HomeMy WebLinkAboutBuilding Permit #124 - 1070 SALEM STREET 8/16/2007 NORTFi
BUILDING PERMIT �f,<`ao ,6�A•�
TOWN OF NORTH ANDOVER °
APPLICATION FOR,JPLAN EXAMINATION
Permit NO: . Date Received " °$ c-cm •.+
�9SsgcHus
Date Issued: IaZ6
IMPORTANT:Applicant must complete all items on this page
LOCATION 60-70 5n�Gwt :-s+
PROPERTY OWNER 6 f a C&—)V A - Me-er jot' L � vv4 A t
'
Print
MAP NO:/�PARCEL:�ZONING DISTRICT: Historic District yes no
/ Machine Shop Village yes no
TYPE OF IMPROVEMENT PROPOSED USE
ResiOential Non- Residential
Ll New Building One family
Ll Addition u Two or more family u Industrial
Ll Meration No. of units': u Commercial
Repair, replacement u Assessory Bldg u Others:
u Demolition u Other
U Septic u Well u Floodplain u Wetlands u Watershed District
U Water/Sewer I L-
DESCRIATIONF WORK TO BE PREF(RME :
<;A,ojN�O(��
;S'(A c X W L V,3 v k".;s
Identification Please Type or Print Clearly)
iER. Name.
��,�V- Co r"b\A`4c �Ag! n of
V�1fNPhone: 1 y �9JC<6`1
Address: . 0 moi 0 ��� w, � ' C141 ij L 3 O - 31 (a Z
CONTRACTOR Name: /--A toard 1 ► EC.Guren"Ahone: 9 o)'
Address: 117 0 f- e i" - - O� 9 R
Supervisor's Construction License: (_ Exp. Date: 7'
Home Improvement License: A� �` Exp. Date:
ARCHITECT/ENGINEER 5avL Phone: L�7
Address: ONLor1 'J '' Reg. No.
r �
FEE SCHEDULE.B�DING PERMITc �$12. PER$1000.00 OF THE TOTAL ESTIMCA�TED COST BASED ON$125 00 PER S.F.
Total Project.Cost: $ bol °c'0 FEE:
Check No.: Receipt No.:
NOTE: Persons cok9ciink with unre • tered contractors do not have access to the guarantyfund
ignature of Agent/Owner ignature of contractor1--',1 z ,_
A.
BUILDING PERMIT o` "o oT" qq,
6 0
TOWN OF NORTH.ANDOVER o�
APPLICATION FOR PLAN EXAMINATION
,>
Permit NO: Date Received ss�sy"°gATeD�•",�.c'�s�
ACHU
Date Issued:
IMPORTANT:Applicant must complete all items on this page
r.
LOCATION
Print
PROPERTY OWNER
Print
MAP NO: PARCEL:' ZONING DISTRICT: Historic District yes no
Machine Shop Village yes;_. no
TYPE OF IMPROVEMENT PROPOSED USE
Residential Non- Residential
New Building One family
Addition Two or more family Industrial
Alteration No. of.units: Commercial °
Repair, replacement Assessory Bldg Others:
Demolition Other
Septic Well Floodplain Wetlands Watershed District
Water/Sewer
DESCRIPTION OF WORK TO BE PREFORMED:
Identification Please Type or Print Clearly)
OWNER: Name: Phone:
Address:
CONTRACTOR Name'' Phone: ` �
Address:
Supervisor's Construction License: Exp. Date:
Home Improvement License: Exp:-Date:
ARCHITECT/ENGINEER Phone:
Address:
Reg. No.
FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F.
Total Project Cost: $ FEE: $
Check No.: Receipt No.:
NOTE: Persons contracting with unregistered contractors do not have access to the gr-aranty fund
gnature of Agent/Owner , :.^ Signature-6f contractor
Building Department
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
❑ Building Permit Application
❑ Workers Comp Affidavit
❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses
❑ Copy of Contract
❑ Floor Plan Or Proposed Interior Work
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition Or Decks
❑ Building Permit Application
❑ Certified Surveyed Plot Plan
❑ Workers Comp Affidavit
❑ Photo Copy of H.I.C. And C.S.L. Licenses
❑ Copy Of Contract
❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Mass check Energy Compliance Report (If Applicable)
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
New Construction (Single and Two Family)
❑ Building Permit Application
❑ Certified Proposed Plot Plan
❑ Photo of H.I.C. And C.S.L. Licenses
❑ Workers Comp Affidavit
❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations_ (If Applicable)
❑ Copy of Contract
❑ Mass check Energy Compliance Report
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
must be submitted with the building application
Doc:INSPECTIONAL SERVICES DEPARTMENT:BPFORM07
4
Revised 2.2007
Plans Submitted Plans Waived Certified Plot Plan Stamped Plans
TYPE OF SEWERAGE DISPOSAL
Public Sewer Tanning/Massage/Body Art Swimming Pools
Well Tobacco Sales Food Packaging/Sales
Private(septic tank,etc. Permanent Dumpster on Site
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF - U FORM
DATE REJECTED DATE APPROVED
PLANNING & DEVELOPMENT
COMMENTS
DATE REJECTED DATE APPROVED
CONSERVATION
COMMENTS
DATE REJECTED DATE APPROVED'
HEALTH
COMMENTS
R
Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision: Comments
1
Conservation Decision: Comments
Water & Sewer Connection/Signature&Date Driveway Permit
Located at 384 Osgood Street
FIRE DEPARTMENT Temp Dumpster on site yes no
Located at 124 Main Street
Fire Department signature/date
t
COMMENTS
i
Dimension
Number of Stories: Total square feet of floor area, based on Exterior dimensions.
Total land area, sq. ft.:
ELECTRICAL: Movement of Meter location, mast or service drop requires approval of
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes No
MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine
NOTES and DATA— For department use
i,
❑ Notified for pickup - Date
Doc.Building Permit Revised 2007
- y
Location fb 7 Ala
No. o Date
TOWN OF NORTH ANDOVER
` Certificate of Occupancy $
r
• i
�,�s',.,°•;<�'
Building/Frame Permit Fee. '$ °100
r�CHus
Foundation Permit Fee $
Other Permit Fee .$
TOTAL $
(2
Check #
�
v Building Inspector
REN. E MUGNIER ASSOCIATES, INC.
40RUCTURAL ENGINEERS
777 CONCORD AVE.,SUITE 201 CAMBRIDGE,MA 02138.1053 PHONE(617)547-7773 FAX(617)547-7743
April 9, 2008
`Mr. Edward McQueeney
Old House Restoration, Inc.
178 Main Street
West Newbury, MA 01985
RE: 1070 Salem Street, North Andover
Dear Mr. McQueeney;
- This letter is to certify that-erre inspected and observed the structural work that took
place at the above-mentioned address on April 8, 2008.
It became our professional opinion that the structural work has been completed
according to our plan as well as the additional recommendations'made by this
office during the progress of the work due to the existing conditions.
To the best of our observations and qualifications, the structural work has been
completed in accordance with the Massachusetts State Building Code and the rules
of good construction.
Ve
E
o M
6NI
P Principal
ASSOCIATES, INC.
RM/j
i
z 'd eib :60 eo so idd
The Commonwealth of Massachusetts
Department of Industrial Accidents
Office of Investigations
600 Washington Street
Boston, MA 02111
s� www.mass.gov/dia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please—Print Legibly
Name (Business/Organization/Individual): \,°_,°_,
Address:
City/State/Zip: 4�, f- h ne#: T741
Are you an employer? Check the appropriate bode:�\�� Type of project(required):
I.El am a employer with 4. I am a g neral contractor and 1 6. ❑ New construction
employees(full and/or part-time).* have hired the sub-contractors
2.❑ I am a sole proprietor or partner- listed on the attached sheet. $ 7 Remodeling
ship and have no employees These sub-contractors have 8. ❑ Demolition
working for me in any capacity. workers' comp. insurance. 9. ❑ Building addition
[No workers' comp. insurance 5. ❑ We are a corporation and its
officers have exercised their 10.[] Electrical repairs or additions
required.]
3.❑ 1 am a homeowner doing all work right of exemption per MGL 11.❑ Plumbing repairs or additions
myself. [No workers' comp." c. 152, §1(4),and we have no 12.❑ Roof repairs
insurance required.] t employees. [No workers' 13.0 Other
comp. insurance required.]
*Any applicant that checks box#1 must also till out the section below showing their workers'compensation policy information.
t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
$Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information. �_—
Insurance Company Name: �����CCS (� i h e
Policy#or Self-ins. Lic.#: ('P'0�) 0 J, �P��� 4 3 Expiration Date: I J
Job Site Address: (� � �erY� L )Jctrq'-'�(4fn46'�(!�City/State/Zip: {� �4 —
Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereb ,c�rtify under the pains and penalties of perjury that the information provided above . 11:11a and correct.
7
Signature: \ Date: i
Phone#: c r l�
Official use only. Do not write in this area,to be completed by city or town officiaL
City or Town: Permit/License#
Issuing Authority(circle one):
1. Board of Health 2. Building Department 3.City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector
6.Other
Contact Person: Phone#:
From:Judi Lynn Marchesini At DAN HURLEY INSURANCE AGENCY,INC. FaxID:978-777-3306 To:. Date:8/152007 11:31 AM Page: 1 of 2
CORD CERTIFICATE C} M
F LIABILITY INSURANCE OP ID DATE(MMlD5/07)
ACORD C UEDi 08/15/07
PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
Dan Hurley insurance Agency ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
Chestnut Green, Suite 24 HOLDER.THIS CERTIFICATE DOES NOTAMEND,EXTEND OR
Seven Federal Street ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
Danvers MA 01923-3620
Phone:978-777-9394 Fax:978-777-3306 INSURERS AFFORDING COVERAGE NAIC#
INSURED INSURER A: Preferred Mutual 15024
INSURER B: American international
Old House Restoration Inc INSURER C:
Ed McQueeney
178 Main Street INSURER D:
West Newbury MA 01985
INSURER E:
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWiTHSTAND ING
ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES,AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
N511 'U -I'MMY EFFECTIVE POLICY EXPIRATION
LTR INSM TYPE OF INSURANCE POLICY NUMBER DATE(MMIDDIYY) DATE(MMIDD/YY) LIMITS
GENERAL tfABRJ TY EACH OCCURRENCE $ 1000000
Ab"IUA X COMMERCIAL GENERAL LIABILITY I CPP0140565643 01/08/07 01/08/08 PREMISEs(EO occarence) $100000
CLAIMS MADE ®OCCUR MED EXP(Any one person) $5000
PERSONAL 8 ADV INJURY $1000000
GENERAL AGGREGATE $2000000
GEN'LAGGREGATE LIMIT APPLIES PER:I PRODUCTS-COMP/OPAGG $2000000
X7 POLICY F PRO JECT 7.LOC
AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $
ANY AUTO (Es eccidenf)
ALL OWNED AUTOS BODILY!NJURY $
SCHEDULEDAUTOS (Pert person)
HIRED AUTOS I BODILY INJURY
INJURY $
NON-OWNED AUTOS (Per accident)
PROPERTY DAMAGE $
(Per accident)
GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $
ANY AUTO I OTHER THAN Flt ACC $
AUTO ONLY: AGG $
EXCESSIUMBRELLA IJABILITY EACH OCCURRENCE I$
OCCUR CLAIMS MADE AGGREGATE 1$
is
DEDUCTIBLE $
RETENTION $ $
WORKERS COMPENSATION AND X I TORY LL S ER
B EMPLOYERTLIABILITY I 6872705 06/17/07 06/17/08 E.L.EACH ACCIDENT $1000000
ANY PROPRIETOR(PARTNER/EXECUTNE
OFFICERIMEMBEREXCLUDED? El DISEASE-EA EMPLOYEE $1000000
If yes,describe under
SPECIAL PROVISIONS below E.L.DISEASE-POLICY LIMIT IS 1000000
OTHER
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS
As per policy.
CERTIFICATE HOLDER CANCELLATION
0000000 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN
NOTICE TO CERTIFICATE HOLDER NAMED TO THE LEFT,BUTFAILURE TO DO SO SHALL
Town of North Andover IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR
Building Inspector
1600 Osgood Street REPRESENTATIVES.
North Andover MA 01845 AUTHORIZED REPRESENTATIVE
Daniel J Hurley
ACORD 25(2001/08) 0 ACORD CORPORATION 1988
Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans
TYPE OF SEWERAGE DISPOSAL
Public Sewer U Tanning/Massage/Body Art U Swimming Pools U
Well U Tobacco Sales U Food Packaging/Sales U
Private(septic tank,etc. U Permanent Dumpster on Site U
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF -U FORM
DATE REJECTED DATE APPROVED
PLANNING & DEVELOPMENT ❑ ❑
COMMENTS
DATE REJECTED DATE APPROVED
CONSERVATION ❑ ❑
COMMENTS
DATE REJECTED DATE APPROVED
HEALTH ❑ ❑
COMMENTS
Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision: Comments
Conservation Decision: Comments
Water& Sewer Connection/Signature&Date Driveway Permit
Located at 384 Osgood Street
FIRE DEPARTMENT -Temp Dumpster on site yes I no
Located at 124 Main Street
Fire Department signatureldate
COMMENTS
BOARD OF BUILDING
License: CONSTRUCTIO N REGUf ATIONS
SUPERVISOR
Numbers C�, 084554
964
�!+r�l��0�168120V8
Tr.no,: 27346
Resr�Y II+j
EDWARD J MCQUEE `Y
47 OLIVE ST
NEWBURYPORT, MA
i
--_
comtslow
"Fs
-...
rte"---•-- —
`` - �1e �omnnonusea�i o�,�aaeac/ucaetfa
Board of Building Regulations and Standards
HOME IMPROVEMENT CONTRACTOR
Regtstraion 96423
{ Cpirat n 7M/2009 Tr# 255974
a.
"Vite Corporation
OLD HOUSE RETQRA7C6N iNG'
r l,zr
EDWARD MCQUENEY
178 MAIN STREET
WEST NEWBURY,MA 01985 Administrator
JL
AGREEMENT FOR SERVICES
This CONTRACT satisfies all basic requirements of the State's Home Improvement
Contractor Law(M.G.L.c. 142A), but does not preclude parties from adding language to protect
their specific interests. Seek legal advice if necessary. Before agreeing to any home
improvement work on your residence you should obtain a free copy of "Consumer Guide to
Home Improvement Contractor Law"by calling the Office of Consumer Affairs and Business
Regulation's Information Hotline at 617-973-8787.
You may cancel this Agreement if is has been signed by a party thereto at a place other
than an address of Old House Restoration,Inc.,which may be its main office or branch thereof,
provided you notify Old House Restoration, Inc., in writing at its main office or branch by
ordinary mail posted,by Telegram sent or by delivery,not later than nudmght of the Hurd
business day following the signing of the Agreement.
See Attached Notice Of Cancellation For An Explanation Of This Right.
Homeowner Information Contractor Information
Margot Lindau&Jeff Comblatt Old House Restoration. Inc.
1070 Salem St Edward McQueeney, President
178 Main St.
North Andover, Ma. IF West Newbur. MA 01985
Business Phone
978-815-9932
Salesperson(s): Edward McQueeney,President Contractor Registration//:156423
Exp.Date:_7/3/2009_
MA Sup.License: G 4554
Y 7 666l495-94Y-- 1-7
3 73- 00
607- p7,-5 Cel//
S <e l/
j WORK TO BE PERFORMED
1. Contractor.Agrees To Do The Following Work For Homeowner: Supply permit
2. Supply dumpster
3. Repoint foundation exterior and interior of basement as needed
4. Pour concrete footing in rear basement wall near chimney
5. Install 4 footings and 4 columns in basement per engineer
6. Install metal brackets to existing floor joist to existing sill
7. Sister existing floor joists in parts of basement per engineer
8. Replace 6 M2 windows in the main part of home with same make of windows. Frame in
new studs in window openings
9. Install and replace existing windows on porch
10. Install French doors on porch
11. Replace exterior clad board on porch area
12. Paint exterior house and garage with 1 coat of paint
13. Lengthen existing ceiling in stairwell per code
14. Fix existing beams in living room and main kitchen area per structural blue prints
15. Demo existing dining room ceiling
16. Fix cathedral
ceiling in kitchen per structural blue prints
17. Build two closets in existing master bedroom by extending exterior wall over living room
2 feet 6 width x 4 feet
18. Install collar ties in main existing attic per structural blue prints
19. Install new insulation, sheetrock in porch area
20. All work to be done per structural blue prints
j
The following schedule will be adhered to unless circumstances beyond the contractor's control arise.
Work Scheduled To Begin:7/16/07 Expected Date Of Completion: 10/12/07
(Date Contractor will begin contracted work) (Date when contracted work will be substantially completed)
TOTAL CONTRACT PRICE AND PAYMENT SCHEDULE
The Contractor agrees to perform the work,furnish the material and labor specified above for the
SUM OF$100,000(*Include all finance charges in this amount)
Payments will be made to the following SCHEDULE:
$32,500 upon signing contract(`Not toexceed 1/3 of the total contract price OR the cost cost ofspecial order items
whichever is greater*)
10,000 6Installments
5,000 1 Installment
2,500 Final Payment
In order to meet the completion schedule,the following material/equipment must be special ordered before the
contracted work begins(Law requires that any deposit or down payment required by the contractor before work
begins may not exceed the greater of(a)one-third of the total contract price or(b)the actual cost of any special
equipment or custom made mater/al which must be special ordered in advance to meet the completion schedule*)
No final payment shall be demanded until the contract is completed to the satisfaction of the parties thereto.
I
Total payments to amount to One Hundred thousand Dollars
OTHER IMPORTANT PROVISIONS
I
You are dealing with a Registered Home Improvement Contractor and are entitled to certain rights under the
provisions of 780 CMR R6 and M.G.L.c. 142A.
Payments: If payment is not received as per the Contract,then the Owner shall be responsible for all attorneys'
fees,court costs,and other costs incurred by the Contractor and enforcing Contractor's rights hereunder.
Pets: Homeowner agrees to keep all pets out of the work area and take whatever steps are necessary to safeguard
them from any harm that may come to them as a result of the work being performed under this Contract,including
but not limited to injury on or outside the Premises or ingestion or inhalation of,or contact with,hazardous
substances. Company assumes no responsibility for any harm to the pets as a result of the work performed under
this Contract. Further,Homeowner shall take all steps necessary to protect Contractor,its agents,servants,
j contractors and employees,from any harm as a result of contact with said pets.
Characteristics of wood: Wood is a hygroscopic material. Wood'swells and/or shrinks in relation to the humidity,
temperature and environmental conditions of its surrounding. Generally,wood flooring is expected to shrink in any
conditions and expand when exposed to moist conditions.Natural wood also contains variations of graining,texture,
hardness and/or knots, depending on the wood chosen.Contractor cannot be responsible for the natural features of
the wood chosen. Contractor is not responsible for shrinkage,checking,swelling,or other conditions which are the
normal condition of wood or the result of household or environmental humidity,heat,cold,or other conditions.
Colors: You may choose colors and finishes for the parts being used in your remodeling project. It is important to
remember that a color or finish you see at the store or in a showroom may not look the same in your home,
especially after all of the different colors and finishes are brought together upon the completion of a project. In
addition,one manufacturer's named color is not the same as another manufacturer's named color. Unless specified
otherwise,Contractor will use band and brand stain. The Contractor cannot be
responsible for the appearance or lack of coverage from Homeowner/chosen paints and/or stains and finishes.
Building Officials: Any additional costs incurred by Contractor as a result of decisions made by Building Officials
will be the responsibility of the Homeowner.The costs of additional work will be calculated as follows:cost of
materials plus an hourly rate of$60.00 per man hour.
Liens: In the event of non justifiable non-payment,Homeowner's residence or property may be subject to a
Mechanic's Lien as a consequence of signing this Contract.
Utilities: The Contractor will use reasonable efforts to notify the Homeowner in advance of any interruption of
utility services. However,there may be instances where the Contractor must shut down these services without
advanced notice. Homeowner must arrange for emergency backup service for any utility critical equipment such as
medical devices and computers. The Homeowner must also notify the Contractor at the start of the work day if you
will be engaged in any utility critical activities in thai the Contractor makes a notification in writing in the daily log
book or otherwise.
Additional work: Any additional work requested by the Homeowner which is beyond the scope of the work to be
performed as set forth in this Agreement,shall be the subject of a separate agreement,and/or if not,subject to the
same terms and conditions as set forth in this Agreement and billed on a time plus cost of materials basis at
Contractor's normal hourly rate. Contractor's normal hourly rate per man hour is$60.00.
In the event that additional work is to be performed on an hourly plus cost of materials basis,the Homeowner
shall be required to execute a Change Order which shall include Contractor's best estimate as to the time required,
together with the cost of labor as well as the type and cost of materials necessary.
Delays: Contractor is not responsible for delays attributable to Homeowner initiated modifications or additions,or
for delays incurred due to the actions or inactions of city/town officials,strikes,acts of God,unfulfilled customer
obligations,vendor delays,interference by other tradespersons,customer supplied items or other delays beyond
Contractor's reasonable control. Contractor will use-reasonable efforts to stay on each job until substantial
completion by allotting specific time periods to each Homeowner to complete each job in as timely a manner as
possible. In the event that Homeowner does not allow Contractor and/or his employees or sub-contractors access to
the residence or property so as to allow Contractor to perform his obligations and/or to complete the scope of work
in as timely a manner as possible,other than for reasons of safety or other reasons mutually agreed to between
Homeowner and Contractor,then the Homeowner shall be responsible to pay Contractor the sum of$500.00 per
day,on a pro rata basis,to cover the costs of delay. Contractor reserves the right to suspend work and/or delivery of
materials in the event of unjustified non-payment. In such event,the Contractor shall have no liability to the
Homeowner for alleged delays or damages due to said suspension.
Punch-list Items: The Homeowner agrees that routine" unch-ist"
or repair items after substantial tantial comP letion are
outside the agreed scope of services,and covered by Contractor's warranty obligation and will be completed as soon
as practicable and according to Contractor's and Homeowner's mutual availability. Homeowner agrees that it shall
use his/her best efforts to make himself/herself available to observe and/or sign off on the any com completion ofsuch
P
punch-list.Items,and that the approval of one Homeowner regarding the completion of any such punch-list items,as
well as change orders shall be binding upon all Homeowners.
Unforeseen Conditions/Circumstances: Contractor shall not be responsible for any changes at the request of the
Building Inspector. Contractor shall also not be responsible for any unforeseen bedrock/ledge or latent defects such
as structural and/or dry rot or insect damage to the existing structure,or for preexisting faulty or inadequate wiring
or plumbing. Contractor shall also not be responsible for any pre-existing code violations or responsible for
correcting contiguous work completed by others not under the Contractor's authority.
Insurance: Homeowner agrees to carry fire,then,vandalism,liability and all other necessary insurances to protect
their personal property while construction is in progress. Contractor will carry all required and necessary insurances
including worker's compensation insurance. Contractor will ensure that all personnel including sub-contractors will
be covered by all required and necessary insurance including worker's compensation insurance.
Homeowner's Cancellation Rights: In addition to the rights the Homeowner has,as set forth in the attached
Notice of Cancellation,the Homeowner may have rights under other Massachusetts Statutes,including M.G.L.c.93
§48,M.G.L.c. 1.401), § 10 and M.G.L.c.255D§ 14.
I
0
ARBITRATION
The contractor and the homeowner hereby mutually agree in advance that in the even the contractor has a dispute
concerningthis contract the contractor ma submit such dis ute to a rivate arbitration service which has been
Approved by the Secretary of the Executive Office of Consumer Affairs and Business Re ulations and the consumer
shall he required to submit to such arbitration as provided in M G L.c.142A.
Contra or: i Home w er:
Date
'c�-� `� Date
NOTICE: THE SIGNATURES OF THE PARTIES ABOVE APPLY ONLY TO THE AGREEMENT OF
THE PARTIES TO ALTERNATIVE DISPUTE SETFLEMENT INITIATED BY THE CONTRACTOR.THE
OWNER MAY INITIATE ALTERNATIVE DISPUTE RESOLUTION EVEN WHERE THIS SECTION IS NOT
SEPARATELY SIGNED BY THE PARTIES.
ACCELERATION OF PAYMENT
Homeowner's Financial Insecurity-A Contractor may not demand payments in advance of the dates specified on
the payment schedule in cases where the homeowner deems hint/herself to be financially insecure.
Contractor's Financial Insecurity-In instances where a contractor deems himself/herself to be financially
insecure,the contractor may require that the balance of funds not yet due be placed in a joint escrow account as a
prerequisite to continuing the contracted work. Withdrawal from said account would require the signatures of both
parties.
Homeowner ag
rees to allow reasonable access to allow Contractor to reasonably attempt to remedy any
outstanding uncompleted,disputed or non-satisfactory item.
If you have genera(questions or need additional information about
The Home Improvement Contractor Law,contact:
Consumer Information Hotline
Commonwealth of Massachusetts
Office of Consumer Affairs and Business Regulation
10 Park Plaza,Room 5170
Boston,MA 02116
617-973-8787
If you have questions about Contractor Registration,contact:
Director of Home Improvement Contractor Registration
Board of Building Regulations and Standards
One Ashburton Place,Room 1301
Boston,MA 02108
617-727-3700,x25205
DO NOT SIGN THIS CONTRACT IF THERE ARE ANY 13LANK SPACES
Identical copies of the contract should go to the homeowner and the contractor.
�
Home `vner's Signature Contractor's Sig—nature
Date Date
You may cancel this agreement if it has been signed by a party thereto at a place other than an address of the seller,
which may be his main office or branch thereof,provided you notify the seller in writing at his main office or branch
by ordinary mail posted,by telegram sent or by delivery,not later than midnight of the third business day following
the signing of the agreement.
See attached notice of cancellation for an explanation of this right.
NO lir- BEGIN UNTIL BOTH PARTIES SIGN THE
CONTRACT AND THE OWNER RECEIVES A COPY
REQUIRED PERMITS
The following building permits are required. It is the obligation of the contractor to secure such
as the homeowners agent: list any and all necessary construction-related permits.
NOTE: Owners who secure their own permits or deal with unregistered contractors are
excluded from the Guaranty Fund provisions of MGL c. 142A.
EXPRESS WARRANTY
All workmanship and materials to be free of material defect for a period of one(1)year. During
the Warranty period,the Company may, at its option, either repair or replace products or
workmanship which prove to be defective. This Warranty shall not apply to defects or damage
arising from improper or inadequate maintenance by the customer, customer's applied products,
unauthorized modification or misuse, damage incurred as a result of acts of God or civil strife, or
normal characteristics of the materials such as wood shrinking, expanding and otherwise reacting
to moisture or environmental conditions. The Company's liability is limited to the repair or
replacement,at its option, set forth herein and Company shall not be liable for any consequential,
sequential, incidental or other damages not set forth herein. The Warranty set forth herein is
exclusive and no other Warranty,whether written or oral, is expressed or implied. Company
specifically disclaims the implied Warranties of Merchantability and Fitness for a Particular
Purpose.
NOTE:All home improvement contractors and subcontractors shall be registered and any inquires about a
contractor subcontractor relating to a registration should he directed to:
Director,Home Improvement Contractor Registration
One Ashburton Place,Room 1301
Boston,MA 02108
617-727-8598
Unless otherwise noted within this document,the contract shall not imply
that any lien or other security interest has been placed on the residence,
NOTICE OF CANCELLATION
YOU MAY CANCEL THIS TRANSACTION,WITHOUT PENALTY OR OBLIGATION,WITHIN
THREE(3)BUSINESS DAYS FROM THE ABOVE DATE.
IF YOU CANCEL,ANY PROPERTY TRADED IN,ANY PAYMENTS MADE BY YOU UNDER THE
CONTRACT OR SALE,AND ANY NEGOTIABLE INSTRUMENTS EXECUTED BY YOU WILL BE
RETURNED WITHIN TEN(10)BUSINESS DAYS FOLLOWING RECEIPT BY THE SELLER OF YOUR
CANCELLATION NOTICE,AND ANY SECURITY INTEREST ARISING OUT OF THE TRANSACTION
WILL BE CANCELLED.
IF YOU CANCEL,YOU MUST MAKE AVAILABLE TO THE SELLER AT YOUR RESIDENCE,IN
SUBSTANTIALLY AS GOOD CONDITION AS WHEN RECEIVED,ANY GOODS DELIVERED TO YOU
UNDER THIS CONTRACT OR SALE;OR YOU MAY,IF YOU WISH,COMPLY WITH THE INSTRUCTIONS
OF THE SELLER REGARDING THE RETURN SHIPMENT OF THE GOODS AT THE SELLER'S EXPENSE
AND RISK.
IF YOU DO MAKE THE GOODS AVAILABLE TO THE SELLER AND THE SELLER DOES NOT PICK
THEM UP WITHIN TWENTY(20)DAYS OF THE DATE OF CANCELLATION,YOU MAY RETAIN OR
DISPOSE OF THE GOODS WITHOUT ANY FURTHER OBLIGATION. IF YOU FAIL TO MAKE THE
GOODS AVAILABLE TO THE SELLER, OR IF YOU AGREE TO RETURN THE GOODS TO THE SELLER
AND FAIL TO DO SO,THEN YOU REMAIN LIABLE FOR PERFORMANCE OF ALL OBLIGATIONS
UNDER THE CONTRACT.
TO CANCEL THIS TRANSACTION,MAIL OR DELIVER A SIGNED AND DATED COPY OF
THIS CANCELLATION NOTICE OR ANY OTHER WRITTEN NOTICE,OR SEND A TELEGRAM TO
Name of Seller: YGlI
At: 7 o. 2192
NOT LATER THAN MIDNIGHT OF � D ATE .
I HEREBY CANCEL THIS TRANSACTION.
Date: Buyer's Signature:
Received:
STRUCTURAL ENGINEERS
777 CONCORD AVE.,SUITE 201 CAMBRIDGE, MA 02138-1053 PHONE(617)547-7773 FAX(617)547-7743
i
May 29, 2007
Mr. Edward McQueeney
Old Restoration Housing, Inc.
178 Main Street
West Newbury, MA 01985
RE: 1070 Salem Street, North Andover
Dear Mr. Mc ueen
Q e .
Y
This report documents our observations made on May 17, 2007, during our visit to
the referenced address.
This report is based on our observations, qualifications, and information provided to
us during this visit. It does not claim to be an itemization of all structural problems,
and is intended only to provide the client with a general idea of the structural
problems observed during the walk-through inspection.
For the purposes of clarity and orientation, the left, right, front, and back relate to
the observation of the building from the street looking at the front of the building.
Some pictures appear less dramatic than the description. They often do not reflect
the importance of the damages but must be used for location. We recommend that
the report be read while visiting the site with the pictures taken during our site visit
to better understand the conditions. See pictures#1 through 58.
OBSERVATIONS AND RECOMMENDATIONS
The purpose of this visit was to observe the structure of this house particularly the
roof and the basement.
We started on the_ roof framing on the right side of the roof, as we could observe it
from the attic. We became very concerned by the fact that the rafters were not
braced laterally creating a lateral push at the bottom, which was not properly
restrained.
Several solutions could be introduced for this problem. Among them, a choice of
two, which would propose:
. 1
One solution would be to create some steel angles introduced at the base on each
side transferring the force to the floor from the rafters. This is the most expensive
solution but it would protect the headroom of the attic. This solution- should be
coupled with the reinforcement of the floor, as this floor is improperly framed and
does not have the capacity to support any appreciable load.
If you do not care about the use of the attic, the least expensive solution would
consist of introducing some wood ties, which could be made of 2 x 8's bolted with
5/8" bolts at each end. This would transfer the load laterally. All sizes of members
or bolts are for pricing only.
We then noticed on the second floor that the attic had substantially deflected, as
one could see in the pictures and we recommend the beam be reinforced, as it
supports only the ceiling load.
This concern may also be addressed by introducing some verticals in the attic
between the beam and the roof rafters to cut the span of the beam in two. This
post must transfer its load all the way down to the proper footings.
We then proceeded to look at the first floor where we noticed a substantial amount
of rot in several'areas, such as the one depicted in our pictures.
Some connections are very improper and need to be addressed, possibly by the
introduction of clip angles. Some of the joists have badly rotted and will need to be
reinforced. See pictures.
As we looked at the framing of the beam located between the living room and the
kitchen/dining room, this beam has badly deteriorated and will need substantial
reinforcement, as it is very long, improperly supported, and badly damaged at mid
span. One could see some very bad cracking and the collapse of the top part of
the beam has a bad hole in it. Several joists are badly underdesigned such as a
joist, which is supporting the light above the dining room table.
As we reached the corridor at the area of the entrance to the kitchen/dining room,
we noticed the support of the beam is in an advanced condition of deterioration.
We recommend this be shored, as at this time, this situation is very improper. See
picture with the beam supported by a column badly deteriorated with a little piece of
1 x 4 horizontally on the right on the flat. Many of these beams are badly
deteriorated and this would be the case for the beam located between the living
room and the corridor. See picture with the knife. (.Picture of the knife on top of the
column. I then took a picture at mid span of the beam that has a bad notch. We
are also concerned about the advanced condition of deterioration of this house.
There are many books, which far exceed the minimum load capacity per the
Massachusetts State Building Code even if the house were in good condition, as
books exceed by far the loads given by the Code. (See pictures with books).
2
As we walked on the floor, we noticed some substantial movement of the floor.
This is an indication of poor reinforcement in the basement.
• As we looked at the structure above the kitchen, we became concerned by the fact
again that the roof is not properly designed, as it does not appear to be properly
designed against the lateral spreading and the chimney is in very bad condition. It
has been parged. Most likely, this is an indication the bricks were improper and
someone parged the bricks instead of repairing them, which would have been the
proper solution.
As we proceeded to the bathroom, we noticed some badly damaged members.
Although the members are damaged, it is difficult at this time to determine whether
they are in hazardous condition because,they were used from other structures and
at this time the load they are supporting is much less. Unfortunately, the beam
between the kitchen and the dining room in our professional opinion is badly
underdesigned, although it is a very large beam. It has some large check marks
and supports a substantial amount of load.
As we discussed the solution and your idea of introducing a post under the large
beam, this would be the least expensive way to resolve the problem. Unfortunately,
the long joists of approximately 3 x 3 taking into consideration they have cuts on
them need to be reinforced. One may think of introducing small steel plates, which
may be '/4" x 3" at the bottom painted in black, which could be screwed up,
reinforcing the joists would still be of an acceptable cosmetic value.
We then proceeded to the basement. Upon reaching the basement at the base of
the stairs, we noticed the header above. the stairs is very .improper and also
appears to be improperly supported. The decorative columns on each side do not
appear to have proper footings and the plate above is improper. See picture. We
looked at the beam supporting the roof on the top. We also noticed the support of
the joists in the back is extremely improper, as one could see several details where
the joists are supported by small pieces of wood. We also noticed many of the
joists indicate some insect or rot damage.
We looked at the beam located under the dining room table and observed some
large cracks in the vicinity of V. See picture with the knife in the crack.
As we walked along, we noticed the need for very deep repointing in all the
masonry and a substantial amount of brick repair in the brickwork under the
chimney. Under the arched chimney, there is a portion of the wall that is in very
bad condition where a substantial amount of rebuilding will be needed. See picture.
This will be all around the small crawlspace in the back of the chimney. It is also j
important the structure be properly exposed throughout, as the wood structure of
the floor above is extremely questionable and will need to be properly assessed
and reinforced. In particular, a substantial amount of joist hangers and beam
hangers will be necessary; and many of the joists and beams will need to be
reinforced. There is much moisture in the basement and this moisture will need to
. 3
r
• w
be controlled. The base of the wall in the crawlspace has been undermined and
the masonry in places is very improperly supported and will need to be
underpinned. It is important to understand the foundation should be a minimum of
4' below grade and not less than 1'6" below the lower basement floor per the
Massachusetts State Building Code.
At this time, this has not been respected and partial underpinning will be necessary.
One could see that some deep repointing has been used in the past to palliate with
these problems, but the.underpinning was never done.
As we looked at the left side of the chimney, there is wood corbel supporting some
beams. The left beam has failed and this is a very concerning situation, which
needs to be addressed. I took two pictures of the corbel — one on the left and one
on the right where both beams were improperly supported. The right connection of
the beam has a knife in it.
Some of the stones are also completely loose. Note that in the other chimney, the
stones are also completely missing. See picture. It is important that the joists
supported on the sill plate be connected with clip angles in order to brace the wall
laterally.
As mentioned above, repointing will be necessary and this must include the existing
repointing was improperly done.
We looked at the .other side, which would be the front part of the basement, and
noticed again that the header above the chimney is in bad condition. The chimney
will need substantial work, as there are some gaps that will need.to be filled solid,
as one could see the beam with the pipe having almost no capacity.
We proceeded to the basement room under the room where all the books are
located. We noticed one of the major girders and the main girder is very badly
damaged by insects, as one could see in the picture. This floor will need to be
substantially reinforced, as it definitely does not have the capacity to support the
load of the books above, which far exceeds the live load usually called for in the
Massachusetts State Building Code. (Even without books, this room's floor would
need reinforcing).
The corbel with a piece of 1 x 2 on top is definitely improper to support the weight of
the beam. There again the chimney will need some very deep repointing and all
the gaps will need to be filled. The floor structure will need to be reinforced to take
the load of the books, which most likely should be up to 175 pounds per square
foot.
We recommend you carefully check the sill plates on the exterior, as they indicate
signs of distress. The columns are not properly connected. It is important that in
order to repair the beam of the second floor, much care must be given to respect
the headroom, which is relatively low.
4
0
As we looked at the foundation, we noticed the house or the stones have moved
laterally probably caused by frost at the front right corner. The stones that have
moved will have to be reset with proper mortar. We recommend you dig down at
least a couple of feet around the perimeter to take care of all gaps and holes found
around the perimeter. It is also important that the siding overlaps the foundation
wall, as the ledge at the top of the masonry wall promotes access to the base of the
wall by water, which creates rot. The wood needs to be kept below maximum
moisture of 19% at all times, so we strongly recommend you create this detail of
overlapping. There are also some cracks in the CMU wall, which will need to be
addressed. It is to be verified you have a 4' minimum deep footing underneath as
mentioned above resting on good undisturbed bearing soil, as this appeared to be
the reason for the settlement and the cracks we observed. The heavy masonry on
the left of the hatch in the back will need'to be partially rebuilt. See pictures. The
back right comer of the house needs to be partially rebuilt and there is also some
rot.
Several areas of the house are in imminent danger of collapse, and professional
shoring must be introduced to prevent an accident from occurring.
In light of the above observations, it is our professional recommendation that a full
structural investigation be conducted to reinforce and to repair the structures of this
building. We recommend, as required by the Massachusetts State Building Code,
that structural plans be drawn indicating the structures as they existed at the time of
the investigation including all new reinforcements necessary to bring the structures
up to Code. Such plans would be useful in that:
• They would allow necessary permits to be obtained for the repair work.
• They would provide a good way to estimate the work to be executed.
• They would document the executed work for future reference, such as an
event of later alterations to the building.
It is also important that the structural engineer visit the site during construction to
verify its compliance with the plans and structural recommendations.
This report addresses only those structural problems observed during the
walk-through and documented above. Since few structures were exposed during
the visit, other structural problems may be concealed behind .finishes, plaster
ceilings, and walls. We did not implement computations and do not claim that the
observed structural members are of the proper size and properly transmit the load
from floor to floor.
The structural engineer is not responsible for determining the existence of insect
infestation and waterproofing.
5
This report and analysis is based upon observations of the visible and apparent
condition of the building and its major components on the date of this inspection.
u Although care was taken to perform a proper and thorough inspection, we make no
" representation regarding the existence of latent or concealed defects. No warranty
or guarantee is expressed or implied with any structure. We do not take
responsibility for the capacity of stairs, banisters, and handrails. This report is
made only in the best exercise of our ability and judgment.
Conclusions in this report are based on the normal working life of various structural
items. Predictions of life expectancy and the balance of useful life are not
necessarily based on industry and/or statistical comparisons. It is essential to
understand that actual working conditions can alter the useful life of any item.
Previous use or misuse, irregular maintenance, faulty manufacture, unfavorable
conditions, unforeseen circumstances and acts of God can make it impossible to
state precisely when a specific item would require replacement. The client should
be aware that certain components at the referenced property may have functioned
normally at the time of the inspection, but due to their nature may have deteriorated
rapidly without notice.
Time spent in legal or insurance related items or subpoenas for fact-findings sent
by the other party (parties), if needed, will be billed on an hourly basis and charged
to you.
All repairs recommended herein require design and supervision from a- structural
engineer. Our office specializes in structural repair and can be contracted for
further investigations and the preparation of structural plans.
If you disagree with any issues pertaining to this report, please contact our office
and send us a marked-up copy with your comments.
Should you have any questions, please feel free to contact me.
Ve
a
R A rincipal
R SOCIATES, INC.
RM/jp
6
RENE MUGNIER ASSOCIATES, INC.
STRUCTURAL ENGINEERS
777 CONCORD AVE.,SUITE 201 CAMBRIDGE,MA 02138-1053 PHONE(617)547-7773 FAX(617)547-7743
April 9, 2008
Mr. Edward McQueeney
Old House Restoration, Inc.
178 Main Street
West Newbury, MA 01985
RE: 1070 Salem Street, North Andover
Dear Mr. McQueeney;
This letter is to certify that we inspected and observed the structural work that took
place at the above-mentioned address on April 8, 2008.
It became our professional opinion that the structural work has been completed
according to our plan as well as the additional recommendations'made by this
office during the progress of the work due to the existing conditions.
To the best of our observations and qualifications, the structural work has been
completed in accordance with the Massachusetts State Building Code and the rules
of good construction.
ve
E
0
6NI
` P , Principal
ASSOCIATES, INC.
RM/jp
- . RT4 :Rn sin Rn JdH
ENE MUGNIER ASSOCIATES, INC.
'STRUCTURAL ENGINEERS
`777 CONCORD AVE.,SUITE 201 CAMBRIDGE,MA 02138-1053 PHONE(617)547-7773 FAX(617)547-7743
October 5, 2007
Mr. Edward McQueeney
Old House Restoration, Inc.
178 Main Street
West Newbury, MA 01985
RE: 1070 Salem Street, Andover
Dear Mr. McQueeney:
This report documents our observations made on September 28, 2007, during our
visit to the referenced address.
This report is based on our observations, qualifications, and information provided to
us during this visit. It does not claim-to be an itemization of all structural problems,
and is intended only to provide the client with a general idea of the structural
problems observed during the walk-through inspection.
For the purposes of clarity and orientation, the left, right, front, and back relate to
the observation of the building from the street looking at the front of the building.
Some pictures appear less dramatic than the description. They often do not reflect
the importance of the damages but must be used for location. We recommend that
the report be read while visiting the site with the pictures taken during our site visit
to better understand the conditions. See pictures#1 through 25.
OBSERVATIONS AND RECOMMENDATIONS
The purpose of this visit was the finding that much of the concealed structure on the
exterior walls of the building has been found to be in a very advanced degree of
deterioration and disrepair.
We started to look at the back wall of the building and noticed that this wall is in an
extreme advanced dangerous condition of deterioration. We noticed that you
started to shore the wall, as this is a necessary precaution. It is our professional
opinion that the wall will need to be completely rebuilt. However, prior to this, any
portion of the floor will need to be properly shored. You already began to shore the
second floor beam, which was found to be substantially damaged at a reduced
section where it is supported on the wall, as it has been substantially notched.
Note that at this support the beam will need to be supported on a bracket and
1
One solution would be to create some steel angles introduced at the base on each
side transferring the force to the floor from the rafters. This is the most expensive
solution but it would protect the headroom of the attic. This solution- should be
` coupled with the reinforcement of the floor, as this floor is improperly framed and
does not have the capacity to support any appreciable load.
If you do not care about the use of the attic, the least expensive solution would
consist of introducing some wood ties, which could be made of 2 x 8's bolted with
5/8" bolts at each end. This would transfer the load laterally. All sizes of members
or bolts are for pricing only.
We then noticed on the second floor that the attic had substantially deflected, as
one could see in the pictures and we recommend the beam be reinforced, as it
supports only the ceiling load.
This concern may also be addressed by introducing some verticals in the attic
between the beam and the roof rafters to cut the span of the beam in two. This
post must transfer its load all the way down to the proper footings.
We then proceeded to look at the first floor where we noticed a substantial amount
of rot in several'areas, such as the one depicted in our pictures.
Some connections are very improper and need to be addressed, possibly by the
introduction of clip angles. Some of the joists have badly rotted and will need to be
reinforced. See pictures.
As we looked at the framing of the beam located between the living room and the
kitchen/dining room, this beam has badly deteriorated and will need substantial
reinforcement, as it is very long, improperly supported, and badly damaged at mid
span. One could see some very bad.cracking and the collapse of the top part of
the beam has a bad hole in it. Several joists are badly underdesigned such as a
joist, which is supporting the light above the dining room table.
As we reached the corridor at the area of the entrance to the kitchen/dining room,
we noticed the support of the beam is in an advanced condition of deterioration.
We recommend this be shored, as at this time, this situation is very improper. See
picture with the beam supported by a column badly deteriorated with a little piece of
1 x 4 horizontally on the right on the flat. Many of these beams are badly
deteriorated and this would be the case for the beam located between the living
room and the corridor. See picture with the knife. (Picture of the knife on top of the
. I then took a picture at mid span of the beam that has a bad notch. We
column p p
are also concerned about the advanced condition of deterioration of this house.
There are many books, which far exceed the minimum load capacity per the
Massachusetts State Building Code even if the house were in good condition, as
books exceed by far the loads given by the Code. (See pictures with books).
2
As we walked on the floor, we noticed some substantial movement of the floor.
This is an indication of poor reinforcement in the basement.
As we looked at the structure above the kitchen, we became concerned by the fact
again that the roof is not properly designed, as it does not appear to be properly
designed against the lateral spreading and the chimney is in very bad condition. It
has been parged. Most likely, this is an indication the bricks were improper and
someone parged the bricks instead of repairing them, which would have been the
proper solution.
As we proceeded to the bathroom, we noticed some badly damaged members.
Although the members are damaged, it is difficult at this time to determine whether
they are in hazardous condition because they were used from other structures and
at this time the load they are supporting is much less. Unfortunately, the beam
between the kitchen and the dining room in our professional opinion is badly
underdesigned, although it is a very large beam. It has some large check marks
and supports a substantial amount of load.
As we discussed the solution and your "idea of introducing a post under the large
beam, this would be the least expensive way to resolve the problem. Unfortunately,
the long joists of approximately 3 x 3 taking into consideration they have cuts. on
them need to be reinforced. One may think of introducing small steel plates, which
may be %" x 3" at the bottom painted in black, which could be screwed up,
reinforcing the joists would still be of an acceptable cosmetic value.
We then proceeded to the basement. Upon reaching the basement at the base of
the stairs, we noticed the header above. the stairs is very .improper and also
appears to be improperly supported. The decorative columns on each side do not
appear to have proper footings and the plate above is improper. See picture. We
looked at the beam supporting the roof on the top. We also noticed the support of
the joists in the back is extremely improper, as one could see several details where
the joists are supported by small pieces of wood. We also noticed many of the
joists indicate some insect or rot damage.
We looked at the beam located under the dining room table and observed some
large cracks in the vicinity of 3/". See picture with'the knife in the crack.
As we walked along, we noticed the need for very deep repointing in all the
masonry and a substantial amount of brick repair in the brickwork under the
chimney. Under the arched chimney, there is a portion of the wall that is in very
bad condition where a substantial amount of rebuilding will be needed. See picture.
This will be all around the small crawlspace in the back of the chimney. It is also
important the structure be properly exposed throughout, as the wood structure of
the floor above is extremely questionable and will need to be properly assessed
and reinforced. In particular, a substantial amount of joist hangers and beam
hangers will be necessary; and many of the joists and beams will need to be
reinforced. There is much moisture in the basement and this moisture will need to
3
be controlled. The base of the wall in the crawlspace has been undermined and
the masonry in places is very improperly supported and will need to be
underpinned. It is important to understand the foundation should be a minimum of
4' below grade and not less than 1'6" below the lower basement floor per the
Massachusetts State Building Code.
At this time, this has not been respected and partial underpinning will be necessary.
One could see that some deep repointing has been used in the past to palliate with
these problems, but the.underpinning was never done.
As we looked at the left side of the chimney, there is wood corbel supporting some
beams. The left beam has failed a concerningd this is a very on the left and one
needs to be addressed. I took two pictures of the corbel one
on the right where both beams were improperly supported. The right connection of
the beam has a knife in it.
Some of the stones are also completely loose. Note that in the other chimney, the
stones are also completely missing. See picture. It is important that the joists
supported on the sill plate be connected with clip angles in order to brace the wall
laterally.
As mentioned above, repointing will be necessary and this must include the existing
improperly done.
was im ro
repointing P P
We looked at the .other side, which would be the front part of the basement, and
noticed again that the header above the chimney is in bad condition. The chimney
will need substantial work, as there are some gaps that will need to be filled solid,
as one could see the beam with the pipe having almost no capacity.
We proceeded to the basement room under the room where all the
books are
located. We noticed one of the major girders and the main girder is very badly
damaged by insects, as one could see in the picture. This floor will need to be
substantially reinforced, as it definitely does not have the capacity to support the
load of the books above, which far exceeds the live load usually called for in the
Massachusetts State Building Code. (Even without books, this room's floor would
need reinforcing).
The corbel with a piece of 1 x 2 on top is definitely improper to support the weight of
the beam. There again the chimney will need some very deep repointing and all
the gaps will need to be filled. The floor structure
will need
reinforced
per square
the load of the books, which most likely should be up to 175 pounds
foot.
We recommend you carefully check the sill plates on the exterior, as they indicate
signs of distress. The columns are not properly connected. It is important that in
order to repair the beam of the second floor, much care must be given to respect
the headroom,which is relatively low.
4
i
A's we looked at the foundation, we noticed the house or the stones have moved
lateral) probably caused b frost at the front right comer. The stones that have
laterally Y Y
moved will have to be reset with proper mortar. We recommend you dig down at
least a couple of feet around the perimeter to take care of all gaps and holes found
around the perimeter. It is also important that the siding overlaps the foundation
wall, as the ledge at the top of the masonry wall promotes access to the base of the
wall by water, which creates rot. The wood needs to be kept below maximum
moisture of 19% at all times, so we strongly recommend you create this detail of
overlapping. There are also some cracks in the CMU wall, which will need to be
addressed. It is to be verified you have a 4' minimum deep footing underneath as
mentioned above resting on good undisturbed bearing soil, as this appeared to be
the reason for the settlement and the cracks we observed. The heavy masonry on
the left of the hatch in the back will need to be partially rebuilt. See pictures. The
back right comer of the house needs to be partially rebuilt and there is also some
rot.
Several areas of the house are in imminent danger of collapse, and professional
shoring must be introduced to prevent an,accident from occurring.
In light of the above observations, it is our professional recommendation that a full
conducted to
reinforce and to repair the structures of this
structural investigation be p
building. We recommend, as required by the Massachusetts State Building Code,
that structural plans be drawn indicating the structures as they existed at the time of
the investigation including all new reinforcements necessary to bring the structures
up to Code. Such plans would be useful in that:
They would allow necessary permits to be obtained for the repair work.
They would provide a good way to estimate the work to be executed.
They would document the executed work for future reference, such as an
event of later alterations to the building.
It is also important that the structural engineer visit the site during construction to
verify its compliance with the plans and structural recommendations.
This report addresses only those structural problems observed during the
walk-through and documented above. Since few structures were exposed during
the visit, other structural problems may be concealed behind finishes, plaster
ceilings, and walls. We did not implement computations and do not claim that the
observed structural members are of the proper size and properly transmit the load
from floor to floor.
The structural engineer is not responsible for determining the existence of insect
infestation and waterproofing.
5
I
This report and analysis is based upon observations of the visible and apparent
condition of the building and its major components on the date of this inspection.
Although care was taken to perform a proper and thorough inspection, we make no
representation regarding the existence of latent or concealed defects. No warranty
or guarantee is expressed or implied with any structure. We do not take
responsibility for the capacity of stairs, banisters, and handrails_ This report is
made only in the best exercise of our ability and judgment.
Conclusions in this report are based on the normal working life of various structural
items. Predictions of life expectancy and the balance of useful life are not
necessarily based on industry and/or statistical comparisons. It is essential to
understand that actual working conditions can alter the useful life of any item.
Previous use or misuse, irregular maintenance, faulty manufacture, unfavorable
conditions, unforeseen circumstances and acts of God can make it impossible to
state precisely when a specific item would require replacement. The client should
be aware that certain components at the referenced property may have functioned
normally at the time of the inspection, but due to their nature may have deteriorated
rapidly without notice.
Time spent in legal or insurance related items or subpoenas for fact-findings sent
by the other party (parties), if needed, will be billed on an hourly basis and charged
to you.
All repairs recommended herein require design and supervision from a structural
engineer. Our office specializes in structural repair and can be contracted for
further investigations and the preparation of structural plans.
If you disagree with any issues pertaining to-this report, please contact our office
and send us a marked-up copy with your comments.
Should you have any questions, please feel free to contact me.
A.
Ve
NE
a
R 'ni rincipal
R SOCIATES, INC.
IOMA4 .
RMrJp
RENE MUGNIER ASSOCIATES, INC.
STRUCTURAL ENGINEERS
777 GONCORD AVE.,SUITE 201 CAMBRIDGE,MA 02138-1053 PHONE(617)547-7773 FAX(617)547.7743
November 6, 2007 C"
Mr. Edward McQueeney
McQueeney Associates
178 Main Street
West Newbury, MA 01985
RE: 1070 Salem Street, Andover
Dear Mr. McQueeney:
This report documents our observations made on October 30, 2007, during our visit
to the referenced address.
This report is based on our observations, qualifications, and information provided to
Cis during this visit. It does not claim to be an itemization of all structural problems,
and is intended only to provide the client with a general idea of the structural
problems observed during the walk-through inspection.
For the purposes of clarity and orientation, the left, right, front, and back relate to
the observation of the building from the street looking at the front of the building.
Some pictures appear less dramatic than the description. They often do not reflect
the importance of the damages but must be used for location. We recommend that
the report be read while visiting the site with the pictures taken during our site visit
to better understand the conditions. See pictures #1 through 7.
OBSERVATIONS AND RECOMMENDATIONS
The purpose of this visit was to observe some conditions, which became
concerning during the demolition, particularly when you found that the slab at the
edge was improperly supported. See pictures #3 and 4. You had introduced a new
footing located 12' from the edge. See picture #3.
We indicated to you that you could use two 2 x 12LVL's to span between the
footing and the exterior wall. Columns will need to be introduced, probably not less
than 4 x 6. Note that the 2-2 x 12LVL can be stacked on top of each other glued
and screwed to the studs.
At the edge of the slab between this slab and the slab of the main room, we
recommend that you introduce a 6" slab doweled into the other slab supported on
1
top of all the foundation walls. No. 4 at 16" on center could be introduced in both
directions to create a structural slab. This slab could be erected on top of the
existing fill and therefore you do not need to get rid of the fill, which will be used
only as a form for the new slab. Once the slab has cured, it will become a structural
slab.
The column shown in picture#2 can be removed.
We also observed the framing on the right side under the second floor and found it
proper for the support of the floor.
Conclusions in this report are based on the normal working life of various structural
items. Predictions of life expectancy and the balance of useful life are not
necessarily based on industry and/or statistical comparisons. It is essential to
understand that actual working conditions can alter the useful life of any item.
Previous use or misuse, irregular maintenance, faulty manufacture, unfavorable
conditions, unforeseen circumstances and acts of God can make it impossible to
state precisely when a specific item would require replacement. The client should
be aware that certain components at the referenced property may have functioned
normally at the time of the inspection, but due to their nature may have deteriorated
rapidly without notice.
If you disagree with any issues pertaining to this report, please contact our office
and send us a marked-up copy with your.comments.
Should you have any questions, please feel free to contact me.
Please contact me by phone, fax, or letter. If you would like to send an email,
please contact our secretary.
Ve. }�
o�� y
ME
NNE
X24
Principal
R �oNAL SSOCIATES, INC.
RM/jp
2
h In
5� A
1070 Salem Street, Andover 1 October 30, 2007 2
tip
® `..
-4t� � -^,tea ��- r.,� � ;.:' c.7
• _,� — � �. �, ..: �� ��� .l F � �a .,;fir. �.,,
3 4
n
v v
4 4 `
iF f+Y rt
5 6
�:. .
a
��
. � � r,
�{'i � �4 `� ..�
c�.
'i � �� �
� '
y
��.. �,� �
� '� � ��
,�
�' �`E �,
r� '� � ;:-
9