HomeMy WebLinkAboutContract #: 934 - From: 11-11-2016 To: 12-31-2017 - LD Russo Inc - Public WorksAndrew W. Maylor
Town Manager
Mr. Lou Russo, President
L.D. Russo, Inc.
198 Ayer Road
Harvard, MA 01451
Dear Mr. Russo:
Town of North Andovef�
Office of the
Town Manager
North Andover Town Hall
120 Main Street
North Andover, MA 01845
amaylor@north an.
February 8, 2018
Telephone (978)688-9510
Fax (978)688-9556
In accordance with the provisions of the contract between the Town of North Andover and
L.D. Russo, Inc. (Contract #934), the contract for improvements to the Public Works facility is extended
through March 31, 2018.
If you have any questions and/or concerns, please call Ray Santilli, Assistant Town Manager, at
978-688-9516.
Sincerely,
Andrew W. Maylor
Town Manager
cc., Ray Santilli, Assistant Town Manager
Contract File
S
Change Order
Co-,J,�+ 0- 93 y
PROJECT. (Name and address)
CHANGE ORDER NUMBER: 007 OWNER ❑
North Andover Public Works Building
DATE: 2/8/2018 ARCHITECT ❑
384 Osgood St.
ARCHITECT'S PROJECT NUMBER: CONTRACTOR
North Andover, Massachusetts 01845
FIELD
TO CONTRACTOR: (Name and address)
OTHER ❑
L.D. Russo Inc.
CONTRACT DATE: February15, 2018
198 Ayer Road
CONTRACT FOR: North Andover Public Works Building
Harvard, Massachusetts 01451
048
Added Labor & Materials, Field Changes & Corrections
2,179.38
The Contract is changed as follows:
Salt Shed Claim resolution
Damaged Desk - Back Charge
(Include, lvhere applicable, any undisputed amount attributed to previously executed Connstruction Change Directives.)
nA1r1=A1T1A1 PIJA\I!_-C ADIICOC IKI TYIC t%wAmr-r r)onpR•
PCO #
Title
Schedule Impact Amount
034
Elevator Shaft Change in Louver
1,943.50
045
Changes to Granite Curb Layout at Entrance
5,000.01
046
Revised Keying & Hardware Sets
910.09
047
Landscape Change - Mulch to River Rock
1,678.59
048
Added Labor & Materials, Field Changes & Corrections
2,179.38
049
050
Salt Shed Claim resolution
Damaged Desk - Back Charge
4,998.50
(1,351.83)
Other
TOTAL: $ 15,358.24
CHANGE ORDER LINE ITEMS:
#
Cost Code
Description
Type
Amount
1
10-200 - Louvers and Vents
Elevator Shaft Louver
Materials
$ 635.00
2
14-200 - Elevators
Elevator Operator - 1 day 8 hours @ $138.00 (straight time)
Commitment
$ 1,104.00
3
17-030 - Bond
Bond & Insurance
Other
$ 27.82
4
17-040 - Management & Overhead
CM Fee
Other
$ 176.68
5
06-100 -Rough Carpentry
NOTE: Rough carpentry hours included in PCO 30/OCO 5 - Added Interior
Framing
Commitment
$ 0.00
Subtotal:
$1,943.50
Grand Total:
$1,943.50
PCO # 045 : Changes to Granite Curb Layout at Entrance
#
Cost Code
Description
Type
Amount
1
02-770 - Curb and Gutters
Remove & reinstall granite curb at entrance - Equipment, Labor & GC
Other
$ 3,789.88
2
03-000 - General
Concrete to set stones
Materials
$ 684.00
3
17-030 - Bond
Bond & Insurance
Other
$ 71.58
4
17.040 - Management & Overhead
CM Fee
Other
$ 454.55
Subtotal:
$5.000.01
Grand Total:
$5,000.01
L.D. Russo Inc. page 1 of 3 Printed On: 2/8/ 2018 10 :52 AM
J
Change Order
nf�e% a{ nAC . 0....:-4 rinrn.. 4. L —A...— Cnt•c
#
Cost Code V
Description
Type Amount
1
08-700 - Hardware
Furnish revised keying and hardware sets at Owners request
Other $ 814.32
2
17-030 - Bond
Bond & Insurance
Other $ 13.03
3
17.040- Management& Overhead
CM Fee
Other $ 82.74
3
17-030 - Bond
Bond & Insurance
Other
$ 24.03
4
17-040- Management& Overhead
Subtotal: $910.09
Other
$ 152.60
Grand Total: $910.09
PCO # 047: Landscape Change - MufCh to Klver KOCK
#
Cost Code
Description
Type
Amount
1
02-900 - Landscaping
Add: Furnish & Install 1 ton of river rock at garden in front of building. Per
Landscape Architect SKL - 4R
Commitment
$ 1,526.96
2
02-900 - Landscaping
Credit: Furnish & Install Mulch 5 SY at $5.00/sy
Commitment
($25.00)
3
17-030 - Bond
Bond & Insurance
Other
$ 24.03
4
17-040- Management& Overhead
CM Fee
Other
$ 152.60
Subtotal: $1,678.59
Grand Total: $1,678.59
PCO # 048 : Added Labor & Materials,
Field Changes & Corrections
#
Cost Code
Description
Type
Amount
1
08-700 - Hardware
Labor charges for changes to hardware - Install passage sets at Owners request
(Materials included in PCO #46). Labor to reverse lock set leading to old DPW
building at Owners request
Other
$ 235.00
2
10 400 -Identification Devices
Added signage, bath accessories furnish & install- Furnish & Install robe hook in
shower room (not shown on plans), furnish & install 1 sanitary napkin disposal
unit (project required 3, only 2 shown on plans) $86.00, added signage at Utility
room, and above elevator at Architects request $164.00
Commitment
$ 250.00
3
05 500 -Metal Fabrications
Added Misc Metals: Furnish & Install Cane Detection Bar - Not shown or detailed
in drawings or specifications. T & M Install 1 hour @$112.00/hr, fabrication &
materials $260.00 Cut wind brace plates. No detail provided time only 2 hours @
$112.00/hr
Commitment
$ 596.00
4
09-900 - Paints and Coatings
Added Paint at Second Floor lobby existing DPW building 4 hours @ $100.00/hr
Other
$ 400.00
5
09-250 - Gypsum Wallboard
Remove Fire Extinguisher in Break Room - Patch Hole, mud & sand- AWC
$369.05. Paint - Bello 1 hour $100.00
Other
$ 469.05
6
17-030 - Bond
Bond & Insurance
Other
$ 31.20
7
17-040- Management& Overhead
CM Fee
Other
$ 198.13
Subtotal: $2,179.38
Grand Total: $2,179.38
PCO # 049: Salt Shed Claim resolution
# Cost Code Description Type Amount
1 13.120 - Pre -Engineered Structures Negotiated settlement of salt shed claim Commitment $4 ,998.50
Subtotal: $4,998.50
Grand Total: $4,998.50
nr^ u ncn . n--
# Cost Code Description Type Amount
1 12-400 - Furnishings and Accessories Back Charge for Damaged desk Other ($1,351.83)
Subtotal: ($1,351.83)
Grand Total: ($1,351.83)
L.D. Russo Inc. page 2 of 3 Printed On: 2/8/ 2018 10:52 AM
Change Order
The original (Contract Sum)
Net change by previously authorized Change Orders
The contract sum prior to this Change Order was
The contract sum will be increased by this Change Order in the amount of
The new contract sum including this Change Order will be
The contract time will by this Change Order by
$ 4,533,000.00
$ 106,292.79
$ 4,639,292.79
$ 15,358.24
$ 4,654,651.03
(Note: This Change Order does not include changes in the Contract Sum, Contract TIme, or Guartanteed Maximum Price that have
been authorized by Contstruction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,
in whish case a Change Order is executed to supersede the Construction Change Directive.)
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
CSS Architects
ARCHITECT (Firm Name)
107 Audubon Rd., Bldg 2, Suite 300
Massachusetts 01880
ADDRESS
BY (Signature)
(Typed Name)
DATE
L.D. Russo Inc.
CONTRACTOR (Firm Name)
198 Ayer Road
Harvard, Massachusetts 01451
ADDRESS
BY (Slgnature)
1�<0'- G9 U. n
(Typed jName)
?1
DATE
page 3 of 3
North Andover Dept. of PublicWorks
OWNER (Firm Name)
384 Osgood St.
North Andover. Massachusetts 01845
ADDRES D
Y (Signature)
1�4 dry .,-kLxler
(Typed Name)
c5z/,�
DATE
cov.f„ �+ # v 3 y
Change Order
PROJECT. (Name and address) CHANGE ORDER NUMBER: 006 OWNER F]
North Andover Public Works Building DATE: 12/13/2017 ARCHITECT F1
384 Osgood St. ARCHITECT'S PROJECT NUMBER: CONTRACTOR r-1
North Andover, Massachusetts 01845 FIELD
TO CONTRACTOR: (Name and address) OTHER F]
L.D. Russo Inc. CONTRACT DATE: December -13,2017
198 Ayer Road CONTRACT FOR: North Andover Public Works Building
Harvard, Massachusetts 01451
The Contract is changed as follows:
(Include, where applicable, any undisputed amount attributed to previously executed Connstructiorz Change Directives)
PnTFNTiAI CHANr.F nRDFRS IN THIS CHANr;F nRDER!
PCO #
I Title Schedule Impact
Amount
018
Testing Services Credit
(3,020.00)
030
Added Interior Framing
5,666.72
033
Existing Garage Door Jambs & Heads - Delete Metal Wrap, Add
Paint
1,863.80
035
Flagpole tight
7,042.00
038
Added Site Worts
870.05
040
Elevator Operator for Furniture Delivery
925.37
041
Change in Bollard at DPW Entry Door
1,192.48
042
Flooring Changes
3,026.55
043
Storm - Tree Removal
1,788.16
TOTAL:
$19,356.13
CHANGE ORDER LINE ITEMS:
or`n If non • T—tinn Cnnrirne r`rorllt
#
Cost Code
bescriptlon
Type
Amount
1
01520 - Construction Facilities
LOR Credit for testing services by UTS. Credit based on testing required in
specification 0145 DD. Invoices for testing done through 417x17, INV #'s 66903,
69209, 69523, 69631, 70133 (see attached)
Other
($1,395,00)
2
01520-ConstrudonFadities
LOR Credit for testing services by UTS. Credit based on testing required In
specification 014500. Invoices for testing done from 51511 7-10120117. WV Vs
70493, 70862, 71228, 71638, 72527, 72987 (see attached)
Other
($1,625,00)
Subtotal: ($3,D20.00)
Grand Total: ($3,020.00)
L.D. Russo Inc. page 1 of 4 Printed On: 12/13/2017 02:30 PM
Change Order
PCO # 030: Added Interior Framin
#
Cost Code
Description
Type
Amount
1
06.100 - Rough Carpentry
Rough Carpentry: Add 12' plywood along B line per SKA-9 (ArAC Inv 33 (I2))
Commitment
$ 648.48
2
06.100 R
Rough Carpentry
Added framing at pipe chase (AW, Inv 108) S89,91, added pipe chase in shower
rm 212 chase couldn't go as shown on plans (AwAC Inv 200) 587.23
Other
$ 171.14
3
ar9h
0'0.100- R Carpentry
Added framing SKA-25. RFI 31, SKA 12, added fra'ng at existing building not
mshorn on plan, frame & drywall I -Beam in elevator mach'ne room (AwAC Inv. 189)
Commitment
$ 2,098.88
4
06.100 - Rough Carpentry
Added framing & fire caulk (AWC Inv 165)
Commitment
S 278.25
5
06.100 - Rough Carpentry
Added Densglass at Elevator Shaft per SKA 31 (ArAC Inv 202)
Commitment
S995.37
6
06100 -Rough Carpentry
Frame under new windov at existing DPW build ng not shown on drawings
(AvwC Inv 201)
Commitment
$872.30
7
17.030 - Bond
Bond & Insurance
Other
$81.14
8
17-040- Management & Overhead
CM Fee
Other
$ 515.16
Subtotal: 55,666.72
Grand Total: $5,666.72
PCO # 033: Existinq Garage Door Jambs & Heads - Delete Metal Wrap. Add Paint
#
Cost Code
Description
Type
Amount
1
07402 - Existing Bdild'ng Wall Panels
Delete: Metal Alrap at garage doorjambs. 11 doors at $220.00 ea.
Commitment
($2,420.00)
2
09.900 - Paints and Coatings
Add Paint existing garage door iambs
Commitment
S 4,089.32
3
17.030 - Bond
Bond & Insurance
Other
$ 25.04
4
1 17-040 - Management & Overhead
CM Fee
Other
$169.44
5
17-040 - Management & Overhead
OH&P
Other
$641.00
Subtotal:
51,863.80
Grand Total:
$1,863.80
r1,V 0 U35 . FfagP01e Ltgnt
#
Cost Cade
Description
Type Amount
Type Amount
1
16-100 - Electrical
Flagpole Light
Other
S 5.100.96
2
01 -520 -Construction Facilities
Lit
Other
$ 300.00
3
02.300 - Earthwork
Trench and backfill
Other
S900.00
4
01-016 - CM Insurance
Bond and insurance
Other
S100.04
5
17-040 - Management & Overhead
OH&P
Other
$641.00
Subtotal: $7,042.00
Grand Total: $7,042.00
MV S UJO : HOUeO one vvorK
#
Cost Code
Description
Type Amount
1
02-300 - Eadhhork
Furnish & Install sewer MH covers not shown on plans
Commitment $ 778.49
2
17-030 - Bond
Bond & Insurance
Other $12.46
3
17.040 - Management & Overhead
CM Fee
Other $ 79.10
CfJ Fee
Other S84.12
Subtotal: $870.05
Subtotal: $925,37
Grand Total: $870.06
rGV S U4u : l:fevator operator for Furniture uellve
#
Cost Code
Description
Type Amount
1
14-200 -Elevators
Elevator Operator for furniture delivery 6 hours Q $138.00mr
Commitment $ 828.00
2
17-030 - Bond
Bond & Insurance
Other $13.25
3
17-040 - Management & Overhead
CfJ Fee
Other S84.12
Subtotal: $925,37
Grand Total: $926.37
L.D. Russo Inc. page 2 of 4 Printed On: 1211312017 02:30 PM
Change Order
PCO # 041 : Chanae in Bollard at DPW Entry Door
#
Cost Code
Description
$86,937.66
Type
$ 4,619,937.66
Amount
1
05-500. Metal Fabrications
Furnish bollard per SKA 37
Commitment
S 1,067.00
2
17-030 - Bond
Bond 8 Insurance
Other
$17.07
3
17-040 - Management d Overhead
CAI Fee
Other
$108.41
Subtotal:
51,192.48
GrandTolal:
$1,192.48
PCO # 042: Flooring Changes
N
Cost Code
Description
Type
Amount
1
09680 - Carpel
Fumish materials only-1A'alk off mat carpet tie for the interior of the elevator.
Commitment
$ 347.42
2
09480 - Carpel
Furnish and Install floor levelers at all ceramic ble to carpet Me transitions
Commitment
S2.360.66
3
17.030 - Bond
Bond 8 Insurance
Other
$ 43.33
4
17-040 - Management S Overhead
CM Fee
Other
$275.14
Subtotal:
$3.026.55
Grand Total:
$3,026.66
PCO # 043: Storm - Tree Removal
#
Cost Code
Description
Type
Amount
1
02.230 - Site Clearing
Removal or tree and brush, tree fell onto lit during a storm and was removed so
that work could continue. DPW was unab:e to remove due to storm clean up in
other areas of town.
Other
S1,600.00
2
17-030 - Bond
Bond 8 Insurance
Other
S26.60
3
1 17.040- Management &Overhead
CM Fee
Other
$162.56
Subtotal:
$1.788.16
Grand Total:
$1,788.16
The original (Contract Sum)
$ 4,533,000.00
Net change by previously authorized Change Orders
$86,937.66
The contract sum prior to this Change Order was
$ 4,619,937.66
The contract sum will be increased by this Change Order in the amount of
$19,355.13
The new contract sum including this Change Order will be
S 4,639,292.79
The contract time vAll by this Change Order by
(Note: This Change Order does not include changes in the Contract Sum, Contract Tlme, or Guartantced Maximum Price that have
been authorized by Contstruction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,
in whish case a Change Order is executed to supersede the Construction Change Directive.)
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
L.D. Russo Inc. page 3 of 4 Printed On: 12/13/ 2017 02:30 PM
Change Order
CSS Architects
ARCHITECT (Firm Name)
107 Audubon Rd.. Bldg 2, Suite 300
Wakefield, Massachusetts 01880
ADDRESS
B ignature)
(Typed Name)
DATE
L.D. Russo Inc.
CONTRACTOR (Firm Name)
198 Ayer Road
Harvard, Massachusetts 01451
ADDRESS
/ f
BY (Signa /
�c�
(Typed Name)
DATE
page 4 of 4
North Andover Dept, of PubficWorks
OWNER (Firm Name)
384 Osgood St.
North Andover, Massachusetts 01845
ADDR
r
Y (Signature)
An dee,,, A�aylor
(Typed Name)
a ! e- a0/7
DATE
Change Order
PROJECT. (Name and address)
CHANGE ORDER NUMBER: 005 OWNER n
North Andover Public Works Building
DATE: 8/29/2017 ARCHITECT F1
384 Osgood St.
ARCHITECT'S PROJECT NUMBER: CONTRACTOR
North Andover, Massachusetts 01845
FIELD
TO CONTRACTOR: (Name and address)
OTHER Q
L.D. Russo Inc.
CONTRACT DATE: September 5, 2017
198 Ayer Road
CONTRACT FOR: North Andover Public Works Building
Harvard, Massachusetts 01451
Commitment
The Contract is changed as folloNvs:
(/nchfde, where applicable, any undisputed amount attributed to previously executed Connstr-itction Change Directives)
PnTFNTIAi CHANCF nRDERS IN THIS CHANGE ORDER,
PCO # I Title
Schedule Impact Amount
029 Deduct Approved Added Catch basin at Gas Pad
(23,384.59)
031 Electrical RFI 59 Response Rework CT Cabinet
6,742.41
032 Asbestos Abatement - Existing DPW Building
3,126.20
Deduct Added Catch Basin at Gas Pad
TOTAL: ($13,515.98)
CHANGE ORDER LINE ITEMS:
Pcn 0 02Q r npduct Anoroved Added Catch basin at Gas Pad
0
Cost Code
Description
Type
Amount
1
02-300- Eartt iork
Deduct Added Catch Basin at Gas Pad
Commitment
($21,666.40)
2
02.300 - Earftvfk
Catch barn Structure delivered - To remain with DPW
Commitment
S763.00
3
17.030 - Bond
Credit Bond d Insurence
Other
(.355.35)
4
17-040 - Management L Overhead
Credit Mi Fee
Other
($2,125.84)
Subtotal:
($23,384.59)
Grand Total:
($23,384.59)
PCO # 031 : Electrical RF159 Response Rework CT Cabinet
S
Cost Code
Description
Type
Amount
i
16.100 Electrical
The existing insta9ation does not allaw for tapping the new 400 amp feeder into
the wires in the wireway as sham on the plans, and National Grid says the
existing CT cabinet can not support adding any more load wiring onto the
CTs.This PCO -008 is for the additional material and labor to modify the
connections at the CT cabinet to alba for adding in the 400 amp feeder in the
vreway, as described in RFl-059. Electrician,
Commitment
$ 6,027.00
2
17-030 - Bond
Bond h insurance
other
S107-461
3
17.040- Management d Overhead
CM Fee
Other
S612.95
Subtotal:
56,742.41
Grand Total:
S6,742.41
L.D. Russo Inc.
page 1 of 2 Printed On: 9/612017 12:47 PM
Change Order
PCO #7 032: Asbestos Abatement - Existinq DPW Buildinq
#
Cost Code
Description
Type
Amount
i
01-903 - Hazardous Materials Abatement
Asbestos Abatement & Disposal: Remove caulking at existing ivindays, and at
existing ceiling at entry. This price does not Include a Hygienist, monitoring, or
visuals, pover, or water. (Ormer to provide)
Commitment
$ 2,800.00
2
117 -030 -Bond
Bond & insurance
Other
$ 42.00
3
17-040 - Management & U1erhead
Ch1 Free
Other
$ 284.20
Subtotal.
$3.121120
GrandTotat:
$3,126.20
The original (Contract Sum) $ 4,533,000.00
Net change by previously authorized Change Orders $ 100,453.64
The contract sum prior to this Change Order was
The contract sum will be decreased by this Change Order in the amount of
The new contract sum including this Change Order will be
The contract time will by this Change Order by
$ 4,633,453.64
($13,515.98)
$ 4,619,937.66
(Note: This Change Order does not include changes in the Contract Sum, Contract Thne, or Guartanteed Maximum Price that have
been authorized by Contstruction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,
in whish case a Change Order is executed to supersede the Construction Change Directive.)
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
CSS Architects
ARCHITECT (Finn Name)
107 Audubon Rd., Bldg 2, Suite 300
107 Audubon Rd_, Bldg 2, Suite
300, Massachusetts 01880
ADORES
S�S
nature)
(Typed Name)
q /(, / -,-7Ql ,.
DAT
L.D. Russo Inc.
CONTRACTOR (Firm Name)
198 Ayer Road
Harvard, Massachusetts 01451
ADDRESS
BY (Slgnature)
d t U U.,
(Typed Name)
iMLZ
page 2 of 2
North Andover Dept. of PublicWotks
OWNER (Firm Name)
384 Osgood St.
North Andover, Massachusetts 01845
ADDRESS
BY (Signature)
lVQylo r
(Typed Name)
2- / /
DATE
i I
Change Order
PROJECT: (Name and address) CHANGE ORDER NUMBER: 004 OWNER R
North Andover Public Works Building DATE: 7/11/2017 ARCHITECT E]
384 Osgood St. ARCHITECT'S PROJECT NUMBER: CONTRACTOR
North Andover, Massachusetts 01845 FIELD
TO CONTRACTOR: (Name and address) OTHER
L.D. Russo Inc. CONTRACT DATE: July 28, 2017
198 Ayer Road CONTRACT FOR: North Andover Public Works Building
Harvard, Massachusetts 01451
The Contract is changed as follows:
(Include, where applicable, any undisputed amount attributed to previously executed Connstruction Change Directives)
PnTFNTIAI CHONrF nRnFRS IN THIS CHONrF nRnFR-
PCO #
Title
Schedule Impact Amount
017
Demolition - Unforeseen Conditions
783.09
022
Garage Siding - Unforeseen Conditions
2,086.38
024
Water Line Field Adjustment - Deduct
(21,010.07)
025
Unforeseen Conditions Salt Shed Foundation Excavation
756.24
026
Equipment Screen Roof Connection
4,518.49
028
Siding Install West Elevation - Electrical Credit
(2,086.91)
Subtotal: $783.09
Grand Total: $783.09
TOTAL: ($14,952.78)
CHANGE ORDER LINE ITEMS:
pro it (17 - nemolition - Unforeseen Conditions
#
Cost Code
Description
Type
Amount
1
02-220 - Site Demolition
Unforeseen conditions encountered during demolition of existing salt shed Costs
for additional dumpster
Commitment
$ 700.00
2
17-030 - Bond
Bond & Insurance
Other
$ 11.90
3
17-040 - Management & Overhead
CM Fee
Other
$ 71.19
4 17-040 - Management & Overhead CM Fee
Subtotal: $783.09
Grand Total: $783.09
PCO # 022 : Garage Siding - untoreseen Conditions
# Cost Code Description
Type
Amount
1 07-402 - Existing Building Wall Panels Replace Header and Jambs - Unforeseen Condition
Commitment
$ 1,450.00
2 07-402 - Existing Building Wall Panels Added Gutter Clips
Other
$ 415.00
3 17-030 - Bond Bond & Insurance
Other
$ 31.71
4 17-040 - Management & Overhead CM Fee
Other
$ 189.67
Subtotal:
$2,086.38
Grand Total:
$2,086.38
PCO # 024: Water Line Field Adjustment - Deduct
#
Cost Code
Description
Type
Amount
1
02-300 -Earthwork
Deduct: Water line excavation from new building to Osgood Street. Price does
not include flow test.
Commitment
($21,010.07)
Subtotal:
($21,010.07)
Grand Total:
($21,010.07)
L.D. Russo Inc. page 1 of 3 Printed On: 8/1/ 2017 10:46 AM
Change Order
PCO # 025: Unforeseen Conditions Salt Shed Foundation Excavation
#
Cost Code
Description
Type
Type
Amount
1
02-201 - Ground Improvement
Cover Piles with pole due to delay in Geolech inspection. See attached
Commitment
The contract time will by this Change Order by
$ 676.00
2
17-030 - Bond
Bond & Insurance
Other
$ 11.49
3
17-040 - Management & Overhead
CM Fee
Other
$ 68.75
Subtotal:
$756.24
Grand Total:
$756.24
PCO # 026: Equipment Screen Roof Connection
#
Cost Code
Description
Type
Amount
1
05-500 - Metal Fabrications
Added equipment screen frame at the connector (See attached)
Commitment
$ 4,519.00
2
06-100 -Rough Carpentry
Credit: Materials and Labor to install 4 x 4 pressure treated posts, and 3
horizontal supports. Materials 2ea. 4 x 4 x8 PT Posts @ $10.57 ea. Clips &
Accessories $20.00.3 ea 2" x 2" Galvanized U -Channels 125"L $60.00 ea. Labor
2 men, 2 hours ea. @ carpenter's prevailing wage rates, $64.70x4 = $258.80
Other
($479.94)
3
j 17-030 - Bond
Bond & Insurance
Other
$ 68.66
4
17-040 - Management & Overhead
CM Fee
Other
$ 410.77
Subtotal:
$4,518.49
Grand Total:
$4,518.49
PCO # 028 : Siding Install West Elevation - Electrical Credit
#
Cost Code
Description
Type
Amount
1
16 100 -Electrical
Credit against CCO#5 for the reduced scope of work to support the residing
work, and add in coring for Tel/Data pathways.
Commitment
($2,086.91)
The contract time will by this Change Order by
Subtotal: ($2,086.91)
Grand Total: ($2,086.91)
The original (Contract Sum)
$ 4,533,000.00
Net change by previously authorized Change Orders
$ 115,406.42
The contract sum prior to this Change Order was
$ 4,648,406.42
The contract sum will be decreased by this Change Order in the amount of
($14,952.78)
The new contract sum including this Change Order will be
$ 4,633,453.64
The contract time will by this Change Order by
(Note: This Change Order does not include changes in the Contract Sum, Contract TIme, or Guartanteed Maximum Price that have
been authorized by Contstruction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,
in whish case a Change Order is executed to supersede the Construction Change Directive.)
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
L.D. Russo Inc. page 2 of 3 Printed On: 8/1/ 2017 10:46 AM
Change Order
CSS Architects
ARCHITECT (Firm Name)
107 Audubon Rd., Bldg 2, Suite 300
107 Audubon Rd., Bldg 2, Suite
300, Massachusetts 01880
ADDRESS,V/-
BY(Signature)
C'Mr►s G�-
(Typed Name)
9�,a 1 17
DAT
L.D. Russo Inc.
CONTRACTOR (Firm Name)
198 Ayer Road
Harvard, Massachusetts 01451
ADDRESS
�j
BY (Slgnatur
��- (��'/ � �-
(Typed Name)
Ir ,
DATE
page 3 of 3
North Andover Dept. of PublicWorks
OWNER (Firm Name)
384 Osgood St.
North Andover, Massachusetts 01845
ADDR
BY (Signature)
Ao%CYre%✓✓"/G �or
(Typed Name)
DATE
Change Order
Cc>nj-, f * q 3 y
PROJECT. (Name and address) CHANGE ORDER NUMBER: 003 OWNER CZ
North Andover Public Works Building DATE: 5/30/2017 ARCHITECT
384 Osgood St. ARCHITECT'S PROJECT NUMBER: CONTRACTOR F1
North Andover, Massachusetts 01845 FIELD F1
TO CONTRACTOR: (Name and address) OTHER
L.D. Russo Inc. CONTRACT DATE: June 21, 2017
198 Ayer Road CONTRACT FOR: North Andover Public Works Building
Harvard, Massachusetts 01451
The Contract is changed as follows:
(Include, where applicable, any undisputed amount attributed to previously executed Connstruction Change Directives)
POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER:
PCO #
Title Schedule Impact
Amount
014
Added Catch Basin at Gas Pad
24,238.20
015
CPR -04 Remove & Replace existing metal siding at West Elevation
29,513.90
016
Added Drop in Sewer Manhole - Wayne Street
2,531.58
019
Bollard Changes
1,200.36
020
Add Sink in Break Room Per SKP 1, SKP 2
8,568.63
021
CPR #5 Interior Adjustments
(10,951.62)
Other
TOTAL:
$ 55,101.05
CHANGE ORDER LINE ITEMS:
PCO # 014: Added Catch Basin at Gas Pad
#
Cost Code
Description
Type
Amount
1
02-300 - Earthwork
Added cathc basin at Gas Pad Regrading
Commitment
$ 21,666.40
2
17-030 - Bond
Bond & Insurance
Other
$ 368.33
3
17-040 - Management & Overhead
CM Fee
Other
$ 2,203.47
Subtotal:
$24,238.20
Grand Total:
$24,238.20
PCO # 015: CPR -04 Remove & Replace existing metal siding at West Elevation
#
Cost Code
Description
Type
Amount
1
16-100 - Electrical
Electrical: Additional materials and labor to disconnect and reconnect electrical to
allow for new siding installation at the West elevation (see attached)
Commitment
$ 10,652.32
2
07.402 - Existing Building Wall Panels
Metal Siding: Remove Existing Metal Siding and Replace to match (see
attached)
Commitment
$ 19,890.00
3
09-900 -Paints and Coatings
Paint: Credit Labor & Materials for paint at West Elevation
Commitment
($4,160.00)
4
17-030 - Bond
Bond & Insurance
Other
$ 448.50
5
17-040 - Management & Overhead
CM Fee
Other
$ 2,683.08
Subtotal:
$29,513.90
Grand Total:
$29,513.90
L.D. Russo Inc. page 1 of 3 Printed On: 6/21/ 2017 07:57 AM
,Change 0Ir
Picb # 61r Added Drop in Sewer Manhole - Wayne Street
# Cost Code Description Type Amount
1 02-300 - Earthwork Add drop to Sewer Manhole - See attached back up Commitment $ 2,265.20
2 17-030 - Bond Bond & Insurance Other $ 36.24
3 17-040 - Management & Overhead CM Fee Other $ 230.14
Subtotal: $2,531.58
Grand Total: $2,531.58
PCO # 019 : Bollard Changes
#
Cost Code
Description
Type
Amount
1
05-500 - Metal Fabrications
Fabricate & Furnish 3 Bollards per SKA - 9. Due to location, and existing
conditions, an alternate design is required.
Commitment
$ 1,073.00
2
02-300 - Earthwork
Install Bollards - Different condition than on original plan - No cost change
Commitment
$ 0.00
3
1 17-030 - Bond
Bond & Insurance
Other
$18.24
4
17-040 - Management & Overhead
CM Fee
Other
$ 109.12
Subtotal: $1,200.36
Grand Total: $1,200.36
PCO # 020: Add Sink in Break Room Per SKP 1, SKP 2
# Cost Code Description Type Amount
1 15-100 - Plumbing Furnish & Install sink and all associated plumbing for sink in breakroom 205. Commitment $ 7,666.99
2 17-030 - Bond Bond & Insurance Other $122.67
3 17-040 - Management & Overhead CM Fee Other $ 776.97
Subtotal: $8,568.63
Grand Total: $8,568.63
PCO # 021 : CPR #5 Interior Adjustments
#
Cost Code
Description
Type
Amount
1
15-100 - Plumbing
Plumbing - No Cost Change
Commitment
$ 0.00
2
12-300 - Manufactured Casework
Cabinetry & Countertops - Credit
Materials
($3,150.00)
3
09-250 - Gypsum Wallboard
Drywall - No Cost Change
Commitment
$ 0.00
4
09-500 - Ceilings
Acoustical Ceiling - No Cost Change
Commitment
$ 0.00
5
15-300 - Fire Protection Piping
Fire Protection - No Cost Change, reserves the right to revisit if coordination to
meet this change requires additional work.
Commitment
$ 0.00
6
15-700 - Heating, Venting and Air Conditioning
HVAC - No Cost Change
Commitment
$ 0.00
7
09 680 -Carpet
Flooring - Carpet - Delete wall between Rooms 112 & 113 - Credit for resilient
base -$87.48, Delete wall between Rooms 203 & 204 - Credit for resilient base
-$87.48, Change ceramic file to carpet in Room 210 $1,125.24, Delete door 112
add resilient base $17.50
Commitment
$ 967.78
8
09-300 - Tile
Flooring - Ceramic Tile - Delete tile Room 210
Commitment
($1,624.27)
9
08-700 - Hardware
Door & Hardware Installation Only - No Cost Change
Other
$ 0.00
10
08-100 - Doors
Doors & Hardware - Materials Only
Commitment
($479.59)
11
08-300 -Specialty Doors
Overhead Coiling doors - Credit for deleting 2 Over head doors, Add change in
cost for change in dimension of remaining door
Commitment
($7,595.00)
12
16-100 - Electrical
Electrical - Additional material and labor for changes per COR #5 (see attached)
Commitment
$ 1,417.62
13
1 08-800 - Glazing
Glass & Glazing - Delete 4 door vision lites and 1 borrowed lite type P
Commitment
($488.16)
Subtotal: ($10,951.62)
Grand Total: ($10,951.62)
L.D. Russo Inc. page 2 of 3 Printed On: 6/21/ 2017 07:57 AM
Change Order
The original (Contract Sum) $ 4,533,000.00
Net change by previously authorized Change Orders $ 60,305.37
The contract sum prior to this Change Order was
The contract sum will be increased by this Change Order in the amount of
The new contract sum including this Change Order will be
The contract time will by this Change Order by
$ 4,593,305.37
$ 55,101.05
$ 4,648,406.42
(Note: This Change Order does not include changes in the Contract Sum, Contract TIme, or Guartanteed Maximum Price that have
been authorized by Contstruction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,
in whish case a Change Order is executed to supersede the Construction Change Directive.)
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
CSS Architects
ARCHITECT (Firm Name)
107 Audubon Rd., Bldg 2, Suite 300
107 Audubon Rd., Bldg 2, Suite
300, Massachusetts 01880
ADDRESS
UY (Signature)
64915 CLOC"a-
(Typed Name)
DATE
L.D. Russo Inc.
CONTRACTOR (Firm Name)
198 Ayer Road
Harvard, Massachusetts 01451
ADDRES
BY Ignat
NQk C009LIits
(Typed Name)
•u .I1
DATE
page 3 of 3
North Andover Dept. of PublicWorks
OWNER (Firm Name)
384 Osgood St.
North Andover, Massachusetts 01845
ADDl.��v
RESS
B (Signature)
ndre .''
(Typed Name)
DATE
Change Order
G_n'f^oc� # 93 y,
PROJECT:(Name and address) CHANGE ORDER NUMBER: 002 OWNER
North Andover Public Works Building DATE: 4/27/2017 ARCHITECT
384 Osgood St. ARCHITECT'S PROJECT NUMBER: CONTRACTOR
North Andover, Massachusetts 01845 FIELD
TO CONTRACTOR: (Name and address) OTHER
L.D. Russo Inc. CONTRACT DATE: May 3, 2017
198 Ayer Road CONTRACT FOR: North Andover Public Works Building
Harvard, Massachusetts 01451
The Contract is changed as follows:
(Include, where applicable, any undisputed amount attributed to previously executed Connstruction Change Directives)
POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER -
PCO #
Title
Schedule Impact Amount
009
Asbestos removal above allowance
5,250.00
010
Curtainwall Insulation
0.00
011
Low Profile Salt Shed
0 days 9,500.00
P= 012
Contaminated Soil Removal
(6,750.00
TOTAL: $8,000.001
CHANGE ORDER LINE ITEMS:
PCO # 009 : Asbestos removal above allowance
#
Cost Code
Description
Type
Amount
1
01-903 -Hazardous Materials Abatement
Asbestos abatement above allowance. SF confirmed in field with CSS & LDR
3/1/17. Add 750 s.f. at $7/s.f.
Commitment
$ 5,250.00
Subtotal:
$5,250.00
Grand Total:
$5,250.00
PCO # 010 : Curtainwall Insulation
#
Cost Code
Description
Type
Amount
1
07-050 - Basic Thermal and Moisture
Protection Materials and Methods
Upgrade insulation, in curtainwall, to 3" to allow for a 0.41 U value curtain wall.
This solution will offset the loss of curtain wall U value, and allow for the timely
installation of the curtainwall. This is a no cost change to the Owner
Materials
$ 0.00
Subtotal:
$0.00
Grand Total:
$0.00
PCO # 011 : Low Profile Salt Shed
#
Cost Code
Description
Type
Amount
1
13-120 - Pre -Engineered Structures
Credit delta from iBeam to open web base salt shed- GC Protest
Commitment
($9,977.00)
2
13-120 - Pre -Engineered Structures
Delete Standard profile proposed salt shed
Commitment
($180,023.00)
3
13-120 - Pre -Engineered Structures
Add Low Profile salt shed with 28'11 frame height
Commitment
$ 198,500.00
4
1 01-016 - CM Insurance
Insurance and Bond
Other
$ 136.00
5
17-040 - Management & Overhead
GC Mgmt and Overhead
Other
$ 864.00
Subtotal:
$9,500.00
Grand Total:
$9,500.00
L.D. Russo Inc. page 1 of 2 Printed On: 5/8/ 2017 03:53 PM
Change Order
PCO # 012: Contaminated Soil Removal
# I Cost Code Description Type Amount
1 1 02-300 - Earthwork Credit - Disposal of clean soil Assume 540 yards @ $12.50/yd Commitment ($6,750.00)
Subtotal: ($6,750.00)
Grand Total: ($6,750.00)
The original (Contract Sum)
Net change by previously authorized Change Orders
The contract sum prior to this Change Order was
The contract sum will be increased by this Change Order in the amount of
The new contract sum including this Change Order will be
The contract time will by this Change Order by
$ 4,533,000.00
$ 52,305.37
$ 4,585,305.37
$ 8,000.00
$ 4,593,305.37
(Note: This Change Order does not include changes in the Contract Sum, Contract TIme, or Guartanteed Maximum Price that have
been authorized by Contstruction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,
in whish case a Change Order is executed to supersede the Construction Change Directive.)
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
CSS Architects
ARCHITECT (Firm Name)
107 Audubon Rd., Bldg 2, Suite 300
107 Audubon Rd., Bldg 2, Suite
300, Massachusetts 01880
ADDRESS
B S/ ture)
C4 I Fj W4 q2a, L4
(Typed Name)
X11
DATE
L.D. Russo Inc.
CONTRACTOR (Firm Name)
198 Ayer Road
Harvard, Massachusetts 01451
(Typed Name)
DATE
page 2 of 2
North Andover Dept. of PublicWorks
OWNER (Firm Name)
384 Osgood St.
North Andover, Massachusetts 01845
ADDRESS
BY (Signature)
(Typed Name)
DATE
t
-x4 934/
Change Order
PROJECT. (Name and address) CHANGE ORDER NUMBER: 001 OWNER
North Andover Public Works Building DATE: 2/27/2017 ARCHITECT
384 Osgood St. ARCHITECT'S PROJECT NUMBER: CONTRACTOR
North Andover, Massachusetts 01845 FIELD 0
TO CONTRACTOR: (Name and address) OTHER F]
L.D. Russo Inc. CONTRACT DATE: March 1, 2017
198 Ayer Road CONTRACT FOR: North Andover Public Works Building
Harvard, Massachusetts 01451
The Contract is changed as follows:
(Include, where applicable, any undisputed amount attributed to previously executed Connstruction Change Directives)
POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER:
PCO #
I Title
Schedule Impact Amount
001
Salt shed remobilization and associated costs
28,526.00
002
Existing metal building conditions
10,711.00
003
Electrical - Add Fixture and Switch above Elevator Motor
2,518.33
004
Raise Elevator Shaft Height
3,785.80
006
Added Heat Trace
6,764.24
Commitment
$ 13,395.00
TOTAL: $ 52,305.37
CHANGE ORDER LINE ITEMS:
PCO # 001 : Salt shed remobilization and associated costs
Cost Code
Description
# Cost Code Description
Type
Amount
1 02-201 - Ground Improvement Remobilization of ground control equipment and operation for spring '17
Commitment
$ 22,500.00
2 02-300 - Earthwork Erosion control rework and remobilization at West side of salt shed
Commitment
$ 3,000.00
3 01-016 - CM Insurance Bond and Insurance 1.7%
Other
$ 433.00
4 1 17-040 - Management & Overhead CM OH&P
Other
$ 2,593.00
Commitment
$ 13,395.00
4
05-500 - Metal Fabrications
Subtotal:
$28,526.00
($5,500.00)
Grand Total:
$28,526.00
PCO # 002 : Existina metal buildina conditions
Other
$ 162.00
#
Cost Code
Description
Type
Amount
1
07402 - Existing Building Wall Panels
Eave/Gutter modification
Commitment
$ 860.00
2
07402 - Existing Building Wall Panels
Base angle at knee wall
Commitment
$ 820.00
3
07402 - Existing Building Wall Panels
Jamb and Header repairs at OH doors
Commitment
$ 13,395.00
4
05-500 - Metal Fabrications
Deduct for acceptance of all canopies
Commitment
($5,500.00)
5
01-016 - CM Insurance
Bond and Insurance
Other
$ 162.00
6
17-040 - Management & Overhead
GC OH&P Markup
Other
$ 974.00
Subtotal:
$10,711.00
Grand Total;
$10,711.00
L.D. Russo Inc. page 1 of 3 Printed On: 2/27/ 2017 10:29 AM
Change Order
PCO # 003: Electrical - Add Fixture and Switch above Elevator Motor
#
Cost Code
Description
Type
Amount
1
16-100 - Electrical
Add Type L Fixture and Switch in elevator shaft - See attached
Labor
$ 1,561.12
2
14-200 - Elevators
Elevator contractor charges for access into the shaft and running the car to give
Electrical contractor access to the work (if required). Straight time for 1 Man
charged at $138.00/hr. Straight time for Team charged at $250.00/hr. (see
attached). Based on time required for electrical work (5 hours). If additional time
is required it may be included in a separate PCO.
Labor
$ 690.00
3
17-030 - Bond
Bond and Insurance
Labor
$ 38.27
4
17-040 - Management & Overhead
CM Fee
Labor
$ 228.94
Subtotal: $2,518.33
Grand Total: $2,518.33
PCO # 004: Raise Elevator Shaft Height
Description Type Amount
1 16-100 - Electrical
# Cost Code Description
Type
Amount
1 07401 -ACP Rainscreen and Panels Add 31 SF of MCM panels, insulation, subgirting and knights system
Commitment
$ 1,390.38
2 04-050 - Basic Masonry Materials and Methods Added CMU labor and materials
Commitment
$ 1,133.88
3 05-100 - Structural Metals Furnish and Install Bent Plate per SKS-4
Other
$ 835.00
4 17-030 - Bond Bond & Insurance
Other
$ 61.09
5 17-040 - Management & Overhead CM Fee
Other
$ 365.45
6 Note: No response from roofer was received at time of this PCO
Labor
$ 0.00
Subtotal:
$3,785.80
Grand Total:
$3,785.80
PCO # 006 : Added Heat Trace
# Cost Code
Description Type Amount
1 16-100 - Electrical
Additional material and labor to furnish and install 178' more heat trace Commitment $ 6,046.52
2 17-020 -Insurance
Bond & Insurance Other $ 102.79
3 17-040 - Management & Overhead
Management OH & P Other $ 614.93
Subtotal: $6,764.24
Grand Total: $6,764.24
The original (Contract Sum) $ 4,533,000.00
Net change by previously authorized Change Orders $ 0.00
The contract sum prior to this Change Order was $ 4,533,000.00
The contract sum will be increased by this Change Order in the amount of $ 52,305.37
The new contract sum including this Change Order will be $ 4,585,305.37
The contract time will by this Change Order by
(Note: This Change Order does not include changes in the Contract Sum, Contract TIme, or Guartanteed Maximum Price that have
been authorized by Contstruction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,
in whish case a Change Order is executed to supersede the Construction Change Directive.)
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
L.D. Russo Inc. page 2 of 3 Printed On: 2/27/ 2017 10 :29 AM
Change Order
CSS Architects
ARCHITECT (Firm Name)
Vkfne&P
ADDRESS
BY (Signature)
(Typed Name)
DATE
L.D. Russo Inc.
CONTRACTOR (Firm Name)
198 Ayer Road
Harvard, Massachusetts 01451
ADDRES
BY (Slga ture)
-C'�-(t-"�I't(�'
(Typed Name)
DATE
page 3 of 3
North Andover Dept. of PublicWorks
OWNER (Firm Name)
384 Osgood St.
North Andove , Massachusetts 01845
ADDRES
1.
Y (Signature)
(Typed Name)
DATE
TOWN OF NORTH ANDOVER
CONTRACT
CONTRACT#
DATE:
This Contract is entered into on, or as of, this date by and between the Town of North Andover
(the "Town"), and
Contractor: L.D. Russo, Inc.
Address: 198 Ayer Road
Harvard, MA 01451
Telephone Number: 978-456-3500
Fax Number: 978-456-3502
1. This is a Contract for the procurement of the following:
Improvements to the Public Works facility per the Project Manual dated September 14,
2016 and associated Addenda
2. The Contract price to be paid to the Contractor by the Town of North Andover is:
Base Bid $ 3,494,000
Alternate #1 $ 865,000
Alternate #2 $ 121,000
Alternate 93 $ 53,000
TOTAL $ 4,533,000
3. Payment will be made as follows:
Upon submission and approval of monthly requisition invoice (net 30)
(Rev 5-2007) Contract by and between Town of North Andover and L.D. Russo, Inc. Page 1
4. Definitions
4.1 Acceptance: All Contracts require proper acceptance of the described goods or
services by the Town of North Andover. Proper acceptance shall be understood to
include inspection of goods and certification of acceptable performance for services by
authorized representatives of the Town to insure that the goods or services are complete
and are as specified in the Contract.
4.2 Contract Documents: All documents relative to the Contract including (where used)
Instructions to Bidders, Proposal Form, General Conditions, Supplementary General
Conditions, General Specifications, Other Specifications included in Project Manual,
Drawings, and all Addenda issued during the bidding period. The Contract documents
are complementary, and what is called for by any one shall be as binding as if called for
by all. The intention of the document is to include all labor and materials, equipment and
transportation necessary for the proper performance of the Contract.
4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as
the sense and particular Contract so require) include Vendor, Contractor, Engineer, or
other label used to identify the other party in the particular Contract. Use of the term
"Contractor" shall be understood to refer to any other such label used.
4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the
services are performed, or the goods delivered, in accordance with Contract documents,
as modified by approved Amendments and Change Orders.
4.5 Goods: Goods, Supplies or Materials.
4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes
one who furnished material worked to a special design according to the Drawings or
Specifications of this work, but does not include one who merely furnishes material not so
worked.
4.7 Work: The services or materials contracted for, or both.
5. Term of Contract and Time for Performance
This Contract shall be fully performed by the Contractor in accordance with the provisions of the
Contract Documents on or before December 31, 2017, unless extended pursuant to a provision
for extension contained in the Contract documents at the sole discretion of the Town, and not
subject to assent by the Contractor, and subject to the availability and appropriation of funds as
certified by the Town Accountant. The time limits stated in the Contract documents are of the
essence of the Contract.
6. Subject to Appropriation
Notwithstanding anything in the Contract documents to the contrary, any and all payments which
the Town is required to make under this Contract shall be subject to appropriation or other
availability of funds as certified by the Town Accountant. In the absence of appropriation, this
(Rev 5-2007) Contract by and between Town of North Andover and L.D. Russo, Inc. Page 2
Contract shall be immediately terminated without liability for damages, penalties or other
charges.
7. Permits and Approvals
Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance
of the Contract shall be secured and paid for by the Contractor.
8. Termination and Default
8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days notice
when in the best interests of the Town by providing notice to the Contractor, which shall be
in writing and shall be deemed delivered and received when given in person to the
Contractor, or when received by fax, express mail, certified mail return receipt requested,
regular mail postage prepaid or delivered by any other appropriate method evidencing
actual receipt by the Contractor. Upon termination without cause, Contractor will be paid
for services rendered to the date of termination.
8.2 For Cause. If the Contractor is determined by the Town to be in default of any term or
condition of this Contract, the Town may terminate this Contract on seven (7) days notice
by providing notice to the Contractor, which shall be in writing and shall be deemed
delivered and received when given in person to the Contractor, or when received by fax,
express mail, certified mail return receipt requested, regular mail postage prepaid or
delivered by any other appropriate method evidencing actual receipt by the Contractor.
8.3 Default. The following shall constitute events of a default under the Contract:
1) any material misrepresentation made by the Contractor to the Town; 2) any failure to
perform any of its obligations under this Contract including, but not limited to the
following: (i) failure to commence performance of this Contract at the time specified
in this Contract due to a reason or circumstance within the Contractor's reasonable
control, (ii) failure to perform this Contract with sufficient personnel and equipment or
with sufficient material to ensure the completion of this Contract within the specified
time due to a reason or circumstance within the Contractor's reasonable control, (iii)
failure to perform this Contract in a manner reasonably satisfactory to the Town, (iv)
failure to promptly re -perform within a reasonable time the services that were rejected
by the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for
reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a
material term of this Contract, including, but not limited to, the provision of insurance
and non-discrimination, (vii) any other acts specifically and expressly stated in this
Contract as constituting a basis for termination of this Contact, and (viii) failure to
comply with any and all requirements of state law and/or regulations, and Town bylaw
and/or regulations.
9. The Contractor's Breach and the Town's Remedies
Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be
deemed a material breach of this Contract, and the Town of North Andover shall have all the
(Rev 5-2007) Contract by and between Town of North Andover and L.D. Russo, Inc. Page 3
rights and remedies provided in the Contract documents, the right to cancel, terminate, or
suspend the Contract in whole or in part, the right to maintain any and all actions at law or in
equity or other proceedings with respect to a breach of this Contract, including damages and
specific performance, and the right to select among the remedies available to it by all of the
above.
From any sums due to the Contractor for services, the Town may keep the whole or any part of
the amount for expenses, losses and damages incurred by the Town as a consequence of
procuring services as a result of any failure, omission or mistake of the Contractor in providing
services as provided in this Contract.
10. Statutory Compliance
10.1 This Contract will be construed and governed by the provisions of applicable federal,
state and local laws and regulations; and wherever any provision of the Contract or
Contract documents shall conflict with any provision or requirement of federal, state or
local law or regulation, then the provisions of law and regulation shall control. Where
applicable to the Contract, the provisions of the General Laws are incorporated by
reference into this Contract, including, but not limited to, the following:
General Laws Chapter 30B — Procurement of Goods and Services.
General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts.
General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts.
10.2 Wherever applicable law mandates the inclusion of any term and provision into a
municipal contract, this Section shall be understood to import such term or provision
into this Contract. To whatever extent any provision of this Contract shall be
inconsistent with any law or regulation limiting the power or liability of cities and
towns, such law or regulation shall control.
10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on
the performance of the Contract. If the Contractor performs the Contract in violation of
any applicable law or regulation, the Contractor shall bear all costs arising therefrom.
10.4 The Contractor shall keep itself fully informed of all existing and future State and
National Laws and Municipal By-laws and Regulations and of all orders and decrees of
any bodies or tribunals having jurisdiction in any manner affecting those engaged or
employed in the work, of the materials used in the work or in any way affecting the
conduct of the work. If any discrepancy or inconsistency is discovered in the Drawings,
Specifications or Contract for this work in violation of any such law, by-law, regulation,
order or decree, it shall forthwith report the same in writing to the Town. It shall, at all
times, itself observe and comply with all such existing and future laws, by-laws,
regulations, orders and decrees; and shall protect and indemnify the Town of North
Andover, and its duly appointed agents against any claim or liability arising from or
based on any violation whether by him or its agents, employees or subcontractors of any
such law, by-law, regulation or decree.
(Rev 5-2007) Contract by and between Town of North Andover and L.D. Russo, Inc. Page 4
11. Conflict of Interest
Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest
Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which
shall constitute a violation of that law. The Contractor shall be deemed to have investigated the
application of M.G.L. c. 268A to the performance of this Contract; and by executing the
Contract documents the Contractor certifies to the Town that neither it nor its agents,
employees, or subcontractors are thereby in violation of General Laws Chapter 268A.
12. Certification of Tax Compliance
This Contract must include a certification of tax compliance by the Contractor, as required by
General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors
Providing Goods, Services, or Real Estate Space to the Commonwealth or Subdivision).
13. Discrimination
The Contractor will carry out the obligations of this Contract in full compliance with all of the
requirements imposed by or pursuant to General Laws Chapter 151B (Law Against
Discrimination) and any executive orders, rules, regulations, and requirements of the
Commonwealth of Massachusetts as they may from time to time be amended.
14. Assi nment
Assignment of this Contract is prohibited, unless and only to the extent that assignment is
provided for expressly in the Contract documents.
15. Condition of Enforceability Against the Town
This Contract is only binding upon, and enforceable against, the Town if. (1) the Contract is
signed by the Town Manager or its designee; and (2) endorsed with approval by the Town
Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the
Town Counsel as to form.
16. Corporate Contractor
If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's
Certificate certifying the corporate capacity and authority of the party signing this Contract for
the corporation. Such certificate shall be accompanied by a letter or other instrument stating that
such authority continues in full force and effect as of the date the Contract is executed by the
Contractor. This Contract shall not be enforceable against the Town of North Andover unless
and until the Contractor complies with this section.
The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws,
Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto,
relating to the appointment of the Commissioner of Corporations as its attorney, shall file with
the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its
(Rev 5-2007) Contract by and between Town of North Andover and L.D. Russo, Inc. Page 5
Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the
Commonwealth.
17. Liability of Public Officials
To the full extent permitted by law, no official, employee, agent or representative of the Town of
North Andover shall be individually or personally liable on any obligation of the Town under this
Contract.
18. Indemnification
The Contractor shall indemnify, defend and save harmless the Town, the Town's officers, agents
and employees, from and against any and all damages, liabilities, actions, suits, proceedings,
claims, demands, losses, costs, expenses, recoveries and judgments of every nature and
description (including reasonable attorneys' fees) that may arise in whole or in part out of or in
connection with the work being performed or to be performed, or out of any act or omission by
the Contractor, its employees, agents, subcontractors, material men, and anyone directly or
indirectly employed by any of them or anyone for whose acts any of them may be liable,
regardless of whether or not it is caused in part by any party indemnified hereunder. The
Contractor further agrees to reimburse the Town for damage to its property caused by the
Contractor, its employees, agents, subcontractors or material men, and anyone directly or
indirectly employed by any of them or anyone for whose acts any of them may be liable,
including damages caused by his, its or their use of faulty, defective, or unsuitable material or
equipment, unless the damage is caused by the Town's gross negligence or willful misconduct.
The existence of insurance shall in no way limit the scope of the Contractor's indemnification
under this contract.
19. Workers Compensation Insurance
The Contractor shall provide by insurance for the payment of compensation and the furnishing of
other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's
Compensation Act) to all employees of the Contractor who are subject to the provisions of
Chapter 152 of the General Laws of Massachusetts.
Failure to provide and continue in force such insurance during the period of this Contract shall be
deemed a material breach of this Contract, shall operate as an immediate termination thereof, and
Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure
to provide the insurance required by this Article.
The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this
Contract before the same shall be binding on the parties thereto, except if specifically waived by
the Town.
20. Documents, Materials, Etc.
Any materials, reports, information, data, etc. given to or prepared or assembled by the
Contractor under this Contract are to be kept confidential and shall not be made available to any
individual or organization by the Contractor (except agents, servants, or employees of the
(Rev 5-2007) Contract by and between Town of North Andover and L.D. Russo, Inc. Page 6
Contractor) without the prior written approval of the Town, except as otherwise required by law.
The Contractor shall comply with the provisions Chapter 66A of the General Laws of
Massachusetts as it relates to public documents, and all other state and federal laws and
regulations relating to confidentiality, security, privacy and use of confidential data.
Any materials produced in whole or in part under this Contract shall not be subject to copyright,
except by the Town, in the United States or any other country. The Town shall have unrestricted
authority to, without payment of any royalty, commission, or additional fee of any type or nature,
publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole
or in part, any reports, data or other materials prepared under this Contract.
All data, reports, programs, software, equipment, furnishings, and any other documentation or
product paid for by the Town shall vest in the Town at the termination of this Contract. The
Contractor shall at all times, during or after termination of this Contract, obtain the prior written
approval of the Town before making any statement bearing on the work performed or data
collected under this Contract to the press or issues any material for publication through any
medium.
21. Audit, Inspection and Recordkeeping
At any time during normal business hours, and as often as the Town may deem it reasonably
necessary, there shall be available in the office of the Contractor for the purpose of audit,
examination, and/or to make excerpts or transcript all records, contracts, invoices, materials,
payrolls, records of personnel, conditions of employment and other data relating to all matters
covered by this Agreement.
22. Pae
The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the
Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work
completed and acceptance from the Town of the work completed.
23. Waiver and Amendment
Amendments, or waivers of any additional term, condition, covenant, duty or obligation
contained in this Contract may be made only by written amendment executed by all signatories to
the original Agreement, prior to the effective date of the amendment.
To the extent allowed by law, any conditions, duties, and obligations contained in this Contract
may be waived only by written Agreement by both parties.
Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver,
nor in any manner limit the legal or equitable remedies available to that party. No waiver by
either party of any default or breach shall constitute a waiver of any subsequent default or breach
of a similar or different matter.
(Rev 5-2007) Contract by and between Town of North Andover and L.D. Russo, Inc. Page 7
24. Forum and Choice of Law
This Contract and any performance herein shall be governed by and be construed in accordance
with the laws of the Commonwealth. Any and all proceedings or actions relating to subject
matter herein shall be brought and maintained in the courts of the Commonwealth or the federal
district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This
paragraph shall not be construed to limit any other legal rights of the parties.
25. Notices
Any notice permitted or required under the provisions of this Contract to be given or served by
either of the parties hereto upon the other party hereto shall be in writing and signed in the name
or on the behalf of the party giving or serving the same. Notice shall be deemed to have been
received at the time of actual service or three (3) business days after the date of a certified or
registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent
to the address set forth in the Contract and to the Town of North Andover by being sent to the
Town Manager, Town Hall, 120 Main Street, North Andover, Massachusetts 01845.
26. Binding on Successors
This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in
interest (and where not corporate, the heirs and estate of the Contractor).
27. Complete Contract
This instrument, together with its endorsed supplements, and the other components of the
contract documents, constitutes the entire contract between the parties, with no agreements other
than those incorporated herein.
28. Supplemental Conditions
The foregoing provisions apply to all contracts to which the Town of North Andover shall be a
parry. One of the following "Supplements" must be "checked" as applicable to this Contract,
shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The
Supplement contains additional terms governing the Contract:
[ ] GOODS
SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods
(governed by the provisions of General Laws Chapter
30B)
[ ] SERVICES
SUPPLEMENT "S" - Applicable to Contracts for the procurement of Services
(governed by the provisions of General Laws Chapter
30B)
[ X ] CONSTRUCTION
SUPPLEMENT "C" - Applicable to Contracts for Construction
(Rev 5-2007) Contract by and between Town of North Andover and L.D. Russo, Inc. Page 8
IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set forth
their hands the day and year first above written.
THE TOWN
SPA -A
- /�0-7 Divisiondepartment Head
Contract Mana er
Town anager Date
THE CONTRACTOR
D 'P c, PSSy -.c.
Company Name
Signature Date
tOU15 QVI 6 D I
Print Name & Title
CERTIFICATION AS TO AVAILABILITY OF FUNDS:
l
Town A countant "-d'Date
(Rev 5-2007) Contract by and between Town of North Andover and L.D. Russo, Inc. Page 9
SUPPLEMENT "C"
[] CONSTRUCTION
SUPPLEMENT "C" - Applicable to Contracts for the construction of:
(1) Public Buildings and Public Works
(governed by the provisions of General Laws Chapter 30B);
(2) Public Buildin&s
(governed by the provisions of General Laws Chapter 149,§ 44A,
et seq.); and
(3) Public Works
(governed by the provisions of General Laws Chapter 30, §39M, et seq)
1. This form supplements the Town of North Andover "Contract and General Conditions" and applies
only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works
or public buildings.
2. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be
understood to be a term and condition of this Contract. The Contractor agrees to secure such bond
(where required) in the form required by the Town and provide an original thereof to the Town prior
to the commencement of performance.
3. E uali :
3.1. In the case of a closed Specification written for a specific item or items to be furnished under
the Base Bid, such specifications shall, as applicable, be in compliance with the
Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq.
3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or
on the Drawings, except as above noted, the intent is to establish a standard and in no way
should be construed to exclude any item or manufacturer not mentioned by name, but whose
product meets the Specifications as to design, utility and quality. Final decision shall rest
with the Project Representative as to its acceptability.
4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of
goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of
Chapter 30B.
The Contractor will carry out the obligations of this contract in full compliance with all of the
requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage
Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of
Massachusetts as they may from time to time be amended. The Contractor will at all times comply
with the wage rates as determined by the Commissioner of the Department of Labor and Industries,
under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall
be in force and as amended.
6. The Contractor shall continuously maintain adequate protection of all work from damage and shall
protect the property of the Town and others, including adjacent property, from injury or loss arising
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page I
and L.D. Russo, Inc.
in connection with the Contract. The Contractor shall make good any such damage, injury or loss,
except as may be directly due to errors in the Contract Documents or caused by agents or employees
of the Town, or due to causes beyond the Contractor's control and not the Contractor's fault or
negligence.
7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall
comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents
or injury to persons on, about or adjacent to the premises where the work is being performed. The
Contractor will erect and properly maintain at all times, as required by the conditions and progress of
the work, all necessary safeguards for the protection of workers and the public, shall post danger
signs warning against the hazards created by such features of construction such as pits, protruding
nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling
materials; and shall designate a responsible member of its organization on the work, whose duty shall
be the prevention of accidents.
8. The Town shall at all times have access to the work wherever it is in preparation or progress and the
Contractor shall provide suitable accommodations for such access.
9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants,
all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the
construction superintendent, foreman, or assistants are unacceptable to the Town, then upon seven
days notice from the Town, the Contractor shall replace such person or persons with people
acceptable to the Town.
10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The
Contractor shall carefully study and compare the drawings, specifications and other instructions and
shall at once report to the Town any error, inconsistency or omission which shall be discovered.
Included in this responsibility shall be supervision of all work performed by subcontractors on the
work.
11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any
of its provisions, the Town, upon three days written notice, may, without prejudice to any other
remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment
then or thereafter due the Contractor.
12. Inspection by the Town's Project Representative
12.1. The Town shall have the right to designate a Project Representative who may make periodic
visits to the site to familiarize the Town generally with the progress and quality of the work,
and to determine in general if the work is proceeding in accordance with the Contract
Documents. The Project Representative will not be required to make exhaustive or
continuous on-site inspections to check the quality or quantity of the work, and will not be
responsible for the Contractor's failure to carry out the construction work in accordance with
the Contract Documents. During such visits and on the basis of these observations while at
the site, the Project Representative will keep the Town informed on the progress of the work,
will endeavor to guard the Town against defects and deficiencies in the work of contractors,
and may condemn structural work as failing to conform to the Contract Documents. The
Project Representative shall have authority to act on behalf of the Town only to the extent
expressly delegated by the Town, which shall be shown to the Contractor, and shall have
authority to stop the work whenever such stoppage may reasonably be necessary to insure
the proper execution of the Contract.
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 2
and L.D. Russo, Inc.
12.2. In connection with the work, the Project Representative shall not be responsible for
construction methods, means, techniques, sequences or procedures employed by the
Contractor or the Contractor's safety programs, requirements, regulations, or precautions.
13. Decisions of the Project Representative
13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of
the Town or the Contractor and on all other matters relating to the execution and progress of
the structural work or the interpretation of the Contract Documents.
13.2. The Project Representative's decision, in matters relating to the project, shall be final, if
within the terms of the Contract Documents.
13.3. If, however, the Project Representative fails to render a decision within ten days after the
parties have presented their evidence, either party may then avail itself of the remedies
provided in this contract or available to it by law. If the Project Representative renders a
decision after such remedies have commenced, such decision may be entered as evidence
but shall not disturb or interrupt such proceedings except where such decision is acceptable
to the parties concerned.
14.1 Use of Premises by the Contractor:
14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of
its workmen to limits indicated by law, by-laws, permits or directions of the Town and
shall not unreasonably encumber the premises with its materials.
14.2. The Contractor shall not load or permit any part of the structure to be loaded with a
weight that will endanger its safety.
15. Maintenance of Premises:
The Contractor shall at all times keep the premises free from accumulation of waste materials or
rubbish caused by its employees or work, and at the completion of the work it shall remove all its
rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall
leave its work "broom -clean.", or its equivalent, unless more exactly specified. In case of dispute,
the Town may remove the rubbish and charge the cost to the several contractors, as the Town
shall determine to be just.
16. Rialit to Terminate
If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit
of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or
repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail
to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently
disregard laws and regulations or lawful directives of the Town, or (7) be guilty of a substantial
violation of any provision of the Contract, then the Town may, without prejudice to any other
right or remedy and after giving the Contractor (or any surety) seven days written notice,
terminate the contract and the employment of the Contractor and take possession of the premises
and of all materials, tools and appliances thereon and finish the work by whatever method it
deems appropriate.
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 3
and L.D. Russo, Inc.
In such cases, the Contractor shall not be entitled to receive any further payment until the work is
finished. If the unpaid amount owed to the Contractor for work already completed shall exceed
the expense of finishing the work, including compensation for additional architectural,
managerial, legal and administrative services, such excess shall be paid to the Contractor. If such
expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the Town.
The Contractor shall not be relieved of liability to the Town by virtue of any termination of this
contract, and any claim for damages against the Contractor relating to the Contractor's
performance under this contract shall survive any termination hereunder.
Notwithstanding any other provision of this Agreement, the Town reserves the right at any time
in its absolute discretion to suspend or terminate this Agreement in whole or in part for its
convenience upon seven days written notice to the Contractor. The Town shall incur no liability
by reason of such termination except for the obligation to pay compensation for all work
performed by the Contractor and accepted by the Town to the termination date.
17. Progress ss Pam:
17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported
to the extent required by the Town by invoices or other vouchers, showing payments for
materials and labor, payments to Subcontractors and such other evidence of the
Contractor's right to payment.
17.2. The Contractor shall, before the first application, submit to the Town a schedule of values
of the various parts of the work, including quantities aggregating the total sum of the
Contract, divided so as to facilitate payments to Subcontractors, made out in such form as
the Town and the Contractor may agree upon, and, if required, supported by such
evidence as to its correctness. This schedule, when approved by the Town, shall be used
as a basis for payment, unless it is found to be in error. If applying for payments, the
Contractor shall submit a statement based upon this schedule.
18. Withholding of Payments
18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the
whole or part of any payment to such extent as may be necessary in its reasonable
opinion to protect the Town of North Andover from loss on account of -
18. 1. 1.
£
18.1.1. Defective work not remedied.
18.1.2. Claims filed or reasonable evidence indicating probable filing of claims.
18.1.3. Failure of the Contractor to make payments properly to Subcontractors or
for material or labor.
18.1.4. A reasonable doubt that the Contract can be completed for the balance
then unpaid.
18.1.5. Damage to another contractor.
18.1.6. Delays resulting in liquidated damages.
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 4
and L.D. Russo, Inc.
18.2. Withholding of payments shall be in strict compliance with statutory requirements.
19. Claims by Contractor and Liability of Town
All claims by the Contractor against the Town shall, unless otherwise provided by law, be
initiated by a written claim submitted to the Town no later than seven (7) calendar days after the
event or the first appearance of the circumstances causing the claim. The claim shall set forth in
detail all known facts and circumstances supporting the claim. The Contractor shall continue its
performance under this contract regardless of the submission or existence of any claims.
The limit of liability of the Town under this Agreement is limited to the compensation provided
herein for work actually performed, and shall in no event include liability for delays or for
incidental, special or consequential damages or lost profits or for damages or loss from causes
beyond the Town's reasonable control.
20. Liquidated Damages:
Because both parties recognize (1) that the time for completion of this Contract is of the essence,
(2) that the Town will suffer loss if the work is not completed within the contract time specified,
plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the
delays, expense and difficulties involved in a legal proceeding to determine the actual loss
suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay
the Town as liquidated damages representing an estimate of delay damages, not as a penalty, the
sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is
completed, whether the work is completed by the Contractor or some other person. The Town's
right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a
legal action for damages in lieu of or in addition to its option to impose liquidated damages. The
Town may deduct any liquidated damages from money due the Contractor, and if such payment is
insufficient to cover the liquidated damages, then the Contractor shall pay the amount due.
21. The Contractors' Mutual Responsibility:
Should the Contractor cause damage to any separate subcontractor on the work, the Contractor
agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies
provided by law or by the provisions of the contract. If such separate contractor sues the Town
on account of any damage alleged to have been sustained, the Town shall notify the Contractor,
who shall defend such proceedings at the Town's expense and, if any judgment against the Town
arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Town.
22. Separate Contracts:
22.1. The Town reserves the right to let other Contracts in connection with this work under
similar General Conditions. The Contractor shall afford other contractors reasonable
opportunity for the introduction and storage of their materials and the execution of their
work, and shall properly connect and coordinate its work with theirs.
22.2. If any part of the Contractor's work depends, for proper execution or results, upon the
work of any other contractor, the Contractor shall inspect and promptly report to the
Town any defects in such work that render it unsuitable for such proper execution and
results. Failure of the Contractor to so inspect and report shall constitute an acceptance
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 5
and L.D. Russo, Inc.
of the other contractor's work as fit and proper for the reception of its work except as to
defects which may develop in the other contractor's work after the execution of its work.
22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work
already in place and shall at once report to the Town any discrepancy between the
executed work and the Drawings.
23. Subcontracts:
23.1. All Subcontracts shall be awarded in conformity with the requirements of the General
Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive.
23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and
omissions of its Subcontractors and of persons either directly or indirectly employed by
them, as it is for the acts and omissions of persons directly employed by it.
23.3. Nothing contained in the Contract Documents shall create any contractual relationship
between any Subcontractor and the Town.
24. Contractor -Subcontractor Relations:
The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound
by the terms of the Agreement, the General Conditions of the Contract, the Supplementary
General Conditions, the Drawings and Specifications, as far as applicable to its work, including
the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A,
et seq.
25. Indemnification:
25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents
and employees from and against any and all damages, liabilities, actions, suits,
proceedings, claims, demands, losses, recoveries and judgments of every nature and
description (including reasonable attorneys' fees) brought or recovered against them that
may arise in whole or in part out of or in connection with the work being performed or to
be performed, or out of any act or omission by the Contractor, its employees, agents,
subcontractors, material men, and anyone directly or indirectly employed by any of them
or anyone for whose acts any of them may be liable, regardless of whether or not it is
caused in part by any party indemnified hereunder. The Contractor further agrees to
reimburse the Town for damage to its property caused by Contractor, its employees,
agents, subcontractors or material men, and anyone directly or indirectly employed by
any of them or anyone for whose acts any of them may be liable, including damages
caused by his, its or their use of faulty, defective or unsuitable material or equipment,
unless the damage is caused by the Town's gross negligence or willful misconduct. The
existence of insurance shall in no way limit the scope of the Contractor's indemnification
under this Contract.
25.2. In any and all claims against the Town or any of their agents or employees by any
employee of the Contractor, any Subcontractor, anyone directly or indirectly employed
by any of them or anyone for whose acts any of them may be liable, the indemnification
obligation under this paragraph shall not be limited in any way by any limitation on the
amount or type of damages, compensation or benefits payable by or for the Contractor or
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 6
and L.D. Russo, Inc.
any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other
employee benefit acts.
25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and
minimum limits of liability acceptable under the Contract. However, it shall be the
Contractor's responsibility to purchase and maintain insurance of such character and in
such amounts as will adequately protect it and the Town from and against all claims,
damages, losses and expenses resulting from exposure to any casualty liability in the
performance of the Work.
26. The Contractor's Insurance:
26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor
from claims set forth below which may arise out of or result from the Contractor's
operations under the Contract, whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them or by anyone
for whose acts any of them may be liable.
26.1.1. Claims under Worker's Compensation, disability benefit and other similar
employee benefit acts;
26.1.2. Claims for damages because of bodily injury, occupational sickness or
disease, or death of its employees, and claims insured by usual personal
injury liability coverage;
26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of
any person other than its employees, and claims insured by usual personal
liability coverage;
26.1.4. Claims for damages because of injury to or destruction of tangible property,
including loss of use resulting therefrom.
26.2. The insurance required by the above shall be written for not less than the following
minimum limits of liability:
26.2.1. Worker's Compensation Insurance Requirements
Workers' Compensation coverage as required by the laws of the Commonwealth of
Massachusetts.
26.2.2. Liability Insurance Requirements
Liability insurance shall include all major divisions and shall be on a comprehensive
general basis including Premises and Operations, Owners and Contractor's Protective,
Products and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles.
All such insurance shall be written for not less than any limits of liability required by law,
unless otherwise provided in the contract documents, or the following limits, whichever
are greater:
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 7
and L.D. Russo, Inc.
Comprehensive General Liability Insurance (Broad Form)
Bodily Injury
Property Damage
Automobile Liability Insurance
Excess Liability (Umbrella)
Excess Liability (Umbrella —Subcontractors)
$1,000,000 per person
$2,000,000 aggregate
$1,000,000 per occurrence
$2,000,000 aggregate
$500,000 per person
$1,000,000 per occurrence
$10,000,000
$1,000,000 or 1.5 times the value of
the subcontract, whichever is higher
26.3. The above insurance policies shall also be subject to the following requirements:
26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as
hereinafter specified under Paragraph entitled "Protective Liability Insurance"
shall be written by one and the same insurance company to avoid the expense of
duplicate and/or overlapping coverage and to facilitate and expedite the
settlement of claims.
26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed
with the Town prior to commencement of the work. Renewal certificates shall be
addressed to and filed with the Town at least ten (10) days prior to the expiration
date of required policies.
26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30)
days prior written notice forwarded by registered or certified mail to the Town.
The Town shall also be notified of the attachment of any restrictive amendments
to the policies.
26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of
Insurance form, shall contain true transcripts from the policies, authenticated by
the proper officer of the Insurer, evidencing in particular those insured, the extent
of coverage, the location and operations to which the insurance applies, the
expiration date and the above-mentioned notice clauses.
26.3.5. All premium costs shall be included in the Contractor's bid.
26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be
maintained without interruption from date of the Contract until date of final
payment and termination of any coverage required to be maintained after
payment.
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover
and L.D. Russo, Inc.
Page 8
27. Protective Liability Insurance:
27.1. The Contractor shall purchase and maintain such insurance as described in the preceding
paragraph as will protect the Town from claims which may arise from operations under
the Contract, including operations performed for the named insureds by independent
contractors and general inspection thereof by the named insureds.
27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town
against Automobile Non -Ownership Liability in connection with the Contractor's
operations under the Contract, whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone
for whose acts any of them may be liable.
27.3. The limits of liability for coverage required under the preceding paragraphs shall be as
specified under the provisions hereof governing the Contractor's General Liability
Policy.
27.4. The Town shall be named as an additional insured on the above referenced liability
Policies, and the Contractor's insurance shall be the primary coverage. The cost of such
insurance, including required endorsements and amendments, shall be the sole
responsibility of the Contractor.
28. Liens:
Neither the Final Payment nor any part of the retained percentage shall become due until the
Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the
Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as
it has knowledge or information, the releases and receipts include all the labor and material for
which a lien could be filed. The Contractor shall comply with all statutory provisions of the
General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149
as amended (as a minimum requirement).
29. Guarantees:
29.1. The Contractor guarantees and warrants to the Town that all labor furnished under this
Contract will be competent to perform the tasks undertaken, that the product of such
labor will yield only first-class results, that materials and equipment furnished will be of
good quality and new unless otherwise permitted by this Contract, and that the Work will
be of good quality, free from faults and defects and in strict conformance with this
Contract. All Work not conforming to these requirements may be considered defective.
29.2. If at any time any part of the work constructed under the terms of this contract shall in the
opinion of the Town Manager require repairing due to defective work or materials
furnished by the Contractor, he may notify the Contractor in writing to make the required
repairs. If the Contractor shall neglect to start such repairs within ten days of the date of
giving it notice thereof and to complete the same to the satisfaction of the Town Manager
with reasonable dispatch, then the latter may employ other persons to make such repairs.
The Town shall charge the expense thereof to the Contractor and may use any moneys
still retained to pay for the same, and if such sum is insufficient, the Contractor shall be
obligated to pay the balance thereof.
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 9
and L.D. Russo, Inc.
29.3. All guarantees and warranties required in the various Sections of the Specifications which
originate with a Subcontractor or Manufacturer must be delivered to the Town before
final payment to the Contractor may be made for the amount of that subtrade or for the
phase of work to which the guarantee or warranty relates. The failure to deliver a
required guarantee or warranty shall be held to constitute a failure of the Subcontractor to
fully complete his work in accordance with the Contract Documents. The Contractor's
obligation to correct work is in addition to, and not in substitution of, such guarantees or
warranties as may be required in the various Sections of the Specifications.
This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals
hereto:
Dated: / 1,
The Town of North Andover by:
Town Manager
Apt,� C=k&
Departme vDivision Head
- h-� P C - � t[AA A
To untant
Certified to Appropriation
The Contractor by: I 1 � e.5 de 4
Authorized Signature
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover
and L.D. Russo, Inc.
Page 10
1 THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
CHARLES D. BAKER As determined by the Director under the provisions of the RONALD L. WALKER, II
Governor Secretary
Massachusetts General Laws, Chapter 149, Sections 26 to 27H WILLIAM D MCKINNEY
KARYN E. POLITO Director
Lt. Govemor
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Public Works Building Improvements - Renovations to existing DPW Building and construction of new addition
Job Location: 384 Osgood St, North Andover MA
Information about Prevailing Wage Schedules for Awarding Authorities and Contractors
• This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the
"Wage Request Number" on all pages of this schedule.
• An Awarding Authority must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has
not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK
projects (bid pursuant to G.L. c. 149A), the earlier of. (a) the execution date of the GMP Amendment, or (b) the bid for the first
construction scope of work must be within 90 -days of the wage schedule issuance date.
• The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149,
§ 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a
conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the
wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime
contractor, a filed sub -bidder, or any sub -contractor.
• All apprentices working on the project are required to be registered with the Massachusetts Department of Labor
Standards, Division of Apprentice Standards (DLS/DAS). Apprentice must keep his/her apprentice identification card on
his/her person during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice
wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DLS/DAS
regardless of whether or not they are registered with any other federal, state, local, or private agency must be paid the
journeyworker's rate for the trade.
• The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction
projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule.
Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the
contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, awarding
authority must request an annual update no later than two weeks before the anniversary date, determined as the earlier of. (a)
the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of
construction services. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than
these rates to covered workers. The annual update requirement is not applicable to 27F "rental of equipment" contracts.
• Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll
reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years.
Each weekly payroll report must contain: the employee's name, address, occupational classification, hours worked, and wages
paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at
http://www.mass.gov/dols/pw.
• Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at (617) 626-6953.
• Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor
Division of the office of the Attorney General at (617) 727-3465.
• Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who
perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and
Issue Date: 09/12/2016 Wage Request Number: 20160910-002
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
Construction
(2 AXLE) DRIVER - EQUIPMENT
08/01/2016
$32.15
$10.91
$10.08
$0.00
$53.14
TEAMSTERS JOINT COUNCIL N0. 10 ZONE B
12/01/2016
$32.15
$10.91
$10.89
$0.00
$53.95
(3 AXLE) DRIVER - EQUIPMENT
08/01/2016
$32.22
$10.91
$10.08
$0.00
$53.21
TEAMSTERS JOINT COUNCIL NO. IO ZONE B
12/01/2016
$32.22
$10.91
$10.89
$0.00
$54.02
(4 & 5 AXLE) DRIVER- EQUIPMENT
08/01/2016
$32.34
$10.91
$10.08
$0.00
$53.33
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
12/01/2016
$32.34
$10.91
$10.89
$0.00
$54.14
ADS/SUBMERSIBLE PILOT
08/01/2015
$88.29
$9.80
$19.23
$0.00
$117.32
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
AIR TRACK OPERATOR
06/01/2016
$32.40
$7.45
$12.65
$0.00
$52.50
LABORERS - ZONE 2
12/01/2016
$33.15
$7.45
$12.65
$0.00
$53.25
For apprentice rates see "Apprentice- LABORER"
ASBESTOS REMOVER - PIPE / MECH. EQUIPT.
06/01/2016
$32.90
$11.50
$7.10
$0.00
$51.50
HEAT & FROST INSULATORS LOCAL 6 (BOSTON)
12/01/2016
$33.90
$11.50
$7.10
$0.00
$52.50
06/01/2017
$34.90
$11.50
$7.10
$0.00
$53.50
12/01/2017
$35.90
$11.50
$7.10
$0.00
$54.50
06/01/2018
$36.90
$11.50
$7.10
$0.00
$55.50
12/01/2018
$37.90
$11.50
$7.10
$0.00
$56.50
06/01/2019
$38.90
$11.50
$7.10
$0.00
$57.50
12/01/2019
$39.90
$11.50
$7.10
$0.00
$58.50
06/01/2020
$40.90
$11.50
$7.10
$0.00
$59.50
12/01/2020
$41.90
$11.50
$7.10
$0.00
$60.50
ASPHALT RAKER
06/01/2016
$31.90
$7.45
$12.65
$0.00
$52.00
LABORERS - ZONE 2
12/01/2016
$32.65
$7.45
$12.65
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE
06/01/2016
$44.23
$10.00
$15.15
$0.00
$69.38
OPERATING ENGINEERS LOCAL 4
12/01/2016
$45.48
$10.00
$15.15
$0.00
$70.63
06/01/2017
$46.48
$10.00
$15.15
$0.00
$71.63
12/01/2017
$47.48
$10.00
$15.15
$0.00
$72.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
BACKHOE/FRONT-END LOADER
06/01/2016
$44.23
$10.00
$15.15
$0.00
$69.38
OPERATING ENGINEERS LOCAL 4
12/01/2016
$45.48
$10.00
$15.15
$0.00
$70.63
06/01/2017
$46.48
$10.00
$15.15
$0.00
$71.63
12/01/2017
$47.48
$10.00
$15.15
$0.00
$72.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
BARCO-TYPE JUMPING TAMPER
06/01/2016
$31.90
$7.45
$12.65
$0.00
$52.00
LABORERS - ZONE 2
12/01/2016
$32.65
$7.45
$12.65
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
BLOCK PAVER, RAMMER / CURB SETTER
06/01/2016
$32.40
$7.45
$12.65
$0.00
$52.50
LABORERS - ZONE 2
12/01/2016
$33.15
$7.45
$12.65
$0.00
$53.25
For apprentice rates see "Apprentice- LABORER"
BOILER MAKER
01/01/2016
$41.62
$6.97
$16.21
$0.00
$64.80
BOILERMAKERS LOCAL 29
01/01/2017
$42.92
$6.97
$16.21
$0.00
$66.10
------------------------------- ------------------------------------------------------------------------------------------------------------
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 2 of 33
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - BOILERMAKER - Local 29
Effective Date - 01/01/2016
Step
percent
Apprentice Base Wage
Health
1
65
$27.05
$6.97
2
65
$27.05
$6.97
3
70
$29.13
$6.97
4
75
$31.22
$6.97
5
80
$33.30
$6.97
6
85
$35.38
$6.97
7
90
$37.46
$6.97
8
95
$39.54
$6.97
Effective Date - 01/01/2017
Step percent Apprentice Base Wage Health
Pension
Supplemental
Unemployment
Total Rate
$10.54
$0.00
$44.56
$10.54
$0.00
$44.56
$11.35
$0.00
$47.45
$12.16
$0.00
$50.35
$12.97
$0.00
$53.24
$13.78
$0.00
$56.13
$14.59
$0.00
$59.02
$15.40
$0.00
$61.91
Supplemental
Pension Unemployment Total Rate
1 65
$27.90
$6.97
$10.54
$0.00
$45.41
2 65
$27.90
$6.97
$10.54
$0.00
$45.41
3 70
$30.04
$6.97
$11.35
$0.00
$48.36
4 75
$32.19
$6.97
$12.16
$0.00
$51.32
5 80
$34.34
$6.97
$12.97
$0.00
$54.28
6 85
$36.48
$6.97
$13.78
$0.00
$57.23
7 90
$38.63
$6.97
$14.59
$0.00
$60.19
8 95
$40.77
$6.97
$15.40
$0.00
$63.14
(Notes: I
I
Apprentice to Journeyworker Ratiwi.5
BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 08/01/2016 $50.76 $10.18 $19.22 $0.00 $80.16
WATERPROOFING) 02/01/2017 $51.33 $10.18 $19.22 $0.00 $80.73
BRICKLAYERS LOCAL 3 (LYNN)
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 3 of 33
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- BRICK/PLASTERICEMENT MASON - Local 3 Lynn
Effective Date - 08/01/2016
Step
percent
Apprentice Base Wage
Health
1
50
$25.38
$10.18
2
60
$30.46
$10.18
3
70
$35.53
$10.18
4
80
$40.61
$10.18
5
90
$45.68
$10.18
Effective Date - 02/01/2017
Step percent Apprentice Base Wage Health
Pension
Supplemental
Unemployment
Total Rate
$19.22
$0.00
$54.78
$19.22
$0.00
$59.86
$19.22
$0.00
$64.93
$19.22
$0.00
$70.01
$19.22
$0.00
$75.08
Supplemental
Pension Unemployment Total Rate
1 50
$25.67
$10.18
$19.22
$0.00
$55.07
2 60
$30.80
$10.18
$19.22
$0.00
$60.20
3 70
$35.93
$10.18
$19.22
$0.00
$65.33
4 80
$41.06
$10.18
$19.22
$0.00
$70.46
5 90
$46.20
$10.18
$19.22
$0.00
$75.60
I(Notes:
$10.00
$15.15
$0.00
$72.17
I
t
$9.80
$16.82
$0.00
I
Apprentice to Journeyworker Ratio: 1:5
06/01/2016
$36.95
$7.45
$14.00
$0.00
BULLDOZER/GRADER/SCRAPER
06/01/2016
$43.81
$10.00
$15.15
$0.00
$68.96
OPERATING ENGINEERS LOCAL 4
$39.05
$9.80
$16.82
$0.00
$65.67
09/01/2017
12/01/2016
$45.04
$10.00
$15.15
$0.00
$70.19
03/01/2018
06/01/2017
$46.03
$10.00
$15.15
$0.00
$71.18
09/01/2018
12/01/2017
$47.02
$10.00
$15.15
$0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
$43.13
$9.80
$16.82
$0.00
$69.75
CAISSON & UNDERPINNING BOTTOM MAN
06/01/2016
$36.95
$7.45
$14.00
$0.00
$58.40
LABORERS- FO UNDA TION AND MARINE
12/01/2016
$37.95
$7.45
$14.00
$0.00
$59.40
For apprentice rates see "Apprentice- LABORER"
CAISSON & UNDERPINNING LABORER
06/01/2016
$35.80
$7.45
$14.00
$0.00
$57.25
LABORERS - FOUNDATION AND MARINE
12/01/2016
$36.80
$7.45
$14.00
$0.00
$58.25
For apprentice rates see "Apprentice- LABORER"
CAISSON & UNDERPINNING TOP MAN
06/01/2016
$35.80
$7.45
$14.00
$0.00
$57.25
LABORERS - FOUNDATIONAND MARINE
12/01/2016
$36.80
$7.45
$14.00
$0.00
$58.25
For apprentice rates see "Apprentice- LABORER"
CARBIDE CORE DRILL OPERATOR 06/01/2016 $31.90 $7.45 $12.65 $0.00 $52.00
LABORERS - ZONE 2
12/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75
For apprentice rates see "Apprentice- LABORER"
CARPENTER
CARPENTERS -ZONE 2 (Eastern Massachusetts)
09/01/2016
$38.08
$9.80
$16.82
$0.00
$64.70
03/01/2017
$39.05
$9.80
$16.82
$0.00
$65.67
09/01/2017
$40.06
$9.80
$16.82
$0.00
$66.68
03/01/2018
$41.06
$9.80
$16.82
$0.00
$67.68
09/01/2018
$42.10
$9.80
$16.82
$0.00
$68.72
03/01/2019
$43.13
$9.80
$16.82
$0.00
$69.75
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 4 of 33
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$0.00
$30.96
2 60
$23.43
Unemployment
Apprentice - CARPENTER -
Zone 2 Eastern MA
$34.86
3 70
$27.34
Effective Date - 09/01/2016
$11.93
$0.00
$49.07
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
unemployment Total Rate
1 50
$19.04
$9.80
$1.63
$0.00 $30.47
2 60
$22.85
$9.80
$1.63
$0.00 $34.28
3 70
$26.66
$9.80
$11.93
$0.00 $48.39
4 75
$28.56
$9.80
$11.93
$0.00 $50.29
5 80
$30.46
$9.80
$13.56
$0.00 $53.82
6 80
$30.46
$9.80
$13.56
$0.00 $53.82
7 90
$34.27
$9.80
$15.19
$0.00 $59.26
8 90
$34.27
$9.80
$15.19
$0.00 $59.26
Effective Date - 03/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$19.53
$9.80
$1.63
$0.00
$30.96
2 60
$23.43
$9.80
$1.63
$0.00
$34.86
3 70
$27.34
$9.80
$11.93
$0.00
$49.07
4 75
$29.29
$9.80
$11.93
$0.00
$51.02
5 80
$31.24
$9.80
$13.56
$0.00
$54.60
6 80
$31.24
$9.80
$13.56
$0.00
$54.60
7 90
$35.15
$9.80
$15.19
$0.00
$60.14
8 90
$35.15
$9.80
$15.19
$0.00
$60.14
(Notes:
Issue Date: 09/12/2016 Wage Request Number: 20160910-002
I
I
Apprentice to Journeyworker Rat w.i.5
CEMENT MASONRY/PLASTERING 01/01/2016 $46.44 $10.90 $18.71 $1.30
BRICKLAYERS LOCAL 3 (LYNN)
Apprentice- CEMENT MASONRY/PLASTERING -Eastern Mass (Lynn)
Effective Date - 01/01/2016
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
$77.35
1 50 $23.22
$10.90
$12.21
$0.00
$46.33
2 60 $27.86
$10.90
$13.71
$1.30
$53.77
3 65 $30.19
$10.90
$14.71
$1.30
$57.10
4 70 $32.51
$10.90
$15.71
$1.30
$60.42
5 75 $34.83
$10.90
$16.71
$1.30
$63.74
6 80 $37.15
$10.90
$17.71
$1.30
$67.06
7 90 $41.80
$10.90
$18.71
$1.30
$72.71
INotes:
I
ISteps 3,4 are 500 hrs. All other steps are 1,000 hrs.
I
Apprentice to Journeyworker R, 7,,
Issue Date: 09/12/2016 Wage Request Number: 20160910-002
Page 5 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
CHAIN SAW OPERATOR 06/01/2016 $31.90 $7.45 $12.65 $0.00 $52.00
LABORERS - ZONE 2
12/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75
For apprentice rates see "Apprentice- LABORER"
CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
06/01/2016
$45.23
$10.00
$15.15
$0.00
$70.38
12/01/2016
$46.48
$10.00
$15.15
$0.00
$71.63
06/01/2017
$47.48
$10.00
$15.15
$0.00
$72.63
12/01/2017
$48.48
$10.00
$15.15
$0.00
$73.63
COMPRESSOR OPERATOR
06/01/2016
$30.40
$10.00
$15.15
$0.00
$55.55
OPERATING ENGINEERS LOCAL 4
$7.85
$3.66
$0.00
$39.26
3 60
$30.28
$7.85
12/01/2016
$31.27
$10.00
$15.15
$0.00
$56.42
$4.32
06/01/2017
$31.96
$10.00
$15.15
$0.00
$57.11
$0.00
12/01/2017
$32.65
$10.00
$15.15
$0.00
$57.80
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
7 80
$40.37
$7.85
$14.77
$0.00
$62.99
DELEADER (BRIDGE)
07/01/2016
$50.46
$7.85
$16.10
$0.00
$74.41
PAINTERS LOCAL 35 - ZONE 2
f Steps are 750 Ins.
01/01/2017
$51.41
$7.85
$16.10
$0.00
$75.36
Apprentice - PAINTER Local 35 - BRIDGES/TANKS
Effective Date - 07/01/2016
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$25.23
$7.85
$0.00
$0.00
$33.08
2 55
$27.75
$7.85
$3.66
$0.00
$39.26
3 60
$30.28
$7.85
$3.99
$0.00
$42.12
4 65
$32.80
$7.85
$4.32
$0.00
$44.97
5 70
$35.32
$7.85
$14.11
$0.00
$57.28
6 75
$37.85
$7.85
$14.44
$0.00
$60.14
7 80
$40.37
$7.85
$14.77
$0.00
$62.99
8 90
$45.41
$7.85
$15.44
$0.00
$68.70
Effective Date - 01/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$25.71
$7.85
$0.00
$0.00
$33.56
2 55
$28.28
$7.85
$3.66
$0.00
$39.79
3 60
$30.85
$7.85
$3.99
$0.00
$42.69
4 65
$33.42
$7.85
$4.32
$0.00
$45.59
5 70
$35.99
$7.85
$14.11
$0.00
$57.95
6 75
$38.56
$7.85
$14.44
$0.00
$60.85
7 80
$41.13
$7.85
$14.77
$0.00
$63.75
8 90
$46.27
$7.85
$15.44
$0.00
$69.56
Notes:
f Steps are 750 Ins.
I
Apprentice to Journeyworker Ratio:1:1
DEMO: ADZEMAN
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
12/01/2015 $35.50 $7.45 $13.55 $0.00 $56.50
---------------------------------------------------------- ----------------------------------------------------------------------------------
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 6 of 33
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
DEMO: BACKHOE/LOADER/HAMMER OPERATOR
12/01/2015
$36.50
$7.45
$13.55
$0.00
$57.50
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
DEMO: BURNERS
12/01/2015
$36.25
$7.45
$13.55
$0.00
$57.25
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
DEMO: CONCRETE CUTTER/SAWYER
12/01/2015
$36.50
$7.45
$13.55
$0.00
$57.50
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
DEMO: JACKHAMMER OPERATOR
12/01/2015
$36.25
$7.45
$13.55
$0.00
$57.25
LABORERS - ZONE 1
For apprentice rates see "Apprentice- LABORER"
DEMO: WRECKING LABORER
12/01/2015
$35.50
$7.45
$13.55
$0.00
$56.50
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
DIRECTIONAL DRILL MACHINE OPERATOR
06/01/2016
$43.81
$10.00
$15.15
$0.00
$68.96
OPERATING ENGINEERS LOCAL 4
12/01/2016
$45.04
$10.00
$15.15
$0.00
$70.19
06/01/2017
$46.03
$10.00
$15.15
$0.00
$71.18
12/01/2017
$47.02
$10.00
$15.15
$0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DIVER
08/01/2015
$58.86
$9.80
$19.23
$0.00
$87.89
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER TENDER
08/01/2015
$42.04
$9.80
$19.23
$0.00
$71.07
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER TENDER (EFFLUENT)
08/01/2015
$63.06
$9.80
$19.23
$0.00
$92.09
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER/SLURRY (EFFLUENT)
08/01/2015
$88.23
$9.80
$19.23
$0.00
$117.26
PILEDRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
DRAWBRIDGE OPERATOR (Construction)
03/01/2016
$46.17
$13.00
$16.39
$0.00
$75.56
ELECTRICIANSLOCAL 103
For apprentice rates see "Apprentice- ELECTRICIAN'
ELECTRICIAN
03/01/2016
$46.17
$13.00
$16.39
$0.00
$75.56
ELECTRICIANS LOCAL 103
Issue Date: 09/12/2016 Wale Request Number: 20160910-002 Page 7 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice- ELECTRICIAN- Local 103
Effective Date - 03/01/2016
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$18.47
$13.00
$0.55
$0.00
$32.02
2
40
$18.47
$13.00
$0.55
$0.00
$32.02
3
45
$20.78
$13.00
$12.34
$0.00
$46.12
4
45
$20.78
$13.00
$12.34
$0.00
$46.12
5
50
$23.09
$13.00
$12.71
$0.00
$48.80
6
55
$25.39
$13.00
$13.07
$0.00
$51.46
7
60
$27.70
$13.00
$13.44
$0.00
$54.14
8
65
$30.01
$13.00
$13.81
$0.00
$56.82
9
70
$32.32
$13.00
$14.18
$0.00
$59.50
10
75
$34.63
$13.00
$14.55
$0.00
$62.18
INotes: :
I
App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80
I
Apprentice
to Journeyworker Ratio:2:3***
ELEVATOR CONSTRUCTOR
ELEVATOR CONSTRUCTORSLOCAL 4
01/01/2016 $54.53 $14.43 $14.96
01/01/2017 $55.86 $15.28 $15.71
Apprentice- ELEVATOR CONSTRUCTOR -Local 4
Effective Date - 01/01/2016
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment
$0.00 $83.92
$0.00 $86.85
Total Rate
1 50
$27.27
$14.43
$0.00
$0.00
$41.70
2 55
$29.99
$14.43
$14.96
$0.00
$59.38
3 65
$35.44
$14.43
$14.96
$0.00
$64.83
4 70
$38.17
$14.43
$14.96
$0.00
$67.56
5 80
$43.62
$14.43
$14.96
$0.00
$73.01
Effective Date - 01/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$27.93
$15.28
$0.00
$0.00
$43.21
2 55
$30.72
$15.28
$15.71
$0.00
$61.71
3 65
$36.31
$15.28
$15.71
$0.00
$67.30
4 70
$39.10
$15.28
$15.71
$0.00
$70.09
5 80
$44.69
$15.28
$15.71
$0.00
$75.68
-----------.-_._.--------..
Notes:
-----_...._.___-,
I
ISteps 1-2 are 6 mos.; Steps 3-5 are 1 year
I
Apprentice to Journeyworker Ratio:i I
ELEVATOR CONSTRUCTOR HELPER 01/01/2016 $38.17 $14.43 $14.96 $0.00 $67.56
ELEVATOR CONSTRUCTORS LOCAL 4
01/01/2017 $39.10 $15.28 $15.71 $0.00 $70.09
For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR"
--------------------------------I-------------------------------------------------------------------------------------- ---------------------
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 8 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
_ Unemployment
FENCE & GUARD RAIL ERECTOR 06/01/2016 $31.90 $7.45 $12.65 $0.00 $52.00
LABORERS - ZONE 2
12/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75
For apprentice rates see "Apprentice- LABORER"
FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY
05/01/2016
$41.03
$10.00
$14.90
$0.00
$65.93
OPERATING ENGINEERS LOCAL 4
11/01/2016
$41.62
$10.00
$14.90
$0.00
$66.52
05/01/2017
$42.50
$10.00
$14.90
$0.00
$67.40
11/01/2017
$43.23
$10.00
$14.90
$0.00
$68.13
05/01/2018
$43.94
$10.00
$14.90
$0.00
$68.84
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
FIELD ENGYARTY CHIEF-BLDG,SITE,HVY/HWY
05/01/2016
$42.47
$10.00
$14.90
$0.00
$67.37
OPERATING ENGINEERS LOCAL 4
11/01/2016
$43.07
$10.00
$14.90
$0.00
$67.97
05/01/2017
$43.96
$10.00
$14.90
$0.00
$68.86
11/01/2017
$44.69
$10.00
$14.90
$0.00
$69.59
05/01/2018
$45.41
$10.00
$14.90
$0.00
$70.31
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY
05/01/2016
$21.88
$10.00
$14.90
$0.00
$46.78
OPERATING ENGINEERS LOCAL 4
11/01/2016
$22.23
$10.00
$14.90
$0.00
$47.13
05/01/2017
$22.76
$10.00
$14.90
$0.00
$47.66
11/01/2017
$23.18
$10.00
$14.90
$0.00
$48.08
05/01/2018
$23.61
$10.00
$14.90
$0.00
$48.51
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
FIRE ALARM INSTALLER
03/01/2016
$46.17
$13.00
$16.39
$0.00
$75.56
ELECTRICIANS LOCAL 103
For apprentice rates see "Apprentice- ELECTRICIAN'
FIRE ALARM REPAIR / MAINTENANCE
03/01/2016
$34.63
$13.00
$14.55
$0.00
$62.18
/ COMMISSIONINGELECTRICIANS
LOCAL 103
For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN"
FIREMAN (ASST. ENGINEER)
06/01/2016
$36.71
$10.00
$15.15
$0.00
$61.86
OPERATING ENGINEERS LOCAL 4
12/01/2016
$37.75
$10.00
$15.15
$0.00
$62.90
06/01/2017
$38.59
$10.00
$15.15
$0.00
$63.74
12/01/2017
$39.42
$10.00
$15.15
$0.00
$64.57
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
FLAGGER & SIGNALER
06/01/2016
$20.50
$7.45
$12.65
$0.00
$40.60
LABORERS - ZONE 2
12/01/2016
$20.50
$7.45
$12.65
$0.00
$40.60
For apprentice rates see "Apprentice- LABORER"
FLOORCOVERER
03/01/2016
$42.13
$9.80
$17.62
$0.00
$69.55
FLOORCOVERERS LOCAL 2168 ZONE I
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 9 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- FLOORCOVERER -Local 2168 Zone I
$44.23
$10.00
$15.15
$0.00
Effective Date - 03/01/2016
12/01/2016
$45.48
$10.00
Supplemental
$0.00
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$21.07
$9.80
$1.79
$0.00
$32.66
2 55
$23.17
$9.80
$1.79
$0.00
$34.76
3 60
$25.28
$9.80
$12.25
$0.00
$47.33
4 65
$27.38
$9.80
$12.25
$0.00
$49.43
5 70
$29.49
$9.80
$14.04
$0.00
$53.33
6 75
$31.60
$9.80
$14.04
$0.00
$55.44
7 80
$33.70
$9.80
$15.83
$0.00
$59.33
8 85
$35.81
$9.80
$15.83
$0.00
$61.44
(Notes:
I
Steps are 750 hrs.
I
Apprentice to Journeyworker Ratio:1:1
FORK LIFT/CHERRY PICKER
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
06/01/2016
$44.23
$10.00
$15.15
$0.00
$69.38
12/01/2016
$45.48
$10.00
$15.15
$0.00
$70.63
06/01/2017
$46.48
$10.00
$15.15
$0.00
$71.63
12/01/2017
$47.48
$10.00
$15.15
$0.00
$72.63
GENERATOR/LIGHTING PLANTMEATERS
06/01/2016
$30.40
$10.00
$15.15
$0.00
$55.55
OPERATING ENGINEERS LOCAL 4
12/01/2016
$31.27
$10.00
$15.15
$0.00
$56.42
06/01/2017
$31.96
$10.00
$15.15
$0.00
$57.11
12/01/2017
$32.65
$10.00
$15.15
$0.00
$57.80
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR
07/01/2016
$39.96
$7.85
$16.10
$0.00
$63.91
SYSTEMS)
GLAZIERS LOCAL 35 (ZONE 2)
01/01/2017
$40.91
$7.85
$16.10
$0.00
$64.86
--------------------- ----------------------------------------------------------------------- - ----------------------------------------------
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 10 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - GLAZIER - Local 35 Zone 2
Effective Date - 07/01/2016
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
50
$19.98
$7.85
$0.00
$0.00
$27.83
2
55
$21.98
$7.85
$3.66
$0.00
$33.49
3
60
$23.98
$7.85
$3.99
$0.00
$35.82
4
65
$25.97
$7.85
$4.32
$0.00
$38.14
5
70
$27.97
$7.85
$14.11
$0.00
$49.93
6
75
$29.97
$7.85
$14.44
$0.00
$52.26
7
80
$31.97
$7.85
$14.77
$0.00
$54.59
8
90
$35.96
$7.85
$15.44
$0.00
$59.25
Effective Date - 01/01/2017
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$20.46
$7.85
$0.00
$0.00
$28.31
2 55
$22.50
$7.85
$3.66
$0.00
$34.01
3 60
$24.55
$7.85
$3.99
$0.00
$36.39
4 65
$26.59
$7.85
$4.32
$0.00
$38.76
5 70
$28.64
$7.85
$14.11
$0.00
$50.60
6 75
$30.68
$7.85
$14.44
$0.00
$52.97
7 80
$32.73
$7.85
$14.77
$0.00
$55.35
8 90
$36.82
$7.85
$15.44
$0.00
$60.11
INotes:
I
ISteps are 750 hrs.
Apprentice to Journeyworker Ratio:1:1
HOISTING ENGINEER/CRANES/GRADALLS
OPERATING ENGINEERS LOCAL 4
06/01/2016
$44.23
$10.00
$15.15
$0.00
$69.38
12/01/2016
$45.48
$10.00
$15.15
$0.00
$70.63
06/01/2017
$46.48
$10.00
$15.15
$0.00
$71.63
12/01/2017
$47.48
$10.00
$15.15
$0.00
$72.63
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 11 of 33
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
Supplemental
Unemployment
Total Rate
$75.56
1 55
Unemployment T
Apprentice- OPERATING ENGINEERS -Local
4
$0.00
$35.01
Effective Date - 06/01/2016
2 60
$27.29
$10.00
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment Total Rate
1 55
$24.33
$10.00
$0.00
$0.00 $34.33
2 60
$26.54
$10.00
$15.15
$0.00 $51.69
3 65
$28.75
$10.00
$15.15
$0.00 $53.90
4 70
$30.96
$10.00
$15.15
$0.00 $56.11
5 75
$33.17
$10.00
$15.15
$0.00 $58.32
6 80
$35.38
$10.00
$15.15
$0.00 $60.53
7 85
$37.60
$10.00
$15.15
$0.00 $62.75
8 90
$39.81
$10.00
$15.15
$0.00 $64.96
Effective Date - 12/01/2016
Step percent
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
$75.56
1 55
$25.01
$10.00
$0.00
$0.00
$35.01
For apprentice rates see "Apprentice- ELECTRICIAN'
2 60
$27.29
$10.00
$15.15
$0.00
$52.44
08/01/2016
3 65
$29.56
$10.00
$15.15
$0.00
SHEETMETAL WORKERS LOCAL 17 -A
$54.71
PIPEFITTERS LOCAL 53 7 (Local 138)
4 70
$31.84
$10.00
$15.15
$0.00
02/01/2017
$56.99
$10.70
5 75
$34.11
$10.00
$15.15
$0.00
$45.51
$59.26
$23.07
6 80
$36.38
$10.00
$15.15
$0.00
$10.70
$61.53
$2.31
7 85
$38.66
$10.00
$15.15
$0.00
$63.81
8 90
$40.93
$10.00
$15.15
$0.00
$66.08
Notes:
I
Apprentice to Journeyworker Ratio:l:6
HVAC (DUCTWORK)
08/01/2016
$43.31
$10.70
$23.07
$2.31
$79.39
SHEETMETAL WORKERS LOCAL 17 - A
02/01/2017
$44.41
$10.70
$23.07
$2.31
$80.49
08/01/2017
$45.51
$10.70
$23.07
$2.31
$81.59
02/01/2018
$46.66
$10.70
$23.07
$2.31
$82.74
For apprentice rates see "Apprentice- SHEET METAL WORKER"
HVAC (ELECTRICAL CONTROLS)
03/01/2016
$46.17
$13.00
$16.39
$0.00
$75.56
ELECTRICIANS LOCAL 103
03/01/2017 $48.86
For apprentice rates see "Apprentice- ELECTRICIAN'
$16.14
$0.00
$74.70
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
HVAC (TESTING AND BALANCING - AIR)
08/01/2016
$43.31
$10.70
$23.07
$2.31
$79.39
SHEETMETAL WORKERS LOCAL 17 -A
$73.70
PIPEFITTERS LOCAL 53 7 (Local 138)
02/01/2017
$44.41
$10.70
$23.07
$2.31
$80.49
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
08/01/2017
$45.51
$10.70
$23.07
$2.31
$81.59
I-------------
20160910-002
02/01/2018
$46.66
$10.70
$23.07
$2.31
$82.74
For apprentice rates see "Apprentice- SHEET METAL WORKER"
HVAC (TESTING AND BALANCING -WATER)
09/01/2016 $47.86
$9.70
$16.14
$0.00
$73.70
PIPEFITTERS LOCAL 53 7 (Local 138)
03/01/2017 $48.86
$9.70
$16.14
$0.00
$74.70
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
HVAC MECHANIC
09/01/2016 $47.86
$9.70
$16.14
$0.00
$73.70
PIPEFITTERS LOCAL 53 7 (Local 138)
03/01/2017 $48.86
$9.70
$16.14
$0.00
$74.70
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
--------------------------------------------------------------------------------------
Issue Date: 09/12/2016 Wage Request Number:
I-------------
20160910-002
-----------------------------------------
Page 12 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
HYDRAULIC DRILLS 06/01/2016 $32.40 $7.45 $12.65 $0.00 $52.50
LABORERS - ZONE 2
12/01/2016 $33.15 $7.45 $12.65 $0.00 $53.25
For apprentice rates see "Apprentice- LABORER"
INSULATOR (PIPES & TANKS)
HEAT & FROST INSULATORS LOCAL 6 (BOSTON)
09/01/2016
$45.09
$11.75
$14.20
$0.00
$71.04
09/01/2017
$47.09
$11.75
$14.20
$0.00
$73.04
09/01/2018
$49.34
$11.75
$14.20
$0.00
$75.29
09/01/2019
$51.84
$11.75
$14.20
$0.00
$77.79
Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston
$23.55
$11.75
$10.45
Effective Date - 09/01/2016
$45.75
2 60
$28.25
Supplemental
$11.20
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$22.55
$11.75
$10.45
$0.00
$44.75
2 60
$27.05
$11.75
$11.20
$0.00
$50.00
3 70
$31.56
$11.75
$11.95
$0.00
$55.26
4 80
$36.07
$11.75
$12.70
$0.00
$60.52
Effective Date - 09/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$23.55
$11.75
$10.45
$0.00
$45.75
2 60
$28.25
$11.75
$11.20
$0.00
$51.20
3 70
$32.96
$11.75
$11.95
$0.00
$56.66
4 80
$37.67
$11.75
$12.70
$0.00
$62.12
(Notes: I
ISteps are 1 year I
Apprentice to Journeyworker Ratio:l:4
IRONWORKER/WELDER 03/16/2016 $38.99 $7.80 $20.85 $0.00 $67.64
IRONWORKERS LOCAL 7 (LAWRENCE AREA) 09/16/2016 $39.64 $7.80 $20.85 $0.00 $68.29
03/16/2017 $40.24 $7.80 $20.85 $0.00 $68.89
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Pa ze,
13 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- IRONWORKER -Local 7 Lawrence
Effective Date - 03/16/2016
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
60
$23.39
$7.80
$20.85
$0.00
$52.04
2
70
$27.29
$7.80
$20.85
$0.00
$55.94
3
75
$29.24
$7.80
$20.85
$0.00
$57.89
4
80
$31.19
$7.80
$20.85
$0.00
$59.84
5
85
$33.14
$7.80
$20.85
$0.00
$61.79
6
90
$35.09
$7.80
$20.85
$0.00
$63.74
Effective Date - 09/16/2016
12/01/2016
$32.40
$7.45
Supplemental
$0.00
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$23.78
$7.80
$20.85
$0.00
$52.43
2 70
$27.75
$7.80
$20.85
$0.00
$56.40
3 75
$29.73
$7.80
$20.85
$0.00
$58.38
4 80
$31.71
$7.80
$20.85
$0.00
$60.36
5 85
$33.69
$7.80
$20.85
$0.00
$62.34
6 90
$35.68
$7.80
$20.85
$0.00
$64.33
Notes:
I
Structural 1:6; Ornamental 1:4
12/01/2016
$32.40
$7.45
$12.65
$0.00
$52.50
Apprentice to Journeyworker Ratio:
JACKHAMMER & PAVING BREAKER OPERATOR
06/01/2016
$31.90
$7.45
$12.65
$0.00
$52.00
LABORERS - ZONE 2
12/01/2016
$32.65
$7.45
$12.65
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
LABORER
06/01/2016
$31.65
$7.45
$12.65
$0.00
$51.75
LABORERS - ZONE 2
12/01/2016
$32.40
$7.45
$12.65
$0.00
$52.50
----------------------------------------------------------------- --------------------------------------------------------------------------
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 14 of 33
Classification
Apprentice - LABORER - Zone 2
Effective Date - 06/01/2016
Step percent
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice Base Wage Health
Supplemental
Pension Unemployment Total Rate
1 60
$18.99
$7.45
$12.65
$0.00
$39.09
2 70
$22.16
$7.45
$12.65
$0.00
$42.26
3 80
$25.32
$7.45
$12.65
$0.00
$45.42
4 90
$28.49
$7.45
$12.65
$0.00
$48.59
Effective Date - 12/01/2016
12/01/2015
$31.35
$7.45
Supplemental
$0.00
$51.40
LABORERS - ZONE 2
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
For apprentice rates see "Apprentice- LABORER"
1 60
$19.44
$7.45
$12.65
$0.00
$39.54
06/01/2016
2 70
$22.68
$7.45
$12.65
$0.00
LABORERS - ZONE 2
$42.78
3 80
$25.92
$7.45
$12.65
$0.00
12/01/2016
$46.02
$7.45
4 90
$29.16
$7.45
$12.65
$0.00
$49.26
[Notes:
LABORER: MULTI -TRADE TENDER
06/01/2016
$31.65
$7.45
I
$0.00
�-- -
-----------------.--
12/01/2016
$32.40
$7.45
$12.65
I
$52.50
Apprentice to Journeyworker Ratio: 1:5
LABORER: TREE REMOVER
LABORER: CARPENTER TENDER
06/01/2016
$31.65
$7.45
$12.65
$0.00
LABORERS - ZONE 2
$51.75
LABORERS - ZONE 2
12/01/2016
$32.40
$7.45
12/01/2016
$32.40
$7.45
$12.65
$0.00
$52.50
For apprentice rates see "Apprentice- LABORER"
LASER BEAM OPERATOR
06/01/2016
$31.90
$7.45
$12.65
$0.00
LABORER: CEMENT FINISHER TENDER
06/01/2016
$31.65
$7.45
$12.65
$0.00
$51.75
LABORERS - ZONE 2
12/01/2016
$32.65
$7.45
$12.65
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
12/01/2016
$32.40
$7.45
$12.65
$0.00
MARBLE & TILE FINISHERS
$52.50
For apprentice rates see "Apprentice- LABORER"
$10.18
$17.78
$0.00
$66.74
BRICKLAYERS LOCAL 3 - MARBLE & TILE
LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER
12/01/2015
$31.35
$7.45
$12.60
$0.00
$51.40
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
LABORER: MASON TENDER
06/01/2016
$31.90
$7.45
$12.65
$0.00
$52.00
LABORERS - ZONE 2
12/01/2016
$32.65
$7.45
$12.65
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
LABORER: MULTI -TRADE TENDER
06/01/2016
$31.65
$7.45
$12.65
$0.00
$51.75
LABORERS - ZONE 2
12/01/2016
$32.40
$7.45
$12.65
$0.00
$52.50
For apprentice rates see "Apprentice- LABORER"
LABORER: TREE REMOVER
06/01/2016
$31.65
$7.45
$12.65
$0.00
$51.75
LABORERS - ZONE 2
12/01/2016
$32.40
$7.45
$12.65
$0.00
$52.50
This classification applies to all tree work associated with the removal of standing trees, and trimming and removal
of branches and limbs when the work is not done for
a utility company for the purpose of operation, maintenance or repair of utility company equipment. For apprentice rates see "Apprentice- LABORER"
LASER BEAM OPERATOR
06/01/2016
$31.90
$7.45
$12.65
$0.00
$52.00
LABORERS - ZONE 2
12/01/2016
$32.65
$7.45
$12.65
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
MARBLE & TILE FINISHERS
08/01/2016
$38.78
$10.18
$17.78
$0.00
$66.74
BRICKLAYERS LOCAL 3 - MARBLE & TILE
02/01/2017
$39.24
$10.18
$17.78
$0.00
$67.20
IssueDate: 09/12/2016 Wage Request Number: 20160910-002 Page 15 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile
Effective Date - 08/01/2016
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$19.39
$10.18
$17.78
$0.00
$47.35
2 60
$23.27
$10.18
$17.78
$0.00
$51.23
3 70
$27.15
$10.18
$17.78
$0.00
$55.11
4 80
$31.02
$10.18
$17.78
$0.00
$58.98
5 90
$34.90
$10.18
$17.78
$0.00
$62.86
Effective Date - 02/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$19.62
$10.18
$17.78
$0.00
$47.58
2 60
$23.54
$10.18
$17.78
$0.00
$51.50
3 70
$27.47
$10.18
$17.78
$0.00
$55.43
4 80
$31.39
$10.18
$17.78
$0.00
$59.35
5 90
$35.32
$10.18
$17.78
$0.00
$63.28
- - - - - - - - - - -
(Notes:
- - - -
- - - -
- - - -
- - -
- ---.I
I
I
$19.22
$0.00
$54.80
2 60
$30.48
Apprentice to Journeyworker Ratio.f-3
$19.22
$0.00
$59.88
3 70
$35.56
MARBLE MASONS,TILELAYERS & TERRAZZO MECH
08/01/2016
$50.80
$10.18
$19.22
$0.00 $80.20
BRICKLAYERS LOCAL 3 - MARBLE & TILE
$30.82
$10.18
$19.22
$0.00
$60.22
3 70
02/01/2017
$51.37
$10.18
$19.22
$0.00 $80.77
Apprentice - MARBLE -TILE -TERRAZZO MECHANIC - Local 3 Marble & Tile
$41.10
$10.18
$19.22
Effective Date - 08/01/2016
$70.50
5 90
$46.23
Supplemental
$19.22
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$25.40
$10.18
$19.22
$0.00
$54.80
2 60
$30.48
$10.18
$19.22
$0.00
$59.88
3 70
$35.56
$10.18
$19.22
$0.00
$64.96
4 80
$40.64
$10.18
$19.22
$0.00
$70.04
5 90
$45.72
$10.18
$19.22
$0.00
$75.12
Effective Date - 02/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$25.69
$10.18
$19.22
$0.00
$55.09
2 60
$30.82
$10.18
$19.22
$0.00
$60.22
3 70
$35.96
$10.18
$19.22
$0.00
$65.36
4 80
$41.10
$10.18
$19.22
$0.00
$70.50
5 90
$46.23
$10.18
$19.22
$0.00
$75.63
(Notes:
I
-..------------------
Apprentice to Journeyworker Ratio:1:5
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 09/12/2016
Wage Request Number: 20160910-002
Page 16 of 33
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$45.04
$10.00
$15.15
$0.00
$70.19
Unemployment
$46.03
MECH. SWEEPER OPERATOR (ON CONST. SITES)
06/01/2016
$43.81
$10.00
$15.15
$0.00
$68.96
OPERATING ENGINEERS LOCAL 4
$0.00
$72.17
- - - - - - - - - - -
(Notes:
- - - - -
- - -
- - - -
- - -
12/01/2016
$45.04
$10.00
$15.15
$0.00
$70.19
06/01/2017
$46.03
$10.00
$15.15
$0.00
$71.18
12/01/2017
$47.02
$10.00
$15.15
$0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
MECHANICS MAINTENANCE
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
06/01/2016
$43.81
$10.00
$15.15
$0.00
$68.96
12/01/2016
$45.04
$10.00
$15.15
$0.00
$70.19
06/01/2017
$46.03
$10.00
$15.15
$0.00
$71.18
12/01/2017
$47.02
$10.00
$15.15
$0.00
$72.17
MILLWRIGHT (Zone 2) 04/01/2015 $34.69 $9.80 $16.21 $0.00
MILLWRIGHTS LOCAL 1121 - Zone 2
Apprentice- MILLWRIGHT -Local 1121 Zone 2
Effective Date - 04/01/2015
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 55
$19.08
$9.80
$4.48
$0.00
$33.36
2 65
$22.55
$9.80
$13.36
$0.00
$45.71
3 75
$26.02
$9.80
$14.18
$0.00
$50.00
4 85
$29.49
$9.80
$14.99
$0.00
$54.28
- - - - - - - - - - -
(Notes:
- - - - -
- - -
- - - -
- - -
- _-I
I
ISteps are 2,000 hours
$10.00
$15.15
$0.00
$48.21
Apprentice to Journeyworker Ratio: .5
$23.57
$10.00
$15.15
$0.00
$48.72
$60.70
MORTAR MIXER
06/01/2016
$31.90
$7.45
$12.65
$0.00
$52.00
LABORERS - ZONE 2
12/01/2016
$32.65
$7.45
$12.65
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
OILER (OTHER THAN TRUCK CRANES,GRADALLS)
06/01/2016
$22.41
$10.00
$15.15
$0.00
$47.56
OPERATING ENGINEERS LOCAL 4
12/01/2016
$23.06
$10.00
$15.15
$0.00
$48.21
06/01/2017
$23.57
$10.00
$15.15
$0.00
$48.72
12/01/2017
$24.09
$10.00
$15.15
$0.00
$49.24
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
OILER (TRUCK CRANES, GRADALLS)
06/01/2016
$26.29
$10.00
$15.15
$0.00
$51.44
OPERATING ENGINEERS LOCAL 4
12/01/2016
$27.04
$10.00
$15.15
$0.00
$52.19
06/01/2017
$27.64
$10.00
$15.15
$0.00
$52.79
12/01/2017
$28.25
$10.00
$15.15
$0.00
$53.40
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
OTHER POWER DRIVEN EQUIPMENT - CLASS II
06/01/2016
$43.81
$10.00
$15.15
$0.00
$68.96
OPERATING ENGINEERS LOCAL 4
12/01/2016
$45.04
$10.00
$15.15
$0.00
$70.19
06/01/2017
$46.03
$10.00
$15.15
$0.00
$71.18
12/01/2017
$47.02
$10.00
$15.15
$0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
PAINTER (BRIDGES/TANKS)
07/01/2016
$50.46
$7.85
$16.10
$0.00
$74.41
PAINTERS LOCAL 35 - ZONE 2
01/01/2017
$51.41
$7.85
$16.10
$0.00
$75.36
IssueDate: 09/12/2016 Wage Request Number: 20160910-002 Page 17 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice - PAINTER Local 35 - BRIDGES/TANKS
Effective Date - 07/01/2016
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
50
$25.23
$7.85
$0.00
$0.00
$33.08
2
55
$27.75
$7.85
$3.66
$0.00
$39.26
3
60
$30.28
$7.85
$3.99
$0.00
$42.12
4
65
$32.80
$7.85
$4.32
$0.00
$44.97
5
70
$35.32
$7.85
$14.11
$0.00
$57.28
6
75
$37.85
$7.85
$14.44
$0.00
$60.14
7
80
$40.37
$7.85
$14.77
$0.00
$62.99
8
90
$45.41
$7.85
$15.44
$0.00
$68.70
Effective Date - 01/01/2017
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
50
$25.71
$7.85
$0.00
$0.00
$33.56
2
55
$28.28
$7.85
$3.66
$0.00
$39.79
3
60
$30.85
$7.85
$3.99
$0.00
$42.69
4
65
$33.42
$7.85
$4.32
$0.00
$45.59
5
70
$35.99
$7.85
$14.11
$0.00
$57.95
6
75
$38.56
$7.85
$14.44
$0.00
$60.85
7
80
$41.13
$7.85
$14.77
$0.00
$63.75
8
90
$46.27
$7.85
$15.44
$0.00
$69.56
Notes:
Steps are 750 hrs.
Apprentice to Journeyworker Ratio: 1:1
PAINTER (SPRAY OR SANDBLAST, NEW) *
* If 30% or more of surfaces to be painted are new construction,
NEW paint rate shall be used.PAINTERS LOCAL 35 - ZONE 2
07/01/2016 $41.36 $7.85 $16.10 $0.00 $65.31
01/01/2017 $42.31 $7.85 $16.10 $0.00 $66.26
---------- - ---------------------------------------------------------------------------------------------------------------------------------
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 18 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 Zone 2 -
Spray/Sandblast - New
Effective Date - 07/01/2016
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$20.68
$7.85
$0.00
$0.00
$28.53
2 55
$22.75
$7.85
$3.66
$0.00
$34.26
3 60
$24.82
$7.85
$3.99
$0.00
$36.66
4 65
$26.88
$7.85
$4.32
$0.00
$39.05
5 70
$28.95
$7.85
$14.11
$0.00
$50.91
6 75
$31.02
$7.85
$14.44
$0.00
$53.31
7 80
$33.09
$7.85
$14.77
$0.00
$55.71
8 90
$37.22
$7.85
$15.44
$0.00
$60.51
Effective Date - 01/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$21.16
$7.85
$0.00
$0.00
$29.01
2 55
$23.27
$7.85
$3.66
$0.00
$34.78
3 60
$25.39
$7.85
$3.99
$0.00
$37.23
4 65
$27.50
$7.85
$4.32
$0.00
$39.67
5 70
$29.62
$7.85
$14.11
$0.00
$51.58
6 75
$31.73
$7.85
$14.44
$0.00
$54.02
7 80
$33.85
$7.85
$14.77
$0.00
$56.47
8 90
$38.08
$7.85
$15.44
$0.00
$61.37
.._. - _ _-___..__.- _ _ - - - __...- - ` _- _ -. _..- _ _ _ - _ ... _,
(Notes:
ISteps are 750 hrs.
Apprentice to Journeyworker Ratio: 1:1
PAINTER (SPRAY OR SANDBLAST, REPAINT)
PAINTERS LOCAL 35 - ZONE 2
07/01/2016 $39.42 $7.85 $16.10 $0.00 $63.37
01/01/2017 $40.37 $7.85 $16.10 $0.00 $64.32
IssueDate: 09/12/2016 Wage Request Number: 20160910-002 Page 19 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - Repaint
Effective Date - 07/01/2016 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$19.71
$7.85
$0.00
$0.00
$27.56
2 55
$21.68
$7.85
$3.66
$0.00
$33.19
3 60
$23.65
$7.85
$3.99
$0.00
$35.49
4 65
$25.62
$7.85
$4.32
$0.00
$37.79
5 70
$27.59
$7.85
$14.11
$0.00
$49.55
6 75
$29.57
$7.85
$14.44
$0.00
$51.86
7 80
$31.54
$7.85
$14.77
$0.00
$54.16
8 90
$35.48
$7.85
$15.44
$0.00
$58.77
Effective Date - 01/01/2017
Supplemental
Step percent Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$20.19
$7.85
$0.00
$0.00
$28.04
2 55
$22.20
$7.85
$3.66
$0.00
$33.71
3 60
$24.22
$7.85
$3.99
$0.00
$36.06
4 65
$26.24
$7.85
$4.32
$0.00
$38.41
5 70
$28.26
$7.85
$14.11
$0.00
$50.22
6 75
$30.28
$7.85
$14.44
$0.00
$52.57
7 80
$32.30
$7.85
$14.77
$0.00
$54.92
8 90
$36.33
$7.85
$15.44
$0.00
$59.62
Notes:
Steps are 750 hrs.
Apprentice to Journeyworker Ratio:l:l
PAINTER (TRAFFIC MARKINGS)
06/01/2016
$31.65
$7.45
$12.65
$0.00
$51.75
LABORERS - ZONE 2
12/01/2016
$32.40
$7.45
$12.65
$0.00
$52.50
For Apprentice rates see "Apprentice- LABORER"
PAINTER / TAPER (BRUSH, NEW) *
07/01/2016
$39.96
$7.85
$16.10
$0.00
$63.91
* If 30% or more of surfaces to be painted are new construction,
01/01/2017
$40.91
$7.85
$16.10
$0.00
$64.86
NEW paint rate shall be used.PA1NTERS LOCAL 35 - ZONE 2
------- ----------------------------------------------------------------------------------------------------------------------------------
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 20 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW
Effective Date - 07/01/2016
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
50
$19.98
$7.85
$0.00
$0.00
$27.83
2
55
$21.98
$7.85
$3.66
$0.00
$33.49
3
60
$23.98
$7.85
$3.99
$0.00
$35.82
4
65
$25.97
$7.85
$4.32
$0.00
$38.14
5
70
$27.97
$7.85
$14.11
$0.00
$49.93
6
75
$29.97
$7.85
$14.44
$0.00
$52.26
7
80
$31.97
$7.85
$14.77
$0.00
$54.59
8
90
$35.96
$7.85
$15.44
$0.00
$59.25
Effective Date - 01/01/2017
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
50
$20.46
$7.85
$0.00
$0.00
$28.31
2
55
$22.50
$7.85
$3.66
$0.00
$34.01
3
60
$24.55
$7.85
$3.99
$0.00
$36.39
4
65
$26.59
$7.85
$4.32
$0.00
$38.76
5
70
$28.64
$7.85
$14.11
$0.00
$50.60
6
75
$30.68
$7.85
$14.44
$0.00
$52.97
7
80
$32.73
$7.85
$14.77
$0.00
$55.35
8
90
$36.82
$7.85
$15.44
$0.00
$60.11
(Notes:
I
Steps are 750 hrs.
I
Apprentice to Journeyworker Ratio:1
PAINTER / TAPER (BRUSH, REPAINT)
PAINTERS LOCAL 35 - ZONE 2
07/01/2016 $38.02 $7.85 $16.10 $0.00 $61.97
01/01/2017 $38.97 $7.85 $16.10 $0.00 $62.92
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 21 of 33
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$0.00
$27.34
2 55
$21.43
Unemplovment
Apprentice- PAINTER Local 35 Zone 2
-BRUSH REPAINT
$32.94
3 60
$23.38
Effective Date - 07/01/2016
$3.99
$0.00
$35.22
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment Total Rate
1 50
$19.01
$7.85
$0.00
$0.00 $26.86
2 55
$20.91
$7.85
$3.66
$0.00 $32.42
3 60
$22.81
$7.85
$3.99
$0.00 $34.65
4 65
$24.71
$7.85
$4.32
$0.00 $36.88
5 70
$26.61
$7.85
$14.11
$0.00 $48.57
6 75
$28.52
$7.85
$14.44
$0.00 $50.81
7 80
$30.42
$7.85
$14.77
$0.00 $53.04
8 90
$34.22
$7.85
$15.44
$0.00 $57.51
Effective Date - 01/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$19.49
$7.85
$0.00
$0.00
$27.34
2 55
$21.43
$7.85
$3.66
$0.00
$32.94
3 60
$23.38
$7.85
$3.99
$0.00
$35.22
4 65
$25.33
$7.85
$4.32
$0.00
$37.50
5 70
$27.28
$7.85
$14.11
$0.00
$49.24
6 75
$29.23
$7.85
$14.44
$0.00
$51.52
7 80
$31.18
$7.85
$14.77
$0.00
$53.80
8 90
$35.07
$7.85
$15.44
$0.00
$58.36
Notes:
Steps are 750 hrs.
I
�-- - -------------------
Apprentice to Journeyworker Ratio:l:l
PANEL & PICKUP TRUCKS DRIVER
12/01/2012
$30.28
$9.07
$8.00
$0.00 $47.35
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2015 $42.04 $9.80 $19.23 $0.00 $71.07
DECK)
PILEDRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
PILE DRIVER
PILEDRIVER LOCAL 56 (ZONE 1)
08/01/2015 $42.04 $9.80 $19.23 $0.00 $71.07
------------------- - -- - ------------------------------------------------------------------------------------------------------- -----------
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 22 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- PILEDRIVER -Local 56 Zone 1
Effective Date - 08/01/2015
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$21.02
$9.80
$19.23
$0.00
$50.05
2 60
$25.22
$9.80
$19.23
$0.00
$54.25
3 70
$29.43
$9.80
$19.23
$0.00
$58.46
4 75
$31.53
$9.80
$19.23
$0.00
$60.56
5 80
$33.63
$9.80
$19.23
$0.00
$62.66
6 80
$33.63
$9.80
$19.23
$0.00
$62.66
7 90
$37.84
$9.80
$19.23
$0.00
$66.87
8 90
$37.84
$9.80
$19.23
$0.00
$66.87
INotes:
I
I
** 1:3; 3:15; 1:10 thereafter / Steps
are I yr.
I
Apprentice to Journeyworker Ratio:1:3
I
Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max)
I
PIPEFITTER & STEAMFITTER
09/01/2016
$47.86
$9.70
$16.14
$0.00 $73.70
PIPEFITTERS LOCAL 53 7 (Local 138)
03/01/2017
$48.86
$9.70
$16.14
$0.00 $74.70
Apprentice- PIPEFI7TER Local 537 (Local 138)
Effective Date - 09/01/2016
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 40
$19.14
$9.70
$5.50
$0.00
$34.34
2 45
$21.54
$9.70
$16.14
$0.00
$47.38
3 60
$28.72
$9.70
$16.14
$0.00
$54.56
4 70
$33.50
$9.70
$16.14
$0.00
$59.34
5 80
$38.29
$9.70
$16.14
$0.00
$64.13
Effective Date - 03/01/2017
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
40
$19.54
$9.70
$5.50
$0.00
$34.74
2
45
$21.99
$9.70
$16.14
$0.00
$47.83
3
60
$29.32
$9.70
$16.14
$0.00
$55.16
4
70
$34.20
$9.70
$16.14
$0.00
$60.04
5
80
$39.09
$9.70
$16.14
$0.00
$64.93
INotes:
I
** 1:3; 3:15; 1:10 thereafter / Steps
are I yr.
I
Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max)
I
Apprentice to Journeyworker Ratio:**
PIPELAYER 06/01/2016 $31.90 $7.45 $12.65 $0.00 $52.00
LABORERS - ZONE 2
12/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75
For apprentice rates see "Apprentice- LABORER"
PLUMBER 09/01/2016 $47.61 $11.32 $15.46 $0.00 $74.39
PLUMBERS & GASFITTEPSL0CAL 12 (Local 13 8) 03/01/2017 $48.61 $11.32 $15.46 $0.00 $75.39
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 23 of 33
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$0.00
$34.07
2 40
$19.44
Unemployment
$6.49
$0.00
$37.25
3 55
$26.74
Apprentice- PLUMBERIGASFITTER
-Local 12 (Local 138)
$0.00
$46.79
4 65
Effective Date - 09/01/2016
$11.32
$10.23
$0.00
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment Total Rate
1 35
$16.66
$11.32
$5.74
$0.00 $33.72
2 40
$19.04
$11.32
$6.49
$0.00 $36.85
3 55
$26.19
$11.32
$8.73
$0.00 $46.24
4 65
$30.95
$11.32
$10.23
$0.00 $52.50
5 75
$35.71
$11.32
$11.72
$0.00 $58.75
Effective Date - 03/01/2017
POWER SHOVEL/DERRICK/TRENCHING MACHINE
06/01/2016
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment Total Rate
1 35
$17.01
$11.32
$5.74
$0.00
$34.07
2 40
$19.44
$11.32
$6.49
$0.00
$37.25
3 55
$26.74
$11.32
$8.73
$0.00
$46.79
4 65
$31.60
$11.32
$10.23
$0.00
$53.15
5 75
$36.46
$11.32
$11.72
$0.00
$59.50
Notes:
$7.45
$12.65
$0.00
$52.75
I
Steps are 1 yr
I Step 4 with lic$55.65 Step5 with lic$61.89
12/01/2016
$33.40
$7.45
$12.65
$0.00
$53.50
For apprentice rates see "Apprentice- LABORER"
Apprentice to Journeyworker Ratio: 1:
POWER SHOVEL/DERRICK/TRENCHING MACHINE
06/01/2016
$44.23
$10.00
PNEUMATIC CONTROLS (TEMP.)
09/01/2016
$47.86
$9.70
$16.14 $0.00
$73.70
PIPEFITTERS LOCAL 53 7 (Local 138)
12/01/2016
$45.48
03/01/2017
$48.86
$9.70
$16.14 $0.00
$74.70
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
$46.48
$10.00
$15.15
$0.00
$71.63
PNEUMATIC DRILL/TOOL OPERATOR
06/01/2016
$31.90
$7.45
$12.65
$0.00
$52.00
LABORERS - ZONE 2
12/01/2016
$32.65
$7.45
$12.65
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
POWDERMAN & BLASTER
06/01/2016
$32.65
$7.45
$12.65
$0.00
$52.75
LABORERS - ZONE 2
12/01/2016
$33.40
$7.45
$12.65
$0.00
$53.50
For apprentice rates see "Apprentice- LABORER"
POWER SHOVEL/DERRICK/TRENCHING MACHINE
06/01/2016
$44.23
$10.00
$15.15
$0.00
$69.38
OPERATING ENGINEERS LOCAL 4
12/01/2016
$45.48
$10.00
$15.15
$0.00
$70.63
06/01/2017
$46.48
$10.00
$15.15
$0.00
$71.63
12/01/2017
$47.48
$10.00
$15.15
$0.00
$72.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
PUMP OPERATOR (CONCRETE)
06/01/2016
$44.23
$10.00
$15.15
$0.00
$69.38
OPERATING ENGINEERS LOCAL 4
12/01/2016
$45.48
$10.00
$15.15
$0.00
$70.63
06/01/2017
$46.48
$10.00
$15.15
$0.00
$71.63
12/01/2017
$47.48
$10.00
$15.15
$0.00
$72.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
PUMP OPERATOR (DEWATERING, OTHER)
06/01/2016
$30.40
$10.00
$15.15
$0.00
$55.55
OPERATING ENGINEERS LOCAL 4
12/01/2016
$31.27
$10.00
$15.15
$0.00
$56.42
06/01/2017
$31.96
$10.00
$15.15
$0.00
$57.11
12/01/2017
$32.65
$10.00
$15.15
$0.00
$57.80
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 24 of 33
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
-n
READY -MIX CONCRETE DRIVER 05/01/2016
$24.15
$8.49
$10.68
$0.00
$43.32
TEAMSTERS LOCAL 42
$46.03
$10.00
$15.15
$0.00
$71.18
04/30/2017
$24.15
$8.49
$11.07
$0.00
$43.71
05/01/2017
$24.21
$8.49
$11.54
$0.00
$44.24
04/30/2018
$24.21
$8.49
$11.96
$0.00
$44.66
05/01/2018
$24.24
$8.49
$12.46
$0.00
$45.19
04/30/2019
$24.24
$8.49
$12.92
$0.00
$45.65
RECLAIMERS
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
06/01/2016
$43.81
$10.00
$15.15
$0.00
$68.96
12/01/2016
$45.04
$10.00
$15.15
$0.00
$70.19
06/01/2017
$46.03
$10.00
$15.15
$0.00
$71.18
12/01/2017
$47.02
$10.00
$15.15
$0.00
$72.17
RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2015 $25.25 $9.80 $16.82 $0.00 $51.87
CARPENTERS -ZONE 2 (Residential Wood)
RESIDENTIAL WOOD FRAME CARPENTER ** 04/01/2015 $25.30 $7.00 $6.31 $0.00 $38.61
** The Residential Wood Frame Carpenter classification applies
only to the construction of new, wood frame residences that do
not exceed four stories including the basement. CARPENTERS -ZONE
2 (Residential Wood)
As of 9/1/09 Carpentry work on wood -frame residential WEATBERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate.
Apprentice- CARPENTER (Residential Wood Frame) -Zone 2
Effective Date - 04/01/2015
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$15.18
$7.00
$0.00
$0.00
$22.18
2 60
$15.18
$7.00
$0.00
$0.00
$22.18
3 65
$16.45
$7.00
$6.31
$0.00
$29.76
4 70
$17.71
$7.00
$6.31
$0.00
$31.02
5 75
$18.98
$7.00
$6.31
$0.00
$32.29
6 80
$20.24
$7.00
$6.31
$0.00
$33.55
7 85
$21.51
$7.00
$6.31
$0.00
$34.82
8 90
$22.77
$7.00
$6.31
$0.00
$36.08
(Notes:
I
I
Apprentice to Journeyworker Ratio:1:5
RIDE -ON MOTORIZED BUGGY OPERATOR 06/01/2016 $31.90 $7.45 $12.65 $0.00 $52.00
LABORERS - ZONE 2
12/01/2016 $32.65 $7.45 $12.65 $0.00 $52.75
For apprentice rates see "Apprentice- LABORER"
ROLLER/SPREADER/MULCHING MACHINE
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
06/01/2016
$43.81
$10.00
$15.15
$0.00
$68.96
12/01/2016
$45.04
$10.00
$15.15
$0.00
$70.19
06/01/2017
$46.03
$10.00
$15.15
$0.00
$71.18
12/01/2017
$47.02
$10.00
$15.15
$0.00
$72.17
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 25 of 33
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg) 08/01/2016
$41.11
$11.00
$13.00
$0.00
$65.1 r
ROOFERS LOCAL 33
$26.72
$11.00
$13.00
$0.00
$50.72
02/01/2017
$42.26
$11.00
$13.00
$0.00
$66.26
08/01/2017
$43.36
$11.00
$13.00
$0.00
$67.36
02/01/2018
$44.51
$11.00
$13.00
$0.00
$68.51
08/01/2018
$45.61
$11.00
$13.00
$0.00
$69.61
02/01/2019
$46.76
$11.00
$13.00
$0.00
$70.76
Apprentice - ROOFER - Local 33
Effective Date - 08/01/2016
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$20.56
$11.00
$3.44
$0.00
$35.00
2 60
$24.67
$11.00
$13.00
$0.00
$48.67
3 65
$26.72
$11.00
$13.00
$0.00
$50.72
4 75
$30.83
$11.00
$13.00
$0.00
$54.83
5 85
$34.94
$11.00
$13.00
$0.00
$58.94
Effective Date - 02/01/2017
Supplemental
Step percent Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$21.13
$11.00
$3.44
$0.00
$35.57
2 60
$25.36
$11.00
$13.00
$0.00
$49.36
3 65
$27.47
$11.00
$13.00
$0.00
$51.47
4 75
$31.70
$11.00
$13.00
$0.00
$55.70
5 85
$35.92
$11.00
$13.00
$0.00
$59.92
'Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1
I
Step 1 is 2000 hrs.; Steps 2-5 are 1000 hrs.
I
Apprentice to Journeyworker Ratio:**
ROOFER SLATE / TILE / PRECAST CONCRETE
08/01/2016
$41.36
$11.00
$13.00
$0.00
$65.36
ROOFERS LOCAL 33
02/01/2017
$42.51
$11.00
$13.00
$0.00
$66.51
08/01/2017
$43.61
$11.00
$13.00
$0.00
$67.61
02/01/2018
$44.76
$11.00
$13.00
$0.00
$68.76
08/01/2018
$45.86
$11.00
$13.00
$0.00
$69.86
02/01/2019
$47.01
$11.00
$13.00
$0.00
$71.01
For apprentice rates see "Apprentice- ROOFER"
SHEETMETAL WORKER
08/01/2016
$43.31
$10.70
$23.07
$2.31
$79.39
SHEETMETAL WORKERS LOCAL 17 -A
02/01/2017
$44.41
$10.70
$23.07
$2.31
$80.49
08/01/2017
$45.51
$10.70
$23.07
$2.31
$81.59
02/01/2018
$46.66
$10.70
$23.07
$2.31
$82.74
---------------------------------------------------------------------------------I-----------------------------------------------------------
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 26 of 33
Classification
v
Apprentice- SHEET METAL WORKER
Effective Date - 08/01/2016
Step percent
Effective Date Base Wage
-Local 17-A
Apprentice Base Wage Health
Health
Pension
Pension Supplemental Total Rate
Unemployment
Supplemental
Unemployment Total Rate
1 40
$17.32
$10.70
$5.24
$0.00
$33.26
2 40
$17.32
$10.70
$5.24
$0.00
$33.26
3 45
$19.49
$10.70
$10.31
$1.21
$41.71
4 45
$19.49
$10.70
$10.31
$1.21
$41.71
5 50
$21.66
$10.70
$11.21
$1.31
$44.88
6 50
$21.66
$10.70
$11.46
$1.31
$45.13
7 60
$25.99
$10.70
$13.02
$1.49
$51.20
8 65
$28.15
$10.70
$13.93
$1.58
$54.36
9 75
$32.48
$10.70
$15.74
$1.77
$60.69
10 85
$36.81
$10.70
$17.05
$1.94
$66.50
Effective Date - 02/01/2017
$37.75
$10.70
$17.05
Supplemental
$67.47
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
40
$17.76
$10.70
$5.24
$0.00
$33.70
2
40
$17.76
$10.70
$5.24
$0.00
$33.70
3
45
$19.98
$10.70
$10.31
$1.23
$42.22
4
45
$19.98
$10.70
$10.31
$1.23
$42.22
5
50
$22.21
$10.70
$11.21
$1.32
$45.44
6
50
$22.21
$10.70
$11.46
$1.33
$45.70
7
60
$26.65
$10.70
$13.02
$1.51
$51.88
8
65
$28.87
$10.70
$13.93
$1.61
$55.11
9
75
$33.31
$10.70
$15.74
$1.79
$61.54
10
85
$37.75
$10.70
$17.05
$1.97
$67.47
INotes:
ISteps
are 6 mos.
Apprentice to Journeyworker Ratio:1:4
SIGN ERECTOR
PAINTERS LOCAL 35 - ZONE 2
06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 27 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment I
• a <
Apprentice- SIGN ERECTOR -Local 35 Zone 2
08/01/2016
$32.44
$10.91
$10.08
Effective Date - 06/01/2013
$53.43
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$12.91
$7.07
$0.00
$0.00
$19.98
2 55
$14.20
$7.07
$2.45
$0.00
$23.72
3 60
$15.49
$7.07
$2.45
$0.00
$25.01
4 65
$16.78
$7.07
$2.45
$0.00
$26.30
5 70
$18.07
$7.07
$7.05
$0.00
$32.19
6 75
$19.36
$7.07
$7.05
$0.00
$33.48
7 80
$20.65
$7.07
$7.05
$0.00
$34.77
8 85
$21.94
$7.07
$7.05
$0.00
$36.06
9 90
$23.23
$7.07
$7.05
$0.00
$37.35
INotes:
ISteps are 4 mos.
Apprentice to Journeyworker Ratio. .I
SPECIALIZED EARTH MOVING EQUIP < 35 TONS
08/01/2016
$32.44
$10.91
$10.08
$0.00
$53.43
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
12/01/2016
$32.44
$10.91
$10.89
$0.00
$54.24
SPECIALIZED EARTH MOVING EQUIP > 35 TONS
08/01/2016
$32.73
$10.91
$10.08
$0.00
$53.72
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
12/01/2016
$32.73
$10.91
$10.89
$0.00
$54.53
SPRINKLER FITTER
03/01/2016
$48.99
$8.67
$16.80
$0.00
$74.46
SPRINKLER FITTERS LOCAL 550 - (Section B) Zone 2
10/01/2016
$49.98
$8.67
$16.80
$0.00
$75.45
03/01/2017 $50.88 $8.67 $16.80 $0.00 $76.35
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 28 of 33
Classification
$43.81
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$68.96
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Apprentice
- SPRINKLER FITTER
- Local 550 (Section B) Zone 2
$8.67
$8.55
$0.00
$34.71
Effective Date - 03/01/2016
$19.99
$8.67
$8.55
Supplemental
$37.21
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
35
$17.15
$8.67
$8.55
$0.00
$34.37
2
40
$19.60
$8.67
$8.55
$0.00
$36.82
3
45
$22.05
$8.67
$8.55
$0.00
$39.27
4
50
$24.50
$8.67
$8.55
$0.00
$41.72
5
55
$26.94
$8.67
$8.55
$0.00
$44.16
6
60
$29.39
$8.67
$8.55
$0.00
$46.61
7
65
$31.84
$8.67
$8.55
$0.00
$49.06
8
70
$34.29
$8.67
$8.55
$0.00
$51.51
9
75
$36.74
$8.67
$8.55
$0.00
$53.96
10
80
$39.19
$8.67
$8.55
$0.00
$56.41
Effective Date - 10/01/2016
$43.81
$10.00
$15.15
Supplemental
$68.96
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 35
$17.49
$8.67
$8.55
$0.00
$34.71
2 40
$19.99
$8.67
$8.55
$0.00
$37.21
3 45
$22.49
$8.67
$8.55
$0.00
$39.71
4 50
$24.99
$8.67
$8.55
$0.00
$42.21
5 55
$27.49
$8.67
$8.55
$0.00
$44.71
6 60
$29.99
$8.67
$8.55
$0.00
$47.21
7 65
$32.49
$8.67
$8.55
$0.00
$49.71
8 70
$34.99
$8.67
$8.55
$0.00
$52.21
9 75
$37.49
$8.67
$8.55
$0.00
$54.71
10 80
$39.98
$8.67
$8.55
$0.00
$57.20
(Notes: Apprentice entered prior 9/30/10:
40/45/50/55/60/65/70/75/80/85
I Steps are 850 hours
Apprentice to Journeyworker Ratio: 1:3
STEAM BOILER OPERATOR
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
TELECOMMUNICATION TECHNICIAN
ELECTRICIANS LOCAL 103
06/01/2016
$43.81
$10.00
$15.15
$0.00
$68.96
12/01/2016
$45.04
$10.00
$15.15
$0.00
$70.19
06/01/2017
$46.03
$10.00
$15.15
$0.00
$71.18
12/01/2017
$47.02
$10.00
$15.15
$0.00
$72.17
06/01/2016
$43.81
$10.00
$15.15
$0.00
$68.96
12/01/2016
$45.04
$10.00
$15.15
$0.00
$70.19
06/01/2017
$46.03
$10.00
$15.15
$0.00
$71.18
12/01/2017
$47.02
$10.00
$15.15
$0.00
$72.17
03/01/2016 $34.63 $13.00 $14.55 $0.00 $62.18
Issue Date: 09/12/2016 Wage Reouest Number: 20160910-002 Pale 29 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103
Effective Date - 03/01/2016
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 40
$13.85
$13.00
$0.42
$0.00
$27.27
2 40
$13.85
$13.00
$0.42
$0.00
$27.27
3 45
$15.58
$13.00
$11.52
$0.00
$40.10
4 45
$15.58
$13.00
$11.52
$0.00
$40.10
5 50
$17.32
$13.00
$11.79
$0.00
$42.11
6 55
$19.05
$13.00
$12.06
$0.00
$44.11
7 60
$20.78
$13.00
$12.34
$0.00
$46.12
8 65
$22.51
$13.00
$12.62
$0.00
$48.13
9 70
$24.24
$13.00
$12.90
$0.00
$50.14
10 75
$25.97
$13.00
$13.17
$0.00
$52.14
-------------,_.,.._.
(Notes:
_...,--------------I
I
I
Apprentice to Journeyworker Ratio: 1:1
TERRAZZO FMSHERS
08/01/2016
$49.70
$10.18
$19.22 $0.00
$79.10
BRICKLAYERS LOCAL 3 - MARBLE & TILE
02/01/2017
$50.27
$10.18
$19.22 $0.00
$79.67
Apprentice- TERRAZZO FINISHER -Local 3 Marble & Tile
Effective Date - 08/01/2016
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$24.85
$10.18
$19.22
$0.00
$54.25
2 60
$29.82
$10.18
$19.22
$0.00
$59.22
3 70
$34.79
$10.18
$19.22
$0.00
$64.19
4 80
$39.76
$10.18
$19.22
$0.00
$69.16
5 90
$44.73
$10.18
$19.22
$0.00
$74.13
Effective Date - 02/01/2017
Step percent
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1
50
$25.14
$10.18
$19.22
$0.00
$54.54
2
60
$30.16
$10.18
$19.22
$0.00
$59.56
3
70
$35.19
$10.18
$19.22
$0.00
$64.59
4
80
$40.22
$10.18
$19.22
$0.00
$69.62
5
90
$45.24
$10.18
$19.22
$0.00
$74.64
INotes: I
I
Apprentice to Journeyworker Ratio:1:3
TEST BORING DRILLER 06/01/2016 $37.20 $7.45 $14.00 $0.00 $58.65
LABORERS - FOUNDATIONAND MARINE
12/01/2016 $38.20 $7.45 $14.00 $0.00 $59.65
For apprentice rates see "Apprentice- LABORER"
---------------------------------------------------------------------------------------- I........ -------------------------------------------
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 30 of 33
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
�--�---
bORING
Unemployment
TEST DRILLER HELPER
06/01/2016
$35.92
$7.45
$14.00
$0.00
$57.37
LABORERS - FOUNDATIONAND MARINE
12/01/2016
$36.92
$7.45
$14.00
$0.00
$58.37
For apprentice rates see "Apprentice- LABORER"
TEST BORING LABORER
06/01/2016
$35.80
$7.45
$14.00
$0.00
$57.25
LABORERS - FOUNDATION AND MARINE
12/01/2016
$36.80
$7.45
$14.00
$0.00
$58.25
For apprentice rates see "Apprentice- LABORER"
TRACTORS/PORTABLE STEAM GENERATORS
06/01/2016
$43.81
$10.00
$15.15
$0.00
$68.96
OPERATING ENGINEERS LOCAL 4
12/01/2016
$45.04
$10.00
$15.15
$0.00
$70.19
06/01/2017
$46.03
$10.00
$15.15
$0.00
$71.18
12/01/2017
$47.02
$10.00
$15.15
$0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
TRAILERS FOR EARTH MOVING EQUIPMENT
08/01/2016
$33.02
$10.91
$10.08
$0.00
$54.01
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
12/01/2016
$33.02
$10.91
$10.89
$0.00
$54.82
TUNNEL WORK - COMPRESSED AIR
06/01/2016
$48.08
$7.45
$14.40
$0.00
$69.93
LABORERS (COMPRESSED AIR)
12/01/2016
$49.08
$7.45
$14.40
$0.00
$70.93
For apprentice rates see "Apprentice- LABORER"
TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE)
06/01/2016
$50.08
$7.45
$14.40
$0.00
$71.93
LABORERS (COMPRESSED AIR)
12/01/2016
$51.08
$7.45
$14.40
$0.00
$72.93
For apprentice rates see "Apprentice- LABORER"
TUNNEL WORK - FREE AIR
06/01/2016
$40.15
$7.45
$14.40
$0.00
$62.00
LABORERS (FREE AIR TUNNEL)
12/01/2016
$41.15
$7.45
$14.40
$0.00
$63.00
For apprentice rates see "Apprentice- LABORER"
TUNNEL WORK - FREE AIR (HAZ. WASTE)
06/01/2016
$42.15
$7.45
$14.40
$0.00
$64.00
LABORERS (FREE AIR TUNNEL)
12/01/2016
$43.15
$7.45
$14.40
$0.00
$65.00
For apprentice rates see "Apprentice- LABORER"
VAC -HAUL
08/01/2016
$32.44
$10.91
$10.08
$0.00
$53.43
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
12/01/2016
$32.44
$10.91
$10.89
$0.00
$54.24
WAGON DRILL OPERATOR
06/01/2016
$31.90
$7.45
$12.65
$0.00
$52.00
LABORERS - ZONE 2
12/01/2016
$32.65
$7.45
$12.65
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
WASTE WATER PUMP OPERATOR
06/01/2016
$44.23
$10.00
$15.15
$0.00
$69.38
OPERATING ENGINEERS LOCAL 4
12/01/2016
$45.48
$10.00
$15.15
$0.00
$70.63
06/01/2017
$46.48
$10.00
$15.15
$0.00
$71.63
12/01/2017
$47.48
$10.00
$15.15
$0.00
$72.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
WATER METER INSTALLER
09/01/2016
$47.61
$11.32
$15.46
$0.00
$74.39
PLUMBERS& GASFITTERS LOCAL 12 (Local 138)
03/01/2017
$48.61
$11.32
$15.46
$0.00
$75.39
For apprentice rates see "Apprentice- PLUMBER/PIPEFITTER" or "PLUMBER/GASFITTER"
Outside Electrical - East
CABLE TECHNICIAN (Power Zone)
08/28/2016
$26.61
$7.50
$1.80
$0.00
$35.91
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$27.14
$7.75
$1.81
$0.00
$36.70
For apprentice rates see "Apprentice- LINEMAN"
CABLEMAN (Underground Ducts & Cables)
08/28/2016
$37.70
$7.50
$8.87
$0.00
$54.07
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$38.45
$7.75
$9.53
$0.00
$55.73
For apprentice rates see "Apprentice- LINEMAN"
DRIVER / GROUNDMAN CDL
08/28/2016
$31.05
$7.50
$8.89
$0.00
$47.44
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$31.66
$7.75
$9.44
$0.00
$48.85
For apprentice rates see "Apprentice- LINEMAN"
-------------------------- ----------------------------------------------------------------------------------
Issue Date: 09/12/2016 Wage Request Number:
20160910-002
------------------------------
Page 31 of 33
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
$37.70
Unemployment
DRIVER / GROUNDMAN -Inexperienced (<2000 Hrs)
08/28/2016 $24.39 $7.50 $1.73 $0.00 $33.62
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017 $24.88 $7.75 $1.75 $0.00 $34.38
For apprentice rates see "Apprentice- LINEMAN'
EQUIPMENT OPERATOR (Class A CDL)
08/28/2016
$37.70
$7.50
$12.95
$0.00
$58.15
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
Supplemental
Step percent
Apprentice Base Wage
Health
09/03/2017
$38.45
$7.75
$13.61
$0.00
$59.81
For apprentice rates see "Apprentice- LINEMAN'
$0.00
$37.41
2 65
$28.83
$7.50
$3.36
EQUIPMENT OPERATOR (Class B CDL)
08/28/2016
$33.26
$7.50
$9.63
$0.00
$50.39
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
4 75
$33.26
$7.50
$5.00
$0.00
$45.76
5 80
09/03/2017
$33.92
$7.75
$10.21
$0.00
$51.88
For apprentice rates see "Apprentice- LINEMAN'
$7.50
$5.13
$0.00
$50.33
7 90
$39.92
GROUNDMAN 08/28/2016 $24.39 $7.50 $1.73 $0.00 $33.62
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017 $24.88 $7.75 $1.75 $0.00 $34.38
For apprentice rates see "Apprentice- LINEMAN'
GROUNDMAN -Inexperienced (<2000 Hrs.)
08/28/2016
$19.96
$7.50
$1.60
$0.00
$29.06
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
Supplemental
Step percent
Apprentice Base Wage
Health
09/03/2017
$20.35
$7.75
$1.61
$0.00
$29.71
For apprentice rates see "Apprentice- LINEMAN'
$0.00
$37.41
2 65
$28.83
$7.50
$3.36
JOURNEYMAN LINEMAN
08/28/2016
$44.35
$7.50
$15.83
$0.00
$67.68
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
4 75
$33.26
$7.50
$5.00
$0.00
$45.76
5 80
09/03/2017
$45.23
$7.75
$16.61
$0.00
$69.59
Apprentice- LINEMAN (Outside Electrical)
-East Local 104
Effective Date - 08/28/2016
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$26.61
$7.50
$3.30
$0.00
$37.41
2 65
$28.83
$7.50
$3.36
$0.00
$39.69
3 70
$31.05
$7.50
$3.43
$0.00
$41.98
4 75
$33.26
$7.50
$5.00
$0.00
$45.76
5 80
$35.48
$7.50
$5.06
$0.00
$48.04
6 85
$37.70
$7.50
$5.13
$0.00
$50.33
7 90
$39.92
$7.50
$7.20
$0.00
$54.62
Effective Date - 09/03/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$27.14
$7.75
$3.31
$0.00
$38.20
2 65
$29.40
$7.75
$3.38
$0.00
$40.53
3 70
$31.66
$7.75
$3.45
$0.00
$42.86
4 75
$33.92
$7.75
$5.02
$0.00
$46.69
5 80
$36.18
$7.75
$5.09
$0.00
$49.02
6 85
$38.45
$7.75
$5.15
$0.00
$51.35
7 90
$40.71
$7.75
$7.22
$0.00
$55.68
(Notes:
I
I
Apprentice to Journeyworker Ratio:1:2
TELEDATA CABLE SPLICER
01/01/2016
$28.98
$4.25
$3.12
$0.00 $36.35
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
TELEDATA LINEMAN/EQUIPMENT OPERATOR 01/01/2016 $27.31 $4.25 $3.07 $0.00 $34.63
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 32 of 33
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
._� Unemployment
TELE�,�ATA WIREMAN/INSTALLER/TECFMICIAN 01/01/2016 $27.31 $4.25 $3.07 $0.00 $34.63
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
TREE TRIMMER
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
01/31/2016 $18.51 $3.55 $0.00 $0.00 $22.06
This classification applies only to tree work done: (a) for a utility company, R.E.A. cooperative, or railroad or coal mining company, and (b) for the purpose of
operating, maintaining, or repairing the utility company's equipment, and (c) by a person who is using hand or mechanical cutting methods and is not on the ground
This classification does not apply to wholesale tree removal.
TREE TRIMMER GROUNDMAN 01/31/2016 $16.32 $3.55 $0.00 $0.00 $19.87
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
This classification applies only to tree work done: (a) for a utility company, R.E.A. cooperative, or railroad or coal mining company, and (b) for the purpose of
operating, maintaining, or repairing the utility company's equipment, and (c) by a person who is using hand or mechanical cutting methods and is on the ground. This
classification does not apply to wholesale tree removal.
Additional Apprentice Information:
Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the
Commissioner imder the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L.
c. 23, ss. I1E-I IL.
All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. I I&I IL.
All steps are six months (1000 hours.)
Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof, unless otherwise specified.
** Multiple ratios are listed in the comment field.
*** APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc.
**** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc.
---------------------------------------------------------------------------------------------------------------------- ----------------------
Issue Date: 09/12/2016 Wage Request Number: 20160910-002 Page 33 of 33
TOWN OF NORTH ANDOVER
120 MAIN STREET
NORTH ANDOVER, MASSACHUSETTS 01845
Raymond T Santilli
Assistant Town Manager
Mr. Lou Russo, President
L.D. Russo, Inc.
198 Ayer Road
Harvard, MA 01451
Dear Mr. Russo:
tot q
06�t4eo �6. ti�
O F
p�RATlo IPP�'(y
.4CHUS��
November 2, 2016
TEL (978) 688-9516
FAX (978) 688-9556
The Town of North Andover has decided to award a contract to L.D. Russo, Inc. for
improvements to the Public Works facility per the Project Manual dated September 14, 2016 and
associated Addenda.
Enclosed please find three (3) original standard Town of North Andover contracts for
appropriate review and signature. Please return the signed contract documents and all required
accompanying paperwork to my attention as soon as possible. Please ensure that all insurance
certificates include the required coverage levels and list the Town of North Andover as an
"additional insured".
In accordance with Massachusetts General Laws, you are required to provide a
performance bond and a payment bond, on the Town's forms that are enclosed, in the amount of
100% of the value year of the contract.
If you have any questions and/or concerns, please call me.
Sincerely,
Raymond T. Santilli
Assistant Town Manager
Enclosures
TOWN OF NORTH ANDOVER
CONTRACT
CONTRACT #_^__T__
DATE:
This Contract is entered into on, or as of, this date by and between the Town of North Andover
(the "Town"), and
Contractor: L.D. Russo, Inc.
Address: 198 Ayer Road
Harvard, MA 01451
Telephone Number: 978-456-3500
Fax Number: 978-456-3502
1. This is a Contract for the procurement of the following:
Improvements to the Public Works facility per the Project Manual dated September 14,
2016 and associated Addenda
2. The Contract price to be paid to the Contractor by the Town of North Andover is:
Base Bid
$ 3,494,000
Alternate #1
$ 865,000
Alternate #2
$ 121,000
Alternate #3
$ 53,000
TOTAL $ 4,533,000
3. Payment will be made as follows:
Upon submission and approval of monthly requisition invoice (net 30)
(Rev 5-2007) Contract by and between Town of North Andover and L.D. Russo, Inc. Page i
4. Definitions
4.1 Acceptance: All Contracts require proper acceptance of the described goods or
services by the Town of North Andover. Proper acceptance shall be understood to
include inspection of goods and certification of acceptable performance for services by
authorized representatives of the Town to insure that the goods or services are complete
and are as specified in the Contract.
4.2 Contract Documents: All documents relative to the Contract including (where used)
Instructions to Bidders, Proposal Form, General Conditions, Supplementary General
Conditions, General Specifications, Other Specifications included in Project Manual,
Drawings, and all Addenda issued during the bidding period. The Contract documents
are complementary, and what is called for by any one shall be as binding as if called for
by all. The intention of the document is to include all labor and materials, equipment and
transportation necessary for the proper performance of the Contract.
4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as
the sense and particular Contract so require) include Vendor, Contractor, Engineer, or
other label used to identify the other party in the particular Contract. Use of the term
"Contractor" shall be understood to refer to any other such label used.
4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the
services are performed, or the goods delivered, in accordance with Contract documents,
as modified by approved Amendments and Change Orders.
4.5 Goods: Goods, Supplies or Materials.
4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes
one who furnished material worked to a special design according to the Drawings or
Specifications of this work, but does not include one who merely furnishes material not so
worked.
4.7 Work: The services or materials contracted for, or both.
5. Term of Contract and Time for Performance
This Contract shall be fully performed by the Contractor in accordance with the provisions of the
Contract Documents on or before December 31, 2017, unless extended pursuant to a provision
for extension contained in the Contract documents at the sole discretion of the Town, and not
subject to assent by the Contractor, and subject to the availability and appropriation of funds as
certified by the Town Accountant. The time limits stated in the Contract documents are of the
essence of the Contract.
6. Subject to Appropriation
Notwithstanding anything in the Contract documents to the contrary, any and all payments which
the Town is required to make under this Contract shall be subject to appropriation or other
availability of funds as certified by the Town Accountant. In the absence of appropriation, this
(Rev 5-2007) Contract by and between Town of North Andover and L.D. Russo, Inc. Page 2
11 t
Hill International, Inc.
330 Congress Street
Hill International
Tel: 617-778-09002210
Boston, MA -0900
Fax: 617-778-0999
www.hillintl.com
October 20, 2016
Mr. Ray Santilli
Assistant Town Manager
Town of North Andover
120 Main Street
North Andover, MA 01845
Re: Improvements to Public Works Building
DCAMM File Review: LD Russo
Dear Ray:
Hill International, Inc. visited the DCAMM offices on October 19, 2016, to review the Contractor File for
LD Russo, Inc. on behalf of the Town of North Andover. Following a comprehensive review of the
documents made available for the review, we can report that there are no negative evaluations or other
factors included in the File that should give the Town any concern, regarding past performance or for
awarding the improvements to the Public Works Building to LD Russo.
The file included evaluations of 9 projects dating back to 2010 all of which were municipal projects
comparable in size and scope to the North Andover Improvements to the Public Works project. A
summary of the information on Russo is as follows:
• Evaluations of 9 municipal projects with construction cost ranging from $181K to $9.5 million.
Average cost of construction $4.12 million.
• Evaluated projects received a ratings ranging from 80-100 with an average rating of 94.
• Lowest ratings listed are 80 (Westford Town Hall) and 81 (Concord Housing Authority).
• Concord did not provide any comments in their evaluation.
• Westford referenced difficulty with managing FSB contractors as a factor in the scoring.
• Westford also gave Russo a rating of 92 for the Cameron Senior Center, constructed at
approximately the same time.
• Recently completed Gardner Police Station received a rating of 99.
Please do not hesitate to contact me at 617-755-0024 if you have any questions regarding this
information.
Sincerely,
Hill International
/ %��
f�J
Daniel Tuberty, AIA, MCPPO
Project Manager
Cc: Joe Naughton
Steve Broadhead
FA
N
O
U
c
E aa
U
Q Q
v
v
a�'i
a�'i
w
_
cc0
a o o >
>
>
>
>
>
>
a a o
0
0
0
CL
0
OL
0
OL
0
CL
a a a
v a) a)
a
v
a
a)
a
a)
a
Q)
a
aj
a
v
m u
3 3 3
3
3
3
3
3
3
a >
>LU
>
>
>
>
°1
CL
ii ii ii
ii
ii
ii
ii
ii
ii
U(Aa
� " a3i a3i �
a3i
a3i
v
v
�
v
L
Zw d
O O O
C) O O
O
O
O
O
O
O
O
O
O
O
O
O
o o O
o
O
o
0
0
0
U 0 O O
i aC
C It O o
N
U
O
r;
O
�n
O
�o
O
ko
O
0
Z
Lj�Nn
Q M M Ln dam'
loo
W
(LO
(n
U')
N O
OZ
.-.
Z p 0 O O O
O
O
O
O
O
O
C O O O
IQ C) O
O
O
O
O
O
ON
O
O O 00
O
O
N
O
O
y '0 67 N N
N
Nlf)
O
O
0�
Q V fPr {{} {f}
ifl�
{f}
{�}
ii}I
4A
{t}
r( O
O ZO
O
Z LO O O
O
O
0
O
O
p
O 4 O O O
O
O
O
O
O
O
41 C O O O
m 0(p O O O
O
O
O
O
.-ip
M
O
O
O
M
C w t O O N
0 U
O
O
l0
-1
l0
p
O
I� to a1
Q t0 l0 00
O
to
O
N
1-1
N
M
i1
N
0
M
Q 0 0 00
-f;pr -b9- lbpr
0)
ift
m
I ifr
N
r i
.-(
N
ift
O
O
O
O
O
O
O
O
O
O
O
O
O O O
O O O
V 41 O O O
I�
O
ko
i
p
to
o
N
Ln
v
O 00 m In
N
ON
N
It
00
It
m Q [t IT Ln
00
O
M M M
M
M
i+Prt�
p1Q
U
►C�
M
O
��
Lr)
ri
N�
Ca C
t0
m
C
' -
p
QD
C
U a) i
C Q to O
C t
Q)
(o
C
~ Z
L
Ln O
L C
a J
C 7
~ O
O a)
m IUU 00 -0V-2
c
Q
t
�-0M
U ��
CO Q
p L
CO�
CL v m '3 '�
L�
o o 'i
N
a) 00
U
U L
0
+
D a) CO c
d
c 3
U
p� '1
(n0
�'
i
7 N
O C+� U o�4-1
V Ln C C (n
H M L
O a)
U Z
L_o
O— Q
C=
t
0 C<
'L 7
�
L +'
(n
V) 4
C (n
}O� L (O .Y
U a) O� O U ,�
t (C0
(0 +.+
V7
C O
O
.0
Q1
�'' .n
N N O
p
L VI
O C
U
0 cn C O
�+ W (LO C �--I
C
Ol L p
O
U
N
C C C
00j
w N
o7 C
O
L
(6 7=
Caul (�0 3 C ip
�Y�
>
0 JM
U ��
a) aai
mAN
7Up
O. --I
> CO
O Ln .-1 O a) O a) Q
0100 -1w ZUm�
(o (LO
UO_O
0) O
2: -(0_'
U O a)
co 3:W
m OL] 4L
Q(n
'N
pM0
00
u) o
N
O
U
FORM FOR GENERAL BID
To the Awarding Authority:
A. The Undersigned proposes to furnish all labor and materials required for Public Works Building
Improvements for the Town of North Andover in North Andover,MA in accordance with the
accompanying plans and specifications prepared by CSS Architects, Inc for the contract price specified
below, subject to additions and deductions according to the terms of the specifications.
B. This bid includes addenda numbered ,1,2,3
C. The proposed contract price is three million four hundred ninety-four thousand dollar $3,494,000.00
For Alternate No. 1 (Add 0 for No Change)
For Alternate No. 2 (Add 0 for No Change)
For Alternate No. 3 (Add 0 for No Change)
Add $865,000.00 Subtract $0.00
Add $121,000.00 Subtract $0.00
Add $53,000.00 Subtract $0.00
D. The subdivision of the proposed contract price is as follows:
Item 1. The work of the general contractor, being all work other than that covered by Item 2.
$2,048,545.00
Item 2. Sub -bids as follows:
Phone: Oct 14 2016 03:07 PM
Sub -Trade
Name of Filed Sub-
Sub -bid Amount
Bond Required
bidder
05 50 00
V&G Ironworks inc.
67 067.00
No
07 00 01
Chapman
12,100.00
No
Water r ofing Co.
07 49 00
Capeway Roofing
76,700.00
No
S stems Inc
0851 00
Aluminum & Glass
192,538.00
No
Concept Inc.
0881 00
Aluminum & Glass
111,510.00
No
Concepts, Inc.
09 30 13
Joseph Cohn and
73,441.00
No
Son Tile &
Terrazzo LLC
0951 23
K&K Acoustical
25,450.00
No
Ceilings, Inc.
0991 00
Bello Painting
34,979.00
No
Com an Inc.
1421 23
Delta Beckwith
147,500.00
No
Elevator Company
21 0000
Sim IexGrinnell LP
36 870.00
No
22 00 00
P.J. Dionne Co.,
104,000.00
No
Inc.
23 00 00
E. Amanti & Sons
318,800.00
No
Inc.
26 00 00
Richard T. Losordo
244,500.00
No
Electrical svc
Total of Item 2 .................................$1,445,455.00
LD Russo, Inc 198 Ayer Road Harvard MA 01451
Phone: 978-456-3500 Oct 14 2016 03:07 PM
BIDDER'S COMPANY NAME; L•D.Russo, Inc.
FORM OF GENERAL BID
TOWN OF NORTH ANDOVER
IMPROVEMENTS TO THE PUBLIC WORKS BUILDING
384 OSGOOD STREET, NORTH ANDOVER, MA
This bid must be accompanied by a bid deposit in the form of cash, or a bid bond, or a certified
check, treasurer's check, or cashier's check, payable to the Town of North Andover(hereinafter
referred to as the "Owner", or the "Awarding Authority") in the amount of five percent (5%) of the
value of the bid. No other form of bid security will be accepted.
By submitting this bid the undersigned represents to the Owner that he/she has examined and
understands the Invitation for Bids, Instructions to Bidders, Contract Forms, Conditions of the
Contract (General and Supplementary), Drawings, Specifications and all other Contract
Documents and has examined the site, as defined therein, and that this bid is made with distinct
reference and relation to all said Contract Documents; but the undersigned declares that in
regard to the conditions affecting the work to be done and the labor and materials needed, this
bid is based solely on his/her own investigation and research and not in reliance upon any
drawings, surveys, measurements, dimensions, calculations, estimates, borings, pile tests or
other tests or representations of any employee, officer, agent or consultant of the Owner. By
submitting this bid, the undersigned agrees that it shall be subject to the jurisdiction of the courts
of the Commonwealth of Massachusetts with respect to any action arising out of or related to this
bid or any contract that may be entered into based upon his bid, and that any such actions
commenced by the undersigned shall bee commenced in the courts of the Commonwealth of
Massachusetts.
The bidder acknowledges that a bidder wising to amend this bid after transmittal to the Owner
may do so only by withdrawing this bid and resubmitting another bid prior to the deadline for
submitting bids.
TO: TOWN OF NORTH ANDOVER
• The undersigned proposes to furnish all labor, materials, equipment and services
required for Improvements to the Public Works Building, 384 Osgood Street, North
Andover, Massachusetts, all in accordance with the accompanying plans and
specifications prepared by CSS Architects Inc for the contract price specified below,
subject to additions and deductions according to the terms of the specifications.
• The bidder acknowledges receipt of addenda, as shown in Item B on the electronic bid
form.
• The proposed contract price is specified in Item C on the electronic bid form.
• The subdivision of the proposed contract price is specified in Item D on the electronic bid
form.
Form of General Bid
Section 00 41 13
Page 1 of 3
Improvements To The Public Works Building
384 Osgood Street, North Andover, MA
E. The undersigned agrees that each of the above-named sub -bidders will be used for the
work indicated at the amount stated, unless a substitution is made. The undersigned
further agrees to pay the premiums for the Performance Bond and Labor and Materials
Payment Bond furnished by sub -bidders as requested herein and that all of the costs of
all such premiums is included in the amount set forth in Item No. 1 of the bid. The
undersigned agrees that if he is selected as general contractor, he will promptly confer
with the Awarding Authority on the question of sub -bidders and that the Awarding
Authority may substitute for any sub -bid listed above a sub -bid duly filed with the
Awarding Authority by another sub -bidder for the sub -trade against whose standing and
ability the undersigned makes no objection, and that the undersigned will use all such
finally selected sub -bidders at the amounts named in their respective sub -bids and be in
every way as responsible for them and their work as if they had been originally named in
this general bid, the total contract price being adjusted to conform thereto.
F. The undersigned agrees that, if he is selected as general contractor, he will within five
days, Saturdays, Sundays, and legal holidays excluded, after presentation thereof by the
Awarding Authority, execute a contract in accordance with the term of this general bid
and furnish a Performance Bond and a Labor and Materials Payment Bond, each of a
surety company qualified to do business under the laws of the Commonwealth of
Massachusetts and satisfactory to the Awarding Authority and each in the sum of at least
one hundred percent of the contract price, the premiums for which are to be paid by the
general contractor and are included in the contract price provided, however, that if there
is more than 1 surety company, the surety companies shall be jointly and severally
Iiable.The undersigned hereby certifies that he is able to furnish labor that can work in
harmony with all other elements of labor employed or to be employed on the work; that all
employees to be employed at the worksite will have successfully completed a course in
construction safety and health approved by the United States Occupational Safety and
Health Administration that is at least 10 hours in duration at the time the employee begins
work and who shall furnish documentation of successful completion of said course with
the first certified payroll report for each employee; and that he will comply fully with all
laws and regulations applicable to awards made subject to section 44A.
G. The undersigned further certifies under the penalties of perjury that this bid is in all
respects bona fide, fair and made without collusion or fraud with any other person. As
used in this subsection the word "person" shall mean any natural person, joint venture,
partnership, corporation or other business or legal entity. The undersigned further
certifies under penalty of perjury that the said undersigned is not presently debarred from
doing public construction work in the Commonwealth under the provisions of section
twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any
other chapter of the General Laws or any rule or regulation promulgated thereunder.
Form of General Bid
Section 00 4113
Page 2 of 3
Improvements To The Public Works Building
384 Osgood Street, North Andover, MA
L.D.Russo, Inc.
Name of General Bidder
Signature C:�p BY:
Date: 10/14/16 Nat Coughlin, Vice President
Name and Title of Person Sienine Bid
198 Ayer Road
Business Address
Harvard, MA 01451
City and State
Form of General Bid
Section 00 41 13
Page 3 of 3
BID BOND
Conforms with The American Institute of
Architects, A.I.A. Document No. A-310
KNOW ALI, BY THESE PRESENTS, That we, L.D. Russo, Inc.
198 Ayer Road, Harvard, MA 01451
as Principal, hereinafter called the Principal,
and the The Hanover Insurance Company
of 440 Lincoln Street, Worcester, MA 01653 , a corporation duly organized under
the laws of the State of New Hampshire , as Surety, hereinafter called the Surety, are held and finely bound unto
Town of North Andover
120 Main Street, North Andover, MA 01845 as Obligee, hereinafter called the Obligee,
in the sum of Five Percent of Bid Amount
Dollars ($ 5% of Bid Amount ) , for the payment of which sum well and truly to be made, the said Principal and the said
Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, finely by these presents.
WHEREAS, the Principal has submitted a bid for North Andover Public Works
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee
in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with
good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in
the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the
Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such
larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this
obligation shall be null and void, otherwise to remain in full force and effect.
Signe and scaled this 13th day of
i
Witness
Witness
October 2016
L.D. Russo, Inc. (Seal)
Principal
{( Title
I By
The HaNver Insurance Company
Attorney -in -Fact
S-00541GEEF 12/00
FRP
THE HANOVER INSURANCE COMPANY
MASSACHUSETTS BAY INSURANCE COMPANY
CITIZENS INSURANCE COMPANY OF AMERICA
POWERS OF ATTORNEY
CERTIFIED COPY
KNOW ALL MEN BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY, both being
corporations organized and existing under the laws of the State of New Hampshire, and CITIZENS INSURANCE COMPANY OF AMERICA, a corporation
organized and existing under the laws of the Stale of Michigan, do hereby constitute and appoint
Dennis W. Driscoll, J. Barry Driscoll, Timothy P. Lyons, Claire A. Cavanaugh, John C. Driscoll,
Lena Brownell, George G. Powers and/or Martin L. Donovan
of Norwell, MA and each is a true and lawful Attorney(s)-in-fact to sign, execute, seal, acknowledge and deliver for,
and on its behalf, and as its act and deed any place within the United States, or, if the following line be filled in, only within the area therein designated
any and all bonds, recognizances, undertakings, contracts of indemnity or other writings obligatory in the nature thereof, as follows:
Any such obligations in the United States, not to exceed Twenty Million and Noll 00 ($20,000,000) in any single instance
and said companies hereby ratify and confirm all and whatsoever said Attorneys) -in -fact may lawfully do in the premises by virtue of these presents.
These appointments are made under and by authority of the following Resolution passed by the Board of Directors of said Companies which resolutions
are still in effect:
'RESOLVED. That the President or any Vice President, inconjunction withanyVice President, be and theyare herebyauthorized and empovreredtoappoint
Attorneys -in -fact of the Company, in its name and as its acts, to execute and acknowledge forand on its behalf as Surety anyand all bonds, recognizances,
contracts of Indemnity, waivetsofcitation and all other w6tings obligatory in thenalufe thereof, %vith power to attach thereto the seat of the Company. Anysuch
writings so executed by such Attomays-in-fact shall be as binding upon the Company as if they had been duly executed and acknowledged by the regularly
elected officers of the Company in their own proper persons.' (Adopted October 7, 1981 - The Hanover Insurance Company; Adopted April 14, 1982 -
Massachusetts Bay Insurance Company, Adopted September 7, 2001- Citizens Insurance Company of America)
IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE
COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seats, duly attested by two Vice Presidents.
this 31st day of October 2011.
r " .,.
�„°' noir
THE COMMONWEALTH OF MASSACHUSETTS )
COUNTY OF WORCESTER )Ss.
THE HANOVER INSURANCE COMPANY
MASSACHUgTTS BAY INSURANCE COMPANY
CITIZENS INSJJPANCE 99MPANY OF AMERICA
Robert Thomas, Vice President
a Vice P ra
Z.
On this 31stday of October 2011 before me came the above named Vice Presidents of The Hanover Insurance Company, Massachusetts Bay Insurance
Company and Citizens Insurance Company of America, tome personally known to be the individuals and officers described herein, and acknowledged that the
seals affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company, Massachusetts Bay insurance Company and Citizens
Insurance Company of America, respectively, and that the said corporate seals and their signatures as officers were duly affixed and subscribed to said
instrument by the authority and direction of said Corporations,
r°`a%� BARBARAAAARIICK
Notary PUM
-lei
Ur Ce si nE4 SW 3t, xi!
Vi
Barbara A. Garllck, Notary Public
My Commission Expires September 21, 2018
1, the undersigned Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America,
hereby certify that the above and foregoing is a full, true and correct copy of the Original Powerof Attorney issued by said Companies, and do hereby further
certify [hat the said Pourers of Attorney are still in force and effect.
This Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of The Hanover Insurance Company,
Massachusetts Bay Insurance Company and Citizens Insurance Company of America,
'RESOLVED, That any and an Pourers of Attorney and Certified Coples of such Powers of Attorney and certification in respect thereto, granted and executed
by the President or any Vice President in conjunction with any Vice President of the Company, shall be binding on the Company to the same extent as it all
signatures therein were manually affixed, even though one or more of any such signatures thereon may be facsimile' (Adopted October 7, 1981 - The
Hanover insurance Company, Adopted April 14,1982 - Massachusetts Bay Insurance Company; Adopted Seplember 7, 2001. Citizens Insurance Company of
America) s�
GIVEN under my hand and the seals of said Companies, at Worcester, Massachusetts, this j� ` day 0 ��-
THE HANOVER 1N RANCE COMPANY
MASSACHUSETTS BAY INSURANCE COMPANY
CITIZENS INSURANCE COMPANY OF AMERICA
I n Margoslan, Vice President
IC-1The
Commonwealth of Massachusetts
y
Executive Office for Administration and Finance
❑ Exterior Siding ❑ Historical Roofing
Division of Capital Asset Management and Maintenance
❑ Deleading
One Ashburton Place, 15th Floor
CHARLES D. BAKER
Boston, Massachusetts 02108 KRISTEN LEPORE
GOVERNOR
SECRETARY
Tel: 857-204-1305
❑ Doors and Windows
ADMINSTRATION & FINANCE
KARYN E. POLITO
Fax: 617-727-8284
LIEUTENANT GOVERNOR
CAROL W. GLADSTONE
❑ Electronic Security Systems
COMMISSONER
❑ Waterproofing
Prime/General
❑ Historical Masonry ❑ Plumbing
Certificate of Contractor Eligibility
CONTRACTOR IDENTIFICATION NUMBER: 1508
only)
This Certificate Shall be Used for Submitting Prime/General Bids Only
1. CERTIFICATION PERIOD: This Certificate is valid from 09/19/2016 to 09/18/2017*
2. CONTRACTOR'S NAME: LD Russo, Inc
3. CONTRACTOR'S ADDRESS: 198 Ayer Road, Harvard, MA 01451
4. WORK CATEGORIES: This Contractor is certified to file bids under Massachusetts General Laws
Chapter 149, Chapter 149A and Chapter 25A in the following checked
Categories of Work:
❑ Alarm Systems
❑ Energy Management Systems ❑ Historical Painting
❑ Pumping Stations
❑ Asbestos Removal
❑ Exterior Siding ❑ Historical Roofing
❑ Roofing
❑ Deleading
❑ Fire Protection Sprinkler Systems ❑ Masonry
❑ Sewage and Water Treatment
❑ Demolition
❑ Floor Covering ❑ Mechanical Systems
Plants
❑ Doors and Windows
2 General Building Construction ❑ Modular
❑ Telecommunications
❑ Electrical
❑ HVAC Construction/Prefab
Systems
❑ Electronic Security Systems
❑ Historical Building Restoration ❑ Painting
❑ Waterproofing
❑ Elevators
❑ Historical Masonry ❑ Plumbing
❑ Special (pre -approved projects
only)
S. EVALUATIONS:
Number of Projects Evaluated: 7
Average Project Evaluation Rating: 96
Number of Projects Below Passing 0
6. PROJECT LIMITS:
Single Project Limit (SPL): $15,243,000
Aggregate Work Limit (AWL): $25,913,000
General Building Construction Limit: $15,243,000
7. SUPPLIER DIVERSITY OFFICE CERTIFICATION: No
1
09/19/2016
Taisha Crayton, Deputy Director, Contractor Certification, Approval Date
for Carol W Gladstone,
Commissioner
*-NOTE TO CONTRACTORS: Complete Applications for Renewal of Con tractor Eligibility are due no later than three
months PRIOR to the Expiration Date of the Certification Period shown above. Failure to submit Complete Application
timely may result in a gap in Certification or a lapse in Certification altogether for your Company.
Reviewer's Initials: KT
EFFECTIVE MARCH 30, 2010
Commonwealth of Massachusetts
Division of Capital Asset Management
PRIME/GENERAL CONTRACTOR
UPDATE STATEMENT
TO ALL BIDDERS AND AWARDING AUTHORITIES
A COMPLETED AND SIGNED PRIME/GENERAL CONTRACTOR UPDATE
STATEMENT MUST BE SUBMITTED WITH EVERY PRIME/GENERAL BID FOR A
CONTRACT PURSUANT TO M.G.L. c.149, §44A AND M.G.L. c. 149A. ANY
PRIME/GENERAL BID SUBMITTED WITHOUT AN APPROPRIATE UPDATE
STATEMENT IS INVALID AND MUST BE REJECTED.
Caution: This form is to be used for submitting Prime/General Contract bids. It is
not to be used for submitting Filed Sub -Bids or Trade Sub -Bids.
AWARDING AUTHORITIES
If the Awarding Authority determines that the bidder does not demonstrably possess
the skill, ability, and integrity necessary to perform the work on the project, it must
reject the bid.
BIDDER'S AFFIDAVIT
I swear under the pains and penalties of perjury that I am duly authorized by the bidder
named below to sign and submit this Prime/General Contractor Update Statement on behalf
of the bidder named below, that I have read this Prime/General Contractor Update Statement,
and that all of the information provided by the bidder in this Prime/General Contractor Update
Statement is true, accurate, and complete as of the bid date.
October 13, 2016 L. D. Russo, Inc.
Bid Date Print Name of Prime/General Contractor
Public Works Bldq. 198 Aver Road, Harvard, MA 01451
Project Number (or Business Address
name if no number)
Town of North Andover (978) 456-3500
Awarding Authority Telephone Number
SIGNATUREi
Bidder's Authorized Representative
Division of Capital Asset Management Page 1 of 10
LDRUSSO-01 TAYER
H�� u CERTIFICATE OF LIABILITY INSURANCE
DATE"
THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
111/9//9/2016
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.
THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER License # 1780862
CONTACT
HUB International New England
275 Great Road
CLAIMS -MADE T OCCUR
PHONE
A/c No Ext : (978 ) 263-9577 (FAX No): (978) 263-4189
Acton, MA 01720-4739
E-MAIL
06/01/2016
ADDRESS:
250,000
INSURER(S) AFFORDING COVERAGE �- NAIC #
INSURER A: Union Insurance Company 25844
INSURED
INSURER B: Acadia Insurance Company 31325
INSURER C :
L.D. Russo, Inc.
198 Ayer Road
INSURER D:
-—
Harvard, MA 01451
INSURER E:
INSURER F:
-- - -- - r�G V IJIv17 IYUIVICCR:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE
POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH
THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSRWDDL SUM - POLICY EFF Y EXP : POLIC-
LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER IMM/DD/YYYY MM/DD/YYYY LIMITS
A
X COMMERCIAL GENERAL LIABILITY
EACH OCCURRENCE $ 1,000,000
CLAIMS -MADE T OCCUR
X
X
CPA011376521
06/01/2016
06/01/2017
250,000
PREMoccurrence)T$
MED EXP (Any one person) $ 5,000
PERSONAL BADV INJURY $ 1,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY D LOC
GENERAL AGGREGATE $ 2,000,000
I
PRODUCTS-COMP/OPAGG $ 2,000,000
JECT
OTHER:
I $
AUTOMOBILE
LIABILITY
1 COMBINED SINGLE LIMIT
4Eaa-de!i!L $ 1,000,000
A
ANY AUTO
MAA011376621
06/01/2016
06/01/2017
BODILY INJURY (Per person) $
ALL OWNED SCHEDULED
X
BODILY INJURY (Per accident) $
AUTOS AUTOS
X
HIREDAUTOS X NON -OWNED
AUTOS
PROPERTY DAMAGE
Per accident)_ $
I$
X
UMBRELLA LIAB X OCCUR I
I
EACH OCCURRENCE $ 10,000,000
B
EXCESS LIAB CLAIMS -MADE
X I
X
CUA01137671
06/01/2016
06/01/2017
AGGREGATE $ 10,000,000
DED I X I RETENTION $ 0
Is
WORKERS COMPENSATION
X I
B
AND EMPLOYERS' LIABILITY
ANY PROPRIETOR/PARTNER/EXECUTIVE YIN
N
X
CA5057245
06/01/2016
STATUTE �EERH
06/01/2017 E.L. EACH ACCIDENT $ 1,000000
AC
OFFICER/MEMBER EXCLUDED?
N / A
- H _ _ ,
(Mandatory in
If describe under und
i E.L. DISEASE - EA EMPLOYEE $ 1,000,000
yes,
DESCRIPTION OF OPERATIONS below
E.L. DISEASE •POLICY LIMIT $ 1,000,000
i
DESCRIPTION OF OPERATIONS / LOCATIONS f VEHICLES (ACORD 101, Additional Remarks Schedule, may attached if more space is required)
11-9-16 Project: North Andover improvements to the Public Works Facility. Town of North Andover is listed as additional insured on a primary
non-contributory basis for ongoing and completed operations with respect to General Liability and Umbrella policies where required by written contract.
Waiver of subrogation in favor of the additional insured with respect to the General Liability, Umbrella and Workers Compensation policies where required by
written contract.
-- L.Ar4L rILLA I IUN
Town of North Andover
120 Main Street
North Andover, MA 01845
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE
?.(??1--7
U 1988-2014 ACORD CORPORATION. All rights reserved.
ACORD 25 (2014/01) The ACORD name and logo are registered marks of ACORD
PERFORMANCE BOND
Bond No, 1050088
KNOW ALL MEN BY THESE PRESENTS, that we
L.D. Russo, Inc. with a place of business at
198 Ayer Road, Harvard, MA 01451 , as Principal (the
"Principal"), and The Hanover Insurance Company , a corporation qualified to
do business in the Commonwealth of Massachusetts, with a place of business at
440 Lincoln Street, Worcester, MA 01653 �� }, as Surety (the
"Surety"), are held and firn�l� b illio in io t �iu d ec�Thi°y-thAee��ioUsandsachusetts as Obligee (the
"Obligee"), in the sum of And No/100THS DOLLARS, ($4,533,000.00) lawful money of the
United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we
bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has assumed and made a Contract with the Obligee, bearing the date of
November 11, 2016 , for the construction of Improvements to the Public Works Facility
NOW THE CONDITIONS of this obligation are such that if the Principal (and all Subcontractors under
said contract) shall well and truly keep and perform all the undertakings, covenants, agreement, terms and
conditions of said contract on its part to be kept and performed during the original term of said contract
and any extensions thereof that may be granted by the Obligee, with or without notice to the Surety, and
during the life and any guarantee required under the contract, and shall also well and truly keep and
perform all the undertakings, covenants, agreements, terms and conditions of any and all duly authorized
modifications, alterations, changes or additions with notice to the Surety being hereby waived, then this
obligation shall become null and void; otherwise, it shall remain in full force and virtue.
IN THE EVENT the Contract is abandoned by the Principal, or is terminated by the Town of North
Andover, Massachusetts under the applicable provisions of the Contract, the Surety hereby further agrees
that the Surety shall, if requested in writing by the Town of North Andover, Massachusetts promptly take
such action as is necessary to complete said Contract in accordance with its terms and conditions.
IN WITNESS WHEREOF, the Principal and Surety have hereto set their hands and seals this 11 th day
of November, 2016
PRINCIPAL
L.D. Russo, Inc..
[Name and Seal]
Pke5:d 4', �,C-
[Title]
Attest: AJA
SURETY
The HanoveplMrance
[Attorney -in -flet] [Seal i othy P. Lyons
93 Longwater Circle, [Sear
IMA 02061
[Address]
781-681-6656
[Phone]
Attest:,N& A
END OF PERFORMANCE BOND
2
PAYMENT BOND
Bond No. 1050088
KNOW ALL MEN BY THESE PRESENTS, that we L.D. Russo, Inc.
with a place of business at 198
as Principal (the "Principal"), and
Road, Harvard, MA 01451
The Hanover Insurance Company
a
corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at
440 Lincoln Street Worcester MA 01653 as Surety
(the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee
Four Million Five Hundred Thirty-three Thousand
(the "Obligee"), in the sum of And Nol100THS DOLLARS ($4,533,000.00) lawful money of
the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we
bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of
November 11th, 2016
for the construction of Improvements to the Public Works Facility
NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under
said contract shall pay for all labor performed or furnished and for all materials used or employed in said
contract and in any and all duly authorized modifications, alterations, extensions of time, changes or
additions to said contract that may hereafter be made, notice to the Surety of such modifications,
alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but
not be limited to, any other purposes or items set out in, and to be subject to, the provisions of
Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then
this obligation shall become null and void; otherwise, it shall remain in frill force and virtue.
IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this
11th day of November, 2016
PRINCIPAL
L.D. R�usso�Inc.
[Name and Seal]
lies �L �—
[Title]
Attest:
SURETY
The Hanove annce Company
J
[Attorney ' l -fact Se ] Timothy P. Lyons
93 Longwater Circle, Norwell MA 02061
[Address]
781-681-6656
[Phone] '/� ,,
L
Attest: U " a
(J'
END OF PAYMENT BOND
THE HANOVER INSURANCE COMPANY
MASSACHUSETTS BAY INSURANCE COMPANY
CITIZENS INSURANCE COMPANY OF AMERICA
POWERS OF ATTORNEY
CERTIFIED COPY
KNOW ALL MEN BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY, both being
corporations organized and existing under the laws of the State of New Hampshire, and CITIZENS INSURANCE COMPANY OF AMERICA, a corporation
organized and existing under the laws of the State of Michigan, do hereby constitute and appoint
Dennis W. Driscoll, J. Barry Driscoll, Timothy P. Lyons, Claire A. Cavanaugh, John C. Driscoll,
Lena Brownell, George G. Powers and/or Martin L. Donovan
of Norwell, MA and each is a true and lawful Attorney(s)-in-fact to sign, execute, seal, acknowledge and deliver for,
and on its behalf, and as its act and deed any place within the United States, or, if the following line be filled in, only within the area therein designated
any and all bonds, recognizances, undertakings, contracts of indemnity or other writings obligatory in the nature thereof, as follows:
Any such obligations in the United States, not to exceed Twenty Million and No/100 ($20,000,000) in any single instance
and said companies hereby ratify and confirm all and whatsoever said Attorney(s)-in-fact may lawfully do in the premises by virtue of these presents.
These appointments are made under and by authority of the following Resolution passed by the Board of Directors of said Companies which resolutions
are still in effect:
'RESOLVED, That the President or any Vice President, in conjunction with any Vice President, be and they are hereby authorized and empowered to appoint
Attomeys-in-fact of the Company, in its name and as its acts, to execute and acknowledge for and on its behalf as Surety any and all bonds, recognizances,
contracts of indemnity, waivers of citation and all other writings obligatory in the nature thereof, with power to attach thereto the seal of the Company. Any such
writings so executed by such Attorneys -in -fact shall be as binding upon the Company as if they had been duty executed and acknowledged by the regularly
elected officers of the Company in their own proper persons." (Adopted October 7, 1981 - The Hanover Insurance Company; Adopted April 14, 1982 -
Massachusetts Bay Insurance Company; Adopted September 7, 2001 - Citizens Insurance Company of America)
IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE
COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seals, duly attested by two Vice Presidents,
this 31st day of October 2011. THE HANOVER INSURANCE COMPANY
W2 LM
>LM p G4
T
THE COMMONWEALTH OF MASSACHUSETTS )
COUNTY OF WORCESTER ) ss.
MASSACHUS TTS BAY INSURANCE COMPANY
CITIZENS 174NSANCE PANY OF AMERICA
Robert Thomas, Vice President
a Vice P
On this 31st day of October 2011 before me came the above named Vice Presidents of The Hanover Insurance Company, Massachusetts Bay Insurance
Company and Citizens Insurance Company of America, to me personally known to be the individuals and officers described herein, and acknowledged that the
seals affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens
Insurance Company of America, respectively, and that the said corporate seals and their signatures as officers were duly affixed and subscribed to said
instrument by the authority and direction of said Corporations.
@=N
A0.GARIICKotaPu 1rnrltctAhss7d+crM.c
pr,Ep�Srt! 1r.xH
,;P..r- e:21,
Barbara A. Garlick, Notary Public
My Commission Expires September 21, 2018
I, the undersigned Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America,
hereby certify that the above and foregoing is a full, true and correct copy of the Original Power of Attorney issued by said Companies, and do hereby further
certify that the said Powers of Attorney are still in force and effect.
This Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of The Hanover Insurance Company,
Massachusetts Bay Insurance Company and Citizens Insurance Company of America.
'RESOLVED, That any and all Powers of Attorney and Certified Copies of such Powers of Attomey and certification in respect thereto, granted and executed
by the President or any Vice President in conjunction with any Vice President of the Company, shall be binding on the Company to the same extent as if all
signatures therein were manually affixed, even though one or more of any such signatures thereon may be facsimile." (Adopted October 7, 1981 - The
Hanover Insurance Company; Adopted April 14,1982 - Massachusetts Bay Insurance Company; Adopted September7, 2001- Citizens Insurance Company of
America) d(
GIVEN under my hand and the seals of said Companies, at Worcester, Massachusetts, this 4 I day of r �v �t�i'^' 20 ' W .
THE HANOVER INSUNRANCE COMPANY
MASSACHUSETTS BAY INSURANCE COMPANY
CITIZENS INSURANCE COMPANY OF AMERICA
I ' n Margostan, Vice President
PERFORMANCE BOND
Bond No. 1050088
KNOW ALL MEN BY THESE PRESENTS, that we
L.D. Russo, Inc.
with a place of business at
198 Ayer Road, Harvard, MA 01451 , as Principal (the
"Principal'), and The Hanover Insurance Company , a corporation qualified to
do business in the Commonwealth of Massachusetts, with a place of business at
440 Lincoln Street, Worcester, MA 01653 as Surety (the
"Surety"), are held and fir% buil un�o thfiTown8fr I,wil� Ando�er Masdsachusetts as Obligee (the
ur i ion ive undre i y- hr oUsan
"Obligee"), in the sum of And No/100THS DOLLARS, ($4,533,000.00) lawful money of the
United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we
bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has assumed and made a Contract with the Obligee, bearing the date of
November 11, 2016 , for the construction of Improvements to the Public Works Facility
NOW THE CONDITIONS of this obligation are such that if the Principal (and all Subcontractors under
said contract) shall well and truly keep and perform all the undertakings, covenants, agreement, terms and
conditions of said contract on its part to be kept and performed during the original term of said contract
and any extensions thereof that may be granted by the Obligee, with or without notice to the Surety, and
during the life and any guarantee required under the contract, and shall also well and truly keep and
perform all the undertakings, covenants, agreements, terms and conditions of any and all duly authorized
modifications, alterations, changes or additions with notice to the Surety being hereby waived, then this
obligation shall become null and void; otherwise, it shall remain in full force and virtue.
IN THE EVENT the Contract is abandoned by the Principal, or is terminated by the Town of North
Andover, Massachusetts under the applicable provisions of the Contract, the Surety hereby further agrees
that the Surety shall, if requested in writing by the Town of North Andover, Massachusetts promptly take
such action as is necessary to complete said Contract in accordance with its terms and conditions.
IN WITNESS WHEREOF, the Principal and Surety have hereto set their hands and seals this 11th day
of November, 2016
PRINCIPAL
L.D. Russo, Inc.
c�
[Name and Seal]
?Rest �e
[Title]
Attest:
SURETY
The Hanover -Insurance
[Attorney -in -fait] [Seal] Ti of y P. Lyons
93 Longwater Circle, No ell A 02061
[Address]
781-681-6656
[Phone]
Attest:
aa&
END OF PERFORMANCE BOND
7
PAYMENT BOND
Bond No. 1050088
KNOW ALL MEN BY THESE PRESENTS, that we L.D. Russo, Inc.
with a place of business at 198 Ayer Road, Harvard, MA 01451 ,
as Principal (the "Principal'), and The Hanover Insurance Company a
corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at
440 Lincoln Street Worcester MA 01653 as Surety
(the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee
Four Million Five Hundred Thirty-three Thousand
(the "Obligee"), in the sum of And No/100THS DOLLARS, ($4,533 lawful money of
the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we
bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of
November 11th, 2016 , for the construction of Improvements to the Public Works Facility
NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under
said contract shall pay for all labor performed or furnished and for all materials used or employed in said
contract and in any and all duly authorized modifications, alterations, extensions of time, changes or
additions to said contract that may hereafter be made, notice to the Surety of such modifications,
alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but
not be limited to, any other purposes or items set out in, and to be subject to, the provisions of
Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then
this obligation shall become null and void; otherwise, it shall remain in frill force and virtue.
IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this
11th day of November, 2016
PRINCIPAL
L.D. Rus o, Inc.
[Name and Seal]
�-' .
[Title]
Attest:
SURETY
The Hano urance Company
[Attorney-' -fact] [Sal] imothy P. Lyons
93 Longwater Circle, orwell MA 02061
[Address]
781-681-6656
[Phone]
END OF PAYMENT BOND
THE HANOVER INSURANCE COMPANY
MASSACHUSETTS BAY INSURANCE COMPANY
CITIZENS INSURANCE COMPANY OF AMERICA
POWERS OF ATTORNEY
CERTIFIED COPY
KNOW ALL MEN BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY, both being
corporations organized and existing under the laws of the State of New Hampshire, and CITIZENS INSURANCE COMPANY OF AMERICA, a corporation
organized and existing under the laws of the State of Michigan, do hereby constitute and appoint
Dennis W. Driscoll, J. Barry Driscoll, Timothy P. Lyons, Claire A. Cavanaugh, John C. Driscoll,
Lena Brownell, George G. Powers and/or Martin L. Donovan
of Norwell, MA and each is a true and lawful Attorney(s)-in-fact to sign, execute, seal, acknowledge and deliver for,
and on its behalf, and as its act and deed any place within the United States, or, if the following line be filled in, only within the area therein designated
any and all bonds, recognizances, undertakings, contracts of indemnity or other writings obligatory in the nature thereof, as follows:
Any such obligations in the United States, not to exceed Twenty Million and Noll 00 ($20,000,000) in any single instance
and said companies hereby ratify and confirm all and whatsoever said Attomey(s)-in-fact may lawfully do in the premises by virtue of these presents.
These appointments are made under and by authority of the following Resolution passed by the Board of Directors of said Companies which resolutions
are still in effect:
'RESOLVED, That the President or any Vice President, in conjunctionwith arty Vice President, be and they are hereby authorized and empowered to appoint
Attomeys-in-fact of the Company, in its name and as its acts, to execute and acknowledge for and on its behalf as Surety any and all bonds, recognizances,
contracts of indemnity, waivers of citation and all othermitings obligatory in the nature thereof, with power to attach thereto the seal of the Company. Anysuch
writings so executed by such Attorneys -in -fact shall be as binding upon the Company as if they had been duly executed and acknowledged by the regularly
elected officers of the Company in their own proper persons.' (Adopted October 7, 1981 - The Hanover Insurance Company; Adopted April 14, 1982 -
Massachusetts Bay Insurance Company; Adopted September 7, 2001 - Citizens Insurance Company of America)
IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE
COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seals, duly attested by two Vice Presidents,
this 31st day of October 2011.
st
1014
00 q:1
THE COMMONWEALTH OF MASSACHUSETTS )
COUNTY OF WORCESTER ) ss.
THE HANOVER INSURANCE COMPANY
MASSACHUSETTS BAY INSURANCE COMPANY
CITIZENS ItyS ANCE�PANY OF AMERICA
Robert Thomas, Vice President
A/1 //,-o
r
Mall~ Vice P
On this 31st day of October 2011 before me came the above named Vice Presidents of The Hanover Insurance Company, Massachusetts Bay Insurance
Company and Citizens Insurance Company of America, tome personally known to be the individuals and officers described herein, and acknowledged that the
seals affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens
Insurance Company of America, respectively, and that the said corporate seals and their signatures as officers were duly affixed and subscribed to said
instrument by the authority and direction of said Corporations.
��' Q�r BARBARA A GARllgt
Notary PubrK
1i ; C;r�oarsrahalWsutficiePs
'� 4
rtrtc-carE Sic!1�.tn1
Barbara A. Garlick, Notary Public
My Commission Expires September 21, 2018
I, the undersigned Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America,
hereby certify that the above and foregoing is a full, true and correct copy of the Original Power of Attorney issued by said Companies, and do hereby further
certify that the said Powers of Attorney are still in force and effect.
This Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of The Hanover Insurance Company,
Massachusetts Bay Insurance Company and Citizens Insurance Company of America.
'RESOLVED. That any and all Powers of Attorney and Certified Copies of such Pourers of Attomey and certification in respect thereto, granted and executed
by the President or any Vice President in conjunction with any Vice President of the Company, shall be binding on the Company to the same extent as if all
signatures therein were manually affixed, even though one or more of any such signatures thereon may be facsimile." (Adopted October 7, 1981 - The
Hanover Insurance Company; Adopted April 14,1982 - Massachusetts Bay Insurance Company; Adopted September7, 2001- Citizens Insurance Companyof
America)
GIVEN under my hand and the seals of said Companies, at Worcester, Massachusetts, this I,'r day of �Npfnbe(20/(0 .
THE HANOVER INSURANCE COMPANY
MASSACHUSETTS BAY INSURANCE COMPANY
CITIZENS INSURANCE COMPANY OF AMERICA
04—
q!on Margosian, Vice President
PERFORMANCE BOND
Bond No. 1050088
KNOW ALL MEN BY THESE PRESENTS, that we
L.D. Russo, Inc.
with a place of business at
_0
198 Aver Road, Harvard, MA 01451 , as Principal (the
"Principal"), and The Hanover Insurance Company , a corporation qualified to
do business in the Commonwealth of Massachusetts, with a place of business at
440 Lincoln Street, Worcester, MA 01653 �� }, as Surety (the
"Surety"), are held and firrr�l� b inion o tli� drec�Th,oill Atidwi,Masanachusetts as Obligee (the
"Obligee"), in the sum of And No/100THS DOLLARS, ($4,533,000.00) lawful money of the
United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we
bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has assumed and made a Contract with the Obligee, bearing the date of
November 11, 2016 , for the construction of Improvements to the Public Works Facility
NOW THE CONDITIONS of this obligation are such that if the Principal (and all Subcontractors under
said contract) shall well and truly keep and perform all the undertakings, covenants, agreement, terms and
conditions of said contract on its part to be kept and performed during the original term of said contract
and any extensions thereof that may be granted by the Obligee, with or without notice to the Surety, and
during the life and any guarantee required under the contract, and shall also well and truly keep and
perform all the undertakings, covenants, agreements, terms and conditions of any and all duly authorized
modifications, alterations, changes or additions with notice to the Surety being hereby waived, then this
obligation shall become null and void; otherwise, it shall remain in full force and virtue.
IN THE EVENT the Contract is abandoned by the Principal, or is terminated by the Town of North
Andover, Massachusetts under the applicable provisions of the Contract, the Surety hereby further agrees
that the Surety shall, if requested in writing by the Town of North Andover, Massachusetts promptly take
such action as is necessary to complete said Contract in accordance with its terms and conditions.
IN WITNESS WHEREOF, the Principal and Surety have hereto set their hands and seals this 11th day
of November, 2016
PRINCIPAL
L.D. Russ q, Inc.
[Name and Seal]
-?Res ielePt �—
[Title]
Attest:
SURETY
The Hanove surance C pany
[Attorney -in act] [Seal]i othy P. Lyons
93 Longwater Circle, No A 02061
[Address]
781-681-6656
[Phone]
Attest:
END OF PERFORMANCE BOND
0
v/
PAYMENT BOND
Bond No. 1050088
KNOW ALL MEN BY THESE PRESENTS, that we L.D. Russo, Inc.
with a place of business at 198
as Principal (the "Principal'), and
Road. Harvard. MA 01451
The Hanover Insurance Company
corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at
440 Lincoln Street Worcester MA 01653 as Surety
(the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee
Four Million Five Hundred Thirty-three Thousand
(the "Obligee"), in the sum of And No/100THS DOLLARS, ($4-533.000.00) lawful money of
the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we
bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of
November 11th, 2016 , for the construction of Improvements to the Public Works Facility
NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under
said contract shall pay for all labor performed or furnished and for all materials used or employed in said
contract and in any and all duly authorized modifications, alterations, extensions of time, changes or
additions to said contract that may hereafter be made, notice to the Surety of such modifications,
alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but
not be limited to, any other purposes or items set out in, and to be subject to, the provisions of
Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then
this obligation shall become null and void; otherwise, it shall remain in fiill force and virtue.
IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this
11th day of November, 2016
PRINCIPAL
L.D. Russa Inc.
[Name and Sea)]
PeeSi e�
[Title]
Attest:
SURETY
The Hanov rance C ny
[Attorney -i fact] [S ] imothy P. Lyons
93 Longwater Circle, Orwell MA 02061
[Address]
781-681-6656
[Phone]
Attest:
END OF PAYMENT BOND
THE HANOVER INSURANCE COMPANY
MASSACHUSETTS BAY INSURANCE COMPANY
CITIZENS INSURANCE COMPANY OF AMERICA
POWERS OF ATTORNEY
CERTIFIED COPY
KNOW ALL MEN BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY, both being
corporations organized and existing under the laws of the State of New Hampshire, and CITIZENS INSURANCE COMPANY OF AMERICA, a corporation
organized and existing under the laws of the State of Michigan, do hereby constitute and appoint
Dennis W. Driscoll, J. Barry Driscoll, Timothy P. Lyons, Claire A. Cavanaugh, John C. Driscoll,
Lena Brownell, George G. Powers and/or Martin L. Donovan
of Norwell, MA and each is a true and lawful Attorney(s)-in-fact to sign, execute, seal, acknowledge and deliver for,
and on its behalf, and as its act and deed any place within the United States, or, if the following line be filled in, only within the area therein designated
any and all bonds, recognizances, undertakings, contracts of indemnity or other writings obligatory in the nature thereof, as follows:
Any such obligations in the United States, not to exceed Twenty Million and No/100 ($20,000,000) in any single instance
and said companies hereby ratify and confirm all and whatsoever said Attomey(s)-in-fact may lawfully do in the premises by virtue of these presents.
These appointments are made under and by authority of the following Resolution passed by the Board of Directors of said Companies which resolutions
are stili in effect:
"RESOLVED, That the President or any Vice President, in conjunction with arryYce President, be and they are hereby authorized and empowered toappoint
Attomeys-in-fact of the Company, in its name and as its acts, to execute and acknowledge for and on its behalf as Surety any and all bonds, recognizances,
contracts of indemnity, waivers of citation and all otherwritings obligatory in the nature thereof, with power to attach thereto the seal of the Company. Any such
writings so executed by such Attomeys-in-tact shall be as binding upon the Company as if they had been duly executed and acknowledged by the regularly
elected officers of the Company in their own proper persons." (Adopted October 7, 1981 - The Hanover Insurance Company; Adopted April 14, 1982 -
Massachusetts Bay Insurance Company; Adopted September 7, 2001 - Citizens Insurance Company or America)
IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE
COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seals, duly attested by two Vice Presidents,
this 31 st day of October 2011. THE HANOVER INSURANCE COMPANY
M2 %% 11414ja
y 10 Z I07s
THE COMMONWEALTH OF MASSACHUSETTS )
COUNTY OF WORCESTER ) ss.
MASSACHUSETTS BAY INSURANCE COMPANY
CITIZENS lNSANCE PANY OF AMERICA
rv4,--
Robert Thomas, Vice President
Ma79ft
104A. Vice P
On this 31stday of October 2011 before me came the above named Vice Presidents of The Hanover Insurance Company, Massachusetts Bay Insurance
Company and Citizens Insurance Company of America, to me personally known to be the individuals and officers described herein, and acknowledged that the
seals affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens
Insurance Company of America, respectively, and that the said corporate seals and their signatures as officers were duly affixed and subscribed to said
instrument by the authority and direction of said Corporations.
�' a�� BARBARAA GARUCK
r Notary Public
i ��1' -� �cr.�fip;rllMClhgSlidY.SlAt
3 `UtGroa'76?c�Se72t.141!
Barbara A. Garlick, Notary Public
My Commission Expires September 21, 2018
I, the undersigned Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America,
hereby certify that the above and foregoing is a full, true and correct copy of the Original Power of Attorney issued by said Companies, and do hereby further
certify that the said Powers of Attorney are still in force and effect.
This Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of The Hanover Insurance Company,
Massachusetts Bay Insurance Company and Citizens Insurance Company of America.
'RESOLVED. That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto, granted and executed
by the President or any Vice President in conjunction with any Vice President of the Company, shall be binding on the Company to the same extent as if all
signatures therein were manually affixed, even though one or more of any such signatures thereon may be facsimile." (Adopted October 7, 1981 - The
Hanover Insurance Company; Adopted April 14,1982 - Massachusetts Bay Insurance Company, Adopted September7, 2001 -Citizens Insurance Companyof
America) y,
GIVEN under my hand and the seals of said Companies, at Worcester, Massachusetts, this Jil' day of ,�, I� `1'll 20
�.
THE HANOVER INSURANCE COMPANY
MASSACHUSETTS BAY INSURANCE COMPANY
CnUENS INSURANCE COMPANY OF AMERICA
!on Margosian, Vice President