83 02/01/2016 $49.93 $10.18 $18.29 $0.00 $78.40 08/01/2016 $50.83 $10.18 $18.37 $0.00 $79,38 02/01/2017 $51.40 $10.18 $18.37 $0.00 $79.95 Apprentice - TERRAZZO FINISHER - Local 3 Marble & Tile Effective Date - 08/01/2013 Supplemental �I Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.50 $10.18 $18.15 $0.00 $51.83 2 60 $28.20 $10.18 $18.15 $0.00 $56.53 3 70 $32.90 $10.18 $18.15 $0.00 $61.23 4 80 $37.60 $10.18 $18.15 $0.00 $65.93 5 90 $42.30 $10.18 $18.15 $0.00 $70.63 Effective Date - 02/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.50 $10.18 $18.15 $0.00 $51.83 2 60 $28.20 $10.18 $18.15 $0.00 $56.53 3 70 $32.90 $10.18 $18.15 $0.00 $61.23 4 80 $37.60 $10.18 $18.15 $0.00 $65.93 5 90. $42.30 $10.18. $18.15 $0.00 $70.63 -- ____®------------_.®--.___------®---- Notes:, I � Tice Apprentice to Journeyworker Ratio:1:3 � TEST BORING DRILLER 12/01/2013 $34.70 $7.30 $12.90 $0.00 $54.90 LABORERS - FOUNDATION AND MARINE 06/01/2014 $35.45 $7.30 $12.90 $0.00 $55.65 12/01/2014 $36.20 $7.30 $1.2.90 $0.00 $56.40 06/01/2015 $36.95 $7.30 $12.90 $0.00 $57.15 12/01/2015 $37.70 $7.30 $12.90 $0.00 $57.90 06/01/2016 $38.45. $7.30 $12.90 $0.00 $58.65 12/01/2016 $39.45 $7.30 $12.90 $0.00 $59.65 For apprentice rates see "Apprentice- LABORER" TEST BORING DRILLER HELPER 12/01/2013 $33.42 $7.30 $12.90 $0.00 $53.62 I.ABORERS - FOUNDATIONAND MARINE 06/01/2014 $34.17 $7.30 $12.90 $0.00 $54.37 12/01/2014 $34.92 $7.30 $12.90 $0.00 $55.12 06/01/2015 $35.67 $7.30 $12.90 $0.00 $55.87 12/01/2015 $36.42 $7.30 $12.90 $0.00 $56.62 06/01/2016 $37.17 $7.30 $12.90 $0.00 $57.37 12/01/2016 $38.17 $7.30 $12.90 $0.00. $58.37 For apprentice rates see "Apprentice- LABORER" ------------ ------------------------------------------------------- Issue Date: 01/22/2014 --------------- --------------- Wage Request Number: 201.40122-006 -------- --- -------------------- Page 37 of 40 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate TEST BORING LABORER 12/01/2013 $33.30 $7.30 $12.90 $0.00 $53.50 LABORERS - FOUNDATIONAND MARINE 06/01/2014 $34.05 $7.30 $12.90 $0.00 $54.25 12/01/2014 $34.80 $7.30 $12.90 $0.00 $55.00 06/01/2015 $35.55 $7.30 $12.90 $0.00 $55.75 12/01/2015 $36.30 $7.30 $12.90 $0.00 $56.50 06/01/2016 $37.05 $7.30. $12.90 $0.00 $57.25 . 12/01/2016 $38.05 $7.30 $12.90 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" TRACTORS/PORTABLE STEAM GENERATORS 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2013 $31.82 $9.41 $8.80 $0.00 $50.03 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2014 $32.17 $9.41 $8.80 $0.00 $5038 08/01/2014 $32.17 $9.91 $8.80 $0.00 $50.88 12/01/2014 $32.17 $9.91 $9.33 $0.00 $51.41 06/01/2015 $32.52 $9.91 $9.33 $0.00 $51.76 08/01/2015 $32.52 $10.41 .. $9.33 $0.00 $52.26 12/01/2015 $32.52 $10.41 $10.08 $0.00 $53.01 06/01/2016 $33.02 $10.41 $10.08 $0.00 $53.51 08/01/2016 $33.02 $10.91 $10.08 $0.00 $54.01 12/01/2016 $33.02 $10.91 $10.89 $0.00 $54.82 TUNNEL WORK - COMPRESSED AIR 12/01/2013 $45.58 $7.30 $13.30 $0.00 $66.18 LABORERS (COMPRESSED AIR) 06/01/2014 $46.33 $7.30 $13.30 $0.00 $66.93 12/01/2014 $47.08 $7.30 $13.30 $0.00 $67.68 06/01/2015 $47.83 $7.30 $13.30 $0.00 $68.43 12/01/2015 $48.58 $7.30 $13.30 $0.00 $69.18 06/01/2016 $49.33 $7.30 $13.30 $0.00 $69.93 12/01/2016 $50.33 $7.30 $13.30 $0.00 $70.93 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) 12/01/2013 $47.58 $7.30 $13.30 $0.00 $68.18 LABORERS (COMPRESSED AIR) .06/01/2014 $48.33 $7.30 $13.30 $0.00 $68.93 12/01/2014 $49.08 $7.30 $13.30 $0.00 $69.68 06/01/2015 $49.83 $7.30 $13.30 $0.00 $70.43 12/01/2015 $50.58 $7.30 $13.30 $0.00 $71.18 06/01/2016 $51.33 $7.30 $13.30 $0.00 $71.93 12/01/2016 $52.33 $7.30 $13.30 $0.00 $72.93 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - FREE AIR 12/01/2013 $37.65 $7.30 $13.30 $0.00 $58.25 LABORERS (FREF. AIR TUNNEL) 06/01/2014 $38.40 $7.30 $13.30 $0.00 $59.00 12/01/2014 $39.15 $7.30 $13.30 $0.00 $59.75 06/01/2015 $39.90 $7.30 $13.30 $0.00 $60.50 12/01/2015 $40.65 $7.30 $13.30 $0.00 $61.25 06/01/2016 $41.40 $7.30 $13.30 $0.00 $62.00 12/01/2016 $42.40 $7.30 $13.30 $0.00 $63.00 For apprentice rates see "Apprentice- LABORER" --------------------------------------------------------------- • Issue Date: 01/22/2014 Wage Request Number: --------------------- ----- 20140122-006 Page 38 of 40 Classification TUNNEL WORK - FREE AIR (HAZ. WASTE) LABORERS (FREE AIR TUNNEL) For apprentice rates see "Apprentice- LABORER" Effective Date Base Wage Health Pension Supplemental Total Rate $49.45 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B . Unemployment 12/01%2013 $39.65 $7.30 $13.30 $0.00 $60.25 06/01/2014 $40.40 $7.30 $13.30 $0.00 $61.00 12/01/2014 $41.15 $7.30 $13.30 $0.00 $61.75 06/01/2015 $41.90 $7.30 $13.30 $0.00 $62.50 12/01/2015 $42.65 $7.30 $13.30 $0.00 $63.25 06/01/2016 $43.40 $7.30 $13.30 $0.00 $64.00 12/01/2016 $44.40 $7.30 $13.30 $0.00 $65.00 VAC HAUL 12/01/2013 $31.24 $9.41 $8.80 $0.00 $49.45 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B . 03/01/2014 $45.98 $9.82 06/01/2014 $31.59 $9.41 $8.80 $0.00 $49.80 $14.04 08/01/2014 $31.59 $9.91 $8.80 $0.00 $50.30 $0.00 12/01/2014 $31.59 $9.91 $9.33 $0.00 $50.83 $72.84 06/01/2015 $31.94 $9.91 $9.33 $0.00 $51.18 09/01/2016 08/01/2015 $31.94 $10.41 $9.33 $0.00 $51.68 $52.18 12/01/2015 $31.94 $10.41 $10.08 $0.00 $52.43 06/01/2016 $32.44 $10.41 $10.08 $0.00 $52.93 08/01/2016 $32.44 $10.91 $10.08 $0.00 $53.43 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24 WAGON DRILL OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS -ZONE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/201.4 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" WASTE WATER PUMP OPERATOR 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" WATER METER INSTALLER 09/01/2013 $44.98 $9.82 $14.04 $0.00 $68.84 PLUMBERS & GASFIITERS LOCAL 12 (Local 138) 03/01/2014 $45.98 $9.82 $14.04 $0.00 $69.84 09/01/2014 $46.98 $9.82 $14.04 $0.00 $70.84 03/01/2015 $47.98 $9.82 $14.04 $0.00 $71.84 09/01/2015 $48.98 $9.82 $14.04 $0.00 $72.84 03/01/2016 $50.13 $9.82 $14.04 $0.00 $73.99 09/01/2016 $51.18 $9.82• $14.04 $0.00 $75.04 03/01/2017 $52.18 $9.82 $14.04 $0.00 $76.04 For apprentice rates see "Apprentice- PLUMBER/PIPEFITTER" or "PLUMBER/GASFITTER" - --------------------- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 ---------------------------------- ------------ Page 39 of 40 i i d Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L. c. 23, ss. 1113-11L. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. 11 E-11 IL. All steps are six months (1000 hours) unless otherwise specified. * Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof. ** Multiple ratios are listed in the comment field. *** APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. **** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6'9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15,10:16, etc. - ------------ ------- ---------- Issue Date: 01/22/2014 Wage Request Number: 20140122-006 Page 40 of 40 A00RO CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) 08124/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER MARSH USA, INC. TWO ALLIANCE CENTER 3560 LENOX ROAD, SUITE 2400 ATLANTA, GA 30326 CONTACT NAME: (A/CNo n/c No): E-MAIL ADDRESS: COMMERCIAL GENERAL LIABILITY INSURERS AFFORDING COVERAGE NAIC # INSURER A: American Guarantee & Liability Ins Co 26247 J34420-OC-UMB-15-16 INSURED P.J. KEATING COMPANY (LUNENBURG) INSURER B: 998 RESERVOIR ROAD INSURER C : INSURER D : LUNENBURG, MA 01462 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: ATL -003518796-07 REVISION NUMBER:4 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF MM/DD/YYYY POLICY EXP MM/DD/YYYY LIMITS Manashi Mukherjeem� COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ DAMAGE TO CLAIMS -MADE F-1OCCUR PREMISESEa occu ence $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GENT AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ POLICYPRO [7 LOC JECT PRODUCTS - COMP/OP AGG $ $ OTHER: AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ Ea accident _ BODILY INJURY (Per person) $ ANY AUTO BODILY INJURY (Per accident) $ ALL OWNED SCHEDULED AUTOS AUTOS PROPERTY DAMAGE $ er dent Pacci NON -OWNED HIRED AUTOS AUTOS $ A X UMBRELLA LIAB X OCCUR AUC655102506 09/01/2015 09/0112016 EACH OCCURRENCE $ 5,000,000 AGGREGATE $ 5,000,000 EXCESS LIAB CLAIMS -MADE DED I I RETENTION $ $ WORKERS COMPENSATIONPER AND EMPLOYERS' LIABILITY Y / N OTH- STATUTE I JER ANY PROPRIETOR/PARTNER/EXECUTIVE a OFFICER/MEMBER EXCLUDED? N / A E.L. EACH ACCIDENT $ (Mandatory in NH) E.L. DISEASE - EA EMPLOYE $ If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT i $ DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) RE: BITUMINOUS CONCRETE PAVING PROJECT. TOWN OF NORTH ANDOVER IS (ARE) INCLUDED AS ADDITIONAL INSURED(S) IF REQUIRED BY WRITTEN CONTRACT, THE UMBRELLA POLICY IS PRIMARY IF REQUIRED BY WRITTEN CONTRACT. CERTIFICATE HOLDER CANCELLATION TOWN OF NORTH ANDOVER SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 120 MAIN ST THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN NORTH ANDOVER, MA 01845 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE of Marsh USA Inc. Manashi Mukherjeem� ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25 (2014/01) The ACORD name and logo are registered marks of ACORD 0411-01-00-0001945-0002-0004110 03/12/2015 12:33 FAX 9785827027 IS CERTIFICATE IS ISSUED AS A MATTER OF INSC MANCE�A(TE HOOUGHFAU WND MY aCEDE � This is to Certify that t PJ Keating Co. 998 Reservoir Rd. Lunenburg, MA 01462 L is,attheissue&teoflhF wff=uS;>=cdbyftCoW C40(fiioasandislmtti1— byanymgtderu*trimora EXP DATE TYPE OF PO11CY Q COMINUOUS ❑ r7crE MM m POLICY TERM WORKERS 9/1/2015 COMPENSATION CE14ii LIABILITY 9/112015 Eloocump qcE ❑ CLAIMS MADE AiT['OMORME LIABILITY •Li OWNED rQ NON -OWNED LI HIRED OTHER Pikeating 0 0002/0002 Certificate of Insurance r AND CONFERS NO RIGHTS UPON YoU THE CER IIFIC 4[E HOLDER 7 F$$ CERTtF7CATE IS NOT AN a• COVERAGE AFFORDED HY i1� POLICIES LISTED BELOW. POLICY LIPhITS ARE NO7.F_cM TIiAW �runce'. n fere AGE ,e.e.....,,....,. NAME AND 1� Mutuga ADDRESS OF INSURED 91 INSURANCE edbebw The instttgnoe aBatded by Ute fisted potiey(ies) Iasobjee2 w aiI rhe'tr terms, aselntioas ttad POLICY NUMBER L MIT OF LIABRM COVERAGEAFFORDED UNDER WC w OF THE FOLLOWM STATES: nwLoym UM WA7-C8D-004095-024 -C81-004095-014 ALL ONC)POLiTICS TES AND > A oa�� VA Bodily I*W By Disease $1,000,000 BOMY bJW By DlzrA 1 000000 TB2-081-004095-114 GUMMI 'were -Per Project Aggregate included. $2 000 000 Products! completed Opeaacons Aggegate 9/1/2015 AS2-C81-004095-124 Comp Ded $10,000 Coll Ded $10,000 Personal & Advertising Injury $2,000.000 P-Personrorgacim6on Other Fire Damage$100,000 Medical EIIp- 5,000 Each Fetson Each Atddent or Ocauremx Each Accident or Oeaunww Town Of North Andover is listed as an additional insured as required under written contract for work performed. Ifthe C=ifieau ncpimtion date is eondnuous or 0=ded tcmy you will be nofified ifoorcraLc is te•oena(ed or reduced before the ocrtiGeue expiration data NOTICE OF CANCELLATION; (NOT AppLICABLE UNLESS A NUMBER OF DAYSXPIRATION DATE IS ENTERED $ELOW. INSBEFOURANCE AFFORDED RE TH STATED EUNDER THE ABOVE EPOEJCMS ?1MMpANy LATLEAASTC QL ON" DAYSUNOTI Q OF SUCH CANCELLATION HAS BEEN MAILED TO: Liberty Muttcal Insurance Group I. . Town Of N. Andover. t- 120 Main St Stan Esposito c E Pittsburgh 10387 AUTHORIZED REPRESENTATIVE N. Andover, MA 01845 12 Federal Street. Ste. 310 Pittsburgh PA 15212-5706 412-231-1331 JOFFICE PHONE DATE ISSUED 'this certificate is executed by LIBERTY MUTUAL INSURANCE GROUP as respects such insurance as is afforded by those Companies NM 772 07-10 CST NC.: 21116920 CLIMI CODE: Lt, 9q Diictto]ds yisoai 8/5/201< 4:57:50 PN (EDTI Page i o: 1 SDI COI 259896 0211 ACOR[)®CERTIFICATE OF LIABILITY INSURANCE DATE0812212/22/200I/DD/YYYY) 14 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER MARSH USA, INC. TWO ALLIANCE CENTER 3560 LENOX ROAD, SUITE 2400 ATLANTA, GA 30326 CONTACT NAME: PHONE o aC Nol: E-MAIL ADDRESS: GENERAL LIABILITY INSURERS AFFORDING COVERAGE NAIC # INSURER A: American Guarantee & Liability Ins Co 26247 J34420-..-EX-14-15 INSURED P.J. KEATING COMPANY (LUNENBURG) INSURER B : 998 RESERVOIR ROAD INSURER C : INSURER D: LUNENBURG, MA 01462 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: ATL -003243476-05 REVISION NUMBER:4 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF MM/DD/YYYY POLICY EXP MM/DDIYYYY LIMITS GENERAL LIABILITY EACH OCCURRENCE $ _ DAMAGE TO RENTED COMMERCIAL GENERAL LIABILITY PREMISES Ea occurrence $ CLAIMS -MADE F-1 OCCUR MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GENERAL AGGREGATE $ GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ $ POLICY PRO- LOC AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT Ea accident BODILY INJURY (Per person) $ ANY AUTO ALL OWNED SCHEDULED AUTOS AUTOS BODILY INJURY (Per accident) $ PROPERTY DAMAGE $ Per accident NON -OWNED HIRED AUTOS AUTOS $ A X UMBRELLA LIAB X OCCUR AUC655102505 0910112014 09/01/2015 EACH OCCURRENCE $ 10,000,000 AGGREGATE $ 10,000,000 EXCESS LIAB CLAIMS -MADE DED RETENTION $ $ WORKERS COMPENSATIONWC RYSTATU-LIMITS OTH- TO rp AND EMPLOYERS' LIABILITY Y / N ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDE N N / A E.L. EACH ACCIDENT $ (Mandatory in NH) E.L. DISEASE - EA EMPLOYE $ If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, If more space is required) RE: BITUMINOUS CONCRETE PAVING PROJECT. TOWN OF NORTH ANDOVER IS (ARE) INCLUDED AS ADDITIONAL INSURED(S) PER WRITTEN CONTRACT. THE UMBRELLA POLICY IS "FOLLOW FORM" AND NON-CONTRIBUTORY. TOWN OF NORTH ANDOVER 120 MAIN ST NORTH ANDOVER, MA 01845 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE of Marsh USA Inc. Manashi Mukherjee �c nam c e ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010/05) The ACORD name and logo are registered marks of ACORD 0300.01.00-0009222-0002-0020687 TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 Raymond T Santilh Assistant Town Manager Mr. Andy Brewer, Assistant Secretary P.J. Keating Company 998 Reservoir Road Lunenburg, MA 01462 Dear Mr. Brewer: March 27, 2014 TEL (978) 688-9516 FAX (978) 688-9556 Enclosed please find the executed contract between the Town of North Andover and P.J. Keating Company to furnish and install bituminous concrete paving for the period of April 1, 2014 through March 31, 2015. In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work performed under this contract. For each week work is performed, you are required to submit certified weekly payroll records. The certified weekly payroll records are to be sent to: Mr. Bruce Thibodeau, Director Department of Public Works 384 Osgood Street North Andover, MA 01845 If you have any questions and/or concerns, please call me. Sincerely, Raymond T. Santilli Assistant Town Manager Enclosure cc., Bruce Thibodeau, DPW Contract File CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature ec,Uer �SS�. e Print N me & Title Date al 2_6 / I q Company Name 1-1 CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I A ndg Cbr , authorized signatory for P. l(eabn' a L 0 Name Vindividual Name of c6Wtracior do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. niZ2�1, fV� t"a�l V/L/ Si ature Date Town of North Andover IFB Page 31 of 35 Bituminous Concrete Paving CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature Anr(r of -r SSi . Je cr� Print me & Title Town of North Andover IFB Bituminous Concrete Paving Date Z21 Company Name Page 32 of 35 CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the held on it was VOTED, THAT (Name) <540 e— aY-9orw�p— vo AC, (Officer) of be and hereby is authorized to execute contracts and bonds in the name and on behalf of said , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of on its behalf by such officer under seal of , shall be valid and binding upon I hereby certify that I am the clerk of the above named and that is the duly elected officer as above of said and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. (Date) (Clerk) Town of North Andover IFB Page 33 of 35 Bituminous Concrete Paving P.J.KEATING P.J. KEATING COMPANY Asphalt and Crushed Stone 998 Reservoir Road Lunenburg, Massachusetts 01462-0367 Tel: (978) 582-5200 • Fax: (978) 582-7130 CORPORATE VOTE I, Jonathan Olson hereby certify that I am the duly elected President of P. J. Keating Company. I hereby certify the following is a true copy of a vote taken at a special meeting of the board of Directors of the corporation, duly called, and held on January 1, 2014 at which a quorum of the board was present and voting. VOTED: JONATHAN OLSON President, JOHN J. KEATING Vice President/Assistant Secretary, ROBERT W. BOBENHAUSEN Chief Financial Officer/Secretary, CHARLES BROWN Treasurer/Assistant Secretary, MICHAEL G. O'DRISCOLL Assistant Secretary, GARY P. HICKMAN Assistant Secretary, ERIC LUNDBERG Assistant Secretary, MARK PILLSBURY Assistant Secretary, GREGORY BOWLES Assistant Secretary, ANDY M. BREWER Assistant Secretary, KEVIN S. YOUNKIN Assistant Secretary, WILLIAM B. MILLER Assistant Secretary, DAVID M. TOOLAN Assistant Secretary, M. CRAIG HALL Assistant Secretary of said corporation, are hereby duly authorized and empowered to execute all documents necessary for submittals and further authorizing said representatives to execute any documents which may in their judgment be desirable or necessary to effect the purpose of this vote. ZA Z6 Sa Date Jo than O so President 0 An Old Castle Company EQUAL OPPORTUNITY EMPLOYER PAYMENT BOND Bond No. 14.066.153 KNOW ALL MEN BY THESE PRESENTS, that we P.J. KEATING COMPANY with a place of business at 998 RESERVOIR ROAD, LUNENBURG, MA 01462 as Principal (tile "Principal"), and LIBERTY MUTUAL INSURANCE COMPANY corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at 175 BERKELEY ST., BOSTON, MA 02116 a5 Surety (the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee THREE HUNDRED FORTY THOUSAND TWO HUNDRED FIFTY AND 001100 (the "Obligee"), in the sum of ($340,250.00) lawful money of the United States of America., to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of FEBRUARY 24, 2014 for the construction of FURNISHING AND INSTALLING BITUMINOUS CONCRETE PAVING FOR THE PERIOD OF APRIL 1, 2014 THROUGH MARCH 3, 2015. NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but not be limited to, any other purposes or items set out in, and to be subject to, the provisions of Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then this obligation shall become null and void; otherwise, it shall remain in full force and virtue. IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this 24TH day of FEBRUARY, 2014 PRINCIPAL SURETY P.J. KEATING CO NY LIBERTY MUTUAL INSURANCE COMPANY [Name Sea r act ea TINA DAVIS ` gZ4 . 5 W. SOUTH TE ; 3T .700, SALT LAKE CITY, UT 84101 [Title] - [Address] 801-533-3624 Attest:4wm SY/(/�, wI [Phone] Attest: END OF PA ,.. SURETY ACKNOWLEDGMENT STATE OF UTAH COUNTY OF SALT LADE } SS On this 24TH day of FEBRUARY, 2014, before me personally came TINA DAVIS to me known, who, being by me duly sworn, did depose and say that she is an Attorney -In -Fact of LIBERTY MUTUAL INSURANCE COMPANY the corporation described in and which executed the within instrument; that she knows the corporate seal of said corporation, that the seal affixed to the within instrument is such corporate seal, and that she signed the said instrument and affixed the said seal as Attorney -In -Fact of the Board of Directors of said corporation and by authority of this office under the Standing Resolutions thereof. d __ ;ZZ ........1...,..1.....m. b®m Notary Public 01��'ajtt LINDSEY PLATTNER jo C Commission Number 559659 My Commission Expires 6 L i�gR •1 --...••" November 30, 2015 1 State of Utah 6 1 CHIS -POWER OF ATTORNEY IS NOT VALID UNLBSS IT IS PRINTED=ON RED. BACKGROUND -�� chis Rower of Attorney I mita the.acts of those named herein, and. -they have no authority to bind the Company except'n the manner and to the extent herein stated !_ .'�•'".���'� ;� r"' �` ^ r� 1.% _'" �- _ � � - _ ``_ ��. / � '/s^ Cer/tlfiCate NO 6349399.; Amencan Fire and Casualty Company - Liberty Mutual Insurance Company f r r\ \ The Ohio Casualty Insurance Company We tAmencan Insura am' p i � = -= :� �..;r�.r� ::_ --• � � , s rice C any- NEY _f OWER OF�ATTOR � �-- WOWNALL PERSONS BY THESE PRESENTS ThatAmencan FIre:B CasualtyvCompany'and The,Ohio Casualty Insurance Company are.corporations.duty organiied under ttie laves of .: r he State of New Hampshire that Liberty Mutual Irisurence Company is:a corporation duly,orgamzed `Under the laws of the State of Massachusetts;. and WesfAmencan Insurance Company ---. ,.,. _ V i s a corporation duly organized under the laws oftne State of Indiana (herein co leetivelycalletl the `Companies"); pu antto,and by authority herein set forth; does hereby name ;constitute; =. ind a omt Jessica Arnold L rid ev PI' pp rn attner Lisa Hall Tina Davis ^\ ill of the city of Salt Lakg City state of DT ae ch:individually rf there be more thari one named; its true and lawful attorney in =fact to make execute; seal acknowledge f 6d -__deliver for and on its be as surety and as:its act;and deed ny;and all undertaking bonds; recogmzances and other surety obligations;an pursu ce of these presents and shall ie as bindin u ori i`the_ ` "~ r the Com antes as if -the liav_e been du si ned .bythe president and attested by tte secretary of ttie:Com antes in ir own: ro er ersons \ y •--'�.:-�� •.. '"` . �, ✓��_`�^�✓,/�..,� " -.', �-per, �.�` N WITNESS WHEREOF this Power_of Attorney lias been subscnbedsby an�authorized ffibef or.o-ffiaal of the -Companies and the;corporate seals of the Compahies have been affixed= hereto;this 14th day of. November % % 2013 �^- - ✓ ��\ r - ^ - j; ✓ r ..r. ../� ^.�•%=��s �...'"""1' .ter'•' ....,y ^. =': ...:ri , - _�` Amencan Fire and Casualty Compan r r CasualtyInsu rAnc6--C ompanVr NF = N:, Liberty Mutual Insurance Company West Amencan Insurance Company "`.,,,.«.,.,> '\\•.Jr `*: yr 1.. "^. ,�- •v K, ssy �-.f�--- By. �`'� Gregor\; W._Davenport, Assistant Secretary. )TATE WASHINGTON? ss ^` �4 /� O : ..v - - 1 y OIiNTYOFK#NG. _ �^ 1 ;_ _✓ �_� )n this=14th day of November 2013" before:rrepersonally appeared Gregory W ;Davenport; whoyacknowledged'himself.to-:be the Assistaht Secretary of Amencan 'R - ,� • r vH ire and Casuafly':Company L berty Mutual Insurance Company The Ohio Casualty Company and West Amencan Insurance Company antl that he, as such being,authonzedrso to do - '�tA xecufe.the foregoing instrument for the purposesahereincontained bysigning on behalf of th6 corporationsby hirn�elf as a duly authorized.officer ^ �'"` J � .._'� ti = W; N WITNESS WHEREOF I have hereunto subscribed my name and affixed my notarial seal at Seattle '.Washingtoh on the day and year first above written-' ,�^"= ✓ v 4 0 --CL ..._ .fid^ l'• .., �.i \ ✓ ~ ./ t � r ,^;�By _ . �- rJ- ,y\'� O _ � ^� ��✓'' �; fr KDRI&y;Not Publicw .. N Ys'�vr. '`:.sem" �:!^�✓ 1" i \. t '/' ° i� S - n r ,yr• �- ` i chis Power ofAttome is made and xecuted u ., n h - y� e p rsua t to and�by aut ority of the following By-laws and Authorizations ofAmencan Fire antl Casualtq Company; ThlOhio Casualty :Insurance--- :y o; ompa`ny Liberty:Mutual Insurance Company and West Aniencan insurance Company which resolutions are now in full force and effect reading as follows �- r \ �� o �RTIGLE IV OFFICERS Section 12'Power of Attorney Any ofticeror otherofficial of the Corporation authorized for that:purpose in wnfng Bettie Chairman or the President)and subject -- =p = o sueh::kmitaUon as the Chairman or.tlie President may prescribe shall appornfisuch aKomeys in'fact as -maybe necessary to act -in behalf of -the Corporation tomake execirte seal . d _ v - - _ _ , fcknowledge and:detiver as surety any and all undertakmgs;Jbonds recognrzances and othersurety-obligafons ";Such attorheys in fact_sublect.to:the limitations set forth intheirrespe motive >owers of attorney shall;have full power to bind thejCorporation bytheir signature arid'ezecution;ofiany such.=ins#rumehts and to attach'#Hereto the seal of the Corporation When so d. �xecutgd such instruments shall be a§:binding as signedti the President and attested to by the Secretary: Any power or authority granted to'any representative or a omey-inVfact under s> = he rgvisions ofthis article ma bs revoked at.ari time b the Board; the Chairman the President of -by the o�cer orofficers rahfn such ower or author\ �s d P Y Y Y.. y ..... .f�� �, �; .._%.-.�.. g,-•-� .'"'�i�"`^ f r . i'•` --'S.r N_ 9 P �RTICL-E XIII =Execution of Contracts =SECTION 5 Surety Bonds-and-Undertakings-An.y offcerof°the Company authorized for that purpose inventing by -the chairman or the president;: < ao rnd subject to such limitations as the cH iairrman orahe president may prescribe=shall appointsuch attorneys in=fact,'afmay be necessary to actin behalf of:the Compariy tomake;execute s cal; acknowledge and deity"er as surety any and=all Gndertakings fonds recognizances and othersurety oliligatwns ,Such attorneys in fact,"subject to the limitations set forth in their ; eo espectiye powers -of attorney shall have full power to bind the Company by theicsignature;and execution of anyswch instruments andao attach thereto the seal of the,Gompany ;When so = O o ' ' - E `� i . . ✓ �r it . `� i ✓ (� �= xecuted such insttuments shall be as -binding as if signed by the president and:attested byahe secretary ✓,,.�;~-.�.r �-�... �^� � ; �-� � , co ekificate of Designations The President ofthe Company actingppmpant to the Bylgws of ther:Compahy au oh nz s GregoryWV Dav ne pR Assistant Se reC tary to s �ttomeys in fact as may b`e necessary;to ct on:behalf ofthe Company to make execute seal acknowledge and delivef as suretyany and all.undertakngs bonds recogniarices and rther surety obligations �� f =` p. 4uthorization By unammous consent of the Company's -Board -of Directors theCompany consents that -facsimile or-mechamcallyreproduced signature of any assistant secretary of the ,ompany wherever appearing upori a cerfifiedcopy of ah`y'power of `attorney issued by.the'Company,,in con e`ction with`surety bonds; shall'be<validand;binding upon the Company with%:` -= - f he same force and effect as:though manually affixed - V _ / -• ✓���_\�� - ti David M Carey,ahe undersigned Assts#ant SecretaryAf Amencan Fin .and Casualty Company Th'e Ohio Gasualry Insurance Company,_Liberty Mutual;Insurance-Company and West v` kmerican Insurance Company do hereby certify that the original power ofattomeyofrWhiclh.the foreg"oingis a full true and correct copy of the PowetofAttomey executed;by saidCoinpanies,l\ s in W force and effect and has not been revoRed _ %_ �� _ �� '� '✓{�"� - ~ ` '~ N TESTIMONY WHEREOF=1 have hereunto setrmy hand and affixed th seals of -said Companies this�2 4TH day of�FEBRUARY - � -! ^. 20 14 ti -vii .s I � Y #fir � 4� /" .' a�, � � :..� � � "'��'"" � °�✓i-�.lf-.. � _ qtr } f\,,'Y :`� 9'cr + p ,v „"�, ✓r �' ` -` .''in.� U "- David a `Assistan cr -^ ✓ Da-, M C eey _ - t Se clary ✓-- r ' "� "'\ P\ 1 nV -.� V u :• ^\Iii r-, _ ���.«U r��.,.^�'�:.. MS 1283 092012 a r - .�„�✓ , ��'` � �.” ...ice. �� � 1;. / ,—...i ti ^ ."-. ✓'.,,/,'\.., Certificate of Insurance THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON YOU THE CERTIFICATE HOLDER. THIS CERTIFICATE is NOT AN INSURANCE POLICY AND GOES NOT AMEND, EXTEND, OR ALTER THE COV I 15E AFF RDE? BY THE POLICIES LISTED BELOW. POLICY LIMITS ARE NO LESS THAN THOSE ,L1S'rWD at L• ,. IbUGH POLICIES MAY INCLUOII ADNTIO)+tAt. SiJBl.lMI'r:l.IMi7'SNOT i:IS'rVD i1L°GO11r,. This is to Certify that FP. J. Keating Company 998 Reservoir Road NAME AND ADDRESS Lunenburg, MA 01462 OF INSURED L libe Mutual. INSURANCE is, at the issue date of this certificate, insured by the Company under the policy(ies) listed below. The insurance afforded by the listed policy(ies) is subject to all their terms, exclusions and Conditions and is not altered by any requirement, term or condition of any contract or other document with respect to which this certificate may be issued. _.. EXP DATE ❑ CONTINUOUS TYPE OF POLICY ❑ EXTENDED POLICY NUMBER LIMIT OF LIABILITY ® POLICY TERM WORKERS 9/1/2014 WA7-C8D-004095-023 COVERAGE AFFORDED UNDER WC EMPLOYERS LIABILITY LAW OF THE FOLLOWING STATES: COMPENSATION WC7-C81-004095-013 ALL STATES EXCLUDING BodilyIn by Accident STATES AND NONOPOLISTICS 1 000 000 r Bodily Injury By Disease wl 11,000,000 Bodily Injury By Disease 1 0 0 00 COMMERCIAL 9/1/2014 TB2-C81-004095-113 General Aggregate GENERAL LIABILITY $2,000,000 m OCCURRENCE Products / Completed Operations Aggregate $2,000,000 n CLAIMS MADE Each Occurrence .......$2,000,000 RETRO DATE Personal &Advertising injury $2 000 000 Per Pelson / Organization a a.. Other FIRE DAMAGE $100,000 AtCr E'ER PROJECTAGGREGATE I/M Ex AUTOMOBILL LE 9/1/2014 AS2-C81-004095-123 EachAccident=Single Limit $2,000,000 B.I. And P.D. Combined LIABILITY Each Person OWNED Each Accident or Occurrence 0 NON -OWNED %LI HIRED Each Accident or Occurrence OTHER Auto: Comp Ded $10 000/ColhDed $10,000 EVIDENCE OF COVERAGE ADDI FIONAL COMMENTS The Town of North Andover is listed as additional insured as required by written contract for work performed under the furnish and install bituminous concrete paving for the period of April 1, 2014 -March 31, 2015. • If the certificate expiration date is continuous or extended term, you wiI I be notified if coverage is terminated or reduced before the certificate expiration date - NOTICE OF CANCELLATION: (NOT APPLICABLE UNLESS A NUMBER OF DAYS IS ENTERED BELOW.) BEFORE THE STATED EXPIRATION DATE THE COMPANY WILL NOT CANCEL OR REDUCE THE INSURANCE AFFORDED UNDER THE ABOVE POLICIES UNTIL AT LEAST 30 DAYS NOTICE OF SUCH CANCELLATION HAS BEEN MAILED TO: Liberty Mutual Insurance Group �* Town of North Andover 4-0_�4' Stan Esposito 120 Main St Pittsburgh / 0387 AUTHORIZED REPRESENTATIVE u= North Andover, MA 01845 12 Federal Street, Ste. 310 Pittsburgh PA 15212-5706 412-231-1331 8/26/2013 LOFFICE - - PHONE DATE ISSUED This certificate is executed by LIBERTY MUTUAL INSURANCE GROUP as respects such insurance as is afforded by those Companies NM 772 07-10 CERT NO.,: 17408488 CLIENT CODE: LM 44 Nicholas Misoni 8/26/2013 2:33:09 PM Page 1 of 1 LD1 COI 268896 02 11 AC40RD CERTIFICATE OF LIABILITY INSURANCE ATE D03/21/2014D ) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in Ileu of such endorsement(s). PRODUCER MARSH USA, INC. TWO ALLIANCE CENTER CONTACT NAME: PHONE FAX AIC No): E-MAIL ADDRESS: 3560 LENOX ROAD, SUITE 2400 ATLANTA, GA 30326 INSURERS AFFORDING COVERAGE NAIC 11 INSURER A: American Guarantee & Liability Ins Co 26247 J34420-..-EX-13-14 INSURED P.J. KEATING COMPANY (LUNENBURG) INSURER B : COMMERCIAL GENERAL LIABILITY 998 RESERVOIR ROAD INSURER C; INSURER D: LUNENBURG, MA 01462 INSURER E: DAMAGE TO RENTED PREMISES Ea occurrence $ INSURER F: CLAIMS -MADE 1-1 OCCUR COVERAGES CERTIFICATE NUMBER: ATL -003243476-02 REVISION NUMBER:4 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR OF INSURANCE ADDLITYPE INAR WVD SUER POLICY NUMBER EFF MMIDVIIYYYY I•DDIYYYYICY EXP MMPOLICY LIMITS Manashi Mukherjee—�Ma+��►� v�� �+e u GENERAL LIABILITY EACH OCCURRENCE $ COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED PREMISES Ea occurrence $ CLAIMS -MADE 1-1 OCCUR MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GENERAL AGGREGATE $ GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ $ POLICY PRO- jECT [7 LOC AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT Ea accident BODILY INJURY (Per person) $ ANY AUTO ALL OWNED SCHEDULED AUTOS AUTOS BODILY INJURY (Per accident) $ DAMAGE Peraccident $ NON-OWNEDPROPERTY HIRED AUTOS AUTOS L A X UMBRELLA LIAB X OCCUR AUC655102504 09/01/2013 09/0112014 EACH OCCURRENCE $ 10,000,000 AGGREGATE $ 10,000,000 EXCESS LIAB CLAIMS -MADE DEC) I I RETENTION $ $ WORKERS COMPENSATIONWC STATU• OTH- AND EMPLOYERS' LIABILITY Y I N OFFICERIMEM ERANY EXCLUDED? PROPRIETOR/PARTNER/EXECUTIVE � N / A E.L. EACH ACCIDENT $ (Mandatory In NH) E.L. DISEASE - EA EMPLOYE $ If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT 1 $ DESCRIPTION OF OPERATIONS / LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, If more space is required) RE: BITUMINOUS CONCRETE PAVING PROJECT. TOWN OF NORTH ANDOVER IS (ARE) INCLUDED AS ADDITIONAL INSURED(S) PER WRITTEN CONTRACT, THE UMBRELLA POLICY IS "FOLLOW FORM" AND NON-CONTRIBUTORY. CERTIFICATE HOLDER CANCELLATION TOWN OF NORTH ANDOVER SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 120 MAIN ST THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN NORTH ANDOVER, MA 01845 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE of Marsh USA Inc. Manashi Mukherjee—�Ma+��►� v�� �+e u ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010/05) The ACORD name and logo are registered marks of ACORD