Contract #: 665 - From: 07-01-2013 To: 06-30-2014 - Marking Inc - Town of North Andover
s 11 TOWN OF NORTH ANDOVER CONTRACT CONTRACT # (40,5 DATE: This Contract is entered into on, or as of, this date by and between the Town of North Andover (the "Town"), and Contractor: Markings Inc Address: 30 Riverside Drive Pembroke, MA 02359 Telephone Number: 781-826-5171 Fax Number: 1. This is a Contract for the procurement of the following: Pavement markings for the period of July 1, 2013 through June 30, 2014 in accordance with the Invitation for Bids issued by the City of Haverhill on behalf of the member communities of the Merrimack Valley Planning Commission 2. The Contract price to be paid to the Contractor by the Town of North Andover is: Water based — 4" double yellow Water based — 4" single line Epoxy/Thermoplastic — 4" double yellow Epoxy/Thermoplastic —12" white line Epoxy/Thermoplastic — 4" single white Epoxy/Thermoplastic — 4" white fog Epoxy/Thermoplastic — 4" yellow centering Epoxy/Thermoplastic — cross walk & stop line Payment will be made as follows: $ 0.0680 per linear foot $ 0.0339 per linear foot $ 0.7000 per linear foot $ 1.3000 per linear foot $ 0.3500 per linear foot $ 0.3500 per linear foot $ 0.3500 per linear foot $ 1.3000 per linear foot Upon completion/acceptance of work and receipt of invoice, net 30 (Rev 5-2007) Contract by and between Town of North Andover and Markings Inc Page 1 Ir 4. Definitions: 4.1 Acceptance: All Contracts require proper acceptance of the described goods or services by the Town of North Andover. Proper acceptance shall be understood to include inspection of goods and certification of acceptable performance for services by authorized representatives of the Town to insure that the goods or services are complete and are as specified in the Contract. 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both. 5. Term of Contract and Time for Performance: This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before June 30, 2014, unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation: Notwithstanding anything in the Contract documents to the contrary, any and all payments which the Town is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be immediately terminated without liability for damages, penalties or other charges. (Rev 5-2007) Contract by and between Town of North Andover and Markings Inc Page 2 7. Permits and Approvals: Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. 8. Termination and Default: 8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days notice when in the best interests of the Town by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. Upon termination without cause, Contractor will be paid for services rendered to the date of termination. 8.2 For Cause. If the Contractor is determined by the Town to be in default of any term or condition of this Contract, the Town may terminate this Contract on seven (7) days notice by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. 8.3 Default. The following shall constitute events of a default under the Contract: 1) any material misrepresentation made by the Contractor to the Town; 2) any failure to perform any of its obligations under this Contract including, but not limited to the following: (i) failure to commence performance of this Contract at the time specified in this Contract due to a reason or circumstance within the Contractor's reasonable control, (ii) failure to perform this Contract with sufficient personnel and equipment or with sufficient material to ensure the completion of this Contract within the specified time due to a reason or circumstance within the Contractor's reasonable control, (iii) failure to perform this Contract in a manner reasonably satisfactory to the Town, (iv) failure to promptly re -perform within a reasonable time the services that were rejected by the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a material term of this Contract, including, but not limited to, the provision of insurance and non-discrimination, (vii) any other acts specifically and expressly stated in this Contract as constituting a basis for termination of this Contact, and (viii) failure to comply with any and all requirements of state law and/or regulations, and Town bylaw and/or regulations. 9. The Contractor's Breach and the Town's Remedies: Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be deemed a material breach of this Contract, and the Town of North Andover shall have all the rights and remedies provided in the Contract documents, the right to cancel, terminate, or suspend the Contract in whole or in part, the right to maintain any and all actions at law or in (Rev 5-2007) Contract by and between Town of North Andover and Markings Inc Page 3 equity or other proceedings with respect to a breach of this Contract, including damages and specific performance, and the right to select among the remedies available to it by all of the above. From any sums due to the Contractor for services, the Town may keep the whole or any part of the amount for expenses, losses and damages incurred by the Town as a consequence of procuring services as a result of any failure, omission or mistake of the Contractor in providing services as provided in this Contract. 10. Statutory Compliance: 10.1 This Contract will be construed and governed by the provisions of applicable federal, state and local laws and regulations; and wherever any provision of the Contract or Contract documents shall conflict with any provision or requirement of federal, state or local law or regulation, then the provisions of law and regulation shall control. Where applicable to the Contract, the provisions of the General Laws are incorporated by reference into this Contract, including, but not limited to, the following: General Laws Chapter 30B — Procurement of Goods and Services. General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts. General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts. 10.2 Wherever applicable law mandates the inclusion of any term and provision into a municipal contract, this Section shall be understood to import such term or provision into this Contract. To whatever extent any provision of this Contract shall be inconsistent with any law or regulation limiting the power or liability of cities and towns, such law or regulation shall control. 10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on the performance of the Contract. If the Contractor performs the Contract in violation of any applicable law or regulation, the Contractor shall bear all costs arising therefrom. 10.4 The Contractor shall keep itself fully informed of all existing and future State and National Laws and Municipal By-laws and Regulations and of all orders and decrees of any bodies or tribunals having jurisdiction in any manner affecting those engaged or employed in the work, of the materials used in the work or in any way affecting the conduct of the work. If any discrepancy or inconsistency is discovered in the Drawings, Specifications or Contract for this work in violation of any such law, by-law, regulation, order or decree, it shall forthwith report the same in writing to the Town. It shall, at all times, itself observe and comply with all such existing and future laws, by-laws, regulations, orders and decrees; and shall protect and indemnify the Town of North Andover, and its duly appointed agents against any claim or liability arising from or based on any violation whether by him or its agents, employees or subcontractors of any such law, by-law, regulation or decree. (Rev 5-2007) Contract by and between Town of North Andover and Markings Inc Page 4 11. Conflict of Interest: Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which shall constitute a violation of that law. The Contractor shall be deemed to have investigated the application of M.G.L. c. 268A to the performance of this Contract; and by executing the Contract documents the Contractor certifies to the Town that neither it nor its agents, employees, or subcontractors are thereby in violation of General Laws Chapter 268A. 12. Certification of Tax Compliance This Contract must include a certification of tax compliance by the Contractor, as required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors Providing Goods, Services, or Real Estate Space to the Commonwealth or Subdivision). 13. Discrimination The Contractor will carry out the obligations of this Contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151B (Law Against Discrimination) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. 14. Assi�mme : Assignment of this Contract is prohibited, unless and only to the extent that assignment is provided for expressly in the Contract documents. 15. Condition of Enforceability Against the Town: This Contract is only binding upon, and enforceable against, the Town if: (1) the Contract is signed by the Town Manager or its designee; and (2) endorsed with approval by the Town Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the Town Counsel as to form. 16. Corporate Contractor: If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's Certificate certifying the corporate capacity and authority of the party signing this Contract for the corporation. Such certificate shall be accompanied by a letter or other instrument stating that such authority continues in full force and effect as of the date the Contract is executed by the Contractor. This Contract shall not be enforceable against the Town of North Andover unless and until the Contractor complies with this section. The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto, relating to the appointment of the Commissioner of Corporations as its attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its (Rev 5-2007) Contract by and between Town of North Andover and Markings Inc Page 5 Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the Commonwealth. 17. Liability of Public Officials: To the full extent permitted by law, no official, employee, agent or representative of the Town of North Andover shall be individually or personally liable on any obligation of the Town under this Contract. 18. Indemnification: The Contractor shall indemnify, defend and save harmless the Town, the Town's officers, agents and employees, from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by the Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective, or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this contract. 19. Workers Compensation Insurance: The Contractor shall provide by insurance for the payment of compensation and the furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's Compensation Act) to all employees of the Contractor who are subject to the provisions of Chapter 152 of the General Laws of Massachusetts. Failure to provide and continue in force such insurance during the period of this Contract shall be deemed a material breach of this Contract, shall operate as an immediate termination thereof, and Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article. The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this Contract before the same shall be binding on the parties thereto, except if specifically waived by the Town. 20. Documents, Materials, Etc. Any materials, reports, information, data, etc. given to or prepared or assembled by the Contractor under this Contract are to be kept confidential and shall not be made available to any individual or organization by the Contractor (except agents, servants, or employees of the (Rev 5-2007) Contract by and between Town of North Andover and Markings Inc Page 6 Contractor) without the prior written approval of the Town, except as otherwise required by law. The Contractor shall comply with the provisions Chapter 66A of the General Laws of Massachusetts as it relates to public documents, and all other state and federal laws and regulations relating to confidentiality, security, privacy and use of confidential data. Any materials produced in whole or in part under this Contract shall not be subject to copyright, except by the Town, in the United States or any other country. The Town shall have unrestricted authority to, without payment of any royalty, commission, or additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole or in part, any reports, data or other materials prepared under this Contract. All data, reports, programs, software, equipment, furnishings, and any other documentation or product paid for by the Town shall vest in the Town at the termination of this Contract. The Contractor shall at all times, during or after termination of this Contract, obtain the prior written approval of the Town before making any statement bearing on the work performed or data collected under this Contract to the press or issues any material for publication through any medium. 21. Audit, Inspection and Recordkeeping At any time during normal business hours, and as often as the Town may deem it reasonably necessary, there shall be available in the office of the Contractor for the purpose of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. 22. Payment The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work completed and acceptance from the Town of the work completed. 23. Waiver and Amendment Amendments, or waivers of any additional term, condition, covenant, duty or obligation contained in this Contract may be made only by written amendment executed by all signatories to the original Agreement, prior to the effective date of the amendment. To the extent allowed by law, any conditions, duties, and obligations contained in this Contract may be waived only by written Agreement by both parties. Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver, nor in any manner limit the legal or equitable remedies available to that party. No waiver by either party of any default or breach shall constitute a waiver of any subsequent default or breach of a similar or different matter. (Rev 5-2007) Contract by and between Town of North Andover and Markings Inc Page 7 24. Forum and Choice of Law This Contract and any performance herein shall be governed by and be construed in accordance with the laws of the Commonwealth. Any and all proceedings or actions relating to subject matter herein shall be brought and maintained in the courts of the Commonwealth or the federal district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any other legal rights of the parties. 25. Notices Any notice permitted or required under the provisions of this Contract to be given or served by either of the parties hereto upon the other party hereto shall be in writing and signed in the name or on the behalf of the party giving or serving the same. Notice shall be deemed to have been received at the time of actual service or three (3) business days after the date of a certified or registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to the Town of North Andover by being sent to the Town Manager, Town Hall, 120 Main Street, North Andover, Massachusetts 01845. 26. Binding on Successors: This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in interest (and where not corporate, the heirs and estate of the Contractor). 27. Complete Contract: This instrument, together with its endorsed supplements, and the other components of the contract documents, constitutes the entire contract between the parties, with no agreements other than those incorporated herein. 28. Supplemental Conditions: The foregoing provisions apply to all contracts to which the Town of North Andover shall be a party. One of the following "Supplements" must be "checked" as applicable to this Contract, shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The Supplement contains additional terms governing the Contract: [ ] GOODS SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods (governed by the provisions of General Laws Chapter 30B) [ ] SERVICES SUPPLEMENT "S" - Applicable to Contracts for the procurement of Services (governed by the provisions of General Laws Chapter 30B) (Rev 5-2007) Contract by and between Town of North Andover and Markings Inc Page 8 [ X ] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for Construction IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set forth their hands the day and year first above written. THE TOWN Town Manager Date APPROVED AS TO FORM: *1/rte kQ� M 14,-.6 11 Town Counsel Date THE CONTRACTOR Company Nam � u3 Sign/atui Dat MONIl 06 A. SovZq Print Name & Title L CERTIFICATION AS TO AVAILABILITY OF FUNDS: Town XcWunfant Date (Rev 5-2007) Contract by and between Town of North Andover and Markings Inc Page 9 SUPPLEMENT "C" [] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for the construction of: (1) Public Buildings and Public Works (governed by the provisions of General Laws Chapter 30B); (2) Public Buildings (governed by the provisions of General Laws Chapter 149,§ 44A, et seq.); and (3) Public Works (governed by the provisions of General Laws Chapter 30, §39M, et seq) 1. This form supplements the Town of North Andover "Contract and General Conditions" and applies only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works or public buildings. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be understood to be a term and condition of this Contract. The Contractor agrees to secure such bond (where required) in the form required by the Town and provide an original thereof to the Town prior to the commencement of performance. E uali : 3.1. In the case of a closed Specification written for a specific item or items to be furnished under the Base Bid, such specifications shall, as applicable, be in compliance with the Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq. 3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or on the Drawings, except as above noted, the intent is to establish a standard and in no way should be construed to exclude any item or manufacturer not mentioned by name, but whose product meets the Specifications as to design, utility and quality. Final decision shall rest with the Project Representative as to its acceptability. 4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of Chapter 30B. 5. The Contractor will carry out the obligations of this contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. The Contractor will at all times comply with the wage rates as determined by the Commissioner of the Department of Labor and Industries, under the provisions of General Laws Chapter 1.49, Sections 26 and 27D (Prevailing Wage), as shall be in force and as amended. The Contractor shall continuously maintain adequate protection of all work from damage and shall protect the property of the Town and others, including adjacent property, from injury or loss arising (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 1 and Markings Inc in connection with the Contract. The Contractor shall make good any such damage, injury or loss, except as may be directly due to errors in the Contract Documents or caused by agents or employees of the Town, or due to causes beyond the Contractor's control and not the Contractor's fault or negligence. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents or injury to persons on, about or adjacent to the premises where the work is being performed. The Contractor will erect and properly maintain at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and the public, shall post danger signs warning against the hazards created by such features of construction such as pits, protruding nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling materials; and shall designate a responsible member of its organization on the work, whose duty shall be the prevention of accidents. The Town shall at all times have access to the work wherever it is in preparation or progress and the Contractor shall provide suitable accommodations for such access. 9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants, all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the construction superintendent, foreman, or assistants are unacceptable to the Town, then upon seven days notice from the Town, the Contractor shall replace such person or persons with people acceptable to the Town. 10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The Contractor shall carefully study and compare the drawings, specifications and other instructions and shall at once report to the Town any error, inconsistency or omission which shall be discovered. Included in this responsibility shall be supervision of all work performed by subcontractors on the work. 11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any of its provisions, the Town, upon three days written notice, may, without prejudice to any other remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor. 12. Inspection by the Town's Project Representative 12.1. The Town shall have the right to designate a Project Representative who may make periodic visits to the site to familiarize the Town generally with the progress and quality of the work, and to determine in general if the work is proceeding in accordance with the Contract Documents. The Project Representative will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the work, and will not be responsible for the Contractor's failure to carry out the construction work in accordance with the Contract Documents. During such visits and on the basis of these observations while at the site, the Project Representative will keep the Town informed on the progress of the work, will endeavor to guard the Town against defects and deficiencies in the work of contractors, and may condemn structural work as failing to conform to the Contract Documents. The Project Representative shall have authority to act on behalf of the Town only to the extent expressly delegated by the Town, which shall be shown to the Contractor, and shall have authority to stop the work whenever such stoppage may reasonably be necessary to insure the proper execution of the Contract. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 2 and Markings Inc 12.2. In connection with the work, the Project Representative shall not be responsible for construction methods, means, techniques, sequences or procedures employed by the Contractor or the Contractor's safety programs, requirements, regulations, or precautions. 13. Decisions of the Project Representative 13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of the Town or the Contractor and on all other matters relating to the execution and progress of the structural work or the interpretation of the Contract Documents. 13.2. The Project Representative's decision, in matters relating to the project, shall be final, if within the terms of the Contract Documents. 13.3. If, however, the Project Representative fails to render a decision within ten days after the parties have presented their evidence, either party may then avail itself of the remedies provided in this contract or available to it by law. If the Project Representative renders a decision after such remedies have commenced, such decision may be entered as evidence but shall not disturb or interrupt such proceedings except where such decision is acceptable to the parties concerned. 1.4.1 Use of Premises by the Contractor: 14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of its workmen to limits indicated by law, by-laws, permits or directions of the Town and shall not unreasonably encumber the premises with its materials. 14.2. The Contractor shall not load or permit any part of the structure to be loaded with a weight that will endanger its safety. 15. Maintenance of Premises: The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its employees or work, and at the completion of the work it shall remove all its rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute, the Town may remove the rubbish and charge the cost to the several contractors, as the Town shall determine to be just. 16. Right to Terminate If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently disregard laws and regulations or lawful directives of the Town, or (7) be guilty of a substantial violation of any provision of the Contract, then the Town may, without prejudice to any other right or remedy and after giving the Contractor (or any surety) seven days written notice, terminate the contract and the employment of the Contractor and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method it deems appropriate. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 3 and Markings Inc In such cases, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid amount owed to the Contractor for work already completed shall exceed the expense of finishing the work, including compensation for additional architectural, managerial, legal and administrative services, such excess shall be paid to the Contractor. If such expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the Town. The Contractor shall not be relieved of liability to the Town by virtue of any termination of this contract, and any claim for damages against the Contractor relating to the Contractor's performance under this contract shall survive any termination hereunder. Notwithstanding any other provision of this Agreement, the Town reserves the right at any time in its absolute discretion to suspend or terminate this Agreement in whole or in part for its convenience upon seven days written notice to the Contractor. The Town shall incur no liability by reason of such termination except for the obligation to pay compensation for all work performed by the Contractor and accepted by the Town to the termination date. 17. Progress ss Payments: 17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported to the extent required by the Town by invoices or other vouchers, showing payments for materials and labor, payments to Subcontractors and such other evidence of the Contractor's right to payment. 17.2. The Contractor shall, before the first application, submit to the Town a schedule of values of the various parts of the work, including quantities aggregating the total sum of the Contract, divided so as to facilitate payments to Subcontractors, made out in such form as the Town and the Contractor may agree upon, and, if required, supported by such evidence as to its correctness. This schedule, when approved by the Town, shall be used as a basis for payment, unless it is found to be in error. If applying for payments, the Contractor shall submit a statement based upon this schedule. 18. Withholding of Payments 18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the whole or part of any payment to such extent as may be necessary in its reasonable opinion to protect the Town of North Andover from loss on account of - 18.1.1. £ 18.1.1. Defective work not remedied. 18.1.2. Claims filed or reasonable evidence indicating probable filing of claims. 1.8.1.3. Failure of the Contractor to make payments properly to Subcontractors or for material or labor. 18.1.4. A reasonable doubt that the Contract can be completed for the balance then unpaid. 18.1.5. Damage to another contractor. 18.1.6. Delays resulting in liquidated damages. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 4 and Markings Inc 18.2. Withholding of payments shall be in strict compliance with statutory requirements. 19. Claims by Contractor and Liability of Town All claims by the Contractor against the Town shall, unless otherwise provided by law, be initiated by a written claim submitted to the Town no later than seven (7) calendar days after the event or the first appearance of the circumstances causing the claim. The claim shall set forth in detail all known facts and circumstances supporting the claim. The Contractor shall continue its performance under this contract regardless of the submission or existence of any claims. The limit of liability of the Town under this Agreement is limited to the compensation provided herein for work actually performed, and shall in no event include liability for delays or for incidental, special or consequential damages or lost profits or for damages or loss from causes beyond the Town's reasonable control. 20. Liquidated Damages: Because both parties recognize (1) that the time for completion of this Contract is of the essence, (2) that the Town will suffer loss if the work is not completed within the contract time specified, plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the delays, expense and difficulties involved in a legal proceeding to determine the actual loss suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay the Town as liquidated damages representing an estimate of delay damages, not as a penalty, the sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is completed, whether the work is completed by the Contractor or some other person. The Town's right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a legal action for damages in lieu of or in addition to its option to impose liquidated damages. The Town may deduct any liquidated damages from money due the Contractor, and if such payment is insufficient to cover the liquidated damages, then the Contractor shall pay the amount due. 21. The Contractors' Mutual Responsibility: Should the Contractor cause damage to any separate subcontractor on the work, the Contractor agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies provided by law or by the provisions of the contract. If such separate contractor sues the Town on account of any damage alleged to have been sustained, the Town shall notify the Contractor, who shall defend such proceedings at the Town's expense and, if any judgment against the Town arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Town. 22. Separate Contracts: 22.1. The Town reserves the right to let other Contracts in connection with this work under similar General Conditions. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate its work with theirs. 22.2. If any part of the Contractor's work depends, for proper execution or results, upon the work of any other contractor, the Contractor shall inspect and promptly report to the Town any defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 5 and Markings Inc of the other contractor's work as fit and proper for the reception of its work except as to defects which may develop in the other contractor's work after the execution of its work. 22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work already in place and shall at once report to the Town any discrepancy between the executed work and the Drawings. 23. Subcontracts: 23.1. All Subcontracts shall be awarded in conformity with the requirements of the General Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive. 23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and omissions of its Subcontractors and of persons either directly or indirectly employed by them, as it is for the acts and omissions of persons directly employed by it. 23.3. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the Town. 24. Contractor -Subcontractor Relations: The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound by the terms of the Agreement, the General Conditions of the Contract, the Supplementary General Conditions, the Drawings and Specifications, as far as applicable to its work, including the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A, et seq. 25. Indemnification: 25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents and employees from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) brought or recovered against them that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this Contract. 25.2. In any and all claims against the Town or any of their agents or employees by any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under this paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 6 and Markings Inc any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other employee benefit acts. 25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and minimum limits of liability acceptable under the Contract. However, it shall be the Contractor's responsibility to purchase and maintain insurance of such character and in such amounts as will adequately protect it and the Town from and against all claims, damages, losses and expenses resulting from exposure to any casualty liability in the performance of the Work. 26. The Contractor's Insurance: 26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable. 26.1.1. Claims under Worker's Compensation, disability benefit and other similar employee benefit acts; 26.1.2. Claims for damages because of bodily injury, occupational sickness or disease, or death of its employees, and claims insured by usual personal injury liability coverage; 26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of any person other than its employees, and claims insured by usual personal liability coverage; 26.1.4. Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 26.2. The insurance required by the above shall be written for not less than the following minimum limits of liability: 26.2.1. Worker's Compensation Insurance Requirements Workers' Compensation coverage as required by the laws of the Commonwealth of Massachusetts. 26.2.2. Liability Insurance Requirements Liability insurance shall include all major divisions and shall be on a comprehensive general basis including Premises and Operations, Owners and Contractor's Protective, Products and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles. All such insurance shall be written for not less than any limits of liability required by law, unless otherwise provided in the contract documents, or the following limits, whichever are greater: (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 7 and Markings Inc 27 Comprehensive General Liability Insurance (Broad Form) Bodily Injury $1,000,000 per person $3,000,000 per occurrence Property Damage $1,000,000 per occurrence $3,000,000 annual aggregate Automobile Liability Insurance $500,000 per person $1,000,000 per occurrence 26.3. The above insurance policies shall also be subject to the following requirements: 26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as hereinafter specified under Paragraph entitled "Protective Liability Insurance" shall be written by one and the same insurance company to avoid the expense of duplicate and/or overlapping coverage and to facilitate and expedite the settlement of claims. 26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed with the Town prior to commencement of the work. Renewal certificates shall be addressed to and filed with the Town at least ten (10) days prior to the expiration date of required policies. 26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30) days prior written notice forwarded by registered or certified mail to the Town. The Town shall also be notified of the attachment of any restrictive amendments to the policies. 26.3.4. All Certificates of Insurance shall be on the "MITA" or "ACORD" Certificate of Insurance form, shall contain true transcripts from the policies, authenticated by the proper officer of the Insurer, evidencing in particular those insured, the extent of coverage, the location and operations to which the insurance applies, the expiration date and the above-mentioned notice clauses. 26.3.5. All premium costs shall be included in the Contractor's bid. 26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be maintained without interruption from date of the Contract until date of final payment and termination of any coverage required to be maintained after payment. Protective Liability Insurance: 27.1. The Contractor shall purchase and maintain such insurance as described in the preceding paragraph as will protect the Town from claims which may arise from operations under the Contract, including operations performed for the named insureds by independent contractors and general inspection thereof by the named insureds. 27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town against Automobile Non -Ownership Liability in connection with the Contractor's (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 8 and Markings Inc operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. 27.3. The limits of liability for coverage required under the preceding paragraphs shall be as specified under the provisions hereof governing the Contractor's General Liability Policy. 27.4. The Town shall be named as an additional insured on the above referenced liability Policies, and the Contractor's insurance shall be the primary coverage. The cost of such insurance, including required endorsements and amendments, shall be the sole responsibility of the Contractor. 28. Liens: Neither the Final Payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as it has knowledge or information, the releases and receipts include all the labor and material for which a lien could be filed. The Contractor shall comply with all statutory provisions of the General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149 as amended (as a minimum requirement). 29. Guarantees: 29.1 The Contractor guarantees and warrants to the Town that all labor furnished under this Contract will be competent to perform the tasks undertaken, that the product of such labor will yield only first-class results, that materials and equipment furnished will be of good quality and new unless otherwise permitted by this Contract, and that the Work will be of good quality, free from faults and defects and in strict conformance with this Contract. All Work not conforming to these requirements may be considered defective. 29.2. If at any time any part of the work constructed under the terms of this contract shall in the opinion of the Town Manager require repairing due to defective work or materials furnished by the Contractor, he may notify the Contractor in writing to make the required repairs. If the Contractor shall neglect to start such repairs within ten days of the date of giving it notice thereof and to complete the same to the satisfaction of the Town Manager with reasonable dispatch, then the latter may employ other persons to make such repairs. The Town shall charge the expense thereof to the Contractor and may use any moneys still retained to pay for the same, and if such sum is insufficient, the Contractor shall be obligated to pay the balance thereof. 29.3. All guarantees and warranties required in the various Sections of the Specifications which originate with a Subcontractor or Manufacturer must be delivered to the Town before final payment to the Contractor may be made for the amount of that subtrade or for the phase of work to which the guarantee or warranty relates. The failure to deliver a required guarantee or warranty shall be held to constitute a failure of the Subcontractor to fully complete his work in accordance with the Contract Documents. The Contractor's obligation to correct work is in addition to, and not in substitution of, such guarantees or warranties as may be required in the various Sections of the Specifications. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 9 and Markings Inc This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals hereto: Dated: The Town of North Andover by: Town Manager e Departm t/ ivision Head U,j �Q, owncountant Certifie as to Appropriation Zo � Town Coun Approved as to Form The Contractor by: Authorized Si ature (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 10 and Markings Inc THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor S—tary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govnnor Director Awarding Authority: City of Haverhill Contract Number: MVPC001.13 City/Town: NORTH ANDOVER Description of Work: The Merrimack Valley Planning Commission is seeking bids for Highway Service Works to include Catch Basin Cleaning, Random Crack Sealing and Pavement Markings Job Location: Various Locations Information about Prevailing Wage Schedules for Awarding Authorities and Contractors • This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage Request Number" on all pages of this schedule. • Awarding authorities must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. • The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. Once a contractor has been selected by the awarding authority, the wage schedule shall be made a part of the contract for that project. The wage schedule must be posted in a conspicuous place at the work site during the life of the project in accordance with M.G.L. c. 149, § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project regardless of whether they are employed by the prime contractor, a filed sub -bidder, or any sub -contractor. • All apprentices must be registered with the Massachusetts Division of Apprenticeship Training (DAT) in order to be paid at the lower apprentice rates. All apprentices must keep his/her apprentice identification card on his/her person during all work hours. If a worker is not registered with DAT, he/she must be paid the "total rate" listed on the wage schedule regardless of experience or skills. • The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F "rental of equipment" contracts. • Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports directly to the awarding authority and keep them on file for three years. Each weekly payroll report must contain: the employee's name, address, occupational classification, howl worked, and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/pw. • Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617) 626-6953. • Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor Division of the office of the Attorney General at (617) 727-3465. • Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties. Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Construction (2 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.45 $8.91 $8.00 $0.00 $47.36 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B (3 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.52 $8.91 $8.00 $0.00 $47.43 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.64 $9.07 $8.00 $0.00 $47.71 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B ADS/SUBMERSIBLE PILOT 08/01/2012 $82.32 $9.80 $17.67 $0.00 $109.79 PILE DRIVER LOCAL 56 (ZONE I) 08/01/2013 $85.47 $9.80 $17.67 $0.00 $112.94 08/01/2014 $88.62 $9.80 $17.67 $0.00 $116.09 08/01/2015 $91.77 $9.80 $17.67 $0.00 $119.24 AIR TRACK OPERATOR 12/01/2012 $30.35 $7.10 $11.55 $0.00 $49.00 LABORERS - ZONE 2 06/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 12/01/2013 $31.35 $7.10 $11.55 $0.00 $50.00 06/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 12/01/2014 $32.35 $7.10 $11.55 $0.00 $51.00 06/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 12/01/2015 $33.35 $7.10 $11.55 $0.00 $52.00 06/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 12/01/2016 $34.60 $7.10 $11.55 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 12/01/2012 $29.08 $10.40 $5.95 $0.00 $45.43 ASBESTOS WORKERS LOCAL 6 (BOSTON) 06/01/2013 $29.88 $10.40 $5.95 $0.00 $46.23 12/01/2013 $30.68 $10.40 $5.95 $0.00 $47.03 06/01/2014 $31.58 $10.40 $5.95 $0.00 $47.93 12/01/2014 $32.48 $10.40 $5.95 $0.00 $48.83 06/01/2015 $33.43 $10.40 $5.95 $0.00 $49.78 12/01/2015 $34.38 $10.40 $5.95 $0.00 $50.73 ASPHALT RAKER 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS - ZONE 2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPE_RA77NG ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 2 of 41. Classification Effective Date Base Wage Health Pension Supplemental Total Rate 06/01/2013 $30.35 $7.10 $11.55 Unemployment $49.00 BACKHOE/FRONT-END LOADER 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BARCO-TYPE JUMPING TAMPER LABORERS -7ONE2 For apprentice rates see "Apprentice- LABORER" BLOCK PAVER, RAMMER / CURB SETTER Irl BORERS - 7ONE 2 For apprentice rates see "Apprentice- LABORER" BOILER MAKER BOILERMAKERSLOCAL 29 Apprentice- BOILERMAKER -Local 29 Effective Date - 01/01/2010 Step percent 1 65 2 65 3 70 4 75 5 80 6 85 7 90 8 95 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 1.2/01/2012 $30.35 $7.10 $11.55 $0.00 $49.00 06/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 1.2/01/2013 $31.35 $7.10 $11.55 $0.00 $50.00 06/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 12/01/2014 $32.35 $7.10 $11.55 $0.00 $51.00 06/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 12/01/2015 $33.35 $7.10 $11.55 $0.00 $52.00 06/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 12/01/2016 $34.60 $7.10 $11.55 $0.00 $53.25 01/01/2010 $37.70 $6.97 $11.18 $0.00 $55.85 Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate $24.51 $6.97 $11.18 $0.00 $42.66 $24.51 $6.97 $1.1.18 $0.00 $42.66 $26.39 $6.97 $11.18 $0.00 $44.54 $28.28 $6.97 $11.18 $0.00 $46.43 $30.16 $6.97 $11.18 $0.00 $48.31 $32.05 $6.97 $11.18 $0.00 $50.20 $33.93 $6.97 $11.18 $0.00 $52.08 $35.82 $6.97 $11.18 $0.00 $53.97 - - - ___. -.._ - - ___. - - - ___. - - - -- _.__ - ,_......__ - _. ____ - - .__., --, (Notes: I I Apprentice to Journepvorker Ratio:1:5 _ ------------------ ------------------------ - - -------------------------------------------------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 3 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $28.45 $10.18 $17.83 $0.00 $56.46 Unemployment $33.19 BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 02/01/2013 $47.41 $10.18 $17.83 $0.00 $75.42 WATERPROOFING) 08/01/2013 $48.31 $10.18 $17.90 $0.00 $76.39 BRICKLAYERS LOCAL 3 (LYNN) $70.68 -----_---_.___.-_..._....-.___-- (Notes: $37.20 $7.10 _.._-_._..-- _-----, $56.90 02/01/2014 $48.87 $10.18 $17.90 $0.00 $76.95 06/01/2016 08/01/2014 $49.77 $10.18 $17.97 $0.00 $77.92 $39.70 02/01/2015 $50.33 $10.18 $17.97 $0.00 $78.48 08/01/2015 $51.23 $10.18 $18.04 $0.00 $79.45 02/01/2016 $51.80 $10.18 $18.04 $0.00 $80.02 08/01/2016 $52.70 $10.18 $18.12 $0.00 $81.00 02/01/2017 $53.27 $10.18 $18.12 $0.00 $81.57 Apprentice- BRICKIPLASTERICEMENT MASON -Local 3 Lynn Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.71 $10.18 $17.83 $0.00 $51.72 2 60 $28.45 $10.18 $17.83 $0.00 $56.46 3 70 $33.19 $10.18 $17.83 $0.00 $61.20 4 80 $37.93 $10.18 $17.83 $0.00 $65.94 5 90 $42.67 $10.18 $17.83 $0.00 $70.68 Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.16 $10.18 $17.90 $0.00 $52.24 2 60 $28.99 $10.18 $17.90 $0.00 $57.07 3 70 $33.82 $10.18 $17.90 $0.00 $61.90 4 80 $38.65 $10.18 $17.90 $0.00 $66.73 5 90 $43.48 $10.18 $17.90 $0.00 $71.56 -----_---_.___.-_..._....-.___-- (Notes: $37.20 $7.10 _.._-_._..-- _-----, $56.90 �._ - ..r _.....------____----_....---._..- Apprentice to Journeyworker Ratio:1:5 $37.95 $7.10 $12.60 $0.00 - BULLDOZER/GRADER/SCRAPER OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" CAISSON & UNDERPINNING BOTTOM MAN LABORERS - EOUNDA770NAND MARINE For apprentice rates see "Apprentice- LABORER" 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 12/01/2012 $33.45 $7.10 $12.60 $0.00 $53.15 06/01/2013 $34.20 $7.10 $12.60 $0.00 $53.90 12/01/2013 $34.95 $7.10 $12.60 $0.00 $54.65 06/01/2014 $35.70 $7.10 $12.60 $0.00 $55.40 12/01/2014 $36.45 $7.10 $12.60 $0.00 $56.15 06/01/2015 $37.20 $7.10 $12.60 $0.00 $56.90 12/01/2015 $37.95 $7.10 $12.60 $0.00 $57.65 06/01/2016 $38.70 $7.10 $12.60 $0.00 $58.40 12/01/2016 $39.70 $7.1.0 $12.60 $0.00 $59.40 ---------------------------------------------------------------------------------- ------ ------------ ----------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 4 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 06/01/2013 $33.05 $7.10 $12.60 Unemployment $52.75 CAISSON & UNDERPINNING LABORER 12/01/2012 $32.30 $7.10 $12.60 $0.00 $52.00 LABORERS - FOUNDATIONAND MARINE $34.55 $7.10 $12.60 $0.00 $54.25 06/01/2013 $33.05 $7.10 $12.60 $0.00 $52.75 12/01/2013 $33.80 $7.10 $1.2.60 $0.00 $53.50 06/01/2014 $34.55 $7.10 $12.60 $0.00 $54.25 12/01/2014 $35.30 $7.10 $12.60 $0.00 $55.00 06/01/2015 $36.05 $7.10 $12.60 $0.00 $55.75 12/01/2015 $36.80 $7.10 $12.60 $0.00 $56.50 06/01/2016 $37.55 $7.10 $12.60 $0.00 $57.25 12/01/2016 $38.55 $7.10 $12.60 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" CAISSON & UNDERPINNING TOP MAN LABORERS - FOUNDATIONAND MARINE For apprentice rates see "Apprentice- LABORER" 12/01/2012 $32.30 $7.10 $1.2.60 $0.00 $52.00 06/01/2013 $33.05 $7.10 $12.60 $0.00 $52.75 12/01/2013 $33.80 $7.10 $12.60 $0.00 $53.50 06/01/2014 $34.55 $7.10 $12.60 $0.00 $54.25 12/01/2014 $35.30 $7.10 $12.60 $0.00 $55.00 06/01/2015 $36.05 $7.10 $12.60 $0.00 $55.75 12/01/2015 $36.80 $7.10 $12.60 $0.00 $56.50 06/01/2016 $37.55 $7.10 $12.60 $0.00 $57.25 12/01/2016 $38.55 $7.10 $12.60 $0.00 $58.25 CARBIDE CORE DRILL OPERATOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS-7_ONE2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 1.2/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $1.1.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" CARPENTER 09/01/2012 $33.48 $9.80 $15.61 $0.00 $58.89 CARPENTERS -7.0NE 2 (Eastern Massachusens) 03/01/2013 $33.92 $9.80 $15.61 $0.00 $59.33 09/01/2013 $34.53 $9.80 $15.61 $0.00 $59.94 03/01/2014 $35.1.3 $9.80 $15.61 $0.00 $60.54 09/01/2014 $35.90 $9.80 $15.61 $0.00 $61.31 03/01/2015 $36.67 $9.80 $15.61 $0.00 $62.08 --------- -- ---- - -------------------- ---------------------------------------------------------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 5 of 41. Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - CARPENTER - Zone 2 Eastern MA Effective Date - 09/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.74 $9.80 $1.57 $0.00 $28.11 2 60 $20.09 $9.80 $1.57 $0.00 $31.46 3 70 $23.44 $9.80 $1.0.90 $0.00 $44.14 4 75 $25.11 $9.80 $10.90 $0.00 $45.81 5 80 $26.78 $9.80 $12.47 $0.00 $49.05 6 80 $26.78 $9.80 $12.47 $0.00 $49.05 7 90 $30.1.3 $9.80 $14.04 $0.00 $53.97 8 90 $30.13 $9.80 $14.04 $0.00 $53.97 Effective Date- 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.96 $9.80 $1.57 $0.00 $28.33 2 60 $20.35 $9.80 $1.57 $0.00 $31.72 3 70 $23.74 $9.80 $10.90 $0.00 $44.44 4 75 $25.44 $9.80 $10.90 $0.00 $46.14 5 80 $27.14 $9.80 $12.47 $0.00 $49.41 6 80 $27.14 $9.80 $12.47 $0.00 $49.41 7 90 $30.53 $9.80 $1.4.04 $0.00 $54.37 8 90 $30.53 $9.80 $14.04 $0.00 $54.37 ------_..--_....-...-._......_...-----------.e._...,...._._, (Notes: I - - - - - - - - - Apprentice to Journeyworker Ratio: 1:5 - - - - - - - - - - - - - - - - - - - CEMENT MASONRY/PLASTERING 02/01/2013 $42.87 $10.50 $18.61 $1.30 $73.28 BRICKLAYERS LOCAL 3(LYNN) 08/01/2013 $43.62 $10.50 $18.61 $1.30 $74.03 02/01/2014 $44.05 $10.50 $18.61 $1.30 $74.46 08/01/2014 $44.80 $10.50 $18.61 $1.30 $75.21 02/01/2015 $45.23 $10.50 $18.61 $1.30 $75.64 08/01/2015 $45.98 $10.50 $18.61 $1.30 $76.39 02/01/2016 $46.43 $10.50 $18.61 $1.30 $76.84 08/01/2016 $47.18 $10.50 $18.61 $1.30 $77.59 02/01/2017 $47.63 $10.50 $18.61 $1.30 $78.04 ..............--------- - ---- --------------------------------------------------------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 6 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $130 $45.72 2 60 $26.17 Unemplovment Apprentice- CEMENT MASONRY/PLASTERING -Eastern Mass $51.58 3 65 $28.35 $10.50 Effective Date - 02/01/2013 $1.30 $54.76 4 70 $30.53 $10.50 $15.61 $1.30 $57.94 5 75 Supplemental $10.50 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.44 $10.50 $12.11 $130 $45.35 2 60 $25.72 $10.50 $13.61 $1.30 $51.13 3 65 $27.87 $10.50 $14.61 $1.30 $54.28 4 70 $30.01 $10.50 $15.61 $130 $57.42 5 75 $32.1.5 $10.50 $16.61 $1.30 $60.56 6 80 $34.30 $10.50 $17.61 $1.30 $63.71 7 90 $38.58 $10.50 $18.61 $1.30 $68.99 Effective Date - 08/01/2013 CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES 12/01/2012 Supplemental $10.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.81 $10.50 $1.2.11 $130 $45.72 2 60 $26.17 $10.50 $13.61 $1.30 $51.58 3 65 $28.35 $10.50 $14.61 $1.30 $54.76 4 70 $30.53 $10.50 $15.61 $1.30 $57.94 5 75 $32.72 $10.50 $16.61 $1.30 $61.13 6 80 $34.90 $10.50 $17.61 $1.30 $64.31 7 90 $39.26 $10.50 $18.61 $1.30 $69.67 ---..-..........-_____._----------- (Notes: 06/01/2015 $32.35 - ---.._...---.__ $11.55 -- Steps are 6000 hours 12/01/2015 $32.85 $7.10 i ---------------------- Apprentice to Journeyworker Ratio:1:3 $51.50 06/01/2016 $33.35 $7.10 CHAIN SAW OPERATOR 1.2/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 Irl BORERS - ZONE 2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 1.2/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES 12/01/2012 $41.09 $10.00 $13.02 $0.00 $64.11 OPERATING ENGINI3ERS LOCAL 4 06/01/2013 $41.87 $10.00 $13.02 $0.00 $64.89 12/01/2013 $42.65 $10.00 $13.02 $0.00 $65.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" COMPRESSOR OPERATOR 12/01/2012 $28.17 $10.00 $13.02 $0.00 $51.19 OPERATING ENGINEERS LOCAL 4 06/01/2013 $28.72 $10.00 $13.02 $0.00 $51.74 12/01/2013 $29.27 $10.00 $13.02 $0.00 $52.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DELEADER (BRIDGE) PAINTERS LOCAL 35 - 7.ONF, 2 01/01/2013 $45.01 $7.80 $15.60 $0.00 $68.41 ------------------------------------------------------------------------ --------- ------------ ------------ ------------------------ Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 7 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date- 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.51 $7.80 $0.00 $0.00 $30.31 2 55 $24.76 $7.80 $3.52 $0.00 $36.08 3 60 $27.01 $7.80 $3.84 $0.00 $38.65 4 65 $29.26 $7.80 $4.1.6 $0.00 $41.22 5 70 $31.51 $7.80 $13.68 $0.00 $52.99 6 75 $33.76 $7.80 $14.00 $0.00 $55.56 7 80 $36.01 $7.80 $14.32 $0.00 $58.13 8 90 $40.51 $7.80 $14.96 $0.00 $63.27 -_._..-_..____-------------------------- Notes: Steps are 750 hrs. Apprentice to Journeyworker RatioA:1 DEMO: ADZEMAN 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35 LABORERS -7.ONE2 For apprentice rates see "Apprentice- LABORER" DEMO: BACKHOEILOADER41AMIvIER OPERATOR 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35 LABORERS - 7.ONE 2 For apprentice rates see "Apprentice- LABORER" DEMO: BURNERS 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10 LABORERS -ZONE2 For apprentice rates see "Apprentice- LABORER" DEMO: CONCRETE CUTTER/SAWYER 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" DEMO: JACKHAMMER OPERATOR 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10 LABORERS -7.ONE2 For apprentice rates see "Apprentice- LABORER" DEMO: WRECKING LABORER 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35. LABORERS - 70NE 2 For apprentice rates see "Apprentice- LABORER" DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DIVER 08/01/2012 $54.88 $9.80 $17.67 $0.00 $82.35 PILE DRIVER LOCAL 56 (70NE 1) 08/01/2013 $56.98 $9.80 $17.67 $0.00 $84.45 08/01/2014 $59.08 $9.80 $17.67 $0.00 $86.55 08/01/2015 $61.18 $9.80 $17.67 $0.00 $88.65 DIVER TENDER 08/01/2012 $54.88 $9.80 $17.67 $0.00 $82.35 PILE DRIVER LOCAL 56(70NEI) 08/01/201.3 $56.98 $9.80 $17.67 $0.00 $84.45 08/01/2014 $59.08 $9.80 $17.67 $0.00 $86.55 08/01/2015 $61.18 $9.80 $17.67 $0.00 $88.65 ---------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 - ---- ------- --------------- Page 8 of 41 Classification DIVER TENDER (EFFLUENT) PILE DRIVER LOCAL 56 (7.0NE 1) Effective Date Base Wage Health Pension Supplemental Total Rate PILE DRIVER LOCAL .i 6 (7.0NE 1) $0.00 Unemployment 08/01/2012 $58.80 $9.80 $17.67 $0.00 $86.27 08/01/2013 $61.05 $9.80 $17.67 $0.00 $88.52 08/01/2014 $63.30 $9.80 $17.67 $0.00 $90.77 08/01/2015 $65.55 $9.80 $17.67 $0.00 $93.02 DIVER/SLURRY (EFFLUENT) 08/01/2012 $82.32 $9.80 $17.67 $0.00 $109.79 PILE DRIVER LOCAL .i 6 (7.0NE 1) $0.00 $69.94 08/01/201.3 $85.47 $9.80 $17.67 $0.00 $11.2.94 08/01/2014 $88.62 $9.80 $17.67 $0.00 $116.09 08/01/2015 $91.77 $9.80 $17.67 $0.00 $119.24 DRAWBRIDGE OPERATOR (Construction) 09/01/2012 $42.81 $13.00 $14.13 $0.00 $69.94 ELECTRICIANS LOCAL 103 03/01/2013 $43.52. $13.00 $14.16 $0.00 $70.68 09/01/2013 $44.20 $13.00 $14.18 $0.00 $71.38 03/01/2014 $44.92 $13.00 $14.20 $0.00 $72.12 09/01/2014 $45.60 $13.00 $14.22 $0.00 $72.82 03/01/2015 $46.32 $13.00 $14.24 $0.00 $73.56 09/01/2015 $47.27 $13.00 $14.27 $0.00 $74.54 03/01/2016 $48.23 $13.00 $14.30 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN' ELECTRICIAN 09/01/2012 $42.81 $13.00 $14.13 $0.00 $69.94 ELECTRICIANS LOCAL 103 03/01/2013 $43.52 $13.00 $14.16 $0.00 $70.68 09/01/2013 $44.20 $13.00 $14.18 $0.00 $71.38 03/01/2014 $44.92 $13.00 $14.20 $0.00 $72.12 09/01/2014 $45.60 $13.00 $14.22 $0.00 $72.82 03/01/2015 $46.32 $13.00 $14.24 $0.00 $73.56 09/01/2015 $47.27 $13.00 $14.27 $0.00 $74.54 03/01/2016 $48.23 $13.00 $14.30 $0.00 $75.53 ---------------------------------------------------------------------------------- ------------------------- ------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 9 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.52 $0.00 $30.93 2 Unemployment Apprentice - ELECTRICIAN - Local 103 $13.00 $0.52 $0.00 $30.93 3 Effective Date - 09/01/2012 $19.58 $13.00 $10.53 Supplemental $43.11 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.12 $13.00 $0.51 $0.00 $30.63 2 40 $17.12 $13.00 $0.51 $0.00 $30.63 3 45 $19.26 $13.00 $10.52 $0.00 $42.78 4 45 $19.26 $13.00 $10.52 $0.00 $42.78 5 50 $21.41 $13.00 $10.84 $0.00 $45.25 6 55 $23.55 $13.00 $11.18 $0.00 $47.73 7 60 $25.69 $13.00 $11.50 $0.00 $50.19 8 65 $27.83 $13.00 $11.84 $0.00 $52.67 9 70 $29.97 $13.00 $12.16 $0.00 $55.13 10 75 $32.11 $13.00 $12.49 $0.00 $57.60 Effective Date - 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 - 40 $17.41 $13.00 $0.52 $0.00 $30.93 2 40 $17.41 $13.00 $0.52 $0.00 $30.93 3 45 $19.58 $13.00 $10.53 $0.00 $43.11 4 45 $19.58 $13.00 $10.53 $0.00 $43.11 5 50 $21.76 $13.00 $10.85 $0.00 $45.61 6 55 $23.94 $13.00 $11.19 $0.00 $48.13 7 60 $26.11 $13.00 $11.51 $0.00 $50.62 8 65 $28.29 $13.00 $11.85 $0.00 $53.14 9 70 $30.46 $13.00 $12.17 $0.00 $55.63 10 75 $32.64 $13.00 $12.51 $0.00 $58.15 ,.-.-.._.._ Notes:: ,__.. - - - _._. - - - _ - - _ - - _._..........,.-... ___....._...-.... _ ....-.. . - - -- App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80 Apprentice to Journeyworker Ratio:2:3*** ELEVATOR CONSTRUCTOR ELEVATOR CONSTRUCTORS LOCAL > 01/01/2012 $52.45 $8.78 $6.96 $0.00 $68.19 ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 10 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELEVA.TOR CONSTRUCTOR -Local 4 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.23 $8.78 $0.00 $0.00 $35.01 2 55 $28.85 $8.78 $6.96 $0.00 $44.59 3 65 $34.09 $8.78 $6.96 $0.00 $49.83 4 70 $36.72 $8.78 $6.96 $0.00 $52.46 5 80 $41.96 $8.78 $6.96 $0.00 $57.70 .._--_-----------------------.......-.,......_.,......-..._, (Notes: $31.85 $7.10 $.11.55 $0.00 $50.50 Steps 1-2 are 6 mos.; Steps 3-5 are 1 year $32.35 $7.1.0 $11.55 $0.00 $51.00 Apprentice to Journeyworker Ratio: 1:1 $32.85 $7.10 $11.55 $0.00 $51.50 ELEVATOR CONSTRUCTOR HELPER 01/01/2012 $38.59 $8.78 $6.96 $0.00 $54.33 ELEVATOR CONSTRUCTORS LOCAL 4 FENCE & GUARD RAIL ERECTOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS -70NF2 $21.54 $1.0.00 $12.65 $0.00 $44.19 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $.11.55 $0.00 $50.50 06/01/2015 $32.35 $7.1.0 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/201.6 $33.35 $7.10 $11.55 $0.00 $52.00 1.2/01/2016 $34.10 $7.10 $1.1.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 1.1/01/2012 $38.26 $10.00 $12.65 $0.00 $60.91 OPERATING ENGINEERS LOCAL 4 $21.54 $1.0.00 $12.65 $0.00 $44.19 05/01/2013 $38.87 $10.00 $12.65 $0.00 $61.52 1.1/01/2013 $39.63 $10.00 $1.2.65 $0.00 $62.28 05/01/2014 $40.40 $10.00 $12.65 $0.00 $63.05 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENG.PARTYCHIEF-BLDG,SITE,HVY/HWY 11/01/2012 $39.66 $10.00 $12.65 $0.00 $62.31. OPERATING ENGINEERS LOCAL 4 $21.54 $1.0.00 $12.65 $0.00 $44.19 05/01/2013 $40.28 $10.00 $12.65 $0.00 $62.93 11/01/2013 $41.05 $10.00 $12.65 $0.00 $63.70 05/01/2014 $41.82 $10.00 $12.65 $0.00 $64.47 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 11/01/2012 $21.18 $10.00 $12.65 $0.00 $43.83 05/01/2013 $21.54 $1.0.00 $12.65 $0.00 $44.19 11/01/2013 $22.00 $10.00 $12.65 $0.00 $44.65 05/01/2014 $22.45 $10.00 $12.65 $0.00 $45.10 --------------------------------------------------------------------- ---------- --------- ---------- ---------- - --------- _ .--- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 11 of 41 Classification Effective Date Base Wage Health Pension Supplemental I Total Rate 03/01/2013 $32.64 $13.00 $12.51 Unemployment $58.15 FIRE ALARM INSTALLER 09/01/2012 $42.81 $13.00 $14.13 $0.00 $69.94 ELECTRICIANS LOCAL 103 $33.69 $13.00 $12.54 $0.00 $59.23 03/01/2013 $43.52 $13.00 $14.16 $0.00 $70.68 09/01/2013 $44.20 $13.00 $14.18 $0.00 $71.38 03/01/2014 $44.92 $13.00 $14.20 $0.00 $72.12 09/01/2014 $45.60 $13.00 $14.22 $0.00 $72.82 03/01/2015 $46.32 $13.00 $14.24 $0.00 $73.56 09/01/2015 $47.27 $13.00 $14.27 $0.00 $74.54 03/01/2016 $48.23 $13.00 $14.30 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN' FIRE ALARM REPAIR / MAINTENANCE / COMMISSIONINGELFCTRimNS LOCAL 103 For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN' FIREMAN (ASST. ENGINEER) OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FLAGGER & SIGNALER 1-48ORERS-7.ONP2 For apprentice rates see "Apprentice- LABORER" 09/01/2012 $32.11 $13.00 $12.49 $0.00 $57.60 03/01/2013 $32.64 $13.00 $12.51 $0.00 $58.15 09/01/2013 $33.15 $13.00 $12.52 $0.00 $58.67 03/01/2014 $33.69 $13.00 $12.54 $0.00 $59.23 09/01/2014 $34.20 $13.00 $12.56 $0.00 $59.76 03/01/2015 $34.74 $13.00 $12.57 $0.00 $60.31 09/01/2015 $35.45 $13.00 $12.59 $0.00 $61.04 03/01/2016 $36.17 $13.00 $12.62 $0.00 $61.79 12/01/2012 $33.61 $10.00 $13.02 $0.00 $56.63 06/01/2013 $34.26 $10.00 $13.02 $0.00 $57.28 12/01/2013 $34.92 $10.00 $13.02 $0.00 $57.94 12/01/2012 $20.50 $7.10 $11.55 $0.00 $39.15 06/01/2013 $20.50 $7.10 $11.55 $0.00 $39.15 12/01/2013 $20.50 $7.10 $11.55 $0.00 $39.15 06/01/2014 $20.50 $7.10 $11.55 $0.00 $39.15 12/01/2014 $20.50 $7.10 $11.55 $0.00 $39.15 06/01/2015 $20.50 $7.10 $11.55 $0.00 $39.15 12/01/2015 $20.50 $7.10 $11.55 $0.00 $39.15 06/01/2016 $20.50 $7.10 $11.55 $0.00 $39.15 12/01/2016 $20.50 $7.10 $11.55 $0.00 $39.15 FLOORCOVERER 03/01/2012 $37.20 $9.80 $16.61 $0.00 $63.61 ELOORCOVE_RERS LOCAL 2168 70NE I Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 12 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate UnemploVment Apprentice- FLOORCOVERER -Local 2168 Zone I Effective Date- 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate I 50 $18.60 0.80 $1.79 $0.00 $30.19 2 55 $20.46 $9.80 $1.79 $0.00 $32.05 3 60 $22.32 $9.80 $11.24 $0.00 $43.36 4 65 $24.18 $9.80 $11.24 $0.00 $45.22 5 70 $26.04 $9.80 $13.03 $0.00 $48.87 6 75 $27.90 $9.80 $13.03 $0.00 $50.73 7 80 $29.76 $9.80 $14.82 $0.00 $54.38 8 85 $31.62 $9.80 $1.4.82 $0.00 $56.24 ---------------------------a------- (Notes: 06/01/2013 $28.72 $10.00 $13.02 fSteps are 750 firs. $51.74 12/01/2013 $29.27 ' --____---_--___.____--_ Apprentice to Journeyworker Ratio: 1:1 --_-__._P----_- $52.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" _ FORK LIFT/CHERRY PICKER 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPF.RA7ING FNGINF_FRSLOCAL 4 $7.80 $3.25 $0.00 $30.58 3 60 $21.31 $7.80 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 $3.84 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" $45.49 6 75 $26.63 $7.80 $13.13 $0.00 GENERATOR/LIGHTING PLANTMEATERS 12/01/2012 $28.17 $10.00 $13.02 $0.00 $51.1.9 OPERATING FNGINELRS LOCAL 4 $31.96 $7.80 $1.4.01 $0.00 $53.77 ._,...-�..............._-----®.---------.......-----------+ Notes: 06/01/2013 $28.72 $10.00 $13.02 $0.00 $51.74 12/01/2013 $29.27 $10.00 $13.02 $0.00 $52.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" --I GLAZIER (GLASS PLANK/AIR BARRIERANTERIOR 01/01/2013 $35.51 $7.80 $14.60 $0.00 $57.91 SYSTEMS) GLA 71h LOCAL 35 (70NF. 2) Apprentice- GLAZIER - Loca135 Zone 2 Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 - $17.76 $7.80 $0.00 $0.00 $25.56 2 55 $19.53 $7.80 $3.25 $0.00 $30.58 3 60 $21.31 $7.80 $3.54 $0.00 $32.65 4 65 $23.08 $7.80 $3.84 $0.00 $34.72 5 70 $24.86 $7.80 $12.83 $0.00 $45.49 6 75 $26.63 $7.80 $13.13 $0.00 $47.56 7 80 '$28.41 $7.80 $13.42 $0.00 $49.63 8 90 $31.96 $7.80 $1.4.01 $0.00 $53.77 ._,...-�..............._-----®.---------.......-----------+ Notes: t Steps are 750 hrs. --_-..,,._.--------------___..-... Apprentice to Journeyworker Ration a. --I ---------------------- ---------------------------------------------------------------------------------------------- ---------------- ----- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 13 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $32.05 2 60 $24.05 Unemployment $13.02 HOISTING ENGINEER/CRANES/GRADALLS 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPERATING ENGINEERS LOCAL 4 $0.00 $49.08 4 70 $28.06 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 Apprentice- OPERATING ENGINEERS -Local 4 Effective Date- 12/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.05 $10.00 $0.00 $0.00 $32.05 2 60 $24.05 $10.00 $13.02 $0.00 $47.07 3 65 $26.06 $10.00 $13.02 $0.00 $49.08 4 70 $28.06 $10.00 $13.02 $0.00 $51.08 5 75 $30.07 $10.00 $13.02 $0.00 $53.09 6 80 $32.07 $10.00 $13.02 $0.00 $55.09 7 85 $34.08 $10.00 $13.02 $0.00 $57.10 8 90 $36.08 $10.00 $13.02 $0.00 $59.10 Effective Date - 06/01/2013 - _..-....._. ^ - w._.. $13.00 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.48 $10.00 $0.00 $0.00 $32.48 2 60 $24.52 $10.00 $13.02 $0.00 $47.54 3 65 $26.57 $10.00 $13.02 $0.00 $49.59 4 70 $28.61 $10.00 $13.02 $0.00 $51.63 5 75 $30.65 $10.00 $13.02 $0.00 $53.67 6 80 $32-70 $10.00 $13.02 $0.00 $55.72 7 85 $34.74 $10.00 $13.02 $0.00 $57.76 8 90 $36.78 $10.00 $13.02 $0.00 $59.80 iNotes: 03/01/2015 $46.32 $13.00 $14.24 I I- - - ____ - _... - _ _.._ ..-...- Apprentice to Journeyworker Ratio:1:6 - ___....._ - -- - _..-....._. ^ - w._.. $13.00 HVAC (DUCTWORK) SHE177ME7AL WORKERSLOCAL 17-A For apprentice rates see "Apprentice- SHEET METAL WORKER" 02/01/2013 $42.32 $9.82 $18.24 $2.11 $72.49 HVAC (ELECTRICAL CONTROLS) 09/01/2012 $42.81 $13.00 $14.13 $0.00 $69.94 ELECTRICIANS LOCAL 103 03/01/2013 $43.52 $13.00 $14.16 $0.00 $70.68 09/01/2013 $44.20 $13.00 $14.18 $0.00 $71.38 03/01/2014 $44.92 $13.00 $14.20 $0.00 $72.12 09/01/2014 $45.60 $13.00 $14.22 $0.00 $72.82 03/01/2015 $46.32 $13.00 $14.24 $0.00 $73.56 09/01/2015 $47.27 $13.00 $14.27 $0.00 $74.54 03/01/2016 $48.23 $13.00 $14.30 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN' HVAC (TESTING AND BALANCING - AIR) 02/01/2013 $42.32 $9.82 $18.24 $2.11 $72.49 SHEETMETAL WORKERS LOCAL 17 -A For apprentice rates see "Apprentice- SHEET METAL WORKER" ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 14 of 41 Classification HVAC (TESTING AND .BALANCING -WATER) PIPEFITTIiRS LOCAL 53 7 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" HVAC MECHANIC PIPEFITTERS LOCAL 537 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or'PLUMBER/PIPEFITTER" Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $43.06 $49.00 $11.50 Unemployment $65.21 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 HYDRAULIC DRILLS 12/01/2012 $30.35 $10.65 $7.1.0 $11.55 $63.61 $0.00 $43.06 $49.00 $11.50 LABORERS - 7.ONE 2 $65.21 09/01/2014 $45.06 $1.0.65 $11.50 $0.00 $67.21 $10.65 $8.60 06/01/2013 $30.85 2 60 $7.10 $11.55 $9.18 $0.00 $44.71 $49.50 $29.02 12/01/2013 $31.35 $0.00 $7.1.0 $11.55 $33.17 $0.00 $10.34 $50.00 $54.16 06/01/2014 $31.85 $7.1.0 $11.55 $0.00 $50.50 12/01/2014 $32.35 Step percent $7.1.0 $11.55 Pension $0.00 Total Rate $51.00 06/01/2015 $32.85 $7.1.0 $11.55 $0.00 $51.50 12/01/2015 $33.35 $7.10 $11.55 $0.00 $52.00 06/01/2016 $33.85 $7.1.0 $11.55 $0.00 $52.50 12/01/2016 $34.60 $7.10 $11.55 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" INSULATOR (PIPES & TANKS) ASBESTOS WORCERSLOCAL 6 (BOSTON) 09/01/2012 $41.46 $10.65 $11.50 $0.00 $63.61 09/01/2013 $43.06 $1.0.65 $11.50 $0.00 $65.21 09/01/2014 $45.06 $1.0.65 $11.50 $0.00 $67.21 Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston $21.53 $10.65 $8.60 Effective Date - 09/01/2012 $40.78 2 60 $25.84 Supplemental $9.18 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.73 $10.65 $8.60 $0.00 $39.98 2 60 $24.88 $10.65 $9.18 $0.00 $44.71 3 70 $29.02 $10.65 $9.76 $0.00 $49.43 4 80 $33.17 $10.65 $10.34 $0.00 $54.16 Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.53 $10.65 $8.60 $0.00 $40.78 2 60 $25.84 $10.65 $9.18 $0.00 $45.67 3 70 $30.14 $10.65 $9.76 $0.00 $50.55 4 80 $34.45 $10.65 $10.34 $0.00 $55.44 - _ T - Notes: ...-._ ...-.. - - �. - _....._........_....... - _.......�,_ - �. ,..m. - _ _._. - _ _ Steps are 1 year _ _ _ _ ----- Apprentice to Journeyworker Ratio:1:4 IRONWORKER/WELDER IRONWORKERS LOCAL 7 (I,AWRFNCEARE.'A) 09/16/2012 $34.57 $7.70 $18.35 $0.00 $60.62 03/16/2013 $35.82 $7.70 $18.35 $0.00 $61.87 ------------------------------------------------------------------------------------ Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 1.5 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Supplemental $48.50 Step percent Apprentice Base Wage Unemployment Apprentice- IRONNZORKER -Local 7 Lawrence Unemployment Total Rate 1 60 Effective Date - 09/16/2012 $7.70 $18.35 $0.00 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $20.74 $7.70 $18.35 $0.00 $46.79 2 70 $24.20 $7.70 $18.35 $0.00 $50.25 3 75 $25.93 $7.70 $1.8.35 $0.00 $51.98 4 80 $27.66 $7.70 $1.8.35 $0.00 $53.71 5 85 $29.38 $7.70 $18.35 $0.00 $55.43 6 90 $31.11 $7.70 $18.35 $0.00 $57.16 Effective Date - 03/16/2013 $29.85 $7.10 $11.55 Supplemental $48.50 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $21.49 $7.70 $18.35 $0.00 $47.54 2 70 $25.07 $7.70 $18.35 $0.00 $51.12 3 75 $26.87 $7.70 $18.35 $0.00 $52.92 4 80 $28.66 $7.70 $18.35 $0.00 $54.71 5 85 $30.45 $7.70 $18.35 $0.00 $56.50 6 90 $32.24 $7.70 $18.35 $0.00 $58.29 -----------------------------____._- Notes: $34.10 $7.10 $11.55 $0.00 - I Structural 1:6; Ornamental 1:4 Appre.ee to-Jo-n-wo-ke-r Ra-tio:----_--_ _- --- _-- n --- JACKHAMMER & PAVING BREAKER OPERATOR LABORERS - 7.0NE 2 For apprentice rates see "Apprentice- LABORER" LABORER LABORERS -7.ONF.2 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.1.0 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 12/01/2012 $29.60 $7.10 $11.55 $0.00 $48.25 06/01/2013 $30.10 $7.10 $11.55 $0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 $0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2015 $32.60 $7.1.0 $11.55 $0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 --------------------------------------------- _...-------------------------------- ------------------ ------ ---- ------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 16 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER - Zone 2 Effective Date - 12/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.76 $7.10 $11.55 $0.00 $36.41 2 70 $20.72 $7.10 $11.55 $0.00 $39.37 3 80 $23.68 $7.10 $1.1.55 $0.00 $42.33 4 90 $26.64 $7.10 $11.55 $0.00 $45.29 Effective Date - 06/01/2013 $11.55 $0.00 $49.25 Supplemental 06/01/2014 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.06 $7.10 $11.55 $0.00 $36.71 2 70 $21.07 $7.10 $11.55 $0.00 $39.72 3 80 $24.08 $7.10 $11.55 $0.00 $42.73 4 90 $27.09 $7.1.0 $11.55 $0.00 $45.74 _._.- - - __._ - - - -. - Notes: - - - . - - - - _.._ ___. - - - - - ___. - - - Apprentice to Journepvorker Ratio:1:5 ---------�....._.. $0.00 -------- For apprentice rates see "Apprentice- LABORER" LABORER: CARPENTER TENDER 12/01/2012 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - 7.0ArE 2 06/01/2013 $30.10 $7.10 $11.55 $0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 $0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/20.14 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 $0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: CEMENT FINISHER TENDER 12/01/2012 $29.60 $7.10 $11.55 $0.00 $48.25 LABORF,R.S - 7.ONF 2 06/01/2013 $30.10 $7.10 $11.55 $0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 $0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 $0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2016 $33.85- $7.10 $11.55 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER' LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 1-4BORF.RS - 70NE 2 For apprentice rates see "Apprentice- LABORER' Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 17 of 41. Classification Effective Date Base Wage Health Pension Supplemental Total Rate $48.25 $48.75 $49.25 $49.75 $50.25 $50.75 $51.25 $51.75 $52.50 LABORER: TREE REMOVER 12/01/2012 $29.60 UnemnloYment $11.55 LABORER: MASON TENDER 12/01/2012 $29.85 $7.1.0 $11.55 $0.00 $48.50 I,4BORFRS-7ONF.2 06/01/2013 $30.10 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.1.0 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" LABORER: MULTI -TRADE TENDER LABORE RS-7,ONF.2 For apprentice rates see "Apprentice- LABORER" 1.2/01/2012 06/01/2013 1.2/01/2013 06/01/2014 12/01/201.4 06/01/2015 12/01/2015 06/01/2016 12/01/2016 $29.60 $30.10 $30.60 $31.10 $31.60 $32.1.0 $32.60 $33.10 $33.85 $7.10 $7.10 $7.10 $7.10 $7.10 $7.10 $7.10 $7.10 $7.10 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $48.25 $48.75 $49.25 $49.75 $50.25 $50.75 $51.25 $51.75 $52.50 LABORER: TREE REMOVER 12/01/2012 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 06/01/2013 $30.10 $7.10 $11.55 $0.00 $48.75 1.2/01/2013 $30.60 $7.10 $11.55 $0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 $0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 This classification applies to the wholesale removal of standing trees including all associated trimming of branches and limbs, and applies to the removal of branches at locations not on or around utility lines. For apprentice rates see "Apprentice- LABORER" LASER BEAM OPERATOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS - ZONE 2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ----------------------------------- -------------------------------------------------------------------------- ------------------- ----- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 18 of 41 Classification MARBLE & TILE FINISHERS BIUCKLAYERS LOCAL 3 - MARBLE R TILE Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate 02/01/2013 $36.20 $10.18 $16.51 $0.00 $62.89 08/01/2013 $36.91 $10.18 $16.58 $0.00 $63.67 02/01/2014 $37.36 $10.1.8 $16.58 $0.00 $64.12 08/01/201.4 $38.07 $10.18 $16.65 $0.00 $64.90 02/01/2015 $38.52 $10.18 $16.65 $0.00 $65.35 08/01/2015 $39.23 $10.18 $16.72 $0.00 $66.13 02/01/2016 $39.68 $10.18 $16.72 $0.00 $66.58 08/01/2016 $40.38 $10.18 $16.80 $0.00 $67.36 02/01/2017 $40.84 $10.18 $16.80 $0.00 $67.82 Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.10 $10.18 $16.51 $0.00 $44.79 2 60 $21.72 $10.1.8 $16.51 $0.00 $48.41 3 70 $25.34 $10.18 $16.51 $0.00 $52.03 4 80 $28.96 $10.18 $16.51 $0.00 $55.65 5 90 $32.58 $10.18 $16.51 $0.00 $59.27 Effective Date - 08/01/2013 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $18.46 $1.0.1.8 $16.58 $0.00 $45.22 2 60 $22.15 $10.18 $16.58 $0.00 $48.91 3 70 $25.84 $10.18 $16.58 $0.00 $52.60 4 80 $29.53 $10.18 $1.6.58 $0.00 $56.29 5 90 $33.22 $10.18 $16.58 $0.00 $59.98 ---------------._. Notes: _.._-- _..--------- �- - Apprentice to Journeyworker Ratio:1:3 ..___®-__-._.__...__....-__- MARBLE MASONS,TILELAYERS & TERRAZZO MECH 02/01/2013 $47.45 $10.18 $17.83 $0.00 $75.46 BRICKLAYERS LOCAL 3 - MARBLE & TILE 08/01/2013 $48.35 $10.18 $17.90 $0.00 $76.43 02/01/2014 $48.91 $10.18 $17.90 $0.00 $76.99 08/01/2014 $49.81 $10.18 $17.97 $0.00 $77.96 02/01/2015 $50.37 $10.18 $17.97 $0.00 $78.52 08/01/2015 $51.27 $10.18 $18.04 $0.00 $79.49 02/01/2016 $51.84 $10.18 $18.04 $0.00 $80.06 08/01/2016 $52.74 $10.18 $18.12 $0.00 $81.04 02/01/2017 $53.31 $10.18 $18.12 $0.00 $81.61 ---------------------------------- ------------------------------------------------ - ----------------------- ------------- --------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 19 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - MARBLE -TILE -TERRAZZO MECHANIC - Local 3 Marble & Tile 12/01/2012 $39.72 $10.00 Effective Date - 02/01/2013 $0.00 $62.74 OPERATING ENGINEERS LOCAL 4 Supplemental $40.49 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate I 50 $23.73 $10.18 $17.83 $0.00 $51.74 2 60 $28.47 $10.18 $17.83 $0.00 $56.48 3 70 $33.22 $10.18 $17.83 $0.00 $61.23 4 80 $37.96 $10.18 $17.83 $0.00 $65.97 5 90 $42.71 $10.18 $17.83 $0.00 $70.72 Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.18 $10.18 $17.90 $0.00 $52.26 2 60 $29.01 $10.18 $17.90 $0.00 $57.09 3 70 $33.85 $10.18 $17.90 $0.00 $61.93 4 80 $38.68 $10.18 $17.90 $0.00 $66.76 5 90 $43.52 $10.18 $17.90 $0.00 $71.60 _._. - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - -- -Notes: ._ - Apprentice to Journeyworker Ratio:1:5 ------------------- MECH. SWEEPER OPERATOR (ON CONST. SITES) 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERATING ENGINEERS LOCA 1, 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51. 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" MECHANICS MAINTENANCE 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" MILLWRIGHT (Zone 2) 04/01/2011 $31.71 $8.67 $15.61 $0.00 $55.99 MILLWRIGHTS LOCAL 1121 - Zone 2 --- ----- ------------------------------------------------------------------------ ------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 20 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MILLWRIGHT -Local 1121 Zone 2 Effective Date- 04/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $15.86 $8.67 $11.64 $0.00 $36.17 2 55 $17.44 $8.67 $11.64 $0.00 $37.75 3 60 $19.03 $8.67 $13.23 $0.00 $40.93 4 65 $20.61 $8.67 $13.23 $0.00 $42.51 5 70 $22.20 $8.67 $14.02 $0.00 $44.89 6 75 $23.78 $8.67 $14.02 $0.00 $46.47 7 80 $25.37 $8.67 $14.82 $0.00 $48.86 8 85 $26.95 $8.67 $14.82 $0.00 $50.44 -------------------.- (Notes: ----------..-..___............_..-- 12/01/2015 $32.85 $7.10 $11.55 -- __._ - _ - ___. - - - ___.- Apprentice to Journeyworker Ratio:1:5 - - - -- - - - - - - ----- - - - - - - ___. MORTAR MIXER 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LARORF.RS-7.0NE2 ' $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.1.0 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2012 $21.28 $10.00 $13.02 $0.00 $44.30 OPERATING ENGINEERS LOCAL 4 06/01/2013 $21.70 $10.00 $13.02 $0.00 $44.72 12/01/2013 $22.12 $10.00 $13.02 $0.00 $45.14 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OILER (TRUCK CRANES, GRADALLS) 12/01/2012 $24.62 $10.00 $13.02 $0.00 $47.64 OPERATING ENGINEERS I.00AL 4 06/01/2013 $25.10 $10.00 $13.02 $0.00 $48.12 12/01/2013 $25.59 $10.00 $13.02 $0.00 $48.61 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT - CLASS II OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PAINTER (BRIDGES/TANKS) PAINTERS LOCAL 35 - 7.ONE 2 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 01/01/2013 $45.01 $7.80 $15.60 $0.00 $68.41 ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 2013021.4-005-9 Page 21 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date- 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate I 50 $22.51 $7.80 $0.00 $0.00 $30.31 2 55 $24.76 $7.80 $3.52 $0.00 $36.08 3 60 $27.01 $7.80 $3.84 $0.00 $38.65 4 65 $29.26 $7.80 $4.16 $0.00 $41.22 5 70 $31.51 $7.80 $13.68 $0.00 $52.99 6 75 $33.76 $7.80 $14.00 $0.00 $55.56 7 80 $36.01 $7.80 $14.32 $0.00 $58.13 8 90 $40.51 $7.80 $14.96 $0.00 $63.27 --------_....._. --------------•°-----._-. (Notes: - Steps are 750 firs. ----- Apprentice to Journeyworker Ratio: 1:1 - - - - - - - - - - - - PAINTER (SPRAY OR SANDBLAST, NEW) * 01/01/2013 $35.91 $7.80 $15.60 $0.00 $59.31 * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be use d.PAINTERSLOCAL 35-7ONE2 Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -New Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.96 $7.80 $0.00 $0.00 $25.76 2 55 $19.75 $7.80 $3.52 $0.00 $31.07 3 60' $21.55 $7.80 $3.84 $0.00 $33.19 4 65 $23.34 $7.80 $4.16 $0.00 $35.30 5 70 $25.1.4 $7.80 $13.68 $0.00 $46.62 6 75 $26.93 $7.80 $14.00 $0.00 $48.73 7 80 $28.73 $7.80 $14.32 $0.00 $50.85 8 90 $32.32 $7.80 $14.96 $0.00 $55.08 ---_......-..-------_...__.__---------®-----__ (Notes: - ------------_.__., Apprentice to Journey_wm•ker Ratioaa ----- PAINTER (SPRAY OR SANDBLAST, REPAINT) PAINTERS LOCAL 35 - 7.ONE 2 01/01/2013 $33.97 $7.80 $15.60 $0.00 $57.37 - ---------------------------------- ---- ------------------------------------------------- --- -- ------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 22 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -Repaint Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.99 $7.80 $0.00 $0.00 $24.79 2 55 $18.68 $7.80 $3.52 $0.00 $30.00 3 60 $20.38 $7.80 $3.84 $0.00 $32.02 4 65 $22.08 $7.80 $4.16 $0.00 $34.04 5 70 $23.78 $7.80 $13.68 $0.00 $45.26 6 75 $25.48 $7.80 $14.00 $0.00 $47.28 7 80 $27.18 $7.80 $14.32 $0.00 $49.30 8 90 $30.57 $7.80 $14.96 $0.00 $53.33 -----------.......-._--------- Notes: $33.85 $7.10 $11.55 ------ $52.50 - -__ ---------------------------- Apprentice to Journeyworker Ratio: 1:1 PAINTER (TRAFFIC MARKINGS) LABORERS - 7.0NE 2 For Apprentice rates see "Apprentice- LABORER" PAINTER / TAPER (BRUSH, NEW) * * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PAINTFRSLOCAL 35-70NE2 12/01/2012 $29.60 $7.10 $11.55 $0.00 $48.25 06/01/2013 $30.10 $7.10 $11.55 $0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 $0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 $0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 01/01/2013 $34.51 $7.80 $15.60 $0.00 $57.91 -------------------------- ------------------ ----- -------------------------------------------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 23 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER -Local 35 Zone 2 - BRUSH NEW Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 2 55 3 60 4 65 5 70 6 75 7 80 8 90 Notes: N - - - $0.00 Steps are 750 firs. Apprentice to Journeyworker Ratio:1:1 $17.26 $7.80 $0.00 $0.00 $25.06 $18.98 $7.80 $3.52 $0.00 $30.30 $20.71 $7.80 $3.84 $0.00 $32.35 $22.43 $7.80 $4.16 $0.00 $34.39 $24.16 $7.80 $13.68 $0.00 $45.64 $25.88 $7.80 $14.00 $0.00 $47.68 $27.61 $7.80 $14.32 $0.00 $49.73 $31.06 --.---------------.- $7.80 $14.96 $0.00 $53.82 I PAINTER / TAPER (BRUSH, REPAINT) 01/01/2013 $32.57 $7.80 $15.60 $0.00 $55.97 PAINTERS LOCAL 35 - 70NE 2 Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.29 $7.80 $0.00 $0.00 $24.09 2 55 $17.91 $7.80 $3.52 $0.00 $29.23 3 60 $19.54 $7.80 $3.84 $0.00 $31.18 4 65 $21.17 $7.80 $4.16 $0.00 $33.13 5 70 $22.80 $7.80 $13.68 $0.00 $44.28 6 75 $24.43 $7.80 $14.00 $0.00 $46.23 7 80 $26.06 $7.80 $14.32 $0.00 $48.18 8 90 $29.31 $7.80 $14.96 $0.00 $52.07 --------------- INotes: ------,..__--._._..-._...-_, I Steps are 750 lus. I Apprentice to Journeyworker Ratio:1:1 PANEL & PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 TEAMS7E24 JOINT COUNCIL NO. 10 ZONE B PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2012 $39.20 $9.80 $17.67 $0.00 $66.67 DECK) PILI, DRIVER LOCAL 56 (70M I) 08/01/2013 $40.70 $9.80 $17.67 $0.00 $68.17 08/01/2014 $42.20 $9.80 $17.67 $0.00 $69.67 08/01/2015 $43.70 $9.80 $17.67 $0.00 $71.17 --------------------------------------------------- -------- - ----------------------------------------------------------------- issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 24 of 41 Classification PILE DRIVER PILE DRIVER LOCAL 56 (7.0NF 1) Effective Date Base Wage Health Pension Supplemental Total Rate $47.07 2 60 $23.52 Unemployment $1.7.67 08/01/2012 $39.20 $9.80 $17.67 $0.00 $66.67 08/01/2013 $40.70 $9.80 $17.67 $0.00 $68.17 08/01/2014 $42.20 $9.80 $17.67 $0.00 $69.67 08/01/2015 $43.70 $9.80 $17.67 $0.00 $71.17 Apprentice- PILEDRIVER -Local 56 Zone I Effective Date - 08/01/2012 Supplements] Step percent Apprentice Base Wage Health Pension Unemployment Total Rate I 50 $19.60 $9.80 $17.67 $0.00 $47.07 2 60 $23.52 $9.80 $1.7.67 $0.00 $50.99 3 70 $27.44 $9.80 $17.67 $0.00 $54.91 4 75 $29.40 $9.80 $17.67 $0.00 $56.87 5 80 $31.36 $9.80 $1.7.b7 $0.00 $58.83 6 80 $31.36 $9.80 $1.7.67 $0.00 $58.83 7 90 $35.28 $9.80 $17.67 $0.00 $62.75 8 90 $35.28 $9.80 $17.67 $0.00 $62.75 Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.35 $9.80 $17.67 $0.00 $47.82 2 60 $24.42 $9.80 $17.67 $0.00 $51.89 3 70 $28.49 $9.80 $17.67 $0.00 $55.96 4 75 $30.53 $9.80 $17.67 $0.00 $58.00 5 80 $32.56 $9.80 $17.67 $0.00 $60.03 6 80 $32.56 $9.80 $17.67 $0.00 $60.03 7 90 $36.63 $9.80 $17.67 $0.00 $64.10 8 90 $36.63 $9.80 $17.67 $0.00 $64.10 ----- (Notes: ---__._-_._.-------- --------- Apprentice to Journeyv✓orker Ratioa:3 PIPEFITTER & STEAMFITTER PIPF.FITTFR S LOCAL 53 7 (Local 138) 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 ---------------------------- ---- -------------------------------------------------------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 25 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate ' Unemployment Apprentice- PIPEFITTER Local 537 (Local 138) Effective Date - 09/01/2012 Step percent Apprentice Base Wage Health 1 40 $18.30 $8.75 2 45 $20.59 $8.75 3 60 $27.46 $8.75 4 70 $32.03 $8.75 5 80 $36.61 $8.75 Effective Date - 03/01/2013 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate $4.50 $0.00 $31.55 $12.39 $0.00 $41.73 $12.39 $0.00 $48.60 $12.39 $0.00 $53.17 $12.39 $0.00 $57.75 Supplemental Pension Unemployment Total Rate 1 40 $18.80 $8.75 $4.50 $0.00 $32.05 2 45 $21.15 $8.75 $12.39 $0.00 $42.29 3 60 $28.21 $8.75 $12.39 $0.00 $49.35 4 70 $32.91 $8.75 $12.39 $0.00 $54.05 5 80 $37.61 $8.75 $12.39 $0.00 $58.75 -----._. 'Notes: --.,.._-___.---------------_.._-- $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 ** 1:3; 3:15; 1:10 thereafter / Steps are 1 yr. $7.10 $11.55 $0.00 $52.00 12/01/2016 ---------------_.----------_....- Rettig/AC Mechanic * * 1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23 (Max) $0.00 I Apprentice to Journeyworker Ratio:** PIPELAYER LABORERS -7.ONE2 For apprentice rates see "Apprentice- LABORER" PLUMBER PLUMBERS & GAS1,77TERS LOCAL 12 (Local 138) 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 09/01/2012 $43.98 $9.32 $13.29 $0.00 $66.59 03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84 ---------------------------------------------------------------------------------------- ---- - ------- ------- ------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 26 of 41 ' Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PLUMBER/G,4SFITTER - Local 12 (Local 138) Effective Date - 09/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $15.39 $9.32 $4.97 $0.00 $29.68 2 40 $17.59 $9.32 $5.61 $0.00 $32.52 3 55 $24.19 $9.32 $7.53 $0.00 $41.04 4 65 $28.59 $9.32 $8.81 $0.00 $46.72 5 75 $32.99 $9.32 $10.09 $0.00 $52.40 Effective Date - 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $15.83 $9.32 $4.97 $0.00 $30.12 2 40 $18.09 $9.32 $5.61 $0.00 $33.02 3 55 $24.88 $9.32 $7.53 $0.00 $41.73 4 65 $29.40 $9.32 $8.81 $0.00 $47.53 5 75 $33.92 $9.32 $10.09 $0.00 $53.33 - - Notes: ._._....._..._... ---- - ....... _.._ .�. - - - _ ___...-�..-.... - - �. - _.._... - Steps are 1 yr Step 4 with lic$50.43 Step5 with lic$56.22 _-........._..------------.--_...---_._---_,,.,-- Apprentice to Journeyworker Ratio: 1:5 PNEUMATIC CONTROLS (TEMP.) 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 PIPEFITTT;RS LOCAL 537 (Local 138) 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 Far apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" PNEUMATIC DRILL/TOOL OPERATOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS -7.ONF.2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.1.0 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.1.0 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" POWDERMAN & BLASTER 12/01/2012 $30.60 $7.10 $11.55 $0.00 $49.25 LABORERS -7.ONE2 06/01/2013 $31.1.0 $7.10 $11.55 $0.00 $49.75 1.2/01/2013 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2014 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2014 $32.60 $7.1.0 $11.55 $0.00 $51.25 06/01/2015 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2015 $33.60 $7.10 $11.55 $0.00 $52.25 06/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 12/01/2016 $34.85 $7.10 $11.55 $0.00 $53.50 For apprentice rates see "Apprentice- LABORER" ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 27 of 41 -------------------------------------------------------------- ---- ---------------------- ----- ----- ------------- ---------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 28 of 41 Classification Ef active Date Base Wage Health Pension Supplemental Total Rate Unemployment POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPERATING F,NGINL•'ERS LOCAL 4 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (CONCRETE) 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (DEWATERING, OTHER) 12/01/2012 $28.1.7 $10.00 $13.02 $0.00 $51.19 OPERATING ENGINEERS LOCAL 4 06/01/2013 $28.72 $10.00 $13.02 $0.00 $51.74 12/01/2013 $29.27 $10.00 $13.02 $0.00 $52.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" READY -MTX CONCRETE DRIVER 04/30/2009 $25.80 $5.96 $5.34 $0.00 $37.10 713AM,STERS LOCAL 42 RECLAIMERS 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42 CARPENTERS-7.ONE2 (Residential Wood) RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81 ** The Residential Wood France Carpenter classification applies only to the construction of new, wood frame residences that do not exceed four stories including the basement. CARPENTERS -ZONE 2 (Residential Wood) As of 9/ 1 /09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. RIDE -ON MOTORIZED BUGGY OPERATOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABO1ERS-70NE2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ROLLER/SPREADER/MULCHING MACHINE 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPE A77NG ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg) 02/01/2013 $37.41 $10.50 $10.70 $0.00 $58.61 ROOFERS LOCAL 33 -------------------------------------------------------------- ---- ---------------------- ----- ----- ------------- ---------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 28 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - ROOFER - Local 33 Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.71 $10.50 $3.38 $0.00 $32.59 2 60 $22.45 $10.50 $1.0.70 $0.00 $43.65 3 65 $24.32 $10.50 $10.70 $0.00 $45.52 4 75 $28.06 $10.50 $10.70 $0.00 $49.26 5 85 $31.80 $10.50 $10.70 $0.00 $53.00 -_..._-_„----_-----_...____-.._...-....-___.--.... Notes: ** 1:5, 2:6-10, the 1:1.0; Reroofing: 1:4, then 1:1 $9.82 $8.75 -----_...........-_, $40.92 6 ' Step 1 is 2000 hrs.; Steps 2-5 are 1000 firs. $21.16 $9.82 $9.00 $1.20 $41.18 -----__..-----------...----------- Apprentice to Journeyworker Ratio:** 60 $25.39 $9.82 $10.24 $1.36 ROOFER SLATE / TILE / PRECAST CONCRETE 02/01/2013 $37.66 $10.50 $10.70 $0.00 $58.86 ROOFERS LOCAL 33 For apprentice rates see "Apprentice- ROOFER" SHEETMETAL WORKER 02/01/2013 $42.32 $9.82 $18.24 $2.11 $72.49 SHEETMETAL WORKERS LOCAL 17 -A Apprentice- SHEET METALWORKER -Local 17-A Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.93 $9.82 $4.00 $0.00 $30.75 2 40 $16.93 $9.82 $4.00 $0.00 $30.75 3 45 $19.04 $9.82 $8.00 $1.11 $37.97 4 45 $19.04 $9.82 $8.00 $1.11 $37.97 5 50 $21.16 $9.82 $8.75 $1.19 $40.92 6 50 $21.16 $9.82 $9.00 $1.20 $41.18 7 60 $25.39 $9.82 $10.24 $1.36 $46.81 8 65 $27.51 $9.82 $10.99 $1.45 $49.77 9 75 $31.74 $9.82 $12.49 $1.62 $55.67 10 85 $35.97 $9.82 $13.49 $1.78 $61.06 --_......_....--,,.,w. (Notes: _._-- - - - - - - - - - - - - - - - - - - - Steps are 6 mos. Apprentice to Journeyworker Ratio: 1:4 SIGN ERECTOR PAINTERS LOCAL 35 - 7.ONF, 2 06/01/2012 $25.37 $6.82 $6.85 $0.00 $39.04 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93 ------------------------------- - ---------------------------------------------------------------------------------------------------------- issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 29 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- SIGN ERECTOR -Local Effective Date - 06/01/2012 Step percent 35 Zone 2 Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $12.69 $6.82 $0.00 $0.00 $19.51 2 55 $13.95 $6.82 $2.35 $0.00 $23.12 3 60 $15.22 $6.82 $2.35 $0.00 $24.39 4 65 $16.49 $6.82 $2.35 $0.00 $25.66 5 70 $17.76 $6.82 $6.85 $0.00 $31.43 6 75 $19.03 $6.82 $6.85 $0.00 $32.70 7 80 $20.30 $6.82 $6.85 $0.00 $33.97 8 85 $21.56 $6.82 $6.85 $0.00 $35.23 9 90 $22.83 $6.82 $6.85 $0.00 $36.50 Effective Date - 06/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 2 55 3 60 4 65 5 70 6 75 7 80 8 85 9 90 Notes: ( __ - - - - - $18.07 Steps are 4 mos. L-- - - - - ® - Apprentice to Journeyworker Ratio:t:I $12.91 $7.07 $0.00 $0.00 $19.98 $14.20 $7.07 $2.45 $0.00 $23.72 $15.49 $7.07 $2.45 $0.00 $25.01 $16.78 $7.07 $2.45 $0.00 $26.30 $18.07 $7.07 $7.05 $0.00 $32.19 $19.36 $7.07 $7.05 $0.00 $33.48 $20.65 $7.07 $7.05 $0.00 $34.77 $21.94 $7.07 $7.05 $0.00 $36.06 $23.23 ........_--------....o---®..- $7.07 $7.05 $0.00 $37.35 - SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2012 $31.03 $8.91 $8.00 $0.00 $47.94 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B SPRINKLER FITTER SPRINKLER FITTERS LOCAL 550 - (Section B) 01/01/2013 $47.13 $8.42 $12.60 $0.00 $68.15 03/01/2013 $48.13 $8.42 $12.60 $0.00 $69.15 ------------- ---------------------- -------------------------- --------------------------- - ----- --- ------------ Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 30 of 41 r 1 i Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SPRINKLER FITTER Effective Date - 01/01/2013 Step percent -Local 550 (Section B) Apprentice Base Wage Health Pension Supplemental unemployment Total Rate 1 35 $16.50 $8.42 $19.25 $8.00 $8.00 $0.00 $32.92 2 40 $18.85 $8.42 $8.42 $8.00 $0.00 $0.00 $35.27 3 45 $21.21 $8.42 $8.00 $8.00 $40.49 $0.00 $37.63 4 50 $23.57 $8.42 $0.00 $8.00 6 $0.00 $39.99 5 55 $25.92 $8.42 $45.30 $8.00 65 $0.00 $42.34 6 60 $28.28 $8.42 8 $8.00 $33.69 $0.00 $44.70 7 65 $30.63 $8.42 75 $8.00 $8.42 $0.00 $47.05 8 70 $32.99 $8.42 $38.50 $8.00 $8.00 $0.00 $49.41 9 75 $35.35 $8.42 _ - - $8.00 ____ - __.. $0.00 $51.77 10 80 $37.70 $8.42 $8.00 $0.00 $54.12 Effective Date - 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 35 $16.85 $8.42 $8.00 $0.00 $33.27 2 40 $19.25 $8.42 $8.00 $0.00 $35.67 3 45 $21.66 $8.42 $8.00 $0.00 $38.08 4 50 $24.07 $8.42 $8.00 $0.00 $40.49 5 55 $26.47 $8.42 $8.00 $0.00 $42.89 6 60 $28.88 $8.42 $8.00 $0.00 $45.30 7 65 $31.28 $8.42 $8.00 $0.00 $47.70 8 70 $33.69 $8.42 $8.00 $0.00 $50.11 9 75 $36.10 $8.42 $8.00 $0.00 $52.52 10 80 $38.50 $8.42 $8.00 $0.00 $54.92 _ - (Notes: - ___, -- - _ _....-., ___- - - „-.,. - _ _ - - - _.__ „...„. - ____ - __.. - - Steps are 850 hours Apprentice to Journeyworker Ratio:l:1 STEAM BOILER OPERATOR 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPFRA TING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERATING FNGINEF,RS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51. 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" -------------------------------_- ---------------- ----------------------------------------------------- --------------------- -- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 31 of 41 Classification TELECOMMUNICATION TECHNICIAN ELECTRICIANS LOCAL 103 Effective Date Base Wage Health Pension Supplemental Unemployment l Total Rate 09/01/2012 $32.11 $13.00 $12.49 $0.00 $57.60 03/01/2013 $32.64 $13.00 $12.51 $0.00 $58.15 09/01/2013 $33.15 $13.00 $12.52 $0.00 $58.67 03/01/2014 $33.69 $13.00 $12.54 $0.00 $59.23 09/01/2014 $34.20 $13.00 $12.56 $0.00 $59.76 03/01/2015 $34.74 $13.00 $12.57 $0.00 $60.31 09/01/2015 $35.45 $13.00 $12.59 $0.00 $61.04 03/01/2016 $36.17 $13.00 $12.62 $0.00 $61.79 Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 Effective Date - 09/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $12.84 $13.00 $0.39 $0.00 $26.23 2 40 $12.84 $13.00 $0.39 $0.00 $26.23 3 45 $14.45 $13.00 $9.77 $0.00 $37.22 4 45 $14.45 $13.00 $9.77 $0.00 $37.22 5 50 $16.06 $13.00 $10.02 $0.00 $39.08 6 55 $17.66 $13.00 $10.27 $0.00 $40.93 7 60 $19.27 $13.00 $10.52 $0.00 $42.79 8 65 $20.87 $13.00 $10.77 $0.00 $44.64 9 70 $22.48 $13.00 $11.02 $0.00 $46.50 10 75 $24.08 $13.00 $11.26 $0.00 $48.34 Effective Date - 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $13.06 $13.00 $0.39 $0.00 $26.45 2 ' 40 $13.06 $13.00 $0.39 $0.00 $26.45 3 45 $14.69 $13.00 $9.78 $0.00 $37.47 4 45 $14.69 $13.00 $9.78 $0.00 $37.47 5 50 $16.32 $13.00 $10.03 $0.00 $39.35 6 55 $17.95 $13.00 $10.28 $0.00 $41.23 7 60 $19.58 $13.00 $10.53 $0.00 $43.11 8 65 $21.22 $13.00 $10.78 $0.00 $45.00 9 70 $22.85 $13.00 $11.03 $0.00 $46.88 10 75 $24.48 $13.00 $11.28 $0.00 $48.76 Notes: tee_ Apprentice to Journeyworker Ratio: 1:1 ------------------------------------------------------- ------------------------------------------------------------------------------ ------ Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 32 of 41 Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $23.63 $10.18 $17.90 $0.00 $51.71 2 60 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 3 70 $33.08 $10.18 $17.90 Unemployment $61.16 TERRAZZO FINISHERS 02/01/2013 $46.35 $10.18 $17.83 $0.00 $74.36 BRICKLAYERS LOCAL 3 - MARBLE & TILF $10.18 $17.90 $0.00 $70.61 _.. --- -_....- -_--__._---_.._-_.. Notes: $38.95 $7.10 08/01/2013 $47.25 $10.18 $17.90 $0.00 $75.33 __ 02/01/2014 $47.81 $10.18' $17.90 $0.00 $75.89 $12.60 $0.00 08/01/2014 $48.71 $10.18 $17.97 $0.00 $76.86 02/01/2015 $49.27 $10.18 $17.97 $0.00 $77.42 08/01/2015 $50.17 $10.18 $18.04 $0.00 $78.39 02/01/2016 $50.74 $10.18 $18.04 $0.00 $78.96 08/01/2016 $51.64 $10.18 $18.12 $0.00 $79.94 02/01/2017 $52.21 $10.18 $18.12 $0.00 $80.51 Apprentice- TERRAZZO FINISHER -Local 3 Marble &. Tile Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $23.18 $10.18 $17.83 $0.00 $51.19 2 60 $27.81 $10.18 $17.83 $0.00 $55.82 3 70 $32.45 $10.18 $17.83 $0.00 $60.46 4 80 $37.08 $10.18 $17.83 $0.00 $65.09 5 90 $41.72 $10.18 $17.83 $0.00 $69.73 Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $23.63 $10.18 $17.90 $0.00 $51.71 2 60 $28.35 $10.18 $17.90 $0.00 $56.43 3 70 $33.08 $10.18 $17.90 $0.00 $61.16 4 80 $37.80 $10.18 $17.90 $0.00 $65.88 5 90 $42.53 $10.18 $17.90 $0.00 $70.61 _.. --- -_....- -_--__._---_.._-_.. Notes: $38.95 $7.10 $12.60 .__--------- I - T ....... Apprentice to Journeyworker Ratio:1:3 _ - -....... _.__ .w....- -- .- __ .,....,...�................._... TEST BORING DRILLER 12/01/2012 $37.30 $7.10 $12.60 $0.00 LABORERS - FOUNDATIONAND MARINE 06/01/2013 $34.45 $7.10 $12.60 $0.00 12/01/2013 $35.20 $7.10 $12.60 $0.00 06/01/2014 $35.95 $7.10 $12.60 $0.00 12/01/2014 $36.70 $7.10 $12.60 $0.00 06/01/2015 $37.45 $7.1.0 $12.60 $0.00 12/01/2015 $38.20 $7.10 $12.60 $0.00 06/01/2016 $38.95 $7.10 $12.60 $0.00 12/01/2016 $39.95 $7.10 $12.60 $0.00 For apprentice rates see "Apprentice- LABORER" $57.00 $54.15 $54.90 $55.65 $56.40 $57.15 $57.90 $58.65 $59.65 Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 33 of 41 � K a Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TEST BORING DRILLER HELPER 12/01/2012 $32.42 $7.10 $12.60 $0.00 $52.12 LABORERS - FOUNDATION AND MARINE 06/01/2013 $33.17 $7.10 $12.60 $0.00 $52.87 12/01/2013 $33.92 $7.10 $12.60 $0.00 $53.62 06/01/2014 $34.67 $7.10 $12.60 $0.00 $54.37 12/01/2014 $35.42 $7.10 $12.60 $0.00 $55.12 06/01/2015 $36.17 $7.10 $12.60 $0.00 $55.87 12/01/2015 $36.92 $7.10 $12.60 $0.00 $56.62 06/01/2016 $37.67 $7.10 $12.60 $0.00 $57.37 12/01/2016 $38.67 $7.10 $12.60 $0.00 $58.37 For apprentice rates see "Apprentice- LABORER" TEST BORING LABORER 12/01/2012 $32.30 $7.10 $12.60 $0.00 $52.00 LABORERS - FOUNDATION AND MARINE 06/01/2013 $33.05 $7.10 $12.60 $0.00 $52.75 12/01/2013 $33.80 $7.10 $12.60 $0.00 $53.50 06/01/2014 $34.55 $7.10 $12.60 $0.00 $54.25 12/01/2014 $35.30 $7.10 $12.60 $0.00 $55.00 06/01/2015 $36.05 $7.10 $12.60 $0.00 $55.75 12/01/2015 $36.80 $7.10 $12.60 $0.00 $56.50 06/01/2016 $37.55 $7.10 $12.60 $0.00 $57.25 12/01/2016 $38.55 $7.10 $12.60 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" TRACTORS/PORTABLE STEAM GENERATORS 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERA TING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2012 $31.32 $8.91 $8.00 $0.00 $48.23 TEAMSTERS JOINT COUNCIL NO. 10 7.ONE B TUNNEL WORK - COMPRESSED AIR 12/01/2012 $44.58 $7.10 $13.00 $0.00 $64.68 LABORERS(COMPRESSED AIR) 06/01/2013 $45.33 $7.10 $13.00 $0.00 $65.43 12/01/2013 $46.08 $7.10 $13.00 $0.00 $66.18 06/01/2014 $46.83 $7.10 $13.00 $0.00 $66.93 12/01/2014 $47.58 $7.10 $13.00 $0.00 $67.68 06/01/2015 $48.33 $7.10 $13.00 $0.00 $68.43 12/01/2015 $49.08 $7.10 $13.00 $0.00 $69.18 06/01/2016 $49.83 $7.10 $13.00 $0.00 $69.93 12/01/2016 $50.83 $7.10 $13.00 $0.00 $70.93 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) 12/01/2012 $46.58 $7.10 $13.00 $0.00 $66.68 LABORERS (COMPRESSED AIR) 06/01/2013 $47.33 $7.10 $13.00 $0.00 $67.43 12/01/2013 $48.08 $7.10 $13.00 $0.00 $68.18 06/01/2014 $48.83 $7.10 $13.00 $0.00 $68.93 12/01/2014 $49.58 $7.10 $13.00 $0.00 $69.68 06/01/2015 $50.33 $7.10 $13.00 $0.00 $70.43 12/01/2015 $51.08 $7.10 $13.00 $0.00 $71.18 06/01/2016 $51.83 $7.10 $13.00 $0.00 $71.93 12/01/2016 $52.83 $7.10 $13.00 $0.00 $72.93 For apprentice rates see "Apprentice- LABORER" ----------------------------------------------------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 ------- -------------- -------------- --------- Page 34 of 41 Classification TUNNEL WORK - FREE AIR LABORERS (FREE AIR TUNNEI) For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - FREE AIR (HAZ. WASTE) LABORERS (FREE AIR TUNNEL) For apprentice rates see "Apprentice- LABORER" Effective Date Base Wage Health Pension Supplemental Total Rate $47.65 TEAMSTERS JOINT COUNCIL NO. 10 7.ONF A Unemployment 12/01/2012 $36.65 $7.1.0 $13.00 $0.00 $56.75 06/01/2013 $37.40 $7.1.0 $13.00 $0.00 $57.50 12/01/2013 $38.15 $7.10 $13.00 $0.00 $58.25 06/01/2014 $38.90 $7.10 $13.00 $0.00 1 $59.00 12/01/2014 $39.65 $7.10 $13.00 $0.00 $59.75 06/01/2015 $40.40 $7.10 $13.00 $0.00 $60.50 12/01/2015 $41.15 $7.10 $13.00 $0.00 $61.25 06/01/2016 $41.90 $7.10 $13.00 $0.00 $62.00 12/01/2016 $42.90 $7.10 $13.00 $0.00 $63.00 12/01/201.2 $38.65 $7.10 $13.00 $0.00 $58.75 06/01/2013 $39.40 $7.10 $13.00 $0.00 $59.50 12/01/2013 $40.15 $7.10 $13.00 $0.00 $60.25 06/01/2014 $40.90 $7.10 $13.00 $0.00 $61.00 12/01/2014 $41.65 $7.10 $13.00 $0.00 $61.75 06/01/2015 $42.40 $7.10 $13.00 $0.00 $62.50 12/01/2015 $43.15 $7.10 $13.00 $0.00 $63.25 06/01/2016 $43.90 $7.10 $13.00 $0.00 $64.00 12/01/2016 $44.90 $7.10 $13.00 $0.00 $65.00 VAC -HAUL 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65 TEAMSTERS JOINT COUNCIL NO. 10 7.ONF A WAGON DRILL OPERATOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS-7.ONE2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" WASTE WATER PUMP OPERATOR 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.1.1 OPERA TING ENGINEERS LOCAL, 4 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" WATER METER INSTALLER 09/01/2012 $43.98 $9.32 $13.29 $0.00 $66.59 PLUMBERS & GASFITTERS LOCAL 12 (Local 138) 03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84 For apprentice rates see "Apprentice- PLUMBER/PIPEFITTER" or "PLUMBER/GASFITTER" Outside Electrical - East CABLE TECHNICIAN (Power Zone) 09/03/2012 $25.18 $7.95 $4.42 $0.00 $37.55 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 03/03/2013 $25.18 $8.20 $4.17 $0.00 $37.55 09/01/2013 $25.66 $8.70 $4.48 $0.00 $38.84 For apprentice rates see "Apprentice- LINEMAN' CABLEMAN (Underground Ducts & Cables) 09/03/2012 $35.67 $7.95 $5.23 $0.00 $48.85 OUTSIDE, ELECTRICAL WORKERS - FAST LOCAL 104 03/03/2013 $35.67 $8.20 $4.98 $0.00 $48.85 09/01/2013 $36.55 $8.70 $6.58 $0.00 $51.83 ------------------------------------------------------------------------------------ Issue Date: 02/14/2013 Wage Request Number: ----------- 20130214-005-9 ---------- ------------------------ - Page 35 of 41. Classification For apprentice rates see "Apprentice- LINEMAN" p Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment DRIVER / GROUNDMAN CDL OUTSIDE El ECTRICAL WORKERS - EAST LOCAL 104 For apprentice rates see "Apprentice- LINEMAN" 09/03/2012 03/03/2013 09/01/2013 $29.38 $29.38 $29.94 $7.95 $8.20 $8.70 $5.93 $5.68 $6.05 $0.00 $0.00 $0.00 $43.26 $43.26 $44.69 DRIVER / GROUNDMAN -Inexperienced (<2000 Hrs) 09/03/2012 $23.08 $7.95 $4.19 $0.00 $35.22 OUTS@E ELECTRICAL WORKERS - EAST LOCAL 104 03/03/2013 $31.48 $8.20 $6.19 $0.00 $45.87 03/03/2013 $23.08 $8.20 $3.94 $0.00 $35.22 For apprentice rates see "Apprentice- LINEMAN' 09/01/2013 $23.52 $8.70 $5.24 $0.00 $37.46 For apprentice rates see "Apprentice- LINEMAN' 09/03/2012 $23.08 $7.95 $3.67 $0.00 $34.70 EQUIPMENT OPERATOR (Class A CDL) 09/03/2012 $35.67 $7.95 $9.23 $0.00 $52.85 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 03/03/2013 $23.08 $8.20 $3.42 $0.00 $34.70 03/03/2013 $35.67 $8.20 $8.98 $0.00 $52.85 For apprentice rates see "Apprentice- LINEMAN' 09/01/2013 $36.35 $8.70 $9.43 $0.00 $54.48 For apprentice rates see "Apprentice- LINEMAN' EQUIPMENT OPERATOR (Class B CDL) 09/03/2012 $31.48 $7.95 $6.44 $0.00 $45.87 OUT.SIDIi EL1iCTR1CAL WORKERS - EAST LOCAL 104 $8.20 $10.31 $0.00 $60.48 09/01/2013 $42.77 $8.70 03/03/2013 $31.48 $8.20 $6.19 $0.00 $45.87 09/01/2013 $32.08 $8.70 $6.59 $0.00 $47.37 For apprentice rates see "Apprentice- LINEMAN' GROUNDMAN 09/03/2012 $23.08 $7.95 $3.67 $0.00 $34.70 OUTSIDEELECTRICAL WORKERS - EAST LOCAL 104 03/03/2013 $23.08 $8.20 $3.42 $0.00 $34.70 09/01/2013 $23.52 $8.70 $3.72 $0.00 $35.94 For apprentice rates see "Apprentice- LINEMAN' GROUNDMAN -Inexperienced (<2000 Hrs.) 09/03/2012 $18.89 $7.95 $2.86 $0.00 $29.70 0UTSIDE EI ECTRICAL WORKERS - EAST LOCAL 104 03/03/2013 $18.89 $8.20 $2.61 $0.00 $29.70 09/01/2013 $19.25 $8.70 $2.85 $0.00 $30.80 For apprentice rates see "Apprentice- LINEMAN' JOURNEYMAN LINEMAN OUTSIDE. ELECTRICAL WORKERS - EAST LOCAL 104 09/03/2012 $41.97 $7.95 $10.56 $0.00 $60.48 03/03/2013 $41.97 $8.20 $10.31 $0.00 $60.48 09/01/2013 $42.77 $8.70 $11.78 $0.00 $63.25 ----------------------------- ---------------------- ---------------------------------- -------...... -- ----- ---- ----- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 36 of 41 1 60 $25.18 $8.20 $2.97 $0.00 $36.35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 3 70 $29.38 $8.20 $4.11 Unemployment Apprentice - LINEMAN (Outside Electrical) - East Local 104 4 75 $31.48 $8.20 $4.81 Effective Date - 09/03/2012 $44.49 5 80 $33.58 Supplemental $5.51 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $25.18 $7.95 $3.22 $0.00 $36.35 2 65 $27.28 $7.95 $3.66 $0.00 $38.89 3 70 $29.38 $7.95 $4.36 $0.00 $41.69 4 75 $31.48 $7.95 $5.06 $0.00 $44.49 5 80 $33.58 $7.95 $5.76 $0.00 $47.29 6 85 $35.67 $7.95 $6.47 $0.00 $50.09 7 90 $37.77 $7.95 $7.66 $0.00 $53.38 Effective Date - 03/03/201.3 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $25.18 $8.20 $2.97 $0.00 $36.35 2 65 $27.28 $8.20 $3.41 $0.00 $38.89 3 70 $29.38 $8.20 $4.11 $0.00 $41.69 4 75 $31.48 $8.20 $4.81 $0.00 $44.49 5 80 $33.58 $8.20 $5.51 $0.00 $47.29 6 85 $35.67 $8.20 $6.22 $0.00 $50.09 7 90 $37.77 $8.20 $7.41 $0.00 $53.38 -- - - _. - ------------- Notes: _ 02/01/2009 --- - - - - - --_., _ _ __..-....,... - - ____ ® - , Apprentice to Journeyworker Ratio:1:2 _....._ TELEDATA CABLE SPLICER 07/16/2012 $26.33 $4.18 $2.79 $0.00 $33.30 OUTSIDr ELrCTRICAL WORKERS- EAST LOCAL 104 TELEDATA LINEMAN/EQUIPMENT OPERATOR 07/16/2012 $24.78 $4.18 $2.74 $0.00 $31.70 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 TELEDATA WIREMAN/INSTALLERTECHNICIAN 07/16/2012 $24.78 $4.18 $2.74 $0.00 $31.70 OUT SIDE'ELECTRICAL WORKFRS - EAST LOCAL 104 TREE TRIMMER 02/01/2009 $16.59 $2.42 $0.00 $0.00 $19.01 OUTSIDE r1,F.CTRIC,4L WORKERS - EAST LOCAL 104 This classification applies only to the trimming of branches on and around utility lines. TREE TRIMMER GROUNDMAN 02/01/2009 $14.64 $2.42 $0.00 $0.00 $17.06 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 This classification applies only to the trimming of branches on and around utility lines. Rental of Equipment - East (2 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.45 $8.91 $0.00 $0.00 $39.36 TEAMSTERS JOINT COUNCIL NO. 10 7.ONF R (3 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.52 $8.91 $0.00 $0.00 $39.43 TEAMSTERS JOINT COUNCIL NO. 10 7.ONE R (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.64 $9.07 $0.00 $0.00 $39.71 TEAMSTERS JOINT COUNCIL NO. 10 7.ONE R ---------------------------------------------------------------------------- ---------------------- ------------------------------------ Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 37 of 41 t N v V Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BACKHOE/FRONT-END LOADER 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BULLDOZER/GRADER/SCRAPER 12/01/2012 $39.72 $10.00 $0.00 $0.00 $49.72 OPERA77NG ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $0.00 $0.00 $50.49 12/01/2013 $41.27 $10.00 $0.00 $0.00 $51.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES 12/01/2012 $41.09 $10.00 $0.00 $0.00 $51.09 OPERATING ENGINEERS LOCAL 4 06/01/2013 $41.87 $10.00 $0.00 $0.00 $51.87 12/01/2013 $42.65 $10.00 $0.00 $0.00 $52.65 For apprentice rates see "Apprentice- OPERATING ENGINEERS" COMPRESSOR OPERATOR 12/01/2012 $28.17 $10.00 $0.00 $0.00 $38.17 OPERATING ENGINEERS LOCAL 4 06/01/2013 $28.72 $10.00 $0.00 $0.00 $38.72 12/01/2013 $29.27 $10.00 $0.00 $0.00 $39.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DIVER 08/01/2012 $54.88 $9.80 $0.00 $0.00 $64.68 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2013 $56.98 $9.80 $0.00 $0.00 $66.78 08/01/2014 $59.08 $9.80 $0.00 $0.00 $68.88 08/01/2015 $61.18 $9.80 $0.00 $0.00 $70.98 DIVER TENDER 08/01/2012 $54.88 $9.80 $0.00 $0.00 $64.68 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2013 $56.98 $9.80 $0.00 $0.00 $66.78 08/01/2014 $59.08 $9.80 $0.00 $0.00 $68.88 08/01/2015 $61.18 $9.80 $0.00 $0.00 $70.98 FLAGGER & SIGNALER 12/01/2012 $20.50 $7.10 $0.00 $0.00 $27.60 LABORERS - 70NE 2 06/01/2013 $20.50 $7.10 $0.00 $0.00 $27.60 12/01/2013 $20.50 $7.10 $0.00 $0.00 $27.60 06/01/2014 $20.50 $7.10 $0.00 $0.00 $27.60 12/01/2014 $20.50 $7.10 $0.00 $0.00 $27.60 06/01/2015 $20.50 $7.10 $0.00 $0.00 $27.60 12/01/2015 $20.50 $7.10 $0.00 $0.00 $27.60 06/01/2016 $20.50 $7.10 $0.00 $0.00 $27.60 12/01/2016 $20.50 $7.10 $0.00 $0.00 $27.60 For apprentice rates see "Apprentice- LABORER" FORK LIFT/CHERRY PICKER 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GENERATOR/LIGHTING PLANTMEATERS 12/01/2012 $28.17 $10.00 $0.00 $0.00 $38.17 OPERATING ENGINEERS LOCAL 4 06/01/2013 $28.72 $10.00 $0.00 $0.00 $38.72 12/01/2013 $29.27 $10.00 $0.00 $0.00 $39.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ----- --------------------------------- Issue Date: 02/14/2013 Wage Request Number: -- --- - ------------------ 20130214-005-9 ------ ----- ---- ----------- Page 38 of 41 Apprentice- OPERATING ENGINEERS - Loca14 Effective Date - 12/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.05 $10.00 $0.00 $0.00 $32.05 2 60 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $10.00 $0.00 $0.00 $36.06 4 70 Unemployment $10.00 HO1ST1NG ENGINEER/CRANES/GRADALLS 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 OPERATING ENGINEERS LOCAL 4 $40.07 6 80 $32.07 $10.00 $0.00 $0.00 $42.07 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 8 90 1.2/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 Apprentice- OPERATING ENGINEERS - Loca14 Effective Date - 12/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.05 $10.00 $0.00 $0.00 $32.05 2 60 $24.05 $10.00 $0.00 $0.00 $34.05 3 65 $26.06 $10.00 $0.00 $0.00 $36.06 4 70 $28.06 $10.00 $0.00 $0.00 $38.06 5 75 $30.07 $10.00 $0.00 $0.00 $40.07 6 80 $32.07 $10.00 $0.00 $0.00 $42.07 7 85 $34.08 $10.00 $0.00 $0.00 $44.08 8 90 $36.08 $10.00 $0.00 $0.00 $46.08 Effective Date - 06/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.48 $10.00 $0.00 $0.00 $32.48 2 60 $24.52 $10.00 $0.00 $0.00 $34.52 3 65 $26.57 $10.00 $0.00 $0.00 $36.57 4 70 $28.61 $10.00 $0.00 $0.00 $38.61 5 75 $30.65 $10.00 $0.00 $0.00 $40.65 6 80 $32.70 $10.00 $0.00 $0.00 $42.70 7 85 $34.74 $10.00 $0.00 $0.00 $44.74 8 90 - .- - - - - - - $36.78 - - - - - - - $10.00 - - - - $0.00 - - - - $0.00 - - - $46.78 - - -+ fNotes: -__.........------_.-_._.---._....._......._...��.. Apprentice to Journeyworker Ratio:1:6 ----- LABORER 12/01/2012 $29.60 $7.10 $0.00 $0.00 $36.70 LABORERS - 70NE 2 06/01/2013 $30.10 $7.10 $0.00 $0.00 $37.20 12/01/2013 $30.60 $7.10 $0.00 $0.00 $37.70 06/01/2014 $31.1.0 $7.10 $0.00 $0.00 $38.20 12/01/2014 $31.60 $7.10 $0.00 $0.00 $38.70 06/01/2015 $32.10 $7.10 $0.00 $0.00 $39.20 12/01/2015 $32.60 $7.10 $0.00 $0.00 $39.70 06/01/2016 $33.10 $7.10 $0.00 $0.00 $40.20 12/01/2016 $33.85 $7.10 $0.00 $0.00 $40.95 ---------------------------- ---------------------------------------------------- -----------------------------------------------------... Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 39 of 41 Classification V4 Effective Date Base Wage Health Pension Supplemental Total Rate YY Unemployment Apprentice - LABORER - Zone 2 Effective Date - 12/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.76 $7.10 $0.00 $0.00 $24.86 2 70 $20.72 $7.10 $0.00 $0.00 $27.82 3 80 $23.68 $7.10 $0.00 $0.00 $30.78 4 90 $26.64 $7.10 $0.00 $0.00 $33.74 Effective Date - 06/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.06 $7.10 $0.00 $0.00 $25.16 2 70 $21.07 $7.10 $0.00 $0.00 $28.17 3 80 $24.08 $7.10 $0.00 $0.00 $31.18 4 90 $27.09 $7.10 $0.00 $0.00 $34.19 -_--.._._----.._.._,_-------------------, (Notes: - - Apprentice to Journe}worker Ratio:1:5 -------_-__------.._..--- OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2012 $21.28 $10.00 $0.00 $0.00 $31.28 OPERA TING FNGINFERS LOCAL 4 06/01/2013 $21.70 $10.00 $0.00 $0.00 $31.70 12/01/2013 $22.12 $10.00 $0.00 $0.00 $32.12 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OILER (TRUCK CRANES, GRADALLS) 12/01/2012 $24.62 $10.00 $0.00 $0.00 $34.62 OPERATING ENGINEERS LOCAL 4 06/01/2013 $25.10 $10.00 $0.00 $0.00 $35.10 1.2/01/2013 $25.59 $10.00 $0.00 $0.00 $35.59 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT - CLASS II 12/01/2012 $39.72 $10.00 $0.00 $0.00 $49.72 OPEWATING ENGINLTRS LOCAL 4 06/01/2013 $40.49 $10.00 $0.00 $0.00 $50.49 12/01/2013 $41.27 $10.00 $0.00 $0.00 $51.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PANEL & PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $0.00 $0.00 $39.35 TEAMST IiR,S.IOIN7' COUNCII. NO. 10 70NE B POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 OPERA TING AWGINFERS LOCAL 4 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (CONCRETE) 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (DEWATERING, OTHER) 12/01/2012 $28.17 $10.00 $0.00 $0.00 $38.17 OPERATING ENGINEERS LOCAL 4 06/01/2013 $28.72 $10.00 $0.00 $0.00 $38.72 12/01/2013 $29.27 $10.00 $0.00 $0.00 $39.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" - -------------------------------- --------------------------- ------------------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page - 40 of 41 Classification ROLLER/SPREADER/MULCHING MACHINE OPFRA77NG ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" Effective Date Base Wage Health Pension Supplemental Total Rate $39.65 TEAMSTERS JOINT COUNCIL NO. 10 7.0NF R Unemployment 12/01/2012 $39.72 $10.00 $0.00 $0.00 $49.72 06/01/2013 $40.49 $10.00 $0.00 $0.00 $50.49 12/01/2013 $41.27 $10.00 $0.00 $0.00 $51.27 SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2012 $30.74 $8.91 $0.00 $0.00 $39.65 TEAMSTERS JOINT COUNCIL NO. 10 7.0NF R SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2012 $31.03 $8.91 $0.00 $0.00 $39.94 TEAMSTERS JOINT COUNCIL NO. 10 7.ONE B TRACTORS/PORTABLE STEAM GENERATORS 12/01/2012 $39.72 $10.00 $0.00 $0.00 $49.72 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $0.00 $0.00 $50.49 12/01/2013 $41.27 $10.00 $0.00 $0.00 $51.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2012 $31.32 $8.91 $0.00 $0.00 $40.23 TEAMSTERS JOINT COUNCIL NO. 10 7ONE B TREE TRIMMER 02/01/2009 $16.59 $2.42 $0.00 $0.00 $19.01 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 This classification applies only to the trimming of branches on and around utility lines. TREE TRIMMER GROUNDMAN 02/01/2009 $14.64 $2.42 $0.00 $0.00 $17.06 OUTSIDE ELFCTRICAL WORMS - FAST LOCAL 104 This classification applies only to the trimming of branches on and around utility lines. VAC-HAUL/CATCH BASIN CLEANING 12/01/2012 $30.74 $8.91 $0.00 $0.00 $39.65 TEAMSTERS JOINT COUNCIL NO. 10 7.ONF B Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage ofthe pre -determined hourly wage rate established by the Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L. c. 23, ss. I IE -I IL. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. l l E -I IL. All steps are six months (1000 hours) unless otherwise specified. * Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof. ** Multiple ratios are listed in the comment field. *** APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. **** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. ------------------------------------------------------------------------------------- -- ------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 41 of 41 BOND #BCN- 1006726 HANOVER INSURANCE © The Hanover Insurance Company ❑ Massachusetts Bay Insurance Company Executive Offices: 100 North Parkway, Worcester, MA 01605 PERFORMANCE BOND KNOW ALL MEN BY THESE PRESENTS, that Markings, Inc. of 30 Riverside Drive, Pembroke, MA 02359 as Principal, .and Massachusetts Bay Insurance Company, .a corporation duly organized and existing under the-laws.of the Commonwealth of Massachusetts and/or The Hanover Insurance Company, a corporation duly organized and existing under the laws of the State of New Hampshire and having an office and usual place of business in Worcester, Massachusetts, as Surety, are held and firmly bound unto the City or Town of North Andover, MA Seventeen Thousand Eight Hundred Thirty Seven &D/ ��ARS($ 17,837.50 lawful money of the United States of America, to be paid tc 4%ity or Town of North Andover, MA for which payment, well and truly to be made, we bind ourselves, pur respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the said Principal has made a contract with the City or Town of North Andover, MA bearing date of April 10, 2013 for Pavement Markings for the Town o77fN. Andover for the Period of NOW the condition of this obligation is such that if the Principal shall We110d1ridMA �qe�/Ae/�Qhfm all the undertakings, covenants, agreements, terms and conditions of said contract on its part to be kept and perform��J.duringover the original term of said contract and any extensions thereof that may be granted by the City or Town of 11``�� ccff _ with or without notice to the Surety, and during the life of any guaranty required under the contract, and shall also well and truly keep and perform all the undertakings, covenants, agreements, terms and conditions of any and all duly authorized modifications, alterations, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, changes or additions being hereby waived, then this obligation shall become null and void; otherwise, it shall remain in force and virtue. IN WITNESS WHEREOF we hereunto set our hands and seals this 19th day of April, 2013 A.D. Markings, Inc. Inc . By : i'U 1 IA" MASSACHUSITTS BAY INSURANCE COMPANY By: Attorney-in-fact By: FORM 571-0732 (2/89) INSWITAMCE COMPANY 0. Smith BOND #BCN-1006726 HMOVER INSURANCE ® The Hanover Insurance Company ❑ Massachusetts Bay Insurance Company Executive Offices: 100 North Parkway, Worcester, MA 01605 PAYMENT BOND KNOW ALL MEN BY THESE PRESENTS, that Markings, Inc. of 30 Riverside Drive, Pembroke, MA. 02359 as Principal, and Massachusetts Bay Insurance Company, a corporation duly organized and existing under the laws of the Commonwealth of Massachusetts and/or The Hanover Insurance Company, a corporation duly organized and existing under the laws of the State of New Hampshire and having an office. and usual place of business in Worcester, Massachusetts, as Surety, are held and firmly bound unto the City or Town of North Andover, MA in the sum of Seventeen Thousand Eight Hundred Thirty Seven & 50/100 17,837.50 DOLLARS IS), lawful money of the United States of America, to be paid to the City or Town of North Andover, MA for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the said Principal has made a contract with the City or Town of North Andover, MA bearing date of April 10, 2013 for Pavement Markings for the Town of North Andover, MA for the Period of 7/01/2013 to 6/30/2014. NOW the condition of this obligation is such that if the principal shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include any other purposes or items set out in, and subject to, the provisions of Massachusetts General laws, Chapter 30, Section 39A, and Chapter 149, Section 29, as amended, then this obligation shall become null and void; otherwise it shall remain in full force and virtue. IN WITNESS WHEREOF we hereunto set our hands and seals this 19th day of April 2013 A.D. FORM 571-0733 (2/89) By: Markings, Inc. B /— MASSACHUSET 'S BAY INSURANC COMPANY Attorney -in -Fact T HANOVER N CE COMPANY By. Attor in -Fact y avid 0. Smith THE HANOVER INSURANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITIZENS INSURANCE COMPANY OF AMERICA POWERS OF ATTORNEY CERTIFIED COPY KNOW ALL MEN BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY, both being corporations organized and existing under the laws of the State of New Hampshire, and CITIZENS INSURANCE COMPANY OF AMERICA, a corporation organized and existing under the laws of the State of Michigan, do hereby constitute and appoint; David O. Smith, Deborah Viveiros and/or Karen Besse of Quincy, MA and each is a true and lawful Attorney(s)-in-fact to sign, execute, seal, acknowledge and deliver for, and on its behalf, and as its act and deed any place within the United States, or, if the following line be filled in, only within the area therein designated any and all bonds, recognizances, undertakings, contracts of indemnity or other writings obligatory in the nature thereof, as follows: Any such obligations in the United States, not to exceed Ten Million and No/100 ($10,000,000) in any single instance and said companies hereby ratify and confirm all and whatsoever said Attorney(s)-in-fact may lawfully do in the premises by virtue of these presents. These appointments are made under and by authority of the following Resolution passed by the Board of Directors of said Companies which resolutions are still in effect: "RESOLVED, That the President or any Vice President, in conjunction with any Assistant Vice President, be and they are hereby authorized and empowered to appoint Attorneys -in -fact of the Company, in its name and as its acts, to execute and acknowledge for and on its behalf as Surety any and all bonds, recognizances, contracts of indemnity, waivers of citation and all other writings obligatory in the nature thereof, with power to attach thereto the seal of the Company. Any such writings so executed by such Attorneys -in -fact shall be as binding upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company in their own proper persons." (Adopted October 7, 1981 - The Hanover Insurance Company; Adopted April 14, 1982 — Massachusetts Bay Insurance Company; Adopted September 7, 2001 - Citizens Insurance Company of America) IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seals, duly attested by a Vice President and an Assistant Vice President, this 13th day of August, 2008. THE COMMONWEALTH OF MASSACHUSETTS ) COUNTY OF WORCESTER )ss. On this 13th day of August 2008, before me came the above named Vice President and Assistant Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, to me personally known to be the individuals and officers described herein, and acknowledged that the seals affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company Massachusetts Bay Insurance Company and Citizens Insurance Company of America, respectively, and that the said corporate seals and their signatures as officers were duly affixed and subscribed to said instrument by the authority and direction of said Corporations. qpNOM G"M No" Fdk ==,"Wol N0181y Pub/f0 My commission expires on November 3, 2011 I, the undersigned Assistant Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, hereby certify that the above and foregoing is a full, true and correct copy of the Original Power of Attorney issued by said Companies, and do hereby further certify that the said Powers of Attorney are still in force and effect. This Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America. "RESOLVED, That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto, granted and executed by the President or any Vice President in conjunction with any Assistant Vice President of the Company, shall be binding on the Company to the same extent as if all signatures therein were manually affixed, even though one or more of any such signatures thereon may be facsimile." (Adopted October 7, 1981 - The Hanover Insurance Company; Adopted April 14, 1982 Massachusetts Bay Insurance Company; Adopted September 7, 2001 - Citizens Insurance Company of America) GIVEN under my hand and the seals of said Companies, at Worcester, Massachusetts, this 19th day of April 2013 THE HANOVER INSURANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITI S INSU CE CO OF ERICA SteBrout , A"ssfstant Vice Pres ,nt Andrew W. Maylor Town Manager Ms. Monique Souza, President Markings Inc 30 Riverside Drive Pembroke, MA 02359 Dear Ms. Souza: Town of North Andover Office of the Town Manager North Andover Town Hall 120 Main Street North Andover,- MA 01845 amaylor@townofnorthandover.com March 14, 2014 a Telephone (978)688-9510 Fax -(978)688-9556 In accordance with the provisions of the contract between the Town of North Andover and Markings Inc (Contract #665), the contract and the respective unit price (see enclosed) to provide pavement markings is extended an additional option year (July 1, 2014 through June 30, 2015). Please provide updated insurance certificates listing the Town of North Andover as `Additional Insured' in accordance with the contract document. The insurance certificates are to be sent to the attention of Ray Santilli, Assistant Town Manager. In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work performed under this contract. An updated prevailing wage report is enclosed. For each week work is performed, you are required to submit certified weekly payroll records. The certified weekly payroll records are to be sent to: Mr. Bruce Thibodeau Department of Public Works 384 Osgood Street North Andover, MA 01845 If you have any questions and/or concerns, please call Mr. Santilli at 978-688-9516. Sincerely, Adrew W. Maylor Town Manager If� cc., Ray Santilli, Assistant Town Manager Bruce Thibodeau, Public Works Contract File July 1, 2014 through Juno 30, 2015 Epoxy/Thermoplastic — 4" double yellow Epoxy/Thermoplastic —12" white line Epoxy/Thermoplastic — 4" single white Epoxy/Thermoplastic — 4" white fog Epoxy/Thermoplastic — 4" yellow centering Epoxy/Thermoplastic — cross walk & stop line $ 0.70 per linear foot $ 1.30 per linear foot $ 0.35 per linear foot $ 0.35 per linear foot $ 0.35 per linear foot $ 1.30 per linear foot THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the RACHEL KAPRIELIAN Gm—or Secretary• Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E.ar RowE Director Awarding Authority: Town of North Andover Contract Number: City/Ibwn: NORTH ANDOVER Description of Work: Provide pavement markings for various roadways throughout Town Job Location: Throughout Town Information about Prevailing Wage Schedules for Awarding Authorities and Contractors • This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage Request Number" on all pages of this schedule. • Awarding authorities must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. • The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. Once a contractor has been selected by the awarding authority, the wage schedule shall be made a part of the contract for that project. The wage schedule must be posted in a conspicuous place at the work site during the life of the project in accordance with M.G.L. c. 149, § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project regardless of whether they are employed by the prime contractor, a filed sub -bidder, or any sub -contractor. • All apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Training (DAT). Apprentices must keep his/her apprentice identification card on his/her person during all work hours on the project. If an apprentice rate is listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAT, the apprentice may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. If an apprentice rate is not listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAT, the apprentice must be paid the journeyworker's rate for the trade. • The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F "rental of equipment" contracts. • Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports directly to the awarding authority and keep them on file for three years. Each weekly payroll report must contain: the employee's name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/pw. • Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617) 626-6953. • Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor Division of the office of the Attorney General at (617) 727-3465. • Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties. Issue Date: 03/14/2014 Wage Request Number: 20140313-004 El Classification Construction Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment (2 AXLE) DRIVER - EQUIPMENT 12/01/2013 $30.95 $9.41 $9.41 $8.80 $0.00 $49.35 $49.16 $12.10 TEAMSTENS JOINT COUNCIL NO. 10 ZONE B $50.50 12/01/2014 $31.60 $7.30 $12.10 $0.00 06/01/2014 $31.49 $9.41 $8.80 06/01/2014 $31.30 $49.70 $9.41 $8.80 $0.00 $9.91 $49.51 $0.00 06/01/2016 08/01/2014 $31.30 12/01/2014 $9.91 $8.80 $0.00 $0.00 $50.01 $50.73 $0.00 12/01/2014 $31.30 $9.91 $9.91 $9.33 $0.00 $51.08 $50.54 08/01/2015 $31.84 06/01/2015 $31.65 $0.00 $9.91 $9.33 . $0.00 12/01/2015 $50.89 $10.41 $10.08 08/01/2015 $31.65 $52.33 $10.41 $9.33 $0.00 $10.41 $51.39 $0.00 12/01/2015 $31.65 08/01/2016 $10.41 $10.08 $0.00 $0.00 $52.14 $53.33 06/01/2016 $32.15 $10.91 $10.41 $10.08 $0.00 $54.14 $52.64 08/01/2013 $84.21 08/01/2016 $32.15 $0.00 $10.91 $10.08 $0.00 $53.14 12/01/2016 $32.15 $10.91 $10.89 $0.00 $9.80 $53.95 $0.00 (3 AXLE) DRIVER - EQUIPMENT 12/01/2013 $31.02 08/01/2015 $9.41 $8.80 $0.00 $0.00 $49.23 $118.48 TEAMST ERS JOINT COUNCIL NO. IO ZONE B 06/01/2014 $31.37 $9.41 $8.80 $0.00 $49.58 08/01/2014 $31.37 $9.91 $8.80 $0.00 $50.08 12/01/2014 $31.37 $9.91 $9.33 $0.00 $50.61 06/01/2015 $31.72 $9.91 $9.33 $0.00 $50.96 08/01/2015 $31.72 $10.41 $9.33 $0.00 $51.46 12/01/2015 $31.72 $10.41 $10.08 $0.00 $52.21 06/01/2016 $32.22 $10.41 $10.08 $0.00 $52.71 08/01/2016 $32.22 $10.91 $10.08 $0.00 $53.21 12/01/2016 $32.22 $10.91 $10.89 $0.00 $54.02 (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2013 $31.14 $9.41 $8.80 $0.00 06/01/2014 $49.35 TEAMSTERS JOINT COUNCIL NO. 10 7ONE B $12.10 $0.00 $50.50 12/01/2014 $31.60 $7.30 $12.10 $0.00 06/01/2014 $31.49 $9.41 $8.80 $0.00 $0.00 $49.70 12/01/2015 08/01/2014 $31.49 $9.91 $8.80 $0.00 06/01/2016 $50.20 $7.30 12/01/2014 $31.49 $9.91 $9.33 $0.00 $7.30 $50.73 $0.00 06/01/2015 $31.84 $9.91 $9.33 $0.00 $51.08 08/01/2015 $31.84 $10.41 $9.33 $0.00 $51.58 12/01/2015 $31.84 $10.41 $10.08 $0.00 $52.33 06/01/2016 $32.34 $10.41 $10.08 $0.00 $52.83 08/01/2016 $32.34 $10.91 $10.08 $0.00 $53.33 12/01/2016 $32.34 $10.91 $10.89 $0.00 $54.14 ADS/SUBMERSIBLE PILOT 08/01/2013 $84.21 $9.80 $18.17 $0.00 $112.18 PILE DRIVEN? LOCAL 56 (ZONE I) 08/01/2014 $87.36 $9.80 $18.17 $0.00 $115.33 08/01/2015 $90.51 $9.80 $18.17 $0.00 $118.48 AIR TRACK OPERATOR LABORERS -7ONE2 For apprentice rates see "Apprentice- LABORER" 12/01/2013 - $30.60 $7.30 $12.10 $0.00 $50.00 06/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 12/01/2014 $31.60 $7.30 $12.10 $0.00 $51.00 06/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 12/01/2015 $32.60 $7.30 $12.10 $0.00 $52.00 06/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 12/01/2016 $33.85 $7.30 $12.10 $0.00 $53.25 ---------------------------------------------------------------------------------------------------------------- ------------------------ Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 2 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 12/01/2013 $30.68 $10.40 $5.95 $0.00 $47.03 HEAT K FROST INSULATORS LOCAL 6 (BOSTON) 06/01/2014 $31.58 $10.40 $5.95 $0.00 $47.93 12/01/2014 $32.48 $10.40 $5.95 $0.00 $48.83 06/01/2015 $33.43 $10.40 $5.95 $0.00 $49.78 12/01/2015 $34.38 $10.40 $5.95 $0.00 $50.73 ASPHALT RAKER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - ZONE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPFRA TING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BACKHOE/FRONT-END LOADER 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERATING FNGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BARCO-TYPE JUMPING TAMPER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - 7.ONE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $1.2.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" BLOCK PAVER, RAMMER / CURB SETTER 12/01/2013 $30.60 $7.30 $12.10 $0.00 $50.00 LABORERS - ZONE 2 06/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 12/01/2014 $31.60 $7.30 $12.10 $0.00 $51.00 06/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 12/01/2015 $32.60 $7.30 $12.10 $0.00 $52.00 06/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 12/01/2016 $33.85 $7.30 $12.10 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" BOILER MAKER 01/01/2010 $37.70 $6.97 $11.18 $0.00 $55.85 BOILFRMAKERS LOCAL 29 ------------------------ ----------------------------------------------------------- - ------------------- ---------------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 3 of 39 a Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - BOILERMAKER - Local 29 Effective Date - 01/01/2010 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $24.51 $6.97 $11.18 $0.00 $42.66 2 65 $24.51 $6.97 $11.18 $0.00 $42.66 3 70 $26.39 $6.97 $11.18 $0.00 $44.54 4 75 $28.28 $6.97 $11.18 $0.00 $46.43 5 80 $30.16 $6.97 $11.18 $0.00 $48.31 6 85 $32.05 $6.97 $11.18 $0.00 $50.20 7 90 $33.93 $6.97 $11.18 $0.00 $52.08 8 95 $35.82 $6.97 $11.18 $0.00 $53.97 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:5 - - - - - - - - - - - - - - - - BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING) BRICKLAYERS LOCAL 3 (LYNN) 02/01/2014 $48.06 $10.18 $18.15 $0.00 $76.39 08/01/2014 $48.96 $10.18 $18.22 $0.00 $77.36 02/01/2015 $49.52 $10.18 $18.22 $0.00 $77.92 08/01/2015 $50.42 $10.18 $18.29 $0.00 $78.89 02/01/2016 $50.99 $10.18 $18.29 $0.00 $79.46 08/01/2016 $51.89 $10.18 $18.37 $0.00 $80.44 02/01/2017 $52.46 $10.18 $18.37 $0.00 $81.01 ------------------------------------- - -------------- -- ---------------------------------------------------------------------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 4 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- BRICK/PLASTERICEMENT MASON -Local 3 Lynn Effective Date - 02/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.03 $10.18 $18.15 $0.00 $52.36 2 60 $28.84 $10.18 $18.15 $0.00 $57.17 3 70 $33.64 $10.18 $18.15 $0.00 $61.97 4 80 $38.45 $10.18 $18.15 $0.00 $66.78 5 90 $43.25 $10.18 $18.15 $0.00 $71.58 Effective Date - 08/01/2014 Apprentice to Journeyworker Ratio:l:5 $35.20 $7.30 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.48 $10.18 $18.22 $0.00 $52.88 2 60 $29.38 $10.18 $18.22 $0.00 $57.78 3 70 $34.27 $10.18 $18.22 $0.00 $62.67 4 80 $39.17 $10.18 $18.22 $0.00 $67.57 5 90 $44.06 $10.18 $18.22 $0.00 $72.46 (Notes: Apprentice to Journeyworker Ratio:l:5 $35.20 $7.30 $12.90 $0.00 $55.40 BULLDOZER/GRADER/SCRAPER 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" CAISSON & UNDERPINNING BOTTOM MAN 12/01/2013 $34.45 $7.30 $12.90 $0.00 $54.65 Irl BORERS - FOUNDAT ION AND MARINE 06/01/2014 $35.20 $7.30 $12.90 $0.00 $55.40 12/01/2014 $35.95 $7.30 $12.90 $0.00 $56.15 06/01/2015 $36.70 $7.30 $12.90 $0.00 $56.90 12/01/2015 $37.45 $7.30 $12.90 $0.00 $57.65 06/01/2016 $38.20 $7.30 $12.90 $0.00 $58.40 12/01/2016 $39.20 $7.30 $12.90 $0.00 $59.40 For apprentice rates see "Apprentice- LABORER" CAISSON & UNDERPINNING LABORER 12/01/2013 $33.30 $7.30 $12.90 $0.00 $53.50 I.ABOIUiRS - FOUNDA770NAND MARINE 06/01/2014 $34.05 $7.30 $12.90 $0.00 $54.25 12/01/2014 $34.80 $7.30 $12.90 $0.00 $55.00 06/01/2015 $35.55 $7.30 $12.90 $0.00 $55.75 12/01/2015 $36.30 $7.30 $12.90 $0.00 $56.50 06/01/2016 $37.05 $7.30 $12.90 $0.00 $57.25 12/01/2016 $38.05 $7.30 $12.90 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" -------------------------------------- ------ -------------------------------------------- ----------- ---------- - --------------- - --- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 5 of 39 Classification CAISSON & UNDERPINNING TOP MAN LABORERS- I,OUNDATIONAND MARINE For apprentice rates see "Apprentice- LABORER" CARBIDE CORE DRILL OPERATOR LABORERS - 7.0NE 2 For apprentice rates see "Apprentice- LABORER" CARPENTER CARPENTERS -70NE 2 (4astern Massachusetts) Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate 12/01/2013 $33.30 $7.30 $12.90 $0.00 $53.50 06/01/2014 $34.05 $7.30 $12.90 $0.00 $54.25 12/01/2014 $34.80 $7.30 $12.90 $0.00 $55.00 06/01/2015 $35.55 $7.30 $12.90 $0.00 $55.75 12/01/2015 $36.30 $7.30 $12.90 $0.00 $56.50 06/01/2016 $37.05 $7.30 $12.90 $0.00 $57.25 12/01/2016 $38.05 $7.30 $12.90 $0.00 $58.25 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 03/01/2014 $34.78 $9.80 $15.91 $0.00 $60.49 09/01/2014 $35.55 $9.80 $15.91 $0.00 $61.26 03/01/2015 $36.32 $9.80 $15.91 $0.00 $62.03 ------------ -------------------------- ------------------------------------------------------------------ ------------------------------ Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 6 of 39 Classification Effective Date Base Wage Ilealth Pension Supplemental Total Rate Unemployment Apprentice - CARPENTER - Zone 2 Eastern MA Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.39 $9.80 $1.57 $0.00 $28.76 2 60 $20.87 $9.80 $1.57 $0.00 $32.24 3 70 $24.35 $9.80 $11.20 $0.00 $45.35 4 75 $26.09 $9.80 $11.20 $0.00 $47.09 5 80 $27.82 $9.80 $12.77 $0.00 $50.39 6 80 $27.82 $9.80 $12.77 $0.00 $50.39 7 90 $31.30 $9.80 $14.34 $0.00 $55.44 8 90 $31.30 $9.80 $14.34 $0.00 $55.44 Effective Date - 09/01/2014 i Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.78 $9.80 $1.57 $0.00 $29.15 2 60 $21.33 $9.80 $1.57 $0.00 $32.70 3 70 $24.89 $9.80 $11.20 $0.00 $45.89 4 75 $26.66 $9.80 $11.20 $0.00 $47.66 5 80 $28.44 $9.80 $12.77 $0.00 $51.01 6 80 $28.44 $9.80 $12.77 $0.00 $51.01 7 90 $32.00 $9.80 $14.34 $0.00 $56.14 8 90 $32.00 $9.80 $14.34 $0.00 $56.14 ----..,__---_.,:.----------._......._.--- (Notes: - --r ff� '-------------------._ Apprentice to Journeyworker Ratio: 1:5 ------------- i CEMENT MASONRY/PLASTERING B/UCKLAYE S LOCAL 3 (LYNN) 01/01/2014 $43.60 $10.90 $18.71 $1.30 07/01/2014 $43.77 $10.90 $18.71 $1.30 01/01/2015 $44.69 $10.90 $18.71 $1.30 07/01/2015 $45.29 $10.90 $18.71 $1.30 01/01/2016 $46.21 $10.90 $18.71 $1.30 $74.51 $74.68 $75.60 $76.20 $77.12 ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 7 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- CEMENT MASONRY/PLASTERING -Eastern Mass (Lynn) Effective Date- 01/01/2014 Step percent Apprentice Base Wage Health 1 50 $21.80 $10.90 2 60 $26.16 $10.90 3 65 $28.34 $10.90 4 70 $30.52 $10.90 5 75 $32.70 $10.90 6 80 $34.88 $10.90 7 90 $39.24 $10.90 Pension Supplemental Unemployment Total Rate $12.21 $1.30 $46.21 $13.71 $1.30 $52.07 $14.71 $1.30 $55.25 $15.71 $1.30 $58.43 $16.71 $1.30 $61.61 $17.71 $1.30 $64.79 $18.71 $1.30 $70.15 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.89 $10.90 $12.21 $1.30 $46.30 2 60 $26.26 $10.90 $13.71 $1.30 $52.17 3 65 $28.45 $10.90 $14.71 $1.30 $55.36 4 70 $30.64 $10.90 $15.71 $1.30 $58.55 5 75 $32.83 $10.90 $16.71 $1.30 $61.74 6 80 $35.02 $10.90 $17.71 $1.30 $64.93 7 90 $39.39 $10.90 $18.71 $1.30 $70.30 _....._-------------------------.......-___, (Notes: Steps 3,4 are 500 firs. All other steps are 1,000 lirs. T-------------�-.--.__.__._----------- Apprentice to Journeyworker Ratio:l:3 CHAIN SAW OPERATOR LABORERS - 7.ONI. 2 For apprentice rates see "Apprentice- LABORER" 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES 12/01/2013 $41.49 $10.00 $14.18 $0.00 $65.67 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" COMPRESSOR OPERATOR 12/01/2013 $28.11 $10.00 $14.18 $0.00 $52.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DELEADER (BRIDGE) 01/01/2014 $45.91 $7.85 $16.10 $0.00 $69.86 PAINT ERS LOCAL 35 - ZONE 2 07/01/2014 $46.76 $7.85 $16.10 $0.00 $70.71 01/01/2015 $47.66 $7.85 $16.10 $0.00 $71.61 07/01/2015 $48.56 $7.85 $16.10 $0.00 $72.51 01/01/2016 $49.51 $7.85 $16.10 $0.00 $73.46 07/01/2016 $50.46 $7.85 $16.10 $0.00 $74.41 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 --------------- --------------------------------------- --- --- -- ---- ------------------------------------------------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 8 of 39 Classification Effective Date Base Wage Health Pension SupplementalTotal Rate $0.00 $31.23 2 55 $25.72 Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS ` 3 60 $28.06 $7.85 Effective Date - 01/01/2014 $0.00 $39.90 4 65 $30.39 $7.85 $4.32 $0.00 $42.56 5 70 Supplemental $7.85 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.96 $7.85 $0.00 $0.00 $30.81 2 55 $25.25 $7.85 $3.66 $0.00 $36.76 3 60 $27.55 $7.85 $3.99 $0.00 $39.39 4 65 $29.84 $7.85 $4.32 $0.00 $42.01 5 70 $32.14 $7.85 $14.11 $0.00 $54.10 6 75 $34.43 $7.85 $14.44 $0.00 $56.72 7 80 $36.73 $7.85 $14.77 $0.00 $59.35 8 90 $41.32 $7.85 $15.44 $0.00 $64.61 Effective Date - 07/01/2014 $0.00 $55.75 Supplemental $36.50 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.38 $7.85 $0.00 $0.00 $31.23 2 55 $25.72 $7.85 $3.66 $0.00 $37.23 3 60 $28.06 $7.85 $3.99 $0.00 $39.90 4 65 $30.39 $7.85 $4.32 $0.00 $42.56 5 70 $32.73 $7.85 $14.11 $0.00 $54.69 6 75 $35.07 $7.85 $14.44 $0.00 $57.36 7 80 $37.41 $7.85 $14.77 $0.00 $60.03 8 90 $42.08 $7.85 $15.44 $0.00 $65.37 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - ---- Steps are 750 hrs. DEMO: BURNERS 12/01/2013 $34.25 $7.30 Apprentice to Journeyworker Ratio:1:1 $0.00 $54.25 LABORERS -7ONE2 DEMO: ADZEMAN LABORERS - 70N],,2 For apprentice rates see "Apprentice- LABORER" 12/01/2013 06/01/2014 12/01/2014 06/01/2015 12/01/2015 $33.50 $34.25 $35.00 $35.75 $36.50 $7.30 $7.30 $7.30 $7.30 $7.30 $12.70 $12.70 $12.70 $12.70 $12.70 $0.00 $0.00 $0.00 $0.00 $0.00 $53.50 $54.25 $55.00 $55.75 $56.50 DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2013 $34.50 $7.30 $12.70 $0.00 $54.50 LABORERS -7.ONE2 06/01/2014 $35.25 $7.30 $12.70 $0.00 $55.25 12/01/2014 $36.00 $7.30 $12.70 $0.00 $56.00 06/01/2015 $36.75 $7.30 $12.70 $0.00 $56.75 12/01/2015 $37.50 $7.30 $12.70 $0.00 $57.50 For apprentice rates see "Apprentice- LABORER" DEMO: BURNERS 12/01/2013 $34.25 $7.30 $12.70 $0.00 $54.25 LABORERS -7ONE2 06/01/2014 $35.00 $7.30 $12.70 $0.00 $55.00 12/01/2014 $35.75 $7.30 $12.70 $0.00 $55.75 06/01/2015 $36.50 $7.30 $12.70 $0.00 $56.50 12/01/2015 $37.25 $7.30 $12.70 $0.00 $57.25 For apprentice rates see "Apprentice- LABORER" ------------------------------------------------- ---------------------------------------------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 ------------------------------ Page 9 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment DEMO: CONCRETE CUTTER/SAWYER 12/01/2013 $34.50 $7.30 $12.70 $0.00 $54.50 LABORI3RS - ZONE 2 06/01/2014 $35.25 $7.30 $12.70 $0.00 $55.25 12/01/2014 $36.00 $7.30 $12.70 $0.00 $56.00 06/01/2015 $36.75 $7.30 $12.70 $0.00 $56.75 12/01/2015 $37.50 $7.30 $12.70 $0.00 $57.50 For apprentice rates see "Apprentice- LABORER" DEMO: JACKHAMMER OPERATOR 12/01/2013 $34.25 $7.30 $12.70 $0.00 $54.25 LABORERS-7,ONE2 06/01/2014 $35.00 $7.30 $12.70 $0.00 $55.00 12/01/2014 $35.75 $7.30 $12.70 $0.00 $55.75 06/01/2015 $36.50 $7.30 $12.70 $0.00 $56.50 12/01/2015 $37.25 $7.30 $12.70 $0.00 $57.25 For apprentice rates see "Apprentice- LABORER" DEMO: WRECKING LABORER 12/01/2013 $33.50 $7.30 $12.70 $0.00 $53.50 LABORERS - 701VE 2 06/01/2014 $34.25 $7.30 $12.70 $0.00 $54.25 12/01/2014 $35.00 $7.30 $12.70 $0.00 $55.00 06/01/2015 $35.75 $7.30 $12.70 $0.00 $55.75 12/01/2015 $36.50 $7.30 $12.70 $0.00 $56.50 For apprentice rates see "Apprentice- LABORER" DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DIVER 08/01/2013 $56.14 $9.80 $18.17 $0.00 $84.11 1111.E DRIVER LOCAL 56 (70NI, 1) 08/01/2014 $58.24 $9.80 $18.17 $0.00 $86.21 08/01/2015 $60.34 $9.80 $18.17 $0.00 $88.31 DIVER TENDER 08/01/2013 $40.10 $9.80 $18.17 $0.00 $68.07 PILFDRIVERLOCAL 56(70NE:1) 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 DIVER TENDER (EFFLUENT) 08/01/2013 $60.15 $9.80 $18.17 $0.00 $88.12 111LE DRIVER LOCAL 56 (70NE I) 08/01/2014 $62.40 $9.80 $1.8.17 $0.00 $90.37 08/01/2015 $64.65 $9.80 $18.17 $0.00 $92.62 DIVER/SLURRY (EFFLUENT) 08/01/2013 $84.21 $9.80 $18.17 $0.00 $112.18 PILE DRIVER LOCAL 56(70NE1) 08/01/2014 $87.36 $9.80 $18.17 $0.00 $115.33 08/01/2015 $90.51 $9.80 $18.17 $0.00 $118.48 DRAWBRIDGE OPERATOR (Construction) 03/01/2014 $44.45 $13.00 $14.68 $0.00 $72.13 ELECTRICIANS LOCAL 103 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN' ELECTRICIAN 03/01/2014 $44.45 $13.00 $14.68 $0.00 $72.13 E"LIiCTRICIANSLOCAL 103 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 --------------------- - ------------- ..----- ---- --------------------------------------------------------- ---- - - ---------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 10 of 39 Classification Apprentice- ELECTRICIAN- Local 103 Effective Date - 03/01/2014 Step percent 1 40 2 40 3 45 4 45 5 50 6 55 7 60 8 65 9 70 10 75 Effective Date - 09/01/2014 Step percent Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate $17.78 $13.00 $0.53 $0.00 $31.31 $17.78 $13.00 $0.53 $0.00 $31.31 $20.00 $13.00 $11.04 $0.00 $44.04 $20.00 $13.00 $11.04 $0.00 $44.04 $22.23 $13.00 $11.37 $0.00 $46.60 $24.45 $13.00 $11.70 $0.00 $49.15 $26.67 $13.00 $12.03 $0.00 $51.70 $28.89 $13.00 $12.37 $0.00 $54.26 $31.12 $13.00 $12.69 $0.00 $56.81 $33.34 $13.00 $13.03 $0.00 $59.37 Supplemental Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.05 $13.00 $0.54 $0.00 $31.59 2 40 $18.05 $13.00 $0.54 $0.00 $31.59 3 45 $20.30 $13.00 $11.05 $0.00 $44.35 4 45 $20.30 $13.00 $11.05 $0.00 $44.35 5 50 $22.56 $13.00 $11.38 $0.00 $46.94 6 55 $24.82 $13.00 $11.71 $0.00 $49.53 7 60 $27.07 $13.00 $12.04 $0.00 $52.11 8 65 $29.33 $13.00 $12.38 $0.00 $54.71 9 70 $31.58 $13.00 $12.71 $0.00 $57.29 10 75 $33.84 $13.00 $13.05 $0.00 $59.89 ---------------,®...._...__._.--®.._., Notes:: --- --- App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80 gg I - tio-----..._........---_.._---.-.....--- ApprenTice to Journeyworker Ra:2:3*** ELEVATOR CONSTRUCTOR 01/01/2012 $52.45 $8.78 $6.96 $0.00 $68.19 ELEVATOR CONSTRUCTORS LOCAL 4 ----------------------------------- - ---- ------------------------------------------- ----------------------- - - ------------------ -- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 11 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- ELEVATOR CONSTRUCTOR -Local 4 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.23 $8.78 $0.00 $0.00 $35.01 2 55 $28.85 $8.78 $6.96 $0.00 $44.59 3 65 $34.09 $8.78 $6.96 $0.00 $49.83 4 70 $36.72 $8.78 $6.96 $0.00 $52.46 5 80 $41.96 $8.78 $6.96 $0.00 $57.70 ---._.,_..._.___...._...._-----------_ (Notes: $7.30 $12.10 - - - - - - - i Steps 1-2 are 6 mos.; Steps 3-5 are 1 year $32.10 $7.30 $12.10 $0.00 I Apprentice to 3ourneyworker Ratio: .1 06/01/2016 $32.60 $7.30 $12.10 $0.00 ELEVATOR CONSTRUCTOR HELPER 01/01/2012 $38.59 $8.78 $6.96 $0.00 $54.33 E% EVATOR CONSTRUCTORS LOCAL 4 $52.75 For apprentice rates see "Apprentice- LABORER" For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR" FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2013 $38.73 FENCE & GUARD RAIL ERECTOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS -ZONE2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2013 $38.73 $10.00 $13.55 $0.00 $62.28 OPERATING ENGINEERS LOCAL 4 05/01/2014 $39.50 $10.00 $13.55 $0.00 $63.05 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENG.PARTY CHIEF-BLDG,SITE,HVY/HWY 11/01/2013 $40.15 $10.00 $13.55 $0.00 $63.70 011ERA7ING ENGINEERS LOCAL 4 05/01/2014 $40.92 $10.00 $13.55 $0.00 $64.47 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY 11/01/2013 $21.10 $10.00 $13.55 $0.00 $44.65 OPERA77NG ENGINEERS LOCAL 4 05/01/2014 $21.55 $10.00 $13.55 $0.00 $45.10 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIRE ALARM INSTALLER 03/01/2014 $44.45 $13.00 $14.68 $0.00 $72.13 ELECTRICIANS LOCAL 103 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN' FIRE ALARM REPAIR / MAINTENANCE 03/01/2014 $33.44 $13.00 $13.03 $0.00 $59.47 / COMMISSIONINGELEcTiacmNs LOCAL 103 09/01/2014 $33.84 $13.00 $13.05 $0.00 $59.89 03/01/2015 $34.38 $13.00 $13.06 $0.00 $60.44 09/01/2015 $35.10 $13.00 $13.08 $0.00 $61.18 03/01/2016 $35.81 $13.00 $13.10 $0.00 $61.91 For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN' -------------------------------------------------------- --- ------- - - - ---- ----------------------------------------- --- --------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 12 of 39 Classification FIREMAN (ASST. ENGINEER) OPEIM TING ENGINEFRS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment 12/01/2013 $33.76 $lo.00 $14-18 $0.00 $57.94 FLAGGER & SIGNALER 12/01/2013 $20.50 $7.30 $12.10 $0.00 $39.90 LABORE'RS - ZONE 2 $9.80 $1.79 $0.00 $33.52 3 60 $23.92 $9.80 06/01/2014 $20.50 $7.30 $12.10 $0.00 $39.90 $11.59 12/01/2014 $20.50 $7.30 $12.10 $0.00 $39.90 $0.00 06/01/2015 $20.50 $7.30 $12.10 $0.00 $39.90 $53.08 12/01/2015 $20.50 $7.30 $12.10 $0.00 $39.90 8 85 06/01/2016 $20.50 $7.30 $12.10 $0.00 $39.90 - - - - - 12/01/2016 $20.50 $7.30 $12.10 $0.00 $39.90 For apprentice rates see "Apprentice- LABORER" $62.96 - - - - - - - - - - Apprentice ioJourncyivorkcrR.ii.o 1:1 - - - - - - - - FLOORCOVERER 03/01/2014 $39.87 $9.80 $16.96 $0.00 $66.63 ELOORCO VERERS LOCAL 2168 ZONE I $40.91 $7.85 $16.10 $0.00 Apprentice- FLOORCOVERER -Local 2168 Zone I Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Healtb Pension Unemployment Total Rate 1 50 $19.94 $9.80 $1.79 $0.00 $31.53 2 55 $21.93 $9.80 $1.79 $0.00 $33.52 3 60 $23.92 $9.80 $11.59 $0.00 $45.31 4 65 $25.92 $9.80 $11.59 $0.00 $47.31 5 70 $27.91 $9.80 $13.38 $0.00 $51.09 6 75 $29.90 $9.80 $13.38 $0.00 $53.08 7 80 $31.90 $9.80 $15.17 $0.00 $56.87 8 85 $33.89 $9.80 $15.17 $0.00 $58.86 - - - - - - --- - - - Notes: - - - - - - - - - - - -- - - - - - - Steps are 750 hrs. $16.10 $0.00 $62.96 - - - - - - - - - - Apprentice ioJourncyivorkcrR.ii.o 1:1 - - - - - - - - - - - - - - - - FORK LIFT/CHERRY PICKER 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERA TING FNGINEERS LOCAL 4 For apprentice rates see 'Apprentice- OPERATING ENGINEERS" GENERATOR/LIGHTING PLANTMEATERS 12/01/2013 $28.11 $10.00 $14.18 $0.00 $52.29 OPE"RA TING FNGJNI,,ERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GLAZIER (GLASS PLANK/AIR BARRIERANTERIOR 01/01/2014 $35.41 $7.85 $16.10 $0.00 $59.36 SYSTEMS) GLA711,, RS LOCAL 35 (70NE 2) 07/01/2014 $36.56 $7.85 $16.10 $0.00 $60.51 01/01/2015 $37.16 $7.85 $16.10 $0.00 $61.11 07/01/2015 $38.06 $7.85 $16.10 $0.00 $62.01 01/01/2016 $39.01 $7.85 $16.10 $0.00 $62.96 07/01/2016 $39.96 $7.85 $16.10 $0.00 $63.91 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86 ----------------------------------- ---- --------------------------- ---------------------- - ----------------------- ------------------ Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 13 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate Unemplovment Apprentice- GLAZIER - Loca135 Zone 2 Effective Date - 01/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.71 $7.85 $0.00 $0.00 $25.56 2 55 $19.48 $7.85 $3.66 $0.00 $30.99 3 60 $21.25 $7.85 $3.99 $0.00 $33.09 4 65 $23.02 $7.85 $4.32 $0.00 $35.19 5 70 $24.79 $7.85 $14.11 $0.00 $46.75 6 75 $26.56 $7.85 $14.44 $0.00 $48.85 7 80 $28.33 $7.85 $14.77 $0.00 $50.95 8 90 $31.87 $7.85 $15.44 $0.00 $55.16 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.28 $7.85 $0.00 $0.00 $26.13 2 55 $20.11 $7.85 $3.66 $0.00 $31.62 3 60 $21.94 $7.85 $3.99 $0.00 $33.78 4 65 $23.76 $7.85 $4.32 $0.00 $35.93 5 70 $25.59 $7.85 $14.11 $0.00 $47.55 6 75 $27.42 $7.85 $14.44 $0.00 $49.71 7 80 $29.25 $7.85 $14.77 $0.00 $51.87 8 90 $32.90 $7.85 $15.44 $0.00 $56.19 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Notes: Steps are 750 hrs. I - - - - - - - - - - - - - - - - - - - - I �o J orker Ra Tio f.1 Apprentice ourneyw HOISTING ENGINEER/CRANES/GRADALLS OPENA TING ENGINEL16 LOCAL 4 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 ---------------------------------------------------- - ---- -------- --------------------------------------------------------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 14 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate Unemployment Apprentice- OPERATING ENGINEERS -Local 4 $42.76 $9.82 $19.74 $2.17 Effective Date - 12/01/2013 SHFFTMETAL WORKERS LOCAL 17 -A Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.27 $10.00 $0.00 $0.00 $32.27 2 60 $24.29 $10.00 $14.18 $0.00 $48.47 3 65 $26.32 $10.00 $14.18 $0.00 $50.50 4 70 $28.34 $10.00 $14.18 $0.00 $52.52 5 75 $30.37 $10.00 $14.18 $0.00 $54.55 6 80 $32.39 $10.00 $14.18 $0.00 $56.57 7 85 $34.42 $10.00 $14.18 $0.00 $58.60 8 90 $36.44 $10.00 $14.18 $0.00 $60.62 - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to 3ourneyworker Ratio:1:6 - - - - - - - - - - - - - - -- HVAC (ELECTRICAL CONTROLS) HVAC (DUCTWORK) 02/01/2014 $42.76 $9.82 $19.74 $2.17 $74.49 SHFFTMETAL WORKERS LOCAL 17 -A 08/01/2014 $43.61 $9.82 $19.74 $2.17 $75.34 02/01/2015 $44.51 $9.82 $19.74 $2.17 $76.24 08/01/2015 $45.51 $9.82 $19.74 $2.17 $77.24 02/01/2016 $46.51 $9.82 $19.74 $2.17 $78.24 08/01/2016 $47.66 $9.82 $19.74 $2.17 $79.39 02/01/2017 $48.76 $9.82 $19.74 $2.17 $80.49 08/01/2017 $49.86 $9.82 $19.74 $2.17 $81.59 02/01/2018 $51.01 $9.82 $19.74 $2.17 $82.74 For apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (ELECTRICAL CONTROLS) 03/01/2014 $44.45 $13.00 $14-68 $0.00 $72.13 E'LFCTRICIANS LOCAL 103 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN" HVAC (TESTING AND BALANCING - AIR) 02/01/2014 $42.76 $9.82 $19.74 $2.17 $74.49 SHEETMETAL WORKTRS LOCAL 17 -A 08/01/2014 $43.61 $9.82 $19.74 $2.17 $75.34 02/01/2015 $44.51 $9.82 $19.74 $2.17 $76.24 08/01/2015 $45.51 $9.82 $19.74 $2.17 $77.24 02/01/2016 $46.51 $9.82 $19.74 $2.17 $78.24 08/01/2016 $47.66 $9.82 $19.74 $2.17 $79.39 02/01/2017 $48.76 $9.82 $19.74 $2.17 $80.49 08/01/2017 $49.86 $9.82 $19.74 $2.17 $81.59 02/01/2018 $51.01 $9.82 $19.74 $2.17 $82.74 For apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (TESTING AND BALANCING -WATER) 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 111PEFITTERS LOCAL 53 7 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFFFrER" ------------------------ ------------------ .... ----------------------- ---------------------------- ------------------------------------ Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 15 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $42.01 2 60 $26.47 Unemployment $9.62 $0.00 11VAC MECHANIC 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 111PE'rITTERS LOCAL 53 7 (Local 138) 4 80 $35.29 $10.95 $10.86 $0.00 For apprentice rates see "Apprentire- PIPEFITrER" or "PLUMBERIPIPEFITTER" - - - - - - - - - - - Notes: - - - - - - - - - - - HYDRAULIC DRILLS 12/01/2013 $30.60 $7.30 $12.10 $0.00 $50.00 LA BORERS - ZONE 2 Apprentice to Journeyworker Ratio:1:4 06/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 $18.60 $0.00 12/01/2014 $31.60 $7.30 $12.10 $0.00 $51.00 $19.25 $0.00 06/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 12/01/2015 $32.60 $7.30 $12.10 $0.00 $52.00 06/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 12/01/2016 $33.85 $7.30 $12.10 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" INSULATOR (PIPES & TANKS) 09/01/2013 $42.11 $10.95 $12.10 $0.00 $65.16 HEAT& h-ROSTINSULATORS LOCAL 6 (BOSTON) 09/01/2014 $44.11 $10.95 $12.10 $0.00 $67.16 Apprentice- ASBESTOS INSULATOR (Pipes& Tanks) -Local 6 Boston Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.06 $10.95 $9.00 $0.00 $41.01 2 60 $25.27 $10.95 $9.62 $0.00 $45.84 3 70 $29.48 $10.95 $10.24 $0.00 $50.67 4 80 $33.69 $10.95 $10.86 $0.00 $55.50 Effective Date - 09/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.06 $10.95 $9.00 $0.00 $42.01 2 60 $26.47 $10.95 $9.62 $0.00 $47.04 3 70 $30.88 $10.95 $10.24 $0.00 $52.07 4 80 $35.29 $10.95 $10.86 $0.00 $57.10 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - Steps are I year Apprentice to Journeyworker Ratio:1:4 ]RONWORKER/WELDER 09/16/2013 $36.44 $7.70 $18.60 $0.00 $62.74 ]RONWORKERS LOCAL 7 (7AWJ?rNCE AREA) 03/16/2014 $36.78 $7.70 $19.25 $0.00 $63.73 -----------------------_-- ------------------------------------------ ---- ------------- -------------------- ----------- ----- -------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 16 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- IRONWORKER -Local 7 Lawrence Effective Date - 09/16/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $21.86 $7.70 $18.60 $0.00 $48.16 2 70 $25.51 $7.70 $18.60 $0.00 $51.81 3 75 $27.33 $7.70 $18.60 $0.00 $53.63 4 80 $29.15 $7.70 $18.60 $0.00 $55.45 5 85 $30.97 $7.70 $18.60 $0.00 $57.27 6 90 $32.80 $7.70 $18.60 $0.00 $59.10 Effective Date - 03/16/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $22.07 $7.70 $19.25 $0.00 $49.02 2 70 $25.75 $7.70 $19.25 $0.00 $52.70 3 75 $27.59 $7.70 $19.25 $0.00 $54.54 4 80 $29.42 $7.70 $19.25 $0.00 $56.37 5 85 $31.26 $7.70 $19.25 $0.00 $58.21 6 90 $33.10 $7.70 $19.25 $0.00 $60.05 - - - - - --- - - - Notes: - - - - - - - - - - - - - - - - - - - Structural 1:6; Ornamental 1:4 Appre. Tice Z Journeyworke, R. T. --- - - - - - - - - - - - - - - - JACKHAMMER & PAVING BREAKER OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 I-4BORERS - 70NE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For appi entice rates see "Apprentice- LABORER" LABORER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 LABORERS - 7ONF 2 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 ---------------- -------------------- ------------------------ ------------- __ ------------- ------------ ------------- ----------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 17 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER - Zone 2 Effective Date - 12/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.91 $7.30 $12.10 $0.00 $37.31 2 70 $20.90 $7.30 $12.10 $0.00 $40.30 3 80 $23.88 $7.30 $12.10 $0.00 $43.28 4 90 $26.87 $7.30 $12.10 $0.00 $46.27 Effective Date - 06/01/2014 $12.10 $0.00 $50.25 Supplemental 06/01/2015 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.21 $7.30 $12.10 $0.00 $37.61 2 70 $21.25 $7.30 $12.10 $0.00 $40.65 3 80 $24.28 $7.30 $12.10 $0.00 $43.68 4 90 $27.32 $7.30 $12.10 $0.00 $46.72 - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - - -- Appre.Tic oJourneyw.,,kerR.T.oi.5 - - - - - - - - - - - - - - - - - - - LABORER: CARPENTER TENDER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 1 A BORE"RS - 70NE 2 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: CEMENT FINISHER TENDER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 1-4130REMS - 70NE 2 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2013 $30.05 $7.30 $12.05 $0.00 $49.40 ]ABORERS - 70NE 2 06/01/2014 $30.55 $7.30 $12.05 $0.00 $49.90 12/01/2014 $31.05 $7.30 $12.05 $0.00 $50.40 06/01/2015 $31.55 $7.30 $12.05 $0.00 $50.90 12/01/2015 $32.05 $7.30 $12.05 $0.00 $51.40 For apprentice rates see "Apprentice- LABORER" -------------------- -------------------------------------------- -- ---------------------------------------------------------- ---------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 18 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment LABORER: MASON TENDER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - ZONE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" LABORER: MULTI -TRADE TENDER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 LA BORFRS - ZONE 2 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: TREE REMOVER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 LABORERS - ZONE 2 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 This classification applies to all tree work associated with the removal of standing trees, and trimming and removal of branches and limbs when the work is riot done for a utility company for the purpose of operation, maintenance or repair of utility company equipment. For apprentice rates see "Apprentice- LABORER" LASER BEAM OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORE16 - 70NE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10, $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" MARBLE & TILE FINISHERS 02/01/2014 $36.66 $10.18 $16.83 $0.00 $63.67 BRICKIA YERS LOCAL 3 - MARBLE & TILE 08/01/2014 $37.37 $10.18 $16.90 $0.00 $64.45 02/01/2015 $37.82 $10.18 $16.90 $0.00 $64.90 08/01/2015 $38.53 $10.18 $16.97 $0.00 $65.68 02/01/2016 $38.98 $10.18 $16.97 $0.00 $66.13 08/01/2016 $39.68 $10.18 $17.05 $0.00 $66.91 02/01/2017 $40.14 $10.18 $17.05 $0.00 $67.37 ---------------- --------------------------------------------------- ---------------------------------------------------------- -------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 19 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE& TILE FINISHER -Local 3 Marble& Tile Effective Date - 02/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.33 $10.18 $16.83 $0.00 $45.34 2 60 $22.00 $10.18 $16.83 $0.00 $49.01 3 70 $25.66 $10.18 $16.83 $0.00 $52.67 4 80 $29.33 $10.18 $16.83 $0.00 $56.34 5 90 $32.99 $10.18 $16.83 $0.00 $60.00 Effective Date - 08/01/2014 $77.96 08/01/2015 $50.46 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.69 $10.18 $16.90 $0.00 $45.77 2 60 $22.42 $10.18 $16.90 $0.00 $49.50 3 70 $26.16 $10.18 $16.90 $0.00 $53.24 4 80 $29.90 $10.18 $16.90 $0.00 $56.98 5 90 $33.63 $10.18 $16.90 $0.00 $60.71 - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - T ourneyw Appren Tice o J orker Ra Tio T3 - - - - - - - - - - - - - - - - - - - MARBLE MASONS,TILELAYERS & TERRAZZO MECH 02/01/2014 $48.10 $10.18 $18.15 $0.00 $76.43 BIUCKLAYERS LOCAL 3 -MARBLE& TILE 08/01/2014 $49.00 $10.18 $18.22 $0.00 $77.40 02/01/2015 $49.56 $10.18 $18-22 $0.00 $77.96 08/01/2015 $50.46 $10.18 $18.29 $0.00 $78.93 02/01/2016 $51.03 $10.18 $18.29 $0.00 $79.50 08/01/2016 $51.93 $10.18 $18.37 $0.00 $80.48 02/01/2017 $52.50 $10. 18 $18.37 $0.00 $81.05 ----------- ----- ------------------- ------------------------- ----------------- -- -------------------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 20 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $52.90 2 60 $29.40 Unemplov.ment Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble& Tile $0.00 $57.80 3 70 Effective Date - 02/01/2014 $10.18 $18.22 $0.00 Supplemental 4 80 Step percent Apprentice Base Wage Health Pension Unernployment Total Rate 1 50 $24.05 $10.18 $18.15 $0.00 $52.38 2 60 $28.86 $10.18 $18.15 $0.00 $57.19 3 70 $33.67 $10.18 $18.15 $0.00 $62.00 4 80 $38.48 $10.18 $18.15 $0.00 $66.81 5 90 $43.29 $10.18 $18.15 $0.00 $71.62 Effective Date - 08/01/2014 04/01/2014 $33.41 Supplemental $16.01 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.50 $10.18 $18.22 $0.00 $52.90 2 60 $29.40 $10.18 $18.22 $0.00 $57.80 3 70 $34.30 $10.18 $18.22 $0.00 $62.70 4 80 $39.20 $10.18 $18.22 $0.00 $67.60 5 90 $44.10 $10.18 $18.22 $0.00 $72.50 - - - - - - - - - - - Notes: - - - - - - - - - - - -- - - - - - ,��pp`re. .7,�eio-Jou-rne-y-tvo,-k,�,,-R. Tio f-5 - - - - - - - - - - - - - - - - MECH. SWEEPER OPERATOR (ON CONST. SITES) 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPE"RA TJNG ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" MECHANICS MAINTENANCE 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERA 77NG ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" MILLWRIGHT (Zone 2) 10/01/2013 $32.81 $9.80 $16.01 $0.00 $58.62 MILL WRIGHTS LOCAL 1121 - 7one 2 04/01/2014 $33.41 $9.80 $16.01 $0.00 $59.22 10/01/2014 $34.17 $9.80 $16.01 $0.00 $59.98 04/01/2015 $34.94 $9.80 $16.01 $0.00 $60.75 ----------------------- ---------------------------------------------- ---------------- ---------------- ---- ----------------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 21 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MILLWRIGHT- Local 1121 Zone 2 Effective Date - 10/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $18.05 $9.80 $4.40 $0.00 $32.25 2 65 $21.33 $9.80 $13.21 $0.00 $44.34 3 75 $24.61 $9.80 $14.01 $0.00 $48.42 4 85 $27.89 $9.80 $14.81 $0.00 $52.50 Effective Date - 04/01/2014 $12.10 $0.00 $50.50 Supplemental 06/01/2015 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $18.38 $9.80 $4.40 $0.00 $32.58 2 65 $21.72 $9.80 $13.21 $0.00 $44.73 3 75 $25.06 $9.80 $14.01 $0.00 $48.87 4 85 $28.40 $9.80 $14.81 $0.00 $53.01 - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - Steps are 2,000 hours - - - - - - - - - - - - - $0.00 $45.14 OJIERA TING ENGINEERS LOCAL 4 Apprentice to 3ourneyworker Ratio:1:5 - - - - - - - - - - - For apprentice rates see "Apprentice- OPERATING ENGINEERS" MORTAR MIXER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS-70NF2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABOFFR" OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2013 $20.96 $10.00 $14.18 $0.00 $45.14 OJIERA TING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OILER (TRUCK CRANES, GRADALLS) 12/01/2013 $24.43 $10.00 $14.18 $0.00 $48.61 0111,7RA 77NG ENGINFERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT - CLASS 11 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINELRS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PAINTER (BRIDGES/TANKS) 01/01/2014 $45.91 $7.85 $16.10 $0.00 $69.86 11AINTERS LOCAL 35 - ZONF 2 07/01/2014 $46.76 $7.85 $16.10 $0.00 $70.71 01/01/2015 $47.66 $7.85 $16.10 $0.00 $71.61 07/01/2015 $48.56 $7.85 $16.10 $0.00 $72.51 01/01/2016 $49.51 $7,85 $16.10 $0.00 $73.46 07/01/2016 $50.46 $7.85 $16.10 $0.00 $74.41 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 ------------ ------------ -------- ---- ------------ ---------- - - -- ------------------ ---------------------------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 22 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGESITANKS Effective Date - 01/01/2014 Step percent Apprentice Base Wage Health 1 50 $22.96 $7.85 2 55 $25.25 $7.85 3 60 $27.55 $7.85 4 65 $29.84 $7.85 5 70 $32.14 $7.85 6 75 $34.43 $7.85 7 80 $36.73 $7.85 8 90 $41.32 $7.85 Pension Supplemental Unemployment Total Rate $0.00 $0.00 $30.81 $3.66 $0.00 $36.76 $3.99 $0.00 $39.39 $4.32 $0.00 $42.01 $14.11 $0.00 $54.10 $14.44 $0.00 $56.72 $14.77 $0.00 $59.35 $15.44 $0.00 $64.61 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.38 $7.85 $0.00 $0.00 $31.23 2 55 $25.72 $7.85 $3.66 $0.00 $37.23 3 60 $28.06 $7.85 $3.99 $0.00 $39.90 4 65 $30.39 $7.85 $4.32 $0.00 $42.56 5 70 $32.73 $7.85 $14.11 $0.00 $54.69 6 75 $35.07 $7.85 $14.44 $0.00 $57.36 7 80 $37.41 $7.85 $14.77 $0.00 $60.03 8 90 $42.08 $7.85 $15.44 $0.00 $65.37 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - Steps are 750 hrs. Tppee.Ze i.-Jo`nrn-eywo`rkc-rRatio:1-:1 - - - - - - - - - - - - - - - - - PAINTER (SPRAY OR SANDBLAST, NEW) - * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PAINTE16 LOCAL 35 - ZONE 2 01/01/2014 $36.81 $7.85 $16.10 $0.00 $60.76 07/01/2014 $37.66 $7.85 $16.10 $0.00 $61.61 01/01/2015 $38.56 $7.85 $16.10 $0.00 $62.51 07/01/2015 $39.46 $7.85 $16.10 $0.00 $63.41 01/01/2016 $40.41 $7.85 $16.10 $0.00 $64.36 07/01/2016 $41.36 $7.85 $16.10 $0.00 $65.31 01/01/2017 $42.31 $7.85 $16.10 $0.00 $66.26 - ------ - - ---------------------------------- - --- ---------------- ------------ ---------------- - -------------- -------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 23 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 - SpraylSandblast -New Effective Date - 01/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.41 $7.85 $0.00 $0.00 $26.26 2 55 $20.25 $7.85 $3.66 $0.00 $31.76 3 60 $22.09 $7.85 $3.99 $0.00 $33.93 4 65 $23.93 $7.85 $4.32 $0.00 $36.10 5 70 $25.77 $7.85 $14.11 $0.00 $47.73 6 75 $27.61 $7.85 $14.44 $0.00 $49.90 7 80 $29.45 $7.85 $14.77 $0.00 $52.07 8 90 $33.13 $7.85 $15.44 $0.00 $56.42 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.83 $7.85 $0.00 $0.00 $26.68 2 55 $20.71 $7.85 $3.66 $0.00 $32.22 3 60 $22.60 $7.85 $3.99 $0.00 $34.44 4 65 $24.48 $7.85 $4.32 $0.00 $36.65 5 70 $26.36 $7.85 $14.11 $0.00 $48.32 6 75 $28.25 $7.85 $14.44 $0.00 $50.54 7 80 $30.13 $7.85 $14.77 $0.00 $52.75 8 90 $33.89 $7.85 $15.44 $0.00 $57.18 - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - - Steps are 750 Ins. - - - - - - - - - Apprentice to Journepvorker Ratio:J:I - - - - - - - - - - - - - - - PAINTER (SPRAY OR SANDBLAST, REPAINT) 01/01/2014 $34.87 $7.85 $16.10 $0.00 $58.82 PAINMRS LOCAL 35 - ZONE2 07/01/2014 $35.72 $7.85 $16.10 $0.00 $59.67 01/01/2015 $36.62 $7.85 $16.10 $0.00 $60.57 07/01/2015 $37.52 $7.85 $16.10 $0.00 $61.47 01/01/2016 $38.47 $7.85 $16.10 $0.00 $62.42 07/01/2016 $39.42 $7.85 $16.10 $0.00 $63.37 01/01/2017 $40.37 $7.85 $16.10 $0.00 $64.32 ------------------------------------------- --------------------------------- ---- -- ---- - ----------------------------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 24 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $25.71 2 55 $19.65 Unemployment Apprentice- PAINTER Local 35 Zone 2 - SpraylSandblast -Repaint $0.00 $31.16 3 60 $21.43 Effective Date - 01/01/2014 $3.99 $0.00 $33.27 4 65 $23.22 $7.85 $4.32 $0.00 $35.39 Supplemental $25.00 Step percent Apprentice Base Wage Healtb Pension Unemployment Total Rate 1 50 $17.44 $7.85 $0.00 $0.00 $25.29 2 55 $19.18 $7.85 $3.66 $0.00 $30.69 3 60 $20.92 $7.85 $3.99 $0.00 $32.76 4 65 $22.67 $7.85 $4.32 $0.00 $34.84 5 70 $24.41 $7.85 $14.11 $0.00 $46.37 6 75 $26.15 $7.85 $14.44 $0.00 $48.44 7 80 $27.90 $7.85 $14.77 $0.00 $50.52 8 90 $31.38 $7.85 $15.44 $0.00 $54.67 Effective Date - 07/01/2014 $16.10 $0.00 $60.21 01/01/2015 $37.16 $7.85 $16.10 $0.00 Supplemental Step percent Apprentice Base Wage Health Pension' Unemployment Total Rate 1 50 $17.86 $7.85 $0.00 $0.00 $25.71 2 55 $19.65 $7.85 $3.66 $0.00 $31.16 3 60 $21.43 $7.85 $3.99 $0.00 $33.27 4 65 $23.22 $7.85 $4.32 $0.00 $35.39 5 70 $25.00 $7.85 $14.11 $0.00 $46.96 6 75 $26.79 $7.85 $14.44 $0.00 $49.08 7 80 $28.58 $7.85 $14.77 $0.00 $51.20 8 90 $32.15 $7.85 $15.44 $0.00 $55.44 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - I Steps are 750 Ins. $52.50 For Apprentice rates see "Apprentice- LABORER" - - - - - - - - - - Apprentice to Journeyworker Ratio:1:1 - - - - - - - - - - - - - - - - $35.41 PAINTER (TRAFFIC MARKINGS) 12/01/2013 $29.85 $7.30 $12.10 $0.06 $49.25 LABORE'RS - 70NE 2 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 For Apprentice rates see "Apprentice- LABORER" PAINTER / TAPER (BRUSH, NEW) 01/01/2014 $35.41 $7.85 $16.10 $0.00 $59.36 * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PAINTFRS LOCAL 35 - ZONE 2 07/01/2014 $36.26 $7.85 $16.10 $0.00 $60.21 01/01/2015 $37.16 $7.85 $16.10 $0.00 $61.11 07/01/2015 $38.06 $7.85 $16.10 $0.00 $62.01 01/01/2016 $39.01 $7.85 $16.10 $0.00 $62.96 07/01/2016 $39.96 $7.85 $16.10 $0.00 $63.91 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86 ----------------------------------------------- --------------------------------------------------- ----------------------------------- - Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 25 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemuloyment Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW Effective Date - 01/01/2014 Step percent Apprentice Base Wage Health 1 50 $17.71 $7.85 2 55 $19.48 $7.85 3 60 $21.25 $7.85 4 65 $23.02 $7.85 5 70 $24.79 $7.85 6 75 $26.56 $7.85 7 80 $28.33 $7.85 8 90 $31.87 $7.85 Pension Supplemental Unemployment Total Rate $0.00 $0.00 $25.56 $3.66 $0.00 $30.99 $3.99 $0.00 $33.09 $4.32 $0.00 $35.19 $14.11 $0.00 $46.75 $14.44 $0.00 $48.85 $14.77 $0.00 $50.95 $15.44 $0.00 $55.16 Effective Date - 07/01/2014 $33.47 $7.85 $16.10 Supplemental $57.42 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.13 $7.85 $0.00 $0.00 $25.98 2 55 $19.94 $7.85 $3.66 $0.00 $31.45 3 60 $21.76 $7.85 $3.99 $0.00 $33.60 4 65 $23.57 $7.85 $4.32 $0.00 $35.74 5 70 $25.38 $7.85 $14.11 $0.00 $47.34 6 75 $27.20 $7.85 $14.44 $0.00 $49.49 7 80 $29.01 $7.85 $14.77 $0.00 $51.63 8 90 $32.63 $7.85 $15.44 $0.00 $55.92 - - - - - - - - - - - - - - - - - - - - Notes: Steps are 750 hrs. TPprentice to Journeyworker Ratio:I:1 - - - - - - - - - - - - - - - - - PAINTER / TAPER (BRUSH, REPAINT) PA INTFRS LOCAL 35 - 7ONE 2 01/01/2014 $33.47 $7.85 $16.10 $0.00 $57.42 07/01/2014 $34.32 $7.85 $16.10 $0.00 $58.27 01/01/2015 $35.22 $7.85 $16.10 $0.00 $59.17 07/01/2015 $36.12 $7.85 $16.10 $0.00 $60.07 01/01/2016 $37.07 $7.85 $16.10 $0.00 $61.02 07/01/2016 $38.02 $7.85 $16.10 $0.00 $61.97 01/01/2017 $38.97 $7.85 $16.10 $0.00 $62.92 ----------------------------------------------------- -- --------------------------------- - -- -------------------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 26 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate Unermfloyment Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date - 01/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.74 $7.85 $0.00 $0.00 $24.59 2 55 $18.41 $7.85 $3.66 $0.00 $29.92 3 60 $20.08 $7.85 $3.99 $0.00 $31.92 4 65 $21.76 $7.85 $4.32 $0.00 $33.93 5 70 $23.43 $7.85 $14.11 $0.00 $45.39 6 75 $25.10 $7.85 $14.44 $0.00 $47.39 7 80 $26.78 $7.85 $14.77 $0.00 $49.40 8 90 $30.12 $7.85 $15.44 $0.00 $53.41 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.16 $7.85 $0.00 $0.00 $25.01 2 55 $18.88 $7.85 $3.66 $0.00 $30.39 3 60 $20.59 $7.85 $3.99 $0.00 $32.43 4 65 $22.31 $7.85 $4.32 $0.00 $34.48 5 70 $24.02 $7.85 $14.11 $0.00 $45.98 6 75 $25.74 $7.85 $14.44 $0.00 $48.03 7 80 $27.46 $7.85 $14.77 $0.00 $50.08 8 90 $30.89 $7.85 $15.44 $0.00 $54.18 - - - - - --- - - - Notes: - - - - - - - - - - - - - - -- - - - - Steps are 750 hrs. -- - - - - - - - - - Apprentice to 3ourneyworker Ratio: 1:1 - - - - - - - - - - - - - - - PANEL & PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 TFAMSTETS JOINTCOUIVCIL NO. 10 70NE B PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2013 $40.10 $9.80 $18.17 $0.00 $68.07 DECK) PILE DRIVER LOCAL 56 (70NF 1) 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 PILE DRIVER 08/01/2013 $40.10 $9.80 $18.17 $0.00 $68.07 PILE- DRIVER LOCAL 56 (70NF 1) 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 ---------- --------------------------------- ..... I ..... 1- - ----------------------------------- ----------------------------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 27 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PILEDRIVER - Local56 Zone I Effective Date - 08/01/2013 Step percent Apprentice Base Wage Health 1 50 $20.05 $9.80 2 60 $24.06 $9.80 3 70 $28.07 $9.80 4 75 $30.08 $9.80 5 80 $32.08 $9.80 6 80 $32.08 $9.80 7 90 $36.09 $9.80 8 90 $36.09 $9.80 Pension Supplemental Unemployment Total Rate $18.17 $0.00 $48.02 $18.17 $0.00 $52.03 $18.17 $0.00 $56.04 $18.17 $0.00 $58.05 $18.17 $0.00 $60.05 $18.17 $0.00 $60.05 $18.17 $0.00 $64.06 $18.17 $0.00 $64.06 Effective Date - 08/01/2014 40 $18.80 $8.75 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.80 $9.80 $18.17 $0.00 $48.77 2 60 $24.96 $9.80 $18.17 $0.00 $52.93 3 70 $29.12 $9.80 $18.17 $0.00 $57.09 4 75 $31.20 $9.80 $18.17 $0.00 $59.17 5 80 $33.28 $9.80 $18.17 $0.00 $61.25 6 80 $33.28 $9.80 $18.17 $0.00 $61.25 7 90 $37.44 $9.80 $18.17 $0.00 $65.41 8 90 $37.44 $9.80 $18.17 $0.00 $65.41 - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - - A pp re.Zie T.-Jn`nrn-e"vo-rke-rRa-tio: 1-:3 - - - - - - - - - - - - - - - PIPEFITTER & STEAMFITTER 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 J11j1FFjT7Y,,'1?SLOCAL 537(Local 138) Apprentice- PIPEFITTER Local 537 (Local 138) Effective Date - 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.80 $8.75 $4.50 $0.00 $32.05 2 45 $21.15 $8.75 $12.39 $0.00 $42.29 3 60 $28.21 $8.75 $12.39 $0.00 $49.35 4 70 $32.91 $8.75 $12.39 $0.00 $54.05 5 80 $37.61 $8.75 $12.39 $0.00 $58.75 - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - I ** 1:3; 3:15; ]:10 thereafter/ Steps are I yr. Refrig/AC Mechanic ** 1: 1;1:2;2:4;3:6;4:8;5: 10;6:12;7:14;8:17;9:20;10:23(Max) - - - - - - - - - - - - - - - Tpprenticc to Journeyworker Ratio:** -------------------------------------------------------------------------- --- --- -- --- -- -- ------ ------ ------------------ Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 28 of 39 I Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate PIPELAYER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - 7ONE2 55 $24.93 $9.82 $8.08 $0.00 $42.83 4 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 5 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 Effective Date - 09/01/2014 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 percent Apprentice Base Wage 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 $16.22 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 $18.53 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" $9.82 $8.08 $0.00 $43.38 4 65 PLUMBER 03/01/2014 $45.33 $9.82 $14.29 $0.00 $69.44 PI UMBERS & GASrl7TER,3 LOCAL 12 (Local 138) $9.82 $10.85 $0.00 $55.42 - - Notes: - - - - - - - - - - - - - - 09/01/2014 $46.33 $9.82 $14.29 $0.00 $70.44 03/01/2015 $47.33 $9.82 $14.29 $0.00 $71.44 - - - - 09/01/2015 $48.33 $9.82 $14.29 $0.00 $72.44 03/01/2016 $49.48 $9.82 $14.29 $0.00 $73.59 09/01/2016 $50.53 $9.82 $14.29 $0.00 $74.64 03/01/2017 $51.53 $9.82 $14.29 $0.00 $75.64 Apprentice- PLUMBERIGASFITTER -Local 12 (Local 138) Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $15.87 $9.82 $5.33 $0.00 $31.02 2 40 $18.13 $9.82 $6.02 $0.00 $33.97 3 55 $24.93 $9.82 $8.08 $0.00 $42.83 4 65 $29. 46 $9.82 $9.47 $0.00 $48.75 5 75 $34.00 $9.82 $10.85 $0.00 $54.67 Effective Date - 09/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.22 $9.82 $5.33 $0.00 $31.37 2 40 $18.53 $9.82 $6.02 $0.00 $34.37 3 55 $25.48 $9.82 $8.08 $0.00 $43.38 4 65 $30.11 $9.82 $9.47 $0.00 $49.40 5 75 $34.75 $9.82 $10.85 $0.00 $55.42 - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - Steps are I yr Step 4 with lic$51.73 Step5 with lic$57.65 - - - - - -i - - - - - - - - - - - - - - - - - - �rker R .5 ApprcnZ� to Journeyw atio: PNEUMATIC CONTROLS (TEMP.) 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 J1JPF1,"J777,,"l?S LOCAL 537 (Local 138) For apprentice rates see "Apprentice- PIPEFITrER" or "PLUMBER/PIPEFITTER" ..... -.1 ------------- --- --- ---------- ...... ---------- ----- ----------------------- --------- ------------ ----------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 29 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PNEUMATIC DRILL/TOOL OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - ZONE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" POWDERMAN & BLASTER 12/01/2013 $30.85 $7.30 $12.10 $0.00 $50.25 LABORERS-ZONE2 06/01/2014 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2014 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2015 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2015 $32.85 $7.30 $12.10 $0.00 $52.25 06/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 12/01/2016 $34.10 $7.30 $12.10 $0.00 $53.50 For apprentice rates see "Apprentice- LABORER" POWER SHOVEL/DERRICKIFRENCHING MACHINE 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERA TING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (CONCRETE) 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 0111,7RA TING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (DEWATERING, OTHER) 12/01/2013 $28.11 $10.00 $14.18 $0.00 $52.29 OPERA TING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" READY -MIX CONCRETE DRIVER 04/30/2009 $25.80 $5.96 $5.34 $0.00 $37.10 TEAMSTERS LOCAL 42 RECLAIMERS 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERA TING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42 CARPENTFRS -70NE 2 (Residential Wood) RESIDENTIAL WOOD FRAME CARPENTER 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81 ** The Residential Wood Frame Carpenter classification applies only to the construction of new, wood frame residences that do not exceed four stories including the basement. cAPPENTERs-zoNE 2 (Residential Wood) As of 9/1/09 Carpentry work on wood-fraine residential WFATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. ----------------------------- -------- -------- --------------------------------------- ---- -- ----- ---- ---------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 30 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate Unemuloyment Apprentice- CARPENTER (Residential Wood Frame) -Zone 2 $7.30 $12.10 $0.00 $49.50 Effective Date - 05/01/2011 $30.60 $7.30 $12.10 Supplemental $50.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $14.54 $6.34 $0.00 $0.00 $20.88 2 60 $14.54 $6.34 $6.23 $0.00 $27.11 3 65 $15.76 $6.34 $6.23 $0.00 $28.33 4 70 $16.97 $6.34 $6.23 $0.00 $29.54 5 75 $18.18 $6.34 $6.23 $0.00 $30.75 6 80 $19.39 $6.34 $6.23 $0.00 $31.96 7 85 $20.60 $6.34 $6.23 $0.00 $33.17 8 90 $21.82 $6.34 $6.23 $0.00 $34.39 - - - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - L--- - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:5 - - - - - - - - - - - - RIDE -ON MOTORIZED BUGGY OPERATOR LA BORERS - 70N],," 2 For apprentice rates see "Apprentice- LABORER" 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 ROLLER/SPREADER/M-ULCFUNG MACHE\TE $40.11 $10.00 $14.18 $0.00 $64.29 OPENATING FNGINEERSLOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ROOFER (IncRoofer Waterprooffig &Roofer Damproofg) ROORERS LOCAL 33 02/01/2014 $39.21 $10.50 $10.70 $0.00 $60.41 08/01/2014 $40.11 $10.50 $10.70 $0.00 $61.31 02/01/2015 $41.01 $10.50 $10.70 $0.00 $62.21 08/01/2015 $41.91 $10.50 $10.70 $0.00 $63.11 02/01/2016 $42.81 $10.50 $10.70 $0.00 $64.01 ------------------------------------------------------------------- - ----------------------------------------------- -------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 31 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - ROOFER - Local 33 Effective Date - 02/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.61 $10.50 $3.38 $0.00 $33.49 2 60 $23.53 $10.50 $10.70 $0.00 $44.73 3 65 $25.49 $10.50 $10.70 $0.00 $46.69 4 75 $29.41 $10.50 $10.70 $0.00 $50.61 5 85 $33.33 $10.50 $10.70 $0.00 $54.53 Effective Date - 08/01/2014 $10.50 $10-70 $0.00 Supplemental For apprentice rates see "Apprentice- ROOFER" Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.06 $10.50 $3.38 $0.00 $33.94 2 60 $24.07 $10.50 $10.70 $0.00 $45.27 3 65 $26.07 $10.50 $10.70 $0.00 $47.27 4 75 $30.08 $10.50 $10.70 $0.00 $51.28 5 85 $34.09 $10.50 $10.70 $0.00 $55.29 - - - - - - - - - - - - - INotes: ** 1:5, 2:6-10, the 1: 10; Reroofing: 1:4, then 1: 1 - - - - - - - - - - - - - - - -- 1 I Step I is 2000 hrs.; Steps 2-5 are 1000 hrs. 08/01/2016 $47.66 $9.82 $19.74 I -- - - - Appren Tice Z Journeyworker Ra Tio.;* - - - - - - - - - - - - - - ROOFER SLATE / TILE / PRECAST CONCRETE 02/01/2014 $39.46 $10.50 $10-70 $0.00 $60.66 RO0r1,'1?S LOCAL 33 08/01/2014 $40.36 $10.50 $10.70 $0.00 $61.56 02/01/2015 $41.26 $10.50 $10.70 $0.00 $62.46 08/01/2015 $42.16 $10.50 $10.70 $0.00 $63.36 02/01/2016 $43.06 $10.50 $10-70 $0.00 $64.26 For apprentice rates see "Apprentice- ROOFER" SHEETMETAL WORKER 02/01/2014 $42.76 $9.82 $19.74 $2.17 $74.49 SHFIF7ME7AL WORM6 LOCAL 17- A 08/01/2014 $43.61 $9.82 $19.74 $2.17 $75.34 02/01/2015 $44.51 $9.82 $19.74 $2.17 $76.24 08/01/2015 $45.51 $9.82 $19.74 $2.17 $77.24 02/01/2016 $46.51 $9.82 $19.74 $2.17 $78.24 08/01/2016 $47.66 $9.82 $19.74 $2.17 $79.39 02/01/2017 $48.76 $9.82 $19.74 $2.17 $80.49 08/01/2017 $49.86 $9.82 $19.74 $2.17 $81.59 02/01/2018 $51.01 $9.82 $19.74 $2.17 $82.74 --------------------------------------------------------- --- ---- --- ----- - -- ---- ----- ----------------------------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 32 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SHEET METALWORKER Effective Date - 02/01/2014 Step percent -Local 17-A Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 40 $17.10 $9.82 $17.44 $4.28 $4.28 $0.00 $31.20 3 2 40 $17.10 $9.82 $8.70 $4.28 $39.27 $0.00 $31.20 $19.62 3 45 $19.24 $9.82 $39.27 $8.70 50 $1.13 $38.89 $9.49 4 45 $19.24 $9.82 50 $8.70 $9.82 $1.13 $38.89 $42.60 5 50 $21.38 $9.82 $9.82 $9.49 $1.40 $1.22 $41.91 65 6. 50 $21.38 $9.82 $1.48 $9.74 9 $1.23 $42.17 $9.82 7 60 $25.66 $9.82 10 $11.05 $37.07 $1.40 $47.93 $1.82 8 65 $27.79 $9.82 - - - - - $11.84 - - - - $1.48 $50.93 9 75 $32.07 $9.82 $13.41 $1.66 $56.96 - - 10 85 $36.35 $9.82 $14.48 $1.82 $62.47 Effective Date - 08/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.44 $9.82 $4.28 $0.00 $31.54 2 40 $17.44 $9.82 $4.28 $0.00 $31.54 3 45 $19.62 $9.82 $8.70 $1.13 $39.27 4 45 $19.62 $9.82 $8.70 $1.13 $39.27 5 50 $21.81 $9.82 $9.49 $1.22 $42.34 6 50 $21.81 $9.82 $9.74 $1.23 $42.60 7 60 $26.17 $9.82 $11.05 $1.40 $48.44 8 65 $28.35 $9.82 $11.84 $1.48 $51.49 9 75 $32.71 $9.82 $13.41 $1.66 $57.60 10 85 $37.07 $9.82 $14.48 $1.82 $63.19 - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - I Steps are 6 mos. Appren Tice �o Journeyworker Ra Tiwf.4 - - - - - - - - - - SIGN ERECTOR PAINTEYS LOCAL 35 - ZONE 2 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93 -------------------------------------------------- ------------------------------------------------------ ------------------- ------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 33 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $49.74 $49.45 $31.88 Unemplovment Apprentice- SIGN ERECTOR -Local 35 Zone 2 $8.80 $0.00 .$31.88 Effective Date - 06/01/2013 $8.80 08/01/2014 $31.59 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $12.91 $7.07 $0.00 $0.00 $19.98 2 55 $14.20 $7.07 $2.45 $0.00 $23.72 3 60 $15.49 $7.07 $2.45 $0.00 $25.01 4 65 $16.78 $7.07 $2.45 $0.00 $26.30 5 70 $18.07 $7.07 $7.05 $0.00 $32.19 6 75 $19.36 $7.07 $7.05 $0.00 $33.48 7 80 $20.65 $7.07 $7.05 $0.00 $34.77 8 85 $21.94 $7.07 $7.05 $0.00 $36.06 9 90 $23.23 $7.07 $7.05 $0.00 $37.35 - - - - - - - - - - - - - - - - - - - - - - - - - - - - Notes: Steps are 4 mos. I - - - - - - - - - - - - - - - - - Tpprcn Tic, �o Journeywoke, RaTio-iT- SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2013 $31.24 $9.41 $8.80 $0.00 $49.74 $49.45 $31.88 TFAMSTE16 JOIN7'COUNCII, NO. 10 ZONE B 06/01/2014 $31.59 $9.41 $8.80 $0.00 .$31.88 $49.80 $8.80 08/01/2014 $31.59 $9.91 $8.80 $0.00 $9.33 $50.30 $51.12 12/01/2014 $31.59 $9.91 $9.33 $0.00 $51.47 $50.83 $32.23 06/01/2015 $31.94 $9.91 $9.33 $0.00 $32.23 $51.18 $10.08 08/01/2015 $31.94 $10.41 $9.33 $0.00 $10.08 $51.68 $53.22 12/01/2015 $31.94 $10.41 $10-09 $0.00 $53.72 $52.43 $32.73 06/01/2016 $32.44 $10.41 $10-08 $0.00 $52.93 08/01/2016 $32.44 sio.9i $10-08 $0.00 $53.43 12/01/2016 $32.44 $10.91 $10-89 $0.00 $54.24 SPECIALIZED EARTH MOVING EQUIP > 35 TONS TEAMSTERSJOINTCOUNCILN0. IOZONEB 12/01/2013 $31.53 $9.41 $8.80 $0.00 $49.74 06/01/2014 $31.88 $9.41 $8.80 $0.00 $50.09 08/01/2014 .$31.88 $9.91 $8.80 $0.00 $50.59 12/01/2014 $31.88 $9.91 $9.33 $0.00 $51.12 06/01/2015 $32.23 $9.91 $9.33 $0.00 $51.47 08/01/2015 $32.23 $10.41 $9.33 $0.00 $51.97 12/01/2015 $32.23 $10.41 $10.08 $0.00 $52.72 06/01/2016 $32.73 $10.41 $10.08 $0.00 $53.22 08/01/2016 $32.73 sio.9i $10-08 $0.00 $53.72 12/01/2016 $32.73 $10.91 $10.89 $0.00 $54.53 ------------- ------------------ ---- --------------- -- --- - - --------------- ---- --- --------------------------- -- - --- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 34 of 39 Classification SPRINKLER FITTER SPRINKLER 1,17-17, RS LOCAL 550 - (Section B) Zone 2A EffectiveDate BaseWage Health Pension Supplemental Unemployment Total Rate 03/01/2014 $48.22 $8.42 $13.60 $0.00 $70.24 10/01/2014 $49.26 $8.42 $13.60 $0.00 $71.28 01/01/2015 $49.26 $8.42 $13.75 $0.00 $71.43 03/01/2015 $50.16 $8.42 $13.75 $0.00 $72.33 10/01/2015 $51.20 $8.42 $13.75 $0.00 $73.37 01/01/2016 $51.20 $8.67 $13.90 $0.00 $73.77 03/01/2016 $52.10 $8.67 $13.90 $0.00 $74.67 10/01/2016 $53.14 $8.67 $13.90 $0.00 $75.71 03/01/2017 $54.00 $8.67 $13.90 $0.00 $76.57 Apprentice- SPRINKLER FITTER -Local 550 (Section B) Zone 2A Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.88 $8.42 $8.25 $0.00 $33.55 2 40 $19.29 $8.42 $8.25 $0.00 $35.96 3 45 $21.70 $8.42 $8.25 $0.00 $38.37 4 50 $24.11 $8.42 $8.25 $0.00 $40.78 5 55 $26.52 $8.42 $8.25 $0.00 $43.19 6 60 $28.93 $8.42 $8.25 $0.00 $45.60 7 65 $31.34 $8.42 $8.25 $0.00 $48.01 8 70 $33.75 $8.42 $8.25 $0.00 $50.42 9 75 $36.17 $8.42 $8.25 $0.00 $52.84 10 80 $38.58 $8.42 $8.25 $0.00 $55.25 Effective Date - 10/01/2014 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 35 $17.24 $8.42 $8.25 $0.00 $33.91 2 40 $19.70 $8.42 $8.25 $0.00 $36.37 3 45 $22.17 $8.42 $8.25 $0.00 $38.84 4 50 $24.63 $8.42 $8.25 $0.00 $41.30 5 55 $27.09 $8.42 $8.25 $0.00 $43.76 6 60 $29.56 $8.42 $8.25 $0.00 $46.23 7 65 $32.02 $8.42 $8.25 $0.00 $48.69 8 70 $34.48 $8.42 $8.25 $0.00 $51.15 9 75 $36.95 $8.42 $8.25 $0.00 $53.62 10 80 $39.41 $8.42 $8.25 $0.00 $56.08 - - - - - - - - - - INotes: Apprentice entered prior 9/30/10: - - - - - - - - - - - - - - - - - - - 1 40/45/50/55/60/65/70/75/80/85 ISteps are 850 hours - - - - - - I Appren Tice to Journeyworker Ra Tio i.3 - - - - - - - - - - - - - - - - - STEAM BOILER OPERATOR 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEFRS LOCAL 4 For apprentice rates see 'Apprentice- OPERATING ENGINEERS" TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPE"IM TING rNGINrr]?S LOCAL 4 ------------------------- --- ----------------- -------------------- --- -------------------------- ------------ ------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 35 of 39 Classification For apprentice rates see "Apprentice- OPERATING ENGINEERS" EffectiveDate BaseWage Health Pension Supplemental Unemployment Total Rate TELECOMMUNICATION TECHNICIAN 03/01/2014 $33.44 $13.00 $13.03 $0.00 $59.47 E"I ECTRICIANS LOCAL 103 09/01/2014 $33.84 $13.00 $13.05 $0.00 $59.89 4 03/01/2015 $34.38 $13.00 $13.06 $0.00 $60.44 5 09/01/2015 $35.10 $13.00 $13-08 $0.00 $61.18 6 03/01/2016 $35.81 $13.00 $13.10 $0.00 $61.91 Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $13.38 $13.00 $0.40 $0.00 $26.78 2 40 $13.38 $13.00 $0.40 $0.00 $26.78 3 45 $15.05 $13.00 $10.29 $0.00 $38.34 4 45 $15.05 $13.00 $10.29 $0.00 $38.34 5 50 $16.72 $13.00 $10.54 $0.00 $40.26 6 55 $18.39 $13.00 $10.79 $0.00 $42.18 7 60 $20.06 $13.00 $11.04 $0.00 $44.10 8 65 $21.74 $13.00 $11.29 $0.00 $46.03 9 70 $23.41 $13.00 $11.54 $0.00 $47.95 10 75 $25.08 $13.00 $11.79 $0.00 $49.87 Effective Date - 09/01/2014 - - - - - - - - Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $13.54 $13.00 $0.41 $0.00 $26.95 2 40 $13.54 $13.00 $0.41 $0.00 $26.95 3 45 $15.23 $13.00 $10.30 $0.00 $38.53 4 45 $15.23 $13.00 $10.30 $0.00 $38.53 5 50 $16.92 $1100 $10.55 $0.00 $40.47 6 55 $18.61 $13.00 $10.80 $0.00 $42.41 7 60 $20.30 $13.00 $11.05 $0.00 $44.35 8 65 $22.00 $13.00 $11.30 $0.00 $46.30 9 70 $23.69 $13.00 $11.55 $0.00 $48.24 10 75 $25.38 $13.00 $11.80 $0.00 $50.18 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - Appreniiiec �o Journeyworker Ra Tio iT- - - - - - - - - - - - - - - - - TERRAZZO FINISHERS 02/01/2014 $47.00 $10.18 $18.15 $0.00 $75.33 BRICKI-4YERSLOCAL 3 -WRBLE&, TILE 08/01/2014 $47.90 $10.18 $18.22 $0.00 $76.30 02/01/2015 $48.46 $10.18 $18.22 $0.00 $76.86 08/01/2015 $49.36 $10.18 $18.29 $0.00 $77.83 02/01/2016 $49.93 $10.18 $18.29 $0.00 $78.40 08/01/2016 $50.83 $10.18 $18.37 $0.00 $79.38 02/01/2017 $51.40 $10.18 $18.37 $0.00 $79.95 ----------------------- ------------------------------------------------------------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 --- --- - -------------------------- Page 36 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemi)lo,vmcnt Apprentice- TERRAZZO FJNJSHER -Local 3 Marble& Tile Effective Date - 02/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.50 $10.18 $18.15 $0.00 $51.83 2 60 $28.20 $10.18 $18.15 $0.00 $56.53 3 70 $32.90 $10.18 $18.15 $0.00 $61.23 4 80 $37.60 $10.18 $18.15 $0.00 $65.93 5 90 $42.30 $10.18 $18.15 $0.00 $70.63 Effective Date - 08/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.95 $10.18 $18.22 $0.00 $52.35 2 60 $28.74 $10.18 $18.22 $0.00 $57.14 3 70 $33.53 $10.18 $18.22 $0.00 $61.93 4 80 $38.32 $10.18 $18.22 $0.00 $66.72 5 90 $43.11 $10.18 $18.22 $0.00 $71.51 - - - - - - - Notes: - - - - - - - - - - - - - - - - - - - - - A p p re nii�, i. -Jo -urn-eywurke _rRatio: 1-:3 - - - - - - - - - - - -- - - - TEST BORING DRILLER 12/01/2013 $34.70 $7.30 $12.90 $0.00 $54.90 LABORERS- FOUNDATIONANDMARINr 06/01/2014 $35.45 $7.30 $12.90 $0.00 $55.65 12/01/2014 $36.20 $7.30 $12.90 $0.00 $56.40 06/01/2015 $36.95 $7.30 $12.90 $0.00 $57.15 12/01/2015 $37.70 $7.30 $12.90 $0.00 $57.90 06/01/2016 $38.45 .$7.30 $12.90 $0.00 $58.65 12/01/2016 $39.45 $7.30 $12.90 $0.00 $59.65 For apprentice rates see "Apprentice- LABORER" TEST BORING DRILLER HELPER 12/01/2013 $33.42 $7.30 $12.90 $0.00 $53.62 LABORERS - TOUNDATIONAND WRINI, 06/01/2014 $34.17 $7.30 $12.90 $0.00 $54.37 12/01/2014 $34.92 $7.30 $12.90 $0.00 $55.12 06/01/2015 $35.67 $7.30 $12.90 $0.00 $55.87 12/01/2015 $36.42 $7.30 $12.90 $0.00 $56.62 06/01/2016 $37.17 $7.30 $12.90 $0.00 $57.37 12/01/2016 $38.17 $7.30 $12.90 $0.00 $58.37 For apprentice rates see "Apprentice- LABORER" TEST BORING LABORER 12/01/2013 $33.30 $7.30 $12.90 $0.00 $53.50 1 ABORERS - FOUNDA77ONAND WRINE 06/01/2014 $34.05 $7.30 $12.90 $0.00 $54.25 12/01/2014 $34.80 $7.30 $12.90 $0.00 $55.00 06/01/2015 $35.55 $7.30 $12.90 $0.00 $55.75 12/01/2015 $36.30 $7.30 $12.90 $0.00 $56.50 06/01/2016 $37.05 $7.30 $12.90 $0.00 $57.25 12/01/2016 $38.05 $7.30 $12.90 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" ----------------------------------------- ------------------ Issue Date: 03/14/2014 ---------- -------------------- Wage Request Number: 20140313-004 ---------- - ------------------------ Page 37 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TRACTORS/PORTABLE STEAM GENERATORS 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERA TING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2013 $31.82 $9.41 $8.80 $0.00 $50.03 7'1,,"AMSTEI?S.JOJN7'COUNCII,NO. IOZONEB 06/01/2014 $32.17 $9.41 $8.80 $0.00 $50.38 08/01/2014 $32.17 $9.91 $8.80 $0.00 $50.88 12/01/2014 $32.17 $9.91 $9.33 $0.00 $51.41 06/01/2015 $32.52 $9.91 $9.33 $0.00 $51.76 08/01/2015 $32.52 $10.41 $9.33 $0.00 $52.26 12/01/2015 $32.52 $10.41 $10.08 $0.00 $53.01 06/01/2016 $33.02 $10.41 $10.08 $0.00 $53.51 08/01/2016 $33.02 $10.91 $10-08 $0.00 $54.01 12/01/2016 $33.02 $10.91 $10.89 $0.00 $54.82 TUNNEL WORK - COMPRESSED AIR 12/01/2013 $45.58 $7.30 $13.30 $0.00 $66.18 JA BORERS (COMPRESSED AIR) 06/01/2014 $46.33 $7.30 $13.30 $0.00 $66.93 12/01/2014 $47.08 $7.30 $13.30 $0.00 $67.68 06/01/2015 $47.83 $7.30 $13.30 $0.00 $68.43 12/01/2015 $48.58 $7.30 $13.30 $0.00 $69.18 06/01/2016 $49.33 $7.30 $13.30 $0.00 $69.93 12/01/2016 $50.33 $7.30 $13.30 $0.00 $70.93 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) 12/01/2013 $47.58 $7.30 $13.30 $0.00 $68.18 LABORERS (COMPRIMEDAIR) 06/01/2014 $48.33 $7.30 $13.30 $0.00 $68.93 12/01/2014 $49.08 $7.30 $13.30 $0.00 $69.68 06/01/2015 $49.83 $7.30 $13.30 $0.00 $70.43 12/01/2015 $50.58 $7.30 $13.30 $0.00 $71.18 06/01/2016 $51.33 $7.30 $13.30 $0.00 $71.93 12/01/2016 $52.33 $7.30 $13.30 $0.00 $72.93 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - FREE AIR 12/01/2013 $37.65 $7.30 $13.30 $0.00 $58.25 LABORERS (TRIE AIR TUNNEL) 06/01/2014 $38.40 $7.30 $13.30 $0.00 $59.00 12/01/2014 $39.15 $7.30 $13.30 $0.00 $59.75 06/01/2015 $39.90 $7.30 $13.30 $0.00 $60.50 12/01/2015 $40.65 $7.30 $13.30 $0.00 $61.25 06/01/2016 $41.40 $7.30 $13.30 $0.00 $62.00 12/01/2016 $42.40 $7.30 $13.30 $0.00 $63.00 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - FREE AIR (HAZ. WASTE) 12/01/2013 $39.65 $7.30 $13.30 $0.00 $60.25 LABORERS (TREI, All? TUNNEL) 06/01/2014 $40.40 $7.30 $13.30 $0.00 $61.00 12/01/2014 $41.15 $7.30 $13.30 $0.00 $61.75 06/01/2015 $41.90 $7.30 $13.30 $0.00 $62.50 12/01/2015 $42.65 $7.30 $13.30 $0.00 $63.25 06/01/2016 $43.40 $7.30 $13.30 $0.00 $64.00 12/01/2016 $44.40 $7.30 $13.30 $0.00 $65.00 For apprentice rates see "Apprentice- LABORER" ------------------ ------------------------------------------------------------------------------------------------------------------------ Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 38 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 06/01/2014 $30.60 $7.30 $12.10 Unemployment $50.00 VAC -HAUL 12/01/2013 $31.24 $9.41 $8.80 $0.00 $49.45 TEAMSTERS JOINT COUNCIL NO. 10 7ONE B $31.60 $7.30 $12.10 $0.00 $51.00 06/01/2014 $31.59 $9.41 $8.80 $0.00 $49.80 08/01/2014 $31.59 $9.91 $8.80 $0.00 $50.30 12/01/2014 $31.59 $9.91 $9.33 $0.00 $50.83 06/01/2015 $31.94 $9.91 $9.33 $0.00 $51.18 08/01/2015 $31.94 $10.41 $9.33 $0.00 $51.68 12/01/2015 $31.94 $10.41 $10.08 $0.00 $52.43 06/01/2016 $32.44 $10.41 $10-08 $0.00 $52.93 08/01/2016 $32.44 $10.91 $10.08 $0.00 $53.43 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24 WAGON DRILL OPERATOR LA BORERS - IONE 2 For apprentice rates see "Apprentice- LABORER" WASTE WATER PUMP OPERATOR OPE'RA TING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" WATER METER INSTALLER PL UMBERS &, GA SFITTERS LOCAL 12 (Local 138) 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 . $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 03/01/2014 $45.33 $9.82 $14.29 $0.00 $69.44 09/01/2014 $46.33 $9.82 $14.29 $0.00 $70.44 03/01/2015 $47.33 $9.82 $14.29 $0.00 $71.44 09/01/2015 $48.33 $9.82 $14.29 $0.00 $72.44 03/01/2016 $49.48 $9.82 $14.29 $0.00 $73.59 09/01/2016 $50.53 $9.82 $14.29 $0.00 $74.64 03/01/2017 $51.53 $9.82 $14.29 $0.00 $75.64 For apprentice rates see "Apprentice- PLUMBERNIPEFITTER" or "PLUMBER/GASFITTER" Additional Apprentice Infonnation: Mininiurn wage rates for apprentices employed on public works projects are listed above as a percentage ofthe pre-deterinined hourly wage rate established by tile Commissioner under the provisions ofthe M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L c. 23, ss. I IE -1 IL. All apprentices inust be registered with the Division ofApprenticeship Training in accordancewith M.G.L. c. 23, ss. I IE -I IL. All steps are six nionths (1000 hours) unless otherwise specified. Ratios are expressed in allowable number ofapprentices tojourneyinen or fraction thereof Multiple ratios are listed in the comment field. APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4�5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. - ----------------- ----------------------------- -------------------- --- ----------------------------------------------------- --------- Issue Date: 03/14/2014 Wage Request Number: 20140313-004 Page 39 of 39 Santilli, Ray From: Thibodeau, Bruce Sent: Wednesday, March 12, 2014 2:10 PM To: Santilli, Ray Subject: FW: Markings Inc. Contract Ray, Based upon the information Dan received, I recommend entering into the one year extension with Markings Inc. Bruce D. Thibodeau, P.E. Director, Department of Public Works Town of North Andover 384 Osgood Street North Andover, MA 01845 Phone 978.685.0950 Fax 978.688.9573 Email bthibodeau townofnorthandover.com Web www.TownofNorthAndover.com From: Concessi, Dan Sent: Wednesday, March 12, 2014 12:47 PM To: Thibodeau, Bruce Subject: Markings Inc. Contract Hi Bruce, Markings Inc. can hold their price on the thermoplastic and the epoxy for another year, however they will need a 10% increase in their water based paint prices. This is a real good deal for the town since we don't use water based paints. Accordingly, I would recommend that we extend their contract with the increase on the paint. Dan C. Daniel J. Concessi Division of Public Works Assistant Operations Manager Town of North Andover 384 Osgood Street North Andover, MA 01845 Phone/cell 978.685.0950 x44016/ 978.476.2029 Fax 978.688.9573 Email dconcessiPtownofnorthandover.com Request Official Wage Schedule Confirmation Page I of 2 Your request for an Official Prevailing Wage Schedule has been successfully received and is being processed by DOS. The schedule will be emailed to the email address provided in your request. Please note the wage request number 20140313-004 for future inquires. Request another official Wage Schedule http://prevailingwage.detma.org/WageRequest.aspx?wr=121&AspxAutoDetectCookieSup... 3/13/2014 Purchase Order Town of North Andover No. 140991 384 Osgood Street North Andover MA 01845 P.O. Date: 08/07/2013 Questions ? Ext: Account: P.O. Issued To: Ship To: Markings Inc North Andover Public Works 30 Riverside Drive Attn: Jo -Ann Lanen Pembroke MA 02359 384 Osgood Street North Andover MA 01845 Contact: Location: PublicWorks (978) 688-9570 Phone: (781) 826-5171 Fax: Project: Undesignated Req# 141041 Reference: Date Required: 08/21/2013 Award Number: 665 Line Qty Unit Part# Description Account Number Unit Price Extended Tax Freight 1 5000 EA CHP 90 3729 -Pavement 3105011.1.0.0429.3729.2.580000. 0000. 0000. 00. 00 1.00 5,000.00 0,00 0.00 Markings on Ash ST Approval Log Approved By Date Notes jlanen 08/06/13 Requisition Submitted for Approval bthibodeau 08/07/13 rsantilli 08/07/13 Isavage 08/07/13 lwebster. 08/07/13 Purchase Order Created Sub -Total: 5,000.00 APPROVAL SIGNATURES: Freight: 0.00 Tax: 0.00 Total Amount: 5,000.00 NOTES: Order Via: Mail CHP 90 3729 1 FILE COPY Wednesday, August 07, 2013 Page 1 of I Purchase Order Town of North Andover No. 141006 384 Osgood Street North Andover MA 01845 P.O. Date: 08/08/2013 Questions ? Ext: Account: P.O. Issued To: Ship To: Markings Inc North Andover Public Works 30 Riverside Drive Attn: Jo -Ann Lanen Pembroke MA 02359 384 Osgood Street North Andover MA 0 1845 Contact: Location: Public Works (978) 688-9570 Phone: (781) 826-5171 Fax: Project: Roadway Req# 141040 Reference: Date Required: 08/21/2013 Award Number: 665 Line Qty Unit Part# Description Account Number Unit Price Extended Tax Freight 1 15000 EA CIP- line striping @various 3114064.1.4.0410.0000.3.580000.0000.0000.00.00 1.00 15,000.00 0.00 0.00 locations Approval Log Approved By Date Notes jlanen 08/06/13 Requisition Submitted for Approval bthibodeau 08/07/13 rsantilli 08/07/13 Isavage 08/07/13 amaylor 08/08/13 Iwebster 08/08/13 Purchase Order Created Sub -Total: 15,000.00 APPROVAL SIGNATURES: Freight: 0.00 Tax: 0.00 Total Amount: 15,000.03 NOTES: Order Via: Mail FILE COPY Thursday, August 08, 2013 Page I of 1 CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the �7114ZIAqs, held on it was VOTED, THAT "?, Z - t �sjqtg (Name) 1 1 .172 na. (Officer) of!!q be and hereby is authorized to execute contracts and bonds in thename and onbehalf of said ?7q1Z1&nCj5 and affix its corporate seal hereto; and such execution of any contract or obligation in the name of I IqCA�,Lq2 on r its behalf by such officer under seal of shall be valid and binding upon I hereby certify that I am the clerk of the above named 0�z/6-nis . and that 11)Z6 is the duly elected officer as above of said 1 9 M"Zn464 -'J4--C. and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. -3 (bato (Clerk) Certification of the Corporate Clerk Appendix D MVPCOO1.13 Non -Collusion Form & Tax Compliance Form 1. CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean any natural person, business, partnership, corporation, union, committee club, or other organization, entity, or group or individuals. 'Vk)A-L--I A - , �L LA-^ SignAure'of inlividual"S'u�—mfttin id or proposal /7AP- 14 t N �s Name of Business IL TAX COMPLIANCE CERTIFICATION Pursuant to M. G.L. Chapter 62C, See. 49A, I certify under the penalties of perjury that, to the best of my knowledge and belief, I am in compliance with all laws of the Commonwealth relating to taxes, reporting of employees and contractors, and withholding and remitting child support. �� PT�,X %4-,( ---1 Signature o 7 dividrd d or proposal - P7A-PX-JAJL% TA—e-, Name of Business MVPCOOI.13 Highway Maintenance Services 17 CERTIFICATION LABORRARMONYAND OSHAITRAINING REQUIREMENTS, T -he undersigned.cerfifies. underpenalties,of " ry- that he is able to -furnish Idbo,r that;can work Terju -i)ri harmony with at!., elements. oflaboT pt*oyed or tobe pmpdbyed at -the work M4 'that all employeag,to.te tiniployea at the W. itc--;.anarm the W-bik, will have completed an OSH,A-approved,�constr.udtlon,safe�y�,and.health course� lasting, at least ten (10) hours. Sign4ture.. Sou Z,,Q� . .Pritilt Nan* & Title 1� ate Company'Name, AC"Rbr CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DDtYYYY) F 4/l/2014 THIS CERTIFICATE IS ISSUEDAS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONTFINSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may requi . re an endorsement. A statement on this certificate does not Confer rights to the certificate holder in lieu of such endorisement(s). PRODUCER Burgi.n, P -latner, Hurley Insulance _:,�genpy, LLC 14 Franklin -'St.- CONTACT Janet Sweeney, �CIC,, CPCU: NAME: IFA N A Nol� (617]11T�-9626 pHC.NE0 (617) 691-2628 C, E-MAIL js2@bphins.com ADDRESS: INSURER(S) AFFORDING COVERAGE NAIC Quincy MA 02169 INSURER A:Travelers Property Casualty INSURED INSURER E;:Travelers Insurance Company 19038 Markings, Inc. INSURERC:Star Insurance 30 Riverside Dr INSURER D: INSURER E: X COMMERCIAL GENERAL LIAE31LITY ,Pembroke MA 02359 1 INSURER F: UUVt7KA[1IN M=011- OM1101^K1 hil mfinnln. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDLSUBR POLICY NUMBER POLICY EFF (MM/DDIYYYY POLICY EXP MM/DDIYYYY LIMITS GENERAL LIABILITY Y Y DT-CO-166MO412 EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIAE31LITY Additional insured for DAMAGE To RENTED PRIEMS ES (E. occurrence) $ 300,000 A CLAIMS -MADE Fx_1OCCUR ongoing & completed ops., 11/l/2013 11/l/2014 MED EXP (Any one person) $ 5,000 PERSONAL & ADV INJURY $ 1,000,000 rimary non-contributory GEN ERAL AGGREGATE $ 2,-000,000 waiver of subrogation GEN -L AGGREGATE LIMIT AP LIES PER: PRODUCTS - COMP/OP AGG s 2, 0 0 0,. 0 0 0 s required by written' PRO - POLICY FX] JECT LOC ontract A:UTOMOBILE LIABILITY y y. DTAO., 8 10 -4,03M6910 COMBINED SINGLE.LIMIT_ (E, 1,000,000 8bbILY INJURY (Pe.r person) B iNY AUTO Additional insured ALL OWNED X. SCHEDULED AUTO��_ 'AUTOS waiver of subrogation as 11/l/2013 11/l/2014 E30DILY INJURY (Per accident) $ X NON -OWNED HIRED AUTOS required by written PERTY DAMAGE $ AUTOSC' (Per accident) $ contract X UMBRELLA LIAB X OCCUR Y Y DTSM-CUP-403M7015 EACH OCCURRENCE $ 5,000,000 B F�DED X EXCESS LIAB CLAIMS -MADE Umbrella follows form AGGREGATE' $ 5,000,000 I x I Rl 10, 00C $ 11/l/2013 11/1/2014 C WORKERS COMPENSATION Y WC 0769820 00 X WC STATIU- JOTH- S I ER TORY LIM T7 AND EMPLOYERS' LIABILITY Y/N E.L. EACH ACCIDENT $ 1,000,000 ANY PROPR ETOR/PARTNER/EX11,E Blanket wavier as OFFICER/MEIMBER EXCLUIDED9 (Mandatory in NH) N/A equired by written 11/l/2013 11/l/2014 E.L. DISEASE - EA EMPLOYEE $ 1,000,000 If yes, describe under DESCRIPTION OF OPERATIONS below ontract L. DISEASE - POLICY LIMIT $ 11000,000 I ri DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) Contract # 665 Additional Insured: Town of North Andover Town of North Andover Office of the Town Manager Attn: Ray Santilli 120 Main Street North Andover, MA 01845 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE M Prendergast CPCU CL AL;UKU 25 (ZU1U1U6) @ 1988-2010 ACORD CORPORATION. All rights reserved. INS025 (201005).01 The ACORD name and logo are registered marks of ACORD INSURER'S AFFIDAVIT AS TO WORKERS' COMPENSATION INSURANCE I,Burgin, Platner, Hurley Insurance Agency, LLC 14 Franklin Street, Quincy, MA 02169 [Name, Address] am: El an authorized representative of Insurance Company [Company Name] (a producer* in the voluntary market)' x El an authorized agent of Star Insurance Company (an agent in the voluntary market, authorized to sign on behalf of a producer) El an authorized signatory of the the Prime Contractor [Company Name] (an insured of a producer in the involuntary market pool)�' El an authorized signatory of the Sub -Contractor (an insured of [Company Name] a producer in the involuntary market pool, group, or otherwise insured)' and do hereby aver that effective November 1, 2013, Markings, Inc., the Prime or Sub -Contractor, is insured for Workers' Compensation insurance with Star Insurance Company under Policy No[s]. WC 0769820 00 pursuant to the attached Certificate of Insurance, and in accordance with Massachusetts General Laws, Chapter 152 and Subsection 7.05A of the Standard Specifications for Highways and Bridges of the Highway Division of the Massachusetts Department of Transportation. Signatur Janet Sw ey, PCU, CI C12:7 Sr. Account Manager COMMONWEALTH OF MASSACHUSETTS r On this day of 2014 before me, the undersigned notary public, personally appeared ja6et' Sweeney, proved to me through satisfactory evidence of identification, which was/were Ma. License to be the person who signed the preceding or attached document in my presence, and who swore or affirmed to me that the contents Qf-the d_G;G1_1FR8Rt ape tr! 1+kf1 id accurate to the best of their knowledge and belief. JL*\ KAREN J. BH§E Notary Public Commonwealth of Massachusetts fj&4�t4� My Commission Expi Notary W June24,201 res Karer�/J_. Besse t A producer is res-hismmice policies directly, not an insurance agent. For Prime or Sub -Contractor companies insured through the voluntary market, this Affidavit must be completed by the insurer or an authorized agent of the insurer. ; If the Prime or Sub -Contractor is insured through the involuntary insurance market, a pool, such as the Worker's Compensation Inspection and Rating Bureau, or is otherwise insured they may provide a Certificate of Insurance and this Affidavit which may be signed by an authorized signatory (company officer) of the Prime or the Sub -Contractor. Effective 10 -May -10