Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract #: 735 - From: 04-18-2014 To: 12-31-2014 - Tyler Munroe - Town of North Andover
0 e TOWN OF NORTH ANDOVER CONTRACT CONTRACTit T5 DATE: This Contract is entered into on, or as of, this date by and between the Town of North Andover (the "Town"), and Contractor: Tyler Munroe Landscape Contractor Address: 100 Foster Street North Andover, MA 01845 Telephone Number: 978-685-3545 Fax Number: 978-989-0934 This is a Contract for the procurement of the following: Landscaping services at the Stevens Estate for calendar year 2014, with two additional one- year options (calendar year 2015 and 2016) solely at the discretion of the Town, in accordance with the Invitation for Bids dated March 4, 2014 2. The Contract price to be paid to the Contractor by the Town of North Andover is: Spring clean-up $ 1,350.00 Seasonal maintenance $ 7,750.00 Labor only to refresh mulch beds $ 700.00 Plantings/Flowers $ 1,325.00 (300 plantings spring/summer, 30 in fall) Fertilization (per application) $ 300.00 3. Payment will be made as follows: Upon performance of services and receipt of invoice, net 30 (Rev 5-2007) Contract by and between Town of North Andover and Tyler Munroe Landscape Contractor Page 1 4. Definitions 4.1 Acceptance: All Contracts require proper acceptance of the described goods or services by the Town of North Andover. Proper acceptance shall be understood to include inspection of goods and certification of acceptable performance for services by authorized representatives of the Town to insure that the goods or services are complete and are as specified in the Contract. 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both. 5. Term of Contract and Time for Performance This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before December 31, 2014, unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation Notwithstanding anything in the Contract documents to the contrary, any and all payments which the Town is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this (Rev 5-2007) Contract by and between Town of North Andover and Tyler Munroe Landscape Contractor Page 2 Contract shall be immediately terminated without liability for damages, penalties or other charges. 7. Permits and Approvals Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. 8. Termination and Default 8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days notice when in the best interests of the Town by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. Upon termination without cause, Contractor will be paid for services rendered to the date of termination. 8.2 For Cause. If the Contractor is determined by the Town to be in default of any term or condition of this Contract, the Town may terminate this Contract on seven (7) days notice by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. 8.3 Default. The following shall constitute events of a default under the Contract: 1) any material misrepresentation made by the Contractor to the Town; 2) any failure to perform any of its obligations under this Contract including, but not limited to the following: (i) failure to commence performance of this Contract at the time specified in this Contract due to a reason or circumstance within the Contractor's reasonable control, (ii) failure to perform this Contract with sufficient personnel and equipment or with sufficient material to ensure the completion of this Contract within the specified time due to a reason or circumstance within the Contractor's reasonable control, (iii) failure to perform this Contract in a manner reasonably satisfactory to the Town, (iv) failure to promptly re -perform within a reasonable time the services that were rejected by the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a material term of this Contract, including, but not limited to, the provision of insurance and non-discrimination, (vii) any other acts specifically and expressly stated in this Contract as constituting a basis for termination of this Contact, and (viii) failure to comply with any and all requirements of state law and/or regulations, and Town bylaw and/or regulations. 9. The Contractor's Breach and the Town's Remedies Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be deemed a material breach of this Contract, and the Town of North Andover shall have all the rights and remedies provided in the Contract documents, the right to cancel, terminate, or (Rev 5-2007) Contract by and between Town of North Andover and Tyler Munroe Landscape Contractor Page 3 suspend the Contract in whole or in part, the right to maintain any and all actions at law or in equity or other proceedings with respect to a breach of this Contract, including damages and specific performance, and the right to select among the remedies available to it by all of the above. From any sums due to the Contractor for services, the Town may keep the whole or any part of the amount for expenses, losses and damages incurred by the Town as a consequence of procuring services as a result of any failure, omission or mistake of the Contractor in providing services as provided in this Contract. 10. Statutory Compliance 10.1 This Contract will be construed and governed by the provisions of applicable federal, state and local laws and regulations; and wherever any provision of the Contract or Contract documents shall conflict with any provision or requirement of federal, state or local law or regulation, then the provisions of law and regulation shall control. Where applicable to the Contract, the provisions of the General Laws are incorporated by reference into this Contract, including, but not limited to, the following: General Laws Chapter 30B — Procurement of Goods and Services. General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts. General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts. 10.2 Wherever applicable law mandates the inclusion of any term and provision into a municipal contract, this Section shall be understood to import such term or provision into this Contract. To whatever extent any provision of this Contract shall be inconsistent with any law or regulation limiting the power or liability of cities and towns, such law or regulation shall control. 10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on the performance of the Contract. If the Contractor performs the Contract in violation of any applicable law or regulation, the Contractor shall bear all costs arising therefrom. 10.4 The Contractor shall keep itself fully informed of all existing and future State and National Laws and Municipal By-laws and Regulations and of all orders and decrees of any bodies or tribunals having jurisdiction in any manner affecting those engaged or employed in the work, of the materials used in the work or in any way affecting the conduct of the work. If any discrepancy or inconsistency is discovered in the Drawings, Specifications or Contract for this work in violation of any such law, by-law, regulation, order or decree, it shall forthwith report the same in writing to the Town. It shall, at all times, itself observe and comply with all such existing and future laws, by-laws, regulations, orders and decrees; and shall protect and indemnify the Town of North Andover, and its duly appointed agents against any claim or liability arising from or based on any violation whether by him or its agents, employees or subcontractors of any such law, by-law, regulation or decree. (Rev 5-2007) Contract by and between Town of North Andover and Tyler Munroe Landscape Contractor Page 4 11. Conflict of Interest Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which shall constitute a violation of that law. The Contractor shall be deemed to have investigated the application of M.G.L. c. 268A to the performance of this Contract; and by executing the Contract documents the Contractor certifies to the Town that neither it nor its agents, employees, or subcontractors are thereby in violation of General Laws Chapter 268A. 12. Certification of Tax Compliance This Contract must include a certification of tax compliance by the Contractor, as required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors Providing Goods, Services, or Real Estate Space to the Commonwealth or Subdivision). 13. Discrimination The Contractor will carry out the obligations of this Contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151B (Law Against Discrimination) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. 14. Assignment Assignment of this Contract is prohibited, unless and only to the extent that assignment is provided for expressly in the Contract documents. 15. Condition of Enforceability Against the Town This Contract is only binding upon, and enforceable against, the Town if: (1) the Contract is signed by the Town Manager or its designee; and (2) endorsed with approval by the Town Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the Town Counsel as to form. 16. Corporate Contractor If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's Certificate certifying the corporate capacity and authority of the party signing this Contract for the corporation. Such certificate shall be accompanied by a letter or other instrument stating that such authority continues in full force and effect as of the date the Contract is executed by the Contractor. This Contract shall not be enforceable against the Town of North Andover unless and until the Contractor complies with this section. The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto, relating to the appointment of the Commissioner of Corporations as its attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its (Rev 5-2007) Contract by and between Town of North Andover and Tyler Munroe Landscape Contractor Page 5 Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the Commonwealth. 17. Liability of Public Officials To the full extent permitted by law, no official, employee, agent or representative of the Town of North Andover shall be individually or personally liable on any obligation of the Town under this Contract. 18. Indemnification The Contractor shall indemnify, defend and save harmless the Town, the Town's officers, agents and employees, from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by the Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective, or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this contract. 19. Workers Compensation Insurance The Contractor shall provide by insurance for the payment of compensation and the furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's Compensation Act) to all employees of the Contractor who are subject to the provisions of Chapter 152 of the General Laws of Massachusetts. Failure to provide and continue in force such insurance during the period of this Contract shall be deemed a material breach of this Contract, shall operate as an immediate termination thereof, and Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article. The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this Contract before the same shall be binding on the parties thereto, except if specifically waived by the Town. 20. Documents, Materials, Etc. Any materials, reports, information, data, etc. given to or prepared or assembled by the Contractor under this Contract are to be kept confidential and shall not be made available to any individual or organization by the Contractor (except agents, servants, or employees of the (Rev 5-2007) Contract by and between Town of North Andover and Tyler Munroe Landscape Contractor Page 6 Contractor) without the prior written approval of the Town, except as otherwise required by law. The Contractor shall comply with the provisions Chapter 66A of the General Laws of Massachusetts as it relates to public documents, and all other state and federal laws and regulations relating to confidentiality, security, privacy and use of confidential data. Any materials produced in whole or in part under this Contract shall not be subject to copyright, except by the Town, in the United States or any other country. The Town shall have unrestricted authority to, without payment of any royalty, commission, or additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole or in part, any reports, data or other materials prepared under this Contract. All data, reports, programs, software, equipment, furnishings, and any other documentation or product paid for by the Town shall vest in the Town at the termination of this Contract. The Contractor shall at all times, during or after termination of this Contract, obtain the prior written approval of the Town before making any statement bearing on the work performed or data collected under this Contract to the press or issues any material for publication through any medium. 21. Audit, Inspection and Recordkeeping At any time during normal business hours, and as often as the Town may deem it reasonably necessary, there shall be available in the office of the Contractor for the purpose of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. 22. Pam The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work completed and acceptance from the Town of the work completed. 23. Waiver and Amendment Amendments, or waivers of any additional term, condition, covenant, duty or obligation contained in this Contract may be made only by written amendment executed by all signatories to the original Agreement, prior to the effective date of the amendment. To the extent allowed by law, any conditions, duties, and obligations contained in this Contract may be waived only by written Agreement by both parties. Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver, nor in any manner limit the legal or equitable remedies available to that party. No waiver by either party of any default or breach shall constitute a waiver of any subsequent default or breach of a similar or different matter. (Rev 5-2007) Contract by and between Town of North Andover and Tyler Munroe Landscape Contractor Page 7 24. Forum and Choice of Law This Contract and any performance herein shall be governed by and be construed in accordance with the laws of the Commonwealth. Any and all proceedings or actions relating to subject matter herein shall be brought and maintained in the courts of the Commonwealth or the federal district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any other legal rights of the parties. 25. Notices Any notice permitted or required under the provisions of this Contract to be given or served by either of the parties hereto upon the other party hereto shall be in writing and signed in the name or on the behalf of the party giving or serving the same. Notice shall be deemed to have been received at the time of actual service or three (3) business days after the date of a certified or registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to the Town of North Andover by being sent to the Town Manager, Town Hall, 120 Main Street, North Andover, Massachusetts 01845. 26. Bindiniz on Successors This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in interest (and where not corporate, the heirs and estate of the Contractor). 27. Complete Contract This instrument, together with its endorsed supplements, and the other components of the contract documents, constitutes the entire contract between the parties, with no agreements other than those incorporated herein. 28. Supplemental Conditions The foregoing provisions apply to all contracts to which the Town of North Andover shall be a party. One of the following "Supplements" must be "checked" as applicable to this Contract, shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The Supplement contains additional terms governing the Contract: [ ] GOODS SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods (governed by the provisions of General Laws Chapter 3013) [ X ] SERVICES SUPPLEMENT "S" - Applicable to Contracts for the procurement of Services (governed by the provisions of General Laws Chapter 30B) [ ] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for Construction (Rev 5-2007) Contract by and between Town of North Andover and Tyler Munroe Landscape Contractor Page 8 IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set forth their hands the day and year first above written. THE TOWN Divisi epartment d Contract Manager THE CONTRACTOR 7YL,F�- AVM)WE 14A)Zk6 4-, .E 00*77 1i J0 - Company Name Town Manager Date Signature Date ?"yL R Z /14 lliVAD,E, 1P r Print Name & Title APPROVED AS TO FORM: q/1 u1 Town Counsel Date CERTIFICATION AS TO AVAILABILITY OF FUNDS: Ist S" 4wil � Town countant bate (Rev 5-2007) Contract by and between Town of North Andover and Tyler Munroe Landscape Contractor Page 9 SUPPLEMENT "S" 1. This form supplements the general provisions of the Contract between the Town of North Andover, and Tyler Munroe Landscape Contractor, which Contract is a contract for the procurement of services. 2. "Services" shall mean furnishing of labor, time, or effort by the Contractor. This term shall not include employment agreements, collective bargaining agreements, or grant agreements. Change Orders: Change orders for contracts subject to Massachusetts General laws Chapter 30B may not increase the quantity of services by more than twenty-five (25%) per cent, in compliance with General Laws Chapter 30B, §13. 4. Minimum Wage/Prevailing Wage; The Contractor will carry out the obligations of this Contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151, § 1, et seq. (Minimum Wage Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. The Contractor will at all times comply with the wage rates as determined by the Commissioner of the Department of Labor and Industries, under the provisions of General Laws Chapter 149, 26 to 27D (Prevailing Wage), as shall be in force and as amended. Insurance: The Contractor shall obtain and maintain the following insurance: 5.1 Workers Compensation Insurance of the scope and amount required by the laws of the Commonwealth of Massachusetts. 5.2 Broad Form Commercial General Liability coverage with limits of at least $1 Million per occurrence and $3 Million aggregate, and which shall cover bodily injury, death, or property damage arising out of the work. 5.3 Automobile Liability Coverage, including coverage for owned, hired, or borrowed vehicles with limits of at least $1 Million per person, and $1 Million per accident. 5.4 The intent of the Specifications regarding insurance is to specify minimum coverage and minimum limits of liability acceptable under the Contract. However, it shall be the Contractor's responsibility to purchase and maintain insurance of such character and in such amounts as will adequately protect it and the Town from and against all claims, damages, losses and expenses resulting from exposure to any casualty liability in the performance of the work. 5.5 All required insurance shall be certified by a duly authorized representative of the insurers on the "MIIA" or "ACORD" Certificate of Insurance form incorporated into and made a part of this agreement. Properly executed certificates signifying adequate coverage in effect for the duration of the contract with renewal certificates issued not less than 30 days prior to (Rev 5-2007) Supplement "S" to Contract between the Town of North Andover and Tyler Munroe Landscape Contractor Page 1 expiration of a policy period, must be submitted to the Town prior to commencement of this Agreement. 5.6 The Town shall be named as an additional insured on the above referenced liability policies, and the Contractor's insurance shall be the primary coverage. The cost of such insurance, including required endorsements or amendments, shall be the sole responsibility of the Contractor. 6. Indemnification: The Contractor shall indemnify, defend and save harmless the Town, its officers, agents and employees from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) brought or recovered against them that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of this indemnification. APPROVED AS TO FORM ONLY: Town Counsel I CERTIFY THAT FUNDS ARE AVAILABLE IN ACCOUNT No � k-,Ao, To c�i o ntant Date: 44 �q TOWN OF NORTH ANDOVER 4��-� Town Manager Depar ent/Divisio&Wad THE CO TRACTOR: (Rev 5-2007) Supplement "S" to Contract between the Town of North Andover and Tyler Munroe Landscape Contractor Page 2 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the RACHEL xAPRIELIAN Governor Massachusetts General Laws, Chapter 149, Sections 26 to 27H secret. HEATHER E.ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Plantings of plants/flowers at Stevens Estate in spring, summer and fall Job Location: 723 Osgood Street Information about Prevailing Wage Schedules for Awarding Authorities and Contractors This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage Request Number" on all pages of this schedule. • Awarding authorities must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. • The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. Once a contractor has been selected by the awarding authority, the wage schedule shall be made a part of the contract for that project. The wage schedule must be posted in a conspicuous place at the work site during the life of the project in accordance with M.G.L. c. 149, § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project regardless of whether they are employed by the prime contractor, a filed sub -bidder, or any sub -contractor. • All apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Training (DAT). Apprentices must keep his/her apprentice identification card on his/her person during all work hours on the project. If an apprentice rate is listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAT, the apprentice may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. If an. apprentice rate is not listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAT, the apprentice must be paid the journeyworker's rate for the trade. The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F "rental of equipment" contracts. • Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports directly to the awarding authority and keep them on file for three years. Each weekly payroll report must contain: the employee's name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/pw. • Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617) 626-6953. • Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor Division of the office of the Attorney General at (617) 727-3465. • Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who. perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties. Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Construction (2 AXLE) DRIVER - EQUIPMENT 12/01/2013 $30.95 $9.41 $8.80 $0.00 $49.16 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2014 $31.30 $9.41 $8.80 $0.00 $49.51 08/01/2014 $31.30 $9.91 $8.80 $0.00 $50.01 12/01/2014 $31.30 $9.91 $9.33 $0.00 $50.54 06/01/2015 $31.65 $9.91 $9.33 $0.00 $50.89 08/01/2015 $31.65 $10.41 $9.33 $0.00 $51.39 12/01/2015 $31.65 $10.41 $10.08 $0.00 $52.14 06/01/2016 $32.15 $10.41 $10.08 $0.00 $52.64 08/01/2016 $32.15 $10.91 $10.08 $0.00 $53.14 12/01/2016 $32.15 $10.91 $10.89 $0.00 $53.95 (3 AXLE) DRIVER - EQUIPMENT 12/01/2013 $31.02 $9.41 $8.80 $0.00 $49.23 TEAMSTERS JOINT COUNCIL NO. 10 7.ONE B 06/01/2014 $31.37 $9.41 $8.80 $0.00 $49.58 08/01/2014 $31.37 $9.91 $8.80 $0.00 $50.08 12/01/2014 $31.37 $9.91 $9.33 $0.00 $50.61 06/01/2015 $31.72 $9.91 $9.33 $0.00 $50.96 08/01/2015 $31.72 $10.41 $9.33 $0.00 $51.46 12/01/2015 $31.72 $10.41 $10.08 $0.00 $52.21 06/01/2016 $32.22 $10.41 $10.08 $0.00 $52.71 08/01/2016 $32.22 $10.91 $10.08 $0.00 $53.21 12/01/2016 $32.22 $10.91 $10.89 $0.00 $54.02 (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2013 $31.14 $9.41 $8.80 $0.00 $49.35 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2014 $31.49 $9.41 $8.80 $0.00 $49.70 08/01/2014 $31.49 $9.91 $8.80 $0.00 $50.20 12/01/2014 $31.49 $9.91 $9.33 $0.00 $50.73 06/01/2015 $31.84 0.91 $9.33 $0.00 $51.08 08/01/2015 $31.84 $10.41 $9.33 $0.00 $51.58 12/01/2015 $31.84 $10.41 $10.08 $0.00 $52.33 06/01/2016 $32.34 $10.41 $10.08 $0.00 $52.83 08/01/2016 $32.34 $10.91 $10.08 $0.00 $53.33 12/01/2016 $32.34 $10.91 $10.89 $0.00 $54.14 ADS/SUBMERSIBLE PILOT 08/01/2013 $84.21 $9.80 $18.17 $0.00 $112.18 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2014 $87.36 $9.80 $18.17 $0.00 $115.33 08/01/2015 $90.51 $9.80 $18.17 $0.00 $118.48 AIR. TRACK OPERATOR 12/01/2013 $30.60 $7.30 $12.10 $0.00 $50.00 LABORERS - ZONE 2 06/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 12/01/2014 $31.60 $7.30 $12.10 $0.00 $51.00 06/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 12/01/2015 $32.60 $7.30 $12.10 $0.00 $52.00 06/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 12/01/2016 $33.85 $7.30 $12.10 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" -------------- ------------------------------ Issue Date: 02/24/2014 -------------------------------- -- --- Wage Request Number: 20140224-029 -- ------------------------- ---------------------- Page 2 of 40 ,.. , Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 12/01/2013 $30.68 $10.40 $5.95 $0.00 $47.03 HEAT & FROST INSULATORS LOCAL 6 (BOSTON) BACKHOE/FRONT-END LOADER 06/01/2014 $31.58 $10.40 $5.95 $0.00 $47.93 OPERATING ENGINEERS LOCAL 4 12/01/2014 $32.48 $10.40 $5.95 $0.00 $48.83 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 06/01/2015 $33.43 $10.40 $5.95 $0.00 $49.78 BARCO-TYPE JUMPING TAMPER 12/01/2015 $34.38 $10.40 $5.95 $0.00 $50.73 ASPHALT RAKER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS-ZONE2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 For apprentice rates see "Apprentice- LABORER" 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" 12/01/2013 $30.60 $7.30 $12.10 $0.00 $50.00 ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BACKHOE/FRONT-END LOADER 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BARCO-TYPE JUMPING TAMPER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS -70NE2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" BLOCK PAVER, RAMMER / CURB SETTER 12/01/2013 $30.60 $7.30 $12.10 $0.00 $50.00 LABORERS - ZONE 2 06/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 12/01/2014 $31.60 $7.30 $12.10 $0.00 $51.00 06/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 12/01/2015 $32.60 $7.30 $12.10 $0.00 $52.00 06/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 12/01/2016 $33.85 $7.30 $12.10 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" BOILER MAKER BOILERMAKERS LOCAL 29 01/01/2010 $37.70 $6.97 $11.18 $0.00 $55.85 - ----------------------------------------------------------------------------------------------------------------------------- -- - ---- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 3 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total RateUnemployment Apprentice- BOILERMAKER -Local 29 Effective Date - 01/01/2010 supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $24.51 $6.97 $11.18 $0.00 $42.66 2 65 $24.51 $6.97 $11.18 $0.00 $42.66 3 70 $26.39 $6.97 $11.18 $0.00 $44.54 4 75 $28.28 $6.97 $11.18 $0.00 $46.43 5 80 $30.16 $6.97 $11.18 $0.00 $48.31 6 85 $32.05 $6.97 $11.18 $0.00 $50.20 7 90 $33.93 $6.97 $11.18 $0.00 $52.08 8 95 $35.82 $6.97 $11.18 $0.00 $53.97 'Notes: Apprentice to Journeyworker Ratio:1:5 BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING) BRICKLAYERS LOCAL 3 (LYNN) 02/01/2014 - $48.06 $10.18 $18.15 $0.00 $76.39 08/01/2014 $48.96 $10.18 $18.22 $0.00 $77.36 02/01/2015 $49.52 $10.18 $18.22 $0.00 $77.92 08/01/2015 $50.42 $10.18 $18.29 $0.00 $78.89 02/01/2016 $50.99 $10.18 $18.29 $0.00 $79.46 08/01/2016 $51.89 $10.18 $18.37 $0.00 $80.44 02/01/2017 $52.46 $10.18 $18.37 $0.00 $81.01 -------------------------------- -- - ----------------------------------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 4 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- BRICK/PLASTERICEMENT MASON -Local 3 Lynn $34.45 $7.30 $12.90 $0.00 Effective Date - 02/01/2014 06/01/2014 $35.20 $7.30 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.03 $10.18 $18.15 $0.00 $52.36 2 60 $28.84 $10.18 .$18.15 $0.00 $57.17 3 70 $33.64 $10.18 $18.15 $0.00 $61.97 4 80 $38.45 $10.18 $18.15 $0.00 $66.78 5 90 $43.25 $10.18 $18.15 $0.00 $71.58 Effective Date - 08/01/2014 For apprentice rates see "Apprentice- LABORER" Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.48 $10.18 $18.22 $0.00 $52.88 2 60 $29.38 $10.18 $18.22 $0.00 $57.78 3 70 $34.27 $10.18 $18.22 $0.00 $62.67 4 80 $39.17 $10.18 $18.22 $0.00 $67.57 5 90 $44.06 $10.18 $18.22 $0.00 $72.46 Notes: Apprentice to Journeyworker Ratio:1:5 BULLDOZER/GRADER/SCRAPER 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" CAISSON & UNDERPINNING BOTTOM MAN LABORERS - FOUNDATIONAND MARINE For apprentice rates see "Apprentice- LABORER" 12/01/2013 $34.45 $7.30 $12.90 $0.00 $54.65 06/01/2014 $35.20 $7.30 $12.90 $0.00 $55.40 12/01/2014 $35.95 $7.30 $12.90 $0.00 $56.15 06/01/2015 $36.70 $7.30 $12.90 $0.00 $56.90 12/01/2015 $37.45 $7.30 $12.90 $0.00 $57.65 06/01/2016 $38.20 $7.30 $12.90 $0.00 $58.40 12/01/2016 $39.20 $7.30 $12.90 $0.00 $59.40 CAISSON & UNDERPINNING LABORER 12/01/2013 $33.30 $7.30 $12.90 $0.00 $53.50 LABORERS - FOUNDATION AND MARINF. 06/01/2014 $34.05 $7.30 $12.90 $0.00 $54.25 12/01/2014 $34.80 $7.30 $12.90 $0.00 $55.00 06/01/2015 $35.55 $7.30 $12.90 $0.00 $55.75 12/01/2015 $36.30 $7.30 $12.90 $0.00 $56.50 06/01/2016 $37.05 $7.30 $12.90 $0.00 $57.25 12/01/2016 $38.05 $7.30 $12.90 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" ------------------------------------------------------------------------------------------------------------------------------------- - ---- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 5 of 40 ---------------------------------------------------------------------------------------------------- - ----- --- -------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 6 of 40 I Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment CAISSON & UNDERPINNING TOP MAN 12/01/2013 $33.30 $7.30 $12.90 $0.00 $53.50 LABORERS - FOUNDATIONAND MARINE 06/01/2014 $34.05 $7.30 $12.90 $0.00 $54.25 12/01/2014 $34.80 $7.30 $12.90 $0.00 $55.00 06/01/2015 $35.55 $7.30 $12.90 $0.00 $55.75 12/01/2015 $36.30 $7.30 $12.90 $0.00 $56.50 06/01/2016 $37.05 $7.30 $12.90 $0.00 $57.25 12/01/2016 $38.05 $7.30 $12.90 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" CARBIDE CORE DRILL OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 1,ABORERS-70NE2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" CARPENTER 09/01/2013 $34.53 $9.80 $15.61 $0.00 $59.94 CARPENTERS -7.01VE 2 (Eastern Massachusetts) 03/01/2014 $35.13 $9.80 $15.61 $0.00 $60.54 09/01/2014 $35.90 $9.80 $15.61 $0.00 $61.31 03/01/2015 $36.67 $9.80 $15.61 $0.00 $62.08 ---------------------------------------------------------------------------------------------------- - ----- --- -------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 6 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - CARPENTER - Zone 2 Eastern MA Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.27 $9.80 $1.57 $0.00 $28.64 2 60 $20.72 $9.80 $1.57 $0.00 $32.09 3 70 $24.17 $9.80 $10.90 $0.00 $44.87 4 75 $25.90 $9.80 $10.90 $0.00 $46.60 5 80 $27.62 $9.80 $12.47 $0.00 $49.89 6 80 $27.62 $9.80 $12.47 $0.00 $49.89 7 90 $31.08 $9.80 $14.04 $0.00 $54.92 8 90 $31.08 $9.80 $14.04 $0.00 $54.92 Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.57 $9.80 $1.57 $0.00 $28.94 2 60 $21.08 $9.80 $1.57 $0.00 $32.45 3 70 $24.59 $9.80 $10.90 $0.00 $45.29 4 75 $26.35 $9.80 $10.90 $0.00 $47.05 5 80 $28.10 $9.80 $12.47 $0.00 $50.37 6 80 $28.10 $9.80 $12.47 $0.00 $50.37 7 90 $31.62 $9.80 $14.04 $0.00 $55.46 8 90 $31.62 $9.80 $14.04 $0.00 $55.46 Notes: t Apprentice to Journeyworker Ratio:1:5 CEMENT MASONRY/PLASTERING 01/01/2014 $43.60 $10.90 $18.71 $1.30 $74.51 BRICKLAYERS LOCAL 3 (LYNN) 07/01/2014 $43.77 $10.90 $18.71 $1.30 $74.68 01/01/2015 $44.69 $10.90 $18.71 $1.30 $75.60 07/01/2015 $45.29 $10.90 $18.71 $1.30 $76.20 01/01/2016 $46.21 $10.90 $18.71 $1.30 $77.12 ----------------- ----------------------------- ------------------- - - - -- -------------------- --------------- ------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 7 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- CEMENT MASONRY/PLASTERING -Eastern Mass (Lynn) Effective Date - 01/01/2014 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $21.80 $10.90 $12.21 $1.30 $46.21 2 60 $26.16 $10.90 $13.71 $1.30 $52.07 3 65 $28.34 $10.90 $14.71 $1.30 $55.25 4 70 $30.52 $10.90 $15.71 $1.30 $58.43 5 75 $32.70 $10.90 $16.71 $1.30 $61.61 6 80 $34.88 $10.90 $17.71 $1.30 $64.79 7 90 .$39.24 $10.90 $18.71 $1.30 $70.15 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.89 $7.30 $10.90 $0.00 $12.21 12/01/2014 $1.30 $7.30 $46.30 $0.00 2 60 $26.26 $31.60 $10.90 $12.10 $13.71 $51.00 $1.30 $32.10 $52.17 $12.10 3 65 $28.45 06/01/2016 $10.90 $7.30 $14.71 $0.00 $1.30 12/01/2016 $55.36 $7.30 4 70 $30.64 $52.75 $10.90 $15.71 $1.30 $58.55 5 75 $32.83 $10.90 $16.71 $1.30 $61.74 6 80 $35.02 $10.90 $17.71 $1.30 $64.93 7 90 $39.39 $10.90 $18.71 $1.30 $70.30 ---------------------•------ Notes: -------------, - ------------- Page 8 of 40 Steps 3,4 are 500 hrs. All other steps are 1,000 hrs. --__..--.m....--__.----_..._..------------------- Apprentice to Journeyworker Ratio:1:3 CHAIN SAW OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - 7.ONE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES 12/01/2013 $41.49 $10.00 $14.18 $0.00 $65.67 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" COMPRESSOR OPERATOR 12/01/2013 $28.11 $10.00 $14.18 $0.00 $52.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DELEADER (BRIDGE) 01/01/2014 $45.91 $7.85 $16.10 $0.00 $69.86 PAINTERS LOCAL 35 - 7.ONE. 2 07/01/2014 $46.76 $7.85 $16.10 $0.00 $70.71 01/01/2015 $47.66 $7.85 $16.10 $0.00 $71.61 07/01/2015 $48.56 $7.85 $16.10 $0.00 $72.51 01/01/2016 $49.51 $7.85 $16.10 $0.00 $73.46 07/01/2016 $50.46 $7.85 $16.10 $0.00 $74.41 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 --------------- ------------------------------------------------- ---------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 - ------------- Page 8 of 40 1J. s Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate .1 50 $22.96 $7.85 $0.00 $0.00 $30.81 2 55 $25.25 $7.85 $3.66 $0.00 $36.76 3 60 $27.55 $7.85 $3.99 $0.00 $39.39 4 65 $29.84 $7.85 $4.32 $0.00 $42.01 5 70 $32.14 $7.85 $14.11 $0.00 $54.10 6 75 $34.43 $7.85 $14.44 $0.00 $56.72 7 80, $36.73 $7.85 $14.77 $0.00 $59.35 8 90 $41.32 $7.85 $15.44 $0.00 $64.61 Effective Date - 07/01/2014 06/01/2014 $35.25 $7.30 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.38 $7.85 $0.00 $0.00 $31.23 2 55 $25.72 $7.85 $3.66 $0.00 $37.23 3 60 $28.06 $7.85 $3.99 $0.00 $39.90 4 65 $30.39 $7.85 $4.32 $0.00 $42.56 5 70 $32.73 $7.85 $14.11 $0.00 $54.69 6 75 $35.07 $7.85 $14.44 $0.00 $57.36 7 80 $37.41 $7.85 $14.77 $0.00 $60.03 8 90 $42.08 $7.85 $15.44 $0.00 $65.37 (- Notes: .® --------_-- _.,_�._.. __,_ ®-..�-__ ----- Steps are 750 hrs. _--..m...--------_-..__- Apprentice to Journeyworker Ratio: 1:1 - - - - - - - i DEMO: ADZEMAN 12/01/2013 $33.50 $7.30 $12.70 $0.00 $53.50 LABORFRS-7.ONE2 06/01/2014 $34.25 $7.30 $12.70 $0.00 $54.25 12/01/2014 $35.00 $7.30 $12.70 $0.00 $55.00 06/01/2015 $35.75 $7.30 $12.70 $0.00 $55.75 12/01/2015 $36.50 $7.30 $12.70 $0.00 $56.50 For apprentice rates see "Apprentice- LABORER" DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2013 $34.50 $7.30 $12.70 $0.00 $54.50 LABORERS - 7.ONE 2 06/01/2014 $35.25 $7.30 $12.70 $0.00 $55.25 12/01/2014 $36.00 $7.30 $12.70 $0.00 $56.00 06/01/2015 $36.75 $7.30 $12.70 $0.00 $56.75 12/01/2015 $37.50 $7.30 $12.70 $0.00 $57.50 For apprentice rates see "Apprentice- LABORER" DEMO: BURNERS 12/01/2013 $34.25 $7.30 $12.70 $0.00 $54.25 LABORERS-ZONF.2 06/01/2014 $35.00 $7.30 $12.70 $0.00 $55.00 12/01/2014 $35.75 $7.30 $12.70 $0.00 $55.75 06/01/2015 $36.50 $7.30 $12.70 $0.00 $56.50 12/01/2015 $37.25 $7.30 $12.70 $0.00 $57.25 For apprentice rates see "Apprentice- LABORER" ----------------------------------------- Issue Date: 02/24/2014 -------------------------------------------------------------------------------------------------- Wage Request Number: 20140224-029 Page 9 of 40 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate DEMO: CONCRETE CUTTER/SAWYER 12/01/2013 $34.50 $7.30 $12.70 $0.00 $54.50 LABORERS - ZONE' 2 06/01/2014 $35.25 $7.30 $12.70 $0.00 $55.25 12/01/2014 $36.00 $7.30 $12.70 $0.00 $56.00 06/01/2015 $36.75 $7.30 $12.70 $0.00 $56.75 12/01/2015 $37.50 $7.30 $12.70 $0.00 $57.50 For apprentice rates see "Apprentice- LABORER" DEMO: JACKHAMMER OPERATOR 12/01/2013 $34.25 $7.30 $12.70 $0.00 $54.25 LABORERS - ZONE z 06/01/2014 $35.00 $7.30 $12.70 $0.00 $55.00. $13.00 12/01/2014 $35.75 $7.30 $12.70 $0.00 $55.75 $14.72 06/01/2015 $36.50 $7.30 $12.70 $0.00 $56.50 $0.00 12/01/2015 $37.25 $7.30 $12.70 $0.00 $57.25 For apprentice rates see "Apprentice- LABORER" -------------- ----- ------------------- --------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 ------------------------------------- Page 10 of 40 DEMO: WRECKING LABORER 12/01/2013 $33.50 $7.30 $12.70 $0.00 $53.50 LABORERS -7.ONE2 06/01/2014 $34.25 $7.30 $12.70 $0.00 $54.25 12/01/2014 $35.00 $7.30 $12.70 $0.00 $55.00 06/01/2015 $35.75 $7.30 $12.70 $0.00 $55.75 12/01/2015 $36.50 $7.30 $12.70 $0.00 $56.50 For apprentice rates see "Apprentice- LABORER" DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINFERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DIVER 08/01/2013 $56.14 $9.80 $18.17 $0.00 $84.11 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2014 $58.24 $9.80 $18.17 $0.00 $86.21 08/01/2015 $60.34 $9.80 $18.17 $0.00 $88.31 DIVER TENDER 08/01/2013 $40.10 $9.80 $18.17 $0.00 $68.07 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 DIVER TENDER (EFFLUENT) 08/01/2013 $60.15 $9.80 $18.17 $0.00 $88.12 PILE DRIVER LOCAL 56 (7.0NE 1) 08/01/2014 $62.40 $9.80 $18.17 $0.00 $90.37 08/01/2015 $64.65 $9.80 $18.17 $0.00 $92.62 DIVER/SLURRY (EFFLUENT) 08/01/2013 $84.21 $9.80 $18.17 $0.00 $112.18 PILE, DRIVER LOCAL 56 (7.0NE I) 08/01/2014 $87.36 $9.80 $18.17 $0.00 $115.33 08/01/2015 $90.51 $9.80 $18.17 $0.00 $118.48 DRAWBRIDGE OPERATOR (Construction) 09/01/2013 $43.96 $13.00 $14.42 $0.00 $71.38 ELECTRICIANS LOCAL 103 03/01/201.4 $44.45 $13.00 $14.68 $0.00 $72.13 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN" ELECTRICIAN 09/01/2013 $43.96 $13.00 $14.42 $0.00 $71.38 ELECTRICIANS LOCAL 103 03/01/2014 $44.45 $13.00 $14.68 $0.00 $72.13 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 -------------- ----- ------------------- --------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 ------------------------------------- Page 10 of 40 h Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELECTRICIAN- Local 103 Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.58 $13.00 $0.53 $0.00 $31.11 2 40 $17.58 $13.00 $0.53 $0.00 $31.11 3 45 $19.78 $13.00 $10.78 $0.00 $43.56 4 45 $19.78 $13.00 $10.78 $0.00 $43.56 5 50 $21.98 $13.00 $11.11 $0.00 $46.09 6 55 $24.18 $13.00 $11.45 $0.00 $48.63 7 60 $26.38 $13.00 $11.77 $0.00 $51.15 8 65 $28.57 $13.00 $12.11 $0.00 $53.68 9 70 $30.77 $13.00 $12.43 $0.00 $56.20 10 75 $32.97 $13.00 $12.77 $0.00 $58.74 Effective Date - 03/01/2014 $13.00 $12.37 $0.00 $54.26 9 70 $31.12 Supplemental $13.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.78 $13.00 $0.53 $0.00 $31.31 2 40 $17.78 $13.00 $0.53 $0.00 $31.31 3 45 $20.00 $13.00 $11.04 $0.00 $44.04 4 45 $20.00 $13.00 $11.04 $0.00 $44.04 5 50 $22.23 $13.00 $11.37 $0.00 $46.60 6 55 $24.45 $13.00 $11.70 $0.00 $49.15 7 60 $26.67 $13.00 $12.03 $0.00 $51.70 8 65 $28.89 $13.00 $12.37 $0.00 $54.26 9 70 $31.12 $13.00 $12.69 $0.00 $56.81 10 75 $33.34 $13.00 $13.03 $0.00 $59.37 App Prior l/l/03;30/35/40/45/50/55/65/70/75/80 L_. __...._... - - ---- - - -.. - .._..-._._ - Apprentice to Journeyworker Ratio:2:3*** - -- _ ___m_ - - . - - - - - -, _ ELEVATOR CONSTRUCTOR 01/01/2012 $52.45 $8.78 $6.96 $0.00 $68.19 ELEVATOR CONSTRUCTORS LOCAL 4 ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 11 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELEVATOR CONSTRUCTOR -Local 4 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.23 $8.78 $0.00 $0.00 $35.01 2 55 $28.85 $8.78 $6.96 $0.00 $44.59 3 65 $34.09 $8.78 $6.96 $0.00 $49.83 4 70 $36.72 $8.78 $6.96 $0.00 $52.46 5 80 $41.96 $8.78 $6.96 $0.00 $57.70 - - _.,.....-. - - ___.- - - _ - __._ Notes: - - _._ - _._. - - - __.. _._, - - - - _ Steps 1-2 are 6 mos.,- Steps 3-5 are 1 year $31.10 $7.30 $12.10 $0.00 $50.50 Apprentice to Journeyworker RatioA:I 06/01/2015 $31.60 $7.30 $12.10 $0.00 ELEVATOR CONSTRUCTOR HELPER 01/01/2012 $38.59 $8.78 .. $6.96 $0.00 $54.33 ELEVATOR CONSTRUCTORS LOCAL 4 For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR" FENCE & GUARD RAIL ERECTOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS -7.ONE2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2013 $38.73 $10.00 $13.55 $0.00 $62.28 OPERATING ENGINEERS LOCAL 4 05/01/2014 $39.50 $10.00 $13.55 $0.00 $63.05 For apprentice rates see "Apprentice- OPERATING ENGINEERS" . FIELD ENGYARTY CHIEF-BLDG,SITE,HVY/HWY 11/01/2013 $40.15 $10.00 $13.55 $0.00 $63.70 OPERATING ENGINEERS LOCAL 4 05/01/2014 $40.92 $10.00 $13.55 $0.00 $64.47 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY 11/01/2013 $21.10 $10.00 $13.55 $0.00 $44.65 OPERATING ENGINEERS LOCAL 4 05/01/2014 $21.55 $10.00 $13.55 $0.00 $45.10 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIRE ALARM INSTALLER 09/01/2013 $43.96 $13.00 $14.42 $0.00 $71.38 ELECTRICIANS LOCAL 103 03/01/2014 $44.45 $13.00 $14.68 $0.00 $72.13 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 .$13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN" FIRE ALARM REPAIR / MAINTENANCE 09/01/2013 $32.97 $13.00 $12.77 $0.00. $58.74 /COMMISS10N1NGEiECTR1CIANs 03/01/2014 $33.44 $13.00 $13.03 $0.00 $59.47 LOCAL 103 09/01/2014 $33.84 $13.00 $13.05 $0.00 $59.89 03/01/2015 $34.38 $13.00 $13.06 $0.00 $60.44 09/01/2015 $35.10 $13.00 $13.08 $0.00 $61.18 03/01/2016 $35.81 $13.00 $13.10 $0.00 $61.91 ----------------------------------------------------- --- --------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 - ----------------------- Page 12 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $30.90 2 55 $21.24 $9.80 Unemployment $0.00 $32.83 3 60 For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN" $9.80 $11.34 $0.00 $44.31 4 65 $25.10 FIREMAN (ASST. ENGINEER) 12/01/2013 $33.76 $10.00 $14.18 $0.00 $9.80 $57.94 OPERATING ENGINEERS LOCAL 4 $49.96 6 75 $28.96 $9.80 $13.1.3 $0.00 $51.89 For apprentice rates see "Apprentice- OPERATING ENGINEERS" $30.89 $9.80 $14.92 $0.00 $55.61 8 85 $32.82 FLAGGER & SIGNALER 12/01/2013 $20.50 $7.30 $12.10 $0.00 - �....� $39.90 LABORERS - ZONE 2 --_., Steps are 750 hrs. --___.________. ________._--- Apprentice to 3ourneyworker Ratio: 1:1 06/01/2014 $20.50 $7.30 $12.10 $0.00 $39.90 12/01/2014 $20.50 $7.30 $12.10 $0.00 $39.90 06/01/2015 $20.50 $7.30 $12.10 $0:00 $39.90 12/01/2015 $20.50 $7.30 $12.10 $0.00 $39.90 06/01/2016 $20.50 $7.30 $12.10 $0.00 $39.90 12/01/2016 $20.50 $7.30 $12.10 $0.00 $39.90 For apprentice rates see "Apprentice- LABORER" FLOORCOVERER 09/01/2013 $38.61 $9.80 $16.71 $0.00 $65.12 FLOORCOVERERS LOCAL 2168 ZONE I 03/01/2014 $38.61 $9.80 $16.71 $0.00 $65.12 Apprentice- FLOORCOVERER -Local 2168 Zone I Effective Date- 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.31 $9.80 $1.79 $0.00 $30.90 2 55 $21.24 $9.80 $1.79 $0.00 $32.83 3 60 $23.17 $9.80 $11.34 $0.00 $44.31 4 65 $25.10 $9.80 $11.34 $0.00 $46.24 5 70 $27.03 $9.80 $13.13 $0.00 $49.96 6 75 $28.96 $9.80 $13.13 $0.00 $51.89 7 80 $30.89 $9.80 $14.92 $0.00 $55.61 8 85 $32.82 $9.80 $14.92 $0.00 $57.54 Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.31 $9.80 $1.79 $0.00 $30.90 2 55 $21.24 $9.80 $1.79 $0.00 $32.83 3 60 $23.17 $9.80 $11.34 $0.00 $44.31 4 65 $25.10 $9.80 $11.34 $0.00 $46.24 5 70 $27.03 $9.80 $13.13 $0.00 $49.96 6 75 $28.96 $9.80 $13.1.3 $0.00 $51.89 7 80 $30.89 $9.80 $14.92 $0.00 $55.61 8 85 $32.82 $9.80 $14.92 $0.00 $57.54 Notes: _._..._..-_-..-.....----®- __- - �....� --- .._... - �..... --_., Steps are 750 hrs. --___.________. ________._--- Apprentice to 3ourneyworker Ratio: 1:1 _ - _ - - -_- _ FORK LIFT/CHERRY PICKER 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GENERATORILIGHTING PLANTIHEATERS 12/01/2013 $28.11 $10.00 $14.18 $0.00 $52.29 OPERATING ENGINEERS LOCAL 4 Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 13 of 40 Classification For apprentice rates see "Apprentice- OPERATING ENGINEERS" Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate GLAZIER (GLASS PLANK/AIR BARRIERANTERIOR 01/01/2014 $35.41 $7.85 $16.10 $0.00 $59.36 SYSTEMS) 07/01/2014 $36.56 $7.85 $16.10 $0.00 $60.51 GLAZIERS LOCAL 35(7.ONE2) 65 $23.02 $7.85 $4.32 $0.00 $35.19 5 01/01/2015 $37.16 $7.85 $16.10 $0.00 $61.11 6 07/01/2015 $38.06 $7.85 $16.10 $0.00 $62.01 7 01/01/2016 $39.01 $7.85 $16.10 $0.00 $62.96 8 07/01/2016 $39.96 $7.85 $16.10 $0.00 $63.91 Effective Date - 07/01/2014 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86 Apprentice- GLAZIER - Local 35 Zone 2 Apprentice Base Wage Health Pension Unemployment Total Rate $10.00 Effective Date - 01/01/2014 $64.67 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.71 $7.85 $0.00 $0.00 $25.56 2 55 $19.48 $7.85 $3.66 $0.00 $30.99 3 60 $21.25 $7.85 $3.99 $0.00 $33.09 4 65 $23.02 $7.85 $4.32 $0.00 $35.19 5 70 $24.79 $7.85 $14.11 $0.00 $46.75 6 75 $26.56 $7.85 $14.44 $0.00 $48.85 7 80 $28.33 $7.85 $14.77 $0.00 $50.95 8 90 $31.87 $7.85 $15.44 $0.00 $55.16 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.28 $7.85 $0.00 $0.00 $26.13 2 55 $20.11 $7.85 $3.66 $0.00 $31.62 3 60 $21.94 $7.85 $3.99 $0.00 $33.78 4 65 $23.76 $7.85 $4.32 $0.00 $35.93 5 70 $25.59 $7.85 $14.11 $0.00 $47.55 6 75 $27.42 $7.85 $14.44 $0.00 $49.71 7 80 $29.25 $7.85 $14.77 $0.00 $51.87 8 90 $32.90 $7.85 $15.44 $0.00 $56.19 Notes: Steps are 750 hrs. Apprentice to 3ourneyworker Ratio: 1:1 HOISTING ENGINEER/CRANES/GRADALLS 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERATING ENGINEERS LOCAL A ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 14 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- OPERATING ENGINEERS -Local 4 $13.00 $14.42 $0.00 $71.38 ELECTIUC/ANS LOCAL 103 Effective Date - 12/01/2013 Supplemental 03/01/2014 $44.45 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate $45.12 1 55 $22.27 $10.00 $0.00 $0.00 03/01/2015 $32.27 $13.00 2 60 $24.29 $10.00 $14.18 $0.00 $46.80 $48.47 $14.75 3 65 $26.32 $10.00 $14.18 $0.00 $13.00 $50.50 $0.00 4 70 $28.34 $10.00 $14.18 $0.00 $9.82 $52.52 $2.17 5 75 $30.37 $10.00 $14.18 $0.00 $9.82 $54.55 $2.17 6 80 $32.39 $10.00 $14.18 $0.00 $9.82 $56.57 $2.17 7 85 $34.42 $10.00 $14.18 $0.00 $9.82 $58.60 $2.17 8 90 $36.44 $10.00 $14.18 $0.00 $60.62 - - - - - - - - (Notes: _ __..-- e - _......_ _ -..._... - - - - ---- - --� $0.00 '--------___.-..-_--. Apprentice to Journeyworker Ratio: 1:6 PIP@FITTERS LOCAL 537 (Local 138) I. HVAC (DUCTWORK) 02/01/2014 $42.76 $9.82 $19.74 $2.17 $74.49 SHEETMF.TAL WORKF.RSLOCAL 17-A 08/01/2014 $43.61 $9.82 $19.74 $2.17 $75.34 02/01/2015 $44.51 $9.82 $19.74 $2.17 $76.24 08/01/2015 $45.51 $9.82 $19.74 $2.17 $77.24 02/01/2016 $46.51 $9.82 $19.74 $2.17 $78.24 08/01/2016 $47.66 $9.82 $19.74 $2.17 $79.39 02/01/2017 $48.76 $9.82 $19.74 $2.17 $80.49 08/01/2017 $49.86 $9.82 $19.74 $2.17 $81.59 02/01/2018 $51.01 $9.82 $19.74 $2.17 $82.74 For apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (ELECTRICAL CONTROLS) 09/01/2013 $43.96 $13.00 $14.42 $0.00 $71.38 ELECTIUC/ANS LOCAL 103 SHLETMETAL WORKERS LOCAL 17 -A 03/01/2014 $44.45 $13.00 $14.68 $0.00 $72.13 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN" 08/01/2016 $47.66 $9.82 $19.74 $2.17 HVAC (TESTING AND BALANCING - AIR) 02/01/2014 $42.76 $9.82 $19.74 $2.17 $74.49 SHLETMETAL WORKERS LOCAL 17 -A 08/01/2014 $43.61 $9.82 $19.74 $2.17 $75.34 02/01/2015 $44.51 $9.82 $19.74 $2.17 $76.24 08/01/2015 $45.51 $9.82 $19.74 $2.17 $77.24 02/01/2016 $46.51 $9.82 $19.74 $2.17 $78.24 08/01/2016 $47.66 $9.82 $19.74 $2.17 $79.39 02/01/2017 $48.76 $9.82 $19.74 $2.17 $80.49 08/01/2017 $49.86 $9.82 $19.74 $2.17 $81.59 02/01/2018 $51.01 $9.82 $19.74 $2.17 $82.74 For apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (TESTING AND BALANCING -WATER) 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PIP@FITTERS LOCAL 537 (Local 138) ------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: ------------------- 20140224-029 --------------------------------------------- Page 15 of 40 Classification For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" HVAC MECHANIC PIPErITTERS LOCAL 537 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or 'PLUMBER/PIPEFITTER" HYDRAULIC DRILLS LABORERS-70NE2 For apprentice rates see "Apprentice- LABORER" . INSULATOR (PIPES & TANKS) NEAT & TROST INSULATORS LOCAL 6 (BOSTON) Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 12/01/2013 $30.60 $7.30 $12.10 $0.00 $50.00 06/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 12/01/2014 $31.60 $7.30 $12.10 $0.00 $51.00 06/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 12/01/2015 $32.60 $7.30 $12.10 $0.00 $52.00 06/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 12/01/2016 $33.85 $7.30 $12.10 $0.00 $53.25 09/01/2013 $42.11 $10.95 $12.10 $0.00 $65.16 09/01/2014 $44.11 $10.95 $12.10 $0.00 $67.16 Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) - Local 6 Boston Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.06 $10.95 $9.00 $0.00 $41.01 2 60 $25.27 $10.95 $9.62 $0.00 $45.84 3 70 $29.48 $10.95 $10.24 $0.00 $50.67 4 80 $33.69 $10.95 $10.86 $0.00 $55.50 Effective Date - 09/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.06 $10.95 $9.00 $0.00 $42.01 2 60 $26.47 $10.95 $9.62 $0.00 $47.04 3 70 $30.88 $10.95 $10.24 $0.00 $52.07 4 80 $35.29 $10.95 $10.86 $0.00 $57.10 Notes: Steps are 1 year .__.-.__.. Apprentice to Journeyworker Ratio:1:4 � - ._ - _ - _.__ _.- ___- ___ - - ..__...._._ IRONWORKER/WELDER 09/16/2013 $36.44 $7.70 $18.60 $0.00 $62.74 IRONWORKERS LOCAL 7 (LAWRENCE AREA) ..... ..... ---------------------------------------------------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 16 of 40 4 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - IRONWORKER - Local Lawrence Effective Date - 09/16/2013 supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $21.86 $7.70 $18.60 $0.00 $49.25 $48.16 $30.35 2 70 $25.51 $7.70 $18.60 $0.00 $30.85 $51.81 $12.10 3 75 $27.33 $7.70 $18.60 $0.00 $12.10 $53.63 $50.75. 4 80 $29.15 $7.70 $18.60 $0.00 $51.25 $55.45 $32.35 5 85 $30.97 $7.70 $18.60 $0.00 $33.10 $57.27 $12.10 6 90 $32.80 $7.70 $18.60 $0.00 $59.10 ..._..._.... _..w ._.m. _- Notes: ___. �. mm.. - __....,� .- ...._..........__. - ..._... _._.....�.. ,.-......_.......-....-..... Structural 1:6; Ornamental 1:4 Apprentice to Journeyworker Ratio: JACKHAMMER & PAVING BREAKER OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - ZONE a 06/01/2014 $30.60 $7.30 $12:10 . $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" LABORER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 LABORERS -70NE1 06/01/2014 $30.35 $7.30- $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75. 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 --------------------------------------------------------------------------------- ---------------------------------------------- -------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 17 of 40 x Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER - Zone 2 Effective Date - 12/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.91 $7.30 $12.10 $0.00 $37.31 2 70 $20.90 $7.30 $12.10 $0.00 $40.30 3 80 $23.88 $7.30 $12.10 $0.00 $43.28 4 90 $26.87 $7.30 $12.10 $0.00 $46.27 Effective Date - 06/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.21 $7.30 $12.10 $0.00 $37.61 2 70 $21.25 $7.30 $12.10 $0.00 $40.65 3 80 $24.28 $7.30 $12.10 $0.00 $43.68 4 90 $27.32 $7.30 $12.10 $0.00 $46.72 Notes: ..,_._ _ ...-....____ ..�... ..�. _.......� _ _ ._....._._. ,. _.........� .-.._. _... _.._ .�. �. _.._ .._.... -,.., ___ �..__:_ Apprentice to Journeyworker Ratio:]:5 _.__�..,.__.__�_.__.. 1 LABORER: CARPENTER TENDER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 LABORERS - 70NE 2 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 - $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: CEMENT FINISHER TENDER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 LABORERS - 70NE 2 06/01/2014 $30.35 $7.30 $12:10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 ]2/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2013 $30.05 $7.30 $12.05 $0.00 $49.40 I.ABORERS - ZONE 1 06/01/2014 $30.55 $7.30 $12.05 $0.00 $49.90 12/01/2014 $31.05 $7.30 $12.05 .50.00 $50.40 06/01/2015 $31.55 $7.30 $12.05 $0.00 $50.90 12/01/2015 $32.05 $7.30 $12.05 $0.00 $51.40 For apprentice rates see "Apprentice- LABORER" -------------------------------------------I----------------------------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 18 of 40 ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 19 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment LABORER: MASON TENDER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS -7.ONE2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" LABORER: MULTI -TRADE TENDER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 LABORERS -7ONE2 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: TREE REMOVER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 LABORERS -7.ONE2 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 This classification applies to the wholesale removal of standing trees including all associated trimming of branches and limbs, and applies to the removal of branches at locations not on or around utility lines. For apprentice rates see "Apprentice- LABORER" LASER BEAM OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - 70NE 1 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" MARBLE & TILE FINISHERS 02/01/2014 $36.66 $10.18 $16.83 $0.00 $63.67 BRICKLAYERS LOCAL 3 - MARBLE & TILE 08/01/2014 $37.37 $10.18 $16.90 $0.00 $64.45 02/01/2015 $37.82 $10.18 $16.90 $0.00 $64.90 08/01/2015 $38.53 $10.18 $16.97 $0.00 $65.68 02/01/2016 $38.98 $10.18 $16.97 $0.00 $66.13 08/01/2016 $39.68 $10.18 $17.05 $0.00 $66.91 02/01/2017 $40.14 $10.18 $17.05 $0.00 $67.37 ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 19 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile $10.18 $16.90 $0.00 $45.77 Effective Date - 02/01/2014 $22.42 $10.18 $16.90 Supplemental $49.50 Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $18.33 $10.18 $16.83 0.00 $45.34 2 60 $22.00 $10.18 $16.83 $0.00 $49.01 3 70 $25.66 $10.18 $16.83 $0.00 $52.67 4 80 $29.33 $10.18 $16.83 $0.00• $56.34 5 90 $32.99 $10.18 $16.83 $0.00 $60.00 Effective Date - 08/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $18.69 $10.18 $16.90 $0.00 $45.77 2 60 $22.42 $10.18 $16.90 $0.00 $49.50 3 70 $26.16 $10.18 $16.90 $0.00 $53.24 4 80 $29.90 $10.18 $16.90 $0.00 $56.98 5 90 $33.63 $10.18 $16.90 $0.00 $60.71 (Notes: $51.93 $10.18 $18.37 $0.00 $80.48 Apprentice to Journeyworker Ratio.i 3 $52.50 $10.18 $18.37 $0.00 $81.05 MARBLE MASONS,TILELAYERS & TERRAZZO MECH BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2014 $48.10 $10.18 $18.15 $0.00 $76.43 08/01/2014 $49.00 $10.18 $18.22 $0.00 $77.40 02/01/2015 $49.56 $10.18 $18.22 $0.00 $77.96 08/01/2015 $50.46 $10.18 $18.29 $0.00 $78.93 02/01/2016 $51.03 $10.18 $18.29 $0.00 $79.50 08/01/2016 $51.93 $10.18 $18.37 $0.00 $80.48 02/01/2017 $52.50 $10.18 $18.37 $0.00 $81.05 ------------------------------------------------------------------------- -------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 20 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE -TILE -TERRAZZO MECHANIC- Local 3 Marble & Tile Effective Date - 02/01/2014 Supplemental 1 50 $24.05 $10.18 $18.15 $0.00 $52.38 2 60 $28.86 $10.18 $18.15 $0.00 $57.19 3 70 $33.67 $10.18 $18.15 $0.00 $62.00 4 80 $38.48 $1.0.18 $18.15 $0.00 $66.81 5 90 $43.29 $10.18 $18.15 $0.00 $71.62 Effective Date - 08/01/2014 Apprentice to Journeyworker Ratio -1 :5 04/01/2014 $33.41 $9.80 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $24.50 $10.18 $18.22 $0.00 $52.90 2 60 $29.40 $10.18 $18.22 $0.00 $57.80 3 70 $34.30 $10.18 $18.22 $0.00 $62.70 4 80 $39.20 $10.18 $18.22 $0.00 $67.60 5 90 $44.10 $10.18 $18.22 $0.00 $72.50 Notes: $9.80 $16.01 $0.00 $58.62 I Apprentice to Journeyworker Ratio -1 :5 MECH. SWEEPER OPERATOR (ON CONST. SITES) OPERA7ING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 MECHANICS MAINTENANCE 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" MILLWRIGHT (Zone 2) 10/01/2013 $32.81 $9.80 $16.01 $0.00 $58.62 MILL WRIGH7SLOCAL 1121 - Zone 2 04/01/2014 $33.41 $9.80 $16.01 $0.00 $59.22 10/01/2014 $34.17 $9.80 $16.01 $0.00 $59.98 04/01/2015 $34.94 $9.80 $16.01 $0.00 $60.75 ----- -- -- -- - --------------------------------------------- --------------------------- ------------------- - ---------------- - - Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 21 of 40 A. 1 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $0.00 $32.58 OPFRA7ING ENGINEERS LOCAL 4 Unemployment Apprentice- MILLWRIGHT- Local 1121 Zone 2 $13.21 $0.00 Effective Date - 10/01/2013 3 75 $25.06 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $18.05 $9.80 $4.40 $0.00 $32.25 2 65 $21.33 $9.80 $13.21 $0.00 $44.34 3 75 $24.61 $9.80 $14.01 $0.00 $48.42 4 85 $27.89 $9.80 $14.81 $0.00 $52.50 Effective Date - 04/01/2014 -- $14.18 $0.00 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 55 $18.38 $9.80 $4.40 $0.00 $0.00 $32.58 OPFRA7ING ENGINEERS LOCAL 4 2 65 $21.72 $9.80 $13.21 $0.00 $44.73 3 75 $25.06 $9.80 $14.01 $0.00 OILER (TRUCK CRANES, GRADALLS) $48.87 $24.43 4 85 $28.40 $9.80 $14.81 $0.00 $53.01 (Notes: For apprentice rates see "Apprentice- OPERATING ENGINEERS" Steps are 2,000 hours _ _-_._.-- -- _--___... 12/01/2013 ._....-.. -- $14.18 $0.00 - Apprentice to Journeyworker Ratio:1:5 OPFRATING FNGINFERS LOCAL 4 MORTAR MIXER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORFRS-7.ONE2 06/01/2014 $30.60 $7.30- $12.10 $0.00 PAINTERS LOCAL 35 - 7.ONF 2 $50.00 $46.76 12/01/2014 $31.10 $7.30 $12.10 $0.00 01/01/2015 $50.50 $7.85 06/01/2015 $31.60 $7.30 $12.10 $0.00 $48.56 $51.00 $16.10 12/01/2015 $32.10 $7.30 $12.10 $0.00 $7.85 $51.50 $0.00 06/01/2016 $32.60 $7.30 $12.10 $0.00 $16.10 $52.00 $74.41 12/01/2016 $33.35 $7.30 $12.10 $0.00 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2013 $20.96 $10.00 $14.18 $0.00 $45.14 OPFRA7ING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OILER (TRUCK CRANES, GRADALLS) 12/01/2013 $24.43 $10.00 $14.18 $0.00 $48.61 OPFRA7ING FNGINEFRS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT - CLASS 11 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPFRATING FNGINFERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PAINTER (BRIDGES/TANKS) 01/01/2014 $45.91 $7.85 $16.10 $0.00 $69.86 PAINTERS LOCAL 35 - 7.ONF 2 07/01/2014 $46.76 $7.85 $16.10 $0.00 $70.71 01/01/2015 $47.66 $7.85 $16.10 $0.00 $71.61 07/01/2015 $48.56 $7.85 $16.10 $0.00 $72.51 01/01/2016 $49.51 $7.85 $16.10. $0.00 $73.46 07/01/2016 $50.46 $7.85 $16.10 $0.00 $74.41 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 ----------------------- ---------------------------- ----- ------------------ - ----------------------------------------- - ------------------ Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 22 of 40 AO $23.38 $7.85 $0.00 $0.00 $31.23 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 3 60 $28.06 $7.85 $3.99 Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS $30.39 $7.85 $4.32 $0.00 Effective Date - 01/01/2014 5 70 $32.73 $7.85 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.96 $7.85 $0.00 $0.00 $30.81 2 55 $25.25 $7.85 $3.66 $0.00 $36.76 3 60 $27.55 $7.85 $3.99 $0.00 $39.39 4 65 $29.84 $7.85 $4.32 $0.00 $42.01 5 - 70 $32.14 $7.85 $14.11 $0.00 $54.10 6 75 $34.43 $7.85 $14.44 $0.00 $56.72 7 80 $36.73 $7.85 $14.77 $0.00 $59.35 8 90 $41.32 $7.85 $15.44 $0.00 $64.61 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.38 $7.85 $0.00 $0.00 $31.23 2 55 $25.72 $7.85 $3.66 $0.00 $37.23 3 60 $28.06 $7.85 $3.99 $0.00 $39.90 4 65 $30.39 $7.85 $4.32 $0.00 $42.56 5 70 $32.73 $7.85 $14.11 $0.00 $54.69 6 75 $35.07 $7.85 $14.44 $0.00 $57.36 7 80 $37.41 $7.85 $14.77 $0.00 $60.03 8 90 $42.08 $7.85 $15.44 $0.00 $65.37 ----___ -----------------------`.___- Notes:. Steps are 750 hrs. Apprentice to Journeyworker Ratioaa PAINTER (SPRAY OR SANDBLAST, NEW) * * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.i AjN7,jRs LOCAL, 35 - ZONE 2 01/01/2014 $36.81 $7.85 $16.10 $0.00 $60.76 07/01/2014 $37.66 $7.85 $16.10 $0.00 $61.61 01/01/2015 $38.56 $7.85 $16.10 $0.00 $62.51 07/01/2015 $39.46 $7.85 $16.10 $0.00 $63.41 01/01/2016 $40.41 $7.85 $16.10 $0.00 $64.36 07/01/2016 $41.36 $7.85 $16.10 $0.00 $65.31 01/01/2017 $42.31 .$7.85 $16.10 $0.00 $66.26 --------------------------------------------------------------------------------------------- - ------ - ------------------------------------ Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 23 of 40 Classification I - Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -New Effective Date - 01/01/2014 Step percent Apprentice Base Wage Health 1 50 $18.41 $7.85 2 55 $20.25 $7.85 3 60 $22.09 $7.85 4 65 $23.93 $7.85 5 70 $25.77 $7.85 6 75 $27.61 $7.85 7 80 $29.45 $7.85 8 90 $33.13 $7.85 Effective Date - 07/01/2014 Supplemental $7.85 Pension Unemployment Total Rate $0.00 $0.00 $26.26 $3.66 $0.00 $31.76 $3.99 $0.00 $33.93 $4.32 $0.00 $36.10 $14.11 $0.00 $47.73 $14.44 $0.00 $49.90 $14.77 $0.00 $52.07 $15.44 $0.00 $56.42 Effective Date - 07/01/2014 $34.87 $7.85 $16.10 Supplemental $58.82 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.83 $7.85 $0.00 $0.00 $26.68 2 55 $20.71 $7.85 $3.66 $0.00 $32.22 3 60 $22.60 $7.85 $3.99 $0.00 $34.44 4 65 $24.48 $7.85 $4.32 $0.00 $36.65 5 70 $26.36 $7.85 $14.11 $0.00 $48.32 6 75 $28.25 $7.85 $14.44 $0.00 $50.54 7 80 $30.13 $7.85 $14.77 $0.00 $52.75 8 90 $33.89 $7.85 $15.44 $0.00 $57.18 -------------._-_--®-_ Notes: - --..-......-...._-- Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 PAINTER (SPRAY OR SANDBLAST, REPAINT) PAINTERS LOCAL 35 - ZONE 2 01/01/2014 $34.87 $7.85 $16.10 $0.00 $58.82 07/01/2014 $35.72 $7.85 $16.10 $0.00 $59.67 01/01/2015 $36.62 $7.85 $16.10 $0.00 $60.57 07/01/2015 $37.52 $7.85 $16.10 $0.00 $61.47 01/01/2016 $38.47 $7.85 $16.10 $0.00 $62.42 07/01/2016 $39.42 $7.85 $16.10 $0.00 $63.37 01/01/2017 $40.37 $7.85 $16.10 $0.00 $64.32 --------------- - - ----- ------------------------------------------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 24 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -Repaint $7.30 12/01/2014 $30.85 $7.30 Effective Date - 01/01/2014 $31.35 $7.30 12/01/2015 Supplemental $7.30 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.44 $7.85 $0.00 $0.00 $25.29 2 55 $19.18 $7.85 $3.66 $0.00 $30.69 3 60 $20.92 $7.85 $3.99 $0.00 $32.76 4 65 $22.67 $7.85 $4.32 $0.00- $34.84 5 70 $24.41 $7.85 $14.11 $0.00 $46.37 6 75 $26.15 $7.85 $14.44 $0.00 $48.44 7 80 $27.90 $7.85 $14.77 $0.00 $50.52 8 90 $31.38 $7.85 $15.44 $0.00 $54.67 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.86 $7.85 $0.00 $0.00 $25.71 2 55 $19.65 $7.85 $3.66 $0.00 $31.16 3 60 $21.43 $7.85 $3.99 $0.00 $33.27 4 65 $23.22 $7.85 $4.32 $0.00 $35.39 5 70 $25.00 $7.85 $14.11 $0.00 $46.96 6 75 $26.79 $7.85 $14.44 $0.00 $49.08 7 80 $28.58 $7.85 $14.77 $0.00 $51.20 8 90 $32.15 $7.85 $15.44 $0.00 $55.44 (Notes: I Steps are 750 hrs. -__._--....---- --- -e®._.....-.._.-__..-- ----- Apprentice to Journeyworker Ratio: 1:1 PAINTER (TRAFFIC MARKINGS) 12/01/2013 $29.85 $7.30 LABORERS - ZONE 2 For Apprentice rates see "Apprentice- LABORER" PAINTER / TAPER (BRUSH, NEW) * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PAINTERS LOCAL 35 - ZONE 2 06/01/2014 $30.35 $7.30 12/01/2014 $30.85 $7.30 06/01/2015 $31.35 $7.30 12/01/2015 $31.85 $7.30 06/01/2016 $32.35 $7.30 12/01/2016 $33.10 $7.30 $12.10 $0.00 $12.10 $0.00 $12.10 $0.00 $12.10 $0.00 $12.10 $0.00 $12.10 $0.00 $12.10 $0.00 01/01/2014 $35.41 $7.85 $16.10 07/01/2014 $36.26 $7.85 $16.10 01/01/2015 $37.16 $7.85 $16.10 07/01/2015 $38.06 $7.85 $16.10 01/01/2016 $39.01 $7.85 $16.10 07/01/2016 $39.96 $7.85 $16.10 01/01/2017 $40.91 $7.85 $16.10 $49.25 $49.75 $50.25 $50.75 $51.25 $51.75 $52.50 $0.00 $59.36 $0.00 $60.21 $0.00 $61.11 $0.00 $62.01 $0.00 $62.96 $0.00 $63.91 $0.00 $64.86 ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 25 of 40 ---------------------------------------------------------------7--------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 26 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER -Local 35 Zone 2 - BRUSH NEW Effective Date - 01/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.71 $7.85 $0.00 $0.00 $25.56 2 55 $19.48 $7.85 $3.66 $0.00 $30.99 3 60 $21.25 $7.85 $3.99 $0.00 $33.09 4 65 $23.02 $7.85 $4.32 $0.00 $35.19 5 70 $24.79 $7.85 $14.11 $0.00 $46.75 6 75 $26.56 $7.85 $14.44 $0.00 $48.85 7 80 $28.33 $7.85 $14.77 $0.00 $50.95 8 90 $31.87 $7.85 $15.44 $0.00 $55.16 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.13 $7.85 $0.00 $0.00 $25.98 2 55 $19.94 $7.85 $3.66 $0.00 $31.45 3 60 $21.76 $7.85 $3.99 $0.00 $33.60 4 65 $23.57 $7.85 $4.32 $0.00 $35.74 5 70 $25.38 $7.85 $14.11 $0.00 $47.34 6 75 $27.20 $7.85 $14.44 $0.00 $49.49 7 80 $29.01 $7.85 $14.77 $0.00 $51.63 8 90 $32.63 $7.85 $15.44 $0.00 $55.92 --.._... ------------------------.._ Notes: - k Steps are 750 Ins. T-- - Apprentice to Journeyworker Ratioa:l ----------------------�-- PAINTER / TAPER (BRUSH, REPAINT) 01/01/2014 $33.47 $7.85 $16.10 $0.00 $57.42 PAINTERS LOCAL 35 - 70NE 2 07/01/2014 $34.32 $7.85 $16.10 $0.00 $58.27 O1/01/2015 $35.22 $7.85 $16.1.0 $0.00 $59.17 07/01/2015 $36.12 $7.85 $16.10 $0.00 $60.07 01/01/2016 $37.07 $7.85 $16.10 $0.00 $61.02 07/01/2016 $38.02 $7.85 $16.10 $0.00 $61.97 01/01/2017 $38.97 0.85 $16.10 $0.00 $62.92 ---------------------------------------------------------------7--------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 26 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date - 01/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.74 $7.85 $0.00 $0.00 $24.59 2 55 $18.41 $7.85 $3.66 $0.00 $29.92 3 60 $20.08 $7.85 $3.99 $0.00 $31.92 4 65 $21.76 $7.85 $4.32 $0.00 $33.93 5 70 $23.43 $7.85 $14.11 $0.00 $45.39 6 75 $25.10 $7.85 $14.44 $0.00 $47.39 7 80 $26.78 $7.85 $14.77 $0.00 $49.40 8 90 $30.12 $7.85 $15.44 $0.00 $53.41 EffectiveDate- 07/01/2014 08/01/2015 $43.10 Supplemental $18.17 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.16 $7.85 $0.00 $0.00 $25.01 2 55 $18.88 $7.85 $3.66 $0.00 $30.39 3 60 $20.59 $7.85 $3.99 $0.00 $32.43 4 65 $22.31 $7.85 $4.32 $0.00 $34.48 5 70 $24.02 $7.85 $14.11 $0.00 $45.98 6 75 $25.74 $7.85 $14.44 $0.00 $48.03 7 80 $27.46 $7.85 $14.77 $0.00 $50.08 8 90, $30.89 $7.85 $15.44 $0.00 $54.18 -....__.__---------_.._._ Notes: ----___.-------.____- - Steps are 750 hrs. I ii Apprentice to Journeyworker Ratio:l:l PANEL & PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 TEAMSTERS JOINT COUNCIL NO. 10 7.ONE B PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2013 $40.10 $9.80 $18.17 $0.00 $68.07 DECK) PILE DRIVER LOCAL SG (7.0NE I) 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 PILE DRIVER 08/01/2013 $40.10 $9.80 $18.17 $0.00 $68.07 PILE DRIVER LOCAL 56 (70NE 1) 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 ---------------------------------------- --- --- --------------------------------------------- --------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 27 of 40 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate Apprentice- PILEDRIVER - Local 56 Zone 1 40 $18.80 $8.75 $4.50 Effective Date - 08/01/2013 $32.05 2 45 Supplemental $8.75 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.05 $9.80 $18.17 $0.00 $48.02 2 60 $24.06 $9.80 $18.17 $0.00 $52.03 3 70 $28.07 $9.80 $18.17 $0.00 $56.04 4 75 $30.08 $9.80 $18.17 $0.00 $58.05 5 80 $32.08 $9.80 $18.17 $0.00 $60.05 6 80 $32.08 $9.80 $18.17 $0.00 $60.05 7 90 $36.09 $9.80 $18.17 $0.00 $64.06 8 90 $36.09 $9.80 $18.17 $0.00 $64.06 Effective Date - 08/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.80 $9.80 $18.17 $0.00 $48.77 2 60 $24.96 $9.80 $18.17 $0.00 $52.93 3 70 $29.12 $9.80 $18.17 $0.00 $57.09 4 75 $31.20 $9.80 $18.17 $0.00 $59.17 5 8-0 $33.28 $9.80 $18.17 $0.00 $61.25 6 80 $33.28 $9.80 $18.17 $0.00 $61.25 7 90 $37.44 $9.80 $18.17 $0.00 $65.41 8 90 $37.44 $9.80 $18.17 $0.00 $65.41 -.-_---..------.----------------_...._..._..� Notes: - --------__..-----------._._-....-w.--_ Apprentice to Journeyworker Ratio:1. 3 - - PIPEFITTER & STEAMFITTER 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 111PER77ERS LOCAL 537 (Local 138) Apprentice- PIPEFITTER Local 537 (Local 138) Effective Date - 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.80 $8.75 $4.50 $0.00 $32.05 2 45 $21.15 $8.75 $12.39 $0.00 $42.29 3 60 $28.21 $8.75 $12.39 $0.00 $49.35 4 70 $32.91 $8.75 $12.39 $0.00 $54.05 5 80 $37.61 $8.75 $12.39 $0.00 $58.75 __._.._._---_..:�..---_... (Notes: ------ -.__._-_--___..---__, I ** 1:3; 3:15; 1:10 thereafter / Steps are 1 yr. ,.,- Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max) .�-___.__..-...-...------------..- i ..� Apprentice to Journeyworker Ratio:** ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 28 of 40 1 35 $16.09 $9.82 $5.26 $0.00 $31.17 2 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate - $25.29 $9.82 $7.95 Unemnloyment $43.06 4 65 PIPELAYER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS-ZONE2 $10.65 $0.00 $54.96 Notes: .._... _._....,-,. __._ .._....__.. _�..._._ --- - _......__..`..._.. ,...... _...... _._......_. _.._ 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 PNEUMATIC CONTROLS (TEMP.) 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" PLUMBER 09/01/2013 $44.98 $9.82 $14.04 $0.00 $68.84 PLUMBERS & GASFITTERS LOCAL 12 (Local 138) 03/01/2014 $45.98 $9.82 $14.04 $0.00 $69.84 09/01/2014 $46.98 $9.82 $14.04 $0.00 $70.84 03/01/2015 $47.98 $9.82 $14.04 $0.00 $71.84 09/01/2015 $48.98 $9.82 $14.04 $0.00 $72.84 03/01/2016 $50.13 $9.82 $14.04 $0.00 $73.99 09/01/2016 $51.18 $9.82 $14.04 $0.00 $75.04 03/01/2017 $52.18 $9.82 $14.04 $0.00 $76.04 Apprentice- PLUMBERIGASFITTER - Loca112 (Local 138) Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health . Pension Unemployment Total Rate 1 35 - $15.74 $9.82 $5.26 $0.00 $30.82 2 40 $17.99 $9.82 $5.92 $0.00 $33.73 3 55 $24.74 $9.82 $7.95 $0.00 $42.51 4 65 $29.24 $9.82 $9.30 $0.00 $48.36 5 75 i i $33.74 $9.82 $10.65 $0.00 $54.21 Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.09 $9.82 $5.26 $0.00 $31.17 2 40 $18.39 $9.82 $5.92 $0.00 $34.13 3 55 $25.29 $9.82 $7.95 $0.00 $43.06 4 65 $29.89 $9.82 $9.30 $0.00 $49.01 5 75 $34.49 $9.82 $10.65 $0.00 $54.96 Notes: .._... _._....,-,. __._ .._....__.. _�..._._ --- - _......__..`..._.. ,...... _...... _._......_. _.._ __._ ..�.. - �..,.._.._..._ - Steps are 1 yr Step 4 with lic$51.31 Step5 with lic$57.15 - .. -._ - .__ ___. - _ Apprentice to Journeyworker Ratio:1:5 _.__ - _ _ ..... - ___ _ _ - ____ - PNEUMATIC CONTROLS (TEMP.) 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PIPEFITTEItS LOCAL 537 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 29 of 40 -----------------------------------I------------------------------------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 30 of 40 a Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PNEUMATIC DRILL/TOOL OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS -ZONE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" POWDERMAN & BLASTER 12/01/2013 $30.85 $7.30 $12.10 $0.00 $50.25 LABORERS - ZONE 2 06/01/2014 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2014 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2015 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2015 $32.85 $7.30 $12.10 $0.00 $52.25 06/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 12/01/2016 $34.10 $7.30 $12.10 $0.00 $53.50 For apprentice rates see "Apprentice- LABORER" POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERA77NG ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (CONCRETE) 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (DEWATERING, OTHER) 12/01/2013 $28.11 $10.00 $14.18 $0.00 $52.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" READY -MIX CONCRETE DRIVER 04/30/2009 $25.80 $5.96 $5.34 $0.00 $37.10 TEAMSTERS LOCAL 42 RECLAIMERS 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS LOCAL, 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42 CARPENTERS -7.ONE 2 (Residential Wood) RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81 ** The Residential Wood Frame Carpenter classification applies only to the construction of new, wood frame residences that do not exceed four stories including the basement. CARPENTERS-zoNE 2 (Residential Wood) As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. -----------------------------------I------------------------------------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 30 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- CARPENTER (Residential Wood Frame) -Zone 2 12/01/2013 $30.10 $7.30 $12.10 Effective Date - 05/01/2011 $49.50 LABORERS-ZONE2 .. Supplemental $30.60 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $14.54 $6.34 $0.00 $0.00 $20.88 2 60 $14.54 $6.34 $6.23 $0.00 $27.11 3 65 $15.76 $6.34 $6.23 $0.00 $28.33 4 70 $16.97 $6.34 $6.23 $0.00 $29.54 5 75 $18.18 $6.34 $6.23 $0.00 $30.75 6 80 $19.39 $6.34 $6.23 $0.00 $31.96 7 85 $20.60 $6.34 $6.23 $0.00 $33.17 8 90 $21.82 $6.34 $6.23 $0.00 $34.39 Notes: Apprentice to Journeyworker Ratio:1:5 RIDE -ON MOTORIZED BUGGY OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS-ZONE2 .. 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ROLLER/SPREADER/MULCHING MACHINE 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ROOFER (Inc.Roofer Waterproofng &RooferDamproofg) 02/01/2014 $39.21 $10.50 $10.70 $0.00 $60.41 ROOFERS LOCAL 33 08/01/2014 $40.11 $10.50 $10.70 $0.00 $61.31 02/01/2015 $41.01 $10.50 $10.70 $0.00 $62.21 08/01/2015 $41.91 $10.50 $10.70 $0.00 $63.11 02/01/2016 $42.81 $10.50 $10.70 $0.00 $64.01 ---------------------- --------------------------------------------------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 31 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - ROOFER - Local 33 Effective Date - 02/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.61 $10.50 $3.38 $0.00 $33.49 2 60 $23.53 $10.50 $10.70 $0.00 $44.73 3 65 $25.49 $10.50 $10.70 $0.00 $46.69 4 75 $29.41 $10.50 $10.70 $0.00 $50.61 5 85 $33.33 $10.50 $10.70 $0.00 $54.53 Effective Date - 08/01/2014 Step 1 is 2000 hrs.; Steps 2-5 are 1000 his. $10.50 $10.70 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.06 $10.50 $3.38 $0.00 $33.94 2 60 $24.07 $10.50 $10.70 $0.00 $45.27 3 65 $26.07 $10.50 $10.70 $0.00 $47.27 4 75 $30.08 $10.50 $10,70 $0.00 $51.28 5 85 $34.09 $10.50 $10.70 $0.00 $55.29 Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1 $62.46 08/01/2015 1 Step 1 is 2000 hrs.; Steps 2-5 are 1000 his. $10.50 $10.70 $0.00 . _ ..�.. __. - Apprentice to Journeyworker Ratio:** - ____..._.....�......_ - --•-- .-- �. --- - _,_.., --- ROOFER SLATE / TILE / PRECAST CONCRETE 02/01/2014 $39.46 $10.50 $10.70 $0.00 $60.66 ROOFERS LOCAL 33 08/01/201.4 $40.36 $10.50 $10.70 $0.00 $61.56 02/01/2015 $41.26 $10.50 $10.70 $0.00 $62.46 08/01/2015 $42.16 $10.50 $10.70 $0.00 $63.36 02/01/2016 $43.06 $10.50 $10.70 $0.00 $64.26 For apprentice rates see "Apprentice- ROOFER" SHEETMETAL WORKER 02/01/2014 $42.76 .$9.82 $19.74 $2.17 $74.49 SHEETMETAL WORKERS LOCAL 17-A 08/01/2014 $43.61 $9.82 $19.74 $2.17 $75.34 02/01/2015 $44.51 $9.82 $19.74 $2.17 $76.24 08/01/2015 $45.51 $9.82 $19.74 $2.17 $77.24 02/01/2016 $46.51 $9.82 $19.74 $2.17 $78.24 08/01/2016 $47.66 $9.82 $19.74 $2.17 $79.39 02/01/2017 $48.76 $9.82 $19.74 $2.17 $80.49 08/01/2017 $49.86 $9.82 $19.74 $2.17 $81.59 02/01/2018 $51.01 $9.82 $19.74 $2.17 $82.74 ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 32 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SHEET METALWORKER -Local 17-A Effective Date - 02/01/2014 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 40 $17.10 $9.82 $4.28 $0.00 $31.20 2 40 $17.10 $9.82 $4.28 $0.00 $31.20 3 45 $19.24 $9.82 $8.70 $1.13 $38.89 4 45 $19.24 $9.82 $8.70 $1.13 $38.89 5 50 $21.38 $9.82 $9.49 $1.22 $41.91 6 50 $21.38 $9.82 $9.74 $1.23 $42.17 7 60 $25.66 $9.82 $11.05 $1.40 $47.93 8 65 $27.79 $9.82 $11.84 $1.48 $50.93 9 75 $32.07 $9.82 $13.41 $1.66 $56.96 10 85 $36.35 $9.82 $14.48 $1.82 $62.47 Effective Date - 08/01/2014 $9.82 $14.48 $1.82 $63.19 Notes: �.....,.,.. _.__ ...._ ._._. - - - - - -... �..._„ - - - ..._. - - - Supplemental - _ Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.44 $9.82 $4.28 $0.00 $31.54 2 40 $17.44 $9.82 $4.28 $0.00 $31.54 3 45 $19.62 $9.82 $8.70 $1.13 $39.27 4: 45 $19.62 $9.82 $8.70 $1.13 $39.27 5 50 $21.81 $9.82 $9.49 $1.22 $42.34 .6 50 $21.81 $9.82 $9.74 $1.23 $42.60 7 60 $26.17 $9.82 $11.05 $1.40 $48.44 8 65 $28.35 $9.82 $11.84 $1.48 $51.49 9 75 $32.71 $9.82 $13.41 $1.66 $57.60 10 85 $37.07 $9.82 $14.48 $1.82 $63.19 Notes: �.....,.,.. _.__ ...._ ._._. - - - - - -... �..._„ - - - ..._. - - - _ ...- - ,__ - _ Steps are 6 mos. Apprentice to Journeyworker Ratioa:4 SIGN ERECTOR PAINTERS LOCAL 35 - 70NE 2 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93 ---------------- ------------------------- ----------------------------- -- -------------- - ------------------------- ----- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 33 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SIGN ERECTOR -Local 35 Zone 2 Effective Date - 06/01/2013 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $12.91 $7.07 $0.00 $0.00 $19.98 2 55 $14.20 $7.07 $2.45 $0.00 $23.72 3 . 60 $15.49 $7.07 $2.45 $0.00 $25.01 41 65 $16.78 $7.07 $2.45 $0.00 $26.30 5 70 $18.07 $7.07 $7.05 $0.00 $32.19 6 75 $19.36 $7.07 $7.05 $0.00 $33.48 7 80 $20.65 $7.07 $7.05 $0.00 $34.77 8 85 $21.94 $7.07 $7.05 $0.00 $36.06 9 90 $23.23 $7.07 $7.05 $0.00 $37.35 Notes: $0.00 $53.43 12/01/2016 $32.44 Steps are 4 mos. $10.89 $0.00 $54.24 SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2013 Apprentice to Journeyworker Ratioaa $9.41 $8.80 $0.00 $49.74 TFAMSTIiRS JOINT COUNCIL NO. 10 ZONE B SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2013 $31.24 $9.41 $8.80 $0.00 $49.45 TFAMSTFI?S JOINT COUNCIL NO. 10 7.ONE B 06/01/2014 $31.59 $9.41 $8.80 $0.00 $49.80 08/01/2014 $31.59 $9.91 $8.80 $0.00 $50.30 12/01/2014 $31.59 $9.91 $9.33 $0.00 $50.83 06/01/2015 $31.94 $9.91 $9.33 $0.00 $51.18 08/01/2015 $31.94 $10.41 $9.33 $0.00 $51.68 12/01/2015 $31.94 $10.41 $10.08 $0.00 $52.43 06/01/2016 $32.44 $10.41 $10.08 $0.00 $52.93 08/01/2016 $32.44 $10.91 $10.08 $0.00 $53.43 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24 SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2013 $31.53 $9.41 $8.80 $0.00 $49.74 TFAMSTIiRS JOINT COUNCIL NO. 10 ZONE B 06/01./2014 $31.88 $9.41 $8.80 $0.00 $50:09 08/01/2014 $31.88 $9.91 $8.80 $0.00 $50.59 12/01/2014 $31.88 $9.91 $9.33 $0.00 $51.12 06/01/2015 $32.23 $9.91 $9.33 $0.00 $51.47 08/01/2015 $32.23 $10.41 $9.33 $0.00 $51.97 12/01/2015 $32.23 $10.41 $10.08 $0.00 $52.72 06/01/2016 $32.73 $10.41 $10.08 $0.00 $53.22 08/01/2016 $32.73 $10.91 $10.08 $0.00 $53.72 12/01/2016 $32.73 $10.91 $10.89 $0.00 $54.53 ---------------------------------------------------------- ----------- ------------------- ------------------------- I ------------------ Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 34 of 40 r'" 1p Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment SPRINKLER FITTER 01/01/2014 $48.00 $8.42 $12.85 $0.00 $69.27 SPRINKLER FITTERS LOCAL 550 - (Section B) Zone 2A 03/01/2014 $49.12 $8.42 $12.85 $0.00 $70.39 10/01/2014 $50.16 $8.42 $12.85 $0.00 $71.43 01/01/2015 $50.16 $8.42 $13.00 $0.00 $71.58 03/01/2015 $51.06 $8.42 $13.00 $0.00 $72.48 10/01/2015 $52.10 $8.42 $13.00 $0.00 $73.52 01/01/2016 $52.10 $8.67 $13.15 $0.00 $73.92 03/01/2016 $53.00 $8.67 $13.15 $0.00 $74.82 10/01/2016 $54.04 $8.67 $13.15 $0.00 $75.86 03/01/2017 $54.90 $8.67 $13.15 $0.00 $76.72 Apprentice- SPRINKLER FITTER -Local 550 (Section B) Zone 2A Effective Date - 01/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.80 $8.42 $8.25 $0.00 $33.47 2 40 $19.20 $8.42 $8.25 $0.00 $35.87 3 45 $21.60 $8.42 $8.25 $0.00 $38.27 4 50 $24.00 $8.42 $8.25 $0.00 $40.67 5 55 $26.40 $8.42 $8.25 $0.00 $43.07 6 60 $28.80 $8.42 $8.25 $0.00 $45.47 7 65 $31.20 $8.42 $8.25 $0.00 $47.87 8 70 $33.60 $8.42 $8.25 $0.00 $50.27 9 75 $36.00 $8.42 $8.25 $0.00 $52.67 10 80 $38.40 $8.42 $8.25 $0.00 $55.07 Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 _ $17.19 $8.42 $8.25 $0.00 $33.86 2 40 $19.65 $8.42 $8.25 $0.00 $36.32 3 45 $22.10 $8.42 $8.25 $0.00 $38.77 4 50 $24.56 $8.42 $8.25 $0.00 $41.23 5 55 $27.02 $8.42 $8.25 $0.00 $43.69 6 60 $29.47 $8.42 $8.25 $0.00 $46.14 7 65 $31.93 $8.42 $8.25 $0.00 $48.60 8 70 $34.38 $8.42 $8.25 $0.00 $51.05 9 75 $36.84 $8.42 $8.25 $0.00 $53.51 10 80 $39.30 $8.42 $8.25 $0.00 $55.97 Notes: Apprentice entered prior 9/30/10: -._.. ____ ____ - - - - - ____ - ____ - - - - - - 40/45/50/55/60/65/70/75/80/85 Steps are 850 hours ^......... - _ ___� ._._ .. - .�. ___ Apprentice to Journeyworker Ratio:1:3 _ �.- - ....- ___ - -___. _. ___ __._ - ____ - ____...._ _...._._ _ STEAM BOILER OPERATOR 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" --------------- ----------------------------------------------------------------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 ---------- --------------------- Page 35 of 40 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERA77NG ENGINEERS LOCAL 4 45 $14.84 $13.00 $10.04 $0.00 $37.88 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 45 $14.84 $13.00 $10.04 $0.00 $37.88 TELECOMMUNICATION TECHNICIAN 09/01/2013 $32.97 $13.00 $12.77 $0.00 $58.74 ELECTRICIANS LOCAL 103 03/01/2014 $33.44 $13.00 $13.03 $0.00 $59.47 7 09/01/2014 $33.84 $13.00 $13.05 $0.00 $59.89 8 03/01/2015 $34.38 $13.00 $13.06 $0.00 $60.44 9 09/01/2015 $35.10 $13.00 $13.08 $0.00 $61.18 10 03/01/2016 $35.81 $13.00 $13.10 $0.00 $61.91 Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $13.19 $13.00 $0.40 $0.00 $26.59 2 40 $13.19 $13.00 $0.40 $0.00 $26.59 3 45 $14.84 $13.00 $10.04 $0.00 $37.88 4 45 $14.84 $13.00 $10.04 $0.00 $37.88 5 50 $16.49 $13.00 $10.29 $0.00 $39.78 6 55 $18.13 $13.00 $10.53 $0.00 $41.66 7 60 $19.78 $13.00 $10.78 $0.00 $43.56 8 65 $21.43 $13.00 $11.03 $0.00 $45.46 9 70 $23.08 $13.00 $11.28 $0.00 $47.36 10 75 $24.73 $13.00 $11.53 $0.00 $49.26 Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $13.38 $13.00 $0.40 $0.00 $26.78 2 40 $13.38 $13.00 $0.40 $0.00 $26.78 3 45 $15.05 $13.00 $10.29 $0.00 $38.34 4 45 $15.05 $13.00 $10.29 $0.00 $38.34 5 50 $16.72 $13.00 $10.54 $0.00 $40.26 6 55 $18.39 $13.00 $10.79 $0.00 $42.18 7 60 $20.06 $13.00 $11.04 $0.00 $44.10 8 65 $21.74 $13.00 $11.29 $0.00 $46.03 9 70 $23.41 $13.00 $11.54 $0.00 $47.95 10 75 $25.08 $13.00 $11.79 $0.00 $49.87 Notes: Apprentice to 3ourneyworker Ratio:]:l --------------------------- - -------- ----------------------------------------- -------- - --------------------- - ------------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 36 of 40 Classification TERRAZZO FINISHERS BRICKLAYERS LOCAL 3 - MARBLE & TILE Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate 02/01/2014 $47.00 $10.18 $18.15 $0.00 $75.33 08/01/2014 $47.90 $10.18 $18.22 $0.00 $76.30 02/01/2015 $48.46 $10.18 $18.22 $0.00 $76.86 08/01/2015 $49.36 $10.18 $18.29 $0.00 $77.83 02/01/2016 $49.93 $10.18 $18.29 $0.00 $78.40 08/01/2016 $50.83 $10.18 $18.37 $0.00 $79.38 02/01/2017 $51.40 $10.18 $18.37 $0.00 $79.95 Apprentice- TERRAZZO FINISHER -Local 3 Marble & Tile Effective Date - 02/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.50 $10.18 $18.15 $0.00 $51.83 2 60 $28.20 $10.18 $18.15 $0.00 $56.53 3 70 $32.90 $10.18 $18.15 $0.00 $61.23 4 80 $37.60 $10.18 $18.15 $0.00 $65.93 5 90 $42.30 $10.18 $18.15 $0.00 $70.63 Effective Date - 08/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.95 $10.18 $18.22 $0.00 $52.35 2 60 $28.74 $10.18 $18.22 $0.00 $57.14 3 70 $33.53 $10.18 $18.22 $0.00 $61.93 4 80 $38.32 $10.18 $18.22 $0.00 $66.72 5 90 $43.11 $10.18 $18.22 $0.00 $71.51 -- (Notes: �..-._..__.._. _ _. -_T---_-_--_ __._-^. - __._._.. - Apprentice to Journeyworker Ratio:l:3 _ _ TEST BORING DRILLER 12/01/2013 $34.70 $7.30 $12.90 $0.00 $54.90 LABORERS - FOUNDATIONAND MARINE 06/01/2014 $35.45 $7.30 $12.90 $0.00 $55.65 12/01/2014 $36.20 $7.30 $12.90 $0.00 $56.40 06/01/2015 $36.95 $7.30 $12.90 $0.00 $57.15 12/01/2015 $37.70 $7.30 $12.90 $0.00 $57.90 06/01/2016 $38.45 $7.30 $12.90 $0.00 $58.65 12/01/2016 $39.45 $7.30 $12.90 $0.00 $59.65 For apprentice rates see "Apprentice- LABORER" TEST BORING DRILLER HELPER 12/01/2013 $33.42 $7.30 $12.90 $0.00 $53.62 LABORERS - FOUNDATION AND MARINE 06/01/2014 $34.17 $7.30 $12.90 $0.00 $54.37 12/01/2014 $34.92 $7.30 $12.90 $0.00 $55.12 06/01/2015 $35.67 $7.30 $12.90 $0.00 $55.87 12/01/2015 $36.42 $7.30 $12.90 $0.00 $56.62 06/01/2016 $37.17 $7.30 $12.90 $0.00 $57.37 12/01/2016 $38.17 $7.30 $12.90 $0.00 $58.37 For apprentice rates see "Apprentice- LABORER" --------------- ------------- ------------- --------- ----- ---------------------_--------------- - -------------------- -------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 37 of 40 Classification TEST BORING LABORER LABORERS- FOUNDATION AND MARINE For apprentice rates see "Apprentice- LABORER" TRACTORS/PORTABLE STEAM GENERATORS OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" Effective Date Base Wage Health Pension Supplemental Total RateUnemployment 12/01/2013 $33.30 $7.30 $12.90 $0.00 $53.50 06/01/2014 $34.05 $7.30 $12.90 $0.00 $54.25 12/01/2014 $34.80 $7.30 $12.90 $0.00 $55.00 06/01/2015 $35.55 $7.30 $12.90 $0.00 $55.75 12/01/2015 $36.30 $7.30 $12.90 $0.00 $56.50 06/01/2016 $37.05 $7.30 $12.90 $0.00 $57.25 12/01/2016 $38.05 $7.30 $12.90 $0.00 $58.25 $51.76 08/01/2015 $32.52 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2013 $31.82 $9.41 $8.80 $0.00 $50.03 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/201.4 $32.17 $9.41 $8.80 $0.00 $50.38 08/01/2014 $32.17 $9.91 $8.80 $0.00 $50.88 12/01/2014 $32.17 $9.91 $9.33 $0.00 $51.41 06/01/2015 $32.52 $9.91 $9.33 $0.00 $51.76 08/01/2015 $32.52 $10.41 $9.33 $0.00 $52.26 12/01/2015 $32.52 $10.41 $10.08 $0.00 $53.01 06/01/2016 $33.02 $10.41 $10.08 $0.00 $53.51 08/01/2016 $33.02 $10.91 $10.08 $0.00 $54.01 12/01/2016 $33.02 $10.91 $10.89 $0.00 $54.82 TUNNEL WORK - COMPRESSED AIR 12/01/2013 $45.58 $7.30 $13.30 $0.00 $66.18 LABORERS (COMPRESSED AIR) 06/01/2014 $46.33 $7.30 $13.30 $0.00 $66.93 12/01/2014 $47.08 $7.30 $13.30 $0.00 $67.68 06/01/2015 $47.83 $7.30 $13.30 $0.00 $68.43 12/01/2015 $48.58 $7.30 $13.30 $0.00 $69.18 06/01/2016 $49.33 $7.30 $13.30 $0.00 $69.93 12/01/2016 $50.33 $7.30 $13.30 $0.00 $70.93 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) 12/01/2013 $47.58 $7.30 $13.30 $0.00 $68.18 LABORERS (COMPRESSED AIR) 06/01/2014 $48.33 $7.30 $13.30 $0.00 $68.93 12/01/2014 $49.08 $7.30 $13.30 $0.00 $69.68 06/01/2015 $49.83 $7.30 $13.30 $0.00 $70.43 12/01/2015 $50.58 $7.30 $13.30 $0.00 $71.18 06/01/2016 $51.33 $7.30 $13.30 $0.00 $71.93 12/01/20]6 $52.33 $7.30 $13.30 $0.00 $72.93 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - FREE AIR 12/01/2013 $37.65 $7.30 $13.30 $0.00 $58.25 LABORERS (TREE All? 'TUNNEL) 06/01/2014 $38.40 $7.30 $13.30 $0.00 $59.00 12/01/2014 $39.15 $7.30 $13.30 $0.00 $59.75 06/01/2015 $39.90 $7.30 $13.30 $0.00 $60.50 12/01/2015 $40.65 $7.30 $13.30 $0.00 $61.25 06/01/2016 $41.40 $7.30 $13.30 $0.00 $62.00 12/01/2016 $42.40 $7.30 $13.30 $0.00 $63.00 For apprentice rates see "Apprentice- LABORER" ------------------- --------- ----------------------------------------------------------------------------- ----------------------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 38 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate TEAMSTERS JOINT COUNCIL NO. 10 7.ONE B Unemployment TUNNEL WORK - FREE ATR (HAZ. WASTE) 12/01/2013 $39.65 $7.30 $13.30 $0.00 $60.25 LABORERS (FREE AIR TUNNEL) 08/01/2014 $31.59 $9.91 $8.80 $0.00 $50.30 06/01/2014 $40.40 $7.30 $13.30 $0.00 $61.00 12/01/2014 $41.15 $7.30 $13.30 $0.00 $61.75 06/01/2015 $41.90 $7.30 $13.30 $0.00 $62.50 12/01/2015 $42.65 $7.30 $13.30 $0.00 $63.25 06/01/2016 $43.40 $7.30 $13.30 $0.00 $64.00 12/01/2016 $44.40 $7.30 $13.30 $0.00 $65.00 For apprentice rates see "Apprentice- LABORER" 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24 VAC -HAUL 12/01/2013 $31.24 $9.41 $8.80 $0.00 $49.45 TEAMSTERS JOINT COUNCIL NO. 10 7.ONE B 06/01/2014 $31.59 $9.41 $8.80 $0.00 $49.80 08/01/2014 $31.59 $9.91 $8.80 $0.00 $50.30 12/01/2014 $31.59 $9.91 $9.33 $0.00 $50.83 06/01/2015 $31.94 $9.91 $9.33 $0.00 $51.18 08/01/2015 $31.94 $10.41 $9.33 $0.00 $51.68 12/01/2015 $31.94 $10.41 $10.08 $0.00 $52.43 06/01/2016 $32.44 $10.41 $10.08 $0.00 $52.93 08/01/2016 $32.44 $10.91 $10.08 $0.00 $53.43 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24 WAGON DRILL OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS -7_ONE2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" WASTE WATER PUMP OPERATOR 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" WATER METER INSTALLER 09/01/2013 $44.98 $9.82 $14.04 $0.00 $68.84 PLUMBERS K GASEITTEIZS LOCAL 12 (Local 138) 03/01/2014 $45.98 $9.82 $14.04 $0.00 $69.84 09/01/2014 $46.98 $9.82 $14.04 $0.00 $70.84 03/01/2015 $47.98 $9.82 $14.04 $0.00 $71.84 09/01/2015 $48.98 $9.82 $14.04 $0.00 $72.84 03/01/2016 $50.13 $9.82 $14.04 $0.00 $73.99 09/01/2016 $51.18 $9.82 $14.04 $0.00 $75.04 03/01/2017 $52.18 $9.82 $14.04 $0.00 $76.04 For apprentice rates see "Apprentice- PLUMBER/PIPEFITTER" or "PLUMBER/GASFITTER" -------------------------------------- ---------- ------------------------------------------ ------------------ -------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 39 of 40 • ;*" Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L. c. 23, ss. I IE -11L. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. I IE -11 L. All steps are six months (1000 hours) unless otherwise specified. * Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof. ** Multiple ratios are listed in the comment field. *** APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. **** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. ---------------------------------- ------------------- -------- ------- ------------------------------ --------- - --- -- -------- Issue Date: 02/24/2014 Wage Request Number: 20140224-029 Page 40 of 40 B Andrew W. Maylor Town Manager Town of North Andover Office of the Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 amaylor@townofnorthandover.com May 13, 2015 Reissued Mr. Tyler Munroe, President Tyler Munroe Landscape Contractors 100 Foster Street North Andover, MA 01845 Dear Mr. Munroe: Telephone (978)688-9510 Fax (978)688-9556 In accordance with the provisions of the contract between the Town of North Andover and Tyler Munroe Landscape Contractors (Contract #735), the contract and the respective unit prices (see enclosed) to provide landscape services at the Stevens Estate for calendar year 2015 is extended an additional option year. Please provide updated insurance certificates listing the Town of North Andover as `Additional Insured' in accordance with the contract document. The insurance certificates are to be sent to the attention of Ray Santilli, Assistant Town Manager. If you have any questions and/or concerns, please call Mr. Santilli at 978-688-9516. cc., Eric Kfoury, Community Development Contract File Sincerely, Andrew W. Maylor Town Manager 2015 Prices a. Spring Clean-up Price for spring clean-up $1,377 b. Seasonal Maintenance Price for grass cutting, edging, $7,905 shrub trimming c. Mulch Labor to refresh beds $714 d. Plantings/Flowers Total number 330 Price for total plantings/flowers $1,350 e. Fertilization of lawn areas Price per application $306 Andrew W. Maylor Town Manager Town of North Andover Office of the Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 amaylor@townofnorthandover.com April 3, 2015 Mr. Tyler Munroe, President Tyler Munroe Landscape Contractors 100 Foster Street North Andover, MA 01845 Dear Mr. Munroe: Telephone (978)688-9510 Fax (978)688-9556 In accordance with the provisions of the contract between the Town of North Andover and Tyler Munroe Landscape Contractors (Contract #735), the contract and the respective unit prices (see enclosed) to provide landscape services at the Stevens Estate for calendar year 2015 is extended an additional option year. Please provide updated insurance certificates listing the Town of North Andover as `Additional Insured' in accordance with the contract document. The insurance certificates are to be sent to the attention of Ray Santilli, Assistant Town Manager. If you have any questions and/or concerns, please call Mr. Santilli at 978-688-9516. cc., Eric Kfoury, Community Development Contract File Sincerely, Andrew W. Maylor Town Manager 2015 Prices a. Spring Clean-up Price for spring clean-up $1,350 b. Seasonal Maintenance Price for grass cutting, edging, $7,750 shrub trimming c. Mulch Labor to refresh beds $700 d. Plantings/Flowers Total number 330 Price for total plantings/flowers $1,325 e. Fertilization of lawn areas Price per application $300 Purchase Requisition Stevens Estate No. 145550 Tyler Munroe Landscape SHIP TO: Stevens Estate Contractors Inc REQUESTER: Deborah Wilson Fiorillo 100 Foster Street PROJECT: Undesignated North Andover MA 01845 REQUISITION TYPE: Purchase Order Contact Person: ORDER METHOD: Mail Phone: (978) 685-3545 Fax: (978) 989-0934 REQUISITION DATE: 4/17/2014 DATE REQUIRED: 4/17/2014 REFERENCE: BUYER: AWARD NUMBER:735 Line Qty Unit Part# Description Account Number Unit Price Extended Tax Freight 1 1350 EA Landscaping Services 6126064.1.0.1237.0000.2.545600.0000.0000.00.00 1.00 1,350.00 0.00 0.00 Internal Notes Sub -Total: 1,350.00 APPROVAL SIGNATURES: Freight: 0.00 Tax: 0.00 Total Amount: 1,350.00 NOTES: REQUESTOR'S COPY Thursday, April 17, 2014 Page 1 of 1 V, CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature 4 Date a o TYL.,Ei2 Ml/N,WZ LANZX3n4PZ TY4EP, Z. 1144,,A/R48�, 04IV72,WC� 1A10 -- Print Name & Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b)), I `% Y1.�2 Z. /1�I1�/i/� authorized signatory for �L�i2 MUl`/i20,� � NASCA,o,� gn rY (_'DA/�C2WA / Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. / 11A A A Si ture Town of North Andover IFB Landscaping Services — Stevens Estate Date Page 25 of 27 rA CERTIFICATE OF VOTE %YL,SR MaAl P,04 LAA At a duly authorized meeting the Board of Directors of the 11i1C, held on FF -,a Z cQD07 it was VOTED, THAT T314,, -- Z2, / ZIAI"Z f RZS1Z,,t=A/ 7 - (Name) (Name) (Officer) TyL.ER_ Mi ,41,4? .P4 L,9Ni3uCAP8_- of (gyp 77,-0 ? 1NC, be and hereby is authorized to execute contracts and bonds in TY1.�e 411,s QO,� Zr4�P� the name and on behalf of said 0,0V722ACM INC. , and affix its corporate seal hereto• -rW SR_ V4;WP_0Z 4 4�- and such execution of any contract or obligation in the name of Cp,U�pg,e fN01 on TYLER LAA� its behalf by such officer under seal of 0®Nm4C7x)...e /NC, , shall be valid and binding %YLoff,e 44MMoW,1_t' ,c.a�rz�sr,4 upon opg7pA07y e /Ao 7`YLr_,,-_ /VVMQ0_,'--- �a4PE I hereby certify that I am the clerk of the above named L%DN4c� IiVC, and that TyL_,t�2 a 11. LIAI,wi is the duly elected officer as above of said C_QQMM41.r7�,ee//VO. , and that the above vote has not been amended or rescinded and remains in full force and effect as the dat (Date) Town of North Andover IFB Landscaping Services — Stevens Estate Page 26 of 27 CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) 3/31/2014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. Astatement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER M P ROBERTS INS AGCY INC 1060 Osgood Street North Andover, MA 01845 IAN DL UUNTACT NAME: Sandi Munroe PHONE. , 978 683-8073 cA/c, No>: (978) 683-3147 AODREss:sandi@mprobertsinsurance.com INSURERS) AFFORDING COVERAGE NAIC# INSURER A: FOREMOST INSURANCE I INSURED TYLER MUNROE LANDSCAPE CONTRACTOR, INC. 100 FOSTER STREET NORTH ANDOVER, MA 01845 978-685-3545 X COMMERCIAL GENERAL LIABILITY INSURER B: MERCHANTS INSURANCE GROUP a 3 3 a 9 INSURER C: WESCO INSURANCE CO p) INSURER D: INSURER E INSURER F: %1%JVCr111VC0 GERIi IGAIENUMt3tzH: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. I TR TYPE OF INSURANCE IAN DL SUBR WVD POLICY NUMBER POLICY EFF_— (MM/DD/YYYY) POLICY UP (MM/DD/YYYY) LIMITS X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE CI OCCUR EACH OCCURRENCE $ 1,000,000 PREMISES (Ea occurrence) $ 300,000 MED EXP (Any oneperson) $ 10,000 SCP000659757 02/28/14 02/28/15 PERSONAL&ADV INJURY $ 1,000,000 A Y GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE . $ 2,000,000 JECT CI LOC F1 POLICY PRO PRODUCTS - COMP/OPAGG $ 2,000,000 $ OTHER: AUTOMOBILE LIABILITY $ 1,000,000 Ea accident ANYAUTO BODILY INJURY (Per person) $ ALLOWNED SCHEDULED MCA7014866 07/18/13 07/18/14 INJURY (Per accident) $ B AUTOS AUTOSBODILY Y NON -OWNED X HIRED AUTOS X AUTOS PROPERTY DAMAGE $ (Per accident) UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAR CLAIMS -MADE AGGREGATE $ DED RETENTION $ $ WORKERS COMPENSATION _ X AND EMPLOYERS' LIABILITY Y/N STATUTE ER E.L. EA CH ACCIDENT $ 500 / 000 C ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER N/A WWC3057558 05/04/13 05/04/14 EXCLUDED? (Mandatory in NH) E.L. DISEASE- EA EMPLOYEE $ 500,000 If yes, describe under E.L. DISEASE- POLICY LIMIT $ 500,000 DESCRIPTION OF OPERATIONS below DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101, Additional Remarks Schedule, maybeattachedif more space is required) TOWN OF NORTH ANDOVER IS NAMED ADDITIONAL INSURED EXCEPT FOR WORKERS COMPENSATION AS PER WRITTEN CONTRACT WITH THE INSURED CERTIFICATE HOLDER CANCELLATION ATION TOWN OF NORTH ANDOVER SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE ATTN: RAYMOND SANTILLI THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 120 MAIN STREET ACCORDANCE WITH THE POLICY PROVISIONS. NORTH ANDOVER MA 01845 AUTHORIZED REPRES T N 0*411r © 1988-2014 ACORD CORPORATION. All rights reserved. ACORD25 (2014/01) The ACORD name and logo are registered marks of ACORD