Loading...
HomeMy WebLinkAboutBuilding Permit #502-14 - 100 COLGATE DRIVE 12/16/2013 TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit N0: JC Date Received �� I Date Issued: IMPORTANT:Applicant must complete all items on this page LOCATION lop - eoL&q i t nes V4 NCt2_Tl4 AIVOc V(�. r UVn A 0183 � Print PROPERTY OWNER RJZI SGI`-A ANy J�F 6"_'e y Print 100 Year Old Structure yes �n MAP NO: PARCEL v�'�% ZONING DISTRICT: Historic District yes (-W- Machine Shop Village yes �d TYPE OF IMPROVEMENT. PROPOSED USE Residential Non- Residential ❑ New Building 9One family (Addition ❑Two or more family 11 Industrial ❑Alteration No. of units: [I Commercial El Repair, replacement ❑Assessory Bldg El Others: ❑ Demolition ❑ Other ❑ Septic 0 Well ❑ Floodplain ❑Wetlands ❑ Watershed District ❑Water/Sewer DESCRIPTION OF WORK TO BE PERFORMED: N5�2 u�T ,�<v L�J- L'+-W �4 DLi T7�n� s"L JC t e.xJ �v,r^L� �� �e c-tic /�c cvfi.4•ti-y >�e L► S �/I Awhl e w Aiala Identification Please Type or Print Clearly) OWNER: Name: ;�2tsr�`l1 �� T'! �iLs��.� Phone: qty Address: !00 L')l �� /yv��— nom/'A [CONTRACTOR Name: l�f 2 I��.�-'' �� � t.r>z� Phone: Cl' 7Y5 Address: 15-5 t / 3OW AX /cv ',+� b)Z Ile a7 IY7 L1 J 2� y Supervisor's Construction License: 7,! / Exp. Date: a:�' cEIA-) Home Improvement License: /0 y�G-L' Exp. Date: 7 �s � ARCHITECT/ENGINEER d Ald, pL'SJG��Js, ll�� Phone: 9��1 �3�i7= 3.1;? -3- Address: Address: dJ 4jiLzcrw 47% 11keRe4'1'k, /M'`>' Olin 32 Reg. No. FEE SCHEDULE:BOLDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. � J Total Project Cost: $ FEE: $ Z �_ Check No.: 3 Receipt No.: NOTE: Persons contr cting with u e ist red ontractors do not have access to the guaranty fund Signature of Agent/O_wner / Signature of contractor 4 O Plans Submitted ❑ ans Waived ❑ Certified Plot Plan ❑ Stamped Plans1 Location,/ba r S ,a Cc— No. U 1 i Date C� 3 • - TOWN OF NORTH ANDOVER Certificate of Occupancy $ Building/Frame Permit Fee $ � r t Foundation Permit Fee $ Other Permit Fee $ TOTAL $ Check • - Building Inspector Plans Submitted ❑ -.Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE_OPSEWERAGE DISPOSAL Public Sewer Tanning/MassageBodyArt ❑ Swimming Pools ❑ Well ❑ Tobacco.Sales El Food Packaging/Sales ❑ Private(septic tank,etc.._ ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM .__.DATE REJECTED DATE.APPR.OVED PLANNING &DEVELOPMENT ❑ dig. COMMENTS CONSERVATION Reviewed on-A I I Signature �o Aj COMMENTS JJC5 ujp-� t.v I'V\ oD` p Wcn' HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes . Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature& Date Driveway Permit DPW Tow;; Engineer: Signature: Loc 384 Osgood Street FIRE DEPARTM:NT - Temp Dumpster on site yes no Located"at 124 Mair Street -Fire Departmerit-signatureldate" /-1 - - COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. .Total land area; sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL-Chapter 166 Section 21A-F and G min.$100-$1000:fine NOTES and DATA — For department use - 1 �M DUO U z" LI Notified for pickup - Date I E Doc.Building Permit Revised 2010 Building Department The foltowing'is�a list of the required forms to be filled out for the appropriate.permit to be obtained. Roofivg, Siding, Interior Rehabilitation Permits ❑- Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks Building Permit Application Certified Surveyed Plot Plan Workers Comp Affidavit Photo Copy of H.I.C. And C.S.L. Licenses Copy Of Contract o Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) Mass check Energy Compliance Report (If Applicable) 7 Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all casts if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the apw-al period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submAted with the building application Doc: Doc.Building Permit Revised 2012 Enter construction cost for fee cal - North Andover Fee Cakulation Construction Cost $ 131 ,862.50 m $ - $ 1,582.35 Plumbing Fee $ 197.79 Gas Fee 100 comm. $ 100.00 Electrical Fee $ 197.79 Total fees collected $ 2,077.94 100 Colgate Drive 502-14 on 12/16/13 In Law Addition The Commonwealth of Massachusetts Department of IndustrialAccidents Office ofInvestigations 600 Washington Street Boston,MA 02111 Uf www.mass gov/dia Workers' Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers Applicant Information / Please Print Le>=ibly Name(Business/OrganizatiorAndividual): �� 8D uehe(Z &-iLC�e_r LT71• Address: /.53' 8A)A0tJA(( 2vAg6 City/State/Zip: baAeuT, /n-- o/Vz G Phone#: 97? Are you an employer?Check the appropriate box: Type of project(required): 1.0 I am a employer with O 4. ❑ I am a general contractor and 1 6. ❑New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ 1 am a sole proprietor or partner- listed on the attached sheet. �• ❑Remodeling ship andhave no employees These sub-contractors have 8. ❑Demolition working for me in any capacity. workers' comp.insurance. g, $ g addition [No workers' comp.insurance 5. El We are a corporation and its 10.❑Electrical repairs or additions required.] officers have exercised their 3.❑ I am a homeowner doing all work right of exemption per MGL 11.❑Plumbing repairs or additions myself. [No workers' comp. c. 152,§1(4),and we have no 12.0 Roofrepairs insurance required.] employees.[No workers' 13.❑Other comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. T Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. TContractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information. lam an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: 'IV /3E Policy#or Self-ins.Lie.#: Expiration Date: Job Site Address: /00 eyL9AT� Pity/State/Zip: VO, 41VOOVCA2 `r.4 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required.under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one=year imprisonment,as well as civil penalties in the form of a STOP-WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of lavestigations of the DIA for insurance coverage verification. X do hereby cert under the pains and penalties ofperjury that the information provided above is true and correct. Signature: ASA po i Date: /,"-/0- .2D13 Phone#• 97;1 �5y-Ut 9(0 Official use only. Do not write in this area,to he completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other - - - Contact Person: Phone#: Information and Instructions Massachusetts General Laws chapter 152 requires all employers to provide workers'compensation for their employees. Pursuant to this statute,an employee is defined as"...every person in the service of another under any contract of hire,- express or implied,oral or written." An em ployeils defined as"an individual,partnership,association,corporation or other legal entity,or any two or more of the foregoing engaged in a joint enterprise,and including the legal representatives of a deceased employer,or the receiver or trustee of an individual,partnership,association or other legal entity,employing employees. However the owner of a dwelling house having not more than three apartments and who resides therein,or the occupant of the dwelling house of another who employs persons to do maintenance,construction or repair work on such dwelling house or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer." MGL chapter 152,§25C(6)also states that"every state or local licensing agency shall withhold the issuance or renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant who has not produced-acceptable evidence of compliance with the insurance coverage required." Additionally,MGL chapter 152,§25C(7)states"Neither the commonwealth nor any of its political subdivisions shall enter into any contract for the performance of public work until acceptable evidence of compliance with the insurance requirements of this chapter have been presented to the contracting authority." Applicants Please fill out the workers' compensation affidavit completely,by checking the boxes that apply to your situation and,if necessary,supply sub-contractors)name(s),address(es)and phone number(s)along with their certificate(s)of insurance. Limited Liability Companies(LLC)or Limited Liability Partnerships(LLP)with no employees other than the members or partners,are not required to carry workers'compensation insurance. If an LLC or LLP does have employees,a policy is required. Be advised that this affidavit maybe submitted to the Department of Industrial Accidents for confirmation of insurance coverage. Also be sure to sign and date the affidavit. The affidavit should be returned to the city or town that the application for the permit or license is being requested,not the Department of Industrial Accidents. Should you have any questions regarding the law or if you are required to obtain a workers' compensation policy,please call the Department at the number listed below. Self-insured companies should enter their self-insurance license number on the appropriate line. City or Town Officials Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant. Please be sure to fill in the permit/license number which will be used as a reference number. In addition,an applicant that must submit multiple permit/license applications in any given year,need only submit one affidavit indicating current policy information(if necessary)and under"Job Site Address"the applicant should write"all locations in (city or town)."A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the applicant as proof that a valid affidavit is on file for future permits or licenses. A new affidavit must be filled out each year.Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture (i.e.a dog license or permit to burn leaves etc.)said person is NOT required to complete this affidavit. The Office of Investigations would like to thank you in advance for your cooperation and should you have any questions, please do not hesitate to give us a call. The Department's address,telephone and fax number: Tho Common reatb oassachvsPtts Department of Industrial Accidents Office ofIaVestigations 600 WasWngtoa Street Boston,,MA.02111 Tel,#61.7-727-4900 ext 406 or-1-877,MASSAFE Revised 5-26-05 Fax#617-727-7749 t WW-mass,gov/dia REScheck Software Version 4.4.0 Compliance Certificate Project Title: The Wilson Residence Energy Code: 20091ECC Location: North Andover,Massachusetts Construction Type: Single Family Project Type: Addition/Alteration Heating Degree Days: 6322 Climate Zone: § Construction Site: Owner/Agent: Designer/Contractor: 100 Colgate Drive Robert Boucher CWC Design,Inc. North Andover,MA 01854 P&R Boucher Builders,Ltd 21 Willow Street 155 Broadway Road Haverhill,MA 01832 Dracut,MA 01826 978-397-3223 978-454-0196 bobboucher@prboucher.com �GjavFgNrrthti3�. Compliance:3.1%Better Than Code Maximum UA:131 Your UA:127 The%Better or Worse Than Code index reflects how dose to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Ceiling 1:Flat Ceiling or Scissor Truss 704 38.0 0.0 21 Wall 1:Wood Frame,16"o.c. 960 20.0 0.0 50 Window 1:Vinyl Frame:Double Pane with Low-E 89 0.300 27 Door 1:Glass 20 0.300 6 Floor 1:All-Wood JoistrTruss:Over Unconditioned Space 704 30.0 0.0 23 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.4.0 and to comply With the mandatory requirements listed in the REScheck Inspection Checklist. ,I- /I./—VX 1,2-/o- 20)S Name-Title Signature Date Project Title: The Wilson Residence Report date: 12/10/13 Data filename: F:\Wilson- NO Andover\Wilson.rck Page 1 of 4 1 REScheck Software Version 4.4.0 Inspection Checklist Ceilings: ❑ Ceiling 1:Flat Ceiling or Scissor Truss,R-38.0 cavity insulation Comments: Above-Grade Walls: ❑ Wall 1:Wood Frame,16"o.c.,R-20.0 cavity insulation Comments: Windows: ❑ Window 1:Vinyl Frame:Double Pane with Low-E,U-factor:0.300 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: Doors: ❑ Door 1:Glass,U-factor:0.300 Comments: Floors: ❑ Floor 1:All-Wood Joist/Truss:Over Unconditioned Space,R-30.0 cavity insulation Comments: Floor insulation is installed in permanent contact with the underside of the subfloor decking. Air Leakage: (j Joints(including rim joist junctions),attic access openings,penetrations,and all other such openings in the building envelope that are sources of air leakage are sealed with caulk,gasketed,weatherstripped or otherwise sealed with an air barrier material,suitable film or solid material. ❑ Air barrier and sealing exists on common walls between dwelling units,on exterior walls behind tubs/showers,and in openings between window/door jambs and framing. ❑ Recessed lights in the building thermal envelope are 1)type IC rated and ASTM E283 labeled and 2)sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. ❑ Access doors separating conditioned from unconditioned space are weather-stripped and insulated(without insulation compression or damage)to at least the level of insulation on the surrounding surfaces.Where loose fill insulation exists,a baffle or retainer is installed to maintain insulation application. ❑ Wood-buming fireplaces have gasketed doors and outdoor combustion air. Air Sealing and Insulation: ❑ Building envelope air tightness and insulation installation complies by either 1)a post rough-in blower door test result of less than 7 ACH at 33.5 psf OR 2)the following items have been satisfied: (a)Air barriers and thermal barrier:Installed on outside of air-permeable insulation and breaks or joints in the air barrier are filled or repaired. (b)Ceiling/attic:Air barrier in any dropped ceiling/soffit is substantially aligned with insulation and any gaps are sealed. (c)Above-grade walls:Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier. (d)Floors:Air barrier is installed at any exposed edge of insulation. (e)Plumbing and wiring:Insulation is placed between outside and pipes.Batt insulation is cut to rd around wiring and plumbing,or sprayed/blown insulation extends behind piping and wiring. (0 Corners,headers,narrow framing cavities,and rim joists are insulated. (9)Shower/tub on exterior wall:Insulation exists between showers/tubs and exterior wall. Sunrooms: Project Title: The Wilson Residence Report date: 12/10/13 Data filename: F:\Wilson-NO Andover\Wilson.rck Page 2 of 4 Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum 0 skylight U-factor of 0.75.New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Materials Identification and Installation: L] Materials and equipment are installed in accordance with the manufacturer's installation instructions. L3 Insulation is installed in substantial contact with the surface being insulated and in a manner that achieves the rated R-value. Materials and equipment are identified so that compliance can be determined. L3 Manufacturer manuals for all installed heafing and cooling equipment and service water heating equipment have been provided. Insulation R-values and glazing U-factors are dearly marked on the building plans or specifications. Duct Insulation: Supply ducts in attics are insulated to a minimum of R-8.All other ducts in unconditioned spaces or outside the building envelope are insulated to at least R-6. Duct Construction and Testing: C] Building framing cavities are not used as supply ducts. All joints and seams of air ducts,air handlers,filter boxes,and building cavities used as retum ducts are substantially airtight by means of tapes,mastics,liquid sealants,gasketing or other approved closure systems.Tapes,mastics,and fasteners are rated UL 181A or UL 181 B and are labeled according to the duct construction.Metal dud connections with equipment and/or fittings are mechanically fastened.Crimp joints for round metal ducts have a contact lap of at least 1 1/2 inches and are fastened with a minimum of three equally spaced sheet-metal screws. Exceptions: Joint and seams covered with spray polyurethane foam. Where a partially inaccessible duct connection exists,mechanical fasteners can be equally spaced on the exposed portion of the joint so as to prevent a hinge effect. Continuously welded and locking-type longitudinal joints and seams on ducts operating at less than 2 in.w.g.(500 Pa). Duct tightness test has been performed and meets one of the following test criteria: (1)Postconstruction leakage to outdoors test:Less than or equal to 8 cfm per 100 ft2 of conditioned floor area. (2)Postconstruction total leakage test(including air handier enclosure):Less than or equal to 12 cfm per 100 ft2 pressure differential of 0.1 inches w.g. (3)Rough-in total leakage test with air handler installed:Less than or equal to 6 cfm per 100 ft2 of conditioned floor area when tested at a pressure differential of 0.1 inches w.g. (4)Rough-in total leakage test without air handler installed:Less than or equal to 4 cfm per 100 ft2 of conditioned floor area. Heating and Cooling Equipment Sizing: Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code. For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial Building Mechanical and/or Service Water Heating(Sections 503 and 504). Circulating Service Hot Water Systems: Circulating service hot water pipes are insulated to R-2. Circulating service hot water systems include an automatic or accessible manual switch to tum off the circulating pump when the system is not in use. Heating and Cooling Piping Insulation: El HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-3. Swimming Pools: E] Heated swimming pools have an on/off heater switch. ❑ Pool heaters operating on natural gas or LPG have an electronic pilot light. Timer switches on pool heaters and pumps are present. Exceptions: Where public health standards require continuous pump operation. Where pumps operate within solar-and/or waste-heat-recovery systems. Lj Heated swimming pools have a cover on or at the water surface.For pools heated over 90 degrees F(32 degrees C)the cover has a minimum insulation value of R-12. Exceptions: Covers are not required when 60%of the heating energy is from site-recovered energy or solar energy source. Lighting Requirements: Project Title:The Wilson Residence Report date: 12/10/13 Data filename: FAWilson-NO AndoverlWilson.rck Page 3 of 4 ❑ A minimum of 50 percent of the lamps in permanently installed lighting fixtures can be categorized as one of the following: (a)Compact fluorescent (b)T-8 or smaller diameter linear fluorescent (c)40 lumens per watt for lamp wattage—15 (d)50 lumens per watt for lamp wattage>15 and—40 (e)60 lumens per watt for lamp wattage>40 Other Requirements: Li Snow-and ice-melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting off the system when a)the pavement temperature is above 50 degrees F,b)no precipitation is falling,and c)the outdoor temperature is above 40 degrees F(a manual shutoff control is also permitted to satisfy requirement'd). Certificate: A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values;window U-factors;type and efficiency of space-conditioning and water heating equipment.The certificate does not cover or obstruct the visibility of the circuit directory label,service disconnect label or other required labels. NOTES TO FIELD:(Building Department Use Only) Project Title: The Wilson Residence Report date: 12/10/13 Data filename: F:\Wilson-NO Andover\Wilson.rck Page 4 of 4 �( 200 DEcc Energy j C odency c erVfi oasts Foj—w�—Anwj- 44000 Ceiling/Roof 38.00 Wall 20.00 Floor!Foundation 30.00 Ductwork(unconditioned spaces): Window 0.30 Door 0.30 NA i" g -. Heating System: Cooling System: Water Heater: Name: Date: Comments: Office of Consumer Affairs and Business Regulation 10 Park Plaza - Suite 5170 Boston, Massachusetts 02116 Home Improvement Contractor Registration Regmtratton 104650 Type Partnership Exptration 7/15/2014 Trj 229117 P & R BOUCHER BUILDERS, LTD Robert Boucher 155 Broadway Road Suite 1 Dracut, MA 01826 Update Address sad return card. Mark reason for change. Address Renewal E.mptoymcnt Lost Card Office of(omsumer %(fairs d,Hemarss Rr;ulattoo License or registration valid for individul use only HOME CIPROVEC.ENT CONTRACTOR before the expiration date. If found return to: Ragiatrrtion: 104660 Typo: Office of ronsumer 4frairs and Business Rq,ut::tion Expiration: TAIF2014 Pcrtncrh;p 10 Park Plata-Suite 5170 Boston,41A 02116 P&R BOUCHER BUILDERS LTD Robert Boucher 155 Broadway Rocd Sura 1 Dracut. kA 01826 l udersecrrury Not satid without signature t..=atxhu--etts -Dcpzrtmcnt of Pub::c Szkty Board of Bu0cling Rcgulwtiono and St=:ldwrdz Construction Supervisor Ucane^: CS-052721 ROBERT A BOUCiER 10 KATIE LN 4z- Pelham NH 03078 Carr ss.c cr 05/28/2015 Q o 'N= ` 0 p CIE y- MA REG.# 104660 wwwprboucher.com 155 BROADWAY ROAD, SUITE#10 DRACUT,MA 01826 978/454-0196 CONTRACTUAL AGREEMENT BETWEEN OWNER AND CONTRACTOR CONTRACTORS NAME: P&R BOUCHER BUILDERS,LTD. ADDRESS: 155 BROADWAY ROAD,SUITE#10 DRACUT,MASSACHUSETTS 01826 PHONE: (978)454-0196 FAX: (978)454-0702 MA LICENSE NUMBER: 052721 MA REGISTRATION: 104660 FEDERAL ID#: 04-3347499 SALESPERSON: ROBERT A.BOUCHER DATE: November 19,2013 OWNER'S NAME: Jeffrey Wilson ADDRESS: 100 Colgate North Andover,MA PROJECT ADDRESS: 100 Colgate North Andover,MA IMPORTANT NOTICE REQUIRED BY LAW All home improvement contractors and subcontractors engaged in home improvement contracting,unless specifically exempt from registration by provisions of the Massachusetts General Laws Chapter 142A,must be registered with the Commonwealth of Massachusetts.You may make inquiries regarding registration and status by contacting the Director, Home Improvement Contract Registration,One Ashburton Place,Room 1301,Boston,MA 02108,(617)727-8598.The registration number of P&R Boucher Builders,Ltd.is HIC Reg.No. 104660 1. PARTIES This Agreement is made and entered into on November 19,2013 between P&R Boucher Builders,Ltd. of 155 Broadway Road-Suite#10,Dracut,Massachusetts 01826(hereinafter referred to as the"Contractor")and Jeffrey Wilson of 100 Colgate North Andover,MA(hereinafter referred to as the"Owner"). In consideration of the mutual promises and covenants contained herein,the Contractor and the Owner hereby agree as follows: 2. GENERAL SCOPE OF WORK DESCRIPTION: Construct a In—Law suite and screen porch and deck according to plans drawn by CWC Design,Inc.and the following addenda,which are an integral part of this contract,are also included as noted: Addendum A Project specifications Addendum B Payment Schedule Addendum C Addition plans CONTRACTOR'S INITIALS 146 OWNER INITIALS Jeffrey Wilson November 19,2013 Construction Agreement V 3. GENERAL CONDITIONS FOR THE AGREEMENT ABOVE: A. Contractor Responsibilities • To supply all labor,materials,tools,equipment,construction.equipment and machinery necessary for the proper execution and completion of the above described project unless otherwise noted in contract documents. • Contractor will possess during this project public liability insurance covering damages up to$2,000,000 and all workers on site will be covered by workers compensation insurance. • Apply for the required building permits • The Contractor shall supervise and direct the Work,using his best skill and attention and shall be solely responsible for all construction means,methods,techniques,and procedures and for coordinating all portions of the work under the Contract. • Contractor will do all work necessary to construct the project as specified.All reasonable precautions will be taken to protect the Owner's property. • Contractor shall enforce strict discipline and good order among the Contractor's employees and other persons carrying out the Agreement.The Contractor shall not permit employment of unfit persons or persons not skilled in task assigned to them. • The Contractor shall be responsible to the Owner for the acts and omissions of the Contractor's employees, Subcontractors and their agents and employees,and other persons performing Work under a contract with the Contractor. • The Contractor shall keep the premises and surrounding area free from accumulation of waste materials or rubbish caused by operations under the Agreement.At the completion of the Work,the Contractor shall remove from and about the Project waste materials,rubbish,the Contractor's tools,construction equipment,machinery and surplus materials. • To advise the Owner promptly if concealed conditions are ascertained which require additional or different work,and to proceed in such event in accordance with this agreement. • Project photographs:During the course of the project photos will be taken.The Contractor may use his sets of photos in his business as examples of specific types of projects.The Owner's name will not be released to any other parties without the Owner's consent. B. Owner Responsibilities • To advise the Contractor of any condition of the property that they become aware of which affects the Contractor's ability to perform. • To secure storage areas for materials delivered to the work site. • To select in a timely manner all allowance items,materials and colors required during the construction process.Once any material has been approved by the Owner said material might not be able to be returned for credit if the Owner subsequently changes their mind. The appropriateness of all selections is the Owner's responsibility;designers,vendors,and sales people's opinions are only opinions and they can not be held responsible for your satisfaction.Please be absolutely certain about selections before ordering. Page 2 of 15 r �, CONTRACTOR'S INITIALS A,, OWNER'S INITIALS J Jeffrey Wilson November l9,2013 Construction Agreement • To avoid interfering with the Contractor,any tradesperson,employees,subcontractors,independent contractors and other workers herein referred to as the"Workers." • Owner shall not contract with,authorize or permit,for any reason whatsoever,arty individual,other contractor or subcontractor to perform,in whole or in part,any additions or changes to plans and specifications unless authorized to do so by the Contractor,in writing. • Owner will assume responsibility to remove from any and all work areas,all household and personal items,and store those items away from the work areas during the entire duration of this job.Contractor will not be held liable for any damage to any items not removed from the work area. C. EXCLUSIONS This agreement does not include labor or materials for the following work: 1.) PROJECT SPECIFIC EXCLUSIONS: • Cost associated with the removal of excess fill from.the job site. • Design lighting fixtures • New Electrical Over head Service and drop • Utility cost which are incurred during the normal operation of construction equipment 2.) STANDARD EXCLUSIONS: Unless specifically included in the"General Scope of Work"section,this Agreement does not.include labor or materials for the following work. • Termite work and dry rot:Contractor shall not be obligated to perform any work to correct damage caused by termites,carpenter ants,or dry rot except if specified in Addendum A. • Contractor shall not be required to provide any services hereunder which are related in any way to the identification, inspection,testing,containment,removal,or handling in any way of containment's,asbestos and or toxic or hazardous waste or subsurface conditions or latent conditions.To the maximum extent permitted by law,Owner hereby agrees to indemnify,defend and hold harmless from any claims or liability arising out of or related to any containment's,asbestos and/or toxic or hazardous waste encountered by the Contractor in the performance of its duties hereunder. • Matching materials:Contractor calls attention to the inherent impossibility of matching plaster,siding,paint,stucco, concrete,etc.and while Contractor shall make every effort to match existing materials,texture,color and planes, exact duplication is not promised. • Removal and/or relocation of ledge,filled ground,rock,asphalt or any other material not Suitable to construct on or not removable by ordinary backhoe equipment.Owner shall pay the additional cost incurred by the Contractor as a result plus 25%Contractor's fee. • The relocation or correction of existing septic tank,leach field,water lines or utility easements. • The correction of substandard framing.Correction of existing out of plumb or out of level conditions of the existing structure and the custom milling of any wood used in the project. • Labor or materials required to repair or replace any Owner supplied materials. • Surveying that may be required to establish accurate property boundaries for set back purposes. • Repair of concealed underground utilities not located on the prints or physically staked out by Owner,which are damaged during construction. Page 3 of 15 M CONTRACTOR'S INITIALSQ OWNER'S INITIALS i Jeffrey Wilson November 19,2013 Construction Agreement • Repair of damage to roadways,sidewalks or driveways that could occur when construction equipment and vehicles are being used in the normal course of construction. • Final construction cleaning.Contractor will leave the site in broom clean condition. 4. COMMENCEMENT AND SUBSTANTIAL COMPLETION OF WORK Commencement of work:Week of November 2013: Unless the Contractor notifies the Owner otherwise,and shall substantially complete the work in 14 to 16 weeks. Start may be affected by the approval date of the North Andover Building Department. The Owner hereby acknowledges and agrees that the scheduling dates are approximate and that delays that are unavoidable by the Contractor,such as delays caused by Change Orders,inclement weather or other reasonable cause(s),shall not be considered a violation of this Agreement. In no event shall the Contractor begin work and order materials called for by this Agreement before the fourth business day following the signing of this Agreement because of the Owner's right to cancel as set forth in Paragraph 23 of this Agreement. 5. EXPIRATION OF THIS AGREEMENT This Agreement will expire 15 days after the date at the top of page one of this Agreement if not accepted in writing by Owner and returned to Contractor within that time. 6. PAYMENT SCHEDULE AND PAYMENT TERMS The Owners shall pay the Contractor for the performance of the work called for by this Agreement,subject to additions or deletions subsequently agreed by a Change Order executed by both the Owner and the Contractor the sum of $ 131,862.50 (One Hundred Thirty One Thousand Eight Hundred Sixty-Two and 50/100 Dollars) ********************************SEE PAYMENT SCHEDULE ATTACHED AS ADDENDUM B************************* IMPORTANT NOTICE REQUIRED BY LAW No contract for residential(Home Improvement)contracting work shall require a down payment(advanced deposit)of more than one-third of the total contract price or the total amount of all deposits or payments which the General Contractor must make,in advance,to order and/or otherwise obtain delivery of special order materials and equipment, whichever amount is greater. 7. FINAL CONTRACT PAYMENT The final contract payment is due and payable upon"Substantial Completion'(not final completion)of all work under this Agreement."Substantial Completion"is defined as being the point at which the Building/Work of improvement is suitable for its intended use,or the issuance of an Occupancy Certificate,or the final building department approval from the town,city or county building department,whichever occurs first. The Contractor may not require payments to be made in advance of the times specified above for the reason that he deems himself or the payments insecure.If,however,the Contractor deems himself to be insecure,the Contractor may,as a condition to continuing the work called for by this Agreement,demand that the balance of the payments under this Agreement be placed in a joint escrow account that requires the signature of both the Contractor and the Owner for withdrawal. If the Contractor deems himself insecure with regard to future payments,the Contractor shall send written notice to the Owner demanding the establishment of a joint escrow account.The Owner shall thereafter take any and all steps required to establish such escrow account within five(5)business days of the Owner's receipt of such written notice from the Contractor. Page 4 of 1.5 CONTRACTOR'S INITIALS OWNER'S INITIALS , Jeffrey Wilson November 19,2013 Construction Agreement 8. PUNCH LIST WORK Prior to the completion of all work under this Agreement,Owner and Contractor will execute a Pre Completion Punch List of all items to be corrected.This Punch List shall serve as the one list to be completed by the Contractor prior to completion of all work under this Agreement.Any item,which may require adjustment or replacement after the initial.Punch List will be covered under "Warranty"as set forth in Paragraph 13 in this Agreement. 9. HOLD BACK FROM FINAL PAYMENT FOR PUNCH LIST WORK At the time of making the final payment,Owner may hold back 150%of the value of all Punch list work not completed,for reasons beyond the control of the Contractor.Owner and Contractor will place a fair and reasonable value on each Punch list item not completed.This 150%hold back for Punch list work assures that all Punch list work will be completed by Contractor in a timely manner. Payment for completed Punch List items is due and payable upon submittal of invoice for those completed items, even though the entire Punch List may not be completed. 10. INTEREST CHARGES Interest in the amount of 2%per month will be charged on all late payments under this Agreement."Late Payments"are defined, as any payment not received within 10 days of receipt of invoice from Contractor. 11. PERMITS AND LICENSES The Contractor shall apply for and obtain all.necessary permits and licenses required from any State or Local authority or agency, including but not limited to all building and construction permits.The Contractor shall not be held responsible for delays in the commencement or the completion of the work called for by this Agreement due to the delay by any regulatory,permit granting or inspectional agency,authority or individual in issuing or signing off on any permits or licenses.Contractor will pay the appropriate cost for the permits and licenses,present the receipts to the Owner,and Owner shall reimburse the Contractor the cost.Note:The permit and license fee is included in this Agreement. Certain home improvement work(i.e..additions,garages,porches etc.)may require other permits including but not limited to Variance and.Special.Permits under Zoning by-laws through the Board of Appeals,Board of Health Permits for expansion of sewage disposal systems,Conservation.Commission for a Order of Conditions,etc.Such permits,which may require non— construction related,engineering,technical or legal representation of the Owner,shall be the responsibility of the Owner. If Owner request Contractor to coordinate or obtain any of these services,Contractor will perform this work on an hourly basis at the rate of $60.00 per hour. IMPORTANT NOTICE REQUIRED BY LAW If the Owner obtains his/her own construction related permits for the work described and called for by this Agreement or deals with unregistered contractors,the Owner is hereby advised that in the event of a dispute,judgment and nonpayment of the Contractor,the Owner will not be entitled to make a claim to or collect from the guaranty fund established by M.G.L. c. 142A 12. CHANGE ORDERS; ADDITIONAL WORK This Agreement,including the cost for completion of the work as set forth in Paragraph 6 of this Agreement,is based solely on the observations the Contractor was able to make with the structure in its current condition at the time this Agreement was executed. The Owner acknowledges and agrees that in certain remodeling work,the demolition of portions of the preexisting structure may reveal additional defects,conditions or the need for additional work which must be repaired,altered or carried out in order to commence or to complete the work described under this Agreement. In such case,the Owner acknowledges and agrees that the price and the scheduled date of commencement and/or completion may differ from the price and date of commencement or completion of the work stated in this Agreement.Further,the Owner acknowledged and agrees that such variation shall not be considered to be a violation of this Agreement. Page 5 of 15 , CONTRACTOR'S INITIALS OWNER'S INITIALS Jeffrey Wilson November 19,2013 Construction Agreement If additional defects,conditions or the need for additional work is discovered once the work has commenced,the Contractor will stop work and will point out these unforeseen defects,conditions or the need for additional work to the Owner so that the Owner and the Contractor can review the work which must be done to remedy or complete these unforeseen defects or conditions.Before work will start again,the Owner and the Contractor shall agree as to any additional cost for such work and the length of any delay in the completion date as a result of the same.Once the scope,cost and time to complete such additional work is determined,the Owner and Contractor shall execute a Change Order indicating the work to be done,the cost for same and the length or delay in completion associated with the same. The Owner may order changes in the work to be completed pursuant to this Agreement.If the Contractor agrees to perform such additional work,a Change Order will be executed by both the Contractor and the Owner setting forth the cost of such change and any delay in the completion of the work called for by this Agreement as a result of such change.If the actual cost associated with the additional work can not be determined in advance,Owner agrees to pay for such Change Order on a time and materials basis along with any subcontractor additional cost.The rates charged for time and materials shall be$60.00 per hour for Contractor and Lead Carpenter,$52.00 per hour for other employees. Materials shall be charged at cost plus 25%. A 25%Contractor profit and overhead shall be charged on all subcontractor additional cost. Any alterations or deviations from the work to be completed pursuant to this Agreement involving extra cost of materials or labor will be commenced only upon execution of a written Change Order executed by both the Owner and the Contractor.No variations, alterations,deviations,deletions or extra work can be or will be made unless both the Owner and the Contractor specifically agree in writing. The Contractors profit and overhead and supervisory labor will not be credited back to Owner with any deductive Change Orders (work deleted from this Agreement by Owner.) Payment for the work called for by the Change Order shall be due and payable upon commencement of the work set forth or required by the Change Order,unless otherwise stated in the Change Order. 13.WARRANTY The Contractor provides a limited warranty on all Contractor and Sub—Contractor supplied labor and materials used in this project for a period of one-year following substantial completion of all work. Work covered by this Agreement is warranted following substantial completion and provided final payment is received in full within ten(10)days from final billing. No warranty is provided by Contractor on any materials furnished by the Owner for installation.No warranty is provided on any existing materials,including but not limited to,those that are moved and/or reinstalled by the Contractor within the dwelling (including any warranty that existing/used materials will not be damaged during the removal and installation process).One year after substantial completion of the project,the Owner's sole remedies(for materials and labor)on all materials that is covered by a manufacture's warranty is strictly with the manufacturer,not with the Contractor. Repair of the following items is specifically EXCLUDED from Contractor's warranty:damages resulting from lack of Owner maintenance,damages resulting from Owner abuse or ordinary wear and tear,deviations that arise such as minor cracking of concrete,stucco and plaster,minor stress fractures in drywall due to the curing of lumber,warping and deflection of wood, shrinking/cracking of grouts and caulking and fading of paints and finishes exposed to sunlight. All warranties for equipment supplied by the Contractor under this Agreement shall be those given by the manufacturers of such equipment,which shall be and are hereby passed through directly to the Owner.Under such manufacturer warranties,the Owner may be required to register or mail in a warranty card or other evidence of ownership and use of such equipment in order to activate such warranties.The Owner's failure to mail in or register such documentation,which failure voids the manufacturer's warranty,shall not create any responsibility for the Contractor to warranty such equipment. The express warranties contained herein are in lieu of all other warranties,express or implied,including any warranties of merchantability,habitability,or fitness for a particular use or purpose.This Limited Warranty excludes consequential and incidental damages and limits the duration of implied warranties to the fullest extent permissible under State and Federal law. Page 6of15 CONTRACTOR'S INITIALS3 OWNER'S INITIALS Jeffrey Wilson November 19,2013 Construction Agreement 14. WORK STOPPAGE,TERMINATION OF CONTRACT FOR DEFAULT The Contractor shall have the right to stop all work called for by this Agreement and has the right to keep the project idle if payments are not made to the Contractor in accordance with the Payment Schedule set for in Paragraph 6 of this Agreement,if payments are not made to the Contractor pursuant to a Change Order as set forth in Paragraph 12 of this Agreement,or if Owner repeatedly fails or refuses to furnish the Contractor with access to the job site and/or product selections or information necessary to complete the Contractor's work.The Contractor may stop work and terminate this Agreement if the Owner fails to pay the Contractor any sum due pursuant to this Agreement within 10 days after the date fixed for payment. If work is stopped due to any of the above reasons(or for any other material.breach of contract by Owner)and Owner has failed to take any significant steps to cure his/her default,then the Contractor may,without prejudicing any other remedies the Contractor may have,give written notice of termination of the Agreement to Owner and demand payment for all completed work and materials ordered through the date of work stoppage,and any other loss sustained by Contractor,including Contractors profit and overhead on the balance of the incomplete work under this Agreement.Thereafter,Contractor is relieved from all other contractual duties,including all Punch List and Warranty work. 15. INSURANCE The Contractor shall purchase and maintain insurance for the protection from claims under worker's compensation acts,claims for damages because of bodily injury and from claims for damages to the property which arise or are the result of the Contractor's work. The Owner shall notify his/her insurance agent of the execution of this Agreement and to obtain any necessary Riders to his/her current coverage to cover the Owner's interest and liabilities during the construction process. 16.RESOLUTION OF DISPUTES The Contractor and the Owner hereby mutually agree in advance that in the event the Contractor has a dispute concerning this Agreement,that the Contractor may submit such dispute to a private arbitration service which has been approved by the Secretary of the Executive Office of Consumer Affairs and Business Regulations,and the Owner shall be required to submit to such arbitration as provided in M.G.L.c. 142A �" A 45,�� /4" Contractor Roberl A.Boucher e e ey Wilson Owner The signatures of the parties above apply only to the Agreement of the Parties to Alternative Dispute Settlement Initiated by the Contractor.The Owner,under provisions of said chapter 142A,may initiate alternative dispute settlement even where that section is not separately signed by the parties. 17. MATERIALS BECOME PROPERTY OF OWNER The Contractor will continue to own all materials delivered to the Owner's premises for use and installation in connection with the work to be performed by this Agreement until paid for by the Owner.When the Contractor shall have received payment for such materials,such materials shall become the property of the Owners.Any surplus materials that have been provided for and paid for by the contractor remain the property of the contractor,unless otherwise mutually agreed upon by both Owner and Contractor Page 7 of 15 CONTRACTOR'S INITIALS OWNER'S INITIALS �� Jeffrey Wilson November 19,2013 Construction Agreement 18. MISCELLANEOUS RADON NOTICE&LEAD BASED PAINT NOTICE&DISCLAIMER:The United States Environmental.Protection Agency has expressed concern over the presence of naturally occurring radon gas in homes,and the presence of lead based products in homes constructed prior to 1978.Prolonged exposure to high levels of indoor radiation,lead based contaminants or its progeny may affect the health of occupants.Contractor has made no investigation to determine whether there is radon gas,lead based products or other environmental hazards in the home or affecting premises,although such conditions may exist.Contractor makes no representation or warranty as to the presence or lack of radon,lead based products or other hazardous environmental condition,or as to the effect of these or any such condition on the premises or its occupants. LIENS&ASSESSMENTS: Unless specifically included in this Agreement,Contractor shall not be held responsible for any bond,liens or assessments on the existing real estate,nor sewer or utility assessments not yet a lien on said property.There is no lien,nor security interest on the residence as a consequence of this Agreement. TOILET FACILITIES&UTILITIES:Contractor will provide temporary toilet facilities for this project.Electric,water and other utilities shall be furnished by the Owner at no expense to Contractor. SIGN: Contractor is authorized to display his sign on the job premises until completion of work. 19. INDEMNIFICATION The Contractor shall hold the Owner harmless from any and all damages and claims that may arise by reason of any negligence on the part of the Contractor,his agents or employees,in the performance of this Agreement;and in case any action is brought against the Owner by reason of the Contractor's negligence in the performance of this Agreement,the Contractor shall assume full responsibility for the defense thereof,and upon failure to do so on proper notice,the Owner reserves the right to defend such action and to charge all cost thereof to the Contractor. 20. ENTIRE AGREEMENT This Agreement contains and represents the entire agreement between the parties hereto.Owners certify that they have read the entire contents of this Agreement and acknowledge receipt of a copy of it.It is expressly agreed that this is the only Contract/ Agreement between Owner and Contractor and no verbal agreement of any kind shall be binding on the parties. 21. GOVERNING LAW This Agreement is governed by the laws of the Commonwealth of Massachusetts and shall be executed in duplicate.The parties acknowledge that the form,substance,content and notices contained in this Agreement are intended to comply with Massachusetts General Law chapter 142A,and regulations promulgated thereunder.In the event of any instance of non-compliance,only such portion shall be invalid and the remainder of this Agreement shall remain in full force and effect.in addition,any such portion not in compliance shall be read and interpreted so as to have its intended meaning to the maximum extent allowed under such law and applicable regulations. 22.NOTICE All notices under this Agreement must be in writing.Any notice given by either party pursuant to this Agreement shall be deemed to be served,if the same is delivered personally or certified mail,return receipt requested,to the other party at the address written in this Agreement. 23. RIGHT TO CANCEL The Owner has the right to cancel this Agreement if the Owner has signed this Agreement at a place other than the place of business of the Contractor(which may be his main office or a branch thereof),provided that the Owner notifies the Contractor in writing,at his main office or branch by certified mail,return receipt requested,by telegram sent or by personal delivery,not latter than midnight of the third business day following the signing of this Agreement.Attached hereto is the Notice of Cancellation, which the Owner may use to cancel this Agreement as provided herein. Page 8 of 15 ^ CONTRACTOR'S INITIALS OWNER'S INITIALS �' Jeffrey Wilson November 19,2013 Construction Agreement 24. COMPLETION OF THE AGREEMENT FOR EXECUTION The owner is hereby advised that he/she should not sign this contract unless and until all blank spaces and sections have been filled in or marked as void,deleted or not applicable,and until all exhibits and related or referenced documents that are incorporated herein are attached heretofore. You are entitled to a copy of the contract at the time you sign.Keep it to protect your legal rights. I have read and understood,and I agree to,all the terms and conditions contained in the Agreement above. Date:_ Wa(o�aot3 Lit A. �Qu,�,,E..�.... T— Robert A.Boucher,Owner P&R Boucher Builders,Ltd. Owner's Signature: Date: Date: Page 9 of 15 CONTRACTOR'S INITIALS OWNER'S INITIALS J. Jeffrey Wilson November 19,2013 Construction Agreement ADDENDUM "A" Specifications sheets Jeffrey Wilson 100 Colgate North Andover,MA The following are complete specifications,to the best of the contractors' ability,for the project as noted. Please also refer to the construction plans for dimensions as well structural and related information.Any changes to these specifications should be noted in writing. EXTERIOR DEMOLITION • Prepare the existing site for excavation by removing the wood fence and the landscape elements to allow for excavation. • Remove the existing screen porch structure and remove any necessary siding on the existing garage. • Remove any existing exterior finishes necessary to complete the designed intent. EXCAVATION • Excavate the necessary amounts of soil to place the footings of the addition at 48"below the proposed finished grade to provide frost protection. • Soil conditions which require the Contractor to excavate to additional depth in order to provide stable soil for the placement of the footings will incur additional costs relative to the time required of the excavating contractor, Contractors' supervision,removal of unsuitable fill,and importing of additional materials if needed. • Upon completion of the foundation, including damp proofing and inspection&approval by the local building department,the Contractor will backfill the foundation with materials which were excavated from the site. If the soil is contaminated,or deemed unsuitable to re-use,the Contractor will advise the Owner and import clean fill to be used as backfill.This will result in an additional cost for the Owner and shall be addressed as a Change Order. • All suitable excess fill will be removed from the existing site,which additional cost is to be determined. • Any contaminated or unsuitable material which must be removed from the site will incur an additional cost and be addressed as a change order. FOUNDATION/CONCRETE • Provide proper 10"x 20"concrete footings(minimum 3,000PSI compressive strength)and 10"poured concrete(minimum 3,000PSI compressive strength)foundation walls.Details and key-outs to be as on plans. • Pour,place and finish concrete(minimum 3,000PSI compressive strength)for the crawl space floor. • NOTE: Even properly poured and cured concrete is susceptible to cracking,and this is not considered a defect unless it is impacting the performance of the concrete or allowing water into the home. • Apply damp proof foundation coating on the addition below finished grade. • Saw cut existing foundation wall to provide access to the existing basement area. FLOOR FRAMING • The floor system for the addition will be 2 x 8 floor joists with a maximum spacing of 16"on center. • Main support beam will be built up dimensional lumber supported on notated Lally columns in the crawl space, • Sub floor will be 3/4"tongue&groove"Advantech"engineered sub floor,glued&nailed to the floor joists. • The intent is for the floor level of the existing kitchen to be flush with the new addition floor. Page 1.0 of 15 CONTRACTOR'S INITIALS (ZA A _ OWNER'S INITIALS L Jeffrey Wilson November 19,2013 Construction Agreement WALL FRAMING • Exterior walls will constructed with 2 x 6 kiln dried lumber with '/2"OSB plywood sheathing on the exterior of the wall assembly.Maximum stud spacing to be 16"on center. • The interior partition walls will be constructed with 2 x 4 kiln dried lumber.All wall studs will have a maximum spacing of 16"on center. • Reference the Construction plans for the layout and proposed framing. ROOF FRAMING • Roof will be a gable style roof with a flat interior ceiling. • Roof framing will be 2 x 8 rafters with a maximum spacing of 16"on center.The roof sheathing will be 1/2" CDX exterior grade plywood. • Construction and structural details will be as noted on the accompanying plans. • Install 1 x 3 wood strapping on the under side of the ceiling joist to prepare to receive 1/2"gypsum blue board. • Frame the roof eaves and gable ends to resemble the existing house. ROOFING • The roofing will be"GAF"or equal 30 year architectural asphalt/fiberglass shingles including#15 felt roofing underlayment. Selections to be made from Contractor's samples. • Ice and water shield at the eaves and valleys. • "Cobra"shingle over roll ridge venting and white aluminum drip and rake edge are included. DECK/PORCH • The new deck and porch will be framed with pressure treated lumber. • The deck surface will be 5/4"x 6"composite decking by Weatherbest or equal. • Supply and install RDI"Titan Pro Rail"white vinyl railings and balusters at the perimeter as required due to the elevation. • Supply and install screen panels and screen door on the porch. SIDING& TRIM • Siding will be Certainteed or equal vinyl siding with a double 4"exposure. Selections to be made from contractor's sources.An exact match is not guaranteed. • The scope of the vinyl siding work is of the new addition and portions of the affected garage structure. • Wrap the trim and moldings with white aluminum coil stock. • Soffits will be triple 4"ventilated soffit panels. • Install Tyvek or similar air infiltration barrier on the exterior walls of the addition. WINDOWS • Supply and install Harvey Industries `Vicon"white vinyl tilt wash windows with High performance Low E glass. Full insect screens and white hardware. 6 over 6 grille pattern with the grilles between the glass. • Window sizes per the plans.Large windows suitable to meet Massachusetts egress code. DOORS • Supply and install a Therma Tru French Wood Hinged unit in the sitting room. • Supply and install a Therma Tru six panel fire door between the garage and the living space. • Re install the existing overhead garage doors and operators. PLUMBING • Supply and install PVC drain lines and a vent line to service one tub shower unit,one toilet and one lavatory basin,one kitchen sink and one laundry hook up. Page 11 of 15 CONTRACTOR'S INITIALS ��g OWNER'S INITIALS •V- Jeffrey Wilson November 19,2013 Construction Agreement • Supply hot and cold water lines for the bathroom fixtures kitchen sink and laundry hook up. Domestic hot water is to come off of the existing hot water heater located in the main basement. • The bathroom plumbing fixtures,faucets and acrylic shower allowance is$1,200.00.Items are to be selected from the contractor's preferred Kohler vendor.The stainless steel kitchen sink is included in the granite counter top. HEATING • Install an electronic zone control for the new addition space. • Install 6 new supply registers and one central return off of the existing duct work. • The intent is to use the existing oil furnace and this agreement does not include additional work to the existing furnace,plenum or duct work. ELECTRICAL • Install a new 100 Amp electric panel in the existing basement. • Bedroom 4 outlets 1 ceiling fan/light(fixture by owner) I smoke detector 2 switch • Bathroom 1 GFCI protected receptacle I vanity light(fixture by owner) 1 Exhaust fan light unit 2 switches • Closet I switch 1 fluorescent light fixture • Laundry 1 outlet for an electric dryer I outlet for the washing machine • Sitting room 5 outlets 1 ceiling fan(fixture by owner) 2 switches 13 way switch 1 cable TV 1 smoke/carbon monoxide detector. • Kitchen 4 counter receptacles 1 refrigerator outlet 1 ceiling light(fixture by owner) I switch • Entry Hall 1 ceiling light(fixture by owner) Page 12 of 15 CONTRACTOR'S INITIALS OWNER'S INITIALS J,�' = Jeffrey Wilson November 19,2013 Construction Agreement 1 switch • Garage 2 outlets for the overhead door operators 2:heat detectors 2 keyless lights I switch I GFCI protected receptacle • Crawlspace 2 keyless lights 1 switch • Deck and Porch 2 wall lights(fixtures by owner) 2 switches 2 weather proof GFC1 protected receptacles • Standard outlets and covers located in each room to code. • Installation of upgrading of any additional smoke detectors and carbon monoxide detectors in the existing house is not included in this contract if deemed necessary by the building or fire official. • Design light fixtures, i. e.ceiling lights,wall sconces and ceiling fan/lights are to be supplied by the owner. • Installation of any security system,computer or home entertainment wiring is specifically excluded from this proposal. INSULATION • Supply and install fiberglass batt insulation to MASS code. • Exterior Walls R-20 fiberglass insulation with poly vapor barrier • Ceilings R-38 fiberglass insulation with baffled rafter vents where necessary. • Basement R-30 fiberglass insulation with 2"ridged foam board. PLASTER • Interior walls and ceiling will be 1/2"blue board in the addition and 5/8"fire code on the garage walls and ceiling with plaster skim coat. • The ceilings and closets and the garage will receive alight texture finish • Repairs to existing home will be repaired and blended in to the best of the contractor's ability. INTERIOR TRIM • The interior finish work will consist of the installation of raised panel molded hollow core doors and jambs with 2-1/2"colonial casing applied. Schlage `Plymouth"style passage sets in a brass finish. • The door schedule includes swing passage doors and bi—fold type door at the laundry closet. • The windows shall receive a traditional stool cap and be trimmed with 2-1/2"colonial casing. • The base board trims with consist of a 3-1/2"one piece base. • The closets will receive birch plywood shelving and wood closet rod and supports. • Install a disappearing stair to provide access to the attic space above. KITCHEN and BATHROOM CABINETS • Kitchen cabinets,door hardware and tier I granite counter top allowance$4,200.00 • Bathroom vanity and vanity integral bowl top.Allowance$650.00 • Install kitchen and bathroom cabinets and hardware. Page 13 of 15 �^ CONTRACTOR'S INITIALS AAS OWNER'S INITIALS J L'`' Jeffrey Wilson November 19,2013 Construction Agreement FLOORING • Supply and install pre finished 3/4"x 3"natural red oak hardwood flooring over#15 felt underlayment in the entry, sitting room and the bedroom and closets. • Supply and install an underlayment suitable to receive ceramic tile flooring.Install ceramic type tile and grout on the bathroom floor.The the material allowance is$385.00. PAINTING • The interior painting will consist of caulking spackling of nail holes and finish sanding. • Install primer and one coat of semi gloss latex paint to the wood work and primer and one finish coat egg shell to the walls. • One color on the walls and one color on the trims. • Additional colors require additional work and clean up and will be addressed with the painting contractor if additional colors are desired. SPECIALTIES—MISC. • Contractor will provide all necessary supervision and coordination and labor to complete the designed intent. • Install the laundry appliances and ventilate the dryer and the bathroom exhaust fan to the outdoors. • Install owner supplied bathroom accessories. • All fencing shall be put back in place if disturbed. CLEAN UP • All construction debris will be removed from the job site to an approved location,or placed into on site roll off trash containers.(30 cubic yard size). • Work site to be left clean and orderly in a"broom clean"condition on a daily basis.Construction materials will be left on site as needed and maintained in an orderly manner. • Contractor will provide and install poly/plastic screening to control.construction dust to the best of Contractor's ability.The owner must understand that this will not contain all the dust which will be generated from this type of remodel,and should expect dust to circulate around the remainder of the home to some extent. EXCLUSIONS • Finished landscaping of the disturbed area. • Gutters and down spouts General Note:We intend to access the work site by exiting the street and coming across the lawn to minimize the impact to the driveway. Page 14 of 15 CONTRACTOR'S INITIALS (FAQ OWNER'S INITIALS �J Jeffrey Wilson November 19,2013 Construction Agreement THIS PAGE LEFT INTENTIONALLY BLANK!! Page 15 of 15 /- CONTRACTOR'S INITIALS (ZA OWNER'S INITIALS �.t./- ADDENDUM "B511 P & R Boucher Builders, Ltd. ,155 Broadway Road, Suite#10 Dracut, MA 01826 (978) 454-0196 Addition Project !Jeffrey Wilson 100 Colgate North Andover, MA CONTRACT PAYMENTS DUE AS FOLLOWS: DATE INVOICE DESCRIPTION AMOUNT check# PD.AMOUNT ATE PAI BALANCE CONTRACT AMOUNT $131,80.50 21, r3 Contract Acceptance $ 3,500.00 $128,362.50 Mobilization and Start of work $ 10,000.00 $118,362.50 Commencement of Foundation work $ 10,000.00 $108,362.50 .Commencement of Framing $ 25,000.00 $83,362.50 Commencement of Roofing $ 7,500.00. $75,862.50 Commencement of Window Installation $ 5,000.00 $70,862.50 Commencement of Vinyl Siding $ 7,500.00 $63,362.50 Commencement of Rough Mechanicals $ 10,000.00 $53,362.50 .Commencement of Insulation $ 5,000.00 $48,362.50 1 Commencement of Plaster Board $ 7,500.00 $40,862.60 Commencement of Interior trim $ 7,500.00 $33,362.50 ,Commencement of Interior painting $ 5,000.00 . $28,362.50 Commencement of Flooring $ 10,000.00 $18,362.50 Commencement of Kitchen Cabinets $ 10,000.00 $8,362.50 Commencement of finish Mechanicals $ 5,000.00 $3,362.50 $3,362.50 .Substantial Completion of Project $ 3,362.50 $0.00 PROJECT TOTALS t—$ 131,862.50 $ 77777t $131,862.50 PA A jV-L-V _ ut :e -(�,O Rimonweal'th of Massachusefts Dep aaeh.t of Fire Srvic'es -Office cf- he State Fire TOarsh'I P.O.Box 10-SC,to Road, Stow,NL6,0177.1 North AndoverPERMIT_ Date: (Cibf of L GWn) eTIDIt NO (if Applicable•) Dig S I T=ber In accordacicc with the provisions of M G1_ 4 8 Ghap.ter_7_0 asprovided in section 34 /'v This Peffiit is granted to: / � v StIILC Date FuII name ofpersoo,Firm'or Corporation Permissiouto locate dumpster • for construction/renovation/demolition of building. Comments:, dumpster must be . 25 ' f clearance dumprom structure if unable to lace with reQui dumps. 0M must be covered with 1 wo-od r or tar end of 'we ork —:d a•y (Give leca FecPaidS 50 .00 bon(�fy street and no.,or describe to such moaner as to pro-vied adequate identification of 1'ocatioa) ,' This Permit will ex ire Fire' I_ Chief (S P � � ignahue of offical;anting permit) Ofrical granting•per�t (Tide) NORT1y Town of 1j ndover O ti y �f1 ver, Mass o > > COC NIC N!W IC K �i9SDR{TED ►P�'�c5 U BOARD OF HEALTH PER Food/Kitchen Septic System HIS CERTIFIES THAT ............ ,,, ,,,,,,,//►► BUILDING INSPECTOR L•Q as permission to erect . buildings on '• D&J. Foundation .nm.I�... � Rough I be occupied as .. ...............�.. �.....�.....� � .�... Chimney rovided that the person accepting this permit shall in every respect conform to the terms of the application n file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Final onstruction of Buildings in the Town of North Andover. PLUMBING INSPECTOR IOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTIONA TS Rough 'r Service ®, • • ' •• Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises - Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. :S�EE�REXV�ERSEDE Smoke Det. BUILDING PERMIT ot,gt,.2o NORTF/,b�a TOWN OF NORTH ANDOVER c? of +.,is O APPLICATION FOR PLAN EXAMINATION Permit NO: c9s Date Received ,T.,,•�`.cti* C14 Date Issued: IMPORTANT:Applicant must complete all items on this page LOCATION � ce) 1(f . Print PROPERTY OWNER Pnnt MAP NO PARCEL: ZONING DISTRICT: Historic District yes o Machine Shop Village yes r a TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential New Building One family Addition Two or more family Industrial Alteration No. of units: Commercial Repair, replacement Assessory Bldg Others: Demolition Other Septic Well Floodplain Wetlands Watershed District Water/Sewer l�� DESPRIPTIONOF WORK -re---BE PR '�FORMED: Identification Please Type or Print Clearly) OWNER: Name: tJd W1 l,5cAl Phone: Address: CONTRACTOR Name: ,T6,7 o1,- - Phone: Address: 1147 A/ Supervisor's Construction License: Exp. Date: Home Improvement License: Exp. Date: ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ �`� FEE: $ 97X7 = Check No.: /L/0-1 / Receipt No.: O)o 0 S� NOTE: Persons contracting with un r ist ed con actors do not have access to the guaranty fund Signature of Agent/Owner ' ignature of contractor Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses a Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:INSPECTIONAL SERVICES DEPARTMENT:BPFORM07 Revised 2.2007 Plans Submitted Plans Waived Certified Plot Plan Stamped Plans TYPE OF SEWERAGE DISPOSAL Public Sewer Tanning/Massage/Body Art Swimming Pools Well Tobacco Sales Food Packaging/Sales Private(septic tank,etc. Permanent Dumpster on Site THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT COMMENTS DATE REJECTED DATE APPROVED CONSERVATION COMMENTS DATE REJECTED DATE APPROVED HEALTH COMMENTS j Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature&Date Driveway Permit Located at 384 Osgood Street FIRE DEPARTMENT Temp Dumpster on site yes no Located at 124 Main Street Fire Department signature/date COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— For department use ❑ Notified for pickup - Date Doc.Building Permit Revised 2007 Location /D e) o A7"f No. Date L ?° — M�RTN TOWN OF NORTH ANDOVER Certificate of Occupancy $ Building/Frame/Frame Permit Fee $ s�CHust 9 Foundation Permit Fee $ r Other Permit Fee $ TOTAL $ Check # 1 2 V I+ V Building Inspector oonrh TOWN OF NORTH ANDOVER ° "'° '•�" OFFICE OF p BUILDING DEPARTMENT 1600 Osgood Street Building 20, Suite 2-36 North Andover,Massachusetts 01845 1ss�tlWstt Gerald A.Brown Telephone(978)688-9545 Inspector of Buildings d, Fax (978)688-9542 HOMEOWNER LICENSE EXEMPTION P1W DATE: JOB LOCATION: �C✓ �� Number Street Address Map/Lot HOMEOWNER 6 /,&!�4) (?;2"f--V/, I3 7S Name Home hone Work Phone PRESENT MAILING ADDRESS L51 le--q City Town State Zip Code The current exemption for"homeowners"was extended to include owner-occupied dwellings to two units or less and to allow such homeowners to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor). State Building (Code Section 108.3.5.1) DEFINITION OF HOMEOWNER Person(s)who owns a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family structures. A person who constructs more that one home in a two-year period shall not be considered a homeowner. The undersigned"homeowner"assumes responsibility for compliances with the State Building Code and other Applicable codes,by-laws,rules and regulations. The undersigned"homeowner"certifies that he/she understands the Town of North Andover Building Department minimum inspection procedures and and that he/she will comply with said procedures and requirements. HOMEOWNERS SIGNATURE r APPROVAL OF BUILDING OFFICIAL Revised 10.2005 Form Homeowners Exemption ROARD OF \PPEALS(M-9541 CO.N'S.ERN-ArION 688-9530 IIEAL'I-H 688-9540 PLANNING 688-9535 Town of ORTH. Andove r 0 to No. C% LAKE 0 over, mass.dap os 6000;w COCHICHEWICK _ ORATE D O`e C5 BOARD OF HEALTH Food/Kitchen PERMIT T D Septic System 6 THIS CERTIFIES THAT...............7.&A....... .............................. BUILDING INSPECTOR Foundation has permission to erect............... buildings on . ........ .................................... Rough to be occupied as 3T :% i .......................................................................... Chimney provided that the person acceptingPt 1s pe shall in every respe conform to the terms of the application on file in Final this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough PERMIT EXPIRES IN 6 MONTHS Final T ELECTRICAL INSPECTOR UNLESS CONSTRU N pS Rough &TS t Service " jlll000 -I$41BIIIUIUillilieLlioDiIING INSPECTOR T...0...R_ ......... ... ........ ... Final Occupancy Permit Required to Occupy Building GAS INSPECTOR Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. SEE REVERSE SIDE Smoke Det.