Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Building Permit #928-15 - 11 MARGATE STREET 5/15/2015
Location No. U Date W/5 . - TOWN OF NORTH ANDOVER a A2 Certificate of Occupancy $ ...,.. - Building/Frame Permit Fees Foundation Permit Fee $ � Other Permit Fee $ TOTAL $ " Check# 28780' Building Inspector a r.+ ais TOMIN OF NORTH ANDOVER Of NORT}�1 APPLICATION FOR PLAN EXAMINATION *�°'_ do F p Permit NO: Date Received t-A S$/1CNUS Date Issued: IMPORTANT:Applicant must complete all items on this page LOCATION /� �� � EDA'� _ PROPERTY OWNER 0,4ROZIyG�Print l4,4/ZO U&,q N l rs Print MAP NO.: O ,52 PARCEL: 61 ZONING DISTRICT: TYPE AND USE OF BUILDING HISTORIC DISTRICT YES ❑ TYPE OF IMPROVEMENT PROPOSED USE Resi ntial Non-Residential ❑New Building One family ❑Addition ❑Two or more family ❑Industrial Alteration No. of units: ❑Repair,replacement ❑Assessory Bldg ❑Commercial ❑Demolition ❑Moving relocation ❑Other ❑ Others: ❑Foundation only DESCRIPTION OF WORK TO BE PREFORMED &7 k olLIf Identification APllease Type or Print Clearly) �-/& OWNER: Name: �i4-J20 i+�- A�/i4 T t3t.��2i`?i Phone: 179- 909-b&g3 y Address: <l RIK 64ke Z�, CONTRACTOR Name: f ���72 1�ug Phone: 603o?✓?,fr9/60 Address: /� h y►/o G(.IL9 c /�9'�S�h� �(! Supervisor's Construction License: Exp. Date: Home Improvement License: Exp. Date: ARCHITECT/ENGINEER Name: Phone: Address: Reg. No. FEE SCHEDULE.BULDING PERMIT $�1 AVER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON,125.00 PER S.F. Total Project Cost :$ x 12.00=FEE:$ f Check No.: Receipt No.: Page lof 4 F BUILDING PERMIT 01 No Dr f1 ,�� TOWN OF NORTH ANDOVER 0 API-LIC A`FION FOR PLAN EXAMINATION _ Permit No#: Date Received �SsarEO cHus���� Date Issued: IMPORTANT:Applicant must complete all items on this page LOCATION Print PROPERTY OWNER Print 100 Year Structure yes no MAP PARCEL: ZONING DISTRICT: Historic District yes no Machine Shop Village yes. no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family ❑Addition ❑Two or more family ❑ Industrial ❑Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other c W eptic 121/11e11 Flo©d�Inl s®Wetlands' a gV�/,� ,ate rshed ist ict _ U1/ater/Sewer L. R .� DESCRIPTION OF WORK TO BE PERFORMED: Identification- Please Type or Print Clearly OWNER: Name: Phone: Address: Contractor Name: Phone: Email: Address: Supervisor's Construction License: Exp. Date: Home Improvement License: Exp. Date: ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE:BULDING PERMIT:$92.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ FEE: $ Check No.: Receipt No.: NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund - e . = b .-c :. R n�. .5 � e ...._..�...__�-._-.1`2 r G' P g•p [ F g ! _ Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits Building Permit Application Workers Comp Affidavit Photo Copy Of H.I.C. And/Or C.S.L. Licenses Copy of Contract 4F Floor Plan Or Proposed Interior Work Engineering Affidavits for Engineered products OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks Building Permit Application Certified Surveyed Plot Plan Workers Comp Affidavit Photo Copy of H.I.C. And C.S.L. Licenses Copy Of Contract Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) Mass check Energy Compliance Report (If Applicable) Engineering Affidavits for Engineered products ISIOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) Building Permit Application Certified Proposed Plot Plan Photo of H.I.C. And C.S.L. Licenses Workers Comp Affidavit Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) Copy of Contract 2012 IECC Energy code Engineering Affidavits for Engineered products OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doe:Building Permit Revised 2014 Plans Submitted [Z- " Plans Waived ❑ Certified Plot Plan F1, Stamped Plans ❑ r_ TYPE OF SEWERAGE DISPOSAL, Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Permanent Dumpster on.Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF m U FORM PLANNING DEVELOPMENT Reviewed On Signature_ COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature COMMENTS 0 Zoning Board of Appeals:Variance, Petition No: Zoning Decision/receipt submitted yes PI'anning Board Decision: Comments Conservation Decision: Comments Water& Sewer Connection/Signature& Date Driveway Permit I DPW Town Engineer: Signature: Located 384 Osgood Street „k ,.A Ii'►,'V'+ LQ "}"`C;""Tt,+i �Y". 77 F�1�RE DEPARIVIEPIT Ternp Dumps teraoriisite ,yesd EtLocated at 1�2�4 air Street" ov ' A" f � y . •r { i } x. Fire Department sign � �� 'C.®MMENT'S � fz. 77tr :..� ' t r Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$10o-$1000 fine NOTES and DATA— (For department ease) s ort. � rM fi d, ( 4-V � I 4 ' ❑ Notified for pickup Call Email Date Time Contact Name 3 Doc.Bnilding Pennit Revised 2014 TYPE OF SEWERAGE DISPOSAL Swimmin Pools ❑ F1Tanning/MassageBody Art ❑ g Public Sewer Well 11Tobacco Sales ❑ Food Packaging/Sales El❑ ❑ Permanent Dumpster on Site Private(septic tank,etc. Electric Meter location to proj ect NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund fL� -r� Signature of Agent/Owner �� Signature of contractor a94�� Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF-U FORM DATE REJECTED DATE APPROVED PLANNING& DEVELOPMENT ❑ ❑ []Water Shed Special Permit ❑ Site Plan Special Permit ❑ Other COMMENTS DATE REJECTED DATE APPROVED CONSERVATION ❑ ❑ COBS DATE REJECTED DATE APPROVED HEALTH ❑ ❑ COMMENTS Zoning Board of Appeals:Variance,Petition No: E Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water&Sewer connection/Signature&Date Driveway Permit Temp Dumpster on site yes—no— Fire Department signature/date Enter construction cost for fee cal - North Andover Fee Calculation Construction Cost $ 50,000.00 m $ - $ 600.00 Plumbing Fee $ 75.00 Gas Fee 100 comm. $ 100.00 Electrical Fee $ 75.00 Total fees collected $ 850.00 11 Margate Road 928-15 on 5/15/15 Finish Basement and 3/4 Bath I I NORTH Town Of E ,, • Andover f No. t - Iti y h ver Mass o . COCNIC Nl WICK 1• is U BOARD OF HEALTH Food/Kitchen PER IT D Septic System THIS CERTIFIES THAT .. ����C...................4. .Z O fAr& I BUILDING INSPECTOR ........... ........ ............... .. .... Foundation has permission to erect ........................ buildings on ....�. ...... ... Qr '�: ... .• g pi ` . � .: .T R�/I... .. Rough t0 be occupied as ....... ..... ..... . . �.... ............................. Chimney provided that the person accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings-in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 N ELECTRICAL INSPECTOR UNLESS CONSTRUC S T Rough Service ............... .. ........ ................................................. Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Buildinz - Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. ' w i Margate 1Andover,Mass Caroline Matzoura�(S �/�//� _ 5/11/15 Final budget CRO Contracting,Plaistow,NH 603-235-8160/cocontracting@hve.com T9-15 charges QAllowances-final selection needed by home owner Section Description Mat'I Labor Other Total 1.00 Design/layout/budget(town fees will be direct billed) $ 0.00 S 22&00 $ 0,00 $225.110 2.00 Permits a.Building $ 0.00 $ 100.00 $ 0.00 $ 100.00 b.Plumbing $ 0.00 $ 50.00 $ 0.00 $ 50.00 c.Electrical $ 0.00 $ 100.00 $ 0.00 $ 100.00 Sub total 2.0 $ 0.00 $250.00 $ 0.00 S 250.00 3.00 Demo a.Basement contents/old flooring/ceiling $ 0.00 $ 250.00 $550.00 $800.00 b.Bathroom(open slab for sewer ejector/trenches-shower/WC) $ 35.00 $ 550.00 $ 125.00 $ 710.00 c.Remove oil tank(pump and disposal) $450.00 $ 450.00 d.Remove old oil burner furnace $350.00 $350.00 Sub total 3.0 $ 35.00 S 800.00 51,475.00 $2,310.00 4.00 Framing a.frame 70 LF exterior wall for insulation R-13 $240.00 $850.00 $ 0.00 $1,090.00 b.Bathroom 8x8 $ 105.00 $450.00 $ 0.00 $555.00 c.Laundry/closet/Bathroom door $405.00 $ 300.00 $ 63.00 $768.00 d Re configure stairs $ 125.00 $ 550.00 $ 0.00 $675.00. e.Re frame 1 st floor closet to gain head roan on stairs $ 25.00 $ 125.00 $ 0.00 $ 150.00 f New windows(Anderson series 70 gliders 3-33x24) $425.00 $575.00 $ 159.00 $1,159.00 g.New ext door walkout(Thermal True/Dbl bore Fan light) $485.00 $ 325.00 $ 21.00 $831.00 h.New interior walk out(SC molded smooth/flat) $ 185.00 $ 100.00 $ 21.00 $306.00 I.Closet-linen with shelving $ 45.00 $ 105.00 $ 0.00 $ 150.00 j.Niche under stairs with book case Subtotal 4.0 $2,040.00 $3,380.00 $264.00 $5,684.00 5.00 Rough electrical a.15 duplex outlets Basement $ 105.00 S 325.00 $ 0.00 $430.00 b.8/5"recessed cans with LED Trims $432.00 $ 712.00 $1,144.00 c.Cable TV jack $ 15.00 $ 35.00 $ 0.00 $ 50.00 d.1-20 AMP home nun bathroom vanity/GFGCI outlet $ 35.00 $ 100.00 $ 12.00 $ 147.00 e.Vanity lights/SW $ 12.00 $ 40.00 $ 25.00 $ 77.00 f.Exhaust fan/light(I 10 CFM-ducted to outside) $ 198.00 $ 185.00 S 0.00 $383.00 g.Sewer ejector $ 50.00 $ 100.00 S 0.00 $ 150.00 Sub total 5.0 $847.00 $1,497.00 S 37.00 $2,381.00 6.00 Rough plumbing _ a.Sewer ejector/vent _ S 440.00 $350.00 $ 0.00 $ 790.00 b.4-PC alcove shower/valve with 2"drain $925.00 $ 550.00 $ 25.00 $1,500.00 c.Vanity waste and water $ 35.00 $220.00 $ 0.00 S 255.00 d.Water closet waste and water(3"flange) $ 75.00 S 290.00 $ 0.00 $365.00 e.Gas piping for furnace and thankless $ 189.00 $450.00 $ 0.00 $639.00 Sub total 6.0 $1,664.00 $1,860.00 $ 25.00 $3,549.00 7.00 Insulation R-13 240C(480 SF) $390.00 $295.00 $ 12.00 $697.00 8.00 Drywall a.Basement(480 SF)4x8x12 reg gyp $380.00 $ 580.00 $ 25.00 $985.00 b.Bathroom(225 SF)4x8x8 MR Gyp $ 145.00 $ 175.00 $ 0.00 $320.00 c.Mud and tape(753 SF) $ 60.00 $ 350.00 $ 0.00 $410.00 Sub total 8.0 $585.00 $1,105.00 S 25.00 51,715.00 9.00 Prime and paint walls 700 SF by others S 0.00 $ 0.00 $ 0.00 $ 0.00 10.00 Flooring a.Basement floor(lament/3MM-float)-600 SF $1,290.00 $1,100.00 $ 75.00 $2,465.00 b.Bathroom floor(70 SF 16x16 porcelain tile) $330.00 $ 350.00 $ 21.00 $701.00 Sub total 10.0 $1,620.00 $1,450.00 S %.00 $3,166.00 11.00 Trim package(IOOLF 5.25 speed basil 100 LF 2.5 colonial PFJ) $398.00 S 175.00 $ 12.00 $585.00 12.00 Bathroom finishes(allowance for vanity/medicine,faucets,shower) a.Shower trim BN kolher Forte $ 138.00 $ 75.00 $ 0.00 $213.00 1 b.Vanity base(anper-+6") $670.00 $ 95.00 $ 0.00 $765.00 c.Vanity top/,', tegral a lute under mount sink $425.00 $ 95.00 $ 0.00 $520.00 d.Lav fiu "wide jead BN Kolher-) $350.00 $ 105.00 $ 0.00 $455.00 e.Water closet(soft close seat-white Kolher-12"RO $290.00 $ 125.00 $ 38.00 $453.00 Sub total 17-0 $1,873.00 S 495.00 S 38.00 $2,406.00 13.00 Suspended ceiling(600 SF)4x2 panel/white rail $1,410.00 $850.00 $ 12.00 $2,272.00 14.00 F __S_nlsh stai irs a.Red oak 10.5x 36 treads/1x8 pine risers S 450.00 $525.00 S 12.00 S 987.00 b.Newel post(hand railing(turned balusters -- -�- - S 190.00 S 350.00 S 0.00 S 540.06 e.Seal treads,post and hand rail $ 42.00 S 125.00 S 0.00 S 167.00 d.Paint risers and balusters _ - S 38.00 S 190.00 S 0.00 S 228.00 Sub total 14.0 $720.001 S1,190.001 S 12 S1,922.00 Total bathroom and basement remodel sli'm.001 S13,572.001 S2,008.001 S27,162.00'i 14.00 New 60,000 BTU Trane gas fired furnacel new feeds appropriately sized Mat'l Labor other Total Includes removing and disposal of all unit Connection to gas meter Need supply sized for each room $6,960.00 $2,440.00 $ 98.00 $9,498.00 Control wiring FHA furnace and one T-Stat $ 21.00 $350.00 $ 0.00 $371.00 Trane 4TX-CCHI EFF cooling coil Trane 2 ton XR 16 compressor(compressor,pad line sets)2399.00/1000.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00, Dedicate circuit/HR with disconnect/control wiring 189.00/390.00 $ 0.00 $ 0.00 $ 0.00 $ 0.001, Sub total 14.0 56,981.00 $2,790.00 $ 98.00 $9,869.00 15.001 New gas main from street(by others-Columbia Gas) $ 0.00 S 0.00 $ 0.00 $ 0.00 16.0030 circuit service panel 150 AMP(arc fault circuit as per code) $ 659.00 $375.00 $ 0.00 $1,034.00 17.001 Tank less water heater-(NavienNPE-2405-NG) $1,434.001 $835.001 $ 75.001 $2,344.00 18.00 Interior French drain to sump pump(whole parameter) I a.Demo slab-trench 140 LF 12"wide slab cut and trench $ 0.00 $225.00 $600.00 $825.00 b.Install 140 LF drain pipe to new sump pump location S 360.00 $ 150.00 $ 0.00 S 510.06 c.Install sealed sump pump housing/1/2 HP sump pump S 200.00 $ 105.00 $ 90.00 $395.00. d.Two Exterior discharge pipe-2"PVC $ 56.00 S 190.00 $ 0.00 S 246.06 e.Back fill and concrete trench s 140LF $ 240.00 $400.00 S 0.00 $640.00 f Add second vessel far emergency discharge with 2"discharge $ 914 $105.00 $ 0.0 $199.00 g.Add battery bark up for sump pump 329S. S 95. S 0. S 390.00 IL Add overflow alarm S 7S S 95. $ 0.0 S 170.00 � I Subtotal 18.0 $1,320.00 $1,365.00 $69HOI $3,375.00 Total all sections $21,976.00 $18,937.00 $2,871.00 543,784.00 Overhead $1,098.80 $568.11 $ 143.55 $1,810.46 Profit $692.24 $585.15 $ 90.44 $1,367.83 Grand total $23,767.04 $20,090.26 53,104.99 546,962.19' Foot notes and conditions 1.This agreement is defined in description column.Any deviation to this scope requires a change order agreed and signed by both parties. 2.C&O Contracting is responsible for dl applicable permits and coordination ofrough and final inspections. 3.Please not,any home owner who pulls there own permits is not reliable for claims against the HIC state fund 4.Schedule-tentative start date week of May 15,2015-Projected completion is week of June 26,2015 5.Gas main is not included in the able schedule-Columbia Gas is handling the gas line from the street to meter 6.Items high lighted in purple are allowances,once final selections have been made budget to be adjusted. 7.Payments are based on initial deposit for long lead and special order materials-balance will be progress payments as work is completed. 8.Warranty on worlananship-6 months form dated completed,manufactures warranty implied for all materials. 9.Contractor and home owner agree to independent arbitration to resolve scope of work and£((faucial disputes. 10.C @.O Contracting Tax ID number 020524775 11.Insurance certificate available upon request-we carry 2 Million liability. ' 12.Heat is budget based on Natural Gas Trane FHA system-60K BTU with manual registers locate in the basement.System will include coil for future A/C system. 13.Interior French drain to sump pump-limited to 140 LF with discharge at front of the home. Add second discharge vessel for over flow situations with separate 2"discharge 14.All deposits be held for 3-days/during this period all funds are 100 percent refundabletothe home owner up to day 3 of the grace period Home owner Date r Contractor Date �- /2e.�►�o✓L_+_ 75�Cr�'4L _ 0i_C,'-- O I G' / I I I I I - —- — + t — +-- �—f-- a — --�— - -_ I I --T- -+-- - T--- t----� I -�`---I --•-- -J-`�-} C- . I 1 �ohUrr! �/�(/l-t rt.i 7-0-,ti�Clc �r---�- I :.-_ _ �S a j.� l _Su• 6' '�N•Yrp� i 7- . . A/tcf } J'/ +_i.JRt'ooivl +. aSPIP.��`' I e.c ., fie cfo✓�-�-- — — t— 1 - 1 I 'u is S D.SfI �l el rt J SCL4C I R vrcC- 1 I I I I 1 1 I ' ' I I I i I i I i I � � 1 I • l 1. 1 1 r _ ., 1. y 1. l , _ I I S I I I { I { I i ' F � 1 � '. 1 ' I i• 1 I i ,1 � �. 1 1.__{- 3 1• J. ' + L_ 1.._.t A_I.L- L. I 1 I 4 l L t _.4 I ,- .l.__ I 1 -.J_ L i I 4-! L 4-.-1 1-4 1 I i I J 1 I I r 1 ' � !k i I 1 1 , F Load Short Form Job: Date: May 14,2015 Entire House By: Custom Climates HVAC q a hj i ac.rsn ,c+{� tT,s, - ,'x. �' k`"•` ' M For: Bob Ouellette 14 North Margate, North Andover MA -: it 5 t ' r '#, `'Sn ;•a 1 .'�, +.y ,T f t- §;r i .'' ix A , a e� 1 rW 'WW..... . gk ",. S S'`u • 0 0 �'y 1,' "'vie, ! ky t &n qt r° , Htg Clg Infiltration Outside db(°F) 9 88 Method Simplified Inside db(°F) 68 75 Construction quality Average Design TD (°F) 59 13 Fireplaces 0 Daily range - M Inside humidity(%) 50 50 Moisture difference(grAb) 44 31 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80 AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 919 cfm Actual air flow 919 cfm Air flow factor 0.026 cfm/Btuh Air flow factor 0.042 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.88 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ftz) (Btuh) (Btuh) (cfm) (cfm) basement C 56o sF 0&,.lPd 1080 12707 3729 335 157 t--A* !Stt)5 Rm*2 120 3284 2145 87 90 eleset 4 SA%th rovvv\ 48 . 781 384 21 16 kitchen 196 4608 4469 121 188 kids room 41 140 1907 1396 50 59 master 196 4070 3374 107 142 Reef+ L. u w.q Zoo rh 380 7537 6395 199 269 Entire House d 2160 34896 21890 919 919 Other equip loads 0 0 Equip. @ 0.93 RSM 20314 Latent cooling 2908 TOTALS 1 2160 1 34896 1 23222 1 919 1 919 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. f"! I1f SOft' 2015-May-14 19:11:03 W �C� 9 Right-Suit,5 Universal 201313.0.13 RSU16206 Page 1 /�i�+r1 Projectl.rup Calc=MJ8 Front Door faces: E Project Summary Job: 1 7 Date: May 14,2015 Entire House By: Custom Climates HVAC ' e - e o For: Bob Ouellette 14 North Margate, North Andover, MA Notes: Weather: Lawrence Muni, MA, US Winter Design Conditions Summer Design Conditions Outside db 9 OF Outside db 88 OF Inside db 68 OF Inside db 75 OF Design TD 59 OF Design TD 13 OF Daily range M Relative humidity 50 % Moisture difference 31 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 27028 Btuh Structure 15548 Btuh Ducts 7867 Btuh Ducts 6343 Btuh Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 34896 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 20314 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 1882 Btuh Ducts 1027 Btuh Heating Cooling Central vent(0 cfm) 0 Btuh Area(ft2) 2160 2160 Equipment latent load 2908 Btuh Volume(W) 15660 15660 Air changes/hour 0.32 0.16 Equipment total load 23222 Btuh Equiv. AVF(cfm) 84 42 Req. total capacity at 0.70 SHR 2.4 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80 AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 919 cfm Actual air flow 919 cfm Air flow factor 0.026 cfm/Btuh Air flow factor 0.042 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.88 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft' Right-Suite&Universal 201313.0.13 RPage SU16206 2015-May-14 19:11 age1 1 Project1.rup Calc=MJ8 Front Door faces: E Load Short Form Job: Date: May 14,2015 Entire House By: Custom Climates HVAC For: Bob Ouellette 14 North Margate, North Andover, MA -"vow in ® o o s f' Htg Clg Infiltration Outside db(°F) 9 88 Method Simplified i Inside db('F) 68 75 Construction quality Average Design TD (°F) 59 13 Fireplaces 0 Daily range - M Inside humidity(%) 50 50 Moisture difference(grAb) 44 31 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80 AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 919 cfm Actual air flow 919 cfm Air flow factor 0.026 cfm/Btuh Air flow factor 0.042 cfm/Btuh Static pressure. . 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.88 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ftz) (Btuh) (Btuh) (cfm) (cfm) basement C 5loo sF tkea4vd 1080 12707 3729 335 157 PQPAW IS tDs Rin*2 120 3284 2145 87 90 ek*E4 3' a Atr oo yv\ 48 , 781 384 21 16 kitchen 196 4608 4469 121 188 kids room 41 140 1907 1396 50 59 master 196 4070 3374 107 142 Reemq@-t-t..t w•q Roo n. 380 7537 6395 199 269 Entire House d 2160 34896 21890 919 919 Other equip loads 0 0 Equip. @ 0.93 RSM 20314 Latent cooling 2908 TOTALS 2160 11 34896 23222 919 11 919 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. +Y1tf 1 htsoft'' 2015-May-1419:11:03 Right-Suite®Universal 201313.0.13 RSU16206 Page 1 Project1.rup Calc=MJ8 Front Door faces: E Level 1 basement i i .Job#: Custom Climates HVAC Scale: 1 : 60 Performed for: Page 1 Bob o 1lette Rig M-SudeS U*e rsal 2013 f4 Neethta '1"- !�� M�('���-W �'�• 13.0.13 RSU16206 A 2 North Andover,M015-May-14 19:11:39 Projects.rup Level 1 rj _ I f �Q se f basement I I i l Job#: Custom Climates HVAC Scale: 1 : 60 Performed for: Page 1 Bob Ouellette RigtttSuke@ Universal 2013 14 North Margate 13.0.13 RSU16206 North Andover,MA 2015-May-14 19:11:39 Project1.rup Level 2 Kas2. rri it master kids room #-( 5 r �gc�SF � wosr G AtKrmorn ASF �'%\j t+n9 Rbo rm 3305F kitchen tq6 5r Job#: Custom Climates HVAC Scale: 1 : 60 Performed for: Page 2 Bob Ouellette Rig ht-Suke®Universal 2013 14 North Margate 13.0.13 RSU16206 North Andover,MA 2015-May-14 19:11:39 Projectl.rup Project Summary Job: 1 7 Date: May 14,2015 Entire House By: Custom Climates HVAC For: Bob Ouellette 14 North Margate, North Andover, MA Notes: 1`Y4 q f.Lh" �`ks'y,3 �.,a"••t t�SK �#^ ffi "` 8}s k Sf .'��.© e I O Weather: Lawrence Muni, MA, US Winter Design Conditions Summer Design Conditions Outside db 9 OF Outside db 88 OF Inside db 68 OF Inside db 75 OF Design TD 59 OF Design TD 13 OF Daily range M Relative humidity 50 % Moisture difference 31 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 27028 Btuh Structure 15548 Btuh Ducts 7867 Btuh Ducts 6343 Btuh Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 34896 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 20314 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 1882 Btuh Ducts 1027 Btuh Heating Cooling Central vent(0 cfm) 0 Btuh Area(ftZ) 2160 2160 Equipment latent load 2908 Btuh Volume(ft3) 15660 15660 Air changes/hour 0.32 0.16 Equipment total load 23222 Btuh Equiv. AVF(cfm) 84 42 Req. total capacity at 0.70 SHR 2.4 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80 AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 919 cfm Actual air flow 919 cfm Air flow factor 0.026 cfm/Btuh Air flow factor 0.042 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.88 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. A wri4 htsoft' Rght-Suite®Universal 201313.0.13 RSU16206 2015 May-1419:Page age 1 1 Ck Projed1.rup Calc=MA Front Door faces: E Load Short Form Job: Date: May 14,2015 Entire House By: Custom Climates HVAC 1 y� ��,''yro�'1 hx � s y, �� eq-,. �:�� � i tH�,�Nc ',,• - � ;.`,.s�.. 2..1 ,.a.�,�. :� . a� 3 ; � ..F . Fr For: Bob Ouellette 14 North Margate, North Andover, MA M x �Sr '<° n, t a Htg Clg Infiltration Outside db(°F) 9 88 Method Simplified Inside db(°F) 68 75 Construction quality Average Design TD (°F) 59 13 Fireplaces 0 Daily range - M Inside humidity(%} 50 50 Moisture difference(grAb) 44 31 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80 AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 919 cfm Actual air flow 919 cfm Air flow factor 0.026 cfm/Btuh Air flow factor 0.042 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.88 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ftz) (Btuh) (Btuh) (cfm) (cfm) basement 'r%M t 4' vck 1080 12707 3729 335 157 PMA9f ��Px+2 t+v% 120 3284 2145 87 90 eles� 13AI t. 48 781 384 21 16 kitchen 196 4608 4469 121 188 kids room 140 1907 1396 50 59 master 196 4070 3374 107 142 .Reeve& L.iviv%-j Rou�� 380 7537 6395 199 269 Entire House d 2160 34896 21890 919 919 Other equip loads 0 0 Equip. @ 0.93 RSM 20314 Latent cooling 2908 TOTALS 2160 34896 23222 1 919 1 919 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. V1/'!'1 htsoft' 2015-May-1419:11:03 � g Right-Suke@ Universal 201313.0.13 RSU16206 Page 1 AM Projectl.rup Calc=MJ8 Front Doorfaces: E Level 2 master kids room ` Re - kitchen Job#: Scale: 1 : 60 Performed for: Custom Climates HVAC Page 2 Bob Ouellette r Rg M-SufteO Urdve(SM 2013 1� Ct K R 13.0.13 RSU16206 North Andover,MA 2015-May-14 19:11:39 Projectl.rup 6�3-a3s�r`v cora �1fte6Ak, Wo4l IVA _ l ZVI /y1/S'!l(� •3r6dJr�;.o _ p f,(��i/t�SfJ�d-- --- - . — - __ -__ ._�._ �. — __ — _ s I aci: arc! Alk Aum-. o ftvAgak VD, M, Wow- (06 LF Wain r 4 011 YAPa - naw 14 ��OG � b����•Z.,l ak ' aha#- tnty Gt" Cocoam IV WDM klf ou t CSt,n.•►c�+��dt f5 3°�xz�i Glydeit,� p,&V (New LA Ohl I-old id { ' 6-AAA, ve..T '9100(amj..1w vie Pad S�' � �actcyc�-,d i 5� v%c)Pvt Ce; � �•S�G�o.SF,� �lur�t��n�� $ewc� �,jcc�t� Ilk' WlG w n)o,.) A710y w Err�1S !h3 e ,►O e2» X41 so s�►�1s �.. gra Tits FCS r -"�_t q NU i-r1. I10CA .y- '� Alcova ' Owl% I aZ TRQv►G� �- � Cc�rlCre+t• � � The Commonwealth of Massachusetts Department of Industrial Accidents I Congress Street,Suite 100 Boston,MA 02114-2017 www mass gov/dia NN'orkers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORrrY. Applicant Information Please Print Leliibly Name (Business/Organization/Individual): Address: /c2 4,Y iV tAJ d d J ("a f / City/State/Zip: �1191S,t-�J Phone#: .3 07.3.E el d Are you an employer?Check the appropriate box: Type of project(required): I. I am a employer with employees(full and/or part-time).* 7. ❑New construction 2. I am a sole proprietor or partnership and have no employees working for me in 8. Remodeling any capacity.[No workers'comp.insurance required.] 3.❑1 am a homeowner doing all work myself.[No workers'comp.insurance required.]t 9. Demolition ❑4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. I will 10 Building addition ensure that all contractors either have workers'compensation insurance or are sole 11.❑Electrical repairs or additions proprietors with no employees. 12.EJ Plumbing repairs or additions 5.❑I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.❑Roof repairs These sub-contractors have employees and have workers'comp.insurance.$ 6.F1 We are a corporation and its officers have exercised their right of exemption per MGL a 14.❑Other 152,§1(4),and we have no employees.[No workers'comp.insurance required.] "Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is thepolicy and job site information. Insurance Company Name: Policy#or Self-ins.Lic.#: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certW under thepains andpenalties of perjury that the information provided above is true and correct. Si a e: Date: S/ xellj Phone#: 3 2 3s—R 6 o Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: Sd0/A09'SseW-MMM :1lslA uonewJo;u!aulsuaon Sd0 joi •3su93ll sl4110 uotiponaJ jol asnea sl apo Hulplmg aieiS suasnPesseW ayi to uolilpa ivajjm a ssassod of ajnllej -aauds pasoloua 30(£U166)1a-J otgno 000`S£missal umuoo goRm dnoj2 asn Sue jo sftppng-pavtjisajun 7-1 /1e3amznza�cueall�aC/l�cr�rac�ccael .` OF/Expirafton: Office of Consumer Affairs&Business Regulation OMEIMPROVEMENT CONTRACTOR egistration 123742 Type: 4/3/2017 Individual i Stephen M.Rothwell:' Stephen Rothwell t' 3 SCOTTSDALE RD. / ATKINSON,NH 03811 Undersecretary Massachusetts -Department of Public Safety Board of.Building Regulations and Standards Construction Supen-isor License: CS-043475 S TEPHEN M RO TtFWE� ;. 3 SCOTTSDALE RD % Attunson NH 03911 Expiration Commissioner 07/24/2016 E Unrestricted-Buildings of any use group which contain less Ithan 35,000 cubic feet(991M )of enclosed space. Failure to possess a current edition of the Massachusetts State Building Code is cause for revocation of this license. For DPS Licensing information vWit www.Mass.Gov/DPS