Loading...
HomeMy WebLinkAboutContract #: 662 - From: 07-01-2013 To: 06-30-2014 - Sealcoating Inc - Town of North AndoverAndrew W. Maylor Town Manager Ms. Elizabeth Wuori, President Sealcoating Inc 825 Granite Street Braintree, MA 02184 Dear Ms. Wuori: Town of North Andover Office of the Town Manager North Andover Town Hall 120 Main Street North Andover, MA 0 1845 amaylor@townofnorthandover.com April 1, 2014 Telephone (978)688-9510 Fax . (978)688-9556 I In accordance with the provisions of the contract between the Town of North Andover and Sealcoating Inc (Contract #662), the contract and the respective unit price ($ 0.28 per linear foot or $5,199 for day rate) to provide random crack sealing (Process A) is extended an additional option year (July 1, 2014 through June 30, 2015). Please provide updated insurance certificates listing the Town of North Andover as 'Additional Insured' in accordance with the contract document. The insurance certificates are to be sent to the attention of Ray Santilli, Assistant Town Manager. In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work performed under this contract. An updated prevailing wage report is enclosed. For each week work is performed, you are required to submit certified weekly payroll records. The certified weekly payroll records are to be sent to: Mr. Bruce Thibodeau Department of Public Works 384 Osgood Street North Andover, MA 0 1845 If you have any questions and/or concerns, p I lease call Mr. Santilli at 978-688-9516. Sincerely, Andrew W. Maylor Town Manager . 00" cc., Ray Santilli, Assistant Town Manager Bruce Thibodeau, Public Works Contract File -�A>ealcoating Inc. Innovative Pavement Preservation Solutions 825 Granite Street, Braintree, MA 02184 Phone: (781) 428-3400 Mr. Daniel J. Concessi Division of Public Works Assistant Operations Manager Town of North Andover 384 Osgood Street North Andover, MA 01845 RE: Extension of Contract #662 Random Cracksealing Dear Mr. Concessi, Fax: (781) 428-3430 In response to your inquiry of March 11, 2014 about extending the above referenced contract, Sealcoating, Inc. agrees to hold the current contract prices with the town of North Andover and extend the contract for another year to June 30, 2015. We look forward to scheduling additional work for North Andover and will anticipate receiving a contract extension prior to the expiration of the contract on June 30, 2014. Thank you. Sincerely, SEALCOATING, . I N Cj Elizabe Wuori Pres)i=lt /bw cc: Patrick D. Hanlon www.sealcoatinginc.com Request Official Wage Schedule Confirmation Page 1 of 2 Your request for an Official Prevailing Wage Schedule has been successfully received and is being processed by DOS. The schedule will be emailed to the email address provided in your request. Please note the wage request number 20140331-064 for future inquires. Request another official Wage Schedule http://prevailingwage.detma.org/WageRequest.aspx?wr=121&AspxAutoDetectCookieSup... 3/31/2014 TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 Raymond T Santilh Assistant Town Manager Ms. Elizabeth Wuori, President Sealcoating, Inc 825 Granite Street Braintree, MA 02184 Dear Ms. Wuori: APO- CHU May 7, 2013 TEL (978) 688-9516 FAX (978) 688-9556 Enclosed please find the executed contract between the Town of North Andover and Sealcoating Inc to provide random crack sealing for the Public Works Department for the period of July 1, 2013 through June 14, 2014. In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work performed under this contract. For each week work is performed, you are required to submit certified weekly payroll records. The certified weekly payroll records are to be sent to: Mr. Bruce Thibodeau, Director Department of Public Works 384 Osgood Street North Andover, MA 0 1845 If you have any questions and/or concerns, please call me. Sincerely, Raymond T. Santilli Assistant Town Manager Enclosure cc., Mr. Bruce Thibodeau, Public Works Contract File A06-1 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT W DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the RACHEL KAPRIELIAN Gov— Smmtary Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Di—t., Awarding Authority: Town of North Andover Contract Number: Cityfrown: NORTH ANDOVER Description of Work: Provide random crack scaling for various locations throughout Town for the period of July 2014 through June 2015 Job Location: Various locations throughout Town Information about Prevailing Wage Schedules for Awarding Authorities and Contractors . This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage Request Number" on all pages of this schedule. . Awarding authorities must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. ;The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 7. Once a contractor has been selected by the awarding authority, the wage schedule shall be made a part of the contract for that project. The wage schedule must be posted in a conspicuous place at the work site during the life of the project in accordance with M.G.L. c. 149, § 27. The wages listed on the wage schedule must be paicl to employees performing construction work on the project regardless of whether they are employed by the prime contractor, a filed sub"bidder, or any sub -contractor. . All apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Training (DAT). Apprentices must keep his/her apprentice identification card on his/her person during all work hours on the project. If an apprentice rate is listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAT, the apprentice may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. If an apprentice rate is not listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAT, the apprentice must be paid the journeyworker's rate for the trade. . The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction prcjects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F "rental of equipment" contracts. . Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports directly to the awarding authority and keep them on file for three years. Each weekly payroll report must contain: the employee's name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/pw. . Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617) 626-6953. . Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor Division of the office of the Attorney General at (617) 727-3465. . Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties. Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate Unemployment Construction (2 AXLE) DRIVER - EQUIPMENT 12/01/2013 $30.95 $9.41 $8.80 $0.00 $49.16 T1,,'AMST1,"RS JOINTCO UNCIL NO. 10 7ONF B 06/01/2014 $31.30 $9.41 $8.80 $0.00 $49.51 08/01/2014 $31.30 $9.91 $8.80 $0.00 $50.01 12/01/2014 $31.30 $9.91 $9.33 $0.00 $50.54 06/01/2015 $31.65 $9.91 $9.33 $0.00 $50.89 08/01/2015 $31.65 $10.41 $9.33 $0.00 $51.39 12/01/2015 $31.65 $10.41 $10.08 $0.00 $52.14 06/01/2016 $32.15 $10.41 $10.08 $0.00 $52.64 08/01/2016 $32.15 $10.91 $10.08 $0.00 $53.14 12/01/2016 $32.15 $10.91 $10.89 $0.00 $53.95 (3 AXLE) DRIVER - EQUIPMENT 12/01/2013 $31.02 $9.41 $8.80 $0.00 $49.23 ITAMSTERS JOINT CO UNCIL NO. 10 ZONE B 06/01/2014 $31.37 $9.41 $8.80 $0.00 $49.58 08/01/2014 $31.37 $9.91 $8.80 $0.00 $50.08 12/01/2014 $31.37 $9.91 $9.33 $0.00 $50.61 06/01/2015 $31.72 $9.91 $9.33 $0.00 $50.96 08/01/2015 $31.72 $10.41 $9.33 $0.00 $51.46 12/01/2015 $31.72 $10.41 $10.08 $0.00 $52.21 06/01/2016 $32.22 $10.41 $10.08 $0.00 $52.71 08/01/2016 $32.22 $10.91 $10.08 $0.00 $53.21 12/01/2016 $32.22 $10.91 $10.89 $0.00 $54.02 (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2013 $31.14 $9.41 $8.80 $0.00 $49.35 7'1,,AMSTEI?S JOINT COUNCIL NO. 107ONEB 06/01/2014 $31.49 $9.41 $8.80 $0.00 $49.70 08/01/2014 $31.49 $9.91 $8.80 $0.00 $50.20 12/01/2014 $31.49 $9.91 $9.33 $0.00 $50.73 06/01/2015 $31.84 $9.91 $9.33 $0.00 $51.08 08/01/2015 $31.84 $10.41 $9.33 $0.00 $51.58 12/01/2015 $31.84 $10.41 $10.08 $0.00 $52.33 06/01/2016 $32.34 $10.41 $10.08 $0.00 $52.83 08/01/2016 $32.34 $10.91 $10.08 $0.00 $53.33 12/01/2016 $32.34 $10.91 $10.89 $0.00 $54.14 ADS/SUBMERSIBLE PILOT 08/01/2013 $84.21 $9.80 $18.17 $0.00 $112.18 PILE DRIVER LOCAL 56 (70NE 1) 08/01/2014 $87.36 $9.80 $18.17 $0.00 $115.33 08/01/2015 $90.51 $9.80 $18.17 $0.00 $118.48 AIR TRACK OPERATOR 12/01/2013 $30.60 $7.30 $12.10 $0.00 $50.00 LABORFRS - 7ONE 2 06/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 12/01/2014 $31.60 $7.30 $12.10 $0.00 $51.00 06/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 12/01/2015 $32.60 $7.30 $12.10 $0.00 $52.00 06/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 12/01/2016 $33.85 $7.30 $12.10 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" --------------------- ----------------------------------- Issue Date: 03/31/2014 ------------------------------- Wage Request Number: 20140331-064 ---------------------------- ------------------ Page 2 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate $49.50 LABORERS-ZONE2 Unemployment ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 12/01/2013 $30.68 $10.40 $5.95 $0.00 $47.03 HFA T & FROST INSULA TORS LOCAL 6 (BOSTON) $0.00 $50.00 12/01/2014 $31.10 06/01/2014 $31.58 $10.40 $5.95 $0.00 $47.93 12/01/2014 $32.48 $10.40 $5.95 $0.00 $48.83 06/01/2015 $33.43 $10.40 $5.95 $0.00 $49.78 12/01/2015 $34.38 $10.40 $5.95 $0.00 $50.73 ASPHALT RAKER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS-ZONE2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERA TING FNGINFERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BACKHOE/FRONT-END LOADER 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 0111TRA TING FNGJNEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BARCO-TYPE JUMPING TAMPER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LA BORrRS - 70NE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" BLOCK PAVER, RAMMER / CURB SETTER 12/01/2013 $30.60 $7.30 $12.10 $0.00 $50.00 1-4 BORERS - 7ONE 2 06/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 12/01/2014 $31.60 $7.30 $12.10 $0.00 $51.00 06/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 12/01/2015 $32.60 $7.30 $12.10 $0.00 $52.00 06/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 12/01/2016 $33.85 $7.30 $12.10 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" BOILER MAKER 01/01/2010 $37.70 $6.97 $11.18 $0.00 $55.85 BOILERMAKERS LOCAL 29 ------------------------------------------------------------------------------------------------ ­ --------------------------------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 3 of 39 Classification Apprentice - BOILERMAKER - Local 29 Effective Date - 01/01/2010 Step percent Effective Date Base Wage Apprentice Base Wage Health Health Pension Pension Supplemental Unemployment Supplemental Unemployment Total Rate Total Rate 1 65 $24.51 $6.97 $11.18 $0.00 $42.66 2 65 $24.51 $6.97 $11.18 $0.00 $42.66 3 70 $26.39 $6.97 $11.18 $0.00 $44.54 4 75 $28.28 $6.97 $11.18 $0.00 $46.43 5 80 $30.16 $6.97 $11.18 $0.00 $48.31 6 85 $32.05 $6.97 $11.18 $0.00 $50.20 7 90 $33.93 $6.97 $11.18 $0.00 $52.08 8 95 $35.82 $6.97 $11.18 $0.00 $53.97 - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:5 - - - - - - - - - - - - - - - BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 02/01/2014 $48.06 $10.18 $18.15 $0.00 $76.39 WATERPROOFING) 08/01/2014 $48.96 $10.18 $18.22 $0.00 $77.36 BRICKLAYERS LOCAL 3 (LYNN) 02/01/2015 $49.52 $10.18 $18.22 $0.00 $77.92 08/01/2015 $50.42 $10.18 $18.29 $0.00 $78.89 02/01/2016 $50.99 $10.18 $18.29 $0.00 $79.46 08/01/2016 $51.89 $10.18 $18.37 $0.00 $80.44 02/01/2017 $52.46 $10.18 $18.37 $0.00 $81.01 ---------------- ----- ------ -------------------------------------------------------------------- ---- -- --- -- ------ ------------ Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 4 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate $0.00 $52.88 2 60 $29.38 Unemployment Apprentice- BRICKIPLASTERICEMENT MASON -Local 3 Lynn $0.00 $57.78 3 70 $34.27 Effective Date - 02/01/2014 $18.22 $0.00 $62.67 4 80 $39.17 $10.18 $18.22 $0.00 $67.57 Supplemental $44.06 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.03 $10.18 $18.15 $0.00 $52.36 2 60 $28.84 $10.18 $18.15 $0.00 $57.17 3 70 $33.64 $10.18 $18.15 $0.00 $61.97 4 80 $38.45 $10.18 $18.15 $0.00 $66.78 5 go $43.25 $10.18 $18.15 $0.00 $71.58 Effective Date - 08/01/2014 06/01/2016 $38.20 Supplemental $12.90 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.48 $10.18 $18.22 $0.00 $52.88 2 60 $29.38 $10.18 $18.22 $0.00 $57.78 3 70 $34.27 $10.18 $18.22 $0.00 $62.67 4 80 $39.17 $10.18 $18.22 $0.00 $67.57 5 90 $44.06 $10.18 $18.22 $0.00 $72.46 - - - - - - - - - --- Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:5 - - - - - - - - - --- - - - - - - - BULLDOZER/GRADER/SCRAPER 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS LOCAL 4 06/01/2014 $34.05 $7.30 $12.90 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 12/01/2014 $34.80 $7.30 $12.90 $0.00 06/01/2015 CAISSON & UNDERPINNING BOTTOM MAN 12/01/2013 $34.45 $7.30 $12.90 $0.00 $54.65 LABORERS - FOUNDATIONAND MARINE $0.00 06/01/2016 $37.05 $7.30 $12.90 $0.00 12/01/2016 06/01/2014 $35.20 $7.30 $12.90 $0.00 $55.40 12/01/2014 $35.95 $7.30 $12.90 $0.00 $56.15 06/01/2015 $36.70 $7.30 $12.90 $0.00 $56.90 12/01/2015 $37.45 $7.30 $12.90 $0.00 $57.65 06/01/2016 $38.20 $7.30 $12.90 $0.00 $58.40 12/01/2016 $39.20 $7.30 $12.90 $0.00 $59.40 For apprentice rates see "Apprentice- LABORER" CAISSON & UNDERPINNING LABORER 12/01/2013 $33.30 $7.30 $12.90 $0.00 LABORERS - FOUNDA TIONAND MRINE 06/01/2014 $34.05 $7.30 $12.90 $0.00 12/01/2014 $34.80 $7.30 $12.90 $0.00 06/01/2015 $35.55 $7.30 $12.90 $0.00 12/01/2015 $36.30 $7.30 $12.90 $0.00 06/01/2016 $37.05 $7.30 $12.90 $0.00 12/01/2016 $38.05 $7.30 $12.90 $0.00 For apprentice rates see "Apprentice- LABORER" $53.50 $54.25 $55.00 $55.75 $56.50 $57.25 $58.25 --------------------- ----- ------------------------------------- ----- ----------- -------------------- -------------- - ----------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 5 of 39 Classification CAISSON & UNDERPINNING TOP MAN LABORFRS - FOUNDA TIONAND MARINE For apprentice rates see "Apprentice- LABORER" CARBIDE CORE DRILL OPERATOR LA BORERS - 70NE 2 For apprentice rates see "Apprentice- LABORER" CARPENTER CARPENTE'RS -70NF 2 (Eastern Massachusells) EffectiveDate BaseWage Health Pension Supplemental Unemployment Total Rate 12/01/2013 $33.30 $7.30 $12.90 $0.00 $53.50 06/01/2014 $34.05 $7.30 $12.90 $0.00 $54.25 12/01/2014 $34.80 $7.30 $12.90 $0.00 $55.00 06/01/2015 $35.55 $7.30 $12.90 $0.00 $55.75 12/01/2015 $36.30 $7.30 $12.90 $0.00 $56.50 06/01/2016 $37.05 $7.30 $12.90 $0.00 $57.25 12/01/2016 $38.05 $7.30 $12.90 $0.00 $58.25 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 03/01/2014 $34.78 $9.80 $15.91 $0.00 $60.49 09/01/2014 $35.55 $9.80 $15.91 $0.00 $61.26 03/01/2015 $36.32 $9.80 $15.91 $0.00 $62.03 --------------- ....................................... --- ------ -- ------------------------------------------------------------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 6 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate Unemployment Apprentice - CARPENTER - Zone 2 Eastern AM Effective Date - 03/01/2014 Step percent Apprentice Base Wage Health 1 50 $17.39 $9.80 2 60 $20.87 $9.80 3 70 $24.35 $9.80 4 75 $26.09 $9.80 5 80 $27.82 $9.80 6 80 $27.82 $9.80 7 90 $31.30 $9.80 8 90 $31.30 $9.80 Effective Date - 09/01/2014 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate $1.57 $0.00 $28.76 $1.57 $0.00 $32.24 $11.20 $0.00 $45.35 $11.20 $0.00 $47.09 $12.77 $0.00 $50.39 $12.77 $0.00 $50.39 $14.34 $0.00 $55.44 $14.34 $0.00 $55.44 Supplemental Pension Unemployment Total Rate 1 50 $17.78 $9.80 $1.57 $0.00 $29.15 2 60 $21.33 $9.80 $1.57 $0.00 $32.70 3 70 $24.89 $9.80 $11.20 $0.00 $45.89 4 75 $26.66 $9.80 $1 1.20 $0.00 $47.66 5 80 $28.44 $9.80 $12.77 $0.00 $51.01 6 80 $28.44 $9.80 $12.77 $0.00 $51.01 7 90 $32.00 $9.80 $14.34 $0.00 $56.14 8 90 $32.00 $9.80 $14.34 $0.00 $56.14 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - TPprentice to Journeyworker Ratio:1:5 - - - - - - CEMENT MASONRY/PLASTERING 01/01/2014 $43.60 $10.90 $18.71 $1.30 $74.51 BRICKLAYERS LOCAL 3 (LYNN) 07/01/2014 $43.77 $10.90 $18.71 $1.30 $74.68 01/01/2015 $44.69 $10.90 $18.71 $1.30 $75.60 07/01/2015 $45.29 $10.90 $18.71 $1.30 $76.20 01/01/2016 $46.21 $10.90 $18.71 $1.30 $77.12 ----------- ----------------------------------------------------------------------------------------------------------------- -- ---- .... Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 7 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate $12.21 $1.30 $46.30 2 Unem[)Iovment Apprentice- CEMENT MASONRYIPLASTERING -Eastern Mass (Lynn) $10.90 $13.71 $1.30 Effective Date - 01/01/2014 3 65 $28.45 Supplemental $14.71 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.80 $10.90 $12.21 $1.30 $46.21 2 60 $26.16 $10.90 $13.71 $1.30 $52.07 3 65 $28.34 $10.90 $14.71 $1.30 $55.25 4 70 $30.52 $10.90 $15.71 $1.30 $58.43 5 75 $32.70 $10.90 $16.71 $1.30 $61.61 6 80 $34.88 $10.90 $17.71 $1.30 $64.79 7 90 $39.24 $10.90 $18.71 $1.30 $70.15 Effective Date - 07/01/2014 $0.00 $65.67 OPI,,"RA TING FNGJNI,,FRS LOCA L 4 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.89 $10.90 $12.21 $1.30 $46.30 2 60 $26.26 $10.90 $13.71 $1.30 $52.17 3 65 $28.45 $10.90 $14.71 $1.30 $55.36 4 70 $30.64 $10.90 $15.71 $1.30 $58.55 5 75 $32.83 $10.90 $16.71 $1.30 $61.74 6 80 $35.02 $10.90 $17.71 $1.30 $64.93 7 90 $39.39 $10.90 $18.71 $1.30 $70.30 - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - - For apprentice rates see "Apprentice- LABORER" Steps 3,4 are 500 hrs. All other steps are 1,000 hrs. $73.46 07/01/2016 $50.46 T - - - - - - - Appren TiceinJourneyworkerRatio:1:3 - - - - - - - - - - - - - - - - C14AIN SAW OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 1-4 BOI?],,"I?S - ZONF 2 $69.86 PAINTERS LOCAL 35 - ZONE"2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 $46.76 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 $16.10 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 $72.51 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" $0.00 $73.46 07/01/2016 $50.46 CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES 12/01/2013 $41.49 $10.00 $14.18 $0.00 $65.67 OPI,,"RA TING FNGJNI,,FRS LOCA L 4 $51.41 $7.85 $16.10 For apprentice rates see "Apprentice- OPERATING ENGINEERS" $75.36 ------------------------------ -------------------------- ­ - -------------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 -------------------------- COMPRESSOR OPERATOR 12/01/2013 $28.11 $10.00 $14.18 $0.00 $52.29 OPTRA TING FNGINFFRS LOCA L 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DELEADER I,13RID6E) 01/01/2014 $45.91 $7.85 $16.10 $0.00 $69.86 PAINTERS LOCAL 35 - ZONE"2 07/01/2014 $46.76 $7.85 $16.10 $0.00 $70.71 01/01/2015 $47.66 $7.85 $16.10 $0.00 $71.61 07/01/2015 $48.56 $7.85 $16.10 $0.00 $72.51 01/01/2016 $49.51 $7.85 $16.10 $0.00 $73.46 07/01/2016 $50.46 $7.85 $16.10 $0.00 $74.41 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 ------------------------------ -------------------------- ­ - -------------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 -------------------------- -- ----------- Page 8 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 BRIDGESITANKS Effective Date - 01/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.96 $7.85 $0.00 $0.00 $30.81 2 55 $25.25 $7.85 $3.66 $0.00 $36.76 3 60 $27.55 $7.85 $3.99 $0.00 $39.39 4 65 $29.84 $7.85 $4.32 $0.00 $42.01 5 70 $32.14 $7.85 $14.11 $0.00 $54.10 6 75 $34.43 $7.85 $14.44 $0.00 $56.72 7 80 $36.73 $7.85 $14.77 $0.00 $59.35 8 90 $41.32 $7.85 $15.44 $0.00 $64.61 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.38 $7.85 $0.00 $0.00 $31.23 2 55 $25.72 $7.85 $3.66 $0.00 $37.23 3 60 $28.06 $7.85 $3.99 $0.00 $39.90 4 65 $30.39 $7.85 $4.32 $0.00 $42.56 5 70 $32.73 $7.85 $14.11 $0.00 $54.69 6 75 $35.07 $7.85 $14.44 $0.00 $57.36 7 80 $37.41 $7.85 $14.77 $0.00 $60.03 8 90 $42.08 $7.85 $15.44 $0.00 $65.37 - - - - - - - - - - Notes: - - -- - - - - - - - - - - - - - - Steps are 750 hrs. -- Appre.T.Te Z Journeyw.rker Ra T.o-i.1 - - - - - - - - - - - - - - - - - DEMO: ADZEMAN 12/01/2013 $33.50 $7.30 $12.70 $0.00 $53.50 1-4 BORERS - ZONE 2 06/01/2014 $34.25 $7.30 $12.70 $0.00 $54.25 12/01/2014 $35.00 $7.30 $12.70 $0.00 $55.00 06/01/2015 $35.75 $7.30 $12.70 $0.00 $55.75 12/01/2015 $36.50 $7.30 $12.70 $0.00 $56.50 For apprentice rates see "Apprentice- LABORER" DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2013 $34.50 $7.30 $12.70 $0.00 $54.50 1-4 BORERS - ZONE 2 06/01/2014 $35.25 $7.30 $12.70 $0.00 $55.25 12/01/2014 $36.00 $7.30 $12.70 $0.00 $56.00 06/01/2015 $36.75 $7.30 $12.70 $0.00 $56.75 12/01/2015 $37.50 $7.30 $12.70 $0.00 $57.50 For apprentice rates see "Apprentice- LABORER" DEMO: BtJRNERS 12/01/2013 $34.25 $7.30 $12.70 $0.00 $54.25 IABORFRS - 70NE2 06/01/2014 $35.00 $7.30 $12.70 $0.00 $55.00 12/01/2014 $35.75 $7.30 $12.70 $0.00 $55.75 06/01/2015 $36.50 $7.30 $12.70 $0.00 $56.50 12/01/2015 $37.25 $7.30 $12.70 $0.00 $57.25 For apprentice rates see "Apprentice- LABORER" ------------------------------------------------ --- ----- ----------------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 -------------------------------------- Page 9 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate Unemployment DEMO: CONCRETE CUTTER/SAWYER 12/01/2013 $34.50 $7.30 $12.70 $0.00 $54.50 LA BORFRS - 70NE 2 06/01/2014 $35.25 $7.30 $12.70 $0.00 $55.25 12/01/2014 $36.00 $7.30 $12.70 $0.00 $56.00 06/01/2015 $36.75 $7.30 $12.70 $0.00 $56.75 12/01/2015 $37.50 $7.30 $12.70 $0.00 $57.50 For apprentice rates see "Apprentice- LABORER" DEMO: JACKHAMMER OPERATOR 12/01/2013 $34.25 $7.30 $12.70 $0.00 $54.25 1 A BORMS - ZONE 2 06/01/2014 $35.00 $7.30 $12.70 $0.00 $55.00 12/01/2014 $35.75 $7.30 $12.70 $0.00 $55.75 06/01/2015 $36.50 $7.30 $12.70 $0.00 $56.50 12/01/2015 $37.25 $7.30 $12.70 $0.00 $57.25 For apprentice rates see "Apprentice- LABORER" DEMO: WRECKING LABORER 12/01/2013 $33.50 $7.30 $12.70 $0.00 $53.50 LABORERS - 70NE 2 06/01/2014 $34.25 $7.30 $12.70 $0.00 $54.25 12/01/2014 $35.00 $7.30 $12.70 $0.00 $55.00 06/01/2015 $35.75 $7.30 $12.70 $0.00 $55.75 12/01/2015 $36.50 $7.30 $12.70 $0.00 $56.50 For apprentice rates see "Apprentice- LABORER" DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPE"RA 77NG FNGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DIVER 08/01/2013 $56.14 $9.80 $18.17 $0.00 $84.11 PILE DRIVFR LOCAL 56 (70NE 1) 08/01/2014 $58.24 $9.80 $18.17 $0.00 $86.21 08/01/2015 $60.34 $9.80 $18.17 $0.00 $88.31 DIVER TENDER 08/01/2013 $40.10 $9.80 $18.17 $0.00 $68.07 PILE DRIVFR LOCAL 56 (70NF 1) 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 DIVER TENDER (EFFLUENT) 08/01/2013 $60.15 $9.80 $18.17 $0.00 $88.12 11JLE DRIVE R LOCA L 56 (ZONE 1) 08/01/2014 $62.40 $9.80 $18.17 $0.00 $90.37 08/01/2015 $64.65 $9.80 $18.17 $0.00 $92.62 DIVER/SLURRY (EFFLUENT) 08/01/2013 $84.21 $9.80 $18.17 $0.00 $112.18 PJLE DRIVER LOCAL 56 (70NE 1) 08/01/2014 $87.36 $9.80 $18.17 $0.00 $115.33 08/01/2015 $90.51 $9.80 $18.17 $0.00 $118.48 DRAWBRIDGE OPERATOR (Construction) 03/01/2014 $44.45 $13.00 $14.68 $0.06 $72.13 ELECTRICIANS LOCAL 103 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN" ELECTRICIAN 03/01/2014 $44.45 $13.00 $14.68 $0.00 $72.13 EUCTRICIANS LOCAL 103 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 --------- --------------------------------------------------- ---------------------------------- --- ------------------------------ --- - Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 10 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate $0.54 $0.00 $31.59 2 Unemployment Apprentice- ELECTRICIAN- Local 103 $13.00 $0.54 $0.00 $31.59 3 Effective Date - 03/01/2014 $20.30 $13.00 $11.05 Supplemental $44.35 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.78 $13.00 $0.53 $0.00 $31.31 2 40 $17.78 $13.00 $0.53 $0.00 $31.31 3 45 $20.00 $13.00 $11.04 $0.00 $44.04 4 45 $20.00 $13.00 $11.04 $0.00 $44.04 5 50 $22.23 $13.00 $11.37 $0.00 $46.60 6 55 $24.45 $13.00 $11.70 $0.00 $49.15 7 60 $26.67 $13.00 $12.03 $0.00 $51.70 8 65 $28.89 $13.00 $12.37 $0.00 $54.26 9 70 $31.12 $13.00 $12.69 $0.00 $56.81 10 75 $33.34 $13.00 $13.03 $0.00 $59.37 Effective Date - 09/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.05 $13.00 $0.54 $0.00 $31.59 2 40 $18.05 $13.00 $0.54 $0.00 $31.59 3 45 $20.30 $13.00 $11.05 $0.00 $44.35 4 45 $20.30 $13.00 $11.05 $0.00 $44.35 5 50 $22.56 $13.00 $11.38 $0.00 $46.94 6 55 $24.82 $13.00 $11.71 $0.00 $49.53 7 60 $27.07 $13.00 $12.04 $0.00 $52.11 8 65 $29.33 $13.00 $12.38 $0.00 $54.71 9 70 $31.58 $13.00 $12.71 $0.00 $57.29 10 75 $33.84 $13.00 $13.05 $0.00 $59.89 - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - -- App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80 - - - --- - - - - - - Apprentice to Journeyworker Ratio:2:3*** - - - - - - - - - - - - -- ELEVATOR CONSTRUCTOR ELEVAMR CONSTRUCIDRS LOCAL 4 01/01/2012 $52.45 $8.78 $6.96 $0.00 $68.19 - ------------------------------------- --------------------------------------------------------------------------------------------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 11 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELEV,4 TOR CONSTRUCTOR -Local 4 12/01/2013 $30.10 $7.30 $12.10 $0.00 Effective Date - 01/01/2012 LABORFRS - 7ONE2 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.23 $8.78 $0.00 $0.00 $35.01 2 55 $28.85 $8.78 $6.96 $0.00 $44.59 3 65 $34.09 $8.78 $6.96 $0.00 $49.83 4 70 $36.72 $8.78 $6.96 $0.00 $52.46 5 80 $41.96 $8.78 $6.96 $0.00 $57.70 - - - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - -- Steps 1-2 are 6 mos.; Steps 3-5 are I year $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" L- - - - - - - - - - - - - Apprentice to Journeyworker RatioA: I - - - - - - - - - - - - - - ELEVATOR CONSTRUCTOR HELPER 01/01/2012 $38.59 $8.78 $6.96 $0.00 $54.33 FLEVATOR CONSTRUCTORS LOCAL 4 For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR" 05/01/2014 $39.50 $10.00 $13.55 $0.00 FENCE & GUARD RAIL ERECTOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORFRS - 7ONE2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2013 $38.73 $10.00 $13.55 $0.00 $62.28 OPERA TING FNGINEERS LOCAL 4 05/01/2014 $39.50 $10.00 $13.55 $0.00 $63.05 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENGYARTY CHIEF-BLDG,SITE,HVY/HWY 11/01/2013 $40.15 $10.00 $13.55 $0.00 $63.70 OPERA TING 1,WGINFE-16 LOCAL 4 05/01/2014 $40.92 $10.00 $13.55 $0.00 $64.47 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY 11/01/2013 $21.10 $10.00 $13.55 $0.00 $44.65 OPERA 77NG ],,NGINI,'F]?S LOCA L 4 05/01/2014 $21.55 $10.00 $13.55 $0.00 $45.10 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIRE ALARM INSTALLER 03/01/2014 $44.45 $13.00 $14.68 $0.00 $72.13 ELECHUCIANSLOCAL 103 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN" FIRE ALARM REPAIR MAINTENANCE 03/01/2014 $33.44 $13.00 $13.03 $0.00 $59.47 COMMISSIONING ELFcTPiCzANs LOCAL 103 09/01/2014 $33.84 $13.00 $13.05 $0.00 $59.89 03/01/2015 $34.38 $13.00 $13.06 $0.00 $60.44 09/01/2015 $35.10 $13.00 $13.08 $0.00 $61.18 03/01/2016 $35.81 $13.00 $13.10 $0.00 $61.91 For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN" --------------------------------------------------------------------------- ­ --------------------- - _ --- ---------------- --------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 12 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate $9.80 $1.79 $0.00 $31.53 2 55 Unemployment $9.86 FIREMAN (ASST. ENGINEER) 12/01/2013 $33.76 $10.00 $14.18 $0.00 $57.94 OPERA TING ENGINFFRS LOCAL 4 $45.31 4 65 $25.92 $9.80 $11.59 $0.00 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 5 70 $27.91 $9.80 $13.38 $0.00 $51.09 FLAGGER & SIGNALER 12/01/2013 $20.50 $7.30 $12.10 $0.00 $39.90 LABORERS - ZONE 2 $9.80 $15.17 $0.00 $56.87 8 85 $33.89 $9.80 06/01/2014 $20.50 $7.30 $12.10 $0.00 $39.90 12/01/2014 $20.50 $7.30 $12.10 $0.00 $39.90 06/01/2015 $20.50 $7.30 $12.10 $0.00 $39.90 12/01/2015 $20.50 $7.30 $12.10 $0.00 $39.90 06/01/2016 $20.50 $7.30 $12.10 $0.00 $39.90 12/01/2016 $20.50 $7.30 $12.10 $0.00 $39.90 For apprentice rates see "Apprentice- LABORER" FLOORCOVERER ELOORCO VERFRS LOCAL 2168 7ONF I 03/01/2014 $39.87 $9.80 $16.96 $0.00 Apprentice- FLOORCOVERER -Local 2168 Zone I Effective Date - 03/01/2014 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $19.94 $9.80 $1.79 $0.00 $31.53 2 55 $21.93 $9.86 $1.79 $0.00 $33.52 3 60 $23.92 $9.80 $11.59 $0.00 $45.31 4 65 $25.92 $9.80 $11.59 $0.00 $47.31 5 70 $27.91 $9.80 $13.38 $0.00 $51.09 6 75 $29.90 $9.80 $13.38 $0.00 $53.08 7 80 $31.90 $9.80 $15.17 $0.00 $56.87 8 85 $33.89 $9.80 $15.17 $0.00 $58.86 $66.63 - - - - - - - - - - - - --- - - - - - - - - --- - - - - - Notes: Steps are 750 hrs. - - - - - - - ---- - - - - - - -- - - Appre.i,ce io Journeyworker Ra T.w.1:1 FORK LIFT/CHERRY PICKER 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPENATING ENGINFERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GENERATOR/LIGHTING PLANTMEATERS 12/01/2013 $28.11 $10.00 $14.18 $0.00 $52.29 OPENA TING ENGINFFI?S LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS) GLAZIER3 LOCAL 35 (ZONE 2) 01/01/2014 $35.41 $7.85 $16.10 $0.00 $59.36 07/01/2014 $36.26 $7.85 $16.10 $0.00 $60.21 01/01/2015 $37.16 $7.85 $16.10 $0.00 $61.11 07/01/2015 $38.06 $7.85 $16.10 $0.00 $62.01 01/01/2016 $39.01 $7.85 $16.10 $0.00 $62.96 07/01/2016 $39.96 $7.85 $16.10 $0.00 $63.91 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86 I ---------- --­------- -------------- -------------------------------------------- ------ --------------------------- ---------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 13 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate $0.00 $25.98 2 55 $19.94 Unemployment Apprentice- GLAZIER -Loca135 Zone 2 $0.00 $31.45 3 60 $21.76 $7.85 Effective Date - 01/01/2014 $0.00 $33.60 4 65 Supplemental $7.85 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.71 $7.85 $0.00 $0.00 $25.56 2 55 $19.48 $7.85 $3.66 $0.00 $30.99 3 60 $21.25 $7.85 $3.99 $0.00 $33.09 4 65 $23.02 $7.85 $4.32 $0.00 $35.19 5 70 $24.79 $7.85 $14.11 $0.00 $46.75 6 75 $26.56 $7.85 $14.44 $0.00 $48.85 7 80 $28.33 $7.85 $14.77 $0.00 $50.95 8 90 $31.87 $7.85 $15.44 $0.00 $55.16 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.13 $7.85 $0.00 $0.00 $25.98 2 55 $19.94 $7.85 $3.66 $0.00 $31.45 3 60 $21.76 $7.85 $3.99 $0.00 $33.60 4 65 $23.57 $7.85 $4.32 $0.00 $35.74 5 70 $25.38 $7.85 $14.11 $0.00 $47.34 6 75 $27.20 $7.85 $14.44 $0.00 $49.49 7 80 $29.01 $7.85 $14.77 $0.00 $51.63 8 90 $32.63 $7.85 $15.44 $0.00 $55.92 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - I Steps are 750 hrs. T - Tppre. Tice i, Journeywork,, RT.,.i-1 - - - - - - - - - - - - - - - - HOISTING ENGINEER/CRANES/GRADALLS OPERA TING ENGINETRS LOCAL 4 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 ------------------------------------------------------------------------------------- ---------------------------------------------- ----- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 14 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate Unemplovment Apprentice- 0PER,4TJNG ENGINEERS -Local 4 Effective Date - 12/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 .$22.27 $10.00 $0.00 $0.00 $32.27 2 60 $24.29 $10.00 $14.18 $0.00 $48.47 3 65 $26.32 $10.00 $14.18 $0.00 $50.50 4 70 $28.34 $10.00 $14.18 $0.00 $52.52 5 75 $30.37 $10.00 $14.18 $0.00 $54.55 6 80 $32.39 $10.00 $14.18 $0.00 $56.57 7 85 $34.42 $10.00 $14.18 $0.00 $58.60 8 90 $36.44 $10.00 $14.18 $0.00 $60.62 - - - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to 3ourneyworker Ratio:1:6 - - - - - - - - - - - - ---- HVAC (DUCTWORK) 02/01/2014 $42.76 $9.82 $19.74 $2.17 $74.49 SHrFTMETAL WORKERS LOCAL 17- A 08/01/2014 $43.61 $9.82 $19.74 $2.17 $75.34 02/01/2015 $44.51 $9.82 $19.74 $2.17 $76.24 08/01/2015 $45.51 $9.82 $19.74 $2.17 $77.24 02/01/2016 $46.51 $9.82 $19.74 $2.17 $78.24 08/01/2016 $47.66 .$9.82 $19.74 $2.17 $79.39 02/01/2017 $48.76 $9.82 $19.74 $2.17 $80.49 08/01/2017 $49.86 $9.82 $19.74 $2.17 $81.59 02/01/2018 $51.01 $9.82 $19.74 $2.17 $82.74 For apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (ELECTRICAL CONTROLS) 03/01/2014 $44.45 $13.00 $14.68 $0.00 $72.13 131 ECTRICIANS LOCAL 103 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72.. $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN" HVAC (TESTING AND BALANCING - AIR) 02/01/2014 $42.76 $9.82 $19.74 $2.17 $74.49 SHr1,,"7MrTA L WORKFI?S LOCAL 17 - A 08/01/2014 $43.61 $9.82 $19.74 $2.17 $75.34 02/01/2015 $44.51 $9.82 $19.74 $2.17 $76.24 08/01/2015 $45.51 $9.82 $19.74 $2.17 $77.24 02/01/2016 $46.51 $9.82 $19.74 $2.17 $78.24 08/01/2016 $47.66 $9.82 $19.74 $2.17 $79.39 02/01/2017 $48.76 $9.82 $19.74 $2.17 $80.49 08/01/2017 $49.86 $9.82 $19.74 $2.17 $81.59 02/01/2018 $51.01 $9.82 $19.74 $2.17 $82.74 For apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (TESTING AND BALANCING -WATER) 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PIPFI-ITTFRS LOCAL 537 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" ------------------------------ --- ------ ----------------------------- - ----------------------------------------------------------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 15 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate Unemployment HVAC MECHANIC 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 NPE1717TERS LOCAL 53 7 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" HYDRAULIC DRILLS 12/01/2013 $30.60 $9.00 $7.30 $12.10 $0.00 $25.27 $50.00 $9.62 LA BOJ?rRS - ZONIT 2 $45.84 3 70 $29.48 $10.95 $10.24 $0.00 $50.67 4 80 $33.69 $10.95 06/01/2014 $31.10 $55.50 $7.30 $12.10 $0.00 $50.50 Step percent 12/01/2014 $31.60 Pension $7.30 $12.10 $0.00 $51.00 06/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 12/01/2015 $32.60 $7.30 $12.10 $0.00 $52.00 06/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 12/01/2016 $33.85 $7.30 $12.10 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" INSULATOR (PIPES & TANKS) 09/01/2013 $42.11 $10.95 $12.10 $0.00 $65.16 HFA T& 17ROST INSULA TORS LOCA L 6 (BOSTON) 09/01/2014 $44.11 $10.95 $12.10 $0.00 $67.16 Apprentice- ASBESTOS INSULATOR (Pipes& Tanks) -Local 6 Boston Effective Date - 09/01/2013 Step percent Apprentice Base Wage Health Supplemental Pension Unemployment Total Rate 1 50 $21.06 $10.95 $9.00 $0.00 $41.01 2 60 $25.27 $10.95 $9.62 $0.00 $45.84 3 70 $29.48 $10.95 $10.24 $0.00 $50.67 4 80 $33.69 $10.95 $10.86 $0.00 $55.50 Effective Date - 09/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 2 60 3 70 4 80 - - - - - - - - - - - Notes: Steps are I year Apprentice to Journeyworker Ratio:1:4 IRONWORKER/WELDER ]RONWORKERS LOCAL 7 (LA WRENCP AREA) $22.06 $10.95 $9.00 $0.00 $42.01 $26.47 $10.95 $9.62 $0.00 $47.04 $30.88 $10.95 $10.24 $0.00 $52.07 $35.29 - - - - - - - --- $10.95 - - - - - - - $10.86 - - - - - - - --- $0.00 - - - - $57.10 - - - I I 03/16/2014 $36.78 $7.70 $19.25 $0.00 $63.73 -------------------------------------------------------------- --------------------- ------------------ --------------------------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 16 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- IRONWORKER -Local 7 Lawrence Effective Date - 03/16/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $22.07 $7.70 $19.25 $0.00 $49.02 2 70 $25.75 $7.70 $19.25 $0.00 $52.70 3 75 $27.59 $7.70 $19.25 $0.00 $54.54 4 80 $29.42 $7.70 $19.25 $0.00 $56.37 5 85 $31.26 $7.70 $19.25 $0.00 $58.21 6 90 $33.10 $7.70 $19.25 $0.00 $60.05 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - Structural 1:6; Ornamental 1:4 $50.50 06/01/2015 $31.60 - - - - - - - - - - - Apprentice to Journeyworker Ratio: - - - - - - - - - - - - - - - - - - JACKHAMMER & PAVING BREAKER OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - 70NE2 06/01/2014 $30.60 . $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01)2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" LABORER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 1-4130RERS - ZONF 2 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 ­­ -- ------------------------------------ -------- -- _ ----- ------------------- I ------ ------ --- --------------------------- Issue Date: 03/31/2014 Wage Request Numbe r: 20140331-064 Page 17 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $37.61 2 70 $21.25 Unemployment Apprentice - LABORER - Zone 2 $0.00 $40.65 3 80 $24.28 Effective Date - 12/01/2013 $12.10 $0.00 $43.68 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.91 $7.30 $12.10 $0.00 $37.31 2 70 $20.90 $7.30 $12.10 $0.00 $40.30 3 80 $23.88 $7.30 $12.10 $0.00 $43.28 4 90 $26.87 $7.30 $12.10 $0.00 $46.27 Effective Date - 06/01/2014 $12.10 $0.00 $52.50 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.21 $7.30 $12.10 $0.00 $37.61 2 70 $21.25 $7.30 $12.10 $0.00 $40.65 3 80 $24.28 $7.30 $12.10 $0.00 $43.68 4 90 $27.32 $7.30 $12.10 $0.00 $46.72 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - Tpprentice to Journeyworker Ratio:1:5 - - - - - - - - - - - - - - - $51.25 LABORER: CARPENTER TENDER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 LABORERS - 7ONE2 $30.55 $7.30 $12.05 $0.00 $49.90 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: CEMENT FINISHER TENDER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 LA BORERS - 7ONE' 2 $30.55 $7.30 $12.05 $0.00 $49.90 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 1-413ORERS - 70NE 2 For apprentice rates see "Apprentice- LABORER" 12/01/2013 $30.05 $7.30 $12.05 $0.00 $49.40 06/01/2014 $30.55 $7.30 $12.05 $0.00 $49.90 12/01/2014 $31.05 $7.30 $12.05 $0.00 $50.40 06/01/2015 $31.55 $7.30 $12.05 $0.00 $50.90 12/01/2015 $32.05 $7.30 $12.05 $0.00 $51.40 ------------------------------------------------ ----- --------------------------- ---- ------------------------- ---- ----------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 18 of 39 Classification Effective Date Base Wage Health Pension Supplemental Unemp] yment Total Rate LABORER: MASON TENDER 12/01/2013 $30.10 $0.00 $7.30 $12.10 $30.35 $0.00 $12.10 $49.50 $49.75 LABORERS - ZONE 2 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 06/01/2014 $30.60 $7.30 $7.30 $12.10 $51.25 $0.00 $32.35 $50.00 $12.10 $0.00 12/01/2014 $31.10 $33.10 $7.30 $12.10 $0.00 $0.00 This classification applies to all tree work associated with the removal ofstanding trees, and trimming and removal $50.50 done for 06/01/2015 $31.60 $7.30 $12.10 $7.30 $0.00 $0.00 $51.00 LABORERS-ZONF2 06/01/2014 $30.60 12/01/2015 $32.10 $0.00 $7.30 $12.10 $31.10 $0.00 $12.10 $51.50 $50.50 06/01/2015 06/01/2016 $32.60 $12.10 $7.30 $12.10 12/01/2015 $0.00 $7.30 $52.00 $0.00 $51.50 12/01/2016 $33.35 $7.30 $7.30 $12.10 $52.00 $0.00 $33.35 $52.75 $12.10 For apprentice rates see "Apprentice- LABORER" $52.75 LABORER: MULTI -TRADE TENDER 12/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 LA BORERS - 70NE 2 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: TREE REMOVER 12/01/2013 $29.85 . $7.30 $12.10 $0.00 $49.25 LABORERS - ZONE 2 $37.37 $10.18 $16.90 $0.00 $64.45 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 This classification applies to all tree work associated with the removal ofstanding trees, and trimming and removal ofbrancbes and limbs wben the work is not done for a utility company for the purpose ofoperation, maintenance or repair ofutility company equipment. For apprentice rates see "Apprentice- LABORER" LASER BEAM OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS-ZONF2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" MARBLE & TILE FINISHERS 02/01/2014 $36.66 $10.18 $16.83 $0.00 $63.67 BRICKLA YERS LOCAL 3 - MARBLE & 77LE 08/01/2014 $37.37 $10.18 $16.90 $0.00 $64.45 02/01/2015 $37.82 $10.18 $16.90 $0.00 $64.90 08/01/2015 $38.53 $10.18 $16.97 $0.00 $65.68 02/01/2016 $38.98 $10.18 $16.97 $0.00 $66.13 08/01/2016 $39.68 $10.18 $17.05 $0.00 $66.91 02/01/2017 $40.14 $10.18 $17.05 $0.00 $67.37 ------------------------------------------- -- ------- ------------------------------------------ ­­ -------------------------------- Issue Date: 03/31/2014 Wage Request Number: . 20140331-064 Page 19 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- M,4RBLE &TILE FINISHER -Local 3 Marble& Tile Effective Date - 02/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.33 $10.18 $16.83 $0.00 $45.34 2 60 $22.00 $10.18 $16.83 $0.00 $49.01 3 70 $25.66 $10.18 $16.83 $0.00 $52.67 4 80 $29.33 $10.18 $16.83 $0.00 $56.34 5 90 $32.99 $10.18 $16.83 $0.00 $60.00 Effective Date - 08/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.69 $10.18 $16.90 $0.00 $45.77 2 60 $22.42 $10.18 $16.90 $0.00 $49.50 3 70 $26.16 $10.18 $16.90 $0.00 $53.24 4 80 $29.90 $10.18 $16.90 $0.00 $56.98 5 90 $33.63 $10.18 $16.90 $0.00 $60.71 - Notes: - - - - - - - - - - - - - - - - - - I - - 'Apprc.T.ceioJourneyw,rk,rR, T.,i.-3- - - - - - - - - - - - - - - - - - MARBLE MASONS,TELELAYERS & TERRAZZO MECH 02/01/2014 $48.10 $10.18 $18.15 $0.00 $76.43 BRICKLAYERS LOCAL 3 - AMRBLE & TILE 08/01/2014 $49.00 $10.18 $18.22 $0.00 $77.40 02/01/2015 $49.56 $10.18 $18.22 $0.00 $77.96 08/01/2015 $50.46 $10.18 $18.29 $0.00 $78.93 02/01/2016 $51.03 $10.18 $18.29 $0.00 $79.50 08/01/2016 $51.93 $10.18 $18.37 $0.00 $80.48 02/01/2017 $52.50 sio. 18 $18-37 $0.00 $81.05 -------------------------------------------------------------------------------------- ------ - --- --- ----------------------------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 20 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - MARBLE -TILE -TERRAZZO MECHANIC - Local 3 Marble & Tile $24.50 $10.18 $18.22 Effective Date - 02/01/2014 $52.90 2 60 $29.40 Supplemental $18.22 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.05 $10.18 $18.15 $0.00 $52.38 2 60 $28.86 $10.18 $18.15 $0.00 $57.19 3 70 $33.67 $10.18 $18.15 $0.00 $62.00 4 80 $38.48 $10.18 $18.15 $0.00 $66.81 5 90 $43.29 $10.18 $18.15 $0.00 $71.62 Effective Date - 08/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.50 $10.18 $18.22 $0.00 $52.90 2 60 $29.40 $10.18 $18.22 $0.00 $57.80 3 70 $34.30 $10.18 $18.22 $0.00 $62.70 4 80 $39.20 $10.18 $18.22 $0.00 $67.60 5 90 $44.10 $10.18 $18.22 $0.00 $72.50 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - ---- 7pprentice to Journeyworker Ratio:1:5 MECH. SWEEPER OPERATOR (ON CONST. SITES) 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPE'RA TING FNGINrrRS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" MECHANICS MAINTENANCE 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPEIM TING ENGINFrRS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" MILLWRIGHT (Zone 2) MILL WRIGHTS LOCAL 1121 - Zone 2 10/01/2013 $32.81 $9.80 $16.01 $0.00 $58.62 04/01/2014 $33.41 $9.80 $16.01 $0.00 $59.22 10/01/2014 $34.17 $9.80 $16.01 $0.00 $59.98 04/01/2015 $34.94 $9.80 $16.01 $0.00 $60.75 ---------------------------------------------------------------------------------------------------------------------- --- --------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 21 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MILLWRIGHT- Local 1121 Zone 2 Effective Date - 10/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $18.05 $9.80 $4.40 $0.00 $32.25 2 65 $21.33 $9.80 $13.21 $0.00 $44.34 3 75 $24.61 $9.80 $14.01 $0.00 $48.42 4 85 $27.89 $9.80 $14.81 $0.00 $52.50 Effective Date - 04/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $18.38 $9.80 $4.40 $0.00 $32.58 2 65 $21.72 $9.80 $13.21 $0.00 $44.73 3 75 $25.06 $9.80 $14.01 $0.00 $48.87 4 85 $28.40 $9.80 $14.81 $0.00 $53.01 - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - Steps are 2,000 hours - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:5 MORTAR MIXER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - 70NE2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2013 $20.96 $10.00 $14.18 $0.00 $45.14 OPERA TING ENGINFERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OILER (TRUCK CRANES, GRADALLS) 12/01/2013 $24.43 $10.00 $14.18 $0.00 $48.61 OPERA TING ENGLYFFRS LOCAL 4 Forapprentice rates see "Apprentice- OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT - CLASS 11 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPE IM TING E"NGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PAINTER (BRIDGES/TANKS) 01/01/2014 $45.91 $7.85 $16.10 $0.00 $69.86 IIAJN7'1,]?S LOCAL 35 - 70NE 2 07/01/2014 $46.76 $7.85 $16.10 $0.00 $70.71 01/01/2015 $47.66 $7.85 $16.10 $0.00 $71.61 07/01/2015 $48.56 $7.85 $16.10 $0.00 $72.51 01/01/2016 $49.51 $7.85 $16.10 $0.00 $73.46 07/01/2016 $50.46 $7.85 $16.10 $0.00 $74.41 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 ------------------------------------------------------------------------------------- --------------------------- - ---- -------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 22 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGESITANKS Effective Date - 01/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.96 $7.85 $0.00 $0.00 $30.81 2 55 $25.25 $7.85 $3.66 $0.00 $36.76 3 60 $27.55 $7.85 $3.99 $0.00 $39.39 4 65 $29.84 $7.85 $4.32 $0.00 $42.01 5 70 $32.14 $7.85 $14.11 $0.00 $54.10 6 75 $34.43 $7.85 $14.44 $0.00 $56.72 7 80 $36.73 $7.85 $14.77 $0.00 $59.35 8 90 $41.32 $7.85 $15.44 $0.00 $64.61 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.38 $7.85 $0.00 $0.00 $31.23 2 55 $25.72 $7.85 $3.66 $0.00 $37.23 3 60 $28.06 $7.85 $3.99 $0.00 $39.90 4 65 $30.39 $7.85 $4.32 $0.00 $42.56 5 70 $32.73 $7.85 $14.11 $0.00 $54.69 6 75 $35.07 $7.85 $14.44 $0.00 $57.36 7 80 $37.41 $7.85 $14.77 $0.00 $60.03 8 90 $42.08 $7.85 $15.44 $0.00 $65.37 --- - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - Steps are 750 hrs. - - - - - - - - - - - Apprentice to Journeyworker Ratio: 1: 1 - - - - - - - - - - - - - - - - - PAINTER (SPRAY OR SANDBLAST, NEW) 01/01/2014 $36.81 $7.85 $16.10 $0.00 $60.76 If 30% or more of surfaces to be painted are new construction, 07/01/2014 $37.66 $7.85 $16.10 $0.00 $61.61 NEW paint rate shall be used.PAINTERS LOCAL 35 - ZONE 2 01/01/2015 $38.56 $7.85 $16.10 $0.00 $62.51 07/01/2015 $39.46 $7.85 $16.10 $0.00 $63.41 01/01/2016 $40.41 $7.85 $16.10 $0.00 $64.36 07/01/2016 $41.36 $7.85 $16.10 $0.00 $65.31 01/01/2017 $42.31 $7.85 $16.10 $0.00 $66.26 ------------------------------- --------------------------------------- -------------- - ----------------------------- ---- - ------------ Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 23 of 39 Classification Effective Date Base Wage Healtb Pension Supplemental Total Rate $0.00 $26.68 2 55 $20.71 Unemployment $3.66 Apprentice- PAINTER Local 35 Zone 2 - SpraylSandblasl -New $32.22 3 60 $22.60 $7.85 Effective Date - 01/01/2014 $0.00 $34.44 4 65 Supplemental $7.85 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.41 $7.85 $0.00 $0.00 $26.26 2 55 $20.25 $7.85 $3.66 $0.00 $31.76 3 60 $22.09 $7.85 $3.99 $0.00 $33.93 4 65 $23.93 $7.85 $4.32 $0.00 $36.10 5 70 $25.77 $7.85 $14.11 $0.00 $47.73 6 75 $27.61 $7.85 $14.44 $0.00 $49.90 7 80 $29.45 $7.85 $14.77 $0.00 $52.07 8 90 $33.13 $7.85 $15.44 $0.00 $56.42 Effective Date - 07/01/2014 $0.00 $64.32 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.83 $7.85 $0.00 $0.00 $26.68 2 55 $20.71 $7.85 $3.66 $0.00 $32.22 3 60 $22.60 $7.85 $3.99 $0.00 $34.44 4 65 $24.48 $7.85 $4.32 $0.00 $36.65 5 70 $26.36 $7.85 $14.11 $0.00 $48.32 6 75 $28.25 $7.85 $14.44 $0.00 $50.54 7 80 $30.13 $7.85 $14.77 $0.00 $52.75 8 90 $33.89 $7.85 $15.44 $0.00 $57.18 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - I Steps are 750 hrs. $0.00 $62.42 - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:1 - - - - - - - - - - - - - - - - PAINTER (SPRAY OR SANDBLAST, REPAINT) 01/01/2014 $34.87 $7.85 $16.10 $0.00 $58.82 PAINTERS LOCAL 35 - ZONE 2 07/01/2014 $35.72 $7.85 $16.10 $0.00 $59.67 01/01/2015 $36.62 $7.85 $16.10 $0.00 $60.57 07/01/2015 $37.52 $7.85 $16.10 $0.00 $61.47 01/01/2016 $38.47 $7.85 $16.10 $0.00 $62.42 07/01/2016 $39.42 $7.85 $16.10 $0.00 $63.37 01/01/2017 $40.37 $7.85 $16.10 $0.00 $64.32 -- --------------------------------- -- ---- ------- ------- --- ---- -- ------------------------------------------------- -_ Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 24 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 - SpraylSandblast -Repaint Effective Date - 01/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.44 $7.85 $0.00 $0.00 $25.29 2 55 $19.18 $7.85 $3.66 $0.00 $30.69 3 60 $20.92 $7.85 $3.99 $0.00 $32.76 4 65 $22.67 $7.85 $4.32 $0.00 $34.84 5 70 $24.41 $7.85 $14.11 $0.00 $46.37 6 75 $26.15 $7.85 $14.44 $0.00 $48.44 7 80 $27.90 $7.85 $14.77 $0.00 $50.52 8 90 $31.38 $T85 $15.44 $0.00 $54.67 Effective Date - 07/01/2014 01/01/2014 $35.41 $7.85 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.86 $7.85 $0.00 $0.00 $25.71 2 55 $19.65 $7.85 $3.66 $0.00 $31.16 3 60 $21.43 $7.85 $3.99 $0.00 $33.27 4 65 $23.22 $7.85 $4.32 $0.00 $35.39 5 70 $25.00 $7.85 $14.11 $0.00 $46.96 6 75 $26.79 $7.85 $14.44 $0.00 $49.08 7 80 $28.58 $7.85 $14.77 $0.00 $51.20 8 90 $32.15 $7.85 $15.44 $0.00 $55.44 - - Notes: - - - - --- - - - - - - - - - - - - - - - - - - - - - Steps are 750 hrs. - Apprentice - - - - - - - - to Journeyworker Ratio:I:I - - - - - - - - - - - - - - - - - PAINTER (TRAFFIC MARKINGS) U/01/2013 $29.85 $7.30 $12.10 $0.00 $49.25 I ABORFRS - 7ONF 2 06/01/2014 $30.35 $7.30 $12.10 $0.00 $49.75 12/01/2014 $30.85 $7.30 $12.10 $0.00 $50.25 06/01/2015 $31.35 $7.30 $12.10 $0.00 $50.75 12/01/2015 $31.85 $7.30 $12.10 $0.00 $51.25 06/01/2016 $32.35 $7.30 $12.10 $0.00 $51.75 12/01/2016 $33.10 $7.30 $12.10 $0.00 $52.50 For Apprentice rates see "Apprentice- LABORER" PAINTER / TAPER 03RUSH, NEW) * 01/01/2014 $35.41 $7.85 $16.10 $0.00 $59.36 * If 30% or more of surfaces to be painted are new construction, 07/01/2014 $36.26 $7.85 $16.10 $0.00 $60.21 NEW paint rate shall be used.pAjNTERS LOCAL 35 - 70NE 2 01/01/2015 $37.16 $7.85 $16.10 $0.00 $61.11 07/01/2015 $38.06 $7.85 $16.10 $0.00 $62.01 01/01/2016 $39.01 $7.85 $16.10 $0.00 $62.96 07/01/2016 $39.96 $7.85 $16.10 $0.00 $63.91 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86 ---- ---- ------------------------------------------------------------------------------------------------ ------- ­ --- ------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 25 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW Effective Date - 01/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.71 $7.85 $0.00 $0.00 $25.56 2 55 $19.48 $7.85 $3.66 $0.00 $30.99 3 60 $21.25 $7.85 $3.99 $0.00 $33.09 4 65 $23.02 $7.85 $4.32 $0.00 $35.19 5 70 $24.79 $7.85 $14.11 $0.00 $46.75 6 75 $26.56 $7.85 $14.44 $0.00 $48.85 7 80 $28.33 $7.85 $14.77 $0.00 $50.95 8 90 $31.87 $7.85 $15.44 $0.00 $55.16 Effective Date - 07/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.13 $7.85 $0.00 $0.00 $25.98 2 55 $19.94 $7.85 $3.66 $0.00 $31.45 3 60 $21.76 $7.85 $3.99 $0.00 $33.60 4 65 $23.57 $7.85 $4.32 $0.00 $35.74 5 70 $25.38 $7.85 $14.11 $0.00 $47.34 6 75 $27.20 $7.85 $14.44 $0.00 $49.49 7 80 $29.01 $7.85 $14.77 $0.00 $51.63 8 90 $32.63 $7.85 $15.44 $0.00 $55.92 - - -- - - - - - - - Notes: - - - - - - - - - - - - - - - - - - - I Steps are 750 hrs. - - - - - - - - Apprentice To Journeyworker Ratio:I:1 - - - - - - - - - - - - - - - - - PAINTER TAPER (BRUSH, REPAINT) 01/01/2014 $33.47 $7.85 $16.10 $0.00 $57.42 FAINTERS LOCAL 35 - 70NE"2 07/01/2014 $34.32 $7.85 $16.10 $0.00 $58.27 01/01/2015 $35.22 $7.85 $16.10 $0.00 $59.17 07/01/2015 $36.12 $7.85 $16.10 $0.00 $60.07 01/01/2016 $37.07 $7.85 $16.10 $0.00 $61.02 07/01/2016 $38.02 $7.85 $16.10 $0.00 $61.97 01/01/2017 $38.97 $7.85 $16.10 $0.00 $62.92 -------------------------------- -- --------------------------- --- ----- --------------------- ------ --- ------------------------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 26 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date - 01/01/2014 Step percent Apprentice Base Wage Health 1 50 $16.74 $7.85 2 55 $18.41 $7.85 3 60 $20.08 $7.85 4 65 $21.76 $7.85 5 70 $23.43 $7.85 6 75 $25.10 $7.85 7 80 $26.78 $7.85 8 90 $30.12 $7.85 Effective Date - 07/01/2014 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate $0.00 $0.00 $24.59 $3.66 $0.00 $29.92 $3.99 $0.00 $31.92 $4.32 $0.00 $33.93 $14.11 $0.00 $45.39 $14.44 $0.00 $47.39 $14.77 $0.00 $49.40 $15.44 $0.00 $53.41 Supplemental Pension Unemployment Total Rate 1 50 $17.16 $7.85 $0.00 $0.00 $25.01 2 55 $18.88 $7.85 $3.66 $0.00 $30.39 3 60 $20.59 $7.85 $3.99 $0.00 $32.43 4 65 $22.31 $7.85 $4.32 $0.00 $34.48 5 70 $24.02 $7.85 $14.11 $0.00 $45.98 6 75 $25.74 $7.85 $14.44 $0.00 $48.03 7 80 $27.46 $7.85 $14.77 $0.00 $50.08 8 90 $30.89 $7.85 $15.44 $0.00 $54.18 - - - - - - - - - - - Notes: - - - - - - - - - - - - -- - - - - - I Steps are 750 hrs. - Tppre. Tice in Journeyw.rker R.T.,.iT- - - - - - - - - - - - - - - - - PANEL & PICKUP TRUCKS DRIVER 12/01/2012 : $30.28 $9.07 $8.00 $0.00 $47.35 Th'AMSTERS JOINT COUNCIL NO. 10 70NE B PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2013 $40.10 $9.80 $18.17 $0.00 $68.07 DECK) 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 PILE DRIVER 08/01/2013 $40.10 $9.80 $18.17 $0.00 $68.07 PILEDRIVER LOCAL 56 (ZONE 1) 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 ------------------------------------------------------------------- --------------------------------------------- - ---------------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 27 of 39 Classification EffectiveDate BaseWage Healtb Pension Supplemental Total Rate $0.00 $48.77 2 60 $24.96 Unemplovinent Apprentice- PILEDRIVER - Local56 Zone I $0.00 $52.93 3 70 $29.12 Effective Date - 08/01/2013 $18.17 $0.00 $57.09 Supplemental $31.20 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.05 $9.80 $18.17 $0.00 $48.02 2 60 $24.06 $9.80 $18.17 $0.00 $52.03 3 70 $28.07 $9.80 $18.17 $0.00 $56.04 4 75 $30.08 $9.80 $18.17 $0.00 $58.05 5 80 $32.08 $9.80 $18.17 $0.00 $60.05 6 80 $32.08 $9.80 $18.17 $0.00 $60.05 7 90 $36.09 $9.80 $18.17 $0.00 $64.06 8 90 $36.09 $9.80 $18.17 $0.00 $64.06 Effective Date - 08/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.80 $9.80 $18.17 $0.00 $48.77 2 60 $24.96 $9.80 $18.17 $0.00 $52.93 3 70 $29.12 $9.80 $18.17 $0.00 $57.09 4 75 $31.20 $9.80 $18.17 $0.00 $59.17 5 80 $33.28 $9.80 $18.17 $0.00 $61.25 6 80 $33.28 $9.80 $18.17 $0.00 $61.25 7 90 $37.44 $9.80 $18.17 $0.00 $65.41 8 90 $37.44 $9.80 $18.17 $0.00 $65.41 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - A pp rentice Z-jo -urn-eywo-rke-rRa-tio: 1-:3 - - - - - - - - - - - - - - - - - PlPEFITTER & STEAMFITTER 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 111PETITTERS LOCAL 53 7 (Local 138) - - - Apprentice- PIPEFITTER Local 537 (Local 138) Effective Date - 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.80 $8.75 $4.50 $0.00 $32.05 2 45 $21.15 $8.75 $12.39 $0.00 $42.29 3 60 $28.21 $8.75 $12.39 $0.00 $49.35 4 70 $32.91 $8.75 $12.39 $0.00 $54.05 5 80 $37.61 $8.75 $12.39 $0.00 $58.75 - - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - I ** 13; 3:15; 1: 10 thereafter / Steps are I yr. Refrig/AC Mechanic 1: 1; 1: 2;2:4; 3:6;4:8;5: 10;6:12; 7:14 8:17;9:20; 10: 23 - - - - - - - - - (Max) - - Appre. Tice To Journeyw ;;ker R. T.o-; -- - - - - --------------------- I ---------------------------------- ---------------------------- - ------------------------------ ---- -------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 28 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 09/01/2014 $46.33 $9.82 $14.29 Unemployment $70.44 PIPELAYER 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - 70NE 2 $48.33 $9.82 $14.29 $0.00 $72.44 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" PLUMBER PLUMBERS& GASF17TFRSLOCAL 12 (Local 138) 03/01/2014 $45.33 $9.82 $14.29 $0.00 $69.44 09/01/2014 $46.33 $9.82 $14.29 $0.00 $70.44 03/61/2015 $47.33 $9.82 $14.29 $0.00 $71.44 09/01/2015 $48.33 $9.82 $14.29 $0.00 $72.44 03/01/2016 $49.48 $9.82 $14.29 $0.00 $73.59 09/01/2016 $50.53 $9.82 $14.29 $0.00 $74.64 03/01/2017 $51.53 $9.82 $14.29 $0.00 $75.64 Apprentice- PLUMBERIGASFITTER -Local 12 (Local 138) $16.22 $9.82 $5.33 $0.00 Effective Date - 03/01/2014 2 40 $18.53 $9.82 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $15.87 $9.82 $5.33 $0.00 $31.02 2 40 $18.13 $9.82 $6.02 $0.00 $33.97 3 55 $24.93 $9.82 $8.08 $0.00 $42.83 4 65 $29.46 $9 .82 $9.47 $0.00 $48.75 5 75 $34.00 $9.82 $10.85 $0.00 $54.67 Effective Date - 09/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.22 $9.82 $5.33 $0.00 $31.37 2 40 $18.53 $9.82 $6.02 $0.00 $34.37 3 55 $25.48 $9.82 $8.08 $0.00 $43.38 4 65 $30.11 $9.82 $9.47 $0.00 $49.40 5 75 $34.75 $9.82 $10.85 $0.00 $55.42 - - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - Steps are I yr Step 4 with lic$51.73 Step5 with lic$57.65 - - - - - - - - - - Appren Tice �o Journeyworker Ra Tio-1-:5 PNEUMATIC CONTROLS (TEMP.) 03/01/200 $47.01 $8.75 $12.39 $0.00 $68.15 PIPENTIERS LOCAL 537 (Local 138) For apprentice rates see "Apprentice- PIPEFITrER" or "PLUMBERNIPEFITTER" ------------------------------------- 11 -------------------------------------------- ------------------------------------------------------ Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 29 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate OPERA TING ENGINEERS LOCAL 4 Unemployment PNEUMATIC DRILLfrOOL OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - ZONE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 OPERA TING ENGINEERS LOCAL 4 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 PUMP OPERATOR (DEWATERING, OTHER) 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 OPERA TING ENGINEERS LOCAL 4 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" 04/30/2009 $25.80 $5.96 $5.34 $0.00 $37.10 POWDERMAN & BLASTER 12/01/2013 $30.85 $7.30 $12.10 $0.00 $50.25 LABORERS - ZONE 2 06/01/2014 $31.35 $7.30 $12.10 $0.00 $50.75 OPERA TING ENGINEERS LOCAL 4 12/01/2014 $31.85 $7.30 $12.10 $0.00 $51.25 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 06/01/2015 $32.35 $7.30 $12.10 $0.00 $51.75 RESIDENTIAL WOOD FRAME (All Other Work) 12/01/2015 $32.85 $7.30 $12.10 $0.00 $52.25 CARPENTERS -ZONE 2 (Residential Wood) 06/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 RESIDENTIAL WOOD FRAME CARPENTER 12/01/2016 $34.10 $7.30 $12.10 $0.00 $53.50 For apprentice rates see "Apprentice- LABORER" POWER SHOVEL/DERRICKfrRENCHING MACHINE 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERA TING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (CONCRETE) 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERA TING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (DEWATERING, OTHER) 12/01/2013 $28.11 $10.00 $14.18 $0.00 $52.29 OPERA TING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" READY -MIX CONCRETE DRIVER 04/30/2009 $25.80 $5.96 $5.34 $0.00 $37.10 TEAMSTERS LOCAL 42 RECLAIMERS 12/01/2013 $40.11 sio.00 $14-18 $0.00 $64.29 OPERA TING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42 CARPENTERS -ZONE 2 (Residential Wood) RESIDENTIAL WOOD FRAME CARPENTER 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81 ** The Residential Wood Frame Carpenter classification applies only to the construction ofnew, wood frame residences that do not exceed four stories including the basement. cARPENTERs -zoNE 2 (Residential Wood) As of9/l/09 Carpentry work on wood-frarne residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. ---------------------------------- - --------------------------------------------------------------------------------------- -------- -- - Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 30 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemoloyment Apprentice- C,4RPENTER (Residential Wood Frame) -Zone 2 Effective Date - 05/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $14.54 $6.34 $0.00 $0.00 $0.00 $20.88 OPE'RA TING ENGJA?EERS LOCA L 4 2 60 $14.54 $6.34 $6.23 $0.00 $27.11 3 65 $15.76 $6.34 $6.23 $0.00 ROOFER (Inc.Roofer Waterproofrig &Roofer Darnprootg) $28.33 $39.21 4 70 $16.97 $6.34 $6.23 $0.00 08/01/2014 $29.54 $10.50 5 75 $18.18 $6.34 $6.23 $0.00 $41.01 $30.75 $10.70 6 80 $19.39 $6.34 $6.23 $0.00 $10.50 $31.96 $0.00 7 85 $20.60 $6.34 $6.23 $0.00 $10.70 $33.17 $64.01 8 90 $21.82 $6.34 $6.23 $0.00 $34.39 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - I I - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:5 - - - - - - - - - - - - - - - - - - RIDE -ON MOTORIZED BUGGY OPERATOR 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 LABORERS - 701VE 2 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ROLLER/SPREADER/MULCHING MACHINE 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPE'RA TING ENGJA?EERS LOCA L 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ROOFER (Inc.Roofer Waterproofrig &Roofer Darnprootg) 02/01/2014 $39.21 $10.50 $10-70 $0.00 $60.41 ROOPFRS LOCAL 33 08/01/2014 $40.11 $10.50 $10.70 $0.00 $61.31 02/01/2015 $41.01 $10.50 $10.70 $0.00 $62.21 08/01/2015 $41.91 $10.50 $10.70 $0.00 $63.11 02/01/2016 $42.81 $10.50 $10.70 $0.00 $64.01 ------------------------------------------------------------------------------------------------ -------- -- --------------------­-- ---- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 31 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate Unemployment Apprentice - ROOFER - Local 33 Effective Date - 02/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.61 $10.50 $3.38 $0.00 $33.49 2 60 $23.53 $10.50 $10.70 $0.00 $44.73 3 65 $25.49 $10.50 $10.70 $0.00 $46.69 4 75 $29.41 $10.50 $10.70 $0.00 $50.61 5 85 $33.33 $10.50 $10.70 $0.00 $54.53 Effective Date - 08/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.06 $10.50 $3.38 $0.00 $33.94 2 60 $24.07 $10.50 $10.70 $0.00 $45.27 3 65 $26.07 $10.50 $10.70 $0.00 $47.27 4 75 $30.08 $10.50 $10.70 $0.00 $51.28 5 85 $34.09 $10.50 $10.70 $0.00 $55.29 - - - - - - - - - - - - - Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1 - - - - - - - - - - - - - - - -- Step I is 2000 hrs.; Steps 2-5 are 1000 Ins. - - - - - - - - - Appre. Tice To Journeyw.rkerR. - - - - - - - - - - - - - - ROOFER SLATE / TILE / PRECAST CONCRETE 02/01/2014 $39.46 $10.50 $10.70 $0.00 $60.66 ROOITRS LOCAL 33 08/01/2014 $40.36 $10.50 $10.70 $0.00 $61.56 02/01/2015 $41.26 $10.50 $10.70 $0.00 $62.46 08/01/2015 $42.16 $10.50 $10.70 $0.00 $63.36 02/01/2016 $43.06 $10.50 $10.70 $0.00 $64.26 For apprentice rates see "Apprentice- ROOFER" SHEETMETAL WORKER 02/01/2014 $42.76 $9.82 $19.74 $2.17 $74.49 SHE'EMETAL WORKERS LOCAL 17 -A 08/01/2014 $43.61 $9.82 $19.74 $2.17 $75.34 02/01/2015 $44.51 $9.82 $19.74 $2.17 $76.24 08/01/2015 $45.51 $9.82 $19.74 $2.17 $77.24 02/01/2016 $46.51 $9.82 $19.74 $2.17 $78.24 08/01/2016 $47.66 $9.82 $19.74 $2.17 $79.39 02/01/2017 $48.76 $9.82 $19.74 $2.17 $80.49 08/01/2017 $49.86 $9.82 $19.74 $2.17 $81.59 02/01/2018 $51.01 $9.82 $19.74 $2.17 $82.74 ...... - ---------------------------------------------- -- ------- ----- --- -- --------- ------ -------- ---------------------------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 32 of 39 Classification 40 EffectiveDate BaseWage Health Pension Supplemental Total Rate $0.00 $31.54 2 40 $17.44 Unemployment Apprentice- SHEETMETAL WOPXER -Local 17-A $31.54 3 45 $19.62 Effective Date - 02/01/2014 $8.70 $1.13 $39.27 Supplemental 45 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.10 $9.82 $4.28 $0.00 $31.20 2 40 $17.10 $9.82 $4.28 $0.00 $31.20 3 45 $19.24 $9.82 $8.70 $1.13 $38.89 4 45 $19.24 $9.82 $8.70 $1.13 $38.89 5 50 $21.38 $9.82 $9.49 $1.22 $41.91 6 50 $21.38 $9.82 $9.74 $1.23 $42.17 7 60 $25.66 $9.82 $11.05 $1.40 $47.93 8 65 $27.79 $9.82 $11.84 $1.48 $50.93 9 75 $32.07 $9.82 $13.41 $1.66 $56.96 10 85 $36.35 $9.82 $14.48 $1.82 $62.47 Effective Date - 08/01/2014 Supplemental Step percent Apprentice Base Wage Health . Pension Unemployment Total Rate 1 40 $17.44 $9.82 $4.28 $0.00 $31.54 2 40 $17.44 $9.82 $4.28 $0.00 $31.54 3 45 $19.62 $9.82 $8.70 $1.13 $39.27 4 45 $19.62 $9.82 $8.70 $1.13 $39.27 5 50 $21.81 $9.82 $9.49 $1.22 $42.34 6 50 $21.81 $9.82 $9.74 $1.23 $42.60 7 60 $26.17 $9.82 $11.05 $1.40 $48.44 8 65 $28.35 $9.82 $11.84 $1.48 $51.49 9 75 $32.71 $9.82 $13.41 $1.66 $57.60 10 85 $37.07 $9.82 .$14.48 $1.82 $63.19 - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - Steps are 6 mos. - - --- - - - - - - ApprenTice To Journeyworker R�tio-i.4 - - - - - - - - - - - ------ - - SIGN ERECTOR PAINTFRS LOCAL 35 - 70NE 2 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93 -------------- ------------------- ---------------------------------------------------- ---------------------------------------- I .... ---- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 33 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate Unemuloyment Apprentice- SIGNERECTOR -Local 35 Zone 2 Effective Date - 06/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $12.91 $7.07 $0.00 $0.00 $19.98 2 55 $14.20 $7.07 $2.45 $0.00 $23.72 3 60 $15.49 $7.07 $2.45 $0.00 $25.01 4 65 $16.78 $7.07 $2.45 $0.00 $26.30 5 70 $18.07 $7.07 $7.05 $0.00 $32.19 6 75 $19.36 $7.07 $7.05 $0.00 $33.48 7 80 $20.65 $7.07 $7.05 $0.00 $34.77 8 85 $21.94 $7.07 $7.05 $0.00 $36.06 9 90 $23.23 $7.07 $7.05 $0.00 $37.35 - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - --- $52.93 Steps are 4 mos. 08/01/2016 $32.44 $10.91 $10.08 -T - ourneyw Appren Tice o J orker Ra Tin- i. I - - - - - - - - - - - - - - - - SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2013 $31.24 $9.41 $9.41 $8.80 $0.00 $49.45 $31.88 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B $8.80 $0.00 $50.09 08/01/2014 $31.88 $9.91 $8.80 06/01/2014 $31.59 12/01/2014 $9.41 $8.80 $0.00 $49.80 $51.12 08/01/2014 $31.59 $9.91 $9.91 $8.80 $0.00 $50.30 $32.23 12/01/2014 $31.59 $0.00 $9.91 $9.33 $0.00 $50.83 $10.08 06/01/2015 $31.94 06/01/2016 $9.91 $9.33 $0.00 $51.18 $53.22 08/01/2015 $31.94 $10.91 $10.41 $9.33 $0.00 $51.68 $32.73 12/01/2015 $31.94 $0.00 $10.41 $10.08 $0.00 $52.43 06/01/2016 $32.44 $10.41 $10.08 $0.00 $52.93 08/01/2016 $32.44 $10.91 $10.08 $0.00 $53.43 12/01/2016 $32.44 sio.9i $10-89 $0.00 $54.24 SPECIALIZED EARTH MOVING EQUIP > 35 TONS 7'1,,'AMS7'1,,]?S.IOJNTCOUNCJI,NO. IOZONEB 12/01/2013 $31.53 $9.41 $8.80 $0.00 $49.74 06/01/2014 $31.88 $9.41 $8.80 $0.00 $50.09 08/01/2014 $31.88 $9.91 $8.80 $0.00 $50.59 12/01/2014 $31.88 $9.91 $9.33 $0.00 $51.12 06/01/2015 $32.23 $9.91 $9.33 $0.00 $51.47 08/01/2015 $32.23 $10.41 $9.33 $0.00 $51.97 12/01/2015 $32.23 $10.41 $10.08 $0.00 $52.72 06/01/2016 $32.73 $10.41 $10.08 $0.00 $53.22 08/01/2016 $32.73 $10.91 $10.08 $0.00 $53.72 12/01/2016 $32.73 $10.91 $10.89 $0.00 $54.53 ----------------------------------------------------------------------- --------------------------------------- - -------- ------------ Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 34 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Unemployment Total Rate SPRINKLER FITTER 03/01/2014 $48.22 $8.42 $13.60 $0.00 $70.24 SPRINKLER FITTEPS LOCAL 550 - (Section B) Zone 2A 45 $21.70 $8.42 4 50 10/01/2014 $49.26 $8.42 $13.60 $0.00 $71.28 01/01/2015 $49.26 $8.42 $13.75 $0.00 $71.43 03/01/2015 $50.16 $8.42 $13.75 $0.00 $72.33 10/01/2015 $51.20 $8.42 $13.75 $0.00 $73.37 01/01/2016 $51.20 $8.67 $13.90 $0.00 $73.77 03/01/2016 $52.10 $8.67 $13.90 $0.00 $74.67 10/01/2016 $53.14 $8.67 $13.90 $0.00 $75.71 03/01/2017 $54.00 $8.67 $13.90 $0.00 $76.57 Apprentice- SPRINKLER FITTER -Local 550 (Section B) Zone 2A Effective Date - 03/01/2014 Step percent Apprentice Base Wage Health 1 35 $16.88 $8.42 2 40 $19.29 $8.42 3 45 $21.70 $8.42 4 50 $24.11 $8.42 5 55 $26.52 $8.42 6 60 $28.93 $8.42 7 65 $31.34 $8.42 8 70 $33.75 $8.42 9 75 $36.17 $8.42 10 80 $38.58 $8.42 Effective Date - 10/01/2014 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate $8.25 $0.00 $33.55 $8.25 $0.00 $35.96 $8.25 $0.00 $38.37 $8.25 $0.00 $40.78 $8.25 $0.00 $43.19 $8.25 $0.00 $45.60 $8.25 $0.00 $48.01 $8.25 $0.00 $50.42 $8.25 $0.00 $52.84 $8.25 $0.00 $55.25 Supplemental Pension Unemployment Total Rate 1 35 $17.24 $8.42 $8.25 $0.00 $33.91 2 40 $19.70 $8.42 $8.25 $0.00 $36.37 3 45 $22.17 $8.42 $8.25 $0.00 $38.84 4 50 $24.63 $8.42 $8.25 $0.00 $41.30 5 55 $27.09 $8.42 $8.25 $0.00 $43.76 6 60 $29.56 $8.42 $8.25 $0.00 $46.23 71 65 $32.02 $8.42 $8.25 $0.00 $48.69 8 70 $34.48 $8.42 $8.25 $0.00 $51.15 9 75 $36.95 $8.42 $8.25 $0.00 $53.62 10 80 $39.41 $8.42 $8.25 $0.00 $56.08 - - - - - - - - - - - lNotes: Apprentice entered prior 9/30/10: - - - - - - - - - - - - - - - - - - 40/45/50/55/60/65/70/75/80/85 Steps are 850 hours Apprentice to Journeyw.rker Ra T..- i-3 STEAM BOILER OPERATOR 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERA TING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPERATING ENGINEERS LOCAL 4 -- ------------------------------------------------------------------------------------------- --------------------------------- - ---- - Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 35 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment For apprentice rates see "Apprentice- OPERATING ENGINEERS" TELECOMMUNICATION TECHNICIAN ELECTRICL4NS LOCAL 103 03/01/2014 $33.44 $13.00 $13.03 $0.00 $59.47 09/01/2014 $33.84 $13.00 $13.05 $0.00 $59.89 03/01/2015 $34.38 $13.00 $13.06 $0.00 $60.44 09/01/2015 $35.10 $13.00 $13.08 $0.00 $61.18 03/01/2016 $35.81 $13.00 $13.10 $0.00 $61.91 Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $13.38 $13.00 $0.40 $0.00 $26.78 2 40 $13.38 $13.00 $0.40 $0.00 $26.78 3 45 $15.05 $13.00 $10.29 $0.00 $38.34 4 45 $15.05 $13.00 $10.29 $0.00 $38.34 5 50 $16.72 $13.00 $10.54 $0.00 $40.26 6 55 $18.39 $13.00 $10.79 $0.00 $42.18 7 60 $20.06 $13.00 $11.04 $0.00 $44.10 8 65 $21.74 $13.00 $11.29 $0.00 $46.03 9 70 $23.41 $13.00 $11.54 $0.00 $47.95 10 75 $25.08 $13.00 $11.79 $0.00 $49.87 Effective Date - 09/01/2014 $22.00 $13.00 $11.30 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $13.54 $13.00 $0.41 $0.00 $26.95 2 40 $13.54 $13.00 $0.41 $0.00 $26.95 3 45 $15.23 $13.00 $10.30 $0.00 $38.53 4 45 $15.23 $13.00 $10.30 $0.00 $38.53 5 50 $16.92 $13.00 $10.55 $0.00 $40.47 6 55 $18.61 $13.00 $10.80 $0.00 $42.41 7 60 $20.30 $13.00 $11.05 $0.00 $44.35 8 65 $22.00 $13.00 $11.30 $0.00 $46.30 9 70 $23.69 $13.00 $11.55 $0.00 $48.24 10 75 $25.38 $13.00 $11.80 $0.00 $50.18 - - - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to - - - - - - - - - - - - - Journeyworker Ratio:1: I - - - - - - - - - - TERRAZZO FINISHERS 02/01/2014 $47.00 $10.18 $18.15 $0.00 $75.33 BRICKLAYERS LOCAL 3 -MARBLE& TILE 08/01/2014 $47.90 $10.18 $18.22 $0.00 $76.30 02/01/2015 $48.46 $10.18 $18.22 $0.00 $76.86 08/01/2015 $49.36 $10.18 $18.29 $0.00 $77.83 02/01/2016 $49.93 $10.18 $18.29 $0.00 $78.40 08/01/2016 $50.83 sio.i8 $18-37 $0.00 $79.38 02/01/2017 $51.40 $10.18 $18.37 $0.00 $79.95 ------- ----- Issue Date: 03/31/2014 -- ---- --------------------------------------------- Wage Request Number: 20140331-064 ---------- --- ----------- Page 36 of 39 Classification EffectiveDate BaseWage Health Pension Supplemental Total Rate Unemplo.vment Apprentice- TERRAZZO FMISHER -Local 3 Marhle &Tile Effective Date - 02/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.50 $10.18 $18.15 $0.00 $51.83 2 60 $28.20 $10.18 $18.15 $0.00 $56.53 3 70 $32.90 $10.18 $18.15 $0.00 $61.23 4 80 $37.60 $10.18 $18.15 $0.00 $65.93 5 90 $42.30 $10.18 $18.15 $0.00 $70.63 Effective Date - 08/011/2014 - - -- -- - - - - - - - Supplemental - - - I Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.95 $10.18 $18.22 $0.00 $52.35 2 60 .$28.74 $10.18 $18.22 $0.00 $57.14 3 70 $33.53 $10.18 $18.22 $0.00 $61.93 4 80 $10.18 $18.22 $0.00 $66.72 5 90 .$43.11 $10.18 $18.22 $0.00 $71.51 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:3 - - -- -- - - - - - - - - - - - - - I TEST BORING DRILLER LABORERS - FOUNDATIONAND MARINE For apprentice rates see "Apprentice- LABORER" 12/01/2013 06/01/2014 12/01/2014 06/01/2015 12/01/2015 06/01/2016 12/01/2016 $34.70 $35.45 $36.20 $36.95 $37.70 $38.45 $39.45 $7.30 $7.30 $7.30 $7.30 $7.30 $730 $7.30 $12.90 $12.90 $12.90 $12.90 $12.90 $12.90 $12.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $54.90 $55.65 $56.40 $57.15 $57.90 $58.65 $59.65 TEST BORING DRILLER HELPER 12/01/2013 $33.42 $7.30 $12.90 $0.00 $53.62 LABORERS - FOUNDATIONAND kfARINE 06/01/2014 $34.17 $7.30 $12.90 $0.00 $54.37 12/01/2014 $34.92 $7.30 $12.90 $0.00 $55.12 06/01/2015 $35.67 $7.30 $12.90 $0.00 $55.87 12/01/2015 $36.42 $7.30 $12.90 $0.00 $56.62 06/01/2016 $37.17 $7.30 $12.90 $0.00 $57.37 12/01/2016 $38.17 $7.30 $12.90 $0.00 $58.37 For apprentice rates see "Apprentice- LABORER" TEST BORING LABORER 12/01/2013 $33.30 $7.30 $12.90 $0.00 $53.50 LABORERS- FOUNDATIONAND MARINE 06/01/2014 $34.05 $7.30 $12.9.0 $0.00 $54.25 12/01/2014 $34.80 $7.30 $12.90 $0.00 $55.00 06/01/2015 $35.55 $7.30 $12.90 $0.00 $55.75 12/01/2015 $36.30 $7.30 $12.90 $0.00 $56.50 06/01/2016 $37.05 $7.30 $12.90 $0.00 $57.25 12/01/2016 $38.05 $7.30 $12.90 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" -------------------------------------------------------------- Issue Date: 03/31/2014 ------ ----- ---- Wage Request Number: 20140331-064 ---------------- ----- --- ------------- ----------- Page 37 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TRACTORS/PORTABLE STEAM GENERATORS 12/01/2013 $40.11 $10.00 $14.18 $0.00 $64.29 OPFRA TING FNGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2013 $31.82 $9.41 $8.80 $0.00 $50.03 TEAMSTERS JOINT COUNCIL NO. 10 7ONE B TUNNEL WORK - COMPRESSED AIR LA BORP RS (COMPRE, SSE D All?) For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) LA BORERS (COMPRESSrD All?) For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - FREE AIR LABORERS (1,-]?IEAIR TUNNIH) For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - FREE AIR (HAZ. WASTE) LA BOI?F7?S (T RL r A 11? TUNNI, L) For apprentice rates see "Apprentice- LABORER" 06/01/2014 $32.17 $9.41 $8.80 $0.00 $50.38 08/01/2014 $32.17 $9.91 $8.80 $0.00 $50.88 12/01/2014 $32.17 $9.91 $9.33 $0.00 $51.41 06/01/2015 $32.52 $9.91 $9.33 $0.00 $51.76 08/01/2015 $32.52 $10.41 $9.33 $0.00 $52.26 12/01/2015 $32.52 $10.41 $10-08 $0.00 $53.01 06/01/2016 $33.02 $10.41 $10.08 $0.00 $53.51 08/01/2016 $33.02 $10.91 $10.08 $0.00 $54.01 12/01/2016 $33.02 sio.9i $10-89 $0.00 $54.82 12/01/2013 $45.58 $7.30 $13.30 $0.00 $66.18 06/01/2014 $46.33 $7.30 $13.30 $0.00 $66.93 12/01/2014 $47.08 $7.30 $13.30 $0.00 $67.68 06/01/2015 $47.83 $7.30 $13.30 $0.00 $68.43 12/01/2015 $48.58 $7.30 $13.30 $0.00 $69.18 06/01/2016 $49.33 $7.30 $13.30 $0.00 $69.93 12/01/2016 $50.33 $7.30 $13.30 $0.00 $70.93 12/01/2013 $47.58 $7.30 $13.30 $0.00 $68.18 06/01/2014 $48.33 $7.30 $13.30 $0.00 $68.93 12/01/2014 $49.08 $7.30 $13.30 $0.00 $69.68 06/01/2015 $49.83 $7.30 $13.30 $0.00 $70.43 12/01/2015 $50.58 $7.30 $13.30 $0.00 $71.18 06/01/2016 $51.33 $7.30 $13.30 $0.00 $71.93 12/01/2016 $52.33 $7.30 $13.30 $0.00 $72.93 12/01/2013 $37.65 $7.30 $13.30 $0.00 $58.25 06/01/2014 $38.40 $7.30 $13.30 $0.00 $59.00 12/01/2014 $39.15 $7.30 $13.30 $0.00 $59.75 06/01/2015 $39.90 $7.30 $13.30 $0.00 $60.50 12/01/2015 $40.65 $7.30 $13.30 $0.00 $61.25 06/01/2016 $41.40 $7.30 $13.30 $0.00 $62.00 12/01/2016 $42.40 $7.30 $13.30 $0.00 $63.00 12/01/2013 $39.65 $7.30 $13.30 $0.00 $60.25 06/01/2014 $40.40 $7.30 $13.30 $0.00 $61.00 12/01/2014 $41.15 $7.30 $13.30 $0.00 $61.75 06/01/2015 $41.90 $7.30 $13.30 $0.00 $62.50 12/01/2015 $42.65 $7.30 $13.30 $0.00 $63.25 06/01/2016 $43.40 $7.30 $13.30 $0.00 $64.00 12/01/2016 $44.40 $7.30 $13.30 $0.00 $65.00 ------------------------------------------------------------- ----- ------ -------------------------------------------------------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 38 of 39 Classification VAC -HAUL TEAMSTERS JOINT COUNCIL NO. 10 7ONE B WAGON DRILL OPERATOR LA BORERS - 7ONE2 For apprentice rates see "Apprentice- LABORER" EffectiveDate BaseWage Health 12/01/2013 $31.24 $9.41 06/01/2014 $31.59 $9.41 08/01/2014 $31.59 $9.91 12/01/2014 $31.59 $9.91 06/01/2015 $31.94 $9.91 08/01/2015 $31.94 $10.41 12/01/2015 $31.94 $10.41 06/01/2016 $32.44 $10.41 08/01/2016 $32.44 $10.91 12/01/2016 $32.44 $10.91 Pension Supplemental Unemployment Tota I Rate $8.80 $0.00 $49.45 $8.80 $0.00 $49.80 $8.80 $0.00 $50.30 $9.33 $0.00 $50.83 $9.33 $0.00 $51.18 $9.33 $0.00 $51.68 $10.08 $0.00 $52.43 $10.08 $0.00 $52.93 $10.08 $0.00 $53.43 $10.89 $0.00 $54.24 12/01/2013 $30.10 $7.30 $12.10 $0.00 $49.50 06/01/2014 $30.60 $7.30 $12.10 $0.00 $50.00 12/01/2014 $31.10 $7.30 $12.10 $0.00 $50.50 06/01/2015 $31.60 $7.30 $12.10 $0.00 $51.00 12/01/2015 $32.10 $7.30 $12.10 $0.00 $51.50 06/01/2016 $32.60 $7.30 $12.10 $0.00 $52.00 12/01/2016 $33.35 $7.30 $12.10 $0.00 $52.75 WASTE WATER PUMP OPERATOR 12/01/2013 $40.49 $10.00 $14.18 $0.00 $64.67 OPERA TING ENGINE"E'RS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" WATER METER INSTALLER 03/01/2014 $45.33 $9.82 $14.29 $0.00 $69.44 PLUMBERS & GASRTTERS LOCAL 12 (Local 138) 09/01/2014 $46.33 $9.82 $14.29 $0.00 $70.44 03/01/2015 $47.33 $9.82 $14.29 $0.00 $71.44 09/01/2015 $48.33 $9.82 $14.29 $0.00 $72.44 03/01/2016 $49.48 $9.82 $14.29 $0.00 $73.59 09/01/2016 $50.53 $9.82 $14.29 $0.00 $74.64 03/01/2017 $51.53 $9.82 $14.29 $0.00 $75.64 For apprentice rates see "Apprentice- PLUMBER/PIPEFITTER" or "PLUMBER/GASFITTER" Additional Apprentice Infonnation Minnnurn wage rates for apprentices employed on public works projects are listed above as a percentage ofthe pre-detennined hourly wage rate established bythe Commissioner under the provisions ofthe M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division ofApprenticeship Training pursuaruto M.G.L. c. 23, ss. I IE -1 IL. All apprentices must be registered with the Division ofApprenticeship Training in accordance with M.G.L. c. 23, ss. I IE -1 1L. All steps are six nionths (1000 hours) unless otherwise specified. Ratios are expressed in allowable number ofapprentices tojourneynnen or fraction thereof Multiple ratios are listed in the comment field. APP to JM; 1: 1, 2:2,23, 3:4,4:4,4:5,4:6, 5:7,6:7,6:8,6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. APP to JM; 1: 1, 1:2, 2:3, 2:4,3:5, 4:6,4:7, 5:8, 6:9,6:10, 7:11, 8:12, 8:13, 9:14,10:15, 10:16, etc. ---------------- -- -- ------------------------------- ---- --------------- .... ---- ----------------------------------- ------------- Issue Date: 03/31/2014 Wage Request Number: 20140331-064 Page 39 of 39 IF 0 ACCORV 11`.� CERTIFICATE OF LIABILITY INSURANCE DATE (MMIDDIYYYY 12/31/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Eastern Insurance Group LLC 77 Accord Park Drive Unit B1 Norwell MA 02061 N T� CT NCAO ME. Norwell Construct South 0782-0251 ____TFA WPHC�N E0, 1-80 ICX. _N Ext), A No); E-MAIL ADDRESS: IN URER(S) AFFORDING COVERAGE NAIC III INSURERA.Acadia Insurance Company 31325 INSURED SEALCOATING INC & B&R Partners, LLC 825 Granite Street Braintree MA 02184 8 -American Guarantee & Liabili!iy -INSURER INSURERC: INSURER D: INSURER E INSURER F COVERAGES CERTIFICATE NUMBER:2014 MASTER REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWTHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WTH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPEOFINSURANCE ADDL SUBR WVD POLICY NUMBER POLICY EFF (MM/DDIYYYY) POLICY EXP IMMIDDfYYYYI LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1000000 COM MERCIAL GENERAL LIABILITY DAMAGE TO RENTED PREMISES (Ea occurrence) $ 300000 A CLAIMS -MADE 5XI OCCUR CPA0170645 1/1/2014 1/1/2015 MED EXP (Any one person) $ 5000 PERSONAL& ADV INJURY $ 1000000 GENERAL AGGREGATE $ 2000000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMPIOP AGG $ 2000000 $ 7 POLICY [ 7X PRO- F-] LOD AFGT AUTOMOBILE LIABILITY COMBINED SINGLE LIL41T (Ea accident) $ 1,000,000 BODILY INJURY (Per person) $ A ANY AUTO' BODILY INJURY (Per accident) $ ALL OWNED SCHEDULED �M&0170646 1/1/2014 /1/2015 AUTOS AUTOS NON -OWNED PROPERTY DAMAGE (per acci ant HIRED AUTOS AUTOS $ UMBRELLA LIAB [X! EOCCLR EACH OCCURRENCE $ 10,000,000 AGGREGATE $ 10,000,000 B EXCESS LIAB CLAIN CLAIMS -MADE DED I x I RE TENTION$ C Products/Comp Ops Aggregate $ 10,000,000 NUC581965300 1/1/2014 1/1/2015 A WORKERS COMPENSATION YSrATUS I - 7 JOTH X I TWOCR LIM ER AND EMPLOYERS'LIABILITY YIN ANY PROPRIETOR/PARTNER/EXECUTIVE . E.L. EACH ACCIDENT $ 1,000,000 OFFICERIMEMBER EXCLUDED? Ifl (Mandatory In NH) N /A 1/1/2014 /1/2015 E.L. DISEASE - EA EMPLOYEE $ 1,000,000 If yes, describe under DESCRIPTION OF OPERATIONS below pAO170647 A0280505 (RI ONLY) 1/1/2014 /1/2015 E.L. DISEASE - POLICY LIMIT $ 1,000,000 A Leased/Rented Equipment ED 1/1/2014 /1/2015 $500,00011$1.000 DED A Phys Dam Hired Auto KAA 01 0646 1/1/2014 /1/2015 $100,000/$500 DED DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, If more space Is required) RE: Random Crack Sealing//If required by written contract Town of North Andover is named Additional Insured for General Liability, Automobile Liability, and Umbrella Liability as respects to the referenced project. CERTIFICATE HOLDER CANCELLATION ACORD 25 (2010/05) INS025 oninnn) ni @ 1988-2010 ACORD CORPORATION. All rights reserved. Tha Ar.r)pn nnnna.%nfil Incon ara ranictarari mnrkc nf Arr)pn SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Town of North Andover 120 Main Street AUTHORIZED REPRESENTATIVE North Andover, MA 01845 Ronald Cleaves/CD1 ACORD 25 (2010/05) INS025 oninnn) ni @ 1988-2010 ACORD CORPORATION. All rights reserved. Tha Ar.r)pn nnnna.%nfil Incon ara ranictarari mnrkc nf Arr)pn TOWN OF NORTH ANDOVER CONTRACT CONTRACT # DATE: This Contract is entered into on, or as of, this date by and between the Town of North Andover (the "Town"), and Contractor: Sealcoating, Inc Address: 825 Granite Street Braintree, MA 02184 Telephone Number: 781-428-3400 Fax Number: 781-428-3430 I . This is a Contract for the procurement of the following: Random crack sealing (Process A) for the period of July 1, 2013 through June 30, 2014 in accordance with the Invitation for Bids issued by the City of Haverhill on behalf of the member communities of the Merrimack Valley Planning Commission 2. The Contract price to be paid to the Contractor by the Town of North Andover is: $ 0.28 per linear foot or $5,199 for day rate 3. Payment will be made as follows: Upon completion/acceptance of work and receipt of invoice, net 30 4. Definitions: 4.1 Acceptance: All Contracts require proper acceptance of the described goods or services by the Town of North Andover. Proper acceptance shall be understood to include inspection of goods and certification of acceptable performance for services by authorized representatives of the Town to insure that the goods or services are complete and are as specified in the Contract. (Rev 5-2007) Contract by and between Town of North Andover and Scalcoating, Inc Page I le 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both. 5. Term of Contract and Time for Performance: This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before June 30, 2014, unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation: Notwithstanding anything in the Contract documents to the contrary, any and all payments which the Town is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be immediately terminated without liability for damages, penalties or other charges. 7. Permits and Approvals: Permits, Licenses, Approvals and all other legal or administrative prerequisites to its perforinance of the Contract shall be secured and paid for by the Contractor. (Rev 5-2007) Contract by and between Town of North Andover and Sealcoating, Inc Page 2 % 0i 8. Termination and Default: 8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days notice when in the best interests of the Town by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. Upon termination without cause, Contractor will be paid for services rendered to the date of termination. 8.2 For Cause. If the Contractor is determined by the Town to be in default of any term or condition of this Contract, the Town may terminate this Contract on seven (7) days notice by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. 8.3 Default. The following shall constitute events of a default under the Contract: 1) any material misrepresentation made by the Contractor to the Town; 2) any failure to perform any of its obligations under this Contract including, but not limited to the following: (i) failure to commence performance of this Contract at the time specified in this Contract due to a reason or circumstance within the Contractor's reasonable control, (ii) failure to perform this Contract with sufficient personnel and equipment or with sufficient material to ensure the completion of this Contract within the specified time due to a reason or circumstance within the Contractor's reasonable control, (iii) failure to perform this Contract in a manner reasonably satisfactory to the Town, (iv) failure to promptly re -perform within a reasonable time the services that were rejected by the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a material term of this Contract, including, but not limited to, the provision of insurance and non-discrimination, (vii) any other acts specifically and expressly stated in this Contract as constituting a basis for termination of this Contact, and (viii) failure to comply with any and all requirements of state law and/or regulations, and Town bylaw and/or regulations. 9. The Contractor's Breach and the Town's Remedies: Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be deemed a material breach of this Contract, and the Town of North Andover shall have all the rights and remedies provided in the Contract documents, the right to cancel, terminate, or suspend the Contract in whole or in part, the right to maintain any and all actions at law or in equity or other proceedings with respect to a breach of this Contract, including damages and specific performance, and the right to select among the remedies available to it by all of the above. (Rev 5-2007) Contract by and between Town of North Andover and Sealcoating, Inc Page 3 IVA From any sums due to the Contractor for services, the Town may keep the whole or any part of the amount for expenses, losses and damages incurred by the Town as a consequence of procuring services as a result of any failure, omission or mistake of the Contractor in providing services as provided in this Contract. 10. Statutory Compliance: 10.1 This Contract will be construed and governed by the provisions of applicable federal, state and local laws and regulations; and wherever any provision of the Contract or Contract documents shall conflict with any provision or requirement of federal, state or local law or regulation, then the provisions of law and regulation shall control. Where applicable to the Contract, the provisions of the General Laws are incorporated by reference into this Contract, including, but not limited to, the following: General Laws Chapter 30B — Procurement of Goods and Services. General Laws Chapter 3 0, Sec. 3 9, et seq: - Public Works Contracts. General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts. 10.2 Wherever applicable law mandates the inclusion of any term and provision into a municipal contract, this Section shall be understood to import such term or provision into this Contract. To whatever extent any provision of this Contract shall be inconsistent with any law or regulation limiting the power or liability of cities and towns, such law or regulation shall control. 10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on the performance of the Contract. If the Contractor performs the Contract in violation of any applicable law or regulation, the Contractor shall bear all costs arising therefrom. 10.4 The Contractor shall keep itself fully informed of all existing and future State and National Laws and Municipal By-laws and Regulations and of all orders and decrees of any bodies or tribunals having jurisdiction in any manner affecting those engaged or employed in the work, of the materials used in the work or in any way affecting the conduct of the work. If any discrepancy or inconsistency is discovered in the Drawings, Specifications or Contract for this work in violation of any such law, by-law, regulation, order or decree, it shall forthwith report the same in writing to the Town. It shall, at all times, itself observe and comply with all such existing and future laws, by-laws, regulations, orders and decrees; and shall protect and indemnify the Town of North Andover, and its duly appointed agents against any claim or liability arising from or based on any violation whether by him or its agents, employees or subcontractors of any such law, by-law, regulation or decree. 11. Conflict of Interest: Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which shall constitute a violation of that law. The Contractor shall be deemed to have investigated the application of M.G.L. c. 268A to the performance of this Contract; and by executing the (Rev 5-2007) Contract by and between Town of North Andover and Sealcoating, Inc Page 4 i Contract documents the Contractor certifies to the Town that neither it nor its agents, employees, or subcontractors are thereby in violation of General Laws Chapter 268A. 12. Certification of Tax Compliance This Contract must include a certification of tax compliance by the Contractor, as required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors Providing Goods, Services, or Real Estate Space to the Commonwealth or Subdivision). 13. Discrimination The Contractor will carry out the obligations of this Contract in full compliance with all of the requirements imposed by or. pursuant to General Laws Chapter 151B (Law Against Discrimination) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. 14. Assignment: Assignment of this Contract is prohibited, unless and only to the extent that assignment is provided for expressly in the Contract documents. 15. Condition of Enforceabilfty Against the Town: This Contract is only binding upon, and enforceable against, the Town if. (1) the Contract is signed by the Town Manager or its designee; and (2) endorsed with approval by the Town Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the Town Counsel as to form. 16. Corporate Contractor: If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's Certificate certifying the corporate capacity and authority of the party signing this Contract for the corporation. Such certificate shall be accompanied by a letter or other instrument stating that such authority continues in full force and effect as of the date the Contract is executed by the Contractor. This Contract shall not be enforceable against the Town of North Andover unless and until the Contractor complies with this section. The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws, Chapter 18 1, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto, relating to the appointment of the Commissioner of Corporations as its attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the Commonwealth. (Rev 5-2007) Contract by and between Town of North Andover and Sealcoating, Inc Page 5 i 17. Liability of Public Officials: To the full extent permitted by law, no official, employee, agent or representative of the Town of North Andover shall be individually or personally liable on any obligation of the Town under this Contract. 18. Indemnification: The Contractor shall indemnify, defend and save harmless the Town, the Town's officers, agents and employees, from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by the Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective, or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this contract. 19. Workers Compensation Insurance: The Contractor shall provide by insurance for the payment of compensation and the furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's Compensation Act) to all employees of the Contractor who are subject to the provisions of Chapter 152 of the General Laws of Massachusetts. Failure to provide and continue in force such insurance during the period of this Contract shall be deemed a material breach of this Contract, shall operate as an immediate termination thereof, and Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article. The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this Contract before the same shall be binding on the parties thereto, except if specifically waived by the Town. 20. Documents, Materials, Etc. Any materials, reports, information, data, etc. given to or prepared or assembled by the Contractor -under this Contract are to be kept confidential and shall not be made available to any individual or organization by the Contractor (except agents, servants, or employees of the Contractor) without the prior written approval of the Town, except as otherwise required by law. The Contractor shall comply with the provisions Chapter 66A of the General Laws of (Rev 5-2007) Contract by and between Town of North Andover and Sealcoating, Inc Page 6 Massachusetts as it relates to public documents, and all other state and federal laws and regulations relating to confidentiality, security, privacy and use of confidential data. Any materials produced in whole or in part under this Contract shall not be subject to copyright, except by the Town, in the United States or any other country. The Town shall have unrestricted authority to, without payment of any royalty, commission, or additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole or in part, any reports, data or other materials prepared under this Contract. All data, reports, programs, software, equipment, furnishings, and any other documentation or product paid for by the Town shall vest in the Town at the termination of this Contract. The Contractor shall at all times, during or after termination of this Contract, obtain the prior written approval of the Town before making any statement bearing on the work performed or data collected under this Contract to the press or issues any material for publication through any medium. 21. Audit, Inspection and Recordkeeping At any time during normal business hours, and as often as the Town may deem it reasonably necessary, there shall be available in the office of the Contractor for the purpose of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. 22. Pqyment The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work completed and acceptance from the Town of the work completed. 23. Waiver and Amendment Amendments, or waivers of any additional term, condition, covenant, duty or obligation contained in this Contract may be made only by written amendment executed by all signatories to the original Agreement, prior to the effective date of the amendment. To the extent allowed by law, any conditions, duties, and obligations contained in this Contract may be waived only by written Agreement by both parties. Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver, nor in any manner limit the legal or equitable remedies available to that party. No waiver by either party of any default or breach shall constitute a waiver of any subsequent default or breach of a similar or different matter. 24. Forum and Choice of Law This Contract and any perfon-nance herein shall be governed by and be construed in accordance with the laws of the Commonwealth. Any and all proceedings or actions relating to subject (Rev 5-2007) Contract by and between Town of North Andover and Sealcoating, Inc Page 7 matter herein shall be brought and maintained in the courts of the Commonwealth or the federal district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any other legal rights of the parties. 25. Notices Any notice permitted or required under the provisions of this Contract to be given or served by either of the parties hereto upon the other party hereto shall be in writing and signed in the name or on the behalf of the party giving or serving the same. Notice shall be deemed to have been received at the time of actual service or three (3) business days after the date of a certified or registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to the Town of North Andover by being sent to the Town Manager, Town Hall, 120 Main Street, North Andover, Massachusetts 0 1845. 26. Binding on Successors: This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in interest (and where not corporate, the heirs and estate of the Contractor). 27. Complete Contract: This instrument, together with its endorsed supplements, and the other components of the contract documents, constitutes the entire contract between the parties, with no agreements other than those incorporated herein. 28. SLipplemental Conditions: The foregoing provisions apply to all contracts to which the Town of North Andover shall be a party. One of the following "SLipplements" must be "checked" as applicable to this Contract, shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The Supplement contains additional terms governing the Contract: [ ] GOODS SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods (governed by the provisions of General Laws Chapter 3013) [ I SERVICES SUPPLEMENT "S" - Applicable to Contracts for the procurement of Services (governed by the provisions of General Laws Chapter 30B) [ X ] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for Construction (Rev 5-2007) Contract by and between Town of Nor-th Andover and Sealcoating, Inc Page 8 IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set forth their hands the day and year first above written. THE TOWN Di n/ epartment Head Contract Manager T6" Manager bate APPROVED AS TO FORM: 7,L, 0 - I,"- C;Z;,— -//, /, 3 Town CounselY datL THE CONTRACTOR SEALCOATING, INC. Company Name A"��4k J�C� 4( It's IX3 SigV, ure Date -41-litlooiYA 'k," Print Name & Title ELIZABETH WUORI, PRESIDENT CERTIFICATION AS TO AVAILABILITY OF FUNDS: L W Ah 0 jzfrf(!, fo-6— wn tccountant ate (Rev 5-2007) Contract by and between Town of North Andover and Sealcoating, Inc Page 9 SUPPLEMENT "C" CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for the construction of - (1) Public BuildiVs and Public Works (governed by the provisions of General Laws Chapter 30B); (2) Public BuildiUs (governed by the provisions of General Laws Chapter 149,§ 44A, et seq.); and (3) Public Works (governed by the provisions of General Laws Chapter 30, §39M, et seq) This form supplements the Town of North Andover "Contract and General Conditions" and applies only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works or public buildings. 2. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be understood to be a term and condition of this Contract. The Contractor agrees to secure such bond (where required) in the form required by the Town and provide an original thereof to the Town prior to the commencement of performance. Equal : 3.1. In the case of a closed Specification written for a specific item or items to be furnished under the Base Bid, such specifications shall, as applicable, be in compliance with the Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq. 3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or on the Drawings, except as above noted, the intent is to establish a standard and in no way should be construed to exclude any item or manufacturer not mentioned by name, but whose product meets the Specifications as to design, utility and quality. Final decision shall rest with the Project Representative as to its acceptability. 4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of goods or services provided by more than twenty-five (25%) per cent, in compliance with See. 13 of Chapter 30B. The Contractor will carry out the obligations of this contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 15 1, Sec. 1, et seq. (Minimum Wage Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. The Contractor will at all times comply with the wage rates as determined by the Commissioner of the Department of Labor and Industries, under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall be in force and as amended. The Contractor shall continuously maintain adequate protection of all work from damage and shall protect the property of the Town and others, including adjacent property, from injury or loss arising (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page I and Sealcoating, Inc in connection with the Contract. The Contractor shall make good any such damage, injury or loss, except as may be directly due to errors in the Contract Documents or caused by agents or employees of the Town, or due to causes beyond the Contractor's control and not the Contractor's fault or negligence. 7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents or injury to persons on, about or adjacent to the premises where the work is being performed. The Contractor will erect and properly maintain at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and the public, shall post danger signs warning against the hazards created by such features of construction such as pits, protruding nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling materials; and shall designate a responsible member of its organization on the work, whose duty shall be the prevention of accidents. 8. The Town shall at all times have access to the work wherever it is in preparation or progress and the Contractor shall provide suitable accommodations for such access. 9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants, all of whom shall be satisfactory to the Town. If the Town in its sole discretion detennines that the construction superintendent, foreman, or assistants are unacceptable to the Town, then upon seven days notice from the Town, the Contractor shall replace such person or persons with people acceptable to the Town. 10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The Contractor shall carefully study and compare the drawings, specifications and other instructions and shall at once report to the Town any error, inconsistency or omission which shall be discovered. Included in this responsibility shall be supervision of all work performed by subcontractors on the work. 11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any of its provisions, the Town, upon three days written notice, may, without prejudice to any other remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor. 12. Inspection by the Town's Project Representative 12.1. The Town shall have the right to designate a Project Representative who may make periodic visits to the site to familiarize the Town generally with the progress and quality of the work, and to determine in general if the work is proceeding in accordance with the Contract Documents. The Project Representative will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the work, and will not be responsible for the Contractor's failure to carry out the construction work in accordance with the Contract Documents. During such visits and on the basis of these observations while at the site, the Project Representative will keep the Town inforined on the progress of the work, will endeavor to guard the Town against defects and deficiencies in the work of contractors, and may condemn structural work as failing to conforin to the Contract Documents. The Project Representative shall have authority to act on behalf of the Town only to the extent expressly delegated by the Town, which shall be shown to the Contractor, and shall have authority to stop the work whenever such stoppage may reasonably be necessary to insure the proper execution of the Contract. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 2 and Sealcoating, Inc 12.2. In connection with the work, the Project Representative shall not be responsible for construction methods, means, techniques, sequences or procedures employed by the Contractor or the Contractor's safety programs, requirements, regulations, or precautions. 13. Decisions of the Project Representative 13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of the Town or the Contractor and on all other matters relating to the execution and progress of the structural work or the interpretation of the Contract Documents. 13.2. The Project Representative's decision, in matters relating to the project, shall be final, if within the terrns of the Contract Documents. 13.3. If, however, the Project Representative fails to render a decision within ten days after the parties have presented their evidence, either party may then avail itself of the remedies provided in this contract or available to it by law. If the Project Representative renders a decision after such remedies have commenced, such decision may be entered as evidence but shall not disturb or interrupt such proceedings except where such decision is acceptable to the parties concerned. 14.1 Use of Premises by the Contractor: 14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of its workmen to limits indicated by law, by-laws, permits or directions of the Town and shall not unreasonably encumber the premises with its materials. 14.2. The Contractor shall not load or permit any part of the structure to be loaded with a weight that will endanger its safety. 15. Maintenance of Premises: The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its employees or work, and at the completion of the work it shall remove all its rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute, the Town may remove the rubbish and charge the cost to the several contractors, as the Town shall determine to be just. 16. Right to Terminate If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently disregard laws and regulations or lawful directives of the Town, or (7) be guilty of a substantial violation of any provision of the Contract, then the Town may, without prejudice to any other right or remedy and after giving the Contractor (or any surety) seven days written notice, terminate the contract and the employment of the Contractor and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method it deems appropriate. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 3 and Sealcoating, Inc In such cases, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid amount owed to the Contractor for work already completed shall exceed the expense of finishing the work, including compensation for additional architectural, managerial, legal and administrative services, such excess shall be paid to the Contractor. If such expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the Town. The Contractor shall not be relieved of liability to the Town by virtue of any termination of this contract, and any claim for damages against the Contractor relating to the Contractor's performance under this contract shall survive any ten-nination hereunder. Notwithstanding any other provision of this Agreement, the Town reserves the right at any time in its absolute discretion to suspend or terminate this Agreement in whole or in part for its convenience upon seven days written notice to the Contractor. The Town shall incur no liability by reason of such ten-nination except for the obligation to pay compensation for all work perforined by the Contractor and accepted by the Town to the termination date. 17. Progress Pgyments: 17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported to the extent required by the Town by invoices or other vouchers, showing payments for materials and labor, payments to Subcontractors and such other evidence of the Contractor's right to payment. 17.2. The Contractor shall, before the first application, submit to the Town a schedule of values of the various parts of the work, including quantities aggregating the total sum of the Contract, divided so as to facilitate payments to Subcontractors, made out in such form as the Town and the Contractor may agree upon, and, if required, supported by such evidence as to its correctness. This schedule, when approved by the Town, shall be used as a basis for payment, unless it is found to be in error. If applying for payments, the Contractor shall submit a statement based upon this schedule. 18. Withholding of PqMents 18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the whole or part of any payment to such extent as may be necessary in its reasonable opinion to protect the Town of North Andover from loss on account of - 18. 1. 1. Defective work not remedied. 18.1.2. Claims filed or reasonable evidence indicating probable filing of claims. 18.1.3. Failure of the Contractor to make payments properly to Subcontractors or for material or labor. 18.1.4. A reasonable doubt that the Contract can be completed for the balance then unpaid. 18.1.5. Damage to another contractor. 18.1.6. Delays resulting in liquidated damages. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 4 and Sealcoating, Inc 18.2. Withholding of payments shall be in strict compliance with statutory requirements. 19. Claims by Contractor and Liabilij)� of Town All claims by the Contractor against the Town shall, unless otherwise provided by law, be initiated by a written claim submitted to the Town no later than seven (7) calendar days after the event or the first appearance of the circumstances causing the claim. The claim shall set forth in detail all known facts and circumstances supporting the claim. The Contractor shall continue its perfon-nance under this contract regardless of the submission or existence of any claims. The limit of liability of the Town under this Agreement is limited to the compensation provided herein for work actually performed, and shall in no event include liability for delays or for incidental, special or consequential damages or lost profits or for damages or loss from causes beyond the Town's reasonable control. 20. Liquidated Damages: Because both parties recognize (1) that the time for completion of this Contract is of the essence, (2) that the Town will suffer loss if the work is not completed within the contract time specified, plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the delays, expense and difficulties involved in a legal proceeding to determine the actual loss suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay the Town as liquidated damages representing an estimate of delay damages, not as a penalty, the sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is completed, whether the work is completed by the Contractor or some other person. The Town's right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a legal action for damages in lieu of or in addition to its option to impose liquidated damages. The Town may deduct any liquidated damages from money due the Contractor, and if such payment is insufficient to cover the liquidated damages, then the Contractor shall pay the amount due. 21. The Contractors' Mutual Responsibili : Should the Contractor cause damage to any separate subcontractor on the work, the Contractor agrees, upon, due notice, to settle with such contractor by agreement, or by recourse to remedies provided by law or by the provisions of the contract. If such separate contractor sues the Town on account of any damage alleged to have been sustained, the Town shall notify the Contractor, who shall defend such proceedings at the Town's expense and, if any judgment against the Town arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Town. 22. Separate Contracts: 22.1. The Town reserves the right to let other Contracts in connection with this work under similar General Conditions. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate its work with theirs. 22.2. If any part of the Contractor's work depends, for proper execution or results, upon the work of any other contractor, the Contractor shall inspect and promptly report to the Town any defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 5 and Sealcoating, Inc of the other contractor's work as fit and proper for the reception of its work except as to defects which may develop in the other contractor's work after the execution of its work. 22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work already in place and shall at once report to the Town any discrepancy between the executed work and the Drawings. 23. Subcontracts: 23.1. All Subcontracts shall be awarded in conformity with the requirements of the General Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive. 23.2. The &ntractor agrees that it is as fully responsible to the Town for the acts and omissions of its Subcontractors and of persons either directly or indirectly employed by them, as it is for the acts and omissions of persons directly employed by it. 23.3. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the Town. 24. Contractor -Subcontractor Relations: The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound by the terms of the Agreement, the General Conditions of the Contract, the Supplementary General Conditions, the Drawings and Specifications, as far as applicable to its work, including the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A, et seq. 25. Indemnification: 25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents and employees from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) brought or recovered against them that may arise in whole or in part out of or in connection with the work being perfon-ned or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this Contract. 25.2. In any and all claims against the Town or any of their agents or employees by any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under this paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 6 and Sealcoating, Inc any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other employee benefit acts. 25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and minimum limits of liability acceptable under the Contract. However, it shall be the Contractor's responsibility to purchase and maintain insurance of such character and in such amounts as will adequately protect it and the Town from and against all claims, damages, losses and expenses resulting from exposure to any casualty liability in the performance of the Work. 26. The Contractor's Insurance: 26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable. 26. 1. 1. Claims under Worker's Compensation, disability benefit and other similar employee benefit acts; 26.1.2. Claims for damages because of bodily injury, occupational sickness or disease, or death of its employees, and claims insured by usual personal injury liability coverage; 26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of any person other than its employees, and claims insured by usual personal liability coverage; 26.1.4. Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 26.2. The insurance required by the above shall be written for not less than the following minimum limits of liability: 26.2. 1. Worker's Compensation Insurance Requirements Workers' Compensation coverage as required by the laws of the Commonwealth of Massachusetts. 26.2.2. Liabili1y Insurance Requirements Liability insurance shall include all major divisions and shall be on a comprehensive general basis including Premises and Operations, Owners and Contractor's Protective, Products and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles. All such insurance shall be written for not less than any limits of liability required by law, unless otherwise provided in the contract documents, or the following limits, whichever are greater: (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 7 and Sealcoating, Inc 27 Comprehensive General Liability Insurance (Broad Form) Bodily Injury $1,000,000 per person $3,000,000 per occurrence Property Damage $1,000,000 per occurrence $3,000,000 annual aggregate Automobile Liability Insurance $500,000 per person $1,000,000 per occurrence 26.3. The above insurance policies shall also be subject to the following requirements: 26.3. 1. Insurance coverage for the Contractor's Comprehensive General Liability, as hereinafter specified under Paragraph entitled "Protective Liability Insurance" shall be written by one and the same insurance company to avoid the expense of duplicate and/or overlapping coverage and to facilitate and expedite the settlement of claims. 26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed with the Town prior to commencement of the work. Renewal certificates shall be addressed to and filed with the Town at least ten (10) days prior to the expiration date of required policies. 26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30) days prior written notice forwarded by registered or certified mail to the Town. The Town shall also be notified of the attachment of any restrictive amendments to the policies. 26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of Insurance forin, shall contain true transcripts from the policies, authenticated by the proper officer of the Insurer, evidencing in particular those insured, the extent of coverage, the location and operations to which the insurance applies, the expiration date and the above-mentioned notice clauses. 26.3.5. All premium costs shall be included in the Contractor's bid. 26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be maintained without interruption from date of the Contract until date of final payment and termination of any coverage required to be maintained after payment. Protective Liability Insurance: 27.1. The Contractor shall purchase and maintain such insurance as described in the preceding paragraph as will protect the Town from claims which may arise from operations under the Contract, including operations performed for the named insureds by independent contractors and general inspection thereof by the named insureds. 27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town against Automobile Non -Ownership Liability in connection with the Contractor's (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 8 and Sealcoating, Inc operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. 27.3. The limits of liability for coverage required under the preceding paragraphs shall be as specified under the provisions hereof governing the Contractor's General Liability Policy. 27.4. The Town shall be named as an additional insured on the above referenced liability Policies, and the Contractor's insurance shall be the primary coverage. The cost of such insurance, including required endorsements and amendments, shall be the sole responsibility of the Contractor. 28. Liens: Neither the Final Payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as it has knowledge or information, the releases and receipts include all the labor and material for which a lien could be filed. The Contractor shall comply with all statutory provisions of the General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149 as amended (as a minimum requirement). 29. Guarantees: 29.1 The Contractor guarantees and warrants to the Town that all labor furnished under this Contract will be competent to perform the tasks undertaken, that the product of such labor will yield only first-class results, that materials and equipment furnished will be of good quality and new unless otherwise permitted by this Contract, and that the Work will be of good quality, free from faults and defects and in strict conformance with this Contract. All Work not conforming to these requirements may be considered defective. 29.2. If at any time any part of the work constructed under the terms of this contract shall in the opinion of the Town Manager require repairing due to defective work or materials furnished by the Contractor, be may notify the Contractor in writing to make the required repairs. If the Contractor shall neglect to start such repairs within ten days of the date of giving it notice thereof and to complete the same to the satisfaction of the Town Manager with reasonable dispatch, then the latter may employ other persons to make such repairs. The Town shall charge the expense thereof to the Contractor and may use any moneys still retained to pay for the same, and if such sum is insufficient, the Contractor shall be obligated to pay the balance thereof. 29.3. All guarantees and warranties required in the various Sections of the Specifications which originate with a Subcontractor or Manufacturer must be delivered to the Town before final payment to the Contractor may be made for the amount of that subtrade or for the phase of work to which the guarantee or warranty relates. The failure to deliver a required guarantee or warranty shall be held to constitute a failure of the Subcontractor to fully complete his work in accordance with the Contract Documents. The Contractor's obligation to correct work is in addition to, and not in substitution of, such guarantees or warranties as may be required in the various Sections of the Specifications. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 9 and Sealcoating, Inc This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals hereto: Dated: 6W The Town of North Andover by d, / A-� T6,Wn Manager Dep, nt7D-ivision Head L,V, � (�), JMWV�Accountant Certif&d as to Appropriaten town Counskl- Approved as to Form - 1 11 The Contractor by: dqolk— 11041� Auth d zed Signature (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover and Sealcoating, Inc Page 10 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. ]PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor Massachusetts General Laws, Chapter 149, Sections 26 to 27H Secretaty TIMOTHY P. MURRAY HEATHER E. ROWE Lt. G-amoi Di—l.. Awarding Authority: City of Haverhill Contract Number: MVPC001.13 City/Town: NORTH ANDOVER Description of Work: The Merrimack Valley Planning Commission is seeking bids for Highway Service Works to include Catch Basin Cleaning, Random Crack Sealing and Pavement Markings Job Location: Various Locations Information about Prevailing Wage Schedules for Awarding Authorities and Contractors This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage Request Number" on all pages of this schedule. . Awarding authorities must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. * The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. Once a contractor has been selected by the awarding authority, the wage schedule shall be made a part of the contract for that project. The wage schedule must be posted in a conspicuous place at the work site during the life of the project in accordance with M.G.L. c. 149, § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project regardless of whether they are employed by the prime contractor, a filed sub -bidder, or any sub -contractor. . All apprentices must be registered with the Massachusetts Division of Apprenticeship Training (DAT) in order to be paid at the lower apprentice rates. All apprentices must keep his/her apprentice identification card on his/her person during all work hours. If a worker is not registered with DAT, he/she must be paid the "total rate" listed on the wage schedule regardless of experience or skills. . The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F "rental of equipment" contracts. . Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports directly to the awarding authority and keep them on file for three years. Each weekly payroll report must contain: the employee's name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at http://WNVW.mass.gov/dols/Pw. . Conti -actors with questions about the wage rates or cl assi.fi cations included on the wage schedule have an affirmative obligation to inquire with DLS at (617) 626-6953. . Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor Division of the office of the Attorney General at (617) 727-3465. . Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties. Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Construction (2 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.45 $8.91 $8.00 $0.00 $47.36 TEAMSTERSJOINT COUNCIL NO. IOZONEB (3 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.52 $8.91 $8.00 $0.00 $47.43 TEAMSTERSJOINTCOUNCILM0. IOZONEB (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.64 $9.07 $8.00 $0.00 $47.71 TEAMSTERS JOINT COUNCIL NO. 10ZONEB ADS/SUBMERSIBLE PILOT 08/01/2012 $82.32 $9.80 $17.67 $0.00 $109.79 PILI, DRIVER LOCAL 56 (ZONE 1) 08/01/2013 $85.47 $9.80 $17.67 $0.00 $112.94 08/01/2014 $88.62 $9.80 $17.67 $0.00 $116.09 08/01/2015 $91.77 $9.80 $17.67 $0.00 $119.24 AIR TRACK OPERATOR 12/01/2012 $30.35 $7.10 $11.55 $0.00 $49.00 LABORERS - 7ONE 2 06/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 12/01/2013 $31.35 $7.10 $11.55 $0.00 $50.00 06/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 12/01/2014 $32.35 $7.10 $11.55 $0.00 $51.00 06/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 12/01/2015 $33.35 $7.10 $11.55 $0.00 $52.00 06/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 12/01/2016 $34.60 $7.10 $11.55 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 12/01/2012 $29.08 $10.40 $5.95 $0.00 $45.43 ASBESTOS WORKE, RS LOCAL 6 (BOSTON) 06/01/2013 $29.88 $10.40 $5.95 $0.00 $46.23 12/01/2013 $30.68 $10.40 $5.95 $0.00 $47.03 06/01/2014 $31.58 $10.40 $5.95 $0.00 $47.93 12/01/2014 $32.48 $10.40 $5.95 $0.00 $48.83 06/01/2015 $33.43 $10.40 $5.95 $0.00 $49.78 12/01/2015 $34.38 $10.40 $5.95 $0.00 $50.73 ASPHALT RAKER 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS - 7ONE2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 Foi apprentice rates see "Apprentice- LABORER" ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $13.02 $0.00 $6189 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ------------------------------------- - ­ -- ------- ---------- ------------------------- ---- ------- --------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 2 of 41 Classification BACKHOE/FRONT-END LOADER OPERA TING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERAflNG ENGINEERS" Effective Date Base Wage Health Pension Supplemental Total Rate 2 65 $0.00 $6.97 $48.50 Unemployment LABORERS - ZONE 2 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 12/01/2013 $41.65 $10.00 $ D 3. 0 2 $0.00 $64.67 BARCO-TYPE JUMPING TAMPER 12/01/2012 $29.85 $11.18 $7.10 $11.55 2 65 $0.00 $6.97 $48.50 $0.00 LABORERS - ZONE 2 3 70 $26.39 $6.97 $11.18 $0.00 $44.54 4 75 $28.28 $6.97 $11.18 $0.00 06/01/2013 $30.35 $30.16 $7.10 $11.55 $0.00 $0.00 6 85 $49.00 $6.97 $11.18 12/01/2013 $30.85 7 90 $7.10 $11.55 $11.18 $0.00 $52.09 $49.50 $35.82 $6.97 06/01/2014 $31.35 $53.97 $7.10 $11.55 - - - $0.00 - - - $50.00 TPprenticc to Journeyworker Ratio:1:5 - - - - - - 12/01/2014 $31.85 - - $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" BLOCK PAVER, RAMMER / CURB SETTER 12/01/2012 $30.35 $7.10 $11.55 $0.00 $49.00 LABORERS - ZONE2 06/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 12/01/2013 $31.35 $7.10 $11.55 $0.00 $50.00 06/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 12/01/2014 $32.35 $7.10 $11.55 $0.00 $51.00 06/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 12/01/2015 $33.35 $7.10 $11.55 $0.00 $52.00 06/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 12/01/2016 $34.60 $7.10 $11.55 $0.00 $53.25 For apprentice rates see " Apprentice- LABORER" BOILER MAKER 01/01/2010 $37.70 $6.97 $11.18 $0.00 $55.85 BOILERMAKERS LOCAL 29 Apprentice - BOILERA14KER - Local 29 Effective Date - 01/01/2010 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $24.51 $6.97 $11.18 $0.00 $42.66 2 65 $24.51 $6.97 $11.18 $0.00 $42.66 3 70 $26.39 $6.97 $11.18 $0.00 $44.54 4 75 $28.28 $6.97 $11.18 $0.00 $46.43 5 80 $30.16 $6.97 $11.18 $0.00 $48.31 6 85 $32.05 $6.97 $11.18 $0.00 $50.20 7 90 $33.93 $6.97 $11.18 $0.00 $52.09 8 95 $35.82 $6.97 $11.18 $0.00 $53.97 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - TPprenticc to Journeyworker Ratio:1:5 - - - - - - - - --- - - - - - ... ... - ----------------------- - -------------------------- - - -- --------------- ----------------------------- - ------------------ Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 3 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $28.45 $10.18 $17.83 $0.00 $56.46 Unemployment $33.19 BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 02/01/2013 $47.41 $10.18 $17.83 $0.00 $75.42 WATERPROOFING) $0.00 $65.94 5 90 $42.67 $10.18 $17.83 BRICKLAYERS LOCAL 3 (LYNN) 08/01/2013 $48.31 $10.18 $17.90 $0.00 $76.39 90 02/01/2014 $48.87 $10.18 $17.90 $0.00 $76.95 06/01/2016 08/01/2014 $49.77 $10.18 $17.97 $0.00 $77.92 $39.70 02/01/2015 $50.33 $10.18 $17.97 $0.00 $78.48 08/01/2015 $51.23 $10.18 $18.04 $0.00 $79.45 02/01/2016 $51.80 $lo.18 $18.04 $0.00 $80.02 08/01/2016 $52.70 $10.18 $18.12 $0.00 $81.00 02/01/2017 $53.27 $10.18 $18.12 $0.00 $81.57 Apprentice- BRICKIPLASTERICEMENT MASON -Local 3 Lynn Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.71 $10.18 $17.83 $0.00 $51.72 2 60 $28.45 $10.18 $17.83 $0.00 $56.46 3 70 $33.19 $10.18 $17.83 $0.00 $61.20 4 80 $37.93 $10.18 $17.83 $0.00 $65.94 5 90 $42.67 $10.18 $17.83 $0.00 $70.68 Effective Date - 08/01/2013 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $24.16 $10.18 $17.90 $0.00 $52.24 2 60 $28.99 $10.18 $17.90 $0.00 $57.07 3 70 $33.82 $10.18 $17.90 $0.00 $61.90 4 80 $3&65 $10.18 $17.90 $0.00 $66.73 5 90 $43.48 $10.18 $17.90 $0.00 $71.56 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Notes: -7 - - - - - - - - - - - - - - - -- - - - - - - - Appren Tice o Journeyworker Ra Tin �T BULLDOZER/GRADER/SCRAPER 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERA TING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For appi entice rates see "Apprentice- OPERATING ENGINEERS" CAISSON & UNDERPINNING BOTTOM MAN LABORE"RE - FOUNDATION AND MARINE For apprentice rates see "Apprentice- LABORER" 12/01/2012 $33.45 $7.10 $12.60 $0.00 $53.15 06/01/2013 $34.20 $7.10 $12.60 $0.00 $53.90 12/01/2013 $34.95 $7.10 $12.60 $0.00 $54.65 06/01/2014 $35.70 $7.10 $12.60 $0.00 $55.40 12/01/2014 $36.45 $7.10 $12.60 $0.00 $56.15 06/01/2015 $37.20 $7.10 $12.60 $0.00 $56.90 12/01/2015 $37.95 $7.10 $12.60 $0.00 $57.65 06/01/2016 $38.70 $7.10 $12.60 $0.00 $58.40 12/01/2016 $39.70 $7.10 $12.60 $0.00 $59.40 ---------------------------------------- ----- ---------------------- - -- ------------- ­ --- ------------------- --------------- ... Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 4 of 41 Classification CAISSON & UNDERPINNING LABORER LABORERS - EOUNDATIONAND MARINE For apprentice rates see "Apprentice- LABORER" CAISSON & UNDERPINNING TOP MAN LA BORERS - FO LNI)A TION AND MARINE For apprentice rates see "Apprentice- LABORER" CARBIDE CORE DML OPERATOR L4BOkERS - 70NE 2 For apprentice rates see "Apprentice- LABORER" CARPENTER CARPEN7ERS -70NL 2 (Eastern Massachusetts) Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate 12/01/2012 $32.30 $7.10 $12.60 $0.00 $52.00 06/01/2013 $33.05 $7.10 $12.60 $0.00 $52.75 12/01/2013 $33.80 $7.10 $12.60 $0.00 $53.50 06/01/2014 $34.55 $7.10 $12.60 $0.00 $54.25 12/01/2014 $35.30 $7.10 $12.60 $0.00 $55.00 06/01/2015 $36.05 $7.10 $12.60 $0.00 $55.75 12/01/2015 $36.80 $7.10 $12.60 $0.00 $56.50 06/01/2016 $37.55 $7.10 $12.60 $0.00 $57.25 12/01/2016 $38.55 $7.10 $12.60 $0.00 $58.25 12/01/2012 $32.30 $7.10 $12.60 $0.00 $52.00 06/01/2013 $33.05 $7.10 $12.60 $0.00 $52.75 12/01/2013 $33.80 $7.10 $12.60 $0.00 $53.50 06/01/2014 $34.55 $7.10 $12.60 $0.00 $54.25 12/01/2014 $35.30 $7.10 $12.60 $0.00 $55.00 06/01/2015 $36.05 $7.10 $12.60 $0.00 $55.75 12/01/2015 $36.80 $7.10 $12.60 $0.00 $56.50 06/01/2016 $37.55 $7.10 $12.60 $0.00 $57.25 12/01/2016 $38.55 $7.10 $12.60 $0.00 $58.25 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 09/01/2012 $33.48 $9.80 $15.61 $0.00 $58.89 03/01/2013 $33.92 $9.80 $15.61 $0.00 $59.33 09/01/2013 $34.53 $9.80 $15.61 $0.00 $59.94 03/01/2014 $35.13 $9.80 $15.61 $0.00 $60.54 09/01/2014 $35.90 $9.80 $15.61 $0.00 $61.31 03/01/2015 $36.67 $9.80 $15.61 $0.00 $62.08 -------------------------- -- ------------ ------------------------------ ------------------------ ------------------------------------ Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 5 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $28.33 2 60 $20.35 Unemployment Apprentice - CARPENTER - Zone 2 Eastern A11A $31.72 3 70 $23.74 $9.80 Effective Date - 09/01/2012 $0.00 $44.44 4 75 Supplemental $9.80 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.74 $9.80 $1.57 $0.00 $28.11 2 60 $20.09 $9.80 $1.57 $0.00 $31.46 3 70 $23.44 $9.80 $10.90 $0.00 $44.14 4 75 $25.11 $9.80 $10.90 $0.00 $45.81 5 80 $26.78 $9.80 $12.47 $0.00 $49.05 6 so $26.78 $9.80 $12.47 $0.00 $49.05 7 90 $30.13 $9.80 $14.04 $0.00 $53.97 8 90 $30.13 $9.80 $14.04 $0.00 $53.97 Effective Date - 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.96 $9.80 $1.57 $0.00 $28.33 2 60 $20.35 $9.80 $1.57 $0.00 $31.72 3 70 $23.74 $9.80 $10.90 $0.00 $44.44 4 75 $25.44 $9.80 $10.90 $0.00 $46.14 5 80 $27.14 $9.80 $12.47 $0.00 $49.41 6 80 $27.14 $9.80 $12.47 $0.00 $49.41 7 90 $30.53 $9.80 $14.04 $0.00 $54.37 8 90 $30.53 $9.80 $14.04 $0.00 $54.37 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - I - - - - - - - - - - Apprentice to Journeyworker Ratio:1:5 - - - - - - - - - - - - - - CEMENT MASONRY/PLASTERING BRICKLAYERS LOCAL 3 (EYAW) 02/01/2013 $42.87 $10.50 $18.61 $1.30 $73.28 08/01/2013 $43.62 $10.50 $18.61 $1.30 $74.03 02/01/2014 $44.05 $10.50 $18.61 $1.30 $74.46 08/01/2014 $44.80 $10.50 $18-61 $1.30 $75.21 02/01/2015 $45.23 $10.50 $18.61 $1.30 $75.64 08/01/2015 $45.98 $10.50 $18-61 $1.30 $76.39 02/01/2016 $46.43 $10.50 $18.61 $1.30 $76.84 08/01/2016 $47.18 $10.50 $18-61 $1.30 $77.59 02/01/2017 $47.63 $10.50 $18-61 $1.30 $78.04 --------------------------------------------------------------------------------- - - - ---- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 6 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $1.30 $45.72 2 60 $26.17 Unemplovment Apprentice- CEMENTAMSONRYIPLASTERING -Eastern Mass $1.30 $51.58 3 65 $28.35 Effective Date - 02/01/2013 $14.61 $1.30 $54.76 Supplemental $30.53 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.44 $10.50 $12.11 $1.30 $45.35 2 60 $25.72 $10.50 $13.61 $1.30 $51.13 3 65 $27.87 $10.50 $14.61 $1.30 $54.28 4 70 $30.01 $10.50 $15.61 $1.30 $57.42 5 75 $32.15 $10.50 $16.61 $1.30 $60.56 6 80 $34.30 $10.50 $17.61 $1.30 $63.71 7 90 $38.58 $10.50 $18.61 $1.30 $68.99 Effective Date - 08/01/2013 $52.75 For apprentice rates see "Apprentice- LABORER" Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 01.81 $10.50 $12.11 $1.30 $45.72 2 60 $26.17 $10.50 $13.61 $1.30 $51.58 3 65 $28.35 $10.50 $14.61 $1.30 $54.76 4 70 $30.53 $10.50 $15.61 $1.30 $57.94 5 75 $32.72 $10.50 $16.61 $1.30 $61.13 6 80 $34.90 $10.50 $17.61 $1.30 $64.31 7 90 $39.26 $10.50 $18.61 $1.30 $69.67 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - Steps are 6000 hours 12/01/2015 $32.85 $7.10 $11.55 - Apprentice to Journeyworker Ratio: 1:3 - - - - - - - - - - - - - - - - - - CHAIN SAW OPERATOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS - ZONE 2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES 12/01/2012 $41.09 $10.00 $13.02 $0.00 $64.11 OPERATING ENGINEERS LOCAL 4 06/01/2013 $41.87 $10.00 $13.02 $0.00 $64.89 12/01/2013 $42.65 $10.00 $13.02 $0.00 $65.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" COMPRESSOR OPERATOR 12/01/2012 $28.17 $10.00 $13.02 $0.00 $51.19 OPERA TING ENGINEERS LOCAL 4 06/01/2013 $28.72 $10.00 $13.02 $0.00 $51.74 12/01/2013 $29.27 $10.00 $13.02 $0.00 $52.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DELEADER (BRIDGE) 01/01/2013 $45.01 $7.80 $15.60 $0.00 $68.41 PAINTERS LOCAL 35 - ZONE 2 --------------- ---------------------------------- -- - ------- ------------ --------------- ----------- ---------------- - Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 7 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemilloyment Apprentice - PAINTER Local 35 - BRIDGESITANKS Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.51 $7.80 $0.00 $0.00 $30.31 2 55 $24.76 $7.80 $3.52 $0.00 $36.08 3 60 $27.01 $7.80 $3.84 $0.00 $38.65 4 65 $29.26 $7.80 $4.16 $0.00 $41.22 5 70 $31.51 $7.80 $13.68 $0.00 $52.99 6 75 $33.76 $7.80 $14.00 $0.00 $55.56 7 80 $36.01 $7.80 $14.32 $0.00 $58.13 8 90 $40.51 $7.80 $14.96 $0.00 $63.27 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - Steps are 750 lirs. For apprentice rates see "Apprentice- LABORER" - - - - - - - - - - - Apprentice to Journeyworker Ratio: 1: 1 - - - - - - - - - - - - - - - --- - DEMO: ADZEMAN 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" DEMO: BACKHOE/LOADER/IIAMMER OPERATOR 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" DEMO: BURNERS 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" DEMO: CONCRETE CUTTER/SAWYER 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" DEMO: JACKHAMMER OPERATOR 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" DEMO: WRECKING LABORER 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35 LABORERS-7ONF2 Foi apprentice rates see "Apprentice- LABORER" DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERA TING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DIVER 08/01/2012 $54.88 $9.80 $17.67 $0.00 $82.35 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2013 $56.98 $9.80 $17.67 $0.00 $84.45 08/01/2014 $59.09 $9.80 $17.67 $0.00 $86.55 08/01/2015 $61.18 $9.80 $17.67 $0.00 $88.65 DIVER TENDER 08/01/2012 $54.88 $9.80 $17.67 $0.00 $82.35 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2013 $56.98 $9.80 $17.67 $0.00 $84.45 08/01/2014 $59.08 $9.80 $17.67 $0.00 $86.55 08/01/2015 $61.18 $9.80 $17.67 $0.00 $89.65 - - - --- - ------------------------------------------ ---- -- --- ------------------ ------- ---- -- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 8 of 41 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate DIVER TENDER (EFFLUENT) 08/01/2012 $58.80 $9.80 $17.67 $0.00 $86.27 PILE DRIVER LOCAL 56 (ZOAFE 1) $14.18 $0.00 $71.38 03/01/2014 $44.92 $13.00 $14.20 08/01/2013 $61.05 $9.80 $17.67 $0.00 $88.52 $0.00 08/01/2014 $63.30 $9.80 $17.67 $0.00 $90.77 $73.56 08/01/2015 $65.55 $9.80 $17.67 $0.00 $93.02 DIVER/SLURRY (EFFLUENT) 08/01/2012 $82.32 $9.80 $17.67 $0.00 $109.79 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2013 $85.47 $9.80 $17.67 $0.00 $112.94 08/01/2014 $88.62 $9.80 $17.67 $0.00 $116.09 08/01/2015 $91.77 $9.80 $17.67 $0.00 $119.24 DRAWBRIDGE OPERATOR (Construction) ELECTPICIANS LOCAL 103 For apprentice rates see "Apprentice- ELECTRICIAN" ELECTRICIAN ELFCTPICIAMS LOCAL 103 09/01/2012 $42.81 $13.00 $14.13 $0.00 $69.94 03/01/2013 $43.52 $13.00 $14.16 $0.00 $70.68 09/01/2013 $44.20 $13.00 $14.18 $0.00 $71.38 03/01/2014 $44.92 $13.00 $14.20 $0.00 $72.12 09/01/2014 $45.60 $13.00 $14.22 $0.00 $72.82 03/01/2015 $46.32 $13.00 $14.24 $0.00 $73.56 09/01/2015 $47.27 $13.00 $14.27 $0.00 $74.54 03/01/2016 $48.23 $13.00 $14.30 $0.00 $75.53 09/01/2012 $42.81 $13.00 $14.13 $0.00 $69.94 03/01/2013 $43.52 $13.00 $14.16 $0.00 $70.68 09/01/2013 $44.20 $13.00 $14.18 $0.00 $71.38 03/01/2014 $44.92 $13.00 $14.20 $0.00 $72.12 09/01/2014 $45.60 $13.00 $14.22 $0.00 $72.82 03/01/2015 $46.32 $13.00 $14.24 $0.00 $73.56 09/01/2015 $47.27 $13.00 $14.27 $0.00 $74.54 03/01/2016 $48.23 $13.00 $14.30 $0.00 $75.53 -- ----------- --------- ------------------ ------------ ----- --------- ------ --------- -------------------- --------- ----- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 9 of 41 Classification Effective Date Base Wage Health I Pension Supplemental Total Rate $0.52 $0.00 $30.93 2 unemplovment Apprentice- ELECTPJCI,4N- Local 103 $13.00 $0.52 $0.00 $30.93 3 Effective Date - 09/01/2012 $19.58 $13.00 $10.53 Supplemental $43.11 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.12 $13.00 $0.51 $0.00 $30.63 2 40 $17.12 $13.00 $0.51 $0.00 $30.63 3 45 $19.26 $13.00 $10.52 $0.00 $42.78 4 45 $19.26 $13.00 $10.52 $0.00 $42.78 5 50 $21.41 $13.00 $10.84 $0.00 $45.25 6 55 $23.55 $13.00 $11.18 $0.00 $47.73 7 60 $25.69 $13.00 $11.50 $0.00 $50.19 8 65 $27.83 $13.00 $11.84 $0.00 $52.67 9 70 $29.97 $13.00 $12.16 $0.00 $55.13 10 75 $32.11 $13.00 $12.49 $0.00 $57.60 Effective Date - 03/01/2013 - - - ---- - Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.41 $13.00 $0.52 $0.00 $30.93 2 40 $17.41 $13.00 $0.52 $0.00 $30.93 3 45 $19.58 $13.00 $10.53 $0.00 $43.11 4 45 $19.58 $13.00 $10.53 $0.00 $43.11 5 50 $21.76 $13.00 $10.85 $0.00 $45.61 6 55 $23.94 $13.00 $11.19 $0.00 $48.13 7 60 $26.11 $13.00 $11.51 $0.00 $50.62 8 65 1 $28.29 $13.00 $11.85 $0.00 $53.14 9 70 $30.46 $13.00 $12.17 $0.00 $55.63 10 75 $32.64 $13.00 $12.51 $0.00 $58.15 - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - App Prior I/l/03; 30/35/40/45/50/55/65/70/75/80 Appre. Tice -toJo-urn-ey w'u-rke-rRatio:2-:3*** - - - - - - - - - - - - - - - - ---- - ELEVATOR CONSTRUCTOR ELEmA TOR COMMUCTORS LOCAL 4 01/01/2012 $52.45 $8.78 $6.96 $0.00 $69.19 -- - - -- -------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 10 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELEVATOR CONSTRUCTOR -Local 4 01/01/2012 $38.59 $8.78 $6.96 $0.00 Effective Date - 01/01/2012 ELEVATOR CONSTRUCTORS LOCAL 4 $10.00 $12.65 Supplemental $62.93 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.23 $8.78 $0.00 $0.00 $35.01 2 55 $28.85 $8.78 $6.96 $0.00 $44.59 3 65 $34.09 $8.78 $6.96 $0.00 $49.83 4 70 $36.72 $8.78 $6.96 $0.00 $52.46 5 80 $41.96 $8.78 $6.96 $0.00 $57.70 - - - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - I Steps 1-2 are 6 mos. � Steps 3-5 are I year $0.00 $50.50 06/01/2015 $32.35 - - - - - - - - - - - - Apprentice to Journeyworker RatioA: 1 - - - - - - - - - - - - - - - - ELEVATOR CONSTRUCTOR BELPER 01/01/2012 $38.59 $8.78 $6.96 $0.00 $54.33 ELEVATOR CONSTRUCTORS LOCAL 4 $10.00 $12.65 $0.00 $62.93 11/01/2013 $41.05 FENCE & GUARD RAIL ERECTOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 IABORERS - 7ONF 2 $0.00 $64.47 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2012 $38.26 $j 0.00 $12.65 $0.00 $60.91 OPERA TfMG ENGINEERS LOCAL 4 05/01/2013 $38.87 $10.00 $12.65 $0.00 $61.52 11/01/2013 $39.63 $10.00 $12.65 $0.00 $62.28 05/01/2014 $40.40 $10.00 $12.65 $0.00 $63.05 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENGTARTY CHIEF-BLDG,SITE,HVY/FfWY OPERA TING EArGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENGROD PERSON-BLDG,SITE,HVY/HWY OPERATJNG EArGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 11/01/2012 $39.66 $10.00 $12.65 $0.00 $62.31 05/01/2013 $40.28 $10.00 $12.65 $0.00 $62.93 11/01/2013 $41.05 $10.00 $12.65 $0.00 $63.70 05/01/2014 $41.82 $10.00 $12.65 $0.00 $64.47 11/01/2012 $21.18 $10.00 $12-65 $0.00 $43.83 05/01/2013 $21.54 $10.00 $12.65 $0.00 $44.19 11/01/2013 $22.00 $10.00 $12.65 $0.00 $44.65 05/01/2014 $22.45 $10.00 $12.65 $0.00 $45.10 -------------------------- --- ------------------------------ --- - - -- ------------------------------------ ------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 11 of 41 Classification FIRE ALARM INSTALLER ELECTRXIANSLOCAL 103 For apprentice rates see "Apprentice- ELECTRICIAN" FIRE ALARM REPAIR MAINTENANCE COMMISSIONINGP'LEcTRiaAArs LOCAL 103 For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN" FIREMAN (ASST. ENGINEER) OPE'RA TING ENGINFE'RS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" Effective Date Base Wage Bealth Pension Supplemental Total Rate 03/01/2013 $32.64 $13.00 $12.51 Unemployment $58.15 09/01/2012 $42.91 $13.00 $14.13 $0.00 $69.94 03/01/2013 $43.52 $13.00 $14.16 $0.00 $70.68 09/01/2013 $44.20 $13.00 $14.18 $0.00 $71.38 03/01/2014 $44.92 $13.00 $14.20 $0.00 $72.12 09/01/2014 $45.60 $13.00 $14.22 $0.00 $72.82 03/01/2015 $46.32 $13.00 $14.24 $0.00 $73.56 09/01/2015 $47.27 $13.00 $14.27 $0.00 $74.54 03/01/2016 $48.23 $13.00 $14-30 $0.00 $75.53 09/01/2012 $32.11 $13.00 $12.49 $0.00 $57.60 03/01/2013 $32.64 $13.00 $12.51 $0.00 $58.15 09/01/2013 $33.15 $13.00 $12.52 $0.00 $58.67 03/01/2014 $33.69 $13.00 $12.54 $0.00 $59.23 09/01/2014 $34.20 $13.00 $12.56 $0.00 $59.76 03/01/2015 $34.74 $13.00 $12.57 $0.00 $60.31 09/01/2015 $35.45 $13.00 $1239 $0.00 $61.04 03/01/2016 $36.17 $13.00 $12.62 $0.00 $61.79 12/01/2012 $33.61 $10.00 $13.02 $0.00 $56.63 06/01/2013 $34.26 $10.00 $13.02 $0.00 $57.28 12/01/2013 $34.92 $10.00 $13.02 $0.00 $57.94 FLAGGER & SIGNALER 12/01/2012 $20.50 $7.10 $11.55 $0.00 $39.15 1-4 BOREMS - 70NIF 2 06/01/2013 $20.50 $7.10 $11.55 $0.00 $39.15 12/01/2013 $20.50 $7.10 $11.55 $0.00 $39.15 06/01/2014 $20.50 $7.10 $11.55 $0.00 $39.15 12/01/2014 $20.50 $7.10 $11.55 $0.00 $39.15 06/01/2015 $20.50 $7.10 $11.55 $0.00 $39.15 12/01/2015 $20.50 $7.10 $11.55 $0.00 $39.15 06/01/2016 $20.50 $7.10 $11.55 $0.00 $39.15 12/01/2016 $20.50 $7.10 $11.55 $0.00 $39.15 For apprentice rates see "Apprentice- LABORER" FLOORCOVERER 1�1,00RCO VERERS LOCAL 2168 ZONE I 03/01/2012 $37.20 $9.80 $16.61 $0.00 $63.61 ---------------- -- - ---------------------------- ----------------- ---------------------- ------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 12 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- FLOORCOVERER -Local 2168 Zone I Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 2 55 3 60 4 65 5 70 6 75 7 80 8 85 - - Notes: - - - - - - - - $0.00 Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 $18.60 $9.80 $1.79 $0.00 $30.19 $20.46 $9.80 $1.79 $0.00 $32.05 $22.32 $9.80 $11.24 $0.00 $43.36 06/01/2013 $9.80 $11.24 $0.00 $45.22 $26.04 $9.80 $13.03 $0.00 $48.87 $27.90 $9.80 $13.03 $0.00 $50.73 09.76 $9.90 $14.82 $0.00 $54.38 $31.62 - - - - - - - - - - $9.80 - - - - - - $14.82 - - - - - - - - $0.00 - - - - -- - $56,24 - - - I - - - I FORK LIFT/CBERRY PICKER 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPERA TING ENGINEERS LOCAL 4 $7.80 $3.25 $0.00 $30.58 3 60 $21.31 $7.80 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 $3.84 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" $45.49 6 75 $26.63 $7.80 $13.13 $0.00 GENERATOR/LIGHTING PLANT/HEATERS 12/01/2012 $28.17 $10.00 $13.02 $0.00 $51.19 OPERA TING ENGINEERS LOCAL 4 $31.96 $7.80 $14.01 $0.00 $53.77 - - - - - - - - - - - Notes: - - - - - 06/01/2013 $28.72 $10.00 $13.02 $0.00 $51.74 12/01/2013 $29.27 $10.00 $13.02 $0.00 $52.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" - - - - - - GLAZIER (GLASS PLANK/AIR BARRIERANTERIOR 01/01/2013 $35.51 $7.80 $14.60 $0.00 $57.91 SYSTEMS) GLAZIERS LOCAL 35 (ZONE 2) Apprentice- GLAZIER - Loca135 Zone 2 Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.76 $7.80 $0.00 $0.00 $25.56 2 55 $19.53 $7.80 $3.25 $0.00 $30.58 3 60 $21.31 $7.80 $3.54 $0.00 $32.65 4 65 $23.08 $7.80 $3.84 $0.00 $34.72 5 70 $24.86 $7.80 $12.83 $0.00 $45.49 6 75 $26.63 $7.80 $13.13 $0.00 $47.56 7 80 $28.41 $7.80 $13.42 $0.00 $49.63 8 90 $31.96 $7.80 $14.01 $0.00 $53.77 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - Steps are 750 hrs. - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:1 - - - - - - - - - - - - - - - - - - ------------------------ ------------ ------ ------------ --- ------------------ --------------------------- ------- ----------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 13 of 41 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate HOISTING ENGINEER/CRANES/GRADALLS 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPERA 77NG ENGINEERS LOCAL 4 $22.48 $10.00 $0.00 $0.00 $32.48 2 60 $24.52 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 $10.00 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 Apprentice- OPERATING ENGINEERS -Local 4 $51.63 5 75 $30.65 $10.00 $13.02 Effective Date - 12/01/2012 $53.67 6 80 $32.70 Supplemental $13.02 $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate $57.76 1 55 $22.05 $10.00 $0.00 $0.00 $32.05 - - - - - - - - - - Notes: 2 60 $24.05 $10.00 $13.02 $0.00 $47.07 - - - - - - 3 65 $26.06 $10.00 $13.02 $0.00 $49.08 $9.92 4 70 $28.06 $10.00 $13.02 $0.00 $51.08 5 75 $30.07 $10.00 $13.02 $0.00 $53.09 6 80 $32.07 $10.00 $13.02 $0.00 $55.09 7 85 $34.08 $10.00 $13.02 $0.00 $57.10 8 90 $36.08 $10.00 $13.02 $0.00 $59.10 Effective Date - 06/01/2013 09/01/2012 $42.91 $13.00 Supplemental $0.00 Step per cent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.48 $10.00 $0.00 $0.00 $32.48 2 60 $24.52 $10.00 $13.02 $0.00 $47.54 3 65 $26.57 $10.00 $13.02 $0.00 $49.59 4 70 $28.61 $10.00 $13.02 $0.00 $51.63 5 75 $30.65 $10.00 $13.02 $0.00 $53.67 6 80 $32.70 $10.00 $13.02 $0.00 $55.72 7 85 $34.74 $10.00 $13.02 $0.00 $57.76 8 90 $36.78 $10.00 $13.02 $0.00 $59.80 - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:6 - - - - - - - - - - - - - - - - - HVAC (DUCTWORK) 02/01/2013 $42.32 $9.92 $18.24 $2.11 $72.49 '�HL ETMETAL WORKERS LOCAL 17 -A For apprentice rates see "Apprentice- SHEET METAL WORKER" I'm apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (ELECTRICAL CONTROLS) 09/01/2012 $42.91 $13.00 $14-13 $0.00 $69.94 ELECTRICIANS LOCAL 103 03/01/2013 $43.52 $13.00 $14.16 $0.00 $70.68 09/01/2013 $44.20 $13.00 $14.18 $0.00 $71.38 03/01/2014 $44.92 $13.00 $14.20 $0.00 $72.12 09/01/2014 $45.60 $13.00 $14.22 $0.00 $72.82 03/01/2015 $46.32 $13.00 $14.24 $0.00 $73.56 09/01/2015 $47.27 $13.00 $14.27 $0.00 $74.54 03/01/2016 $48.23 $13.00 $14.30 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN" HVAC (TESTING AND BALANCING - AIR) 02/01/2013 $42.32 $9.82 $18.24 $2.11 $72.49 SHEETMETAL WORKERS LOCAL 17 - A I'm apprentice rates see "Apprentice- SHEET METAL WORKER" ----------------------- - - --------------------------------- --- ----- ----------------------- --- - ------------ Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 14 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $24.88 $10.65 $9.18 $0.00 $44.71 Unemployment $29.02 HVAC (TESTING AND BALANCING -WATER) 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 PIPEFITTE"RS LOCAL 53 7 (Local 138) $0.00 $54.16 Effective Date - 09/01/2013 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" Step percent Apprentice Base Wage Health Pension Unemployment Total Rate HVAC MECHANIC 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 PIPFFITTERS LOCAL 53 7 (Local 138) $10.65 $9.18 $0.00 $45.67 3 70 $30.14 $10.65 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 Fen apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFMER" $0.00 $55.44 - - - - - - - - - - Notes: - - - - - - - - - - - - HYDRAULIC DRILLS 12/01/2012 $30.35 $7.10 $11.55 $0.00 $49.00 LABORERS - 7ONE 2 Appre. Tice i.-jo-urn-eyworke-rRatio: 1-:4 - - - - - - - - - - - - - - - 06/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 12/01/2013 $31.35 $7.10 $11.55 $0.00 $50.00 06/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 12/01/2014 $32.35 $7.10 $11.55 $0.00 $51.00 06/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 12/01/2015 $33.35 $7.10 $11.55 $0.00 $52.00 06/01/2016 $33.85 $7.10 $11.55 $0.00 $52:50 12/01/2016 $34.60 $7.10 $11.55 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" INSULATOR (PIPES & TANKS) 09/01/2012 $41.46 $10.65 $11-50 $0.00 $63.61 ASBESTOS WORKERS LOCAL 6 (BOSTON) 09/01/2013 $43.06 $10.65 $11.50 $0.00 $65.21 09/01/2014 $45.06 $10.65 $11.50 $0.00 $67.21 Apprentice- ASBESTOS INSULATOR (Pipes& Tanks) -Local 6 Boston Effective Date - 09/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.73 $10.65 $8.60 $0.00 $39.98 2 60 $24.88 $10.65 $9.18 $0.00 $44.71 3 70 $29.02 $10.65 $9.76 $0.00 $49.43 4 80 $33.17 $10.65 $10.34 $0.00 $54.16 Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.53 $10.65 $8.60 $0.00 $40.78 2 60 $25.84 $10.65 $9.18 $0.00 $45.67 3 70 $30.14 $10.65 $9.76 $0.00 $50.55 4 80 $34.45 $10.65 $10.34 $0.00 $55.44 - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - Steps are I year Appre. Tice i.-jo-urn-eyworke-rRatio: 1-:4 - - - - - - - - - - - - - - - IRONWORKERfWELDER ]RONWORKE, RS LOCAL 7 (1,4 WRENCE AREA) 09/16/2012 $34.57 $7.70 $18.35 $0.00 $60.62 03/16/2013 $35.82 $7.70 $18.35 $0.00 $61.87 ---------------------- --------------------------- ------------------------- --------------------------------------------------- -- ------ Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 15 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $47.54 2 70 $25.07 Unemi)loyment Apprentice- IR0JVTf,'0RKER -Local 71,awrence $0.00 $51.12 3 75 $26.87 Effective Date - 09/16/2012 $18.35 $0.00 $52.92 Supplemental $28.66 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $20.74 $7.70 $18.35 $0.00 $46.79 2 70 $24.20 $7.70 $18.35 $0.00 $50.25 3 75 $25.93 $7.70 $18.35 $0.00 $51.98 4 80 $27.66 $7.70 $18.35 $0.00 $53.71 5 85 $29.38 $7.70 $18.35 $0.00 $55.43 6 90 $31.11 $7.70 $18.35 $0.00 $57.16 Effective Date - 03/16/2013 12/01/2015 $32.85 $7.10 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $21.49 $7.70 $18.35 $0.00 $47.54 2 70 $25.07 $7.70 $18.35 $0.00 $51.12 3 75 $26.87 $7.70 $18.35 $0.00 $52.92 4 80 $28.66 $7.70 $18.35 $0.00 $54.71 5 85 $30.45 $7.70 $18.35 $0.00 $56.50 6 90 $32.24 $7.70 $18.35 $0.00 $58.29 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - Structural 1:6- Ornamental 1:4 $50.00 $7.10 12/01/2014 $31.85 $7.10 Apprentice ;.-Journeywo-rke-rRatio: - - - - - - - - - - - - - - - - - - - - JACKHAMMER & PAVING BREAKER OPERATOR 12/01/2012 $29.95 $7.10 $11.55 $0.00 $0.00 06/01/2013 $48.50 $7.10 1-4 BORFRS - 70M, 2 $0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 $0.00 $49.25 06/01/2013 $30.35 $7.10 $11.55 $0.00 $0.00 12/01/2014 $49.00 $7.10 12/01/2013 $30.85 $7.10 $11.55 $32.10 $0.00 $11.55 $49.50 $50.75 06/01/2014 $31.35 $7.10 $11.55 $0.00 $0.00 06/01/2016 $50.00 $7.10 12/01/2014 $31.85 $7.10 $11.55 $33.85 $0.00 $11.55 $50.50 $52.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" LABORER I-4BORFRE - ZONE2 12/01/2012 $29.60 $7.10 $11.55 $0.00 $48.25 06/01/2013 $30.10 $7.10 $11.55 $0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 $0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 $0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 ----------- --------------------------- ----------------- ----------------- -------------- ---------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 16 of 41 1 60 $18.06 $7.10 $11.55 $0.00 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $39.72 3 80 $24.08 unemployment Apprentice - LABORER - Zone 2 $0.00 $42.73 4 90 $27.09 Effective Date - 12/01/2012 $11.55 $0.00 $45.74 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.76 $7.10 $11.55 $0.00 $36.41 2 70 $20.72 $7.10 $11.55 $0.00 $39.37 3 80 $23.68 $7.10 $11.55 $0.00 $42.33 4 90 $26.64 $7.10 $11.55 $0.00 $45.29 Effective Date - 06/01/2013 $32.60 $7.10 $11.55 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.06 $7.10 $11.55 $0.00 $36.71 2 70 $21.07 $7.10 $11.55 $0.00 $39.72 3 80 $24.08 $7.10 $11.55 $0.00 $42.73 4 90 $27.09 $7.10 $11.55 $0.00 $45.74 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - Appre. TCI�.70-jou-rne-ywor-ker-Rati-o:l:-5 - - - - - - - - - - - - - - - - - - - LABORER: CARPENTER TENDER 12/01/2012 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE2 06/01/2013 $30.10 $7.10 $11.55 $0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 $0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 $0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: CEMENT FINISHER TENDER 12/01/2012 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS-ZONF2 06/01/2013 $30.10 $7.10 $11.55 $0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 $0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 $0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORFRS - ZONE 2 For apprentice rates see "Apprentice- LABORER" ------------------------------ ----- I -- ----------- --------- --------- --------------- ------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 17 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $48.25 $48.75 $49.25 $49.75 $50.25 $50.75 $51.25 $51.75 $52.50 LABORER: TREE REMOVER 12/01/2012 $29.60 Unemployment $11.55 LABORER: MASON TENDER 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 IABORERS - 70NE 2 06/01/2013 $30.10 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" LABORER: MULTI -TRADE TENDER L4BORLRS - 7OArE 2 For apprentice rates see "Apprentice- LABORER" 12/01/2012 06/01/2013 12/01/2013 06/01/2014 12/01/2014 06/01/2015 12/01/2015 06/01/2016 12/01/2016 $29.60 $30.10 $30.60 $31.10 $31.60 $32.10 $32.60 $33.10 $33.85 $7.10 $7.10 $7.10 $7.10 $7.10 $7.10 $7.10 $7.10 $7.10 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $48.25 $48.75 $49.25 $49.75 $50.25 $50.75 $51.25 $51.75 $52.50 LABORER: TREE REMOVER 12/01/2012 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - 7ONF 2 06/01/2013 $30.10 $7.10 $11.55 $0.00 $48.75 12/01/20,13 $30.60 $7.10 $11.55 $0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 $0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 $0.00 $52.50 'Mis classification applies to the wholesale removal ofstanding frees including all associated trimming ofbranches and limbs, and applies to the removal ol'branches at locations not on or around utility lines. For apprentice rates see "Apprentice- LABORER" LASER BEAM OPERATOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LA BORFRS - 70NE 2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ------------------------------------------------------------------------------ ---- -- --- ­ --------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 18 of 41 Classification MARBLE & TILE FINISHERS BRICKLAYERS LOCAL 3 -MARBLE& TILE Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate 02/01/2013 $36.20 $10.18 $16.51 $0.00 $62.89 08/01/2013 $36.91 $10.18 $16.58 $0.00 $63.67 02/01/2014 $37.36 $10.18 $16.58 $0.00 $64.12 08/01/2014 $38.07 $10.18 $16.65 $0.00 $64.90 02/01/2015 $38.52 $10.18 $16.65 $0.00 $65.35 08/01/2015 $39.23 $10.18 $16.72 $0.00 $66.13 02/01/2016 $39.68 $10.18 $16.72 $0.00 $66.58 08/01/2016 $40.38 $10.18 $16.80 $0.00 $67.36 02/01/2017 $40.84 $10.18 $16.80 $0.00 $67.82 Apprentice- AL4RBLE &TILE FINISHER -Local 3 Allarble &Tile Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.10 $10.18 $16.51 $0.00 $44.79 2 60 $21.72 $10.18 $16.51 $0.00 $48.41 3 70 $25.34 $10.18 $16.51 $0.00 $52.03 4 80 $28.96 $10.18 $16.51 $0.00 $55.65 5 90 $32.58 $10.18 $16.51 $0.00 $59.27 Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.46 $10.18 $16.58 $0.00 $45.22 2 60 $22.15 $10.18 $16.58 $0.00 $48.91 3 70 $25.84 $10.18 $16.58 $0.00 $52.60 4 80 $29.53 $10.18 $16.58 $0.00 $56.29 5 90 $33.22 $10.18 $16.58 $0.00 $59.98 - --- - - - - - - - - Notes: - - - - - - - - - - - - - ---- - - - -T - ApprenTice o Journeyworker RaTo i 3 - - - - - - - - - - - - - - - - - - MARBLE MASONS,TILELAYERS & TERRAZZO MECH BR,'CKI,A YERS LOCAL 3 -MARBLE& TILE 02/01/2013 $47.45 $10.18 $17.83 $0.00 $75.46 08/01/2013 $48.35 $10.18 $17.90 $0.00 $76.43 02/01/2014 $48.91 $10.18 $17.90 $0.00 $76.99 08/01/2014 $49.81 $10.18 $17.97 $0.00 $77.96 02/01/2015 $50.37 $10.18 $17.97 $0.00 $78.52 08/01/2015 $51.27 $10.18 $18.04 $0.00 $79.49 02/01/2016 $51.84 $10.18 $18.04 $0.00 $80.06 08/01/2016 $52.74 $10.18 $18.12 $0.00 $81.04 02/01/2017 $53.31 $10.18 $18.12 $0.00 $81.61 - ---------- - -- ------------------- --- --- ---------------- --- ------ -------------------------- - ---------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 19 of 41 1 50 $24.18 $10.18 $17.90 $0.00 $52.26 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 3 70 $33.85 $10.18 $17.90 Unemployment Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble &Tile 4 80 $38.68 $10.18 Effective Date - 02/01/2013 $0.00 $66.76 5 90 Supplemental $10.18 Step percent Apprentice Base Wage Heal th Pension Unemployment Total Rate 1 50 $23.73 $10.18 $17.83 $0.00 $51.74 2 60 $28.47 $10.18 $17.83 $0.00 $56.48 3 70 $33.22 $10.19 $17.83 $0.00 $61.23 4 80 $37.96 $10.18 $17.83 $0.00 $65.97 5 90 $42.71 $10.18 $17.83 $0.00 $70.72 Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base.Wage Health Pension Unemployment Total Rate 1 50 $24.18 $10.18 $17.90 $0.00 $52.26 2 60 $29.01 $10.18 $17.90 $0.00 $57.09 3 70 $33.85 $10.18 $17.90 $0.00 $61.93 4 80 $38.68 $10.18 $17.90 $0.00 $66.76 5 90 $43.52 $10.18 $17.90 $0.00 $71.60 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - I - - Tppre. Tice in Journeyworker Ra To- i 5 - - - - - - - - - - - - - - $63.51 MECH. SWEEPER OPERATOR (ON CONST. SITES) 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERA TING EArGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" MECHANICS MAINTENANCE 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERA 77NG ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" MILLWRIGHT (Zone 2) 04/01/2011 $31.71 $8.67 $15.61 $0.00 $55.99 MILL WRIGHTS LOCAL 1121 - Zone 2 ------ -- -- -------------------------------- -- --- - ----------------------- -- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 20 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MILLWRIGHT- Local 1121 Zone 2 Effective Date - 04/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $15.86 $8.67 $11.64 $0.00 $36.17 2 55 $17.44 $8.67 $11.64 $0.00 $37.75 3 60 $19.03 $8.67 $13.23 $0.00 $40.93 4 65 $20.61 $8.67 $13.23 $0.00 $42.51 5 70 $22.20 $8.67 $14.02 $0.00 $44.89 6 75 $23.78 $8.67 $14.02 $0.00 $46.47 7 80 $25.37 $8.67 $14.82 $0.00 $48.86 8 85 $26.95 $8.67 $14.82 $0.00 $50.44 - - - - - --- - - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:5 - - - - - - - - - - - - - - ---- - - - MORTAR MIXER 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS - ZONE 2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2012 $21.28 $10.00 $13.02 $0.00 $44.30 OPERATING ENGINEERS LOCAL 4 06/01/2013 $21.70 $10.00 $13.02 $0.00 $44.72 12/01/2013 $22.12 $10.00 $13.02 $0.00 $45.14 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OILER (TRUCK CRANES, GRADALLS) 12/01/2012 V4.62 $10.00 $13.02 $0.00 $47.64 OPERA TING ENGINEERS LOCAL 4 06/01/2013 $25.10 $10.00 $13.02 $0.00 $48.12 12/01/2013 $25.59 $10.00 $13.02 $0.00 $48.61 I'm apprentice rates see "Apprentice- OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT - CLASS 11 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERA TING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PAINTER (BRIDGES/TANKS) 01/01/2013 $45.01 $7.80 $15.60 $0.00 $68.41 PAINTERS LOCAL 35 - ZONE 2 ----------------------------- - ------------------------------------- ------ ------------ ------------- - -- ---------------- --- Issue Date: 02/14/2013 Wage Request Number.' 20130214-005-9 Page 21 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGESITANKS Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.51 $7.80 $0.00 $0.00 $30.31 2 55 $24.76 $7.80 $3.52 $0.00 $36.08 3 60 $27.01 $7.80 $3.84 $0.00 $38.65 4 65 $29.26 $7.80 $4.16 $0.00 $41.22 5 70 $31.51 $7.80 $13.68 $0.00 $52.99 6 75 $33.76 $7.80 $14.00 $0.00 $55.56 7 80 $36.01 $7.80 $14.32 $0.00 $58.13 8 90 $40.51 $7.80 $14.96 $0.00 $63.27 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - --- - Steps arc 750 lirs. - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:1 - - - - - - - - - - - - - - - --- - PAINTER (SPRAY OR SANDBLAST, NEW) - 01/01/2013 $35.91 $7.80 $15.60 $0.00 $59.31 * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PAINTERS LOCAL 35 - ZONE 2 Apprentice- PAINTER Local 35 Zone 2 - SpraylSandblast - Alew Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.96 $7.80 $0.00 $0.00 $25.76 2 55 $19.75 $7.80 $3.52 $0.00 $31.07 3 60 $21.55 $7.80 $3.84 $0.00 $33.19 4 65 $23.34 $7.80 $4.16 $0.00 $35.30 5 70 $25.14 $7.80 $13.68 $0.00 $46.62 6 75 $26.93 $7.80 $14.00 $0.00 $48.73 7 80 $28.73 $7.80 $14.32 $0.00 $50.85 8 90 $32.32 $7.80 $14.96 $0.00 $55.08 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - Tpp-ren-tice -toJuurn-eywu-rke-rRa-tio:1-:1 - - - - - - - - - - - - - - - PAINTER (SPRAY OR SANDBLAST, REPAINT) PAINTFRS LOCAL 35 - ZONE 2 01/01/2013 $ 33. 9 7 $7.80 $15.60 $0.00 $57.37 ----------------------------------- --- ---- --- ----------------------- -- -- ------ ---------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 22 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- PAINTER Local 35 Zone 2 - SpraylSandblasl -Repaint Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.99 $7.80 $0.00 $0.00 $24.79 2 55 $18.68 $7.80 $3.52 $0.00 $30.00 3 60 $20.38 $7.80 $3.94 $0.00 $32.02 4 65 $22.08 $7.80 $4.16 $0.00 $34.04 5 70 $23.78 $7.80 $13.68 $0.00 $45.26 6 75 $25.48 $7.80 $14.00 $0.00 $47.28 7 80 $27.18 $7.80 $14.32 $0.00 $49.30 8 90 $30.57 $7.80 $14.96 $0.00 $53.33 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:1 - - - - - - - - - - - - - - PAINTER (TRAFFIC MARKINGS) 12/01/2012 $29.60 $7.10 $11.55 $0.00 1A BORERS - 70NE 2 06/01/2013 $30.10 $7.10 $11.55 $0.00 12/01/2013 $30.60 $7.10 $11.55 $0.00 06/01/2014 $31.10 $7.10 $11.55 $0.00 12/01/2014 $31.60 $7.10 $11.55 $0.00 06/01/2015 $32.10 $7.10 $11.55 $0.00 12/01/2015 $32.60 $7.10 $11.55 $0.00 06/01/2016 $33.10 $7.10 $11.55 $0.00 12/01/2016 $33.85 $7.10 $11.55 $0.00 For Apprentice rates see "Apprentice- LABORER" $48.25 $48.75 $49.25 $49.75 $50.25 $50.75 $51.25 $51.75 $52.50 PAINTER / TAPER (BRUSH, NEW) * 01/01/2013 $34.51 $7.80 $15.60 $0.00 $57.91 * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PAINTERSLOC4L 35 - 70NE 2 ---------------------------- -- ------------------------ -------------------------- ------------------------- -------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 23 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.26 $7.80 $0.00 $0.00 $25.06 2 55 $18.98 $7.80 $3.52 $0.00 $30.30 3 60 $20.71 $7.80 $3.84 $0.00 $32.35 4 65 $22.43 $7.80 $4.16 $0.00 $34.39 5 70 $24.16 $7.80 $13.68 $0.00 $45.64 6 75 $25.88 $7.80 $14.00 $0.00 $47.68 7 80 $27.61 $7.80 $14.32 $0.00 $49.73 8 90 $31.06 $7.80 $14.96 $0.00 $53.82 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - Steps are 750 lirs. - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:1 - - - - - - - - - - - - - - - PAINTER / TAPER (BRUSH, REPAINT) 01/01/2013 $32.57 $7.80 $15.60 $0.00 $55.97 PAINTEERS LOCAL 35 - ZONP2 Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.29 $7.80 $0.00 $0.00 $24.09 2 55 $17.91 $7.80 $3.52 $0.00 $29.23 3 60 $19.54 $7.80 $3.84 $0.00 $31.18 4 65 $21.17 $7.90 $4.16 $0.00 $33.13 5 70 $22.80 $7.80 $13.68 $0.00 $44.28 6 75 $24.43 $7.80 $14.00 $0.00 $46.23 7 80 $26.06 $7.80 $14.32 $0.00 $48.18 8 90 $29.31 $7.80 $14.96 $0.00 $52.07 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - Steps are 750 brs. - - - - - - - - - - Apprentice to Journeyworker Ratio:1:1 - - - - - - - - - - - - - - - - PANEL & PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 T1,,'AMSTERS JOINT COUNCIL NO. 107ONEB PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2012 $39.20 $9.80 $17.67 $0.00 $66.67 DECK) PH 1, ])]?IVFR LOCAL 56 (70N]� 1) 08/01/2013 $40.70 $9.80 $17.67 $0.00 $68.17 08/01/2014 $42.20 $9.80 $17.67 $0.00 $69.67 08/01/2015 $43.70 $9.80 $17.67 $0.00 $71.17 -------------------------------- -- ------------------------ --------­------ - --------------------- --------------------- -------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 24 of 41 Classification PILE DRIVER PILE DPlVl.,R LOCAL 56 (ZONEJ) Apprentice- PILEDRIVER -Local 56 Zone I Effective Date - 08/01/2012 Effective Date Base Wage Health Pension Supplemental UneMDIOVMCI 08/01/2012 $39.20 $9.80 $17.67 $0.00 08/01/2013 $40.70 $9.80 $17.67 $0.00 08/01/2014 $42.20 $9.80 $17.67 $0.00 08/01/2015 $43.70 $9.80 $17.67 $0.00 Step percent Apprentice Base Wage Health 1 50 $19.60 $9.80 2 60 $23.52 $9.80 3 70 $27.44 $9.80 4 75 $29.40 $9.80 5 80 $31.36 $9.80 6 80 $31.36 $9.80 7 90 $35.28 $9.80 8 90 $35.28 $9.80 Pension Supplemental Unemployment Total Rate $17.67 $0.00 $47.07 $17.67 $0.00 $50.99 $17.67 $0.00 $54.91 $17.67 $0.00 $56.87 $17.67 $0.00 $58.83 $17.67 $0.00 $58.83 $17.67 $0.00 $62.75 $17.67 $0.00 $62.75 Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.35 $9.80 $17.67 $0.00 $47.82 2 60 $24.42 $9.80 $17.67 $0.00 $51.99 3 70 $28.49 $9.80 $17.67 $0.00 $55.96 4 75 $30.53 $9.80 $17.67 $0.00 $58.00 5 80 $32.56 $9.80 $17.67 $0.00 $60.03 6 80 $32.56 $9.80 $17.67 $0.00 $60.03 7 90 $36.63 $9.80 $17.67 $0.00 $64.10 8 90 $36.63 $9.80 $17.67 $0.00 $64.10 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - I - - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:3 - - - - - - - - - - - - - - - - - - I PIPEFITTER & STEAMFITTER PIPEFITTEInLOCAL 537 (Local 138) Total Rate $66.67 $68.17 $69.67 $71.17 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 -------- I -------------------- - ------------------ --- -------------------------------------- --------- --------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 25 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate unemploVment Apprentice- PIPEFITTER Local 537 (Local 138) 40 $18.80 $8.75 $4.50 Effective Date - 09/01/2012 $32.05 2 45 Supplemental $8.75 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.30 $8.75 $4.50 $0.00 $31.55 2 45 $20.59 $8.75 $12.39 $0.00 $41.73 3 60 $27.46 $9.75 $12.39 $0.00 $48.60 4 70 $32.03 $8.75 $12.39 $0.00 $53.17 5 80 $36.61 $8.75 $12.39 $0.00 $57.75 Effective Date - 03/01/2013 06/01/2016 $33.35 Refrig/AC Mechanic ** 1: 1;1:2;2:4;3:6;4:8;5: 10;6:12;7:14;8:17;9:20;10:23(Max) - - - - - - - - - - - - - - Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unernploynient Total Rate 1 40 $18.80 $8.75 $4.50 $0.00 $32.05 2 45 $21.15 $8.75 $12.39 $0.00 $42.29 3 60 $28.21 $8.75 $12.39 $0.00 $49.35 4 70 $32.91 $8.75 $12.39 $0.00 $54.05 5 80 $37.61 $8.75 $12.39 $0.00 $58.75 - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - I 12/01/2015 ** 1:3; 3:15; 1: 10 thereafter / Steps are I yr. $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 Refrig/AC Mechanic ** 1: 1;1:2;2:4;3:6;4:8;5: 10;6:12;7:14;8:17;9:20;10:23(Max) - - - - - - - - - - - - - - - - $0.00 Appre. .7a"�o-iou-rne-ywor-ker-Rati-o:** 12/01/2016 $34.10 $7.10 $11.55 $0.00 PIPELAYER 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS - ZONE 2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.S5 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" PLUMBER PL UMBERS & GA SFITTEMS LOCAL 12 (Local 138) 09/01/2012 $43.98 $9.32 $13.29 $0.00 $66.59 03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84 -------------------- ------ ----------------------------------- ------- ----- - -------------------- ------ ------------------- - - Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 26 of 41 1 35 $15.83 $9.32 $4.97 _$0.00 $30.12 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 3 55 $24.88 $9.32 $7.53 Unemployment Apprentice- PLUMBERIGAVITTER -Local 12 (Local 138) 4 65 $29.40 $9.32 $8.81 Effective Date - 09/01/2012 $47.53 5 75 $33.92 Supplernental $10.09 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $15.39 $9.32 $4.97 $0.00 $29.68 2 40 $17.59 $9.32 $5.61 $0.00 $32.52 3 55 $24.19 $9.32 $7.53 $0.00 $41.04 4 65 $28.59 $9.32 $8.81 $0.00 $46.72 5 75 $32.99 $9.32 $10.09 $0.00 $52.40 Effective Date - 03/01/2013 $0.00 03/01/2013 Supplernental $8.75 Step percent Apprentice Base Wage Health Pension Uneniploynient Total Rate 1 35 $15.83 $9.32 $4.97 _$0.00 $30.12 2 40 $18.09 $9.32 $5.61 $0.00 $33.02 3 55 $24.88 $9.32 $7.53 $0.00 $41.73 4 65 $29.40 $9.32 $8.81 $0.00 $47.53 5 75 $33.92 $9.32 $10.09 $0.00 $53.33 - - - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - Steps are I yr $49.50 06/01/2014 $31.35 Step 4 with lic$50.43 Step5 with lic$56.22 - - - -- - - - - - - - - - - - $11.55 $0.00 $50.00 Apprentice to Journeyworker Ratio:1:5 - - - - - - - - - - - $7.10 PNEUMATIC CONTROLS (TEMP.) 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 PIPI,,'FJTTFRS LOCAL 53 7 (1 ocal 138) $32.35 $7.10 $11.55 $0.00 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" $7.10 $11.55 $0.00 $51.50 PNEUMATIC DRILL/TOOL OPERATOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABORERS - ZONE 2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 Foi apprentice rates see "Apprentice- LABORER" POWDERMAN & BLASTER 12/01/2012 $30.60 $7.10 $11.55 $0.00 $49.25 LABORERS - ZONE 2 06/01/2013 $31.10 $7.10 $11.55 $0.00 $49.75 12/01/2013 $31.60 $7.10 $11.55 $0.00 $50.25 06/01/2014 $32.10 $7.10 $11.55 $0.00 $50.75 12/01/2014 $32.60 $7.10 $11.55 $0.00 $51.25 06/01/2015 $33.10 $7.10 $11.55 $0.00 $51.75 12/01/2015 $33.60 $7.10 $11.55 $0.00 $52.25 06/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 12/01/2016 $34.85 $7.10 $11.55 $0.00 $53.50 For apprentice rates see "Apprentice- LABORER" -------------- ­­ ­ ----------------------------------------- ---------- --- ------------ ---------------------- --------------- _ --- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 27 of 41 RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81 Classification Effective Date Base Wage Health Pension Supplemental Total Rate only to the construction of new, wood frame residences that do Unemployment POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPERA TING ENGINEERS LOCAL 4 As of 9/1/09 Carpentry work on wood-franic residential WEATHERIZATION projects sball be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. 06/01/2013 $40.87 $10.00 $ 1.33. 02 $0.00 $63.89 $11.55 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" $0.00 $49.00 12/01/2013 $30.85 $7.10 PUMP OPERATOR (CONCRETE) 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPIFRA TING rNGINEERS LOCAL 4 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 $11.55 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" $0.00 $51.50 06/01/2016 $33.35 $7.10 PUMP OPERATOR (DEWATERING, OTHER) 12/01/2012 $28.17 $10.00 $13.02 $0.00 $51.19 OPE'RATING FArG[AFEERS LOCAL 4 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" 06/01/2013 $28.72 $10.00 $13.02 $0.00 $51.74 $13.02 12/01/2013 $29.27 $10.00 $13.02 $0.00 $52.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 06/01/2013 $40.49 $10.00 READY -MIX CONCRETE DRIVER 04/30/2009 $25.80 $5.96 $5.34 $0.00 $37.10 TEAMSTERS LOCAL 42 $0.00 $64.29 Foi apprentice rates see "Apprentice- OPERATING ENGINEERS" RECLAIMERS 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERA 77NG FNGINFFRS LOCAL 4 $0.00 $58.61 ROOPERS LOCAL 33 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42 CARPFIVTERS -70NE 2 (Residenfial Wood) RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81 ** The Residential Wood Frame Carpenter classification applies only to the construction of new, wood frame residences that do not exceed four stories including die basement. cARPENTER5 -zONE 2 (Residential Wood) As of 9/1/09 Carpentry work on wood-franic residential WEATHERIZATION projects sball be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. RJDE-ON MOTORIZED BUGGY OPERATOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 I-4BORERS - 70NE2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ROLLER/SPREADER/MULCHING MACHINE 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERATING ENGINELRS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 Foi apprentice rates see "Apprentice- OPERATING ENGINEERS" ROOFER (IncRoofer Waterprooffig &Roofer Damproofg) 02/01/2013 $37.41 $10.50 $10.70 $0.00 $58.61 ROOPERS LOCAL 33 ------------------------------------------ - ------ ----- ------ ------- --------------------------------------- -- --- --- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 28 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - ROOFER - Local 33 Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.71 $10.50 $3.38 $0.00 $32.59 2 60 $22.45 $10.50 $10.70 $0.00 $43.65 3 65 $24.32 $10.50 $10.70 $0.00 $45.52 4 75 $28.06 $10.50 $10.70 $0.00 $49.26 5 85 $31.80 $10.50 $10.70 $0.00 $53.00 - - - - - - - - - - - - - Notes: ** 1:5, 2:6-10, the 1: 10; Reroofing: 1:4, then 1: 1 - - - - - - - - - - - - - - - Step I is 2000 hrs.; Steps 2-5 are 1000 hrs. $21.16 $9.82 $9.00 $1.20 $41.18 - - - - - - - - - - Appre. Tice to Journeyworker Ratio:** - - - - - - - - - - - - - - ROOFER SLATE / TILE / PRECAST CONCRETE 02/01/2013 $37.66 $10.50 $10.70 $0.00 $58.86 ROOFERS LOCAL 33 For apprentice rates see "Apprentice- ROOFER" SHEETMETAL WORKER 02/01/2013 $42.32 $9.82 $18.24 $2.11 $72.49 '?Hr r7METAL WORKERS LOCAL 17 -A Apprentice- SHEET METALWORKER -Local 17-A Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.93 $9.82 $4.00 $0.00 $30.75 2 40 $16.93 $9.82 $4.00 $0.00 $30.75 3 45 $19.04 $9.82 $8.00 $1.11 $37.97 4 45 $19.04 $9.82 $8.00 $1.11 $37.97 5 50 $21.16 $9.82 $8.75 $1.19 $40.92 6 50 $21.16 $9.82 $9.00 $1.20 $41.18 7 60 $25.39 $9.82 $10.24 $1.36 $46.81 8 65 $27.51 $9.82 $10.99 $1.45 $49.77 9 75 $31.74 $9.82 $12.49 $1.62 $55.67 10 85 $35.97 $9.82 $13.49 $1.78 $61.06 - - Notes: - - - - - - - - - - - - - ---- - ---- - - - - - - - - - Steps are 6 mos. L - - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:4 - - - - - - - - - - - - - - - - SIGN ERECTOR PAINTERS LOCAL 35 - ZONE 2 06/01/2012 $25.37 $6.82 $6.85 $0.00 $39.04 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93 ---------------- -- -------------------------- ------------------------- ------------- * --------------------------------- * -------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 29 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SIGN ERECTOR -Local 35 Zone 2 Effective Date - 06/01/2012 Suppleniental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $12.69 $6.82 $0.00 $0.00 $19.51 2 55 $13.95 $6.82 $2.35 $0.00 $23.12 3 60 $15.22 $6.82 $2.35 $0.00 $24.39 4 65 $16.49 $6.82 $2.35 $0.00 $25.66 5 70 $17.76 $6.82 $6.85 $0.00 $31.43 6 75 $19.03 $6.82 $6.85 $0.00 $32.70 7 80 $20.30 $6.82 $6.85 $0.00 $33.97 8 85 $21.56 $6.82 $6.85 $0.00 $35.23 9 90 $22.83 $6.82 $6.85 $0.00 $36.50 Effective Date - 06/01/2013 Suppleniental Step percent Apprentice Base Wage Health Pension Uneniploynient Total Rate 1 50 $12.91 $7.07 $0.00 $0.00 $19.98 2 55 $14.20 $7.07 $2.45 $0.00 $23.72 3 60 $15.49 $7.07 $2.45 $0.00 $25.01 4 65 $16.78 $7.07 $2.45 $0.00 $26.30 5 70 $18.07 $7.07 $7.05 $0.00 $32.19 6 75 $19.36 $7.07 $7.05 $0.00 $33.48 7 80 $20.65 $7.07 $7.05 $0.00 $34.77 8 85 $21.94 $7.07 $7.05 $0.00 $36.06 9 90 $23.23 $7.07 $7.05 $0.00 $37.35 - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - - Steps are 4 mos. Appre. Tice i0_ju­urncywo_rke_rRa_tio: 1-:1 - - - - - - - - - - - - - - - - - SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65 TFAM,37'1,,']?,5JOIArTCOUAFCILNO. 1070ATEB SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2012 $31.03 $8.91 $8.00 $0.00 $47.94 TLAMS7 7,716.10INT CO UNCIL ArO. 10 ZONE B SPRINKLER FITTER 01/01/2013 $47.13 $8.42 $12.60 $0.00 $68.15 SPRINKI E'R FITTERS LOCAL 550 - (Section B) 03/01/2013 $48.13 $8.42 $12.60 $0.00 $69.15 ----- ---------------------------------------------------- ------- - ----- --- ----- ---- -- -- - - ------ ----------- --- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 30 of 41 1 35 $16.85 $8.42 $8.00 $0.00 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $8.00 $0.00 UnemPloyment Apprentice- SPRINKLER FJTTER -Local 550 (Seclion B) $21.66 $8.42 $8.00 Effective Date - 01/01/2013 $38.08 Supplemental $24.07 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.50 $8.42 $8.00 $0.00 $32.92 2 40 $18.85 $8.42 $8.00 $0.00 $35.27 3 45 $21.21 $8.42 $8.00 $0.00 $37.63 4 50 $23.57 $8.42 $8.00 $0.00 $39.99 5 55 $25.92 $8.42 $8.00 $0.00 $42.34 6 60 $28.28 $8.42 $8.00 $0.00 $44.70 7 65 $30.63 $8.42 $8.00 $0.00 $47.05 8 70 $32.99 $8.42 $8.00 $0.00 $49.41 9 75 $35.35 $8.42 $8.00 $0.00 $51.77 10 80 $37.70 $8.42 $8.00 $0.00 $54.12 Effective Date - 03/01/2013 - - - Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.85 $8.42 $8.00 $0.00 $33.27 2 40 $19.25 $8.42 $8.00 $0.00 $35.67 3 45 $21.66 $8.42 $8.00 $0.00 $38.08 4 50 $24.07 $8.42 $8.00 $0.00 $40.49 5 55 $26.47 $8.42 $8.00 $0.00 $42.89 6 60 $28.88 $8.42 $8.00 $0.00 $45.30 7 65 $31.28 $8.42 $8.00 $0.00 $47.70 8 70 $33.69 $8.42 $8.00 $0.00 $50.11 9 75 $36.10 $8.42 $8.00 $0.00 $52.52 10 80 $38.50 $8.42 $8.00 $0.00 $54.92 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - Steps are 850 hours - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:1 - - - - - - - - - - - - - - - - - - STEAM BOILER OPERATOR 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For appientice rates see "Apprentice- OPERATING ENGINEERS" TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPERA TING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ---------------------------------------------------------------------------------------------------------- ----------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 31 of 41 Classification TELECOMMUNICATION TECHNICIAN EI ECTRICIANS LOCAL 103 Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 E tTcctivc Date - 09/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $12.84 $13.00 $0.39 $0.00 $26.23 Effective Date Base Wage Health Pension Supplemental Total Rate 3 45 $14.45 $13.00 $9.77 Unemployment $37.22 09/01/2012 $32.11 $13.00 $12.49 $0.00 $57.60 03/01/2013 $32.64 $13.00 $12.51 $0.00 $58.15 09/01/2013 $33.15 $13.00 $12.52 $0.00 $58.67 03/01/2014 $33.69 $13.00 $12.54 $0.00 $59.23 09/01/2014 $34.20 $13.00 $12.56 $0.00 $59.76 03/01/2015 $34.74 $13.00 $12.57 $0.00 $60.31 09/01/2015 $35.45 $13.00 $12.59 $0.00 $61.04 03/01/2016 $36.17 $13.00 $12.62 $0.00 $61.79 Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 E tTcctivc Date - 09/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $12.84 $13.00 $0.39 $0.00 $26.23 2 40 $12.84 $13.00 $0.39 $0.00 $26.23 3 45 $14.45 $13.00 $9.77 $0.00 $37.22 4 45 $14.45 $13.00 $9.77 $0.00 $37.22 5 50 $16.06 $13.00 $10.02 $0.00 $39.08 6 55 $17.66 $13.00 $10.27 $0.00 $40.93 7 60 $19.27 $13.00 $10.52 $0.00 $42.79 8 65 $20.87 $13.00 $10.77 $0.00 $44.64 9 70 $22.48 $13.00 $11.02 $0.00 $46.50 10 75 $24.08 $13.00 $11.26 $0.00 $48.34 Effective Date - 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $13.06 $13.00 $0.39 $0.00 $26.45 2 40 $13.06 $13.00 $0.39 $0.00 $26.45 3 45 $14.69 $13.00 $9.78 $0.00 $37.47 4 45 $14.69 $13.00 $9.78 $0.00 $37.47 5 50 $16.32 $13.00 $10.03 $0.00 $39.35 6 55 $17.95 $13.00 $10.28 $0.00 $41.23 7 60 $19.58 $13.00 $10.53 $0.00 $43.11 8 65 $21.22 $13.00 $10.78 $0.00 $45.00 9 70 $22.85 $13.00 $11.03 $0.00 $46.88 10 75 $24.48 $13.00 $11.28 $0.00 $48.76 - - Notes: - - - - - - - - - - - - - - - - - - - - - -- - - - - - I - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:1 - - - - - - - - - - - - - - - - ... ... ----------------------------- ------------- -- ------------------------------------------ --- --------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 32 of 41 Classification TERRAZZO FINISHERS BRICKL,4YERS LOCAL 3 - MARBLE & TILE Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate 02/01/2013 $46.35 $10.18 $17.83 $0.00 $74.36 08/01/2013 $47.25 $10.18 $17.90 $0.00 $75.33 02/01/2014 $47.81 $10.18 $17.90 $0.00 $75.89 08/01/2014 $48.71 $10.18 $17.97 $0.00 $76.86 02/01/2015 $49.27 $10.18 $17.97 $0.00 $77.42 08/01/2015 $50.17 $10.18 $18-04 $0.00 $79.39 02/01/2016 $50.74 $10.18 $18.04 $0.00 $78.96 08/01/2016 $51.64 $10.18 $18.12 $0.00 $79.94 02/01/2017 $52.21 $10.18 $18.12 $0.00 $80.51 Apprentice- TERRAZZO FINJSHER -Local 3 Marhle &Tile Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.18 $10.18 $17.83 $0.00 $51.19 2 60 $27.81 $10.18 $17.83 $0.00 $55.82 3 70 $32.45 $10.18 $17.83 $0.00 $60.46 4 80 $37.08 $10.18 $17.83 $0.00 $65.09 5 90 $41.72 $10.18 $17.83 $0.00 $69.73 Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unernployment Total Rate 1 50 $23.63 $10.18 $17.90 $0.00 $51.71 2 60 $28.35 $10.18 $17.90 $0.00 $56.43 3 70 $33.08 $10.18 $17.90 $0.00 $61.16 4 80 $37.80 $10.18 $17.90 $0.00 $65.88 5 90 $42.53 $10.18 $17.90 $0.00 $70.61 - - - - - - - - - - - Notes: - - - - - - - -- - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:3 - - - - - - - - - - - - - - - - $57.90 TEST BORING DRILLER LABORERS - FOUNDAHONAND MARINE For apprentice rates see "Apprentice- LABORER" 12/01/2012 $37.30 $7.10 $12.60 $0.00 $57.00 06/01/2013 $34.45 $7.10 $12.60 $0.00 $54.15 12/01/2013 $35.20 $7.10 $12.60 $0.00 $54.90 06/01/2014 $35.95 $7.10 $12.60 $0.00 $55.65 12/01/2014 $36.70 $7.10 $12.60 $0.00 $56.40 06/01/2015 $37.45 $7.10 $12.60 $0.00 $57.15 12/01/2015 $38.20 $7.10 $12.60 $0.00 $57.90 06/01/2016 $38.95 $7.10 $12.60 $0.00 $59.65 12/01/2016 $39.95 $7.10 $12.60 $0.00 $59.65 --------------- -- --------------------------------- ------------------- - -------------------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 33 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TEST BORING DRILLER HELPER 12/01/2012 $32.42 $7.10 $12.60 $0.00 $52.12 LABORFRS - FOUNDA 770N AND MARINE 06/01/2013 $33.17 $7.10 $12.60 $0.00 $52.87 12/01/2013 $33.92 $7.10 $12.60 $0.00 $53.62 06/01/2014 $34.67 $7.10 $12.60 $0.00 $54.37 12/01/2014 $35.42 $7.10 $12.60 $0.00 $55.12 06/01/2015 $36.17 $7.10 $12.60 $0.00 $55.87 12/01/2015 $36.92 $7.10 $12.60 $0.00 $56.62 06/01/2016 $37.67 $7.10 $12.60 $0.00 $57.37 12/01/2016 $38.67 $7.10 $12.60 $0.00 $58.37 For apprentice rates see "Apprentice- LABORER" TEST BORING LABORER 12/01/2012 $32.30 $7.10 $12.60 $0.00 $52.00 1-413ORERS - FOLWDA 77ONAND MARINE 06/01/2013 $33.05 $7.10 $12.60 $0.00 $52.75 12/01/2013 $33.80 $7.10 $12.60 $0.00 $53.50 06/01/2014 $34.55 $7.10 $12.60 $0.00 $54.25 12/01/2014 $35.30 $7.10 $12.60 $0.00 $55.00 06/01/2015 $36.05 $7.10 $12.60 $0.00 $55.75 12/01/2015 $36.80 $7.10 $12.60 $0.00 $56.50 06/01/2016 $37.55 $7.10 $12.60 $0.00 $57.25 12/01/2016 $38.55 $7.10 $12.60 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" TRACTORS/PORTABLE STEAM GENERATORS 12/01/2012 $39.72 $10.00 $13.02 $0.00 $62.74 OPE'RA TING ENGIATE"EMS LOCAL 4 06/01/2013 $40.49 $10.00 $13.02 $0.00 $63.51 12/01/2013 $41.27 $10.00 $13.02 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2012 $31.32 $8.91 $8.00 $0.00 $48.23 TEAMSTERSJOINTCOUNCIL NO. 107ONF)3 TUNNEL WORK - COMPRESSED AIR 12/01/2012 $44.58 $7.10 $13.00 $0.00 $64.68 LABORFRE (COMPREME 1) AIR) 06/01/2013 $45.33 $7.10 $13.00 $0.00 $65.43 12/01/2013 $46.08 $7.10 $13.00 $0.00 $66.18 06/01/2014 $46.83 $7.10 $13.00 $0.00 $66.93 12/01/2014 $47.58 $7.10 $13.00 $0.00 $67.68 06/01/2015 $48.33 $7.10 $13.00 $0.00 $68.43 12/01/2015 $49.08 $7.10 $13.00 $0.00 $69.18 06/01/2016 $49.83 $7.10 $13.00 $0.00 $69.93 12/01/2016 $50.83 $7.10 $13.00 $0.00 $70.93 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) 12/01/2012 $46.58 $7.10 $13.00 $0.00 $66.68 LABORERS (COMPRESSED AJR) 06/01/2013 $47.33 $7.10 $13.00 $0.00 $67.43 12/01/2013 $48.08 $7.10 $13.00 $0.00 $68.18 06/01/2014 $48.83 $7.10 $13.00 $0.00 $68.93 12/01/2014 $49.58 $7.10 $13.00 $0.00 $69.68 06/01/2015 $50.33 $7.10 $13.00 $0.00 $70.43 12/01/2015 $51.08 $7.10 $13.00 $0.00 $71.18 06/01/2016 $51.83 $7.10 $13.00 $0.00 $71.93 12/01/2016 $52.83 $7.10 $13.00 $0.00 $72.93 For apprentice rates see "Apprentice- LABORER" ----------------------------------- --- --------------------------------------------- .Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 ----------------------------------------------- Page 34 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate OUTSIDEELECTRICAL WORKERS -EAST LOCAL 104 Unempl2yment TUNNEL WORK - FREE AIR 12/01/2012 $36.65 $7.10 $13.00 $0.00 $56.75 LABORERS (FRE E AIR TUNNEL) 09/01/2013 $25.66 $8.70 $4.48 $0.00 $38.84 For apprentice rates see "Appi entice- LINEMAN" 06/01/2013 $37.40 $7.10 $13.00 $0.00 $57.50 CABLEMAN (Underground Ducts & Cables) 12/01/2013 $38.15 $7.10 $13.00 $0.00 $58.25 OUTSIDEELECTRICAL WORKERS- FASTLOCAL 104 06/01/2014 $38.90 $7.10 $13.00 $0.00 $59.00 12/01/2014 $39.65 $7.10 $13.00 $0.00 $59.75 06/01/2015 $40.40 $7.10 $13.00 $0.00 $60.50 -- --------------- ------------- Issue Date: 02/14/2013 12/01/2015 $41.15 $7.10 $13.00 $0.00 $61.25 06/01/2016 $41.90 $7.10 $13.00 $0.00 $62.00 12/01/2016 $42.90 $7.10 $13.00 $0.00 $63.00 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - FREE AIR (HAZ. WASTE) 12/01/2012 $38.65 $7.10 $13.00 $0.00 $58.75 LABORI,RS (FREI, AIR TUAWEI) 06/01/2013 $39.40 $7.10 $13.00 $0.00 $59.50 12/01/2013 $40.15 $7.10 $13.00 $0.00 $60.25 06/01/2014 $40.90 $7.10 $13.00 $0.00 $61.00 12/01/2014 $41.65 $7.10 $13.00 $0.00 $61.75 06/01/2015 $42.40 $7.10 $13.00 $0.00 $62.50 12/01/2015 $43.15 $7.10 $13.00 $0.00 $63.25 06/01/2016 $43.90 $7.10 $13.00 $0.00 $64.00 12/01/2016 $44.90 $7.10 $13.00 $0.00 $65.00 For apprentice rates see "Apprentice- LABORER" VAC-14AUL 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65 TEAMSTERS JOINT COLWC11, NO. 10 70NE B WAGON DRILL OPERATOR 12/01/2012 $29.85 $7.10 $11.55 $0.00 $48.50 LABOREYS - ZONE 2 06/01/2013 $30.35 $7.10 $11.55 $0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 $0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 $0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 $0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 $0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 $0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 $0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" WASTE WATER PUMP OPERATOR 12/01/2012 $40.09 $10.00 $13.02 $0.00 $63.11 OPERA TING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $13.02 $0.00 $63.89 12/01/2013 $41.65 $10.00 $13.02 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" WATER METER INSTALLER 09/01/2012 $43.98 $9.32 $13.29 $0.00 $66.59 PLUMBERS & GAST"ITTERS LOCAL 12 (Local 138) 03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84 For apprentice rates see "Apprentice- PLUMBER/PIPEFI77ER" or "PLUMBER/GASFITTER" Outside Electrical - East CABLE TECHNICIAN (Power Zone) 09/03/2012 $25.18 $7.95 $4.42 $0.00 $37.55 OUTSIDEELECTRICAL WORKERS -EAST LOCAL 104 03/03/2013 $25.18 $8.20 $4.17 $0.00 $37.55 09/01/2013 $25.66 $8.70 $4.48 $0.00 $38.84 For apprentice rates see "Appi entice- LINEMAN" CABLEMAN (Underground Ducts & Cables) 09/03/2012 $35.67 $7.95 $5.23 $0.00 $48.85 OUTSIDEELECTRICAL WORKERS- FASTLOCAL 104 03/03/2013 $35.67 $8.20 $4.98 $0.00 $48.85 09/01/2013 $36.55 $8.70 $6.58 $0.00 $51.83 -- --------------- ------------- Issue Date: 02/14/2013 --- ---------- ---------------------------- ---------- Wage Request Number: 20130214-005-9 -------------------------------------- Page 35 of 41 ....... ... ------- ------------------------------------------- ----- ---------------------- ----------- ------ --------------------- - Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 36 of 41 - Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Fot apprentice rates see "Apprentice- LINEMAN" DRIVER / GROUNDMAN CDL 09/03/2012 $29.38 $7.95 $5.93 $0.00 $43.26 OUTSIDE E[ ECTRICAL 117ORKFRS - EASTLOCAL 104 03/03/2013 $29.39 $8.20 $5.68 $0.00 $43.26 09/01/2013 $29.94 $8.70 $6.05 $0.00 $44.69 For apprentice rates see "Apprentice- LINEMAN" DRIVER / GROUNDMAN -Inexperienced (<2000 Hrs) 09/03/2012 $23.08 $7.95 $4.19 $0.00 $35.22 OUTSIDE ELECTRICAL T17ORKERS -EAST LOCAL 104 03/03/2013 $23.08 $8.20 $3.94 $0.00 $35.22 09/01/2013 $23.52 $8.70 $5.24 $0.00 $37.46 For apprentice rates see "Apprentice- LINEMAN" EQUIPMENT OPERATOR (Class A CDL) 09/03/2012 $35.67 $7.95 $9.23 $0.00 $52.85 OUTSIDE ELECTRICAL WORKERS - FAST LOCAL 104 03/03/2013 $35.67 $8.20 $8.98 $0.00 $52.85 09/01/2013 $36.35 $8.70 $9.43 $0.00 $54.48 For apprentice rates see "Apprentice- LINEMAN" EQUIPMENT OPERATOR (Class B CDL) 09/03/2012 $31.48 $7.95 $6.44 $0.00 $45.87 OUTS11)FELECTRICAL WORKERS - LASTLOCAL 104 03/03/2013 $31.48 $8.20 $6.19 $0.00 $45.87 09/01/2013 $32.08 $8.70 $6.59 $0.00 $47.37 For apprentice rates see "Apprentice- LINEMAN" GROUNDMAN 09/03/2012 $23.08, $7.95 $3.67 $0.00 $34.70 OUTSIDE ELECTRICAL WORKERS - EASTLOCAL 104 03/03/2013 $23.08 $8.20 $3.42 $0.00 $34.70 09/01/2013 $23.52 $8.70 $3.72 $0.00 $35.94 For apprentice rates see "Apprentice- LINEMAN" GROUNDMAN -Inexperienced (<2000 Hrs.) 09/03/2012 $18.89 $7.95 $2.86 $0.00 $29.70 OUTSIDE ELECTRICAL WORKERS - EASTLOCAL 104 03/03/2013 $18.89 $8.20 $2.61 $0.00 $29.70 09/01/2013 $19.25 $8.70 $2.85 $0.00 $30.80 For apprentice rates see "Apprentice- LINEMAN" JOURNEYMAN LINEMAN 09/03/2012 $41.97 $7.95 $10.56 $0.00 $60.48 OUTSIDE ELECTRICAL WORKERS - PAST LOCA L 104 03/03/2013 $41.97 $8.20 $10.31 $0.00 $60.48 09/01/2013 $42.77 $8.70 $11.78 $0.00 $63.25 ....... ... ------- ------------------------------------------- ----- ---------------------- ----------- ------ --------------------- - Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 36 of 41 1 60 $25.18 $8.20 $2.97 $0.00 $36.35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 3 70 $29.38 $8.20 $4.11 UnemPloyment Apprentice - LINEMAN (Outside Electrical) - East Local 104 $31.48 $8.20 $4.81 $0.00 Effective Date - 09/03/2012 5 80 $33.58 $8.20 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $25.18 $7.95 $3.22 $0.00 $36.35 2 65 $27.28 $7.95 $3.66 $0.00 $38.89 3 70 $29.38 $7.95 $4.36 $0.00 $41.69 4 75 $31.48 $7.95 $5.06 $0.00 $44.49 5 80 $33.58 $7.95 $5.76 $0.00 $47.29 6 85 $35.67 $7.95 $6.47 $0.00 $50.09 7 90 $37.77 $7.95 $7.66 $0.00 $53.38 Effective Date - 03/03/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $25.18 $8.20 $2.97 $0.00 $36.35 2 65 $27.28 $8.20 $3.41 $0.00 $38.89 3 70 $29.38 $8.20 $4.11 $0.00 $41.69 4 75 $31.48 $8.20 $4.81 $0.00 $44.49 5 80 $33.58 $8.20 $5.51 $0.00 $47.29 6 85 $35.67 $8.20 $6.22 $0.00 $50.09 7 90 $37.77 $8.20 $7.41 $0.00 $53.38 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - Tpprentice to Journeyworker Ratio:1:2 - - - - - - - - - - - - - --- TELEDATA CABLE SPLICER 07/16/2012 $26.33 $4.18 $2.79 $0.00 $33.30 OUTSIDE ELECTRICAL WORKERS -LAST LOCAL 104 TELEDATA LINEMAN/EQUIPMENT OPERATOR 07/16/2012 $24.78 $4.18 $2.74 $0.00 $31.70 OUTSIDE ELECTRICAL WORKERS- EAST LOCAL 104 TELEDATA WIREMAN/INSTALLERJECHNICIAN 07/16/2012 $24.78 $4.18 $2.74 $0.00 $31.70 OUTSIDE ELICTRICAL WORKERS - LAST LOCAL 104 TREE TRIMMER 02/01/2009 $16.59 $2.42 $0.00 $0.00 $19.01 OUTSIDEELECTRICAL WORKERS - EAST LOCAL 104 This classification applies only to the trimming ofbrancbes on and around utility lines, TREE TRIMMER GROUNDMAN 02/01/2009 $14.64 $2.42 $0.00 $0.00 $17.06 OUTSIDE ELECTIUCAL WORKERS - EASTLOCAL 104 This classification applies only to the trimming ol'branches on and around utility lines. Rental of Equipment - East (2 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.45 $8.91 $0.00 $0.00 $39.36 TEAWSTERSJOINTCOUNCILMO. 107ONEB (3 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.52 $8.91 $0.00 $0.00 $39.43 TEAMSTERS JOINT COUNCIL NO. 10 70AIE B (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.64 $9.07 $0.00 $0.00 $39.71 TFAMSTERSJOINTCOUNCILNO 107ONEB - - ------------------------ --- -- - --------------------------------- ----------------------------- - --------------- ---------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 37 of 41 10 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 OPERA TING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 Foi apprentice rates see "Apprentice- OPERATING ENGINEERS" BACKHOE/FRONT-END LOADER 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 OPERA TING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.6S $10.00 $0.00 $0.00 $51.65 Foi apprentice rates see "Apprentice- OPERATING ENGINEERS" BULLDOZER/GRADER/SCRAPER 12/01/2012 $39.72 $10.00 $0.00 $0.00 $49.72 OPERA TING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $0.00 $0.00 $50.49 12/01/2013 $41.27 $10.00 $0.00 $0.00 $SI.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES 12/01/2012 $41.09 $10.00 $0.00 $0.00 $51.09 OPERA TING ENGINEERS LOCAL 4 06/01/2013 $41.87 $10.00 $0.00 $0.00 $51.87 12/01/2013 $42.65 $10.00 $0.00 $0.00 $52.65 For apprentice rates see "Apprentice- OPERATING ENGINEERS" COMPRESSOR OPERATOR 12/01/2012 $28.17 $10.00 $0.00 $0.00 $38.17 OPE"RATING ENGINEERS LOCAL 4 06/01/2013 $28.72 $10.00 $0.00 $0.00 $38.72 12/01/2013 $29.27 $10.00 $0.00 $0.00 $39.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DIVER 08/01/2012 $54.88 $9.80 $0.00 $0.00 $64.68 PILE DRIVER LOCAL 56 (7ONE 1) 08/01/2013 $56.98 $9.80 $0.00 $0.00 $66.78 08/01/2014 $59.08 $9.80 $0.00 $0.00 $68.88 08/01/2015 $61.18 $9.80 $0.00 $0.00 $70-98 DIVER TENDER 08/01/2012 $54.88 $9.80 $0.00 $0.00 $64�68 PJLP DRIVER LOCAL 56 (70NP 1) 08/01/2013 $56.98 $9.80 $0.00 $0.00 $66.78 08/01/2014 $59.08 $9.80 $0.00 $0.00 $68.88 08/01/2015 $61.18 $9.80 $0.00 $0.00 $70.98 FLAGGER & SIGNALER 12/01/2012 $20.50 $7.10 $0.00 $0.00 $27.60 LA BORERS - ZONE 2 06/01/2013 $20.SO $7.10 $0.00 $0.00 $27.60 12/01/2013 $20.50 $T10 $0.00 $0.00 $27.60 06/01/2014 $20.50 $7.10 $0.00 $0.00 $27.60 12/01/2014 $20.50 $7.10 $0.00 $0.00 $27.60 06/01/2015 $20.SO $7.10 $0.00 $0.00 $27.60 12/01/2015 $20.50 $7.10 $0.00 $0.00 $27.60 06/01/2016 $20.50 $7.10 $0.00 $0.00 $27.60 12/01/2016 $20.50 $7.10 $0.00 $0.00 $27.60 For apprentice rates see "Apprentice- LABORER" FORK LIFT/CHERRY PICKER 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 OPERA TING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GENERATOR/LIGHTING PLANTMEATERS 12/01/2012 $28.17 $10.00 $0.00 $0.00 $38.17 OPI, RA TING ENGINEERS LOCAL 4 06/01/2013 $28.72 $10.00 $0.00 $0.00 $38.72 12/01/2013 $29.27 $10.00 $0.00 $0.00 $39.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ---------------------------------------- --------- --- ---- ------- Issue Date: 02/14/2013 Wage Request Number: --- - ---- 20130214-005-9 --------- -- --- ....... --- --- -------- Page 38 of 41 '1 61 Classification HOISTING ENGINEER/CRANES/GRADALLS OPERATING ENGINEERS LOCAL 4 Effective Date Base Wage Health Pension Supplemental Total Rate 2 60 $24.05 ' $10.00 $0.00 Unemployment $34.05 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 Apprentice- OPERATING ENGINEERS- Local 4 Effective Date - 12/01/2012 Suppleniental Step percent Apprentice Base Wage Health Pension Uncinployment Total Rate 1 55 $22.05 $10.00 $0.00 $0.00 $32.05 2 60 $24.05 ' $10.00 $0.00 $0.00 $34.05 3 65 $26.06 $10.00 $0.00 $0.00 $36.06 4 70 $28.06 $10.00 $0.00 $0.00 $38.06 5 75 $30.07 $10.00 $0.00 $0.00 $40.07 6 80 $32.07 $10.00 $0.00 $0.00 $42.07 7 85 $34.08 $10.00 $0.00 $0.00 $44.08 8 90 $36.08 $10.00 $0.00 $0.00 $46.08 Effective Date - 06/01/2013 Suppleniental Step percent Apprentice Base Wage Health Pension Uneniployment Total Rate 1 55 $22.48 $10.00 $0.00 $0.00 $32.48 2 60 $24.52 $10.00 $0.00 $0.00 $34.52 3 65 $26.57 $10.00 $0.00 $0.00 $36.57 4 70 $28.61 $10.00 $0.00 $0.00 $38.61 5 75 $30.65 $10.00 $0.00 $0.00 $40.65 6 80 $32.70 $10.00 $0.00 $0.00 $42.70 7 85 $34.74 $10.00 $0.00 $0.00 $44.74 8 90 $36.78 $10.00 $0.00 $0.00 $46.78 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - L-- - - - - - - - - - - Apprentice to Journeyworker Ratio:1:6 - - - - - - - - - - - - - - - - - - LABORER 12/01/2012 $29.60 $7.10 $0.00 $0.00 $36.70 LABORERS - ZONP2 06/01/2013 $30.10 $7.10 $0.00 $0.00 $37.20 12/01/2013 $30.60 $7.10 $0.00 $0.00 $37.70 06/01/2014 $31.10 $7.10 $0.00 $0.00 $38.20 12/01/2014 $31.60 $7.10 $0.00 $0.00 $38.70 06/01/2015 $32.10 $7.10 $0.00 $0.00 $39.20 12/01/2015 $32.60 $7.10 $0.00 $0.00 $39.70 06/01/2016 $33.10 $7.10 $0.00 $0.00 $40.20 12/01/2016 $33.85 $7.10 $0.00 $0.00 $40.95 ----------------------------------------------------------------------------------------------- .... ...... ------ - --------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 39 of 41 4. r - Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER - Zone 2 Effective Date - 12/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.76 $7.10 $0.00 $0.00 $24.86 2 70 $20.72 $7.10 $0.00 $0.00 $27.82 3 80 $23.68 $7.10 $0.00 $0.00 $30.78 4 90 $26.64 $7.10 $0.00 $0.00 $33.74 Effective Date - 06/01/2013 - - - - - - - - - - - - Supplemental - - Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.06 $7.10 $0.00 $0.00 $25.16 2 70 $21.07 $7.10 $0.00 $0.00 $28.17 3 80 $24.08 $7.10 $0.00 $0.00 $31.18 4 90 $27.09 $7.10 $0.00 $0.00 $34.19 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journe3worker Ratio: 1:5 - - - - - - - - - - - - - - - - - - OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2012 $21.28 $10.00 $0.00 $0.00 $31.28 OPERA TING ENGINEERS LOCAL 4 06/01/2013 $21.70 $10.00 $0.00 $0.00 $31.70 12/01/2013 $22.12 $10.00 $0.00 $0.00 $32.12 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OILER (TRUCK CRANES, GRADALLS) 12/01/2012 $24.62 $10.00 $0.00 $0.00 $34.62 OPERA TING ENGINEERS LOCAL 4 06/01/2013 $25.10 $10.00 $0.00 $0.00 $35.10 12/01/2013 $25.59 $10.00 $0.00 $0.00 $35.59 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT - CLASS 11 12/01/2012 $39.72 $10.00 $0.00 $0.00 $49.72 OPERA TJNG IFNGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $0.00 $0.00 $50.49 12/01/2013 $41.27 $10.00 $0.00 $0.00 $51.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PANEL & PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $0.00 $0.00 $39.35 TFAMSTERSJOINT CO UNCH, NO. 10 7ONE B 130WER SHOVELfDERRICK/TRENCHING MACHINE 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 OPERA TING ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (CONCRETE) 12/01/2012 $40.09 $10.00 $0.00 $0.00 $50.09 OPERA 71NG ENGINEERS LOCAL 4 06/01/2013 $40.87 $10.00 $0.00 $0.00 $50.87 12/01/2013 $41.65 $10.00 $0.00 $0.00 $51.65 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PUMP OPERATOR (DEWATERING, OTHER) 12/01/2012 $28.17 $10.00 $0.00 $0.00 $39.17 OPERA TING EIVGINEERS LOCAL 4 06/01/2013 $28.72 $10.00 $0.00 $0.00 $38.72 12/01/2013 $29.27 $10.00 $0.00 $0.00 $39.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" -------------- ------------- -------- - ----------------------- ----- -- --- ------------------ ------------------- ---------- ------ - Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 40 of 41 Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage ofthe pre -determined hourly wage rate established by the Commissioner wider the provisions ofthe M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division ofApprenticeship Training pursuant to M.G.L c. 23, ss. I IE -I IL. All apprentices must be registered with the Division ofApprenticeslup Training in accordance with M.G.L. c. 23, ss. I IE -I IL. All steps are six months (1000 hours) unless otherwise specified. Ratios are expressed in allowable number ofapprentices to journeymen or fraction thereof Multiple ratios are listed in the comment field. APP to JM, 1: 1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. APP to JM, 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. ----------------- ------------------------------------------------- ------------------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 41 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment ROLLER/SPREADER/MULCHING MACHINE 12/01/2012 $39.72 $10.00 $0.00 $0.00 $49.72 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $0.00 $0.00 $50.49 12/01/2013 $41.27 $10-00 $0.00 $0.00 $51.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2012 $30.74 $8.91 $0.00 $0.00 $39.65 TEAMSTERSJOINTCOUNCILNO. 1070NEB SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2012 $31.03 $8.91 $0.00 $0.00 $39.94 TEAMSTERS JOINT COUNCIL NO. 10 70NE B TRACTORS/PORTABLE STEAM GENERATORS 12/01/2012 $39.72 $10.00 $0.00 $0.00 $49.72 OPERATING ENGINEERS LOCAL 4 06/01/2013 $40.49 $10.00 $0.00 $0.00 $50.49 12/01/2013 $41.27 $10.00 $0.00 $0.00 $51.27 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2012 $31.32 $8.91 $0.00 $0.00 $40.23 TEAMSTERS JOINT COUNCIL NO IOZONEB TREE TRIMMER 02/01/2009 $16.59 $2.42 $0.00 $0.00 $19.01 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 This classification applies only to the trimming ofbrancbes on and around utility lines. TREE TRIMMER GROUNDMAN 02/01/2009 $14.64 $2.42 $0.00 $0.00 $17.06 OUTSIDE ELECTRICA L WORKERS - FAST LOCAL 104 This classification applies only to die trimming ofbranches on and around utility lines. VAC -H Al JL/CATCH BASIN CLEANING 12/01/2012 $30.74 $8.91 $0.00 $0.00 $39.65 TEAMSTERS JOINT CO UNCIL)NO. 10 70,NE R Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage ofthe pre -determined hourly wage rate established by the Commissioner wider the provisions ofthe M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division ofApprenticeship Training pursuant to M.G.L c. 23, ss. I IE -I IL. All apprentices must be registered with the Division ofApprenticeslup Training in accordance with M.G.L. c. 23, ss. I IE -I IL. All steps are six months (1000 hours) unless otherwise specified. Ratios are expressed in allowable number ofapprentices to journeymen or fraction thereof Multiple ratios are listed in the comment field. APP to JM, 1: 1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. APP to JM, 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. ----------------- ------------------------------------------------- ------------------------------------------------------------- Issue Date: 02/14/2013 Wage Request Number: 20130214-005-9 Page 41 of 41 Phone: (781) 428-3400 ting Inc. t Prmrvadon Solutims 825 Granite Street Braintree, MA 02184 Certificate of Corporate Vote FAX: (781) 428-3430 At a meeting of the Board of Directors of SEALCOATING, INC. held on January 23, 2013, at which all the Directors were present or waived notice, it was VOTED: That Elizabeth Wuori, President of this Company, be and she hereby is authorized to execute bids, contracts and bonds in the name and behalf of said Company, and aff ix its corporate seal thereto; and such execution of any contract or obligation in this company's name on its behalf by such President, under seal of the Company, shall be valid and binding upon this Company. A true copy ATTEST: (�2AO- AV -44-4— . Clerk/Jecretary Place of business, Braintree, MA Date of this contract: March 13, 2013 I hereby certify that I am the clerk of SEALCOATING, INC., that Elizabeth Wuori is the duly elected President of said Company, and that the above vote has not been amended or rescinded and remains in full force and ef fpq as of this date. I April buraJ, Clerk (CORPORATE SEAL) 01-23-13 Appendix D MVPCOO1.13 Non -Collusion Form & Tax Compliance Form 1. CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of peijury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall. mean any natural person, business, partnership, corporation, union, committee club, or other organization, entity, or group orindividuals. Signat6i of individual submitting bid or proposal Ell-lbeth Wuori, President Sealcoating, Inc. Name of Business 11. TAX COMPLIANCE CERTIFICATION Pursuant to M.G.L. Chapter 62C, Sec. 49A, I certify under the penalties of pedury that, to the best of my knowledge and belief, I am in compliance with all laws of the Commonwealth relating to taxes, reporting of employees and contractors, a d withholding and remitting child support. SignattTre 6 naividuaT_subfi�iitting bid or proposal Eli 't Wuori, President JIV Sealcoating, Inc. Nameof Business MVPCOOL 13 Higbway Maintenance Services AC40REP 16.� CERTIFICATE OF LIABILITY INSURANCE DA E (MUMDNYYY) 4/T11/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such ondorsement(s). PRODUCER Eastern Insurance Group LLC 77 Accord Park Drive Unit Ell Norwell bLk 02061 CONTACT Norwell Construct South -NAME: PHONE FAX N. ryfl- AIC, Not: _(AQ E-MAIL -ADDRESS: INSURER(S) AFFORDING COVERAGE NAIC # INSURERA-Acadia Insurance Company 31325 INSURED SEALCOATING INC & B&R PARTNERS, LLC 825 Granite Street Braintree MA 02184 INSURER B -Continental Casualty ompany 20443 INSURER C: INSURERD: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:2013-2014 MASTER REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR .LTR. TYPE OF INSURANCE ADDLSUBR POLICY NUMBER__ POLICY EFF (MWDDrrrrn POLICY EXP (MMIDDIYYYYJ LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1000000 X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED PREMISES (Ea occurrence) $ 300000 A CLAIMS-MADEFx-]OCCUR CRA0170645 1/1/2013 1/1/2014 MED EXP (Any one person) $ 5000 PERSONAL & ADV INJURY $ 1000000 AGGREGATE $ 2000000 GEN'L AGGREGATE LIMIT APPLIES PER: _��ENIERAL PRODUCTS - COMPIOP AGG $ 2000000 F-1 POLICYFXI PER,0j F-] LOC $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT (Ea accident) $ 1,000,000 BODILY INJURY (Per person) $ A ANY AUTO BODILY INJURY (Per accident) $ ALL OWNED SCHEDULED MRA0170646 1/1/2013 /1/2014 AUTOS AUTOS NON -OWNED 1 PRO MAGE $ HIRED AUTOS AUTOS (per $ X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 10,000,000 AGGREGATE $ 10,000,000 B EXCESS LIAO I C,IMS-MADE L5085705326 1/1/2013 1/1/2014 DED I X I RETENTION$ 10,00C $ A WORKERS COMPENSATION X I �&SIATU LIM , I ER AND EMPLOYERV LIABILITY YIN ANY PROPRIETORIPARTNER/EXECUTIVE RCA0170647 (HA) 1/1/2013 1/1/2014 EACH ACCIDENT $ 500,000 rA OFFICER/MEMBER EXCLUDED? 1E (Mandatory in NH) NIA 280505 (RI) /1/2013 ./l/2014 -E.L- E.L. DISEASE - EA EMPLOYEE, $ 500,000 If yes, describe under DESCRIPTION OF OPERATIONS below E -L DISEASE - POLICY LIMIT 1 $ 500,000 Leased Rented Equipment 0 170645 1/1/2013 1/1/2014 $175,000/$1,000 DED A Phys Dam Hired Auto 0170646 1/1/2013 1/1/2014 $50,0001$5W DED DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, If more space is required) RE: Random Crack Sealing//If required by written contract Town of North Andover is named Additional I Insured for General Liability, Automobile Liability, and Umbrella Liability as respects to the referenced project. CERTIFICATE HOLDER CANCF[ I ATION ACORD 25 (2010/05) INS025(2ninnsini @ 1988-2010 ACORD CORPORATION. All rights reserved. Tho Aenpn noma nnel Inn^ 2rsh ranieforarl marlea nf Att117n SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Town of North Andover ACCORDANCE WITH THE POLICY PROVISIONS. 120 Main Street AUTHORIZED REPRESENTATIVE North Andover, bfik 01845 I Ronald Cleaves/CD1 ACORD 25 (2010/05) INS025(2ninnsini @ 1988-2010 ACORD CORPORATION. All rights reserved. Tho Aenpn noma nnel Inn^ 2rsh ranieforarl marlea nf Att117n