HomeMy WebLinkAboutContract #: 1016 - From: 10-01-2017 To: 09-30-2018 - National Water Main Cleaning Co - Town of North AndoverAndrew W. Maylor
Town Manager
Town of North Andover
Office of the
Town Manager
North Andover Town Hall
120 Main Street
North Andover, MA 01845
amaylor@northandoverma.gov
February 28, 2018
Mr. Dennis Sullivan, Vice President
National Water Main Cleaning Co.
25 Marshall Street
Canton, MA 02021
Dear Mr. Sullivan:
Telephone (978)688-9510
Fax (978)688-9556
In accordance with the provisions of the contract between the Town of North Andover and National
Water Main Cleaning Co. (Contract 41016), please be advised that the contract is hereby terminated
effective March 9, 2018.
Due to issues encountered .the previous time your company was awarded a similar contract, a
meeting with Town staff was held prior to this award to ensure history did not repeat itself. However, in
the few times your company has been utilized for scheduled cleaning of sewer pump station wet wells, the
same issues have reoccurred. This decision is made based upon the recommendation of the Public Works
Director and the Water Treatment Plant Superintendent.
I regret this action is necessary.
Sincerely,
/_7
Andrew W. Maylor
Town Manager
cc., Suzanne Egan, Town Counsel
James Stanford, Public Works
Glen Alt, Water Treatment Plant
Contract File
DATE:
December
18, 2017
INTEROFFICE MEMC
TO: Ray Santilli, Assistant Town Manager
Cc: Jim Stanford, DPW Director
FROM: Glen C. Alt, Superintendent WTP
RE: National Water Main
Concerning the response from National Water Main dated November 27, 2017 1 have the
following comments:
In paragraph one Mr. Sullivan states that we have wet wells 40 feet deep. This is incorrect as
the deepest stations are in the 21 to 30 foot range. I agree that our 4 deepest stations do have
more solids partly because of the high flows they take in. Because of these high solids, we
have these stations cleaned twice a year as we do with several of the smaller wet wells for the
same reason.
In paragraphs two and three there is discussion on how a septic truck is inadequate to clean
these stations. Our experience in the past with other cleaning companies has shown us that
those regular septic trucks can clean all our wet wells.
In paragraph three it is pointed out that National Water Main's vehicle cannot be dumped at our
location like a dump truck. We clearly pointed this out in our September 21, 2017 meeting that
was held before contracts were signed.
We have had three incidents where sewerage was spilled on the ground. The first two were
discussed in my last memo. The third incident happened at the Boston Hill station November
15, 2017. It was reported to me that a truck discharge pipe was plugged and that a National
Water Main employee removed the blockage by hand with the discharge valve open causing
sewerage to spill upon the ground. Several workers were sprayed with sewerage before the
valve was closed.
Because of this spill, the Town of North Andover filed a Sanitary Sewer Overflow Report with
DEP on 11/16/2017.
The Town of North Andover Sewer Mechanics who all have at least 9 years' experience working
on these stations have expressed a deep concern about their safety while working with National
Water Main.
Page 2
12/19/2017
I have the same concern as the sewer mechanics plus in the response letter National Water
Main states that they may not be able to get the stations clean. Because National Water Main
states that they cannot get the stations cleaned to our satisfaction, the safety concerns of the
sewer mechanics and the three spills that have occurred, I feel we are wasting the Town of
North Andover's money and therefore should terminate the contract.
TOWN OF NORTH ANDOVER
DIVISION OF PUBLIC WORKS
384 OSGOOD STREET NORTH ANDOVER, MASSACHUSETTS 01845-2909
NATIONAL WATER MAIN CLEANING CO.
The Environmental Protection Specialists
An Equal Opportunity Employer
November 27, 2017
Ray Santilli
Assistant Town Manager
Town of North Andover
120 Main Street
North Andover, MA 01845
Email rsantilli@northandoverma.gov
Subject: Pump Station Wet Well Cleaning
North Andover, MA
Dear Mr. Santilli,
In response to your email dated November 27, 2017,1 offer the following response.
NYC BIC License #468
The Town of North Andover's Wet Well Cleaning contract consists of 22 Wet Well Pump Stations located
throughout the Town. The majority of the wet well structures are standard depth (10'-15' deep) and size (5'
diameter). However, several of the wet wells are large structures with deeper depth ranging up to 40' in
depth. In addition, the larger wet well contains a high amount of solids consisting of rags and grease.
The type of equipment to clean a wet can vary. The standard size wet wells (with low solid content) can be
cleaned with a standard septic truck. A standard septic truck consists of a tanker unit and a "liquid pump"
utilizing a 3" suction hose and 4" diameter discharge hose. A standard septic truck is designed to pump
mostly liquid. A vacuum truck, in contrast with a septic truck, is a more industrial piece of equipment
designed to remove a solids and liquid. A vacuum truck creates its suction with a blower unit and utilizes a 6"
diameter suction hose and 6" diameter discharge hose. A vacuum truck consists of a tanker unit and a
"blower" unit capable producing 28" of Hg suction force and 3600 Cubic feet of air movement. A vacuum
truck is designed to move solids and liquid. Our style vacuum truck is typically used on large diameter
sewers, tunnels, and wastewater treatment facilities. A vacuum truck moves the liquids/solids through air
movement, where a septic style truck utilized a liquid pump to remove liquid material.
Cleaning a pump stations containing rags and grease always presents a challenge on what type of equipment is
best suited for the job at hand. The standard septic style truck is not designed to remove rags and heavy
grease. Septic truck also struggle to remove liquids at depths greater than 20 feet. A septic truck would leave
the majority of large debris and solids behind in the wet well. A vacuum truck is a more suited for pump
station containing rags and large grease pockets. However, the challenge with a vacuum truck arises when
needing to discharge the content. A vacuum truck is best designed to dump like a dump truck. However, the
DPW sewer manhole discharge location is designed to accept liquid being pumped off a septic truck. Since
dumping is not allowed at the North Andover DPW facility, our vacuum trucks are forced to decant its content
through a 6" discharge hose. This decanting process can be impacted when heavy rags are mixed with grease.
New Jersey Office
1806 Newark Turnpike
Kearny, NJ 07032
P: 973.483.3200
F: 973.483.5065
Email: office@nwmcc.com
New York Office
928 Broadway
Utica, NY 13501
P: 315.624.9520
F: 315.624.9523
Email: boston@nwmcc.com
Boston Office
25 Marshall St
Canton, MA 02021
P: 781.828.0863
F: 781.828.2473
Email: boston@nwmcc.com
Connecticut Office
1000 (Rear) Elm St
Rocky Hill, CT 06067
P: 860.793.2808
Email: boston@nwmcc.com
The high amount of rags can cause blockages to the decant valve on the truck. The minor spill incident was
caused by trying to unclog the rags from the decant valve during this liquid transfer step.
You are correct in your observations that the project did not get started off on the right foot. The suction hose
was not connected properly to the truck on the first day. Although, the need for duct tape is a very typical
application with vacuum trucks, the connections should have been more secure and was eventually corrected
on the following day. Once the first wet well was cleaned and the decanting process began, the decant valve
became plugged from all the grease and rags. A minor spill occurred while trying to remove the rags from the
decant valve. We reacted quickly and cleaned up the 5-10 gallons of sewer that was spilled at that moment.
We feel a vacuum truck is certainly the best application for the larger pump station containing rags and
grease. A septic truck will not end up removing the rags and grease and will perform a less quantity cleaning
job. I understand that your staff was surprise the level of cleanliness the pump station looked at the
completion of our work. The vacuum truck application was able to remove all solids, grease and rags during
the cleaning operation. However, since we need to decant the truck, the decant valve becomes susceptible to
becoming clogged.
Fortunately, the larger structures have been complete and we can certainly switch our approach to a standard
septic truck to clean the remaining pump stations. Please note however, the septic truck will not remove the
rags and grease like you have witnessed with the vacuum truck application. Although the septic truck will
transfer the liquid more efficiently at the North Andover DPW facility, the quality of cleaning may suffer
slightly.
We are sincerely disappointed that the project started off on a bad note. NWMCC performs the majority of
sewer inspection, cleaning and rehabilitation in the Northeast. We pride ourselves on quality work and
customer satisfaction. We will make our full effort to complete the remainder of this project utilizing a septic
truck without incident.
Lastly, your comment relative to safety is a matter we take very seriously at National Water Main Cleaning
Company. All our employees are confined space certified and most are 40 Hour Hazwoper trained. We
dedicate a great amount time and training each year to safety awareness. Although we may have a new
employee on a crew on occasion, our supervisors are experience in our work and in a broad range of safety
matters. If your staff witnesses a safety issue without crew, please notify either the onsite supervisor or
project engineer so that the matter can be investigated and corrected immediately.
If you have any questions or comments, I may be contacted at 800-422-0815.
Sincerely,
NATIONAL WATER MAIN CLEANING COMPANY
,o. Rs
Dennis P. Sullivan, P.E.
Vice President
14/27/2017 Town of North Andover Mail - Fwd: National Water Main
NORTOVER
Massachusf: s Ray Santilli <rsantilli@northandoverma.gov>
��t�r..r..�
Fwd: National Water Main
1 message
Ray Santilli <rsantilli@northandoverma.gov> Mon, Nov 27, 2017 at 9:44 AM
To: dennis@nwmcc-bos.com
Mr. Sullivan,
National Water Main Cleaning Co. was recently awarded a contract from the Town of North Andover to perform scheduled
cleanings of sewer pump station wet wells. Due to issues encountered the last time your company had the contract, a
meeting was held prior to this year's award to ensure history did not repeat. However, as you can see from the attached
memo and photos provided by Glen Alt, Superintendent at the Water Treatment Plant, the relationship has not started on a
positive note.
Please provide me with a written response/explanation to the issues raised by Mr. Alt. Thank you.
;'a y sa. A ,c'
Assistant Town Manager
Town of North Andover
120 Main Street
North Andover, MA 01845
Phone
978.688.9516
Fax
978.688.9556
Email
rsantilli@northandoverma.gov
Web
www.northandoverma.gov
---------- Forwarded message ----------
From: Glen Alt <galt@northandoverma.gov>
Date: Fri, Oct 27, 2017 at 9:36 AM
Subject: National Water Main
To: Ray Santilli <rsantilli@northandoverma.gov>, James Stanford <jstanford@northandoverma.gov>
Memo and pictures regarding National Water Main
Glen C. Alt
Superintendent
Town of North Andover
Drinking Water Treatment Plant
420 Great Pond Road
North Andover, MA 01845
https://mail.google.com/mail/u/0/?ui=2&ik=f7Oe2f4909&jsver-CS87NgUoRx4.en.&view=pt&search=sent&th=15ffdfO3736c2cl4&siml=15ffdfO3736c2cl4 1/2
11/27/2017 Town of North Andover Mail - Fwd: National Water Main
Phone 978.688.9574
Fax 978.688.9575
Email galt@northandoverma.gov
Web www.TownofNorthAndover.com
5 attachments
i
Duct tape connection.jpg
2173K
spill 2.JPG
152K
Spill.JPG
164K
National Water Main-memo.doc
53K
Duct taping hose.MOV
8927K
https:Hmail.google.com/mail/u/0/?ui=2&ik=f70e2f4909&jsver-CS87NgUoRx4.en.&view=pt&search=sent&th=15ffdf03736c2cl4&siml=15ffdf03736c2cl4 2/2
11/27/201`1 Town of North Andover Mail - National Water Main
NORTH AN _ ,OVER
Massachu� Ray Santilli <rsantilli@northandoverma.gov>
National Water Main
1 message
Glen Alt <galt@northandoverma.gov> Fri, Oct 27, 2017 at 9:36 AM
To: Ray Santilli <rsantilli@northandoverma.gov>, James Stanford <jstanford@northandoverma.gov>
Memo and pictures regarding National Water Main
Glen C. Alt
Superintendent
Town of North Andover
Drinking Water Treatment Plant
420 Great Pond Road
North Andover, MA 01845
Phone 978.688.9574
Fax 978.688.9575
Email galt@northandoverma.gov
Web www.TownofNoahAndover.com
5 attachments
Duct tape connection.jpg
2173K
spill 2.JPG
152K
Spill.JPG
164K
https://mail.google.com/mail/u/0/?ui=2&ik=f7Oe2f4909&jsver-CS87NgUoRx4.en.&view=pt&q=galt%40northandoverma.gov&qs=true&search=query&th ... 1/2
11/27/201't
National Water Main-memo.doc
i 53K
® Duct taping hose.MOV
8927K
Town of North Andover Mail - National Water Main
https://mail.google.com/mail/u/0/?ui=2&ik=f70e2f4909&jsver-CS87NgUoRx4.en.&view=pt&q=galt%40northandoverma.gov&qs=true&search=query&th ... 2/2
DATE: October 27, 2017
INTEROFFICE
TO: Ray Santilli, Assistant Town Manager
Cc: Jim Stanford, DPW Director
FROM: Glen C. Alt, Superintendent WTP
RE: National Water Main
On Monday, October 23, National Water Main arrived to begin the wet well cleaning project. While
they were finishing cleaning the first wet well at Winter Street, the contractor's suction hose
disconnected from the truck spraying sewerage on the ground. The hose was connected to the
truck using duct tape. When I asked about this, the foreman explained that they didn't have the
correct fitting but one was on the way. I informed him that as discussed in our preconstruction
meeting this method is inappropriate
National Water Main then moved to the Holly Ridge station. The Town sewer crew informed me
that the fitting arrived but was not the correct one and that the contractor once again duct taped the
hose to the truck. Although the hose did not disconnect during this cleaning, the sewer crew
observed the tape began to rip and the contractor had to quickly apply more duct tape.
After finishing this wet well, the truck needed to be emptied. The contractor was escorted to the
DPW yard to a manhole that has been used in the past. The truck's outlet was plugged and the
sewerage would not come out. The contractor attempted to clear the blockage by "jerking" the
truck which caused a small amount of sewerage to come out of the truck vent system and onto the
new parking lot. I immediately had them bring in a crew to clean this small spill up.
National Water Main also was lacking small tools to complete the project correctly. They had to
borrow a shovel, rope and lights from our sewer mechanics.
The contractor's employee that was entering the wet wells stated to the sewer mechanics that he
had never seen a wet well.
Myself and the Sewer Mechanics feel uncomfortable because of the safety issues, inexperienced
employees and improper equipment as to the ability for National Water Main to complete this
project.
Page 2
11/27/2017
TOWN OF NORTH ANDOVER
DIVISION OF PUBLIC WORKS
384 OSGOOD STREET NORTH ANDOVER, MASSACHUSETTS 01.845-2909
"` t^":''r ,,,i y " � ,'i � '� s. �• '+ � ++*ter y` {r '�` w� „ � �+� +",,.,•
• yJ_
� ,�' * . • ,� t� - s , . p ' +w. � ' , �•'�•�Ct � �Y : � f s - ,. � .rte
Q 44
,. 's i s ! a f �. .
a
+v
t.
�+' ;"1t`� �^ v^"'g,.,"r 4a'^` .�; . � its., .•w� y ���'�, IV
1KR:`Q2L1� +l�+,a�j�.r,�""
•
w ,yr
`�•��� _ ,*� �jt� � ! +.✓ �� •�`l� ti;A '�� *i �' mat f ✓' � �t ���� -. �r �-... �y.
NI
ell
S. �� s.. ����T��% •+� .`v„�I �'M' ',..'�L.{ �
a4
- +"l�" ��;��,"�•wr4�„ •w R '� r�:r � ,�,L,y.,, �
-
ti
' s
y,
+S, /� '��y,• ��'y1 � � `�s, .+. A ,a�,�d•_ .:r sib � s
cam; ' } _,`7 : � • �.` pr :F � `-� w
•s:`-- -��`. ^.. '+ }. ti4-;'_w • `}
-+- Al =:..+ice-+^+.,. •t.R ^ -P€ '"k: .�L,'-+ -.�-..
464
•i � l� q
c �\
. d � tea. ♦ ` ..� l� W... VOL
_ W
E,.
p , \•-��� \ .. �7 ; rf.^�. a ..�p`�'"� �'`.,
I
1
11 /27/2017
spill 2.JPG
https://mail.google.com/mail/u/O/#search/galt%40northandoverma.gov/15f5eOdOd5f1 bc44? projector= 1 1 /1
11/2.7/' 011' Spill.JPG
https://mail.google.com/mail/u/O/#search/galt%40northandoverma.gov/15f5eOdOd5f1 bc44?projector=1 1/1
TOWN OF NORTH ANDOVER
120 MAIN STREET
NORTH ANDOVER, MASSACHUSETTS 01845
Raymond T Santilh
Assistant Town Manager
Mr. Dennis Sullivan, Vice President
National Water Main Cleaning Co.
25 Marshall Street
Canton, MA 02021
Dear Mr. Sullivan:
E tot 1
�SSACHUS�
October 12, 2017
TEL (978) 688-9516
FAX (978) 688-9556
Enclosed please find the executed contract between the Town of North Andover and
National Water Main Cleaning Company to perform scheduled cleanings of sewer pump station
wet wells for the period of October 1, 2017 through September 30, 2018, with two additional
one-year renewals solely at the discretion of the Town.
In accordance with Massachusetts General Laws, you are required to pay prevailing wage
for the work performed under this contract. For each week work is performed, you are required
to submit certified weekly payroll records. The certified weekly payroll records are to be sent to:
Mr. Glen Alt
Water Treatment Plant
420 Great Pond Road
North Andover, MA 01845
If you have any questions and/or concerns, please call me.
Sincerely,
Raymond T. Santilli
Assistant Town Manager
Enclosure
cc., Glen Alt, WTP
Contract File
TOWN OF NORTH ANDOVER
CONTRACT
CONTRACT #f0142
DATE: / o -/d -,D 0/!2
This Contract is entered into on, or as of, this date by and between the Town of North Andover
(the "Town"), and
Contractor: National Water Main Cleaning Company
Address: 25 Marshall Street
Canton, MA 02021
Telephone Number: 781-828-0863
Fax Number: 781-828-2473
1. This is a Contract for the procurement of the following:
Perform scheduled cleaning of sewer pump station wet wells for the period of October 1,
2017 through September 30, 2018 (with two additional one-year renewals, solely at the
discretion of the Town) in accordance with the Invitation for Bids dated August 9, 2017
2. The Contract price to be paid to the Contractor by the Town of North Andover is:
See attached price list
3. Payment will be made as follows:
Upon successful completion of work and receipt of invoice (net 30)
4. Definitions
4.1 Acceptance: All Contracts require proper acceptance of the described goods or
services by the Town of North Andover. Proper acceptance shall be understood to
include inspection of goods and certification of acceptable performance for services by
authorized representatives of the Town to insure that the goods or services are complete
and are as specified in the Contract.
(Rev 5-2007) Contract by and between Town of North Andover and National Water Main Cleaning Co. Page 1
4.2 Contract Documents: All documents relative to the Contract including (where used)
Instructions to Bidders, Proposal Form, General Conditions, Supplementary General
Conditions, General Specifications, Other Specifications included in Project Manual,
Drawings, and all Addenda issued during the bidding period. The Contract documents
are complementary, and what is called for by any one shall be as binding as if called for
by all. The intention of the document is to include all labor and materials, equipment and
transportation necessary for the proper performance of the Contract.
4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as
the sense and particular Contract so require) include Vendor, Contractor, Engineer, or
other label used to identify the other party in the particular Contract. Use of the term
"Contractor" shall be understood to refer to any other such label used.
4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the
services are performed, or the goods delivered, in accordance with Contract documents,
as modified by approved Amendments and Change Orders.
4.5 Goods: Goods, Supplies or Materials.
4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes
one who furnished material worked to a special design according to the Drawings or
Specifications of this work, but does not include one who merely furnishes material not so
worked.
4.7 Work: The services or materials contracted for, or both.
Term of Contract and Time for Performance
This Contract shall be fully performed by the Contractor in accordance with the provisions of the
Contract Documents on or before September 30, 2018, unless extended pursuant to a provision
for extension contained in the Contract documents at the sole discretion of the Town, and not
subject to assent by the Contractor, and subject to the availability and appropriation of funds as
certified by the Town Accountant. The time limits stated in the Contract documents are of the
essence of the Contract.
6. Subject to Appropriation
Notwithstanding anything in the Contract documents to the contrary, any and all payments which
the Town is required to make under this Contract shall be subject to appropriation or other
availability of funds as certified by the Town Accountant. In the absence of appropriation, this
Contract shall be immediately terminated without liability for damages, penalties or other
charges.
7. Permits and Approvals
Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance
of the Contract shall be secured and paid for by the Contractor.
(Rev 5-2007) Contract by and between Town of North Andover and National Water Main Cleaning Co. Page 2
8. Termination and Default
8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days notice
when in the best interests of the Town by providing notice to the Contractor, which shall be
in writing and shall be deemed delivered and received when given in person to the
Contractor, or when received by fax, express mail, certified mail return receipt requested,
regular mail postage prepaid or delivered by any other appropriate method evidencing
actual receipt by the Contractor. Upon termination without cause, Contractor will be paid
for services rendered to the date of termination.
8.2 For Cause. If the Contractor is determined by the Town to be in default of any term or
condition of this Contract, the Town may terminate this Contract on seven (7) days notice
by providing notice to the Contractor, which shall be in writing and shall be deemed
delivered and received when given in person to the Contractor, or when received by fax,
express mail, certified mail return receipt requested, regular mail postage prepaid or
delivered by any other appropriate method evidencing actual receipt by the Contractor.
8.3 Default. The following shall constitute events of a default under the Contract:
1) any material misrepresentation made by the Contractor to the Town; 2) any failure to
perform any of its obligations under this Contract including, but not limited to the
following: (i) failure to commence performance of this Contract at the time specified
in this Contract due to a reason or circumstance within the Contractor's reasonable
control, (ii) failure to perform this Contract with sufficient personnel and equipment or
with sufficient material to ensure the completion of this Contract within the specified
time due to a reason or circumstance within the Contractor's reasonable control, (iii)
failure to perform this Contract in a manner reasonably satisfactory to the Town, (iv)
failure to promptly re -perform within a reasonable time the services that were rejected
by the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for
reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a
material term of this Contract, including, but not limited to, the provision of insurance
and non-discrimination, (vii) any other acts specifically and expressly stated in this
Contract as constituting a basis for termination of this Contact, and (viii) failure to
comply with any and all requirements of state law and/or regulations, and Town bylaw
and/or regulations.
9. The Contractor's Breach and the Town's Remedies
Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be
deemed a material breach of this Contract, and the Town of North Andover shall have all the
rights and remedies provided in the Contract documents, the right to cancel, terminate, or
suspend the Contract in whole or in part, the right to maintain any and all actions at law or in
equity or other proceedings with respect to a breach of this Contract, including damages and
specific performance, and the right to select among the remedies available to it by all of the
above.
From any sums due to the Contractor for services, the Town may keep the whole or any part of
the amount for expenses, losses and damages incurred by the Town as a consequence of
(Rev 5-2007) Contract by and between Town of North Andover and National Water Main Cleaning Co. Page 3
procuring services as a result of any failure, omission or mistake of the Contractor in providing
services as provided in this Contract.
10. Statutory Compliance
10.1 This Contract will be construed and governed by the provisions of applicable federal,
state and local laws and regulations; and wherever any provision of the Contract or
Contract documents shall conflict with any provision or requirement of federal, state or
local law or regulation, then the provisions of law and regulation shall control. Where
applicable to the Contract, the provisions of the General Laws are incorporated by
reference into this Contract, including, but not limited to, the following:
General Laws Chapter 30B — Procurement of Goods and Services.
General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts.
General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts.
10.2 Wherever applicable law mandates the inclusion of any term and provision into a
municipal contract, this Section shall be understood to import such term or provision
into this Contract. To whatever extent any provision of this Contract shall be
inconsistent with any law or regulation limiting the power or liability of cities and
towns, such law or regulation shall control.
10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on
the performance of the Contract. If the Contractor performs the Contract in violation of
any applicable law or regulation, the Contractor shall bear all costs arising therefrom.
10.4 The Contractor shall keep itself fully informed of all existing and future State and
National Laws and Municipal By-laws and Regulations and of all orders and decrees of
any bodies or tribunals having jurisdiction in any manner affecting those engaged or
employed in the work, of the materials used in the work or in any way affecting the
conduct of the work. If any discrepancy or inconsistency is discovered in the Drawings,
Specifications or Contract for this work in violation of any such law, by-law, regulation,
order or decree, it shall forthwith report the same in writing to the Town. It shall, at all
times, itself observe and comply with all such existing and future laws, by-laws,
regulations, orders and decrees; and shall protect and indemnify the Town of North
Andover, and its duly appointed agents against any claim or liability arising from or
based on any violation whether by him or its agents, employees or subcontractors of any
such law, by-law, regulation or decree.
11. Conflict of Interest
Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest
Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which
shall constitute a violation of that law. The Contractor shall be deemed to have investigated the
application of M.G.L. c. 268A to the performance of this Contract; and by executing the
Contract documents the Contractor certifies to the Town that neither it nor its agents,
employees, or subcontractors are thereby in violation of General Laws Chapter 268A.
(Rev 5-2007) Contract by and between Town of North Andover and National Water Main Cleaning Co. Page 4
12. Certification of Tax Compliance
This Contract must include a certification of tax compliance by the Contractor, as required by
General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors
Providing Goods, Services, or Real Estate Space to the Commonwealth or Subdivision).
13. Discrimination
The Contractor will carry out the obligations of this Contract in full compliance with all of the
requirements imposed by or pursuant to General Laws Chapter 151B (Law Against
Discrimination) and any executive orders, rules, regulations, and requirements of the
Commonwealth of Massachusetts as they may from time to time be amended.
14. Assignment
Assignment of this Contract is prohibited, unless and only to the extent that assignment is
provided for expressly in the Contract documents.
15. Condition of Enforceability Against the Town
This Contract is only binding upon, and enforceable against, the Town if. (1) the Contract is
signed by the Town Manager or its designee; and (2) endorsed with approval by the Town
Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the
Town Counsel as to form.
16. Corporate Contractor
If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's
Certificate certifying the corporate capacity and authority of the party signing this Contract for
the corporation. Such certificate shall be accompanied by a letter or other instrument stating that
such authority continues in full force and effect as of the date the Contract is executed by the
Contractor. This Contract shall not be enforceable against the Town of North Andover unless
and until the Contractor complies with this section.
The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws,
Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto,
relating to the appointment of the Commissioner of Corporations as its attorney, shall file with
the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its
Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the
Commonwealth.
17. Liability of Public Officials
To the full extent permitted by law, no official, employee, agent or representative of the Town of
North Andover shall be individually or personally liable on any obligation of the Town under this
Contract.
(Rev 5-2007) Contract by and between Town of North Andover and National Water Main Cleaning Co. Page 5
18. Indemnification
The Contractor shall indemnify, defend and save harmless the Town, the Town's officers, agents
and employees, from and against any and all damages, liabilities, actions, suits, proceedings,
claims, demands, losses, costs, expenses, recoveries and judgments of every nature and
description (including reasonable attorneys' fees) that may arise in whole or in part out of or in
connection with the work being performed or to be performed, or out of any act or omission by
the Contractor, its employees, agents, subcontractors, material men, and anyone directly or
indirectly employed by any of them or anyone for whose acts any of them may be liable,
regardless of whether or not it is caused in part by any party indemnified hereunder. The
Contractor further agrees to reimburse the Town for damage to its property caused by the
Contractor, its employees, agents, subcontractors or material men, and anyone directly or
indirectly employed by any of them or anyone for whose acts any of them may be liable,
including damages caused by his, its or their use of faulty, defective, or unsuitable material or
equipment, unless the damage is caused by the Town's gross negligence or willful misconduct.
The existence of insurance shall in no way limit the scope of the Contractor's indemnification
under this contract.
19. Workers Compensation Insurance
The Contractor shall provide by insurance for the payment of compensation and the furnishing of
other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's
Compensation Act) to all employees of the Contractor who are subject to the provisions of
Chapter 152 of the General Laws of Massachusetts.
Failure to provide and continue in force such insurance during the period of this Contract shall be
deemed a material breach of this Contract, shall operate as an immediate termination thereof, and
Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure
to provide the insurance required by this Article.
The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this
Contract before the same shall be binding on the parties thereto, except if specifically waived by
the Town.
20. Documents, Materials, Etc.
Any materials, reports, information, data, etc. given to or prepared or assembled by the
Contractor under this Contract are to be kept confidential and shall not be made available to any
individual or organization by the Contractor (except agents, servants, or employees of the
Contractor) without the prior written approval of the Town, except as otherwise required by law.
The Contractor shall comply with the provisions Chapter 66A of the General Laws of
Massachusetts as it relates to public documents, and all other state and federal laws and
regulations relating to confidentiality, security, privacy and use of confidential data.
Any materials produced in whole or in part under this Contract shall not be subject to copyright,
except by the Town, in the United States or any other country. The Town shall have unrestricted
authority to, without payment of any royalty, commission, or additional fee of any type or nature,
(Rev 5-2007) Contract by and between Town of North Andover and National Water Main Cleaning Co. Page 6
publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole
or in part, any reports, data or other materials prepared under this Contract.
All data, reports, programs, software, equipment, furnishings, and any other documentation or
product paid for by the Town shall vest in the Town at the termination of this Contract. The
Contractor shall at all times, during or after termination of this Contract, obtain the prior written
approval of the Town before making any statement bearing on the work performed or data
collected under this Contract to the press or issues any material for publication through any
medium.
21. Audit, Inspection and Recordkeeping
At any time during normal business hours, and as often as the Town may deem it reasonably
necessary, there shall be available in the office of the Contractor for the purpose of audit,
examination, and/or to make excerpts or transcript all records, contracts, invoices, materials,
payrolls, records of personnel, conditions of employment and other data relating to all matters
covered by this Agreement.
22. Payment
The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the
Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work
completed and acceptance from the Town of the work completed.
23. Waiver and Amendment
Amendments, or waivers of any additional term, condition, covenant, duty or obligation
contained in this Contract may be made only by written amendment executed by all signatories to
the original Agreement, prior to the effective date of the amendment.
To the extent allowed by law, any conditions, duties, and obligations contained in this Contract
may be waived only by written Agreement by both parties.
Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver,
nor in any manner limit the legal or equitable remedies available to that party. No waiver by
either party of any default or breach shall constitute a waiver of any subsequent default or breach
of a similar or different matter.
24. Forum and Choice of Law
This Contract and any performance herein shall be governed by and be construed in accordance
with the laws of the Commonwealth. Any and all proceedings or actions relating to subject
matter herein shall be brought and maintained in the courts of the Commonwealth or the federal
district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This
paragraph shall not be construed to limit any other legal rights of the parties.
(Rev 5-2007) Contract by and between Town of North Andover and National Water Main Cleaning Co. Page 7
25. Notices
Any notice permitted or required under the provisions of this Contract to be given or served by
either of the parties hereto upon the other party hereto shall be in writing and signed in the name
or on the behalf of the party giving or serving the same. Notice shall be deemed to have been
received at the time of actual service or three (3) business days after the date of a certified or
registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent
to the address set forth in the Contract and to the Town of North Andover by being sent to the
Town Manager, Town Hall, 120 Main Street, North Andover, Massachusetts 01845.
26. Binding on Successors
This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in
interest (and where not corporate, the heirs and estate of the Contractor).
27. Complete Contract
This instrument, together with its endorsed supplements, and the other components of the
contract documents, constitutes the entire contract between the parties, with no agreements other
than those incorporated herein.
28. Supplemental Conditions
The foregoing provisions apply to all contracts to which the Town of North Andover shall be a
party. One of the following "Supplements" must be "checked" as applicable to this Contract,
shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The
Supplement contains additional terms governing the Contract:
[ ] GOODS
SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods
(governed by the provisions of General Laws Chapter
3013)
[ ] SERVICES
SUPPLEMENT "S" - Applicable to Contracts for the procurement of Services
(governed by the provisions of General Laws Chapter
30B)
[ X ] CONSTRUCTION
SUPPLEMENT "C" - Applicable to Contracts for Construction
(Rev 5-2007) Contract by and between Town of North Andover and National Water Main Cleaning Co. Page 8
IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set forth
their hands the day and year first above written.
THE TOWN
. C, mjj\�-
Division/Department Head
4.1, /P - /a. 17
Town Manager Date
THE CONTRACTOR
Company Name
c
Y1/1�� p. SV,1tV4r1. Mole—
-.jtLC QCtYQVLKk
Print Name & Title
Federal Identification
No.: da -175 3261
APPROVED AS TO FORM:
a66//j
own Counsel Date
CERTIFICATION AS TO AVAILABILITY OF FUNDS:
- a"� , b4)%,-1Ay,0 1VkDk-7
TownACwuntant Date
(Rev 5-2007) Contract by and between Town of North Andover and National Water Main Cleaning Co. Page 9
SUPPLEMENT "C"
[] CONSTRUCTION
SUPPLEMENT "C" - Applicable to Contracts for the construction of:
(1) Public Buildings and Public Works
(governed by the provisions of General Laws Chapter 30B);
(2) Public Buildings
(governed by the provisions of General Laws Chapter 149,§ 44A,
et seq.); and
(3) Public Works
(governed by the provisions of General Laws Chapter 30, §39M, et seq)
This form supplements the Town of North Andover "Contract and General Conditions" and applies
only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works
or public buildings.
2. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be
understood to be a term and condition of this Contract. The Contractor agrees to secure such bond
(where required) in the form required by the Town and provide an original thereof to the Town prior
to the commencement of performance.
3. E uali :
3.1. In the case of a closed Specification written for a specific item or items to be furnished under
the Base Bid, such specifications shall, as applicable, be in compliance with the
Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq.
3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or
on the Drawings, except as above noted, the intent is to establish a standard and in no way
should be construed to exclude any item or manufacturer not mentioned by name, but whose
product meets the Specifications as to design, utility and quality. Final decision shall rest
with the Project Representative as to its acceptability.
4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of
goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of
Chapter 30B.
The Contractor will carry out the obligations of this contract in full compliance with all of the
requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage
Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of
Massachusetts as they may from time to time be amended. The Contractor will at all times comply
with the wage rates as determined by the Commissioner of the Department of Labor and Industries,
under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall
be in force and as amended.
The Contractor shall continuously maintain adequate protection of all work from damage and shall
protect the property of the Town and others, including adjacent property, from injury or loss arising
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 1
and National Water Main Cleaning Co.
in connection with the Contract. The Contractor shall make good any such damage, injury or loss,
except as may be directly due to errors in the Contract Documents or caused by agents or employees
of the Town, or due to causes beyond the Contractor's control and not the Contractor's fault or
negligence.
7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall
comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents
or injury to persons on, about or adjacent to the premises where the work is being performed. The
Contractor will erect and properly maintain at all times, as required by the conditions and progress of
the work, all necessary safeguards for the protection of workers and the public, shall post danger
signs warning against the hazards created by such features of construction such as pits, protruding
nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling
materials; and shall designate a responsible member of its organization on the work, whose duty shall
be the prevention of accidents.
8. The Town shall at all times have access to the work wherever it is in preparation or progress and the
Contractor shall provide suitable accommodations for such access.
9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants,
all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the
construction superintendent, foreman, or assistants are unacceptable to the Town, then upon seven
days notice from the Town, the Contractor shall replace such person or persons with people
acceptable to the Town.
10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The
Contractor shall carefully study and compare the drawings, specifications and other instructions and
shall at once report to the Town any error, inconsistency or omission which shall be discovered.
Included in this responsibility shall be supervision of all work performed by subcontractors on the
work.
11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any
of its provisions, the Town, upon three days written notice, may, without prejudice to any other
remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment
then or thereafter due the Contractor.
12. Inspection by the Town's Project Representative
12.1. The Town shall have the right to designate a Project Representative who may make periodic
visits to the site to familiarize the Town generally with the progress and quality of the work,
and to determine in general if the work is proceeding in accordance with the Contract
Documents. The Project Representative will not be required to make exhaustive or
continuous on-site inspections to check the quality or quantity of the work, and will not be
responsible for the Contractor's failure to carry out the construction work in accordance with
the Contract Documents. During such visits and on the basis of these observations while at
the site, the Project Representative will keep the Town informed on the progress of the work,
will endeavor to guard the Town against defects and deficiencies in the work of contractors,
and may condemn structural work as failing to conform to the Contract Documents. The
Project Representative shall have authority to act on behalf of the Town only to the extent
expressly delegated by the Town, which shall be shown to the Contractor, and shall have
authority to stop the work whenever such stoppage may reasonably be necessary to insure
the proper execution of the Contract.
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 2
and National Water Main Cleaning Co.
12.2. In connection with the work, the Project Representative shall not be responsible for
construction methods, means, techniques, sequences or procedures employed by the
Contractor or the Contractor's safety programs, requirements, regulations, or precautions.
13. Decisions of the Project Representative
13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of
the Town or the Contractor and on all other matters relating to the execution and progress of
the structural work or the interpretation of the Contract Documents.
13.2. The Project Representative's decision, in matters relating to the project, shall be final, if
within the terms of the Contract Documents.
13.3. If, however, the Project Representative fails to render a decision within ten days after the
parties have presented their evidence, either party may then avail itself of the remedies
provided in this contract or available to it by law. If the Project Representative renders a
decision after such remedies have commenced, such decision may be entered as evidence
but shall not disturb or interrupt such proceedings except where such decision is acceptable
to the parties concerned.
14.1 Use of Premises by the Contractor:
14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of
its workmen to limits indicated by law, by-laws, permits or directions of the Town and
shall not unreasonably encumber the premises with its materials.
14.2. The Contractor shall not load or permit any part of the structure to be loaded with a
weight that will endanger its safety.
15. Maintenance of Premises:
The Contractor shall at all times keep the premises free from accumulation of waste materials or
rubbish caused by its employees or work, and at the completion of the work it shall remove all its
rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall
leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute,
the Town may remove the rubbish and charge the cost to the several contractors, as the Town
shall determine to be just.
16. Right to Terminate
If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit
of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or
repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail
to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently
disregard laws and regulations or lawful directives of the Town, or (7) be guilty of a substantial
violation of any provision of the Contract, then the Town may, without prejudice to any other
right or remedy and after giving the Contractor (or any surety) seven days written notice,
terminate the contract and the employment of the Contractor and take possession of the premises
and of all materials, tools and appliances thereon and finish the work by whatever method it
deems appropriate.
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 3
and National Water Main Cleaning Co.
In such cases, the Contractor shall not be entitled to receive any further payment until the work is
finished. If the unpaid amount owed to the Contractor for work already completed shall exceed
the expense of finishing the work, including compensation for additional architectural,
managerial, legal and administrative services, such excess shall be paid to the Contractor. If such
expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the Town.
The Contractor shall not be relieved of liability to the Town by virtue of any termination of this
contract, and any claim for damages against the Contractor relating to the Contractor's
performance under this contract shall survive any termination hereunder.
Notwithstanding any other provision of this Agreement, the Town reserves the right at any time
in its absolute discretion to suspend or terminate this Agreement in whole or in part for its
convenience upon seven days written notice to the Contractor. The Town shall incur no liability
by reason of such termination except for the obligation to pay compensation for all work
performed by the Contractor and accepted by the Town to the termination date.
17. Pro erg ss Pgyments:
17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported
to the extent required by the Town by invoices or other vouchers, showing payments for
materials and labor, payments to Subcontractors and such other evidence of the
Contractor's right to payment.
17.2. The Contractor shall, before the first application, submit to the Town a schedule of values
of the various parts of the work, including quantities aggregating the total sum of the
Contract, divided so as to facilitate payments to Subcontractors, made out in such form as
the Town and the Contractor may agree upon, and, if required, supported by such
evidence as to its correctness. This schedule, when approved by the Town, shall be used
as a basis for payment, unless it is found to be in error. If applying for payments, the
Contractor shall submit a statement based upon this schedule.
18. Withholding of Pam
18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the
whole or part of any payment to such extent as may be necessary in its reasonable
opinion to protect the Town of North Andover from loss on account of:
18.1.1. Defective work not remedied.
18.1.2. Claims filed or reasonable evidence indicating probable filing of claims.
18.1.3. Failure of the Contractor to make payments properly to Subcontractors or
for material or labor.
18.1.4. A reasonable doubt that the Contract can be completed for the balance
then unpaid.
18.1.5. Damage to another contractor.
18.1.6. Delays resulting in liquidated damages.
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 4
and National Water Main Cleaning Co.
18.2. Withholding of payments shall be in strict compliance with statutory requirements.
19. Claims by Contractor and Liability of Town
All claims by the Contractor against the Town shall, unless otherwise provided by law, be
initiated by a written claim submitted to the Town no later than seven (7) calendar days after the
event or the first appearance of the circumstances causing the claim. The claim shall set forth in
detail all known facts and circumstances supporting the claim. The Contractor shall continue its
performance under this contract regardless of the submission or existence of any claims.
The limit of liability of the Town under this Agreement is limited to the compensation provided
herein for work actually performed, and shall in no event include liability for delays or for
incidental, special or consequential damages or lost profits or for damages or loss from causes
beyond the Town's reasonable control.
20. Liquidated Damages:
Because both parties recognize (1) that the time for completion of this Contract is of the essence,
(2) that the Town will suffer loss if the work is not completed within the contract time specified,
plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the
delays, expense and difficulties involved in a legal proceeding to determine the actual loss
suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay
the Town as liquidated damages representing an estimate of delay damages, not as a penalty, the
sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is
completed, whether the work is completed by the Contractor or some other person. The Town's
right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a
legal action for damages in lieu of or in addition to its option to impose liquidated damages. The
Town may deduct any liquidated damages from money due the Contractor, and if such payment is
insufficient to cover the liquidated damages, then the Contractor shall pay the amount due.
21. The Contractors' Mutual Responsibility:
Should the Contractor cause damage to any separate subcontractor on the work, the Contractor
agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies
provided by law or by the provisions of the contract. If such separate contractor sues the Town
on account of any damage alleged to have been sustained, the Town shall notify the Contractor,
who shall defend such proceedings at the Town's expense and, if any judgment against the Town
arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Town.
22. Separate Contracts:
22.1. The Town reserves the right to let other Contracts in connection with this work under
similar General Conditions. The Contractor shall afford other contractors reasonable
opportunity for the introduction and storage of their materials and the execution of their
work, and shall properly connect and coordinate its work with theirs.
22.2. If any part of the Contractor's work depends, for proper execution or results, upon the
work of any other contractor, the Contractor shall inspect and promptly report to the
Town any defects in such work that render it unsuitable for such proper execution and
results. Failure of the Contractor to so inspect and report shall constitute an acceptance
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 5
and National Water Main Cleaning Co.
of the other contractor's work as fit and proper for the reception of its work except as to
defects which may develop in the other contractor's work after the execution of its work.
22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work
already in place and shall at once report to the Town any discrepancy between the
executed work and the Drawings.
23. Subcontracts:
23.1. All Subcontracts shall be awarded in conformity with the requirements of the General
Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive.
23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and
omissions of its Subcontractors and of persons either directly or indirectly employed by
them, as it is for the acts and omissions of persons directly employed by it.
23.3. Nothing contained in the Contract Documents shall create any contractual relationship
between any Subcontractor and the Town.
24. Contractor -Subcontractor Relations:
The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound
by the terms of the Agreement, the General Conditions of the Contract, the Supplementary
General Conditions, the Drawings and Specifications, as far as applicable to its work, including
the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A,
et seq.
25. Indemnification:
25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents
and employees from and against any and all damages, liabilities, actions, suits,
proceedings, claims, demands, losses, recoveries and judgments of every nature and
description (including reasonable attorneys' fees) brought or recovered against them that
may arise in whole or in part out of or in connection with the work being performed or to
be performed, or out of any act or omission by the Contractor, its employees, agents,
subcontractors, material men, and anyone directly or indirectly employed by any of them
or anyone for whose acts any of them may be liable, regardless of whether or not it is
caused in part by any party indemnified hereunder. The Contractor further agrees to
reimburse the Town for damage to its property caused by Contractor, its employees,
agents, subcontractors or material men, and anyone directly or indirectly employed by
any of them or anyone for whose acts any of them may be liable, including damages
caused by his, its or their use of faulty, defective or unsuitable material or equipment,
unless the damage is caused by the Town's gross negligence or willful misconduct. The
existence of insurance shall in no way limit the scope of the Contractor's indemnification
under this Contract.
25.2. In any and all claims against the Town or any of their agents or employees by any
employee of the Contractor, any Subcontractor, anyone directly or indirectly employed
by any of them or anyone for whose acts any of them may be liable, the indemnification
obligation under this paragraph shall not be limited in any way by any limitation on the
amount or type of damages, compensation or benefits payable by or for the Contractor or
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 6
and National Water Main Cleaning Co.
any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other
employee benefit acts.
25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and
minimum limits of liability acceptable under the Contract. However, it shall be the
Contractor's responsibility to purchase and maintain insurance of such character and in
such amounts as will adequately protect it and the Town from and against all claims,
damages, losses and expenses resulting from exposure to any casualty liability in the
performance of the Work.
26. The Contractor's Insurance:
26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor
from claims set forth below which may arise out of or result from the Contractor's
operations under the Contract, whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them or by anyone
for whose acts any of them may be liable.
26.1.1. Claims under Worker's Compensation, disability benefit and other similar
employee benefit acts;
26.1.2. Claims for damages because of bodily injury, occupational sickness or
disease, or death of its employees, and claims insured by usual personal
injury liability coverage;
26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of
any person other than its employees, and claims insured by usual personal
liability coverage;
26.1.4. Claims for damages because of injury to or destruction of tangible property,
including loss of use resulting therefrom.
26.2. The insurance required by the above shall be written for not less than the following
minimum limits of liability:
26.2.1. Worker's Compensation Insurance Requirements
Workers' Compensation coverage as required by the laws of the Commonwealth of
Massachusetts.
26.2.2. Liability Insurance Requirements
Liability insurance shall include all major divisions and shall be on a comprehensive
general basis including Premises and Operations, Owners and Contractor's Protective,
Products and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles.
All such insurance shall be written for not less than any limits of liability required by law,
unless otherwise provided in the contract documents, or the following limits, whichever
are greater: '
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 7
and National Water Main Cleaning Co.
Comprehensive General Liability Insurance (Broad Form)
Bodily Injury
Property Damage
Automobile Liability Insurance
Excess Liability (Umbrella)
$1,000,000 per person
$2,000,000 aggregate
$1,000,000 per occurrence
$2,000,000 aggregate
$500,000 per person
$1,000,000 per occurrence
$2,000,000
26.3. The above insurance policies shall also be subject to the following requirements:
26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as
hereinafter specified under Paragraph entitled "Protective Liability Insurance"
shall be written by one and the same insurance company to avoid the expense of
duplicate and/or overlapping coverage and to facilitate and expedite the
settlement of claims.
26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed
with the Town prior to commencement of the work. Renewal certificates shall be
addressed to and filed with the Town at least ten (10) days prior to the expiration
date of required policies.
26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30)
days prior written notice forwarded by registered or certified mail to the Town.
The Town shall also be notified of the attachment of any restrictive amendments
to the policies.
26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of
Insurance form, shall contain true transcripts from the policies, authenticated by
the proper officer of the Insurer, evidencing in particular those insured, the extent
of coverage, the location and operations to which the insurance applies, the
expiration date and the above-mentioned notice clauses.
26.3.5. All premium costs shall be included in the Contractor's bid.
26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be
maintained without interruption from date of the Contract until date of final
payment and termination of any coverage required to be maintained after
payment.
27. Protective Liability Insurance:
27.1. The Contractor shall purchase and maintain such insurance as described in the preceding
paragraph as will protect the Town from claims which may arise from operations under
the Contract, including operations performed for the named insureds by independent
contractors and general inspection thereof by the named insureds.
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 8
and National Water Main Cleaning Co.
27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town
against Automobile Non -Ownership Liability in connection with the Contractor's
operations under the Contract, whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone
for whose acts any of them may be liable.
27.3. The limits of liability for coverage required under the preceding paragraphs shall be as
specified under the provisions hereof governing the Contractor's General Liability
Policy.
27.4. The Town shall be named as an additional insured on the above referenced liability
Policies, and the Contractor's insurance shall be the primary coverage. The cost of such
insurance, including required endorsements and amendments, shall be the sole
responsibility of the Contractor.
28. Liens:
Neither the Final Payment nor any part of the retained percentage shall become due until the
Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the
Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as
it has knowledge or information, the releases and receipts include all the labor and material for
which a lien could be filed. The Contractor shall comply with all statutory provisions of the
General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149
as amended (as a minimum requirement).
29. Guarantees:
29.1. The Contractor guarantees and warrants to the Town that all labor furnished under this
Contract will be competent to perform the tasks undertaken, that the product of such
labor will yield only first-class results, that materials and equipment furnished will be of
good quality and new unless otherwise permitted by this Contract, and that the Work will
be of good quality, free from faults and defects and in strict conformance with this
Contract. All Work not conforming to these requirements may be considered defective.
29.2. If at any time any part of the work constructed under the terms of this contract shall in the
opinion of the Town Manager require repairing due to defective work or materials
furnished by the Contractor, he may notify the Contractor in writing to make the required
repairs. If the Contractor shall neglect to start such repairs within ten days of the date of
giving it notice thereof and to complete the same to the satisfaction of the Town Manager
with reasonable dispatch, then the latter may employ other persons to make such repairs.
The Town shall charge the expense thereof to the Contractor and may use any moneys
still retained to pay for the same, and if such sum is insufficient, the Contractor shall be
obligated to pay the balance thereof.
29.3. All guarantees and warranties required in the various Sections of the Specifications which
originate with a Subcontractor or Manufacturer must be delivered to the Town before
final payment to the Contractor may be made for the amount of that subtrade or for the
phase of work to which the guarantee or warranty relates. The failure to deliver a
required guarantee or warranty shall be held to constitute a failure of the Subcontractor to
fully complete his work in accordance with the Contract Documents. The Contractor's
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 9
and National Water Main Cleaning Co.
obligation to correct work is in addition to, and not in substitution of, such guarantees or
warranties as may be required in the various Sections of the Specifications.
This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals
hereto:
Dated: �6 �� •�7
The Contractor by:
Au orized Signa e
The Town of North Andover by:
Town anager
My"'�C.('%�
Department/Division Head
V--�
wn Counsel
Approved as to Form
" , , 6 1
ToWY ountant
Certified as to Appropriation
(Rev 5-2007) Supplement "C" to Contract between the Town of North Andover Page 10
and National Water Main Cleaning Co.
Cleaning of Sewer Pump Station Wet Wells
October 1, 2017 through September 30, 2018
Alcott Village, 105 Andover By -Pass (*to be cleaned twice)
$ 1,900.00
Blue Ridge Road, 410 Blue Ridge Road (*to be cleaned twice)
$ 1,900.00
Bonny Lane, 120 Bonny Lane
$
950.00
Boston Hill Road, 1280 Turnpike Street (*to be cleaned twice)
$ 1,900.00
Butcher Boy, 1945 Great Pond Road (*to be cleaned twice)
$ 1,900.00
Campbell Road, 1875 Salem Street
$
950.00
Carter Field, 75 Carter Road
$
950.00
Coachman Lane, 70 Coachman Lane
$
950.00
Dale Street, 595 Dale Street
$
950.00
Flagship Drive, 87 Flagship Drive
$
950.00
Forest View, 14 Palomino Drive (*to be cleaned twice)
$ 1,900.00
Hawthorne Place, 45 Hawthorne Place
$
950.00
Holly Ridge, 1 Holly Ridge
$
950.00
Jasmine Plaza, 720 Turnpike Street
$
950.00
Johnson Circle, 85 Johnson Circle
$
950.00
Meeting House, 44 Meeting House
$
950.00
Rea's Pond, 1653 Great Pond Road
$
950.00
Saile Way, 89 Saile Way
$
950.00
Sargent School, 300 Abbott Street
$
950.00
Water Treatment Plant, 420 Great Pond Road
$
950.00
Willows, 5 Willows Street
$
950.00
Winter Street, 60 Winter Street (*to be cleaned twice)
$ 1,900.00
TOTAL $26,600.00
CHARLES D. BAKER
Governor
KARYN E. POLITO
Lt. Governor
Awarding Authority:
Contract Number:
Description of Work:
Job Location:
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
Town of North Andover
Perform scheduled annual cleaning of sewer pump station wet wells
Various locations
City/Town
Information about Prevailing Wage Schedules for Awarding Authorities and Contractors
ROSALIN ACOSTA
Secretary
WILLIAM D MCKINNEY
Director
NORTH ANDOVER
• This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the
"Wage Request Number" on all pages of this schedule.
• An Awarding Authority must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has
not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK
projects (bid pursuant to G.L. c. 149A), the earlier of. (a) the execution date of the GMP Amendment, or (b) the bid for the first
construction scope of work must be within 90 -days of the wage schedule issuance date.
• The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149,
§ 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a
conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the
wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime
contractor, a filed sub -bidder, or any sub -contractor.
• All apprentices working on the project are required to be registered with the Massachusetts Department of Labor
Standards, Division of Apprentice Standards (DLS/DAS). Apprentice must keep his/her apprentice identification card on
his/her person during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice
wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DLS/DAS
regardless of whether or not they are registered with any other federal, state, local, or private agency must be paid the
journeyworker's rate for the trade.
• The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction
projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule.
Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the
contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, awarding
authority must request an annual update no later than two weeks before the anniversary date, determined as the earlier of: (a)
the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of
construction services. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than
these rates to covered workers. The annual update requirement is not applicable to 27F "rental of equipment" contracts.
• Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll
reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years.
Each weekly payroll report must contain: the employee's name, address, occupational classification, hours worked, and wages
paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at
http://www.mass.gov/dols/pw.
• Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at (617) 626-6953.
• Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor
Division of the office of the Attorney General at (617) 727-3465.
• Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who
perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and
Issue Date: 07/31/2017 Wage Request Number: 20170731-033
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
Construction
(2 AXLE) DRIVER - EQUIPMENT
12/01/2016
$32.15
$10.91
$10.89
$0.00
$53.95
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
(3 AXLE) DRIVER - EQUIPMENT
12/01/2016
$32.22
$10.91
$10.89
$0.00
$54.02
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
(4 & 5 AXLE) DRIVER - EQUIPMENT
12/01/2016
$32.34
$10.91
$10.89
$0.00
$54.14
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
ADS/SUBMERSIBLE PILOT
08/01/2015
$88.29
$9.80
$19.23
$0.00
$117.32
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
AIR TRACK OPERATOR
06/01/2017
$33.15
$7.60
$13.50
$0.00
$54.25
LABORERS - ZONE 2
12/01/2017
$33.78
$7.60
$13.50
$0.00
$54.88
06/01/2018
$34.62
$7.60
$13.50
$0.00
$55.72
12/01/2018
$35.46
$7.60
$13.50
$0.00
$56.56
06/01/2019
$36.33
$7.60
$13.50
$0.00
$57.43
12/01/2019
$37.19
$7.60
$13.50
$0.00
$58.29
For apprentice rates see "Apprentice- LABORER"
ASBESTOS REMOVER - PIPE / MECH. EQUIPT.
06/01/2017
$34.90
$11.50
$7.10
$0.00
$53.50
HEAT& FROSTINSULATORS LOCAL 6 (BOSTON)
12/01/2017
$35.90
$11.50
$7.10
$0.00
$54.50
06/01/2018
$36.90
$11.50
$7.10
$0.00
$55.50
12/01/2018
$37.90
$11.50
$7.10
$0.00
$56.50
06/01/2019
$38.90
$11.50
$7.10
$0.00
$57.50
12/01/2019
$39.90
$11.50
$7.10
$0.00
$58.50
06/01/2020
$40.90
$11.50
$7.10
$0.00
$59.50
12/01/2020
$41.90
$11.50
$7.10
$0.00
$60.50
ASPHALT RAKER
06/01/2017
$32.65
$7.60
$13.50
$0.00
$53.75
LABORERS - ZONE 2
12/01/2017
$33.28
$7.60
$13.50
$0.00
$54.38
06/01/2018
$34.12
$7.60
$13.50
$0.00
$55.22
12/01/2018
$34.96
$7.60
$13.50
$0.00
$56.06
06/01/2019
$35.83
$7.60
$13.50
$0.00
$56.93
12/01/2019
$36.69
$7.60
$13.50
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE
06/01/2017
$46.38
$10.00
$15.25
$0.00
$71.63
OPERATING ENGINEERS LOCAL 4
12/01/2017
$47.38
$10.00
$15.25
$0.00
$72.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
BACKHOE/FRONT-END LOADER
06/01/2017
$46.38
$10.00
$15.25
$0.00
$71.63
OPERATING ENGINEERS LOCAL 4
12/01/2017
$47.38
$10.00
$15.25
$0.00
$72.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
BARCO-TYPE JUMPING TAMPER
06/01/2017
$32.65
$7.60
$13.50
$0.00
$53.75
LABORERS - ZONE 2
12/01/2017
$33.28
$7.60
$13.50
$0.00
$54.38
06/01/2018
$34.12
$7.60
$13.50
$0.00
$55.22
12/01/2018
$34.96
$7.60
$13.50
$0.00
$56.06
06/01/2019
$35.83
$7.60
$13.50
$0.00
$56.93
12/01/2019
$36.69
$7.60
$13.50
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
-----------------------------------------------------------------------------------------------------------------------I---------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 2 of 35
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
2 65
$27.90
$6.97
$10.54
Unemployment
$45.41
BLOCK PAVER, RAMMER / CURB SETTER 06/01/2017
$33.15
$7.60
$13.50
$0.00
$54.25
LABORERS - ZONE 2
$32.19
$6.97
$12.16
$0.00
$51.32
12/01/2017
$33.78
$7.60
$13.50
$0.00
$54.88
06/01/2018
$34.62
$7.60
$13.50
$0.00
$55.72
12/01/2018
$35.46
$7.60
$13.50
$0.00
$56.56
06/01/2019
$36.33
$7.60
$13.50
$0.00
$57.43
12/01/2019
$37.19
$7.60
$13.50
$0.00
$58.29
For apprentice rates see "Apprentice- LABORER"
BOILERMAKER 01/01/2017 $42.92 $6.97 $16.21 $0.00 $66.10
BOILERMAKERS LOCAL 29
Apprentice - BOILERMAKER - Local 29
Effective Date - 01/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 65
$27.90
$6.97
$10.54
$0.00
$45.41
2 65
$27.90
$6.97
$10.54
$0.00
$45.41
3 70
$30.04
$6.97
$11.35
$0.00
$48.36
4 75
$32.19
$6.97
$12.16
$0.00
$51.32
5 80
$34.34
$6.97
$12.97
$0.00
$54.28
6 85
$36.48
$6.97
$13.78
$0.00
$57.23
7 90
$38.63
$6.97
$14.59
$0.00
$60.19
8 95
$40.77
$6.97
$15.40
$0.00
$63.14
Notes:
r
Apprentice to Journeyworker Ratio:1:5
Apprentice to Journeyworker Ratio:l:5
BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 03/01/2017 $50.76 $10.75 $19.22 $0.00 $80.73
WATERPROOFING)
BRICKLAYERS LOCAL 3 (LYNN)
Apprentice- BRICK1TLASTER/CEMENT MASON - Local 3 Lynn
Effective Date - 03/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$25.38
$10.75
$19.22
$0.00
$55.35
2 60
$30.46
$10.75
$19.22
$0.00
$60.43
3 70
$35.53
$10.75
$19.22
$0.00
$65.50
4 80
$40.61
$10.75
$19.22
$0.00
$70.58
5 90
$45.68
$10.75
$19.22
$0.00
$75.65
Notes:
r
Apprentice to Journeyworker Ratio:l:5
BULLDOZER/GRADER/SCRAPER
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
06/01/2017 $45.93 $10.00 $15.25 $0.00 $71.18
12/01/2017 $46.92 $10.00 $15.25 $0.00 $72.17
----------------------------------------------------------------------------------------------------------- -------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 3 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
CAISSON & UNDERPINNING BOTTOM MAN 12/01/2016 $37.45 $7.60 $14.35 $0.00 $59.40
LABORERS - FOUNDATION AND MARINE
For apprentice rates see "Apprentice- LABORER"
CAISSON & UNDERPINNING LABORER 12/01/2016 $36.30 $7.60 $14.35 $0.00 $58.25
LABORERS -FOUNDATION AND MARINE
For apprentice rates see "Apprentice- LABORER"
CAISSON & UNDERPINNING TOP MAN 12/01/2016 $36.30 $7.60 $14.35 $0.00 $58.25
LABORERS - FO UNDA TION AND MARINE
For apprentice rates see "Apprentice- LABORER"
CARBIDE CORE DRILL OPERATOR
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
CARPENTER
CARPENTERS -ZONE 2 (Eastern Massachusetts)
06/01/2017
$32.65
$7.60
$13.50
$0.00
$53.75
12/01/2017
$33.28
$7.60
$13.50
$0.00
$54.38
06/01/2018
$34.12
$7.60
$13.50
$0.00
$55.22
12/01/2018
$34.96
$7.60
$13.50
$0.00
$56.06
06/01/2019
$35.83
$7.60
$13.50
$0.00
$56.93
12/01/2019
$36.69
$7.60
$13.50
$0.00
$57.79
03/01/2017
$38.77
$9.90
$17.00
$0.00
$65.67
09/01/2017
$39.78
$9.90
$17.00
$0.00
$66.68
03/01/2018
$40.78
$9.90
$17.00
$0.00
$67.68
09/01/2018
$41.82
$9.90
$17.00
$0.00
$68.72
03/01/2019
$42.85
$9.90
$17.00
$0.00
$69.75
-------------------------------------------- ------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 4 of 35
Classification
Effective Date Base Wage
Health
Pension Supplemental
$0.00
$31.42
2 60
$23.87
Unemployment
Apprentice - CARPENTER -
Zone 2 Eastern MA
$35.40
3 70
$27.85
$9.90
Effective Date - 03/01/2017
$0.00
$49.86
4 75
$29.84
$9.90
$12.11
$0.00
$51.85
5 80
Supplemental
$9.90
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$19.39
$9.90
$1.63
$0.00
$30.92
2 60
$23.26
$9.90
$1.63
$0.00
$34.79
3 70
$27.14
$9.90
$12.11
$0.00
$49.15
4 75
$29.08
$9.90
$12.11
$0.00
$51.09
5 80
$31.02
$9.90
$13.74
$0.00
$54.66
6 80
$31.02
$9.90
$13.74
$0.00
$54.66
7 90
$34.89
$9.90
$15.37
$0.00
$60.16
8 90
$34.89
$9.90
$15.37
$0.00
$60.16
Effective Date - 09/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$19.89
$9.90
$1.63
$0.00
$31.42
2 60
$23.87
$9.90
$1.63
$0.00
$35.40
3 70
$27.85
$9.90
$12.11
$0.00
$49.86
4 75
$29.84
$9.90
$12.11
$0.00
$51.85
5 80
$31.82
$9.90
$13.74
$0.00
$55.46
6 80
$31.82
$9.90
$13.74
$0.00
$55.46
7 90
$35.80
$9.90
$15.37
$0.00
$61.07
8 90
$35.80
$9.90
$15.37
$0.00
$61.07
Notes:
Apprentice to Journeyworker Ratio:1:5
CEMENT MASONRY/PLASTERING
BRICKLAYERS LOCAL 3 (LYNN)
Total Rate
07/01/2017
$46.30
$12.20
$19.41
$1.30
$79.21
01/01/2018
$46.54
$12.20
$19.41
$1.30
$79.45
07/01/2018
$46.79
$12.20
$19.41
$1.30
$79.70
01/01/2019
$47.03
$12.20
$19.41
$1.30
$79.94
07/01/2019
$47.27
$12.20
$19.41
$1.30
$80.18
01/01/2020
$47.52
$12.20
$19.41
$1.30
$80.43
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 5 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- CEMENT MASONRY/PLASTERING -Eastern Mass (Lynn)
Effective Date - 07/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
50
$23.15
$12.20
$12.41
$0.00
$47.76
2
60
$27.78
$12.20
$14.41
$1.30
$55.69
3
65
$30.10
$12.20
$15.41
$1.30
$59.01
4
70
$32.41
$12.20
$16.41
$1.30
$62.32
5
75
$34.73
$12.20
$17.41
$1.30
$65.64
6
80
$37.04
$12.20
$18.41
$1.30
$68.95
7
90
$41.67
$12.20
$19.41
$1.30
$74.58
Effective
Date - 01/01/2018
$19.41
$1.30
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$23.27
$12.20
$12.41
$0.00
$47.88
2 60
$27.92
$12.20
$14.41
$1.30
$55.83
3 65
$30.25
$12.20
$15.41
$1.30
$59.16
4 70
$32.58
$12.20
$16.41
$1.30
$62.49
5 75
$34.91
$12.20
$17.41
$1.30
$65.82
6 80
$37.23
$12.20
$18.41
$1.30
$69.14
7 90
$41.89
$12.20
$19.41
$1.30
$74.80
Notes:
Steps 3,4 are 500 hrs. All other steps are 1,000 hrs.
Apprentice to Journeyworker Ratio:l:3
CHAIN SAW OPERATOR
06/01/2017
$32.65
$7.60
$13.50
$0.00
$53.75
LABORERS - ZONE 2
12/01/2017
$33.28
$7.60
$13.50
$0.00
$54.38
06/01/2018
$34.12
$7.60
$13.50
$0.00
$55.22
12/01/2018
$34.96
$7.60
$13.50
$0.00
$56.06
06/01/2019
$35.83
$7.60
$13.50
$0.00
$56.93
12/01/2019
$36.69
$7.60
$13.50
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES
06/01/2017
$47.38
$10.00
$15.25
$0.00
$72.63
OPERATING ENGINEERS LOCAL 4
12/01/2017
$48.38
$10.00
$15.25
$0.00
$73.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
COMPRESSOR OPERATOR 06/01/2017 $31.86 $10.00 $15.25 $0.00 $57.11
OPERATING ENGINEERS LOCAL 4
12/01/2017 $32.55 $10.00 $15.25 $0.00 $57.80
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DELEADER (BRIDGE) 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36
PAINTERS LOCAL 35 - ZONE 2
------------------------------------------------------------------------------------------------------I--------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 6 of 35
Classification Effective Date Base Wage Health Pension Supplemental
Unemployment
Apprentice - PAINTER Local 35 - BRIDGES/TANKS
$37.00
$7.60
$14.65
$0.00
Effective Date - 01/01/2017
12/01/2017
$37.85
$7.60
Supplemental
$0.00
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$25.71
$7.85
$0.00
$0.00
$33.56
2 55
$28.28
$7.85
$3.66
$0.00
$39.79
3 60
$30.85
$7.85
$3.99
$0.00
$42.69
4 65
$33.42
$7.85
$4.32
$0.00
$45.59
5 70
$35.99
$7.85
$14.11
$0.00
$57.95
6 75
$38.56
$7.85
$14.44
$0.00
$60.85
7 80
$41.13
$7.85
$14.77
$0.00
$63.75
8 90
$46.27
$7.85
$15.44
$0.00
$69.56
Notes:
Steps are 750 hrs.
i
1
Apprentice to Journeyworker Ratio -1
DEMO: ADZEMAN
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
DEMO: BACKHOE/LOADER/HATAMER OPERATOR
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
DEMO: BURNERS
LABORERS-ZONE2
For apprentice rates see "Apprentice- LABORER"
DEMO: CONCRETE CUTTER/SAWYER
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
Total Rate
06/01/2017
$37.00
$7.60
$14.65
$0.00
$59.25
12/01/2017
$37.85
$7.60
$14.65
$0.00
$60.10
06/01/2018
$38.80
$7.60
$14.65
$0.00
$61.05
12/01/2018
$39.75
$7.60
$14.65
$0.00
$62.00
06/01/2019
$40.75
$7.60
$14.65
$0.00
$63.00
12/01/2019
$41.75
$7.60
$14.65
$0.00
$64.00
06/01/2017
$38.00
$7.60
$14.65
$0.00
$60.25
12/01/2017
$38.85
$7.60
$14.65
$0.00
$61.10
06/01/2018
$39.80
$7.60
$14.65
$0.00
$62.05
12/01/2018
$40.75
$7.60
$14.65
$0.00
$63.00
06/01/2019
$41.75
$7.60
$14.65
$0.00
$64.00
12/01/2019
$42.75
$7.60
$14.65
$0.00
$65.00
06/01/2017
$37.75
$7.60
$14.65
$0.00
$60.00
12/01/2017
$38.60
$7.60
$14.65
$0.00
$60.85
06/01/2018
$39.55
$7.60
$14.65
$0.00
$61.80
12/01/2018
$40.50
$7.60
$14.65
$0.00
$62.75
06/01/2019
$41.50
$7.60
$14.65
$0.00
$63.75
12/01/2019
$42.50
$7.60
$14.65
$0.00
$64.75
06/01/2017
$38.00
$7.60
$14.65
$0.00
$60.25
12/01/2017
$38.85
$7.60
$14.65
$0.00
$61.10
06/01/2018
$39.80
$7.60
$14.65
$0.00
$62.05
12/01/2018
$40.75
$7.60
$14.65
$0.00
$63.00
06/01/2019
$41.75
$7.60
$14.65
$0.00
$64.00
12/01/2019
$42.75
$7.60
$14.65
$0.00
$65.00
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 7 of 35
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
DEMO: JACKHAMMER OPERATOR
06/01/2017
$37.75
$7.60
$14.65
$0.00
$60.00
LABORERS - ZONE 2
12/01/2017
$38.60
$7.60
$14.65
$0.00
$60.85
06/01/2018
$39.55
$7.60
$14.65
$0.00
$61.80
12/01/2018
$40.50
$7.60
$14.65
$0.00
$62.75
06/01/2019
$41.50
$7.60
$14.65
$0.00
$63.75
12/01/2019
$42.50
$7.60
$14.65
$0.00
$64.75
For apprentice rates see "Apprentice- LABORER"
DEMO: WRECKING LABORER
06/01/2017
$37.00
$7.60
$14.65
$0.00
$59.25
LABORERS - ZONE 2
12/01/2017
$37.85
$7.60
$14.65
$0.00
$60.10
06/01/2018
$38.80
$7.60
$14.65
$0.00
$61.05
12/01/2018
$39.75
$7.60
$14.65
$0.00
$62.00
06/01/2019
$40.75
$7.60
$14.65
$0.00
$63.00
12/01/2019
$41.75
$7.60
$14.65
$0.00
$64.00
For apprentice rates see "Apprentice- LABORER"
DIRECTIONAL DRILL MACHINE OPERATOR
06/01/2017
$45.93
$10.00
$15.25
$0.00
$71.18
OPERATING ENGINEERS LOCAL 4
12/01/2017
$46.92
$10.00
$15.25
$0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DIVER
08/01/2015
$58.86
$9.80
$19.23
$0.00
$87.89
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER TENDER
08/01/2015
$42.04
$9.80
$19.23
$0.00
$71.07
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER TENDER (EFFLUENT)
08/01/2015
$63.06
$9.80
$19.23
$0.00
$92.09
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER/SLURRY (EFFLUENT)
08/01/2015
$88.23
$9.80
$19.23
$0.00
$117.26
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
DRAWBRIDGE OPERATOR (Construction)
03/01/2017
$48.33
$13.00
$17.45
$0.00
$78.78
ELECTRICIANS LOCAL 103
09/01/2017
$49.28
$13.00
$17.48
$0.00
$79.76
03/01/2018
$50.48
$13.00
$17.51
$0.00
$80.99
09/01/2018
$51.67
$13.00
$17.55
$0.00
$82.22
03/01/2019
$52.87
$13.00
$17.59
$0.00
$83.46
For apprentice rates see "Apprentice- ELECTRICIAN'
ELECTRICIAN
03/01/2017
$48.33
$13.00
$17.45
$0.00
$78.78
ELECTRICIANS LOCAL 103
09/01/2017
$49.28
$13.00
$17.48
$0.00
$79.76
03/01/2018
$50.48
$13.00
$17.51
$0.00
$80.99
09/01/2018
$51.67
$13.00
$17.55
$0.00
$82.22
03/01/2019
$52.87
$13.00
$17.59
$0.00
$83.46
-------------------------------- ------------------------------------------------ - ----------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 8 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice- ELECTRICIAN- Local 103
Effective Date - 03/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$19.33
$13.00
$0.58
$0.00
$32.91
2
40
$19.33
$13.00
$0.58
$0.00
$32.91
3
45
$21.75
$13.00
$13.37
$0.00
$48.12
4
45
$21.75
$13.00
$13.37
$0.00
$48.12
5
50
$24.17
$13.00
$13.75
$0.00
$50.92
6
55
$26.58
$13.00
$14.11
$0.00
$53.69
7
60
$29.00
$13.00
$14.48
$0.00
$56.48
8
65
$31.41
$13.00
$14.85
$0.00
$59.26
9
70
$33.83
$13.00
$15.22
$0.00
$62.05
10
75
$36.25
$13.00
$15.60
$0.00
$64.85
Effective Date - 09/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$19.71
$13.00
$0.59
$0.00
$33.30
2
40
$19.71
$13.00
$0.59
$0.00
$33.30
3
45
$22.18
$13.00
$13.39
$0.00
$48.57
4
45
$22.18
$13.00
$13.39
$0.00
$48.57
5
50
$24.64
$13.00
$13.76
$0.00
$51.40
6
55
$27.10
$13.00
$14.12
$0.00
$54.22
7
60
$29.57
$13.00
$14.50
$0.00
$57.07
8
65
$32.03
$13.00
$14.87
$0.00
$59.90
9
70
$34.50
$13.00
$15.25
$0.00
$62.75
10
75
$36.96
$13.00
$15.62
$0.00
$65.58
Notes::
App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80
I
Apprentice to Journeyworker Ratio:2:3***
ELEVATOR CONSTRUCTOR
ELEVATOR CONSTRUCTORS LOCAL 4
01/01/2017 $55.86 $15.28 $15.71 $0.00 $86.85
......... ......... I -------- --------- ---------------------------------------- ----------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 9 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
UnemoloYment
Apprentice- ELEVATOR CONSTRUCTOR -Local 4
01/01/2017
$39.10
$15.28
$15.71
$0.00
Effective Date - 01/01/2017
ELEVATOR CONSTRUCTORS LOCAL 4
03/01/2017
$36.25
Supplemental
$15.60
Step percent Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$27.93
$15.28
$0.00
$0.00
$43.21
2 55
$30.72
$15.28
$15.71
$0.00
$61.71
3 65
$36.31
$15.28
$15.71
$0.00
$67.30
4 70
$39.10
$15.28
$15.71
$0.00
$70.09
5 80
$44.69
$15.28
$15.71
$0.00
$75.68
(Notes:
$55.22
------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number:
12/01/2018
$34.96
$7.60
Steps 1-2 are 6 mos.; Steps 3-5 are 1 year
$0.00
$56.06
06/01/2019
$35.83
Apprentice to Journeyworker Ratio:l:l.
$13.50
$0.00
$56.93
12/01/2019
ELEVATOR CONSTRUCTOR HELPER
01/01/2017
$39.10
$15.28
$15.71
$0.00
$70.09
ELEVATOR CONSTRUCTORS LOCAL 4
03/01/2017
$36.25
$13.00
$15.60
$0.00
$64.85
For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR"
09/01/2017
$36.96
$13.00
$15.62
$0.00
$65.58
FENCE & GUARD RAIL ERECTOR
06/01/2017
$32.65
$7.60
$13.50
$0.00
$53.75
LABORERS - ZONE 2
03/01/2018
$37.86
$13.00
$15.65
$0.00
$66.51
12/01/2017
$33.28
$7.60
$13.50
$0.00
$54.38
06/01/2018
$34.12
$7.60
$13.50
$0.00
$55.22
------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number:
12/01/2018
$34.96
$7.60
$13.50
$0.00
$56.06
06/01/2019
$35.83
$7.60
$13.50
$0.00
$56.93
12/01/2019
$36.69
$7.60
$13.50
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY
05/01/2017
$42.15
$10.00
$15.25
$0.00
$67.40
OPERATING ENGINEERS LOCAL 4
11/01/2017
$42.88
$10.00
$15.25
$0.00
$68.13
05/01/2018
$43.59
$10.00
$15.25
$0.00
$68.84
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
FIELD ENGYARTY CHIEF-BLDG,SITE,HVY/HWY
05/01/2017
$43.61
$10.00
$15.25
$0.00
$68.86
OPERATING ENGINEERS LOCAL 4
11/01/2017
$44.34
$10.00
$15.25
$0.00
$69.59
05/01/2018
$45.06
$10.00
$15.25
$0.00
$70.31
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY
05/01/2017
$22.41
$10.00
$15.25
$0.00
$47.66
OPERATING ENGINEERS LOCAL 4
11/01/2017
$22.83
$10.00
$15.25
$0.00
$48.08
05/01/2018
$23.26
$10.00
$15.25
$0.00
$48.51
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
FIRE ALARM INSTALLER
03/01/2017
$48.33
$13.00
$17.45
$0.00
$78.78
ELECTRICIANS LOCAL 103
09/01/2017
$49.28
$13.00
$17.48
$0.00
$79.76
03/01/2018
$50.48
$13.00
$17.51
$0.00
$80.99
09/01/2018
$51.67
$13.00
$17.55
$0.00
$82.22
03/01/2019
$52.87
$13.00
$17.59
$0.00
$83.46
For apprentice rates see "Apprentice- ELECTRICIAN'
FIRE ALARM REPAIR / MAINTENANCE
03/01/2017
$36.25
$13.00
$15.60
$0.00
$64.85
/ COMMISSIONINGELECTRICIANS
09/01/2017
$36.96
$13.00
$15.62
$0.00
$65.58
LOCAL 103
03/01/2018
$37.86
$13.00
$15.65
$0.00
$66.51
09/01/2018
$38.75
$13.00
$15.67
$0.00
$67.42
03/01/2019
$39.65
$13.00
$15.70
$0.00
$68.35
------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number:
20170731-033
--------------------
Page 10 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN'
FIREMAN (ASST. ENGINEER)
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
FLAGGER & SIGNALER
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
06/01/2017
12/01/2017
$38.49
$39.32
$10.00
$10.00
$15.25
$15.25
$0.00
$0.00
$63.74
$64.57
06/01/2017
$20.50
$7.60
$13.50
$0.00
$41.60
12/01/2017
$21.50
$7.60
$13.50
$0.00
$42.60
06/01/2018
$21.50
$7.60
$13.50
$0.00
$42.60
12/01/2018
$22.50
$7.60
$13.50
$0.00
$43.60
06/01/2019
$22.50
$7.60
$13.50
$0.00
$43.60
12/01/2019
$23.50
$7.60
$13.50
$0.00
$44.60
FLOORCOVERER 03/01/2016 $42.13 $9.80 $17.62 $0.00
FLOORCOVERERS LOCAL 2168 ZONE I
Apprentice- FLOORCOVERER -Local 2168 Zone I
Effective Date - 03/01/2016
Supplemental
Step percent Apprentice Base Wage Health Pension unemployment Total Rate
1 50
$21.07
$9.80
$1.79
$0.00
$32.66
2 55
$23.17
$9.80
$1.79
$0.00
$34.76
3 60
$25.28
$9.80
$12.25
$0.00
$47.33
4 65
$27.38
$9.80
$12.25
$0.00
$49.43
5 70
$29.49
$9.80
$14.04
$0.00
$53.33
6 75
$31.60
$9.80
$14.04
$0.00
$55.44
7 80
$33.70
$9.80
$15.83
$0.00
$59.33
8 85
$35.81
$9.80
$15.83
$0.00
$61.44
Notes:
Steps are 750 hrs.
Apprentice to Journeyworker Ratio:I:I
$69.55
FORK LIFT/CHERRY PICKER 06/01/2017 $46.38 $10.00 $15.25 $0.00 $71.63
OPERATING ENGINEERS LOCAL 4
12/01/2017 $47.38 $10.00 $15.25 $0.00 $72.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
GENERATOR/LIGHTING PLANT/HEATERS 06/01/2017 $31.86 $10.00 $15.25 $0.00 $57.11
OPERATING ENGINEERS LOCAL 4
12/01/2017 $32.55 $10.00 $15.25 $0.00 $57.80
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR
SYSTEMS)
GLAZIERS LOCAL 35 (ZONE 2)
01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 11 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - GLAZIER - Local 35 Zone 2
Effective Date - 01/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$20.46
$7.85
$0.00
$0.00
$28.31
2 55
$22.50
$7.85
$3.66
$0.00
$34.01
3 60
$24.55
$7.85
$3.99
$0.00
$36.39
4 65
$26.59
$7.85
$4.32
$0.00
$38.76
5 70
$28.64
$7.85
$14.11
$0.00
$50.60
6 75
$30.68
$7.85
$14.44
$0.00
$52.97
7 80
$32.73
$7.85
$14.77
$0.00
$55.35
8 90
$36.82
$7.85
$15.44
$0.00
$60.11
(Notes:
Steps are 750 hrs.
I
Apprentice to Journeyworker Ratio:1:1
HOISTING ENGINEER/CRANES/GRADALLS
OPERATING ENGINEERS LOCAL 4
06/01/2017 $46.38 $10.00 $15.25 $0.00 $71.63
12/01/2017 $47.38 $10.00 $15.25 $0.00 $72.63
---------------------------------------- -----------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 12 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice- OPERATING ENGINEERS -Local 4
Effective Date - 06/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 55
$25.51
$10.00
$0.00
$0.00
$35.51
2 60
$27.83
$10.00
$15.25
$0.00
$53.08
3 65
$30.15
$10.00
$15.25
$0.00
$55.40
4 70
$32.47
$10.00
$15.25
$0.00
$57.72
5 75
$34.79
$10.00
$15.25
$0.00
$60.04
6 80
$37.10
$10.00
$15.25
$0.00
$62.35
7 85
$39.42
$10.00
$15.25
$0.00
$64.67
8 90
$41.74
$10.00
$15.25
$0.00
$66.99
Effective Date - 12/01/2017
Supplemental
Step percent Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 55
$26.06
$10.00
$0.00
$0.00
$36.06
2 60
$28.43
$10.00
$15.25
$0.00
$53.68
3 65
$30.80
$10.00
$15.25
$0.00
$56.05
4 70
$33.17
$10.00
$15.25
$0.00
$58.42
5 75
$35.54
$10.00
$15.25
$0.00
$60.79
6 80
$37.90
$10.00
$15.25
$0.00
$63.15
7 S5
$40.27
$10.00
$15.25
$0.00
$65.52
8 90
$42.64
$10.00
$15.25
$0.00
$67.89
Notes:
Apprentice to Journeyworker Ratio:1:6
HVAC (DUCTWORK)
02/01/2017
$43.72
$11.45
$23.07
$2.35
$80.59
SHEETMETAL WORKERS LOCAL 17 -A
08/01/2017
$43.83
$11.45
$24.03
$2.38
$81.69
02/01/2018
$44.98
$11.45
$24.03
$2.38
$82.84
For apprentice rates see "Apprentice- SHEET METAL WORKER"
HVAC (ELECTRICAL CONTROLS)
03/01/2017
$48.33
$13.00
$17.45
$0.00
$78.78
ELECTRICIANS LOCAL 103
09/01/2017
$49.28
$13.00
$17.48
$0.00
$79.76
03/01/2018
$50.48
$13.00
$17.51
$0.00
$80.99
09/01/2018
$51.67
$13.00
$17.55
$0.00
$82.22
03/01/2019
$52.87
$13.00
$17.59
$0.00
$83.46
For apprentice rates see "Apprentice- ELECTRICIAN"
HVAC (TESTING AND BALANCING - AIR)
02/01/2017
$43.72
$11.45
$23.07
$2.35
$80.59
SHEETMETAL WORKERS LOCAL 17 -A
08/01/2017
$43.83
$11.45
$24.03
$2.38
$81.69
02/01/2018
$44.98
$11.45
$24.03
$2.38
$82.84
For apprentice rates see "Apprentice- SHEET METAL WORKER"
HVAC (TESTING AND BALANCING -WATER)
03/01/2017
$48.86
$9.70
$16.14
$0.00
$74.70
PIPEFITTERS LOCAL 537 (Local 138)
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
HVAC MECHANIC
03/01/2017
$48.86
$9.70
$16.14
$0.00
$74.70
PIPEFITTERS LOCAL 537 (Local 138)
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number:
20170731-033
Page 13 of 35
Classification
Effective Date Base Wage Health
Pension
Supplemental
Total Rate
$45.75
2 60
$28.25
$11.75
$11.20
Unemployment
$51.20
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
$32.96
$11.75
$11.95
$0.00
$56.66
4 80
HYDRAULIC DRILLS
06/01/2017
$33.15
$7.60
$13.50
$0.00
$54.25
LABORERS - ZONE 2
Steps are 1 year
12/01/2017
$33.78
$7.60
$13.50
$0.00
$54.88
06/01/2018
$34.62
$7.60
$13.50
$0.00
$55.72
12/01/2018
$35.46
$7.60
$13.50
$0.00
$56.56
IRONWORKERS LOCAL 7 (LAWRENCE AREA)
06/01/2019
$36.33
$7.60
$13.50
$0.00
$57.43
12/01/2019
$37.19
$7.60
$13.50
$0.00
$58.29
For apprentice rates see "Apprentice- LABORER"
INSULATOR (PIPES & TANKS)
09/01/2016
$45.09
$11.75
$14.20
$0.00
$71.04
HEAT & FROST INSULATORS LOCAL 6 (BOSTON)
09/01/2017
$47.09
$11.75
$14.20
$0.00
$73.04
09/01/2018
$49.34
$11.75
$14.20
$0.00
$75.29
09/01/2019
$51.84
$11.75
$14.20
$0.00
$77.79
Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston
Effective Date - 09/01/2016
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$22.55
$11.75
$10.45
$0.00
$44.75
2 60
$27.05
$11.75
$11.20
$0.00
$50.00
3 70
$31.56
$11.75
$11.95
$0.00
$55.26
4 80
$36.07
$11.75
$12.70
$0.00
$60.52
Effective Date - 09/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$23.55
$11.75
$10.45
$0.00
$45.75
2 60
$28.25
$11.75
$11.20
$0.00
$51.20
3 70
$32.96
$11.75
$11.95
$0.00
$56.66
4 80
$37.67
$11.75
$12.70
$0.00
$62.12
(Notes:
Steps are 1 year
Apprentice to Journeyworker Ratio:l:4
IRONWORKER/WELDER
03/16/2017
$40.24
$7.80
$20.85
$0.00 $68.89
IRONWORKERS LOCAL 7 (LAWRENCE AREA)
------------- -------------------------------------------------------- ----------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 14 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- IRONWORKER -Local 7 Lawrence
Effective Date - 03/16/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$24.14
$7.80
$20.85
$0.00
$52.79
2 70
$28.17
$7.80
$20.85
$0.00
$56.82
3 75
$30.18
$7.80
$20.85
$0.00
$58.83
4 80
$32.19
$7.80
$20.85
$0.00
$60.84
5 85
$34.20
$7.80
$20.85
$0.00
$62.85
6 90
$36.22
$7.80
$20.85
$0.00
$64.87
Notes:
I Structural 1:6; Ornamental 1:4
I
Apprentice to Journeyworker Ratio:
JACKHAMMER & PAVING BREAKER OPERATOR
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
LABORER
LABORERS - ZONE 2
06/01/2017
$32.65
$7.60
$13.50
$0.00
$53.75
12/01/2017
$33.28
$7.60
$13.50
$0.00
$54.38
06/01/2018
$34.12
$7.60
$13.50
$0.00
$55.22
12/01/2018
$34.96
$7.60
$13.50
$0.00
$56.06
06/01/2019
$35.83
$7.60
$13.50
$0.00
$56.93
12/01/2019
$36.69
$7.60
$13.50
$0.00
$57.79
06/01/2017
$32.40
$7.60
$13.50
$0.00
$53.50
12/01/2017
$33.03
$7.60
$13.50
$0.00
$54.13
06/01/2018
$33.87
$7.60
$13.50
$0.00
$54.97
12/01/2018
$34.71
$7.60
$13.50
$0.00
$55.81
06/01/2019
$35.58
$7.60
$13.50
$0.00
$56.68
12/01/2019
$36.44
$7.60
$13.50
$0.00
$57.54
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 15 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - LABORER - Zone 2
Effective Date - 06/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$19.44
$7.60
$13.50
$0.00
$40.54
2 70
$22.68
$7.60
$13.50
$0.00
$43.78
3 80
$25.92
$7.60
$13.50
$0.00
$47.02
4 90
$29.16
$7.60
$13.50
$0.00
$50.26
Effective Date - 12/01/2017
$0.00
$7.60
$50.83
Supplemental
$56.68
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$19.82
$7.60
$13.50
$0.00
$53.50
$40.92
2 70
$23.12
$7.60
$13.50
$0.00
06/01/2018
$44.22
3 80
$26.42
$7.60
$13.50
$0.00
$34.71
$47.52
4 90
$29.73
$7.60
$13.50
$0.00
$7.60
$50.83
Notes:
$56.68
12/01/2019
$36.44
$7.60
$13.50
'
Apprentice to Journeyworker Ratio:1:5
06/01/2017
$32.60
$7.60
$13.45
$0.00
$53.65
LABORER: CARPENTER TENDER
06/01/2017
$32.40
$7.60
$13.50
$0.00
06/01/2018
LABORERS-ZONE2
12/01/2017
$33.03
$7.60
$13.50
$0.00
$34.91
$7.60
06/01/2018
$33.87
$7.60
$13.50
$0.00
$7.60
$13.45
12/01/2018
$34.71
$7.60
$13.50
$0.00
$13.45
$0.00
06/01/2019
$35.58
$7.60
$13.50
$0.00
12/01/2019
$36.44
$7.60
$13.50
$0.00
For apprentice rates see "Apprentice- LABORER"
LABORER: CEMENT FINISHER TENDER
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER
LAB ORERS-ZONE 2
For apprentice rates see "Apprentice- LABORER"
$53.50
$54.13
$54.97
$55.81
$56.68
$57.54
06/01/2017
$32.40
$7.60
$13.50
$0.00
$53.50
12/01/2017
$33.03
$7.60
$13.50
$0.00
$54.13
06/01/2018
$33.87
$7.60
$13.50
$0.00
$54.97
12/01/2018
$34.71
$7.60
$13.50
$0.00
$55.81
06/01/2019
$35.58
$7.60
$13.50
$0.00
$56.68
12/01/2019
$36.44
$7.60
$13.50
$0.00
$57.54
06/01/2017
$32.60
$7.60
$13.45
$0.00
$53.65
12/01/2017
$33.23
$7.60
$13.45
$0.00
$54.28
06/01/2018
$34.07
$7.60
$13.45
$0.00
$55.12
12/01/2018
$34.91
$7.60
$13.45
$0.00
$55.96
06/01/2019
$35.78
$7.60
$13.45
$0.00
$56.83
12/01/2019
$36.64
$7.60
$13.45
$0.00
$57.69
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 16 of 35
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
LABORER: MASON TENDER 06/01/2017
$32.65
$7.60
$13.50
$0.00
$53.75
LABORERS - ZONE 2
Apprentice Base Wage
Health
12/01/2017
$33.03
$7.60
12/01/2017
$33.28
$7.60
$13.50
$0.00
$54.38
06/01/2018
$34.12
$7.60
$13.50
$0.00
$55.22
12/01/2018
$34.96
$7.60
$13.50
$0.00
$56.06
06/01/2019
$35.83
$7.60
$13.50
$0.00
$56.93
12/01/2019
$36.69
$7.60
$13.50
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
LABORER: MULTI -TRADE TENDER
06/01/2017
$32.40
$7.60
$13.50
$0.00
$53.50
LABORERS - ZONE 2
Supplemental
Step percent
Apprentice Base Wage
Health
12/01/2017
$33.03
$7.60
$13.50
$0.00
$54.13
$17.67
06/01/2018
$33.87
$7.60
$13.50
$0.00
$54.97
$0.00
12/01/2018
$34.71
$7.60
$13.50
$0.00
$55.81
$55.57
06/01/2019
$35.58
$7.60
$13.50
$0.00
$56.68
5 90
12/01/2019
$36.44
$7.60
$13.50
$0.00
$57.54
For apprentice rates see "Apprentice- LABORER"
LABORER: TREE REMOVER
06/01/2017
$32.40
$7.60
$13.50
$0.00
$53.50
LABORERS - ZONE 2
MARBLE MASONS,TILELAYERS & TERRAZZO MECH
02/01/2017
$50.80
$10.75
$19.22
12/01/2017
$33.03
$7.60
$13.50
$0.00
$54.13
06/01/2018
$33.87
$7.60
$13.50
$0.00
$54.97
12/01/2018
$34.71
$7.60
$13.50
$0.00
$55.81
06/01/2019
$35.58
$7.60
$13.50
$0.00
$56.68
12/01/2019
$36.44
$7.60
$13.50
$0.00
$57.54
This classification applies to all tree work associated with the removal of standing trees, and trimming and removal
of branches and limbs when the work is not
done for
a utility company for the purpose of operation, maintenance or repair of utility company equipment. For apprentice rates see "Apprentice- LABORER"
LASER BEAM OPERATOR
06/01/2017
$32.65
$7.60
$13.50
$0.00
$53.75
LABORERS - ZONE 2
12/01/2017
$33.28
$7.60
$13.50
$0.00
$54.38
06/01/2018
$34.12
$7.60
$13.50
$0.00
$55.22
12/01/2018
$34.96
$7.60
$13.50
$0.00
$56.06
06/01/2019
$35.83
$7.60
$13.50
$0.00
$56.93
12/01/2019
$36.69
$7.60
$13.50
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
MARBLE & TILE FINISHERS
02/01/2017
$38.78
$10.75
$17.67
$0.00
$67.20
BRICKLAYERS LOCAL 3 - MARBLE & TILE
Apprentice - MARBLE & TILE FINISHER
- Local 3 Marble & Tile
Effective Date - 02/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$19.39
$10.75
$17.67
$0.00
$47.81
2 60
$23.27
$10.75
$17.67
$0.00
$51.69
3 70
$27.15
$10.75
$17.67
$0.00
$55.57
4 80
$31.02
$10.75
$17.67
$0.00
$59.44
5 90
$34.90
$10.75
$17.67
$0.00
$63.32
Notes:
Apprentice to Journeyworker Ratio: 1:3
MARBLE MASONS,TILELAYERS & TERRAZZO MECH
02/01/2017
$50.80
$10.75
$19.22
$0.00 $80.77
BRICKLAYERS LOCAL 3 - MARBLE & TILE
----------------------- -----------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033
---------
--------------------------
- ----
Page 17 of 35
Classification Effective Date Base Wage Health Pension Supplemental
Unemplovment
Apprentice - MARBLE -TILE -TERRAZZO MECHANIC - Local 3 Marble & Tile
$35.47
$9.90
$18.50
Effective Date - 02/01/2017
$63.87
10/01/2017
$36.32
Supplemental
$18.50
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$25.40
$10.75
$19.22
$0.00
$55.37
2 60
$30.48
$10.75
$19.22
$0.00
$60.45
3 70
$35.56
$10.75
$19.22
$0.00
$65.53
4 80
$40.64
$10.75
$19.22
$0.00
$70.61
5 90
$45.72
$10.75
$19.22
$0.00
$75.69
f� Notes:
Apprentice to Journeyworker Ratio: 1:5
MECH. SWEEPER OPERATOR (ON CONST. SITES)
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
MECHANICS MAINTENANCE
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
MILLWRIGHT (Zone 2)
MILLWRIGHTS LOCAL 1121 -Zone 2
Total Rate
06/01/2017 $45.93 $10.00 $15.25 $0.00 $71.18
12/01/2017 $46.92 $10.00 $15.25 $0.00 $72.17
06/01/2017 $45.93 $10.00 $15.25 $0.00 $71.18
12/01/2017 $46.92 $10.00 $15.25 $0.00 $72.17
04/01/2017
$35.47
$9.90
$18.50
$0.00
$63.87
10/01/2017
$36.32
$9.90
$18.50
$0.00
$64.72
04/01/2018
$37.17
$9.90
$18.50
$0.00
$65.57
10/01/2018
$38.02
$9.90
$18.50
$0.00
$66.42
04/01/2019
$38.87
$9.90
$18.50
$0.00
$67.27
Apprentice- MILLWRIGHT- Local 1121 Zone 2
$19.98
$9.90
$5.31
$0.00
Effective Date - 04/01/2017
2 65
$23.61
$9.90
Supplemental
$0.00
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 55
$19.51
$9.90
$5.31
$0.00
$34.72
2 65
$23.06
$9.90
$15.13
$0.00
$48.09
3 75
$26.60
$9.90
$16.10
$0.00
$52.60
4 85
$30.15
$9.90
$17.06
$0.00
$57.11
Effective Date - 10/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 55
$19.98
$9.90
$5.31
$0.00
$35.19
2 65
$23.61
$9.90
$15.13
$0.00
$48.64
3 75
$27.24
$9.90
$16.10
$0.00
$53.24
4 85
$30.87
$9.90
$15.06
$0.00
$55.83
Notes:
Steps are 2,000 hours
I
Apprentice to Journeyworker Ratio:1:5
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 18 of 35
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
OPERATING ENGINEERS LOCAL 4
Supplemental
Step percent
Unemployment
Health
MORTAR MIXER
06/01/2017
$32.65
$7.60
$13.50
$0.00
$53.75
LABORERS - ZONE 2
12/01/2017
$33.28
$7.60
$13.50
$0.00
$54.38
OILER (TRUCK CRANES, GRADALLS)
06/01/2018
$34.12
$7.60
$13.50
$0.00
$55.22
OPERATING ENGINEERS LOCAL 4
12/01/2018
$34.96
$7.60
$13.50
$0.00
$56.06
$35.99
06/01/2019
$35.83
$7.60
$13.50
$0.00
$56.93
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
12/01/2019
$36.69
$7.60
$13.50
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
06/01/2017
$45.93
$10.00
$15.25
$0.00
$71.18
OILER (OTHER THAN TRUCK CRANES,GRADALLS)
06/01/2017
$23.47
$10.00
$15.25
$0.00
$48.72
OPERATING ENGINEERS LOCAL 4
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
12/01/2017
$23.99
$10.00
$15.25
$0.00
$49.24
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
$33.56
2 55
$28.28
$7.85
$3.66
$0.00
OILER (TRUCK CRANES, GRADALLS)
06/01/2017
$27.54
$10.00
$15.25
$0.00
$52.79
OPERATING ENGINEERS LOCAL 4
$33.42
$7.85
$4.32
$0.00
$45.59
5 70
$35.99
12/01/2017
$28.15
$10.00
$15.25
$0.00
$53.40
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
$14.44
$0.00
$60.85
7 80
$41.13
$7.85
OTHER POWER DRIVEN EQUIPMENT - CLASS II
06/01/2017
$45.93
$10.00
$15.25
$0.00
$71.18
OPERATING ENGINEERS LOCAL 4
12/01/2017
$46.92
$10.00
$15.25
$0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
Steps are 750 hrs.
PAINTER (BRIDGES/TANKS)
01/01/2017
$51.41
$7.85
$16.10
$0.00
$75.36
PAINTERS LOCAL 35 - ZONE 2
Apprentice - PAINTER Local 35 - BRIDGES/TANKS
Effective Date - 01/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$25.71
$7.85
$0.00
$0.00
$33.56
2 55
$28.28
$7.85
$3.66
$0.00
$39.79
3 60
$30.85
$7.85
$3.99
$0.00
$42.69
4 65
$33.42
$7.85
$4.32
$0.00
$45.59
5 70
$35.99
$7.85
$14.11
$0.00
$57.95
6 75
$38.56
$7.85
$14.44
$0.00
$60.85
7 80
$41.13
$7.85
$14.77
$0.00
$63.75
8 90
$46.27
$7.85
$15.44
$0.00
$69.56
INotes:
Steps are 750 hrs.
Apprentice to Journeyworker Ratio: 1:1
PAINTER (SPRAY OR SANDBLAST, NEW) * 01/01/2017 $42.31 $7.85 $16.10 $0.00 $66.26
* If 30% or more of surfaces to be painted are new construction,
NEW paint rate shall be used.PAINTERS LOCAL 35 - ZONE 2
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 19 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - New
Effective Date - 01/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$21.16
$7.85
$0.00
$0.00
$29.01
2 55
$23.27
$7.85
$3.66
$0.00
$34.78
3 60
$25.39
$7.85
$3.99
$0.00
$37.23
4 65
$27.50
$7.85
$4.32
$0.00
$39.67
5 70
$29.62
$7.85
$14.11
$0.00
$51.58
6 75
$31.73
$7.85
$14.44
$0.00
$54.02
7 80
$33.85
$7.85
$14.77
$0.00
$56.47
8 90
$38.08
$7.85
$15.44
$0.00
$61.37
- - _..,.- _ - - - - - - ----
(Notes:
- - - -
- - -
-- --
_ - __....
- --I
i
Steps are 750 hrs.
5 70
$28.26
$7.85
$14.11
$0.00
$50.22
6 75
$30.28
$7.85
$14.44
$0.00
$52.57
7 80
Apprentice to Journeyworker Ratio: 1:1
$7.85
$14.77
$0.00
$54.92
PAINTER (SPRAY OR SANDBLAST, REPAINT)
01/01/2017
$40.37
$7.85
$16.10 $0.00
$64.32
PAINTERS LOCAL 35 - ZONE 2
$59.62
Notes:
Apprentice - PAINTER Local 35 Zone 2
- Spray/Sandblast - Repaint
Effective Date - 01/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$20.19
$7.85
$0.00
$0.00
$28.04
2 55
$22.20
$7.85
$3.66
$0.00
$33.71
3 60
$24.22
$7.85
$3.99
$0.00
$36.06
4 65
$26.24
$7.85
$4.32
$0.00
$38.41
5 70
$28.26
$7.85
$14.11
$0.00
$50.22
6 75
$30.28
$7.85
$14.44
$0.00
$52.57
7 80
$32.30
$7.85
$14.77
$0.00
$54.92
8 90
$36.33
$7.85
$15.44
$0.00
$59.62
Notes:
ISteps are 750 hrs.
Apprentice to Journeyworker Ratio: 1:1
PAINTER (TRAFFIC MARKINGS)
06/01/2017
$32.40
$7.60
$13.50
$0.00
$53.50
LABORERS - ZONE 2
12/01/2017
$33.03
$7.60
$13.50
$0.00
$54.1.3
06/01/2018
$33.87
$7.60
$13.50
$0.00
$54.97
12/01/2018
$34.71
$7.60
$13.50
$0.00
$55.81
06/01/2019
$35.58
$7.60
$13.50
$0.00
$56.68
12/01/2019
$36.44
$7.60
$13.50
$0.00
$57.54
For Apprentice rates see "Apprentice- LABORER"
PAINTER / TAPER (BRUSH, NEW) *
01/01/2017
$40.91
$7.85
$16.10
$0.00
$64.86
* If 30% or more of surfaces to be painted are new construction,
NEW paint rate shall be used.PAINTERS LOCAL 35 - ZONE 2
-------------I-------------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033
Page 20 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW
Effective Date - 01/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$20.46
$7.85
$0.00
$0.00
$28.31
2 55
$22.50
$7.85
$3.66
$0.00
$34.01
3 60
$24.55
$7.85
$3.99
$0.00
$36.39
4 65
$26.59
$7.85
$4.32
$0.00
$38.76
5 70
$28.64
$7.85
$14.11
$0.00
$50.60
6 75
$30.68
$7.85
$14.44
$0.00
$52.97
7 80
$32.73
$7.85
$14.77
$0.00
$55.35
8 90
$36.82
$7.85
$15.44
$0.00
$60.11
INotes:
I
Steps are 750 hrs.
I
Apprentice to Journeyworker Ratio:1:1
PAINTER / TAPER (BRUSH, REPAINT)
01/01/2017
$38.97
$7.85
$16.10 $0.00
$62.92
PAINTERS LOCAL 35 - ZONE 2
12/01/2012
$30.28
$9.07
$8.00 $0.00
$47.35
Apprentice- PAINTER Local 35 Zone 2 - BRUSH REPAINT
Effective Date - 01/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$19.49
$7.85
$0.00
$0.00
$27.34
2 55
$21.43
$7.85
$3.66
$0.00
$32.94
3 60
$23.38
$7.85
$3.99
$0.00
$35.22
4 65
$25.33
$7.85
$4.32
$0.00
$37.50
5 70
$27.28
$7.85
$14.11
$0.00
$49.24
6 75
$29.23
$7.85
$14.44
$0.00
$51.52
7 80
$31.18
$7.85
$14.77
$0.00
$53.80
8 90
$35.07
$7.85
$15.44
$0.00
$58.36
'Notes:
I
Steps are 750 hrs.
I
Apprentice to Journeyworker Ratio:1:1
PANEL & PICKUP TRUCKS DRIVER
12/01/2012
$30.28
$9.07
$8.00 $0.00
$47.35
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2015 $42.04 $9.80 $19.23 $0.00 $71.07
DECK)
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
PILE DRIVER
PILEDRIVER LOCAL 56 (ZONE 1)
08/01/2015 $42.04 $9.80 $19.23 $0.00 $71.07
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 21 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- PILEDRIVER -Local 56 Zone I
Effective Date - 08/01/2015
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$21.02
$9.80
$19.23
$0.00
$50.05
2 60
$25.22
$9.80
$19.23
$0.00
$54.25
3 70
$29.43
$9.80
$19.23
$0.00
$58.46
4 75
$31.53
$9.80
$19.23
$0.00
$60.56
5 80
$33.63
$9.80
$19.23
$0.00
$62.66
6 80
$33.63
$9.80
$19.23
$0.00
$62.66
7 90
$37.84
$9.80
$19.23
$0.00
$66.87
8 90
$37.84
$9.80
$19.23
$0.00
$66.87
Notes:
'
Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max)
I
Apprentice to Journeyworker Ratio: 1:3
Apprentice to Journeyworker Ratio:**
PIPEFITTER & STEAMFITTER 03/01/2017 $48.86 $9.70 $16.14 $0.00
PIPEFITTERS LOCAL 537 (Local 138)
Apprentice- PIPEFITTER Local 537 (Local 138)
Effective Date - 03/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$19.54
$9.70
$5.50
$0.00
$34.74
2
45
$21.99
$9.70
$16.14
$0.00
$47.83
3
60
$29.32
$9.70
$16.14
$0.00
$55.16
4
70
$34.20
$9.70
$16.14
$0.00
$60.04
5
80
$39.09
$9.70
$16.14
$0.00
$64.93
(Notes:
I
** 1:3; 3:15; 1:10 thereafter / Steps are 1 yr.
'
Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max)
I
Apprentice to Journeyworker Ratio:**
PIPELAYER
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
PLUMBER
PLUMBERS & GASFITTERS LOCAL 12 (Local 138)
$74.70
06/01/2017
$32.65
$7.60
$13.50
$0.00
$53.75
12/01/2017
$33.28
$7.60
$13.50
$0.00
$54.38
06/01/2018
$34.12
$7.60
$13.50
$0.00
$55.22
12/01/2018
$34.96
$7.60
$13.50
$0.00
$56.06
06/01/2019
$35.83
$7.60
$13.50
$0.00
$56.93
12/01/2019
$36.69
$7.60
$13.50
$0.00
$57.79
03/01/2017 $48.61 $11.32 $15.46 $0.00 $75.39
-------------------------------------------------- --------------------------------------------------------- - -------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 22 of 35
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice- PLUAMERIGASF17TER -Local
12 (Local 138)
Effective Date - 03/01/2017
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 35
$17.01
$11.32
$5.74
$0.00
$34.07
2 40
$19.44
$11.32
$6.49
$0.00
$37.25
3 55
$26.74
$11.32
$8.73
$0.00
$46.79
4 65
$31.60
$11.32
$10.23
$0.00
$53.15
5 75
$36.46
$11.32
$11.72
$0.00
$59.50
Notes:
Steps are 1 yr
Step 4 with lic$55.65 Step5 with lic$61.89
Apprentice to Journeyworker Ratio:1 5
PNEUMATIC CONTROLS (TEMP.)
03/01/2017
$48.86
$9.70
$16.14
$0.00
$74.70
PIPEFITTERS LOCAL 537 (Local 138)
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
PNEUMATIC DRILL/TOOL OPERATOR
06/01/2017
$32.65
$7.60
$13.50
$0.00
$53.75
LABORERS - ZONE 2
12/01/2017
$33.28
$7.60
$13.50
$0.00
$54.38
06/01/2018
$34.12
$7.60
$13.50
$0.00
$55.22
12/01/2018
$34.96
$7.60
$13.50
$0.00
$56.06
06/01/2019
$35.83
$7.60
$13.50
$0.00
$56.93
12/01/2019
$36.69
$7.60
$13.50
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
POWDERMAN & BLASTER
06/01/2017
$33.40
$7.60
$13.50
$0.00
$54.50
LABORERS -ZONE2
12/01/2017
$34.03
$7.60
$13.50
$0.00
$55.13
06/01/2018
$34.87
$7.60
$13.50
$0.00
$55.97
12/01/2018
$35.71
$7.60
$13.50
$0.00
$56.81
06/01/2019
$36.58
$7.60
$13.50
$0.00
$57.68
12/01/2019
$37.44
$7.60
$13.50
$0.00
$58.54
For apprentice rates see "Apprentice- LABORER"
POWER SHOVEL/DERRICK/TRENCHING MACHINE
06/01/2017
$46.38
$10.00
$15.25
$0.00
$71.63
OPERATING ENGINEERS LOCAL 4
12/01/2017
$47.38
$10.00
$15.25
$0.00
$72.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
PUMP OPERATOR (CONCRETE)
06/01/2017
$46.38
$10.00
$15.25
$0.00
$71.63
OPERATING ENGINEERS LOCAL 4
12/01/2017
$47.38
$10.00
$15.25
$0.00
$72.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
PUMP OPERATOR (DEWATERING, OTHER)
06/01/2017
$31.86
$10.00
$15.25
$0.00
$57.11
OPERATING ENGINEERS LOCAL 4
12/01/2017
$32.55
$10.00
$15.25
$0.00
$57.80
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
READY -MIX CONCRETE DRIVER
05/01/2017
$24.21
$8.49
$11.54
$0.00
$44.24
TEAMSTERS LOCAL 42
04/30/2018
$24.21
$8.49
$11.96
$0.00
$44.66
05/01/2018
$24.24
$8.49
$12.46
$0.00
$45.19
04/30/2019
$24.24
$8.49
$12.92
$0.00
$45.65
RECLAIMERS
06/01/2017
$45.93
$10.00
$15.25
$0.00
$71.18
OPERATING ENGINEERS LOCAL 4
12/01/2017
$46.92
$10.00
$15.25
$0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033
Page 23 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
RESIDENTIAL WOOD FRAME (All Other Work) 06/01/2016 $25.32 $9.80 $16.82 $0.00 $51.94
CARPENTERS -ZONE 2 (Residential Wood)
RESIDENTIAL WOOD FRAME CARPENTER **
04/01/2017
$26.31
$7.07
$7.18
$0.00
$40.56
** The Residential Wood Frame Carpenter classification applies
10/01/2017
$26.93
$7.07
$7.18
$0.00
$41.18
only to the construction of new, wood frame residences that do
$7.18
$0.00
$31.35
4 70
$18.42
$7.07
not exceed four stories including the basement. CARPENTERS-zONE
04/01/2018
$27.35
$7.07
$7.18
$0.00
$41.60
2 (Residential Wood)
10/01/2018
$27.77
$7.07
$7.18
$0.00
$42.02
$35.30
04/01/2019
$28.20
$7.07
$7.18
$0.00
$42.45
8 90
10/01/2019
$28.63
$7.07
$7.18
$0.00
$42.88
As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER
rate.
Apprentice- CARPENTER (Residential Wood Frame) -Zone 2
Effective Date - 04/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$15.79
$7.07
$0.00
$0.00
$22.86
2 60
$15.79
$7.07
$0.00
$0.00
$22.86
3 65
$17.10
$7.07
$7.18
$0.00
$31.35
4 70
$18.42
$7.07
$7.18
$0.00
$32.67
5 75
$19.73
$7.07
$7.18
$0.00
$33.98
6 80
$21.05
$7.07
$7.18
$0.00
$35.30
7 85
$22.36
$7.07
$7.18
$0.00
$36.61
8 90
$23.68
$7.07
$7.18
$0.00
$37.93
Effective Date - 10/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$16.16
$7.07
$0.00
$0.00
$23.23
2 60
$16.16
$7.07
$0.00
$0.00
$23.23
3 65
$17.50
$7.07
$7.18
$0.00
$31.75
4 70
$18.85
$7.07
$7.18
$0.00
$33.10
5 75
$20.20
$7.07
$7.18
$0.00
$34.45
6 80
$21.54
$7.07
$7.18
$0.00
$35.79
7 85
$22.89
$7.07
$7.18
$0.00
$37.14
8 90
$24.24
$7.07
$7.18
$0.00
$38.49
Notes:
I
Apprentice to Journeyworker Ratio: 1:5
RIDE -ON MOTORIZED BUGGY OPERATOR
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
ROLLER/SPREADER/MULCHING MACHINE
OPERATING ENGINEERS LOCAL 4
06/01/2017
$32.65
$7.60
$13.50
$0.00
$53.75
12/01/2017
$33.28
$7.60
$13.50
$0.00
$54.38
06/01/2018
$34.12
$7.60
$13.50
$0.00
$55.22
12/01/2018
$34.96
$7.60
$13.50
$0.00
$56.06
06/01/2019
$35.83
$7.60
$13.50
$0.00
$56.93
12/01/2019
$36.69
$7.60
$13.50
$0.00
$57.79
06/01/2017 $45.93 $10.00 $15.25 $0.00 $71.18
12/01/2017 $46.92 $10.00 $15.25 $0.00 $72.17
--------------------------------- -----------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 24 of 35
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$24.82
$11.10
$13.80
$0.00
$49.72
Unemployment
$26.88
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
$13.80
$0.00
$51.78
4 75
$31.02
$11.10
ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg)
02/01/2017
$41.36
$11.10
$13.80
$0.00
$66.26
ROOFERSLOCAL 33
$60.06
Effective Date - 08/01/2017
$11.20
$14.80
$0.00
Supplemental
08/01/2017
$41.36
$11.20
$14.80
$0.00
$67.36
$20.68
02/01/2018
$42.51
$11.20
$14.80
$0.00
$68.51
$11.20
08/01/2018
$43.61
$11.20
$14.80
$0.00
$69.61
$14.80
02/01/2019
$44.76
$11.20
$14.80
$0.00
$70.76
Apprentice - ROOFER - Local 33
Effective Date - 02/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$20.68
$11.10
$3.44
$0.00
$35.22
2 60
$24.82
$11.10
$13.80
$0.00
$49.72
3 65
$26.88
$11.10
$13.80
$0.00
$51.78
4 75
$31.02
$11.10
$13.80
$0.00
$55.92
5 85
$35.16
$11.10
$13.80
$0.00
$60.06
Effective Date - 08/01/2017
$11.20
$14.80
$0.00
Supplemental
Step percent Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$20.68
$11.20
$3.44
$0.00
$35.32
2 60
$24.82
$11.20
$14.80
$0.00
$50.82
3 65
$26.88
$11.20
$14.80
$0.00
$52.88
4 75
$31.02
$11.20
$14.80
$0.00
$57.02
5 85
$35.16
$11.20
$14.80
$0.00
$61.16
Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1
$44.98
$11.45
$24.03
$2.38
$82.84
Step 1 is 2000 hrs.; Steps 2-5 are 1000 hrs.
(Hot Pitch Mechanics' receive $1.00 hr. above ROOFER)
Apprentice to Journeyworker Ratio:**
ROOFER SLATE /TILE / PRECAST CONCRETE
02/01/2017
$41.61
$11.10
$13.80
$0.00
$66.51
ROOFERS LOCAL 33
08/01/2017
$41.61
$11.20
$14.80
$0.00
$67.61
02/01/2018
$42.76
$11.20
$14.80
$0.00
$68.76
08/01/2018
$43.86
$11.20
$14.80
$0.00
$69.86
02/01/2019
$45.01
$11.20
$14.80
$0.00
$71.01
For apprentice rates see "Apprentice- ROOFER"
SHEETMETAL WORKER
02/01/2017
$43.72
$11.45
$23.07
$2.35
$80.59
SHEETMETAL WORKERS LOCAL 17 -A
08/01/2017
$43.83
$11.45
$24.03
$2.38
$81.69
02/01/2018
$44.98
$11.45
$24.03
$2.38
$82.84
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 25 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice - SHEET METAL WORKER - Local 17-A
Effective Date - 02/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$17.49
$11.45
$5.24
$0.00
$34.18
2
40
$17.49
$11.45
$5.24
$0.00
$34.18
3
45
$19.67
$11.45
$10.31
$1.24
$42.67
4
45
$19.67
$11.45
$10.31
$1.24
$42.67
5
50
$21.86
$11.45
$11.21
$1.34
$45.86
6
50
$21.86
$11.45
$11.46
$1.34
$46.11
7
60
$26.23
$11.45
$13.02
$1.52
$52.22
8
65
$28.42
$11.45
$13.93
$1.61
$55.41
9
75
$32.79
$11.45
$15.74
$1.80
$61.78
10
85
$37.16
$11.45
$17.05
$1.97
$67.63
Effective Date - 08/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 40
$17.53
$11.45
$5.61
$0.00
$34.59
2 40
$17.53
$11.45
$5.61
$0.00
$34.59
3 45
$19.72
$11.45
$10.76
$1.26
$43.19
4 45
$19.72
$11.45
$10.76
$1.26
$43.19
5 50
$21.92
$11.45
$11.71
$1.35
$46.43
6 50
$21.92
$11.45
$11.96
$1.36
$46.69
7 60
$26.30
$11.45
$13.61
$1.54
$52.90
8 65
$28.49
$11.45
$14.56
$1.64
$56.14
9 75
$32.87
$11.45
$16.47
$1.82
$62.61
10 85
$37.26
$11.45
$17.87
$2.00
$68.58
(Notes:
Steps are 6 mos.
0
Apprentice to Journeyworker Ratio:1:4
SIGN ERECTOR
06/01/2013
$25.81
$7.07
$7.05
$0.00 $39.93
PAINTERS LOCAL 35 - ZONE 2
-------------------------------------------------------------------------------------------------------------------- -----------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 26 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice- SIGNERECTOR -Local 35 Zone 2
Effective Date - 06/01/2013
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$12.91
$7.07
$0.00
$0.00
$19.98
2 55
$14.20
$7.07
$2.45
$0.00
$23.72
3 60
$15.49
$7.07
$2.45
$0.00
$25.01
4 65
$16.78
$7.07
$2.45
$0.00
$26.30
5 70
$18.07
$7.07
$7.05
$0.00
$32.19
6 75
$19.36
$7.07
$7.05
$0.00
$33.48
7 80
$20.65
$7.07
$7.05
$0.00
$34.77
8 85
$21.94
$7.07
$7.05
$0.00
$36.06
9 90
$23.23
$7.07
$7.05
$0.00
$37.35
(Notes:
$40.38
$8.77
$10.20
$0.00
$59.35
Steps are 4 mos.
40/45/50/55/60/65/70/75/80/85
Apprentice to Journeyworker Ratio: 1:1
II'
SPECIALIZED EARTH MOVING EQUIP < 35 TONS
12/01/2016
$32.44
$10.91
$10.89 $0.00
$54.24
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
06/01/2017
$45.93
$10.00
$15.25 $0.00
$71.18
SPECIALIZED EARTH MOVING EQUIP > 35 TONS
12/01/2016
$32.73
$10.91
$10.89 $0.00
$54.53
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
12/01/2017
$46.92
$10.00
$15.25 $0.00
$72.17
SPRINKLER FITTER
03/01/2017
$50.47
$8.77
$17.20 $0.00
$76.44
SPRINKLER FITTERS LOCAL 550 - (Section B) Zone 2
-----------
Page 27 of 35
Apprentice - SPRINKLER FITTER - Local 550 (Section B) Zone 2
Effective Date - 03/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 35
$17.66
$8.77
$8.70
$0.00
$35.13
2 40
$20.19
$8.77
$8.70
$0.00
$37.66
3 45
$22.71
$8.77
$8.70
$0.00
$40.18
4 50
$25.24
$8.77
$8.70
$0.00
$42.71
5 55
$27.76
$8.77
$8.70
$0.00
$45.23
6 60
$30.28
$8.77
$10.20
$0.00
$49.25
7 65
$32.81
$8.77
$10.20
$0.00
$51.78
8 70
$35.33
$8.77
$10.20
$0.00
$54.30
9 75
$37.85
$8.77
$10.20
$0.00
$56.82
10 80
$40.38
$8.77
$10.20
$0.00
$59.35
(Notes: Apprentice entered prior 9/30/10:
40/45/50/55/60/65/70/75/80/85
I Steps are 850 hours
Apprentice to Journeyworker Ratio:1:3
STEAM BOILER OPERATOR
06/01/2017
$45.93
$10.00
$15.25 $0.00
$71.18
OPERATING ENGINEERS LOCAL 4
12/01/2017
$46.92
$10.00
$15.25 $0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
----------------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033
-----------
Page 27 of 35
Classirication Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 06/01/2017 $45.93 $10.00 $15.25 $0.00 $71.18
OPERATING ENGINEERS LOCAL 4
12/01/2017 $46.92 $10.00 $15.25 $0.00 $72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
TELECOMMUNICATION TECHNICIAN
ELECTRICIANS LOCAL 103
03/01/2017
$36.25
$13.00
$15.60
$0.00
$64.85
09/01/2017
$36.96
$13.00
$15.62
$0.00
$65.58
03/01/2018
$37.86
$13.00
$15.65
$0.00
$66.51
09/01/2018
$38.75
$13.00
$15.67
$0.00
$67.42
03/01/2019
$39.65
$13.00
$15.70
$0.00
$68.35
Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103
Effective Date - 03/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$14.50
$13.00
$0.44
$0.00
$27.94
2
40
$14.50
$13.00
$0.44
$0.00
$27.94
3
45
$16.31
$13.00
$12.54
$0.00
$41.85
4
45
$16.31
$13.00
$12.54
$0.00
$41.85
5
50
$18.13
$13.00
$12.81
$0.00
$43.94
6
55
$19.94
$13.00
$13.09
$0.00
$46.03
7
60
$21.75
$13.00
$13.37
$0.00
$48.12
8
65
$23.56
$13.00
$13.65
$0.00
$50.21
9
70
$25.38
$13.00
$13.93
$0.00
$52.31
10
75
$27.19
$13.00
$14.21
$0.00
$54.40
Effective Date - 09/01/2017
Step percent
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1
40
$14.78
$13.00
$0.44
$0.00
$28.22
2
40
$14.78
$13.00
$0.44
$0.00
$28.22
3
45
$16.63
$13.00
$12.55
$0.00
$42.18
4
45
$16.63
$13.00
$12.55
$0.00
$42.18
5
50
$18.48
$13.00
$12.82
$0.00
$44.30
6
55
$20.33
$13.00
$13.10
$0.00
$46.43
7
60
$22.18
$13.00
$13.39
$0.00
$48.57
8
65
$24.02
$13.00
$13.66
$0.00
$50.68
9
70
$25.87
$13.00
$13.95
$0.00
$52.82
10
75
$27.72
$13.00
$14.22
$0.00
$54.94
- --- -.. - - - - - - - - - --.- - - - - - - - - - --s - - .-. ..- - --I
Notes:
Apprentice to Journeyworker Ratio:1:1
TERRAZZO FINISHERS 02/01/2017 $49.70 $10.75 $19.22 $0.00 $79.67
BRICKLAYERS LOCAL 3 - MARBLE & TILE
--------------------- ------------------------------ - ----------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 28 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice- TERRAZZO FINISHER -Local 3 Marble & Tile
Effective Date - 02/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$24.85
$10.75
$19.22
$0.00
$54.82
2 60
$29.82
$10.75
$19.22
$0.00
$59.79
3 70
$34.79
$10.75
$19.22
$0.00
$64.76
4 80
$39.76
$10.75
$19.22
$0.00
$69.73
5 90
$44.73
$10.75
$19.22
$0.00
$74.70
Notes:
For apprentice rates see "Apprentice- LABORER"
Apprentice to Journeyworker Ratio:1:3
TEST BORING DRILLER
12/01/2016
$37.70
$7.60
$14.35
$0.00
$59.65
LABORERS - FOUNDATIONAND MARINE
For apprentice rates see "Apprentice- LABORER"
TEST BORING DRILLER HELPER
12/01/2016
$36.42
$7.60
$14.35
$0.00
$58.37
LABORERS - FOUNDATION AND MARINE
For apprentice rates see "Apprentice- LABORER"
TEST BORING LABORER
12/01/2016
$36.30
$7.60
$14.35
$0.00
$58.25
LABORERS - FO UNDATION AND MARINE
For apprentice rates see "Apprentice- LABORER"
TRACTORS/PORTABLE STEAM GENERATORS
06/01/2017
$45.93
$10.00
$15.25
$0.00
$71.18
OPERATING ENGINEERS LOCAL 4
12/01/2017
$46.92
$10.00
$15.25
$0.00
$72.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
TRAILERS FOR EARTH MOVING EQUIPMENT
12/01/2016
$33.02
$10.91
$10.89
$0.00
$54.82
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
TUNNEL WORK - COMPRESSED AIR
12/01/2016
$48.58
$7.60
$14.75
$0.00
$70.93
LABORERS (COMPRESSED AIR)
For apprentice rates see "Apprentice- LABORER"
TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE)
12/01/2016
$50.58
$7.60
$14.75
$0.00
$72.93
LABORERS (COMPRESSED AIR)
For apprentice rates see "Apprentice- LABORER"
TUNNEL WORK - FREE AIR
12/01/2016
$40.65
$7.60
$14.75
$0.00
$63.00
LABORERS (FREE AIR TUNNEL)
For apprentice rates see "Apprentice- LABORER"
TUNNEL WORK - FREE AIR (HAZ. WASTE)
12/01/2016
$42.65
$7.60
$14.75
$0.00
$65.00
LABORERS (FREEAIR TUNNEL)
For apprentice rates see "Apprentice- LABORER"
VAC -HAUL
12/01/2016
$32.44
$10.91
$10.89
$0.00
$54.24
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
WAGON DRILL OPERATOR
06/01/2017
$32.65
$7.60
$13.50
$0.00
$53.75
LABORERS - ZONE 2
12/01/2017
$33.28
$7.60
$13.50
$0.00
$54.38
06/01/2018
$34.12
$7.60
$13.50
$0.00
$55.22
12/01/2018
$34.96
$7.60
$13.50
$0.00
$56.06
06/01/2019
$35.83
$7.60
$13.50
$0.00
$56.93
12/01/2019
$36.69
$7.60
$13.50
$0.00
$57.79
For apprentice rates see "Apprentice- LABORER"
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number:
20170731-033
Page 29 of 35
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
WASTE WATER PUMP OPERATOR
06/01/2017
$46.38
$10.00
$15.25
$0.00
$71.63
OPERATING ENGINEERS LOCAL 4
12/01/2017
$47.38
$10.00
$15.25
$0.00
$72.63
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
WATER METER INSTALLER
03/01/2017
$48.61
$11.32
$15.46
$0.00
$75.39
PLUMBERS& GASFITTERS LOCAL 12 (Local 138)
For apprentice rates see "Apprentice- PLUMBER/PIPEFITTER" or "PLUMBER/GASFITTER"
Outside Electrical - East
CABLE TECHNICIAN (Power Zone)
08/28/2016
$26.61
$7.50
$1.80
$0.00
$35.91
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$27.14
$7.75
$1.81
$0.00
$36.70
For apprentice rates see "Apprentice- LINEMAN"
CABLEMAN (Underground Ducts & Cables)
08/28/2016
$37.70
$7.50
$8.87
$0.00
$54.07
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$38.45
$7.75
$9.53
$0.00
$55.73
For apprentice rates see "Apprentice- LINEMAN"
DRIVER / GROUNDMAN CDL
08/28/2016
$31.05
$7.50
$8.89
$0.00
$47.44
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$31.66
$7.75
$9.44
$0.00
$48.85
For apprentice rates see "Apprentice- LINEMAN'
DRIVER / GROUNDMAN -Inexperienced (<2000 Hrs)
08/28/2016
$24.39
$7.50
$1.73
$0.00
$33.62
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$24.88
$7.75
$1.75
$0.00
$34.38
For apprentice rates see "Apprentice- LINEMAN'
EQUIPMENT OPERATOR (Class A CDL)
08/28/2016
$37.70
$7.50
$12.95
$0.00
$58.15
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$38.45
$7.75
$13.61
$0.00
$59.81
For apprentice rates see "Apprentice- LINEMAN'
EQUIPMENT OPERATOR (Class B CDL)
08/28/2016
$33.26
$7.50
$9.63
$0.00
$50.39
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$33.92
$7.75
$10.21
$0.00
$51.88
For apprentice rates see "Apprentice- LINEMAN'
GROUNDMAN
08/28/2016
$24.39
$7.50
$1.73
$0.00
$33.62
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$24.88
$7.75
$1.75
$0.00
$34.38
For apprentice rates see "Apprentice- LINEMAN'
GROUNDMAN -Inexperienced (<2000 Hrs.)
08/28/2016
$19.96
$7.50
$1.60
$0.00
$29.06
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$20.35
$7.75
$1.61
$0.00
$29.71
For apprentice rates see "Apprentice- LINEMAN'
JOURNEYMAN LINEMAN
08/28/2016
$44.35
$7.50
$15.83
$0.00
$67.68
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
09/03/2017
$45.23
$7.75
$16.61
$0.00
$69.59
---------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 30 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice - LINEMAN (Outside Electrical) - East Local 104
Effective Date - 08/28/2016
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
60
$26.61
$7.50
$3.30
$0.00
$37.41
2
65
$28.83
$7.50
$3.36
$0.00
$39.69
3
70
$31.05
$7.50
$3.43
$0.00
$41.98
4
75
$33.26
$7.50
$5.00
$0.00
$45.76
5
80
$35.48
$7.50
$5.06
$0.00
$48.04
6
85
$37.70
$7.50
$5.13
$0.00
$50.33
7
90
$39.92
$7.50
$7.20
$0.00
$54.62
Effective Date - 09/03/2017
$0.00
$43.06
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$27.14
$7.75
$3.31
$0.00
$38.20
2 65
$29.40
$7.75
$3.38
$0.00
$40.53
3 70
$31.66
$7.75
$3.45
$0.00
$42.86
4 75
$33.92
$7.75
$5.02
$0.00
$46.69
5 80
$36.18
$7.75
$5.09
$0.00
$49.02
6 85
$38.45
$7.75
$5.15
$0.00
$51.35
7 90
$40.71
$7.75
$7.22
$0.00
$55.68
!Notes:
classification does not apply to wholesale tree removal.
Rental of Equipment - East
Apprentice to Journeyworker Ratio: 1:2
(2 AXLE) DRIVER - EQUIPMENT 12/01/2016 $32.15 $10.91 $0.00
$0.00
$43.06
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
TELEDATA CABLE SPLICER 01/01/2016 $28.98 $4.25 $3.12
$0.00
$36.35
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
TELEDATA LINEMAN/EQUIPMENT OPERATOR 01/01/2016 $27.31 $4.25 $3.07
$0.00
$34.63
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
TELEDATA WIREMAN/INSTALLER/TECHNICIAN 01/01/2016 $27.31 $4.25 $3.07
$0.00
$34.63
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
TREE TRIMMER 01/31/2016 $18.51 $3.55 $0.00
$0.00
$22.06
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
This classification applies only to tree work done: (a) for a utility company, R.E.A. cooperative, or railroad or coal mining company, and (b) for the purpose of
operating, maintaining, or repairing the utility company's equipment, and (c) by a person who is using hand or mechanical cutting methods and is not on the ground.
This classification does not apply to wholesale tree removal.
TREE TRIMMER GROUNDMAN 01/31/2016 $16.32 $3.55 $0.00
$0.00
$19.87
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
This classification applies only to tree work done: (a) for a utility company, R.E.A. cooperative, or railroad or coal mining company, and (b) for the purpose of
operating, maintaining, or repairing the utility company's equipment, and (c) by a person who is using hand or mechanical cutting methods and is on the ground. This
classification does not apply to wholesale tree removal.
Rental of Equipment - East
(2 AXLE) DRIVER - EQUIPMENT 12/01/2016 $32.15 $10.91 $0.00
$0.00
$43.06
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
(3 AXLE) DRIVER - EQUIPMENT 12/01/2016 $32.22 $10.91 $0.00
$0.00
$43.13
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
(4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2016 $32.34 $10.91 $0.00
$0.00
$43.25
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
..... I ------------------------------------------------- --------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 31 of 35
Classification
ADS/SUBMERSIBLE PILOT
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
08/01/2015 $88.29 $9.80 $0.00 $0.00 $98.09
ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE
06/01/2017
$46.38
$10.00
$0.00
$0.00
$56.38
OPERATING ENGINEERS LOCAL 4
12/01/2017
$47.38
$10.00
$0.00
$0.00
$57.38
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
$0.00
$0.00
$29.10
12/01/2018
$22.50
$7.60
BACKHOE/FRONT-END LOADER
06/01/2017
$46.38
$10.00
$0.00
$0.00
$56.38
OPERATING ENGINEERS LOCAL 4
$30.10
12/01/2019
$23.50
$7.60
$0.00
$0.00
$31.10
12/01/2017
$47.38
$10.00
$0.00
$0.00
$57.38
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
BULLDOZER/GRADER/SCRAPER
06/01/2017
$45.93
$10.00
$0.00
$0.00
$55.93
OPERATING ENGINEERS LOCAL 4
12/01/2017
$46.92
$10.00
$0.00
$0.00
$56.92
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES
06/01/2017
$47.38
$10.00
$0.00
$0.00
$57.38
OPERATING ENGINEERS LOCAL 4
12/01/2017
$48.38
$10.00
$0.00
$0.00
$58.38
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
COMPRESSOR OPERATOR
06/01/2017
$31.86
$10.00
$0.00
$0.00
$41.86
OPERATING ENGINEERS LOCAL 4
12/01/2017
$32.55
$10.00
$0.00
$0.00
$42.55
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DIVER
08/01/2015
$58.86
$9.80
$0.00
$0.00
$68.66
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER TENDER
08/01/2015
$42.04
$9.80
$0.00
$0.00
$51.84
PILEDRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER TENDER (EFFLUENT)
08/01/2015
$63.06
$9.80
$0.00
$0.00
$72.86
PILEDRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER/SLURRY (EFFLUENT)
PILE DRIVER LOCAL 56 (ZONE 1)
For apprentice rates see "Apprentice- PILE DRIVER"
FLAGGER & SIGNALER
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
FORK LIFT/CHERRY PICKER
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
GENERATOR/LIGHTING PLANT/HEATERS
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
HOISTING ENGINEER/CRANES/GRADALLS
OPERATING ENGINEERS LOCAL 4
08/01/2015 $88.23 $9.80 $0.00 $0.00 $98.03
06/01/2017
$20.50
$7.60
$0.00
$0.00
$28.10
12/01/2017
$21.50
$7.60
$0.00
$0.00
$29.10
06/01/2018
$21.50
$7.60
$0.00
$0.00
$29.10
12/01/2018
$22.50
$7.60
$0.00
$0.00
$30.10
06/01/2019
$22.50
$7.60
$0.00
$0.00
$30.10
12/01/2019
$23.50
$7.60
$0.00
$0.00
$31.10
06/01/2017
$46.38
$10.00
$0.00
$0.00
$56.38
12/01/2017
$47.38
$10.00
$0.00
$0.00
$57.38
06/01/2017
$31.86
$10.00
$0.00
$0.00
$41.86
12/01/2017
$32.55
$10.00
$0.00
$0.00
$42.55
06/01/2017 $46.38 $10.00 $0.00 $0.00 $56.38
12/01/2017 $47.38 $10.00 $0.00 $0.00 $57.38
---------------------------------------- ------------------------------------------------ -------------------- ------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 32 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- OPERATING ENGINEERS -Local 4
Effective Date - 06/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
55
$25.51
$10.00
$0.00
$0.00
$35.51
2
60
$27.83
$10.00
$0.00
$0.00
$37.83
3
65
$30.15
$10.00
$0.00
$0.00
$40.15
4
70
$32.47
$10.00
$0.00
$0.00
$42.47
5
75
$34.79
$10.00
$0.00
$0.00
$44.79
6
80
$37.10
$10.00
$0.00
$0.00
$47.10
7
85
$39.42
$10.00
$0.00
$0.00
$49.42
8
90
$41.74
$10.00
$0.00
$0.00
$51.74
Effective Date - 12/01/2017
$10.00
$0.00
$0.00
Supplemental
$50.27
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
55
$26.06
$10.00
$0.00
$0.00
$36.06
2
60
$28.43
$10.00
$0.00
$0.00
$38.43
3
65
$30.80
$10.00
$0.00
$0.00
$40.80
4
70
$33.17
$10.00
$0.00
$0.00
$43.17
5
75
$35.54
$10.00
$0.00
$0.00
$45.54
6
80
$37.90
$10.00
$0.00
$0.00
$47.90
7
85
$40.27
$10.00
$0.00
$0.00
$50.27
8
90
$42.64
$10.00
$0.00
$0.00
$52.64
Notes:
Apprentice to Journeyworker Ratio: 1:6
LABORER
06/01/2017
$32.40
$7.60
$0.00
$0.00
$40.00
LAB ORERS-ZONE 2
12/01/2017
$33.03
$7.60
$0.00
$0.00
$40.63
06/01/2018
$33.87
$7.60
$0.00
$0.00
$41.47
12/01/2018
$34.71
$7.60
$0.00
$0.00
$42.31
06/01/2019
$35.58
$7.60
$0.00
$0.00
$43.18
12/01/2019
$36.44
$7.60
$0.00
$0.00
$44.04
---------------------------------------------------------------------------------------------------------- - -----------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 33 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - LABORER - Zone 2
Effective Date - 06/01/2017
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$19.44
$7.60
$0.00
$0.00
$27.04
2 70
$22.68
$7.60
$0.00
$0.00
$30.28
3 80
$25.92
$7.60
$0.00
$0.00
$33.52
4 90
$29.16
$7.60
$0.00
$0.00
$36.76
Effective Date - 12/01/2017
$0.00
$0.00
....._---.......----.I
Supplemental
'
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$19.82
$7.60
$0.00
$0.00
$27.42
2 70
$23.12
$7.60
$0.00
$0.00
$30.72
3 80
$26.42
$7.60
$0.00
$0.00
$34.02
4 90
$29.73
$7.60
$0.00
$0.00
$37.33
- _....--------------------.-...
(Notes:
$0.00
$0.00
....._---.......----.I
OPERATING ENGINEERS LOCAL 4
'
Apprentice to Journeyworker Ratio:1:5
$28.15
$10.00
$0.00
$0.00
$38.15
OILER (OTHER THAN TRUCK CRANES,GRADALLS)
06/01/2017
$23.47
$10.00
$0.00
$0.00
$33.47
OPERATING ENGINEERS LOCAL 4
12/01/2017
$23.99
$10.00
$0.00
$0.00
$33.99
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
OILER (TRUCK CRANES, GRADALLS)
06/01/2017
$27.54
$10.00
$0.00
$0.00
$37.54
OPERATING ENGINEERS LOCAL 4
12/01/2017
$28.15
$10.00
$0.00
$0.00
$38.15
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
OTHER POWER DRIVEN EQUIPMENT - CLASS H
06/01/2017
$45.93
$10.00
$0.00
$0.00
$55.93
OPERATING ENGINEERS LOCAL 4
12/01/2017
$46.92
$10.00
$0.00
$0.00
$56.92
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
PANEL & PICKUP TRUCKS DRIVER
12/01/2012
$30.28
$9.07
$0.00
$0.00
$39.35
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
POWER SHOVEL/DERRICK/TRENCHING MACHINE
06/01/2017
$46.38
$10.00
$0.00
$0.00
$56.38
OPERATING ENGINEERS LOCAL 4
12/01/2017
$47.38
$10.00
$0.00
$0.00
$57.38
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
PUMP OPERATOR (CONCRETE)
06/01/2017
$46.38
$10.00
$0.00
$0.00
$56.38
OPERATING ENGINEERS LOCAL 4
12/01/2017
$47.38
$10.00
$0.00
$0.00
$57.38
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
PUMP OPERATOR (DEWATERING, OTHER)
06/01/2017
$31.86
$10.00
$0.00
$0.00
$41.86
OPERATING ENGINEERS LOCAL 4
12/01/2017
$32.55
$10.00
$0.00
$0.00
$42.55
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
ROLLER/SPREADER/MULCHING MACHINE
06/01/2017
$45.93
$10.00
$0.00
$0.00
$55.93
OPERATING ENGINEERS LOCAL 4
12/01/2017
$46.92
$10.00
$0.00
$0.00
$56.92
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
SPECIALIZED EARTH MOVING EQUIP < 35 TONS
12/01/2016
$32.44
$10.91
$0.00
$0.00
$43.35
TEAMSTERS JOINT CO UNCIL NO. 10 ZONE B
SPECIALIZED EARTH MOVING EQUIP > 35 TONS
12/01/2016
$32.73
$10.91
$0.00
$0.00
$43.64
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
- ------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 34 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
TRACTORS/PORTABLE STEAM GENERATORS 06/01/2017 $45.93 $10.00 $0.00 $0.00 $55.93
OPERATING ENGINEERS LOCAL 4
12/01/2017 $46.92 $10.00 $0.00 $0.00 $56.92
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2016 $33.02 $10.91 $0.00 $0.00 $43.93
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
TREE TRIMMER 01/31/2016 $18.51 $3.55 $0.00 $0.00 $22.06
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
This classification applies only to tree work done: (a) for a utility company, R.E.A. cooperative, or railroad or coal mining company, and (b) for the purpose of
operating, maintaining, or repairing the utility company's equipment, and (c) by a person who is using hand or mechanical cutting methods and is not on the ground.
This classification does not apply to wholesale tree removal.
TREE TRIMMER GROUNDMAN 01/31/2016 $16.32 $3.55 $0.00 $0.00 $19.87
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
This classification applies only to tree work done: (a) for a utility company, R.E.A. cooperative, or railroad or coal mining company, and (b) for the purpose of
operating, maintaining, or repairing the utility company's equipment, and (c) by a person who is using hand or mechanical cutting methods and is on the ground. This
classification does not apply to wholesale tree removal.
VAC-HAUL/CATCH BASIN CLEANING 12/01/2016 $32.44 $10.91 $0.00 $0.00 $43.35
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
Additional Apprentice Information
Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the
Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L
c. 23, ss. IIE- I IL.
All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. I IE -I IL.
All steps are six months (1000 hours.)
Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof, unless otherwise specified.
** Multiple ratios are listed in the comment field.
*** APP to JM; 1:1, 2:2,2:3,3:4,4:4,4:5,4:6,5:7,6:7, 6:8,6:9,7:10,8:10,8:11, 8:12, 9:13, 10:13,10:14, etc.
**** APP to JM; 1:1, 1:2,2:3,2:4,3:5,4:6,4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc.
------------------------------------------------------------------------- ------ ---------------------------------------------------
Issue Date: 07/31/2017 Wage Request Number: 20170731-033 Page 35 of 35
CERTIFICATE OF CORPORATE AUTHORITY
At a duly authorized meeting of the Board of Directors of National Water Main Cleaning Co.
(name of corporation)
held on October 31, 2016 Directors were present or waived notice, it was voted that Dennis P. Sullivan
(date)
Vice President of this company be and hereby is authorized to execute contracts and bonds
(name and title)
in the name and behalf of said company, and affix its Corporate Seal thereto, and such execution
of any contract or bond of obligation in this company's name on its behalf of such Vice President
(OFFICER)
under seal of the company shall be valid and binding upon this company.
A TRUE COPY
ATTEST:
5�;� Place of Business:
25 Marshall Street
Canton, MA 02021
I, Jonathan Reynolds hereby certify that I am the _Assistant Secretary/Treasurer of National Water
Main Cleaning Co. (Title) (Name
of Corporation)
that Dennis P. Sullivan is the duly. elected Vice President of said
(Name of Officer) (Title)
company, and the above vote has not been amended or rescinded and remains in full force and effect as of the
date of this contract.
Signature:'
Jo athan Re,y ids
Name/Title: ssistant SecretarV/Treasurer
Date: September 28.261'_
(Corporate Seal)
CERTIFICATE OF VOTE
At a duly authorized meeting the Board of Directors of the National Water Main Cleaning
Co.
held on October 31, 2016 it was
VOTED, THAT
Dennis P. Sullivan
(Name)
Vice President
(Officer)
of National Water Main be and hereby is authorized to execute contracts and bonds in
Cleanin Co.
the name and on behalf of said corporation , and affix its corporate seal hereto;
Cleaning Co.
and such execution of any contractor obligation in the name of National Water Main on
its behalf by such officer under seal of National Water Main , shall be valid and binding
upon National Water Main Cleaning Co. Cleaning Co.
I hereby certify that I am the clerk of the above named corporation and
that Dennis P. Sullivan
is the duly elected officer as above of said
Vice President , and that the above vote has not been amended or rescinded and
remains in full force and effect as the date of this contract.
August 30, 2017
(Date) (Clerk)
Town of North Andover 1FB Page 35 of 37
Cleaning of Sewer Pump Station Wet Wells
CERTIFICATION
LABOR HARMONY AND OSHA TRAINING REQUIREMENTS
The undersigned certifies under penalties of perjury that he is able to furnish labor that can work
in harmony with all other elements of labor employed or to be employed at the work
and
that all employees to be employed at the worksite and in the work will have completed an
OSHA -approved construction safety and health course lasting at least ten (10) hours.
Signa Date August 30, 2017
Dennis P. Sullivan, Vice President National Water Main Cleaning Co.
Print Name & Title Company Name
Town of North Andover IFB Page 34 of 37
Cleaning of Sewer Pump Station Wet Wells
CERTIFICATIONS
CERTIFICATE OF NON -COLLUSION
The undersigned certifies under penalties of perjury that this bid or proposal has been made and
submitted in good faith and without collusion or fraud with any other person. As used in this
certification, the word "person" shall mean natural person, business, partnership, corporation,
committee, union, club or other organization, entity, or group of individuals.
Signator Date August 30, 2017
Dennis P. Sullivan, Vice President National Water Main Cleaning Co.
Print Name & Title Company Name
CERTIFICATE OF TAX COMPLIANCE
Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I
Dennis P. Sullivan ,authorized signatory for National Water Main Cleaning Co.
Name of individual Name of contractor
do hereby certify under the pains and penalties of perjury that said contractor has complied with
all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to
taxes, permit or other fees, reporting of employees and contractors, and withholding and
remitting child support.
August 30, 2017
Signature Date
Town of North Andover IFB Page 33 of 37
Cleaning of Sewer Pump Station Wet Wells
Ac<:>R CERTIFICATE OF LIABILITY INSURANCE
DATE IYYYY)
v
/2017
os/27/2017
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER
CONTACT
NAME'
MARSH USA INC.
FAX
PHC.
540 W. MADISON
N No):
E-MAIL
ADDRESS:
CHICAGO, IL 60661
Attn: chicago.CertRequest@marsh.com
CLAIMS -MADE T OCCUR
INSURERS AFFORDING COVERAGE NAIC #
INSURER A: Zurich American Insurance Company 16535
NWMC
INSURED NATIONAL WATER MAIN CLEANING CO.
INSURER B : American Zurich Insurance Company 40142
INSURER C : American Guarantee and Liability Insurance Company 26247
25 MARSHALL STREET
INSURER D:
CANTON, MA 02021-2479
INSURER E:
INSURER F:
COVERAGES CERTIFICATE NUMBER: CHI -008750681-01 REVISION NUMBER: 2
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
LTR
TYPE OF INSURANCE
ADDL
SUER
POLICY NUMBER
EFF
MM/DDfYYYY
MOLICY LICY EXP
M
IDDfYYYY
LIMITS
A
X COMMERCIAL GENERAL LIABILITY
GLO9377201-13
10/31/2016
10/31/2017
EACH OCCURRENCE $ 1,000,000
CLAIMS -MADE T OCCUR
DAMAGE 11
EMSES Ea occurrDence $ 1,000,000
PREMISES
MED EXP (Any one person) $ 10,000
X XCU INCLUDED
PERSONAL & ADV INJURY $ 1,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
GENERAL AGGREGATE $ 2,000,000
POLICY M JE� F—] LOC2,000,000
PRODUCTS-COMP/OPAGG $
$
OTHER:
A
AUTOMOBILE
LIABILITY
BAP 9377199-13
10/31/2016
10/31/2017
COMBINED SINGLE LIMIT $ 2,000,000
Ea accident
BODILY INJURY (Per person) $
X
ANY AUTO
OWNED SCHEDULED
AUTOS ONLY AUTOS
BODILY INJURY (Per accident) $
HIRED NON -OWNED
AUTOS ONLY AUTOS ONLY
PROPERTYDAMAGE $
Per accident
X
UMBRELLA LIAB X
OCCUR
AUC591694711
10/31/2016
10/31/2017
EACH OCCURRENCE $ 2,000,000
AGGREGATE $ 2,000,000
EXCESS LIAB
CLAIMS -MADE
DED X RETENTION $10,000
$
B
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
ANYPROPRIETOR/PARTNER/EXECUTIVE YIN
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
NIA
WC 9377202-13
10/31/2017
oTH-
X STATUTE PER R
E
E.L. EACH ACCIDENT $ 1,000,000
E.L. DISEASE - EA EMPLOYEE $ 1,000,000
If yes, describe under
DESCRIPTION OF OPERATIONS below
E.L. DISEASE -POLICY LIMIT $ 1,000,000
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
RE: PROJECT: CLEANING OF SEWER PUMP STATION WET WELLS
THE TOWN OF NORTH ANDOVER, MA IS AN ADDITIONAL INSURED UNDER GENERAL LIABILITY, AUTOMOBILE LIABILITY AND EXCESS LIABILITY, BUT ONLY TO THE EXTENT REQUIRED BY THEIR
WRITTEN CONTRACT WITH THE NAMED INSURED FOR OPERATIONS PERFORMED BY THE NAMED INSURED.
TOWN OF NORTH ANDOVER
120 MAIN STREET
NORTH ANDOVER, MA 01845
KslCltla1111A_1ILei 0
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE
of Marsh USA Inc.
Manashi Mukherjee _Nlk��
@ 1988-2016 ACORD CORPORATION. All rights reserved.
ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD
PAYMENT BOND
Bond No. 106807831
KNOW ALL MEN BY THESE PRESENTS, that we National Water Main Cleaning Company
with a place of business at 25 Marshall Street, Canton, MA 02021 ,
as Principal (the "Principal"), and Travelers Casualty and Surety Company of America a
corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at
One Tower Square, Hartford, CT 06183 as Surety
(the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee
(the "Obligee"), in the sum ofThirteen Thousand Three Hundred and 00/100 ($13,300.0%wful money of
the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we
bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of
for the construction of Scheduled cleanings of sewer pump station
water wells for the period October 1, 2017 through September 30, 2018
NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under
said contract shall pay for all labor performed or furnished and for all materials used or employed in said
contract and in any and al l duly authorized modifications, alterations, extensions of time, changes or
additions to said contract that may hereafter be made, notice to the Surety of such modifications,
alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but
not be limited to, any other purposes or items set out in, and to be subject to, the provisions of
Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then
this obligation shall become null and void; otherwise, it shall remain in full force and virtue.
IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this
day of
PRINCIPAL
NsSQnal Water Main Clean in C any
[Name and Seal]
\%re e a!( -i th t
[Title]
est:
SURETY
Travelers Casualty and Surety Company of America
[Attorney-in-fact] [Seal] Brenda D. F%ckberger, Attorney -in -Fact `
215 Shuman Blvd., Naperville, IL 60563
[Address]
630 961-7012
[Phone]
'\ \\ p
Attest: I o A, _ A. A i6PM1 w
mar Moore, Witness
END OF PAYMENT BOND
WARNING: THIS POWER OF
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company, Fidelity*
and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance
Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States
Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows:
RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice
President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf
of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the
Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any
of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may
delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy
thereof is filed in the office of the Secretary; and it is
FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking
shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice
President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the
Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power
prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is
FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President,
any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any
certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds
and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal
shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on
the Company in the future with respect to any bond or understanding to which it is attached.
I, Kevin E. Hughes, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance
Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and
Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing
is a true and correct copy of the Power of Attorney executed by said Compames, which is in full force and effect and has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this day of 20
Kevin E. Hughes, Assistant Sec tary
1Y 4Iy �✓
CI.SU.��T QW"'� v, NRE 4� \ N �Ny.U� P..�'wwc�,4h• JP` Q
�� y g r ORGOR4l'i ice•:' (�s. 9 � Y.
PoRATED n m : cP f
HARTFORD, S tt4RIFYSR0.
3' ',- _ i • n i
ot +:SEALo : o nCQVN. R m 1896
-iaF CONN.
�y !•�' ! � sNccc alS .•AM�� "kS....�.rradD
To verify the authenticity of this Power of Attorney, call 1-800-421-3880 or contact us at www.travelersbond.com. Please refer to the Attorney -In -Fact number, the
above-named individuals and the details of the bond to which the power is attached.
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
PAYMENT BOND
Bond No. 106807831
KNOW ALL MEN BY THESE PRESENTS, that we National Water Main Cleaning Company
with a place of business at 25 Marshall Street, Canton, MA 02021
as Principal (the "Principal"), and Travelers Casualty and Surety Company of America , a
corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at
One Tower Square, Hartford, CT 06183
as Surety
(the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee
(the "Obligee"), in the sum ofThirteen Thousand Three Hundred and 00/100 ($13,300.0%wful money of
the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we
bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of
for the construction of Scheduled cleanings of sewer pump station
water wells for the period October 1, 2017 through September 30, 2018
NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under
said contract shall pay for all labor performed or furnished and for all materials used or employed in said
contract and in any and all duly authorized modifications, alterations, extensions of time, changes or
additions to said contract that may hereafter be made, notice to the Surety of such modifications,
alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but
not be limited to, any other purposes or items set out in, and to be subject to, the provisions of
Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then
this obligation shall become null and void; otherwise, it shall remain in full force and virtue.
IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this
day of
PRINCIPAL
National Water Main Cleanina CDracra_n
[Name and Seal]
V%ere Prew%AAYJlk-
SURETY
Travelers Casualty and Surety Company of America
[Attorney-in-fact] [Seal] Brenda D. Hoc berger, Attorney -in -Fact
215 Shuman Blvd., Naperville, IL 60563
[Address]
630 961-7012
[Phone]
Attest:
mar Moore, Witness
END OF PAYMENT BOND
State of ILLINOIS
County of COOK
On this day of . 9 2017 _, before me personally appeared
Brenda D. Hockberger , known to me to be the Attorney -in -Fact of TRAVELERS CASUALTY AND SURETY
COMPANY OF AMERICA, the corporation that executed the within instrument and acknowledged to me that such
corporation executed the same.
IN WITNESS WEEREOF, I have hereunto set my hand and affixed my official seal the da and year in this certificate first written above.
OFFICIAL =SEAL
OSCAR F. RINCON
ly L
NOTARY PUBLIC - STATE OF ILLINOIS
NO CO AMISSIO P SS P'r. 1�,N I(Na�� Public)
My COMMISSION EXPIRES SEPT. 13,2(fZ0
E.
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
a
Q POWER OF ATTORNEY
TRAVELERSJ Farmington Casualty Company St. Paul Mercury Insurance Company
Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company
Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America
St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company
St. Paul Guardian Insurance Company
Attorney -In Fact No. 231865 Certificate No. 007132060
KNOW ALL MEN BY THESE PRESENTS: That Farmington Casualty Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance
Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States
Fidelity and Guaranty Company are corporations duly organized under the laws of the State of Connecticut, that Fidelity and Guaranty Insurance Company is a
corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the
laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint
Carol F. Tasciotti, Evonne Brown, Adele M. Korczak, Grace Villarreal, Gail Schroeder, Gina M. Damato, Thomas A. Pictor, Michael Damewood,
Luisa Seymour, Thomas N. Tague, Brenda D. Hockberger, Carlina A. Oswald, Tara S. Petersen, Todd D. Baraniak, Dale F. Poquette, Oscar F. Rincon,
Moises Alcantar, James P. Fagan, Stephanie Miller, Grace Fowlkes, Ann Mulder, Launa Reidenbach, Mary D. Thomas, Amber Derkson, Dan Hasson,
Kristan Retusnic, Kathleen Stewart, Mary Jo Campbell, Carrie Smith, Adam Kveton, Jessica Hernandez, Robin Vinci, Jason Cummings,
Emily Swatkowski, Renee D. Davis, Tiffany Uribe, Kyle Pollock, and Erik Harms
of the City of Chicago/Naperville , State of Illinois , their true and lawful Attomey(s)-in-Fact,
each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and
other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of
contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
t
IN Vt1ITNESS WHEREOF, the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this 21 st
day of February 2017 ,
Farmington Casualty Company
Fidelity and Guaranty Insurance Company
Fidelity and Guaranty Insurance Underwriters, Inc.
St. Paul Fire and Marine Insurance Company
St. Paul Guardian Insurance Company
St. Paul Mercury Insurance Company
Travelers Casualty and Surety Company
Travelers Casualty and Surety Company of America
United States Fidelity and Guaranty Company
pr SU��T iY JyF\n6,� �aN NSO a� \" nsv J QTY AA,,,
411 r F?AYAMO
f�^':'' y(�S cP G9 T t�
' b" n i$ a�ORPORATfD M9'' E
9 8 Z. a 1977 HARTFORD FNWIFdBG
• = 1951 '•SEAL,°"s int 'O � CwIN. 0 se.
�\✓
bry • rY' �� � T`+'sc, E o° ;•'�� .. L t >.... • a >b at
+ Pby Rm N„�9 l��'j,11't.J [g....... *N � Q.j ��1 1 • AIS,
State of Connecticut
City of Hartford ss.
:
BY t''t�rtCy
Robert L. Raney, Senior Vice President
On this the 21st day ofFebru� 2017 before me personally appeared Robert L. Raney, who acknowledged himself to
be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul
Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers
Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do, executed the foregoing
instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
7 e#A%In Witness Whereof, I hereunto set my hand and official seal.My Commission expires the 30th day of June, 2021.
58440-5-16 Printed in U.S.A.
WARNING:
Marie C. Tetreault, Notary Public
RED BORDER
WARNING: THIS
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company, Fideliiyo
and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance
Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States
Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows:
RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice
President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attomeys-in-Fact and Agents to act for and on behalf
of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the
Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any
of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may
delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy
thereof is filed in the office of the Secretary; and it is
FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking
shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice
President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the
Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power
prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is
FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President,
any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any
certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attomeys-in-Fact for purposes only of executing and attesting bonds
and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal
shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on
the Company in the future with respect to any bond or understanding to which it is attached.
I, Kevin E. Hughes, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance
Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and
Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing
is a true and correct copy of the Power of Attorney executed by said Companies, which is in full force and effect and has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this day of 204
S
' Kevin E. Hughes, Assistant Sec tary
INS` ..s+ INSU "w TV ANO 0!
M Y
,nNW Ay�
� 3� ' ��• (� t1 N a .. - ,, �fZpRPFRA�E� f'��' RPORAl'�jn: �P a � Ty
Y y'YMtC Q ,�.7� CRATED i . • 6� E'? n : a HARTFORD. t @ 3 FNf3TF6Fl0. Ti
q i f951 �.S�AL;o';�' SBALa' coNN. o c�Rn. �Q N 7848
< . '�?� AN't
To verify the authenticity of this Power of Attorney, call 1-800-421-3880 or contact us at www.travelersbond.com. Please refer to the Attorney -In -Fact number, the
above-named individuals and the details of the bond to which the power is attached.
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
PAYMENT BOND
Bond No. 106807831
KNOW ALL MEN BY THESE PRESENTS, that we National Water Main Cleaning Company
with a place of business at 25 Marshall Street, Canton, MA 02021
as Principal (the "Principal"), and Travelers Casualty and Surety Company of America , a
corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at
One Tower Square, Hartford, CT 06183 as Surety
(the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee
(the "Obligee"), in the sum ofThirteen Thousand Three Hundred and 00/100 ($13,300.0%wful money of
the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we
bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of
for the construction of Scheduled cleanings of sewer pump station
water wells for the period October 1, 2017 through September 30, 2018
NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under
said contract shall pay for all labor performed or furnished and for all materials used or employed in said
contract and in any and all duly authorized modifications, alterations, extensions of time, changes or
additions to said contract that may hereafter be made, notice to the Surety of such modifications,
alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but
not be limited to, any other purposes or items set out in, and to be subject to, the provisions of
Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then
this obligation shall become null and void; otherwise, it shall remain in frill force and virtue.
IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this
day of
PRINCIPAL
National Water Main Cleanina Ccirarra—n
[Name and Seal]
[Title]
st:
SURETY
Travelers Casualty and Surety Company of America
[Attorney-in-fact] [Seal] Brenda D. Hoc Berger, Attorney -in -Fact
215 Shuman Blvd., Naperville, IL 60563
[Address]
630 961-7012
[Phone]
Attest:
mar Moore, Witness
END OF PAYMENT BOND
State of ILLINOIS
County of COOK
011,, this day of 1 2017 , before me personally appeared
Brenda D. Hockberger , known to me to be the Attorney -in -Fact of TRAVELERS CASUALTY AND SURETY
COMTANY OF AMERICA, the corporation that executed the within instrument and acknowledged to me that such
corporation executed the same.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year in this certificate first written above.
OFFICV.L SEAL
OSCAR F. RINCON
3L C
� ST TE
NOTARY PUBLIC - STATE 0 OF ILL�INOIS
My COMMISSION EXPIRES SEPT. 13,2020 taK Public)
INVALID WITHOUT THE RED BORDER
G1 POWER OF ATTORNEY
TRAVELERSJ Farmington Casualty Company St. Paul Mercury Insurance Company
Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company
Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America
St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company
St. Paul Guardian Insurance Company
Attorney -In Fact No. 231.865 Certificate No. O O 7 .L: 3 2 0 5 9
KNOW ALL MEN BY THESE PRESENTS: That Farmington Casualty Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance
Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States
Fidelity and Guaranty Company are corporations duly organized under the laws of the State of Connecticut, that Fidelity and Guaranty Insurance Company is a
corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the
laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint
Carol F. Tasciotti, Evonne Brown, Adele M. Korczak, Grace Villarreal, Gail Schroeder, Gina M. Damato, Thomas A. Pictor, Michael Damewood,
Luisa Seymour, Thomas N. Tague, Brenda D. Hockberger, Carlina A. Oswald, Tara S. Petersen, Todd D. Baraniak, Dale F. Poquette, Oscar F. Rincon
Moises Alcantar, James P. Fagan, Stephanie Miller, Grace Fowlkes, Ann Mulder, Latina Reidenbach, Mary D. Thomas, Amber Derkson, Dan Hasson,
Kristan Retusnic, Kathleen Stewart, Mary Jo Campbell, Carrie Smith, Adam Kveton, Jessica Hernandez, Robin Vinci, Jason Cummings,
Emily Swatkowski, Renee D. Davis, Tiffany Uribe, Kyle Pollock, and Erik Harms
of the City of Chinagn[NaperviIle , State of Tllinoic , their true and lawful Attomey(s)-in-Fact,
each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and
other writings obligatory in the nature thereof on behalf of the Companies in their business of_ guaranteeing the fidelity of persons, guaranteeing the performance of
contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or. proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this 21st
}
day of February 2017 r, "
Farmington Casualty Company` J
Fidelity and Guaranty Insurance Company
Fidelity and Guaranty Insurance Underwriters, Inc.
St. Paul Fire and Marine Insurance Company
St. Paul Guardian Insurance Company
St. Paul Mercury Insurance Company
Travelers Casualty and Surety Company
Travelers Casualty and Surety Company of America
United States Fidelity and Guaranty Company
G�SU,F FIRE 6 }W �Nf 1� N3� (Y AMO Y
pl
,...........
O s �� n�ryy�,,,�,,,,"M m'' JS'i�Op P...R.ITFtP PORAT :T' 9w •i` 4% �y�,_
"`^"'rveWTtD m W iCAa f i -[
NARfFORD,
• s; 1951 �.5E$Lio3 S9AL:;3 CONN. o >3 2 1896
mn:m�mo� tea.. AN..� 1y. ..�....*A bf ' �,�� t � V. •'// At1t�
State of Connecticut
City of Hartford ss.
By: '44e
Robert L. Raney, Senior Vice President
On this the 21 st day of February 2017, before me personally appeared Robert L. Raney, who acknowledged himself to
be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul
Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers
Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do, executed the foregoing
instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
G•T�
In Witness Whereof, I hereunto set my hand and official seal. �
My Commission expires the 30th day of June, 2021.
58440-5-16 Printed in U.S.A.
TH I
`AIMA�k C. d.
Marie C. Tetreault, Notary Public
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
•
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company, Fidelity
and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance
Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States
Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows:
RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice
President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf
of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the
Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any
of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may
delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy
thereof is filed in the office of the Secretary; and it is
FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking
shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice
President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the
Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attomeys-in-Fact and Agents pursuant to the power
prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is
FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President,
any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any
certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds
and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal
shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on
the Company in the future with respect to any bond or understanding to which it is attached.
I, Kevin E. Hughes, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance
Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and
Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing
is a true and correct copy of the Power of Attorney executed by said Companies, which is in full force and effect and has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this day of 20
Kevin E. Hughes, Assistant Sec tary
mxn' Nu
7:11"1 TV 4N
,�, <> J� 4 Q\. �......G,Y J��•`,JP+....... ,Aq`'t 9JP� Oy.
Q.`,-00004).'
ti 3 ' b" ti NCa1fbRAtfD ? z �i aTFci ;:�''� w S IBRD
HARTFORD, HA4tFDR0. ` 1896
A,SEAL,io"J .58AL:r;E y CCNN. o CQVN. R w
To verify the authenticity of this Power of Attorney, call 1-800-421-3880 or contact us at www.travelersbond.com. Please refer to the Attorney -In -Fact number, the
above-named individuals and the details of the bond to which the power is attached.
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER