HomeMy WebLinkAboutContract #: 975 - From: 06-29-2017 To: 09-15-2017 - SprinTurf, LLC - North Andover School Department�03M
NORTH ANDOVER SCHOOL DEPARTMENT
CONTRACT
(GOODS / SERVICES)
CONTRACT 4 _
.q
DATE: 06-09-04017
This Contract is entered into on, or as of, this date by and between the North Andover
School Department (the "School"), and
Contractor: SprinTurf, LLC
Address: 550 Long Point Road, Suite 205
Mount Pleasant, SC 29464
Telephone Number: 1 -877 -686 -TURF (8873)
Fax Number:
l . This is a Contract for the procurement of the following:
To furnish all labor, equipment and materials required for the construction of the
Replacement of Turf Fields Project at North Andover High School, North Andover,
MA.
2. The Contract price to be paid to the Contractor by the North Andover School Department
is:
Base Bid: $523,000
Alternate 1 (Logo) $ 5,900
Alternate 2 (Track and Field) $267,000
Total $795,900
3. Payment will be made as follows:
Upon completion and acceptance of work and receipt of invoice (net 30).
4. Definitions
(Rev 1-2016) Contract by and between North Andover School Department and SprinTurf, LLC Page 1
4.1 Acceptance: All Contracts require proper acceptance of the described goods or
services by the North Andover School Department. Proper acceptance shall be
understood to include inspection of goods and certification of acceptable
performance for services by authorized representatives of the School to insure that
the goods or services are complete and are as specified in the Contract.
4.2 Contract Documents: All documents relative to the Contract including (where
used) Invitation to Bid, Request for Proposals, Instructions to Bidders/Proposers,
Proposal Form, General Conditions, Supplementary General Conditions, General
Specifications, Other Specifications included in Project Manual, Drawings, and all
Addenda issued during the bidding period or proposal. The Contract documents are
complementary, and what is called for by any one shall be as binding as if called for
by all. The intention of the document is to include all labor and materials,
equipment and transportation necessary for the proper performance of the Contract.
4.3 The Contractor: The "other party" to any Contract with the School. This term
shall (as the sense and particular Contract so require) include Vendor, Contractor,
Engineer, or other label used to identify the other party in the particular Contract.
Use of the term "Contractor" shall be understood to refer to any other such label
used. The Contractor's relationship to the School is that of an independent
contractor and not that of an agent or employee of the School.
4.4 Date of Substantial Performance: The date when the work is sufficiently complete,
the services are performed, or the goods delivered, in accordance with Contract
documents, as modified by approved Amendments and Change Orders.
4.5 Goods: Goods, Supplies or Materials.
4.6 Sub -Contractor: Those having a direct Contract with the Contractor. The term
includes one who furnished material worked to a special design according to the
Drawings or Specifications of this work, but does not include one who merely
furnishes material not so worked.
4.7 Work: The services or materials contracted for, or both.
5. Term of Contract and Time for Performance
This Contract shall be fully performed by the Contractor in accordance with the provisions
of the Contract Documents on or before September 15, 2017, unless extended pursuant to
a provision for extension contained in the Contract documents at the sole discretion of the
School, and not subject to assent by the Contractor, and subject to the availability and
appropriation of funds as certified by the Town Accountant.
The time limits stated in the Contract documents are of the essence of the Contract.
6. Subject to Appropriation
(Rev 1-2016) Contract by and between North Andover School Department and SprinTurf, LLC Page 2
Notwithstanding anything in the Contract documents to the contrary, any and all payments
which the School is required to make under this Contract shall be subject to appropriation
or other availability of funds as certified by the Town Accountant. The School may
immediately terminate or suspend this Agreement without liability on the part of the School
for damages, penalties or other charges in the event the appropriation funding this
Agreement is terminated or reduced to an amount which will be insufficient to support
anticipated future obligations under this Agreement.
7. Permits and Approvals
Permits, Licenses, Approvals and all other legal or administrative prerequisites to its
performance of the Contract shall be secured and paid for by the Contractor.
8. Termination and Default
8.1 Without Cause. The School may terminate this Contract at its sole discretion on
seven (7) calendar days' notice when in the best interests of the School by providing
notice to the Contractor, which shall be in writing and shall be deemed delivered and
received when given in person to the Contractor, or when received by fax, express
mail, certified mail return receipt requested, regular mail postage prepaid or delivered
by any other appropriate method evidencing actual receipt by the Contractor. Upon
termination without cause, Contractor will be paid for services rendered to the date of
termination.
8.2 For Cause. if the Contractor is determined by the School to be in default of any term
or condition of this Contract, the School may terminate this Contract on seven (7)
days' notice by providing notice to the Contractor, which shall be in writing and shall
be deemed delivered and received when given in person to the Contractor, or when
received by fax, express mail, certified mail return receipt requested, regular mail
postage prepaid or delivered by any other appropriate method evidencing actual
receipt by the Contractor.
8.3 Default. The following shall constitute events of a default under the Contract:
1) any material misrepresentation made by the Contractor to the School; 2) any
failure to perform any of its obligations under this Contract including, but not
limited to the following: (i) failure to commence performance of this Contract at
the time specified in this Contract due to a reason or circumstance within the
Contractor's reasonable control, (ii) failure to perform this Contract with
sufficient personnel and equipment or with sufficient material to ensure the
completion of this Contract within the specified time due to a reason or
circumstance within the Contractor's reasonable control, (iii) failure to perform
this Contract in a manner reasonably satisfactory to the School, (iv) failure to
promptly re -perform within a reasonable time the services that were rejected by
the School as unsatisfactory, or erroneous, (v) discontinuance of the services for
reasons not beyond the Contractor's reasonable control, (vi) failure to comply
with a material term of this Contract, including, but not limited to, the provision
(Rev 1-2016) Contract by and between North Andover School Department and SprinTurf, LLC Page 3
of insurance and non-discrimination, (vii) any other acts specifically and
expressly stated in this Contract as constituting a basis for termination of this
Contract, and (viii) failure to comply with any and all requirements of federal or
state law and/or regulations, and "Town bylaws and/or regulations.
9. The Contractor's Breach and the School's Remedies
Failure of the Contractor to comply with any of the terms or conditions of this Contract
shall be deemed a material breach of this Contract, and the North Andover School
Department shall have all the rights and remedies provided in the Contract documents, the
right to cancel, terminate, or suspend the Contract in whole or in part, the right to maintain
any and all actions at law or in equity or other proceedings with respect to a breach of this
Contract, including damages and specific performance, and the right to select among the
remedies available to it by all of the above.
From any sums due to the Contractor for services, the School may keep the whole or any
part of the amount for expenses, losses and damages incurred by the School as a
consequence of procuring services as a result of any failure, omission or mistake of the
Contractor in providing services as provided in this Contract.
10. Statutory Compliance
10.1 This Contract will be construed and governed by the provisions of applicable
federal, state and local laws and regulations; and wherever any provision of the
Contract or Contract documents shall conflict with any provision or requirement of
federal, state or local law or regulation, then the provisions of law and regulation
shall control. Where applicable to the Contract, the provisions of the Massachusetts
General Laws are incorporated by reference into this Contract, including, but not
limited to, the following:
M.G.L. Chapter 30B — Procurement of Goods and Services.
M.G.L. Chapter 30, Sec. 39, et seq: - Public Works Contracts.
M.G.L. Chapter 149, Section 44A, et seq: Public Buildings Contracts.
10.2 Wherever applicable law mandates the inclusion of any term and provision into a
municipal contract, then it shall be understood that this Agreement shall import
such term or provision into this Contract. To whatever extent any provision of this
Contract shall be inconsistent with any law or regulation limiting the power or
liability of cities and towns, such law or regulation shall control.
10.3 The Contractor shall give all notices and comply with all laws and regulations
bearing on the performance of the Contract. If the Contractor performs the Contract
in violation of any applicable law or regulation, the Contractor shall bear all costs
(Rev 1-2016) Contract by and between North Andover School Department and SprinTurf, LLC Page 4
arising therefrom.
10.4 The Contractor shall keep itself fully informed of all existing and future State and
Federal Laws and Municipal By-laws and Regulations and of all orders and decrees
of any bodies or tribunals having jurisdiction in any manner affecting those engaged
or employed in the work, of the materials used in the work or in any way affecting
the conduct of the work. If any discrepancy or inconsistency is discovered in the
Drawings, Specifications, Scope of Business or Contract for this work in violation
of any such law, by-law, regulation, order or decree, it shall forthwith report the
same in writing to the School. It shall, at all times, itself observe and comply with
all such existing and future laws, by-laws, regulations, orders and decrees; and shall
protect and indemnify the North Andover School Department, and its duly
appointed agents against any claim or liability arising from or based on any
violation whether by it or its agents, employees or subcontractors of any such law,
by-law, regulation or decree.
11. Conflict of Interest
Both the School and the Contractor acknowledge the provisions of the State Conflict of
Interest Law (General Laws c268A), and this Contract expressly prohibits any activity
which shall constitute a violation of that law. The Contractor shall be deemed to have
investigated the application of M.G.L. c268A to the performance of this Contract; and by
executing the Contract documents the Contractor certifies to the School that neither it nor
its agents, employees, or subcontractors are thereby in violation of General Laws Chapter
268A.
12. Certification of Tax Compliance
This Contract must include a certification of tax compliance by the Contractor, as required
by General Laws c62C, Section 49A (Requirement of Tax Compliance by All Contractors
Providing Goods, Services, or Real Estate Space to the Commonwealth or Subdivision).
13. Affirmative Action-, Non -Discrimination
The Contractor will carry out the obligations of this Contract in full compliance with all of
the requirements imposed by or pursuant to General Laws c151B (Law Against
Discrimination) and any executive orders, rules, regulations, and requirements of the
Commonwealth of Massachusetts as they may from time to time be amended.
The Contractor shall comply with all federal and state laws, rules and regulations
promoting fair employment practices or prohibiting employment discrimination and unfair
labor practices and shall not discriminate in the hiring of any applicant for employment nor
shall any qualified employee be demoted, discharged or otherwise subject to discrimination
in the tenure, position, promotional opportunities, wages, benefits or terms and conditions
of their employment because of race, color, national origin, ancestry, age, sex, religion,
disability, handicap, sexual orientation or for exercising any rights afforded by law.
(Rev 1-2016) Contract by and between North Andover School Department and SprinTurf, LLC Page 5
14. Condition of Enforceability Against the School
This Contract is only binding upon, and enforceable against, the School if; (1) the Contract
is signed by the School Superintendent or its designee; and (2) endorsed with approval by
the Town Accountant as to appropriation or availability of funds.
15. Corporate Contractor
If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its
Clerk's Certificate or if a Limited Liability Corporation, a Manager's Certificate or other
documentation satisfactory to the School certifying the corporate capacity and authority of
the party signing this Contract for the corporation. Such certificate shall be accompanied
by a letter or other instrument stating that such authority continues in fall force and effect
as of the date the Contract is executed by the Contractor. This Contract shall not be
enforceable against the North Andover School Department unless and until the Contractor
complies with this section,
The Contractor, if a foreign corporation, shall comply with the provisions of the General
Laws, c181, §3, and any Acts and Amendments thereof, and in addition thereto, relating to
the appointment of the Commissioner of Corporations as its attorney, shall file with the
Commissioner of Corporations a Power of Attorney and duly authenticated copies of its
Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws
of the Commonwealth.
16. Liability of Public Officials
To the full extent permitted by law, no official, employee, agent or representative of the
North Andover School Department shall be individually or personally liable on any
obligation of the School under this Contract.
17. Indemnification
The Contractor shall indemnify, defend and save harmless the School, the School's
officers, attorneys, agents and employees, fiom and against any and all damages, liabilities,
actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and
judgments of every nature and description (including reasonable attorneys' fees) that may
arise in whole or in part out of or in connection with the work being performed or to be
performed, or out of any act or omission by the Contractor, its employees, agents,
subcontractors, material men, and anyone directly or indirectly employed by any of them or
anyone for whose acts any of them may be liable, regardless of whether or not it is caused
in part by any party indemnified hereunder. The Contractor further agrees to reimburse the
School for damage to its property caused by the Contractor, its employees, agents,
subcontractors or material men, and anyone directly or indirectly employed by any of them
or anyone for whose acts any of them may be liable, including damages caused by his, its'
(Rev 1-2016) Contract by and between North Andover School Department and SprinTurf, LLC rage 6
or their use of faulty, defective, or unsuitable material or equipment, unless the damage is
caused by the School's gross negligence or willful misconduct. The existence of insurance
shall in no way limit the scope of the Contractor's indemnification under this contract.
18. Workers Compensation Insurance
The Contractor shall provide by insurance for the payment of compensation and the
furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts (The
Worker's Compensation Act) to all employees of the Contractor who are subject to the
provisions of Chapter 152 of the General Laws of Massachusetts.
Failure to provide and continue in force such insurance during the period of this Contract
shall be deemed a material breach of this Contract, shall operate as an immediate
termination thereof, and the Contractor shall indemnify the School for all losses, claims,
and actions resulting from the failure to provide the insurance required by this Article.
The Contractor shall furnish to the School evidence of such insurance prior to the execution
of this Contract in a form satisfactory to the School before the same shall be binding on the
parties thereto, except if specifically waived by the School.
18.1 The Contractor further understands and agrees that in rendering services to the
School under this Contract that the Contractor is an independent contractor and not
an employee of the School, that the Contractor is not covered by the Town's
Workers' Compensation, or liability insurance, that the Contractor shall not make
any claim against the School, its officers, agents and employees and that the
Contractor indemnifies, holds harmless, and releases the School from any claims of
the Contractor or of any other party that may arise in whole or in part out of or in
connection with the work being performed by the Contractor.
19. Documents, Materials, Etc.
Any materials, reports, information, data, etc. given to or prepared or assembled by the
Contractor under this Contract are to be kept confidential and shall not be made available to
any individual or organization by the Contractor (except agents, servants, or employees of
the Contractor) without the prior written approval of the School, except as otherwise
required by law. The Contractor shall comply with the provisions of Chapter 66 and
Chapter 66A of the General Laws of Massachusetts as they relates to public documents,
and all other state and federal laws and regulations relating to confidentiality, security,
privacy and use of confidential data.
Any materials produced in whole or in part under this Contract shall not be subject to
copyright, except by the School, in the United States or any other country. The School
shall have unrestricted authority to, without payment of any royalty, commission, or
additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise
use, and authorize others to use, in whole or in part, any reports, data or other materials
prepared under this Contract.
(Rev 1-2016) Contract by and between North Andover School Department and Sprin'rurf, LLC Page 7
All data, reports, programs, software, equipment, furnishings, and any other documentation
or product paid for by the School shall vest in the School. The Contractor shall at all times,
during or after tertnination of this Contract, obtain the prior written approval of the School
before making any statement bearing on the work performed or data collected under this
Contract to the press or issues any material for publication through any medium.
20. Confidentiality
The Contractor shall comply with M.G.L. c66A if the Contractor becomes a "holder" of
"personal data". The Contractor shall also protect the physical security and restrict any
access to personal or other School data in the Contractor's possession, or used by the
Contractor in the performance of this Contract, which shall include, but is not limited to the
School's public records, documents, files, software, equipment or systems.
21. Record -Keeping and Retention, Inspection of Records
The Contractor shall maintain records, books, files and other data as specified in this
Contract and in such detail as shall properly substantiate claims for payment under this
Contract, for a minimum retention period of seven (7) years beginning on the first day after
the final payment under this Contract, or such longer period as is necessary for the
resolution of any litigation, claim, negotiation, audit or other inquiry involving this
Contract. The School shall have access during the Contractor's regular business hours and
upon reasonable prior notice, to such records, including on-site reviews and reproduction of
such records at a reasonable expense.
22. Assignment
The Contractor shall not assign or delegate, in whole or in part or otherwise transfer any
liability, responsibility, obligation, duty or interest under this Contract without the written
approval of the School.
23. Subcontracting By Contractor
Any subcontract entered into by the Contractor for the purposes of fulfilling the obligations
under this Contract must be in writing, authorized in advance by the School and shall be
consistent with and subject to the provisions of this Contract. Subcontracts will not relieve
or discharge the Contractor from any duty, obligation, responsibility or liability arising
under this Contract. The School is entitled to copies of all subcontracts and shall not be
bound by any provisions contained in a subcontract to which it is not a party.
24. Risk of Loss
The Contractor shall bear the risk of loss for any Contractor materials used for this Contract
and for all deliveries, and personal or other data which is in the possession of the
(Rev 1-2016) Contract by and between North Andover School Department and SprinTurf, LLC Page 8
Contractor or used by the Contractor in the performance of this Contract until possession,
ownership and full legal title to the deliverables are transferred to and accepted by the
School.
25. Minimum Wage/Prevailing Wage
The Contractor will carry out the obligations of this Contract in full compliance with all of
the requirements imposed by or pursuant to General Laws el51, §1, et seq. (Minimum
Wage Law) and any executive orders, rules, regulations, and requirements of the
Commonwealth of Massachusetts as they may from time to time be amended. The
Contractor will at all times comply with the wage rates as determined by the Commissioner
of the Department of Labor and Industries, under the provisions of General Laws c149,
§§26 to 27D (Prevailing Wage Law), as shall be in force and as amended. The Contractor
will, in addition to any other submissions required by the Prevailing Wage Law, submit
certified weekly payrolls to the School with the information described in General Laws
c149, §27B.
26. Audit Inspection and Recordkeepinn
At any time during normal business hours, and as often as the School may deem it
reasonably necessary, there shall be available in the office of the Contractor for the purpose
of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices,
materials, payrolls, records of personnel, conditions of employment and other data relating
to all matters covered by this Agreement.
27. Payment
The School agrees to make all reasonable efforts to pay to the Contractor the sum set forth
in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing
the work completed and acceptance from the School of the work completed.
28. Waiver and Amendment
Amendments, or waivers of any additional term, condition, covenant, duty or obligation
contained in this Contract may be made only by written amendment executed by all
signatories to the original Contract, prior to the effective date of the amendment.
To the extent allowed by law, any conditions, duties, and obligations contained in this
Contract may be waived only by written agreement by both parties.
Forbearance or indulgence in any form or manner by a party shall not be construed as a
waiver, nor in any manner limit the legal or equitable remedies available to that party. No
waiver by either party of any default or breach shall constitute a waiver of any subsequent
default or breach of a similar or different matter.
29. Forum and Choice of Law
(Rev 1-2016) Contract by and between North Andover School Department and SprinTurf, LLC Page 9
This Contract and any performance herein shall be governed by and be construed in
accordance with the laws of the Commonwealth of Massachusetts. Any and all
proceedings or actions relating to subject matter herein shall be brought and maintained in
the courts of the Commonwealth of Massachusetts, which shall have exclusive jurisdiction
thereof. This paragraph shall not be construed to limit any other legal rights of the parties.
30. Notices
Any notice permitted or required under the provisions of this Contract to be given or served
by either of the parties hereto upon the other party hereto shall be in writing and signed in
the name or on the behalf of the party giving or serving the same. Notice shall be deemed
to have been received at the time of actual service or three (3) business days after the date
of a certified or registered mailing properly addressed. Notice to the Contractor shall be
deemed sufficient if sent to the address set forth in the Contract and to the North Andover
School Department by being sent to the School Superintendent, North Andover School
Department, 566 Main Street, North Andover, Massachusetts 01845.
31. Binding on Successors
This Contract shall be binding upon the Contractor, its assigns, transferees, and/or
successors in interest (and where not corporate, the heirs and estate of the Contractor).
32. Complete Contract
This instrument, together with its endorsed supplements, and the other components of the
contract documents, constitutes the entire contract between the parties, with no agreements
other than those incorporated herein.
33. Contractor Certifications
33.1 By signing this contract, the Contractor certifies under the penalties of perjury that
pursuant to General Laws c62C §49A, the Contractor has filed all state tax returns,
paid all taxes and complied with all laws of the Commonwealth relating to taxes;
and that pursuant to General Laws c151A, §19A, the Contractor has complied with
all laws of the Commonwealth relating to contributions and payments in lieu of
contributions.
33.2 By signing this contract, the Contractor certifies under the penalties of perjury that
this contract has been obtained in good faith and without collusion or fraud with
any other person. As such in this certification, the word "person" shall mean any
natural person, business, partnership, corporation, union, committee, client or other
organization, entity or group of individuals.
(Rev 1-2016) Contract by and between North Andover School Department and SprinTurf, LLC Page 10
33.3 Qualifications. The Contractor certifies it is qualified and shall at all times remain
qualified to perform this Contract, that performance shall be timely and meet or
exceed industry standards for the performance required, including obtaining
requisite licenses, registrations, pennits, resources for performance, and sufficient
professional, liability, and other appropriate insurance to cover the performance. If
the Contractor is a corporation, the Contractor certifies that it is in good standing
with the office of the Secretary of State. If the Contractor is a foreign business, the
Contractor certifies that it is listed under the Secretary of State's website as licensed
to do business in Massachusetts, as required by law.
33.4 Business Ethics and Fraud, Waste and Abuse Prevention. The Contractor certifies
that performance under this Contract, in addition to meeting the terms of the
Contract, will be made using ethical business standards and good stewardship of
taxpayer and other public funding and resources to prevent fraud, waste and abuse.
33.5 Debarment. The Contractor certifies that neither it nor any of its subcontractors are
currently debarred or suspended by the federal or state government under any law
or regulations including, Executive Order 147, M.G.L. e29, §29F, M.G.L. c30,
§39R, M.G.L. c149, §27C, M.G.L. 049, §44C, M.G.L. c149, §148B and M.G.L.
c152, §25C.
34. Additional Provisions:
34.1 Applicable to Contracts for the Procurement of Goods
34.1.1 "Goods" shall mean Goods, Supplies, or Materials, as described in the
Contract.
34.1.2 Change Orders:
Change orders for contracts subject to M.G.L. c30B may not increase the total
contract price by more than twenty-five (25.0%) percent and shall be in compliance
with Massachusetts General Laws c3 OB, §13.
This Contract for purchase includes the following delivery, installation or setup
requirements:
34.2 Applicable to Contracts for Services
(Rev 1-2016) Contract by and behveen North Andover School Department and SprinTurf, LLC Page 11
34.2.1 "Services" shall mean furnishing of labor, time, or effort by the Contractor.
This term shall not include employment agreements, collective bargaining
agreements, or grant agreements.
34.2.2 Change Orders:
Change orders for contracts subject to Massachusetts General Laws c30B
may not increase the total contract price by more than twenty-five (25%) per
cent and shall be in compliance with Massachusetts General Laws c30B,
§13.
34.2.3 Minimum Wage/Prevailing Wage:
The Contractor will carry out the obligations of this Contract in full
compliance with all of the requirements imposed by or pursuant to General
Laws c151, §1, et seq. (Minimum Wage Law) and any executive orders,
rules, regulations, and requirements of the Commonwealth of Massachusetts
as they may from time to time be amended. The Contractor will at all times
comply with the wage rates as determined by the Commissioner of the
Department of Labor and Industries, under the provisions of General Laws
c149, §§26 to 27D (Prevailing Wage Law), as shall be in force and as
amended. The Contractor will, in addition to any other submissions
required by the Prevailing Wage Law, submit certified weekly payrolls to
the School with the information described in General Laws c149, §27B.
34.2.4 Insurance:
The Contractor shall obtain and maintain the following insurance:
34.2.4.1 Workers Compensation Insurance of the scope and amount
required by the laws of the Commonwealth of Massachusetts.
34.2.4.2 Broad Form Commercial General Liability coverage with limits of
at least $1 Million per occurrence and $2 Million aggregate, and
which shall cover bodily injury, death, or properly damage arising
out of the work. el
34.2.4.3 Automobile Liability Coverage, including coverage for owned,
hired, or borrowed vehicles with limits of at least $1 Million per
person, and $1 Million per accident. The intent of the
Specifications regarding insurance is to specify minimum coverage
and minimum limits of liability acceptable under the Contract.
However, it shall be the Contractor's responsibility to purchase and
maintain insurance of such character and in such amounts as will
adequately protect it and the School from and against all claims,
damages, losses and expenses resulting from exposure to any
casualty liability in the performance of the work.
(Rev 1-2016) Contract by and behveen North Andover School Department and SprinTurf, LLC Page 12
34.2.4.3 All required insurance shall be certified by a duly authorized
representative of the insurers on the "MIIA" or "ACORD"
Certificate of Insurance form incorporated into and made a part of
this agreement. Properly executed certificates signifying adequate
coverage in effect for the duration of the contract with renewal
certificates issued not less than 30 days prior to expiration of a
policy period, must be submitted to the School prior to
commencement of this Contract.
34.2.4.4 The School shall be named as an additional insured on the above
referenced liability policies, and the Contractor's insurance shall
be the primary coverage. The cost of such insurance, including
required endorsements or amendments, shall be the sole
responsibility of the Contractor.
34.2.4.5 Contractual liability must recognize the indemnities contained in
this Agreement.
34.2.4.6 Coverages are to be maintained for a period of two (2) years after
final payment.
34.2.4.7 The Contractor shall maintain all required insurance in full force
and effect as required by this Contract or the Contractor shall be in
material breach hereof
(Rev 1-2016) Contract by and between North Andover School Department and SprinTurf, LLC Page 13
IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set
forth their hands the day and year first above written.
THESCHOOL
D� 'on/Department Head
THE CONTRACTOR
Co pany Name
_ ash
SchV
uperintendent Date
-r.4e I- .�-,�
Print Name & Title
Federal Identification
No.: Y S - /C O 2 70;
CERTIFICATION AS TO AVAILABILITY OF FUNDS:
(Rev 1-2016) Contract by and between North Andover School Department and SprinTurr, LLC Page 14
SUPPLEMENT "C"
[X] CONSTRUCTION
SUPPLEMENT "C" - Applicable to Contracts for the construction of -
(1)
f
(1) Public Buildings and Public Works
(governed by the provisions of General Laws Chapter 30B);
(2) Public Buildings
(governed by the provisions of General Laws Chapter 149,§ 44A,
et seq.); and
(3) Public Works
(governed by the provisions of General Laws Chapter 30, §39M, et seq)
This form supplements the Town of North Andover "Contract and General Conditions" and applies
only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works
or public buildings.
2. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be
understood to be a term and condition of this Contract. The Contractor agrees to secure such bond
(where required) in the form required by the Town and provide an original thereof to the Town prior
to the commencement of performance.
3. E uali
3.1. in the case of a closed Specification written for a specific item or items to be furnished under
the Base Bid, such specifications shall, as applicable, be in compliance with the
Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq.
3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or
on the Drawings, except as above noted, the intent is to establish a standard and in no way
should be construed to exclude any item or manufacturer not mentioned by name, but whose
product meets the Specifications as to design, utility and quality. Final decision shall rest
with the Project Representative as to its acceptability.
4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of
goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of
Chapter 30B.
The Contractor will carry out the obligations of this contract in full compliance with all of the
requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage
Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of
Massachusetts. as they may fi•om time to time be amended. The Contractor will at all times comply
with the wage rates as determined by the Commissioner of the Department of Labor and Industries,
under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall
be in force and as amended.
6. The Contractor shall continuously maintain adequate protection of all work from damage and shall
protect the property of the Town and others, including adjacent property, from injury or loss arising
(Rev 5-2007) Supplement "C" to Contract between the North Andover School Dept and SprinTurf, LLC Page t
in connection with the Contract. The Contractor shall make good any such damage, injury or loss,
except as may be directly due to errors in the Contract Documents or caused by agents or employees
of the Town, or due to causes beyond the Contractor's control and not the Contractor's fault or
negligence.
7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall
comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents
or injuryto persons on, about or adjacent to the premises where the work is being performed. The
Contractor will erect and properly maintain at all tines, as required by the conditions and progress of
the work, all necessary safeguards for the protection of workers and the public, shall post danger
signs warning against the hazards created by such features of construction such as pits, protruding
nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling
materials; and shall designate a responsible member of its organization on the work, whose duty shall
be the prevention of accidents.
8. The Town shall at all tines have access to the work wherever it is in preparation or progress and the
Contractor- shall provide suitable accommodations for such access.
The Contractor shall appoint a competent superintendent and foreman and any necessary assistants,
all of whom shall be satisfactory to the 'town. If the Town in its sole discretion determines that the
construction superintendent, foreman, or assistants are unacceptable to the Town, then upon seven
days notice frorn the Town, the Contractor shall replace such person or persons with people
acceptable to the Town.
10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The
Contractor shall carefully study and compare the drawings, specifications and other instructions and
shall at once report to the Town any error, inconsistency or omission which shall be discovered.
Included in this responsibility shall be supervision of all work performed by subcontractors on the
work.
11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any
of its provisions, the Town, upon three days written notice, may, without prejudice to any other
remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment
then or thereafter due the Contractor.
12. Inspection by the Town's Project Representative
12.1. The Town shall have the right to designate a Project Representative who may make periodic
visits to the site to familiarize the Town generally with the progress and quality of the work,
and to determine in general if the work is proceeding in accordance with the Contract
Documents. The Project Representative will not be required to make exhaustive or
continuous on-site inspections to check the quality or quantity of the work, and will not be
responsible for the Contractor's failure to carry out the construction work in accordance with
the Contract Documents. During such visits and on the basis of these observations while at
the site, the Project Representative will keep the Town informed on the progress of the work,
will endeavor to guard the Town against defects and deficiencies in the work of contractors,
and may condemn structural work as failing to conform to the Contract Documents. The
Project Representative shall have authority to act on behalf of the Town only to the extent
expressly delegated by the Town, which shall be shown to the Contractor, and shall have
authority to stop the work whenever such stoppage may reasonably be necessary to insure
the proper execution of the Contract.
(Rev 5-2007) Supplement "C" to Contract between the North Andover School Dept and SprinTurf, LLC Page 2
12.2. In connection with the work, the Project Representative shall not be responsible for
construction methods, means, techniques, sequences or procedures employed by the
Contractor or the Contractor's safety programs, requirements, regulations, or precautions.
13. Decisions of the Project Representative
13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of
the Town or the Contractor and on all other matters relating to the execution and progress of
the structural work or the interpretation of the Contract Documents.
13.2. The Project Representative's decision, in matters relating to the project, shall be final, if
within the terms of the Contract Documents.
13.3. If, however, the Project Representative fails to render a decision within ten days after the
parties have presented thein evidence, either party may then avail itself of the remedies
provided in this contract or available to it by law. If the Project Representative renders a
decision after such remedies have commenced, such decision may be entered as evidence
but shall not disturb or interrupt such proceedings except where such decision is acceptable
to the parties concerned.
14.1 Use of Premises by the Contractor:
14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of
its workmen to limits indicated by Iaw, by-laws, permits or directions of the Town and
shall not unreasonably encumber the premises with its materials.
14.2. The Contractor shall not load or permit any part of the structure to be loaded with a
weight that will endanger its safety.
15. Maintenance of Premises:
The Contractor shall at all times keep the premises free from accumulation of waste materials or
rubbish caused by its employees or work, and at the completion of the work it shall remove all its
rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall
leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute,
the Town may remove the rubbish and charge the cost to the several contractors, as the Town
shall determine to be just.
16. Right to Terminate
If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit
of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or
repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail
to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently
disregard laws and regulations or lawful directives of the Town, or (7) be guilty of a substantial
violation of any provision of the Contract, then the Town may, without prejudice to any other
right or remedy and after giving the Contractor (or any surety) seven days written notice,
terminate the contract and the employment of the Contractor and take possession of the premises
and of all materials, tools and appliances thereon and finish the work by whatever method it
deems appropriate.
(Rev 5-2007) Supplement "C" to Contract between the North Andover School Dept and SprinTurf, LLC Page 3
In such cases, the Contractor shall not be entitled to receive any further payment until the work is
finished. If the unpaid amount owed to the Contractor for work already completed shall exceed
the expense of finishing the work, including compensation for additional architectural,
managerial, legal and administrative services, such excess shall be paid to the Contractor. If such
expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the Town.
The Contractor shall not be relieved of liability to the Town by virtue of any termination of this
contract, and any claim for damages against the Contractor relating to the Contractor's
performance under this contract shall survive any termination hereunder.
Notwithstanding any other provision of this Agreement, the Town reserves the right at any time
in its absolute discretion to suspend or terminate this Agreement in whole or in part for its
convenience upon seven days written notice to the Contractor. The Town shall incur no liability
by reason of such termination except for the obligation to pay compensation for all work
performed by the Contractor and accepted by the Town to the termination date.
17. Progress ss Payments:
17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported
to the extent requi=red by the Town by invoices or other vouchers, showing payments for
materials and labor, payments to Subcontractors and such other evidence of the
Contractor's right to payment.
17.2. The Contractor shall, before the first application, submit to the Town a schedule of values
of the various parts of the work, including quantities aggregating the total sum of the
Contract, divided so as to facilitate payments to Subcontractors, made out in such form as
the Town and the Contractor may agree upon, and, if required, supported by such
evidence as to its correctness. This schedule, when approved by the Town, shall be used
as a basis for payment, unless it is found to be in error. If applying for payments, the
Contractor shall submit a statement based upon this schedule.
18. Withholding of Payments
18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the
whole or part of any payment to such extent as may be necessary in its reasonable
opinion to protect the Town of North Andover from loss on account of.
18.1.1. Defective work not remedied.
18.1.2. Claims filed or reasonable evidence indicating probable filing of claims.
18.1.3. Failure of the Contractor to make payments properly to Subcontractors or
for material or labor.
18.1.4. A reasonable doubt that the Contract can be completed for the balance
then unpaid.
18.1.5. Damage to another contractor.
18.1.6. Delays resulting in liquidated damages.
(Rev 5-2007) Supplement "C" to Contract between the North Andover School Dept and SprinTurf, LLC Page 4
18.2, Withholding of payments shall be in strict compliance with statutory requirements.
19. Claims by Contractor and Liability of Town
All claims by the Contractor against the Town shall, unless otherwise provided by law, be
initiated by a written claim submitted to the Town no later than seven (7) calendar days after the
event or the first appearance of the circumstances causing the claim. The claim shall set forth in
detail all known facts and circumstances supporting the claim. The Contractor shall continue its
performance under this contract regardless of the submission or existence of any claims.
The limit of liability of the Town under this Agreement is limited to the compensation provided
herein for work actually performed, and shall in no event include liability for delays or for
incidental, special'or consequential damages or lost profits or for damages or loss from causes
beyond the Town's reasonable control,
20. Liquidated Damages:
Because both parties recognize (1) that the time for completion of this Contract is of the essence,
(2) that the Town will suffer loss if the work is not completed within the contract time specified,
plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the
delays, expense and difficulties involved in a legal proceeding to determine the actual loss
suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay
the Town as liquidated damages representing an estimate of delay damages, not as a penalty, the
sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is
completed, whether the work is completed by the Contractor or some other person. The Town's
right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a
legal action for damages in lieu of or in addition to its option to impose liquidated damages. The
Town may deduct any liquidated damages from money due the Contractor, and if such payment is
insufficient to cover the liquidated damages, then the Contractor shall pay the amount due.
21. The Contractors' Mutual Responsibility:
Should the Contractor cause damage to any separate subcontractor on the work, the Contractor
agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies
provided by law or by the provisions of the contract. If such separate contractor sues the Town
on account of any damage alleged to have been sustained, the Town shall notify the Contractor,
who shall defend such proceedings at the Town's expense and, if any judgment against the Town
arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Town.
22. Separate Contracts:
22.1. The Town reserves the right to let other Contracts in connection with this work under
similar General Conditions. The Contractor shall afford other contractors reasonable
opportunity for the introduction and storage of their materials and the execution of their
work, and shall properly connect and coordinate its work with theirs.
22.2. If any part of the Contractor's work depends, for proper execution or results, upon the
work of any other contractor, the Contractor shall inspect and promptly report to the
Town any defects in such work that render it unsuitable for such proper execution and
results. Failure of the Contractor to so inspect and report shall constitute an acceptance
(Rev 5-2007) Supplement "C" to Contract between the North Andover School Dept and SprinTurf, LLC Page 5
of the other contractor's work as fit and proper for the reception of its work except as to
defects which may develop in the other contractor's work after the execution of its work.
22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work
already in place and shall at once report to the Town any discrepancy between the
executed work and the Drawings.
23. Subcontracts:
23.1. All Subcontracts shall be awarded in conformity with the requirements of the General
Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive.
23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and
omissions of its Subcontractors and of persons either directly or indirectly employed by
them, as it is for the acts and omissions of persons directly employed by it.
23.3. Nothing contained in the Contract Documents shall create any contractual relationship
between any Subcontractor and the Town.
24. Contractor -Subcontractor Relations:
The Contractor agrees to bind every Subcontractor- and every Subcontractor agrees to be bound
by the terms of the Agreement, the General Conditions of the Contract, the Supplementary
General Conditions, the Drawings and Specifications, as far as applicable to its work, including
the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A,
et seq.
25. Indemnification:
25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents
and employees from and against any and all damages, liabilities, actions, suits,
proceedings, claims, demands, losses, recoveries and judgments of every nature and
description (including reasonable attorneys' fees) brought or recovered against them that
may arise in whole or in part out of or in connection with the work being performed or to
be performed, or out of any act or ornission by the Contractor, its employees, agents,
subcontractors, material men, and anyone directly or indirectly employed by any of them
or anyone for whose acts any of them may be liable, regardless of whether or not it is
caused in part by any party indemnified hereunder. The Contractor fiu-ther agrees to
reimburse the Town for damage to its property caused by Contractor, its employees,
agents, subcontractors or material then, and anyone directly or indirectly employed by
any of them or anyone for whose acts any of them may be liable, including damages
caused by his, its or their use of faulty, defective or unsuitable material or equipment,
unless the damage is caused by the Town's gross negligence or willful misconduct. The
existence of insurance shall in no way limit the scope of the Contractor's indemnification
under this Contract.
25.2. In any and all claims against the Town or any of their agents or employees by any
employee of the Contractor, any Subcontractor, anyone directly or indirectly employed
by any of them or anyone for whose acts any of thein may be liable, the indemnification
obligation under this paragraph shall not be limited in any way by any limitation on the
amount or type of damages, compensation or benefits payable by or for the Contractor or
(Rev 5-2007) Supplement "C" to Contract between the North Andover School Dept and SprinTurf, LLC Page 6
any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other
employee benefit acts.
25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and
minimum limits of liability acceptable under the Contract. However, it shall be the
Contractor's responsibility to purchase and maintain insurance of such character and in
such amounts as will adequately protect it and the Town from and against all claims,
damages, losses and expenses resulting from exposure to any casualty liability in the
performance of the Work.
26. The Contractor's Insurance:
26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor
from claims set forth below which may arise out of or result from the Contractor's
operations under the Contract, whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them or by anyone
for whose acts any of them may be liable.
26.1.1. Claims under Worker's Compensation, disability benefit and other similar
employee benefit acts;
26.1.2. Claims for damages because of bodily injury, occupational sickness or
disease, or death of its employees, and claims insured by usual personal
injury liability coverage;
26.13. Claims for damage because of bodily injury, sickness or disease, or death of
any person other than its employees, and claims insured by usual personal
liability coverage;
26.1.4. Claims for damages because of injury to or destruction of tangible property,
including loss of use resulting therefrom.
26.2. The insurance required by the above shall be written for not less than the following
minimum limits of liability:
26.2.1. Worker's Compensation Insurance Requirements
Workers' Compensation coverage as required by the laws of the Commonwealth of
Massachusetts.
26.2.2. Liability Insurance Requirements
Liability insurance shall include all major divisions and shall be on a comprehensive
general basis including Premises and Operations, Owners and Contractor's Protective, Products
and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles. All such
insurance shall be written for not less than any limits of liability required by law, unless otherwise
provided in the contract documents, or the following limits, whichever are greater:
(Rev 5-2007) Supplement "C' to Contract between the North Andover School Dept and Spriniurf, LLC Page 7
Coznprebensive General Liability Insurance (Broad Form)
Bodily Injury
Property Damage
Automobile Liability Insurance
Excess Liability (Umbrella)
$1,000,000 per person
$3,000,000 per occurrence
$1,000,000 per occurrence
$3,000,000 annual aggregate
$500,000 per person
$1,000,000 per occurrence
$10,000,000
Excess Liability (Umbrella) Insurance (Subcontractors) $1,000,000 or 1.5 times the value of
The subcontract, whichever is
Higher
26.3. The above insurance policies shall also be subject to the following requirements:
26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as
hereinafter specified under Paragraph entitled "Protective Liability Insurance"
shall be written by one and the same insurance company to avoid the expense of
duplicate and/or overlapping coverage and to facilitate and expedite the
settlement of claims.
26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed
with the Town prior to commencement of the work. Renewal certificates shall be
addressed to and filed with the Town at least ten (10) days prior to the expiration
date of required policies.
26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30)
days prior written notice forwarded by registered or certified mail to the Town.
The Town shall also be notified of the attachment of any restrictive amendments
to the policies.
26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of
hrsurance form, shall contain true transcripts fi•om the policies, authenticated by
the proper officer of the Insurer, evidencing in particular those insured, the extent
of coverage, the location and operations to which the insurance applies, the
expiration date and the above-mentioned notice clauses.
26.3.5. All premium costs shall be included in the Contractor's bid.
26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be
maintained without interruption from date of the Contract until date of final
payment and termination of any coverage required to be maintained after
payment.
(Rev 5-2007) Supplement "C" to Contract between the North Andover School Dept and SprinTurf, LLC Page 8
27. Protective Liability Insurance:
27.1. The Contractor shall purchase and maintain such insurance as described in the preceding
paragraph as will protect the Town from claims which may arise from operations under
the Contract, including operations performed for the named insureds by independent
contractors and general inspection thereof by the named insureds.
27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town
against Automobile Non -Ownership Liability in connection with the Contractor's
operations under the Contract, whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone
for whose acts any of them may be liable.
27.3. The limits of liability for coverage required under the preceding paragraphs shall be as
specified under the provisions hereof governing the Contractor's General Liability
Policy,
27.4. The Town shall be named as an additional insured on the above referenced liability
Policies, and the Contractor's insurance shall be the primary coverage. The cost of such
insurance, including required endorsements and amendments, shall be the sole
responsibility of the Contractor.
28. Liens:
Neither the Final Payment nor any part of the retained percentage shall become due until the
Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the
Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as
it has knowledge or information, the releases and receipts include all the labor and material for
which a lien could be filed. The Contractor shall comply with all statutory provisions of the
General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149
as amended (as a minimum requirement).
29. Guarantees:
29.1 The Contractor guarantees and warrants to the Town that all labor furnished under this
Contract will be competent to perform the tasks undertaken, that the product of such
labor will yield only first-class results, that materials and equipment furnished will be of
good quality and new unless otherwise permitted by this Contract, and that the Work will
be of good quality, free from faults and defects and in strict conformance with this
Contract. All Work not conforming to these requirements may be considered defective.
29.2. If at any time any part of the work constructed under the terns of this contract shall in the
opinion of the Town Manager require repairing due to defective work or materials
furnished by the Contractor, he may notify the Contractor in writing to make the required
repairs. If the Contractor shall neglect to start such repairs within ten days of the date of
giving it notice thereof and to complete the same to the satisfaction of the Town Manager
with reasonable dispatch, then the latter may employ other persons to make such repairs.
The Town shall charge the expense thereof to the Contractor and may use any moneys
still retained to pay for the same, and if such sum is insufficient, the Contractor shall be
obligated to pay the balance thereof.
(Rev 5-2007) Supplement "C" to Contract between the North Andover School Dept and SprinTurf, L[.0 Page 9
29.3. All guarantees and warranties required in the various Sections of the Specifications which
originate with a Subcontractor or Manufacturer must be delivered to the Town before
final payment to the Contractor may be made for the amount of that subtrade or for the
phase of work to which the guarantee or warranty relates. The failure to deliver a
required guarantee or warranty shall be held to constitute a failure of the Subcontractor to
fully complete his work in accordance with the Contract Documents. The Contractor's
obligation to correct work is in addition to, and not in substitution of, such guarantees or
warranties as may be required in the various Sections of the Specifications.
This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals
hereto:
Dated: (i&Y— /I -)
The North Andover School Dept by:
Town ACWuntant
Certified as to Appropriation
A
Counsel
Certified as to Form
The Contractor by:
Au at
(Rev 5-2007) Supplement "C" to Contract between the North Andover School Dept and SprinTurf, LLC Page 10
THE COMMONWEALTH OF MASSACHUSETTS
' EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
CHARLES D. BAKER As determined by the Director under the provisions of the RONALD L. WALKER, II
Go— Massachusetts General Laws, Chapter 149, Sections 26 to 27H WILLIAM D cKINNEY
KARYN E. POLITO Ditectm
Lt. Governor
Awarding Authority: North Andover School Department
Contract Number: 717570 City/Town: NORTH ANDOVER
Description of Work: Replacement of Turf Fields at North Andover High School.
Job Location: 430 Osgood Street, North Andover
Information about Prevailing Wage Schedules for Awarding Authorities and Contractors
• This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the
"Wage Request Number" on all pages of this schedule.
• An Awarding Authority must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has
not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK
projects (bid pursuant to G.L. c. 149A), the earlier of: (a) the execution date of the GMP Amendment, or (b) the bid for the first
construction scope of work must be within 90 -days of the wage schedule issuance date.
• The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149,
§ 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a
conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the
wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime
contractor, a filed sub -bidder, or any sub -contractor.
• All apprentices working on the project are required to be registered with the Massachusetts Department of Labor
Standards, Division of Apprentice Standards (DLS/DAS). Apprentice must keep his/her apprentice identification card on
his/her person during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice
wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DLS/DAS
regardless of whether or not they are registered with any other federal, state, local, or private agency must be paid the
journeyworker's rate for the trade.
• The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction
projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule.
Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the
contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, awarding
authority must request an annual update no later than two weeks before the anniversary date, determined as the earlier o£ (a)
the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of
construction services. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than
these rates to covered workers. The annual update requirement is not applicable to 27F "rental of equipment" contracts.
• Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll
reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years.
Each weekly payroll report must contain: the employee's name, address, occupational classification, hours worked, and wages
paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at
http://www.mass.gov/dols/pw.
• Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at (617) 626-6953.
• Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor
Division of the office of the Attorney General at (617) 727-3465.
• Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who
perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and
Issue Date: 04/27/2017 Wage Request Number: 20170427-007
J
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
PILE DRIVER LOCAL 56 (ZONE 1)
Unemployment
$34.90
Construction
$7.10
$0.00
$53.50
12/01/2017
$35.90
$11.50
(2 AXLE) DRIVER - EQUIPMENT
12/01/2016
$32.15
$10.91
$10.89
$0.00
$53.95
TEAMSTERS JOINT COUNCIL NO. /OZONE B
$55.50
12/01/2018
$37.90
$11.50
$7.10
$0.00
(3 AXLE) DRIVER - EQUIPMENT
12/01/2016
$32.22
$10.91
$10.89
$0.00
$54.02
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
12/01/2017
$34.28
$7.60
$13.00
$0.00
$54.88
(4 & 5 AXLE) DRIVER - EQUIPMENT
12/01/2016
$32.34
$10.91
$10.89
$0.00
$54.14
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
12/01/2018
$35.96
$7.60
$13.00
$0.00
$56.56
ADS/SUBMERSIBLE PILOT
08/01/2015
$88.29
$9.80
$19.23
$0.00
$117.32
PILE DRIVER LOCAL 56 (ZONE 1)
06/01/2017
$34.90
For apprentice rates see "Apprentice- PILE DRIVER"
$7.10
$0.00
$53.50
12/01/2017
$35.90
$11.50
AIR TRACK OPERATOR
12/01/2016
$32.65
$7.60
$13.00
$0.00
$53.25
LABORERS - ZONE 2
$55.50
12/01/2018
$37.90
$11.50
$7.10
$0.00
$56.50
06/01/2017
$33.65
$7.60
$13.00
$0.00
$54.25
12/01/2019
12/01/2017
$34.28
$7.60
$13.00
$0.00
$54.88
$40.90
06/01/2018
$35.12
$7.60
$13.00
$0.00
$55.72
$11.50
12/01/2018
$35.96
$7.60
$13.00
$0.00
$56.56
06/01/2019
$36.83
$7.60
$13.00
$0.00
$57.43
12/01/2019
$37.69
$7.60
$13.00
$0.00
$58.29
For apprentice rates see "Apprentice- LABORER"
ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 12/01/2016
$33.90
$11.50
$7.10
$0.00
$52.50
HEAT & FROST INSULATORS LOCAL 6 (BOSTON)
OPERATING ENGINEERSLOCAL 4
06/01/2017
$34.90
$11.50
$7.10
$0.00
$53.50
12/01/2017
$35.90
$11.50
$7.10
$0.00
$54.50
06/01/2018
$36.90
$11.50
$7.10
$0.00
$55.50
12/01/2018
$37.90
$11.50
$7.10
$0.00
$56.50
06/01/2019
$38.90
$11.50
$7.10
$0.00
$57.50
12/01/2019
$39.90
$11.50
$7.10
$0.00
$58.50
06/01/2020
$40.90
$11.50
$7.10
$0.00
$59.50
12/01/2020
$41.90
$11.50
$7.10
$0.00
$60.50
ASPHALT RAKER 12/01/2016
$32.15
$7.60
$13.00
$0.00
$52.75
LABORERS-ZONE2
OPERATING ENGINEERSLOCAL 4
06/01/2017
$33.15
$7.60
$13.00
$0.00
$53.75
12/01/2017
$33.78
$7.60
$13.00
$0.00
$54.38
06/01/2018
$34.62
$7.60
$13.00
$0.00
$55.22
12/01/2018
$35.46
$7.60
$13.00
$0.00
$56.06
06/01/2019
$36.33
$7.60
$13.00
$0.00
$56.93
12/01/2019
$37.19
$7.60
$13.00
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
06/01/2017
$46.38
$10.00
$15.25
ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE
12/01/2016
$45.38
$10.00
$15.25
$0.00
$70.63
OPERATING ENGINEERSLOCAL 4
06/01/2017
$46.38
$10.00
$15.25
$0.00
$71.63
12/01/2017
$47.38
$10.00
$15.25
$0.00
$72.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
BACKHOE/FRONT-END LOADER
12/01/2016
$45.38
$10.00
$15.25
$0.00
$70.63
OPERATING ENGINEERS LOCAL 4
06/01/2017
$46.38
$10.00
$15.25
$0.00
$71.63
12/01/2017
$47.38
$10.00
$15.25
$0.00
$72.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
--------------------------------------------- - - --------- ----------------------------- - ------------------------ -_ ---------------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 2 of 33
I
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
06/01/2017
$33.65
$7.60
$13.00
Unemployment
$54.25
BARCO-TYPE JUMPING TAMPER 12/01/2016
$32.15
$7.60
$13.00
$0.00
$52.75
LABORERS-ZONE2
$35.12
$7.60
$13.00
$0.00
$55.72
06/01/2017
$33.15
$7.60
$13.00
$0.00
$53.75
12/01/2017
$33.78
$7.60
$13.00
$0.00
$54.38
06/01/2018
$34.62
$7.60
$13.00
$0.00
$55.22
12/01/2018
$35.46
$7.60
$13.00
$0.00
$56.06
06/01/2019
$36.33
$7.60
$13.00
$0.00
$56.93
12/01/2019
$37.19
$7.60
$13.00
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
BLOCK PAVER, RAMMER / CURB SETTER
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
BOILER MAKER
BOILERMAKERS LOCAL 19
Apprentice - BOILERMAKER - Local 29
Effective Date - 01/01/2017
Step percent
1 65
2 65
3 70
4 75
5 80
6 85
7 90
8 95
12/01/2016
$32.65
$7.60
$13.00
$0.00
$53.25
06/01/2017
$33.65
$7.60
$13.00
$0.00
$54.25
12/01/2017
$34.28
$7.60
$13.00
$0.00
$54.88
06/01/2018
$35.12
$7.60
$13.00
$0.00
$55.72
12/01/2018
$35.96
$7.60
$13.00
$0.00
$56.56
06/01/2019
$36.83
$7.60
$13.00
$0.00
$57.43
12/01/2019
$37.69
$7.60
$13.00
$0.00
$58.29
01/01/2017 $42.92 $6.97 $16.21 $0.00
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
$27.90
$6.97
$10.54
$0.00
$45.41
$27.90
$6.97
$10.54
$0.00
$45.41
$30.04
$6.97
$11.35
$0.00
$48.36
$32.19
$6.97
$12.16
$0.00
$51.32
$34.34
$6.97
$12.97
$0.00
$54.28
$36.48
$6.97
$13.78
$0.00
$57.23
$38.63
$6.97
$14.59
$0.00
$60.19
$40.77
$6.97
$15.40
$0.00
$633.14
$66.10
-------_._....__.----.--__--...-^---------+
Notes:
----_.._--._._.__-__.------------------__.._-._..
Apprentice to Journeyworker Ratio: 1:5
BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 03/01/2017 $50.76 $10.75 $19.22 $0.00 $80.73
WATERPROOFING)
BRICKLAYERSLOCAL 3 (LYNN)
-------------------------------------------------------- - --------- - ------------------------------------------------------------------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 3 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- BRICKITEASTERICEMENT MASON -Local 3 Lynn
12/01/2016
$44.94
$10.00
$15.25
Effective Date - 03/01/2017
$70.19
OPERATING ENGINEERS LOCAL 4
06/01/2017
Supplemental
$10.00
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$25.38
$10.75
$19.22
$0.00
$55.35
2 60
$30.46
$10.75
$19.22
$0.00
$60.43
3 70
$35.53
$10.75
$19.22
$0.00
$65.50
4 80
$40.61
$10.75
$19.22
$0.00
$70.58
5 90
$45.68
$10.75
$19.22
$0.00
$75.65
-------------------------------�
(Notes:
CAISSON & UNDERPINNING LABORER
12/01/2016
$36.30
$7.60
I ----------------------------
Apprentice to Journeyworker Ratio: 1:5
$0.00
$58.25
LABORERS - FOUNDATIONAND MARINE
BULLDOZER/GRADER/SCRAPER
12/01/2016
$44.94
$10.00
$15.25
$0.00
$70.19
OPERATING ENGINEERS LOCAL 4
06/01/2017
$45.93
$10.00
$15.25
$0.00
$71.18
12/01/2017
$46.92
$10.00
$15.25
$0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
CAISSON & UNDERPINNING BOTTOM MAN
12/01/2016
$37.45
$7.60
$14.35
$0.00
$59.40
LABORERS - FOUNDATIONAND MARINE
For apprentice rates see "Apprentice- LABORER"
CAISSON & UNDERPINNING LABORER
12/01/2016
$36.30
$7.60
$14.35
$0.00
$58.25
LABORERS - FOUNDATIONAND MARINE
For apprentice rates see "Apprentice- LABORER"
CAISSON & UNDERPINNING TOP MAN
12/01/2016
$36.30
$7.60
$14.35
$0.00
$58.25
LABORERS - FOUNDATIONAND MARINE
For apprentice rates see "Apprentice- LABORER"
CARBIDE CORE DRILL OPERATOR
12/01/2016
$32.15
$7.60
$13.00
$0.00
$52.75
LABORERS-ZONE1
06/01/2017
$33.15
$7.60
$13.00
$0.00
$53.75
12/01/2017
$33.78
$7.60
$13.00
$0.00
$54.38
06/01/2018
$34.62
$7.60
$13.00
$0.00
$55.22
12/01/2018
$35.46
$7.60
$13.00
$0.00
$56.06
06/01/2019
$36.33
$7.60
$13.00
$0.00
$56.93
12/01/2019
$37.19
$7.60
$13.00
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
CARPENTER
03/01/2017
$38.77
$9.90
$17.00
$0.00
$65.67
CARPENTERS -ZONE 2 (Eastern Massachusetts)
09/01/2017
$39.78
$9.90
$17.00
$0.00
$66.68
03/01/2018
$40.78
$9.90
$17.00
$0.00
$67.68
09/01/2018
$41.82
$9.90
$17.00
$0.00
$68.72
03/01/2019
$42.85
$9.90
$17.00
$0.00
$69.75
---------------------------------------------------------------- -------- -------------------------------------------------------------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 4 of 33
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - CARPENTER - Zone 2 Eastern MA
Effective Date - 03/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$19.39
$9.90
$1.63
$0.00
$30.92
2 60
$23.26
$9.90
$1.63
$0.00
$34.79
3 70
$27.14
$9.90
$12.11
$0.00
$49.15
4 75
$29.08
$9.90
$12.11
$0.00
$51.09
5 80
$31.02
$9.90
$13.74
$0.00
$54.66
6 80
$31.02
$9.90
$13.74
$0.00
$54.66
7 90
$34.89
$9.90
$15.37
$0.00
$60.16
8 90
$34.89
$9.90
$15.37
$0.00
$60.16
Effective Date - 09/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$19.89
$9.90
$1.63
$0.00
$31.42
2 60
$23.87
$9.90
$1.63
$0.00
$35.40
3 70
$27.85
$9.90
$12.11
$0.00
$49.86
4 75
$29.84
$9.90
$12.11
$0.00
$51.85
5 80
$31.82
$9.90
$13.74
$0.00
$55.46
6 80
$31.82
$9.90
$13.74
$0.00
$55.46
7 90
$35.80
$9.90
$15.37
$0.00
$61.07
8 90
$35.80
$9.90
$15.37
$0.00
$61.07
---------..._._._..-_._.-------_._.--------+
(Notes:
�
i
________._..
Apprentice to Journeyworker Ratio:1:5
--__-_______
CEMENT MASONRY/PLASTERING
01/01/2017
$45.67
$12.20
$19.41
$1.30
$78.58
RRICKtarERSLOCAL 3(LYAW)
07/01/2017
$46.30
$12.20
$19.41
$1.30
$79.21
01/01/2018
$46.54
$12.20
$19.41
$1.30
$79.45
07/01/2018
$46.79
$12.20
$19.41
$1.30
$79.70
01/01/2019
$47.03
$12.20
$19.41
$1.30
$79.94
07/01/2019
$47.27
$12.20
$19.41
$1.30
$80.18
01/01/2020
$47.52
$12.20
$19.41
$1.30
$80.43
--------------------------------------- - --------- ---- - --- ---- --------------------------------------------------------- -- --- ---------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 5 of 33
Classification
Effective Date Base Wage
Health
Pension Supplemental
Total Rate
Unemployment
Apprentice- CEMENT MASONRY/PLASTERING -Eastern Mass (Lynn)
Effective Date - 01/01/2017
Supplemental
Step percent
Apprentice Base Wage Health
Pension
Unemployment
Total Rate
1 50
$22.84 $12.20
$12.41
$0.00
$47.45
2 60
$27.40 $12.20
$14.41
$1.30
$55.31
3 65
$29.69 $12.20
$15.41
$1.30
$58.60
4 70
$31.97 $12.20
$16.41
$1.30
$61.88
5 75
$34.25 $12.20
$17.41
$1.30
$65.16
6 80
$36.54 $12.20
$18.41
$1.30
$68.45
7 90
$41.10 $12.20
$19.41
$1.30
$74.01
Effective Date - 07/01/2017
Supplemental
Step percent
Apprentice Base Wage Health
Pension
Unemployment
Total Rate
1 50
$23.15 $12.20
$12.41
$0.00
$47.76
2 60
$27.78 $12.20
$14.41
$1.30
$55.69
3 65
$30.10 $12.20
$15.41
$1.30
$59.01
4 70
$32.41 $12.20
$16.41
$1.30
$62.32
5 75
$34.73 $12.20
$17.41
$1.30
$65.64
6 80
$37.04 $12.20
$18.41
$1.30
$68.95
7 90
$41.67 $12.20
$19.41
$1.30
$74.58
-_.-- _._-----._-_._._.-----------------+
Notes:
Steps 3,4 are 500 hrs. All other steps are 1,000 hrs.
L---------------
Apprentice to Journeyworker Ratio: 1:3
--.-------------
CHAIN SAW OPERATOR
12/01/2016 $32.15
$7.60
$13.00
$0.00
$52.75
LABORERS - ZONE 2
06/01/2017 $33.15
$7.60
$13.00
$0.00
$53.75
12/01/2017 $33.78
$7.60
$13.00
$0.00
$54.38
06/01/2018 $34.62
$7.60
$13.00
$0.00
$55.22
12/01/2018 $35.46
$7.60
$13.00
$0.00
$56.06
06/01/2019 $36.33
$7.60
$13.00
$0.00
$56.93
12/01/2019 $37.19
$7.60
$13.00
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES 12/01/2016 $46.38
$10.00
$15.25
$0.00
$71.63
OPERATING ENGINEERS LOCAL 4
06/01/2017 $47.38
$10.00
$15.25
$0.00
$72.63
12/01/2017 $48.38
$10.00
$15.25
$0.00
$73.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
COMPRESSOR OPERATOR
12/01/2016 $31.17
$10.00
$15.25
$0.00
$56.42
OPERATING ENGINEERS LOCAL 4
06/01/2017 $31.86
$10.00
$15.25
$0.00
$57.11
12/01/2017 $32.55
$10.00
$15.25
$0.00
$57.80
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DELEADER (BRIDGE)
01/01/2017 $51.41
$7.85
$16.10
$0.00
$75.36
PAINTERS LOCAL 35 - ZONE 2
-------------------------------------------------------------- --------------------------------- ------------------- -- ------------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 6 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice - PAINTER Local 35 - BRIDGESITANKS
$36.50
$7.60
$14.15
$0.00
Effective Date - 01/01/2017
06/01/2017
$37.50
$7.60
Supplemental
$0.00
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$25.71
$7.85
$0.00
$0.00
$33.56
2 55
$28.28
$7.85
$3.66
$0.00
$39.79
3 60
$30.85
$7.85
$3.99
$0.00
$42.69
4 65
$33.42
$7.85
$4.32
$0.00
$45.59
5 70
$35.99
$7.85
$14.11
$0.00
$57.95
6 75
$38.56
$7.85
$14.44
$0.00
$60.85
7 80
$41.13
$7.85
$14.77
$0.00
$63.75
8 90
$46.27
$7.85
$15.44
$0.00
$69.56
_._.- -_..._-------------------------
Notes:
` Steps are 750 hrs.
i
Apprentice to Jour.e rker Ratio -4.1
DEMO: ADZEMAN
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
DEMO: BACKHOE/LOADER/HAMMER OPERATOR
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
DEMO: BURNERS
LABORERS - ZONE 1
For apprentice rates see "Apprentice- LABORER"
12/01/2016
$36.50
$7.60
$14.15
$0.00
$58.25
06/01/2017
$37.50
$7.60
$14.15
$0.00
$59.25
12/01/2017
$38.35
$7.60
$14.15
$0.00
$60.10
06/01/2018
$39.30
$7.60
$14.15
$0.00
$61.05
12/01/2018
$40.25
$7.60
$14.15
$0.00
$62.00
06/01/2019
$41.25
$7.60
$14.15
$0.00
$63.00
12/01/2019
$42.25
$7.60
$14.15
$0.00
$64.00
12/01/2016
$37.50
$7.60
$14.15
$0.00
$59.25
06/01/2017
$38.50
$7.60
$14.15
$0.00
$60.25
12/01/2017
$39.35
$7.60
$14.15
$0.00
$61.10
06/01/2018
$40.30
$7.60
$14.15
$0.00
$62.05
12/01/2018
$41.25
$7.60
$14.15
$0.00
$63.00
06/01/2019
$42.25
$7.60
$14.15
$0.00
$64.00
12/01/2019
$43.25
$7.60
$14.15
$0.00
$65.00
12/01/2016
$37.25
$7.60
$14.15
$0.00
$59.00
06/01/2017
$38.25
$7.60
$14.15
$0.00
$60.00
12/01/2017
$39.10
$7.60
$14.15
$0.00
$60.85
06/01/2018
$40.05
$7.60
$14.15
$0.00
$61.80
12/01/2018
$41.00
$7.60
$14.15
$0.00
$62.75
06/01/2019
$42.00
$7.60
$14.15
$0.00
$63.75
12/01/2019
$43.00
$7.60
$14.15
$0.00
$64.75
---------------------------------------------------------------------------------------------------------------------------- -- -------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 7 of 33
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
LABORERS - ZONE 2
Unemployment
DEMO: CONCRETE CUTTER/SAWYER
12/01/2016
$37.50
$7.60
$14.15
$0.00
$59.25
LABORERS-ZONE2
12/01/2017
$39.10
$7.60
$14.15
$0.00
$60.85
06/01/2017
$38.50
$7.60
$14.15
$0.00
$60.25
12/01/2017
$39.35
$7.60
$14.15
$0.00
$61.10
06/01/2018
$40.30
$7.60
$14.15
$0.00
$62.05
12/01/2018
$41.25
$7.60
$14.15
$0.00
$63.00
For apprentice rates see "Apprentice- LABORER"
06/01/2019
$42.25
$7.60
$14.15
$0.00
$64.00
DEMO: WRECKING LABORER
12/01/2019
$43.25
$7.60
$14.15
$0.00
$65.00
For apprentice rates see "Apprentice- LABORER"
DEMO: JACKHAMMER OPERATOR
12/01/2016
$37.25
$7.60
$14.15
$0.00
$59.00
LABORERS - ZONE 2
06/01/2017
$38.25
$7.60
$14.15
$0.00
$60.00
12/01/2017
$39.10
$7.60
$14.15
$0.00
$60.85
06/01/2018
$40.05
$7.60
$14.15
$0.00
$61.80
12/01/2018
$41.00
$7.60
$14.15
$0.00
$62.75
06/01/2019
$42.00
$7.60
$14.15
$0.00
$63.75
12/01/2019
$43.00
$7.60
$14.15
$0.00
$64.75
For apprentice rates see "Apprentice- LABORER"
DEMO: WRECKING LABORER
12/01/2016
$36.50
$7.60
$14.15
$0.00
$58.25
LABORERS - ZONE 2
06/01/2017
$37.50
$7.60
$14.15
$0.00
$59.25
12/01/2017
$38.35
$7.60
$14.15
$0.00
$60.10
06/01/2018
$39.30
$7.60
$14.15
$0.00
$61.05
12/01/2018
$40.25
$7.60
$14.15
$0.00
$62.00
06/01/2019
$41.25
$7.60
$14.15
$0.00
$63.00
12/01/2019
$42.25
$7.60
$14.15
$0.00
$64.00
For apprentice rates see "Apprentice- LABORER"
DIRECTIONAL DRILL MACHINE OPERATOR
12/01/2016
$44.94
$10.00
$15.25
$0.00
$70.19
OPERATING ENGINEERS LOCAL 4
06/01/2017
$45.93
$10.00
$15.25
$0.00
$71.18
12/01/2017
$46.92
$10.00
$15.25
$0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DIVER
08/01/2015
$58.86
$9.80
$19.23
$0.00
$87.89
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER TENDER
08/01/2015
$42.04
$9.80
$19.23
$0.00
$71.07
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER TENDER (EFFLUENT)
08/01/2015
$63.06
$9.80
$19.23
$0.00
$92.09
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER/SLURRY (EFFLUENT)
08/01/2015
$88.23
$9.80
$19.23
$0.00
$117.26
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
DRAWBRIDGE OPERATOR (Construction)
03/01/2017
$48.33
$13.00
$17.45
$0.00
$78.78
ELECTRICIANS LOCAL 103
09/01/2017
$49.28
$13.00
$17.48
$0.00
$79.76
03/01/2018
$50.48
$13.00
$17.51
$0.00
$80.99
09/01/2018
$51.67
$13.00
$17.55
$0.00
$82.22
03/01/2019
$52.87
$13.00
$17.59
$0.00
$83.46
For apprentice rates see "Apprentice- ELECTRICIAN"
---------------------------------------------------------------------------------------------- ------------------------------------------- -
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 8 of 33
Classification
ELECTRICIAN
ELECTRICIANS LOCAL 103
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$32.91
2
40
$19.33
Unemployment
$0.58
03/01/2017
$48.33
$13.00
$17.45
$0.00
$78.78
09/01/2017
$49.28
$13.00
$17.48
$0.00
$79.76
03/01/2018
$50.48
$13.00
$17.51
$0.00
$80.99
09/01/2018
$51.67
$13.00
$17.55
$0.00
$82.22
03/01/2019
$52.87
$13.00
$17.59
$0.00
$83.46
Apprentice- ELECTRICIAN- Local 103
Effective Date - 03/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$19.33
$13.00
$0.58
$0.00
$32.91
2
40
$19.33
$13.00
$0.58
$0.00
$32.91
3
45
$21.75
$13.00
$13.37
$0.00
$48.12
4
45
$21.75
$13.00
$13.37
$0.00
$48.12
5
50
$24.17
$13.00
$13.75
$0.00
$50.92
6
55
$26.58
$13.00
$14.11
$0.00
$53.69
7
60
$29.00
$13.00
$14.48
$0.00
$56.48
8
65
$31.41
$13.00
$14.85
$0.00
$59.26
9
70
$33.83
$13.00
$15.22
$0.00
$62.05
10
75
$36.25
$13.00
$15.60
$0.00
$64.85
Effective Date - 09/01/2017
___...___. ____.._-_ __-_ - __-. __-_ -
- ___- -
- ___..-__- -
Supplemental
- - ____
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
40
$19.71
$13.00
$0.59
$0.00
$33.30
2
40
$19.71
$13.00
$0.59
$0.00
$33.30
3
45
$22.18
$13.00
$13.39
$0.00
$48.57
4
45
$22.18
$13.00
$13.39
$0.00
$48.57
5
50
$24.64
$13.00
$13.76
$0.00
$51.40
6
55
$27.10
$13.00
$14.12
$0.00
$54.22
7
60
$29.57
$13.00
$14.50
$0.00
$57.07
8
65
$32.03
$13.00
$14.87
$0.00
$59.90
9
70
$34.50
$13.00
$15.25
$0.00
$62.75
10
75
$36.96
$13.00
$15.62
$0.00
$65.58
_--- __--..___.
Notes::
___...___. ____.._-_ __-_ - __-. __-_ -
- ___- -
- ___..-__- -
- _ - -
- - ____
---_..__.,
App Prior I/1/03; 30/35/40/45/50/55/65/70/75/80
Apprentice to Journeyworker Ratio:2:3***
ELEVATOR CONSTRUCTOR
ELEVATOR CONSTRUCTORSLOCAL 4
01/01/2017 $55.86 $15.28 $15.71 $0.00 $86.85
-------------------------- --------------------- -------------------------------------------------------- ----- ------- ----- -----------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 9 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- ELEVATOR CONSTRUCTOR -Local 4
Effective Date - 01/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$27.93
$15.28
$0.00
$0.00
$43.21
2 55
$30.72
$15.28
$15.71
$0.00
$61.71
3 65
$36.31
$15.28
$15.71
$0.00
$67.30
4 70
$39.10
$15.28
$15.71
$0.00
$70.09
5 80
$44.69
$15.28
$15.71
$0.00
$75.68
---------------,_._..---_
'Notes:
$10.00
$15.25
-------_.-._._,
$48.08
Steps 1-2 are 6 mos.; Steps 3-5 are 1 year
$33.15
$7.60
$13.00
$0.00
$53.75
Apprentice to Journeyworker Ratio:1:1
12/01/2017
$33.78
$7.60
$13.00
$0.00
ELEVATOR CONSTRUCTOR HELPER
01/01/2017
$39.10
$15.28
$15.71
$0.00
$70.09
ELEVATOR CONSTRUCTORS LOCAL 4
11/01/2016
$21.98
$10.00
$15.15
05/01/2017
$42.15
For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR"
$15.25
$0.00
$67.40
11/01/2017
$42.88
$10.00
FENCE & GUARD RAIL ERECTOR
12/01/2016
$32.15
$7.60
$13.00
$0.00
$52.75
LABORERS - ZONE 2
$68.84
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
$10.00
$15.25
$0.00
$48.08
06/01/2017
$33.15
$7.60
$13.00
$0.00
$53.75
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
12/01/2017
$33.78
$7.60
$13.00
$0.00
$54.38
FIRE ALARM INSTALLER
06/01/2018
$34.62
$7.60
$13.00
$0.00
$55.22
ELECTRICIANS LOCAL 103
12/01/2018
$35.46
$7.60
$13.00
$0.00
$56.06
06/01/2019
$36.33
$7.60
$13.00
$0.00
$56.93
12/01/2019
$37.19
$7.60
$13.00
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2016
$41.37
$10.00
$15.15
$0.00
$66.52
OPERATING ENGINEERS LOCAL 4
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY
11/01/2016
$21.98
$10.00
$15.15
05/01/2017
$42.15
$10.00
$15.25
$0.00
$67.40
11/01/2017
$42.88
$10.00
$15.25
$0.00
$68.13
05/01/2018
$43.59
$10.00
$15.25
$0.00
$68.84
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
$10.00
$15.25
$0.00
$48.08
FIELD ENG.PARTY CHIEF-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
11/01/2016
05/01/2017
11/01/2017
05/01/2018
$42.82
$43.61
$44.34
$45.06
$10.00
$10.00
$10.00
$10.00
$15.15
$15.25
$15.25
$15.25
$0.00
$0.00
$0.00
$0.00
$67.97
$68.86
$69.59
$70.31
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY
11/01/2016
$21.98
$10.00
$15.15
$0.00
$47.13
OPERATING ENGINEERS LOCAL 4
05/01/2017
$22.41
$10.00
$15.25
$0.00
$47.66
11/01/2017
$22.83
$10.00
$15.25
$0.00
$48.08
05/01/2018
$23.26
$10.00
$15.25
$0.00
$48.51
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
FIRE ALARM INSTALLER
03/01/2017
$48.33
$13.00
$17.45
$0.00
$78.78
ELECTRICIANS LOCAL 103
09/01/2017
$49.28
$13.00
$17.48
$0.00
$79.76
03/01/2018
$50.48
$13.00
$17.51
$0.00
$80.99
09/01/2018
$51.67
$13.00
$17.55
$0.00
$82.22
03/01/2019
$52.87
$13.00
$17.59
$0.00
$83.46
For apprentice rates see "Apprentice- ELECTRICIAN"
-------------------------------------------------------------------------------------------------------- - -------- ------------------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 10 of 33
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
OPERATING ENGINEERS LOCAL 4
$9.80
$1.79
$0.00
$34.76
Unemployment
$25.28
FIRE ALARM REPAIR / MAINTENANCE
03/01/2017
$36.25
$13.00
$15.60
$0.00
$64.85
I COMMISSIONINGELECTRIcrANs
12/01/2017
$39.32
$10.00
$15.25
$0.00
$64.57
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
09/01/2017
$36.96
$13.00
$15.62
$0.00
$65.58
LOCAL 103
12/01/2016
$20.50
$7.60
$13.00
$0.00
$41.10
LABORERS - ZONE 2
03/01/2018
$37.86
$13.00
$15.65
$0.00
$66.51
For apprentice rates see "Apprentice- LABORER"
09/01/2018
$38.75
$13.00
$15.67
$0.00
$67.42
03/01/2019
$39.65
$13.00
$15.70
$0.00
$68.35
For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN'
- - -
- -
FIREMAN (ASST. ENGINEER)
12/01/2016
$37.65
$10.00
$15.25
$0.00
$62.90
OPERATING ENGINEERS LOCAL 4
$9.80
$1.79
$0.00
$34.76
3 60
$25.28
$9.80
06/01/2017
$38.49
$10.00
$15.25
$0.00
$63.74
$12.25
12/01/2017
$39.32
$10.00
$15.25
$0.00
$64.57
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
$53.33
6 75
$31.60
$9.80
$14.04
$0.00
FLAGGER & SIGNALER
12/01/2016
$20.50
$7.60
$13.00
$0.00
$41.10
LABORERS - ZONE 2
$35.81
$9.80
$15.83
$0.00
$61.44
--------------_-
Notes:
For apprentice rates see "Apprentice- LABORER"
06/01/2017
$31.86
$10.00
$15.25
Steps are 750 hrs.
$57.11
FLOORCOVERER 03/01/2016 $42.13 $9.80 $17.62 $0.00 $69.55
FLOORCOVERERS LOCAL 2168 ZONE I
Apprentice- FLOORCOVERER -Local 2168 Zone I
Effective Date - 03/01/2016
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$21.07
$9.80
$1.79
$0.00
$32.66
2 55
$23.17
$9.80
$1.79
$0.00
$34.76
3 60
$25.28
$9.80
$12.25
$0.00
$47.33
4 65
$27.38
$9.80
$12.25
$0.00
$49.43
5 70
$29.49
$9.80
$14.04
$0.00
$53.33
6 75
$31.60
$9.80
$14.04
$0.00
$55.44
7 80
$33.70
$9.80
$15.83
$0.00
$59.33
8 85
$35.81
$9.80
$15.83
$0.00
$61.44
--------------_-
Notes:
----------..__.._.-_,
06/01/2017
$31.86
$10.00
$15.25
Steps are 750 hrs.
$57.11
12/01/2017
$32.55
$10.00
�- - - - - - - - - - -
Apprentice to Journeyworker Ratio: 1:1
- - - - -
- - -
- - - -
- - -
- -
FORK LIFT/CHERRY PICKER
12/01/2016
$45.38
$10.00
$15.25
$0.00
$70.63
OPERATING ENGINEERS LOCAL 4
06/01/2017
$46.38
$10.00
$15.25
$0.00
$71.63
12/01/2017
$47.38
$10.00
$15.25
$0.00
$72.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
GENERATOR/LIGHTING PLANT/HEATERS
12/01/2016
$31.17
$10.00
$15.25
$0.00
$56.42
OPERATING ENGINEERS LOCAL 4
06/01/2017
$31.86
$10.00
$15.25
$0.00
$57.11
12/01/2017
$32.55
$10.00
$15.25
$0.00
$57.80
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR
01/01/2017
$40.91
$7.85
$16.10
$0.00
$64.86
SYSTEMS)
GLAZIERS LOCAL 35 (ZONE 2)
- ------------------ - ------------ ---------------------------- ------ - ---------------- ------------ ----- ------------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 11 of 33
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- GLAZIER -Local35 Zone 2
Effective Date - 01/01/2017
Step percent
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1 50
$20.46
$7.85
$0.00
$0.00
$28.31
2 55
$22.50
$7.85
$3.66
$0.00
$34.01
3 60
$24.55
$7.85
$3.99
$0.00
$36.39
4 65
$26.59
$7.85
$4.32
$0.00
$38.76
5 70
$28.64
$7.85
$14.11
$0.00
$50.60
6 75
$30.68
$7.85
$14.44
$0.00
$52.97
7 80
$32.73
$7.85
$14.77
$0.00
$55.35
8 90
$36.82
$7.85
$15.44
$0.00
$60.11
- - - - - - - - - -
Notes:
- - - - - -
- - -
- - -
- - -
- - - -
Steps are 750 hrs.
- - - - - - - - - -
Apprentice to Journeyworker Ratio:1:1
- - - - -
- - -
- - -
- - - -
-
HOISTING ENGINEER/CRANES/GRADALLS
12/01/2016
$45.38
$10.00
$15.25
$0.00 $70.63
OPERATING ENGINEERS LOCAL 4
06/01/2017
$46.38
$10.00
$15.25
$0.00 $71.63
12/01/2017
$47.38
$10.00
$15.25
$0.00 $72.63
--------------------------------------------------------- --------------------------------------- -- -------------------------- - ------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 12 of 33
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- OPERATING ENGINEERS -Local 4
Effective Date - 12/01/2016
Supplemental
Step percent
Apprentice Base Wage Health
Pension
Unemployment
Total Rate
1 55
$24.96 $10.00
$0.00
$0.00
$34.96
2 60
$27.23 $10.00
$15.25
$0.00
$52.48
3 65
$29.50 $10.00
$15.25
$0.00
$54.75
4 70
$31.77 $10.00
$15.25
$0.00
$57.02
5 75
$34.04 $10.00
$15.25
$0.00
$59.29
6 80
$36.30 $10.00
$15.25
$0.00
$61.55
7 85
$38.57 $10.00
$15.25
$0.00
$63.82
8 90
$40.84 $10.00
$15.25
$0.00
$66.09
Effective Date - 06/01/2017
Supplemental
Step percent
Apprentice Base Wage Health
Pension
Unemployment
Total Rate
1 55
$25.51 $10.00
$0.00
$0.00
$35.51
2 60
$27.83 $10.00
$15.25
$0.00
$53.08
3 65
$30.15 $10.00
$15.25
$0.00
$55.40
4 70
$32.47 $10.00
$15.25
$0.00
$57.72
5 75
$34.79 $10.00
$15.25
$0.00
$60.04
6 80
$37.10 $10.00
$15.25
$0.00
$62.35
7 85
$39.42 $10.00
$15.25
$0.00
$64.67
8 90
$41.74 $10.00
$15.25
$0.00
$66.99
- - - - - - - - - -
(Notes:
- - - - - - - - -
- - -
- - -
- -
- -+
----._.____.._._.-._._._...
Apprentice to Journeyworker Ratio:1:6
-----._.....-.___..----
-
-
HVAC (DUCTWORK)
02/01/2017 $43.72
$11.45
$23.07
$2.35
$80.59
SHEETMETAL WORKERS LOCAL 17 -A
08/01/2017 $44.82
$11.45
$23.07
$2.35
$81.69
02/01/2018 $45.97
$11.45
$23.07
$2.35
$82.84
For apprentice rates see "Apprentice- SHEET METAL WORKER"
HVAC (ELECTRICAL CONTROLS)
03/01/2017 $48.33
$13.00
$17.45
$0.00
$78.78
ELECTRICIANS LOCAL 103
09/01/2017 $49.28
$13.00
$17.48
$0.00
$79.76
03/01/2018 $50.48
$13.00
$17.51
$0.00
$80.99
09/01/2018 $51.67
$13.00
$17.55
$0.00
$82.22
03/01/2019 $52.87
$13.00
$17.59
$0.00
$83.46
For apprentice rates see "Apprentice- ELECTRICIAN"
HVAC (TESTING AND BALANCING - AIR)
02/01/2017 $43.72
$11.45
$23.07
$2.35
$80.59
SHEETMETAL WORKERS LOCAL 17 -A
08/01/2017 $44.82
$11.45
$23.07
$2.35
$81.69
02/01/2018 $45.97
$11.45
$23.07
$2.35
$82.84
For apprentice rates see "Apprentice- SHEET METAL WORKER"
HVAC (TESTING AND BALANCING -WATER)
03/01/2017 $48.86
$9.70
$16.14
$0.00
$74.70
PIPEFITTERS LOCAL 537 (Local 138)
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBERIPIPEFITTER"
HVAC MECHANIC
03/01/2017 $48.86
$9.70
$16.14
$0.00
$74.70
PIPEF17TERS LOCAL 537 (Local 138)
------------------------------------------------------------------------------------------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007
-----------
-----------------------------
--
Page 13 of 33
Classification Effective Date
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
HYDRAULIC DRILLS
12/01/2016
$32.65
$7.60
$13.00
$0.00
$53.25
LABORERS - ZONE 1
$11.75
$11.95
$0.00
$55.26
4 80
$36.07
$11.75
06/01/2017
$33.65
$7.60
$13.00
$0.00
$54.25
12/01/2017
$34.28
$7.60
$13.00
$0.00
$54.88
Unemployment
06/01/2018
$35.12
$7.60
$13.00
$0.00
$55.72
$45.75
12/01/2018
$35.96
$7.60
$13.00
$0.00
$56.56
3 70
06/01/2019
$36.83
$7.60
$13.00
$0.00
$57.43
$37.67
12/01/2019
$37.69
$7.60
$13.00
$0.00
$58.29
For apprentice rates see "Apprentice- LABORER"
i
1
Steps are 1 year
INSULATOR (PIPES & TANKS)
09/01/2016
$45.09
$11.75
$14.20
$0.00
$71.04
HEAT & EROSTINSULA TORS LOCAL 6 (BOSTON)
_ -
09/01/2017
$47.09
$11.75
$14.20
$0.00
$73.04
09/01/2018
$49.34
$11.75
$14.20
$0.00
$75.29
09/01/2019
$51.84
$11.75
$14.20
$0.00
$77.79
Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston
Effective Date - 09/01/2016
Supplemental
Step percent
Apprentice Base Wage Health
Pension
Unemployment Total Rate
1 50
$22.55
$11.75
$10.45
$0.00
$44.75
2 60
$27.05
$11.75
$11.20
$0.00
$50.00
3 70
$31.56
$11.75
$11.95
$0.00
$55.26
4 80
$36.07
$11.75
$12.70
$0.00
$60.52
Effective Date - 09/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$23.55
$11.75
$10.45
$0.00
$45.75
2 60
$28.25
$11.75
$11.20
$0.00
$51.20
3 70
$32.96
$11.75
$11.95
$0.00
$56.66
4 80
$37.67
$11.75
$12.70
$0.00
$62.12
---------_._...-----....._..--------_._..._.._--------,
Notes:
i
1
Steps are 1 year
Apprentice to Journeyworker Ratio:1:4
_
_ -
IRONWORKER/WELDER
IRONWORKERS LOCAL 7 (LAWRENCE AREA)
03/16/2017 $40.24 $7.80 $20.85 $0.00 $68.89
------------------------------------------------------------------------------------------- - - ----------------------------- -------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 14 of 33
Classification Effective Date Base Wage Health Pension Supplemental
Unemployment
Apprentice- IRONWORKER -Local 7 Lawrence
$32.15
$7.60
$13.00
$0.00
Effective Date - 03/16/2017
06/01/2017
$33.15
$7.60
Supplemental
$0.00
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$24.14
$7.80
$20.85
$0.00
$52.79
2 70
$28.17
$7.80
$20.85
$0.00
$56.82
3 75
$30.18
$7.80
$20.85
$0.00
$58.83
4 80
$32.19
$7.80
$20.85
$0.00
$60.84
5 85
$34.20
$7.80
$20.85
$0.00
$62.85
6 90
$36.22
$7.80
$20.85
$0.00
$64.87
- - - - - - - _. ____ _._
Notes:
_.._..._.._. - - - -
-___..._...._....
......................_....._..._........_..
- -
i
1
} Structural 1:6; Ornamental 1:4
I
Apprentice to Journeyworker Ratio:
JACKHAMMER & PAVING BREAKER OPERATOR
LABORERS-ZONE2
For apprentice rates see "Apprentice- LABORER"
LABORER
LABORERS - ZONE 2
Total Rate
12/01/2016
$32.15
$7.60
$13.00
$0.00
$52.75
06/01/2017
$33.15
$7.60
$13.00
$0.00
$53.75
12/01/2017
$33.78
$7.60
$13.00
$0.00
$54.38
06/01/2018
$34.62
$7.60
$13.00
$0.00
$55.22
12/01/2018
$35.46
$7.60
$13.00
$0.00
$56.06
06/01/2019
$36.33
$7.60
$13.00
$0.00
$56.93
12/01/2019
$37.19
$7.60
$13.00
$0.00
$57.79
12/01/2016
$31.90
$7.60
$13.00
$0.00
$52.50
06/01/2017
$32.90
$7.60
$13.00
$0.00
$53.50
12/01/2017
$33.53
$7.60
$13.00
$0.00
$54.13
06/01/2018
$34.37
$7.60
$13.00
$0.00
$54.97
12/01/2018
$35.21
$7.60
$13.00
$0.00
$55.81
06/01/2019
$36.08
$7.60
$13.00
$0.00
$56.68
12/01/2019
$36.94
$7.60
$13.00
$0.00
$57.54
---- -------------------------------------------------------------------------------------------------------------------------- -
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 15 of 33
Classification
Apprentice - LABORER - Zone 2
Effective Date - 12/01/2016
Step percent
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Supplemental
Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$19.14
$7.60
$13.00
$0.00
$39.74
2 70
$22.33
$7.60
$13.00
$0.00
$42.93
3 80
$25.52
$7.60
$13.00
$0.00
$46.12
4 90
$28.71
$7.60
$13.00
$0.00
$49.31
Effective Date - 06/01/2017
$13.00
$0.00
$54.97
Supplemental
12/01/2018
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$19.74
$7.60
$13.00
$0.00
$40.34
2 70
$23.03
$7.60
$13.00
$0.00
$43.63
3 80
$26.32
$7.60
$13.00
$0.00
$46.92
4 90
$29.61
$7.60
$13.00
$0.00
$50.21
-----.---------------_--___.------+
(Notes:
$0.00
$52.50
LABORERS - ZONE 2
06/01/2017
I!
--- --------_----____------
Apprentice to Journeyworker Ratio:1:5
$13.00
-_-__.---____-----I
$53.50
12/01/2017
LABORER: CARPENTER TENDER
12/01/2016
$31.90
$7.60
$13.00
$0.00
$52.50
LABORERS - ZONE 1
06/01/2017
$32.90
$7.60
$13.00
$0.00
$53.50
12/01/2017
$33.53
$7.60
$13.00
$0.00
$54.13
06/01/2018
$34.37
$7.60
$13.00
$0.00
$54.97
12/01/2018
$35.21
$7.60
$13.00
$0.00
$55.81
06/01/2019
$36.08
$7.60
$13.00
$0.00
$56.68
12/01/2019
$36.94
$7.60
$13.00
$0.00
$57.54
For apprentice rates see "Apprentice- LABORER"
LABORER: CEMENT FINISHER TENDER
12/01/2016
$31.90
$7.60
$13.00
$0.00
$52.50
LABORERS - ZONE 2
06/01/2017
$32.90
$7.60
$13.00
$0.00
$53.50
12/01/2017
$33.53
$7.60
$13.00
$0.00
$54.13
06/01/2018
$34.37
$7.60
$13.00
$0.00
$54.97
12/01/2018
$35.21
$7.60
$13.00
$0.00
$55.81
06/01/2019
$36.08
$7.60
$13.00
$0.00
$56.68
12/01/2019
$36.94
$7.60
$13.00
$0.00
$57.54
For apprentice rates see "Apprentice- LABORER"
LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER
12/01/2016
$32.10
$7.60
$12.95
$0.00
$52.65
LABORERS - ZONE 1
06/01/2017
$33.10
$7.60
$12.95
$0.00
$53.65
12/01/2017
$33.73
$7.60
$12.95
$0.00
$54.28
06/01/2018
$34.57
$7.60
$12.95
$0.00
$55.12
12/01/2018
$35.41
$7.60
$12.95
$0.00
$55.96
06/01/2019
$36.28
$7.60
$12.95
$0.00
$56.83
12/01/2019
$37.14
$7.60
$12.95
$0.00
$57.69
For apprentice rates see "Apprentice- LABORER"
---------------------- ----------------------------------------------------------------------------------------------- -------------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 16 of 33
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$52.50
LABORERS - ZONE 2
Unemployment
LABORER: MASON TENDER 12/01/2016
$32.15
$7.60
$13.00
$0.00
$52.75
LABORERS - ZONE 2
$0.00
$53.50
12/01/2017
$33.53
06/01/2017
$33.15
$7.60
$13.00
$0.00
$53.75
12/01/2017
$33.78
$7.60
$13.00
$0.00
$54.38
06/01/2018
$34.62
$7.60
$13.00
$0.00
$55.22
12/01/2018
$35.46
$7.60
$13.00
$0.00
$56.06
06/01/2019
$36.33
$7.60
$13.00
$0.00
$56.93
12/01/2019
$37.19
$7.60
$13.00
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
LABORER: MULTI -TRADE TENDER
12/01/2016
$31.90
$7.60
$13.00
$0.00
$52.50
LABORERS - ZONE 2
06/01/2017
$32.90
$7.60
$13.00
$0.00
$53.50
12/01/2017
$33.53
$7.60
$13.00
$0.00
$54.13
06/01/2018
$34.37
$7.60
$13.00
$0.00
$54.97
12/01/2018
$35.21
$7.60
$13.00
$0.00
$55.81
06/01/2019
$36.08
$7.60
$13.00
$0.00
$56.68
12/01/2019
$36.94
$7.60
$13.00
$0.00
$57.54
For apprentice rates see "Apprentice- LABORER"
LABORER: TREE REMOVER
12/01/2016
$31.90
$7.60
$13.00
$0.00
$52.50
LABORERS - ZONE 2
06/01/2017
$32.90
$7.60
$13.00
$0.00
$53.50
12/01/2017
$33.53
$7.60
$13.00
$0.00
$54.13
06/01/2018
$34.37
$7.60
$13.00
$0.00
$54.97
12/01/2018
$35.21
$7.60
$13.00
$0.00
$55.81
06/01/2019
$36.08
$7.60
$13.00
$0.00
$56.68
12/01/2019
$36.94
$7.60
$13.00
$0.00
$57.54
This classification applies to all tree work associated with the removal of standing trees, and trimming and removal of branches and limbs when the work is not done for
a utility company for the purpose of operation, maintenance or repair of utility company equipment. For apprentice rates see "Apprentice- LABORER"
LASER BEAM OPERATOR
12/01/2016
$32.15
$7.60
$13.00
$0.00
$52.75
LABORERS - ZONE 2
06/01/2017
$33.15
$7.60
$13.00
$0.00
$53.75
12/01/2017
$33.78
$7.60
$13.00
$0.00
$54.38
06/01/2018
$34.62
$7.60
$13.00
$0.00
$55.22
12/01/2018
$35.46
$7.60
$13.00
$0.00
$56.06
06/01/2019
$36.33
$7.60
$13.00
$0.00
$56.93
12/01/2019
$37.19
$7.60
$13.00
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
MARBLE & TILE FINISHERS
02/01/2017
$38.78
$10.75
$17.67
$0.00
$67.20
BRICKLAYERS LOCAL 3 - MARBLE & TILE
---------------------------------------------------------- - -...-- ------- ------------------------------- ---- - --- --- ...- -------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 17 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile
Effective Date - 02/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$19.39
$10.75
$17.67
$0.00
$47.81
2 60
$23.27
$10.75
$17.67
$0.00
$51.69
3 70
$27.15
$10.75
$17.67
$0.00
$55.57
4 80
$31.02
$10.75
$17.67
$0.00
$59.44
5 90
$34.90
$10.75
$17.67
$0.00
$63.32
--------_....._..._._ _._.--------------_.-
(Notes:
I
----------.r._._._.
Apprentice to Journeyworker Ratio: 1:3
-----------._..
$9.90
$18.50
----
- -
MARBLE MASONSJILELAYERS & TERRAZZO MECH
02/01/2017
$50.80
$10.75
$19.22
$0.00 $80.77
BRICKLAYERS LOCAL 3 -MARBLE & TILE
04/01/2018
$37.17
$9.90
$18.50
Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble & Tile
Effective Date - 02/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$25.40
$10.75
$19.22
$0.00
$55.37
2 60
$30.48
$10.75
$19.22
$0.00
$60.45
3 70
$35.56
$10.75
$19.22
$0.00
$65.53
4 80
$40.64
$10.75
$19.22
$0.00
$70.61
5 90
$45.72
$10.75
$19.22
$0.00
$75.69
-----._._.---____.-------._.-----._.-_.._.-.-
Notes:
MILLWRIGHT (Zone 2)
_--.---_.--------------.-._
Apprentice to Journeyworker Ratio:1:5
$35.47
$9.90
$18.50
- -
- -
MECH. SWEEPER OPERATOR (ON CONST. SITES)
OPERATING ENGINEERS LOCAL 9
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
12/01/2016
06/01/2017
12/01/2017
$44.94
$45.93
$46.92
$10.00
$10.00
$10.00
$15.25
$15.25
$15.25
$0.00
$0.00
$0.00
----------
$70.19
$71.18
$72.17
MECHANICS MAINTENANCE
12/01/2016
$44.94
$10.00
$15.25
$0.00
$70.19
OPERATING ENGINEERS LOCAL 4
06/01/2017
$45.93
$10.00
$15.25
$0.00
$71.18
12/01/2017
$46.92
$10.00
$15.25
$0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
MILLWRIGHT (Zone 2)
04/01/2017
$35.47
$9.90
$18.50
$0.00
$63.87
MILLWRIGHTS LOCAL 1121 - Zone 2
10/01/2017
$36.32
$9.90
$18.50
$0.00
$64.72
04/01/2018
$37.17
$9.90
$18.50
$0.00
$65.57
10/01/2018
$38.02
$9.90
$18.50
$0.00
$66.42
04/01/2019
$38.87
$9.90
$18.50
$0.00
$67.27
------------------------------------ --- -----.---------- ---------------------- ------------------------- -- -----------------------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 18 of 33
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- MILLWRIGHT- Local 1121 Zone 2
Effective Date - 04/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 55
$19.51
$9.90
$5.31
$0.00
$34.72
2 65
$23.06
$9.90
$15.13
$0.00
$48.09
3 75
$26.60
$9.90
$16.10
$0.00
$52.60
4 85
$30.15
$9.90
$17.06
$0.00
$57.11
Effective Date - 10/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 55
$19.98
$9.90
$5.31
$0.00
$35.19
2 65
$23.61
$9.90
$15.13
$0.00
$48.64
3 75
$27.24
$9.90
$16.10
$0.00
$53.24
4 85
$30.87
$9.90
$15.06
$0.00
$55.83
----____.--------
(Notes:
-_.-,_ ---------------
Steps are 2,000 hours
-
1
- ._._.-_..-
Apprentice to Journeyworker Ratio: 1:5
---------
--------
MORTAR MIXER
12/01/2016
$32.15
$7.60
$13.00
$0.00
$52.75
LABORERS - ZONE 2
06/01/2017
$33.15
$7.60
$13.00
$0.00
$53.75
12/01/2017
$33.78
$7.60
$13.00
$0.00
$54.38
06/01/2018
$34.62
$7.60
$13.00
$0.00
$55.22
12/01/2018
$35.46
$7.60
$13.00
$0.00
$56.06
06/01/2019
$36.33
$7.60
$13.00
$0.00
$56.93
12/01/2019
$37.19
$7.60
$13.00
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
OILER (OTHER THAN TRUCK CRANES,GRADALLS)
12/01/2016
$22.96
$10.00
$15.25
$0.00
$48.21
OPERATING ENGINEERS LOCAL 4
06/01/2017
$23.47
$10.00
$15.25
$0.00
$48.72
12/01/2017
$23.99
$10.00
$15.25
$0.00
$49.24
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
OILER (TRUCK CRANES, GRADALLS)
12/01/2016
$26.94
$10.00
$15.25
$0.00
$52.19
OPERATING ENGINEERS LOCAL 4
06/01/2017
$27.54
$10.00
$15.25
$0.00
$52.79
12/01/2017
$28.15
$10.00
$15.25
$0.00
$53.40
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
OTHER POWER DRIVEN EQUIPMENT - CLASS II
12/01/2016
$44.94
$10.00
$15.25
$0.00
$70.19
OPERATING ENGINEERS LOCAL 4
06/01/2017
$45.93
$10.00
$15.25
$0.00
$71.18
12/01/2017
$46.92
$10.00
$15.25
$0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
PAINTER (BRIDGES/TANKS)
01/01/2017
$51.41
$7.85
$16.10
$0.00
$75.36
PAINTERS LOCAL 35 - ZONE 1
----------------------- ---------------------------------------------------------------------------------------------------------------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 19 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 - BRIDGESITANKS
Effective Date - 01/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$25.71
$7.85
$0.00
$0.00
$33.56
2 55
$28.28
$7.85
$3.66
$0.00
$39.79
3 60
$30.85
$7.85
$3.99
$0.00
$42.69
4 65
$33.42
$7.85
$4.32
$0.00
$45.59
5 70
$35.99
$7.85
$14.11
$0.00
$57.95
6 75
$38.56
$7.85
$14.44
$0.00
$60.85
7 80
$41.13
$7.85
$14.77
$0.00
$63.75
8 90
$46.27
$7.85
$15.44
$0.00
$69.56
------._.._---------.--_._-
(Notes:
_.__------___..---
----._....._._.._._--
i
I
Steps are 750 hrs.
Apprentice to Journeyworker Ratio: 1:1
- - -
- - -
_.._ _.._ _.._ -
_._. - -
- - -
PAINTER (SPRAY OR SANDBLAST, NEW) * 01/01/2017 $42.31 $7.85 $16.10 $0.00 $66.26
* If 30% or more of surfaces to be painted are new construction,
NEW paint rate shall be used.PAINTERS LOCAL 35 - ZONE 1
Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - New
Effective Date - 01/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$21.16
$7.85
$0.00
$0.00
$29.01
2 55
$23.27
$7.85
$3.66
$0.00
$34.78
3 60
$25.39
$7.85
$3.99
$0.00
$37.23
4 65
$27.50
$7.85
$4.32
$0.00
$39.67
5 70
$29.62
$7.85
$14.11
$0.00
$51.58
6 75
$31.73
$7.85
$14.44
$0.00
$54.02
7 80
$33.85
$7.85
$14.77
$0.00
$56.47
8 90
$38.08
$7.85
$15.44
$0.00
$61.37
___.---._.._.__...-._... ____---___.-----_._..
Notes:
_.__------___..---
t Steps are 750 hrs.
- - ___..._...._,..
Apprentice to Journeyworker Ratio: 1:1
- - -
- - -
_.._ _.._ _.._ -
_._. - -
- - -
PAINTER (SPRAY OR SANDBLAST, REPAINT)
PAINTERS LOCAL 35 - ZONE 1
01/01/2017 $40.37 $7.85 $16.10 $0.00 $64.32
--------------------------------- -----------------------------------------------------------------------------------------------------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 20 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - Repaint
Effective Date - 01/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$20.19
$7.85
$0.00
$0.00
$28.04
2 55
$22.20
$7.85
$3.66
$0.00
$33.71
3 60
$24.22
$7.85
$3.99
$0.00
$36.06
4 65
$26.24
$7.85
$4.32
$0.00
$38.41
5 70
$28.26
$7.85
$14.11
$0.00
$50.22
6 75
$30.28
$7.85
$14.44
$0.00
$52.57
7 80
$32.30
$7.85
$14.77
$0.00
$54.92
8 90
$36.33
$7.85
$15.44
$0.00
$59.62
_..-..-.___......._.-----------------
(Notes:
8
90
---
--.-_.--
-,
Steps are 750 hrs.
$60.11
- -
(Notes:
- - - - - - - -
- - - - - -
-_.._-----.._.-._._._...--,
._._ _._..._.._.._._......._. ____ ,- _._. - - ___.
Apprentice to Journeyworker Ratio:l:l
____ ____ - -
- - -
- - - ___.
_.._ - -
- _
PAINTER (TRAFFIC MARKINGS) 12/01/2016
$31.90
$7.60
$13.00
$0.00
$52.50
LABORERS-ZONE2
2
55
$22.50
$7.85
$3.66
06/01/2017
$32.90
$7.60
$13.00
$0.00
$53.50
12/01/2017
$33.53
$7.60
$13.00
$0.00
$54.13
06/01/2018
$34.37
$7.60
$13.00
$0.00
$54.97
12/01/2018
$35.21
$7.60
$13.00
$0.00
$55.81
06/01/2019
$36.08
$7.60
$13.00
$0.00
$56.68
12/01/2019
$36.94
$7.60
$13.00
$0.00
$57.54
For Apprentice rates see "Apprentice- LABORER"
8
90
$36.82
$7.85
$15.44
PAINTER / TAPER (BRUSH, NEW) * 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86
* If 30% or more of surfaces to be painted are new construction,
NEW paint rate shall be used.PAINTERS LOCAL 35 - ZONE 2
Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW
Effective Date - 01/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
50
$20.46
$7.85
$0.00
$0.00
$28.31
2
55
$22.50
$7.85
$3.66
$0.00
$34.01
3
60
$24.55
$7.85
$3.99
$0.00
$36.39
4
65
$26.59
$7.85
$4.32
$0.00
$38.76
5
70
$28.64
$7.85
$14.11
$0.00
$50.60
6
75
$30.68
$7.85
$14.44
$0.00
$52.97
7
80
$32.73
$7.85
$14.77
$0.00
$55.35
8
90
$36.82
$7.85
$15.44
$0.00
$60.11
- -
(Notes:
- - - - - - - -
- - - - - -
-_.._-----.._.-._._._...--,
i
Steps are 750 hrs.
Apprentice to Journeyworker Ratio: 1:1
--------------------------------------------------------------- ------ --------------------- -- --------------------------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 21 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
PAINTER / TAPER (BRUSH, REPAINT) 01/01/2017 $38.97 $7.85 $16.10 $0.00 $62.92
PAINTERS LOCAL 35 - ZONE I
Apprentice- PAINTER Local 35 Zone 2 - BRUSHREPAINT
Effective Date - 01/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$19.49
$7.85
$0.00
$0.00
$27.34
2 55
$21.43
$7.85
$3.66
$0.00
$32.94
3 60
$23.38
$7.85
$3.99
$0.00
$35.22
4 65
$25.33
$7.85
$4.32
$0.00
$37.50
5 70
$27.28
$7.85
$14.11
$0.00
$49.24
6 75
$29.23
$7.85
$14.44
$0.00
$51.52
7 80
$31.18
$7.85
$14.77
$0.00
$53.80
8 90
$35.07
$7.85
$15.44
$0.00
$58.36
------_-__----------------------,
(Notes:
$9.80
$19.23
$0.00
$62.66
i
I
Steps are 750 hrs.
$9.80
$19.23
$0.00
$66.87
8 90
'-_--.--.---_.__-.----.----.--_--_-------__-_
Apprentice to Journeyworker Ratio:1:1
$9.80
$19.23
$0.00
$66.87
--
PANEL & PICKUP TRUCKS DRIVER
12/01/2012
$30.28
$9.07
$8.00 $0.00
$47.35
TEAMSTERSJOINT COUNCIL NO. 10 ZONE B
------
i
PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2015 $42.04 $9.80 $19.23 $0.00 $71.07
DECK)
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
PILE DRIVER 08/01/2015 $42.04 $9.80 $19.23 $0.00 $71.07
PILE DRIVER LOCAL 56 (ZONE 1)
Apprentice- PILEDRIVER -Local 56 Zone I
Effective Date - 08/01/2015
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$21.02
$9.80
$19.23
$0.00
$50.05
2 60
$25.22
$9.80
$19.23
$0.00
$54.25
3 70
$29.43
$9.80
$19.23
$0.00
$58.46
4 75
$31.53
$9.80
$19.23
$0.00
$60.56
5 80
$33.63
$9.80
$19.23
$0.00
$62.66
6 80
$33.63
$9.80
$19.23
$0.00
$62.66
7 90
$37.84
$9.80
$19.23
$0.00
$66.87
8 90
$37.84
$9.80
$19.23
$0.00
$66.87
- - - - - - - - - -
Notes:
- - - - - -
----------._____....-,
--------------___.------_._
Apprentice to Journeyworker Ratio: 1:3
------
i
PIPEFITTER & STEAMFITTER
PIPEFITTERS LOCAL 537 (Local 138)
03/01/2017 $48.86 $9.70 $16.14 $0.00 $74.70
----------------------- ... - --------------------------------------------------- ---------------------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 22 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- PIPEFIITER Local 537 (Local 138)
Effective Date - 03/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$19.54
$9.70
$5.50
$0.00
$34.74
2
45
$21.99
$9.70
$16.14
$0.00
$47.83
3
60
$29.32
$9.70
$16.14
$0.00
$55.16
4
70
$34.20
$9.70
$16.14
$0.00
$60.04
5
80
$39.09
$9.70
$16.14
$0.00
$64.93
-------_.__-.®__..----------------------
Notes:
06/01/2019
$36.33
$7.60
$13.00
$0.00
$56.93
12/01/2019
** 1:3; 3:15; 1:10 thereafter / Steps are 1 yr.
$7.60
$13.00
$0.00
$57.79
- -
Apprentice to Journeyworker Ratio:1:5
L--.._._-._-_.,...-------------------
Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max)
- - - -
- - -
- - -
1
Apprentice to Journeyworker Ratio:**
_ -
_ -
PIPELAYER 12/01/2016
$32.15
$7.60
$13.00
$0.00
$52.75
LABORERS-ZONE2
$19.44
$11.32
$6.49
$0.00
$37.25
06/01/2017
$33.15
$7.60
$13.00
$0.00
$53.75
12/01/2017
$33.78
$7.60
$13.00
$0.00
$54.38
06/01/2018
$34.62
$7.60
$13.00
$0.00
$55.22
12/01/2018
$35.46
$7.60
$13.00
$0.00
$56.06
06/01/2019
$36.33
$7.60
$13.00
$0.00
$56.93
12/01/2019
$37.19
$7.60
$13.00
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
PLUMBER 03/01/2017 $48.61 $11.32 $15.46 $0.00 $75.39
PLUMBERS& GASF17TERSLOCAL 12 (Local 138)
Apprentice- PLUMBERIGASFITTER -Local 12 (Local 138)
Effective Date - 03/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 35
$17.01
$11.32
$5.74
$0.00
$34.07
2 40
$19.44
$11.32
$6.49
$0.00
$37.25
3 55
$26.74
$11.32
$8.73
$0.00
$46.79
4 65
$31.60
$11.32
$10.23
$0.00
$53.15
5 75
$36.46
$11.32
$11.72
$0.00
$59.50
-- ----._._.----------------___.-----,
(Notes:
Steps are 1 yr
Step 4 with lic$55.65 Step5 with lic$61.89
-- - - - - - - -. - -
- -
- -
Apprentice to Journeyworker Ratio:1:5
- - - -
-
- - - -
- - -
- - -
PNEUMATIC CONTROLS (TEMP.) 03/01/2017 $48.86 $9.70 $16.14 $0.00 $74.70
PIPEFITTERSLOCAL 537 (Local 138)
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 23 of 33
Classification
PNEUMATIC DRILL/TOOL OPERATOR
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
POWDERMAN & BLASTER
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
POWER SHOVEL/DERRICK/TRENCHING MACHINE
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
PUMP OPERATOR (CONCRETE)
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
PUMP OPERATOR (DEWATERING, OTHER)
OPERA TING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
Effective Date
Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
12/01/2016
$32.15
$7.60
$13.00
$0.00
$52.75
06/01/2017
$33.15
$7.60
$13.00
$0.00
$53.75
12/01/2017
$33.78
$7.60
$13.00
$0.00
$54.38
06/01/2018
$34.62
$7.60
$13.00
$0.00
$55.22
12/01/2018
$35.46
$7.60
$13.00
$0.00
$56.06
06/01/2019
$36.33
$7.60
$13.00
$0.00
$56.93
12/01/2019
$37.19
$7.60
$13.00
$0.00
$57.79
12/01/2016
$32.90
$7.60
$13.00
$0.00
$53.50
06/01/2017
$33.90
$7.60
$13.00
$0.00
$54.50
12/01/2017
$34.53
$7.60
$13.00
$0.00
$55.13
06/01/2018
$35.37
$7.60
$13.00
$0.00
$55.97
12/01/2018
$36.21
$7.60
$13.00
$0.00
$56.81
06/01/2019
$37.08
$7.60
$13.00
$0.00
$57.68
12/01/2019
$37.94
$7.60
$13.00
$0.00
$58.54
12/01/2016
$45.38
$10.00
$15.25
$0.00
$70.63
06/01/2017
$46.38
$10.00
$15.25
$0.00
$71.63
12/01/2017
$47.38
$10.00
$15.25
$0.00
$72.63
12/01/2016
$45.38
$10.00
$15.25
$0.00
$70.63
06/01/2017
$46.38
$10.00
$15.25
$0.00
$71.63
12/01/2017
$47.38
$10.00
$15.25
$0.00
$72.63
12/01/2016
$31.17
$10.00
$15.25
$0.00
$56.42
06/01/2017
$31.86
$10.00
$15.25
$0.00
$57.11
12/01/2017
$32.55
$10.00
$15.25
$0.00
$57.80
READY -MIX CONCRETE DRIVER
05/01/2016
$24.15
$8.49
$10.68
$0.00
$43.32
TEAMSTERS LOCAL 41
04/30/2017
$24.15
$8.49
$11.07
$0.00
$43.71
only to the construction of new, wood frame residences that do
05/01/2017
$24.21
$8.49
$11.54
$0.00
$44.24
not exceed four stories including the basement. CARPENTERS -ZONE
04/30/2018
$24.21
$8.49
$11.96
$0.00
$44.66
2 (Residential Wood)
05/01/2018
$24.24
$8.49
$12.46
$0.00
$45.19
04/30/2019
$24.24
$8.49
$12.92
$0.00
$45.65
RECLAIMERS
12/01/2016
$44.94
$10.00
$15.25
$0.00
$70.19
OPERATING ENGINEERS LOCAL 4
06/01/2017
$45.93
$10.00
$15.25
$0.00
$71.18
12/01/2017
$46.92
$10.00
$15.25
$0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
RESIDENTIAL WOOD FRAME (All Other Work) 06/01/2016 $25.32 $9.80 $16.82 $0.00 $51.94
CARPENTERS -ZONE 2 (Residential Wood)
RESIDENTIAL WOOD FRAME CARPENTER **
04/01/2017
$26.31
$7.07
$7.18
$0.00
$40.56
** The Residential Wood Frame Carpenter classification applies
10/01/2017
$26.93
$7.07
$7.18
$0.00
$41.18
only to the construction of new, wood frame residences that do
not exceed four stories including the basement. CARPENTERS -ZONE
04/01/2018
$27.35
$7.07
$7.18
$0.00
$41.60
2 (Residential Wood)
10/01/2018
$27.77
$7.07
$7.18
$0.00
$42.02
04/01/2019
$28.20
$7.07
$7.18
$0.00
$42.45
10/01/2019
$28.63
$7.07
$7.18
$0.00
$42.88
As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall
be paid the RESIDENTIAL WOOD FRAME CARPENTER
rate.
- --------------------------- -- ----------------- ---- ---------------------....-
Issue Date: 04/27/2017 Wage Request Number:
----------------------------------------------
20170427-007
-------
Page 24 of 33
Classification
Effective Date Base Wage
Health
Pension Supplemental
Total Rate
Unemployment
Apprentice- CARPENTER (Residential Wood Frame) -Zone 2
Effective Date - 04/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$15.79
$7.07
$0.00
$0.00
$22.86
2 60
$15.79
$7.07
$0.00
$0.00
$22.86
3 65
$17.10
$7.07
$7.18
$0.00
$31.35
4 70
$18.42
$7.07
$7.18
$0.00
$32.67
5 75
$19.73
$7.07
$7.18
$0.00
$33.98
6 80
$21.05
$7.07
$7.18
$0.00
$35.30
7 85
$22.36
$7.07
$7.18
$0.00
$36.61
8 90
$23.68
$7.07
$7.18
$0.00
$37.93
Effective Date - 10/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$16.16
$7.07
$0.00
$0.00
$23.23
2 60
$16.16
$7.07
$0.00
$0.00
$23.23
3 65
$17.50
$7.07
$7.18
$0.00
$31.75
4 70
$18.85
$7.07
$7.18
$0.00
$33.10
5 75
$20.20
$7.07
$7.18
$0.00
$34.45
6 80
$21.54
$7.07
$7.18
$0.00
$35.79
7 85
$22.89
$7.07
$7.18
$0.00
$37.14
8 90
$24.24
$7.07
$7.18
$0.00
$38.49
-------._.......... ___.-------------------+
(Notes:
._._.---------------.._.....-________---
Apprentice to Journeyworker Ratio:1:5
-_....--_.
RIDE -ON MOTORIZED BUGGY OPERATOR
12/01/2016
$32.15
$7.60
$13.00
$0.00
$52.75
LABORERS - ZONE 1
06/01/2017
$33.15
$7.60
$13.00
$0.00
$53.75
12/01/2017
$33.78
$7.60
$13.00
$0.00
$54.38
06/01/2018
$34.62
$7.60
$13.00
$0.00
$55.22
12/01/2018
$35.46
$7.60
$13.00
$0.00
$56.06
06/01/2019
$36.33
$7.60
$13.00
$0.00
$56.93
12/01/2019
$37.19
$7.60
$13.00
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
ROLLER/SPREADER/MULCHING MACHINE
12/01/2016
$44.94
$10.00
$15.25
$0.00
$70.19
OPERATING ENGINEERS LOCAL 4
06/01/2017
$45.93
$10.00
$15.25
$0.00
$71.18
12/01/2017
$46.92
$10.00
$15.25
$0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg)
02/01/2017
$41.36
$11.10
$13.80
$0.00
$66.26
ROOFERS LOCAL 33
08/01/2017
$42.46
$11.10
$13.80
$0.00
$67.36
02/01/2018
$43.61
$11.10
$13.80
$0.00
$68.51
08/01/2018
$44.71
$11.10
$13.80
$0.00
$69.61
02/01/2019
$45.86
$11.10
$13.80
$0.00
$70.76
------------------------------- - --- -------------------------------------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007
----------------
---
- ----------------
----------------
Page 25 of 33
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$0.00
$35.77
2 60
$25.48
Unemployment
Apprentice- ROOFER - Local 33
$0.00
$50.38
3 65
$27.60
$11.10
Effective Date - 02/01/2017
$0.00
$52.50
4 75
Supplemental
$11.10
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$20.68
$11.10
$3.44
$0.00
$35.22
2 60
$24.82
$11.10
$13.80
$0.00
$49.72
3 65
$26.88
$11.10
$13.80
$0.00
$51.78
4 75
$31.02
$11.10
$13.80
$0.00
$55.92
5 85
$35.16
$11.10
$13.80
$0.00
$60.06
Effective Date - 08/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$21.23
$11.10
$3.44
$0.00
$35.77
2 60
$25.48
$11.10
$13.80
$0.00
$50.38
3 65
$27.60
$11.10
$13.80
$0.00
$52.50
4 75
$31.85
$11.10
$13.80
$0.00
$56.75
5 85
$36.09
$11.10
$13.80
$0.00
$60.99
---------._.._..-___.------._..---.----..._..._._._....--
(Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1
$11.10
$13.80
$0.00
$69.86
,
Step 1 is 2000 hrs.; Steps 2-5 are 1000 hrs.
$46.11
$11.10
$13.80
$0.00
$71.01
I (Hot Pitch Mechanics' receive $1.00 hr. above ROOFER)
- - ____. - - - - - - - - -
- __.. _._..._._.._._..._........._..
- -
____. -
Apprentice to Journeyworker Ratio:**
.._......_.._.
SHEETMETAL WORKER
02/01/2017
$43.72
$11.45
ROOFER SLATE / TILE / PRECAST CONCRETE
02/01/2017
$41.61
$11.10
$13.80
$0.00
$66.51
ROOFERS LOCAL 33
08/01/2017
$42.71
$11.10
$13.80
$0.00
$67.61
02/01/2018
$43.86
$11.10
$13.80
$0.00
$68.76
08/01/2018
$44.96
$11.10
$13.80
$0.00
$69.86
02/01/2019
$46.11
$11.10
$13.80
$0.00
$71.01
For apprentice rates see "Apprentice- ROOFER"
SHEETMETAL WORKER
02/01/2017
$43.72
$11.45
$23.07
$2.35
$80.59
SHEETMETAL WORKERS LOCAL I7 -A
08/01/2017
$44.82
$11.45
$23.07
$2.35
$81.69
02/01/2018
$45.97
$11.45
$23.07
$2.35
$82.84
---------------------------- -------------------------------------------------------------------------------------- - - -------- ---------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 26 of 33
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - SHEET METAL WORKER - Local 17-A
Effective Date - 02/01/2017
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
40
$17.49
$11.45
$5.24
$0.00
$34.18
2
40
$17.49
$11.45
$5.24
$0.00
$34.18
3
45
$19.67
$11.45
$10.31
$1.24
$42.67
4
45
$19.67
$11.45
$10.31
$1.24
$42.67
5
50
$21.86
$11.45
$11.21
$1.34
$45.86
6
50
$21.86
$11.45
$11.46
$1.34
$46.11
7
60
$26.23
$11.45
$13.02
$1.52
$52.22
8
65
$28.42
$11.45
$13.93
$1.61
$55.41
9
75
$32.79
$11.45
$15.74
$1.80
$61.78
10
85
$37.16
$11.45
$17.05
$1.97
$67.63
Effective Date - 08/01/2017
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
40
$17.93
$11.45
$5.24
$0.00
$34.62
2
40
$17.93
$11.45
$5.24
$0.00
$34.62
3
45
$20.17
$11.45
$10.31
$1.26
$43.19
4
45
$20.17
$11.45
$10.31
$1.26
$43.19
5
50
$22.41
$11.45
$11.21
$1.35
$46.42
6
50
$22.41
$11.45
$11.46
$1.36
$46.68
7
60
$26.89
$11.45
$13.02
$1.54
$52.90
8
65
$29.13
$11.45
$13.93
$1.64
$56.15
9
75
$33.62
$11.45
$15.74
$1.82
$62.63
10
85
$38.10
$11.45
$17.05
$2.00
$68.60
----------------.®..._._....----.___...,..-
Notes:
Steps are 6 mos.
Apprentice to Journeyworker Ratio:1:4
SIGN ERECTOR
PAINTERS LOCAL 35 - ZONE 2
06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93
------------------ ---- ------- -------------------------------------------------------------------------------------- -- ---- -------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 27 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- SIGN ERECTOR -Local 35 Zone 2
12/01/2016
$32.44
$10.91
$10.89
Effective Date - 06/01/2013
TEAMSTERSJOINT COUNCIL NO. ]OZONE B
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$12.91
$7.07
$0.00
$0.00
$19.98
2 55
$14.20
$7.07
$2.45
$0.00
$23.72
3 60
$15.49
$7.07
$2.45
$0.00
$25.01
4 65
$16.78
$7.07
$2.45
$0.00
$26.30
5 70
$18.07
$7.07
$7.05
$0.00
$32.19
6 75
$19.36
$7.07
$7.05
$0.00
$33.48
7 80
$20.65
$7.07
$7.05
$0.00
$34.77
8 85
$21.94
$7.07
$7.05
$0.00
$36.06
9 90
$23.23
$7.07
$7.05
$0.00
$37.35
-------__._.----------------
,Notes:
$25.24
$8.77
$8.70
--_.-�
$42.71
Steps are 4 mos.
$27.76
$8.77
$8.70
$0.00
€
3
`--------------------____-.-------
Apprentiee to Journeyworker Ratio:1:1
$30.28
$8.77
$10.20
$0.00
$49.25
SPECIALIZED EARTH MOVING EQUIP < 35 TONS
12/01/2016
$32.44
$10.91
$10.89
$0.00 $54.24
TEAMSTERSJOINT COUNCIL NO. ]OZONE B
SPECIALIZED EARTH MOVING EQUIP > 35 TONS
12/01/2016
$32.73
$10.91
$10.89
$0.00 $54.53
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
SPRINKLER FITTER
03/01/2017
$50.47
$8.77
$17.20
$0.00 $76.44
SPRINKLER FITTERS LOCAL 550 - (Section B) Zone 1
Apprentice - SPRINKLER FITTER - Local 550 (Section B) Zone 2
Effective Date - 03/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 35
$17.66
$8.77
$8.70
$0.00
$35.13
2 40
$20.19
$8.77
$8.70
$0.00
$37.66
3 45
$22.71
$8.77
$8.70
$0.00
$40.18
4 50
$25.24
$8.77
$8.70
$0.00
$42.71
5 55
$27.76
$8.77
$8.70
$0.00
$45.23
6 60
$30.28
$8.77
$10.20
$0.00
$49.25
7 65
$32.81
$8.77
$10.20
$0.00
$51.78
8 70
$35.33
$8.77
$10.20
$0.00
$54.30
9 75
$37.85
$8.77
$10.20
$0.00
$56.82
10 80
$40.38
$8.77
$10.20
$0.00
$59.35
- -._----_..-----------------------
(Notes: Apprentice entered prior 9/30/10:
I
I
40/45/50/55/60/65/70/75/80/85
Steps are 850 hours
�-
- - -
- - -
- - -
- - -
- - - -
- - - - - - - - -
Apprentice to Journeyworker Ratio:1:3
- - -
STEAM BOILER OPERATOR 12/01/2016 $44.94 $10.00 $15.25 $0.00 $70.19
OPERATING ENGINEERS LOCAL 4
06/01/2017 $45.93 $10.00 $15.25 $0.00 $71.18
12/01/2017 $46.92 $10.00 $15.25 $0.00 $72.17
---------------------- ------- --- -------------------------------------------- ---------------------------- -------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 28 of 33
Classification
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
TELECOMMUNICATION TECHNICIAN
ELECTRICIANS LOCAL 103
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
09/01/2017
$36.96
$13.00
$15.62
Unemployment
$65.58
12/01/2016
$44.94
$10.00
$15.25
$0.00
$70.19
06/01/2017
$45.93
$10.00
$15.25
$0.00
$71.18
12/01/2017
$46.92
$10.00
$15.25
$0.00
$72.17
03/01/2017
$36.25
$13.00
$15.60
$0.00
$64.85
09/01/2017
$36.96
$13.00
$15.62
$0.00
$65.58
03/01/2018
$37.86
$13.00
$15.65
$0.00
$66.51
09/01/2018
$38.75
$13.00
$15.67
$0.00
$67.42
03/01/2019
$39.65
$13.00
$15.70
$0.00
$68.35
Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103
Effective Date - 03/01/2017
Step percent Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1 40
$14.50
$13.00
$0.44
$0.00
$27.94
2 40
$14.50
$13.00
$0.44
$0.00
$27.94
3 45
$16.31
$13.00
$12.54
$0.00
$41.85
4 45
$16.31
$13.00
$12.54
$0.00
$41.85
5 50
$18.13
$13.00
$12.81
$0.00
$43.94
6 55
$19.94
$13.00
$13.09
$0.00
$46.03
7 60
$21.75
$13.00
$13.37
$0.00
$48.12
8 65
$23.56
$13.00
$13.65
$0.00
$50.21
9 70
$25.38
$13.00
$13.93
$0.00
$52.31
10 75
$27.19
$13.00
$14.21
$0.00
$54.40
Effective Date - 09/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$14.78
$13.00
$0.44
$0.00
$28.22
2
40
$14.78
$13.00
$0.44
$0.00
$28.22
3
45
$16.63
$13.00
$12.55
$0.00
$42.18
4
45
$16.63
$13.00
$12.55
$0.00
$42.18
5
50
$18.48
$13.00
$12.82
$0.00
$44.30
6
55
$20.33
$13.00
$13.10
$0.00
$46.43
7
60
$22.18
$13.00
$13.39
$0.00
$48.57
8
65
$24.02
$13.00
$13.66
$0.00
$50.68
9
70
$25.87
$13.00
$13.95
$0.00
$52.82
10
75
$27.72
$13.00
$14.22
$0.00
$54.94
- -
(Notes:
I---_-------------------__.__.._...._-_I
_-_. ____ ____ - - _--_ - _--- - .Y
___ - _-._ ____
- - _
- __-.._--_ -
__-_.._._. - ,_._.
-
{
Apprentice to Journeyworker Ratio:l:1
TERRAZZO FINISHERS
BRICKLAYERS LOCAL 3 - MARBLE & TILE
02/01/2017 $49.70 $10.75 $19.22 $0.00 $79.67
---------------------------------------------------------------------------------------------------------------------- - ---------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 29 of 33
Classification
I
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- TERRAZZO FINISHER -Local 3 Marble& Tile
Effective Date - 02/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$24.85
$10.75
$19.22
$0.00
$54.82
2 60
$29.82
$10.75
$19.22
$0.00
$59.79
3 70
$34.79
$10.75
$19.22
$0.00
$64.76
4 80
$39.76
$10.75
$19.22
$0.00
$69.73
5 90
$44.73
$10.75
$19.22
$0.00
$74.70
- - - - - - - - - -
Notes:
- - - - - -
- - -
- - -
- - -
- -
-
- - -
-----
Apprentice to Journeyworker Ratio: 1:3
- - - - - -
- - -
- - -
- - - -
-
- -
TEST BORING DRILLER
12/01/2016
$37.70
$7.60
$14.35
$0.00
$59.65
LABORERS - FOUNDA TIONAND MARINE
For apprentice rates see "Apprentice- LABORER"
TEST BORING DRILLER HELPER
12/01/2016
$36.42
$7.60
$14.35
$0.00
$58.37
LABORERS - FOUNDA TIONAND MARINE
For apprentice rates see "Apprentice- LABORER"
TEST BORING LABORER
12/01/2016
$36.30
$7.60
$14.35
$0.00
$58.25
LABORERS - FOUNDA TIONAND MARINE
For apprentice rates see "Apprentice- LABORER"
TRACTORS/PORTABLE STEAM GENERATORS
12/01/2016
$44.94
$10.00
$15.25
$0.00
$70.19
OPERATING ENGINEERS LOCAL 4
06/01/2017
$45.93
$10.00
$15.25
$0.00
$71.18
12/01/2017
$46.92
$10.00
$15.25
$0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
TRAILERS FOR EARTH MOVING EQUIPMENT
12/01/2016
$33.02
$10.91
$10.89
$0.00
$54.82
TEAMSTERS JOINT COUNCIL NO. ]OZONE B
TUNNEL WORK - COMPRESSED AIR
12/01/2016
$48.58
$7.60
$14.75
$0.00
$70.93
LABORERS (COMPRESSED AIR)
For apprentice rates see "Apprentice- LABORER"
TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE)
12/01/2016
$50.58
$7.60
$14.75
$0.00
$72.93
LABORERS (COMPRESSED AIR)
For apprentice rates see "Apprentice- LABORER"
TUNNEL WORK - FREE AIR
12/01/2016
$40.65
$7.60
$14.75
$0.00
$63.00
LABORERS (FREE AIR TUNNEL)
For apprentice rates see "Apprentice- LABORER"
TUNNEL WORK - FREE AIR (HAZ. WASTE)
12/01/2016
$42.65
$7.60
$14.75
$0.00
$65.00
LABORERS (FREE AIR TUNNEL)
For apprentice rates see "Apprentice- LABORER"
VAC -HAUL
12/01/2016
$32.44
$10.91
$10.89
$0.00
$54.24
TEAMSTERSJOINT COUNCIL NO. 10 ZONE B
-------------------- --------------- -------------------------------------------------------------- ---_ -----------------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 30 of 33
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
WAGON DRILL OPERATOR
12/01/2016
$32.15
$7.60
$13.00
$0.00
$52.75
LABORERS - ZONE 1
06/01/2017
$33.15
$7.60
$13.00
$0.00
$53.75
12/01/2017
$33.78
$7.60
$13.00
$0.00
$54.38
06/01/2018
$34.62
$7.60
$13.00
$0.00
$55.22
12/01/2018
$35.46
$7.60
$13.00
$0.00
$56.06
06/01/2019
$36.33
$7.60
$13.00
$0.00
$56.93
12/01/2019
$37.19
$7.60
$13.00
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
WASTE WATER PUMP OPERATOR
12/01/2016
$45.38
$10.00
$15.25
$0.00
$70.63
OPERATING ENGINEERS LOCAL 4
06/01/2017
$46.38
$10.00
$15.25
$0.00
$71.63
12/01/2017
$47.38
$10.00
$15.25
$0.00
$72.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
WATER METER INSTALLER
03/01/2017
$48.61
$11.32
$15.46
$0.00
$75.39
PLUMBERS & GASFITTERS LOCAL 12 (Local 138)
For apprentice rates see "Apprentice- PLUMBER/PIPEFITTER" or "PLUMBER/GASFITTER"
Outside Electrical - East
CABLE TECHNICIAN (Power Zone)
08/28/2016
$26.61
$7.50
$1.80
$0.00
$35.91
OUTSIDE ELECTRICAL WORKERS -EAST LOCAL 104
09/03/2017
$27.14
$7.75
$1.81
$0.00
$36.70
For apprentice rates see "Apprentice- LINEMAN'
CABLEMAN (Underground Ducts & Cables)
08/28/2016
$37.70
$7.50
$8.87
$0.00
$54.07
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$38.45
$7.75
$9.53
$0.00
$55.73
For apprentice rates see "Apprentice- LINEMAN'
DRIVER / GROUNDMAN CDL
08/28/2016
$31.05
$7.50
$8.89
$0.00
$47.44
OUTSIDE ELECTRICAL WORKERS -EAST LOCAL 104
09/03/2017
$31.66
$7.75
$9.44
$0.00
$48.85
For apprentice rates see "Apprentice- LINEMAN'
DRIVER / GROUNDMAN -Inexperienced (<2000 Hrs)
08/28/2016
$24.39
$7.50
$1.73
$0.00
$33.62
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$24.88
$7.75
$1.75
$0.00
$34.38
For apprentice rates see "Apprentice- LINEMAN'
EQUIPMENT OPERATOR (Class A CDL)
08/28/2016
$37.70
$7.50
$12.95
$0.00
$58.15
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$38.45
$7.75
$13.61
$0.00
$59.81
For apprentice rates see "Apprentice- LINEMAN'
EQUIPMENT OPERATOR (Class B CDL)
08/28/2016
$33.26
$7.50
$9.63
$0.00
$50.39
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$33.92
$7.75
$10.21
$0.00
$51.88
For apprentice rates see "Apprentice- LINEMAN'
GROUNDMAN
08/28/2016
$24.39
$7.50
$1.73
$0.00
$33.62
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$24.88
$7.75
$1.75
$0.00
$34.38
For apprentice rates see "Apprentice- LINEMAN'
GROUNDMAN -Inexperienced (<2000 Hrs.)
08/28/2016
$19.96
$7.50
$1.60
$0.00
$29.06
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$20.35
$7.75
$1.61
$0.00
$29.71
For apprentice rates see "Apprentice- LINEMAN'
JOURNEYMAN LINEMAN
08/28/2016
$44.35
$7.50
$15.83
$0.00
$67.68
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$45.23
$7.75
$16.61
$0.00
$69.59
------------------------------------------------------------------------ ........... ----------------------------------- ------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 31 of 33
1 60
$27.14
$7.75
$3.31
$0.00
$38.20
ClassificationSupplemental
Effective Date
Base Wage
Health
Pension Total Rate
$40.53
3 70
$31.66
$7.75
Unemployment
$0.00
Apprentice- LINEMAN (Outside Electrical) -East Local 104
4 75
$33.92
$7.75
$5.02
Effective Date - 08/28/2016
$46.69
5 80
$36.18
Supplemental
$5.09
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$26.61
$7.50
$3.30
$0.00
$37.41
2 65
$28.83
$7.50
$3.36
$0.00
$39.69
3 70
$31.05
$7.50
$3.43
$0.00
$41.98
4 75
$33.26
$7.50
$5.00
$0.00
$45.76
5 80
$35.48
$7.50
$5.06
$0.00
$48.04
6 85
$37.70
$7.50
$5.13
$0.00
$50.33
7 90
$39.92
$7.50
$7.20
$0.00
$54.62
Effective Date - 09/03/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$27.14
$7.75
$3.31
$0.00
$38.20
2 65
$29.40
$7.75
$3.38
$0.00
$40.53
3 70
$31.66
$7.75
$3.45
$0.00
$42.86
4 75
$33.92
$7.75
$5.02
$0.00
$46.69
5 80
$36.18
$7.75
$5.09
$0.00
$49.02
6 85
$38.45
$7.75
$5.15
$0.00
$51.35
7 90
$40.71
$7.75
$7.22
$0.00
$55.68
-_._._------__.__._----___..---___.___.____-------
INotes:
classification does not apply to wholesale tree removal.
I
I
'- - - - - - - - - - -
Apprentice to Journeyworker Ratio: 1:2
- - - - -
- - -
-
- -
I
- -
TELEDATA CABLE SPLICER 01/01/2016 $28.98 $4.25 $3.12
$0.00
$36.35
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
TELEDATA LINEMAN/EQUIPMENT OPERATOR 01/01/2016 $27.31 $4.25 $3.07
$0.00
$34.63
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
TELEDATA WIREMAN/INSTALLER/TECHNICIAN 01/01/2016 $27.31 $4.25 $3.07
$0.00
$34.63
OUTSIDE ELECTRICAL WORKERS -EAST LOCAL 104
TREE TRIMMER 01/31/2016 $18.51 $3.55 $0.00
$0.00
$22.06
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
This classification applies only to tree work done: (a) for a utility company, R.E.A. cooperative, or railroad or coal mining company, and (b) for the purpose of
operating, maintaining, or repairing the utility company's equipment, and (c) by a person who is using hand or mechanical cutting methods and is not on the ground.
This classification does not apply to wholesale tree removal.
TREE TRIMMER GROUNDMAN 01/31/2016 $16.32 $3.55 $0.00
$0.00
$19.87
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
This classification applies only to tree work done: (a) for a utility company, R.E.A. cooperative, or railroad or coal mining company, and (b) for the purpose of
operating, maintaining, or repairing the utility company's equipment, and (c) by a person who is using hand or mechanical cutting methods and is on the ground. This
classification does not apply to wholesale tree removal.
----------------------------------------------------------------------------------------------------------------------------------- --------
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 32 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Additional Apprentice Information:
Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the
Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L.
c. 23, ss. I IE-1IL.
All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. I lE-11L.
All steps are six months (1000 hours.)
Ratios are expressed in allowable number of apprentices to journeymen or &action thereof, unless otherwise specified.
Multiple ratios are listed in the comment field.
••• APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4,4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc.
•"•" APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc.
----------------------------------------------------------------------------------------------------------------------------------------- ---
Issue Date: 04/27/2017 Wage Request Number: 20170427-007 Page 33 of 33
CERTIFICATE OF VOTE
At a duly authorized meeting the Board of Directors of the ��' v`Ye �
held on W I 7,911 it was
VOTED, THAT
Squ (bVb'V\' C-awtw m PffW"
(Name) r (Officer)
of be and hereby is authorized to execute contracts and bonds in
the name and on behalf of said �DY)A LAG ,and affix its corporate seal hereto;
and such execution of any contract or obligation in the name of , V 1V�� V� on
its behalf by such officer under seal of �(�, L� , shall be valid and binding
upon ��i�(`Y 111h��1Luc
I hereby certify that I am the clerk of the above named SP n ff � ac and
�T
that 6up is the duly elected officer as above of said
SOYAN and that the above vote has not been amended or rescinded and
remains in full force and effect as the date of this contract.
(Date) (Clerk)
���•`' SPRINT'%
•
F•:
L
.4/vy
Certification of the Corporate Clerk
CERTIFICATIONS
CERTIFICATE OF NON -COLLUSION
The undersigned certifies under penalties of perjury that this bid or proposal has been made and
submitted in good faith and without collusion or fraud with any other person. As used in this
certification, the word "person" shall mean natural person, business, partnership, corporation,
committee, union, club or other organization, entity, or group of individuals.
Signature
Print Name & Title
-/Y-Zv/
S� �•� r N
Company Name
CERTIFICATE OF TAX COMPLIANCE
Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I
,authorized signatory for ,) r -e, r4 L( C
Name of individual Name of contractor
do hereby certify under the pains and penalties of perjury that said contractor has complied with
all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to
taxes, permit or other fees, reporting of employees and contractors, and withholding and
remitting child support.
S' n Date
CERTIFICATION
LABOR HARMONY AND OSHA TRAINING REQUIREMENTS
The undersigned certifies under penalties of perjury that he is able to furnish labor that can work
in harmony with all other elements of labor employed or to be employed at the work
and
that all employees to be employed at the worksite and in the work will have completed an
OSHA -approved construction safety and health course lasting at least ten (14) hours.
Signature ate
PrcntName & Title6/1��S�al Company Name T
PAYMENT BOND
Bond No. K09606658
KNOW ALL MEN BY THESE PRESENTS, that we Sprinturf, LLC
with a place of business at 550 Long Point Rd., Suite 205, Mt Pleasant, SC 29464 ,
as Principal (the "Principal"), and Westchester Fire Insurance Company , a
corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at
436 Walnut St., Philadelphia, PA 19106
as Surety
(the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee
(the "Obligee"), in the Sum of Three hundred ninety seven thousand nine hundred fifty --- ($397,950.0o}aawful money of
the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we
bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of
for the construction of Replacement of Turf Fields
Project at North Andover High School
NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under
said contract shall pay for all labor performed or furnished and for all materials used or employed in said
contract and in any and all duly authorized modifications, alterations, extensions of time, changes or
additions to said contract that may hereafter be made, notice to the Surety of such modifications,
alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but
not be limited to, any other purposes or items set out in, and to be subject to, the provisions of
Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then
this obligation shall become null and void; otherwise, it shall remain in full force and virtue.
IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this
l l day of f✓t,� �0/7
PRINCIPAL
Sprinturf, LLC
t; rte---- -
[Title]
SEAL`;,`:
r
2011 = END OF PAYI
DELAWARE �t
�= ''C�MPANy •,
SURETY
Westchester Fire Insurance Company
[Attorney-in-fact] [Seal] Carl R. Wise
P.O. Box 724137, Atlanta, GA 31139
[Address]
WESTCHESTER FIRE INSURANCE COMPANY
Know all men by these presents: That WESTCHESTER FIRE INSURANCE COMPANY, a corporation of the Commonwealth of Pennsylvania pursuant to the
following Resolution,, adopted by the Board of Directors of the said Company on December], 2006, to wit:
URE50LVEb that thefollowing.authorizadons relate to the execution; for andon behalf of the Company, of bonds, undertakings, rewgnizances, contracts and other written commitments of the Company
enicied into the:ordinary course of business (each a "Written Commitment"):
(1) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized to execute any Written Commitment for and on behalf of the Company, under the seal of the Company or
otherwise.
(2) Each duly appointed ailomoyin-fact of the Company is hereby authorized to exeOuto any Mitten Cbminitment for and an behalf ofthe Company, under the seal of the Company or otherwise, to the extent that
slith..action is authorized by the grant of powots provided for in such persons written: appointmentassuch attomey-in-foci.
(3) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized, for and on behalf of the Company, to appoint in writing any person the attumey-in-fact of the Company with
full power and authority to execute, for and on behalf of the Company, under the seal of the Company or otherwise, such Written Commitments of the Company as may be specified in such written
appointment, which specification may be by general type or class of Written Commitments or by specification of one or more particular Written Commitments.
(d) Each of the Chairman, the President and Vice Presidents of the Company in hereby authorized, found on Whalfof the Company, to delegate in writing any other officer of the: Company theauthority to .
execute,: for and on behalf of the Company; under the Company's seal or otherwise;:such Written Commitments of the Company as are specified in such written delegation, Which specification may be by
general type or class of Written Commitments or by specifrcation.of one or more particular Written Commitments,
(5) The signature of any officer or other person executing any Written Commitment or appointment or delegation pursuant to this Resolution, and the seal of the Company, may be affixed by facsimile on such
Written Commitment or written appointment or delegation.
- FURTHER RESOLVED, that the foregoing Resolution shall not be deemed to. be anexclusive statement of the:powers andjauthority of officers, employees and other persons to act for and on behalf of the
Company, and such Resolution shall not limit or otherwise affect the exercise ofanyauch poweror authority, otherwise validly grantedorvested.
Does hereby nominate, constitute and appoint Brian M. Perry, Carl R. Wise, Debra Johnson, Douglas L. Rieder, J. Bart Miller, John W. Miller III, Margaret S. Meyers,
Misty L. Haig, S. Lynn Sghiatti, all of the City of MARIETTA, Georgia, each individually if there be more than one named, its true and lawful attorney-in-fact, to
make, execute, seal and deliver on its behalf, and as its act and deed any and all bonds, undertakings, recognizances, contracts and other writings in the nature thereof in
penalties not exceeding Ten million dollars ;& zero cents. ($10,000,000.00) and the execution of such writings inpursuance _of these presents shall be as binding upon
said Company, as fully and amply; as i ... ey had been duly executed and acknowledged by the regularly elected officers of the Company at its principal' office,
IN WITNESS WHEREOF, the said Stephen M. Raney, Vice -President, has hereunto subscribed his name and affixed the Corporate seal of the said WESTCHESTER
FIRE INSURANCE COMPANY this 24 day of March 2017.
WESTCHESTER FIRE INSURANCE COMPANY
li,r T 1'1
t 4alStsphcn M. II►trocy Vice President
COMMONWEALTHOF PENNSYLVANIA
COUNTY OF` PHILADELPHIA ss.
On this 24 day of March, AD. 2017 before me, a Notary Public of the Commonwealth of Pennsylvania in and for the County of Philadelphia came Stephen
M. Haney ,Vice -President of the WESTCHESTER FIRE INSURANCE COMPANY to me personally known to be the individual and officer who executed the
preceding instrument, and he acknowledged that he executed the same, and that the seal affixed to the preceding inStrument.is the corporate seal of said Company; that
the said corporate seal and his signature were duly affixed by the authority and direr on of the said corporation, acid that Resolution, adopted by the Board of Directors
of said Company, referred to in the preceding instrument, is now in force. ,
THIS POWER OF ATTORNEY MAY NOT BE USED TO EXECUTE ANY BOND WITH AN INCEPTION DATE AFTER March 24, 2019.
printing on border.
t SENSITIV8 SH'
O
O
CFS w>N HEAT PS JU
PAYMENT BOND
Bond No. K09606658
KNOW ALL MEN BY THESE PRESENTS, that we Sprinturf, LLC
with a place of business at 550 Long Point Rd., Suite 205, Mt Pleasant, SC 29464 ,
as Principal (the "Principal"), and Westchester Fire Insurance Company , a
corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at
436 Walnut St., Philadelphia, PA 19106 as Surety
(the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee
(the "Obligee"), in the sum of Three hundred ninety seven thousand nine hundred fifty --- ($397,950.00)awful money of
the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we
bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of
for the construction of Replacement of Turf Fields
Project at North Andover High School
NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under
said contract shall pay for all labor performed or furnished and for all materials used or employed in said
contract and in any and all duly authorized modifications, alterations, extensions of time, changes or
additions to said contract that may hereafter be made, notice to the Surety of such modifications,
alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but
not be limited to, any other purposes or items set out in, and to be subject to, the provisions of
Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then
this obligation shall become null and void; otherwise, it shall remain in full force and virtue.
IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this
Zi
day of ) -Lz L6
PRINCIPAL
SURETY
Sprinturf, LLC Westchester Fire Insurance Company
[N [Attorney-in-fact] [Seal] Carl R. Wise
4 e c rL1111 L%x�� ✓��-c %�� :..% P.O. Box 724137, Atlanta, GA 31139
[Address]
P\1.1TU/�F'� , (678)424-6500
�Q ' ' • ,-.�� [Phone]
:•'SEAL Attest:
2011 - a . "ient
DELAWARE END OF PAYMENT BOND
'., •'• MPA.•.•' ��.
fill
FURTHER RESOLVED, thatthe faregoingResclutlon shall riot be deemed to be amexclusive statement of the.powers and autborityof officers, employees andother persons to act for and on behalf of the
. Company, and such Resolution shall not hm t or otherwiseaffect the exercise ofanysueh poweror auth°rity otherwise validly granted onVestetl.
Does hereby nominate, constitute and appoint Brian M:'Perry, Carl R. Wise, Debra Johnson, Douglas L. Rieder, J. `Bart Miller, John W. Miller II, Margaret S. Meyers,
Misty L. Haig, S. Lynn Sghiatti, all of the City of MARIETTA, Georgia, each individually if there be more than one named, its true and lawful attorney-in-fact, to
make, execute, seal and deliver on its behalf, and as its act and deed any and all bonds, undertakings, recognizances, contracts and other writings in the nature thereof in
nrnnlfie.q nnA exr.Perlinn 7'en rniIlinn rinllars & zero cents410.000.000.001,.and the executionuf such writings in;;pursuance;of these Presents shall be as binding;upon _
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my official seal at the City of Philadelphia the day and year first above written.
In witness whereof, I have hereunto subscribed my name as Assistant Secretary, and affixed the corporate seal of the Corporation, this
day of
THIS POWER OF ATTORNEY MAY NOT IIE USED TO EXECUTE ANY BOND WITH AN INCEPTION DATE AFTER March ,24, 2019.
SIKSITIVEO
O
QocoGard #04 48 contains.a secority bantooraoh. bfoe b,406mond, heat -sensitive ink coin -reactive watermark. and roll rote�nrintitxr on border. swr„ Ee* °"`°
SPHJINTURF
June 9, 2017
Gales Associates, Inc.
163 Libbey Parkway
Weymouth, MA 02189
RE: Replacement of Turf Fields North Andover High School
Peter Spanos,
Sprinturf, LLC as the turf manufacturer company, holds the Owner (North Andover Public Schools),
Designer (Gale Associates, Inc.) and all other project consultants harmless for any violation of patent
rights or infringements and claims related to hazardous materials (e.g. lead or zinc) or other
environmental impacts.
Sincerely,
Bruce Cheskin
Executive Vice President
Sprinturf, LLC
P: 843.936.6023 1 F: 843.284.8823 1550 Long Point Road, Suite 205 1 Mt. Pleasant, SC 129464
MORRIS,
MANNING &
MARTIN, LLP
June 27, 2017
Via Email & Federal Express
Mr. Kevin E. Warner, Esq.
Winston and Strawn LLP
35 W. Wacker Drive
Chicago, IL 60601
kwarner(&winston. con:
RE: U.S. Patent No. 6,746,752
Dear Kevin:
John P. Fry
404-504-7728
jfry@mmmlaw.com
www.mmmlaw.com
I write on behalf of Sprinturf to respond to your June 19, 2017 letter regarding the above -
referenced patent and the North Andover High School synthetic turf surfacing replacement project.
I have reviewed the specification for the North Andover turf replacement project and see nothing
that could or would be implicated by the required layer elements of claim 1, the only independent claim,
of the `752 patent. Similarly, there appears to be nothing in any of the bid documents that can be read to
provide that a layered system within the scope of the `752 patent was offered to be installed or would be
installed as part of the North Andover turf replacement project. As a result, there simply is no basis for
any claim that the North Andover turf replacement project could, would or will infringe any claim of the
`752 patent.
I trust this puts to rest any concerns you and Field Turf have with regard to this issue. As always,
Sprinturf respects the intellectual property rights of others as it expects others to respect its intellectual
property rights. Please do not hesitate to contact me if you wish to discuss this matter further.
JPF: smk
Very truly yours,
John P. Fry
Phone: 404.233.7000 j www.mmmlaw.com
1600 Atlanta Financial Center 13343 Peachtree Road, NE Atlanta, Georgia 30326 11012791 v1
Atlanta • Washington, DC • Raleigh-Durham Savannah
International Marketing Office: Beijing
SPHJINTURFO
6/28/2017
Subject: North Andover, MA - Required Submittal
Statement of Patent Non -Infringement
Sprinturf certifies that the proposed Ultrablade DFE synthetic turf system, materials, details
and/or installation methods do not violate any manufacturers' patents or patents pending. It is
the intent of this Section not to infringe upon any existing patents, licenses or rights of
individuals or companies.
Upon approval of the synthetic turf system, Sprinturf shall hold the Owner and Architect
harmless as to any liability and/or costs of any type, including but not limited to, legal costs,
royalties, replacement costs, etc. associated with any patent infringement claim from our
materials and/or installation.
Please feel free to contact me at our corporate office for any questions or clarifications
regarding this letter.
Sincerely,
Bruce Cheskin, Manager
Sprinturf, LLC
843.936.6023 1 fax: 843.284.8823 1 550 Long Point Road, Suite 205 1 Mt. Pleasant, SC 1 29464
www.sprinturf.com I info@sprinturf.com I customercare@sprinturf.com
189195
AC40R V® CERTIFICATE OF LIABILITY INSURANCE
DATE (MWDD/YYYY)
1 7/10/2017
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER
Commercial Lines - (704) 543-0258
Wells Fargo Insurance Services USA, Inc.
6100 Fairview Road
CONTACT Rhonda Witmore
PHONE AX
C No Ext :7O4-557-7271('AC.No): 866.332.3051
E-MAIL rhonda.witmore@wellsfargo.com
INSURER(S) AFFORDING COVERAGE NAIC#
Charlotte, NC 28210
INSURERA: AIG Specialty Insurance Company 26883
INSURED
ITS Sprinturf Holdings, LLC
INSURER B: Trumbull Insurance Company ,27120
INSURER C : Twin Cit Fire Insurance Company 29459
550 Long Point Road (Main Location)
INSURER D:
INSURER E:
GENERAL AGGREGATE $ 2,000,000
Mt. Pleasant, SC 92464
INSURER F:
COVERAGES CERTIFICATE NUMBER: 12059126 REVISION NUMBER: See below
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
LTR
TYPE OF INSURANCE
ADDL
SUBR
POLICY NUMBER
POLICY EFF
MMIDD/YYYY
POLICY EXP
MMIDD/YYYY
LIMITS
A
X COMMERCIAL GENERAL LIABILITY
CLAIMS -MADE � OCCUR
X
EG17070145
8/8/2016
10/1/2017
EACH OCCURRENCE $ 1,000,000
DA ( RENTED 300,000
PREMMISESS Ea occurrence S
MED EXP (Any one person) $ 25,000
PERSONAL & ADV INJURY $ 1,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICYFX] PJLOC
OTHER:
GENERAL AGGREGATE $ 2,000,000
PRODUCTS -COMP/OP AGG $ 2,000,000
Deductible 0 $
B
AUTOMOBILE
X
X
LIABILITY
ANY AUTO
OWNED SCHEDULED
AUTOS ONLY AUTOS
HIRED X NON -OWNED
AUTOS ONLY AUTOS ONLY
22UENNL3281
Coll Ded:$1 ,000
Com Ded:$1 ,000
P
10/01/2016
10/01/2017
.)MBI EDISINGLELIMIT $ 1,000,000
1IF
BODILY INJURY (Per person) $
BODILY INJURY (Per accident) S
PROPERTY DAMAGE $
Per accident
A
X
UMBRELLA LIAB
EXCESS LIAB
X
OCCUR
CLAIMS -MADE
EGU17070654
08/08/2016
10/01/2017
EACH OCCURRENCE $ 1,000,000
AGGREGATE $ 1,000,000
OED I X I RETENTION $ 10,000
$
C
WORKERS EMPLOYCOMPENSATION EMPLOYERS'
AND EMPLOYERS' LIABILITY YIN
ANYPROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED? C
(Mandatory in NH)
If yes, describe under
DESCRIPTION OF OPERATIONS below
N / A
22WBEK8815
10/01/2016
10/01/2017
X STATUTE ERH
E.L. EACH ACCIDENT $ 1,000,000
E.L. DISEASE - EA EMPLOYEE $ 1,000,000
E.L. DISEASE - POLICY LIMIT $ 1,000,000
7
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
North Andover Public Schools is named as additional insured as it relates to general liability in accordance with the terms and conditions of the policy.
Umbrella follows form as it relates to additional insureds.
CERTIFICATE HOLDER CANrFI I ATIf)N
North Andover Public Schools
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
566 Main Street
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
North Andover, MA 01845
AUTHORIZED REPRESENTATIVE
The ACORD name and logo are registered marks of ACORD @ 1988-2015 ACORD CORPORATION. All rights reserved.
ACORD 25 (2016/03)
(This cenllicate replaces cenKcate# 11956305 issued on 612 012 01 7)
ENDORSEMENT NO. 8
This endorsement, effective 12:01 AM, August 8, 2016
Forms a part of Policy No: EG 17070145
Issued to: INTEGRATED TURF SOLUTIONS, LLC
By: AIG SPECIALTY INSURANCE COMPANY
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
WAIVER OF TRANSFER OF RIGHTS OF RECOVERY
AGAINST OTHERS TO US ENDORSEMENT
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY AND
POLLUTION LEGAL LIABILITY COVERAGE FORM
It is hereby agreed as follows:
SECTION IV - CONDITIONS, Paragraph 7. Transfer of Rights of Recovery Against Others to Us - Applicable to
Coverages A, B, C and E is amended by the addition of the following at the end of such subparagraph:
We waive any right of recovery we may have against the person or organization shown in the Schedule below because
of payments we make under Coverage A, B, C and E for injury or damage arising out of your ongoing operations or
your work done under a contract with that person or organization and included in the products -completed operations
hazard. This waiver applies only to the person or organization shovm in the Schedule below.
SCHEDULE
Name of Person or Organization:
WHERE REQUIRED BY WRITTEN CONTRACT
All other terms, conditions, and exclusions shall remain the same.
AUTHORIZED REPRESENTATIVE
or countersignature (in states where applicable)
94283 (3/07)
C 13021 PAGE 1 OF 1
ENDORSEMENT NO.9
This endorsement, effective 12:01 AM: August 8, 2016
Forms a part of policy no.: EG 17070145
Issued to: INTEGRATED TURF SOLUTIONS, LI -C
By: AIG SPECIALTY INSURANCE COMPANY
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSURED PRIMARY AND NON-CONTRIBUTORY ENDORSEMENT -
OWNERS, LESSEES OR CONTRACTORS - YOUR WORK
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY AND
POLLUTION LEGAL LIABILITY POLICY
SCHEDULE
Name of Additional Insured Person(s) or Organization(s):
WHERE REQUIRED BY WRITTEN CONTRACT
I. Solely as respects COVERAGE A - BODILY INJURY AND PROPERTY DAMAGE LIABILITY,
COVERAGE B - PERSONAL AND ADVERTISING INJURY LIABILITY, COVERAGE E-2
PRODUCTS POLLUTION AND EXPOSURE LIABILITY, and COVERAGE E-3 - CONTRACTORS
POLLUTION LIABILITY, SECTION 11 - WHO IS AN INSURED is amended to include as an
additional insured the person(s) or organization(s) shown in the Schedule, but only with respect
to liability for bodily injury, property damage, personal and advertising injury, environmental
damage or emergency response costs caused, in whole or in part, by:
ENDORSEMENT NO. 9 (Continued)
A. Your acts or omissions; or
B. The acts or ornissions of those acting on your behalf;
arising out of your work or your product.
However:
T. The insurance afforded to such additional insured only applies to the extent permitted by law;
and
2. If coverage provided to the additional insured is required by a contract or agreement, the
insurance afforded to such additional insured will not be broader than that which you are
required by the contract or agreement to provide for such additional insured.
II. As respects the coverage afforded the additional insureds) scheduled above, this insurance is
primary and non-contributory, and our obligations are not affected by any other insurance
carried by such additional insured(s) whether primary, excess, contingent, or on any other basis.
III. With respect to the insurance afforded to these additional insureds, the following is added to
Section III - Limits Of Insurance:
If coverage provided to the additional insured is required by a contract or agreement, the most
we will pay un behalf of the additional insured is the amount of insurance:
1. Required by the contract or agreement; or
2. Available under the applicable Limits of Insurance shown in the Declarations;
whichever is less.
This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations.
All other terms, conditions and exclusions remain the same. 11
Authorized Representative
or countersignature (where required by law)