Loading...
HomeMy WebLinkAboutBuilding Permit #010-15 - 1065 Osgood Street 7/2/2014 If NORTH 3? BUILDING PERMIT Oe f�eo.eb e�0 TOWN OF NORTH ANDOVER ° ' %J APPLICATION FOR PLAN EXAMINATION Permit NO: V r l� Date Received 4/14/14 Too Date Issued: ��SSwcHus MPORTANT: Applicant must complete all items on this page LOCATION` '1077 Osgood St PROI?EI T '`OWNER Angus Rei3lfji '`orporatiion -17 } -. MAP NO ��_ PARCEL: '2 � � ONJNQW J$ I s Its i �lstriCt yes o . 1\11ar,�ii�ie 50 Village ye no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential X New Building ❑ One family ❑Addition ❑Two or more family ❑ Industrial ❑Alteration No. of units: X Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other Qy_ jtK. lfelf EI=�o4dpiam m atetsh6d.QlAW tkl Identification Please Type or Print Clearly) OWNER: Name: Pentucket Bank Phone: 978-372-7731 Address: 1 Merrimack St. Haverhill, MA j J .g ARCHITECT/ENGINEER Lloyd Architects Phone: 508-746-4646 Address: 32 Court St. Plymouth, MA 02360 Reg. No. 5442 FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$12+5.00 PER S.F. /0.(/,ole. Total Project Cost: e-- FEE: $ AOL Check No.:��T� 7 a1 Receipt No.: �-Z 7 NOTE: Persons contracting with unr gistered contractors do not have access to the guaranty fund ignature of Agent/Owner Zip -, SiQnature of contractor - , TOWN,OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO: Date Received Date Issued: IMPORTANT:Applicant must complete all items on this page LOCATION _ Print. PROPERTY OWNER Print 100 Year Old Structure yes no MAP NO: PARCEL: ZONING DISTRICT: Historic District yes no Machine Shop Village yes no i .TYPE OF IMPROVEMENT. PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family ❑Addition ❑Two or more family ❑ Industrial ❑Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other ❑ Septic ❑Well ❑ Floodplain ❑Wetlands ❑ Watershed District ❑Water/Sewer DESCRIPTION OF WORK TO BE PERFORMED: Identification Please Type or Print Clearly) OWNER: Name: Phone: Address: CONTRACTOR Name: Phone: Address: Supervisor's Construction License: Exp. Date: Home Improvement License: Exp. Date: ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ FEE: $ Check No.: Receipt No.: NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund Signature of Agerit%Owner Y Sick^t��r^ of contractor Plans Submitted Plans Waived ❑ CertifiL", Plot Plan ❑ Stamped Plans ❑ - Plans Submitted ❑ .-. Plan!Maived-❑:. Certified Plot Plan ❑ Stamped Plans ❑ TWE:O'MWERAGEDiSP"OSAL" Public Sewer ❑ Tanning/Massage/Body Art ❑-. Swimming Pools ❑ Well ❑ Tobacco.Sales ❑ Food Pri..vate.(septic tank,etc:_ Packaging/Sales El Permanent P'Mpster on=Site ❑ ------------ -THE.FOLLOWING SECTIONS FOROFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF U FORM . .-:,--DATE REJECTED DATE:APPROVED PLAN'NING'& DEVELOPMENT` ❑ ❑ i COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer ConnectioniSignature& Date Driveway Permit DPW Todv 2 Engineer: Signature: Located 384 Osgood Street FIRE DEPARTM:I N'T' - Temp Dump;ster on site yes::... no 'Located-at 124SMain Street: _ Fire"Departme►if sigi�atu"reldate`' a COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total,land area, sq. ft.: ELECTRICAL: Movement of.Meter.locatFon-, niast orservice drop requires approval of Electrical Inspector Yes No DANGER Z®NE LITERATURE: Yes No MGL.Chapter 166.Section 21A-F and G min.$100=$100.0...fin.e NOTES and DATA— For department use �-- �VKk ® Notified for pickup - Date Doe.Building Permit Revised 2010 r Building Department The foe{-awing.is'a-list of the req uired.forms to be filled out'-for-the appropriate.permit to.be obtained. Roofing, Siding, Interior Rehabilitation Permits u Building Permit Application Li Workers Comp Affidavit u Photo Copy Of H.I.C. And/Or-C.S.L Licenses u Copy of Contract u Floor Plan Or Proposed Interior Work u Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire- Department prior to issuance of Bldg Permit Addition Or Decks Li Building Permit Application u Certified Surveyed Plot Plan Li Workers Comp Affidavit o Photo Copy of H.I.C. And C.S.L. Licenses u Copy Of Contract u Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) o Mass check Energy Compliance Report (If Applicable) o Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) o Building Permit Application u Certified Proposed Plot Plan o Photo of H.I.C. And C.S.L. Licenses u Workers Comp Affidavit Li Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) Li Copy of Contract u Mass check Energy Compliance Report u Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the api),?al period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be subm.tted with the building application Doc: Doc.Buil,ding permit Revised 2012 Location No. ' S I Date 7 Z /z/ . - TOWN OF NORTH ANDOVER b ` • Certificate of Occupancy $ Building/Frame Permit Fee $1Z, �/ Foundation Permit Fee $ Other Permit Fee $ TOTAL Check#�'� ; 7-2 Z7 Quilding Inspector + Deems, Maura From: Brown, Gerald Sent: Thursday, December 04, 201410:34 AM To: Deems, Maura Subject: Re: Final Certificate of Occupancy- Pentucket Bank Yes Sent from my iPhone On Dec 4, 2014, at 10:31 AM, Deems, Maura<mdeems@townofnorthandover.com> wrote: Jerry, We have the final construction control document,the CO application was completed for the temp CO and now with the d Let me know, Thanks, Maura From: Brown, Gerald Sent: Thursday, December 04, 2014 9:59 AM To: Deems, Maura Subject: Fwd: Final Certificate of Occupancy - Pentucket Bank Sent from my iPhone Begin forwarded message: From: William Francoeur<wfrancoeur@mlccinc.com> Date: December 4, 2014 at 9:53:30 AM EST To: 'Brown, Gerald" <gabrown@townofnorthandover.com> Subject: Final Certificate of Occupancy - Pentucket Bank Hello Gerry. I just spoke with Matt of the planning department and he informed me that he was all set with Signing off on the permanent CO. He also informed me that the Building Department is responsible for the Issuing the final CO. Can this be completed at this time now? The Pentucket Bank has inquired on the status of the Certificate of Occupancy. Please get back to me so I can update my client please. They are concerned that the temp CO will run out. Thank You. Bill Francoeur Project Manager Maple-Leaf Construction Company, Inc. 5 Congress St. Nashua, NH 03062 Telephone- (603)882-7498 1 i Engineers and Environmental Consultants fl November 24, 2014 Town of North Andover Planning Department 1600 Osgood Street North Andover, MA 01845 Attention: Mr. Matthew Egge, Town Planner Subject: Watershed Special Permit Form and Site Plan Review Pentucket Bank at Butcher Boy Marketplace 1077 Osgood Street North Andover, MA LEI Job No. 530-30 Dear Mr. Egge: < In compliance with Special Conditions 5.)a. of the Watershed Special Permit and Site Plan Special Permit, please find enclosed a copy of the as-built drawing for the above-referenced project. A digital version (pdf) of the as built is also enclosed. Lynnfield Engineering, Inc. has inspected the site and stormwater management system and herein certifies that they substantially comply with the approved plans. If you have any questions or desire any additional information regarding this matter, please do not hesitate to contact me at 978.777.7250 Ext. 12. Very truly yours, Lynnfield Engineering, Inc. Richard Barthelmes, P.E. enclosures c: Alan Yameen, Angus Realty William Francouer, Maple-Leaf Construction Co., Inc. w/enclosures 2 Electronics Avenue, Suite 41 • Danvers, MA 01923 -978.777.7250 •fax 978.777.8650 •www.lynnfieldeng.com K:\530-30\Corr\Egge M-112414—let—as-built plan.docx *.JijijE,J� �j 1�1 51 1 ej I Im P11 v 92 #Y PENTUCKET BANK AT BUTCHER BOY MARKETPLACE LYNNFIELD ENOINEEIR1110, INC, 1077­0 STREET CONSULTING ENVIRONMENTAL ENGINEERS RECORD IM.A-.---DIBIS CONDIVONS PLAN PREPARED FOR 2 ELECTRONICS AVE,SWIr 41 BANX DANVERS,MASSACHUSETTS 01923 I MRI.AI (978)777-7250 FAX(978)777-8650 Final Construction Control Document N To be submitted at completion of construction by a Registered Design Professional ,eW for work per the 8th edition of the 01 sY�v Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Pentucket Bank Date: 10/24/14 Permit No. Property Address: 1077 Osgood Street,North Andover MA 01845 Project: Check(x)one or both as applicable: X New construction Existing Construction Project description: Construction of a single story, slab on grade, full service bank I Lester Lloyd, MA Registration Number: 5442 Expiration date: 8/31/15,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: X Architectural Structural Mechanical Fire Protection Electrical Other: Describe for the above named project. 1, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or St N � r,&�4.roc' n u � A Fq1 rH OF, electronic signature and seal: Phone number: 508 746.4646 Email: ll@lloydarch.com Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 'SSCNUSEt CERTIFICATE OF USE & OCCUPANCY TOWN OF NORTH ANDOVER Building Permit Number 0 10-15 on 7/2/2014 Date: December 4, 2014 THIS CERTIFIES THAT THE BUILDING LOCATED ON 1065 Osgood Street MAY BE OCCUPIED AS Pentucket Bank IN ACCORDANCE WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY APPLY. Certificate Issued to: Angus Realty Corporation 1065 Osgood Street North Andover,MA 01845 5 Bui ing nspector Fee: PrePaid $100.00 Receipt: 27738 Cheek : 52377 ttORTH Town o . t E : .t ndover b i *� h ver, Mass, c oc"Ic"t-1c l 1' S V BOARD OF HEALTH Food/Kitchen PERMIT T LD _ Septic System THIS CERTIFIES THAT ...........:.........................................................:. DI OR ..................................................... BUILDING INS CT OR u, ation �! has.permission to erect ........................... buildings on .............................................................................. ��/ \ g tobe occupied as .................:.........:....................................................................................................... c provided that the person accepting this permit shall in every respect conform to the terms of the application inal on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover.9 Rough /�f�S ;01'�LING IASPC#T � VIOLATION of the Zoning or Building Regulations Voids this Permit. ina/1"C I()/.:9/ PERMIT EXPIRES IN 6 MONTHSDovl, ; ELECTRICAL INSPECT R UNLESS CONSTRUCTION STARTS Service ` .. _ .........'...........�..........:...:....BUIL DING.INSPECTOR• Fin �,��'tJ�!�-�� IV GAS�SP,�CTOR r Occupancy Permit Required to Occupy Building Rough �s� fA Q///� Display in a Conspicuous Place on the Premises — Do Not Remove ` F i nai sv 11/y/-/V, No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner kAo. Street No. f--,tz- _ Smoke Det. (,�12 AO.7M 1b . O SSICINSE TEMPORARY CERTIFICATE OF USE & OCCUPANCY TOWN OF NORTH ANDOVER Valid for 30 Days from November 6, 2014 Building Permit Number 010-15 on 7/2/2014 Date: November 6, 2014 THIS CERTIFIES THAT THE BUILDING LOCATED ON 1065 Osgood Street MAY BE OCCUPIED AS Pentucket Bank IN ACCORDANCE WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY APPLY. Certificate Issued to: Angus Realty Corporation 1065 Osgood Street North Andover, MA 01845 Building Inspector Fee: PrePaid $100.00 Receipt: 27738 Check : 52377 � NhRTy q APPLICATION FOR CERTIFICATE OF OCCUPANCY/INSPECTION ORATED�`Pp`y 5 BUILDING PERMIT # o 9SSACHUS�� ADDRESS/LOCATION OF PROPERTY: Map ''f Parcel � Lot Number SUBDIVISION: DATE REQUESTED FILED/READY FOR INSPECTION: CLOSING DATE ON PROPERTY: -3!Er FIVE(5)DAYS NOTICE PRIOR TO CLOSING DATE IS REQUIRED ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A REINSPECTION FEE OF TWENTY DOLLARS ($20.00)WILL BE CHARGED IF THE STRUCTURE DOES NOT MEET ALL APPLICABLE CODES. APPLICANT SIGNATURE Permit Issued to: Address: ROUTING TOWN ENGINEER; SITE PLA —DRIVF-WAY REVIEW F]CONSERVATION ILA PLANNING DPW-WATER METER IJ P/1 CXXI q I k 1 SEWER CONNECTION DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO SUBMITTAL OF THE OCCUPANCYANSPECTION REQUEST DPW . SIGNATURE File:Application for OC form revised Jan 2007/2011 � a r y 'SSACN`'E1 CERTIFICATE OF USE & OCCUPANCY TOWN OF NORTH ANDOVER Building Permit Number 010-15 on 7/2/2014 Date: December 4, 2014 THIS CERTIFIES THAT THE BUILDING LOCATED ON 1065 Osgood Street MAY BE OCCUPIED AS Pentucket Bank IN ACCORDANCE WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY APPLY. Certificate Issued to: Angus Realty Corporation 1065 Osgood Street North Andover, MA 01845 Bui mg nspector Fee: PrePaid $100.00 Receipt: 27738 Cheek : 52377 NORTH own of ndover 0 0 t T h ver, Mass, , coc"ic"twicw V11- BOARD OF HEALTH Food/Kitchen PERMIT T LD . Septic System THIS CERTIFIES THAT BUILDING INS CTOR has.permission to erect ........................... buildings on ..................................... ........................................• F u ation to be occupied as ................. ......:.......................................................................................""',........... ... c ' provided that the person accepting this permit shall in every respect conform to the terms of the application on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. UMBING�IASP CT�2 Rough � VIOLATION of the Zoningor Building Regulations Voids this Permit. Rlt5e g gPERMIT EXPIRES IN 6 MONTHS ,� ELECTRICAL INSPECT R UNLESS CONSTRUCTION STARTS Service i ...._............`................................................................ Fin �+L �tJ-•-�/�-�� BUILDING INSPECTOR GASSP, CTOR ,r Occupancy Permit Required to Occupy Building Raugn �s� f� r� Display in a Conspicuous Place on the Premises — Do Not Remove ' Final ' - >/�� No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner X///-)- Street No. Smoke Det. AoRtN 4 A 4 t v v �• ;r �7@ hCRU5Et49 TEMPORARY CERTIFICATE OF USE & OCCUPANCY TOWN OF NORTH ANDOVER Valid for 30 Days from November 6, 2014 Building Permit Number 010-15 on 7/2/2014 Date:November 6, 2014 THIS CERTIFIES THAT i THE BUILDING LOCATED ON 1065 Osgood Street MAY BE OCCUPIED AS Pentucket Bank IN ACCORDANCE WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY APPLY. Certificate Issued to: Angus Realty Corporation 1065 Osgood Street North Andover,MA 01845 i Building Inspector Fee: PrePaid$100.00 Receipt: 27738 Check : 52377 NORTH I O ,iteo f6 , 32 yE�' a•.'a p APPLICATION FOR CERTIFICATE OF OCCUPANCY/INSPECTION �9SSgTED CH„5���� BUILDING PERMIT # ADDRESS/LOCATION OF PROPERTY: 6 MParcel Lot Number SUBDIVISION: DATE REQUESTED FILED/READY FOR INSPECTION: CLOSING DATE ON PROPERTY: j sp FIVE (5)DAYS NOTICE PRIOR TO CLOSING DATE IS REOUIRED ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A REINSPECTION FEE OF TWENTY DOLLARS ($20.00)WILL BE CHARGED IF THE STRUCTURE DOES NOT MEET ALL APPLICABLE CODES. APPLICANT SIGNATURE Permit Issued to: Address: , Q o r ROUTING TOWN ENGINEER; SITE PLAN—D WAY REVIEW ❑ CONSERVATION PLANNING DPW-WATER METER L`� ���`� ' '� �+4 k 1 SEWER CONNECTION L� � DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO SUBMITTAL OF THE OCCUPANCYANSPECTION REQUEST DPW SIGNATURE File:Application for OC form revised Jan 2007/2011 NORTH own Of . � _ ndover 0 . : . ..� h ver, Mass, , coc«IC.,2 W.C.. 1. 'Qo ��. S V BOARD OF HEALTH Food/Kitchen PERMIT T D , Septic System THIS CERTIFIES THAT ..............................:............................................................................................... OR 077 has.permission to erect ......... buildings on tobe occupied as .................:................................................................................................................. c provided that the person accepting this permit shall in every respect conform to the terms of the application on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. UMBIING I sP c Rough VIOLATION of the Zoning or Building Regulations Voids this Permit. aRt6,C PERMIT EXPIRES IN 6 MONTHS ' .fir ELECTRICAL INSPECT R UNLESS CONSTRUCTION STARTS Service ` ....................................... Fin ��/ �/--lv BUILDING INSPECTOR �a7z' GASSPCTOR Occupancy Permit Required to Occupy Building Rough ls� /� /fw Display in a Conspicuous Place on the Premises — Do Not Remove Fnai el sf' No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. f-Az- lM� Smoke Det. OE AORYN,H ♦;, r h SS/IClNSE TEMPORARY CERTIFICATE OF USE & OCCUPANCY TOWN OF NORTH ANDOVER Valid for 30 Days from November 6, 2014 Building Permit Number 010-15 on 7/2/2014 Date:November 6, 2014 THIS CERTIFIES THAT THE BUILDING LOCATED ON 1065 Osgood Street MAY BE OCCUPIED AS Pentucket Bank IN ACCORDANCE WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY APPLY. Certificate Issued to: Angus Realty Corporation 1065 Osgood Street North Andover,MA 01845 I I Building Inspector Fee: Prepaid $100.00 Receipt: 27738 Check : 52377 NORTH 0��,LED lb�N t APPLICATION FOR CERTIFICATE OF OCCUPANCY/INSPECTION 41 .0 re <OCMKwtwKw 1' T � D„P'`�y.�5 BUILDING PERMIT # o 9SAC14us ADDRESS/LOCATION OF PROPERTY: Map ' `t ' Parcel Lot Number SUBDIVISION: DATE REQUESTED FILED/READY FOR INSPECTION: CLOSING DATE ON PROPERTY: 1 -r FIVE(5)DAYS NOTICE PRIOR TO CLOSING DATE IS REQUIRED ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A REINSPECTION FEE OF TWENTY DOLLARS ($20.00)WILL BE CHARGED IF THE STRUCTURE DOES NOT MEET ALL APPLICABLE CODES. APPLICANT SIGNATURE Permit Issued to: Address: ' 0 ,30 i ROUTING TOWN ENGINEER; SITE PLA —DRIVE -WAY REVIEW ❑ ILA CONSERVATION �,�� PLANNING DPW-WATERMETER H SEWER CONNECTION DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO SUBMITTAL OF THE OCCUPANCY/INSPECTION REQUEST DPW­2YAM5112� SIGNATURE File:Application for OC form revised Jan 2007/2011 NORTy 0��,6ED l6�N 0 t APPLICATION FOR CERTIFICATE OF OCCUPANCY/INSPECTION Opp!�w ti eyb.,L �9S RATED.p��q5 BUILDING PERMIT # o SgCHus ADDRESS/LOCATION OF PROPERTY: 6 Map Pare el Lot Number SUBDIVISION: DATE REQUESTED FILED/READY FOR INSPECTION: CLOSING DATE ON PROPERTY: 1 sr FIVE (5)DAYS NOTICE PRIOR TO CLOSING DATE IS REOUIRED ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A REINSPECTION FEE OF TWENTY DOLLARS ($20.00)WILL BE CHARGED IF THE STRUCTURE DOES NOT MEET ALL APPLICABLE CODES. APPLICANT SIGNATURE Permit Issued to: Address: < 0 3 p 21 ROUTING TOWN ENGINEER; SITE PLAIN—DRIV -WAY REVIEW ❑ CONSERVATION PLANNING DPW-WATER METER SEWER CONNECTION ' DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO SUBMITTAL OF THE OCCUPANCY/INSPECTION REQUEST DPW M,8 SIGNATURE File:Application for OC form revised Jan 2007/2011 i L*NA Final Construction Control Document = To be submitted at completion of construction by a Registered Design Professional M for work per the 8`"edition of the Y Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Pentucket Bank Date: 9/15/2014 Permit No.: 010-15 Property Address: 1077 Osgood Street,North Andover,MA i Project: Check(x)one or both as applicable:X New construction Existing Construction Project description:New Pentucket Bank branch wood-framed construction with steel frames at drive-thru on shallow concrete foundations. Slab-on-grade first floor. 1,Wayne R. Lawson,P.E.,MA Registration Number: 35102 Expiration date: 6/30/2016,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural X Structural Mechanical Fire Protection Electrical Other:Describe for the above named project. I,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge,information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions s WAYNE R o LAWSON Enter in the space to the right a"wet"or STRUCT- URAL electronic signature and seal: 9�No.351a2 0 C/sTE9� NAL Elv�'\`y P Phone number: 617-268-8977 Email: wlawson@cbiconsultinginc.com Building Official Use Only Building Official Name: Permit No.: Date: i Version 06 11 2013 9 CBC CON SU LTfNG tNC - Page 2 Field Report#001 Pentucket Bank—North Andover,MA CBI Job No.: 14009 _ June 24,2014 Pentucket Bank— Photo Index CBI Job No.: 14009 Photo No. Description r l View of the site at the time of the visit. 2 View of a the framing conditions inside the building :gip View of the framing over the drive through canopy. Note 3 the horizontal truss pieces nailed to the bottom chord of the metal-plate connected wood trusses 75Q DORCHESTER AVENUE 150STON, MASSACHUSETTS (1,2127 CRI CONSULTING INC _ t FIELD REPORT #02 1 PROJECT: Pentucket Bank CBI JOB NO.: 14009 CBI PERSONNEL: Keith M.Bouchard,P.E. C,an&E 111�5 ,,,CRIUMS„E..R DATE: August 22,2014 `owm a. CONTRACTOR: Maple Leaf Construction AUMM F_!EIZZ rF SITE LOCATION: North Andover,MA .ase�rc WEATHER: Mostly Sunny, 75°F ATTENDEES: Keith Bouchard,CBI Consulting Larry Bird,Maple Leaf Construction DISTRIBUTION: Lester Lloyd,Lloyd Architects Robert Reifeiss,Lloyd Architects William Francoeur,Maple Leaf Construction CONSTRUCTION ACTIVITIES/OBSERVATIONS CBI visited the site at approximately 8:00 AM on this date to view the progress of construction. The contractor had completed the installation of the structural framing, including steel and wood members. CBI walked the site with the contractor to view the framing. The attic of the drive-through roof area was accessed via a lift through a ceiling hatch. All members and connections viewed appeared to agree with the design documents. The contractor can proceed with the installation of finishes. KMB " 0ACBI PROJECTS\2014\14009WSWORDTIELD REPORTS\14009 FRO02 2014-08-22.doc cc�e� "Kam r�-�sassis F f117-lit1SAE 2.50 DORCHESTER"ENUE - BOSTON., MASSACHUSETTS 02127 i Pentucket Bank 1085 Osgood Street 1-Jul-14 Permit# Dt. Issued Est. Cost Permit Fee Scope of Work Fees Based On $2,104,012.00 Cost of Building 690-14 4/8/2014 $724,550.00 $8,695.00 Excavation for Bank $724,550.00 Site Work Permit Cost 703-14 4/11/2014 $50.00 Temp Trailer $1,379,462.00 Net Cost of Building 031-14 4/29/2014 $30.00 Sign Permit for Construction $16,553.54 Building Permit Fee 12283 4/14/2014 $85.00 Temp Service - Electrical $100.00 Certificate of Occupancy Fee 900-14 6/11/2014 $100.00 Foundation Permit $16,653.54 Total Fee 10613 7/1/2014 $2,069.00 Plumbing Permit 9392G 7/1/2014 $100.00 Gas Permit Enter construction cost for fee cal - North Andover Fee Calculation Construction Cost $ 1137%462.00 m $ - $ 16,553.54 Plumbing Fee $ 2,069.19 Gas Fee 100 comm. $ 100.00 Electrical Fee $ 2,069.19 Total fees collected $ 20,791.93 1085 Osgood Street Pentucket Bank i NORTh Town of . � 1, ndover O - No. IL Y h ver, Mass, /' A_ C0C"1CK[WICK X01. 7aS0RATED PPP��S U BOARD OF HEALTH Food/Kitchen PERMIT Sept System 11 THIS CERTIFIES THAT /"'7�.. ,,...... BUILDING INSPECTOR has.permission to erect ....... buildings on ..'. :� 7� �S�0�� Fo ation Rough to be occupied as .. '� / .................................................. Chimney ................. . ...... ...................................... provided that the person-accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTION T TS Rough Service ................. ............... ...��...':............................. ` Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Buildinz Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. Pentucket Bank 1085 Osgood Street 1-Jul-14 Permit# Dt. Issued Est. Cost Permit Fee Scope of Work Fees Based On $2,104,012.00 Cost of Building 690-14 4/8/2014 $724,550.00 $8,695.00 Excavation for Bank $724,550.00 Site Work Permit Cost 703-14 4/11/2014 $50.00 Temp Trailer $1,379,462.00 Net Cost of Building 031-14 4/29/2014 $30.00 Sign Permit for Construction $16,553.54 Building Permit Fee 12283 4/14/2014 $85.00 Temp Service - Electrical $100.00 Certificate of Occupancy Fee 900-14 6/11/2014 $100.00 Foundation Permit $16,653.54 Total Fee 10613 7/1/2014 $2,069.00 Plumbing Permit 9392G 7/1/2014 $100.00 Gas Permit CV ' MAPLE LEAF CONSTRUCTION COMPANY INC. 05/29/14 Pentucket Bank North Andover, MA Control Estimate Schedule of Values 1 GENERAL CONDITIONS 1.69,592 Permitting 26,102 2 SITEWORK AND DEMOLITION 773,527 3 CONCRETE 57,082 4 MASONRY 61,000 5 METALS 18,538 6 WOOD AND PLASTICS 140,830 Millwork 92,700 7 THERMAL AND MOISTURE PROTECTION 33,977 8 DOORS AND WINDOWS 72,950 9 FINISHES 95,200 Metal Studs and Gypsum Wallboard 36,800 Acoustic Ceilings 13,280 E.I.F.S. 6,400 Flooring &Ceramic Tile 27,820 Painting 10,900 10 SPECIALTIES 3,745 11 EQUIPMENT 0 12 FURNISHINGS 0 13 SPECIAL CONSTRUCTION 0 14 CONVEYING SYSTEMS 0 15 MECHANICAL 188,575 Sprinkler 27,400 Plumbing 19,575 HVAC 141,600 16 ELECTRICAL 158,140 SUBTOTAL 1,891,958 CONTRACTORS OVERHEAD &FEE 212,054 TOTAL CONTRACT COST $2,104,012 603 882-7498 FAX: 603 595-8688 5 CONGRESS ST. NASHUA, NH 03062 s � Document AlUm — 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee without a Guaranteed Maximum Price AGREEMENT made as of the 25th day of March in the year 2014 This document has important legal (In words, indicate day,month and year.) consequences.Consultation with an attorney is encouraged with BETWEEN the Owner. Pentucket Bank respect to its completion or (Name, legal.status and address) Go Scott D.Cote,President(CEO modification. One Merrimack Street AIA Document A201 m"-2007, Haverhill,MA 01831-2479 General Conditions of the Contract for Construction,is adopted In this document by and the Construction Manager: Maple-Leaf Construction Co.,Inc. reference.Do not use with other g Go Loren Dubois,President general conditions unless this (Name, legal status and address) 5 Congress Street document is modified, Nashua,NH 03062 for the following Project: New Branch Bank (Name and address or location) 1077 Osgood Road North Andover,MA 01845 The Architect: c/o Lester Lloyd,AIA (Name, legal status and address) Lloyd Architects 32 Court Street Plymouth,MA 02360 The Owner's Designated Representative: Gregory J.Shaw,Sr.Vice President (Name,address and other information) Pentucket Bank One Merrimack Street Haverhill,MA 01831-2479 The Construction Manager's Designated Representative: Loren Dubois,President (Name, address and other information) Go Maple-Leaf Construction Co., Inc. 5 Congress Street Nashua,NH 03062 The Architect's Designated Representative: Lester Lloyd,AIA (Name,address and other information) Go Lester Loyd Architects 32 Court Street Plymouth,MA 02360 The Owner and Construction Manager agree as follows. AIA Document A134m—2009(formerly A131TuCMc—2003).Copyright@ 1994,2403 and 2809 by The American Institute or Architects.All rights Init. reserved.WARNING This AW bocnmtrN js tnaltsiea by 0 S-Cspy""taw and International Treaties.Unauthorized reproduction or distribution � of this AIA'Document,or any portion of t1.otiv resuft In scvotu ctv7!arw=irrdrral penalties,and will be prosecuted to the maximum extent possible under the law.Purchasers are permitted to reproduce ten(14)copies of this documttnifwRt ffaurr ikW.."r0 reportcopynghty 6Mfibns or AIA Contract Documents,e-mail The American Institute of ArchilecW legal counsel,copyright@aia.org. TABLE OF ARTICLES 1 GENERAL PROVISIONS 2 CONSTRUCTION MANAGER'S RESPONSIBILITIES 3 OWNER'S RESPONSIBILITIES 4 COMPENSATION AND PAYMENTS FOR PRECONSTRUCTION PHASE SERVICES 5 COMPENSATION FOR CONSTRUCTION PHASE SERVICES 6 COST OF THE WORK FOR CONSTRUCTION PHASE 7 PAYMENTS FOR CONSTRUCTION PHASE SERVICES 6 INSURANCE AND BONDS 9 DISPUTE RESOLUTION 10 TERMINATION OR SUSPENSION 11 MISCELLANEOUS PROVISIONS 12 SCOPE OF THE AGREEMENT ARTICLE 1 GENERAL PROVISIONS §1.1 The Contract Documents The Contract Documents consist of this Agreement,Conditions of the Contract(General,Supplementary and other Conditions),Drawings,Specifications,Addenda issued prior to the execution of this Agreement,other documents listed in this Agreement,and Modifications issued after execution of this Agreement,all of which form the Contract and are as fully a part of the Contract as if attached to this Agreement or repeated herein.Upon the Owner's approval of the Control Estimate,the Contract Documents will also include the documents described in Section 2.2.4 and revisions prepared by the Architect and fumished by the Owner as described in Section 2.2.5.The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations,representations or agreements,either written or oral.If anything in the other Contract Documents,other than a Modification,is inconsistent with this Agreement,this Agreement shall govern. §1.2 Relationship of the Parties The Construction Manager accepts the relationship of trust and confidence established by this Agreement and covenants with the Owner to cooperate with the Architect and exercise the Construction Manager's skill and judgment in furthering the interests of the Owner,to furnish efficient construction administration,management services and supervision,to furnish at all times an adequate supply of workers and materials;and to perform the Work in an expeditious and economical manner consistent with the Owner's interests.The Owner agrees to furnish or approve,in a timely manner,information required by the Construction Manager and to make payments to the Construction Manager in accordance with the requirements of the Contract Documents. §1.3 General Conditions For the Preconstruction Phase,AIA Document A201TM--2007,General Conditions of the Contract for Construction, shall apply only as specifically provided in this Agreement.For the Construction Phase,the general conditions of the contract shall be as set forth in A201-2007,which document is incorporated herein by reference.The term "Contractor"as used in A201-2007 shall mean the Construction Manager. §1.4 Contract Sum,Contract Time and Changes in the Work The Contract Sum is the actual Cost of the Work as defined in Section 6.1.1 plus the Construction Manager's Fee as defined in Section 5.1.The Contract Time is the period of time,including authorized adjustments,allotted in the Contract Documents for Substantial Completion of the Work as certified by the Architect in accordance with Section 9.8 of AIA Document A201-2007.The Contract Time shall be measured from the date of commencement of the Construction Phase as established pursuant to Section 2.3.1.2 of this Agreement.Changes in the Work shall be Init AIA Document A134TM—2009{formerly A131TMCMc—2003).Copyright Q 1994.2003 and 2fflq by Tha American Instiitule or Architects.Ail rl@hts reserved.WARNING:This Ale Doccmvv t to protected by u-s cypyrirlm Lew rola bumnational Treaties.Unauthorized reproduction or distribution 2 of this AIA"Document or any porton of it trrgr re*t.t in severe civil and crialinat pow.ties,and will be prosecuted to the maximum extent possible under the law.Puti teasers are permitted to reproduce ten(10)copies of this document when compkied.To report copyngtrtwforaduns ufAt t Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright@aia.org. governed by Section 5.2 of this Agreement and not by Article 7 of A201-2007. If,however,the Contract Time has been established in accordance with Section 2.2.4.5,Article 7 of A201-2007 shall control adjustments to the Contract Time. ARTICLE 2 CONSTRUCTION MANAGER'S RESPONSIBILITIES The Construction Manager's Preconstruction Phase responsibilities are set forth in Sections 2.1 and 2.2.The Construction Manager's Construction Phase responsibilities are set forth in Section 2.3.The Owner and Construction Manager may agree,in consultation with the Architect,for the Construction Phase to commence prior to completion of the Preconstruction Phase,in which case,both phases will proceed concurrently.The Construction Manager shall identify a representative authorized to act on behalf of the Construction Manager with respect to the Project. §2.1 Preconstruction Phase §2.1,1 The Construction Manager shall provide a preliminary evaluation of the Owner's program,schedule and construction budget requirements,each in terms of the other. §2.1.2 Consultation The Construction Manager shall schedule and conduct meetings with the Architect and Owner to discuss such matters as procedures,progress,coordination,and scheduling of the Work.The Construction Manager shall advise the Owner and the Architect on proposed site use and improvements,selection of materials,and building systems and equipment. The Construction Manager shall also provide recommendations consistent with the Project requirements to the Owner and Architect on construetability;availability of materials and labor;time requirements for procurement,installation and construction;and factors related to construction cost including,but not limited to,costs of alternative designs or materials,preliminary budgets,life-cycle data,and possible cost reductions. §2,1,3 When Project requirements in Section 3.1.1 have been sufficiently identified,the Construction Manager shall prepare and periodically update a Project schedule for the Architect's review and the Owner's acceptance.The Construction Manager shall obtain the Architect's approval for the portion of the Project schedule relating to the performance of the Architect's services.The Project schedule shall coordinate and integrate the Construction Manager's services,the Architect's services,other Owner consultants'services,and the Owner's responsibilities and identify items that could affect the Project's timely completion.The updated Project schedule shall include the following:submission of the Control Estimate;the components of the Work;times of commencement and completion required of each Subcontractor;ordering and delivery of products,including those that must be ordered well in advance of construction;and the occupancy requirements of the Owner. §2.1,4 Phased Construction The Construction Manager shall provide recommendations with regard to accelerated or fast-track scheduling, procurement,or phased construction.The Construction Manager shall take into consideration cost reductions,cost information,constructability,provisions for temporary facilities and procurement and construction scheduling issues. §2.1..SPm[--twyCost E §X1.5.1 Based an the prelimmary design and otter dcsign uiwria prqmed by tI r Arsht,the Construcan strap psTm prefirrifilary estimatas of tht Cost of 6e W ark or the cog ofix requiremeds using area, or shnillar owl,teciliniq=far the ArchiteWs review and Owner's 1l-If the Ambited or C: m blaimiger slit altenatit-e rr s and s}vftr,the Chmaixtion Adwnger shall prmade cw era of dx se alernative mks and s)�mrs §Z1.,2 As the Architect progresses vith the prqparafirm aftls Scbemafic lam,ltd DevehWrEt and Constimeboni Docuimts,,the Construction AL-mgm shaU pep=and fir,at appropnabe iinteavats aid to by the C=W=bm M=zW and Arm,estimaus of dx Coa of the ijin*ofmcli=shig dcW and refinemerit =d frac the&n her devehqmeut of the design u=tfl=ch time as tlx Construction hlaimW wits a CacriM Esliimde 1br the Wedge to Secdon 22.Such esth=tes"he Favt*d fir d=Ams revue and the ow=esq4ravaL 11te Construdian MwxW siaail mfmm the Owm and Ar when Ii Ier of the Cast of the Wcke=eedft latm approved Prtajw butt=d main rrcfor CO3=11tiVE a>ft. §11AS cc�arswildSqVrm The Cmilsbucti=MmW shsll de-wmlup bis'iu rest in tix Ptd §LIJM=Cansbuxtion ManW doll prepare,for tits Atebit d's redew aird tlx tis a precurew= schbd—'.e far its dot t1 be wderedmel in adv=c oFcwWxcctm=The C slap mpelfift aad tom. Dccc=m tAX114m- �A1XI —a�3j. +d MLZ=aand2=ty73a t ct• .AM WARNING:This AIA Dom=wat 1a pnnadsd by U1'Cvy9 Vht craw and International Treaties.Unauthorized reproduction or distribut[on 3 of this AIAe Document,or any podioa di 4.may resuftin ae-me-civic and crimiralparralties,and will be prosecuted to the maximum extent possible under the law. s2Wp t3I I; t=(10)Ca;&sC1Ct QC=;t!3%L T*VP:t 4cfXA CWt2dDam==cfs e4=3MnA=w=hsncn3vf legal oatsI I coordinate the ordering and delivery of materials that must be ordered well in advance of construction. If the Owner agrees to procure any items prior to the Owner's approval of the Control Estimate,the Owner shall procure the items on terms and conditions acceptable to the Construction Manager.Upon the Owner's approval of the Control Estimate, the Owner shall assign all contracts for these items to the Construction Manager and the Construction Manager shall thereafter accept responsibility for them. §2.1.8 Extent of Responsibility The Construction Manager shall exercise reasonable care in preparing schedules and estimates.The Construction Manager,however,does not warrant or guarantee estimates and schedules,including the Control Estimate and the estimated date of Substantial Completion.except as provided in Section 2.2.4.5.The Construction Manager is not required to ascertain that the Drawings and Specifications are in accordance with applicable laws,statutes,ordinances, codes,rules and regulations,or lawful orders of public authorities,but the Construction Manager shall promptly report to the Architect and Owner any nonconformity discovered by or made known to the Construction Manager as a request for information in such form as the Architect may require. §2.1.9 Notices and Compliance with Laws The Construction Manager shall comply with applicable laws,statutes,ordinances,codes,rules and regulations,and lawful orders of public authorities applicable to its performance under this Contract,and with equal employment opportunity programs,and other programs as may be required by governmental and quasi governmental authorities for inclusion in the Contract Documents. §2.2 Control Estimate §2.2.1 At a time to be mutually agreed upon by the Owner and the Construction Manager and in consultation with the Architect,the Construction Manager shall prepare a Control Estimate for the Owner's review and acceptance.The Control Estimate shall be the sum of the Construction Manager's estimate of the Cost of the Work and the Construction Manager's Fee and shall include those items set forth in Section 2.2.4 below.When the Control Estimate is acceptable to the Owner,the Owner shall acknowledge it in writing. §2.2.2 The Construction Manager shall develop and implement a detailed system of cost control that will provide the Owner and Architect with timely information as to the anticipated total Cost of the Work.The cost control system shall compare the Control Estimate with the actual cost for activities in progress and estimates for uncompleted tasks and proposed changes.This information shall be reported to the Owner,in writing,no later than the Construction Manager's first Application for Payment and shall be revised and submitted with each Application for Payment. §2,2.3 To the extent that the Drawings and Specifications are anticipated to require further development by the Architect,the Construction Manager shall provide in the Control Estimate for such further development consistent with the Contract Documents and reasonably inferable therefrom.Such further development does not include changes in scope,systems,kinds and quality of materials,finishes or equipment,all of which,if required,shall be incorporated in a revised Control Estimate by mutual agreement of the parties. §2.2.4 The Control Estimate shall include .1 a list of the Drawings and Specifications,including all Addenda thereto,and the Conditions of the Contract; .2 a list of the clarifications and assumptions made by the Construction Manager in the preparation of the Control Estimate,including assumptions under Section 2.2.3,to supplement the information provided by the Owner and contained in the Drawings and Specifications; .3 a statement of the estimated Cost of the Work organized by trade categories or systems,allowances, and the Construction Manager's Fee; .4 the anticipated date of Substantial Completion upon which the Control Estimate is based,and a schedule for the issuance dates of the Construction Documents upon which the anticipated Substantial Completion date relies;and .5 a statement as to whether or not the duration from the stated date of commencement of the Construction Phase to the estimated date of Substantial Completion shall become the Contract Time and be subject to the provisions of Article S of A201-2007. §2.2.5 The Owner shall authorize the Architect to incorporate the agreed-upon assumptions and clarifications contained in the Control Estimate.The Owner shall promptly furnish those revised Drawings and Specifications to the Construction Manager as they are revised.The Construction Manager shall notify the Owner and Architect of any inconsistencies between the Control Estimate and the revised Drawings and Specifications. Init. AIA Document A134TM—2009 tfnrmartq A131TMCG —2trQ31-_Cott d S.�11994,2003 and 2QQ by! At+wdrao.InsGlaalar�f.Arrd+i!r�ts 411.d ht� reserved.WARNING:This AIA°Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution 4 of this AIA°Document,or any portion of it,may result in severe civil and criminal penalties,and wit!be prosecuted to the maximum extent f possible under the law.purchasers are permffieft reproduce Ven tYL1 copies ofMis obcumentwhen completed.To report copynght violations orAIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright@aia.org. i i §2.3 Construction Phase §2.3,1 General §2.3.1.1 For purposes of Section 8.1.2 of A201-2007,the date of commencement of the Work shall mean the date of commencement of the Construction Phase. §2.3.1.2 The Construction Phase shall commence upon the Owner's approval of the Control Estimate or the Owner's issuance of a Notice to Proceed,whichever occurs earlier. §2.3.1.3 Prior to commencement of the Construction Phase,the Construction Manager shall not incur any cost to be reimbursed as part of the Cost of the Work. §2.3.2 Administration §2.3.2.9 Those portions of the Work that the Construction Manager does not customarily perform with the Construction Manager's own personnel shall be performed under subcontracts or by other appropriate agreements with the Construction Manager.The Owner may designate specific persons from whom,or entities from which,the Construction Manager shall obtain bids.The Construction Manager shall obtain bids from Subcontractors and from suppliers of materials or equipment fabricated especially for the Work and shall deliver such bids to the Architect.The Owner shall then determine,with the advice of the Construction Manager and the Architect,which bids will be accepted,The Construction Manager shall not be required to contract with anyone to whom the Construction Manager has reasonable objection. §2.3.2,2 Subcontracts or other agreements shall conform to the applicable payment provisions of this Agreement,and shall not be awarded on the basis of cost plus a fee without the prior consent of the Owner,if the Subcontract is awarded on a cost-plus a fee basis,the Construction Manager shall provide in the Subcontract for the Owner to receive the same audit rights with regard to the Subcontractor as the Owner receives with regard to the Construction Manager in Section 6.11 below. §2.3.2.3 If the Construction Manager recommends a specific bidder that may be considered a"related party" according to Section 6.10,then the Construction Manager shall promptly notify the Owner in writing of such relationship and notify the Owner of the specific nature of the contemplated transaction,according to Section 6.10.2. §2.3.2.4 The Construction Manager shall schedule and conduct meetings to discuss such matters as procedures, progress,coordination,scheduling,and status of the Work.The Construction Manager shall prepare and promptly distribute minutes to the Owner and Architect §2.3.2,5 Upon the Owner's approval of the Control Estimate,the Construction Manager shall prepare and submit to the Owner and Architect a construction schedule for the Work and submittal schedule in accordance with Section 3.10 of A201-2007. §2.3.2,6 The Construction Manager shall record the progress of the Project.On a monthly basis,or otherwise as agreed to by the Owner,the Construction Manager shall submit written progress reports to the Owner and Architect, showing percentages of completion and other information required by the Owner.The Construction Manager shall also keep,and make available to the Owner and Architect,a daily log containing a record for each day of weather, portions of the Work in progress,number of workers on site,identification of equipment on site,problems that might affect progress of the Work,accidents,injuries,and other information required by the Owner. §2.4 Professional Services Section 3.12.10 of A201-2007 shall apply to both the Preconstruction and Construction Phases. I §2.5 Hazardous Materials Section 10.3 of A201-2007 shall apply to both the Preconstruction and Construction Phases. ARTICLE 3 OWNER'S RESPONSIBILITIES §3.1 Information and Services Required of the Owner §3.1.1 The Owner shall provide information with reasonable promptness,regarding requirements for and limitations on the Project,including a written program which shall set forth the Owner's objectives,constraints,and criteria, including schedule,space requirements and relationships,flexibility and expandability,special equipment,systems sustainability and site requirements. Init. AIA Document A134714•-2009{formerly A131*"CMc—20031.Copyrtot®1994,.2003 and 2009 by The Amarir�nlnsljlidriol Arr2�lt�a.�IA�Lgt� reserved.WARNING:This Ale Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this Ale Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent ! possible under the law.Pur hasemampermii1'WraVeptcnibLuitmry copiesoriYM;obeurnsveLitstsa,�rspi6W.Faitpnet'L:upydgitCviineiliriniofATA Contract Documents.e-mail The American institute of Architects'legal counsel,copyright@aia.org. §3.1.2 Prior to the Owner's approval of the Control Estimate,or within seven days of receiving the Owner's written acknowledgment required by Section 2.2.1,the Construction Manager may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner's obligations under the Contract.Thereafter,the Construction Manager may only request such evidence if(1)the Owner fails to make payments to the Construction Manager as the Contract Documents require,(2)a change in the Work materially changes the Contract Sum,or(3)the Construction Manager identifies in writing a reasonable concern regarding the Owner's ability to make payment when due.The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or the portion of the Work affected by a material change.After the Owner furnishes the evidence,the Owner shall not materially vary such financial arrangements without prior notice to the Construction Manager and Architect. §3.1.3 The Owner shall establish and periodically update the Owner's budget for the Project,including(1)the budget for the Cost of the Work as defined in Section 6.1.1,(2)the Owner's other costs,and(3)reasonable contingencies related to all of these costs.If the Owner significantly increases or decreases the Owner's budget for the Cost of the Work,the Owner shall notify the Construction Manager and Architect.The Owner and the Architect,in consultation with the Construction Manager,shall thereafter agree to a corresponding change in the budget for the Cost of the Work or in the Project's scope and quality. §3.1.4 Structural and Environmental Tests,Surveys and Reports.During the Preconstruction Phase,the Owner shall furnish the following information or services with reasonable promptness.The Owner shall also furnish any other information or services under the Owner's control and relevant to the Construction Manager's performance of the Work with reasonable promptness after receiving the Construction Manager's written request for such information or services.The Construction Manager shall be entitled to rely on the accuracy of information and services furnished by the Owner but shall exercise proper precautions relating to the safe performance of the Work. §3.1.4.1 The Owner shall furnish tests,inspections and reports required by law and as otherwise agreed to by the parties,such as structural,mechanical,and chemical tests,tests for air and water pollution,and tests for hazardous materials. §3.1.4.2 The Owner shall furnish surveys describing physical characteristics,legal limitations and utility locations for the site of the Project,and a legal description of the site.The surveys and legal information shall include,as applicable,grades and lines of streets,alleys,pavements and adjoining property and structures;designated wetlands; adjacent drainage;rights-of-way,restrictions,easements,encroachments,zoning,deed restrictions,boundaries and contours of the site;locations,dimensions and necessary data with respect to existing buildings,other improvements and trees;and information concerning available utility services and lines,both public and private,above and below grade,including inverts and depths.All the information on the survey shall be referenced to a Project benchmark. §3.1.4.3 The Owner,when such services are requested,shall furnish services of geotechnical engineers,which may include but are not limited to test borings,test pits,determinations of soil bearing values,percolation tests,evaluations of hazardous materials,seismic evaluation,ground corrosion tests and resistivity tests,including necessary operations for anticipating subsoil conditions,with written reports and appropriate recommendations. §3.1,4.4 During the Construction Phase,the Owner shall furnish information or services required of the Owner by the Contract Documents with reasonable promptness.The Owner shall also furnish any other information or services under the Owner's control and relevant to the Construction Manager's performance of the Work with reasonable promptness after receiving the Construction Manager's written request for such information or services. §3.2 Owner's Designated Representative The Owner shall identify a representative authorized to act on behalf of the Owner with respect to the Project.The Owner's representative shall render decisions promptly and furnish information expeditiously,so as to avoid unreasonable delay in the services or Work of the Construction Manager.Except as otherwise provided in Section 4.2.1 of A201-2007,the Architect does not have such authority.The term"Owner"means the Owner or the Owner's authorized representative. §3.2.1 Legal Requirements.The Owner shall furnish all legal,insurance and accounting services,including auditing services,that may be reasonably necessary at any time for the Project to meet the Owner's needs and interests. Init. AIA Document A134m—2009(formerly A131 TMCMc—2003).Copyright®1994,2003 anr13[ >�s;?!r�Amr�rirtalnstit li�nf llt hitaai .All rlghts reserved.WARNING:This Ali`''Dotuovid 14 proamied h115. lg 4 Lem it 3c1'national Treaties.Unauthorized reproduction or distribution s of this AIA®Document,or any poruan zi i&nuts sasufi to severe tivIl and ertmbia'1 psmities,and will be prosecuted to the maximum extent f possible under the Iaw.Purchasers are permitted to reproduce ten(10)copies of[his document when comprered:to report copyngllrvielbtibns o AIA Contract Documents,e-mail The American institute of Architects'legal counsel,copyright&m.org. §3.3 Architect The Owner shall retain an Architect to provide services,duties and responsibilities as described in AIA Document B 103Tm-2007,Standard Form of Agreement Between Owner and Architect,including any additional services requested by the Construction Manager that are necessary for the Preconstruction and Construction Phase services under this Agreement.The Owner shall provide the Construction Manager a copy of the executed agreement between the Owner and the Architect,and any further modifications to the agreement. ARTICLE 4 COMPENSATION AND PAYMENTS FOR PRECONSTRUCTION PHASE SERVICES §4.1 Compensation §4.1,1 For the Construction Manager's Preconstruction Phase services,the Owner shall compensate the Construction Manager as follows: §4,1.2 For the Construction Manager's Preconstruction Phase services described in Sections 2.1 and 2.2: (Insert amount of,or basis for, compensation and include a list of reimbursable cost items, as applicable.) When Construction Manager's indirect personnel are utilized in a consultant's capacity(Project Manager/Estimator),without the ability to be reimbursed through billings to owner for field labor,materials,equipment,sub-contractors,etc.,invoicing of Project Manager/Estimator actual time shall be invoiced per EXHIBIT"B". §4.1.3 If the Preconstruction Phase services covered by this Agreement have not been completed within two ( 2 )months of the date of this Agreement,through no fault of the Construction Manager,the Construction Manager's compensation for Preconstruction Phase services shall be equitably adjusted. §4.1.4 Compensation based on Direct Personnel Expense includes the direct salaries of the Construction Manager's personnel providing Preconstruction Phase services and the Construction Manager's costs for the mandatory and customary contributions and benefits related thereto,such as employment taxes and other statutory employee benefits, insurance,sick leave,holidays,vacations,employee retirement plans and similar contributions. §4.2 Payments §4.2.1 Unless otherwise agreed,payments for services shall be made monthly in proportion to services performed. §4.2,2 Payments are due and payable upon presentation of the Construction Manager's invoice.Amounts unpaid twenty ( 20 )days after the invoice date shall bear interest at the rate entered below,or in the absence thereof at the legal rate prevailing from time to time at the principal place of business of the Construction Manager. (Insert rate of monthly or annual interest agreed upon.) ARTICLE 5 COMPENSATION FOR CONSTRUCTION PHASE SERVICES §5.1 For the Construction Manager's performance of the Work as described in Section 2.3,the Owner shall pay the Construction Manager the Contract Sum in current funds for the Construction Manager's performance of the Contract. The Contract Sum is the Cost of the Work as defined in Section 6.1.1 plus the Construction Manager's Fee. §5.1.1 The Construction Manager's Fee: (State a lump sum,percentage of Cost of the Work or otherprovision for determining the Construction Manager's Fee.) The Construction Manager's Fee is 9.5%of the material,subcontractor,and other costs,plus 2%of total of: The Monthly Invoicing is as follows: Labor+((Material+Subcontractor+Other)x 1.095=Sub-total. Sub-total x 1.02=Total. Init. AIA Document A1341"—2009{formerly A131 T"CMc—2003).Copyright®1994,2003 and 2009 by The American Institute of Architects.All rights reserved. WARNING:This Ale Docum vO is prWrctno try 41.5,Copy4ryht Low and IMernatlonei Trea&w.unauthorized reproduction or distribution 7 of this A[A`�Document,or any portio of IL mar resu:a in s evara cwt!aril ct erthiel.t�aMes,and will be prosecuted to the maximum extent 1 possible under the Iaw.Purchasers are permitted to reproduce ten(10)copies of[his document when completed.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright@aia.org. §5.1.2 The method of adjustment of the Construction Manager's Fee for changes in the Work: §5,1.3 Limitations,if any,on a Subcontractor's overhead and profit for increases in the cost of its portion of the Work: Limitations,if any,on a Subcontractors'overhead and profit for increases in the cost of its portion of the work will be requested within the original bid proposal with stipulated labor,overhead and profit for changes in the work. §5.1.4 Rental rates for Construction Manager-owned equipment shall not exceed One hundred percent{ 100 %)of the standard rate paid at the place of the Project. §5,1.5 Unit prices,if any: (Identify and state the unit price;state the quantil�v limitations, if any,to which the emit price tit-ill he applicable.) Item Units and Limitations Price per Unit($0.00) Unit prices,if any,are to be determined at the time of the Control Estimate. §5.2 Changes in the Work §5,2.9 The Owner may,without invalidating the Contract,order changes in the Work within the general scope of the Contract consisting of additions,deletions or other revisions.The Owner shall issue such changes in writing.The Architect may make minor changes in the Work as provided in Section 7.4 of AIA Document A201-2007,General Conditions of the Contract for Construction.The Construction Manager shall be entitled to an equitable adjustment in the Contract Time as a result of changes in the Work.The Construction Manager shall incorporate all changes in the Work and Contract Time as separate entries in the Control Estimate. §5.2.2 Increased costs for the items set forth in Sections 6,1 through 6.7 that result from changes in the Work shall become part of the Cost of the Work,and the Construction Manager's Fee shall be adjusted as provided in Section 5.1.2. §5.2.3 If the Construction Manager receives any Drawings,Specifications,interpretations or instructions from the Owner or Architect which are inconsistent with the Contract Documents,or encounters unanticipated conditions,any of which will result in a significant change in the Cost of the Work or estimated date of Substantial Completion in comparison with the Control Estimate,the Construction Manager shall promptly notify the Owner and Architect in writing and shall not proceed with the atTected Work until the Construction Manager receives further written instructions from the Owner and Architect. §5.2.41f no specific provision is made in Section 5.1.2 for adjustment of the Construction Manager's Fee in the case of changes in the Work,or if the extent of such changes is such,in the aggregate,that application of the adjustment provisions of Section 5.1.2 will cause substantial inequity to the Owner or Construction Manager,the Construction Manager's Fee shall be equitably adjusted on the same basis that was used to establish the Fee for the original Work. ARTICLE 6 COST OF THE WORK FOR CONSTRUCTION PHASE §6.1 Costs to Be Reimbursed §6.1.1 The term Cost of the Work shall mean costs necessarily incurred by the Construction Manager in the proper performance of the Work.Such costs shall be at rates not higher than the standard paid at the place of the Project except with prior consent of the Owner.The Cost of the Work shall include only the items set forth in Sections 6.1 through 6.7. AIA Document A134TM-2009(har_a�rAig AMTMQMr.-2003),Co,gvripht®1994,.2043 and 2-4 4Y TbaAmeraran.insliluta ufArchileets.All rip is Init. reserved.WARNING:This AIA°Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution a of this Ale Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent t posslbleunderthelaw.Purchasrmmvpemi*LAu'*is�i*617 Pmn1a}s�3eis.titb cca'M runr@si i sirtlstnfi:u�grt ttfairr,"diti�i3- �4tifi Contract Documents,e-mail The American Institute of Architects'legai counsel,aopyright@aia.org. §6.1.2 Where any cost is subject to the Owner's prior approval,the Construction Manager shall obtain this approval prior to incurring the cost. §6.2 Labor Costs §6.2.1 Wages of construction workers directly employed by the Construction Manager to perform the construction of the Work at the site or,with the Owner's prior approval,at off-site workshops. §6.2.2 Wages or salaries of the Construction Manager's supervisory and administrative personnel when stationed at the site with the Owner's prior approval. (If it is intended that the wages or salaries of certain personnel stationed at the Construction Manager's principal or other offices shall be included in the Cost of the Work, identify in Section 11.5. the personnel to be included, whether for all or only part of their time,and the rates at which their time will be charged to the Work.) §6.2.3 Wages and salaries of the Construction Manager's supervisory or administrative personnel engaged at factories,workshops or on the road,in expediting the production or transportation of materials or equipment required for the Work,but only for that portion of their time required for the Work. §6.2.4 Costs paid or incurred by the Construction Manager for taxes,insurance,contributions,assessments and benefits required by law or collective bargaining agreements and,for personnel not covered by such agreements, customary benefits such as sick leave,medical and health benefits,holidays,vacations and pensions,provided such costs are based on wages and salaries included in the Cost of the Work under Sections 6.2.1 through 6.2.3. §6.2.5 Bonuses,profit sharing,incentive compensation and any other discretionary payments paid to anyone hired by the Construction Manager or paid to any Subcontractor or vendor,with the Owner's prior approval. §6,3 Subcontract Costs Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the subcontracts. §6.4 Costs of Materials and Equipment Incorporated in the Completed Construction §6.4,1 Costs,including transportation and storage,of materials and equipment incorporated or to be incorporated in the completed construction. §6.4.2 Costs of materials described in the preceding Section 6.4.1 in excess of those actually installed to allow for reasonable waste and spoilage.Unused excess materials,if any,shall become the Owner's property at the completion of the Work or,at the Owner's option,shall be sold by the Construction Manager.Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work. §6.5 Costs of Other Materials and Equipment,Temporary Facilities and Related Items §6.5.1 Costs of transportation,storage,installation,maintenance,dismantling and removal of materials,supplies, temporary facilities,machinery,equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and fully consumed in the performance of the Work.Costs of materials,supplies,temporary facilities,machinery,equipment and tools that are not fully consumed shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site.Costs for items not fully consumed by the Construction Manager shall mean fair market value. §6.5.2 Rental charges for temporary facilities,machinery,equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and costs of transportation,installation, minor repairs,dismantling and removal.The total rental cost of any Construction Manager-owned item may not exceed the purchase price of any comparable item.Rates of Construction Manager-owned equipment and quantities of equipment shall be subject to the Owner's prior approval. §6.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal. §6,5.4 Costs of document reproductions,facsimile transmissions and long-distance telephone calls,postage and parcel delivery charges,telephone service at the site and reasonable petty cash expenses of the site office. §6.5.5 That portion of the reasonable expenses of the Construction Manager's supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work. AIA Document A134TM—2009(formerly A131"CW—2003).Copyright®1994,2103 and 2009 by The American Institula of ArthitW_r A4J.tl4W Init. reserved.WARNING_This AIA°Document is flrtY.t:cmd L-y1JS Copyright!.aw and International Treaties.Unauthorized reproduction or distribution 9 cf this AIA°Document,or any pones"of It,may rasun'n sever= :ivll asd rdrmnal nemities,and will be prosecuted to the maximum extent t possible under the Iaw.Purchasers are permitted to reproduce len(10)copies of[his documeW when oump(srgd'r o reportcopynghf vrbfaGbns DrAiA Contract Documents,e-mail The American institute of Architects'legal counsel,copyright@aia.org. §6.5.6 Costs of materials and equipment suitably stored off the site at a mutually acceptable location,subject to the Owner's prior approval. §6.6 Miscellaneous Costs §6.6.1 Premiums for that portion of insurance and bonds required by the Contract Documents that can be directly attributed to this Contract.Self-insurance for either full or partial amounts of the coverages required by the Contract Documents,with the Owner's prior approval. §6.6.2 Sales,use or similar taxes imposed by a governmental authority that are related to the Work and for which the Construction Manager is liable. §6.6.3 Fees and assessments for the building permit and for other permits,licenses and inspections for which the Construction Manager is required by the Contract Documents to pay. §6.6.4 Fees of laboratories for tests required by the Contract Documents,except those related to defective or nonconforming Work for which reimbursement is excluded by Section 13.5.3 of ATA Document A201-2007 or by other provisions of the Contract Documents,and which do not fall within the scope of Section 6.7.3. §6.6.5 Royalties and license fees paid for the use of a particular design,process or product required by the Contract Documents;the cost of defending suits or claims for infringement of patent rights arising from such requirement of the Contract Documents;and payments made in accordance with legal judgments against the Construction Manager resulting from such suits or claims and payments of settlements made with the Owner's consent.However,such costs of legal defenses,judgments and settlements shall not be included in the calculation of the Construction Manager's Fee.If such royalties,fees and costs are excluded by the last sentence of Section 3.17 of AIA Document A201-2007 or other provisions of the Contract Documents,then they shall not be included in the Cost of the Work. §6.6.6 Costs for electronic equipment and software,directly related to the Work with the Owner's prior approval. §6.6.7 Deposits lost for causes other than the Construction Manager's negligence or failure to fulfill a specific responsibility in the Contract Documents. §6.6.8 Legal,mediation and arbitration costs,including attorneys'fees,other than those arising from disputes between the Owner and Construction Manager,reasonably incurred by the Construction Manager after the execution of this Agreement in the performance of the Work and with the Owner's prior approval,which shall not be unreasonably withheld. §6.6.9 Subject to the Owner's prior approval,expenses incurred in accordance with the Construction Manager's standard written personnel policy for relocation and temporary living allowances of the Construction Manager's personnel required for the Work. §6.7 Other Costs and Emergencies §6,7.1 Other costs incurred in the performance of the Work if,and to the extent,approved in advance in writing by the Owner. §6.7.2 Costs incurred in taking action to prevent threatened damage,injury or loss in case of an emergency affecting the safety of persons and property,as provided in Section 10.4 of AIA Document A201-2007. §6.7.3 Costs of repairing or correcting damaged or nonconforming Work executed by the Construction Manager, Subcontractors or suppliers,provided that such damaged or nonconforming Work was not caused by negligence or failure to fulfill a specific responsibility of the Construction Manager and only to the extent that the cost of repair or correction is not recovered by the Construction Manager from insurance,sureties,Subcontractors,suppliers,or others. §6.7.4 The costs described in Sections 6.1 through 6.7 shall be included in the Cost of the Work notwithstanding any provision of AIA Document A201-2007 or other Conditions of the Contract which may require the Construction Manager to pay such costs,unless such costs are excluded by the provisions of Section 6.8. AIA Document A13410—2009(formerly A131 TMCMc-2003).Copyright®19%,2003 and 2009 by The American Institute of Architects.All rights Inst. reserved. WARNING.This Ale Doc=nemisVrotnftd by U.9 Gopyrtgtzt tea rnd tratmational Treaties.Unauthorized reproduction or distribution 10 of this AIA'Document,or any portmn.id it=7 resta to Strr m ow i ltd crimiaw pmuEtties,and will be prosecuted to the maximum extent possible under the law.Purchesers are permitted to reproduce ten(10)copies of this documemT WAM oarnpithW.Pa Ywpyrigil viWatrnrrsai`FtfS Contract Documents,e-mail The American Institute of Architects legal counsel.copyrighl@aia.org. §U Cain Rd fico Be §x&.8.1 The Cost ofthe Work soli colt iii t1m i!=Usted bftw ,1 Salaries and odzr co=p=saT=offhe Cv=structim hr's pmannel stati oned at the Constraction AUnaVWs pnnmpal oflime at offices cid=th3n the sate ofrce,cKe g2 as specificafly provided m Section 62,or astray be pfd in Artic&11; 3 apenses of the CamtrCclim Aftnaaws pri ski oboe and offices ad=rbcs the sft of c1c; .3 Ovmdmd and goal cxp=m end as may be cxpressly mdaded in Sacs om 6.1 dmcgb 6.7; A The Constructimm bkrnmgWs t sal etch,fi=hmft into on the C on 's capital employed fbrtbe'cit .a Fxc ept.as provided in,Seim fa 73 of ft Agneement,costs s=to&e negOV=or fad oftbe Cion MmmW,Stboo wt rrs ad sWh or anyone directly car indirirdy emp%yed by am) of them or fbcr whose uts any of tliarrn may be HaMe m folfrll a specific reqmnsdiffity of the Colzttasstf .6 Any cad not specificaIly and cquessly 11escrititd in Sectiom 6.1 throes 6.7;and 7 Costs for services id during ft Precan*txtim l 69 Mwomts.Mates mid ftknds M1 Coh discounts obtained an payments Inde by the Construction Maw shall accrue tD the Owner if(1) befom makingthe payment tl=Constrectim 14=3er included tlzem m an Applicat=for Payment and received paymmd from the Ownw.or(2)gibe Otter bas domed fbnds with the Construction Air with which tD makc paymea%other ,cash dlscsDums shall zccinxe to the Commuc i€on Tri discounts,rebatm,rcfbnds and amotirils retied fmm sdm of sem`=materials ard egvipmect shall accrue to the Otter,and the Ctinstractilm Maw sball make provisions sor dant ffiey can be obbEned §612 Amourds that arm to dm Ommir in nclordz=e with the provisions of Section 6.91.1 shall be Credited to the Owner ars adedcctian fivm the rust of the Wwk §6.18 Rehited"Tm §6,11#,1 For pmposm of$ecfm&ltt,tllz--trim party"sban meen a p3rtszt,may,of rl1late or ofiter entity ham+aim on amp or M111028=2=1'x the Cwsft=t=Man%w.ay entity i u which my stcrr3tlanider in,or of;the C omer owns any i f s I in ear of ten percent in the or mypemn or eathy which bias the right to control the tinsiness or affairs of the Construction,Managm lin team 1e12d parte'�mchides ang member offt irmtediate fly of my person ideadfied abovv— §&122 if wry of the costs to be cry arise frflm a tranmction between the Cam Mmiager and a related. Ste Construction M shall mitify the Oar ofthe q=&nature afthe the ids of the related pirtty=d 1&c zatickwed oust to be hicerred,before any such triumcitioni is or c ostiscmred.fftht Ow=after such notifimballi,atm the proposed transaction,thm the cost i na=e+d shzU be i=�as a cost to be.rr. ,a=l tine Qmstrimfim k4w%w sb21I procare the Wo*, goons cl:rservim fi am the reb:e+d piety,as a Scram,wading to tt a teams.of 2321. X22 and 2.323.ff fire Ow=fad to=2=ite Otic hoz,tl:a Caesstructiact Mznzgw sbzn procum the Work g or service fig some persmt or certify odier Um a rebted pasty swag to dmcerins of Secbm 2 32.1,232.2 and 23.23. §6.11 Accomigag Re= IteCondmctitmMawgerdmBkftpfifflz=ddeftRadiaom mdemounurebftdtotbeenaafthzwcdkmtd emrise such els as may be nwesmy fair proper:fel managernent=�der this Co::tact taxi to solishrottate all costs incurred.The acomithig and sl=it be atiffccitury to the Ota:711 Ow=and d=Otis auditurs shAL dna regular h s1==awl up rewm notice,be afforded msacss to,and;;hall be pm to a=dit mid.cuff,the C s rte mad accounts,inctuding c orders,vouchers, f i ram titt=er&!a rebding to ds s Csstrm t The Cansucctim hftager sball ffi=records for a peaW ofd n e yous aflir find paymect,or for such hrmw period ars m3y be rcqihed by brW- ARTICLE 7 PAYMENTS FOR CONSTRUCTION PHASE SERVICES §7.1 Progress Payments §7.1.1 Based upon Applications for Payment submitted to the Architect by the Construction Manager and Certificates for Payment issued by the Architect,the Owner shall make progress payments on account of the Contract Sum to the Construction Manager as provided below and elsewhere in the Contract Documents. Init. AIA Document A1341"-2009(formerly A131"'CMe-2003).Copyright®1994,2003 and 2009 by The American Institute of Architects.All rights reserved.WARWN G Thk& is a-by U.S.Copyright Lars=0 International Treaties.Unauthorized reproduction or distribution of IN$Aw c=*4 t,ni arry=Braun of at,mayrneut:in ss cMl and cr3mr>sfi penalties,and will be prosecuted to the maximum extent spdr under tba I*,rr_Purchasers are permitted to reproduce ten(10)copies of this documwrtwftrr tAmtpSHt'buT.r v itrpjKcUpyii&viuiltiSrnfirtr?A9 Contract Documents,e-mail The American Institute of Architects'legal counsel,copydght@aie.org. §7.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month,or as follows: §T.1.3 Provided that an Application for Payment is received by the Architect not later than the 1 oth day of a month,the Owner shall make payment of the certified amount to the Construction Manager not later than the 30th day of the same month.If an Application for Payment is received by the Architect after the application date fixed above,payment shall be made by the Owner not later than twenty ( 20 )days after the Architect receives the Application for Payment. (Federal,state or local laws may require payment within a certain period of time.) §T.1.4 With each Application for Payment,the Construction Manager shall submit payrolls,petty cash accounts, receipted invoices or invoices with check vouchers attached,and any other evidence required by the Owner or Architect to demonstrate that cash disbursements already made by the Construction Manager on account of the Cost of the Work equal or exceed progress payments already received by the Construction Manager,less that portion of those payments attributable to the Construction Manager's Fee,plus payrolls for the period covered by the present Application for Payment. §7.1.5 Applications for Payment shall show the Cost of the Work actually incurred by the Construction Manager through the end of the period covered by the Application for Payment and for which the Construction Manager has made or intends to make actual payment prior to the next Application for Payment. §7.1.6 Subject to other provisions of the Contract Documents.the amount of each progress payment shall be computed as follows: .1 Take the Cost of the Work as described in Section 6.1.1; .2 Add the Construction Manager's Fee,less retainage of ten percent( 10 %).The Construction Manager's Fee shall be computed upon the Cost of the Work described in the preceding Section 7.1.6.1 at the rate stated in Section 5.1.1;or if the Construction Manager's Fee is stated as a fixed sum in that Section,an amount that bears the same ratio to that fixed-sum Fee as the Cost of the Work bears to a reasonable estimate of the probable Cost of the Work upon its completion; .3 Subtract retainage of ten percent( 10 %)from that portion of the Work that the Construction Manager self-performs; .4 Subtract the aggregate of previous payments made by the Owner; .5 Subtract the shortfall,if any,indicated by the Construction Manager in the documentation required by Section 7.1.4 or resulting from errors subsequently discovered by the Owner's auditors in such documentation;and .6 Subtract amounts,if any,for which the Architect has withheld or withdrawn a Certificate for Payment as provided in the Contract Documents. §7.1.7 The Owner and Construction Manager shall agree upon(1)a mutually acceptable procedure for review and approval of payments to Subcontractors and(2)the percentage of retainage held on Subcontracts,and the Construction Manager shall execute subcontracts in accordance with those agreements. §7.1.8 Except with the Owner's prior approval,the Construction Manager shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. §7.1.9 In taking action on the Construction Manager's Applications for Payment,the Architect shall be entitled to rely on the accuracy and completeness of the information furnished by the Construction Manager and shall not be deemed to represent that the Architect has made a detailed examination,audit or arithmetic verification of the documentation submitted in accordance with Section 7.1.4 or other supporting data;that the Architect has made exhaustive or continuous on-site inspections;or that the Architect has made examinations to ascertain how or for what purposes the Construction Manager has used amounts previously paid on account of the Contract.Such examinations,audits and verifications,if required by the Owner,will be perforated by the Owner's auditors acting in the sole interest of the Owner. AIA Document A134m—2009(formerly A131*"CMc—2003).Copyright®1994,2003 and 2009 by The American Institute of Architects.All rights [nit. reserved.WARNING:This Ale Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution 12 of this AJO Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the taw.Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright@aia.org. §7.2 Final Payment §7.2.1 Final payment,constituting the entire unpaid balance of the Contract Sum,shall be made by the Owner to the Construction Manager when .1 the Construction Manager has fully performed the Contract except for the Construction Manager's responsibility to correct Work as provided in Section 12,2.2 of AIA Document A201-2007,and to satisfy other requirements, if any.which extend beyond final payment; .2 the Construction Manager has submitted a final accounting for the Cost of the Work and a final Application for Payment;and .3 a final Certificate for Payment has been issued by the Architect. The Owner's final payment to the Construction Manager shall be made no later than 30 days after the issuance of the Architect's final Certificate for Payment,or as follows: §7.2.2 The Owner's auditors will review and report in writing on the Construction Manager's final accounting within 30 days after delivery of the final accounting to the Architect by the Construction Manager.Based upon such Cost of the Work as the Owner's auditors report to be substantiated by the Construction Manager's final accounting,and provided the other conditions of Section 7,2,1 have been met,the Architect will,within seven days af3er receipt of the written report of the Owner's auditors,either issue to the Owner a final Certificate for Payment with a copy to the Construction Manager,or notify the Construction Manager and Owner in writing of the Architect's reasons for withholding a certificate as provided in Section 9.5.1 of the AIA Document A201-2007.The time periods stated in this Section supersede those stated in Section 9.4.1 of the AIA Document A201-2007.The Architect is not responsible for verifying the accuracy of the Construction Manager's final accounting. §7.2.31f the Owner's auditors report the Cost of the Work as substantiated by the Construction Manager's final accounting to be less than claimed by the Construction Manager,the Construction Manager shall be entitled to request mediation of the disputed amount without seeking an initial decision pursuant to Section 15.2 of A201-2007.A request for mediation shall be made by the Construction Manager within 30 days after the Construction Manager's receipt of a copy of the Architect's final Certificate for Payment.Failure to request mediation within this 30-day period shall result in the substantiated amount reported by the Owner's auditors becoming binding on the Construction Manager.Pending a final resolution of the disputed amount,the Owner shall pay the Construction Manager the amount certified in the Architect's final Certificate for Payment. §7.2.4 If,subsequent to final payment and at the Owner's request,the Construction Manager incurs costs described in Section 6.1.1 and not excluded by Section 6.8 to correct defective or nonconforming Work,the Owner shall reimburse the Construction Manager such costs and the Construction Manager's Fee applicable thereto on the same basis as if such costs had been incurred prior to final payment. ARTICLE 8 INSURANCE AND BONDS For all phases of the Project,the Construction Manager and the Owner shall purchase and maintain insurance,and the Construction Manager shall provide bonds as set forth in Article I l of AIA Document A201-2007. (State bonding requirements,zf am,and limits of liahility for insurance required in Article 11 of AIA Document ,4201-2007.),,p,of Insurance and Bond Limit of Liability or Bond Amount($0.00) General Liability': Each Occurrence $1,000,000 'Additional Insured Coverage as required by contract and General Aggregate $2,000,000 will apply on a primary basis with owners'coverage being Products-Comp/Op AGG $2,000,000 noncontributory.Coverage will include per project general Automobile Liability: Combined Single Limit(ea.accident) $1,000,000 aggregate. Umbrella: Each Occurrence $5,000,000 Aggregate $5,000,000 Workers Compensation&Employers Liability: W/C Statutory Limits:E.L.each accident $ 100,000 E.L.Disease-Ea.Employee $ 100,000 E.L.Disease-Policy Limit $ 500,000 Payment and Performance Bonds are available upon request,with reimbursement under this Agreement 5.1.1. ARTICLE 9 DISPUTE RESOLUTION §9.1 Any Claim between the Owner and Construction Manager shall be resolved in accordance with the provisions set forth in this Article 9 and Article 15 of A201-2007.However,for Claims arising from or relating to the Construction Manager's Preconstruction Phase services,no decision by the Initial Decision Maker shall be required as a condition precedent to mediation or binding dispute resolution,and Section 9.3 of this Agreement shall not apply. Init. AIA Document A1347N—2009(formerly A131 T ClVic—2003).Copyright 01994,2003 and-9.St N$Lfie�mrt 2rt.!r lihzra ML i1er,�s,.gdl, reserved, WARNING:This Ale Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA'r Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent 3 ( possible under the law-Purchasers are permitted to reproduce ten 00)copies of this document when oompieted.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright@aia.org. §9.2 For any Claim subject to,but not resolved by mediation pursuant to Section 15.3 of AIA Document A201-2007, the method of binding dispute resolution shall be as follows: (Check the appropriate box.If the Owner and Construction Manager do not select a method of binding dispute resolution below,or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction.) ❑ Arbitration pursuant to Section 15.4 of AIA Document A201-2007 ❑ Litigation in a court of competent jurisdiction Q Other:(Specify) §93 Initial Decision Maker The Architect will serve as the Initial Decision Maker pursuant to Section 15.2 of AIA Document A201-2007 for Claims arising from or relating to the Construction Manager's Construction Phase services,unless the parties appoint below another individual,not a party to the Agreement,to serve as the Initial Decision Maker. (If the parties mutually agree,insert the name,address and other contact information of the Initial Decision Maker,if other than the Architect.) ARTICLE 10 TERMINATION OR SUSPENSION §10.1 Termination Prior to Owner's Approval of the Control Estimate §10.1.1 Prior to the Owner's approval of the Control Estimate,the Owner may terminate this Agreement upon not less than seven days'written notice to the Construction Manager for the Owner's convenience and without cause and the Construction Manager may terminate this Agreement,upon not less than seven days'written notice to the Owner,for the reasons set forth in Section 14.1.1 of A201-2007. §10.1.2 In the event of termination of this Agreement pursuant to Section 10.1.1,the Construction Manager shall be equitably compensated for Preconstruction Phase services performed prior to receipt of a notice of termination.In no event shall the Construction Manager's compensation under this Section exceed the compensation set forth in Section 4.1. §10.1.3 In the event of termination or this Agreement pursuant to Section 10.1.1 after the commencement of the Construction Phase but prior to the Owner's approval of the Control Estimate,the Owner shall pay to the Construction Manager under Section 10.1.2 an amount calculated as follows,which amount shall be in addition to any compensation paid to the Construction Manager under Section 10.1.2: .1 Take the Cost of the Work incurred by the Construction Manager to the date of termination; .2 Add the Construction Manager's Fee computed upon the Cost of the Work to the date of termination at the rate stated in Section 5.1 or,if the Construction Manager's Fee is stated as a fixed sum in that Section,an amount that bears the same ratio to that fixed-sum Fee as the Cost of the Work at the time of termination bears to a reasonable estimate of the probable Cost of the Work upon its completion;and .3 Subtract the aggregate of previous payments made by the Owner for Construction Phase services. The Owner shall also pay the Construction Manager fair compensation,either by purchase or rental at the election of the Owner,for any equipment owned by the Construction Manager which the Owner elects to retain and which is not otherwise included in the Cost of the Work under Section 10.1.3.1.To the extent that the Owner elects to take legal assignment of subcontracts and purchase orders(including rental agreements),the Construction Manager shall,as a condition of receiving the payments referred to in this Article 10,execute and deliver all such papers and take all such steps,including the legal assignment of such subcontracts and other contractual rights of the Construction Manager,as +i the Owner may require for the purpose of fully vesting in the Owner the rights and benefits of the Construction Init. AIA Document A134TO—2009(formerly A131"rCMc—2003).Copyright®1994,2003 and ZQQ9 4Y,The American Institute of Architects.All rights reserved. Ttxs AVV 00cumera Is protected by U.ls copyrioiintry International Treaties.Unauthorized reproduction or distribution 14 of tms MA"Vw--=M or mV Po-*"of It,-may rr Dd uracvom ervii a:sf cabntns7 penalties,and will be prosecuted to the maximum extent t Verses rrndat the Ix w.Purchasers are permitted to reproduce ten(10)copies of this documentwhen wrrrpVhitsu:Sry ieputif ctr{rptty sir3i9iful�sarF;41st Contract Documents,e-mail The American Institute of Architects'legal counsel,mpyrighL@aia.org. Manager under such subcontracts or purchase orders.All Subcontracts,purchase orders and rental agreements entered into by the Construction Manager will contain provisions allowing for assignment to the Owner as described above. If the Owner accepts assignment of subcontracts,purchase orders or rental agreements as described above,the Owner will reimburse or indemnify the Construction Manager for all costs arising under the subcontract,purchase order or rental agreement if those costs would have been reimbursable as Cost of the Work if the contract had not been terminated.If the Owner chooses not to accept assignment of any subcontract,purchase order or rental agreement that would have constituted a Cost of the Work had this agreement not been terminated,the Construction Manager will terminate the subcontract,purchase order or rental agreement and the Owner will pay the Construction Manager the costs necessarily incurred by the Construction Manager because of such termination. §10.2 Termination Subsequent to the Owner's Approval of the Control Estimate §10.2.1 Subsequent to the Owner's approval of the Control Estimate,the Contract may be terminated as provided in Sections I4.1.1,14.1.2 and 14.2.1 of A201-2007.The provisions of Article 14 of A201-2007 do not otherwise apply to this Section 10.2. §10.2.2 In the event of such termination by the Owner,the amount payable to the Construction Manager shall not exceed the amount the Construction Manager would have been entitled to receive pursuant to Sections 10.1.2 and 10.1.3 of this Agreement,less any compensation that may be awarded to the Owner pursuant to Article 9. §10.2.3 In the event of such termination by the Construction Manager,the amount payable to the Construction Manager shall be in accordance with Sections 10.1.2 and 10.1.3 of this Agreement,except that the Construction Manager's Fee shall be calculated as if the Work had been fully completed by the Construction Manager,including a reasonable estimate of the Cost of the Work for Work not actually completed. §10.2.4 In addition to the Owner's right to terminate this Agreement for cause as provided in Section 14.2.1 of A201- 2007,the Owner may terminate this Agreement for convenience as provided in Section 14.4;however,the Owner shall then only pay the Construction Manager an amount calculated as follows: .1 Take the Cost of the Work incurred by the Construction Manager to the date of termination; .2 Add the Construction Manager's Fee computed upon the Cost of the Work to the date of termination at the rate stated in Section 5.1.1 or,if the Construction Manager's Fee is stated as a fixed sum in that Section,an amount that bears the same ratio to that fixed-sum Fee as the Cost of the Work at the time of termination bears to a reasonable estimate of the probable Cost of the Work upon its completion;and .3 Subtract the aggregate of previous payments made by the Owner. §10.3 Suspension The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201-2007.In such case,the Control Estimate and Contract Time shall be increased as provided in Section 14.3.2 of AIA Document A201-2007, except that the term"profit'shall be understood to mean the Construction Manager's Fee as described in Sections 5.1 and 5.2.4 of this Agreement. ARTICLE 11 MISCELLANEOUS PROVISIONS §11,1 Terms in this Agreement shall have the same meaning as those in A201-2007. §11.2 Ownership and Use of Documents Section 1.5 of A201-2007 shall apply to both the Preconstruction and Construction Phases. §11.3 Governing Law Section 13.1 of A201-2007 shall apply to both the Preconstruction and Construction Phases. §11.4 Assignment The Owner and Construction Manager,respectively,bind themselves,their agents,successors,assigns and legal representatives to this Agreement.Neither the Owner nor the Construction Manager shall assign this Agreement without the written consent of the other,except that the Owner may assign this Agreement to a lender providing financing for the Project if the lender agrees to assume the Owrier's rights and obligations under this Agreement. Except as provided in Section 13.2.2 of A201-2007,neither party to the Contract shall assign the Contract as a whole without written consent of the other.If either party attempts to make such an assignment without such consent,that party shall nevertheless remain legally responsible for all obligations under the Contract. snit. AIA Document A134rm-2009(formerly A131 T°CMc—20031.Copyright®1994,2003 and 2009 by The American Institute of Architects.All rights reserved.t1V+4RM11110 33tis AMA Documar4k Vvirded by U.&Copyright!awmd hibu.ationai Treaties.unauthorized reproduction or distribution 15 of lila%A)e D=Mmtom,or wy paham of 7t,,way result.m severe ui*R air3 crirainat pernities,and will be prosecuted to the maximum extent j payaabta tw Itio U*Purchasers ere permitted to reproduce ten(10)copies of this docurrtentwhatrccmlpib W..Tu reparf oopyri hNibilditons orAX Contract Documents,e-mail The American Institute or Architects'legal counsel,copyrighl(3aia.org, §11.5 Other provisions: ARTICLE 12 SCOPE OF THE AGREEMENT §12.1 This Agreement represents the entire and integrated agreement between the Owner and the Construction Manager and supersedes all prior negotiations,representations or agreements,either written or oral.This Agreement maybe amended only by written instrument signed by both Owner and Construction Manager. §12,2 The following documents comprise the Agreement: ,1 AIA Document A 134-2009,Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee without a Guaranteed Maximum Price ,2 AIA Document A201-2007,General Conditions of the Contract for Construction .3 AIA Document E201 m-2007,Digital Data Protocol Exhibit,if completed,or the following: A AIA Document E202Tm-2008,Building Information Modeling Protocol Exhibit,if completed,or the following: .5 Other documents: (List other documents,if any,forming part of the Agreement.) Revised Date Exhibit"A" - Page 1 of 3 Employee Trade Designation 03120/14 — Exhibit"B" - Page 2 of 3 Labor Rate Schedule 03/20/14 — Exhibit"C" Page 3 of 3 Equipment Rate Schedule 03/20/14 — Exhibit"D" Page 5 of 5 Statement of Work 04/02/13 — Exhibit"E" - Page 4 of 4 Site Cost Breakout 12/09/13 - Exhibit'F" - Page 3 of 3 Soil Borings E-Mail 03/06/14 Exhibit'G" - Page 1 of 1 Schedule of Values 03120114 — Exhibit'H" Page 1 of 1 Enumeration of Documents 12/10/13 — This Agreement is entered into as of the day and year first written above. Pentucket Bank Maple-Leaf Construction Co.,Inc. OWNER(Signature) -V—� CONSTRUCTION MA ER(Signature) 4 Scott D.Cote,President/CEO Loren Dubois,President (Printed name and title) (Printed name and title) CAUTION:You should sign an original AIA Contract Document,on which this text appears in RED.An original assures that changes will not be obscured. Init A1A DocumentA113410—2009(formerly AM TMCMc—2003).Copyright®1994.2003 and 2009 by The American Institute of Architects.Alt rights raserved. WARNING_This AIA'"Doclw pmt ist#dig4-d tYllw; •,3i:ry'=?'Caa at+!kttHr nafional TreaBes Unauthorized reproduo0on or dlstributlon 16 of this AIA Document,or any poria t to iI mop tcsi r i*at*- ts•i aar-Lnrr:w1•aa•utties and will be prosecuted to the maximum extent 1 possib',e under the law Purchasers are permitted to reproduce ten(10)copies of this document when completed_ro report copyright violations oPAIA Contract Documents,a-mall The American institute W Artidtec s'legal counsel,copyrighl@Wa.org. LECLAIR-YAN April 14, 2014 VIA CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Scott Cote, President Pentucket Bank 1 Merrimack Street P.O. Box 791 Haverhill, MA 01831 Re: Copyright Infringement— Cease and Desist Dear Mr. Cote: Please note that I represent the interests of Design Partnership Architects ("DPA") in connection with its claims against the Pentucket Bank (the "Bank") for copyright violation. As you are aware, by written contract dated March 1, 2010, the Bank and DPA entered into an agreement whereby DPA agreed to provide professional architectural services in connection with the design of f new branch bank located at Lincoln Avenue in Haverhill. This contract expressly incorporated the terms and requirements of the AIA standard form agreement between Owner and Architect, B 141 (1987 edition). Section 6.1 of the B 141 provides in pertinent part: "The Drawings, Specifications and other documents prepared by the Architect for this Project are instruments of the Architect's service for use solely with respect to this Project and, unless otherwise provided, the Architect shall retain all common law, statutory and otherreserved rights, including the copyright. . . The Architect's Drawings, Specification or other documents shah not be used by the Owner or others on other projects . . . except by agreement in writing and with appropriate compensation to the Architect." At no time has DPA assigned to the Bank (or to any third party) DPA's rights in its design of the Haverhill branch of the Bank. It has come to DPA's attention that the Bank has apparently violated DPA's copyright and other rights by copying DPA's design for a new Bank branch in North Andover. The similarities in the exterior profiles and the interior lay out of DPA's protected design and the design depicted in drawings issued by Lloyd Architects for the North Andover branch leave no E-MAIL: JAY.GREGORYeQLECLAIRRYAN.COM ONE INTERNATIONAL PLACE, ELEVENTH FLOOR DIRECT PHONE: 617.502.8208 BOSTON, MASSACHUSETTS 02110 DIRECT FAX: 617.502.8258 PHONE: 617.502.8200 I FAX: 617.502.8201 CALIFORNIA ICONNECTICUT IMASSACHUSETTS IMICHIGAN INEWJERSEY I NEWYORK I PENNSYLVANIA IVIRGINIA IWASHINGTON,D.C. ATTORNEYS AT LAW \ WWW.LECLAIRRYAN.COM Mr. Scott Cote April 14, 2014 Page: 2 doubt but that the Bank and Lloyd Architects have misappropriated DPA's design and violated Federal copyright law. DPA has been damaged as a result of the Bank's violation of its copyright. Accordingly, DPA demands that the Bank and Lloyd Architects immediately cease and desist from violating DPA's copyright. To be clear, this means that the Bank must halt its North Andover project. DPA also demands that the Bank immediately compensate DPA for its damages. Federal copyright law provides that a copyright owner is entitled to recover a variety of damages stemming from a violation including but not limited to the revenue received by the copyright infringer as a result of the infringement. Based on the fact that DPA's contract with the Bank in 2010 called for DPA to receive a fee in the amount of$85,000, DPA demands that the Bank pay DPA that same amount. If the Bank fails to accept the above demands I will file suit to enforce DPA's rights. I look forward to hearing from you at your earliest convenience. Very truly yours, J y . Grego CC: Angelo Petrozzelli, AIA Lester Lloyd, AIA Mr. Brian Leathe 12924562 i MAPLE-LEAF CONSTRUCTION COMPANY INC . 5 CONGRESS STREET NASHUA, NH 03062 TEL (603) 882-7498 FAX (603) 595-8688 TRANSMITTAL TO: TOWN OF NORTH ANDOVER DATE: April 11,2014 1600 Osgood St North Andover,MA 01845 RE: BUILDKING PLANS PERMIT APPLICATION ATTN: BUILDING DEPARTMENT JOB NO: 14-013 WE ARE SENDING YOU®ATTACHED❑UNDER SEPARATE COVER VIA Hand Delivery ❑ Shop Drawings ❑ For Approval ® Plans ❑ For Your Use ❑ Samples ❑ Approved as Noted ❑ Specifications ❑ Approved as Submitted ❑ Change Order ❑ Revise and Resubmit ❑ Copy of Letter ❑ For Field Use ❑ Permit Applications ❑ For Review and Response ® Other Building Permit Application ❑ For Bids Due COPIES DATE NO. DESCRIPTION 3 Stamped Buildng Plans 2 Site Plans 1 4/4/14 Architect Affidavit 1 4/7/14 Structural Engineer Affidavit 1 4/4/14 Electrical ENgineer Affidavit 1 4/4/14 Mechanical Engineer Affidavit 1 Workers Compensation Insurance Certificate 1 Photo of Construction Supervisors Liscence 1 4/11/14 Buildig Permit Application COMMENTS CC SIGNED Bill Francoeur IF ENCLOSURES ARE NOT AS NOTED,KINDLY NOTIFY US AT ONCE A� CERTIFICATE OF LIABILITY INSURANCEF4/11/2014° . THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Danielle Rice THE ROWLEY AGENCY INC. ONE . (603)224-2562 FAX PHNo):(603)224-8012 139 Loudon Road EADDRES Y 4enc-MAIL drice@rowle a com Y P.O. BOX 511 INSURERS AFFORDING COVERAGE NAIC# Concord NH 03302-0511 INSURER A:Firemen Is Ins Co of Wash. DC 21784 INSURED INSURERBAcadia Insurance Company 31325 Maple-Leaf Construction Co., Inc. INSURER C: PO BOX 443 INSURER D: 5 Congress Street INSURERE: Nashua NH 03062-0443 INSURERF: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL UBR POLICY EFF POLICY EXP LTR POLICY NUMBER MM/DD MM/DD LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 11000,000 X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED PREMISES Ea occurrence $ 250,000 A CLAIMS-MADE OCCUR PA0376492-13 /1/2014 /1/2015 MED EXP(Any one person) $ 5,000 PERSONAL BADV INJURY $ 11000,000 GENERAL AGGREGATE $ 2,000,000 GEHL AGGREGATE LIMIT APPLIES PER PRODUCTS-COMP/OP AGG $ 2,000,000 POLICYFX PRO LOC $ AUTOMOBILE LIABILITY Ea accident) SINGLE LIMIT 1,000,000 A X ANY AUTO BODILY INJURY(Per person) $ ALL AUTOS OWNED SCHEDULED 0376574-13 ( ) /1/2014 /1/2015 BODILY INJURY Per accident $ X HIRED AUTOS X NON-OWNED PROPERTY DAMAGE AUTOS Per.accident $ X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 9,000,000 B EXCESS LIAB I CLAIMS-MADE AGGREGATE $ 91000,000 DED X I RETENTION A0376575-13 /1/2014 /1/2015 $ A WORKERS COMPENSATIONX WC STATU- OTH- AND EMPLOYERS'LIABILITY Y/N I TYLIMITS ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ 100,000 OFFICER/MEMBER EXCLUDED? [XK] N/A (Mandatory in NH) A0376576-13 /1/2014 /1/2015 E.L.DISEASE-EA EMPLOYEE $ 100,000 If yes,describe under rA 3tatea: NH & MADESCRIPTION OF OPERATIONS belowE.L.DISEASE-POLICY LIMIT $ 500,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(Attach ACORD 101,Additional Remarks Scheduled more space is required) Job # 14-013 Pentucket Bank - New Branch - North Andover, MA. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Town of Andover, Mass. 36 Bartlett Street Andover, MA 01810 AUTHORIZED REPRESENTATIVE Danielle Rice/DJR ACORD 25(2010/05) ©1988-2010 ACORD CORPORATION. All rights reserved. INS025 mmnm)m Tho Arnpn name anrl Inn^aro ronietororl marlre of Ar npn } Massachusetts -Department of Public Safety �f Board of Building Regulations and Standards i Construction Supervisor License: CS-056615 , iI" WILLIAM W"COEUR 3 MITCHELL ST; s Nashua NH 03068 ,y Expiration Cornmissioner 05/23/2015 Initial Construction Control Document Z To be submitted with the building permit application by a u ^_ d Registered Design Professional for work per the 8th edition of the See Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Pentucket Bank Date: 040414 Property Address: 1077 Osgood Street N Andover MA 01845 Project: Check(x)one or both as applicable: x New construction Existing Construction Project description: Site work and construction of a new slab on grade full service bank w/3 drive up lanes I Lester Lloyd, MA Registration Number: 5442 Expiration date: 8/30/2014 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': x Architectural Structural Mechanical Fire Protection Electrical Other: for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I(or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Document'. Enter in the space to the right a"wet"or electronic signature and seal: Nb ?ED ARCP cy�� L�011 a Fpm O o J No.5442 .CAMBRIggg, W $ MA pyo PG�J F9!rH OF MASS Phone number: 508-746-4646 Email: ll@lloydarch.com Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised.If`other' is chosen, provide a description. Version 06 11 2013 Initial Construction Control Document H To be submitted with the building permit application by a _ o d Registered Design Professional for work per the 8th edition of the gYeV'�r Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Pentucket Bank Date: April 7, 2014 Property Address: 1077 Osgood Road,North Andover,MA 01845 Project: Check(x)one or both as applicable: X New construction Existing Construction Project description: New Pentucket Bank branch, wood-framed construction with steel frames at drive-thru on shallow concrete foundations. Slab-on-grade first floor. I, Wayne R. Lawson, MA Registration Number: 35102 Expiration date: 6/30/2014 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': Architectural X Structural Mechanical Fire Protection Electrical Other: for the above named project and that to the best of my knowledge, information, and belief such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR),and accepted engineering practices for the proposed project. I understand and agree that I(or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. PVjN OF Mgssq Upon completion of the work, I shall submit to the building official a `Final Constructio of Docum WAYNE R. m o LAWSON —+ U STRUCTURAL Cn Enter in the space to the right a"wet"or A , No.35102 O electronic signature and seal: �o� 11 STEL``` FSS/oNAL ENG" Phone number: 617 268-8977 Email: wlawson@cbiconsultinginc.com Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised.If`other'is chosen, provide a description. Version 06 11 2013 Initial Construction Control Document n To be submitted with the Building Permit Application by a a , d Registered Design Professional �< for work per the 8 th Edition of the Massachusetts State Building Code, 780 CMR, Section 107.6.2 Project Title: Pentucket Bank Date: April 4, 2014 Property Address: 1077 Osgood Road—North Andover, Massachusetts Project: Check One or Both as applicable: (X)New Construction ()Existing Construction Project Description: New single-story Branch Bank. I, Steven A.Karan,PE,MA Registration Number: 34989 Expiration Date: 06/30/2014,am a Registered Design Professional, and hereby certify that I will prepare or directly supervised the preparation of all design plans, computations and specifications concerning: [] Architectural [] Structural [41 Mechanical [ ] Fire Protection [ ] Electrical [] Other: [ ] for the above named project and that such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I(or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this Code and the design concept, shop drawings, samples and other submittals by the Contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this Code. When required by the Building Official, I shall submit field/progress reports(see Item 3.)together with pertinent comments, in a form acceptable to the Building Official. Upon completion of the work, I shall submit to the Building Official a `Final Construction Control Document'. A�St1 Of Enter in the space to the right a"wet"or s9� �` . tiG electronic signature and seal: STEWN A.� o , KARAN 06 MEMANICAL 3 9 s Phone Number: (508)230-0260 Email: skaran(a)ber-en2ineerin2.com Building Official Use Only Building Official Name: Permit No.: Date: Initial Construction Control Document A To be submitted with the Building Permit Application by a dRegistered Design Professional for work per the 8 th Edition of the Massachusetts State Building Code, r 'wM 780 CMR, Section 107.6.2 Project Title: Pentucket Bank Date: April 4,2014 Property Address: 1077 Osgood Road—North Andover,Massachusetts Project: Check One or Both as applicable: (X)New Construction ()Existing Construction Project Description: New single-story Branch Bank. I,Marc R.Plante,PE,MA Registration Number: 38119 Expiration Date: 06/30/2014,am a Registered Design Professional, and hereby certify that I will prepare or directly supervised the preparation of all design plans, computations and specifications concerning: [] Architectural [] Structural [] Mechanical [ ] Fire Protection Electrical [] Other: [ ] for the above named project and that such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this Code and the design concept, shop drawings, samples and other submittals by the Contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this Code. When required by the Building Official, I shall submit field/progress reports(see Item 3.)together with pertinent comments, in a form acceptable to the Building Official. Upon completion of the work, I shall submit to the Building Official a`Final Construction Control Document'.. Enter in the space to the right a"wet"or electronic signature and seal: t . BIT i Phone Number: (508)230-0260 Email: mplante(ii)ber-engineering.com Building Official Use Only Building Official Name: Permit No.: Date: Initial Construction Control Document To be submitted with the Building Permit Application by a dRegistered Design Professional A Ih for work per the 8 Edition of the Massachusetts State Building Code, r 780 CMR, Section 107.6.2 Project Title: Pentucket Bank Date:April 4,2014 Property Address: 1077 Osgood Road—North Andover,Massachusetts Project: Check One or Both as applicable: (X)New Construction ()Existing Construction Project Description: New single-story Branch Bank. I, Steven A.Karan,PE,MA Registration Number: 34989 Expiration Date: 06/30/2014,am a Registered Design Professional, and hereby certify that I will prepare or directly supervised the preparation of all design plans, computations and specifications concerning: [ ] Architectural [] Structural [] Mechanical [] Fire Protection [] Electrical Other: Plumbing for the above named project and that such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I(or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this Code and the design concept, shop drawings, samples and other submittals by the Contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this Code. When required by the Building Official, I shall submit field/progress reports(see Item 3.)together with pertinent comments, in a form acceptable to the Building Official. Upon completion of the work, I shall submit to the Building Official a`Final Construction Control Documen ' V\"Uf u4s. Enter in the space to the right a"wet"or STEVEN A. tic electronic signature and seal: AN + ME HANICAL .34989 �GFF G\a�c" S/0 ' L Phone Number: (508)230-0260 Email: skaran(a,ber-eneineerine.com Building Official Use Only Building Official Name: Permit No.: Date: Initial Construction Control Document To be submitted with the Building Permit Application by a q d Registered Design Professional th �< for work per the 8 Edition of the Massachusetts State Building Code, 780 CMR, Section 107.6.2 Project Title: Pentucket Bank Date: April 4,2014 Property Address: 1077 Osgood Road—North Andover, Massachusetts Project: Check One or Both as applicable: (X)New Construction O Existing Construction Project Description: New single-story Branch Bank. I, Steven A.Karan,PE,MA Registration Number: 34989 Expiration Date: 06/30/2014,am a Registered Design Professional, and hereby certify that I will prepare or directly supervised the preparation of all design plans, computations and specifications concerning: [] Architectural [] Structural [] Mechanical [�] Fire Protection [ ] Electrical [] Other: [ ] for the above named project and that such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I(or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this Code and the design concept, shop drawings, samples and other submittals by the Contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this Code. When required by the Building Official, I shall submit field/progress reports(see Item 3.)together with pertinent comments, in a form acceptable to the Building Official. Upon completion of the work, I shall submit to the Building Official a`Final Construction Control Document'. Enter in the space to the right a"wet"or S� STEVEN A.s9csG electronic signature and seal: fi �C M ANI L H JAL Phone Number: (508)230-0260 Email: skaran(i0er-en2ineerina.com Building Official Use Only Building Official Name: Permit No.: Date: f COMcheck Software Version 3.9.3 Interior Lighting Compliance Certificate 2009 IECC Section 1: Project Information Project Type: New Construction Project Title : Pentucket Bank Construction Site: Owner/Agent: Designer/Contractor: 1077 Osgood Road Lloyd Architects North Andover,MA 01845 32 Court Street Plymouth,MA 02360 Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B x C) Office 3800 1 3800 Total Allowed Watts= 3800 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Office(3800 sq.ft.) Compact Fluorescent 1:A:Triple 4-pin 18W:Electronic: 1 4 21 84 Linear Fluorescent 1:B:24"T8U 32W:Electronic: 2 30 62 1860 LED 1:61:LED Linear 33W: 1 15 33 495 LED 2:C: LED Other Fixture Unit 28W: 1 25 28 700 LED 3:Cl:LED PAR 18W: 1 5 18 90 LED 4:D:LED A Lamp 7W: 1 2 7 14 LED 5:F:LED A Lamp 7W: 1 3 7 21 Linear Fluorescent 2:G:48"T8 25W(Super T8):Electronic: 1 11 22 242 LED 6:1-11:LED Linear 10W: 1 1 10 10 LED 7:1-12:LED Linear 10W: 1 22 10 220 LED 8:L1: LED Linear 10W: 1 1 10 10 LED 9:1-2:LED Linear 20W: 1 1 20 20 Total Proposed Watts= 3766 Section 4: Requirements Checklist code.Interior Lighting PASSES:Design 1%better than Lighting Wattage: rl 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 3800 3766 YES Controls, Switching, and Wiring: ❑ 2. Daylight zones under skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to vertical fenestration. Project Title: Pentucket Bank Report date: 04/07/14 Data filename: P:\14024\Drawings\Elec\04042014_14024_PentucketBank.cck Page 1 of 2 j F_J 3. Dayljght zones have individual lighting controls independent from that of the general area lighting. Exceptions: LJ Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device. O Daylight spaces enclosed by walls or ceiling height partitions and containing two or fewer light fixtures are not required to have a separate switch for general area lighting. F1 4. Independent controls for each space(switch/occupancy sensor). Exceptions: ❑ Areas designated as security or emergency areas that must be continuously illuminated. ❑ Lighting in stairways or corridors that are elements of the means of egress. F-i 5. Master switch at entry to hotel/motel guest room. F1 6. Individual dwelling units separately metered. F-I 7. Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. Lj 8. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either controlling all luminaires,dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps,switching the middle lamp luminaires independently of other lamps,or switching each luminaire or each lamp. Exceptions: F-1 Only one luminaire in space. L) An occupant-sensing device controls the area. The area is a corridor,storeroom,restroom,public lobby or sleeping unit. ❑ Areas that use less than 0.6 Watts/sq.ft. L1 9. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft. Exceptions: L] Sleeping units,patient care areas;and spaces where automatic shutoff would endanger safety or security. F11 10.Photocell/astronomical time switch on exterior lights. Exceptions: Lighting intended for 24 hour use. ❑ 11.Tandem wired one-lamp and three-lamp ballasted luminaires(No single-lamp ballasts). Exceptions: LJ Electronic high-frequency ballasts;Luminaires on emergency circuits or with no available pair. Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2009 IECC requirements in COMcheck Version 3.9.3 and to comply with the mandatory requirements i the Requirements Checklist. Marc R. Plante, PE 4/7 / Name-Title Signature Date MAW it PLANTE A �L �F ST�'�O Project Title: Pentucket Bank Report date: 04/07/14 Data filename: P:\14024\Drawings\Elec\04042014_14024_PentucketBank.cck Page 2 of 2 j COMcheck Software Version 3.9.3 Interior Lighting Compliance Certificate 2009 IECC Section 1: Project Information Project Type: New Construction Project Title : Pentucket Bank Construction Site: Owner/Agent: Designer/Contractor: 1077 Osgood Road Lloyd Architects North Andover,MA 01845 32 Court Street Plymouth,MA 02360 Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B x C) Office 3800 1 3800 Total Allowed Watts= 3800 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID:Description/Lamp/Wattage Per Lamp!Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Waft. Office(3800 sq.ft.) Compact Fluorescent 1:A:Triple 4-pin 18W:Electronic: 1 4 21 84 Linear Fluorescent 1:B:24"T8U 32W:Electronic: 2 30 62 1860 LED 1:B1:LED Linear 33W: 1 15 33 495 LED 2:C:LED Other Fixture Unit 28W: 1 25 28 700 LED 3:Cl:LED PAR 18W: 1 5 18 90 LED 4:D:LED A Lamp 7W: 1 2 7 14 LED 5:F:LED A Lamp 7W: 1 3 7 21 Linear Fluorescent 2:G:48"T8 25W(Super T8):Electronic: 1 11 22 242 LED 6:H1:LED Linear 10W: 1 1 10 10 LED 7:1-12:LED Linear 10W: 1 22 10 220 LED 8:L1:LED Linear 10W: 1 1 10 10 LED 9:1-2: LED Linear 20W: 1 1 20 20 Total Proposed Watts= 3766 Section 4: Requirements Checklist code.Interior Lighting PASSES:Design 1%better than Lighting Wattage: F1 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Wafts Complies 3800 3766 YES Controls, Switching, and Wiring: n 2. Daylight zones under skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to vertical fenestration. Project Title: Pentucket Bank Report date: 04/07/14 Data filename: P:\14024\Drawings\Elec\04042014_14024_PentucketBank.cck Page 1 of 2 Lj.3. Daylight zones have individual lighting controls independent from that of the general area lighting. b Exceptions: LJ Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device. ❑ Daylight spaces enclosed by walls or ceiling height partitions and containing two or fewer light fixtures are not required to have a separate switch for general area lighting. ❑ 4. Independent controls for each space(switch/occupancy sensor). Exceptions: ❑ Areas designated as security or emergency areas that must be continuously illuminated. ❑ Lighting in stairways or corridors that are elements of the means of egress. ❑ 5. Master switch at entry to hotel/motel guest room. ❑ 6. Individual dwelling units separately metered. ❑ 7. Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. F] 8. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either controlling all luminaires,dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps,switching the middle lamp luminaires independently of other lamps,or switching each luminaire or each lamp. Exceptions: F1 Only one luminaire in space. L] An occupant-sensing device controls the area. F1 The area is a corridor,storeroom,restroom,public lobby or sleeping unit. F1 Areas that use less than 0.6 Watts/sq.ft. F1 9. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft. Exceptions: L] Sleeping units,patient care areas;and spaces where automatic shutoff would endanger safety or security. F1 10.Photocell/astronomical time switch on exterior lights. Exceptions: L] Lighting intended for 24 hour use. F-1 11.Tandem wired one-lamp and three-lamp ballasted luminaires(No single-lamp ballasts). Exceptions: L] Electronic high-frequency ballasts;Luminaires on emergency circuits or with no available pair. Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2009 IECC requirements in COMcheck Version 3.9.3 and to comply with the mandatory requirements in the Requirements Checklist. Marc R. Plante, PE L 7 Name-Title Signature Date MARY RPLANTE m ELECTRICAL No.36119 .ft��$jEQ�O Project Title: Pentucket Bank Report date: 04/07/14 Data filename: P:\14024\Drawings\Elec\04042014_14024_PentucketBank.cck Page 2 of 2 COMcheck Software Version 3.9.3 Interior Lighting Compliance Certificate 2009 IECC Section 1: Project Information Project Type: New Construction Project Title : Pentucket Bank Construction Site: Owner/Agent: Designer/Contractor: 1077 Osgood Road Lloyd Architects North Andover,MA 01845 32 Court Street Plymouth,MA 02360 Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B x C) Office 3800 1 3800 Total Allowed Watts= 3800 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Waft. Office(3800 sq.ft.) Compact Fluorescent 1:A:Triple 4-pin 18W:Electronic: 1 4 21 84 Linear Fluorescent 1:B:24"T8U 32W:Electronic: 2 30 62 1860 LED 1:B1:LED Linear 33W: 1 15 33 495 LED 2:C:LED Other Fixture Unit 28W: 1 25 28 700 LED 3:Cl:LED PAR 18W: 1 5 18 90 LED 4:D:LED A Lamp 7W: 1 2 7 14 LED 5:F:LED A Lamp 7W: 1 3 7 21 Linear Fluorescent 2:G:48"T8 25W(Super T8):Electronic: 1 11 22 242 LED 6:1-11:LED Linear 10W: 1 1 10 10 LED 7:1-12:LED Linear 10W: 1 22 10 220 LED 8:L1:LED Linear 10W: 1 1 10 10 LED 9:1-2:LED Linear 20W: 1 1 20 20 Total Proposed Watts= 3766 Section 4: Requirements Checklist code.Interior Lighting PASSES:Design 1%better than Lighting Wattage: F1 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 3800 3766 YES Controls, Switching, and Wiring: F-1 2. Daylight zones under skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to vertical fenestration. Project Title: Pentucket Bank Report date: 04/07/14 Data filename: P:\14024\Drawings\Elec\04042014_14024_PentucketBank.cck Page 1 of 2 a 3. Day�ight zones have individual lighting controls independent from that of the general area lighting. Exceptions: L] Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device. LJ Daylight spaces enclosed by walls or ceiling height partitions and containing two or fewer light fixtures are not required to have a separate switch for general area lighting. F1 4. Independent controls for each space(switch/occupancy sensor). Exceptions: ❑ Areas designated as security or emergency areas that must be continuously illuminated. L] Lighting in stairways or corridors that are elements of the means of egress. F-i 5. Master switch at entry to hotel/motel guest room. F1 6. Individual dwelling units separately metered. Li 7. Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. rl 8. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either controlling all luminaires,dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps,switching the middle lamp luminaires independently of other lamps,or switching each luminaire or each lamp. Exceptions: ❑ Only one luminaire in space. ❑ An occupant-sensing device controls the area. F-1 The area is a corridor,storeroom,restroom,public lobby or sleeping unit. LJ Areas that use less than 0.6 Watts/sq.ft. ❑ 9. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft. Exceptions: LJ Sleeping units,patient care areas;and spaces where automatic shutoff would endanger safety or security. 10.Photocell/astronomical time switch on exterior lights. Exceptions: Lighting intended for 24 hour use. F-1 11.Tandem wired one-lamp and three-lamp ballasted luminaires(No single-lamp ballasts). Exceptions: LJ Electronic high-frequency ballasts;Luminaires on emergency circuits or with no available pair. Section 5: Compliance Statement Compliance Statement. The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2009 IECC requirements in COMcheck Version 3.9.3 and to comply with the mandatory requirements in the Requirements Checklist. Marc R. Plante, PE 1 Name-Title Signature Date k�OF MARV ItPLAWIE � ELECMAL N0.38119 Project Title: Pentucket Bank Report date: 04/07/14 Data filename: P:\14024\Drawings\Elec\04042014_14024_PentucketBank.cck Page 2 of 2