Loading...
HomeMy WebLinkAboutBuilding Permit #Exception - 11 HAMILTON ROAD 5/1/2018 � a TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit N0: Date Received Date Issued: IMPORTANT: Applicant must complete all items on this page LOCATION Print PROPERTY OWNER Print 100 Year Old Structure yes no i MAP NO: PARCEL: ZONING DISTRICT: Historic District yes no Machine Shop Village yes no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family ❑Addition ❑Two or more family ❑ Industrial ❑Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other ❑ Septic ❑Well ❑ Floodplain ❑Wetlands ❑ Watershed District Water/Sewer DESCRIPTION OF WORK TO BE PERFORMED: Identification Please Type or Print Clearly) OWNER: Name: Phone: Address: CONTRACTOR Name: Phone: Address: Supervisor's Construction License: Exp. Date: Home Improvement License: Exp. Date: ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ FEE: $ Check No.: Receipt No.: NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund Signature of Agent%Owrer Signature of contractor Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Starred Flans El { Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE_OF SEWERAGE.DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑. . Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes- .- Planning es -Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature& Date Driveway Permit DPW Towi� ]Engineer: Signature: Located 384 Osgood Street FIRE DEPe4RTMENT' -Temp Dumpster on site yes no Located at 124 Main`Street Fire Departinerit,signature/date COMMENTS ,� Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions._ Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$10041000 fine NOTES and DATA— (For department use ® Notified for pickup - Date f � Doe.Building Permit Revised 2010 Building Department The fol awing is a list of the required forms to be filled out for the appropriate.permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy. Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (if Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application o Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the app.,al period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc: Doc.Building Permit Revised 2012 Location I'► Date--� � • • TOWN OF NORTH ANDOVER e - . * Certificate of Occupancy Building/Frame Permit Fee Foundation Permit Fee Other Permit Fee $ TOTAL $ Check# /7— 26413 Building Inspector Enter construction cost for fee cal- North Andover Fee Calculation Construction Cost 28,649.00 m $ - $ 343.79 Plumbing Fee $ 42.97 Gas Fee 100 comm. $ 100.00 Electrical Fee $ 42.97 Total fees collected $ 529.74 11 Hamilton Road 784-13 on 5/16/2013 Convert Attic into Bedroom The Official Website of the Office of Consumer Affairs&Business Regulation(OCABR) Consumer Affairs and Business Regulation Home Consumer Home Improvement Contracting J.xu I HIC Registration Complaints t Registration . . - 126125 Home# Improvement Contractor Registration Home Page Registrant Name RICPARD FIORENZA Address 167 WASHINGTON ST. City, State B Zip _ _OXFORD,INA 01921 - Expiration 04/22/2014 Date Complaints Details No complaints found for this registrant. `Massachusetty s Department Qf Public Safety Board of Building Regulations and Standards Construction Supervisor License: CS-067249 O RICHARD A FIOR-kNZA--- 167 WASHINGTON ST Massachusetts. BOXFORD MA 61921 ` 41 /1� „ ,ai"• Expiration 05/20/2014 Commissioner r fae;a�aasaapun _ :;, OL810 b'W'Zi3nO0Nd f�E •r 14 3N dl MI 5 13 MWHOW c- 5 V_ ZN3b013 0 ON 1 lenP1A1pu1 ZI.OZ/ZZ/t,P .uo1;eJ1dx3 :odA.L 9Z69ZLa :u01;e1;s168M UMO` ULNO01NaMAO MI 3WOH uopgn3a-d ssauls g ip saie33d nwnsuo0 3o aa!330 NORTH own Of z t 6Andover No. h ver, Mass, COCMIC"t WIC« �• A0RC S u { BOARD OF HEALTH Food/Kitchen PERM -IT, T LD Septic System s THIS CERTIFIES THAT .anr4ok%...... BUILDING INSPECTOR i 11 (f ... Foundation has permission to erect ....... buildings on . Q. . .:.....`.... ..................................... ............. T .... .... J.C;( g Rou h to be occupied as ........0.0A�.................... ...... ................................................'F�' ®..... Chimney provided that the person accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTINST TS Rough Service ........... ..... .................................................... Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Reguired to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. SEE REVERSE SIDE i HOME ADDITION CONTRACT FOR HOPKINS RESIDENCE 11 HAMILTON ROAD NORTH ANDOVER,MA 01845 This agreement is made on THURSDAY,MAY 16, 2013 by and between RICHARD A. FIORENZA 167 WASHINGTON ST, BOXFORD,MA 0 192 1.Mass. Home Improvement License number 126125 and Mass.Unrestricted Supervisor License number C867249 (hereinafter"Contractor") and DARREN&FELICIA HOPKINS 11 HAMILTON RD, NORTH ANDOVER,MA 01845 (hereinafter "Homeowner"). WITNESSETH: The Homeowner does hereby employ the Contractor to provide the labor,tools,machinery, materials and supervision necessary for the construction of a HOME ADDITION located at 11 HAMILTON RD,NORTH ANDOVER,MA 01845 and based on architectural drawings supplied to this contractor by W.A. HURLEY AND ASSOCIATES dated March 29, 2013 for the amount detailed in the breakdown below. THE WORK TO BE PERFORMED BY THE CONTRACTOR WILL CONSIST OF: PERMIT COST 1000 DEMOLITION AND TRASH DISPOSAL-Removal of concrete section in basement for new footings,demolition of partial ceiling, (2)wall areas and a doorway 1St floor, removal of roof and structural framing 3200 CONSTRUCTION-Installation of new concrete footings,new support columns in basement,installation of new LVL beam 1"floor,installation of new LVL beam support framing, frame new dormer,walls and roof line,frame new interior walls for addition,reframe exterior wall for new window installation of(2)new windows,installation of new exterior siding and trim in new dormer and installation of roof shingles to match existing 6260 PLUMBING/HVAC-Installation of new baseboard heat to addition, splice off existing upstairs heat zone to operate addition heat through 2nd floor thermostat 1280 ELECTRICAL-Installation of new electrical outlets to code throughout new space installation of(4) new lights in addition with separate switches and installation of new fire alarm hard wired to existing system 1460 INSULATION-Install new fiberglass insulation throughout new addition 1160 BLUE BOARD AND PLASTER-Installation of blue board in the addition, 1"floor ceiling and opened walls for new framing.Plaster applied to blue board installed 2240 INTERIOR TRIM PACKAGE-Installation of new casing,window stool and apron to new windows to match existing,installation of baseboard to match existing, fabricate and install (3)new access panels in new addition,reinstall crown moldings first floor and furnish and install(3)custom bookshelves for storage in new addition 940 PAINTING-Painting of walls,ceiling and trim in new addition per Homeowners specifications,painting of ceilings and crown moldings 1St floor room per Homeowners specifications 1840 CARPETING-Installation of new carpet and pad in new addition per Homeowners specifications 1200 ALL MATERIALS COSTS 8069 TOTAL CONTRACT AMOUNT- $28, 649 HOMEOWNER/CONTRACTOR CONTACT INFORMATION: Homeowner: Darren&Felicia Hopkins 11 Hamilton Road North Andover, MA 01845 978 688 0867 Contractor: Richard A. Fiorenza 167 Washington Street Boxford, MA 01921 978 764 4388 CHANGE ORDERS: The Homeowner has the right to make changes to the project after the contract is signed. The Contractor agrees not to make any changes in the schedule of work,design or specifications outlined in the provided architectural drawings without written authorization or confirmation email by the Homeowner(Change Order)and the Contractor. Any changes requested will also require a written estimate or confirmation email of additional costs provided by the Contractor with written authorization or confirmation email by the Homeowner. WORK PERFORMANCE AND MISC NOTES: • The Contractor shall not substitute any materials without written consent of Homeowner. • The Contractor shall complete all work in a timely manner,time being of the essence of this contract. Project time frame 3-4 weeks.Payment schedule will be broken into 5 drawers,with 1"drawer due upon issuance of permit and balance due upon completion. All checks made payable to Richard Fiorenza. 0 The Contractor shall carry Workman's Compensation insurance with the limits of $500.000 and shall provide certificate of proof to the North Andover Building Department as required by the North Andover Building Department upon filing of permit application. • The Contractor shall protect all work adjacent to the Contract site from any damage resulting from the work of the Contractor. Homeowner is expected to remove all personal belongings and breakables from the Contract site prior to project start. • The Contractor shall replace and put in good condition any existing conditions damaged in carrying out the contract. • The Contractor shall take all precautions to protect persons from injury and unnecessary interference or inconvenience. • The Contractor shall conduct his activities in a businesslike manner and adhere to the reasonable wishes of the Homeowner in relation to his working schedule. CONDITION OF PREMISES: • The Contractor agrees to keep the premises clean and orderly and to remove all debris as needed during the hours of work in order to maintain work conditions which do not cause health or safety hazards. • The Homeowner shall have the right to inspect all work performed under this contract. • The Contractor is responsible for all inspections required by the Town of North Andover • Building Dept. at each necessary stage before further construction can continue. PAYMENT&WORK SCHEDULE: • Project start date and schedule to be determined once permit is obtained TBD • 1"Drawer due once permit is obtained 8000 • 2nd Drawer 5000 • 3rd Drawer 5000 • 4t"Drawer 7784 0 10%Retainage/Balance due when project is 100° complete 2865 • Payments for work completed shall be disbursed as billed by Contractor via email. SIGNATURES: In witness of their agreement to the terms above,the Contractor and Homeowner hereby affix their signatures: Contractor/Richard A.Fiorenz Date Homeowner/Darren T. Hopkins Date r41 Homeown r/Felicia s Date