Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract #: 836 - From: 08-04-2015 To: 07-15-2016 - Waterline Ind - Town of North Andover
Andrew W. Maylor Town Manager Town of North Andover Office of the Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 amaylor@townofnorthandover.com Mr. Michael Girard, Vice President Waterline Industries Corporation 7 London Lane Seabrook, NH 03874 Dear Mr. Girard: Telephone (978)688-9510 Fax (978)688-9556 September 12, 2016 Please be advised the contract between the Town of North Andover and Waterline Industries Corporation (Contract 4836), for the construction of the Rea's Pond Pumping Station has been extended until November 30, 2016. The extension is for time only and does not impact the contract's dollar amount. If you have any questions and/or concerns, please call Ray Santilli, Assistant _Town Manager, at 978-688-9516. Sincerely, Andrew W. Maylor Town Manager cc., Bruce Thibodeau, Public Works Glen Alt, Water Treatment Plant Contract File i• INTEROFFICE MEMORANDUM DATE: September 6, 2016 TO: Andrew Maylor, Town Manager CC: Ray Santilli, Assistant Town Manager FROM: Bruce Thibodeau, Director of DPW RE: Rea's Pond Pump Station Contract Extension — Waterline Industries Please find attached a request from Waterline Industries for a time extension to their contract with the Town for the above referenced project. Also attached is a recommendation from Glen Alt to extend the contract. After review of the issues related to National Grid's lack of timely response I concur with Glen's recommendation and recommend extension of the contract from August 24, 2016 to November 14, 2016. If you should have any questions, please do not hesitate to contact me. INTEROFFICE MEMORANDUM DATE: September 6, 2016 TO: Bruce Thibodeau, Director of Public Works FROM: Glen C. Alt, Superintendent WTP GC A\ RE: Rea's Pond Change Order Waterline Industries has requested a time extension change order for the Rea's Pond project. This request is a result of National Grid's lack of timely response when trying to complete the new power service into the station. This change order is for time only and does not carry any monetary changes. Woodard & Curran also recommends this change. I � WATERLINE INDUSTRIES CORPORATION 7 London Lane • Seabrook, NH 03874 • Tel 603-474-7477 Fax 603-47478578 www.waterlinecompanies.com 8/19/2016 Jason J. Kreil, P.E. Project Engineer Woodard & Curran 980 Washington Street - Suite 325 Dedham, Massachusetts 02026 Re: Substantial Completion 11507 North Andover Contract #2 Rea's Pond Pump Station Dear Jason, As you are aware Waterline is currently waiting for NGRID to energize power to the transformer. The continued delays from NGRID have caused us to miss not only the substantial completion date, but we will also miss the final completion date. There have been numerous issues with National Grid on this project, but the issue which had the greatest effect on project completion was National Grid's lack of timely response when trying to complete the new power service: A brief timeline on that is as follows: 6/20116: Trench Inspection Complete 7/15/16: National Grid delivered transformer (25 days) 7/21/16: Waterline completed secondary service, local inspector called inspection in to NGRID TBD: NGRID has still yet to energize the transformer (28 days) We were assured by NGRID that we would have power this week, but that has yet to happen. They may have been delayed due to weather. If we assume that we will have power next week, we will then need approximately 2-3 weeks to schedule Flygt and one additional week for start-up and testing. It would be beneficial to leave add one additional week in case Flygt is further out than expected or National Grid causes further delays. Therefore, Waterline requests to move the substantial completion date to September 30th, 2016. Waterline will have approximately 40 days of work remaining after substantial completion, so we request that the final completion date be moved to November 14th, 2016 Please contact me if you have any questions or concerns. Sincerely, 9 Jan Vastl SECTION 00520 TOWN OF NORTH ANDOVER CONTRACT N CONTRACT# DATE: &JG �4 01D�J This Contract is entered into on, or as of, this date by and between the Town of North Andover (the "Town"), and Contractor: Waterline Industries, Corp. Address: 7 London Lane Seabrook, NH 03874 Telephone Number: (603) 474-7477 Fax Number: (603) 474-8578 1. This is a Contract for the procurement of the following: Construction of Rea's Pond Pumping Station including all utilities, connection of the proposed station to existing gravity sewer pipe, connection of proposed pump station to the existing forcemain, installation of manholes, maintenance of existing sewer flows during construction, demolition of existing pumping station after acceptance of new station and overall site restoration. a 2. The Contract price to be paid to the Contractor by the Town of North Andover is: i $1,594,677.00 3. Payment will be made as follows: Upon completion of work and receipt of invoice, net 30 4. Definitions: 4.1 Acceptance: All Contracts require proper acceptance of the described goods or services by the Town of North Andover. Proper acceptance shall be understood to include inspection of goods and certification of acceptable performance for services by authorized (Rev 5-2007) Contract by and between Town of North Andover and Waterline Industries Corp. Page 1 representatives of the Town to insure that the goods or services are complete and are as specified in the Contract. 0 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. n 4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the p services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 0 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 0 4.7 Work: The services or materials contracted for, or both. D 5. Term of Contract and Time for Performance: This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before July 15, 2016, unless extended pursuant to a provision for extension a contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation: Notwithstanding anything in the Contract documents to the contrary, any and all payments which the Town is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be immediately terminated without liability for damages, penalties or other charges. 7. Permits and Approvals: Q Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. 0 (Rev 5-2007) Contract by and between Town of North Andover and Waterline Industries Corp. Page 2 N I 8. Termination and Default: 8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days notice when in the best interests of the Town by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. Upon termination without cause, Contractor will be paid for services rendered to the date of termination. 8.2 For Cause. If the Contractor is determined by the Town to be in default of any term or condition of this Contract, the Town may terminate this Contract on seven (7) days notice by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. 8.3 Default. The following shall constitute events of a default under the Contract: 1) any material misrepresentation made by the Contractor to the Town; 2) any failure to perform any of its obligations under this Contract including, but not limited to the following: (i) failure to commence performance of this Contract at the time specified in this Contract due to a reason or circumstance within the Contractor's reasonable control, (ii) failure to perform this Contract with sufficient personnel and equipment or with sufficient material to ensure the completion of this Contract within the specified time due to a reason or circumstance within the Contractor's reasonable control, (iii) failure to perform this Contract in a manner reasonably satisfactory to the Town, (iv) failure to promptly re -perform within a reasonable time the services that were rejected by the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a material term of this Contract, including, but not limited to, the provision of insurance and non- discrimination, (vii) any other acts specifically and expressly stated in this Contract as constituting a basis for termination of this Contact, and (viii) failure to comply with any and all requirements of state law and/or regulations, and Town bylaw and/or regulations. 9. The Contractor's Breach and the Town's Remedies: Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be deemed a material breach of this Contract, and the Town of North Andover shall have all the rights and remedies provided in the Contract documents, the right to cancel, terminate, or suspend the Contract in whole or in part, the right to maintain any and all actions at law or in equity or other proceedings with respect to a breach of this Contract, including damages and specific performance, and the right to select among the remedies available to it by all of the above. (Rev 5-2007) Contract by and between Town of North Andover and Waterline Industries Corp. Page 3 0 From any sums due to the Contractor for services, the Town may keep the whole or any part of the amount for expenses, losses and damages incurred by the Town as a consequence of procuring services as a result of any failure, omission or mistake of the Contractor in providing services as provided in this Contract. a 10. Statutory Compliance: 10.1 This Contract will be construed and governed by the provisions of applicable federal state and local laws and regulations; and wherever any provision of the Contract or Contract documents shall conflict with any provision or requirement of federal, state or local law or regulation, then the provisions of law and regulation shall control. Where applicable to the Contract, the provisions of the General Laws are incorporated by reference into this Contract, including, but not limited to, the following: a General Laws Chapter 30B — Procurement of Goods and Services. General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts. General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts. 10.2 Wherever applicable law mandates the inclusion of an term and provision into a PP Y municipal contract, this Section shall be understood to import such term or provision into this Contract. To whatever extent any provision of this Contract shall be inconsistent with any law or regulation limiting the power or liability of cities and towns, such law or regulation shall control. 10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on the performance of the Contract. If the Contractor performs the Contract in violation of law the Contractor shall bear all costs arising therefrom. D any applicable or regulation, 10.4 The Contractor shall keep itself fully informed of all existing and future State and National Laws and Municipal By-laws and Regulations and of all orders and decrees of any bodies or tribunals having jurisdiction in any manner affecting those engaged or employed in the work, of the materials used in the work or in any way affecting the conduct of the work. a If any discrepancy or inconsistency is discovered in the Drawings, Specifications or Contract for this work in violation of any such law, by-law, regulation, order or decree, it shall forthwith report the same in writing to the Town. It shall, at all times, itself observe and comply with all such existing and future laws, by-laws, regulations, orders and decrees; and shall protect and indemnify the Town of North Andover, and its duly appointed agents against any claim or liability arising from or based on any violation whether by him or its agents, employees or subcontractors of any such law, by-law, regulation or decree. 11. Conflict of Interest: D Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest a Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which shall constitute a violation of that law. The Contractor shall be deemed to have investigated the application of M.G.L. c. 268A to the performance of this Contract; and by executing the Contract (Rev 5-2007) Contract by and between Town of North Andover and Waterline Industries Corp. Page 4 fl D Q documents the Contractor certifies to the Town that neither it nor its agents, employees, or subcontractors are thereby in violation of General Laws Chapter 268A. D it I 12. Certification of Tax Compliance This Contract must include a certification of tax compliance by the Contractor, as required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors Providing Goods, Services, or Real Estate Space to the Commonwealth or Subdivision). 13. Discrimination The Contractor will carry out the obligations of this Contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151B (Law Against Discrimination) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. 14. Assignment: Assignment of this Contract is prohibited, unless and only to the extent that assignment is provided for expressly in the Contract documents. 15. Condition of Enforceability gainst the Town: This Contract is only binding upon, and enforceable against, the Town if. (1) the Contract is signed by the Town Manager or its designee; and (2) endorsed with approval by the Town Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the Town Counsel as to form. 16. Corporate Contractor: If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's Certificate certifying the corporate capacity and authority of the party signing this Contract for the corporation. Such certificate shall be accompanied by a letter or other instrument stating that such authority continues in full force and effect as of the date the Contract is executed by the Contractor. This Contract shall not be enforceable against the Town of North Andover unless and until the Contractor complies with this section. The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto, relating to the appointment of the Commissioner of Corporations as its attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the Commonwealth. 17. Liability of Public Officials: (Rev 5-2007) Contract by and between Town of North Andover and Waterline Industries Corp. Page 5 0 To the full extent permitted by law, no official, employee, agent or representative of the Town of North Andover shall be individually or personally liable on any obligation of the Town under this Contract. 18. Indemnification: a The Contractor shall indemnify, defend and save harmless the Town, the Town's officers, agents and employees, from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every nature and a description (including reasonable attorneys' fees) that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, a regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by the Contractor, its employees, agents, subcontractors or material men, and anyone directly or a indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective, or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. a The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this contract. 19. Workers Compensation Insurance: The Contractor shall provide by insurance for the payment of compensation and the furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's Compensation Act) to all employees of the Contractor who are subject to the provisions of Chapter 152 of the General Laws of Massachusetts. D Failure to provide and continue in force such insurance during the period of this Contract shall be deemed a material breach of this Contract, shall operate as an immediate termination thereof, and Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article. a The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this Contract before the same shall be binding on the parties thereto, except if specifically waived by the Town. 20. Documents, Materials, Etc. Any materials, reports; information, data, etc. given to or prepared or assembled by the Contractor under this Contract are to be kept confidential and shall not be made available to any a individual or organization by the Contractor (except agents, servants, or employees of the Contractor) without the prior written approval of the Town, except as otherwise required by law. The Contractor shall comply with the provisions Chapter 66A of the General Laws of Massachusetts as it relates to public documents, and all other state and federal laws and regulations relating to confidentiality, security, privacy and use of confidential data. Rev 5-2007 Contract b and between Town of North Andover and Waterline Industries Corp. Page 6 � ) Y rP g a n Any materials produced in whole or in part under this Contract shall not be subject to copyright, Uexcept by the Town, in the United States or any other country. The Town shall have unrestricted authority to, without payment of any royalty, commission, or additional fee of any type or nature, a publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole or in part, any reports, data or other materials prepared under this Contract. All data, reports, programs, software, equipment, furnishings, and any other documentation or product paid for by the Town shall vest in the Town at the termination of this Contract. The Contractor shall at all times, during or after termination of this Contract, obtain the prior written approval of the Town before making any statement bearing on the work performed or data collected under this Contract to the press or issues any material for publication through any n medium. LJ 21. Audit, Inspection and Recordkeeping Q At any time during normal business hours, and as often as the Town may deem it reasonably necessary, there shall be available in the office of the Contractor for the purpose of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices, materials, D payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. 22. Pent The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the D Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work completed and acceptance from the Town of the work completed. 0 23. Waiver and Amendment Amendments, or waivers of any additional term, condition, covenant, duty or obligation contained in this Contract may be made only by written amendment executed by all signatories to the original Agreement, prior to the effective date of the amendment. To the extent allowed by law, any conditions, duties, and obligations contained in this Contract may be waived only by written Agreement by both parties. DForbearance or indulgence in any form or manner by a party shall not be construed as a waiver, nor in any manner limit the legal or equitable remedies available to that party. No waiver by either party of any default or breach shall constitute a waiver of any subsequent default or breach of a similar or different matter. 24. Forum and Choice of Law This Contract and any performance herein shall be governed by and be construed in accordance a with the laws of the Commonwealth. Any and all proceedings or actions relating to subject matter herein shall be brought and maintained in the courts of the Commonwealth or the federal district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any other legal rights of the parties. (Rev 5-2007) Contract by and between Town of North Andover and Waterline Industries Corp. Page 7 25. 27 ►: Notices Any notice permitted or required under the provisions of this Contract to be given or served by either of the parties hereto upon the other party hereto shall be in writing and signed in the name or on the behalf of the party giving or serving the same. Notice shall be deemed to have been received at the time of actual service or three (3) business days after the date of a certified or registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to the Town of North Andover by being sent to the Town Manager, Town Hall, 120 Main Street, North Andover, Massachusetts 01845. Binding on Successors: This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in interest (and where not corporate, the heirs and estate of the Contractor). Complete Contract: This instrument, together with its endorsed supplements, and the other components of the contract documents, constitutes the entire contract between the parties, with no agreements other than those incorporated herein. Supplemental Conditions: The foregoing provisions apply to all contracts to which the Town of North Andover shall be a party. One of the following "Supplements" must be "checked" as applicable to this Contract, shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The Supplement contains additional terms governing the Contract: [ ] GOODS SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods (governed by the provisions of General Laws Chapter 30B) [ ] SERVICES SUPPLEMENT "S" - Applicable to Contracts for the procurement of Services (governed by the provisions of General Laws Chapter 30B) [ X ] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for Construction (Rev 5-2007) Contract by and between Town of North Andover and Waterline Industries Corp. Page 8 I I 11 I I D 1 n IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set forth their hands the day and year first above written. THE TOWN i ' epa ment Head Contract Manager THE CONTRACTOR Waterline Industries Corp. Company Name AAf,j, f5 k y �Town Manager Date Signature Date Michael A. Girard, Vice President Print Name & Title CERTIFICATION AS TO AVAILABILITY OF FUNDS: Q'k�\o �a � Vz Town ccountantJ-Date .Q (Rev 5-2007) Contract by and between Town of North Andover and Waterline Industries Corp. Page 9 u . SECTION 00520A QSUPPLEMENT "C" [] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for the construction of: (1) Public Buildings and Public Works (governed by the provisions of General Laws Chapter 30B); (2) Public Buildings (governed by the provisions of General Laws Chapter 149,§ 44A, n et seq.); and (3) Public Works (governed by the provisions of General Laws Chapter 30, §39M, et seq) Q1. This form supplements the Town of North Andover "Contract and General Conditions" and applies only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works or public buildings. 2. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be a understood to be a term and condition of this Contract. The Contractor agrees to secure such bond (where required) in the form required by the Town and provide an original thereof to the Town prior to the commencement of performance. d3. E uali : 3.1. In the case of a closed Specification written for a specific item or items to be furnished under the Base Bid, such specifications shall, as applicable, be in compliance with the Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq. a 3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or on the Drawings, except as above noted, the intent is to establish a standard and in no way should be construed to exclude any item or manufacturer not mentioned by name, but whose product meets the Specifications as to design, utility and quality. Final decision shall rest with the Project Representative as to its acceptability. 4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of Chapter 30B. 5. The Contractor will carry out the obligations of this contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage D Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. The Contractor will at all times comply with the wage rates as determined by the Commissioner of the Department of Labor and Industries, under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall be in force and as amended. 6. The Contractor shall continuously maintain adequate protection of all work from damage and shall [�] protect the property of the Town and others, including adjacent property, from injury or loss arising (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 1 and in connection with the Contract. The Contractor shall make good any such damage, injury or loss, except as may be directly due to errors in the Contract Documents or caused by agents or employees of the Town, or due to causes beyond the Contractor's control and not the Contractor's fault or negligence. 7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents or injury to persons on, about or adjacent to the premises where the work is being performed. The Contractor will erect and properly maintain at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and the public, shall post danger signs warning against the hazards created by such features of construction such as pits, protruding nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling materials; and shall designate a responsible member of its organization on the work, whose duty shall be the prevention of accidents. The Town shall at all times have access to the work wherever it is in preparation or progress and the Contractor shall provide suitable accommodations for such access. 9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants, all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the construction superintendent, foreman, or assistants are unacceptable to the Town, then upon seven days notice from the Town, the Contractor shall replace such person or persons with people acceptable to the Town. 10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The Contractor shall carefully study and compare the drawings, specifications and other instructions and shall at once report to the Town any error, inconsistency or omission which shall be discovered. Included in this responsibility shall be supervision of all work performed by subcontractors on the work. 11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any of its provisions, the Town, upon three days written notice, may, without prejudice to any other remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor. 12. Inspection by the Town's Project Representative 12.1. The Town shall have the right to designate a Project Representative who may make periodic visits to the site to familiarize the Town generally with the progress and quality of the work, and to determine in general if the work is proceeding in accordance with the Contract Documents. The Project Representative will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the work, and will not be responsible for the Contractor's failure to carry out the construction work in accordance with the Contract Documents. During such visits and on the basis of these observations while at the site, the Project Representative will keep the Town informed on the progress of the work, will endeavor to guard the Town against defects and deficiencies in the work of contractors, and may condemn structural work as failing to conform to the Contract Documents. The Project Representative shall have authority to act on behalf of the Town only to the extent expressly delegated by the Town, which shall be shown to the Contractor, and shall have authority to stop the work whenever such stoppage may reasonably be necessary to insure the proper execution of the Contract. 1 11 M I D A r 0 I I 8 I (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 2 and 0 12.2. In connection with the work, the Project Representative shall not be responsible for construction methods, means, techniques, sequences or procedures employed by the Contractor or the Contractor's safety programs, requirements, regulations, or precautions. Q13. Decisions of the Project Representative 13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of the Town or the Contractor and on all other matters relating to the execution and progress of the structural work or the interpretation of the Contract Documents. 13.2. The Project Representative's decision, in matters relating to the project, shall be final, if within the terms of the Contract Documents. 13.3. If, however, the Project Representative fails to render a decision within ten days after the parties have presented their evidence, either party may then avail itself of the remedies provided in this contract or available to it by law. If the Project Representative renders a decision after such remedies have commenced, such decision may be entered as evidence but shall not disturb or interrupt such proceedings except where such decision is acceptable to the parties concerned. n 14.1 Use of Premises by the Contractor: u 14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of its workmen to limits indicated by law, by-laws, permits or directions of the Town and shall not unreasonably encumber the premises with its materials. 14.2. The Contractor shall not load or permit any part of the structure to be loaded with a weight that will endanger its safety. 15. Maintenance of Premises: aThe Contractor shall at all times keep theP remises free from accumulation of waste materials or rubbish caused by its employees or work, and at the completion of the work it shall remove all its rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute, the Town may remove the rubbish and charge the cost to the several contractors, as the Town shall determine to be just. 16. Right to Terminate If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently disregard laws and regulations or lawful directives of the Town, or (7) be guilty of a substantial violation of any provision of the Contract, then the Town may, without prejudice to any other right or remedy and after giving the Contractor (or any surety) seven days written notice, terminate the contract and the employment of the Contractor and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method it deems appropriate. �'j (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 3 U and In such cases, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid amount owed to the Contractor for work already completed shall exceed the expense of finishing the work, including compensation for additional architectural, managerial, legal and administrative services, such excess shall be paid to the Contractor. If such expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the Town. The Contractor shall not be relieved of liability to the Town by virtue of any termination of this contract, and any claim for damages against the Contractor relating to the Contractor's performance under this contract shall survive any termination hereunder. Notwithstanding any other provision of this Agreement, the Town reserves the right at any time in its absolute discretion to suspend or terminate this Agreement in whole or in part for its convenience upon seven days written notice to the Contractor. The Town shall incur no liability by reason of such termination except for the obligation to pay compensation for all work performed by the Contractor and accepted by the Town to the termination date. 17. Pro egr ss Payments: 17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported to the extent required by the Town by invoices or other vouchers, showing payments for materials and labor, payments to Subcontractors and such other evidence of the Contractor's right to payment. 17.2. The Contractor shall, before the first application, submit to the Town a schedule of values of the various parts of the work, including quantities aggregating the total sum of the Contract, divided so as to facilitate payments to Subcontractors, made out in such form as the Town and the Contractor may agree upon, and, if required, supported by such evidence as to its correctness. This schedule, when approved by the Town, shall be used as a basis for payment, unless it is found to be in error. If applying for payments, the Contractor shall submit a statement based upon this schedule. 18. Withholding o,__ f Payments 18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the whole or part of any payment to such extent as may be necessary in its reasonable opinion to protect the Town of North Andover from loss on account of - 18. 1. 1. f: 18.1.1. Defective work not remedied. 18.1.2. Claims filed or reasonable evidence indicating probable filing of claims. 18.1.3. Failure of the Contractor to make payments properly to Subcontractors or for material or labor. 18.1.4. A reasonable doubt that the Contract can be completed for the balance then unpaid. 18.1.5. Damage to another contractor. 18.1.6. Delays resulting in liquidated damages. N M I D D D D 1 r I I I (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 4 and 0 a 18.2. Withholding of payments shall be in strict compliance with statutory requirements. 19. Claims by Contractor and Liability of Town Q All claims by the Contractor against the Town shall, unless otherwise provided by law, be initiated by a written claim submitted to the Town no later than seven (7) calendar days after the event or the first appearance of the circumstances causing the claim. The claim shall set forth in detail all known facts and circumstances supporting the claim. The Contractor shall continue its performance under this contract regardless of the submission or existence of any claims. The limit of liability of the Town under this Agreement is limited to the compensation provided herein for work actually performed, and shall in no event include liability for delays or for incidental, special or consequential damages or lost profits or for damages or loss from causes beyond the Town's reasonable control. 20. Liquidated Damages: Because both parties recognize (1) that the time for completion of this Contract is of the essence, (2) that the Town will suffer loss if the work is not completed within the contract time specified, plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the delays, expense and difficulties involved in a legal proceeding to determine the actual loss suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay the Town as liquidated damages representing an estimate of delay damages, not as a penalty, the sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is completed, whether the work is completed by the Contractor or some other person. The Town's right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a legal action for damages in lieu of or in addition to its option to impose liquidated damages. The Town may deduct any liquidated damages from money due the Contractor, and if such payment is insufficient to cover the liquidated damages, then the Contractor shall pay the amount due. 21. The Contractors' Mutual ResponsibilitX: Should the Contractor cause damage to any separate subcontractor on the work, the Contractor agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies provided by law or by the provisions of the contract. If such separate contractor sues the Town on account of any damage alleged to have been sustained, the Town shall notify the Contractor, Q who shall defend such proceedings at the Town's expense and, if any judgment against the Town arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Town. a22. Separate Contracts: 22.1. The Town reserves the right to let other Contracts in connection with this work under similar General Conditions. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate its work with theirs. n22.2. If any part of the Contractor's work depends, for proper execution or results, upon the U work of any other contractor, the Contractor shall inspect and promptly report to the Town any defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance Q (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 5 and 23 24 25 9 The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound a by the terms of the Agreement, the General Conditions of the Contract, the Supplementary General Conditions, the Drawings and Specifications, as far as applicable to its work, including the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A, a et seq. Indemnification: a of the other contractors work as fit and proper for the reception of its work except as to defects which may develop in the other contractor's work after the execution of its work. a 22.3. To insure the ro er execution of its subsequent work the Contractor shall measure work P p a already in place and shall at once report to the Town any discrepancy between the executed work and the Drawings. a Subcontracts: Q subcontractors, material men, and anyone directly or indirectly employed by any of them 23.1. All Subcontracts shall be awarded in conformity with the requirements of the General Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive. 23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and omissions of its Subcontractors and of persons either directly or indirectly employed by them, as it is for the acts and omissions of persons directly employed by it. a 23.3. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the Town. Contractor -Subcontractor Relations: The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound a by the terms of the Agreement, the General Conditions of the Contract, the Supplementary General Conditions, the Drawings and Specifications, as far as applicable to its work, including the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A, a et seq. Indemnification: a 25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents and employees from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, recoveries and judgments of every nature and a description (including reasonable attorneys' fees) brought or recovered against them that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, Q subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this Contract. 25.2. In any and all claims against the Town or any of their agents or employees by any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under this paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 6 and 0 a an Subcontractor under Workmen's Compensation Acts disability benefit acts or other Y p � Y employee benefit acts. 25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and minimum limits of liability acceptable under the Contract. However, it shall be the Contractor's responsibility to purchase and maintain insurance of such character and in such amounts as will adequately protect it and the Town from and against all claims, damages, losses and expenses resulting from exposure to any casualty liability in the aperformance of the Work. 26. The Contractor's Insurance: 26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable. 26.1.1. Claims under Worker's Compensation, disability benefit and other similar employee benefit acts; a 26.1.2. Claims for damages because of bodily injury, occupational sickness or disease, or death of its employees, and claims insured by usual personal injury liability coverage; M Il FI 26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of any person other than its employees, and claims insured by usual personal liability coverage; 26.1.4. Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 26.2. The insurance required by the above shall be written for not less than the following minimum limits of liability: 26.2.1. Worker's Compensation Insurance Requirements Workers' Compensation coverage as required by the laws of the Commonwealth of Massachusetts. 26.2.2. Liability Insurance Requirements Liability insurance shall include all major divisions and shall be on a comprehensive general basis including Premises and Operations, Owners and Contractor's Protective, Products and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles. All such insurance shall be written for not less than any limits of liability required by law, unless otherwise provided in the contract documents, or the following limits, whichever are greater: (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 7 and 0 Comprehensive General Liability Insurance (Broad Form) Bodily Injury $1,000,000 per person $3,000,000 per occurrence Property Damage $1,000,000 per occurrence a $3,000,000 annual aggregate Automobile Liability Insurance $500,000 per person $1,000,000 per occurrence Excess Liability (Umbrella) $5,000,000 a Excess Liability (Umbrella) Insurance (Subcontractors) $1,000,000 or 1.5 times the value of The subcontract, whichever is Higher a 26.3. The above insurance policies shall also be subject to the following requirements: 26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as hereinafter specified under Paragraph entitled "Protective Liability Insurance" shall be written by one and the same insurance company to avoid the expense of a duplicate and/or overlapping coverage and to facilitate and expedite the settlement of claims. a 26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed with the Town prior to commencement of the work. Renewal certificates shall be addressed to and filed with the Town at least ten (10) days prior to the expiration date of required policies. a 26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30) days prior written notice forwarded by registered or certified mail to the Town. The Town shall also be notified of the attachment of any restrictive amendments to the policies. 26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of a Insurance form, shall contain true transcripts from the policies, authenticated by the proper officer of the Insurer, evidencing in particular those insured, the extent a of coverage, the location and operations to which the insurance applies, the expiration date and the above-mentioned notice clauses. 26.3.5. All premium costs shall be included in the Contractor's bid. O 26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be a maintained without interruption from date of the Contract until date of final payment and termination of any coverage required to be maintained after payment. a (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 8 a and 0 a27. Protective Liability Insurance: D m 11 Neither the Final Payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as it has knowledge or information, the releases and receipts include all the labor and material for which a lien could be filed. The Contractor shall comply with all statutory provisions of the General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149 as amended (as a minimum requirement). 29. Guarantees: 29.1 The Contractor guarantees and warrants to the Town that all labor furnished under this Contract will be competent to perform the tasks undertaken, that the product of such labor will yield only first-class results, that materials and equipment furnished will be of good quality and new unless otherwise permitted by this Contract, and that the Work will be of good quality, free from faults and defects and in strict conformance with this Contract. All Work not conforming to these requirements may be considered defective. 29.2. If at any time any part of the work constructed under the terms of this contract shall in the opinion of the Town Manager require repairing due to defective work or materials furnished by the Contractor, he may notify the Contractor in writing to make the required repairs. If the Contractor shall neglect to start such repairs within ten days of the date of giving it notice thereof and to complete the same to the satisfaction of the Town Manager with reasonable dispatch, then the latter may employ other persons to make such repairs. The Town shall charge the expense thereof to the Contractor and may use any moneys still retained to pay for the same, and if such sum is insufficient, the Contractor shall be obligated to pay the balance thereof. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 9 and 27.1. The Contractor shall purchase and maintain such insurance as described in the preceding paragraph as will protect the Town from claims which may arise from operations under the Contract, including operations performed for the named insureds by independent contractors and general inspection thereof by the named insureds. 27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town against Automobile Non -Ownership Liability in connection with the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. 27.3. The limits of liability for coverage required under the preceding paragraphs shall be as specified under the provisions hereof governing the Contractor's General Liability aPolicy. 27.4. The Town shall be named as an additional insured on the above referenced liability Policies, and the Contractor's insurance shall be the primary coverage. The cost of such insurance, including required endorsements and amendments, shall be the sole responsibility of the Contractor. 28. Liens: D m 11 Neither the Final Payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as it has knowledge or information, the releases and receipts include all the labor and material for which a lien could be filed. The Contractor shall comply with all statutory provisions of the General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149 as amended (as a minimum requirement). 29. Guarantees: 29.1 The Contractor guarantees and warrants to the Town that all labor furnished under this Contract will be competent to perform the tasks undertaken, that the product of such labor will yield only first-class results, that materials and equipment furnished will be of good quality and new unless otherwise permitted by this Contract, and that the Work will be of good quality, free from faults and defects and in strict conformance with this Contract. All Work not conforming to these requirements may be considered defective. 29.2. If at any time any part of the work constructed under the terms of this contract shall in the opinion of the Town Manager require repairing due to defective work or materials furnished by the Contractor, he may notify the Contractor in writing to make the required repairs. If the Contractor shall neglect to start such repairs within ten days of the date of giving it notice thereof and to complete the same to the satisfaction of the Town Manager with reasonable dispatch, then the latter may employ other persons to make such repairs. The Town shall charge the expense thereof to the Contractor and may use any moneys still retained to pay for the same, and if such sum is insufficient, the Contractor shall be obligated to pay the balance thereof. (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 9 and 0 1i The Contractor by: / I/ vU'q--%-u U -t4,- ' a Authorized Signature Michael A. Girard, Vice President a y N 0 (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 10 and a 29.3. All guarantees and warranties required in the various Sections of the Specifications which originate with a Subcontractor or Manufacturer must be delivered to the Town before final payment to the Contractor may be made for the amount of that subtrade or for the D phase of work to which the guarantee or warranty relates. The failure to deliver a required guarantee or warranty shall be held to constitute a failure of the Subcontractor to fully complete his work in accordance with the Contract Documents. The Contractor's a obligation to correct work is in addition to, and not in substitution of, such guarantees or warranties as may be required in the various Sections of the Specifications. This Agreement is intended to take effeft as a sealed instrument. Witness our hands and seals hereto: Dated: The Town of North Andover by:l Q� Town Manager'4 a ent ivisi n Head Town Akcbuntant Certified as to Appropriation 1i The Contractor by: / I/ vU'q--%-u U -t4,- ' a Authorized Signature Michael A. Girard, Vice President a y N 0 (Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 10 and THE COMMONWEALTH OF MASSACHUSETTS FA tt7 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS AN ARDS Prevailing Wage Rates CHARLES D. BAKER As determined by the Director under the provisions of the RONALD L. WALKER, II Governor Secretary Massachusetts General Laws, Chapter 149, Sections 26 to 27H JEAN ZEII ER KARYN E. POLITO rl_ Lt. Governor Acting Director arding Authority: ntract Number: Description of Work: 0 Job Location: Town of North Andover City/Town: NORTH ANDOVER Contract 2 — Rea's Pond Pumping Station: Construction of the Rea's Pond Pump Station Replacement including connection to existing forcemain and associated site work. 1653 Great Pond Road, North Andover, MA 01845 Information about Prevailing Wage Schedules for Awarding Authorities and Contractors This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the j ige Request Number" on all pages of this schedule. •`7� An Awarding Authority must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has r ,-Opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK f jects (bid pursuant to G.L. c.149A), the earlier of. (a) the execution date of the GMP Amendment, or (b) the bid for the first construction scope of work must be within 90 -days of the wage schedule issuance date. The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the wane schedule must be paid to employees performing construction work on the project whether they are employed by the prime cj �tactor, a filed sub -bidder, or any sub -contractor. All apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Standards (DAS). Apprentice must keep his/her apprentice identification card on his/her person during all work hours on the 1ect. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on i4revailing wage schedule. If an apprentice rate is not listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAS, the apprentice must be paid the journeyworker's rate for the trade. The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction ects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the r' `tract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, awarding ;_�orlty must request an annual update no later than two weeks before the anniversary date, determined as the earlier of: (a) the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of r,?-truction services. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than 1e rates to covered workers. The annual update requirement is not applicable to 27F "rental of equipment" contracts. • Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll rts and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years. 'll weekly payroll report must contain: the employee's name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at //www.mass.gov/dols/pw. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617) 626-6953. Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor ision of the office of the Attorney General at (617) 727-3465. • Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who erform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and *al penalties. 0 sue Date: 06/01/2015 Wage Request Number: 20150601-026 Classification Effective Date Base Wage Health Pension Supplemental 'total Rate. 6 } $44.08 $10.00 $14.55 $0.00 $68.63 Unemployment 06/01/2016 $44.83 Construction $14.55 $0.00 $69.38 12/01/2016 $46.08 $10.00 (2 AXLE) DRIVER - EQUIPMENT 06/01/2015 $31.65 $9.91 $9.33 $0.00 $50.89 $14.55 TEAMSTERS JOINT COUNCIL NO. 10 ZONE 08/01/2015 $31.65 $10.41 $9.33 $0.00 $51.39 I $72.63 12/01/2015 $31.65 $10.41 $10.08 $0.00 $52.14 Page 2 of 3' g 06/01/2016 $32.15 $10.41 $10.08 $0.00 $52.64 �S 08/01/2016 $32.15 $10.91 $10.08 $0.00 $53.14 12/01/2016 $32.15 $10.91 $10.89 $0.00 $53.95 (3 AXLE) DRIVER - EQUIPMENT 06/01/2015 $31.72 $9.91 $9.33 $0.00 $50.96 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 08/01/2015 $31.72 $10.41 $9.33 $0.00 $51.46 12/01/2015 $31.72 $10.41 $10.08 $0.00 $52.21 D 06/01/2016 $32.22 $10.41 $10.08 $0.00 $52.71 08/01/2016 $32.22 $10.91 $10.08 $0.00 $53.21 12/01/2016 $32.22 $10.91 $10.89 $0.00 $54.02 (4 & 5 AXLE) DRIVER - EQUIPMENT 06/01/2015 $31.84 $9.91 $9.33 $0.00 $51.08 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 08/01/2015 $31.84 $10.41 $9.33 $0.00 $51.58 D 12/01/2015 $31.84 $10.41 $10.08 $0.00 $52.33 N 06/01/2016 $32.34 $10.41 $10.08 $0.00 $52.83 08/01/2016 $32.34 $10.91 $10.08 $0.00 $53.33 0 12/01/2016 $32.34 $10.91 $10.89 $0.00 $54.14 ADS/SUBMERSIBLE PILOT 08/01/2014 $87.36 $9.80 $18.17 $0.00 $115.33 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2015 $90.51 $9.80 $18.17 $0.00 $118.48 D AIR TRACK OPERATOR 06/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 LABORERS - ZONE 2 12/01/2015 $32.40 $7.30 $12.30 $0.00 $52.00 06/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" 12/01/2016 $33.65 $7.30 $12.30 $0.00 $53.25 13 ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 06/01/2015 $33.43 $10.40 $5.95 $0.00 $49.78 HEAT & FROST INSULATORS LOCAL 6 (BOSTON) 12/01/2015 $34.38 $10.40 $5.95 $0.00 $50.73 ASPHALT RAKER 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 LABORERS - ZONE 2 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 lam, l 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 06/01/2015 $42.83 $10.00 $14.55 $0.00 $67.38 OPERATING ENGINEERS LOCAL 4 12/01/2015 $44.08 $10.00 $14.55 $0.00 $68.63 06/01/2016 $44.83 $10.00 $14.55 $0.00 $69.38 12/01/2016 $46.08 $10.00 $14.55 $0.00 $70.63 06/01/2017 $47.08 $10.00 $14.55 $0.00 $71.63 12/01/2017 $48.08 $10.00 $14.55 $0.00 $72.63 I f For apprentice rates see "Apprentice- OPERATING ENGINEERS" L� BACKHOE/FRONT-END LOADER 06/01/2015 $42.83 $10.00 $14.55 $0.00 $67.38 OPERATING ENGINEERS LOCAL 4 12/01/2015 $44.08 $10.00 $14.55 $0.00 $68.63 06/01/2016 $44.83 $10.00 $14.55 $0.00 $69.38 12/01/2016 $46.08 $10.00 $14.55 $0.00 $70.63 06/01/2017 $47.08 $10.00 $14.55 $0.00 $71.63 12/01/2017 $48.08 $10.00 $14.55 $0.00 $72.63 g ------ ----- ------ Page 2 of 3' g Issue Date: 06/01/2015 W a Request Number: 20150601-026 F-1 . , ation +' Effective Date Base Wage Health Pension Supplemental Total Rate LITERPROOFING) 2 65 $24.51 $6.97 $11.18 Unemployment $42.66 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 3 70 $26.39 $6.97 $11.18 $0.00 q.AJCO-TYPE JUMPING TAMPER 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 IRERS -ZONE 2 $46.43 08/01/2016 5 80 $30.16 $6.97 $11.18 $0.00 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 $0.00 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 or apprentice rates see "Apprentice- LABORER" 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 -$000- - $53.97 (Notes: BLOCK PAVER, RAMMER / CURB SETTER 06/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 IRERS -ZONE 2 12/01/2015 $32.40 $7.30 $12.30 $0.00 $52.00 Page 3 of 39 06/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 f� 12/01/2016 $33.65 $7.30 $12.30 $0.00 $53.25 Iy or apprentice rates see "Apprentice- LABORER" BOILER MAKER BQERMAKERS LOCAL 29 01/01/2010 $37.70 $6.97 $11.18 $0.00 $55.85 Apprentice - BOILERMAKER - Local 29 Li Effective Date - 01/01/2010 Step percent Apprentice Base Wage Health Supplemental Pension Unemployment Total Rate j 1 65 $24.51 $6.97 $11.18 $0.00 $42.66 LITERPROOFING) 2 65 $24.51 $6.97 $11.18 $0.00 $42.66 7:LAYERS LOCAL 3 (LYNN) 3 70 $26.39 $6.97 $11.18 $0.00 $44.54 02/01/2016 $50.43 4 75 $28.28 $6.97 $11.18 $0.00 $46.43 08/01/2016 5 80 $30.16 $6.97 $11.18 $0.00 $48.31 n 6 85 $32.05 $6.97 $11.18 $0.00 $50.20 �J 7 90 $33.93 $6.97 $11.18 $0.00 $52.08 8 95 - - - - - - - - - - - $35.82 - - - - - $6.97 - - - $11.18 - - - - -$000- - $53.97 (Notes: - - - - - - - 20150601-026 Apprentice to Journeyworker Ratio: 1:5 Page 3 of 39 -�e Date: 06/01/2015 CK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 02/01/2015 $48.96 $10.18 $18.50 $0.00 $77.64 LITERPROOFING) 08/01/2015 $49.86 $10.18 $18.57 $0.00 $78.61 7:LAYERS LOCAL 3 (LYNN) 02/01/2016 $50.43 $10.18 $18.57 $0.00 $79.18 08/01/2016 $51.33 $10.18 $18.65 $0.00 $80.16 02/01/2017 $51.90 $10.18 $18.65 $0.00 $80.73 ------------------------------------------------------------------------------------------------------------------------------------------ Wage Request Number: 20150601-026 Page 3 of 39 -�e Date: 06/01/2015 Classification Effective Date Base Wage Health Pension Supplemental ,Total Rate. 0 Apprentice- BRICKIPLASTERICEMENT MASON - Loca13 Lynn Effective Date - 02/01/2015 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate $53.68 1 50 $24.48 $10.18 $18.50 $0.00 $53.16 3 70 2 60 3 70 $29.38 $34.27 $10.18 $10.18 $18.50 $18.50 $0.00 $0.00 $58.06 $62.95 ; + ���•••rrr 4 80 $39.17 $10.18 $18.50 $0.00 $67.85 $10.18 5 90 $44.06 $10.18 $18.50 $0.00 $72.74 - - - - Effective Date - 08/01/2015 - - --- - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:5 - - - - - Supplemental - - - - - - - Step percent Apprentice Base Wage Health Pension Unemployment Total Rate of 1 50 $24.93 $10.18 $18.57 $0.00 $53.68 2 60 $29.92 $10.18 $18.57 $0.00 $58.67 3 70 $34.90 $10.18 $18.57 $0.00 $63.65 4 80 $39.89 $10.18 $18.57 $0.00 $68.64 5 90 $44.87 $10.18 $18.57 $0.00 $73.62 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - --- - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:5 - - - - - - - - - - - - - - - - - BULLDOZER/GRADER/SCRAPER OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" CAISSON & UNDERPINNING BOTTOM MAN LABORERS - FOUNDATIONAND MARINE For apprentice rates see "Apprentice- LABORER" CAISSON & UNDERPINNING LABORER LABORERS - FOUNDATION AND MARINE For apprentice rates see "Apprentice- LABORER" 06/01/2015 $42.42 $10.00 $14.55 $0.00 12/01/2015 $43.66 $10.00 $14.55 $0.00 06/01/2016 $44.41 $10.00 $14.55 $0.00 12/01/2016 $45.64 $10.00 $14.55 $0.00 06/01/2017 $46.63 $10.00 $14.55 $0.00 12/01/2017 $47.62 $10.00 $14.55 $0.00 06/01/2015 $36.45 $7.30 $13.15 $0.00 12/01/2015 $37.20 $7.30 $13.15 $0.00 06/01/2016 $37.95 $7.30 $13.15 $0.00 12/01/2016 $38.95 $7.30 $13.15 $0.00 $7.30 $13.15 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" 06/01/2015 $35.30 $7.30 $13.15 $0.00 12/01/2015 $36.05 $7.30 $13.15 $0.00 06/01/2016 $36.80 $7.30 $13.15 $0.00 12/01/2016 $37.80 $7.30 $13.15 $0.00 D $66.97 $68.21 $68.96 $70.19 $71.18 $72.17 t' - $56.90 $57.65 $58.40 $59.40 $55.75 $56.50 $57.25 $58.25 CAISSON & UNDERPINNING TOP MAN 06/01/2015 $35.30 $7.30 $13.15 $0.00 $55.75 Lj LABORERS - FOUNDATION AND MARINE 12/01/2015 $36.05 $7.30 $13.15 $0.00 $56.50 06/01/2016 $36.80 $7.30 $13.15 $0.00 $57.25 12/01/2016 $37.80 $7.30 $13.15 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" 026 Page 4 3; Issue Date: 06/01/2015 Wage Request Number: 20150601- of lion CARBIDE CORE DRILL OPERATOR LABORERS - ZONE 2 0 apprentice rates see "Apprentice- LABORER" Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 CARPENTERS -ZONE 2 (Eastern Massachusetts) Unemployment 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 i Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment $12.21 $1.30 $47.32 2 60 $27.49 $10.90 $13.71 $1.30 Mass 3 65 $29.78 $10.90 $14.71 Apprentice- CEMENT MMSONRY/PLASTERING -Eastern (Lynn) 4 70 $32.07 $10.90 Effective Date - 01/01/2015 $1.30 $59.98 5 Supplemental $34.37 $10.90 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate $10.90 1 50 $22.45 $10.90 $12.21 $1.30 $46.86 $10.90 2 60 $26.94 $10.90 $13.71 $1.30 $52.85 $14.55 3 65 $29.19 $10.90 $14.71 $1.30 $56.10 4 70 $31.43 $10.90 $15.71 $1.30 $59.34 - - - - 5 75 $33.68 $10.90 $16.71 $1.30 $62.59 12/01/2015 6 80 $35.92 $10.90 $17.71 $1.30 $65.83 7 90 $40.41 $10.90 $18.71 $1.30 $71.32 Effective Date - 07/01/2015 12/01/2016 $31.87 $10.00 Supplemental $0.00 $56.42 Step Apprentice Base Wage Health Pension Unemployment Total Rate $0.00 percent 12/01/2017 $33.25 $10.00 t� 1 50 $22.91 $10.90 $12.21 $1.30 $47.32 2 60 $27.49 $10.90 $13.71 $1.30 $53.40 3 65 $29.78 $10.90 $14.71 $1.30 $56.69 4 70 $32.07 $10.90 $15.71 $1.30 $59.98 5 75 $34.37 $10.90 $16.71 $1.30 $63.28 6 80 $36.66 $10.90 $17.71 $1.30 $66.57 7 90 $41.24 $10.90 $18.71 $1.30 $72.15 -.------_.....,..----------------------5 iNotes: $49.08 $10.00 $14.55 $0.00 $73.63 For apprentice rates see "Apprentice- OPERATING ENGINEERS" Steps 3,4 are 500 hrs. All other steps are 1,000 hrs. I - - - - - - - - - - Apprentice to Journeyworker Ratio:1:3 - - - - - - - - - - - - - - - - - - CHAIN SAW OPERAIUR LABORERS - ZONE 2 r, 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 [3 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES 06/01/2015 $43.83 $10.00 $14.55 $0.00 $68.38 - OPERATING ENGINEERS LOCAL 4 12/01/2015 $45.08 $10.00 $14.55 $0.00 $69.63 06/01/2016 $45.83 $10.00 $14.55 $0.00 $70.38 12/01/2016 $47.08 $10.00 $14.55 $0.00 $71.63 06/01/2017 $48.08 $10.00 $14.55 $0.00 $72.63 f'1 12/01/2017 $49.08 $10.00 $14.55 $0.00 $73.63 For apprentice rates see "Apprentice- OPERATING ENGINEERS" COMPRESSOR OPERATOR 06/01/2015 $29.61 $10.00 $14.55 $0.00 $54.16 OPERATING ENGINEERS LOCAL 4 12/01/2015 $30.48 $10.00 $14.55 $0.00 $55.03 06/01/2016 $31.00 $10.00 $14.55 $0.00 $55.55 12/01/2016 $31.87 $10.00 $14.55 $0.00 $56.42 f 06/01/2017 $32.56 $10.00 $14.55 $0.00 $57.11 12/01/2017 $33.25 $10.00 $14.55 $0.00 $57.80 For apprentice rates see "Apprentice- OPERATING ENGINEERS" Issue Date: 06/01/2015 Wa a Request Number 20150601-026 Page 6 of 3 0 DELEADER (BRIDGE) TERS LOCAL 35 - ZONE 2 i•, Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment 01/01/2015 $47.66 $7.85 $16.10 $0.00 $71.61 07/01/2015 $48.56 $7.85 $16.10 $0.00 $72.51 01/01/2016 $49.51 $7.85 $16.10 $0.00 $73.46 07/01/2016 $50.46 $7.85 $16.10 $0.00 $74.41 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 Apprentice - PAINTER Local 35 - BRIDGESITANKS Effective Date - 01/01/2015 Step percent Apprentice Base Wage Health 1 n 2 U. 3 4 [=J 5 6 7 8 Supplemental Pension Unemployment Total Rate 50 $23.83 $7.85 $0.00 $0.00 $31.68 55 $26.21 $7.85 $3.66 $0.00 $37.72 60 $28.60 $7.85 $3.99 $0.00 $40.44 65 $30.98 $7.85 $4.32 $0.00 $43.15 70 $33.36 $7.85 $14.11 $0.00 $55.32 75 $35.75 $7.85 $14.44 $0.00 $58.04 80 $38.13 $7.85 $14.77 $0.00 $60.75 90 $42.89 $7.85 $15.44 $0.00 $66.18 Effective Date - 07/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.28 $7.85 $0.00 $0.00 $32.13 j -j 2 55 $26.71 $7.85 $3.66 $0.00 $38.22 3 60 $29.14 $7.85 $3.99 $0.00 $40.98 4 65 $31.56 $7.85 $4.32 $0.00 $43.73 5 70 $33.99 $7.85 $14.11 $0.00 $55.95 "y 6 75 $36.42 $7.85 $14.44 $0.00 $58.71 7 80 8 90 $38.85 $7.85 $14.77 $0.00 $61.47 $43.70 $7.85 $15.44 $0.00 $66.99 ----------------------..-------- (Notes: Steps are 750 hrs. II 6-- - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:l:l EyfO: ADZEZ 06/01/2015 $35.50 $7.30 $12.95 $0.00 $55.75 LABORERS - ZONE 2 12/01/2015 $36.25 $7.30 $12.95 $0.00 $56.50 nFor apprentice rates see "Apprentice- LABORER" �ivi0: BACKHOE/LOADER/1lAM1v1ER OPERATOR 06/01/2015 $36.50 $7.30 $12.95 $0.00 $56.75 LABORERS - ZONE 2 12/01/2015 $37.25 $7.30 $12.95 $0.00 $57.50 DFor apprentice rates see "Apprentice- LABORER" vlO: BURNERS 06/01/2015 $36.25 $7.30 $12.95 $0.00 $56.50 LABORERS - ZONE 2 12/01/2015 $37.00 $7.30 $12.95 $0.00 $57.25 For apprentice rates see "Apprentice- LABORER' L O: CONCRETE CUTTER/SAWYER 06/01/2015 $36.50 $7.30 $12.95 $0.00 $56.75 LABORERS - ZONE 2 n 12/01/2015 $37.25 $7.30 $12.95 $0.00 $57.50 For apprentice rates see "Apprentice- LABORER" --------- - ----------------------------------------------------------------------------------------------------------------------------- l, Date: 06/01/2015 Wage Request Number: 20150601-026 Page 7 39 -,'e of Classification Effective Date Base Wage Health Pension Supplemental Total Rate ELECTRICIANS LOCAL 103 09/01/2015 $46.13 $13.00 $15.43 Unemployment $74.56 }� DEMO: JACKHAMMER OPERATOR 06/01/2015 $36.25 $7.30 $12.95 $0.00 $56.50 LABORERS - ZONE 2 12/01/2015 $37.00 $7.30 $12.95 $0.00 $57.25 For apprentice rates see "Apprentice- LABORER" ELECTRICIAN 03/01/2015 $45.17 $13.00 $15.40 $0.00 $73.57 DEMO: WRECKING LABORER 06/01/2015 $35.50 $7.30 $12.95 $0.00 $55.75 $74.56 LABORERS - ZONE 2 12/01/2015 $36.25 $7.30 $12.95 $0.00 $56.50 $75.54 For apprentice rates see "Apprentice- LABORER' DIRECTIONAL DRILL MACHINE OPERATOR 06/01/2015 $42.42 $10.00 $14.55 $0.00$66.97 OPERATING ENGINEERS LOCAL 4 12/01/2015 $43.66 $10.00 $14.55 $0.00 $68.21 06/01/2016 $44.41 $10.00 $14.55 $0.00 $68.96 12/01/2016 $45.64 $10.00 $14.55 $0.00 $70.19 06/01/2017 $46.63 $10.00 $14.55 $0.00 $71.18 12/01/2017 $47.62 $10.00 $14.55 $0.00 $72.17 For apprentice rates see "Apprentice- OPERATING ENGINEERS" Issue Date: 06/01/2015 Wage Request Number 20150601-026 Page 8 of DIVER 08/01/2014 $58.24 $9.80 $18.17 $0.00 $86.21 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2015 $60.34 $9.80 $18.17 $0.00 $88.31 DIVER TENDER 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 DIVER TENDER (EFFLUENT) 08/01/2014 $62.40 $9.80 $18.17 $0.00 $90.37 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2015 $64.65 $9.80 $18.17 $0.00 $92.62 DIVER/SLURRY (EFFLUENT) 08/01/2014 $87.36 $9.80 $18.17 $0.00 $115.33 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2015 $90.51 $9.80 $18.17 $0.00 $118.48 n I DRAWBRIDGE OPERATOR (Construction) 03/01/2015 $45.17 $13.00 $15.40 $0.00 $73.57 ELECTRICIANS LOCAL 103 09/01/2015 $46.13 $13.00 $15.43 $0.00 $74.56 03/01/2016 $47.08 $13.00 $15.46 $0.00 $75.54 For apprentice rates see "Apprentice- ELECTRICIAN" ELECTRICIAN 03/01/2015 $45.17 $13.00 $15.40 $0.00 $73.57 ELECTRICIANS LOCAL 103 09/01/2015 $46.13 $13.00 $15.43 $0.00 $74.56 _. 03/01/2016 $47.08 $13.00 $15.46 $0.00 $75.54 ------------- ----- ------ -30 Issue Date: 06/01/2015 Wage Request Number 20150601-026 Page 8 of \ sification • Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate ELECTRIMN Apprentice - - Local 103 Effective Date - 03/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.07 $13.00 $0.54 $0.00 $31.61 2 40 3 45 $18.07 $20.33 $13.00 $13.00 $0.54 $11.64 $0.00 $0.00 $31.61 $44.97 4 45 $20.33 $13.00 $11.64 $0.00 $44.97 5 50 $22.59 $13.00 $11.98 $0.00 $47.57 L3 6 55 $24.84 $13.00 $12.33 $0.00 $50.17 7 60 $27.10 $13.00 $12.66 $0.00 $52.76 J t_! 8 65 $29.36 $13.00 $13.01 $0.00 $55.37 9 70 $31.62 $13.00 $13.35 $0.00 $57.97 LI10 75 $33.88 $13.00 $13.70 $0.00 $60.58 Effective Date - 09/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.45 $13.00 $0.55 $0.00 $32.00 2 40 $18.45 $13.00 $0.55 $0.00 $32.00 n t ( 3 45 $20.76 $13.00 $11.65 $0.00 $45.41 4 45 $20.76 $13.00 $11.65 $0.00 $45.41 5 50 $23.07 $13.00 $11.99 $0.00 $48.06 6 55 $25.37 $13.00 $12.34 $0.00 $50.71 7 60 $27.68 $13.00 $12.68 $0.00 $53.36 8 65 $29.98 $13.00 $13.03 $0.00 $56.01 9 70 $32.29 $13.00 $13.37 $0.00 $58.66 10 75 ------------ ---------------------------- $34.60 $13.00 $13.72 $0.00 $61.32 Notes: : Notes:: I App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80 L ------------------------------ Apprentice to Journeyworker Ratio:2:3*** f,VATORCONSTRUCTOR 01/01/2015 $53.30 $13.58 $14.21 $0.00 $81.09 'YATOR CONSTRUCTORSLOCAL 4 01/01/2016 $54.53 $14.43 $14.96 $0.00 $83.92 01/01/2017 $55.86 $15.28 $15.71 $0.00 $86.85 1-- - - - - - Date: - - - - - - - - - - - - - - - - - - - - - - - - -- - ------------------------------------------------------------------------------------------------------ 06/01/2015 Wage Request Number• 20150601-026 -1-, Page 9 of 39 Supplemental Total Rate Classification Effective Date Base Wage Health Pension Unemployment , 0 Apprentice- ELEVATOR CONSTRUCTOR -Local 4 Effective Date - 01/01/2015 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate $65.10 1 50 $26.65 $13.58 $0.00 $0.00 $40.23 J� 2 55 $29.32 $13.58 $14.21 $0.00 $57.11 $52.75 3 65 $34.65 $13.58 $14.21 $0.00 $62.44 $66.58 4 70 $37.31 $13.58 $14.21 $0.00 $65.10 $67.46 $68.19 5 80 $42.64 $13.58 $14.21 $0.00 $70.43 $68.90 Effective Date.- 01/01/2016 $45.35 $10.00 $14.30 Supplemental $69.65 1 t�J Step percent Apprentice Base Wage Health Pension Unemployment Total Rate $70.31 1 50 $27.27 $14.43 $0.00 $0.00 $41.70 2 55 3 65 $29.99 $35.44 $14.43 $14.43 $14.96 $14.96 $0.00 $0.00 $59.38 $64.83 n I 1 4 70 $38.17 $14.43 $14.96 $0.00 $67.56 5 80 $43.62 $14.43 $14.96 $0.00 $73.01 - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - -- Steps 1-2 are 6 mos.; Steps 3-5 are I year L- - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:1 ELEVATOR CONSTRUCTOR HELPER ELEVATOR CONSTRUCTORS LOCAL 4 For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR" FENCE & GUARD RAIL ERECTOR LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER' FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 01/01/2015 $37.31 $13.58 $14.21 $0.00 $65.10 01/01/2016 $38.17 $14.43 $14.96 $0.00 $67.56 01/01/2017 $39.10 $15.28 $15.71 $0.00 $70.09 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 '- 12/01/2015 06/01/2016 $31.90 $32.40 $7.30 $7.30 $12.30 $12.30 $0.00 $0.00 $51.50 $52.00 ���------►►► 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 $14.30 05/01/2015 $40.22 $10.00 $14.30 $0.00 $64.52 $65.95 11/01/2015 $40.80 $10.00 $14.30 $0.00 $65.10 $0.00 05/01/2016 $41.69 $10.00 $14.30 $0.00 $65.99 $14.30 11/01/2016 $42.28 $10.00 $14.30 $0.00 $66.58 $10.00 05/01/2017 11/01/2017 $43.16 $43.89 $10.00 $10.00 $14.30 $14.30 $0.00 $0.00 $67.46 $68.19 $44.62 05/01/2018 $44.60 $10.00 $14.30 $0.00 $68.90 11/01/2017 FIELD ENGYARTY CHIEF-BLDG,SITE,HVY/HWY 05/01/2015 $41.65 $10.00 $14.30 $0.00 $65.95 OPERATING ENGINEERS LOCAL 4 11/01/2015 $42.24 $10.00 $14.30 $0.00 $66.54 05/01/2016 $43.13 $10.00 $14.30 $0.00 $67.43 11/01/2016 $43.73 $10.00 $14.30 $0.00 $68.03 05/01/2017 $44.62 $10.00 $14.30 $0.00 $68.92 11/01/2017 $45.35 $10.00 $14.30 $0.00 $69.65 1 t�J 05/01/2018 $46.07 $10.00 $14.30 $0.00 $70.31 For apprentice rates see "Apprentice- OPERATING ENGINEERS" Issue Date: 06/01/2015 Wage Request Number: 20150601-026 l Page 10 of 3 1 �stfication • Effective Date Base Wage Health Pension Supplemental TotalRate Unemployment FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY 05/01/2015 $21.68 $10.00 $14.30 $0.00 $45.98 n eTNG ENGINEERS LOCAL 4 I{l 11/01/2015 $22.02 $10.00 $14.30 $0.00 $46.32 J,I 05/01/2016 $22.54 $10.00 $14.30 $0.00 $46.84 11/01/2016 $22.89 $10.00 $14.30 $0.00 $47.19 D05/01/2017 $23.42 $10.00 $14.30 $0.00 $47.72 11/01/2017 $23.84 $10.00 $14.30 $0.00 $48.14 05/01/2018 $24.27 $10.00 $14.30 $0.00 $48.57 or apprentice rates see "Apprentice- OPERATING ENGINEERS" E FIRE ALARM INSTALLER 03/01/2015 $45.17 $13.00 $15.40 $0.00 $73.57 (MYCIANS LOCAL 103 09/01/2015 $46.13 $13.00 $15.43 $0.00 $74.56 03/01/2016 $47.08 $13.00 $15.46 $0.00 $75.54 For apprentice rates see "Apprentice- ELECTRICIAN' { ALARM REPAIR / MAINTENANCE 03/01/2015 $33.88 $13.00 $13.70 $0.00 $60.58 U / COMMISSIONINGELECTRIcuArs LOCAL 103 09/01/2015 $34.60 $13.00 $13.72 $0.00 $61.32 03/01/2016 $35.31 $13.00 $13.74 $0.00 $62.05 For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN' 1' MAN (ASST. ENGINEER) 06/01/2015 $35.64 $10.00 $14.55 $0.00 $60.19 OPERATING ENGINEERS LOCAL 4 12/01/2015 $36.69 $10.00 $14.55 $0.00 $61.24 06/01/2016 $37.31 $10.00 $14.55 $0.00 $61.86 12/01/2016 $38.35 $10.00 $14.55 $0.00 $62.90 06/01/2017 $39.19 $10.00 $14.55 $0.00 $63.74 12/01/2017 $40.02 $10.00 $14.55 $0.00 $64.57 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 1�. �.GGER & SIGNALER 06/01/2015 $20.50 $7.30 $12.30 $0.00 $40.10 �t FIRERS - ZONE 2 12/01/2015 $20.50 $7.30 $12.30 $0.00 $40.10 06/01/2016 $20.50 $7.30 $12.30 $0.00 $40.10 }lel 12/01/2016 $20.50 $7.30 $12.30 $0.00 $40.10 For apprentice rates see "Apprentice- LABORER" I--I)ORCOVERER 09/01/2014 $40.40 $9.80 $17.21 $0.00 $67.41 t,'ORCOVERERS LOCAL 2168 ZONE I a ----------------------------------------------------------------------------------------------------------- 06/01/2015 Wage Request Number: 20150601-026 --------------------------- Page 11 of 39 L--Je Date: Classification Effective Date Base Wage Health Pension Supplemental Unemployment 'total Rate �J i Apprentice- FLOORCOVERER -Local 2168 Zone 1 =1 Effective Date - 09/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.20 $9.80 $1.79 $0.00 $31.79 2 55 $22.22 $9.80 $1.79 $0.00 $33.81 3 60 $24.24 $9.80 $11.84 $0.00 $45.88 4 65 $26.26 $9.80 $11.84 $0.00 $47.90 5 70 $28.28 $9.80 $13.63 $0.00 $51.71 6 75 $30.30 $9.80 $13.63 $0.00 $53.73 7 80 8 85 $32.32 $34.34 $9.80 $9.80 $15.42 $15.42 $0.00 $0.00 $57.54 $59.56 D - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - --- -Notes: Steps are 750 hrs. f �-- - - - - - - - - - Apprentice to Journeyworker Ratio:1:1 - - - - - - - - - - - - - - - - - - - FORK LIFT/CHERRY PICKER 06/01/2015 $42.83 $10.00 $14.55 $0.00 $67.38 OPERATING ENGINEERS LOCAL 4 12/01/2015 $44.08 $10.00 $14.55 $0.00 $68.63 06/01/2016 $44.83 $10.00 $14.55 $0.00 $69.38 12/01/2016 $46.08 $10.00 $14.55 $0.00 $70.63 06/01/2017 $47.08 $10.00 $14.55 $0.00 $71.63 12/01/2017 $48.08 $10.00 $14.55 $0.00 $72.63 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GENERATORILIGHTING PLANTMEATERS OPERATING ENGINEERS LOCAL 4 06/01/2015 12/01/2015 $29.61 $30.48 $10.00 $10.00 $14.55 $14.55 $0.00 $0.00 $54.16 $55.03 06/01/2016 $31.00 $10.00 $14.55 $0.00 $55.55 12/01/2016 $31.87 $10.00 $14.55 $0.00 $56.42 06/01/2017 $32.56 $10.00 $14.55 $0.00 $57.11 �iJy 12/01/2017 $33.25 $10.00 $14.55 $0.00 $57.80 For apprentice rates see "Apprentice- OPERATING ENGINEERS" j GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR 01/01/2015 $37.16 $7.85 $16.10 $0.00 $61.11 SYSTEMS) 07/01/2015 $38.06 $7.85 $16.10 $0.00 $62.01 GLAZIERS LOCAL 35 (ZONE 2) n 01/01/2016 $39.01 $7.85 $16.10 $0.00 $62.96 07/01/2016 $39.96 $7.85 $16.10 $0.00 $63.91 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86 -0 ------------ ------ ------ g Issue Date: 06/01/2015 W ge Request Number 20150601-026 Pae 12 of 3 Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - GLAZIER - Local 35 Zone 2 Effective Date - 01/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.58 $7.85 $0.00 $0.00 $26.43 2 55 $20.44 $7.85 $3.66 $0.00 $31.95 3 60 $22.30 $7.85 $3.99 $0.00 $34.14 4 65 $24.15 $7.85 $4.32 $0.00 $36.32 5 70 $26.01 $7.85 $14.11 $0.00 $47.97 6 75 $27.87 $7.85 $14.44 $0.00 $50.16 7 80 $29.73 $7.85 $14.77 $0.00 $52.35 8 90 $33.44 $7.85 $15.44 $0.00 $56.73 Effective Date - 07/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.03 $7.85 $0.00 $0.00 $26.88 2 55 $20.93 $7.85 $3.66 $0.00 $32.44 3 60 $22.84 $7.85 $3.99 $0.00 $34.68 4 65 $24.74 $7.85 $4.32 $0.00 $36.91 5 70 $26.64 $7.85 $14.11 $0.00 $48.60 6 75 $28.55 $7.85 $14.44 $0.00 $50.84 7 80 $30.45 $7.85 $14.77 $0.00 $53.07 8 90 $34.25 $7.85 $15.44 $0.00 $57.54 - - - - - - - - - - - (Notes: - - - - - - -- - - - - - - - - - �' ! Steps are 750 hrs. a - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:1 - - - - - - - - - - - - - - - - - -L_jS'I'1NG ENUINEER/CRANES/GRADALLS 06/01/2015 $42.83 $10.00 $14.55 $0.00 $67.38 OPERATING ENGINEERS LOCAL 4 12/01/2015 $44.08 $10.00 $14.55 $0.00 $68.63 06/01/2016 $44.83 $10.00 $14.55 $0.00 $69.38 12/01/2016 $46.08 $10.00 $14.55 $0.00 $70.63 06/01/2017 12/01/2017 $47.08 $48.08 $10.00 $10.00 $14.55 $14.55 $0.00 $0.00 $71.63 $72.63 a a I----------------------------------------------------------------------------------------------------------------------------------g-------- JL -'e Date: 06/01/2015 Wage Request Number: 20150601-026 Pae 13 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment 0 Apprentice- OPERATING ENGINEERS- Local Effective Date - 06/01/2015 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate n 1 55 $23.56 $10.00 $0.00 $0.00 $33.56 $77.24 2 60 3 65 $25.70 $27.84 $10.00 $10.00 $14.55 $14.55 $0.00 $0.00 $50.25 $52.39 $78.24 4 70 $29.98 $10.00 $14.55 $0.00 $54.53 $79.39 5 75 $32.12 $10.00 $14.55 $0.00 $56.67 $80.49 6 80 $34.26 $10.00 $14.55 $0.00 $58.81 $81.59 7 85 $36.41 $10.00 $14.55 $0.00 $60.96 $82.74 8 90 $38.55 $10.00 $14.55 $0.00 $63.10 Effective Date - 12/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $24.24 $10.00 $0.00 $0.00 $34.24 2 60 $26.45 $10.00 $14.55 $0.00 $51.00 a 3 65 $28.65 $10.00 $14.55 $0.00 $53.20 4 70 $30.86 $10.00 $14.55 $0.00 $55.41 5 75 $33.06 $10.00 $14.55 $0.00 $57.61 a 6 80 $35.26 $10.00 $14.55 $0.00 $59.81 7 85 $37.47 $10.00 $14.55 $0.00 $62.02 n 8 90 $39.67 $10.00 $14.55 $0.00 $64.22 - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:6 - - - - - - - - - - - - - - - - - - - �--1 HVAC (DUCTWORK) SHEETMETAL WORKERS LOCAL 17 -A For apprentice rates see "Apprentice- SHEET METAL WORKER' HVAC (ELECTRICAL CONTROLS) ELECTRICIANS LOCAL 103 For apprentice rates see "Apprentice- ELECTRICIAN' 02/01/2015 $43.28 $10.20 $20.54 $2.22 $76.24 -i 08/01/2015 $44.28 $10.20 $20.54 $2.22 $77.24 02/01/2016 $45.28 $10.20 $20.54 $2.22 $78.24 08/01/2016 $46.43 $10.20 $20.54 $2.22 $79.39 02/01/2017 $47.53 $10.20 $20.54 $2.22 $80.49 08/01/2017 $48.63 $10.20 $20.54 $2.22 $81.59 02/01/2018 $49.78 $10.20 $20.54 $2.22 $82.74 03/01/2015 $45.17 $13.00 $15.40 $0.00 $73.57 L- J 09/01/2015 $46.13 $13.00 $15.43 $0.00 $74.56 03/01/2016 $47.08 $13.00 $15.46 $0.00 $75.54 Issue Date: 06/01/2015 Wa a Request Number 20150601-026 Pae 14 of 3. HVAC (TESTING AND BALANCING - AIR) SHEETkIETAL WORKERS LOCAL 17 -A c apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (TESTING AND BALANCING -WATER) LUF�I�E_ TTERSLOCALL 537 (Local 138) EFor apprentice rates see "Apprentice- PIPEFTITER" or "PLUMBER/PIPEFITPER" HVAC MECHANIC FITTERS LOCAL 537 (Local 138) For apprentice rates see "Apprentice- PIPEFTTTER" or "PLUMBER/PIPEFITTER" LIC DRILLS ZONE 2 EFor apprentice rates see "Apprentice- LABORER" ��ULATOR (PIPES & TANKS) T & FROST INSULATORS LOCAL 6 (BOSTON) 01 IN Effective Date Base Wage Health Pension Supplemental Un em nlavm er 02/01/2015 $43.28 $10.20 $20.54 $2.22 08/01/2015 $44.28 $10.20 $20.54 $2.22 02/01/2016 $45.28 $10.20 $20.54 $2.22 08/01/2016 $46.43 $10.20 $20.54 $2.22 02/01/2017 $47.53 $10.20 $20.54 $2.22 08/01/2017 $48.63 $10.20 $20.54 $2.22 02/01/2018 $49.78 $10.20 $20.54 $2.22 Total Rate $76.24 $77.24 $78.24 $79.39 $80.49 $81.59 $82.74 03/01/2015 $46.36 $9.70 $14.89 $0.00 $70.95 09/01/2015 $47.36 $9.70 $14.89 $0.00 $71.95 03/01/2016 $48.36 $9.70 $14.89 $0.00 $72.95 09/01/2016 $49.36 $9.70 $14.89 $0.00 $73.95 03/01/2017 $50.36 $9.70 $14.89 $0.00 $74.95 03/01/2015 $46.36 $9.70 $14.89 $0.00 $70.95 09/01/2015 $47.36 $9.70 $14.89 $0.00 $71.95 03/01/2016 $48.36 $9.70 $14.89 $0.00 $72.95 09/01/2016 $49.36 $9.70 $14.89 $0.00 $73.95 03/01/2017 $50.36 $9.70 $14.89 $0.00 $74.95 06/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 12/01/2015 $32.40 $7.30 $12.30 $0.00 $52.00 06/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 12/01/2016 $33.65 $7.30 $12.30 $0.00 $53.25 09/01/2014 $43.31 $11.25 $12.60 $0.00 $67.16 Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston Effective Date - 09/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.66 $11.25 $9.35 $0.00 $42.26 2 60 $25.99 $11.25 $10.00 $0.00 $47.24 3 70 $30.32 $11.25 $10.65 $0.00 $52.22 4 80 $34.65 $11.25 $11.30 $0.00 $57.20 - - - - - - - - - - - (Notes: - - - - - - - - - - - - - - - - - �I Steps are 1 year ` _ _ _ _ _ _ Apprentice to Journeyworker Ratio:f 4 IRONWORKERIWELDER [1WORKERS LOCAL 7 (LAWRENCE AREA) 03/16/2015 $37.70 $7.70 $20.25 $0.00 $65.65 R.................__.__.._.________.____._ ___.__..__.___.._.____._._._..____...._..._____._._._.__._._._._._.._.____._...____.___._.- ], _,e Date: 06/01/2015 Wage Request Number: 20150601-026 Page 15 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate a 2 70 $22.16 $7.30 $12.30 $0.00 Unemployment 3 80 $25.32 $7.30 IRONWORKER 7 Lawrence $0.00 $44.92 4 90 $28.49 $7.30 $12.30 Apprentice- -Local $48.09 (- - - - Notes: Effective Date - 03/16/2015 a --urn- - - - - - - - App-rentice to- Joey -worker - - Ratio:l:5 - - - Supplemental - - - - - - Step percent Apprentice Base Wage Health Pension Unemployment Total Rate Issue Date: 06/01/2015 Wage Request Number: 20150601-026 n 1 60 $22.62 $7.70 $20.25 $0.00 $50.57 2 70 3 75 $26.39 $28.28 $7.70 $7.70 $20.25 $20.25 $0.00 $0.00 $54.34 $56.23 4 80 $30.16 $7.70 $20.25 $0.00 $58.11 5 85 $32.05 $7.70 $20.25 $0.00 $60.00 6 90 $33.93 $7.70 $20.25 $0.00 $61.88 - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - 6 a Structural 1:6; Ornamental 1:4 f - - - - - - - - - - Apprentice to Journeyworker Ratio: - - - - - - - - - - - - - - - - - - - JACKHAMMER & PAVING BREAKER OPERATOR 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 LABORERS - ZONE 2 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" LABORER 06/01/2015 $31.15 $7.30 $12.30 $0.00 $50.75 LABORERS - ZONE 2 12/01/2015 $31.65 $7.30 $12.30 $0.00 $51.25 06/01/2016 $32.15 $7.30 $12.30 $0.00 $51.75 a 12/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 a Apprentice - LABORER - Zone 2 Effective Date - 06/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.69 $7.30 $12.30 $0.00 $38.29 2 70 $21.81 $7.30 $12.30 $0.00 $41.41 3 80 $24.92 $7.30 $12.30 $0.00 $44.52 4 90 $28.04 $7.30 $12.30 $0.00 $47.64 Effective Date - 12/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.99 $7.30 $12.30 $0.00 $38.59 Lj 2 70 $22.16 $7.30 $12.30 $0.00 $41.76 3 80 $25.32 $7.30 $12.30 $0.00 $44.92 4 90 $28.49 $7.30 $12.30 $0.00 $48.09 (- - - - Notes: ® a --urn- - - - - - - - App-rentice to- Joey -worker - - Ratio:l:5 - - - - - - - - - - - - - .. ........ Issue Date: 06/01/2015 Wage Request Number: 20150601-026 Page 16 of 3, ossification . Effective Date Base Wage Health Pension Supplemental Total Rate l Unemployment LABORER: CARPENTER TENDER 06/01/2015 $31.15 $7.30 $12.30 $0.00 $50.75 LABORERS - ZONE 2 02/01/2016 $38.53 $10.18 $17.25 $0.00 $65.96 a08/01/2016 12/01/2015 $31.65 $7.30 $12.30 $0.00 $51.25 06/01/2016 $32.15 $7.30 $12.30 $0.00 $51.75 12/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" 1..-30RER: CEMENT FINISHER TENDER 06/01/2015 $31.15 $7.30 $12.30 $0.00 $50.75 LABORERS - ZONE 2 Wage Request Number: 20150601-026 12/01/2015 06/01/2016 $31.65 $7.30 $12.30 $0.00 $51.25 $32.15 $7.30 $12.30 $0.00 $51.75 III 12/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 For re apprentice rates see "Apprentice- LABORER" i --y SORER: HAZARDOUS WASTE/ASBESTOS REMOVER 06/01/2015 $31.35 $7.30 $12.25 $0.00 $50.90 LABORERS - ZONE 2 12/01/2015 $31.85 $7.30 $12.25 $0.00 $51.40 CFor apprentice rates see "Apprentice- LABORER" ORER: MASON TENDER 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 LABORERS - ZONE 2 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 D06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" SORER: MULTI -TRADE TENDER 06/01/2015 $31.15 $7.30 $12.30 $0.00 $50.75 RERS - ZONE 2 12/01/2015 $31.65 $7.30 $12.30 $0.00 $51.25 06/01/2016 $32.15 $7.30 $12.30 $0.00 $51.75 12/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER' PORER: TREE REMOVER 06/01/2015 $31.15 $7.30 $12.30 $0.00 $50.75 1 JRERS-ZONE 2 12/01/2015 $31.65 $7.30 $12.30 $0.00 $51.25 06/01/2016 12/01/2016 $32.15 $32.90 $7.30 $7.30 $12.30 $12.30 $0.00 $0.00 $51.75 $52.50 This classification applies to all tree work associated with the removal of standing trees, and trimming and removal of branches and limbs when the work is not done for a utility company for the purpose of operation, maintenance or repair of utility company equipment. For apprentice rates see "Apprentice- LABORER" SER BEAM OPERATOR 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 �JRERS - ZONE 2 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 12/01/2016 $32.40 $33.15 $7.30 $7.30 $12.30 $12.30 $0.00 $0.00 $52.00 $52.75 For apprentice rates see Apprentice- LABORER AAA LE & TILE FINISHERS 02/01/2015 $37.37 $10.18 $17.18 $0.00 $64.73 UZ YERS LOCAL 3 -MARBLE &TILE 08/01/2015 $38.08 $10.18 $17.25 $0.00 $65.51 02/01/2016 $38.53 $10.18 $17.25 $0.00 $65.96 a08/01/2016 $39.23 $10.18 $17.33 $0.00 $66.74 02/01/2017 $39.69 $10.18 $17.33 $0.00 $67.20 I, ------------------------------------------------------------------------------------------------------------------------------------------- ],,,,e Date: 06/01/2015 Wage Request Number: 20150601-026 Page 17 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile Effective Date - 02/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate n 1 50 2 60 3 70 4 80 5 90 Effective Date - 08/01/2015 Step percent $18.69 $22.42 $26.16 $29.90 $33.63 $10.18 $10.18 $10.18 $10.18 $10.18 Apprentice Base Wage Health $17.18 $0.00 $46.05 $17.18 $0.00 $49.78 $17.18 $0.00 $53.52 $17.18 $0.00 $57.26 $17.18 $0.00 $60.99 $26.66 Supplemental $17.25 Pension Unemployment Total Rate 1 50 $19.04 $10.18 $17.25 $0.00 $46.47 02/01/2017 $51.94 $10.18 $18.65 $0.00 2 60 $22.85 $10.18 $17.25 $0.00 $50.28 U 3 70 $26.66 $10.18 $17.25 $0.00 $54.09 a 4 80 $30.46 $10.18 $17.25 $0.00 $57.89 5 90 $34.27 $10.18 $17.25 $0.00 $61.70 -i - - - - - - - - - - Notes: Notes: - - - - - - - - - - - - - - - - - -- ___________________________ I a Apprentice to Journeyworker Ratio: 1:3 ... ...��... `..-.•-___--• __ ______-_ Vc.iV li�Vi.+ WTJ.VV Wiv.aV ...-...-.. �.....- BRICKLAYERS LOCAL 3 - MARBLE & TILE 08/01/2015 $49.90 $10.18 $18.57 $0.00 ... ..__ $78.65 -- 02/01/2016 $50.47 $10.18 $18.57 $0.00 $79.22 08/01/2016 $51.37 $10.18 $18.65 $0.00 $80.20 02/01/2017 $51.94 $10.18 $18.65 $0.00 $80.77 U ----- - - g f 3 g--------- Issue Date: 06/01/2015 W a Request Number 20150601-026 Pae 18 of - Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble & Tile Effective Date - 02/01/2015 Step percent Apprentice Base Wage Health 1 50 $24.50 $10.18 2 60 $29.40 $10.18 3 70 $34.30 $10.18 4 80 $39.20 $10.18 5 90 $44.10 $10.18 Effective Date - 08/01/2015 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate $18.50 $0.00 $53.18 $18.50 $0.00 $58.08 $18.50 $0.00 $62.98 $18.50 $0.00 $67.88 $18.50 $0.00 $72.78 Supplemental Pension Unemployment Total Rate 1 50 $24.95 $10.18 $18.57 $0.00 $53.70 2 60 $29.94 $10.18 $18.57 $0.00 $58.69 3 70 $34.93 $10.18 $18.57 $0.00 $63.68 4 80 $39.92 $10.18 $18.57 $0.00 $68.67 5 90 $44.91 $10.18 $18.57 $0.00 $73.66 - - - - - - - - - - - Notes: I - - - - - - - - - - - - - - - - ----- -Notes: - - - - - - - - - - Apprentice to Journeyworker Ratio:1:5 - - - - - - - - - - - - - - - - - - 1 FH. SWEEPER OPERATOR (ON CONST. SITES) 06/01/2015 $42.42 $10.00 $14.55 $0.00 $66.97 RATING ENGINEERS LOCAL 4 l__j 12/01/2015 $43.66 $10.00 $14.55 $0.00 $68.21 06/01/2016 $44.41 $10.00 $14.55 $0.00 $68.96 a12/01/2016 $45.64 $10.00 $14.55 $0.00 $70.19 06/01/2017 $46.63 $10.00 $14.55 $0.00 $71.18 12/01/2017 $47.62 $10.00 $14.55 $0.00 $72.17 For apprentice rates see "Apprentice- OPERATING ENGINEERS" lIIMECHANICS MAINTENANCE 06/01/2015 $42.42 $10.00 $14.55 $0.00 $66.97 RATING ENGINEERS LOCAL 4 12/01/2015 $43.66 $10.00 $14.55 $0.00 $68.21 06/01/2016 $44.41 $10.00 $14.55 $0.00 $68.96 12/01/2016 $45.64 $10.00 $14.55 $0.00 $70.19 a06/01/2017 $46.63 $10.00 $14.55 $0.00 $71.18 12/01/2017 $47.62 $10.00 $14.55 $0.00 $72.17 For apprentice rates see "Apprentice- OPERATING ENGINEERS" LLWRIGHT (Zone 2) 04/01/2015 $34.69 $9.80 $16.21. $0.00 $60.70 - WRIGHTS LOCAL 1121 - Zone 2 ------------------------------------------------------------------------------------------------- ---------------------------------- LJe Date: 06/01/2015 Wage Request Number: 20150601-026 Page 19 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment . 0 Apprentice- MILLWRIGHT- Local 1121 Zone 2 Effective Date - 04/01/2015 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate n 1 55 $19.08 $9.80 $4.48 $0.00 $33.36 $51.50 2 65 3 75 $22.55 $26.02 $9.80 $9.80 $13.36 $14.18 $0.00 $0.00 $45.71 $50.00 $52.00 4 85 $29.49 $9.80 $14.99 $0.00 $54.28 $52.75 ________________________---- 12/01/2017 $47.62 $10.00 .� $0.00 a (Notes: 06/01/2015 $21.97 $10.00 $14.55 $0.00 $46.52 Steps are 2,000 hours 12/01/2015 06/01/2016 $22.62 $23.01 $10.00 $10.00 $14.55 $14.55 $0.00 $0.00 $47.17 $47.56 Apprentice to Journeyworker Ratio: 1:5 12/01/2016 $23.66 $10.00 $14.55 $0.00 1j MORTAR MIXER LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" OILER (OTHER THAN TRUCK CRANES,GRADALLS) OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OILER (TRUCK CRANES, GRADALLS) OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT - CLASS II OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PAINTER (BRIDGES/TANKS) PAINTERS LOCAL 35 - ZONE 2 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 a 12/01/2017 $47.62 $10.00 $14.55 $0.00 $72.17 06/01/2015 $21.97 $10.00 $14.55 $0.00 $46.52 L- 12/01/2015 06/01/2016 $22.62 $23.01 $10.00 $10.00 $14.55 $14.55 $0.00 $0.00 $47.17 $47.56 12/01/2016 $23.66 $10.00 $14.55 $0.00 $48.21 06/01/2017 $24.17 $10.00 $14.55 $0.00 $48.72 a 12/01/2017 $24.69 $10.00 $14.55 $0.00 $49.24 06/01/2015 $25.68 $10.00 $14.55 $0.00 $50.23 12/01/2015 $26.43 $10.00 $14.55 $0.00 $50.98 06/01/2016 12/01/2016 $26.89 $27.64 $10.00 $10.00 $14.55 $14.55 $0.00 $0.00 $51.44 $52.19 06/01/2017 $28.24 $10.00 $14.55 $0.00 $52.79 12/01/2017 $28.85 $10.00 $14.55 $0.00 $53.40 06/01/2015 $42.42 $10.00 $14.55 $0.00 $66.97 12/01/2015 $43.66 $10.00 $14.55 $0.00 $68.21 06/01/2016 $44.41 $10.00 $14.55 $0.00 $68.96 12/01/2016 06/01/2017 $45.64 $46.63 $10.00 $10.00 $14.55 $14.55 $0.00 $0.00 $70.19 $71.18 a 12/01/2017 $47.62 $10.00 $14.55 $0.00 $72.17 L- 01/01/2015 $47.66 $7.85 $16.10 $0.00 $71.61 07/01/2015 $48.56 $7.85 $16.10 $0.00 $72.51 01/01/2016 $49.51 $7.85 $16.10 $0.00 $73.46 07/01/2016 $50.46 $7.85 $16.10 $0.00 $74.41 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 ------------ --- - ------- Is s u e ----- Issue Date: 06/01/2015 Wage Request Number: 20150601-026 Page 20 of 3 Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGESITANKS Effective Date - 01/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.83 $7.85 $0.00 $0.00 $31.68 2 55 $26.21 $7.85 $3.66 $0.00 $37.72 3 60 $28.60 $7.85 $3.99 $0.00 $40.44 4 65 $30.98 $7.85 $4.32 $0.00 $43.15 5 70 $33.36 $7.85 $14.11 $0.00 $55.32 6 75 $35.75 $7.85 $14.44 $0.00 $58.04 7 80 $38.13 $7.85 $14.77 $0.00 $60.75 8 90 $42.89 $7.85 $15.44 $0.00 $66.18 Effective Date - 07/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.28 $7.85 $0.00 $0.00 $32.13 2 55 $26.71 $7.85 $3.66 $0.00 $38.22 Lel 3 60 $29.14 $7.85 $3.99 $0.00 $40.98 4 65 $31.56 $7.85 $4.32 $0.00 $43.73 5 70 $33.99 $7.85 $14.11 $0.00 $55.95 6 75 $36.42 $7.85 $14.44 $0.00 $58.71 7 80 a 8 90 $38.85 $7.85 $14.77 $0.00 $61.47 $43.70 $7.85 $15.44 $0.00 $66.99 - - - - - - - - - - - - (Notes: Steps are 750 hrs. - - - - - - - - - - - - - - - - I Apprentice to Journeyworker Ratio:1:1 EKTER (SPRAY OR SANDBLAST, NEW) * 01/01/2015 $38.56 $7.85 $16.10 $0.00 $62.51 * If 30% or more of surfaces to be painted are new construction, NFW paint rate shall be used.PAINTERS LOCAL 35 - ZONE 2 07/01/2015 $39.46 $7.85 $16.10 $0.00 $63.41 U01/01/2016 $40.41 $7.85 $16.10 $0.00 $64.36 07/01/2016 $41.36 $7.85 $16.10 $0.00 $65.31 0 01/01/2017 $42.31 $7.85 $16.10 $0.00 $66.26 Q a �a ------------------------------------------------------------------------------------------------------------------------------------------ ], Date: 06/01/2015 Wage Request Number: 20150601-026 Page 21 39 pie of Classification Effective Date Base Wage health Pension Supplemental Total Rate Unemployment . 12 Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - New Effective Date - 01/01/2015 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate $60.57 1 50 $19.28 $7.85 $0.00 $0.00 $27.13k JI 2 55 3 60 $21.21 $23.14 $7.85 $7.85 $3.66 $3.99 $0.00 $0.00 $32.72 $34.98 a 4 65 $25.06 $7.85 $4.32 $0.00 $37.23 $63.37 5 70 $26.99 $7.85 $14.11 $0.00 $48.95 $64.32 6 75 $28.92 $7.85 $14.44 $0.00 $51.21 7 80 $30.85 $7.85 $14.77 $0.00 $53.47 8 90 $34.70 $7.85 $15.44 $0.00 $57.99 D Effective Date - 07/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate �J 1 1 50 $19.73 $7.85 $0.00 $0.00 $27.58 2 55 $21.70 $7.85 $3.66 $0.00 $33.21 3 60 $23.68 $7.85 $3.99 $0.00 $35.52 4 65 $25.65 $7.85 $4.32 $0.00 $37.82 5 70 $27.62 $7.85 $14.11 $0.00 $49.58 6 75 $29.60 $7.85 $14.44 $0.00 $51.89 7 80 $31.57 $7.85 $14.77 $0.00 $54.19 n 8 90 $35.51 $7.85 $15.44 $0.00 $58.80 [{ JI - - - - - - - - - - (Notes: - - - - - - - - - - - - - - - - - - - ( a Steps are 750 hrs. - - - - - - - - - Apprentice to Journeyworker Ratio:1:1 - - - - - - - - - - - - - - - - - - - PAINTER (SPRAY OR SANDBLAST, REPAINT) 01/01/2015 $36.62 $7.85 $16.10 $0.00 $60.57 PAINTERS LOCAL 35 - ZONE 2 07/01/2015 $37.52 $7.85 $16.10 $0.00 $61.47 01/01/2016 $38.47 $7.85 $16.10 $0.00 $62.42 07/01/2016 $39.42 $7.85 $16.10 $0.00 $63.37 01/01/2017 $40.37 $7.85 $16.10 $0.00 $64.32 Issue Date: 06/01/2015 Wage Request Number 20150601-026 Page 22 of 3 Issification C Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - Repaint Effective Date - 01/01/2015 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $18.31 $7.85 $0.00 $0.00 $26.16 2 55 $20.14 $7.85 $3.66 $0.00 $31.65 3 60 $21.97 $7.85 $3.99 $0.00 $33.81 4 65 $23.80 $7.85 $4.32 $0.00 $35.97 5 70 $25.63 $7.85 $14.11 $0.00 $47.59 6 75 $27.47 $7.85 $14.44 $0.00 $49.76 7 80 $29.30 $7.85 $14.77 $0.00 $51.92 8 90 $32.96 $7.85 $15.44 $0.00 $56.25 Effective Date - 07/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.76 $7.85 $0.00 $0.00 2 55 $20.64 $7.85 $3.66 $0.00 06/01/2016 60 $22.51 $7.85 $3.99 $0.00 4 65 $24.39 $7.85 $4.32 $0.00 5 70 $26.26 $7.85 $14.11 $0.00 6 75 $28.14 $7.85 $14.44 $0.00 7 80 $30.02 $7.85 $14.77 $0.00 8 - - 90 - - - - - - $33.77 - - - - - - - - $7.85 - - - $15.44 - - - - $0.00 - - - Notes: Steps are 750 hrs. - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:1 L=�NTER (TRAFFIC MARKINGS) LABORERS - ZONE 2 0 For Apprentice rates see "Apprentice- LABORER" $26.61 $32.15 $34.35 $36.56 $48.22 $50.43 $52.64 $57.06 06/01/2015 $31.15 $7.30 $12.30 $0.00 $50.75 12/01/2015 $31.65 $7.30 $12.30 $0.00 $51.25 06/01/2016 $32.15 $7.30 $12.30 $0.00 $51.75 12/01/2016 $32.90 $7.30 $12.30 $0.00 $52.50 LLATER / TAPER (BRUSH, NEW) * 01/01/2015 $37.16 $7.85 $16.10 $0.00 $61.11 )30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PArNTERSLOCAL 35 - ZONE 2 07/01/2015 $38.06 $7.85 $16.10 $0.00 $62.01 (� 01/01/2016 $39.01 $7.85 $16.10 $0.00 $62.96 I{L 11 07/01/2016 $39.96 $7.85 $16.10 $0.00 $63.91 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86 a ----------------------------------------------------------------------------------------------------------------------------------------- ],-'.e Date: 06/01/2015 Wage Request Number: 20150601-026 Page 23 39 of Classification Effective Date Base Wage Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW Effective Date - 01/01/2015 Step percent Apprentice Base Wage Health Health Pension Pension Supplemental Total Rate Unemployment Supplemental Unemployment Total Rate n 1 50 $18.58 $7.85 $0.00 $0.00 $26.43 11�j 2 55 3 60 $20.44 $22.30 $7.85 $7.85 $3.66 $3.99 $0.00 $0.00 $31.95 $34.14 Q 4 65 $24.15 $7.85 $4.32 $0.00 $36.32 01/01/2017 5 70 $26.01 $7.85 $14.11 $0.00 $47.97 6 75 $27.87 $7.85 $14.44 $0.00 $50.16 7 80 $29.73 $7.85 $14.77 $0.00 $52.35 8 90 $33.44 $7.85 $15.44 $0.00 $56.73 I f Effective Date - 07/01/2015 Supplemental Pa 24 3 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate n �} 1 50 $19.03 $7.85 $0.00 $0.00 $26.88 2 55 $20.93 $7.85 $3.66 $0.00 $32.44 3 60 $22.84 $7.85 $3.99 $0.00 $34.68 4 65 $24.74 $7.85 $4.32 $0.00 $36.91 5 70 $26.64 $7.85 $14.11 $0.00 $48.60 D 6 75 $28.55 $7.85 $14.44 $0.00 $50.84 7 80 $30.45 $7.85 $14.77 $0.00 $53.07 8 90 $34.25 $7.85 $15.44 $0.00 $57.54 - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - -_ Steps are 750 hrs. - - - - - - - - - Apprentice to Journeyworker Ratio: 1:1 - - - - - - - - - - - - - - - - - - - �--� PAINTER / TAPER (BRUSH, REPAINT) 01/01/2015 $35.22 $7.85 $16.10 $0.00 $59.17 U PAINTERS LOCAL 35 - ZONE 2 07/01/2015 $36.12 $7.85 $16.10 $0.00 $60.07 01/01/2016 $37.07 $7.85 $16.10 $0.00 $61.02 07/01/2016 $38.02 $7.85 $16.10 $0.00 $61.97 01/01/2017 $38.97 $7.85 $16.10 $0.00 $62.92 Pa 24 3 Issue Date: 06/01/2015 W ge Request Number 20150601-026 a of . ossification . Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date - 01/01/2015 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $17.61 $7.85 $0.00 $0.00 $25.46 2 55 $19.37 $7.85 $3.66 $0.00 $30.88 3 60 $21.13 $7.85 $3.99 $0.00 $32.97 4 65 $22.89 $7.85 $4.32 $0.00 $35.06 5 70 $24.65 $7.85 $14.11 $0.00 $46.61 6 75 $26.42 $7.85 $14.44 $0.00 $48.71 7 80 $28.18 $7.85 $14.77 $0.00 $50.80 8 90 $31.70 $7.85 $15.44 $0.00 $54.99 Effective Date - 07/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.06 $7.85 $0.00 $0.00 $25.91 $69.57 2 55 $19.87 $7.85 $3.66 $0.00 $31.38 3 60 $21.67 $7.85 $3.99 $0.00 $33.51 4 65 $23.48 $7.85 $4.32 $0.00 $35.65 1 ± 5 70 $25.28 $7.85 $14.11 $0.00 $47.24 [ 6 75 $27.09 $7.85 $14.44 $0.00 $49.38 7 80 $28.90 $7.85 $14.77 $0.00 $51.52 )L �I 8 90 $32.51 $7.85 $15.44 $0.00 $55.80 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - Steps are 750 hrs. 20150601-026 39 `- - - - - - - - - - - Apprentice to Journeyworker Ratio:1:1 - - - - - - - - - - - - - - - - - - EJE &PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 L_j_-K) PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 p -1E DRIVER 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 DRIVER LOCAL 56 (ZONE 1) 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 n------------------------------------------------------------------------------------------------------------------------------------------a 1',se Date: 06/01/2015 Wage Request Number: 20150601-026 39 Page 25 of Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment 1 0 Apprentice- PILEDRIVER -Local 56 Zone I Effective Date - 08/01/2014 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate n 1 50 $20.80 $9.80 $18.17 $0.00 $48.77-►, $0.00 2 60 3 70 $24.96 $29.12 $9.80 $9.80 $18.17 $18.17 $0.00 $0.00 $52.93 $57.09 $0.00 4 75 $31.20 $9.80 $18.17 $0.00 $59.17 $0.00 5 80 $33.28 $9.80 $18.17 $0.00 $61.25 $0.00 6 80 $33.28 $9.80 $18.17 $0.00 $61.25 7 90 $37.44 $9.80 $18.17 $0.00 $65.41 8 90 $37.44 $9.80 $18.17 $0.00 $65.41 j Effective Date - 08/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.55 $9.80 $18.17 $0.00 $49.52 Page 26 of 2 60 $25.86 $9.80 $18.17 $0.00 $53.83 3 70 $30.17 $9.80 $18.17 $0.00 $58.14 4 75 $32.33 $9.80 $18.17 $0.00 $60.30 5 80 $34.48 $9.80 $18.17 $0.00 $62.45 I 6 80 $34.48 $9.80 $18.17 $0.00 $62.45 �J 7 90 $38.79 $9.80 $18.17 $0.00 $66.76 8 90 $38.79 $9.80 $18.17 $0.00 $66.76 - - - - - - - - - - (Notes: - - - - - - - - - - - - - - - - - - - � (� Apprentice to Journe"orker Ratio:l:3 PIPEFITTER & STEAWITTER 03/01/2015 $46.36 $9.70 $14.89 $0.00 $70.95 U PIPERYTERS LOCAL 537 (Local 138) 09/01/2015 $47.36 $9.70 $14.89 $0.00 $71.95 03/01/2016 $48.36 $9.70 $14.89 $0.00 $72.95 09/01/2016 $49.36 $9.70 $14.89 $0.00 $73.95 03/01/2017 $50.36 $9.70 $14.89 $0.00 $74.95 ---------------- - -- Issue Date: 06/01/2015 Wage Request Number: 20150601-026 Page 26 of ii 3;11 Osification D Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PIPEFI7TER Local 537 (Local 138) Effective Date - 03/01/2015 Step percent Apprentice Base Wage Health 1 2 3 4 5 Supplemental Pension Unemployment Total Rate 40 $18.54 $9.70 $5.50 $0.00 $33.74 45 $20.86 $9.70 $14.89 $0.00 $45.45 60 $27.82 $9.70 $14.89 $0.00 $52.41 70 $32.45 $9.70 $14.89 $0.00 $57.04 80 $37.09 $9.70 $14.89 $0.00 $61.68 1'-fLAYER Effective Date - 09/01/2015 $31.40 $7.30 Supplemental $0.00 $51.00 [� 12/01/2015 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 06/01/2016 4J`Ji $7.30 1 40 $18.94 $9.70 $5.50 $0.00 $34.14 $7.30 2 45 $21.31 $9.70 $14.89 $0.00 $45.90 �'{{ U 3 60 $28.42 $9.70 $14.89 $0.00 $53.01 4 70 $33.15 $9.70 $14.89 $0.00 $57.74 5 80 $37.89 $9.70 $14.89 $0.00 $62.48 Notes: i3C 1:10 thereafter / Steps are 1 yr. efrig/AC Mechanic ** 1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:1-:20;10:23(Max) R- - - - - - f Apprentice to Journeyworker Ratio:** Page 27 of 39 Date: 06/01/2015 1'-fLAYER 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 1 )KERS - ZONE 2 L--1 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 Ror12/01/2016 apprentice rates see "Apprentice- LABORER" $33.15 $7.30 $12.30 $0.00 $52.75 PLUMBER ERS & GASF17TERS LOCAL 12 (Loca1138) 03/01/2015 $46.13 $10.32 $14.89 $0.00 $71.34 1..._ I 09/01/2015 $47.13 $10.32 $14.89 $0.00 $72.34 03/01/2016 $48.28 $10.32 $14.89 $0.00 $73.49 09/01/2016 $49.33 $10.32 $14.89 $0.00 $74.54 1� JI 03/01/2017 $50.33 $10.32 $14.89 $0.00 $75.54 U De Wage Request Number 20150601-026 Page 27 of 39 Date: 06/01/2015 Classification Effective Date Base Wage Health Pension Supplemental Total Rate j } Unemployment j` J a Apprentice- PLUMBERIGASFITTER -Local 12 (Local 138) 06/01/2015 $42.83 $10.00 $14.55 $0.00 $67.38 Effective Date - 03/01/2015 OPERATING ENGINEERS LOCAL 4 12/01/2015 Supplemental $10.00 $14.55 $0.00 $68.63 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate $14.55 $0.00 1 35 $16.15 $10.32 $5.54 $0.00 $46.08 $32.01 $14.55 $0.00 2 40 3 55 $18.45 $10.32 $25.37 $10.32 $6.27 $8.42 $0.00 $0.00 $47.08 $35.04 $44.11 $14.55 $0.00 4 65 $29.98 $10.32 $9.87 $0.00 $48.08 $50.17 $14.55 $0.00 5 75 $34.60 $10.32 $11.30 $0.00 $56.22 Effective Date - 09/01/2015 ----- Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate n 1 35 $16.50 $10.32 $5.54 $0.00 $32.36 2 40 3 55 $18.85 $10.32 $25.92 $10.32 $6.27 $8.42 $0.00 $0.00 $35.44 $44.66 4 65 $30.63 $10.32 $9.87 $0.00 $50.82 5 75 $35.35 $10.32 $11.30 $0.00 $56.97 {w'•j - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - --- --Notes: Steps are 1 yr Step 4 with lic$53.20 Step5 with lic$59.23 Apprentice to Journeyworker Ratio:1:5 PNEUMATIC CONTROLS (TEMP.) 03/01/2015 $46.36 $9.70 $14.89 $0.00 $70.95 PIPEFITTERS LOCAL 537 (Local 138) 09/01/2015 $47.36 $9.70 $14.89 $0.00 $71.95 03/01/2016 $48.36 $9.70 $14.89 $0.00 $72.95 09/01/2016 $49.36 $9.70 $14.89 $0.00 $73.95 j 03/01/2017 $50.36 $9.70 $14.89 $0.00 $74.95 1`l For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" PNEUMATIC DRILL/TOOL OPERATOR 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 LABORERS -ZONE2 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER' POWDERMAN & BLASTER 06/01/2015 $32.15 $7.30 $12.30 $0.00 $51.75 LABORERS - ZONE 1 12/01/2015 $32.65 $7.30 $12.30 $0.00 $52.25 06/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 12/01/2016 $33.90 $7.30 $12.30 $0.00 $53.50 For apprentice rates see "Apprentice- LABORER' POWER SHOVEL/DERRICK/TRENCHING MACHINE 06/01/2015 $42.83 $10.00 $14.55 $0.00 $67.38 OPERATING ENGINEERS LOCAL 4 12/01/2015 $44.08 $10.00 $14.55 $0.00 $68.63 06/01/2016 $44.83 $10.00 $14.55 $0.00 $69.38 12/01/2016 $46.08 $10.00 $14.55 $0.00 $70.63 06/01/2017 $47.08 $10.00 $14.55 $0.00 $71.63 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 12/01/2017 $48.08 $10.00 $14.55 $0.00 $72.63 ----- -...... ------------ Issue Date: 06/01/2015 Wage Request Number 20150601-026 Page 28 of ' 3 �tOPERATOR con .(CONCRETE) OPERATING ENGINEERS LOCAL 4 0 a For apprentice rates see "Apprentice- OPERATING ENGINEERS" OPERATOR (DEWATERING, OTHER) 1NG ENGINEERS LOCAL 4 DFor apprentice rates see "Apprentice- OPERATING ENGINEERS" READY -MIX CONCRETE DRIVER ESTERS LOCAL 42 ENGINEERS LOCAL 4 -0 0For apprentice rates see "Apprentice- OPERATING ENGINEERS" [AL WOOD FRAME (All Other Work) -ZONE 2 (Residential Wood) Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment 06/01/2015 $42.83 $10.00 $14.55 $0.00 $67.38 12/01/2015 $44.08 $10.00 $14.55 $0.00 $68.63 06/01/2016 $44.83 $10.00 $14.55 $0.00 $69.38 12/01/2016 $46.08 $10.00 $14.55 $0.00 $70.63 06/01/2017 $47.08 $10.00 $14.55 $0.00 $71.63 12/01/2017 $48.08 $10.00 $14.55 $0.00 $72.63 06/01/2015 $29.61 $10.00 $14.55 $0.00 $54.16 12/01/2015 $30.48 $10.00 $14.55 $0.00 $55.03 06/01/2016 $31.00 $10.00 $14.55 $0.00 $55.55 12/01/2016 $31.87 $10.00 $14.55 $0.00 $56.42 06/01/2017 $32.56 $10.00 $14.55 $0.00 $57.11 12/01/2017 $33.25 $10.00 $14.55 $0.00 $57.80 05/01/2015 $22.66 $8.49 $9.89 $0.00 $41.04 11/01/2015 $22.78 $8.49 $9.89 $0.00 $41.16 04/30/2016 $22.78 $8.49 $10.25 $0.00 $41.52 05/01/2016 $24.15 $8.49 $10.68 $0.00 $43.32 04/30/2017 $24.15 $8.49 $11.07 $0.00 $43.71 05/01/2017 $24.21 $8.49 $11.54 $0.00 $44.24 04/30/2018 $24.21 $8.49 $11.96 $0.00 $44.66 05/01/2018 $24.24 $8.49 $12.46 $0.00 $45.19 04/30/2019 $24.24 $8.49 $12.92 $0.00 $45.65 06/01/2015 $42.42 $10.00 $14.55 $0.00 $66.97 12/01/2015 $43.66 $10.00 $14.55 $0.00 $68.21 06/01/2016 $44.41 $10.00 $14.55 $0.00 $68.96 12/01/2016 $45.64 $10.00 $14.55 $0.00 $70.19 06/01/2017 $46.63 $10.00 $14.55 $0.00 $71.18 12/01/2017 $47.62 $10.00 $14.55 $0.00 $72.17 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42 RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 ** The Residential Wood Frame Carpenter classification applies (i / to the construction of new, wood frame residences that do "xceed four stories including the basement. CARPENTERS-z0NE 2 (Residential Wood) 0 A of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. $0.00 $36.81 ----------------------------------------------------------------------- - ------------------------------------------------------------------ I ,e Date: 06/01/2015 Wage Request Number 20150601-026 Page 29 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment . 0 Apprentice- CARPENTER (Residential Wood Frame) -Zone 2 Effective Date - 05/01/2011 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 12/01/2015 1 60 $14.54 $6.34 $0.00 $0.00 $20.88 $7.30 2 60 3 65 $14.54 $15.76 $6.34 $6.34 $6.23 $6.23 $0.00 $0.00 $27.11 $28.33 $0.00 4 70 $16.97 $6.34 $6.23 $0.00 $29.54 $47.62 5 75 $18.18 $6.34 $6.23 $0.00 $30.75 6 80 $19.39 $6.34 $6.23 $0.00 $31.96 7 85 $20.60 $6.34 $6.23 $0.00 $33.17 8 90 $21.82 $6.34 $6.23 $0.00 $34.39 i - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - --- ---Notes: - - - - - - - - - - - - Apprentice to Journeyworker Ratio: 1:5 - - - - - - - - - - - - - - - - - RIDE -ON MOTORIZED BUGGY OPERATOR LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER' ROLLER/SPREADER/MULCHING MACHINE OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg) ROOFERS LOCAL 33 06/01/2015 $31.40 $7.30 $12.30 $0.00 12/01/2015 $31.90 $7.30 $12.30 $0.00 06/01/2016 $32.40 $7.30 $12.30 $0.00 12/01/2016 $33.15 $7.30 $12.30 $0.00 06/01/2015 $42.42 $10.00 $14.55 $0.00 12/01/2015 $43.66 $10.00 $14.55 $0.00 06/01/2016 $44.41 $10.00 $14.55 $0.00 12/01/2016 $45.64 $10.00 $14.55 $0.00 06/01/2017 $46.63 $10.00 $14.55 $0.00 12/01/2017 $47.62 $10.00 $14.55 $0.00 $51.00 Li $51.50 $52.00 ("') $52.75 ILJ� $66.97 $68.21 $68.96 $70.19 $71.18 $72.17 >•'1 02/01/2015 $40.11 $10.50 $11.60 $0.00 $62.21 08/01/2015 $41.01 $10.50 $11.60 $0.00 $63.11 02/01/2016 $41.91 $10.50 $11.60 $0.00 $64.01 - ------------ ---- - g Issue Date: 06/01/2015 W a Request Number: 20150601-026 Pa a 30 of 3 Apprentice - ROOFER - Local 33 Effective Date - 02/01/2015 Step percent Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice Base Wage Health Supplemental Pension Unemployment Total Rate 1 50 $20.06 $10.50 $3.38 $0.00 $33.94 2 60 $24.07 $10.50 $11.60 $0.00 $46.17 3 65 $26.07 $10.50 $11.60 $0.00 $48.17 4 75 $30.08 $10.50 $11.60 $0.00 $52.18 5 85 $34.09 $10.50 $11.60 $0.00 $56.19 Effective Date - 08/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.51 $10.50 $3.38 $0.00 $34.39 2 60 $24.61 $10.50 $11.60 $0.00 $46.71 3 65 $26.66 $10.50 $11.60 $0.00 $48.76 4 75 $30.76 $10.50 $11.60 $0.00 $52.86 5 85 $34.86 $10.50 $11.60 $0.00 $56.96 - - - - - - - - - - - - - Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1 - - - - - - - - - - - - - - ----- Step 1 is 2000 hrs.; Steps 2-5 are 1000 hrs. yul 08/01/2017 $48.63 - - - - - - - - - - - - Apprentice to Journeyworker Ratio:** - - - - - - - - - - - - - - - - rFER SLATE / TILE / PRECAST CONCRETE FERS LOCAL 33 For apprentice rates see "Apprentice- ROOFER" 02/01/2015 $40.36 $10.50 $11.60 $0.00 $62.46 08/01/2015 $41.26 $10.50 $11.60 $0.00 $63.36 02/01/2016 $42.16 $10.50 $11.60 $0.00 $64.26 I----FETMETAL WORKER 02/01/2015 $43.28 $10.20 $20.54 $2.22 $76.24 SHEETMETAL WORKERS LOCAL 17 - A 08/01/2015 02/01/2016 $44.28 $45.28 $10.20 $10.20 $20.54 $20.54 $2.22 $2.22 $77.24 $78.24 08/01/2016 $46.43 $10.20 $20.54 $2.22 $79.39 02/01/2017 $47.53 $10.20 $20.54 $2.22 $80.49 yul 08/01/2017 $48.63 $10.20 $20.54 $2.22 $81.59 02/01/2018 $49.78 $10.20 $20.54 $2.22 $82.74 ---------------------------------------- e Date: 06/01/2015 --------------------------------------- Wage Request Number: 20150601-026 ----------------------------------------------- ------------ _ Page 31 of 39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment SHEET METALWORKER 17-A Apprentice- -Local Effective Date - 02/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.31 $10.20 $4.58 $0.00 $32.09 2 40 $17.31 $10.20 $4.58 $0.00 $32.09 3 45 $19.48 $10.20 $9.09 $1.16 $39.93 , 4 45 $19.48 $10.20 $9.09 $1.16 $39.93 5 50 $21.64 $10.20 $9.91 $1.25 $43.00 6 50 $21.64 $10.20 $10.16 $1.26 $43.26 7 60 $25.97 $10.20 $11.55 $1.43 $49.15 8 65 $28.13 $10.20 $12.38 $1.52 $52.23 i 9 75 $32.46 $10.20 $14.02 $1.70 $58.38 �J 10 85 $36.79 $10.20 $15.16 $1.86 $64.01 Effective Date - 08/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.71 $10.20 $4.58 $0.00 $32.49 2 40 $17.71 $10.20 $4.58 $0.00 $32.49 3 45 $19.93 $10.20 $9.09 $1.18 $40.40 4 45 $19.93 $10.20 $9.09 $1.18 $40.40 5 50 $22.14 $10.20 $9.91 $1.27 $43.52 6 50 $22.14 $10.20 $10.16 $1.28 $43.78 7 60 $26.57 $10.20 $11.55 $1.45 $49.77 8 65 $28.78 $10.20 $12.38 $1.54 $52.90 9 75 $33.21 $10.20 $14.02 $1.72 $59.15 10 85 - - - - - $37.64 - - - - - - - $10.20 - $15.16 $1- -- --89 $64.89 (Notes: Steps are 6 mos. --- -------------------- --_...---- -- Apprentice to Journeyworker Ratio: 1:4 SIGN ERECTOR 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93 PAINTERS LOCAL 35 - ZONE 2 .......... ..... ------- ----- Issue Date: 06/01/2015 Is s u e Wage Request Number 20150601-026 Page 32 of 3, i !ssification• �j t1NKLER FITTER VhNKLER FITTERS LOCAL 550 - (Section B) Zone 2 Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate $72.31 10/01/2015 $50.03 $8.42 $14.90 $0.00 $73.35 QApprentice- SIGNERECTOR $8.67 $15.05 $0.00 $73.75 03/01/2016 $50.93 $8.67 -Local 35 Zone 2 $0.00 $74.65 10/01/2016 03/01/2017 $51.97 $52.87 $8.67 $8.67 $15.05 $15.05 Effective Date - 06/01/2013 $75.69 $76.59 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $12.91 $7.07 $0.00 $0.00 $19.98 2 55 3 60 $14.20 $7.07 $2.45 $0.00 Date: 06/01/2015 $23.72 $15.49 $7.07 $2.45 $0.00 $25.01 Page 33 of 4 65 $16.78 $7.07 $2.45 $0.00 $26.30 5 70 $18.07 $7.07 $7.05 $0.00 $32.19 6 75 $19.36 $7.07 $7.05 $0.00 $33.48 7 80 8 85 $20.65 $21.94 $7.07 $7.07 $7.05 $7.05 $0.00 $0.00 $34.77 $36.06 9 90 $23.23 $7.07 $7.05 $0.00 $37.35 G(Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - - - Steps are 4 mos. Apprentice to Journeyworker Ratio:1:1 SPECIALIZED EARTH MOVING EQUIP < 35 TONS 06/01/2015 $31.94 $9.91 $9.33 $0.00 $51.18 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 08!01/2015 $31.94 $10.41 $9.33 $0.00 $51.68 12/01/2015 $31.94 $10.41 $10.08 $0.00 $52.43 06/01/2016 $32.44 $10.41 $10.08 $0.00 $52.93 1 J 08/01/2016 $32.44 $10.91 $10.08 $0.00 $53.43 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24 '-�CIALIZED EARTH MOVING EQUIP > 35 TONS 06/01/2015 $32.23 $9.91 $9.33 $0.00 $51.47 TERS JOINT COUNCIL NO. 10 ZONE B 08/01/2015 $32.23 $10.41 $9.33 $0.00 $51.97 12/01/2015 $32.23 $10.41 $10.08 $0.00 $52.72 06/01/2016 $32.73 $10.41 $10.08 $0.00 $53.22 08/01/2016 $32.73 $10.91 $10.08 $0.00 $53.72 t"1 12/01/2016 $32.73 $10.91 $10.89 $0.00 $54.53 t1NKLER FITTER VhNKLER FITTERS LOCAL 550 - (Section B) Zone 2 03/01/2015 $48.99 $8.42 $14.90 $0.00 $72.31 10/01/2015 $50.03 $8.42 $14.90 $0.00 $73.35 01/01/2016 $50.03 $8.67 $15.05 $0.00 $73.75 03/01/2016 $50.93 $8.67 $15.05 $0.00 $74.65 10/01/2016 03/01/2017 $51.97 $52.87 $8.67 $8.67 $15.05 $15.05 $0.00 $0.00 $75.69 $76.59 Date: 06/01/2015 Wage Request Number• -3- 9 - e .20150601-026 Page 33 of Classification Effective Date Base Wage Health Pension Supplemental Unemployment 'Total Rate Local 550 B) Zone 2 { Apprentice - SPRINKLER FITTER - (Section Effective Date - 03/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate �f 1 35 $17.15 $8.42 $8.40 $0.00 $33.971 2 40 3 45 $19.60 $22.05 $8.42 $8.42 $8.40 $8.40 $0.00 $0.00 $36.42 $38.87 4 50 $24.50 $8.42 $8.40 $0.00 $41.32 5 55 $26.94 $8.42 $8.40 $0.00 $43.76 6 60 $29.39 $8.42 $8.40 $0.00 $46.21 7 65 $31.84 $8.42 $8.40 $0.00 $48.66 8 70 $34.29 $8.42 $8.40 $0.00 $51.11 y 9 75 $36.74 $8.42 $8.40 $0.00 $53.56 10 80 $39.19 $8.42 $8.40 $0.00 $56.01 Effective Date - 10/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $17.51 $8.42 $8.40 $0.00 $34.33 2 40 $20.01 $8.42 $8.40 $0.00 $36.83 3 45 $22.51 $8.42 $8.40 $0.00 $39.33 ' { �J 4 50 $25.02 $8.42 $8.40 $0.00 $41.84 5 55 $27.52 $8.42 $8.40 $0.00 $44.34 {� } 6 60 $30.02 $8.42 $8.40 $0.00 $46.84�J( 7 65 $32.52 $8.42 $8.40 $0.00 $49.34 8 70 $35.02 $8.42 $8.40 $0.00 $51.84 9 75 $37.52 $8.42 $8.40 $0.00 $54.34 10 80- $40.02 $8.42 $8.40 $56.84 - - - - - - - - - (Notes: Apprentice entered prior 9/30/10: - - - - - - - -$000- - 40/45/50/55/60/65/70/75/80/85 L__- Steps are 850 hours - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:3 II��JJ STEAM BOILER OPERATOR 06/01/2015 $42.42 $10.00 $14.55 $0.00 $66.97 1 OPERATING ENGINEERS LOCAL 4 12/01/2015 $43.66 $10.00 $14.55 $0.00 $68.21 I j U 06/01/2016 $44.41 $10.00 $14.55 $0.00 $68.96 12/01/2016 $45.64 $10.00 $14.55 $0.00 $70.19 06/01/2017 $46.63 $10.00 $14.55 $0.00 $71.18 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 12/01/2017 $47.62 $10.00 $14.55 $0.00 $72.17 f� j TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 06/01/2015 $42.42 $10.00 $14.55 $0.00 $66.97 OPERATING ENGINEERS LOCAL 4 12/01/2015 $43.66 $10.00 $14.55 $0.00 $68.21 06/01/2016 $44.41 $10.00 $14.55 $0.00 $68.96 12/01/2016 $45.64 $10.00 $14.55 $0.00 $70.19 06/01/2017 $46.63 $10.00 $14.55 $0.00 $71.18 12/01/2017 $47.62 $10.00 $14.55 $0.00 $72.17 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ---- g q--------- Issue Date: 06/01/2015 W a Request Number 20150601-026 g t Pa a 34 of 3 ion r TELECOMMUNICATION TECHNICIAN TRICIANSLOCAL 103 I U D Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate 03/01/2015 $33.88 $13.00 $13.70 $0.00 $60.58 09/01/2015 $34.60 $13.00 $13.72 $0.00 $61.32 03/01/2016 $35.31 $13.00 $13.74 $0.00 $62.05 Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 D Effective Date - 03/01/2015 Step percent Apprentice Base Wage Health Supplemental Pension Unemployment Total Rate $13.55 1 40 $0.41 2 40 $26.96 3 45 $13.00 4 45 $0.00 5 50 $15.25 6 55 $10.87 Q $39.12 7 60 $13.00 $10.87 $0.00 8 65 $16.94 9 70 $11.11 10 75 $41.05 Effective Date - 09/01/2015 $13.00 $11.38 Step percent Supplemental Pension Unemployment Total Rate $13.55 $13.00 $0.41 $0.00 $26.96 $13.55 $13.00 $0.41 $0.00 $26.96 $15.25 $13.00 $10.87 $0.00 $39.12 $15.25 $13.00 $10.87 $0.00 $39.12 $16.94 $13.00 $11.11 $0.00 $41.05 $18.63 $13.00 $11.38 $0.00 $43.01 $20.33 $13.00 $11.64 $0.00 $44.97 $22.02 $13.00 $11.89 $0.00 $46.91 $23.72 $13.00 $12.15 $0.00 $48.87 $25.41 $13.00 $12.41 $0.00 $50.82 Supplemental Apprentice Base Wage Health Pension Unemployment Total Rate ZZO FINISHERS YERS LOCAL 3 - MARBLE & TILE 02/01/2015 $47.90 $10.18 $18.50 $0.00 $76.58 08/01/2015 $48.80 $10.18 $18.57 $0.00 $77.55 1 40 $13.84 $13.00 $0.42 $0.00 $27.26 2 40 $13.84 $13.00 $0.42 $0.00 $27.26 3 45 $15.57 $13.00 $10.88 $0.00 $39.45 4 45 $15.57 $13.00 $10.88 $0.00 $39.45 5 50 $17.30 $13.00 $11.14 $0.00 $41.44 6 55 $19.03 $13.00 $11.39 $0.00 $43.42 7 60 $20.76 $13.00 $11.65 $0.00 $45.41 8 65 $22.49 $13.00 $11.90 $0.00 $47.39 9 70 $24.22 $13.00 $12.17 $0.00 $49.39 10 75 $25.95 $13.00 $12.43 $0.00 $51.38 - - (Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - �...._. ___ __ - _ ------®------------ I Apprentice to Journe"orker Ratio:1:1 ZZO FINISHERS YERS LOCAL 3 - MARBLE & TILE 02/01/2015 $47.90 $10.18 $18.50 $0.00 $76.58 08/01/2015 $48.80 $10.18 $18.57 $0.00 $77.55 02/01/2016 549.37 5.10.18 $18.57 100.00 5,78.12 08/01/2016 $50.27 $10.18 $18.65 $0.00 $79.10 02/01/2017 $50.84 $10.18 $18.65 $0.00 $79.67 R------------------------------------------------------------------------------------------------------------------------------------------ l;..;e Date: 06/01/2015 Wage Request Number: 20150601-026 Page 35 of 39 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate $55.75 12/01/2015 3 Marble & Tile $7.30 $13.15 $0.00 $56.50 06/01/2016 $36.80 Apprentice- TERRAZZO FINISHER -Local $13.15 $0.00 $57.25 12/01/2016 $37.80 $7.30 Effective Date - 02/01/2015 $0.00 $58.25 Supplemental 06/01/2016 $44.41 $10.00 $14.55 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate $45.64 $10.00 1 50 $23.95 $10.18 $18.50 $0.00 $52.63�Jj $46.63 $10.00 2 60 3 70 $28.74 $10.18 $33.53 $10.18 $18.50 $18.50 $0.00 $0.00 $57.42 $62.21 $47.62 $10.00 4 80 $38.32 $10.18 $18.50 $0.00 For apprentice rates see "Apprentice- OPERATING ENGINEERS" $67.00 5 90 $43.11 $10.18 $18.50 $0.00 $71.79 Effective Date - 08/01/2015 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 20150601-026 1 50 $24.40 $10.18 $18.57 $0.00 $53.15 2 60 $29.28 $10.18 $18.57 $0.00 $58.03 3 70 $34.16 $10.18 $18.57 $0.00 $62.91 4 80 $39.04 $10.18 $18.57 $0.00 $67.79 5 90 $43.92 $10.18 $18.57- $72.67 - - - - - - - - - - INotes: - - - -$000- - - - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:3 TEST BORING DRILLER 06/01/2015 $36.70 $7.30 $13.15 $0.00 $57.15 LABORERS - FOUNDATIONAND MARINE 12/01/2015 $37.45 $7.30 $13.15 $0.00 $57.90 In J( 06/01/2016 $38.20 $7.30 $13.15 $0.00 $58.65 12/01/2016 $39.20 $7.30 $13.15 $0.00 $59.65 For apprentice rates see "Apprentice- LABORER" TEST BORING DRILLER HELPER LABORERS - FOUNDATIONAND MARINE 06/01/2015 $35.42 12/01/2015 $36.17 $7.30 $7.30 $13.15 $13.15 $0.00 $0.00 $55.87 $56.62 06/01/2016 $36.92 $7.30 $13.15 $0.00 $57.37 12/01/2016 $37.92 $7.30 $13.15 $0.00 $58.37 f "j For apprentice rates see "Apprentice- LABORER" TEST BORING LABORER LABORERS - FOUNDATIONAND MARINE 06/01/2015 $35.30 $7.30 $13.15 $0.00 $55.75 12/01/2015 $36.05 $7.30 $13.15 $0.00 $56.50 06/01/2016 $36.80 $7.30 $13.15 $0.00 $57.25 12/01/2016 $37.80 $7.30 $13.15 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" I f TRACTORS/PORTABLE STEAM GENERATORS 06/01/2015 $42.42 $10.00 $14.55 $0.00 $66.97 OPERATING ENGINEERS LOCAL 4 12/01/2015 $43.66 $10.00 $14.55 $0.00 $68.21 06/01/2016 $44.41 $10.00 $14.55 $0.00 $68.96 12/01/2016 $45.64 $10.00 $14.55 $0.00 $70.19 06/01/2017 $46.63 $10.00 $14.55 $0.00 $71.18 12/01/2017 $47.62 $10.00 $14.55 $0.00 $72.17 For apprentice rates see "Apprentice- OPERATING ENGINEERS" Issue Date: 06/01/2015 W ge Request Number: 20150601-026 Pa a 36 of 3 } ossification. Effective Date Base Wage Health Pension Supplemental Total Rate 'IRERS (COMPRESSED AIR) Unemployment TRAILERS FOR EARTH MOVING EQUIPMENT 06/01/2015 $32.52 $9.91 $9.33 $0.00 $51.76 T AMSTERSJOINT COUNCIL N0. 10 ZONEB 06/01/2016 $51.08 $7.30 $13.55 $0.00 08/01/2015 $32.52 $10.41 $9.33 $0.00 $52.26 $13.55 12/01/2015 $32.52 $10.41 $10.08 $0.00 $53.01 06/01/2016 $33.02 $10.41 $10.08 $0.00 $53.51 $ 08/01/2016 $33.02 $10.91 $10.08 $0.00 $54.01 12/01/2016 $33.02 $10.91 $10.89 $0.00 $54.82 WORK -COMPRESSED AIR 06/01/2015 $47.58 $7.30 $13.55 $0.00 $68.43 J -)RERRS (COMPRESSED AIR) $13.55 $0.00 $62.00 12/01/2016 $42.15 U� 12/01/2015 $48.33 $7.30 $13.55 $0.00 $69.18 06/01/2016 $49.08 $7.30 $13.55 $0.00 $69.93 $7.30 $13.55 $0.00 $62.50 LABORERS (FREE AIR TUNNEL) I 12/01/2016 $50.08 $7.30 $13.55 $0.00 $70.93 - For apprentice rates see "Apprentice- LABORER" $13.55 $0.00 $63.25 $43.15 TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) 06/01/2015 $49.58 $7.30 $13.55 $0.00 $70.43 'IRERS (COMPRESSED AIR) 12/01/2015 $50.33 $7.30 $13.55 $0.00 $71.18 06/01/2016 $51.08 $7.30 $13.55 $0.00 $71.93 n 12/01/2016 $52.08 $7.30 $13.55 $0.00 $72.93 j For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - FREE AIR 06/01/2015 $39.657.30 $ $13.55 $ 0.00 $60.50 BORERS (FREE AIR TUNNEL) 12/01/2015 $40.40 $7.30 $13.55 $0.00 $61.25 06/01/2016 $41.15 $7.30 $13.55 $0.00 $62.00 12/01/2016 $42.15 $7.30 $13.55 $0.00 $63.00 or apprentice rates see "Apprentice- LABORER" L WORK -FREE AIR (HAZ. WASTE) 06/01/2015 $41.65 $7.30 $13.55 $0.00 $62.50 LABORERS (FREE AIR TUNNEL) 12/01/2015 06/01/2016 $42.40 $7.30 $13.55 $0.00 $63.25 $43.15 $7.30 $13.55 $0.00 $64.00 12/01/2016 $44.15 $7.30 $13.55 $0.00 $65.00 apprentice rates see "Apprentice- LABORER" �For "-�� 06/01/2015 $31.94 $9.91 $9.33 $0.00 $51.18 TEAMSTERS JOINT COUNCIL N0. 10 ZONE B 08/01/2015 $31.94 $10.41 $9.33 $0.00 $51.68 12/01/2015 $31.94 $10.41 $10.08 $0.00 $52.43 06/01/2016 $32.44 $10.41 $10.08 $0.00 $52.93 08/01/2016 $32.44 $10.91 $10.08 $0.00 $53.43 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24 WAGON DRILL OPERATOR 06/01/2015 $31.40 $7.30 $12.30 $0.00 $51.00 ORERS -ZONE 2 12/01/2015 $31.90 $7.30 $12.30 $0.00 $51.50 06/01/2016 $32.40 $7.30 $12.30 $0.00 $52.00 For apprentice rates see "Apprentice- LABORER" 12/01/2016 $33.15 $7.30 $12.30 $0.00 $52.75 STE WATER PUMP OPERATOR 06/01/2015 $42.83 $10.00 $14.55 $0.00 $67.38 OPERATING ENGINEERS LOCAL 4 12/01/2015 $44.08 $10.00 $14.55 $0.00 $68.63 fl 06/01/2016 $44.83 $10.00 $14.55 $0.00 $69.38 12/01/2016 $46.08 $10.00 $14.55 $0.00 $70.63 06/01/2017 $47.08 $10.00 $14.55 $0.00 $71.63 12/01/2017 $48.08 $10.00 $14.55 $0.00 $72.63 For apprentice rates see "Apprentice- OPERATING ENGINEERS" De Date: 06/01/2015 Wage Request Number 20150601-026 Page 37 of 39 Classification Effective Date Base Wage Health ' Pension Supplemental Unemployment J,otal Rates WATER METER INSTALLER 03/01/2015 $46.13 $10.32 $14.89 $0.00 $71.34 PL UMBERS & GASFITTERS LOCAL 12 (Local 138) 09/01/2015 $47.13 $10.32 $14.89 $0.00 $72.34 03/01/2016 $48.28 $10.32 $14.89 $0.00 $73.49 09/01/2016 $49.33 $10.32 $14.89 $0.00 $74.54 03/01/2017 $50.33 $10.32 $14.89 $0.00 $75.54 For apprentice rates see "Apprentice- PLUMBER/PIPEF=R" or "PLUMBER/GASF=R" Outside Electrical -East __T CABLE TECHNICIAN (Power Zone) 09/01/2013 $25.66 $8.70 $4.48 $0.00 $38.84 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 For apprentice rates see "Apprentice- LINEMAN' CABLEMAN (Underground Ducts & Cables) 09/01/2013 $36.55 $8.70 $6.58 $0.00 $51.83 OUTSIDE ELECTRICAL WORKERS -EAST LOCAL 104 For apprentice rates see "Apprentice- LINEMAN' DRIVER / GROUNDMAN CDL 09/01/2013 $29.94 $8.70 $6.05 $0.00 $44.69 OUTSIDE ELECTRICAL WORKERS -EAST LOCAL 104 For apprentice rates see "Apprentice- LINEMAN" DRIVER / GROUNDN AN -Inexperienced (<2000 Hrs) 09/01/2013 $23.52 $8.70 $5.24 $0.00 $37.46 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 For apprentice rates see "Apprentice- LINEMAN" EQUIPMENT OPERATOR (Class A CDL) 09/01/2013 $36.35. $8.70 $9.43 $0.00 $54.48 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 For apprentice rates see "Apprentice- LINEMAN' EQUIPMENT OPERATOR (Class B CDL) 09/01/2013 $32.08 $8.70 $6.59 $0.00 $47.37 OUTSIDE ELECTRICAL WORKERS -EAST LOCAL 104 For apprentice rates see "Apprentice- LINEMAN' GROUNDMAN 09/01/2013 $23.52 $8.70 $3.72 $0.00 $35.94 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 For apprentice rates see "Apprentice- LINEMAN" GROUNDMAN -Inexperienced (<2000 Hrs.) 09/01/2013 $19.25 $8.70 $2.85 $0.00 $30.80 OUTSIDE ELECTRICAL WORKERS -EAST LOCAL 104 For apprentice rates see "Apprentice- LINEMAN" JOURNEYMAN LINEMAN 09/01/2013 $42.77 $8.70 $11.78 $0.00 $63.25 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 Apprentice - LINEMAN (Outside Electrical) - East Local 104 Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $25.66 $8.70 $4.24 $0.00 $38.60 2 65 $27.80 $8.70 $4.71 $0.00 $41.21 3 70 $29.94 $8.70 $5.43 $0.00 $44.07 4 75 $32.08 $8.70 $6.16 $0.00 $46.94 5 80 $34.22 $8.70 $6.88 $0.00 $49.80 6 85 $36.35 $8.70 $7.62 $0.00 $52.67 7 90 $38.49 $8.70 $8.83 $0.00 $56.02 - - - - - - - - - - (Notes: - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:2 ------ ------------ -- Issue Date: 06/01/2015 W a Request Number: 20150601-026 Pa e 38 of 3 g nssifications, Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TELEDATA CABLE SPLICER 01/01/2015 $28.12 $4.25 $3.09 $0.00 $35.46 ELECTRICAL WORKERS -EAST LOCAL 104 LIDATADE 01/01/2016 $28.98 $4.25 $3.12 $0.00 $36.35 LINEMAN/EQUIPMENT OPERATOR 01/01/2015 $26.49 $4.25 $3.04 $0.00 $33.78 OUTSIDE ELECTRICAL WORKERS -EAST LOCAL 104 01/01/2016 $27.31 $4.25 $3.07 $0.00 $34.63 _EDATA WIREMAN/INSTALLER/TECHNICIAN -" 01/01/2015 $26.49 $4.25 $3.04 $0.00 $33.78 SIDE ELECTRICAL WORKERS -EAST LOCAL 104 01/01/2016 $27.31 $4.25 $3.07 $0.00 $34.63 ^ E TRIIv1MER , 02/01/2015 $18.05 $3.55 $0.00 $0.00 $21.60 SIDE ELECTRICAL WORKERS - EAST LOCAL 104 01/31/2016 $18.51 $3.55 $0.00 $0.00 $22.06 This classification applies only to tree work done: (a) for a utility company, R.E.A. cooperative, or railroad or coal mining company, and (b) for the purpose of operating, maintaining, or repairing the utility company's equipment and (c) by a person who is using hand or mechanical cutting methods and is not on the ground. This classification does not apply to wholesale tree removal. " E TRIIvIIvIER GROUNDMAN 02/01/2015 $15.92 $3.55 $0.00 $0.00 $19.47 OUTSIDE ELECTRICAL WORKERS -EAST LOCAL 104 01/31/2016 $16.32 $3.55 $0.00 $0.00 $19.87 This classification applies only to tree work done: (a) for a utility company, RE.A. cooperative, or railroad or Doperating, coal mining company, and (b) for the purpose of maintaining, or repairing the utility company's equipment, and (c) by a person who is using hand or mechanical cutting methods and is on the ground. This classification does not apply to wholesale tree removal. tional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the T" sioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L. IIE- 11L. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. I IE -11L. f7ieps are six months (1000 hours.) are expressed in allowable number of apprentices to journeymen or fraction thereof, unless otherwise specified. ' Multiple ratios are listed in the comment field. APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8,6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. r�J U1 111 U11 11 Date: 06/01/2015 Wage Request Number 20150601-026 Page 39 of 39 00520-B CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the Waterline Industries Corp. held on July 15, 2015 it Was VOTED, THAT Michael A. Girard (Name) Vice President (Officer) of'Waterline Industries Corp. be and hereby is authorized to execute contracts and bonds in the name and on behalf of said Corporation , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of Waterline Industries Corp. on its behalf by such officer under seal of the Corporation , shall be valid and binding upon this Corporation I hereby certify that I am the clerk of the above named Corporation and that Michael A. Girard I is the duly elected officer as above of said Corporation , and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. 7/21/2015 (Date) (Clerk) Alicia McLaughlin, Corporate Secretary Certification of the Corporate Cleric a 225073.19 Issue Date: May 2015 0 i d D Sewer System Improvements Contract 2 — Rea's Pond Pumping Station North Andover, MA CERTIFICATIONS CERTIFICATE OF NON -COLLUSION TI a undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature Date 7/8/2015 Michael A. Girard, Vice President Waterline Industries Corp. Print Name & Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I Michael A. Girard ,authorized signatory for Waterline Industries Corp. Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. Signature Michael A. Girard, Vice President No Andover Master WOODARD & CURRAN 7/8/2015 Date BIDDER'S REPRESENTATIONS AND CERTIFICATIONS 00450-5 0 225073.19 Sewer System Improvements Issue Date: April, 2014 Contract 1— Sutton Street Sewer Replacement North Andover, MA CERTIFICATION LABOR HARMONY AND.OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an QSHA-approved construction safety and health course lasting at least ten (10) hours. Signature: J/ Date: 7/8/2015 Michael A. Girard, Vice President Print Name & Title WOODARD & CURRAN Waterline Industries Corp. Company Name BIDDER'S REPRESENTATIONS AND CERTIFICATIONS 00450-6 00520C PAYMENT BOND Bond No. .259707P KNOW ALL MEN BY THESE PRESENTS, that we Waterline Industries Corp. with a place of business at 7 London Lane, Seabrook, NH 03874 as Principal (the "Principal"), and CorePointe Insurance Company , a corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at 401 S. Old Woodward Avenue, Suite 300, Birmingham, MI 49009 as Surety (the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee (the "Obligee"), in the sum of Seven Hundred Ninety Seven Thousand Three Hundred Thuty Eight Dollars and 50/100 ($797,338,.50) lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, :executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of Jorthe construction of,..,Rea's.Pond Pumping Station Improvements NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but not be limited to, any other purposes or items set out in, and to be subject to the provisions of Massachusetts General Laws, Chapter 30, Section 39K and Chapter 149, Section 29, as amended then this obligation shall become null and void; otherwise, it shall remain in full force and virtue. IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this day of PRINCIPAL Waterline Industries Corp. [Name and Seal] Michael A. Girard, ViceTresident SURETY CorePointe Insurance Co any, [Attorney-in-fartl {Seal] Mark D. Leskanic 945 Great Plain Ave., Ste 15, Needham, MA 02492 [Title] ] � [Address] 781-559-0568 Attest~ (� . _. _ [Phone] / Alicia McLa g lin, Corporate ecret ry ` Attest: (--�� PERFORMANCE BOND Bond No. 259707P KNOW -ALL MEN BY THESE PRESENTS, that we Waterline Industries Corp. with a place of business at 7 London Lane, Seabrook, NH 03874 as Principal (the "Principal"), and CorePointe Insurance Company , a corporation qualified to do 'business in the Commonwealth of Massachusetts, with a place of business at 401 S. Old Woodward Avenue, Suite 300, Birmingham, MI 49009 as Surety (the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee (the "Obligee"), in the sum of Seven Hundred Ninety Seven Thousand Three Hundred Thirty Eight Dollars and 50/100 ($797,338.50 lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a Contract with the Obligee, bearing the date of for the construction of Rea's Pond Pumping Station Improvements NOW THE CONDITIONS of this obligation are such that if the Principal (and all Subcontractors under said contract) shall well and truly keep and perform all the undertakings, covenants, agreement, terms and conditions of said contract on its part to be kept and performed during the original term of said contract and any extensions thereof that may be granted by the Obligee, with or without notice to the Surety, and during the life and any guarantee required under the contract, and shall also well and truly keep and perform all the undertakings, covenants, agreements, terms and conditions of any and all duly authorized modifications, alterations, changes or additions with notice to the Surety being hereby waived, then this obligation shall become null and void; otherwise, it shall remain in full force and virtue. IN THE EVENT the Contract is abandoned by the Principal, or is terminated by the Town of North Andover, Massachusetts under the applicable provisions of the Contract, the Surety hereby further agrees that the Surety shall, if requested in writing by the Town of North Andover, Massachusetts promptly take such action as is necessary to complete said Contract in accordance with its terms and conditions. 225.073.06 School St. & Bunker Hill St. Sewer Upgrade Issue Date: June, 2013 North Andover, MA IN WITNESS WHEREOF, the Principal and Surety have hereto set their hands and seals this day of PRINCIPAL Waterline Industries Cor [Name and Seal] Michael A. Girard, Vice President [Title] Attest• Alicia,, -.:McLaughlin, Corporate Secretary SURETY CorePointe Insurance o an [Attomey-in-fact] [Seal] Mark D. Leskanic 945 Great Plain Ave., Ste 15, Needham, MA 02492 [Address] 781-559-0568 [Phone] Attest: POWER OF ATTORNEY COREPOINTE INSURANCE COMPANY KNOW ALL MEN BY THESE PRESENTS, that COREPOINTE INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Michigan, having its principal office at 401 S. Old Woodward Ave, Suite 300, Birmingham, Michigan, has made, constituted and appointed, and does by these presents make, constitute and appoint: Mark D. Leskanic Maria Plaisted each its true and lawful Attorney -in -Fact, to sign its name as surety as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed UNLIMITED, to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Michigan, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions, which were duly and validly adopted at a meeting of the Board of Directors of the Company held on December 6, 2012: RESOLVED, that all bonds, undertakings, powers of attorney, and other instruments for and on behalf of the Company which it is authorized to execute, may be executed in the name and on behalf of the Company by the Chairman of the Board or the President, jointly with the Secretary or an Assistant Secretary, under their respective designations, except that any one or more officers or attorneys -in -fact designated in any resolution of the Board of Directors, or in any power of attorney executed as provided for in these resolutions, may execute any such bond, undertaking, or other instrument as provided in such resolution or power of attorney. IN WITNESS WHEREOF, the Company has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this 30th day of April , 2015. CorePointe Insurance Company s 11 SEAL By By °�••.,;,,,.•`�;'mes S. Haan, President Thomas J. O'Brien, Assistant Secretary STATE OF MICHIGAN ) ss: COUNTY OF OAKLAND ) Sworn to before me, a Notary Public in the State of Michigan, this 30th day of April . 2015, by James S. Haan who swore to be the President of corePointe Insurance Company. STACY CAMPBELL Notary Public, State of Michigar, tNotary p a (seal) County of Oakland blic, StatB c Michigan My Commission Expires 06-22-201, Acting in the County of My Commission Expires June 22, 2019 I, the undersigned, Assistant Secretary of COREPOINTE INSURANCE COMPANY, do hereby certify that the foregoing is a true, correct and complete copy of the original Power of Attorney; that said Power of Attorney has not been revoked or rescinded and that the authority of the Attomey-in-Fact set forth therein, who executed the bond or undertaking to which this Power of Attorney is attached, is in full force and effect as of this date. Given under my hand and seal of the Company, this day of Thomas J. O'Brien, Assistant Secretary ACORbr CERTIFICATE OF LIABILITY INSURANCEDATE(MMIDD/YYYY) F7/27/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Pamela J. Poland CIC FAX PHONENo. (802) 223-7735 AIC No): (802) 223-7515 Noyle W Johnson Insurance 119 River Street E-MAIL Oland@nw7 ' insurance. com. ADDRESS: pp INSURERS AFFORDING COVERAGE NAIC # P.O. BOX 279 Montpelier VT 05601-0279 INSURERAOld Republic General Ins Corp4139 INSURED INSURERBNational Union Fire Cc 19445 INSURER CHanover Insurance Company 2292 Waterline Industries Corporation INSURER D: 7 London Lane INSURER E: Seabrook NH 03874 INSURER F: COVERAGES CERTIFICATE NUMBER:CL1492822252 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF MMIDD POLICY EXP MM/DD/YYYY LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY DAMAGE ( RENTED PREMISESS Ea occurrence) $ 100,000 A CLAIMS -MADE F_XI OCCUR X k2CG95931304 0/1/2014 10/1/2015 MED EXP (Any one person) $ 10,000 PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 2,000,000 POLICYFX PRO X LOC $ AUTOMOBILE LIABILITY Ee COMBINEDaw SINGLELIMIT 1,000,000 BODILY INJURY (Per person) $ A X ANY AUTO BODILY INJURY (Per accident) $ ALL OWNED SCHEDULED AUTOS AUTOS CA95931304 0/1/2014 10/1/2015 NON -OWNED HIRED AUTOS AUTOS PROPERTY DAMAGE $ Peraccdent Medical Payments $ 10,000 UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 10,000,000 AGGREGATE $ 10,000,000 B X EXCESS LAB CLAIMS -MADE DED I I RETENTION$ $ 8766142 0/1/2014 10/1/2015 A WORKERS COMPENSATION WC STATU- I OTH- XTORY LIMITS E AND EMPLOYERS' LIABILITY Y / N E.L. EACH ACCIDENT $ 1,000,000 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? Ifl (Mandatory in NH) NIA CW95931305 0/1/2014 10/1/2015 E.L. DISEASE - EA EMPLOYE $ 1,000,000 If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ 1,000,000 C Builders Risk Coverage 1HV9721385 0/1/2014 10/1/2015 Any Single Location $5,000,000 $2,500 Deductible Per Building DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) Certificate issued as respects to North Andover, MA Rea's Pond Pumping Station Replacement. Town of North Andover and Woodward & Curran are Additional Insured on General Liability per form CG20100413, on a primary basis per form CGENGN00290906, with a 30 -day cancellation clause per form ILENGN00040911. All referenced forms are attached to and form part of this certificate. CERTIFICATE HOLDER CANCELLATION Town of North Andover 384 Osgood Street North Andover, MA 01845 ACORD 25 (2010/05) N 9025 rgm nnsi ni SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE Poland/PAM ©1988-2010 ACORD CORPORATION. All rights reserved. Tho ArOPI1 nnmc and Innn mro rnniefarnA mnrlrc of Arnpin 0 POLICY NUMBER: A-2CG-959313-04 COMMERCIAL GENERAL LIABILITY CG 2010 0413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) Locations Of Covered Operations WHERE REQUIRED BY WRITTEN CONTRACT. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section 11 — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. CG 2010 0413 B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to "bodily injury" or "property damage" occurring after: 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. © Insurance Services Office, Inc., 2012 Page 1 of 2 C. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or Page 2 of 2 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. © Insurance Services Office, Inc., 2012 CG 2010 0413 OLD REPUBLIC GENERAL INSURANCE CORPORATION CHANGES ADDITIONAL INSU ED PRIMARY WO DING SCHEDULE THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. THIS ENDORSEMENT MODIFIES INSURANCE PROVIDED UNDER THE FOLLOWING: COMMERCIAL GENERAL LIABILITY COVERAGE FORM Name of Additional Insured Person(s) Or Organization(s): As required by written contract. Location(s) of Covered Operations Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The insurance provided by this endorsement is primary insurance and we will not seek contribution from any other insurance of a like kind available to the person or organization shown in the schedule above unless the other insurance is provided by a contractor other than the person or organization shown in the schedule above forthe same operation and job location. If so, we will share with that other insurance by the method described in paragraph 4.c. of Section IV — Commercial General Liability Conditions. All other terms and conditions remain unchanged. Named Insured Policy Number Endorsement No. Policy Period to Endorsement Effective Date: Producer's Name: Producer Number: AUTHORIZED REPRESENTATIVE CG EN GN 0029 09 06 DATE OLD REPUBLIC GENERAL INSURANCE CORPORATION CANCELLATION OR NON -RENEWAL TO SPECIFIED PERSONS OR ORGANIZATIONS ENDORSEMENT THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. THIS ENDORSEMENT MODIFIES INSURANCE PROVIDED UNDER THE FOLLOWING: BUSINESS AUTO COVERAGE FORM COMMERCIAL GENERAL LIABILITY COVERAGE FORM PART OWNERS AND CONTRACTORS PROTECTIVE LIABILITY COVERAGE PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART If we cancel or non -renew this policy for any reason other than non-payment, we will deliver notice of the cancellation or non -renewal to all Specified Persons or Organizations on file with us THIRTY (30 ) days prior to the effective date of cancellation or non -renewal. If we cancel this policy for non-payment, we will deliver notice of the cancellation to all Specified Persons or Organizations on file with us TEN (10 ) days prior to the effective date of cancellation. If notice is mailed, proof of mailing will be sufficient proof of notice. Named Insured WATERLINE INDUSTRIES CORPORATION Policy Number A-2CG-959313-04 Endorsement No. 000 Policy Period 10-01-13 to 10-01-14 Endorsement Effective Date: 10-01-13 Producer's Name: OLD REPUBLIC CONSTRUCTION INSURANCE AGENCY, INC. Producer Number: 0000007002 AUTHORIZED REPRESENTATIVE IL EN GN 0004 0911 Page 1 of 1 DATE * CONSTRUCTION PROGRAM GROUP, INC. 199 Water Street, 11th Floor OLD REPUBLIC New York, NY 10038 **, & ** License No.: BR 668042 Owners Contractors Protective Confirmation of Coverage Coverage bound per your request with respect to the following. Policy Number: A2CO10181500 INSURED: Town of North Andover ADDRESS: 384 Osgood Street North Andover, MA 01845 ASSOCIATED CONTRACTOR: Waterline Industries Corporation ADDRESS: 7 London Lane Seabrook, NH 03874 PROJECT DESCRIPTION: Rea's Pond Pumping Station Replacement PROJECT LOCATION: 1653 Great Pond Road, North Andover, MA CONTRACT NUMBER: Contract 2 CLASS CODE: 16292 POLICY LIMIT: Occurrence $1,000,000 Aggregate $3,000,000 CARRIER: Old Republic General Insurance Corporation POLICY PERIOD* 8/1/15-10/1/15 EST. CONSTRUCTION COST: $1,594,677 (Total) EST. PREMIUM FOR POLICY PERIOD: $1,500 - MINIMUM PREMIUM: $1,500 Audible at a Rate of: FLAT per $1000 of Construction Cost Commission: 10% Coverage provided under this proposal may vary from that requested in the insurance specifications provided. Amendments of Coverage: Mandatory State Endorsements Exclusions of Coverage: Asbestos Exclusion; Lead Exclusion; Fungus Exclusion; Silica Exclusion; War Liability Exclusion. *A Owners Contractors Protective policy will be issued for the term of 8/1/15 to 10/1/15. In the event the project extends beyond the expiration date of the associated contractor's general liability policy, the extension of the OCP policy will be contingent upon Renewal/extension of the associated contractor's general liability policy. NOTE: Any request to add any additional insured can only be granted if it is required by written contract. In such cases a copy of the contract must accompany request. No Exceptions Provided. Premium will be billed to broker by ORCPG and is payable to ORCPG within 25 calendar days of ORCPG invoice date. Remit payment to: Overnight payments should be sent to: Old Republic Construction Insurance of NY JPMorgan Chase - Lockbox Processing P.O. Box 30485 Lockbox Old Republic Construction Insurance of NY New York, NY 10087-0485 Inc. LBX 30485 4 Chase Metrotech Center 7th floor East Brooklyn, NY 11245 Underwriter Name: Mike Gallagher Date: 7/27/15 00520C PAYMENT BOND Bond No. 259707P KNOW ALL MEN BY THESE PRESENTS, that we Waterline Industries Co with aplace of business at 7 London Lane, Seabrook, NH 03874 as Principal (the "Principal"), and CorePointe Insurance Company a corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at 401 S. Old Woodward Avenue, Suite 300, Birmingham, MI 49009 as Surety (the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee (the "Obligee'), III the sum Of Seven Hundred Ninety Seven Thousand Three Hundred Thirty Eight Dollars and 50/100 ($797,338, 50) lawful money Of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of r.Jafor the construction of..,.Rea's. Pond Pumpinq Station Improvements NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but not be limited to, any other purposes or items set out in, and to be subject to the provisions of Massachusetts General Laws, Chapter 34, Section 39M, and Chapter 149, Section 29, as amended then this obligation shall become null and void, otherwise, it shall remain in full force and virtue. IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this -- , , day of PRINCIPAL Waterline Jndugstries �OILMQ � [Name and Seal] Michael A. Girard, Vice President SURETY CorePointe Insurance Company [Attorney-in-fact] Seal] Mark D. Leskanic 945 Great Plain Ave., Ste 15, Needham, MA 02492 [Title] [Address] 781-559-0568 Attest:. _ M_ . v4v�[Phone] L Alicia McLaughlin, orporate Secretary ' Attest: PERFORMANCE BOND Bond No. 259707P KNOW -ALL MEN BY THESE PRESENTS, that we Waterline Industries Corp. with a place of business at 7 London Lane, Seabrook, NH 03874 , as Principal (the "Principal"), and CorePointe Insurance Company , a corporation qualified to do 'business in the Commonwealth of Massachusetts, with a place of business at 401 S. Old Woodward Avenue, Suite 300, Birmingham, MI 49009 as Surety (the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee (the "Obligee"), in the sum of Seven Hundred Ninety Seven Thousand Three Hundred Thirty Eight Dollars and 501100 ($797,338.50 lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a Contract with the Obligee, bearing the date of for the construction of Rea's Pond Pumping Station Improvements NOW THE CONDITIONS of this obligation are such that if the Principal (and all Subcontractors under said contract) shall well and truly keep and perform all the undertakings, covenants, agreement, terms and conditions of said contract on its part to be kept and performed during the original term of said contract and any extensions thereof that may be granted by the Obligee, with or without notice to the Surety, and during the life and any guarantee required under the contract, and shall also well and truly keep and perform all the undertakings, covenants, agreements, terms and conditions of any and all duly authorized modifications, alterations, changes or additions with notice to the Surety being hereby waived, then this obligation shall become null and void; otherwise, it shall remain in full force and virtue. IN THE EVENT the Contract is abandoned by the Principal, or is terminated by the Town of North Andover, Massachusetts under the applicable provisions of the Contract, the Surety hereby further agrees that the Surety shall, if requested in writing by the Town of North Andover, Massachusetts promptly take such action as is necessary to complete said Contract in accordance with its terms and conditions. 225073.06 Issue Date: June, 2013 School St. & Bunker Hill St. Sewer Upgrade North Andover, MA IN WITNESS WHEREOF, the Principal and Surety have hereto set their hands and seals this day of PRINCIPAL SURETY Waterline Industries Corp.. CoreP.o,inte InsuranceC-of;r)ariv [Name and Seal] [Attomey-in-fact] [Seal] Mark D. Leskanic Michael A. Girard, Vice President 945 Great Plain Ave., Ste 15, Needham, MA 02492 [Title] [Address] 781-559-0568 Attest: . fauoo [Phone] n Alicia McLaughlin, Corporate Secretary (' �/j�/ Attest: / G v' 2 POWER OF ATTORNEY COREPOINTE INSURANCE COMPANY KNOW ALL MEN BY THESE PRESENTS, that COREPOINTE INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Michigan, having its principal office at 401 S. Old Woodward Ave, Suite 300, Birmingham, Michigan, has made, constituted and appointed, and does by these presents make, constitute and appoint: Mark D. Leskanic Maria Plaisted each its true and lawful Attorney -in -Fact, to sign its name as surety as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed UNLIMITED, to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Michigan, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions, which were duly and validly adopted at a meeting of the Board of Directors of the Company held on December 6, 2012: RESOLVED, that all bonds, undertakings, powers of attorney, and other instruments for and on behalf of the Company which it is authorized to execute, may be executed in the name and on behalf of the Company by the Chairman of the Board or the President, jointly with the Secretary or an Assistant Secretary, under their respective designations, except that any one or more officers or attorneys -in -fact designated in any resolution of the Board of Directors, or in any power of attorney executed as provided for in these resolutions, may execute any such bond, undertaking, or other instrument as provided in such resolution or power of attorney. IN WITNESS WHEREOF, the Company has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this 30th day of Ari , 2015. """'••., CorePointe Insurance Company r NsuR,�,'%, � �P fin - SEAL.- BY VV-� By °'0'•.,;4*C,,,GA.* fames S. Haan, President Thomas J. O'Brien, Assistant Secretary STATE OF MICHIGAN ss: COUNTY OF OAKLAND ) Sworn to before me, a Notary Public in the State of Michigan, this 30th day of Aril 2015, by James S. Haan who swore to be the President of rePo'pte Insurance Company. STACY CAMPBELL Notary Public, State of Michigan Stac amp a (seal) County of Oakland My Commission Expires 06-22-201' Notary Public, Staii Michigan Acting In the County of My Commission Expires June 22, 2019 I, the undersigned, Assistant Secretary of COREPOINTE INSURANCE COMPANY, do hereby certify that the foregoing is a true, correct and complete copy of the original Power of Attorney; that said Power of Attorney has not been revoked or rescinded and that the authority of the Attorney -in -Fact set forth therein, who executed the bond or undertaking to which this Power of Attorney is attached, is in full force and effect as of this date. Given under my hand and seal of the Company, this day of Thomas J. O'Brien, Assistant Secretary 00520C PAYMENT BOND Bond No. , 259707P KNOW ALL MEN BY THESE PRESENTS, that we Waterline Industries Corp. with a place of business at 7 London Lane, Seabrook, NH 03874 as Principal (the "Principal"), and CorePointe Insurance Company , a corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at 401 S. Old Woodward Avenue, Suite 300, Birmingham, MI 49009 as Surety (the "Surety"), are held and firmly bound unto. the Town of North Andover, Massachusetts as Obligee the "Obligee"), in the sum of Seven Hundred Ninety Seven Thousand Three Hundred Thirty Eight Dollars and 50/100 ($797,338,.50) ( g ), lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of for the construction of,, Rea's Pond Pumping Station Improvements ,.. NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but not be limited to, any other purposes or items set out in, and to be subject to the provisions of Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then this obligation shall become null and void; otherwise, it shall remain in full force and virtue. IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this day of PRINCIPAL Waterline stries Corp. (16 V4 zc'4 (Name and Seal] Michael A. Girard, Vice President [Title] e , Attest: ZOUAI Alicia McLau li Corporate Secretary SURETY Core Poll inte Insurance Co pany [Attorney-in-fact] [Seal] Mark D. Leskanic 945 Great Plain Ave., Ste 15, Needham, MA 02492 [Address] 781-559-0568 [Phone] Attest: PERFORMANCE BOND Bond No. 259707P KNOW ALL MEN BY THESE PRESENTS, that we Waterline Industries Corp. with a place of business at 7 London Lane, Seabrook, NH 03874 as Principal (the "Principal"), and CorePointe Insurance Company , a corporation qualified to do -business in the Commonwealth of Massachusetts, with a place of business at 401 S. Old Woodward Avenue, Suite 300, Birmingham, MI 49009 as Surety (the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee (the "Obligee"), in the sum of Seven Hundred Ninety Seven Thousand Three Hundred Thirty Eight Dollars and 501100 ($797,338.50 lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a Contract with the Obligee, bearing the date of for the construction of Rea's Pond Pumping Station Improvements NOW THE CONDITIONS of this obligation are such that if the Principal (and all Subcontractors under said contract) shall well and truly keep and perform all the undertakings, covenants, agreement, terms and conditions of said contract on its part to be kept and performed during the original term of said contract and any extensions thereof that may be granted by the Obligee, with or without notice to the Surety, and during the life and any guarantee required under the contract, and shall also well and truly keep and perform all the undertakings, covenants, agreements, terms and conditions of any and all duly authorized modifications, alterations, changes or additions with notice to the Surety being hereby waived, then this obligation shall become null and void; otherwise, it shall remain in full force and virtue. IN THE EVENT the Contract is abandoned by the Principal, or is terminated by the Town of North Andover, Massachusetts under the applicable provisions of the Contract, the Surety hereby further agrees that the Surety shall, if requested in writing by the Town of North Andover, Massachusetts promptly take such action as is necessary to complete said Contract in accordance with its terms and conditions. 225073.06 School St. & Bunker Hill St. Sewer Upgrade Issue Date: June, 2013 North Andover, MA IN WITNESS WHEREOF, the Principal and Surety have hereto set their hands and seals this day of PRINCIPAL Waterline Industries Corp. [Name and Seal] Michael A. Girard, Vice President [Title] • 1 r �.� Attest: Alicia McLa ghlin, Corporate ecretaty SURETY CorePointe Insurance C m [Attomey-in-fact] [Seal] Mark D. Leskanic 945 Great Plain Ave., Ste 15, Needham, MA 02492 [Address] 781-559-0568 POWER OF ATTORNEY COREPOINTE INSURANCE COMPANY KNOW ALL MEN BY THESE PRESENTS, that COREPOINTE INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Michigan, having its principal office at 401 S. Old Woodward Ave, Suite 300, Birmingham, Michigan, has made, constituted and appointed, and does by these presents make, constitute and appoint: Mark D. Leskanic Maria Plaisted each its true and lawful Attorney -in -Fact, to sign its name as surety as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed UNLIMITED, to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Michigan, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions, which were duly and validly adopted at a meeting of the Board of Directors of the Company held on December 6, 2012: RESOLVED, that all bonds, undertakings, powers of attorney, and other instruments for and on behalf of the Company which it is authorized to execute, may be executed in the name and on behalf of the Company by the Chairman of the Board or the President, jointly with the Secretary or an Assistant Secretary, under their respective designations, except that any one or more officers or attorneys -in -fact designated in any resolution of the Board of Directors, or in any power of attorney executed as provided for in these resolutions, may execute any such bond, undertaking, or other instrument as provided in such resolution or power of attorney. IN WITNESS WHEREOF, the Company has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this 30th day of April , 2015. CorePointe Insurance Company Su a`� RPo;�. r1� •; o►SE'r.�a By »yam By�l%�'►� • u •..;�nc,,,.•'t; mes S. Haan, President Thomas J. O'Brien Assistant Secretary STATE OF MICHIGAN ss: COUNTY OF OAKLAND ) Sworn to before me, a Notary Public in the State of Michigan, this 30th day of Aril 2015, by James S. Haan who swore to be the President of rePo.me Insurance Company. STACY CAMPBELL Notary Public, State of Michigan mp e 1 (seal) County of Oakland Stac a My Commission Expires 06-22-201 f' Notary Public, Sta* Michigan Acting In the COunty of My Commission Expires June 22, 2019 I, the undersigned, Assistant Secretary of COREPOINTE INSURANCE COMPANY, do hereby certify that the foregoing is a true, correct and complete copy of the original Power of Attorney; that said Power of Attorney has not been revoked or rescinded and that the authority of the Attorney -in -Fact set forth therein, who executed the bond or undertaking to which this Power of Attorney is attached, is in full force and effect as of this date. Given under my hand and seal of the Company, this day of Thomas J. O'Brien, Assistant Secretary