Loading...
HomeMy WebLinkAbout2018-03-22 Board of Health Supplemental Materials ROBERT K. DAIGLE CONSTRUCTION CO., LLC 14 COFFIN AVENUE HAVERHILL, MA 01830 1 March 1, 2018 Mr. Brian LaGrasse North Andover Health Department 120 Main Street North Andover, MA 01845 Mr. LaGrasse: Upon receipt of your letter today denying my Disposal Works Installers License for 2018, 1 would like to request a hearing before the Board of Health. Sincerely, Robert K. Daigle i i 1 1, North Andover Health Department Community and Economic Development Division March 16, 201.8 Daigle Construction,LLC. Attn. Robert Daigle 14 Coffin Avenue Haverhill, MA 01.830 RE: Request for a hearing before the Board of Health for Disposal Works Installers License Robert Daigle: The Health Department has received your request for a hearing regarding the Board of Health Denial Letter dated February 20, 2018. As requested., the hearing has been placed on the agenda for the Board of Health meeting on Thursday, March 22, 2018. The meeting shall take place at the North Andover Town Hall, Main Street, North Andover, MA 01.845 and will be held in the Board of Selectmer s Meeting Room on the second floor. The meeting will begin at 7:00 PM. The hearing will begin at 7:1.5 PM. At the hearing you shall be given the opportunity to be heard, to present witnesses or documentary evidence, and to show why the denial should be modified or withdrawn. Please feel free to call ine if you have any question, comments or concerns. Seely, gri .'LaGrasse, CERT North Andover Director of Public Health Cc: BOH File Page 1 of I North.Andover Health Department 120 main Street North Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688.9542' F l North Andover Health Department r fommunity and Economic Development Division NORTH ANDOVER BOARD OF HEALTH Issued under the provisions set forth in the State Environmental Code,Title 5 (310 CMR 15.000) and the North Andover Board of Health Regulations-Minimum Requirements for the Design, Construction and Maintenance of Onsite Wastewater Treatment Disposal Systems. February 20, 2018 Daigle Construction,LLC. 14 Coffin Avenue Haverhill,NIA 01830 RE: Application for Disposal Works Installers License Robert Daigle: The North Andover Health Department has received your Application for Disposal Works Installers License for the upcoming 201.8 season. The North Andover Health Department has DENIED your application in accordance with 310 CMR 15.019 and Section 7.5.1 of the North Andover Board. of Health - Minimum Requirements for the Design, Construction and Maintenance of Onsite Wastewater Treatment Disposal Systems. During the 2017 septic installation season,the Health Department encountered several issues on septic system disposal works installation projects that you pulled permits for and were responsible for. The Health Department had the following issues on the projects listed below: 1024 Turnpike Street: This project involved an emergency distribution box (d-box) replacement, removing roots from the system lines and removal of several trees to eliminate the invasive root source. 1. On Friday June 30,2017 at 11:30 am,you called the Health Department for an Emergency d- box repair. Our office closes at 12:00 pm on Fridays and you were not able to make it down prior to the close of business to pull the permit and pay the fee before the weekend. You were granted a verbal approval to complete the repair over the weekend based on the stipulation that you would submit the permit application and fee on the next business day. The Health. Department had to request its submittal the following week and the permit application and associated fee were not submitted until the week after that on Monday, July 10,2017. Pagel of 3 North Andover Health Department 120 Main. Street North Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688.9542 2. The inspection.at 1024 Turnpike Street also revealed the installation of a polyethylene d-box which is in violation of the North Andover Board of Health Regulations which requires an EI-20 Concrete d-box. The d-box needed to be removed., replaced and re-inspected by department staff-. 325 Boston Street: This project involved the installation of an additional leaching trench to an existing system to increase the gallons per day capacity of the dwelling. 1. The bottom of bed excavation for the trench was left open for an extended period of time without being marked off. The excavation was open for approximately 10 days which is not standard practice arid is an unsafe condition in a residential yard. 2. During construction of the leaching trench, a required sand inspection was not requested and the sand was iristalled without inspection or approval. In accordance with the Septic System Installer Project Management Obligations form that you signed and submitted with the permit application,item 5a requires the inspection of the sand that is going to be used. 3. During construction, an effluent leak from the d-box was discovered by the homeowner and brought to our attention. It was clearly evident upon inspection that effluent was leaking out of the d-box and flowing down the pipe channel. As the installer, you should have brought this to our attention immediately and you would have received the necessary approvals to replace the component. 'I'he Health Department had to request a d-box replacement. 4. The Health Depart-merit has not received an Installation Certification Form (Certificate of Compliance) signed by you in accordance with. section 5.2 of the North Andover Board of Health Regulations. This form is required to be submitted within 30 days of completion of the final inspection. As discussed during our phone conversation, the Health Department is responsible for regulatory compliance and construction inspections. The health Department does not get involved with client/contractor Ltractor financial issues or disagreements. The department had to go above and. beyond to obtain the As-built plans and an Installation Certification signed by the engineer directly from the engineer because the first set of As-builts and dually signed Iristallation Certification were never delivered. The Health. Department as the inspecting authority and in conjunction with the engineer, determined that the system was constructed in accordance with the design plans and a Certificate of Compliance was issued. In reviewhag the issues encountered in 2017,the Health Department has denied your 2018, Application for Disposal Works Installers License. You have the right to request a hearing before the Board of Health if you feel this denial should be modified or withdrawn. A request for said hearing must be made in writing and received by the Health Department within seven (7) days from receipt of this denial. At said hear you.will be given in,,g an opportunity to be heard and to present to the Board of Health as to why this denial should be modified or withdrawn. If you have any questions,,comments or concerns,please feel free to call the Health Department between the hours of 8:00-4:30 on Monday,Wednesday and Thursday, 8:00-6:00 on Tuesday and 8:00-12:00 on Friday. Any questions regarding this matter can be answered through the North Andover Health Department. Page 2 of 3 North Andover Health Department 120 Main Street North Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688.9542 Sincerely, Ian J. aGrasse,CEI T director of Public Health CC: Board of Health File Suzanne Egan,Esq.,Town Counsel Eric Kfonry,Comm-unity and.Economic Development Director Sent via: CERTIFIED MAIL## f -f -- 006 8 9-Z J3//and; Regular First Class Mail Page 3 of 3 North Andover Health Department 120 Main Street North Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688.9542 � m 0 mr rq �e rf td't a err e a r rl f ruo r°rOSlagp Cprtii7pd Ppp � �'�TM!' py. C3 — YisdsWork C3 Return Rccelpt Pee c:Iprp C3 (Endorsement Required) ILI "I vi I Restricted Delivery Pep Endorsement Required) C3 ( (,s� ru 'total Postage&Fees ? � p�1 Ile n3 Sent To P'roet& f n7o., J or PO Box No. AZ-69--(,��.n. we .......... City,SParo,ACIP+4 ��, , � 711 Y I Complete items 1";��;grid 3. I gnatur Print your name and address on the reverse gent so that we cart return the card to you. Ci Addressee Attach this card to the back of the maiipiece,, c ived by(Printed Name) C. II of Delivery or on the front if space permits. t ""� 1 i _ s delivery address different ftrom item 17 ®Yes If YES,enter delivery address below: 0 No Dangle Construction LLC, Attention: Robert Daigle 14 Coffin Avenue , Haverhill, MA 01830 r °� Y Service yTyp, Priority Mall Express ❑Adult Sign��tur� Registered MaIITM ❑Adult Signature' strtatad D ry RpgIstered Mall Restricted Certified MalkD e , De very 9590 9402 2103 6131 5174 76 a Certified all RtttiStd f5s1C eh� Return Recelpt for ❑collect on Detivery`ro o Mprchand➢se 2. Article Number Mansfer from service laben ❑Collect on Delivery Restricted Delivery ❑Signature ConfirmationTM 7 ®� ured Mall 13 Signature confirmation 0 8322 5511 ured Mall Restdoted Delivery Restricted Delivery er$506 PS Form 3811,July 2015 PSN 7530-02-000-9053 Domestic Return Receipt i f Natasha Vance October 27, 2017 Andrew Maylor Town Manager Town of North Andover 120 Main Street North Andover,MA 01845 Dear Mr. Maylor: My husband and I recently completed finishing the third floor of our home in North Andover. As part of that effort,we were required to expand our septic system. Our contractor contacted the engineer who designed our original system, Chrristiansen&Sergi., and they designed the expansion. They irr turn recommended.Rol)Daigle to do the installation of the system expansion, We had a number of difficulties with Rob Daigle's work acrd wanted to bring it to the attention of the Town,as he is one of the companies certified to work in North Andover. The first issue is one of timeliness. We received an estimate for the work on March 8, 2017. The contract was signed oil March 20`h and we paid a deposit of$4000 to Rob Dangle on April 21, 2017. We received a Dig Safe authorization to begin work on May 1, 2017. Rol)estimated that work would tape 3 days. He confirmed that to me and to my contractor,Mike Koulheras. Rol)did not begin the work until July,despite calls frorn me in May and June. 1 contacted him on July 10"to ask when he would begirt the work because all of the interior work.was complete,but we couldn't use it because the final inspection couldn't be done until the septic line was complete. He began work on July 13/14. He excavated and left it open for several days.By July 25', the sand and chambers had been installed. There was a sewage smell and what appeared to be a leak along the older pipe leading to the original septic system. The excavation remained open until Aug-List.1",when the surveyor carne to complete the as-built survey. At that time,it was determined by the Town of North Andover inspector, Michelle Grant, that the distribution box needed to be replaced. Rob carne to replace it on August 5". The excavation was covered up and work was essentially complete as of August 18". A project that was supposed to take 3 days and be complete in May took over 30 days once it was begun 2 months late. The final inspection was signed on August 23"and we could finally use the space that had been ready since July 10, The next issue is one of the duality of his work. The contract he signed with us states that all of the work will be completed in a workmarifike manner according to standard practices. Some things that concerned me were the following, When he was ready to begin the excavation,the Dig Safe ticket had expired and they had riot marked the electrical and cable litres on our property,which is standard practice,but:we,being from VA,were not aware of that. lie proposed performing the excavation anyway without knowing definitively where the Innes were. We declined that offer,asked Dig Safe to reopen our ticket and got:a private company to mark the line on our property. He didn't call for an inspection of the bottom of the trench or of the sand once it had been delivered. When I called and asked him about the leak along the pipe,lie told me it was normal and nothing to be concerned with. Michelle Grant informed nae that the leak.was not normal or acceptable grid that the distribution box was crumbling and needed to be replaced.Also,the pipes coming out of the distribution box were: not sealed. He disagreed with Michelle that the distribution box needed to be replaced and carne to replace it on a Saturday when the Inspector wasn't available. All the inspections were completed clue to the exceptional effort made by Michelle Grant and Brian LaGrasse who continually monitored the progress of our project and took the tirrre to respond to any l questions that I had throughout the project. Additionally,he kept a number of pieces of large construction equipment in al ,`fir����h,m s x,t�„m x�rc�''N�;a*� f" � r� .'± r� r���e�v� ,✓�+� ��rY'Pw, t ,,,�"r�'1'�' our front yard fronn the beginning of,July through mid-August. Aside from being unsightly,itis also unsafe.,because itis air attractive nuisance. Lastly,his estimate was not accurate and did riot disclose a number of costs. Itis original estimate was for$6000-$8000. 1 spoke to Phil Christiansen and my contractor,Mike Koulheraas,who both agreed that$6000 was reasonable and $8000 would be the high end for the work required. The$2000 variance was to cover the cost of sand.There was also a$600 allowance for loam. He stated that he would provide the quantity lie had to purchase to confirm the;actual cost of the project. He did riot provide any documentation for the quantity and when asked for it,said, "I'm not giving you that." He added$1000 to the project cost for removing fill. Again,he provided no documentation or warning that we would incur an additional fec. He told the at the start of the job that he would riot require payment until die end of the job,but asked several tames for checks. I paid him $2400 once the work was substantially complete and lie had replaced the distribution box. He did not clarify that the costs of staking and surveying were separate and that he apparently had an agreement with j Christiansen and Sergi to perform the work. We do not have a contract for work with drern, but have received two bills from them - one for$350 and one for$667.50 -which were completely hidden costs that I didn't have the opportunity to shop around for a better price. He offered to connect us with a person he knew who could mark the utility lines on our property and quoted me a price of$700. 1 called.Dig Safe,got the,name of the company that they use and they were able to come mark it that day for$50. When I asked him for a cost to replace the distribution box,which was completely excavate and exposed,he quoted rrre$1000. Since distribution boxes cost$100 and the work was minimal,I told hirn I would get someone else to do it.Their he dropped his price to $400. It took hire less than an hour to install it. When I got the final bill,it was elated August 23, 2017, We had a Net 30 contract and I planned to pay the balance of$3000 on September 23, 2017. lie carne to my house to ask for a cheek on September 16"'.1 told him that I would pay him on the 23`°, due to all of his delays mid our contract terms. Iie said he would split the difference with me if he could get a check that day for$1500, so I did'pay him that amount, Prior to that adjustment, total actual cost for the project was $10,467.50. If I had accepted Rob's costs at face value for the electrical marking and the distribution box,it would have cost$11,717 - almost double his original estimate. My last issue with him was one of his attitude. Ile is not a good communicator. He was angry and unfriendly on the phone when I was pressing frim to start the work. Ile was very defensive when asked about any issues. Ile said disparaging things about the Town of North Andover inspectors in general and Michelle Grant in particular. Ile was riot truthful when asked. about the leak/sewage smell. I appreciate your consideration of the above issues. Please let me know if you have any questions. i Sincerely, Natasha Vance North tlndover resident Cc: Ray Santilli,Town of North Andover Assistant Town Manager Brian LaGrasse,"Town of North Andover Department of Health Director Michelle Grant,'Town of North Andover Department of Health Inspector i 2 of the VFW co.nfirmed that the money came from Mrs.Mallory and the VFW members are waiting for Mrs,Mallory to receive her next check so they can help fix the plumbing issues to got the shower working.They are asking the Board for more time to fix the plumbing issues.There has been a lot of progress but there is a lot more work involved than was previously anticipated. A discussion ensued regarding the future sale of the home.Ms.Rillahan stressed that it's important for the Health Department and the VFW members to work together to help the homeowner and other residents living in the home,Dr.McMillan questioned what exactly was being requested fi-om the Board members.Ms. Rillaban stated that the request is for the Board members to lift the previous order that deemed the home uninhabitable.Mrs.Sawyer stated that a home can be habitable with unsanitary conditions present.As long as primary human needs are being met such as heat and hot water,the home can be habitable,The improvement of unsanitary conditions will be monitored by the Health Dept.team. Motion made by Mr.Pease to lift the current order deeming the home at 98 Lyman Rd. uninhabitable.Motion seconded by Mr.Fixier.All were in favor. B. Tobacco Regulation—The new Tobacco Regulation was presented for signatures-fi-orn the Board. There were no objections to the vote already taken at a prior meeting,and the regulation was signed by the members. V1. NEW BUSINESS A. 143 Lacy Street/51 Bay Meadow Road-Request for an out of season subsurface disposal installation,to occur after November 30"h,dependent on the weather. ember 15 th is the last Mrs.Sawyer explained the North Andover Subsurface'irface Disposal Regulations.Nov day septic installation permits are given out, She stated that out of season installations are only for existing systems that have failed and not for now construction installations,Although out of season permits can be issued for septic repairs,Ms.Sawyer explained why it's best that repairs are completed before the November 30"'deadline.Robert Daigle,the septic installer for 143 Lacy Street and 51 Hay Meadow approached the podium.Mrs. Sawyer asked Mr.Daigle what his intended timeline was for getting both the systems in.Mr.Daigle stated that he intended on the work being done in about a week at 51 flay Meadow and anticipates less time for 143 Lacy St.Mi.Fixievasked why the systems were son,Mr.Daigle stated being installed so late in the sea that his timing on when the permits were pulled asked Mrs.Sawyer what weather conditions prevented him from starting the jobs.Dr.Trowbridgepossible problems that bad could prevent the installation of the systems.Mrs Sawyer explained the possof preventing the weather could have on the installation of a septic system including the possibility - I system from working properly.Mrs. Sawyer stated that she contacts anyone anticipating installing a system that the deadline for pulling the permit is getting close and encourages them to got the system in the ground before the deadline.The goal is to work together to prevent out of season installations and to provide the homeowners the best installation possible.It is important to have the commitment from the installers to see that the systems are installed before the November 30"'deadline.Mr.Daigle assured the Board that the work will be done within his anticipated timeline,Mr.Pease asked Mrs. Sawyer how many systems Mr.Daigle has installed and his track record on the installations.Mrs. Sawyer stated that there had been some difficult installations that required additional inspections needing to be done,The Health Department is there to observe the installation of the system,having the best interest for the homeowner.Once the system is installed during an out of season installation, the Health Department will sign off on the paperwork and issue a COC Only if the homeowners agree that the seeding will be done in the spring,(Note:The original agenda had the cutoff date for the out of season installation as December 30"'.This was a typo as the correct cutoff date for out of season installation is November 30fl'.This has been corrected in these minutes). Motion made by Dr.McMillan to approve the out of season installation for 143 Lacy St.Motion seconded by Mr.Pixter.All were in favor. Motion made by Dr.McMillan to approve the out of season installation for 51 Hay Meadow Road.Motion seconded by Mr.Pease.Ail were in favor. B. 712 and 724 Sharpners Pond Road-Mitchell E.Weisman,Esquire,representing owners of 712 and 724 Sharpners Pond Road,requesting a variance resulting fi-orn a violation of 310 CMR 15.211(1)(5), to allow an existing subsurface disposal system to be located outside the property it services, Mrs,Sawyer explained the division of the lots of 712 and 724 Sharpners Pond Road using an aerial view printout from MIMAP and where the septic systems are located.The location of the septic tanks for 724 and 712 Sharpners.Pond are both located in the backyard of 712 Sharpners Pond,Mrs,Sawyer explained that Title 5 inspections have been done recently on both addresses and both systems are currently in good working condition.The issue is that the owner of 724 Sharpners Pond is in non- compliance and doesn't have a septic system On his property.That requires that the Health Dept,grants 310 CMR: DEPAR."I`MENT OF ENVIRONMENTAL PROTECTION 15.402: Use of Local Upgrade Approvals or Variances 15.403: Local Upgrade Approvals 15.404: Maximum Feasible Compliance-Approvals for Upgrades 15.405: Contents of Local Upgrade Approval 15,410: Variances-Standard of Review 15.411: Process for Seeking a Variance From Local Approving Authorities t 15.412: Review of Variances by the Department 15.413: Conditioning of Variances 15.414: Variances for Increased Flow to Existing System 15.415: Provisions From Which No Variance May be Granted 15.416: Variances for Schools 15.421: Appeals From Determinations by Local Approving Authority 15.422: Appeals of Departmental Determinations SUBPART F: TRANSPORTATION AND DISPOSAL OF SEPTAGE 15.500: Purpose 15.501: Regional Abatement Districts 15.502: Transportation 15.503: Transfer Locations 15.504: Disposal 15.505: Equipment Appendix 1: Model Grant of Title 5, 310 CMR 15.000, Covenant and Easement SUBPART A: GENERAL PROVISIONS AND ENFORCEMENT 15,001: Purpose, Authority and Related Provisions (1) The purpose of Title 5, 310 CMR 15.000, of the State Environmental Code is to provide for the protection of public health, safety, welfare and the environment by requiring the proper siting, construction, upgrade, and maintenance of on-site sewage disposal systems and appropriate means for the transport and disposal of septage. (2) 310 CMR 15.000 is promulgated pursuant to the authority of M.G.L. c. 21A, § 13. i (3) The provisions of 310 CMR 15.000 should be read together with 314 CMR 5.00 and 6.00 which applies to all discharges to ground of sanitary sewage. t (4) Title 5, 310 CMR 15.000, should be read together with M.G.L. c. 21A, §§ 13 & 13A, M.G.L c. 21 §§26 through 53, M.G.L. c. 111, §§ 17, 27, 27A, 27B, 27C, 30, 31, 31A, 31B, 31C, 31D, 31E, 122, 124, 125, 125A, 127, 127A, 127P, 127E and 129; M.G.L. c. 83, § 11; M.G.L. c. 131, §40; St. 1996, c. 204, § 148; and St. 2002, c.176; St. 2004, c. 149, §39. 15.002: Definitions 310 CMR: DL PART ENT OF ENVIRONMENTAL PROTECTION For the purposes of 310 CMR 15.000, the following terms shall have the following meanings, unless the context clearly requires otherwise. Terms expressed in - the singular shall be construed to incorporate the plural, and vice versa, unless the context otherwise requires. 1978 Code- Title 5 of the State Environmental Code, 310 CMR 15.000, as revised and in effect as of 1978. Acre-a unit of land measure equal to 40,000 square feet which is considered a building acre in accordance with standard real estate practices. Agency-an agency, department, board, commission or authority of the Commonwealth or of the federal government and any authority of any political subdivision, which is specifically created as an authority under special or general law. The term shall not include housing authorities permitted pursuant to M.G.L. c. 40A. Alternative Systems-Systems designed to provide or enhance on-site sewage disposal which either do not contain all of the components of an on-site disposal system constructed in accordance with 310 CMR 15.100 through 15.255 or which contain components in addition to those specified in 310 CMR 15.100 through 15.255 and which are proposed to the local Approving Authority and/or the Department for remedial, pilot, provisional, or general use approval pursuant to 310 CMR 15.280 through 15.289. Approved Capacity—The capacity of a 1978 Code system reflected by the sewage flow as shown on the Disposal Works Construction Permit Application or as shown on the Certificate of Compliance, whichever is less for that system and not the calculated capacity based on 1978 Code loading rates which may account for overdesign or safety factors. For a system designed in accordance with 310 CMR 15.000, the approved calculated capacity is based on the loading rates found at 310 CMR 15.242. Approving Authority-A local Approving Authority as defined in 310 CMR 15.002; or the Department, with regard to systems owned or operated by an agency of the Commonwealth or of the federal government, or to systems serving a facility with a design flow of 10,000 gallons per day or greater, or on a case-by-case basis as determined by the Department to be necessary to carry out the purposes of 310 CMR 15.000. ASTM - The American Society of Testing and Materials. Bank(Coastal)— Any land or surface area so defined by the Massachusetts Wetlands Protection Act, M.G.L. c. 131, § 40 and 310 CMR 10.30(2). Generally, the seaward face or side of any elevated landform, other than a coastal dune, which lies at the landward edge of a coastal beach, land subject to tidal action, or other wetland Bank(Inland)—Any land or surface area so defined by the Massachusetts Wetlands Protection Act , M.G.L. c. 131, § 40 and 310 CMR 10.54(2). Generally, a portion of the land surface which normally abuts and confines a water body. I 310 CMR: DEPARTMENT OF ENVIRONMENTAL,PROTECTION Irrigation Well -Any on-site source of groundwater not certified as a potable water supply by the local Board of Health or the Department in accordance with M.G.L. c.111, § 122A and 160 or 310 CMR 22.00. Local Approving Authority-The board of health or its authorized agent or an agent of a health district constituted pursuant to M.G.L. c. 111, § 27 acting on behalf of the applicable board of health. Local Upgrade Approval-an approval granted by the Approving Authority allowing the owner or operator of a nonconforming system to perform an upgrade of the nonconforming system to the maximum feasible extent, all in accordance with the provisions of 310 CMR 15.401 through 15.405. Long-Term Acceptance Rate(LTAR) -The stable rate of effluent acceptance through the biological mat of a soil absorption system measured in gallons per day per square foot (gpd/sf) or centimeters per second (cm/s). Maintenance-All activities required to assure the effective and continuous operation and performance of an on-site system including, but not limited to, solids and scum removal from the septic tank, grease trap, dosing chamber or pump chamber and, re-leveling the distribution box, but not including a system upgrade. Mobile Home-A single transportable structure on a chassis designed to be used, with or without a permanent foundation, as a dwelling. The support system of a mobile home is constructed so that the mobile home may be moved from time to time. Modular Home-A prefabricated building designed and constructed to be used as a dwelling and to be transported in two or more sections to a site where the sections are permanently connected and installed on a permanent foundation. Mottling Due to Wetness (Redoximorphic Features) -A color pattern in soil consisting of blotches or spots of contrasting high or low chroma colors which may be an indication of the upper extent of soil saturation by groundwater. Multiple Compartment Tank-A septic tank containing more than one settling compartment in series. Munsell System-The system of classifying soil color consisting of an alpha-numeric designation for hue, value and chroma together with a descriptive color name accepted by the USDA/Natural Resources Conservation Service (NRCS) used as a standard procedure in soil classification. Naturally Occurring Pervious Material- Naturally occurring soil exhibiting a percolation rate of 60 minutes or less per inch which was deposited on a site by natural causes and not by human action. 310C&0R: (}FP1{{)]E-CllLN area are determined for purposes of applying the siting and design criteria set forth in 310 CMR 15.000. Soil Evaluators may perform the site evaluation required by 310 CK8R 15.100 while acting either as an agent of an Approving Authority (a fee may be assessed pursuant to M.G.L c. 40, § 22F), or as an independent agent of the owner in the presence nfthe Approving Authority. |fthe evaluator ioanagent ormember ofthe Approving Authority having jurisdiction over the system, h8orshe shall not act 8o8D agent for the owner. (�\ Based upon aoevaluation ofthe eu�abUitynfthe proposed disposal area for o ' 'proposed, 15.107, the Soil Evaluator shall certify to the Approving Authority and the Designer as to the accuracy of the soil evaluation in conformance with 310 CIVIR 15.100 through 15.107. The certification shall contain a recitation of the facts and rationale underlying the soil evaluation and acopy ofthe soil evaluation form. The soil evaluator shall submit the results with the following statement: \ certify that | 8rncurrently approved bythe Department qf Environmental Protection pursuant ho31OCK8R15.O17t0conduct soil evaluations and that the above analysis has been performed by me consistent with the required training, expertise, and experience described in310C)K8R15.O17. | further certify that the results 0frOy soil evaluation, 8sindicated 0Othe attached soil evaluation form, are accurate and iDaccordance with 31OCW1R 15.1OOthrough 15.1U7. Any certifications shall be forwarded to the Approving Authority, the Designer and the property owner. Failure tnforward certifications tothe Approving Authority within OD days ofthe date ofthe field testing shall hecause for revocation Vfthe Soil Evaluator's approval. 15.019: Disposal System Installer's Permit No individual shall engage in the construction, upgrade,modification, emergency repair, or expansion of any on-site system without first obtaining a Disposal System Installer's Permit from the Approving AV[hOrhM0 Authority. OispOGm| �ySt� |OetaUe[ P8rnnitSGhmU more The local Approving Authority shall issue Disposal System Installer Permits only to those individuals who have demonstrated knowledge of and experience with the proper construction and installation ofsystems inaccordance with 31OCK0R15.O80. The Approving Authority, bxissuance Ofonorder, may suspend Vrrevoke aDisposal System Installer's Permit, for otime specified inthe order, when itdetermines that the Installer has failed hOcomply with 31O CK8R15.8QOwith respect tothe installation ofone Vrmore systems, including, without limitation, the Installers failure tm provide the certification [gqVinad by 310 CK8Fl 15.V21(3). orthe Installer's installation orcertification {da system that fails tO comply with the Disposal System Construction Permit. 7.1.2 All fees shall be as indicated on the most recent fee schedule as created by the Health Department. 7.1.3 All licenses shall expire on December 31st of each year. A nonrefundable fee for annual permit shall be paid to the Town of North Andover pursuant to the current fee schedule. 7.2 DISPOSAL SYSTEM INSTALLER'S PE18UT 7.2.1, The initial application for certification shall include copies of licenses from other Massachusetts communities or two (2) years experience working for a licensed onsite wastewater system installer,three (3) letters of reference, copies of heavy equipment operator's-license and proof of possession of at least$100,000 of general liability insurance, 7.2.2 Initial certification to install or repair any individual onsite wastewater system or component of said system will require a 75% score on a written and field examination,prepared by the North Andover Board of Health. The examination will test the applicant's knowledge of sections of Title 5 and these regulations which pertain to onsite wastewater system construction. The examination will be scheduled within thirty(3 0) days after receipt of a completed application. 7.2.3 If an individual receives below 75%on the written portion of the exam,but above 75% on the field portion,the Director will approve the issuance of a single onsite wastewater system installation permit. Extra oversight will accompany this installation. If satisfactory practices are observed by the Health Department,the Director may approve the certification of that individual at his or her discretion. 7.2.4 A Disposal Systems Installer's Permit shall rest with an individual, not with a company. 7.2.5 The licensed installer shall be on-site at minimum for all scheduled construction inspections and specific construction points as detailed in the guidance document entitled "Installer Obligation Form" and shall maintain the construction permit.and a copy of the approved plan on site at all times. 7.3 SEPTAGE HAULER PERMIT 7.3.1 Permits to transport septage are to be maintained per vehicle which operates within North Andover. A copy of vehicle registration and proof of possession of at least$100,000 of general liability insurance shall be required for issuance of an annual license for each vehicle. 7.3.2 Septage pumping records shall be submitted monthly to the Health Department. 7.3.3 Vehicles shall have company name and gallons printed on vehicle.Vehicle and equipment must be in good condition, free from leaks, safe and secure. Inspections of new or additional trucks shall take place prior to initial permit issuance of each vehicle and episodic inspections will be conducted on renewals per Health Department discretion. Page March 21, 2018 To Whom It May Concern; Bob Daigle was hired by Beechwood Properties,40-60 Beechwood Drive,North Andover to repair and rebuild the septic system at 45 Beechwood Drive and to construct a water runoff swale at 1755 Osgood Street. As the property manager for these properties I worked with Bob on both projects. From beginning to completion Bob provided me with step by step details of his work. Bob's work was first rate. He was a true professional in all my interactions with him. I would hire Bob Daigle again and gladly provide this letter of recommendation Regard, William"Bud"Hart Manager, Beechwood Properties CHRISTIANSEN I/ INC. PROFESSIONAL ENGINEERS AND LAND SURVEYOR'S' March 20, 2018 Rob Daigle Re: As-built Plan for 325 Boston Street Dear Mr. Daigle: This letter is to state that on 12/22/17 you paid $600.00 to settle the balance of the outstanding invoice(dated 8/31/2017)that was owed by Richard Vance in the amount of $667.50 . This invoice was for the preparation of the As-built plan for the expansion of the septic system you installed. Please contact me if you have any questions regarding this matter. Very truly yours, Chris 'ansen & Sergi c `' Philip G. Chri I a en "" " ToWhom ItMay Concern: March 22, 2018 I am writing with reference to Rob (Robert) Daigle, Robert K. Daigle excavation and septic. I've known Rob for many years aya business owner with acredible track record. HeiSresponsive, does reliable work at a fair price and is knowledgeable in the field of drainage, excavation, and septic installation and repair. Asaself-employed business woman and entrepreneur inthe North Andover area, | find itsV important to beable to call onother business people and consultants inmany areas ofspecialty tmsupport our client service promises tQthe real estate brokerage clients vveserve. Over 34 years practice,xvehave accumulated a solid list ofgo-to people who help our clients and � friends with their home related n8eds For � . � Rob makes himself available atmocost, toanswer questions. Asone ofNorth Andover's most active real estate teams, at Susan Sells we would not hesitate to call on Rob for a homeowner needing septic repairs or replacement, d-box replacement, or other repairs related to Title 5 compliance orsafe and proper septic operation. Over the past few years, Rob assisted several homeowners all with good feedback, positive reviews and a good business experience. |f| can provide any additional information, please reach out to nl8. 978.470.2040. Best regards, Susan RochVVarQ, Broker Susan Sells Team, real estate Keller Williams Realty 138River Rd Andover K4A0l8lO J�� ��X � ~ 51 1N SELLS Real �stat e l e' am Keller Williams Realty Success North Andover Health Department Community and Economic Development Division NORTH ANDOVER BOARD OF HEALTH ORDER TO CORRECT Issued under the provisions set forth in Massachusetts General Laws 780 CMR,105 CMR 410.000 and MGL Chapter 111.Section 1.23. Date: February 9,2018 To Owner of Record: Property Location: AIMCO 50 Royal Crest Drive Corporate Office North.Andover,MA 4582 S.Ulster Street 01845 Suite 1100 Denver,CO 80237 Re:Inspection of Building 16,Building 1, Building 2 Dear Ms.Digiacomo., On November 30, 2017 Building #16, January 18, 2018 Building #1, January 25, 2018 Building #2 were inspected by the following staff of Community Development Division and Fire Prevention from the Town of North Andover, Brian.LaGrasse-Health Department Director Donald Belanger-Inspector of Buildings Michele Grant-Health Inspector Jennifer Hughes-Conservation Administrator Monica Gregoire--Staff Planner(January 18,2018 onward) Lt, Robert Bonenfant-Fire Prevention Allan Paduchowslci-Electrical Inspector Jim Hurley-Plumbing Inspector Please see the attached write up(s) that summarize by department, violations and corrections that need to be made to ensure the health and,safety of the residents of Royal Crest. Page 1. of 2 North.Andover health Department 120 Main Street North Andover,MA 01845 Phone: 978.688.9540 Fax: 978.688.9542 As we continue to conduct weekly inspections on Thursdays we will email and mail summaries of violations by building,by unit the following Wednesday.In this manner when we are at Royal Crest for remaining inspections we can re-inspect the buildings that have corrected all outstanding issues.Please let us know if there are issues correcting building/tuut violations by each departments specified deadline(s). r You have the right to request a hearing before the Board of Health if you feel this Order to Correct should be modified of withdrawn. A request for said hearing must be in writing and received be the Health Department within (7) days from the receipt of this Order.At said hearing you will be given the opportunity to be heard and to present witnesses and. documentary evidence as to why this Order should be modified or withdrawn. S' ely, Brian.Lrasse North Andover Health Director Cc. AIMCO-Denver Donald Belanger Michele Grant Monica Gregoire fennifer Hughes Lt. Robert Bonenfant Allan Paduchowski Jim Hurley Page 2 of 2 North.Andover Health Department 120 Main Street North Andover,MA 01845 Phone: 978.688.9540 Fax: 978.688.9542 50 Royal Crest Drive Inspection Report Health Department 105 CMR 416.000 ut o C N P I ti n o Io w g c s uai s z a } v Z 2 Z v1 s=1 I1 si �I r1 �i LI uti s) o A S _ _ �RG 16 Royal Electrical Room and&alter Room-Bath have open PPS and holes Crest Drive The I in Root waits and ceilings. building � i Third Floor common area•Walipaperis peeling and there are < i6 (structurally) 30-Nov-17 Michele Gran[ jPaz Fag Fag Pau Pass Pass Fag Pass 1pass Pass Pass i cracks and stains in the coiling -Fag 112 22-Mar•Ig ! 1.Set Floor halh ay has cracks In ceiling,wall paper peeling and waitswe ked 16 Co l 2.Visible holes do rcoFcornerx,entry for rodents 16 Area 3C-N—v RNchek Grant Pass Pass Fail Pass ,Pass Fall Pass Pass Pass Pass Pass k 1.3.Dead squirzel to attk _Fail 112 2�CRar-SE L Bathroom sinkis leaking. 2.Maid in cabinet nmdto stove. 3.Bathroom ceilings am water stained. 4.Broken wIndaw- 5.Nap screen an living mom Window 36 34Nav-?7 Michele Grznt Past Fail Pass Pass Pass Fall Fail Far? Fail Nate:A twos humid/mo1sL =Fa#1 -112 !ZZ-Mar-18 1 L kitchen sink glees are wrapped with electrical tape. 2.Uneven flooring In living roam. 16 2 130-Nav-37 Michele Grant 4 Pass Fan Pass Pass Pass Pass Fail Pass Pass Pass 3.Shade broken in INN room. Fag .112 22•Man18 t s L Shelves umder sink are ratted and buckling 2.Fainted over mold,must remove and replace 16 3 1—M-11.7 Michele Grant Pass Fass Pass Pass IPass Pass F�� FaA 3-Water stalm on ceiling in living room. .Fail 22-Mar-18 i kitchen sink doesn't drain Properly. _ 2.Uv;ng room ceiling is cracked. ++ &Apartment damp.Tenant stat ed it is better since drainswere 16 4 30-Nov-17 Michele Grant Pass Fail Pass Pass Pass Pass Fail Fail Pass Pass installed buta artmern still has.lot ofmoisture Fail .112 22-Mar-18 I 1 L Stove tap is corroded 2.Cabinet doarknob ls missing. I B.Tub finish Is warn away 4.bathroom vent Is broken. 5.Bathmom tight Is noted. 6.SlIderscreen is dpped 7.Master badraam shade does not work 16 is II IW-NOV-17 Michele Grant Pass Fan 1pass !Pass Pass Pass Pass Pass Fail S.Condensation,draft around AC unit.Not weatherught Fab 112 Z2402r-18 Vacant Apartment III I L Needs to be painted 16 6 LNov-17 Michele Grant I C Pass Pass Pass Pass Pass Pass Fall Pass Pass €an. 2.Secar:d bedroom screen is not tight fitting.it is bowed Fag 112 22-Mar-18 LKEtchen stnkfaucetis loose 2.Kitchen sink cabinet in poor condition 3Sllder screen has small hales 16 7 30•Nov-17 Michele Grant ! Pass Fan Pass Pass Pass Pass Fail Fag 4.Masterbathventisbroken Fag :112 22-Mar-18 ! 16 8 30-Nav-17 Mtehele Gram k I Pass Fail 'Pass Pass Pass Pass Pass Pus Pau Pass It Kitchen Sink is base. Fag 112 22-Mar-18 Page 1 of 6 So Royal Gest Drive Inspection Report Health Department 105 CMR 410.000 o v v 6. (fig 2 iQ o m to v D d O a a C O w z ti `t cl Lr `r tl 'i �r i ar L I i 1.Under kitchen sink is deteriorating, j I Z Surface behind kitchen sink needs to be replaced. 3.Master bathroom light fixture is rusted. 4.Slker door tack is broken 5-Slideres donot open or dose easily. 6.Windows thmn8trout apt have broken blinds,condensation 16 S 30-Nm,17 Michele Grant Pass Fail Paz Paz Pass Fall FAH Pass Fait Fall and broke I pedscreens Fail 112 22-Mar-18 1 L Ught in second iL bad raam oat working. 610 30•Nev17 Michele rant 1 i Pass Fail Pass Paz Pass Pass Fab 2.latch-sink base is roes,natsmooth Fall 112 22-Mar-1g 1.Bottom drawer of stove does not work. 2.Seccnd bedroom woli paint Peeling. *,5 ii 30-Nov-17 Michele Grant ;Pass -Fall Pass Pass Pass Pact .Fail Fail Pass !Pass Sewndbedroom ceiling int pee'! Fall ;1112 22-Mar-I& i i 1.BaU;room sinkstappers broken. � 1 2.Under kitchen sink is budded,parousjnon washable. 3.Living roam walls and turners cracked- 4.Livingroom ceiling cracked. i S-Master Bedroom ceiling cracked and has water damage. 1fi 112 30.81ov-17 h9rhele Grant Pass Fit Pass. Pass pass Pass FaH Fail 'P�ass�Fall 6.Hole In second bedroom=eM Fail 112 22-Mar-19 2 1 19-Jan-18 �MldieleGrant Pass Fait Pass 1Pass Fail Fail Fab Pass Pass I Fall 63 22-Mar-18 i Gartege Gree ler daesnt wruk grid Bedroom screen is bowed Bathroom vent dant work Closet Ught daesntwenk mirrorbacking Is Falling Shdtis drippkrg 1 2 I 118-1a,18 Michele GM11 I Pass Fall .Pass Pass Fall Fall Fail Fail Paz Fail Master bathroom light doesn't work Fall 53 22-Mar-18 I Bathroom fan doesn't wank 1 3 18-Jan-18 'Michele Grant I .Pass Fail Pass 1paz FaR Pass Pass Pass Jr. watertema is 160 degrees Fall 63 22-Mar-18 Bathroom Vent doesn't work- i 4 18-Jan-18 Michele Grant Pass Fa .:Pass Pass Fail Paz Pass Pass Pass Pass Water7em wasl60d reel Fag 63 72-Mar-18 Master bathroom vent doesn't work Main Bathroom vent doesnt=rk i Uving ram Closet,No card an the closet light 1 5 1&lar,-28 Michele Grant Pass Fall rPaz Pass Fait Pass Pass !Pass Pas Pass Floors arc uneven Fail 63 22-Mar-18 { Living mom floor,under the heatingelement,fioortngis not flush to the wal!There's a gap that Is not washable. Slider shade is broken Main Bathroom Towel rack Is broken Ceiling IS Subbltng,Gelling contains asbestos 1 fi 18,lan-19 A7rchck Grant Pass PastPass Pass Fail Pas Fall Fail Pass Fall water Tem Isl6od rees Fail 63 22 Mar-18 I Page 2 of 6 50 Royal Crest Drive Inspection Report Health Department 105 CMR 410.000 $ Im c; o i O .O R O o C C a 9 n ¢ C C u I Wz i zr _ cl of $I $i �' s ' i £I o s b o ai o — — ILL j2 �w Sliding Door,Screen has holes In It j I Floor In the Hallway,kitchen and living room completely uneven The kitchen like does not shutoff 1 Second hedraam screen is buckled and k no4 decked to 1 7 18 -S8 Mic'tete Grant ! I Pass Pass Pass L.. Pass Pass 1pass Pass Na Bathroom mGmr,back€ng is peeing away Fag 63 �22-Mar-1E j sliding glass door,Missing handle set door Is broken j Oven drawer is broken II[ Halfway,Waterleak stain ;8 f18-San-SE M'.chete6rant f -Fast Pau Fait Fail Pau feR €fit Fag 2nd bedroom Holeslnthe wail Fait 63 22-Mar-18 Main fiathroum Sink is not draining properly i No stopper to the sink 2nd Bedroom Blind doesn't work Master Bedroom,semen Is bowed 11 targe crackabove the bathroom door �6 !1g-Jan-18 Michele Grant Fag Pass Pau Pass Fall Pau Fall Fail Water temps are running at 160 degrees FaR 63 22•Mar-19 1 II Fmom are extremely uneven 1 10 38-lan-18 IM€thele GrznF I {Pass Pass Pau Pass Fag Fess Pass Fait .Pass Pau lVentin the bathroom has abate In it-creattngJaMed edges Fail R 22-Ma*-13 I 2nd Bedmom-Screens arm broken 11 I 12-lan.18 Michele Grant I Pass Pass Pass Pass Fab Pass NO Fail Pass Fag Master Bedroom-Celgngk cracked —Fill 63 22-Mar-Sg Dining room dimmer doesn't work Kitchen stove vent doesn'twork I Water stains on the bathroom celgig Bathroom sink stopper doesn4 work Batluoom-11 paper is pealing Sibling glass door lock is broken 1 12 18-Jan-18 Mkhele Grant Pass Fag Pass Pass fail Fait Fall Pau iPass Fail Master Bedroom-Sink stopper is broken fall 63 22-Mar-18 Calling-8ubbiing and buckling - Hotel In walls-Kitchen and Bedroom#2 Bathroom sink Is cogged ! Minor in bathroom-Backing is chipping No Screens an bedroom windows - 2 1 264an-181MIchele Grant Pass Pau Pass Fait Pass Pau Pass Fag Pau Pass Pass i Closet light bulb is exposed Fab 55 22-Mar-18 I Living mom-tlnevenfioors Tenant has had multiple centipedes : Closet Betlroom 42 Exposed bulb 2 2642n-18 MtMele GranF Fars Pass Fag Fag Fag Fag Pass Pass Bathroom Mirror-Baddng is chipped FatJ SS 22-M.ar-S8 I Exterior Rotten Facing-Boards itarge holes-in soffir below balcony on lower side Window Boarders have insect Infestation-Holes throughout i Boards are also compromised j rash,dothes and DWI behind the washer and drier Front Door-Needs weather stripping Front Door-Crackat the threshold 1 3rd Fbor-Cellie8 is hubbtinglchipping Areas throughout the common area is peeing-a lot on the3rd i____25-Jan-181MJcheleGrant Pass Fag Fag Pass Pau Pass Pass Pass Pass Fag Pao Boor Fag 56 22-Mar-18 Page 3 of 6 50 Royal Crest Drive Inspection Report Health Department 105 CMR 410.000 Zq IM Is 6 z z Celling-Bulabli gandbuciding Kitchen and Bedroom 2-Holes in wails Bathroom-Clogged sink Bathroom Mirror-Backing is chipped Pass Far 56 �22-Mar­18 25-Jan-18 Michele Grant _Fad Fail Far Paz Pass Pass lPzn Ceiling Is bubbling and buckling Kitchen and Bedroom B2-Hotel In 111—111 Bathroom-Sink is clogged Bathroom Mirror-Back Is chipping Bedroom Window-No Screens 2I 1 2-jan-18 IP= Fait Far Fall par Pa. Pa. pass Ckis Fall 56 22-Mar-18 5 Ichele Grant Uneven Floors Multiple Centipedes Bedroom 2-past-exposed'"Re �1.o la Michele Grant 1P.. Fag Fail Fall Fall Pass F-U Pass Pass 1 Paw bwathroom•Chllll db1lrg,nMl— FAR 56 122-Mar-18 Strong moisture odor In mathmern Closet rmthen Closetneedsa door runner on floor Dining Room-Exposed Bulb Hannay closet-LIgbtis, 26-jan,la MitheleGrant Pass Pass Pass P� Fail Pass fall Pass Pass �pass Rear Bedroom-N­=g Fall 55 22-Mar-73 Strong Moisture odor In bathroom closet kitchen closet-sliding door needs a runner on the bottom. Dining room-Exposed bulb Hallway closet-light(10ISn't work 254an-18, �JeGmnt Fass Fa3 .s Pass Fall Pass F., Pass L Pass Rear Bedroom-No cover over light —Fail 56 22-M.,18 thing room-Water damage to walls-Chipping and bubbling- Not ubbling-Not a smooth washolde,surface AIC-C-ld at'coming through-Moisture and condensation buildup Stove-Ray burners Bathroom sink doesn't work Bathroom-Underneath the sink-Surface is not smooth and washable II Dining room-No cover on bulb/right fixture 26-jan-13 MicheleGrant, Paz Fag Far fag Pass Fad Fait Pass Rear Bedroom-No Bulb W 55 22-Mar-'18 !Living room-Water damage to waits-Chipping and bubbling- Non-smooth Non washable surfaces AJC Cold air coming through cracks-Condensation buildup Stove-Rusty burners Bathroom-Sink stopper-Broken Bathroom topper-Brk­ Bathroom Cabinet-Not srnticith washable surface Dining room-No cover on bulb Pass Fail Pass Fail fall Pass—Fail Pass Fall P= 1Bedroom Rear-No bulb Fail 56 22-Mar-18 Page 4 of 6 50 Royal Crest Drive Inspection Report Health Department 105 CMR 410,000 i ci 4i Q 0 'y a'M u .'� C 1 Cr C ca w o Fi a i G 9 a o w ! =m3 g I�! Q° Ut s �I a o° a! idtchen Sink-Front drawer-Broken Bathroom sink-Drains to slow Master bath-Broken popup red ! Dining mom-No bulb and gaps between the fixture and the calling No nature in the rear bedroam Sween-Ripped-Behmd slider handle 2 5 26-1an-18 Mkhele Grant 4 ;Pass Pass Pass Fell fail Pass Fab Fab Fars FaB Masterbedroam-Screen needsto besecure Fail 55 22-Mar-18 Kitchen Sink.Front drawers broken Bathroom-Drains are slow Mastemath-Popup and-Broken Dining roam-No bulb and gaps between the fixture and the calling. No fixture In the rear bedroom III Screen-Behind slider door handle-Rippe 2 5 25-tan-l8 Michele Grant f Pass Nil Pass €ail Felt Pass Fall Pass Pass Fail Master Bedroom screen needs to be secured Fail '56 i22-Mar-18 Kitchen Faucet-loose Master Bath-Stopper Is broken Kitchen-Electrical outlet Is broken i Master Bathroom-Broken the Master Bathroom-Broken Stopper Dining Room-Exposed bulbs ! I .Rear bedroom-Exposed bulbs 2 5 26-tan-18 Michele Grant Pass Fag Pass Fall Fag Pass Fall Fat? Pass kFass ieedmom-tamimteundertheautleth thedoor Fait 55 22.Nar-18 3 ! Kitchen Faucet needs repacing i i Master Bathroom-Stopper is broken I!I K'itdten electrical outlet-broken 7 Master Bathmom-Broken tile and broken stopper llj DIBFng room-Bxposed bulb •Bedroom rear-Exposed bulb 2 8; 2S-lan-lg Michele Grant Pass Fail Pass Fall Fail Pass Fall .Pass Pass Pass Bedroom-Laminate under door broken Fall 55 1 Z-Mar-18 Kitchen-faucetlsloose Main Bathroom-Stopparisbroken Master bathroom-Stopper doesn't work Dining room-Exposed bulbs in closet Bedroom-Screen is broken 2, 7 26-1 -18 Michele Grant Pass Nq Fars Fail Fag FA Fall Pass Pass Fall UvinBroom Door-Slider door is difBcuit to open FaB 55 22-Mar-18 ! Kitchen Faucet loose Main bathroom stopper broken Master hathroom stopper broken l Dining roam closet-Exposed bulbs i Bed room screen broken 2 7 25-Jan-l8 Michele Grant Pass fail Pass Fall Paz Fall Fall Pass Pass €aiS Living mons slider,QSNFcuittaopen Fait 56 22-Mar-18 j N.Rchen Faucet-Repair - - Master bathroom-Stopper broken Main Bathroom-Sink stopper broken '.. j K tchen-Food closets-Nota smooth washable surface �Kltrhen sink Grout-Replace 2 g 25-tan-18 MEcltele Gnnt Fass Pass Fars Fait Fag 'Pats Fall Pass Pass M.ssKitthen Slrk Cabtnek-Notasmoath washable surface Fab 'S6 322-Mar-18 I Page 5 of 6 50 Royal Crest Drive Inspection Report Health Department IDS CIVIF 410.000 —8. "0, -2 t9 !2E X1 o F Ed Toget Seat-Broken Bathroom Mirror-Backing Is chipped Master 13.1ham-Sink stopper broken Sudirm,Door Replace weather stripping Sliding Door-tack Is broken Rear Bedroom•Exposed Bulb DiningRoom-Expwcd bulb 9 25-jan-18 Michele Grant ilass Fag Paz 1,Pass Fail Fall Fall Pass pass Dninit room-Exposed bulb "1 56 22-Mar-18 Dining room-Exposed bulb-Lg gap between the fixture and the telling. Rear Bedroom-exposed bulb Kitchen Sink Faucet-Broken Kitchen sink cabinet-Not a smooth washable surface. Kitchen Light tWa R Snitch)-Broken Main Bathroom=Broken Stopper Master Bath tub-Seal faucet Pass ss Pass Chip ed b.ckIng to the mirror 10 pFail P= Fait Fad Pass Fell Pass P. F.11 S6 22-Mar-18 Diningrcom-Exposesibult, o Rear dr.m-Exposedbulb RearB:dreWall-Damage near the the cellIng 11 7S4-18 Michele Grant I.s. Fall Pass Pass Fag P_ F.R Pass Pass Back Closet-Where the ceiling meats the mil them are cracks Fall 56 22MVI­28 INIaln Bathroom-Replacegrout aroundthetub Master 1,11r...-Threshold the-broken ;Master Bathroom-Stopper Is broken roken Dining roam Exposed bulb 2 - 21-1811 MJChela Grant Pass Pass Pass Ps Pass a,Bedroom-No pull chain In closer Fall S6 L_.. Page 6 of 6 50 Royal Gest Drive inspection Report Building,Electrical,Plumbing.Fire Prevention 9th ofthe Massachusetts State Building Code 780 CMR _ 0 � d g o p a z a, o F - G E £ _ .� `_ 9 z i C�.in dectricai mom exposed to auris,should have min.518 � flro rated sheetrxkw3th ap penetraElartssealed. 3n1 flaorhaU mcep*ack mistnggmuM. { Front outside box needswp cover. Rear expased electrlcal conductor. :Gable ,dd--apes,to the elements,need to be repaired. 1 18-larr•:8 Dorukt BBE er Pazs Pas Pass Pass Fars IPau PauPas Pass Fsif Fad Pass Pass Mier heater needs m4zlr.vaFx temperature smtexi en caun rrecep c no pr a n. j 1hinE roamWati mcep3acte-rtversew:red. 3k ' Bathre m reseptade no GFCI i.8-Jan•18 Donald r Pass F Fail Fag t ffa8 Tub&5'.:avxrvaNe needza ustment Pass P— Fad 3 018 3 018 1 2 1 2 3122f203E 1 3 1 Z Bathroom tan networking Praperii'• 1 4 1 2 18dan-18 Donald Mauer Pass Pas Pasz Pass r,_ Fal Fad Fab Tubsh—ervalveadivahnent FA 3 018 Met— receptacles no Erourds S 2 l2 i8.3an-18 QonaM Bela r Pass Pass jPatt FaR Fs$ F10 €al Pati Both bathroom riacIn no qM f 3,12212018 1 6 2 .2 28-j I- Darraid 8e Pass Pala Pass Pass Pass rA FaE Fab 'T b showerodiustmenrvafve Fbd 3 KRd:en counter no GFr1 pratecttnn 1 1 7 2 1 18-Jar!-18 'Danatd eda^. 1 Pas iFas Pass Pazs Fri Fag :fad Fst3 Tub atmw-_radlustmentvalves Fab >'-IJZC1016 .. � ' I 1 .Broken handiu oasttding dear .'hen GFCI notworking, i Muhrpleexgnslancmd In r¢arbedr—n. 1 8 2 i2 IH-?an-16 Oanald Bean er Pats 1P.. Pass Gass Fan Fag 'F M Tubshowervaiveadlustment. €a8. .3I2220i8 Bathroom re.lecle na GM 3 4 3 2 i38-1�n 18 Qwwid Befan ,Pass Pass Pass 1Fas Fall FO FA F RsPtace3 aywi[hand-sca?d tub shawvvatve F44 '.3f22t2028 # Bathe oro msePtacle rw srourtd. j :iQtchan wunIer recePgdes co grounds 1 10 3 1 UW!--18 Donldlld. or i i Pas Pass IPa. Pass F.1 Fal FA Fab Rzp' Sway Fth fF old tubshrnvnrva&e(seticmosj f;4 312212018 I i Bathroom fan rretwarkrtg properly BaLhmam recePgde no Emund. { Mwtlple Mmptactes throughoutapartmentwithautsmu:ds 1 11 3 2 28dan-16 Dar�dBelan v i 11 Pats Pass Pass F FOR Fab Fal F .adusttm in both bathrooms Fafl :3(22/2018 . Lving raam—optaces reverze scare Wen—M 1 �5etten for both bathrooms. 1 12 3 2 18-1a,la .Donald Behn er p.. Pass Pass Fag Fed FA Fag F# N—Rxtures rw rm?t. Fal 3, 018 3/72!2018 I i 1 } ' € 3t2zr<B1s 3 18 818 1 3frz�v38 I I Page 1 of 3 Mfl!p mwm M I vM095.1 U MME a f i � f v 9 M 92 92 M 99M 29 9z � e Wee JF..RE3 p iy E e .ez ziS4. ;".Hzz o z99z z$z°zmziO - _— -— — _. .. al 233 2 2 Zia "h ar 0 lz Ti ax E ° p q ' �� �• m � mem � 'm"� mmr`S �aiQS ., $� `�� � s M �gg L g s s Nz N N N N W So Reyal Cres!Drive Inspection Report Butding,Electrical,Plumbing,Fire Prevention 9th ofthe Massachusetts State 3uilding Code 780 CMR 2 ,4 1 2 Note the water heater tempcmium for the budding Is to hkgh 2 'S 2 2 Note the water heater tem erature for the bullding Is to high Note the water heater temperature forthe budding is to high 3lal2rn8 2 6 2 2 Note the water heater temperature for the budding is to high i 3/22j2ai8 2 7 2 2 i 3j27fiAi8 2 8 12 2 Note the water heater tem stature for the budding Is to high � 2 9 3 2 I 1 Notethewaterheatertemperatumforthebufldinglsto high_.. I 3f2212o18 2 3 2 { Note the water heater tenperature forthe building is to high 3f�2I�t8 2 T i-2- 1 Note the water heaterteraperature for the building Isto high 31 ��efe 2 H 3 2 !No".e water heater temperature for the buCdingis to high I i Page 3 of 3 50 Royal Crest Drive Inspection Report Fire ins no bid numb ins date ins nam f bidno ILsprink If falarm f exblock f sdet'f hwsmoke (ffext notes status fu date I Unit 1 smoke co aetector was not operational due to a wiring Issue. RC-SFreExtlns 16 8-Dec-17 Lt RobertBonenfant Pass ':Fail !Pass Pass Pass Pass Drier vents were in need ofcieaning,fou ndahemyaccumulationoflint bythe flapper. Pass 3/22/2018 RC-2FlraExtlns 1 18-Jan-18 Lt.6onenfart Pass Pass Pass Pass 3/22/2018 RC4FineExtlns 2 25-1an-18 Lt Robert Bonenfant Pass 'Fail Pass Pass Pass Pass Fall Housekeeping behind the clothes dryers needs im rovemenL Pass 3/22/2018 I Page 1 of 1 1 JOHNSON& Mark B.Johnson(MA,NII,DC) BORENSTEIN, LLC Donald F.Borenstein(MA,ME,Nn) ATTORNEYS AT t.A W Rachel Davis Baime(MA) Gregory R.Richard(MA,NH) 12 Chestnut Street Kathleen M.Heyer(MA,NH) Andover,MA 01810-3706 Thomas D.Orr(MA) Tel: 978-475-4488 Fax: 978-475-6703 O£Counsel www.jbllclaw.com Robert W.Lavoie(MA,NH) don@jbllclaw.com Lorri S.Gill(MA) Paral�_gals Karen L.Bussell Danielle R.Corey Lianne Patenaude Ellen M.Melvin Via Email: segan@noriliatidovei-m(i.gov m(r.gov Tina M.Wilson March 19, 2018 Suzanne Egan, Town Counsel Town of North Andover North Andover Town Hall 120 Main Street North Andover,MA 01845 Re: Owner AIMCO Property: Royal.Crest Apartments,known and numbered as 1 Royal Crest Drive and 28 Royal Crest Drive,No. Andover,MA Dear Suzanne: Thank you again for arranging last Thursday's meeting between my client's team and yourself,Mr. Maylor and Mr. I-foury. I believe it was very productive and puts Aimco and the Town on a path towards addressing their respective concerns cooperatively. As we discussed at our meeting this letter will confirm that, 1.) the North Andover Board of Health hearing scheduled for March 22, 2018 pursuant to 105 CMR 410.850 will be postponed and rescheduled if necessary to allow Aimco and the Town to further explore a cooperative resolution of the issues under appear and 2.) the Town's weekly, scheduled inspections at Royal Crest will be suspended to allow Aimco and the Town to further explore a cooperative resolution of the concerns that prompted these inspections. Any inspections required of the Board of Health under 105 CMR 410.820 or other applicable law are, of course,not subject hereto. As you know,the Town's Building Inspector,Mr. Belanger, also issued a violation letter dated March 6,2018, subject to a 45-day appeal period. It is requested that the Town and Mr. Belanger consider temporarily revoking that notice without prejudice, also to allow Aimco and the Town to explore cooperative resolution of those issues. Suzanne Egan,Town Counsel Town of North.Andover March 19,2018 Page 2 I 1 would appreciate your confirming agreement with (1) and (2) and your thoughts on the building inspector order. Thank you again for your time and consideration and that shown by Mr. Maylor and Mr. Kfoury. Very truly yours, JOHNSON &BoRF-NSTEIN, LLC ,,''Donald F. Borenstein DFB/mbf Cc: Aimco i TOWN OF NORTH ANDOVER OFFICE OF TOWN COUNSEL 120 MAIN STREET NOR'T`H ANDOVER, MASSACI=II.IST,TI-S 01815 Stizaime P,Egan TEL(978)794-1709 Town C''ounsel FAX(978)688-9556 segan@nortliatidoveriiia.gov hortliandoverriia.gov Via Email: don(a-)jbllclaw.coni March 19,2018 Donald Borenstein Johnson&Borenstein,LLC 12 Chestnut Street Andover,MA 01810-3706 Re: Royal Crest Apartments lRoyal Crest Drive and 28 Royal Crest Drive Board of Health Appeal Dear Don, Thank you for your letter of today,March 19,2018. 1 would like to clarify the Town's understanding of the agreement reached between your client,AIMCO, and the Town at last Thursday's meeting. I agree that the meeting put the parties on a path toward addressing the concerns surrounding the property. However,it was the Town's understanding that the Board of Health matter will be stayed and the weekly inspections will be suspended on the following conditions: 1; The Town will provide AIMCO with a list of the significant violations discovered during the inspections; i 2. The:Parties will meet to establish apriority list of the most significant violations and to t f establish a time table by which the violations will be remedied. AIMCO will make the necessary repairs in all buildings within the complex,including those that have not yet been inspected. The non-compliant conditions will be resolved in order of the health and safety risk posed by the j violations;and, 1 3. AIMCO will obtain the proper permits for the work,to be performed. The parties agree that the work will be inspected by the Town inspectional services officials. With regard to the Building Inspector's violation letter of March 6,2018,the Town cat-mot agree to revolve the letter without prejudice. However,the Town will agree to wrap the building;code violations into the schedule of repairs to be done throughout the complex and in consideration agree to stay the appeal period. Thank you for your anticipated cooperation and your client's attention to these important issues is appreciated. Very truly yours, Suzanne P. Egan Town Counsel l ; I t I r 1 I i i i I iII 1 ti RN MONTHLY REPORT— March 201.8 Immunizations- -Just a few in office flu shots i -Inventory, MHS Data Entry, filing with reimbursement company for completed shots. -**Since last meeting: Flumist,which has not been recommended the last two years,was re-added in late February to the list of recommended vaccines for the 2018-2010 season. There will be limited availability and priority will go to school based immunization clinics. - Clinics/Outreach- -BP/Cholesterol Clinics @ Snr Center every 2t,' and 4th Wednesday of the month -BP clinic rotation continues at Senior Housing -Free Cholesterol Screenings planned for Health Fair @ Senior Center Monday March 2611 -Office walk in's-----residents with general health concerns, requesting blood pressure and glucose checks. -Teaching done with resident on checking glucose at home and how to use device. Meetings/Trainings--- -Coalition &MRC -Senior center staff -Adult Mental Health First Aid"Training/ 8hr training -Emergency Risk Communication Training/ 8hr training Communicable Disease/MAVEN- -Research, calls, follow-up. Low activity. -A few more Influenza, activity slowed in last few weeks- 68 total since Fall Misc- -Sharps collection and packaging -Library Series. Christine Shaw, Director of School Counseling Program at Merrimack College and also a Mental health First Aid Instructor came to speak at the Library about Mental Health and what the first aid class encompasses. i I MqqLhly Report—March—Michele Septic Inspections: l SEPTIC, Bottom of the Bed, Final Grades, Tank inspection and re-inspections As-Built— 2 COC's — 2 D-Box — 2 Family Co-op Royal Crest Meetings and Inspection Meetings Order Letter/Spreadsheet Preparation Inspections — Health Fair HOUSING Meetings - 2 Pleasant st-- 3 Meetings—16 MHOA Meetings-2 TRASH TRUCK PERMITTING Many Trash Truck Companies are still have not permitted — Including, North Side Carting, TBI TRAINING—3 Royal Crest— 2 FOOD Babba's Howling Wolfe - 6 Jade — 5 Home Cook-- 1 Mobile Food - I Meetings — 7 Complaint based inspections Family Co-op MONTHLY REPORT from the Public Health Director March 2018 MEETINGS: • Region 3 HMCC Meeting • Region 3B Coalition Meeting • Region MRC Meeting • Lyne Savage Budget Meeting • Meeting with Division Head regarding Budget • Meeting with Division I-lead regarding other town department personnel issues • Meetings with Town Counsel regarding multiple topics • Regional Opioid Meeting (MVPASAP) Board of Directors • Meeting with JRM and town Counsel • Meeting with Dynamic Waste- Permitting • DPW/Wheelabrator regarding sign installation • Region 313 EDS Contractor meeting • Town Manager-Department Mead Meeting • Rec Department Meeting—Running Series • Finance Committee Meeting TRAININGS: • Website Maintenance training- IT • Cultural Diversity seminar- HR INSPECTIONS: • Food: 1 • Trash truck route signage • Housing: 13 • Trash Complaint: 1 • Dumpster: 1 Compactor/Noise issue REVIEWS: • Building Permit Applications and Occupancy Permits: 58 • Reviewed 37 Food Inspection Reports • Title 5 reports: 6 1 Administration: • 2 Budget/Revolving Account Memo's • General Customer Service • General Animal Control • Route research for Waste Haulers/designated routes • News Letter . 0 Septic Brochure Drafted • Interview Intern for One Year Fellowship i • Power Outage PSA on Food Saf'e'ty Correspondence: • Septic Approvals,Denials • Garbage disposal removals • Septic Installer Denial • Royal Crest Appeal • Ron Beauregard-Tobacco Control MISC: • Correspondence with Chairman • Snow, Snow and Snow Happy Spring i i 1 1 t 1 1 1 i i Effects Marijuana Use On Adolescents Short-term effeds include: I []Problems with learning, attention span, and memory marijuana�,,,�-� 1.1 Paranoia f � 0 Altered vision, hearing, and sense of HAT EVERY ADULT SHOULD"KNO*", 1 touch and time d E]Increased heart rate and anxiety `p " [.1 Impaired motor coordination, movement, and timing ' ° ❑ Altered judgement that may lead to ! ;' risky, impulsive behavior 0 Increased risk of accidents and injuries, including car crashes Long-term c,4h ittdude: C7 Impaired cognitive function G Reduced chance of graduation 11 Having a drug problem as adults ,P. F1 Having a greater chance of being , � unemployed as an adult and/or N , having a low income JIM, ril�ii/'ir ,. FINNo', uj�1/11o,l�111EJ//�1�1 i ,! 1, 100) ) r ` V rF, � �r •.t�i,lm�iy t rry i u YNI u �I I .,.,, /CU (r[ � (1hi( _4 j j6.,. � i M k r V.0-5L maCK , 926-SL Frpnt Talk to the child about healthy behaviors,and model those behaviors yourself.Spend time together doing fun activities,and stay involved in the childls life.Also,familiarize yourself with social Legal marijuana is regulated much like tobacco and media and other ways kids communicate as a way j alcohol.IM illegal for those under 21.Minors caught with I s to keep track of their behavior, marijuana can face legal consequences,such as fines, and those who drive under the fnfluence'could have their driverfls licenses suspended. The way marijuana makes people feel might be different,Out all three can be harrnful to children and 9 adults from health and safety perspectives.Because Brainstorm with the child or teen ways to handle peer marijuana use alters oners ability to function pressure and get out of those uncomfortable situations. normally,much like consuming alcohol,it can make Role play situations where someone offers the child doing some things dangerous,such as driving. marijuana,and help the child find the right words to refuse it.Tell kids it is all right if they walk away:from someone, including a friend,who is offering drugs. If you use marijuana for medical or recreational purposes,do not use it around children.Keep it Yes.Adolescents who use it do worse in school than those locked up where children cannot gain access to it, who dont.(See the back for more effects of use,)Plus, some can become dependent on it,and it can interfere with aspects of their daily life.As many as 9 percent of rn people develop a dependency to it,That percentage almost doubles for those who begin using as teens, Stay calm,and let the child know that youLre concerned about how using marijuana can harm his/her health and future.offer support to help Marijuana has been approved to treat certain health him/her quit,If youWe set consequences for using o conditions,including nausea,lass of appetite,spasms, E pain,and seizures.It is proscribed to patients under a marijuana,stick to them. e 0 healthcare professionally supervision.Just because it is approved to treat some conditions does not make it ,0 safe for everyone. r. The physical side effects of marijuana use include: N o red eyes 9 forgetUness 0 increased heart rate it Let children know that you are not OK with them using coughing r excessive laughter 0 intense hunger a marijuana,Theylre less likely to use it if they know a an altered sense of time. trusted adult strongly disapproves,If you have children, set rules for healthy behaviors in your house,and have consequences for breaking them, Signs of use include possession of lighters and smoking devices(see outside back)and the presence of marijuana candies and other edibles, Discussions with children should begin no later than 4th such as brownies, or 5th grade.Treat it as you would talks about alcohol and tobacco use,Make talks about marijuana an ongoing discussion through adolescence. Smoke Vs, Edible: Whatls the Difference? <{ Smoking marijuana produces an almost instant effect on the Nicknames and Other Marijuana-Related Terms user. Feeling those effects takes longer when consuming edibles Marijuanais nicknames include pot,weed,dope, chronic, because the marijuana must first pass through the stomach and reefer, grass,herb, ganja,and Mary Jane. Devices used to then be absorbed into the bloodstream. Consequently, many people ingest it include bowls(glass pipes), bongs (water pipes), accidentally ingest much more than they intend to when they eat bubblers (a bong/bowl combo), vaporizers, electronic marijuana. Itis impossible to overdose on marijuana, but consuming too much can cause people to have panic attacks or cigarettes,joints(hand-rolled marijuana cigarettes),and become extremely paranoid, blunts (marijuana rolled in cigar wraps). It also can be applied topically in lotions or oils, but usually for medical use. PULL i 1