Loading...
HomeMy WebLinkAboutBuilding Permit #024-2011 - 19 COCHICHEWICK DRIVE 7/1/2010 t4ORTH i BUILDING PERMIT a� l TOWN OF NORTH ANDOVER �'? 4"'- •_~' '` o APPLICATION FOR PLAN EXAMINATION Permit NO: (7�y Date Received °4A0 "' * �gSSACHU`�E� Date Issued: IM ORTANT: Applicant must complete all items on this page LOCATION 1 L a C,o CtA t CAA*w (etc. Daxv E Print PROPERTY OWNER WmftoY4 6-&TATrzS , LL C O 0 9�( Print MAP 210 OG •O PARCEL: do` S ZONING DISTRICT:Historic District yes no Machine Shap Village yes no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential New Building One family Addition Two or more family Industrial Alteration No. of units: 4 Commercial Repair, replacement Assessory Bldg Others: Demolition Other Se tic Well Floodplain Wetlands Watershed District Wa#er/Sewerr10 l`t o S DESCRIPTION OF WORK TO BE PREFORMED: GoN SVLU EM oa -d I i W c a 0 F2.AMG- 0LUFLL-I u G Identification Please Type or Print Clearly) OWNER: Name: ToSEPIA A LIFIeoif , MNAace Phone: 478-(e��•1t off' Address: SLP IwMAO(LG B N Olt Ve- C1-)Ay i 3 iwA a i F44 i CONTRACTOR NameS"14- LgzAiJE Phone: -9-) Address: At W fL C A O IPP- rn F-7vHa" rd t4 Ol Supervisor's Construction License: CS14 3 0(Oa Exp. Date: E1 1 9 '? e) 0 Home Improvement License Exp. Date: ARCHITECT/ENGINEER 1g0-6 SgArnl4AL . P�f&c.Rhone: q'�8• ��t�' 3(0 03 Address: V4 eftAd, Si E2 h1 Reg. No. gileno FEE SCHEDULE.BOLDING PERMIT:$12.00 PER$1000.00 OF THE TOTA STIMATED COST BASED ON$125.00 PER S.F. .Total Project Cost: $ Check No.: � Receipt No.: NOTE: Persons contracting with unregistere contractors do not have access to the guaranty fund Signatureof Agent/Owner .. gnature of contractor ____ _ + Location/ (, °�zCjF"wolc� ��'�vf No. O'? a?o�/ Date b NaRTh TOWN OF NORTH ANDOVER 3?O�,t``O �•,'yO�L F P Y Certificate of Occupancy $ s�CMUSEt�'' Building/Frame Permit Fee $ Foundation Permit Fee $ X00 Y Other Permit Fee $ TOTAL $ Check # 2 v G wilding inspector Plans Submitted Plans Waived Certified Plot Plan Stamped Plans TYPE OF SEWERAGE DISPOSAL Public Sewer Tanning/Massage/Body Art Swimming Pools Well Tobacco Sales Food Packaging/Sales Private(septic tank;etc. Permanent Dumpster on Site THE FOLLOWING SECTIONS FOR OFFICE USE.ONLY INTERDEPARTMENTAL SIGN-OFF'-�U FORM ' DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT hp/w COMMENTS l( a ATION N E V CO S R Reviewed on . _ Si nature , e 1 COMMENTS o"C\ ,n Dc:,Q)tAb �.����• . HEALTH Reviewed on Signature COMMENTS t {.Zoning Board'of Appeals:,Variance,-Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation`Decisiori: Comments Water & Sewer Corinection/Si natureL A LA, 8,� I�e a, - Uriveway Permit DPW Tpwn Engineer: Signature: - X Yo Located 384 Osgood Street FIRE DEPARTMENT -Temp Durnpster on site yes no Locatedat 124 Main Street Fire Department signature/date COMMENTS I Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. _ r Total land area, sq. ft.: cS .g AcItg i ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— (For department use i i i h I I I ❑ Notified for pickup - Date I .........��..................__. ._................_.._..........---._....................---..................--- ._.................. _._........_.... . i Doc.Building Permit Revised 2010 r r V i` { Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit i New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:Building Permit Revised 2008 NORTH TO" of _ Andover St..O �.�,•�+.•ro,-^ ..vii;y:• �` '>t..• . OA �O/ �`y = o , over, Mass., T Q -- LAK COCMICMEWICK 7� ADRATED PPC5 `S U BOARD OF HEALTH Food/Kitchen .PERMIT T D Septic System BUILDING INSPECTOR THIS CERTIFIES THAT `� �.®� ............................ ........................;............................:yl....................:.................................... Foundation has permission to erect........................................ buildings on ../........................ `.G........ ......... ..�... Rough �-Y /Z Chimne y to be occupied as......................... ............................................................................... .............................................................. provided that the person accepting this permit shall in every respect conform t the terms of the application on file in Final this office, and to the provisions of the Codes and By-Laws relating to the I pection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations'Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTION TARTS Rough ................ ................ ............ ..................... Service BUILD 11 INSPECTOR Final Occupancy Permit Required to OCcuPy Building GAS INSPECTOR Rough Display in a Conspicuous Place on the -Premises — Do Not Remove Final No Lathing or Dry wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. - Burner',- Street urner-Street No. SEE REVERSE SIDE Smoke Det. i PROJECT LOCATION 11,15,17&19 Cochituate Drive,North Andover,MA PROJECT NAME Campion Estates—Summer House ARCHITECT Rob Bramhall Architects ADDRESS 14 Park Street,Andover,MA 01810 TELEPHONE NO ,978-749-3663 In accordance with Section.1.10 and 116.0 of the Massachusetts State Buildin Code,I, Registration No. being a registered professional architect,hereby certify that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: ARCHITECTURAL DRAWINGS For the above named project and that,to the best of my knowledge,such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code,all accepted i engineering practices and applicable laws and ordinances for the proposed use and occupancy. I further certify that I shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to determine that the work is proceeding in accordance with the documents I approved for the building permit and shall be responsible for the following as specified in Section 116.2. 1.Review of shop drawings,samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit,and approval for conformance to the design concept. 2.Review and approval of the quality control procedures for all code-required controlled materials. 3.Special architectural or engineering professional inspection of critical construction components requiring controlled materials or construction specified in the accepted engineering practice standards listed in Appendix G. ! Upon completion of the work,architect,and/or engineers shall submit final affidavits as to the satisfactory completion and readiness of the project for occupancy. Signatu Subscribed and sworn to before me this day of(At V ,201 U . t My Commission Expires Nofry Public 9 Kt� 'EN.P41j 1GS G.tiftcARTHUR xiL Notary public �M1s! Comm^nti.ealth of Massachusetts E spires December 17,2015 it t I . I Aw AW REScheck Software Version 4.2.2 ff 11111" AW 0 4M AV 0 Compliance Certificate Project Title: REScheck Calculation Energy Code: 2006 IECC Location: North Andover, Massachusetts Construction Type: Single Family Building Orientation: Bldg.faces 90 deg.from North Conditioned Floor Area: 2431 ft2 Glazing Area Percentage: 13% Heating Degree Days: 6322 Climate Zone: 5 I Construction Site: Owner/Agent: Designer/Contractor: Summ r House SUN Engineering Inc. Unit# 491 Maple Street North Andover,MA Suite 209 Danvers,MA 01923 Compliance:3.0%Better Than Code Gross Cavity Cont. Glazing UA Assembly Area or R-Value R-Value or Door Perimeter U-Factor Wall 1:Wood Frame, 16"o.c. 656 15.0 0.0 40 Orientation:Front Window 1:Wood Frame:Double Pane with Low-E 120 0.330 40� SHGC:0.27 Orientation:Front i Door 1:Solid 21 0.500 11 . Orientation:Front Wall 2:Wood Frame,16"o.c. 665 15.0 0.0 42 Orientation:Back Window 2:Wood Frame:Double Pane with Low-E 125 0.330 41 -SHGC:0.27 Orientation:Back Wall 3:Wood Frame,16"o.c. 1009 15.0 0.0 70 Orientation:Right Side Window 3:Wood Frame:Double Pane with Low-E 85 0.330 28 SHGC:0.27 Orientation:Right Side i Door 3:Solid 21 0.500 11 ' Orientation:Right Side Wall 4:Wood Frame,16"o.c. 908 15.0 0.0 62 Orientation:Left Side Window 4:Wood Frame:Double Pane with Low-E 99 0.330 33 ' SHGC:0.27 Orientation:Left Side Ceiling 1:Flat Ceiling or Scissor Truss 1398 38.0 0.0 42 i Ceiling 2:Cathedral Ceiling(no attic) 119 38.0 0.0 3 Floor 1:All-Wood Joist/Truss:Over Unconditioned Space 1382 38.0 0.0 36 Floor 2:All-Wood Joist/Truss:Over Outside Air 32 38.0 0.0 1 Furnace 1:Forced Hot Air 90 AFUE Air Conditioner 1:Electric Central Air 15 SEER i Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2006 IECC requirements in REScheck Version 4.2.2 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Project Title: REScheck Calculation Report date: 06122/10 Data filename:\\Computer1\pct work files\Check\REScheck\2010 REScheck\Summer House Unit 1.rck Page 1 of 5 I i Name-Title Signature Date �a I i I i ii I a 1 I+ I I + I If i I I Project Title: REScheck Calculation Report date: 06/22/10 Data filename:\\Computer1\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 1.rck Page 2 of 5 i REScheck Software Version 4.2.2 Nor Inspection Checklist I Ceilings: ❑ Ceiling 1:Flat Ceiling or Scissor Truss,R-38.0 cavity insulation Comments: ❑ Ceiling 2:Cathedral Ceiling(no attic),R-38.0 cavity insulation Comments: i Above-Grade Walls: ❑ Wall 1:Wood Frame,16"o.c.,R-15.0 cavity insulation Comments: ❑ Wall 2:Wood Frame,16"o.c.,R-15.0 cavity insulation Comments: ❑ Wall 3:Wood Frame,16"o.c.,R-15.0 cavity insulation Comments: ❑ Wall 4:Wood Frame, 16"o.c.,R-15.0 cavity insulation Comments: Windows: ❑ Window 1:Wood Frame:Double Pane with Low-E,U-factor:0.330 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: ❑ Window 2:Wood Frame:Double Pane with Low-E,U-factor:0.330 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: ❑ Window 3:Wood Frame:Double Pane with Low-E,U-factor:0.330 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No s Comments: i ❑ Window 4:Wood Frame:Double Pane with Low-E,U-factor:0.330 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No i Comments: Note:Up to 15 sq.ft.of glazed fenestration per dwelling is exempt from U-factor and SHGC requirements. I I Doors: i ❑ Door 1:Solid,U-factor:0.500 Comments: This door is exempt from the U-factor requirement. ❑ Door 3:Solid,U-factor:0.500 i Comments: I i Floors: i I ❑ Floor 1:All-Wood Joist/Truss:Over Unconditioned Space,R-38.0 cavity insulation r � i Project Title: REScheck Calculation Report date: 06/22/10 Data filename:\\Computer1\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 1.rck Page 3 of 5 Comments: Floor insulation is installed in permanent contact with the underside of the subfloor decking. 1 ` `❑ Floor 2:All-Wood Joist/Truss:Over Outside Air,R-38.0 cavity insulation Comments: Floor insulation is installed in permanent contact with the underside of the subfloor decking. Heating and Cooling Equipment: ❑ Furnace 1:Forced Hot Air:90 AFUE or higher Make and Model Number: ❑ Air Conditioner 1:Electric Central Air:15 SEER or higher Make and Model Number: Air Leakage: ❑ Joints,penetrations,and all other such openings in the building envelope that are sources of air leakage are sealed. Recessed lights are either 1)Type IC rated with enclosures sealed/gasketed against leaks to the ceiling,or 2)Type IC rated and ASTM E283 labeled,or 3)installed inside an air-tight assembly with a 0.5"clearance from combustible materials and a 3"clearance from insulation. Sunrooms: ❑ Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum skylight U-factor of 0.75.New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Vapor Retarder: ❑ Vapor retarder is installed on the warm-in-winter side of all non-vented framed ceilings,walls,and floors;or it has been determined that moisture or its freezing will not damage the materials;or other approved means to avoid condensation are provided. Comments: Materials Identification and Installation: ❑ Materials and equipment are identified so that compliance can be determined. ❑ Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. ❑ Insulation R-values,glazing U-factors,and heating and cooling equipment efficiency are clearly marked on the building plans or specifications. Duct Insulation: ❑ Ducts in unconditioned spaces or outside the building are insulated to at least R-8. i ❑ Ducts in floor trusses above unconditioned spaces or above the outdoors are insulated to at least R-6. Duct Construction: I ❑ Air handlers,filter boxes,and duct connections to flanges of air distribution system equipment or sheet metal fittings are sealed and mechanically fastened. ❑ All joints,seams,and connections are made substantially airtight with tapes,gasketing,mastics(adhesives)or other approved closure systems.Tapes and mastics are rated UL 181A or UL 181 B. ❑ Building framing cavities are not used as supply ducts. ❑ Automatic or gravity dampers are installed on all outdoor air intakes and exhausts. ❑ Additional requirements for tape sealing and metal duct crimping are included by an inspection for compliance with the International Mechanical Code. Temperature Controls: I ❑ Thermostats exist for each separate HVAC system.A manual or automatic means to partially restrict or shut off the heating and/or cooling input to each zone or floor is provided. Heating and Cooling Equipment Sizing: ❑ Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code. Circulating Service Hot Water Systems: Lj Circulating service hot water pipes are insulated to R-2. ❑ Circulating service hot water systems include an automatic or accessible manual switch to tum off the circulating pump when the system is not in use. i Heating and Cooling Piping Insulation: i Project Title: REScheck Calculation Report date: 06/22/10 Data filename:\\Computer1\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 1.rck Page 4 of 5 0 HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-2. 1 '` :f Certificate: I a ' A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values;window U-factors;type and efficiency of space-conditioning and water heating equipment. NOTES TO FIELD:(Building Department Use Only) i I I i i i i Project Title: REScheck Calculation Report date:06/22/10 Data filename:\\Computer1\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 1.rck Page 5 of 5 � I 2000 IECC Energy Efficiency Certificate Ceiling/Roof 38.00 Wall 15.00 Floor I Foundation 38.00 Ductwork(unconditioned spaces): 1111111111 lill ILIA �.. Window 0.33 0.27 Door 0.50 NA Forced Hot Air Furnace 90 AFUE Electric Central Air Conditioner 15 SEER Water Heater: Name: Date: Comments: i I I J '� I I REScheck Software Version 4.3.1 Compliance Certificate . w Project Title: REScheck Calculation Energy Code: 2006 IECC ` Location: North Andover,Massachusetts Construction Type: Single Family Building Orientation: Bldg.faces 90 deg.from North Conditioned Floor Area: 2431 ft2 Glazing Area Percentage: 13% Heating Degree Days: 6322 Climate Zone: 5 Construction Site: Owner/Agent: Designer/Contractor: Summer House SUN Engineering Inc. Unit#0 491 Maple Street North Andover,MAi Suite 209 Danvers,MA 01923 Compliance:0.5%Better Than Code Gross Cavity Cont. Glazing ILIA Assembly Area or R-Value R-Value or D.. 1 Perimeter U-Factor Wall 1:Wood Frame,16"o.c. 636 15.0 0.0 38 Orientation:Front Window 1:Wood Frame:Double Pane with Low-E 118 0.330 39 SHGC:0.27 Orientation:Front Door 1:Solid 21 0.500 11 Orientation:Front Wall 2:Wood Frame,16"o.c. 775 15.0 0.0 51 Orientation:Back Window 2:Wood Frame:Double Pane with Low- E 119 0.330 39 � SHGC:0.27 Orientation:Back Wall 3:Wood Frame,16"o.c. 557 15.0 0.0 37 Orientation:Right Side Window 3:Wood Frame:Double Pane with Low-E 70 0.330 23 SHGC:0.27 Orientation:Right Side Wall 4:Wood Frame,16"o.c. 1009 15.0 0.0 70 Orientation:Left Side Window 4:Wood Frame:Double Pane with Low-E 75 0.330 25 SHGC:0.27 I Orientation:Left Side Door 2:Solid 21 0.500 11 Orientation:Left Side Ceiling 1:Flat Ceiling or Scissor Truss 1398 38.0 0.0 42 Ceiling 2:Cathedral Ceiling(no attic) 119 38.0 0.0 3 ; Floor 1:All-Wood Joist/Truss:Over Unconditioned Space 1382 38.0 0.0 36 Floor 2:All-Wood Joist/Truss:Over Outside Air 32 38.0 0.0 1 Furnace 1:Forced Hot Air 90 AFUE Air Conditioner 1:Electric Central Air 15 SEER Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2006 IECC requirements in i REScheck Version 4.3.1 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. E Project Title: REScheck Calculation Report date:06/22/10 Data filename:\\Computerl\pct work files\Check\REScheck\2010 REScheck\Summer House Unit 2.rck Page 1 of 5 i .1" Name Title Signature Date 4 1 r 1 i 1 l I I I 1 I 1 it i Project Title: REScheck CalculationReport date:06/22/10 Data filename:\\Computerl\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 2.rck Page 2 of 5 9 I I J • i REScheck Software Version 4.3.1 f Inspection Checklist i Ceilings: i ❑ Ceiling 1:Flat Ceiling or Scissor Truss,R-38.0 cavity insulation Comments: ❑ Ceiling 2:Cathedral Ceiling(no attic),R-38.0 cavity insulation Comments: Above-Grade Walls: ❑ Wall 1:Wood Frame,16"o.c.,R-15.0 cavity insulation Comments: ❑ Wall 2:Wood Frame,16"o.c.,R-15.0 cavity insulation Comments: ❑ Wall 3:Wood Frame,16"o.c.,R-15.0 cavity insulation Comments: ❑ Wall 4:Wood Frame 16"6 o.c. R-1 5.0 cavity insulation Comments: Windows: ❑ Window 1:Wood Frame:Double Pane with Low-E,U-factor:0.330 For windows without labeled U-factors,describe features: Vanes Frame Type Thermal Break? Yes No Comments: i i ❑ Window 2:Wood Frame:Double Pane with Low-E,U-factor:0.330 1 For windows without labeled U-factors,describe features: 4 #Panes _ Frame Type Thermal Break? Yes No Comments: ❑ Window 3:Wood Frame:Double Pane with Low-E,U-factor:0.330 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: ❑ Window 4:Wood Frame:Double Pane with Low-E,U-factor:0.330 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: Note:Up to 15 sq-ft.of glazed fenestration per dwelling is exempt from U-factor and SHGC requirements. i I Doors: ❑ Door 1:Solid,U-factor:0.500 Comments: This door is exempt from the U-factor requirement. ❑ Door 2:Solid,U-factor:0.500 i Comments: Floors: I" d ❑ Floor 1:All-Wood Joist/Truss:Over Unconditioned Space,R-38.0 cavity insulation Project Title: REScheck Calculation Report date:06/22/10 Data filename:\\Computerl\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 2.rck Page 3 of 5 i Comments: a 1 Floor insulation is installed in permanent contact with the underside of the subfloor decking. i ❑ Floor 2:All-Wood Joist/Truss:Over Outside Air,R-38.0 cavity insulation Comments: Floor insulation is installed in permanent contact with the underside of the subfloor decking. Heating and Cooling Equipment: ❑ Furnace 1:Forced Hot Air:90 AFUE or higher Make and Model Number: ❑ Air Conditioner 1:Electric Central Air:15 SEER or higher Make and Model Number: Air Leakage: ❑ Joints,penetrations,and all other such openings in the building envelope that are sources of air leakage are sealed. ❑ Recessed lights are either 1)Type IC rated with enclosures sealed/gasketed against leaks to the ceiling,or 2)Type IC rated and ASTM E283 labeled,or 3)installed inside an air-tight assembly with a 0.5"clearance from combustible materials and a 3"clearance from insulation. Sunrooms: ❑ Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum skylight U-factor of 0.75.New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Vapor Retarder: ❑ Vapor retarder is installed on the warm-in-winter side of all non-vented framed ceilings,walls,and floors;or it has been determined that moisture or its freezing will not damage the materials;or other approved means to avoid condensation are provided. Comments: Materials Identification and Installation: ❑ Materials and equipment are installed in accordance with the manufacturer's installation instructions. ❑ Insulation is installed in substantial contact with the surface being insulated and in a manner that achieves the rated R-value. ❑ Materials and equipment are identified so that compliance can be determined. ❑ Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. ❑ Insulation R-values,glazing U-factors,and heating and cooling equipment efficiency are clearly marked on the building plans or specifications. Duct Insulation: ❑ Ducts in unconditioned spaces or outside the building are insulated to at least R-8. ❑ Ducts in floor trusses above unconditioned spaces or above the outdoors are insulated to at least R-6. i Duct Construction: ❑ Air handlers,filter boxes,and duct connections to flanges of air distribution system equipment or sheet metal fittings are sealed and mechanically fastened. ❑ All joints,seams,and connections are made substantially airtight with tapes,gasketing,mastics(adhesives)or other approved closure systems.Tapes and mastics are rated UL 181A or UL 181 B. ❑ Building framing cavities are not used as supply ducts. ❑ Automatic or gravity dampers are installed on all outdoor air intakes and exhausts. Additional requirements for tape sealing and metal duct crimping are included b an inspection for compliance with the International Y P P ' Mechanical Code. Temperature Controls: ❑ Thermostats exist for each separate HVAC system.A manual or automatic means to partially restrict or shut off the heating and/or cooling input to each zone or floor is provided. , Heating and Cooling Equipment Sizing: I Additional requirements for equipment sizin are included b an inspection for compliance with the International Residential Code. ❑ q � 9 Y P P� , Circulating Service Hot Water Systems: ❑ Circulating service hot water pipes are insulated to R-2. i ❑ Circulating service hot water systems include an automatic or accessible manual switch to tum off the circulating pump when the system is not in use. I Project Title: REScheck Calculation Report date:06/22/10 Data filename:\\Computerl\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 2.rck Page 4 of 5 E � I I i • Heating and Cooling Piping Insulation: HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-2. j Certificate: A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values;window U-factors;type and efficiency of space-conditioning and water heating equipment. it NOTES TO FIELD:(Building Department Use Only) I I i 1 l 1 1 III i I II I i l 1 I i I it ii I i Project Title: REScheck Calculation Report date:06/22/10 �I Data filename:\\Computerl\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 2.rck Page 5 of 5 I 1 r •�� 2006 IECC Energy Efficiency Certificate Ceiling/Roof 38.00 Wall 15.00 Floor/Foundation 38.00 Ductwork(unconditioned spaces): Window 0.33 0.27 Door 0.50 NA Forced Hot Air Furnace 90 AFUE Electric Central Air Conditioner 15 SEER Water Heater: Name: Date: Comments: I '1 III I it �I J ' a Aw REScheck Software Version 4.3.1 I Ar I Compliance Certificate i Project Title: REScheck Calculation i I Energy Code: 2006 IECC Location: North Andover,Massachusetts Construction Type: Single Family Building Orientation: Bldg.faces 90 deg.from North Conditioned Floor Area: 2646 ft2 Glazing Area Percentage: 12% Heating Degree Days: 6322 Climate Zone: 5 Construction Site: Owner/Agent: Designer/Contractor: Summer flouse SUN Engineering Inc. Unit ley 491 Maple Street J North Andover,MA Suite 209 1 Danvers,MA 01923 . • trial Compliance:2.1%Better Than Code AssemblyGross Cavity Cont. Glazing UA or or D•• Perimeter U-Factor Wall 1:Wood Frame,16"o.c. 728 15.0 0.0 51 Orientation:Front Window 1:Wood Frame:Double Pane with Low-E 24 0.330 8 SHGC:0.27 Orientation:Front Door 1:Solid 42 0.500 21 Orientation:Front Wall 2:Wood Frame,16"o.c. 843 15.0 0.0 53 Orientation:Back Window 2:Wood Frame:Double Pane with Low-E 152 0.330 50 SHGC:0.27 Orientation:Back I Wall 3:Wood Frame,16"o.c. 888 15.0 0.0 58 Orientation:Right Side Window 3:Wood Frame:Double Pane with Low-E 138 0.330 46 SHGC:0.27 Orientation:Right Side Wall 4:Wood Frame,16"o.c. 476 15.0 0.0 35 Orientation:Left Side Window 4:Wood Frame:Double Pane with Low-E 26 0.330 9 SHGC:0.27 Orientation:Left Side Ceiling 1:Flat Ceiling or Scissor Truss 1572 38.0 0.0 47 Ceiling 2:Cathedral Ceiling(no attic) 125 38.0 0.0 3 Floor 1:All-Wood Joist/fruss:Over Unconditioned Space 1556 38.0 0.0 40 i Furnace 1:Forced Hot Air 90 AFUE Air Conditioner 1:Electric Central Air 15 SEER I , Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2006 IECC requirements in i REScheck Version 4.3.1 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. I I _ I Project Title: REScheck Calculation Report date:06/22/10 Data filename:\\Computers\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 3.rck Page 1 of 5 I � M? Name-Title Signature Date 1 I I I i Project Title: REScheck Calculation _ Report date:06/22/10 Data filename:\\Computerl\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 3.rck Page 2 of 5 k I .Q J REScheck Software Version 4.3.1 LJ Inspection Checklist Ceilings: ❑ Ceiling 1:Flat Ceiling or Scissor Truss,R-38.0 cavity insulation Comments: ❑ Ceiling 2:Cathedral Ceiling(no attic),R-38.0 cavity insulation Comments: Above-Grade Walls: 1 ❑ Wall 1:Wood Frame,16"o.c.,R-15.0 cavity insulation Comments: ❑ Wall 2:Wood Frame,16"o.c.,R-15.0 cavity insulation Comments: ❑ Wall 3:Wood Frame,16"o.c.,R-15.0 cavity insulation Comments: ❑ Wall 4:Wood Frame,16"o.c.,R-15.0 cavity insulation Comments: Windows: ❑ Window 1:Wood Frame:Double Pane with Low-E,U-factor:0.330 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: i ❑ Window 2:Wood Frame:Double Pane with Low-E,U-factor:0.330 For windows without labeled U-factors,describe features: Vanes Frame Type Thermal Break? Yes No Comments: ❑ Window 3:Wood Frame:Double Pane with Low-E,U-factor:0.330 For windows without labeled U-factors,describe features: Vanes Frame Type Thermal Break? Yes No Comments: ❑ Window 4:Wood Frame:Double Pane with Low-E,U-factor:0.330 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: Note:Up to 15 sq.ft.of glazed fenestration per dwelling is exempt from U-factor and SHGC requirements. Doors: ❑ Door 1:Solid,U-factor:0.500 Comments: Up to 40 sq.ft.of this door is exempt from the U-factor requirement. Floors: ❑ Floor 1:All-Wood Joist/Truss:Over Unconditioned Space,R-38.0 cavity insulation Comments: Floor insulation is installed in permanent contact with the underside of the subfloor decking. Heating and Cooling Equipment: Project Title: REScheck Calculation Report date:06/22/10 Data filename:\\Computerl\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 3.rck Page 3 of 5 ❑ Furnace 1:Forced Hot Air:90 AFUE or higher Make and Model Number: ❑ Air Conditioner 1:Electric Central Air:15 SEER or higher Make and Model Number: Air Leakage: ❑ Joints,penetrations,and all other such openings in the building envelope that are sources of air leakage are sealed. ❑ Recessed lights are either 1)Type IC rated with enclosures sealed/gasketed against leaks to the ceiling,or 2)Type IC rated and ASTM ` E283 labeled,or 3)installed inside an air-tight assembly with a 0.5°clearance from combustible materials and a 3"clearance from 1 insulation. Sunrooms: ❑ Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum skylight U-factor of 0.75.New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Vapor Retarder: ❑ Vapor retarder is installed on the warm-in-winter side of all non-vented framed ceilings,walls,and floors;or it has been determined that moisture or its freezing will not damage the materials;or other approved means to avoid condensation are provided. Comments: Materials Identification and Installation: ❑ Materials and equipment are installed in accordance with the manufacturer's installation instructions. ❑ Insulation is installed in substantial contact with the surface being insulated and in a manner that achieves the rated R-value. ❑ Materials and equipment are identified so that compliance can be determined. ❑ Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. ❑ Insulation R-values,glazing U-factors,and heating and cooling equipment efficiency are clearly marked on the building plans or specifications. Duct Insulation: ❑ Ducts in unconditioned spaces or outside the building are insulated to at least R-8. ❑ Ducts in floor trusses above unconditioned spaces or above the outdoors are insulated to at least R-6. Duct Construction: ❑ Air handlers,filter boxes,and duct connections to flanges of air distribution system equipment or sheet metal fittings are sealed and mechanically fastened. ❑ All joints,seams,and connections are made substantially airtight with tapes,gasketing,mastics(adhesives)or other approved closure systems.Tapes and mastics are rated UL 181A or UL 181 B. ❑ Building framing cavities are not used as supply ducts. ❑ Automatic or gravity dampers are installed on all outdoor air intakes and exhausts. ❑ Additional requirements for tape sealing and metal duct crimping are included by an inspection for compliance with the International Mechanical Code. , Temperature Controls: ❑ Thermostats exist for each separate HVAC system.A manual or automatic means to partially restrict or shut off the heating and/or cooling input to each zone or floor is provided. Heating and Cooling Equipment Sizing: ❑ Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code. Circulating Service Hot Water Systems: , ❑ Circulating service hot water pipes are insulated to R-2. ❑ Circulating service hot water systems include an automatic or accessible manual switch to tum off the circulating pump when the system is not in use. Heating and Cooling Piping Insulation: ❑ HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-2. Certificate: ❑ A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values;window U-factors;type and efficiency of space-conditioning and water heating equipment. NOTES TO FIELD:(Building Department Use Only) Project Title: REScheck Calculation Report date:06/22/10 Data filename:\\Computerl\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 3.rck Page 4 of 5 i 11 1 i f Project Title: REScheck Calculation Report^date:06/22/10 Data filename:\\Computerl\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 3.rck Page 5 of 5 rAir 2006 6 ECC Energy Efficiency Certificate Ceiling/Roof 38.00 Wall 15.00 Floor/Foundation 38.00 I Ductwork(unconditioned spaces): Window 0.33 0.27 I Door 0.50 NA Forced Hot Air Furnace 90 AFUE Electric Central Air Conditioner 15 SEER Water Heater: Name: Date: Comments: I I I I I j '� REScheck Software Version 4.2.2 AV I AV 0 Compliance Certificate Project Title: REScheck Calculation Energy Code: 2006 IECC Location: North Andover, Massachusetts Construction Type: Single Family Building Orientation: Bldg.faces 270 deg.from North Conditioned Floor Area: 2646 ft2 Glazing Area Percentage: 10% Heating Degree Days: 6322 Climate Zone: 5 Construction Site: Owner/Agent: Designer/Contractor: l Summer House SUN Engineering Inc. Unit#16 491 Maple Street North Andover,MA Suite 209 Danvers,MA 01923 . . - . - Algol, Compliance:4.2%.Better Than Code Gross Cavity Cont. Glazing LIA Assembly Area or R-Value R-Value or D.. Perimeter LI-Factor Wall 1:Wood Frame,16"o.c. 765 15.0 0.0 54 Orientation:Front Window 1:Wood Frame:Double Pane with Low-E 24 0.330 8 SHGC:0.27 Orientation:Front Door 1:Solid 42 0.500 21 Orientation:Front Wall 2:Wood Frame, 16"o.c. 863 15.0 0.0 55 Orientation:Back Window 2:Wood Frame:Double Pane with Low-E 152 0.330 50 f SHGC:0.27 Orientation:Back Wall 3:Wood Frame,16"o.c. 878 15.0 0.0 63 Orientation:Right Side Window 3:Wood Frame:Double Pane with Low-E 56 0.330 18 SHGC:0.27 Orientation:Right Side Wall 4:Wood Frame, 16"o.c. 1178 15.0 0.0 80 Orientation:Left Side Window 4:Wood Frame:Double Pane with Low-E 138 0.330 46 SHGC:0.27 I Orientation:Left Side Ceiling 1:Flat Ceiling or Scissor Truss 1572 38.0 0.0 47 Ceiling 2:Cathedral Ceiling(no attic) 125 38.0 0.0 3 Floor 1:All-Wood Joist/Truss:Over Unconditioned Space 1556 38.0 0.0 40 Furnace 1:Forced Hot Air 90 AFUE Air Conditioner 1:Electric Central Air 15 SEER l Compliance StatementThe proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2006 IECC requirements in REScheck Version 4.2.2 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Project Title: REScheck Calculation Report date: 06/22/10 Data filename:\\Computer1\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 4.rck Page 1 of 5 ++I I Name-Title Signature Date i i 0 I I I I I t I I I i i I I t I I Project Title: REScheck Calculation Report date: 06/22/10 i Data filename:\\Computer1\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 4.rck Page 2 of 5 ' i REScheck Software Version 4.2.2 Inspection Checklist Ceilings: ❑ Ceiling 1:Flat Ceiling or Scissor Truss,R-38.0 cavity insulation Comments: ❑ Ceiling 2:Cathedral Ceiling(no attic),R-38.0 cavity insulation Comments: Above-Grade Walls: ❑ Wall 1:Wood Frame, 16"o.c.,R-15.0 cavity insulation Comments: ❑ Wall 2:Wood Frame, 16"o.c.,R-15.0 cavity insulation Comments: ❑ Wall 3:Wood Frame, 16"o.c.,R-15.0 cavity insulation Comments: ❑ Wall 4:Wood Frame,16"o.c.,R-15.0 cavity insulation Comments: Windows: ❑ Window 1:Wood Frame:Double Pane with Low-E,U-factor:0.330 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: , ❑ Window 2:Wood Frame:Double Pane with Low-E,U-factor:0.330 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: ❑ Window 3:Wood Frame:Double Pane with Low-E,U-factor:0.330 For windows without labeled U-factors,describe features: Wanes Frame Type Thermal Break? Yes No Comments: ❑ Window 4:Wood Frame:Double Pane with Low-E,U-factor:0.330 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: Note:Up to 15 sq.ft.of glazed fenestration per dwelling is exempt from U-factor and SHGC requirements. Doors: ❑ Door 1:Solid,U-factor:0.500 Comments: Up to 40 sq.ft.of this door is exempt from the U-factor requirement. Floors: ❑ Floor 1:All-Wood Joist/Truss:Over Unconditioned Space,R-38.0 cavity insulation Comments: Floor insulation is installed in permanent contact with the underside of the subfloor decking. Heating and Cooling Equipment: Project Title: REScheck Calculation Report date: 06/22/10 Data filename:\\Computer1\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 4.rck Page 3 of 5 I C,] Furnace 1:Forced Hot Air:90 AFUE or higher Make and Model Number: . ❑ Air Conditioner 1:Electric Central Air:15 SEER or higher Make and Model Number: Air Leakage: ❑ Joints,penetrations,and all other such openings in the building envelope that are sources of air leakage are sealed. ❑ Recessed lights are either 1)Type IC rated with enclosures sealed/gasketed against leaks to the ceiling,or 2)Type IC rated and ASTM E283 labeled,or 3)installed inside an air-tight assembly with a 0.5"clearance from combustible materials and a 3"clearance from . insulation. �I Sunrooms: ❑ Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum skylight U-factor of 0.75.New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Vapor Retarder: ❑ Vapor retarder is installed on the warm-in-winter side of all non-vented framed ceilings,walls,and floors;or it has been determined that moisture or its freezing will not damage the materials;or other approved means to avoid condensation are provided. Comments: Materials Identification and Installation: i ❑ Materials and equipment are identified so that compliance can be determined. ❑ Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. Insulation R-values,glazing U-factors,and heating and cooling equipment efficienc are clear) marked on the building plans or ❑ 9 9 9 9Y Y 9 specifications. Duct Insulation: I ❑ Ducts in unconditioned spaces or outside the building are insulated to at least R-8. ❑ Ducts in floor trusses above unconditioned spaces or above the outdoors are insulated to at least R-6. Duct Construction: ❑ Air handlers,filter boxes,and duct connections to flanges of air distribution system equipment or sheet metal fittings are sealed and mechanically fastened. I ❑ All joints,seams,and connections are made substantially airtight with tapes,gasketing,mastics(adhesives)or other approved closure systems.Tapes and mastics are rated UL 181A or UL 181 B. ❑ Building framing cavities are not used as supply ducts. ❑ Automatic or gravity dampers are installed on all outdoor air intakes and exhausts. ❑ Additional requirements for tape sealing and metal duct crimping are included by an inspection for compliance with the International Mechanical Code. Temperature Controls: ❑ Thermostats exist for each separate HVAC system.A manual or automatic means to partially restrict or shut off the heating and/or { cooling input to each zone or floor is provided. Heating and Cooling Equipment Sizing: ❑ Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code. Circulating Service Hot Water Systems: ❑ Circulating service hot water pipes are insulated to R-2. ❑ Circulating service hot water systems include an automatic or accessible manual switch to tum off the circulating pump when the system is not in use. Heating and Cooling Piping Insulation: ❑ HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-2. Certificate: ❑ A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values;window U-factors;type and efficiency of space-conditioning and water heating equipment. NOTES TO FIELD:(Building Department Use Only) Project Title: REScheck Calculation Report date: 06/22/10 Data filename:\\Computer1\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 4.rck Page 4 of 5 . i I u d I I ' I I i II Project Title: REScheck Calculation Report date: 06/22/10 Data filename:\\Computer1\pc2 work files\Check\REScheck\2010 REScheck\Summer House Unit 4.rck Page 5 of 5 2006 !ECC Energy '*U'If Efficiency Certificate Ceiling/Roof 38.00 Wall 15.00 Floor/Foundation 38.00 Ductwork(unconditioned spaces): im Window 0.33 0.27 Door 0.50 NA Forced Hot Air Furnace 90 AFUE Electric Central Air Conditioner 15 SEER Water Heater: Name: Date: Comments: i I I I