Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract #: 668 - From: 07-01-2013 To: 06-30-2014 - Northern Tree Service - Town of North Andover
�r C' ��� �/ f TOWN OF NORTH ANDOVER CONTRACT CONTRACT it (dgV2 DATE: This Contract is entered into on, or as of, this date by and between the Town of North Andover (the "Town"), and Contractor: Northern Tree Service, Inc Address: P.O. Box 790, 1290 Park Street Palmer, MA 01069 Telephone Number: 800-232-6132 Fax Number: 413-283-5132 1. This is a Contract for the procurement of the following: Tree removal services, as planned maintenance or on an as -needed emergency basis, for Division of Public Works for the period of July 1, 2013 through June 30, 2014 with one (1) additional one-year renewal, solely at the discretion of the Town 2. The Contract price to be paid to the Contractor by the Town of North Andover is: Tub grinder with operator $4,800 per day 3. Payment will be made as follows: Upon delivery of services and receipt of invoice, net 30 4. Definitions: 4.1 Acceptance: All Contracts require proper acceptance of the described goods or services by the Town of North Andover. Proper acceptance shall be understood to include inspection of goods and certification of acceptable performance for services by authorized representatives of the Town to insure that the goods or services are complete and are as specified in the Contract. (Rev 5-2007) Contract by and between Town of North Andover and Northern Tree Service. Inc Page I 4.2 Contract Documents: All documents relative to the Contract including (where .used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both. 5. Term of Contract and Time for Performance: This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before June 30, 2014, unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation: Notwithstanding anything in the Contract documents to the .contrary, any and all payments which the Town is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be immediately terminated without liability for damages, penalties or other charges. 7. Permits and Approvals: Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. (Rev 5-2007) Contract by and between Town of North Andover and Northern Tree Service, Inc Page 2 8. Termination and Default: 8.1 Without .Cause. The Town may terminate this Contract on seven (7) calendar days notice when in the best interests of the Town by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. Upon termination without cause, Contractor will be paid for services rendered to the date of termination. 8.2 For Cause. If the Contractor is determined by the Town to be in default of any term or condition of this Contract, the Town may terminate this Contract on seven (7) days notice by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. 8.3 Default. The following shall constitute events of a default under the Contract: 1) any material misrepresentation made by the Contractor to the Town; 2) any failure to perform any of its obligations under this Contract including, but not limited to the following: (i) failure to commence performance of this Contract at the time specified in this Contract due to a reason or circumstance within the Contractor's reasonable control, (ii) failure to perform this Contract with sufficient personnel and equipment or with sufficient material to ensure the completion of this Contract within the specified time due to a reason or circumstance within the Contractor's reasonable control, (iii) failure to perform this Contract in a manner reasonably satisfactory to the Town, (iv) failure to promptly re -perform within a reasonable time the services that were rejected by the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a material term of this Contract, including, but not limited to, the provision of insurance and non-discrimination, (vii) any other acts specifically and expressly stated in this Contract as constituting a basis for termination of this Contact, and (viii) failure to comply with any and all requirements of state law and/or regulations, and Town bylaw and/or regulations. 9. The Contractor's Breach and the Town's Remedies: Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be deemed a material breach of this Contract, and the Town of North Andover shall have all the rights and remedies provided in the Contract documents, the right to cancel, terminate, or suspend the Contract in whole or in part, the right to maintain any and all actions at law or in equity or other proceedings with respect to a breach of this Contract, including damages and specific performance, and the right to select among the remedies available to it by all of the above. (Rev 5-2007) Contract by and between Town of North Andover and Northern Tree Service, Inc Page 3 From any sums due to the Contractor for services, the Town may keep the whole or any part of the amount for expenses, losses and damages incurred by the Town as a consequence of procuring services as a result of any failure, omission or mistake of the Contractor in providing services as provided in this Contract. 10. Statutory Compliance: 10.1 This Contract will be construed and governed by the provisions of applicable federal, state and local laws and regulations; and wherever any provision of the Contract or Contract documents shall conflict with any provision or requirement of federal, state or local law or regulation, then the provisions of law and regulation shall control: Where applicable to the Contract, the provisions of the General Laws are incorporated by reference into this Contract, including, but not limited to, the following: General Laws Chapter 30B — Procurement of Goods and Services. General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts. General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts. 10.2 Wherever applicable law mandates the inclusion of any term and provision into a municipal contract, this Section shall be understood to import such term or provision into this Contract. To whatever extent any provision of this Contract shall be inconsistent with any law or regulation limiting the power or liability of cities and towns, such law or regulation shall control. 10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on the performance of the Contract. If the Contractor performs the Contract in violation of any applicable law or regulation, the Contractor shall bear all costs arising therefrom. 10.4 The Contractor shall keep itself fully informed of all existing and future State and National Laws and Municipal By-laws and Regulations and of all orders and decrees of any bodies or tribunals having jurisdiction in any manner affecting those engaged or employed in the work, of the materials used in the work or in any way affecting the conduct of the work. If any discrepancy or inconsistency is discovered in the Drawings, Specifications or Contract for this work in violation of any such law, by-law, regulation, order or decree, it shall forthwith report the same in writing to the Town. It shall, at all times, itself observe and comply with all such existing and future laws, by-laws, regulations, orders and decrees; and shall protect and indemnify the Town of North Andover, and its duly appointed agents against any claim or liability arising from or based on any violation whether by him or its agents, employees or subcontractors of any such law, by-law, regulation or decree. 11. Conflict of Interest: Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which shall constitute a violation of that law. The Contractor shall be deemed to have investigated the application of M.G.L. c. 268A to the performance of this Contract; and by executing the (Rev 5-2007) Contract by and between Town of North Andover and Northern Tree Service, Inc Page 4 Contract documents the Contractor certifies to the Town that neither it nor its agents, employees, or subcontractors are thereby in violation of General Laws Chapter 268A. 12. Certification of Tax Compliance This Contract must include a certification of tax compliance by the Contractor, as required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors Providing Goods, Services, or Real Estate Space to the Commonwealth or Subdivision). 13. Discrimination The Contractor will carry out the obligations of this Contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151B (Law Against Discrimination) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. 14. Assi nment: Assignment of this Contract is prohibited, unless and only to the extent that assignment is provided for expressly in the Contract documents. 15. Condition of Enforceability gainst the Town: This Contract is only binding upon, and enforceable against, the Town if. (1) the Contract is signed by the Town Manager or its designee; and (2) endorsed with approval by the Town Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the Town Counsel as to form. 16. Corporate Contractor: If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's Certificate certifying the corporate capacity and authority of the party signing this Contract for the corporation. Such certificate shall be accompanied by a letter or other instrument stating that such authority continues in full force and effect as of the date the Contract is executed by the Contractor. This Contract shall not be enforceable against the Town of North Andover unless and until the Contractor complies with this section. The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto, relating to the appointment of the Commissioner of Corporations as its attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the Commonwealth. (Rev 5-2007) Contract by and between Town of North Andover and Northern Tree Service, Inc Page 5 17. Liability of Public Officials: To the full extent permitted by law, no official, employee, agent or representative of the Town of North Andover shall be individually or personally liable on any obligation of the Town under this Contract. 18. Indemnification: The Contractor shall indemnify, defend and save harmless the Town, the Town's officers, agents and employees, from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by the Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective, or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this contract. 19. Workers Compensation Insurance: The Contractor shall provide by insurance for the payment of compensation and the furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's Compensation Act) to all employees of the Contractor who are subject to the provisions of Chapter 152 of the General Laws of Massachusetts. Failure to provide and continue in force such insurance during the period of this Contract shall be deemed a material breach of this Contract, shall operate as an immediate termination thereof, and Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article. The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this Contract before the , same shall be binding on the parties thereto, except if specifically waived by the Town. 20. Documents, Materials, Etc. Any materials, reports, information, data, etc. given to or prepared or assembled by the Contractor under this Contract are to be kept confidential and shall not be made available to any individual or organization by the Contractor (except agents, servants, or employees of the Contractor) without the prior written approval of the Town, except as otherwise required by law. The Contractor shall comply with the provisions Chapter 66A of the General Laws of (Rev 5-2007) Contract by and between Town of North Andover and Northern Tree Service, Inc Page 6 Massachusetts as it relates to public documents, and all other state and federal laws and regulations relating to confidentiality, security, privacy and use of confidential data. Any materials produced in whole or in part under this Contract shall not be subject to copyright, except by the Town, in the United States or any other country. The Town shall have unrestricted authority to, without payment of any royalty, commission, or additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole or in part, any reports, data or other materials prepared under this Contract. All data, reports, programs, software, equipment, furnishings, and any other documentation or product paid for by the Town shall vest in the Town at the termination of this Contract. The Contractor shall at all times, during or after termination of this Contract, obtain the prior written approval of the Town before making any statement bearing on the work performed or data collected under this Contract to the press or issues any material for publication through any medium. 21. Audit, Inspection and Recordkeeping At any time during normal business hours, and as often as the Town may deem it reasonably necessary, there shall be available in the office of the Contractor for the purpose of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. 22. Payment The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work completed and acceptance from the Town of the work completed. 23. Waiver and Amendment Amendments, or waivers of any additional term, condition, covenant, duty or obligation contained in this Contract may be made only by written amendment executed by all signatories to the original Agreement, prior to the effective date of the amendment. To the extent allowed by law, any conditions, duties, and obligations contained in this Contract may be waived only by written Agreement by both parties. Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver, nor in any manner limit the legal or equitable remedies available to that party. No waiver by either party of any default or breach shall constitute a waiver of any subsequent default or breach of a similar or different matter. 24. Forum and Choice of Law This Contract and any performance herein shall be governed by and be construed in accordance with the laws of the Commonwealth. Any and all proceedings or actions relating to subject (Rev 5-2007) Contract by and between Town of North Andover and Northern Tree Service, Inc Page 7 matter herein shall be brought and maintained in the courts of the Commonwealth or the federal district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any other legal rights of the parties. 25. Notices Any notice permitted or required under the provisions of this Contract to be given or served by either of the parties hereto upon the other party hereto shall be in writing and signed in the name or on the behalf of the party giving or serving the same. Notice shall be deemed to have been received at the time of actual service or three (3) business days after the date of a certified or registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to the Town of North Andover by being sent to the Town Manager, Town Hall, 120 Main Street, North Andover, Massachusetts 01845. 26. Binding on Successors: This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in interest (and where not corporate, the heirs and estate of the Contractor). 27. Complete Contract: This instrument, together with its endorsed supplements, and the other components of the contract documents, constitutes the entire contract between the parties, with no agreements other than those incorporated herein. 28. Supplemental Conditions: The foregoing provisions apply to all contracts to which the Town of North Andover shall be a party. One of the following "Supplements" must be "checked" as applicable to this Contract, shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The Supplement contains additional terms governing the Contract: [ ] GOODS SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods (governed by the provisions of General Laws Chapter 30B) [ ] SERVICES SUPPLEMENT "S" - Applicable to Contracts for the procurement of Services (governed by the provisions of General Laws Chapter 30B) [ X ] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for Construction (Rev 5-2007) Contract by and between Town of North Andover and Northern Tree Service, Inc Page 8 IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set forth their hands the day and year first above written. THE TOWN i 'si n/Departm nt Head Contract a ger T wn Manager Date APPROVED AS TO FORM: Town Counsel Date THE CONTRACTOR / /Z,e -e fe 1'14 CL ZLL— Company Name a6 "'q / ('lea 113 Signa re Date P A I L A 6-A- /90 Ptes lie A - Print Name & Title CERTIFICATION AS TO AVAILABILITY OF FUNDS: Town*X tountant Date (Rev 5-2007) Contract by and between Town of North Andover and Northern Tree Service, Inc Page 9 SUPPLEMENT "C" [] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for the construction of: (1) Public BuildinLs and Public Works (governed by the provisions of General Laws Chapter 30B); (2) Public Buildings (governed by the provisions of General Laws Chapter 149,§ 44A, et seq.); and (3) Public Works (governed by the provisions of General Laws Chapter 30, §39M, et seq) 1. This form supplements the Town of North Andover "Contract and General Conditions" and applies only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works or public buildings. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be understood to be a term and condition of this Contract. The Contractor agrees to secure such bond (where required) in the form required by the Town and provide an original thereof to the Town prior to the commencement of performance. E uali : 3.1. In the case of a closed Specification written for a specific item or items to be furnished under the Base Bid, such specifications shall, as applicable, be in compliance with the Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq. 3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or on the Drawings, except as above noted, the intent is to establish a standard and in no way should be construed to exclude any item or manufacturer not mentioned by name, but whose product meets the Specifications as to design, utility and quality. Final decision shall rest with the Project Representative as to its acceptability. 4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of Chapter 30B. The Contractor will carry out the obligations of this contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. The Contractor will at all times comply with the wage rates as determined by the Commissioner of the Department of Labor and Industries, under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall be in force and as amended. The Contractor shall continuously maintain adequate protection of all work from damage and shall protect the property of the Town and others, including adjacent property, from injury or loss arising (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 1 and Northern Tree Service, Inc in connection with the Contract. The Contractor shall make good any such damage, injury or loss, except as may be directly due to errors in the Contract Documents or caused by agents or employees of the Town, or due to causes beyond the Contractor's control and not the Contractor's fault or negligence. 7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents or injury to persons on, about or adjacent to the premises where the work is being performed. The Contractor will erect and properly maintain at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and the public, shall post danger signs warning against the hazards created by such features of construction such as pits, protruding nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling materials; and shall designate a responsible member of its organization on the work, whose duty shall be the prevention of accidents. The Town shall at all times have access to the work wherever it is in preparation or progress and the Contractor shall provide suitable accommodations for such access. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants, all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the construction superintendent, foreman, or assistants are unacceptable to the Town, then upon seven days notice from the Town, the Contractor shall replace such person or persons with people acceptable to the Town. 10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The Contractor shall carefully study and compare the drawings, specifications and other instructions and shall at once report to the Town any error, inconsistency or omission which shall be discovered. Included in this responsibility shall be supervision of all work performed by subcontractors on the work. 11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any of its provisions, the Town, upon three days written notice, may, without prejudice to any other remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor. 1.2. Inspection by the Town's Project Representative 12.1. The Town shall have the right to designate a Project Representative who may make periodic visits to the site to familiarize the Town generally with the progress and quality of the work, and to determine in general if the work is proceeding in accordance with the Contract Documents. The Project Representative will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the work, and will not be responsible for the Contractor's failure to carry out the construction work in accordance with the Contract Documents. During such visits and on the basis of these observations while at the site, the Project Representative will keep the Town informed on the progress of the work, will endeavor to guard the Town against defects and deficiencies in the work of contractors, and may condemn structural work as failing to conform to the Contract Documents. The Project Representative shall have authority to act on behalf of the Town only to the extent expressly delegated by the Town, which shall be shown to the Contractor, and shall have authority to stop the work whenever such stoppage may reasonably be necessary to insure the proper execution of the Contract. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 2 and Northern Tree Service, Inc 12.2. In connection with the work, the Project Representative shall not be responsible for construction methods, means, techniques, sequences or procedures employed by the Contractor or the Contractor's safety programs, requirements, regulations, or precautions. 13. Decisions of the Project Representative 13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of the Town or the Contractor and on all other matters relating to the execution and progress of the structural work or the interpretation of the Contract Documents. 13.2. The Project Representative's decision, in matters relating to the project, shall be final, if within the terms of the Contract Documents. 13.3. If, however, the Project Representative fails to render a decision within ten days after the parties have presented their evidence, either parry may then avail itself of the remedies provided in this contract or available to it by law. If the Project Representative renders a decision after such remedies have commenced, such decision may be entered as evidence but shall not disturb or interrupt such proceedings except where such decision is acceptable to the parties concerned. 14.1 Use of Premises by the Contractor: 14.1. The Contractor shall confine its apparatus; the storage of materials and the operations of its workmen to limits indicated by law, by-laws, permits or directions of the Town and shall not unreasonably encumber the premises with its materials. 14.2. The Contractor shall not load or permit any part of the structure to be loaded with a weight that will endanger its safety. 15. Maintenance of Premises: The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its employees or work, and at the completion of the work it shall remove all its rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute, the Town may remove the rubbish and charge the cost to the several contractors, as the Town shall determine to be just. 16. Right to Terminate If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently disregard laws and regulations or lawful directives of the Town, or (7) be guilty of a substantial violation of any provision of the Contract, then the Town may, without prejudice to any other right or remedy and after giving the Contractor (or any surety) seven days written notice, terminate the contract and the employment of the Contractor and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method it deems appropriate. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 3 and Northern Tree Service, Inc In such cases, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid amount owed to the Contractor for work already completed shall exceed the expense of finishing the work, including compensation for additional architectural, managerial, legal and administrative services, such excess shall be paid to the Contractor. If such expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the Town. The Contractor shall not be relieved of liability to the Town by virtue of any termination of this contract, and any claim for damages against the Contractor relating to the Contractor's performance under this contract shall survive any termination hereunder. Notwithstanding any other provision of this Agreement, the Town reserves the right at any time in its absolute discretion to suspend or terminate this Agreement in whole or in part for its convenience upon seven days written notice to the Contractor. The Town shall incur no liability by reason of such termination except for the obligation to pay compensation for all work performed by the Contractor and accepted by the Town to the termination date. 17. Progress Payments: 17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported to the extent required by the Town by invoices or other vouchers, showing payments for materials and labor, payments to Subcontractors and such other evidence of the Contractor's right to payment. 17.2. The Contractor shall, before the first application, submit to the Town a schedule of values of the various parts of the work, including quantities aggregating the total sum of the Contract, divided so as to facilitate payments to Subcontractors, made out in such form as the Town and the Contractor may agree upon, and, if required, supported by such evidence as to its correctness. This schedule, when approved by the Town, shall be used as a basis for payment, unless it is found to be in error. If applying for payments, the Contractor shall submit a statement based upon this schedule. 18. Withholding of Payments 18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the whole or part of any payment to such extent as may be necessary in its reasonable opinion to protect the Town of North Andover from loss on account of: 18.1.1. Defective work not remedied. 18.1.2. Claims filed or reasonable evidence indicating probable filing of claims. 18.1.3. Failure of the Contractor to make payments properly to Subcontractors or for material or labor. 18.1.4. A reasonable doubt that the Contract can be completed for the balance then unpaid. 18.1.5. Damage to another contractor. 18.1.6. Delays resulting in liquidated damages. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 4 and Northern Tree Service, Inc 18.2. Withholding of payments shall be in strict compliance with statutory requirements. 19. Claims by Contractor and Liability of Town All claims by the Contractor against the Town shall, unless otherwise provided by law, be initiated by a written claim submitted to the Town no later than seven (7) calendar days after the event or the first appearance of the circumstances causing the claim. The claim shall set forth in detail all known facts and circumstances supporting the claim. The Contractor shall continue its performance under this contract regardless of the submission or existence of any claims. The limit of liability of the Town under this Agreement is limited to the compensation provided herein for work actually performed, and shall in no event include liability for delays or for incidental, special or consequential damages or lost profits or for damages or loss from causes beyond the Town's reasonable control. 20. Liquidated Damages: Because both parties recognize (1) that the time for completion of this Contract is of the essence, (2) that the Town will suffer loss if the work is not completed within the contract time specified, plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the delays, expense and difficulties involved in a legal proceeding to determine the actual loss suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay the Town as liquidated damages representing an estimate of delay damages, not as a penalty, the sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is completed, whether the work is completed by the Contractor or some other person. The Town's right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a legal action for damages in lieu of or in addition to its option to impose liquidated damages. The Town may deduct any liquidated damages from money due the Contractor, and if such payment is insufficient to cover the liquidated damages, then the Contractor shall pay the amount due. 21. The Contractors' Mutual Responsibility: Should the Contractor cause damage to any separate subcontractor on the work, the Contractor agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies provided by law or by the provisions of the contract. If such separate contractor sues the Town on account of any damage alleged to have been sustained, the Town shall notify the Contractor, who shall defend such proceedings at the Town's expense and, if any judgment against the Town arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Town. 22. Separate Contracts: 22.1. The Town reserves the right to let other Contracts in connection with this work under similar General Conditions. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate its work with theirs. 22.2. If any part of the Contractor's work depends, for proper execution or results, upon the work of any other contractor, the Contractor shall inspect and promptly report to the Town any defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 5 and Northern Tree Service, Inc of the other contractor's work as fit and proper for the reception of its work except as to defects which may develop in the other contractor's work after the execution of its work. 22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work already in place and shall at once report to the Town any discrepancy between the executed work and the Drawings. 23. Subcontracts: 23.1. All Subcontracts shall be awarded in conformity with the requirements of the General Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive. 23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and omissions of its Subcontractors and of persons either directly or indirectly employed by them, as it is for the acts and omissions of persons directly employed by it. 23.3. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the Town. 24. Contractor -Subcontractor Relations: The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound by the terms of the Agreement, the General Conditions of the Contract, the Supplementary General Conditions, the Drawings and Specifications, as far as applicable to its work, including the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A, et seq. 25. Indemnification: 25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents and employees from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) brought or recovered against them that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this Contract. 25.2. In any and all claims against the Town or any of their agents or employees by any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under this paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 6 and Northern Tree Service, Inc any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other employee benefit acts. 25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and minimum limits of liability acceptable under the Contract. However, it shall be the Contractor's responsibility to purchase and maintain insurance of such character and in such amounts as will adequately protect it and the Town from and against all claims, damages, losses and expenses resulting from exposure to any casualty liability in the performance of the Work. 26. The Contractor's Insurance: 26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable. 26.1.1. Claims under Worker's Compensation, disability benefit and other similar employee benefit acts; 26.1.2. Claims for damages because of bodily injury, occupational sickness or disease, or death of its employees, and claims insured by usual personal injury liability coverage; 26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of any person other than its employees, and claims insured by usual personal liability coverage; 26.1.4. Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 26.2. The insurance required by the above shall be written for not less than the following minimum limits of liability: 26.2.1. Worker's Compensation Insurance Requirements Workers' Compensation coverage as required by the laws of the Commonwealth of Massachusetts. 26.2.2. Liability Insurance Requirements Liability insurance shall include all major divisions and shall be on a comprehensive general basis including Premises and Operations, Owners and Contractor's Protective, Products and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles. All such insurance shall be written for not less than any limits of liability required by law, unless otherwise provided in the contract documents, or the following limits, whichever are greater: (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 7 and Northern Tree Service, Inc Comprehensive General Liability Insurance (Broad Form) Bodily Injury $1,000,000 per person $3,000,000 per occurrence Property Damage $1,000,000 per occurrence $3,000,000 annual aggregate Automobile Liability Insurance $500,000 per person $1,000,000 per occurrence 26.3. The above insurance policies shall also be subject to the following requirements: 26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as hereinafter specified under Paragraph entitled "Protective Liability Insurance" shall be written by one and the same insurance company to avoid the expense of duplicate and/or overlapping coverage and to facilitate and expedite the settlement of claims. 26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed with the Town prior to commencement of the work. Renewal certificates shall be addressed to and filed with the Town at least ten (10) days prior to the expiration date of required policies. 26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30) days prior written notice forwarded by registered or certified mail to the Town. The Town shall also be notified of the attachment of any restrictive amendments to the policies. 26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of Insurance form, shall contain true transcripts from the policies, authenticated by the proper officer of the Insurer, evidencing in particular those insured, the extent of coverage, the location and operations to which the insurance applies, the expiration date and the above-mentioned notice clauses. 26.3.5. All premium costs shall be included in the Contractor's bid. 26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be maintained without interruption from date of the Contract until date of final payment and termination of any coverage required to be maintained after payment. 27. Protective Liability Insurance: 27.1. The Contractor shall purchase and maintain such insurance as described in the preceding paragraph as will protect the Town from claims which may arise from operations under the Contract, including operations performed for the named insureds by independent contractors and general inspection thereof by the named insureds. 27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town against Automobile Non -Ownership Liability in connection with the Contractor's (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 8 and Northern Tree Service, Inc operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. 27.3. The limits of liability for coverage required under the preceding paragraphs shall be as specified under the provisions hereof governing the Contractor's General Liability Policy. 27.4. The Town shall be named as an additional insured on the above referenced liability Policies, and the Contractor's insurance shall be the primary coverage. The cost of such insurance, including required endorsements and amendments, shall be the sole responsibility of the Contractor. 28. Liens: Neither the Final Payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as it has knowledge or information, the releases and receipts include all the labor and material for which a lien could be filed. The Contractor shall comply with all statutory provisions of the General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149 as amended (as a minimum requirement). 29. Guarantees: 29.1 The Contractor guarantees and warrants to the Town that all labor furnished under this Contract will be competent to perform the tasks undertaken, that the product of such labor will yield only first-class results, that materials and equipment furnished will be of good quality and new unless otherwise permitted by this Contract, and that the Work will be of good quality, free from faults and defects and in strict conformance with this Contract. All Work not conforming to these requirements may be considered defective. 29.2. If at any time any part of the work constructed under the terms of this contract shall in the opinion of the Town Manager require repairing due to defective work or materials furnished by the Contractor, he may notify the Contractor in writing to make the required repairs. If the Contractor shall neglect to start such repairs within ten days of the date of giving it notice thereof and to complete the same to the satisfaction of the Town Manager with reasonable dispatch, then the latter may employ other persons to make such repairs. The Town shall charge the expense thereof to the Contractor and may use any moneys still retained to pay for the same, and if such sum is insufficient, the Contractor shall be obligated to pay the balance thereof. 29.3. All guarantees and warranties required in the various Sections of the Specifications which originate with a Subcontractor or Manufacturer must be delivered to the Town before final payment to the Contractor may be made for the amount of that subtrade or for the phase of work to which the guarantee or warranty relates. The failure to deliver a required guarantee or warranty shall be held to constitute a failure of the Subcontractor to fully complete his work in accordance with the Contract Documents. The Contractor's obligation to correct work is in addition to, and not in substitution of, such guarantees or warranties as may be required in the various Sections of the Specifications. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 9 and Northern Tree Service, Inc This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals hereto: Dated: 7 41a - The Town of North Andover by: Town Manager ent/Division Tlead Town Aountant Certified s to Appropriation Af" 7 sa Town Nunsoj Approved asYo Form The Contractor by: Y Autho ' ed Signature (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover and Northern Tree Service, Inc Page 10 THE COMMONWEALTH OF MASSACHUSETTS t EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE P. GOLDSTEIN Governor Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Tree removal services for Public Works Department (bucket truck, chip truck, log truck, and stump grinder all will operator) Job Location: Throughout Town of North Andover Information about Prevailing Wage Schedules for Awarding Authorities and Contractors • This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage Request Number" on all pages of this schedule. • Awarding authorities must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. • The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. Once a contractor has been selected by the awarding authority, the wage schedule shall be made a part of the contract for that project. The wage schedule must be posted in a conspicuous place at the work site during the life of the project in accordance with M.G.L. c. 149, § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project regardless of whether they are employed by the prime contractor, a filed sub -bidder, or any sub -contractor. • All apprentices must be registered with the Massachusetts Division of Apprenticeship Training (DAT) in order to be paid at the lower apprentice rates. All apprentices must keep his/her apprentice identification card on his/her person during all work hours. If a worker is not registered with DAT, he/she must be paid the "total rate" listed on the wage schedule regardless of experience or skills. • The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F "rental of equipment" contracts. • Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports directly to the awarding authority and keep them on file for three years. Each weekly payroll report must contain: the employee's name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/pw. • Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617) 626-6953. • Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor Division of the office of the Attorney General at (617) 727-3465. • Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties. Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Classification Construction Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment (2 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.45 $8.91 $8.00 $0.00 $47.36 TE'AMSTE`RS JOINT COUNCIL NO. 10 ZONE B (3 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.52 $8.91 $8.00 $0.00 $47.43 7'1,,-AMS7'1 RS.IOIN7'COUNCILNO. 107.ONE'B (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.64 $5.95 $9.07 $45.43 $8.00 $0.00 $10.00 $47.71 77iAMS7'Ii72S.1O1N7' 000NCIL NO. 107ONE H $63.89 06/01/2013 $29.88 $10.40 $5.95 $0.00 $46.23 12/01/2013 $30.68 ADS/SUBMERSIBLE PILOT 08/01/2012 $82.32 $47.03 $9.80 $31.58 $17.67 $0.00 $0.00 $109.79 PILE DRI VER LOCAL 56(7ONL1) $32.48 $10.40 $5.95 $0.00 $48.83 06/01/2015 $33.43 $10.40 $5.95 $0.00 08/01/2013 $85.47 $34.38 $9.80 $5.95 $17.67 $0.00 06/01/2016 $112.94 $7.10 08/01/2014 $88.62 $52.00 $9.80 $34.10 $17.67 $0.00 $0.00 $116.09 For apprentice rates see "Apprentice- LABORER" 08/01/2015 $91.77 $9.80 $17.67 $0.00 $119.24 AIR TRACK OPERATOR 12/01/2012 $30.35 $7.10 $11.55 $0.00 $49.00 LABORERS - ZONE 2 06/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 12/01/2013 $31.35 $7.10 $11.55 $0.00 $50.00 06/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 12/01/2014 $32.35 $7.10 $11.55 $0.00 $51.00 06/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 12/01/2015 $33.35 $7.10 $11.55 $0.00 $52.00 06/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 12/01/2016 $34.60 $7.10 $11.55 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 12/01/2012 $29.08 $10.40 $5.95 $0.00 $45.43 HEAT & FROST INSULATORS LOCAL 6 (BOSTON) $40.87 $10.00 $13.02 $0.00 $63.89 06/01/2013 $29.88 $10.40 $5.95 $0.00 $46.23 12/01/2013 $30.68 $10.40 $5.95 $0.00 $47.03 06/01/2014 $31.58 $10.40 $5.95 $0.00 $47.93 12/01/2014 $32.48 $10.40 $5.95 $0.00 $48.83 06/01/2015 $33.43 $10.40 $5.95 $0.00 $49.78 12/01/2015 $34.38 $10.40 $5.95 $0.00 $50.73 ASPHALT RAKER 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS - 7.ON1: 2 $40.87 $10.00 $13.02 $0.00 $63.89 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE OPERATING ENCINE'LRS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 2 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $24.51 $6.97 $11.18 $0.00 $42.66 Unemployment $26.39 BACKHOE/FRONT-END LOADER 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPERATING FNGINFERS LOCAL 4 $0.00 $46.43 5 80 $30.16 $6.97 $11.18 $0.00 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 $50.20 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" $35.82 $6.97 $11.18 $0.00 $53.97 -- Notes: ............. _,._............._----- BA:RCO-TYPE JUMPING TAMPER 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS-7_ONE2 1 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" BLOCK PAVER, RAMMER / CURB SETTER 12/01/2012 $30.35 $7.10 $11.55 $0.00 $49.00 LABORERS - 70NE 2 06/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 12/01/2013 $31.35 $7.10 $11.55 $0.00 $50.00 06/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 12/01/2014 $32.35 $7.10 $11.55 $0.00 $51.00 06/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 12/01/2015 $33.35 $7.10 $11.55 $0.00 $52.00 06/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 12/01/2016 $34.60 $7.10 $11.55 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" BOILERMAKER 01/01/2010 $37.70 $6.97 $11.18 $0.00 $55.85 BOILEI MAKFRS LOCAL 29 Apprentice- BOILERMAKER -Local 29 Effective Date - 01/01/2010 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $24.51 $6.97 $11.18 $0.00 $42.66 2 65 $24.51 $6.97 $11.18 $0.00 $42.66 3 70 $26.39 $6.97 $11.18 $0.00 $44.54 4 75 $28.28 $6.97 $11.18 $0.00 $46.43 5 80 $30.16 $6.97 $11.18 $0.00 $48.31 6 85 $32.05 $6.97 $11.18 $0.00 $50.20 7 90 $33.93 $6.97 $11.18 $0.00 $52.08 8 95 $35.82 $6.97 $11.18 $0.00 $53.97 -- Notes: ............. _,._............._----- ___..m_ ------ .�... --- - - __..---....,..-_T...............----......---__ Apprentice to Journeyworker Ratio:1:5 1 -------------------------------- ----------------------------- ------------------ - -------------------- - - --------------- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 3 of 40 Classification BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING) BRICKLAYERS LOCAL 3 (LYNN) Effective Date Base Wage Health Pension Supplemental Total Rate $51.72 2 60 $28.45 Unemployment $17.83 02/01/2013 $47.41 $10.18 $17.83 $0.00 $75.42 08/01/2013 $48.31 $10.18 $17.90 $0.00 $76.39 02/01/2014 $48.87 $10.18 $17.90 $0.00 $76.95 08/01/2014 $49.77 $10.18 $17.97 $0.00 $77.92 02/01/2015 $50.33 $10.18 $17.97 $0.00 $78.48 08/01/2015 $51.23 $10.18 $18.04 $0.00 $79.45 02/01/2016 $51.80 $10.18 $18.04 $0.00 $80.02 08/01/2016 $52.70 $10.18 $18.12 $0.00 $81.00 02/01/2017 $53.27 $10.18 $18.12 $0.00 $81.57 Apprentice- BRICKIPLASTERICEMENT MASON -Local 3 Lynn Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.71 $10.18 $17.83 $0.00 $51.72 2 60 $28.45 $10.18 $17.83 $0.00 $56.46 3 70 $33.19 $10.18 $17.83 $0.00 $61.20 4 80 $37.93 $10.18 $17.83 $0.00 $65.94 5 90 $42.67 $10.18 $17.83 $0.00 $70.68 Effective Date - 08/01/2013 _ Apprentice to Journeyworker Ratio: 1:5 $7.10 $12.60 $0.00 $55.40 12/01/2014 $36.45 $7.10 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.16 $10.18 $17.90 $0.00- $52.24 2 60 $28.99 $10.18 $17.90 $0.00 $57.07 3 70 $33.82 $10.18 $17.90 $0.00 $61.90 4 80 $38.65 $10.18 $17.90 $0.00 $66.73 5 90 $43.48 $10.18 $17.90 $0.00 $71.56 _. ----- ®-- Notes: - $12.60 _.r--._.._ .__ ®_, i _ Apprentice to Journeyworker Ratio: 1:5 $7.10 $12.60 $0.00 $55.40 BULLDOZER/GRADER/SCRAPER OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 12/01/2012 06/01/2013 12/01/2013 $39.72 $40.49 $41.27 $10.00 $10.00 $10.00 $13.02 $13.02 $13.02 $0.00 $0.00 $0.00 $62.74 $63.51 $64.29 CAISSON & UNDERPINNING BOTTOM MAN 12/01/2012 $33.45 $7.10 $12.60 $0.00 $53.15 LABOR RS-TOUNDATIONANDMARINE 06/01/2013 $34.20 $7.10 $12.60 $0.00 $53.90 12/01/2013 $34.95 $7.10 $12.60 $0.00 $54.65 06/01/2014 $35.70 $7.10 $12.60 $0.00 $55.40 12/01/2014 $36.45 $7.10 $12.60 $0.00 $56.15 06/01/2015 $37.20 $7.10 $12.60 $0.00 $56.90 12/01/2015 $37.95 $7.10 $12.60 $0.00 $57.65 06/01/2016 $38.70 $7.10 $12.60 $0.00 $58.40 12/01/2016 $39.70 $7.10 $12.60 $0.00 $59.40 For apprentice rates see "Apprentice- LABORER" -- ---------- -------------------- -------- ------------ -- - - -------- -- - --------- - Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 4 of 40 Classification CAISSON & UNDERPINNING LABORER LABORERS - FOUNDATION AND MARINE For apprentice rates see "Apprentice- LABORER" Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $30.35 $52.00 $11.55 Unemployment $49.00 12/01/2012 $32.30 $7.10 $12.60 $0.00 $52.00 06/01/2013 $33.05 $7.10 $12.60 $0.00 $52.75 12/01/2013 $33.80 $7.10 $12.60 $0.00 $53.50 06/01/2014 $34.55 $7.10 $12.60 $0.00 $54.25 12/01/2014 $35.30 $7.10 $12.60 $0.00 $55.00 06/01/2015 $36.05 $7.10 $12.60 $0.00 $55.75 12/01/2015 $36.80 $7.10 $12.60 $0.00 $56.50 06/01/2016 $37.55 $7.10 $12.60 $0.00 $57.25 12/01/2016 $38.55 $7.10 $12.60 $0.00 $58.25 CAISSON & UNDERPINNING TOP MAN 12/01/2012 $32.30 $7.10 $7.10 $12.60 $48.50 $0.00 $30.35 $52.00 $11.55 LABORERS - FOUNDATIONAND MARINE $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 06/01/2013 $33.05 $0.00 $7.10 $12.60 $31.85 $0.00 $11.55 $52.75 $50.50 12/01/2013 $33.80 $7.10 $7.10 $12.60 $51.00 $0.00 $32.85 $53.50 $11.55 06/01/2014 $34.55 06/01/2016 $7.10 $12.60 $11.55 $0.00 $52.00 $54.25 $34.10 12/01/2014 $35.30 $0.00 $7.10 $12.60 $0.00 $55.00 06/01/2015 $36.05 $7.10 $12.60 $0.00 $55.75 12/01/2015 $36.80 $7.1.0 $12.60 $0.00 $56.50 06/01/2016 $37.55 $7.10 $12.60 $0.00 $57.25 12/01/2016 $38.55 $7.10 $12.60 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" CARBIDE CORE DRILL OPERATOR LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" CARPENTER CARPEN77,MS-ZONB2 (Eastern Massachusetts) 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 03/01/2013 $33.92 $9.80 $15.61 $0.00 $59.33 09/01/2013 $34.53 $9.80 $15.61 $0.00 $59.94 03/01/2014 $35.13 $9.80 $15.61 $0.00 $60.54 09/01/2014 $35.90 $9.80 $15.61 $0.00 $61.31 03/01/2015 $36.67 $9.80 $15.61 $0.00 $62.08 ---------- -------------------------------------------------------------------------------------------------------------------------- . Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 5 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - CARPENTER - Zone 2 Eastern MA Effective Date - 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.96 $9.80 $1.57 $0.00 $28.33 2 60 $20.35 $9.80 $1.57 $0.00 $31.72 3 70 $23.74 $9.80 $10.90 $0.00 $44.44 4 75 $25.44 $9.80 $10.90 $0.00 $46.14 5 80 $27.14 $9.80 $12.47 $0.00 $49.41 6 80 $27.14 $9.80 $12.47 $0.00 $49.41 7 90 $30.53 $9.80 $14.04 $0.00 $54.37 8 90 $30.53 $9.80 $14.04 $0.00 $54.37 Effective Date - 09/01/2013 $18.61 $1.30 $77.89 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.27 $9.80 $1.57 $0.00 $28.64 2 60 $20.72 $9.80 $1.57 $0.00 $32.09 3 70 $24.17 $9.80 $10.90 $0.00 $44.87 4 75 $25.90 $9.80 $10.90 $0.00 $46.60 5 80 $27.62 $9.80 $12.47 $0.00 $49.89 6 80 $27.62 $9.80 $12.47 $0.00 $49.89 7 90 $31.08 $9.80 $14.04 $0.00 $54.92 8 90 $31.08 $9.80 $14.04 $0.00 $54.92 Notes: ( - - - - - - - - - - - - - - - - - - -- - - _v. --^ i `. _ Apprentice to Journeyworker Ratio:1:5 -_------____----- --.....--- CEMENT MASONRY/PLASTERING 02/01/2013 $42.55 $10.65 $18.61 $1.30 $73.11 BRtCKtAY1,16 LOCAL 3 (LrMd) 08/01/2013 $43.32 $10.65 $18.61 $1.30 $73.88 02/01/2014 $43.75 $10.65 $18.61 $1.30 $74.31 08/01/2014 $44.50 $10.65 $18.61 $1.30 $75.06 02/01/2015 $44.93 $10.65 $18.61 $1.30 $75.49 08/01/2015 $45.68 $10.65 $18.61 $1.30 $76.24 02/01/2016 $46.13 $10.65 $18.61 $1.30 $76.69 08/01/2016 $46.88 $10.65 $18.61 $1.30 $77.44 02/01/2017 $47.33 $10.65 $18.61 $1.30 $77.89 -- ----------------- ---------------- ----------------- - - ---- ------ --- --- - - - --- ---------------- ----- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 6 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $1.30 $45.72 2 60 $25.99 Unemployment $13.61 Apprentice- CEMENT MASONRY/PLASTERING -Eastern Mass (Lynn) $51.55 3 65 $28.16 Effective Date - 02/01/2013 $14.61 $1.30 $54.72 Supplemental $30.32 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.28 $10.65 $12.11 $1.30 $45.34 2 60 $25.53 $10.65 $13.61 $1.30 $51.09 3 65 $27.66 $10.65 $14.61 $1.30 $54.22 4 70 $29.79 $10.65 $15.61 $1.30 $57.35 5 75 $31.91 $10.65 $16.61 $1.30 $60.47 6 80 $34.04 $10.65 $17.61 $1.30 $63.60 7 90 $38.30 $10.65 $18.61 $1.30 $68.86 Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.66 $10.65 $12.11 $1.30 $45.72 2 60 $25.99 $10.65 $13.61 $1.30 $51.55 3 65 $28.16 $10.65 $14.61 $1.30 $54.72 4 70 $30.32 $10.65 $15.61 $1.30 $57.88 5 75 $32.49 $10.65 $16.61 $1.30 $61.05 6 80 $34.66 $10.65 $17.61 $1.30 $64.22 7 90 $38.99 $10.65 $18.61 $1.30 $69.55 --_--- ---------__._---- Notes: $32.85 ---- .----____------- $0.00 , ' Steps are 6000 hours $33.35 $7.10 $11.55 $0.00 $52.00 Apprentice to Journeyworker Ratio:l:3 $34.10 $7.10 $11.55 $0.00 $52.75 CHAIN SAW OPERATOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORIi'I?S - 7.ONF. 2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES 12/01/2012 $41.09 $10.00 $13.02 $0.00 $64.11 OPERATING ENGINEERS LOCAL 4 06/01/2013 $41.87 $10.00 $13.02 $0.00 $64.89 12/01/2013 $42.65 $10.00 $13.02 $0.00 $65.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" COMPRESSOR OPERATOR 12/01/2012 $28.17 $10.00 $13.02 $0.00 $51.19 OPERATING ENGINEERS LOCAL 4 06/01/2013 $28.72 $10.00 $13.02 $0.00 $51.74 12/01/2013 $29.27 $10.00 $13.02 $0.00 $52.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DELEADER (BRIDGE) PAINT F'I2S LOCAL 35 - 7.0N131 01/01/2013 $45.01 $7.80 $15.60 $0.00 $68.41 ----------------------------------------------- ---------- ----------------------------------------------------------- -- ---------------- Issue Date: 05/13/2013 Wage Request Number: 201.30513-083 Page 7 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date- 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.51 $7.80 $0.00 $0.00 $30.31 2 55 $24.76 $7.80 $3.52 $0.00 $36.08 3 60 $27.01 $7.80 $3.84 $0.00 $38.65 4 65 $29.26 $7.80 $4.16 $0.00 $41.22 5 70 $31.51 $7.80 $13.68 $0.00 $52.99 6 75 $33.76 $7.80 $14.00 $0.00 $55.56 7 80 $36.01 $7.80 $14.32 $0.00 $58.13 8 90 $40.51 $7.80 $14.96 $0.00 $63.27 (Notes: LABORERS-7.ON'2 Steps are 750 firs. For apprentice rates see "Apprentice- LABORER" Tice Joneywrk Apprento ur oer a a Ratio - - - --- _ _ -- --- 12/01/2011 ®® DEMO: ADZEMAN 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35 LABORERS - 7.ONE 2 For apprentice rates see "Apprentice- LABORER" DEMO: BURNERS 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10 LABORERS-7.ON'2 For apprentice rates see "Apprentice- LABORER" DEMO: CONCRETE CUTTER/SAWYER 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35 LABORERS - ZONE" 2 For apprentice rates see "Apprentice- LABORER" DEMO: JACKHAMMER OPERATOR 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10 1r1 BORERS - 70NE' 2 For apprentice rates see "Apprentice- LABORER" DEMO: WRECKING LABORER 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35 LABORERS -ZONE2 For apprentice rates see "Apprentice- LABORER" DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DIVER 08/01/2012 $54.88 $9.80 $17.67 $0.00 $82.35 PILE DRIVER LOCAL 56 (70NE 1) 08/01/2013 $56.98 $9.80 $17.67 $0.00 $84.45 08/01/2014 $59.08 $9.80 $17.67 $0.00 $86.55 08/01/2015 $61.18 $9.80 $17.67 $0.00 $88.65 DIVER TENDER 08/01/2012 $54.88 $9.80 $17.67 $0.00 $82.35 111LE DRIVER LOCAL 56 (7.0NE 1) 08/01/2013 $56.98 $9.80 $17.67 $0.00 $84.45 08/01/2014 $59.08 $9.80 $17.67 $0.00 $86.55 08/01/2015 $61.18 $9.80 $17.67 $0.00 $88.65 -- ------ ---------------------------- _ - ---------------- ---------------- - - ------------ --- - Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 8 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment DIVER TENDER (EFFLUENT) 08/01/2012 $58.80 $9.80 $17.67 $0.00 $86.27 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2013 $61.05 $9.80 $17.67 $0.00 $88.52 08/01/2014 $63.30 $9.80 $17.67 $0.00 $90.77 08/01/2015 $65.55 $9.80 $17.67 $0.00 $93.02 DIVER/SLURRY (EFFLUENT) 08/01/2012 $82.32 $9.80 $17.67 $0.00 $109.79 PILE DRIVERLOCAL 56(7ONlil) 08/01/2013 $85.47 $9.80 $17.67 $0.00 $112.94 08/01/2014 $88.62 $9.80 $17.67 $0.00 $116.09 08/01/2015 $91.77 $9.80 $17.67 $0.00 $119.24 DRAWBRIDGE OPERATOR (Construction) 03/01/2013 $43.52 $13.00 $14.16 $0.00 $70.68 ELECTRICIANS LOCAL 103 09/01/2013 $44.20 $13.00 $14.18 $0.00 $71.38 03/01/2014 $44.92 $13.00 $14.20 $0.00 $72.12 09/01/2014 $45.60 $13.00 $14.22 $0.00 $72.82 03/01/2015 $46.32 $13.00 $14.24 $0.00 $73.56 09/01/2015 $47.27 $13.00 $14.27 $0.00 $74.54 03/01/2016 $48.23 $13.00 $14.30 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN' ELECTRICIAN 03/01/2013 $43.52 $13.00 $14.16 $0.00 $70.68 ELECTRICIANS LOCAL 103 09/01/2013 $44.20 $13.00 $14.18 $0.00 $71.38 03/01/2014 $44.92 $13.00 $14.20 $0.00 $72.12 09/01/2014 $45.60 $13.00 $14.22 $0.00 $72.82 03/01/2015 $46.32 $13.00 $14.24 $0.00 $73.56 09/01/2015 $47.27 $13.00 $14.27 $0.00 $74.54 03/01/2016 $48.23 $13.00 $14.30 $0.00 $75.53 .....- -------------------...----------------------- - -------------- -------------------------------------------------------- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 9 of 40 Classification Apprentice- ELECTRICIAN- Local 103 Effective Date - 03/01/2013 Step percent Effective Date Base Wage Apprentice Base Wage Health Health Pension Pension supplemental Total Rate Unemployment Supplemental Unemployment Total Rate 1 40 $17.41 $13.00 $0.52 $0.00 $30.93 2 40 $17.41 $13.00 $0.52 $0.00 $30.93 3 45 $19.58 $13.00 $10.53 $0.00 $43.11 4 45 $19.58 $13.00 $10.53 $0.00 $43.11 5 50 $21.76 $13.00 $10.85 $0.00 $45.61 6 55 $23.94 $13.00 $11.19 $0.00 $48.13 7 60 $26.11 $13.00 $11.51 $0.00 $50.62 8 65 $28.29 $13.00 $11.85 $0.00 $53.14 9 70 $30.46 $13.00 $12.17 $0.00 $55.63 10 75 $32.64 $13.00 $12.51 $0.00 $58.15 Effective Date - 09/01/2013 $33.15 $13.00 $12.53 Supplemental $58.68 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.68 $13.00 $0.53 $0.00 $31.21 2 40 $17.68 $13.00 $0.53 $0.00 $31.21 3 45 $19.89 $13.00 $10.54 $0.00 $43.43 4 45 $19.89 $13.00 $10.54 $0.00 $43.43 5 50 $22.10 $13.00 $10.86 $0.00 $45.96 6 55 $24.31 $13.00 $11.20 $0.00 $48.51 7 60 $26.52 $13.00 $11.53 $0.00 $51.05 8 65 $28.73 $13.00 $11.86 $0.00 $53.59 9 70 $30.94 $13.00 $12.19 $0.00 $56.13 10 75 $33.15 $13.00 $12.53 $0.00 $58.68 (:-- _...: _. ..-------- .�._.._____ - - - - - - - -. - - i Notes: App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80 1 -__ --_------- Apprentice to Journeyworker Ratio:2:3*** -._____----�....._---�..._.- ELEVATOR CONSTRUCTOR LLL'VATOR CONSTRUCTORS LOCAL 4 01/01/2012 $52.45 $8.78 $6.96 $0.00 $68.19 --------------------- ------------- - ------------- ------- -------------- ------ ------------ ------------ Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 10 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELEVATOR CONSTRUCTOR -Local 4 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.23 $8.78 $0.00 $0.00 $35.01 2 55 $28.85 $8.78 $6.96 $0.00 $44.59 3 65 $34.09 $8.78 $6.96 $0.00 $49.83 4 70 $36.72 $8.78 $6.96 $0.00 $52.46 5 80 $41.96 $8.78 $6.96 $0.00 $57.70 - - - - - - - - -----.-----------._......-.e Notes: - - - I Steps 1-2 are 6 mos.; Steps 3-5 are I year - - - - - - - Apprentice to Journeyworker Ratio:1:1 - - - - - - - - - - - -- - - - - ELEVATOR CONSTRUCTOR HELPER 01/01/2012 $38.59 $8.78 $6.96 $0.00 $54.33 ELEVATOR CONSTRUCTORS LOCAL 4 FENCE & GUARD RAIL ERECTOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORrRS - 7ONE 2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $6.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" FIELD ENG.fNST.PERSON-BLDG,SITE,FfVY/HWY 05/01/2013 $38.50 $10.00 $13.02 $0.00 $61.52 OPERATING ENGINEERS LOCAL 4 11/01/2013 $39.26 $10.00 $13.02 $0.00 $62.28 05/01/2014 $40.03 $10.00 $13.02 $0.00 $63.05 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENGTARTY CHIEF-BLDG,SITE,IqVY/HWY 05/01/2013 $39.91 $10.00 $13.02 $0.00 $62.93 OPE'IM77NG 1,,NG1NFE'1?S LOCAL 4 11/01/2013 $40.68 $10.00 $13.02 $0.00 $63.70 05/01/2014 $41.45 $10.00 $13.02 $0.00 $64.47 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENGROD PERSON-BLDG,SITE,HVY/HWY 05/01/2013 $21.17 $10.00 $13.02 $0.00 $44.19 OPERATING ENGINEERS LOCAL 4 11/01/2013 $21.63 $10.00 $13.02 $0.00 $44.65 05/01/2014 $22.08 $10.00 $13.02 $0.00 $45.10 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIRE ALARM INSTALLER 03/01/2013 $43.52 $13.00 $14.16 $0.00 $70.68 ELECTRICIANS LOCAL 103 09/01/2013 $44.20 $13.00 $14.18 $0.00 $71.38 03/01/2014 $44.92 $13.00 $14.20 $0.00 $72.12 09/01/2014 $45.60 $13.00 $14.22 $0.00 $72.82 03/01/2015 $46.32 $13.00 $14.24 $0.00 $73.56 09/01/2015 $47.27 $13.00 $14.27 $0.00 $74.54 03/01/2016 $48.23 $13.00 $14.30 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN" ---------------------------------------------------------------- Issue Date: 05/13/2013 Wage Request Number: - --------------- 20130513-083 - ---------------- ----------------- --- Page 11 of 40 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate FIRE ALARM REPAIR / MAINTENANCE 03/01/2013 $32.64 $13.00 $12.51 $0.00 $58.15 ICOMMISSIONINGnjcmcmNs $16.71 $0.00 $65.12 LOCAL103 09/01/2013 $33.15 $13.00 $12.52 $0.00 $58.67 03/01/2014 $33.69 $13.00 $12.54 $0.00 $59.23 09/01/2014 $34.20 $13.00 $12.56 $0.00 $59.76 03/01/2015 $34.74 $13.00 $12.57 $0.00 $60.31 09/01/2015 $35.45 $13.00 $12.59 $0.00 $61.04 03/01/2016 $36.17 $13.00 $12.62 $0.00 $61.79 For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN' 06/01/2016 $20.50 $7.10 $11.55 $0.00 $39.15 FIREMAN (ASST. ENGINEER) OPERATING E"NGINEE"RS LOCAL d For apprentice rates see "Apprentice- OPERATING ENGINEERS" 12/01/2012 06/01/2013 12/01/2013 $33.61 $34.26 $34.92 $10.00 $10.00 $10.00 $13.02 $13.02 $13.02 $0.00 $0.00 $0.00 $56.63 $57.28 $57.94 FLAGGER & SIGNALER 12/01/2012 $20.50 $7.10 $11.55 $0.00 $39.15 1-4 BORERS - 7.ONE 2 $16.71 $0.00 $65.12 06/01/2013 $20.50 $7.10 $11.55 $0.00 $39.15 12/01/2013 $20.50 $7.10 $11.55 $0.00 $39.15 06/01/2014 $20.50 $7.10 $11.55 $0.00 $39.15 12/01/2014 $20.50 $7.10 $11.55 $0.00 $39.15 06/01/2015 $20.50 $7.10 $11.55 $0.00 $39.15 12/01/2015 $20.50 $7.10 $11.55 $0.00 $39.15 06/01/2016 $20.50 $7.10 $11.55 $0.00 $39.15 12/01/2016 $20.50 $7.10 $11.55 $0.00 $39.15 For apprentice rates see "Apprentice- LABORER" FLOORCOVERER 1,10ORCOVERERS LOCAL 21687.ONE E 03/01/2013 $38.61 $9.80 $16.71 $0.00 $65.12 09/01/2013 $38.61 $9.80 $16.71 $0.00 $65.12 03/01/2014 $38.61 $9.80 $16.71 $0.00 $65.12 ------------------------------------------ ------------------------------------- --- -- ----------------------------------- -- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 12 of 40 Classification Effective Date Base Wage Health Pension SupplementalTotal Rate $0.00 $30.90 2 55 $21.24 Unemployment $1.79 Apprentice- FLOORCOVERER -Local 2168 Zone I 3 60 $23.17 $9.80 $11.34 Effective Date - 03/01/2013 $44.31 4 65 $25.10 Supplemental $11.34 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.31 $9.80 $1.79 $0.00 $30.90 2 55 $21.24 $9.80 $1.79 $0.00 $32.83 3 60 $23.17 $9.80 $11.34 $0.00 $44.31 4 65 $25.10 $9.80 $11.34 $0.00 $46.24 5 70 $27.03 $9.80 $13.13 $0.00 $49.96 6 75 $28.96 $9.80 $13.13 $0.00 $51.89 7 80 $30.89 $9.80 $14.92 $0.00 $55.61 8 85 $32.82 $9.80 $14.92 $0.00 $57.54 Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.31 $9.80 $1.79 $0.00 $30.90 2 55 $21.24 $9.80 $1.79 $0.00 $32.83 3 60 $23.17 $9.80 $11.34 $0.00 $44.31 4 65 $25.10 $9.80 $11.34 $0.00 $46.24 5 70 $27.03 $9.80 $13.13 $0.00 $49.96 6 75 $28.96 $9.80 $13.13 $0.00 $51.89 7 80 $30.89 $9.80 $14.92 $0.00 $55.61 8 85 $32.82 $9.80 $14.92 $0.00 $57.54 ---___....._---_e_--...._..-....--_-_._-_- Notes: 06/01/2013 $28.72 --- _._.- -- ! Steps are 750 hrs. $51.74 12/01/2013 $29.27 $10.00 Apprentice to Journeyvvorker Ratio:l:l $0.00 $52.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FORK LIFT/CHERRY PICKER 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPERATING F,NGINIiIi12S LOCAL 4 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GENERATOR/LIGHTING PLANT/HEATERS 12/01/2012 $28.17 $10.00 $13.02 $0.00 $51.19 OPERATING FNG1N1.,'1i1?8 LOCAL 4 06/01/2013 $28.72 $10.00 $13.02 $0.00 $51.74 12/01/2013 $29.27 $10.00 $13.02 $0.00 $52.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR 01/01/2013 $35.51 $7.80 $14.60 $0.00 $57.91 SYSTEMS) GLA7IERS LOCAL 35 (ZONE 2) ---------------------------------------------------------------- ----------------------- ------------------- ----------------------- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 13 of 40 Classification Apprentice- GLAZIER- Loca135 Zone 2 Effective Date- 01/01/2013 Step percent 1 50 2 55 3 60 4 65 5 70 6 75 7 80 8 90 Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate $17.76 $7.80 $0.00 $0.00 $25.56 $19.53 $7.80 $3.25 $0.00 $30.58 $21.31 $7.80 $3.54 $0.00 $32.65 $23.08 $7.80 $3.84 $0.00 $34.72 $24.86 $7.80 $12.83 $0.00 $45.49 $26.63 $7.80 $13.13 $0.00 $47.56 $28.41 $7.80 $13.42 $0.00 $49.63 $31.96 $7.80 $14.01 $0.00 $53.77 - - - - - - - - --- - - - - -- - - - - - - - - - - - - - - Notes: Steps are 750 lirs. - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice ioJourneyworkerRatioAA HOISTING ENGINEERICRANES/GRADALLS 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 ----------- I --- ------------ ---------------------------- - ----------- ...... ----- -- ------- - ------ Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 14 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $0.00 $0.00 ELECTRICIANS LOCAL 103 Unemployment 2 60 Apprentice- OPERATING ENGINEERS - Loca14 $13.02 $0.00 Effective Date - 12/01/2012 $47.54 3 65 $26.57 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.05 $10.00 $0.00 $0.00 $32.05 2 60 $24.05 $10.00 $13.02 $0.00 $47.07 3 65 $26.06 $10.00 $13.02 $0.00 $49.08 4 70 $28.06 $10.00 $13.02 $0.00 $51.08 5 75 $30.07 $10.00 $13.02 $0.00 $53.09 6 80 $32.07 $10.00 $13.02 $0.00 $55.09 7 85 $34.08 $10.00 $13.02 $0.00 $57.10 8 90 $36.08 $10.00 $13.02 $0.00 $59.10 Effective Date - 06/01/2013 For apprentice rates see "Apprentice- SHEET METAL WORKER' Supplemental - Ticeo Apprene Journeyworker Ratio:]:6 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.48 $10.00 $13.00 $0.00 $0.00 $0.00 ELECTRICIANS LOCAL 103 $32.48 2 60 $24.52 $10.00 $13.02 $0.00 $44.20 $47.54 3 65 $26.57 $10.00 $13.02 $44.92 $0.00 $14.20 $49.59 4 70 $28.61 $10.00 $45.60 $13.02 $14.22 $0.00 $72.82 $51.63 5 75 $30.65 $10.00 $14.24 $13.02 $73.56 $0.00 09/01/2015 $53.67 6 80 $32.70 $10.00 $74.54 $13.02 03/01/2016 $0.00 $13.00 $55.72 7 85 $34.74 $10.00 $13.02 $0.00 $57.76 8 90 $36.78 $10.00 $9.82 $13.02 $2.11 $0.00 SHEET METAL WORKERS LOCAL 17 - A $59.80 -_----..----...--_._...-- Notes: -----____-------� For apprentice rates see "Apprentice- SHEET METAL WORKER' - Ticeo Apprene Journeyworker Ratio:]:6 --.._..--- -.---------....... �- HVAC (DUCTWORK) 02/01/2013 $42.32 $9.82 $18.24 $2.11 $72.49 SHFFTMETAL WORKFRSLOCAL I7 -A For apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (ELECTRICAL CONTROLS) 03/01/2013 $43.52 $13.00 $14.16 $0.00 $70.68 ELECTRICIANS LOCAL 103 09/01/2013 $44.20 $13.00 $14.18 $0.00 $71.38 03/01/2014 $44.92 $13.00 $14.20 $0.00 $72.12 09/01/2014 $45.60 $13.00 $14.22 $0.00 $72.82 03/01/2015 $46.32 $13.00 $14.24 $0.00 $73.56 09/01/2015 $47.27 $13.00 $14.27 $0.00 $74.54 03/01/2016 $48.23 $13.00 $14.30 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN' HVAC (TESTING AND BALANCING - AIR) 02/01/2013 $42.32 $9.82 $18.24 $2.11 $72.49 SHEET METAL WORKERS LOCAL 17 - A For apprentice rates see "Apprentice- SHEET METAL WORKER' HVAC (TESTING AND BALANCING -WATER) 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PIPFFl777l1?S LOCAL 537 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" HVAC MECHANIC 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 P1PFF17T1,,'RS LOCAL 537 (Local 138) Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 15 of 40 Classification For apprentice rates see "Apprentice- PIPEF117ER" or "PLUM BER/PIPEFITTER" HYDRAULIC DRILLS LABOL2I RS - 70NE 2 For apprentice rates see "Apprentice- LABORER" Effective Date Base Wage Health Pension Supplemental Total Rate HEAT & EROST INSULATORS LOCAL, 6 (BOSTON) $21.53 $10.65 $8.60 $0.00 $40.78 Unemployment 09/01/2013 $43.06 12/01/2012 $30.35 $7.10 3 70 $11.55 $0.00 $10.65 $49.00 $0.00 $67.21 06/01/2013 $30.85 $10.65 $7.10 Effective Date - 09/01/2012 $11.55 $0.00 -----------r..------_ $49.50 12/01/2013 $31.35 Health $7.10 Unemployment $11.55 $0.00 $20.73 $50.00 $8.60 06/01/2014 $31.85 2 60 $7.10 $10.65 $11.55 $0.00 $44.71 $50.50 $29.02 12/01/2014 $32.35 $0.00 $7.10 4 80 $11.55 $0.00 $10.34 $51.00 $54.16 06/01/2015 $32.85 $7.10 Supplemental $11.55 $0.00 $51.50 12/01/2015 $33.35 $7.10 $11.55 $0.00 $52.00 06/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 12/01/2016 $34.60 $7.10 $11.55 $0.00 $53.25 INSULATOR (PIPES & TANKS) 09/01/2012 $41.46 $10.65 $11.50 $0.00 $63.61 HEAT & EROST INSULATORS LOCAL, 6 (BOSTON) $21.53 $10.65 $8.60 $0.00 $40.78 2 60 09/01/2013 $43.06 $10.65 $11.50 $0.00 $65.21 3 70 09/01/2014 $45.06 $10.65 $11.50 $0.00 $67.21 Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston $34.45 $10.65 $10.34 Effective Date - 09/01/2012 $55.44 --- --- ----_.. (Notes: -----------r..------_ Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.73 $10.65 $8.60 $0.00 $39.98 2 60 $24.88 $10.65 $9.18 $0.00 $44.71 3 70 $29.02 $10.65 $9.76 $0.00 $49.43 4 80 $33.17 $10.65 $10.34 $0.00 $54.16 Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.53 $10.65 $8.60 $0.00 $40.78 2 60 $25.84 $10.65 $9.18 $0.00 $45.67 3 70 $30.14 $10.65 $9.76 $0.00 $50.55 4 80 $34.45 $10.65 $10.34 $0.00 $55.44 --- --- ----_.. (Notes: -----------r..------_ Steps are 1 year t Apprentice to Journeyworker Ratio: 1:4 IRONWORKER/WELDER IRONWORKERS LOCAL 7 (LAWI?INCE AREA) 03/16/2013 $35.82 $7.70 $18.35 $0.00 $61.87 Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 16 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- IRONWORKER -Local 7 Lawrence Effective Date - 03/16/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $21.49 $7.70 $18.35 $0.00 $47.54 2 70 $25.07 $7.70 $18.35 $0.00 $51.12 3 75 $26.87 $7.70 $18.35 $0.00 $52.92 4 80 $28.66 $7.70 $18.35 $0.00 $54.71 5 85 $30.45 $7.70 $18.35 $0.00 $56.50 6 90 $32.24 $7.70 $18.35 $0.00 $58.29 _....-..- --._--_.-...._.--._....-_._.-_.-.. (Notes: $32.85 -------------, $11.55 $0.00 $51.50 Structural 1:6; Ornamental 1:4 $33.35 $7.10 $11.55 $0.00 ` _ _ _ Apprentice to Journeyworker Ratio: $34.10 $7.10 $11.55 $0.00 I JACKHAMMER & PAVING BREAKER OPERATOR 14B0RERS-70NE2 For apprentice rates see "Apprentice- LABORER" LABORER LABORERS - 7.0N& 2 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 12/01/2012 $29.60 $7.10 $11.55 $0.00 $48.25 06/01/2013 $30.10 $7.10 $11.55 $0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 $0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 $0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 ---- ----------------------------------------------------------------------------- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 17 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- LABORER - Zone 2 Effective Date - 12/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.76 $7.10 $11.55 $0.00 $36.41 2 70 $20.72 $7.10 $11.55 $0.00 $39.37 3 80 $23.68 $7.10 $11.55 $0.00 $42.33 4 90 $26.64 $7.10 $11.55 $0.00 $45.29 Effective Date - 06/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.06 $7.10 $11.55 $0.00 $36.71 2 70 $21.07 $7.10 $11.55 $0.00 $39.72 3 80 $24.08 $7.10 $11.55 $0.00 $42.73 4 90 $27.09 $7.10 $11.55 $0.00 $45.74 ----___....._.-----_..„„........f_...----- Notes: ----------- Apprentice to Journeyworker Ratio:1:5 ----___..-,._._----___. ---.-- LABORER: CARPENTER TENDER 12/01/2012 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS -7.ONR2 06/01/2013 $30.10 $7.10 $11.55 $0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 $0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 $0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: CEMENT FINISHER TENDER 12/01/2012 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS-7.ONE2 06/01/2013 $30.10 $7.10 $11.55 $0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 $0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 $0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS -7ONB2 For apprentice rates see "Apprentice- LABORER" Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 18 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment LABORER: MASON TENDER 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS-7ONr2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" LABORER: MULTI -TRADE TENDER 12/01/2012 $29.60 $7.10 $11.55 $0.00 $48.25 LABORLYS - 70NE 2 06/01/2013 $30.10 $7.10 $11.55 $0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 $0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 $0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: TREE REMOVER 12/01/2012 $29.60 $7.10 $11.55 $0.00 $48.25 LABORE RS-7_ONE2 06/01/2013 $30.10 $7.10 $11.55 $0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 $0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 $0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 This classification applies to the wholesale removal of standing trees including all associated trimming of branches and limbs, and applies to the removal of branches at locations not on or around utility lines. For apprentice rates see "Apprentice- LABORER" LASER BEAM OPERATOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORLRS - 70NE 2 06/01/201.3 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" -------------------------------I--------------------------------------------------------------------------------------- --------------- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 19 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 2 60 $22.15 $10.18 Supplemental Unemployment Step percent MARBLE & TILE FINISHERS 02/01/2013 $36.20 $10.18 $16.51 $0.00 $62.89 BRICKLAYERS LOCAL 3 - MARBLE & TILE $10.18 $16.51 $0.00 $44.79 2 60 08/01/2013 $36.91 $10.18 $16.58 $0.00 $63.67 02/01/2014 $37.36 $10.18 $16.58 $0.00 $64.12 08/01/2014 $38.07 $10.18 $16.65 $0.00 $64.90 02/01/2015 $38.52 $10.18 $16.65 $0.00 $65.35 08/01/2015 $39.23 $10.18 $16.72 $0.00 $66.13 02/01/2016 $39.68 $10.18 $16.72 $0.00 $66.58 08/01/2016 $40.38 $10.18 $16.80 $0.00 $67.36 02/01/2017 $40.84 $10.18 $16.80 $0.00 $67.82 Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile $18.46 $10.18 $16.58 $0.00 Effective Date - 02/01/2013 2 60 $22.15 $10.18 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.10 $10.18 $16.51 $0.00 $44.79 2 60 $21.72 $10.18 $16.51 $0.00 $48.41 3 70 $25.34 $10.18 $16.51 $0.00 $52.03 4 80 $28.96 $10.18 $16.51 $0.00 $55.65 5 90 $32.58 $10.18 $16.51 $0.00 $59.27 Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.46 $10.18 $16.58 $0.00 $45.22 2 60 $22.15 $10.18 $16.58 $0.00 $48.91 3 70 $25.84 $10.18 $16.58 $0.00 $52.60 4 80 $29.53 $10.18 $16.58 $0.00 $56.29 5 90 $33.22 $10.18 $16.58 $0.00 $59.98 - -------------------- I--®-®--- Notes: '- - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:3 - MARBLE MASONS,TILELAYERS & TERRAZZO MECH BRICKLAYERS LOCAL 3 - MARBLE. & TILE 02/01/2013 $47.45 $10.18 $17.83 $0.00 $75.46 08/01/2013 $48.35 $10.18 $17.90 $0.00 $76.43 02/01/2014 $48.91 $10.18 $17.90 $0.00 $76.99 08/01/2014 $49.81 $10.18 $17.97 $0.00 $77.96 02/01/2015 $50.37 $10.18 $17.97 $0.00 $78.52 08/01/2015 $51.27 $10.18 $18.04 $0.00 $79.49 02/01/2016 $51.84 $10.18 $18.04 $0.00 $80.06 08/01/2016 $52.74 $10.18 $18.12 $0.00 $81.04 02/01/2017 $53.31 $10.18 $18.12 $0.00 $81.61 --------------------------- - ------ -------------- --- --- ------------------ ---------------------- - --- - - ------ -- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 20 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble & Tile Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.73 $10.18 $17.83 $0.00 $51.74 2 60 $28.47 $10.18 $17.83 $0.00 $56.48 3 70 $33.22 $10.18 $17.83 $0.00 $61.23 4 80 $37.96 $10.18 $17.83 $0.00 $65.97 5 90 $42.71 $10.18 $17.83 $0.00 $70.72 Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.18 $10.18 $17.90 $0.00 $52.26 2 60 $29.01 $10.18 $17.90 $0.00 $57.09 3 70 $33.85 $10.18 $17.90 $0.00 $61.93 4 80 $38.68 $10.18 $17.90 $0.00 $66.76 5 90 $43.52 $10.18 $17.90 $0.00 $71.60 yNotes: - - __. __._ ^ ___. ____ _ - Apprentice to Journeyworker Ratio:1:5 - _.._ - _ _ _ MECH. SWEEPER OPERATOR (ON CONST. SITES) 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERATING SNGINESRS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" MECHANICS MAINTENANCE 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERATING IiNGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING. ENGINEERS" MILLWRIGHT (Zone 2) 04/01/2011 $31.71 $8.67 $15.61 $0.00 $55.99 MILLWRIGHTS LOCAL 1121 -7,one 2 --------------------------------------- ----- ------- ------------ ------------------------ --------------------- ------------------- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 21 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MILLWRIGHT- Local 1121 Zone 2 Effective Date - 04/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $15.86 $8.67 $11.64 $0.00 $36.17 2 55 $17.44 $8.67 $11.64 $0.00 $37.75 3 60 $19.03 $8.67 $13.23 $0.00 $40.93 4 65 $20.61 $8.67 $13.23 $0.00 $42.51 5 70 $22.20 $8.67 $14.02 $0.00 $44.89 6 75 $23.78 $8.67 $14.02 $0.00 $46.47 7 80 $25.37 $8.67 $14.82 $0.00 $48.86 8 85 $26.95 $8.67 $14.82 $0.00 $50.44 ___- _ - - _ - _ - _-.. - _._ (Notes: .__ - $7.10 $11.55 $0.00 $52.00 -_._....._-------__ Apprentice to Journeyworker Ratio: 1:5 ----------- $7.10 $11.55 $0.00 $52.75 MORTAR MIXER 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS-7ONE2 $21.70 $10.00 $13.02 $0.00 $44.72 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" OILER (OTHER THAN TRUCK CRANES,GRADALLS) OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 12/01/2012 $21.28 $10.00 $13.02 $0.00 $44.30 06/01/2013 $21.70 $10.00 $13.02 $0.00 $44.72 12/01/2013 $22.12 $10.00 $13.02 $0.00 $45.14 OILER (TRUCK CRANES, GRADALLS) 12/01/2012 $24.62 $10.00 $13.02 $0.00 $47.64 OPERATING ENGINEERS LOCAL 4 06/01/2013 $25.10 $10.00 $13.02 $0.00 $48.12 12/01/2013 $25.59 $10.00 $13.02 $0.00 $48.61 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT - CLASS II 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PAINTER (BRIDGES/TANKS) 01/01/2013 $45.01 $7.80 $15.60 $0.00 $68.41 PAINTERS LOCAL, 35 - 70NE 2 -------------- - - --- ------------------ ----- -------------------------------------------- --- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 22 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2013 Step percent Apprentice Base Wage Health 1 50 $22.51 $7.80 2 55 $24.76 $7.80 3 60 $27.01 $7.80 4 65 $29.26 $7.80 5 70 $31.51 $7.80 6 75 $33.76 $7.80 7 80 $36.01 $7.80 8 - - 90 - - - - - $40.51 - - - - - - - - --- $7.80 - - Pension Supplemental Unemployment Total Rate $0.00 $0.00 $30.31 $3.52 $0.00 $36.08 $3.84 $0.00 $38.65 $4.16 $0.00 $41.22 $13.68 $0.00 $52.99 $14.00 $0.00 $55.56 $14.32 $0.00 $58.13 $14.96 $0.00 $63.27 Notes: Steps are 750 hrs. -- - - - - - - - - - - - - - - - - - - - - -- Apprentice -Apprentice to Journeyworker RatioA: I PAINTER (SPRAY OR SANDBLAST, NEW) * 01/01/2013 $35.91 $7.80 $15.60 $0.00 $59.31 * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PAINTARS LOCAL 35-70ME2 Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -New Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.96 $7.80 $0.00 $0.00 $25.76 2 55 $19.75 $7.80 $3.52 $0.00 $31.07 3 60 $21.55 $7.80 $3.84 $0.00 $33.19 4 65 $23.34 $7.80 $4.16 $0.00 $35.30 5 70 $25.14 $7.80 $13.68 $0.00 $46.62 6 75 $26.93 $7.80 $14.00 $0.00 $48.73 7 80 $28.73 $7.80 $14.32 $0.00 $50.85 8 90 $32.32 $7.80 $14.96 $0.00 $55.08 - - - - - - - - - - Notes: - - - - - - - - - - - - - - - -- - - I - - - - Apprentice to Journeyworker Ratio:1:1 - - - - - - - - - - - - - - - - - PAINTER (SPRAY OR SANDBLAST, REPAINT) 01/01/2013 $33.97 $7.80 $15.60 $0.00 $57.37 PAINTERS LOCAL 35 - 70jVE2 ------ ---------------------------- ---- ------------------------------------------- ------------------------ -_ ----------------- ----- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 23 of 40 Classification $29.60 Effective Date Base Wage Health Pension Supplemental Total Rate $48.25 06/01/2013 $30.10 $7.10 $11.55 Unemployment Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -Repaint $30.60 $7.10 $11.55 $0.00 Effective Date - 01/01/2013 06/01/2014 $31.10 $7.10 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.99 $7.80 $0.00 $0.00 $24.79 2 55 $18.68 $7.80 $3.52 $0.00 $30.00 3 60 $20.38 $7.80 $3.84 $0.00 $32.02 4 65 $22.08 $7.80 $4.16 $0.00 $34.04 5 70 $23.78 $7.80 $13.68 $0.00 $45.26 6 75 $25.48 $7.80 $14.00 $0.00 $47.28 7 80 $27.18 $7.80 $14.32 $0.00 $49.30 8 90 $30.57 $7.80 $14.96 $0.00 $53.33 --..... (Notes: -_-----__._-----___.--_.._-_--- 1 _.-------._..-___ ----------._.._--- Apprentice to Journeyworker Ratio:1:1 PAINTER (TRAFFIC MARKINGS) LABORERS - 70NE 2 For Apprentice rates see "Apprentice- LABORER" 12/01/2012 $29.60 $7.10 $11.55 $0.00 $48.25 06/01/2013 $30.10 $7.10 $11.55 $0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 $0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 $0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 PAINTER / TAPER (BRUSH, NEW) * 01/01/2013 $34.51 $7.80 $15.60 $0.00 $57.91 * if 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.nAZNTERSLOCAL 35-70Nc2 ---------------------------- - ----- --- ---- --------------------------------- - ----- - ----------------------- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 24 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.26 $7.80 $0.00 $0.00 $25.06 2 55 $18.98 $7.80 $3.52 $0.00 $30.30 3 60 $20.71 $7.80 $3.84 $0.00 $32.35 4 65 $22.43 $7.80 $4.16 $0.00 $34.39 5 70 $24.16 $7.80 $13.68 $0.00 $45.64 6 75 $25.88 $7.80 $14.00 $0.00 $47.68 7 80 $27.61 $7.80 $14.32 $0.00 $49.73 8 90 $31.06 $7.80 $14.96 $0.00 $53.82 ._._.-_._---- ---- _._- Notes: --- --_._---..-...------- ---- --, ' Steps are 750 hrs. Apprentice to Journeyworker RatioA:1 PAINTER / TAPER (BRUSH, REPAINT) 01/01/2013 $32.57 $7.80 $15.60 $0.00 $55.97 PAINTERS LOCAL 35 - 70NE 2 Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date- 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.29 $7.80 $0.00 $0.00 $24.09 2 55 $17.91 $7.80 $3.52 $0.00 $29.23 3 60 $19.54 $7.80 $3.84 $0.00 $31.18 4 65 $21.17 $7.80 $4.16 $0.00 $33.13 5 70 $22.80 $7.80 $13.68 $0.00 $44.28 6 75 $24.43 $7.80 $14.00 $0.00 $46.23 7 80 $26.06 $7.80 $14.32 $0.00 $48.18 8 90 $29.31 $7.80 $14.96 $0.00 $52.07 .__...,.._------------------_._..____ Notes: ---- Steps are 750 hrs. ----------------_.....------_---.----.-- Apprentice to Journeyworker Ratio:1:1 PANEL & PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 TEAMSTERS JOINT COUNCIL NO. 107.ONE R PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND DECK) PILE DRIVER LOCAL, 56 (7.0NE 1) 08/01/2012 $39.20 $9.80 $17.67 $0.00 $66.67 08/01/2013 $40.70 $9.80 $17.67 $0.00 $68.17 08/01/2014 $42.20 $9.80 $17.67 $0.00 $69.67 08/01/2015 $43.70 $9.80 $17.67 $0.00 $71.17 ---------------------------------------------------------------------------------------------------- --------------- - --- - -------- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 25 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 2 60 $23.52 $9.80 $17.67 Unemployment $50.99 PILE DRIVER 08/01/2012 $39.20 $9.80 $17.67 $0.00 $66.67 PILE ]VIVEI? LOCAL 56 (70NE 1) $29.40 $9.80 $17.67 $0.00 $56.87 08/01/2013 $40.70 $9.80 $17.67 $0.00 $68.17 08/01/2014 $42.20 $9.80 $17.67 $0.00 $69.67 08/01/2015 $43.70 $9.80 $17.67 $0.00 $71.17 Apprentice- PILE DRIVER - Loca156 Zone I Effective Date - 08/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.60 $9.80 $17.67 $0.00 $47.07 2 60 $23.52 $9.80 $17.67 $0.00 $50.99 3 70 $27.44 $9.80 $17.67 $0.00 $54.91 4 75 $29.40 $9.80 $17.67 $0.00 $56.87 5 80 $31.36 $9.80 $17.67 $0.00 $58.83 6 80 $31.36 $9.80 $17.67 $0.00 $58.83 7 90 $35.28 $9.80 $17.67 $0.00 $62.75 8 90 $35.28 $9.80 $17.67 $0.00 $62.75 Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.35 $9.80 $17.67 $0.00 $47.82 2 60 $24.42 $9.80 $17.67 $0.00 $51.89 3 70 $28.49 $9.80 $17.67 $0.00 $55.96 4 75 $30.53 $9.80 $17.67 $0.00 $58.00 5 80 $32.56 $9.80 $17.67 $0.00 $60.03 6 80 $32.56 $9.80 $17.67 $0.00 $60.03 7 90 $36.63 $9.80 $17.67 $0.00 $64.10 8 90 $36.63 $9.80 $17.67 $0.00 $64.10 ----_.__..---------__-----___.---,.._. Notes: ----� -- __ ---..----_--.. Apprentice to Journeyworker Ratio: 1:3 ---_-._.-___..._..- PIPEFITTER & STEAMFITTE.R PIPEFITTERSLOCAL 537 (Local 138) 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 ----- --------- ----------- --- -- ----------------------- ---------- - ---- -------------------- - ------- - ---------- - Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 26 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PIPEFITTER Local 537 (Local 138) Effective Date - 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.80 $8.75 $4.50 $0.00 $32.05 2 45 $21.15 $8.75 $12.39 $0.00 $42.29 3 60 $28.21 $8.75 $12.39 $0.00 $49.35 4 70 $32.91 $8.75 $12.39 $0.00 $54.05 5 80 $37.61 $8.75 $12.39 $0.00 $58.75 - - Notes: - - - - ----- .-- - - __._ - _ _._ ..._ _._. - s - - ---- _. -- - _ - - - .-.., Step 4 with lic$50.43 Steps with lic$56.22 * * 1:3; 3:15; 1:10 thereafter / Steps are 1 yr. $32.35 $7.10 $11.55 $0.00 $51.00 Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max) $32.85 $7.10 $11.55 Apprentice to Journeyworker Ratio:** $51.50 06/01/2016 $33.35 $7.10 PIPELAYER 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS-7ONF2 $9.32 $5.61 $0.00 $33.02 3 55 $24.88 $9.32 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 $8.81 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 $0.00 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 Step 4 with lic$50.43 Steps with lic$56.22 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" PLUMBER 03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84 PLUMBERS & GASF/TTLRS LOCAL 12 (Local 138) Apprentice- PLUMBER/GASFITTER -Local 12 (Local 138) Effective Date- 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unetnployment Total Rate 1 35 $15.83 $9.32 $4.97 $0.00 $30.12 2 40 $18.09 $9.32 $5.61 $0.00 $33.02 3 55 $24.88 $9.32 $7.53 $0.00 $41.73 4 65 $29.40 $9.32 $8.81 $0.00 $47.53 5 75 $33.92 $9.32 $10.09 $0.00 $53.33 Notes: Steps are 1 yr Step 4 with lic$50.43 Steps with lic$56.22 Apprentice to Journeyworker Ratio:l:5 PNEUMATIC CONTROLS (TEMP.) 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PIPE1`I7TERS LOCAL 53 7 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 27 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PNEUMATIC DR]LL/TOOL OPERATOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS -7.ONE2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" POWDERMAN & BLASTER 12/01/2012 $30.60 $7.10 $11.55 $0.00 $49.25 1-4BORERS-7ONE2 06/01/2013 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/2013 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2014 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2014 $32.60 $7.10 $11.55 $0.00 $51.25 06/01/2015 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2015 $33.60 $7.10 $11.55 $0.00 $52.25 06/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 12/01/2016 $34.85 $7.10 $11.55 $0.00 $53.50 For apprentice rates see "Apprentice- LABORER" POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (CONCRETE) 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPERATING FNGINEENS LOCAL 4 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (DEWATERING, OTHER) 12/01/2012 $28.17 $10.00 $13.02 $0.00 $51.19 OPERATING ENGINIiENS LOCAL 4 06/01/2013 $28.72 $10.00 $13.02 $0.00 $51.74 12/01/2013 $29.27 $10.00 $13.02 $0.00 $52.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" READY -MIX CONCRETE DRIVER 04/30/2009 $25.80 $5.96 $5.34 $0.00 $37.10 TEAMSTERS LOCAL 42 RECLAIMERS 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42 CARPENTERS -7.0NE 2 (Residential Wood) RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81 ** The Residential Wood Frame Carpenter classification applies only to the construction of new, wood frame residences that do not exceed four stories including the basement. CARPENTERS-7oNF 2 (Resider ial Wood) As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. ----- ---------------- -- -- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 28 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $22.45 $10.50 $10.70 $0.00 $43.65 Unemployment $24.32 RIDE -ON MOTORIZED BUGGY OPERATOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS -7ONEa $0.00 $49.26 5 S5 $31.80 $10.50 $10.70 $0.00 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 - - -- Apprentice to Journeyworker Ratio:** 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ROLLER/SPREADER/MULCHING MACHINE 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg) ROOFERS LOCAL. 33 Apprentice - ROOFER - Local 33 Effective Date - 02/01/2013 Step percent 02/01/2013 $37.41 $10.50 $10.70 $0.00 $58.61 Supplemental Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.71 $10.50 $3.38 $0.00 $32.59 2 60 $22.45 $10.50 $10.70 $0.00 $43.65 3 65 $24.32 $10.50 $10.70 $0.00 $45.52 4 75 $28.06 $10.50 $10.70 $0.00 $49.26 5 S5 $31.80 $10.50 $10.70 $0.00 $53.00 _..----_.---._....-___.--- Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1 --------- ----- Step 1 is 2000 hrs.; Steps 2-5 are 1000 hrs. I - - -- Apprentice to Journeyworker Ratio:** -- --__---.___-------___.. ROOFER SLATE / TILE / PRECAST CONCRETE 02/01/2013 $37.66 $10.50 $10.70 $0.00 $58.86 ROOFERS LOCAL 33 For apprentice rates see "Apprentice- ROOFER" SHEETMETAL WORKER 02/01/2013 $42.32 $9.82 $18.24 $2.11 $72.49 SHFISW TAL WORKERS LOCAL 17 - A --------------------------------------------------------- --- ------------------- - ----------- -------- --------------------------- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 29 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SHEET METALWORKER -Local 17-A Effective Date - 02/101/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.93 $9.82 $4.00 $0.00 $30.75 2 40 $16.93 $9.82 $4.00 $0.00 $30.75 3 45 $19.04 $9.82 $8.00 $1.11 $37.97 4 45 $19.04 $9.82 $8.00 $1.11 $37.97 5 50 $21.16 $9.82 $8.75 $1.19 $40.92 6 50 $21.16 $9.82 $9.00 $1.20 $41.18 7 60 $25.39 $9.82 $10.24 $1.36 $46.81 8 65 $27.51 $9.82 $10.99 $1.45 $49.77 9 75 $31.74 $9.82 $12.49 $1.62 $55.67 10 85 $35.97 $9.82 $13.49 $1.78 $61.06 - - Notes: - - - - - - - - - - - - - - - -- -----------W-------, Steps are 6 mos. ApprenTice o Journeyw orker Ra Tio-1-- :4 ----------------- - - - - - - - - - - - - - - - SIGN ERECTOR 06/01/2012 $25.37 $6.82 $6.85 $0.00 $39.04 PAINTETS LOCAL 35 - 70NE2 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93 I - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 30 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $19.98 2 55 $14.20 Unemployment Apprentice- SIGNERECTOR - Local 35 Zone 2 $23.72 3 60 $15.49 $7.07 Effective Date - 06/01/2012 $0.00 $25.01 4 65 Supplemental $7.07 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $12.69 $6.82 $0.00 $0.00 $19.51 2 55 $13.95 $6.82 $2.35 $0.00 $23.12 3 60 $15.22 $6.82 $2.35 $0.00 $24.39 4 65 $16.49 $6.82 $2.35 $0.00 $25.66 5 70 $17.76 $6.82 $6.85 $0.00 $31.43 6 75 $19.03 $6.82 $6.85 $0.00 $32.70 7 80 $20.30 $6.82 $6.85 $0.00 $33.97 8 85 $21.56 $6.82 $6.85 $0.00 $35.23 9 90 $22.83 $6.82 $6.85 $0.00 $36.50 Effective Date - 06/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $12.91 $7.07 $0.00 $0.00 $19.98 2 55 $14.20 $7.07 $2.45 $0.00 $23.72 3 60 $15.49 $7.07 $2.45 $0.00 $25.01 4 65 $16.78 $7.07 $2.45 $0.00 $26.30 5 70 $18.07 $7.07 $7.05 $0.00 $32.19 6 75 $19.36 $7.07 $7.05 $0.00 $33.48 7 80 $20.65 $7.07 $7.05 $0.00 $34.77 8 85 $21.94 $7.07 $7.05 $0.00 $36.06 9 90 $23.23 $7.07 $7.05 $0.00 $37.35 ____ - - _... - - __._ v - ___. Notes: - _..__.._... - -.. ___. __._ _ - - __._ _ _.._ - _ - ___, Steps are 4 mos. i Apprentice to Journeyworker Ratio:l:l SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65 TEAMSTERS JOINT COUNCIL NO. 10 70NE B SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2012 $31.03 $8.91 $8.00 $0.00 $47.94 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B SPRINKLER FITTER 03/01/2013 $48.13 $8.42 $12.60 $0.00 $69.15 SPRINKLER TITTERSLOCAL 550 - (Section B) --------- ------ ------------------------------------------------------------------------- ---------------------------- ---------- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 31 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - SPRINKLER FITTER - Local 550 (Section B) Effective Date - 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.85 $8.42 $8.00 $0.00 $33.27 2 40 $19.25 $8.42 $8.00 $0.00 $35.67 3 45 $21.66 $8.42 $8.00 $0.00 $38.08 4 50 $24.07 $8.42 $8.00 $0.00 $40.49 5 55 $26.47 $8.42 $8.00 $0.00 $42.89 6 60 $28.88 $8.42 $8.00 $0.00 $45.30 7 65 $31.28 $8.42 $8.00 $0.00 $47.70 8 70 $33.69 $8.42 $8.00 $0.00 $50.11 9 75 $36.10 $8.42 $8.00 $0.00 $52.52 10 80 $38.50 $8.42 $8.00 $0.00 $54.92 -----_.i---._._.----- Notes: 09/01/2014 .-_ -_.._--______.._._._._._,-_-..-_, $12.56 $0.00 + Steps are 850 hours $34.74 $13.00 $12.57 $0.00 I i --- --- _.__._--e. Apprentice to Journey -worker Ratio: 1:1 --------_.___._-_.__--m. $35.45 $13.00 $12.59 - _ STEAM BOILER OPERATOR OPERAS/NG ENGINEMRS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 12/01/2012 06/01/2013 12/01/2013 $39.72 $40.49 $41.27 $10.00 $10.00 $10.00 $13.02 $13.02 $13.02 $0.00 $0.00 $0.00 $62.74 $63.51 $64.29 TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERATING IiNGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TELECOMMUNICATION TECHNICIAN 03/01/2013 $32.64 $13.00 $12.51 $0.00 $58.15 ELECTRIC/ANS LOCAL 103 09/01/2013 $33.15 $13.00 $12.52 $0.00 $58.67 03/01/2014 $33.69 $13.00 $12.54 $0.00 $59.23 09/01/2014 $34.20 $13.00 $12.56 $0.00 $59.76 03/01/2015 $34.74 $13.00 $12.57 $0.00 $60.31 09/01/2015 $35.45 $13.00 $12.59 $0.00 $61.04 03/01/2016 $36.17 $13.00 $12.62 $0.00 $61.79 ----------------------- ------------ - --------------- - ---- -------------- -- - -- ---------------- - ------- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 32 of 40 Classification $46.35 Effective Date Base Wage Health Pension Supplemental Total Rate $74.36 Step percent Apprentice Base Wage Health Pension Unemployment Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 $13.26 $13.00 $0.40 $0.00 Effective Date - 03/01/2013 2 40 $13.26 $13.00 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $13.06 $13.00 $0.39 $0.00 $26.45 2 40 $13.06 $13.00 $0.39 $0.00 $26.45 3 45 $14.69 $13.00 $10.77 $0.00 $38.46 4 45 $14.69 $13.00 $10.77 $0.00 $38.46 5 50 $16.32 $13.00 $11.02 $0.00 $40.34 6 55 $17.95 $13.00 $11.27 $0.00 $42.22 7 60 $19.58 $13.00 $11.52 $0.00 $44.10 8 65 $21.22 $13.00 $11.77 $0.00 $45.99 9 70 $22.85 $13.00 $12.02 $0.00 $47.87 10 75 $24.48 $13.00 $12.26 $0.00 $49.74 Effective Date - 09/01/2013 $46.35 $10.18 $17.83 Supplemental $74.36 Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 40 $13.26 $13.00 $0.40 $0.00 $26.66 2 40 $13.26 $13.00 $0.40 $0.00 $26.66 3 45 $14.92 $13.00 $9.79 $0.00 $37.71 4 45 $14.92 $13.00 $9.79 $0.00 $37.71 5 50 $16.58 $1.3.00 $10.04 $0.00 $39.62 6 55 $18.23 $13.00 $10.29 $0.00 $41.52 7 60 $19.89 $13.00 $10.54 $0.00 $43.43 8 65 $21.55 $13.00 $10.79 $0.00 $45.34 9 70 $23.21 $13.00 $11.04 $0.00 $47.25 10 75 $24.86 $13.00 $11.29 $0.00 $49.15 ---_.....__ ---__- - (Notes: - - - - - ®------- ------ -.--- --- --__..-----____-------- Apprentice to Journeyworker Ratio:1:1 ....-® ®- TERRAZZO FINISHERS 02/01/2013 $46.35 $10.18 $17.83 $0.00 $74.36 B1?1CKLAYEI3S LOCAL, 3 - MARBLE & 71LE 08/01/2013 $47.25 $10.18 $17.90 $0.00 $75.33 02/01/2014 $47.81 $10.18 $17.90 $0.00 $75.89 08/01/2014 $48.71 $10.18 $17.97 $0.00 $76.86 02/01/2015 $49.27 $10.18 $17.97 $0.00 $77.42 08/01/2015 $50.17 $10.18 $18.04 $0.00 $78.39 02/01/2016 $50.74 $10.18 $18.04 $0.00 $78.96 08/01/2016 $51.64 $10.18 $18.12 $0.00 $79.94 02/01/2017 $52.21 $10.18 $18.12 $0.00 $80.51 - ------- -------------- -------------- -- ------ - --------------------------------------------- --- - ----------------------- - Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 33 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TERRAZZO FINISHER -Local 3 Marble & Tile Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.18 $10.18 $17.83 $0.00 $51.19 2 60 $27.81 $10.18 $17.83 $0.00 $55.82 3 70 $32.45 $10.18 $17.83 $0.00 $60.46 4 80 $37.08 $10.18 $17.83 $0.00 $65.09 5 90 $41.72 $10.18 $17.83 $0.00 $69.73 Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.63 $10.18 $17.90 $0.00 $51.71 2 60 $28.35 $10.18 $17.90 $0.00 $56.43 3 70 $33.08 $10.18 $17.90 $0.00 $61.16 4 80 $37.80 $10.18 $17.90 $0.00 $65.88 5 90 $42.53 $10.18 $17.90 $0.00 $70.61 -_..._.._._ ----------._....-------- (Notes: ----_.., Apprentice to Journeyworker Ratio: 1:3 - - _._ - - - - ___ ____ - .. _ - - - - - - __.. TEST BORING DRILLER 12/01/2012 $33.70 $7.10 $12.60 $0.00 $53.40 LABORERS - FOUNDA7I0N AND MARINE 06/01/2013 $34.45 $7.10 $12.60 $0.00 $54.15 12/01/2013 $35.20 $7.10 $12.60 $0.00 $54.90 06/01/2014 $35.95 $7.10 $12.60 $0.00 $55.65 12/01/2014 $36.70 $7.10 $12.60 $0.00 $56.40 06/01/2015 $37.45 $7.10 $12.60 $0.00 $57.15 12/01/2015 $38.20 $7.10 $12.60 $0.00 $57.90 06/01/2016 $38.95 $7.10 $12.60 $0.00 $58.65 12/01/2016 $39.95 $7.10 $12.60 $0.00 $59.65 For apprentice rates see "Apprentice- LABORER" TEST BORING DRILLER HELPER 12/01/2012 $32.42 $7.10 $12.60 $0.00 $52.12 LABORRiRS - I,0UNDA7/0NAND MARINE 06/01/2013 $33.17 $7.10 $12.60 $0.00 $52.87 12/01/2013 $33.92 $7.10 $12.60 $0.00 $53.62 06/01/2014 $34.67 $7.10 $12.60 $0.00 $54.37 12/01/2014 $35.42 $7.10 $12.60 $0.00 $55.12 06/01/2015 $36.17 $7.10 $12.60 $0.00 $55.87 12/01/2015 $36.92 $7.10 $12.60 $0.00 $56.62 06/01/2016 $37.67 $7.10 $12.60 $0.00 $57.37 12/01/2016 $38.67 $7.10 $12.60 $0.00 $58.37 For apprentice rates see "Apprentice- LABORER" ----------------------------- -- ------------------ ------------------ ...-- ------ - -------------------- -- - -- ------------ Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 34 of 40 Classification TEST BORING LABORER LABORERS - FOUNDATION AND MARINE For apprentice rates see "Apprentice- LABORER" TRACTORS/PORTABLE STEAM GENERATORS OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate 12/01/2012 $32.30 $7.10 $12.60 $0.00 $52.00 06/01/2013 $33.05 $7.10 $12.60 $0.00 $52.75 12/01/2013 $33.80 $7.10 $12.60 $0.00 $53.50 06/01/2014 $34.55 $7.10 $12.60 $0.00 $54.25 12/01/2014 $35.30 $7.10 $12.60 $0.00 $55.00 06/01/2015 $36.05 $7.10 $12.60 $0.00 $55.75 12/01/2015 $36.80 $7.10 $12.60 $0.00 $56.50 06/01/2016 $37.55 $7.10 $12.60 $0.00 $57.25 12/01/2016 $38.55 $7.10 $12.60 $0.00 $58.25 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 TRAILERS .FOR EARTH MOVING EQUIPMENT 12/01/2012 $31.32 $8.91 $8.00 $0.00 $48.23 TFAMSTFRS JOINT COUNCIL NO. 10 70NE B $7.10 $13.00 $0.00 $67.43 12/01/2013 $48.08 TUNNEL WORK - COMPRESSED AIR 12/01/2012 $44.58 $7.10 $13.00 $0.00 $64.68 LABORE16(COMPRFSSFDAIR) $0.00 $68.93 12/01/2014 $49.58 $7.10 $13.00 $0.00 06/01/2013 $45.33 $7.10 $13.00 $0.00 $65.43 $70.43 12/01/2013 $46.08 $7.10 $13.00 $0.00 $66.18 06/01/2016 06/01/2014 $46.83 $7.10 $13.00 $0.00 $66.93 $52.83 12/01/2014 $47.58 $7.10 $13.00 $0.00 $67.68 06/01/2015 $48.33 $7.10 $13.00 $0.00 $68.43 12/01/2015 $49.08 $7.10 $13.00 $0.00 $69.18 06/01/2016 $49.83 $7.10 $13.00 $0.00 $69.93 12/01/2016 $50.83 $7.10 $13.00 $0.00 $70.93 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) LABORERS (COMPRFSSF_D AIR) For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - FREE AIR I.ABORERS (1,RE 1, AIR TUNNEL) For apprentice rates see "Apprentice- LABORER" 12/01/2012 $46.58 $7.10 $13.00 $0.00 $66.68 06/01/2013 $47.33 $7.10 $13.00 $0.00 $67.43 12/01/2013 $48.08 $7.10 $13.00 $0.00 $68.18 06/01/2014 $48.83 $7.10 $13.00 $0.00 $68.93 12/01/2014 $49.58 $7.10 $13.00 $0.00 $69.68 06/01/2015 $50.33 $7.10 $13.00 $0.00 $70.43 12/01/2015 $51.08 $7.10 $13.00 $0.00 $71.18 06/01/2016 $51.83 $7.10 $13.00 $0.00 $71.93 12/01/2016 $52.83 $7.10 $13.00 $0.00 $72.93 12/01/2012 $36.65 $7.10 $13.00 $0.00 $56.75 06/01/2013 $37.40 $7.10 $13.00 $0.00 $57.50 12/01/2013 $38.15 $7.10 $13.00 $0.00 $58.25 06/01/2014 $38.90 $7.10 $13.00 $0.00 $59.00 12/01/2014 $39.65 $7.10 $13.00 $0.00 $59.75 06/01/2015 $40.40 $7.10 $13.00 $0.00 $60.50 12/01/2015 $41.15 $7.10 $13.00 $0.00 $61.25 06/01/2016 $41.90 $7.10 $13.00 $0.00 $62.00 12/01/2016 $42.90 $7.10 $13.00 $0.00 $63.00 --------------------------------------------------------- ----- -------------------------------- ------ Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 35 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TUNNEL WORK - FREE AIR (HAZ. WASTE) 12/01/2012 $38.65 $7.10 $13.00 $0.00 $58.75 LABORERS (1,RFEA1RTUNNEL) 06/01/2013 $39.40 $7.10 $13.00 $0.00 $59.50 12/01/2013 $40.15 $7.10 $13.00 $0.00 $60.25 06/01/2014 $40.90 $7.10 $13.00 $0.00 $61.00 12/01/2014 $41.65 $7.10 $13.00 $0.00 $61.75 06/01/2015 $42.40 $7.10 $13.00 $0.00 $62.50 12/01/2015 $43.15 $7.10 $13.00 $0.00 $63.25 06/01/2016 $43.90 $7.10 $13.00 $0.00 $64.00 12/01/2016 $44.90 $7.10 $13.00 $0.00 $65.00 For apprentice rates see "Apprentice- LABORER" VAC -HAUL 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65 T1iAMSTFRS.1OINT COUNCIL NO. 1070NIi B WAGON DRILL OPERATOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS -7.ONE2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" WASTE WATER PUMP OPERATOR 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPERATING E"NGINIi1i1?SLOCAL 4 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" WATER METER INSTALLER 03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84 PLUMBERS & GAS1,17TERSLOCAL 12 (Local 138) For apprentice rates see "Apprentice- PLUM BER/PIPEFITTER" or "PLUMBER/GASFITI'ER" Rental of Equipment - East (2 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.45 $8.91 $0.00 $0.00 $39.36 TEAMS'T'ERS JOINT COUNCIL NO. 10 7.ONh B (3 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.52 $8.91 $0.00 $0.00 $39.43 TEAMSTFK5 JOINT COUNCIL NO. 10 ZONE B (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.64 $9.07 $0.00 $0.00 $39.71 77sAMSTERS JOINT COUNCIL NO. 10 7.ONE B ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 OPERATING 1iNG1NEBRS LOCAL 4 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BACKHOE/FRONT-END LOADER 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 01'1i12ATING FNGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BULLDOZER/GRADER/SCRAPER 12/01/2012 $39.72 $10.00 $0.00 $0.00 $49.72 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $0.00 $0.00 $50.49 12/01/2013 $41.27 $10.00 $0.00 $0.00 $51.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ------------------------------------------------------ ------ Issue Date: 05/13/2013 Wage Request Number: ----------------- 20130513-083 ------- -- ---- --------------------------- Page 36 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate OPERATING ENGINEERS LOCAL 4 $64.68 I'ILEDRI VER LOCAL 56 (7.0NE 1) Unemployment $20.50 CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES 12/01/2012 $41.09 $10.00 $0.00 $0.00 $51.09 OPERATING ENGINEERS LOCAL 4 12/01/2013 $29.27 $10.00 $0.00 $0.00 $39.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 06/01/2013 $41.87 $10.00 $0.00 $0.00 $51.87 DIVER 12/01/2013 $42.65 $10.00 $0.00 $0.00 $52.65 For apprentice rates see "Apprentice- OPERATING ENGINEERS" $9.80 $7.10 $0.00 $0.00 $0.00 $70.98 COMPRESSOR OPERATOR 12/01/2012 $28.17 $10.00 $0.00 $0.00 $38.17 OPERATING ENGINEERS LOCAL 4 $64.68 I'ILEDRI VER LOCAL 56 (7.0NE 1) 06/01/2013 $20.50 $7.10 06/01/2013 $28.72 $10.00 $0.00 $0.00 $38.72 $56.98 12/01/2013 $29.27 $10.00 $0.00 $0.00 $39.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" $27.60 08/01/2014 $59.08 $7.10 $9.80 $0.00 DIVER 08/01/2012 $54.88 $9.80 $0.00 $0.00 $64.68 PILE DRIVER LOCAL 56 (7.0NE 1) $9.80 $7.10 $0.00 $0.00 $0.00 $70.98 $20.50 08/01/2013 $56.98 $9.80 $0.00 $0.00 $66.78 $7.10 08/01/2014 $59.08 $9.80 $0.00 $0.00 $68.88 08/01/2015 $61.18 $9.80 $0.00 $0.00 $70.98 DIVER TENDER 08/01/2012 $54.88 $7.10 $9.80 $0.00 $0.00 LABORERS-7ONE2 $0.00 $64.68 I'ILEDRI VER LOCAL 56 (7.0NE 1) 06/01/2013 $20.50 $7.10 $0.00 $0.00 $27.60 12/01/2013 $20.50 08/01/2013 $56.98 $0.00 $9.80 06/01/2014 $0.00 $7.10 $0.00 $66.78 $27.60 08/01/2014 $59.08 $7.10 $9.80 $0.00 $0.00 06/01/2015 $0.00 $68.88 $0.00 08/01/2015 $61.18 12/01/2015 $9.80 $7.10 $0.00 $0.00 $0.00 $70.98 $20.50 FLAGGER & SIGNALER 12/01/2012 $20.50 $7.10 $0.00 $0.00 $27.60 LABORERS-7ONE2 OPERATING ENGINEERS LOCAL 4 06/01/2013 $20.50 $7.10 $0.00 $0.00 $27.60 12/01/2013 $20.50 $7.10 $0.00 $0.00 $27.60 06/01/2014 $20.50 $7.10 $0.00 $0.00 $27.60 12/01/2014 $20.50 $7.10 $0.00 $0.00 $27.60 06/01/2015 $20.50 $7.10 $0.00 $0.00 $27.60 12/01/2015 $20.50 $7.10 $0.00 $0.00 $27.60 06/01/2016 $20.50 $7.10 $0.00 $0.00 $27.60 12/01/2016 $20.50 $7.10 $0.00 $0.00 $27.60 For apprentice rates see "Apprentice- LABORER" $0.00 $51.65 FORK LIFT/CHERRY PICKER 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GENERATOR/LIGHTING PLANT/HEATERS 12/01/2012 $28.17 $10.00 $0.00 $0.00 $38.17 OPERATING ENGINEERS LOCAL 4 06/01/2013 $28.72 $10.00 $0.00 $0.00 $38.72 12/01/2013 $29.27 $10.00 $0.00 $0.00 $39.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" HOISTING ENGINEER/CRANES/GRADALLS 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 OPFRA TING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 -------------------------- ------------ ------------------------------------------------------------ -------------- ----- - - ------ Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 37 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- OPERATING ENGINEERS -Local 4 Effective Date - 12/01/2012 Step percent Apprentice Base Wage Health 1 55 $22.05 $10.00 2 60 $24.05 $10.00 3 65 $26.06 $10.00 4 70 $28.06 $10.00 5 75 $30.07 $10.00 6 80 $32.07 $10.00 7 85 $34.08 $10.00 8 90 $36.08 $10.00 Pension Supplemental Unemployment Total Rate $0.00 $0.00 $32.05 $0.00 $0.00 $34.05 $0.00 $0.00 $36.06 $0.00 $0.00 $38.06 $0.00 $0.00 $40.07 $0.00 $0.00 $42.07 $0.00 $0.00 $44.08 $0.00 $0.00 $46.08 Effective Date - 06/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.48 $10.00 $0.00 $0.00 $32.48 2 60 $24.52 $10.00 $0.00 $0.00 $34.52 3 65 $26.57 $10.00 $0.00 $0.00 $36.57 4 70 $28.61 $10.00 $0.00 $0.00 $38.61 5 75 $30.65 $10.00 $0.00 $0.00 $40.65 6 80 $32.70 $10.00 $0.00 $0.00 $42.70 7 85 $34.74 $10.00 $0.00 $0.00 $44.74 8 90 $36.78 $10.00 $0.00 $0.00 $46.78 s,Notes: $33.10 $7.10 $0.00 $0.00 $40.20 I Apprentice to Journeyworker Ratio:l:6 $33.85 $7.10 $0.00 $0.00 $40.95 LABORER 12/01/2012 $29.60 $7.10 $0.00 $0.00 $36.70 I,ABONIiRS - 7.0JVL 2 06/01/2013 $30.10 $7.10 $0.00 0.00 $37.20 12/01/2013 $30.60 $7.10 $0.00 $0.00 $37.70 06/01/2014 $31.10 $7.10 $0.00 $0.00 $38.20 12/01/2014 $31.60 $7.10 $0.00 $0.00 $38.70 06/01/2015 $32.10 $7.10 $0.00 $0.00 $39.20 12/01/2015 $32.60 $7.10 $0.00 $0.00 $39.70 06/01/2016 $33.10 $7.10 $0.00 $0.00 $40.20 12/01/2016 $33.85 $7.10 $0.00 $0.00 $40.95 -- - -- ---------------------- - ----------------------- - - ------------------------------------- --------------- ------- Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 38 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER - Zone 2 Effective Date - 12/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.76 $7.10 $0.00 $0.00 $24.86 2 70 $20.72 $7.10 $0.00 $0.00 $27.82 3 80 $23.68 $7.10 $0.00 $0.00 $30.78 4 90 $26.64 $7.10 $0.00 $0.00 $33.74 Effective Date - 06/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.06 $7.10 $0.00 $0.00 $25.16 2 70 $21.07 $7.10 $0.00 $0.00 $28.17 3 80 $24.08 $7.10 $0.00 $0.00 $31.18 4 90 $27.09 $7.10 $0.00 $0.00 $34.19 _-_____--_.-___..._---..-_--._.__.-___-____., Notes: I -__-------_--.._.___._.-_ Apprentice to Journeyworker Ratio:1:5 ---____ _ I OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2012 $21.28 $10.00 $0.00 $0.00 $31.28 OPE1tA7ING ENGINEERS LOCAL 4 06/01/2013 $21.70 $10.00 $0.00 $0.00 $31.70 12/01/2013 $22.12 $10.00 $0.00 $0.00 $32.12 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OILER (TRUCK CRANES, GRADALLS) 12/01/2012 $24.62 $10.00 $0.00 $0.00 $34.62 OPERATING ENGINEERS LOCAL 4 06/01/2013 $25.10 $10.00 $0.00 $0.00 $35.10 12/01/2013 $25.59 $10.00 $0.00 $0.00 $35.59 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT - CLASS II 12/01/2012 $39.72 $10.00 $0.00 $0.00 $49.72 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $0.00 $0.00- $50.49 12/01/2013 $41.27 $10.00 $0.00 $0.00 $51.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PANEL & PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $0.00 $0.00 $39.35 7'Is'AMS7'ERS JOINT COUNCIL NO. 10 ZONE B POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (CONCRETE) 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (DEWATERING, OTHER) 12/01/2012 $28.17 $10.00 $0.00 $0.00 $38.17 OPERATING ENGINEERS LOCAL 4 06/01/2013 $28.72 $10.00 $0.00 $0.00 $38.72 12/01/2013 $29.27 $10.00 $0.00 $0.00 $39.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" -------------------------------------------------------------------- - -- - Issue Date: 05/13/2013 Wage Request Number: 20130513-083 - -------------------- --------------------- ---- ------- Page 39 of 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment ROLLER/SPREADER/MULCHING MACHINE 12/01/2012 $39.72 $10.00 $0.00 $0.00 $49.72 OPERATING ENGINEERS' LOCAL 4 06/01/2013 $40.49 $10.00 $0.00 $0.00 $50.49 12/01/2013 $41.27 $10.00 $0.00 $0.00 $51.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2012 $30.74 $8.91 $0.00 $0.00 $39.65 TEAMSTERS JOINT COUNCIL NO. 107ONE B SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2012 $31.03 $8.91 $0.00 $0.00 $39.94 TIEAMS7'E7dS.JOIN7' CO(JNCJL NO. 10 ZONE B TRACTORS/PORTABLE STEAM GENERATORS 12/01/2012 $39.72 $10.00 $0.00 $0.00 $49.72 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $0.00 $0.00 $50.49 12/01/2013 $41.27 $10.00 $0.00 $0.00 $51.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2012 $31.32 $8.91 $0.00 $0.00 $40.23 TEAMSTERSJOINT COUNCIL NO. 10 ZONIE B TREE TRIMMER 02/01/2009 $16.59 $2.42 $0.00 $0.00 $19.01 OUTSIDE' ELECTRICAL WORKERS - EAST LOCAL 104 This classification applies only to the trimming of branches on and around utility lines. TREE TRIMMER GROUNDMAN 02/01/2009 $14.64 $2.42 $0.00 $0.00 $17.06 OUTSIDE,`ELIEC7RICAL WORKERS- EASTLOCAL 104 This classification applies only to the trinuring of branches on and around utility lines. VAC-HAUL/CATCH BASIN CLEANING 12/01/2012 $30.74 $8.91 $0.00 $0.00 $39.65 TE"AMSTE"RS JOINT COUNCIL NO. 10 ZONE B Additional Apprentice Infonnation: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L. c. 23, ss. 1 IE -1 I L. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. 11 E-1 IL. All steps are six months (1000 hours) unless otherwise specified. « Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof. «« Multiple ratios are listed in the cotmnent field. ««« APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. «««« APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. --------- . Issue Date: 05/13/2013 Wage Request Number: 20130513-083 Page 40 of 40 ACC>RV CERTIFICATE OF LIABILITY INSURANCE1 5/12/2014 (MMIDD/YYYY) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Alliant Insurance Services, Inc. 40 Stanford Dr, 2nd FI Farmington CT 06032 NAME: Catherine Marten Aro" 0 869-2181 ac No : 60 0003 E-MAIL ADD REss:cmartinaall iant.com INSURER(S) AFFORDING COVERAGE NAICO A INSURER A:ZU rich American535 Y INSURED INSURER B :MerChantS Insurance Group Northern Tree Service, Inc. 1290 Park Street, PO Box 790 Palmer, MAO 1069 INSURER C: INSURER D: X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE li-I OCCUR INSURER E: INSURER F: GUVEHAGES CERTIFICATE NUMBER:01aatOzrO REVISION NIIMRFR• THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCEADDLSUBR POLICYNUMBER POLICY EFF MMIDDIYYYY POLICY EXP WDDIYYYY LIMITS A GENERAL LIABILITY Y Y GLO303518407 1/1/2013 1/1/2014 EACH OCCURRENCE $1,000,000 X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE li-I OCCUR DAMAGE TO RENTED_ PREMISES Ea occunenoe $100,000 MED EXP (Any oneperson) $10,000 PERSONAL & ADV INJURY $1,000,000 GENERAL AGGREGATE $2,000,000 GEN'LAGGREGATELIMITAPPLIESPER : PRODUCTS -COMP/OPAGG $2,000,000 17 POLICY X PRO- LOC $ A AUTOMOBILE LIABILITY Y Y BAP303518307 1/1/2013 1/1/2014 EaaociderR) $1,000,000 X ANY AUTO BODILY INJURY (Per person) $ X ALLOWNED SCHEDULED AUTOS AUTOS BODILY INJURY (Per accident) $ X NON -OWNED HIREDAUTOSX AUTOS PROPERTY DAMAGE Per accident $ B X UMBRELLA LIAB X OCCUR Y Y CUP0000674 1/1/2013 11/1/2014 EACH OCCURRENCE $5,000,000 EXCESS LIAB CLAIMS -MADE AGGREGATE $5,000,000 DED I X I RETENTION$ 10,000 $ A WORKERS COMPENSATION ANDEMPLOYERS'LIABILITY YIN ANY PROPRIETOR/PARTNERIEXECUTIVE OFRCERIMEMBER EXCLUDED? N❑ N / A Y WC303518207 1/1/2013 1/1/2014 XWCSTATU- X OTH- MIT E.LEACHACCIDENT $1,000,000 E.L. DISEASE - EA EMPLOYE $1,00C),000 (Mandatory in NH) It yes, describe under E.L. DISEASE -POLICY LIMIT 1 $1.000 000 DESCRIPTION OF OPERATIONS below DESCRIPTION OF OPERATIONS I LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) The Town of North Andover is included as Additional Insured as respects Liability arising out of operations (work) performed by the Named Insured as required by written contract. The insurance provided shall be primary and any other insurance maintained by the Additional Insured is excess and non-contributory. Waiver of Subrogation applies as required by written contract. Reference Number: Contract #668 Ln=G1I120fl1117 ae] 41a:: Town of North Andover North Andover Town Hall 120 Main Street North Andover MA 0184E SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010/05) The ACORD name and logo are registered marks of ACORD 0 Andrew W. Maylor Town Manager Mr. Timothy Lamotte, Treasurer Northern Tree Service, Inc P.O. Box 790, 1290 Park Street Palmer, MA 01069 Dear Mr. Lamotte: Town of North Andover Office of the Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 amaylor@townofnorthandover.com May 6, 2014 Telephone (978)688-9510 Fax (978)688-9556 In accordance with the provisions of the contract between the Town of North Andover and Northern Tree Service, Inc. (Contract #668), the contract and the respective unit price ($4,800/day) to provide a tub grinder with operator is extended an additional option year (July 1, 2014 through June 30, 2015). Please provide updated insurance certificates listing the Town of North Andover as `Additional Insured' in accordance with the contract document. The insurance certificates are to be sent to the attention of Ray Santilli, Assistant Town Manager. In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work performed under this contract. An updated prevailing wage report is enclosed. For each week work is performed, you are required to submit certified weekly payroll records. The certified weekly payroll records are to be sent to: Mr. Bruce Thibodeau Department of Public Works 384 Osgood Street North Andover, MA 01845 If you have any.questions and/or concerns, please call Mr. Santilli at 978-688-9516. Sincerely, AP1511 4 Andrew W. May KoY Town Manager cc., Ray Santilli, Assistant Town Manager Bruce Thibodeau, Public Works Contract File 0 .. THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the RACHEL KAPRIELIAN Go—, Massachusetts General Laws, Chapter 149, Sections 26 to 27H secretary HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Tub grinder services, with operator, for Public Works Department Job Location: Throughout town Information about Prevailing Wage Schedules for Awarding Authorities and Contractors • This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage Request Number" on all pages of this schedule. • Awarding authorities must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. • The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. Once a contractor has been selected by the awarding authority, the wage schedule shall be made a part of the contract for that project. The wage schedule must be posted in a conspicuous place at the work site during the life of the project in accordance with M.G.L. c. 149, § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project regardless of whether they are employed by the prime contractor, a filed sub -bidder, or any sub -contractor. • All apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Training (DAT). Apprentices must keep his/her apprentice identification card on his/her person during all work hours on the project. If an apprentice rate is listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAT, the apprentice may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. If an apprentice rate is not listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAT, the apprentice must be paid the journeyworker's rate for the trade. • The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F "rental of equipment" contracts. • Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports directly to the awarding authority and keep them on file for three years. Each weekly payroll report must contain: the employee's name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/pw. • Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617) 626-6953. • Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor Division of the office of the Attorney General at (617) 727-3465. • Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties. Issue Date: 05/06/2014 Wage Request Number: 20140506-001 Classification Rental of Equipment - East Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment (2 AXLE) DRIVER - EQUIPMENT 12/01/2013 $30.95 $9.41 $0.00 $0.00 $40.36 TEAMSTERS JOINT COUNCIL NO. 10 7.ONL•' B $40.43 TEAMSTER.SJOINT COUNCIL NO. 1070NIi B 06/01/2014 $31.30 $9.41 $0.00 $0.00 $40.71 $31.37 08/01/2014 $31.30 $9.91 $0.00 $0.00 $40.78 $41.21 12/01/2014 $31.30 $9.91 $0.00 $0.00 $0.00 $41.21 $41.28 06/01/2015 $31.65 $9.91 $0.00 $0.00 $0.00 $41.56 $0.00 08/01/2015 $31.65 $10.41 $0.00 $0.00 $31.72 $42.06 $0.00 12/01/2015 $31.65 $10.41 $0.00 $0.00 $42.06 $31.72 06/01/2016 $32.15 $10.41 $0.00 $0.00 $42.13 $42.56 08/01/2016 $32.15 $10.91 $0.00 $0.00 $0.00 $43.06 $42.13 12/01/2016 $32.15 $10.91 $0.00 $0.00 $0.00 $43.06 $0.00 (3 AXLE) DRIVER - EQUIPMENT 12/01/2013 $31.02 $9.41 $0.00 $0.00 $40.43 TEAMSTER.SJOINT COUNCIL NO. 1070NIi B 06/01/2014 $31.37 $9.41 $0.00 $0.00 $40.78 08/01/2014 $31.37 $9.91 $0.00 $0.00 $41.28 12/01/2014 $31.37 $9.91 $0.00 $0.00 $41.28 06/01/2015 $31.72 $9.91 $0.00 $0.00 $41.63 08/01/2015 $31.72 $10.41 $0.00 $0.00 $42.13 12/01/2015 $31.72 $10.41 $0.00 $0.00 $42.13 06/01/2016 $32.22 $10.41 $0.00 $0.00 $42.63 08/01/2016 $32.22 $10.91 $0.00 $0.00 $43.13 12/01/2016 $32.22 $10.91 $0.00 $0.00 $43.13 (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2013 $31.14 $9.41 $0.00 $0.00 $40.55 TEAMSTERS JOINT COUNCIL NO. 10 7ONE B 06/01/2014 $31.49 $9.41 $0.00 $0.00 $40.90 08/01/2014 $31.49 $9.91 $0.00 $0.00 $41.40 12/01/2014 $31.49 $9.91 $0.00 $0.00 $41.40 06/01/2015 $31.84 $9.91 $0.00 $0.00 $41.75 08/01/2015 $31.84 $10.41 $0.00 $0.00 $42.25 12/01/2015 $31.84 $10.41 $0.00 $0.00 $42.25 06/01/2016 $32.34 $10.41 $0.00 $0.00 $42.75 08/01/2016 $32.34 $10.91 $0.00 $0.00 $43.25 12/01/2016 $32.34 $10.91 $0.00 $0.00 $43.25 ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2013 $40.49 $10.00 $0.00 $0.00 $50.49 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BACKHOE/FRONT-END LOADER 12/01/2013 $40.49 $10.00 $0.00 $0.00 $50.49 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BULLDOZER/GRADER/SCRAPER 12/01/2013 $40.11 $10.00 $0.00 $0.00 $50.11 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES 12/01/2013 $41.49 $10.00 $0.00 $0.00 $51.49 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ------------------------------------------------------------------------------------------------------- --------- ----------------- Issue Date: 05/06/2014 Wage Request Number: 20140506-001 Page 2 of 6 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment COMPRESSOR OPERATOR 12/01/2013 $28.11 $10.00 $0.00 $0.00 $38.11 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DIVER 08/01/2013 $56.14 $9.80 $0.00 $0.00 $65.94 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2014 $58.24 $9.80 $0.00 $0.00 $68.04 08/01/2015 $60.34 $9.80 $0.00 $0.00 $70.14 DIVER TENDER PILE DRIVER LOCAL 56 (7.0NE 1) 08/01/2013 08/01/2014 08/01/2015 $40.10 $41.60 $43.10 $9.80 $9.80 $9.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $49.90 $51.40 $52.90 FLAGGER & SIGNALER 12/01/2013 $20.50 $7.30 $0.00 $0.00 $27.80 LABORERS - ZONE 2 1 55 $22.27 $10.00 $0.00 $0.00 2 60 $24.29 06/01/2014 $20.50 $7.30 $0.00 $0.00 $27.80 $0.00 12/01/2014 $20.50 $7.30 $0.00 $0.00 $27.80 5 75 06/01/2015 $20.50 $7.30 $0.00 $0.00 $27.80 $10.00 12/01/2015 $20.50 $7.30 $0.00 $0.00 $27.80 $0.00 06/01/2016 $20.50 $7.30 $0.00 $0.00 $27.80 12/01/2016 $20.50 $7.30 $0.00 $0.00 $27.80 For apprentice rates see "Apprentice- LABORER" FORK LIFT/CHERRY PICKER 12/01/2013 $40.49 $10.00 $0.00 $0.00 $50.49 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GENERATOR/LIGHTING PLANT/HEATERS 12/01/2013 $28.11 $10.00 $0.00 $0.00 $38.11 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" HOISTING ENGINEER/CRANES/GRADALLS OPERATING ENGINEERS LOCAL 4 12/01/201.3 $40.49 $10.00 $0.00 $0.00 $50.49 Apprentice - OPERATING ENGINEERS - Local . Effective Date - 12/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment 1 55 $22.27 $10.00 $0.00 $0.00 2 60 $24.29 $10.00 $0.00 $0.00 3 65 $26.32 $10.00 $0.00 $0.00 4 70 $28.34 $10.00 $0.00 $0.00 5 75 $30.37 $10.00 $0.00 $0.00 6 80 $32.39 $10.00 $0.00 $0.00 7 85 $34.42 $10.00 $0.00 $0.00 8 90 --------------------------- $36.44 $10.00 $0.00 $0.00 Total Rate Notes: ------ -.------_._..------_...-...._.---- -- Apprentice to Journeyworker Ratio:1:6 $32.27 $34.29 $36.32 $38.34 $40.37 $42.39 $44.42 $46.44 ------------------------------------------------------------------------------------------------------------------------------------ ----- Issue Date: 05/06/2014 Wage Request Number: 20140506-001 Page 3 of 6 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate LABORER 12/01/2013 $29.85 $7.30 $0.00 $0.00 $37.15 LABORERS -7_ONE2 $23.88 $7.30 $0.00 $0.00 $31.18 06/01/2014 $30.35 $7.30 $0.00 $0.00 $37.65 12/01/2014 $30.85 $7.30 $0.00 $0.00 $38.15 06/01/2015 $31.35 $7.30 - $0.00 $0.00 $38.65 12/01/2015 $31.85 $7.30 $0.00 $0.00 $39.15 06/01/2016 $32.35 $7.30 $0.00 $0.00 $39.65 12/01/2016 $33.10 $7.30 $0.00 $0.00 $40.40 Apprentice - LABORER - Zone 2 Effective Date - 12/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.91 $7.30 $0.00 $0.00 $25.21 2 70 $20.90 $7.30 $0.00 $0.00 $28.20 3 80 $23.88 $7.30 $0.00 $0.00 $31.18 4 90 $26.87 $7.30 $0.00 $0.00 $34.17 Effective Date - 06/01/2014 $0.00 $0.00 $34.43 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.21 $7.30 $0.00 $0.00 $25.51 2 70 $21.25 $7.30 $0.00 $0.00 $28.55 3 80 $24.28 $7.30 $0.00 $0.00 $31.58 4 90 $27.32 $7.30 $0.00 $0.00 $34.62 -- --.-------------------------+ Notes: $0.00 $0.00 $34.43 OPERATING ENGINEERS LOCAL 4 Apprentice to Journeyworker Ratio:]:5 --._..._ ----------- For apprentice rates see "Apprentice- OPERATING ENGINEERS" OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2013 $20.96 $10.00 $0.00 $0.00 $30.96 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OILER (TRUCK CRANES, GRADALLS) 12/01/2013 $24.43 $10.00 $0.00 $0.00 $34.43 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT - CLASS 11 12/01/2013 $40.11 $10.00 $0.00 $0.00 $50.11 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PANEL & PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $0.00 $0.00 $39.35 TF.AMSTF.RS JOINT COUNCIL NO. 10 70NE B POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2013 $40.49 $10.00 $0.00 $0.00 $50.49 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (CONCRETE) 12/01/2013 $40.49 $10.00 $0.00 $0.00 $50.49 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (DEWATERING, OTHER) 12/01/2013 $28.11 $10.00 $0.00 $0.00 $38.11 OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ------------------------------------------------------------------------------------------------------ ------- --------------------- Issue Date: 05/06/2014 Wage Request Number: 20140506-001 Page 4 of 6 Classification Effective Date Base Wage Health Pension Supplemental Total Rate TEAMSTERS JOINT COUNCIL N0. 10 7.ONB B $41.23 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B Unemployment ROLLER/SPREADER/MULCHING MACHINE 12/01/2013 $40.11 $10.00 $0.00 $0.00 $50.11 OPERATING ENGINEERS LOCAL 4 08/01/2014 $31.88 $9.91 $0.00 $0.00 $41.79 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 12/01/2014 $31.88 $9.91 $0.00 $0.00 $41.79 SPECIALIZED EARTH .MOVING EQUIP < 35 TONS 12/01/2013 $31.24 $9.41 $0.00 $0.00 $40.65 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 08/01/2015 $32.23 $10.41 $0.00 $0.00 $42.64 06/01/2015 06/01/2014 $31.59 $9.41 $0.00 $0.00 $41.00 08/01/2014 $31.59 $9.91 $0.00 $0.00 $41.50 $0.00 12/01/2014 $31.59 $9.91 $0.00 $0.00 $41.50 $32.52 06/01/2015 $31.94 $9.91 $0.00 $0.00 $41.85 TRACTORS/PORTABLE STEAM GENERATORS 08/01/2015 $31.94 $10.41 $0.00 $0.00 $42.35 OPERATING ENGINEERS LOCAL 4 12/01/2015 $31.94 $10.41 $0.00 $0.00 $42.35 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 06/01/2016 $32.44 $10.41 $0.00 $0.00 $42.85 08/01/2016 $32.44 $10.91 $0.00 $0.00 $43.35 $0.00 12/01/2016 $32.44 $10.91 $0.00 $0.00 $43.35 SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2013 $31.53 $9.41 $0.00 $0.00 $40.94 TEAMSTERS JOINT COUNCIL N0. 10 7.ONB B $41.23 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2014 $31.88 $9.41 $0.00 $0.00 $41.29 08/01/2014 $31.88 $9.91 $0.00 $0.00 $41.79 12/01/2014 $31.88 $9.91 $0.00 $0.00 $41.79 $0.00 06/01/2015 $32.23 $9.91 $0.00 $0.00 $42.14 $9.91 08/01/2015 $32.23 $10.41 $0.00 $0.00 $42.64 06/01/2015 12/01/2015 $32.23 $10.41 $0.00 $0.00 $42.64 06/01/2016 $32.73 $10.41 $0.00 $0.00 $43.14 $0.00 08/01/2016 $32.73 $10.91 $0.00 $0.00 $43.64 $32.52 12/01/2016 $32.73 $10.91 $0.00 $0.00 $43.64 TRACTORS/PORTABLE STEAM GENERATORS 12/01/2013 $40.11 $10.00 $0.00 $0.00 $50.11 OPERATING ENGINEERS LOCAL 4 $0.00 $43.43 08/01/2016 $33.02 For apprentice rates see "Apprentice- OPERATING ENGINEERS" $10.91 $0.00 $0.00 $43.93 TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2013 $31.82 $9.41 $0.00 $0.00 $41.23 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2014 $32.17 $9.41 $0.00 $0.00 $41.58 08/01/2014 $32.17 $9.91 $0.00 $0.00 $42.08 12/01/2014 $32.17 $9.91 $0.00 $0.00 $42.08 06/01/2015 $32.52 $9.91 $0.00 $0.00 $42.43 08/01/2015 $32.52 $10.41 $0.00 $0.00 $42.93 12/01/2015 $32.52 $10.41 $0.00 $0.00 $42.93 06/01/2016 $33.02 $10.41 $0.00 $0.00 $43.43 08/01/2016 $33.02 $10.91 $0.00 $0.00 $43.93 12/01/2016 $33.02 $10.91 $0.00 $0.00 $43.93 TREE TRIMMER 01/29/2012 $17.18 $3.37 $0.00 $0.00 $20.55 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 This classification applies only to tree work done: (a) for a utility company, R.E.A. cooperative, or railroad or coal mining company, and (b) for the propose of operating, maintaining, or repairing the utility company's equipment, and (c) by a person who is using hand or mechanical cutting methods and is not on the ground. This classification does not apply to wholesale tree removal. TREE TRIMMER GROUNDMAN 01/29/2012 $15.15 $3.37 $0.00 $0.00 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 This classification applies only to tree work done: (a) for a utility company, R.E.A. cooperative, or railroad or coal mining company, and (b) for the purpose of operating, maintaining, or repairing the utility company's equipment, and (c) by a person who is using hand or mechanical cutting methods and is on the ground. This classification does not apply to wholesale tree removal. $18.52 ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 05/06/2014 Wage Request Number: 20140506-001 Page 5 of 6 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment VAC-HAUL/CATCH BASIN CLEANING 12/01/2013 $31.24 $9.41 $0.00 $0.00 $40.65 TEAMSTERS JO/NT COUNCR NO. 10 ZONF. B 06/01/2014 $31.59 $9.41 $0.00 $0.00 $41.00 08/01/2014 $31.59 $9.91 $0.00 $0.00 $41.50 12/01/2014 $31.59 $9.91 $0.00 $0.00 $41.50 06/01/2015 $31.94 $9.91 $0.00 $0.00 $41.85 08/01/2015 $31.94 $10.41 $0.00 $0.00 $42.35 12/01/2015 $31.94 $10.41 $0.00 $0.00 $42.35 06/01/2016 $32.44 $10.41 $0.00 $0.00 $42.85 08/01/2016 $32.44 $10.91 $0.00 $0.00 $43.35 12/01/2016 $32.44 $10.91 $0.00 $0.00 $43.35 Additional Apprentice Information Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L. c. 23, ss. 11E -11L. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. I IE -11L. All steps are six months (1000 hours) unless otherwise specified. * Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof. ** Multiple ratios are listed in the cormment field. *** APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. **** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 05/06/2014 Wage Request Number: 20140506-001 Page 6 of 6 TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 Raymond T Santini Assistant Town Manager Mr. Timothy Lamotte, Treasurer Northern Tree Service, Inc P.O. Box 790, 1290 Park Street Palmer, MA 01069 Dear Mr. Lamotte: f �10RTF� 1 O F ��SSACHUSEt�y July 9, 2013 TEL (978) 688-9516 FAX (978) 688-9556 Enclosed please find the executed contract between the Town of North Andover and Northern Tree Service, Inc to provide tree removal services, as planned maintenance or on an as - needed basis, for the period of July 1, 2013 through June 30, 2014 with one (1) additional one-year renewal, solely at the discretion of the Town. In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work performed under this contract. For each week work is performed, you are required to submit certified weekly payroll records. The certified weekly payroll records are to be sent to: Mr. Bruce Thibodeau, Director Department of Public Works 384 Osgood Street North Andover, MA 01 845 If you have any questions and/or concerns, please call me. Sincerely, 7 -S-. - _f j 02 Raymond T. Santilli Assistant Town Manager Enclosure cc., Mr. Bruce Thibodeau, Public Works Contract File Northern Tree Service, Inc. 1290 Park St., P.O. Box 790 Palmer MA 01069 800-232-6132 fax 413-283-5132 At a meeting of the Board of Directors of the Northern Tree Service, Inc., a Massachusetts Corporation, held on June 27, 2013 , at which all the Directors were present or waived notice, it was VOTED, that Philip Cambo President of this company, and he is hereby authorized to execute bids, contracts and bonds in the name and behalf of said company, and affix its corporate seal thereto; and such execution of any bid, contract, bond or obligation in this company's name on its behalf by such President under seal of this company shall be valid and binding upon this company. A True Copy ttest: Clerk: ^//" (signature) Kathleen Cambo (print name) 1290 Park Street, P.O. Box 790, Palmer, MA (Place of business) June 27, 2013 (Date) I, Kathleen Cambo hereby certify that I am the clerk of the Northern Tree Service, Inc. and that Philip Cambo is the President of said company, and that the above vote has not been amended or rescinded and remains in full force and as of this date. Clerk (Corporate Seal) CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature�� Print Name & Title Date 06-11-2013 NORTHERN TREE SERVICE, INC. Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I TIMOTHY LAMOTTE , authorized signatory for NORTHERN TREE SERVICE, INC. Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. " �, /111� Signature V /V Town of North Andover IFB Tree Removal Services 06-11-2013 Date Page 30 of 34 CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature Date 06-11-2013 / { moiiy L -q 1''01,4o T' io" (fir&_X--NORTHERN TREE SERVICE INC. Print Name & Title Company Name Town of North Andover IFB Page 31 of 34 Tree Removal Services ACCMV CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDD/YYYY) TYPE OF INSURANCE 6/27/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER A NTCT NAME: Catberine Martin PHHONE FAX AIC- 1 1 AIC No):860-284-0003 Alliant Insurance Services, Inc. 195 Farmington Ave., Suite 300 Farmington CT 06032 E-MAIL ADDREss:cmartin@alliant.com EACH OCCURRENCE $1,000,000 DAMA E TO RENTED PREMISES Ea occurrence $100,000 INSURERS AFFORDING COVERAGE NAIC q INSURERA:Zurich American Ins Co Of 11 278 5 INSURED INSURERB:American Zurich Insurance C 40142 INSURERC:TOWER INS CO OF 430 Northern Tree Service, Inc. INSURER D: 1290 Park Street, PO Box 790 Palmer, MA 01069 INSURERE: INSURER F: Y COVERAGES CERTIFICATE NUMBER: 2134205439 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADL INSR U WVD POLICY NUMBER POLICY EFF MMIDDIYYYY POLICY EXP MM/DD/YYYY LIMITS A GENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE � OCCUR Y Y GL0303518406 11/1/2012 1/1/2013 EACH OCCURRENCE $1,000,000 DAMA E TO RENTED PREMISES Ea occurrence $100,000 MED EXP (Any one person) $10,000 PERSONAL BADV INJURY $1,000,000 GENERAL AGGREGATE $2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: POLICY X PRO- LOC JECT PRODUCTS - COMP/OP AGG $2,000,000 $ B AUTOMOBILE X X LIABILITY ANY AUTO ALL OWNED SCHEDULED AUTOS AUTOS NON -OWNED HIREDAUTOS X AUTOS Y BAP303518305 11/1/2012 1/1/2013 Ea aGUM1ccident $1,000,000 BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ ERTY DAMAGE PROPen Per idt $ acc C X UMBRELLA LIAB EXCESS LIAB X OCCUR CLAIMS -MADE Y Y NUGDN0221512 11/1/2012 1/1/2013 EACH OCCURRENCE $5,000,000 AGGREGATE $5,000,000 DEDTX7 RETENTION $10,000 $ A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY YIN ANY PROPRIETOR/PARTNER/EXECUTIVEE.L. OFFICER/MEMBER EXCLUDED? N❑ (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below N I A Y 0303518205 11/1/2012 1/1/2013 X WC T'RySTMT- X OTH- EEL - EACH ACCIDENT $1,000,000 E.L. DISEASE - EA EMPLOYEE $1,000,000 E.L. DISEASE - POLICY LIMIT J $1,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) THE TOWN OF NORTH ANDOVER IS NAMED AS ADDITIONAL INSURED WITH RESPECTS TO WORK PERFORMED BY THE NAMED INSURED CERTIFICATE HOLDER CANCELLATION ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010/05) The ACORD name and logo are registered marks of ACORD SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN TOWN OF NORTH ANDOVER ACCORDANCE WITH THE POLICY PROVISIONS. 120 MAIN ST NORTH ANDOVER MA 01845 AUTHORIZEDREPRESENTATIVE ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010/05) The ACORD name and logo are registered marks of ACORD PAYMENT BOND Bond No. 929565585 KNOW ALL MEN BY THESE PRESENTS, that we NORTHERN TREE SERVICE, INC with a place of business at 1290 PARK STREET, PALMER, MA 01069 as Principal (the "Principal"'), and WFSTMN SCiRMY MMP,M _ __ , a corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at 175 CAPITAL BOULEVARD , ROCKY HILL, CT 01069 as Surety (the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee (the "Obligee"), in the sum of TWENTY FOUR THOUSAND DOLLARS00/100 lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, finely by these presents. WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of JULY 1, 2013 14 F.11 1►IMII► F11 ► AN I ; I ►111111111 hull%; dl+► N 'for the construction of TREE REMOVAL SERVICES, ASP RUM NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but not be limited to, any other purposes or items set out in, and to be subject to, the provisions of Massachusetts General Laws, Chapter 30, Section 39K and Chapter 149, Section 29, as amended then this obligation shall become null and void; othcrwiso, it shall remain in full force and virtue. IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this 22ND day of PRINCIPAL JUNE 2013 NORTHERN TREE SERVICE, INC. BTAe�z�[NaineSeal) h, U p a Ar, ,,�rO d, -&y [Title] Attest: I.0 •a 1 SURETY WESTERNOM'A1� [Atto n -fact] e ATTORNEY IN FACT 1381 WESTFIELD STREr, WEST SPRINGFIELD , MA 01089 Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IN-FACT Know All Men By These Presents, That WESTERN SURETY COMPANY, a South Dakota corporation, is a duly organized and existing corporation having its principal office in the City of Sioux Falls, and State of South Dakota, and that it does by virtue of the signature and seal herein affixed hereby make, constitute and appoint Bruce T Underwood, James P Daley, Tina M Genza, Anne E Klejna, Kathleen J Daley, Individually of West Springfield, MA, its true and lawful Attorney(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on its behalf bonds, undertakings and other obligatory instruments of similar nature - In Unlimited Amounts - and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said Attorney, pursuant to the authority hereby given, are hereby ratified and confirmed. ,This Power of Attorney is made and executed pursuant to and by authority of the By -Law printed on the reverse hereof, duly adopted, as indicated, by the shareholders of the corporation. In Witness Whereof, WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate seal to be hereto affixed on this 20th day of March, 2013. WESTERN SURETY COMPANY �5................ .iz ZPaul T. Bruflat, Vice President State of South Dakota I ss County of Minnehaha On this 20th day of March, 2013, before me personally came Paul T. Bruflat, to me known, who, being by me duly sworn, did depose and say: that he resides in the City of Sioux Falls, State of South Dakota; that he is the Vice President of WESTERN SURETY COMPANY described in and which executed the above instrument; that he knows the seal of said corporation; that the seal affixed to the said instrument is such corporate seal; that it was so affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said corporation. My commission expires *``"" """""""""""""""`"" • s J. MOHR s ^ NOTARY PUBLIC^ r June 23, 2015 J SEAL seau t s SOUTH DAKOTA 44aV�tiY44WtitiM+MriN�M�M�ti+ !'F�! V � J. Mohr, Notary Public CERTIFICATE I, L. Nelson, Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in force, and further certify that the By -Law of the corporation printed on the reverse hereof is still in force. In testimony whereof I have hereunto subscribed my name and affixed the seal of the said corporation this 22ND day of JIMPX013 `PSJRET o; WESTERN SURETY COMPANY 3w '�pQOggjilts, 27, 1, .Wf4 l�'Da >ll DPK F v�IIlIl11Pp� L. Nelson, Assistant Secretary Form F4280-7-2012 Authorizing By -Law ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY This Power of Attorney is made and executed pursuant to and by authority of the following By -Law duly adopted by the shareholders of the Company. Section 7. All bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation shall be executed in the corporate name of the Company by the President, Secretary, and Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile.