HomeMy WebLinkAboutBuilding Permit #177-2012 - 1160 GREAT POND ROAD 9/1/2011 TOWN OF NORTH ANDOVER .
APPLICATION FOR PLAN EXAMINATION
Permit NO: /Q'7 Date Received
Date Issued: / / ' ^
IWORTANT:Applicant must complete all items on this page
LOCATi'ON TO—1s, Jen,,- . /I Gn 4ILL-A r PP^/D 1112 N. A uet-vnn NIA
Print
PROPERTY OWNER izi—k 1 5e H o, L-
Print
MAP NO: u PARCEL:62a ZONING DISTRICT: Historic District yes o
Machine Shop Village yes no
TYPE OF IMPROVEMENT PROPOSED USE -
Residential Non- Residential
&New Building ❑One family
❑Addition ❑Two or more family ❑Industrial
❑Alteration No. of units: ❑Commercial
❑ Repair, replacement ❑Assessory Bldg ❑ Others:
❑ Demolition ❑-Other iueF w Qi AN t r,1-y -
❑'Wetlands'` ❑ �Watershed,lDistrict'`
D S eptic, ❑Well -
p t �.� , f`
-a •?fTaer/Se�,Ner .add . s;:c
DES UR11 El ON OF WORD TO EE-�'-'ERiiO-Rlbf=�D:
'4j=L, L,w15TR we r10i,o S_T�2�__ wbUD �12�KE_d S7KV[T(/TLE
V 1T-4 73A set+F F+r , c I�,aZlc iAILLWEf Arspe LAZ b f1Ty .M/D---1,7II-I9Y W/26c
flrlq 1.trsc r1-rs ��Pnav�►K�r.IfiS_
(Identification Please Type or Print Clearly)
OWNER; Name; LoVHN �C?�EPhone: 9a8--t ZS--628U
Addressnn 61. swvovER ./UIQ o/Ay`•S
�( cHar—/M 7Z:�.A4f es : /ali(sS
CONTRACTOR Name: ,ysg-tet=r- MF, Phone: g�-•�s�_2zzU
Address: /a s��p rz u�H �n s,.lT>r- -30� n/EEfl1f/q RA AA 07-41N
Supervisor's Construction License: e s Exp. Date: 8-zc-tz
Home Improvement License: Exp. Date:
ARCH ITECT/ENGIN EErzcHrrErrf_Phone: 918--4Yy-3443
Address: Pt Pan r• ANo Y1 " ,c(� Reg. No._ gZo o
FEE SCHEDULE:B ULD/NG PERMIT:$92.00 PFR$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$?25.00 PER S.F.
Total Project Cost: $ 2,g sem, o0o FEE: $--- woo _
Check No.: 10 �-ct8 Receipt No.:'. ?1115:76
NOTE: Persons contracting with unregistered contractors do not have access to the guaran fund
. riatu
Building Department -
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
i
❑ Building Permit Application
❑ Workers Comp Affidavit
❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses
❑ Copy of Contract
❑ Floor Plan Or Proposed Interior Work
❑ Engineering Affidavits for Engineered products
MOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition Or Decks
❑ Building Permit Application -
❑ Certified Surveyed Plot Plan
❑ Workers Comp Affidavit
❑ Photo Copy of H.I.C. And C.S.L. Licenses
❑ Copy Of Cos r(aac
❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Mass check Energy Compliance Report (If Applicable)
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
t
New Construction (Single and Two Family)
❑ Building Permit Application
❑ Certified Proposed Plot Plan
❑ Photo of H.I.C. And C.S.L. Licenses
.❑ Workers Comp Affidavit
o Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
1 Hydraulic Calculations (If Applicable)
❑ Copy of Contract
a Mass check Energy Compliance Report
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg .Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp.the decision from the Board of Appeals
that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. one copy and proof of recording
must lie submitted with the building application
Dox Doc.BuildingPermit Revised 2008mi
L
Dimension
Number of Stories: 2 Total square feet of floor area, based on Exterior dimensions. h, 1a-z
Total land area, sq. it.: -
ELECTRICAL: Movement of Mc;ter location, mast or service drop requires approval of
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes No
MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine
NOTES and DATA-- For department use
• I
® Notified for pickup - Date
I
Doc:.Building Permit Revised 2008mi
"T
J
Plans
Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stan-,ped Plans ❑
TYPE OF SEWERAGE DISPOSAL
Public Sewer ElElTanning/Massage/BodyArt
Swimming Pools El
Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑
Private(septic tank,etc. ❑ • Permanent Dumpster on Site ❑
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF-U FORM
DATE REJECTED DATE APPROVED
} PLANNING & DEVELOPMENT ❑ ❑ �`
COMMENTS e
CONSERVA T ION Reviewed on,
��� Sic�natur
COMMENTS
HEALTH Reviewed on Signature
COMMENTS
Zoning Board of Appeals:Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board-Decision: Comments
,Conservation Decision: Comments
1Wat3r & Sevier Con nection/si nature&D Driveway Permit I �I
DPW Town Engineer: Signature:
Located 38 Os ood Street
X FIRE DEPARTMENT -Temp Dempster on site yes no
Located at 124 Main Street
Fire Department signature/date
COMMENTS
Location 1160
No. 7 7 " D/L Date
^T►, TOWN OF NORTH ANDOVER
F R
9
a ; : Certificate of Occupancy $
Building/Frame Permit Fee $ o0
J�cmus
Foundation Permit Fee $
Other Permit Fee $
TOTAL $ _
i
Check # 7�U
L`t 5J O /wilding Inspector
NORTH
` �
TO" of Andover . .
061 .
No. -'1C 1
��`( - tor, dover, Mass., `�. /�/
Y O �=- LAKE �.
I� COCHICHEWICK
7�ADARTED PV C;�
S V BOARD OF HEALTH
_----� Food/Kitchen
PERMIT T D -d-'�)�— ce Sy tr/e/ L
11INSPECTOR
THIS CERTIFIES THAT........... ..�..d. ......0 . ' X,
1C -P..............................................................
...........
r oundation'
/�
has permission to erect......... .............................. buildings on .. ...l�f�..d....... .:.. "�^ f............. ug
!C f2h 1 �f'j�5-� �, Chimney
to be occupied as............. ............. .:........:........................................ .............:......................:
provided that the person accepting this permit shall in every respect conform to the terms of the application on file in Fine' f U
this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of
Buildings in'the Town of North Andover. PL ING SECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit.
Finale"
PERMIT EXPIRES IN 6 MONTHS
ELECTRICAL INSP CTOR
UNLESS CONSTRUCTION STARTS
.................................................. Service
BUILDING INSPECTOR
Fin Olt 1`z-
Occupancy Permit Required to Occupy Building GAS INSPECTOR
Roughj'� � -
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To BeDone ��� �� �DEPARTMENT
Until Inspected and Approved by the Building Inspector. B ner - °
Street No.
SEE REVERSE SIDE 4bea-- Smoke Det.y . `f 7 12.
-
NORTH Q'
TO'" Of And
0
No. :77 - 41 - 7
t° =
ort dover, Mass.,
COC'ICMEWICK
7�s RATED P'P" \' 5�
U BOARD OF HEALTH
--- Food/Kitchen
�..�',._.=- Sy to
S/PERMIT T D
�. ,
INSPECTOR
THISCERTIFIES THAT.............................:................................................................................................................................. ounda n
haspermission to erect........................................ buildings on ..............................:................................:............................... ug
tobe occupied as......................:.....................:......................:...................................................................................................: Chimney
provided that the person accepting this permit shall in every respect conform to the terms of the application on file in Fine C'�a ,"rJ•
this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of
Buildings in'the Town n of North Andover. PL SING S ECTOJR
VIOLATION of the Zoningor Building Regulations Voids this Permit. Rough,71 /
. 9 9
Final ji-ove�
PERMIT EXPIRES IN 6 MONTHS
ELECTRICAL INS CTOR
UNLESS CONSTRUCTION STARTS
'Service
BUILDING INSPECTOR
Fin ait
Occupancy Permit Required to Occupy Building G S7INS
Rough �� ''��E
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done DEPARTMENT J
Until Inspected and Approved by the Building Inspector. Yner �
Street No.
SEE REVERSE SIDESmoke Det. ; �Z
f � •
GENERAL BUILDING NOTES/CHECKLIST-NOT LIMITED TO ITEM LOW C� C
S
POST ALL LOT NUMBERS,ADDRESS, AND PERMIT(COPY 0 no inspecti ns �s
INSPECTIONS: (Minimum) Excavation , Footing, Foundation, Frame Insulation, inab '� \
FOOTINGS: Continuous Full 2x4 Keyway ( ,
Continuous strip footings for interior columns `^ C
FOUNDATION: Rebar as required
Anchor bolts or straps
Damproofing1 :*
Foundation drain-pipe/stone/fabric filter/co "�_\_Ih d c utlet-connec
FRAME:Fireblock-over girts/plates between floor joist
_ U
Penetrations for plumbing, heat, elec,etc.
Walls at stair stringers.
Windbrace corners and center bearing partitions.l\
Size ridge to provide full bearing at rafter cuts. '( "
Hip and Valley rafters-watch bearing at walls.
Ridge&Hip-Provide proper connections. � b
Cathedral roof rafters provide proper connection'sal9 I 34s "Hurr cane Clips"tie to plate.`
Stair stringers-watch cuts and-heal support.
Joist hangers-fully nailed w/hanger nails.
Sill plates 2-2X6(1 PT)w/sill seal. !l
Girls-solid brick or steel plate bearing at foundations
air space at sides in foundation pockets
Lateral bracing at ends.
Certified calculations. required for Beams/LVL's Truss
Solid bearing support for Headers/Beams etc.
Check headroom clearances-stairways, under beams
Attic Access. (min.22x30 w/3' headroom above). tt`�
Crawls ace access. (min. 18x24).
�
Bath exhaust fans to have metal duct to exterior(not in soffit). r
Firecode S/R wood frame of"0"clearance fireplaces&stoves
Window Schedule or Every Habitable Room Must Have:
Natural light equal to 8%of floor area. c `
of required glazing shall be openable. ,
Bedrooms required min.20x24 egress window or door
Vent ro-attics aces "proper er vent" soffit and required ridge vents.
P
Firecode under stairs if used for storage
FIREPLACES: Separate permit required.
Inspections at Footing-Smoke Chamber- Finish
Smooth parging, clean joints,8"solid @ combust.
DECKS: �house;..provide flashing.
shirr �6~-hi@"aluster max space 5"on center.
e\$`abeve grade, use 6x6 posts w/lateral bracing.
-ag_all_posts and rails.
Pier footings down 48", Conc. pad at stair base.
FINISH: Handrails returned to wall/newall post.
Guardrails required alongside open cellar stairs.
Exterior grading complete.
Certificate or occupancy required prior to occupying structure. -�
Temporary Stairs required for inspection.
Re inspection fee- $30.00(Be Ready).
Certificate of occupancy required prior to occupying structure.. ' . _r)
r 1 U
1
pwlzr-
7- fi =t _
GENERAL BUILDING NOTES/CHECKLIST-NOT LIMITED TO ITEIM4 EiLOW CS
POST ALL LOT NUMBERS,ADDRESS, AND PERMIT(COPY 0 Jno inspecti
i � y
INSPECTIONS: (Minimum) Excavation , Footing, Foundation, Frame Insulation, I inab I
FOOTINGS: Continuous Full 2x4 Keyway
Continuous strip footings for interior columns `^
F
FOUNDATION: Rebar as required t
Anchor bolts or straps
Damproofing
o ,
Foundation drain-pipe/stone/fabric filter/cov d utlet_conn ion. \
FRAME:Fireblock-over girts/plates between floor joist I r~ a
Penetrations for plumbing, heat,elec,etc.
Walls at stair stringers. y
Windbrace corners and center bearing partitions.l\
Size ridge to provide full bearing at rafter cuts. �(
Hip and Valley rafters-watch bearing at walls.
Ridge&Hip-Provide proper connections. l
Cathedral roof rafters provide proper connections Na d s "Hurr cane Clips"tie to plate.
Stair stringers-watch cuts and,heal support. I
Joist hangers-fully nailed w/hanger nails.
Sill plates 2-2X6(1 PT)w/sill seal. �l
Girts-solid brick or steel plate bearing at foundations
air space at sides in foundation pockets
Lateral bracing at ends.
Certified calculations. required for Beams/LVL's Trusses,
Solid bearing support for Headers/Beams etc. `J
Check headroom clearances-stairways, under beams
Attic Access. (min.22x30 w/3' headroom above). tZ`�
Crawl space access. (min. 18x24).
Bath exhaust fans to have metal duct to exterior(not in soffit). h
Firecode S/R wood frame of"0"clearance fireplaces&stoves °4
Window Schedule or Every Habitable Room Must Have:
Natural light equal to 8%of floor area. �. e
'/of required glazing shall be openable.
Bedrooms required min. 20x24 egress window or door. R,
Vent attic spaces-"proper vent", soffit and required ridge vents.
Firecode under stairs if used for storage
FIREPLACES: Separate permit required. ® p
Inspections at Footing-Smoke Chamber- Finish 'gyp
Smooth parging, clean joints,8"solid @ combust.
DECKS: ag t house;.provide flashing.
'sn�8 i§"aluster max space 5"on center.
r8'=abeve grade, use 6x6 posts w/lateral bracing. i
.posts and rails.` .
Pier footings down 48", Conc. pad at stair base. �.
FINISH: Handrails returned to wall/newall post. �r
Guardrails required alongside open cellar stairs.
eq 9 P
Exterior grading complete.
Certificate or occupancy required prior to occupying structure. - �
Temporary Stairs required for inspection.
Re-inspection fee- $30.00(Be Ready).
Certificate of occupancy required prior to occupying structure.
N �
ryORT►•�
® of
0
Q = LAKE a dover, Mass.,— 91111.1
IV
C OC MIC HEWICN yI(.
SATED p'? �2
U BOARD OF HEALTH
PERMIT T D Food/Kitchen
Septic System
BUILDING INSPECTOR
THIS CERTIFIES THAT............ . .
r� ..... �./00I..........................................
"""""""""""' Foundation
has permission to erect........................................ buildings on .116.E 9�! t�o;"L�/!( ...... .... ........................ Rough
to be occupied as SG p.�1. �'. °torr.. �� �! Chimney
provided that the person accepting this permit shall in eve respect conform to the terms of tlPpplication on file in Final
this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Afteratidn and Construction of
Buildings 'In'the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRES IN 6 MONTHS
T T ►q- ELECTRICAL INSPECTOR
UNLESS CONSTRUCTION S� 1L S Rough
�j
......... . :..r+.... .... Service
B LDING INSPECTOR
Final
Occupancy Permit Required to Ocatpy Building GAS INSPECTOR
Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE.DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
SEE REVERSE SLIDE Smoke Det.
NORTH
0 0r6 over
= VIA
LAKE o '� dover, Mass., 911111
coca CHEwiCH �1'
.QS RATED P,Pa,`��
U BOARD OF HEALTH
Food/Kitchen
PERMIT T D Septic System
BUILDING INSPECTOR
THIS CERTIFIES THAT............��Iho c..... -....................
............................................. ......................... Foundation
has permission to erect........................................ buildings on .,1 .tl... ,1 TTnGRough
to be occupied as................./ /�� ......SOS►. ...............
... .. .. il .�`. � KIM
...... a.� G,�s Chimn y
e
provided that the person accepting this permit shall in eve respect conform to the terms ofpplication on file in Final-
this
inal
this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alterand Construction of
Buildings in'the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRES IN 6 MONTHS
ELECTRICAL INSPECTOR
UNLESS CONSTRUCTION ST TS Rough
..... .. ....... . . .... .......
Service
B LDING INSPECTOR
Final
Occupancy Permit Required to Occupy Building GAS INSPECTOR
Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE-DEPARTMENT
Until Inspected and Approved--by-,the Building Inspector. Burner
Street No.
SEE REVERSE SIDE Smoke Det.
ROB BRAMHALL ARCHITECTS
August 31,2011
Gerald Brown
Inspector of Buildings
1600 Osgood Street
North Andover,MA 01845
Dear Gerald:
The New dormitory at the Brooks school has been designed in accordance with the requirements of the
Massachusetts Architectural Access Board(521 CMR). I have summarized the review of the requirements for this
project for your use.
Massachusetts Architectural Access Board Regulations
All areas open to the general public(residents,students,etc.)are required to comply with the requirements of the
Massachusetts Architectural Access Board(521 CMR).
This section includes the following major provisions:
All public entrances must be accessible(521 CMR 25.1).
• All public and common use areas must be accessible and provided with an accessible route thereto(521
CMR Section 8.2 and 20.1). Note that an elevator is not required since the building is less than 3 stories
and no common use areas are located on the 2nd Floor(521 CMR 8.5.2).
• Based on 22 beds,at least I bed and the associated amenities must be
accessible(521 CMR 8.4).
• At least 1 dormitory unit must be designed for a person who is deaf or
hard of hearing(521 CMR 8.4.5).
• Accessible toilet rooms that comply with 521 CMR Chapters 30 and 31
must be provided for the dormitory units(521 CMR 8.2.1).
• The apartments are not required to be designed to meet Group I
requirements since they are 2 stories in height(townhouses)or not
located on the Ground Floor(521 CMR 9.6& 9.3). Since the building
contains less than 20 apartments,they are not required to meet Group 2
requirements(521 CMR 9.4).
Please call with any questions.
Sincerely,
ROB BRAMHALL ARCHITECTS, INC.
I�
Robert A.Bramhall,AIA
Principal
14 Park Street
Andover,Massachusetts
01810
Telephone:978 749 3663
Facsimile:978 749 9659
REGISTERED ARCHITECTURAL AND ENGINEERING SERVICES
CONSTRUCTION CONTROL AFFIDAVIT
PROJECT TITLE: Brooks School—New Dormitory
PROJECT LOCATION: Brooks School
1160 Great pond Road
North Andover, MA 01845
SCOPE OF PROJECT: New construction
In accordance with the Massachusetts State Building Code,I John L. Scott,Mass.Registration No.29134 being a registered
professional engineer/architect hereby certify that I have prepared
or directly supervised the preparation of all design plans,computations and specifications concerning:
ENTIRE PROJECT ARCHITECTURAL STRUCTURAL
MECHANICAL FIRE PROTECTION ELECTRICAL
CIVIL OTHER(specify)
For the above named project and that,to the best of my knowledge,such plans,computations and specifications meet the
applicable provisions of the Massachusetts State Building Code.All acceptable engineering practices and all applicable laws for
the proposed project.
I further certify that I shall perform the necessary professional services and be present on the construction site on a regular and
periodic basis to determine that the work is proceeding in accordance with the documents approved for the building permit and
shall be responsible for the following as specified in the building code.
1. Review,for conformance to the design concept,shop drawings,samples and other submittals which are submitted by the
contractor in accordance with the requirements of the construction documents.
2.Review and approval of the quality control procedures for all code-required materials.
3.Be present at intervals appropriate to the stage of construction to become,generally familiar with the progress and quality of
the work and to determine, in general,if the work is being performed in a manner consistent with the construction documents.
1 shall submit periodically,a progress report together with pertinent comments to the Building
Department.Upon Completion of the Work as needed,I shall submit a final report as to the satisfactory completion and readiness
of the project for occupancy.
Signature
Subscribed and sworn to me this—. 3�'� day of 20l
NOTARY PUBLIC My Commission Expires On
KATHLEEN HILLER,Notary Public
My Commission Expires September 23,2014
-1-
REGISTERED ARCHITECTURAL AND ENGINEERING SERVICES
CONSTRUCTION CONTROL AFFIDAVIT
PROJECT TITLE: Brooks School—New Dormitory
PROJECT LOCATION: Brooks School
1160 Great pond Road
North Andover, MA 01845
SCOPE OF PROJECT: New construction
In accordance with the Massachusetts State Building Code,I,—Robert A.Bramhall
Mass.Registration No._8200_being a registered professional engineer/architect hereby certify that I have prepared
or directly supervised the preparation of all design plans,computations and specifications concerning:
ENTIRE PROJECT _X_ARCHITECTURAL STRUCTURAL
MECHANICAL FIRE PROTECTION ELECTRICAL
OTHER(specify)
For the above named project and that,to the best of my knowledge,such plans,computations and specifications meet the
applicable provisions of the Massachusetts State Building Code.All acceptable engineering practices and all applicable laws for
the proposed project.
I further certify that I shall perform the necessary professional services and be present on the construction site on a regular and
periodic basis to determine that the work is proceeding in accordance with the documents approved for the building permit and
shall be responsible for the following as specified in the building code.
1.Review,for conformance to the design concept,shop drawings,samples and other submittals which are submitted by the
contractor in accordance with the requirements of the construction documents.
2.Review and approval of the quality control procedures for all code-required materials.
3.Be present at intervals appropriate to the stage of construction to become,generally familiar with the progress and quality of
the work and to determine,in general,if the work is being performed in a manner consistent with the construction documents.
I shall submit periodically,a progress report together with pertinent comments to the Building
Department.Upon Completion of the Work as needed,I shall submit a final report as to the satisfactory completion and readiness
of the project for occupancy.
Signature
Subscribed and sworn to me this day of krlyn- 2011
� fi)
4"L_& —
NOTARY PUBLI My Commission
EDWARD M.NYME
Notary Pubic,CommoMMM of Maaeschumb
My Commkaion Fom August 4,2D17
-1-
{r '
muma husett%- Uep;t1•tntenl ul'Public S'Arcq
iSuard ul'Buildimt Rc�ul:uiuns:u►(1 4tand;u•dx
construction Supervisor License
License: CS 74387
KEVIN P RANDALL
91 WALKER R ST
NEWTONVILLE, EWA 02460
Expiration: 812612012
2450
REGISTERED ARCHITECTURAL AND ENGINEERING SERVICES
CONSTRUCTION CONTROL AFFIDAVIT
PROJECT TITLE: Brooks School—New Dormitory
PROJECT LOCATION: Brooks School
1160 Great pond Road
North Andover, MA 01845
SCOPE OF PROJECT: New Construction
In accordance with the Massachusetts State Building Code,1, Erik M.Gath
Mass. Registration No. 48162 being a registered professional engineer/architect hereby certify that I have
prepared or directly supervised the preparation of all design plans,computations and specifications concerning:
ENTIRE PROJECT ARCHITECTURAL STRUCTURAL
X MECHANICAL FIRE PROTECTION ELECTRICAL
OTHER(specify)
For the above named project and that,to the best of my knowledge,such plans,computations and specifications meet the
applicable provisions of the Massachusetts State Building Code.All acceptable engineering practices and all applicable laws for
the proposed project.
I further certify that I shall perform the necessary professional services and be present on the construction site on a regular and
periodic basis to determine that the work is proceeding in accordance with the documents approved for the building permit and
shall be responsible for the following as specified in the building code.
1.Review,for conformance to the design concept,shop drawings,samples and other submittals which are submitted by the
contractor in accordance with the requirements of the construction documents.
2.Review and approval of the quality control procedures for all code-required materials.
3.Be present at intervals appropriate to the stage of construction to become,generally familiar with the progress and quality of
the work and to determine,in general, if the work is being performed in a manner consistent with the construction documents.
I shall submit periodically,a progress report together with pertinent comments to the Building Department.Upon Completion of
the Work as needed,I shall submit a final report as to the satisfactory completion and read' ss of the pro'ect for occupancy.
Signature JU
Sub *
bsw to me this 24th day of August 2011 .
October 24,20 14
NOTARY PUBLIC My Commission Expires On
IA OF 4f4,9
ERIK M. tiG
GATH m
o
MECHANICAL +
DONNA P. HAGENS _ No.48162 C'
NOTARY PUBLIC 1 900 /STER��
COMMONWEALTH OF MASSACHUSETTS Fps/0
My Commission Expires Oct.24,2014 NAL
REGISTERED ARCHITECTURAL AND ENGINEERING SERVICES
CONSTRUCTION CONTROL AFFIDAVIT
PROJECT TITLE: Brooks School—New Dormitory
PROJECT LOCATION: Brooks School
1160 Great pond Road
North Andover, MA 01845
SCOPE OF PROJECT: New Construction
In accordance with the Massachusetts State Building Code,I, John C.Pierga
Mass.Registration No. 48291 being a registered professional engineer/architect hereby certify that I have
prepared or directly supervised the preparation of all design plans,computations and specifications concerning:
ENTIRE PROJECT ARCHITECTURAL STRUCTURAL
MECHANICAL FIRE PROTECTION X ELECTRICAL
OTHER(specify)
For the above named project and that,to the best of my knowledge, such plans,computations and specifications meet the
applicable provisions of the Massachusetts State Building Code.All acceptable engineering practices and all applicable laws for
the proposed project.
I further certify that I shall perform the necessary professional services and be present on the construction site on a regular and
periodic basis to determine that the work is proceeding in accordance with the documents approved for the building permit and
shall be responsible for the following as specified in the building code.
1.Review,for conformance to the design concept,shop drawings,samples and other submittals which are submitted by the
contractor in accordance with the requirements of the construction documents.
2.Review and approval of the quality control procedures for all code-required materials.
3.Be present at intervals appropriate to the stage of construction to become,generally familiar with the progress and quality of
the work and to determine,in general,if the work is being performed in a manner consistent with the construction documents.
I shall submit periodically,a progress report together with pertinent comments to the Building
Department.Upon Completion of the Work as needed,I shall submit a final report as to the satisfactory completion and readiness
of the project for occupancy.
Signature 1k.
Subs 'bed and swo to me this 24th day of August 2011 .
October 24,2014
NOTARY PUBLlit 0 My Commission Expires On P�_SH OF RqS,
JOHN C. tiG
s
c PIERGA
ELECTRICAL
v
+ No.48291
DONNA P. HAGENS
*� NOTARY PUBLIC
COMMONWEALTH OF MASSACHUSETTS SSS/ONAL ANG
My Commission Expires Oct.24,2014
REGISTERED ARCHITECTURAL AND ENGINEERING SERVICES
CONSTRUCTION CONTROL AFFIDAVIT
PROJECT TITLE: Brooks School—New Dormitory
PROJECT LOCATION: Brooks School
1160 Great pond Road
North Andover, MA 01845
SCOPE OF PROJECT: New construction
In accordance with the Massachlisetts State Building Code,I, J! �yE� 451 L+�
Mass.Registration No. % being a registered professional engineer/architect hereby certify that I have prepared
or directly supervised the preparation of all design plans,computations and specifications concerning:
ENTIRE PROJECT ARCHITECTURAL STRUCTURAL
MECHANICAL FIRE PROTECTION ELECTRICAL
OTHER(specify)
For the above named project and that,to the best of my knowledge,such plans,computations and specifications meet the
applicable provisions of the Massachusetts State Building ng Code.All acceptable engineering practices and all applicable laws for
the proposed project.
I further certify that I shall perform the necessaryprofessional services and be resent on the construction site on a regular ular and
P p g
periodic basis to determine that the work is proceeding in accordance with the documents approved for the building permit and
shall be responsible for the following as specified in the building code.
1.Review, for conformance to the design concept,shop drawings, samples and other submittals which are submitted by the
contractor in accordance with the requirements of the construction documents.
2.Review and approval of the quality control procedures for all code-required materials.
3.Be present at intervals appropriate to the stage of construction to become,generally familiar with the progress and quality of
the work and to determine,in general, if the work is being performed in a manner consistent with the construction documents.
I shall submit periodically,a progress report together with pertinent comments to the Building
Department.Upon Completion of the Work as needed,I shall submit a final report as to the satisfactory completion and readiness
of the project for occupancy. `
Signature
SubscriW and sworn to me this 'L S 7H day of A44UrT 201.1
O2�j5r2oi3
NO UBLIC My Commission Expires On
ERIN E. WALKER
NOTARY PUBLIC
�2 COMMONWEALTH OF MASSACHUSETTS
-1- {..,N.+MY COMMISSION EXPIRES.02/1�5/2O 3
The Commonwealth of Massachusetts
1 Department of Industrial Accidents
1''E M. - Office of Investigations
:'EN
600 Washington Street
Boston, MA 02111
www.nzass.gov/dia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Legibly
Name (Business/Organization/Individual); ^1 vier eorvsrAue-neN CcR?..
Address: /o K&-NAA1&Y i20 5c lr-- 30 7
City/State/Zip: i1477phlogm x44 o2494 Phone #:_78/--q53 -2z2o
Are you an employer?Check the appropriate box: Type of project(required):
1.Q I am a employer with 2_� 4. ❑ 1 am a general contractor and 1 6. 0 New construction
P
(full and/or part-time).* have hired the sub-contractors
2.❑ I am a sole proprietor or partner- listed on the attached sheet t 7. ❑ Remodeling
ship and have no employees These sub-contractors have 8. ❑Demolition.
workingfor me in an capacity, workers' cotnp. insurance.
y p �'• 9. ❑ Building addition
[No workers'comp. insurance 5. ❑ We are a corporation and its
10.7 Electrical repairs or additions
required.] officers have exercised their
3.❑ i am a homeowner doing all work right of exemption per MGL 11.0 Plumbing repairs or additions
myself.[No workers'comp. c. 152, §1(4),and we have no 12.❑ Roof repairs
insurance required.)t employees. [No workers' 13.❑ Other
comp. insurance required.]
*Any applicant that checks boz#l must also fill out the section below showing their workers'compensation policy information.
t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
xContractors that check this box must attached an additional sheer showing the name of the sub-contractors and their workers'comp.policy information.
!am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name: /1_2A11 .zgE71S 1A15*61 0A1e.E eo.
Policy#or Self-ins. Lic.#: USS-42/21-5/oy-P1i'W Expiration Date: ?-30-00//
.lob Site Address: 9�--140,CL
/iso City/State/Zip: A14v.40azx ililp 0%45-
o,oM rW aiL/>ovE�, At/A
Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
Ido hereby certify under he pains ndpenalties of perjury that the information provided above is true and correct
Signature: Date: 9/9 s1//
Phone 4: ?6/- 453-2220 x107
Official use only. Do not write in this area,to he completed by city or town official,
City or Town: Permit/License#
Issuing Authority(circle one):
1. Board of Health 2. Building Department 3.City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector
6.Other
Contact Person: Phone#:
FIRE PROTECTION NARRATIVE
Brook Academy
New Dormitory
, North Andover, Massachusetts
DATE: AUGUST 25, 2011
TO: North Andover lnspectional Services z OF M
FROM: Mike Denommee r NETT t (sm
ECK _+
BLW Engineers M CAL
446
SUBJECT: Brooks Academy—New Dormatory �
PROPOSED FIRE PROTECTION SYSTEMS
COPIES TO: File
Gentlemen, in accordance with the Massachusetts State Building Code 8"' edition chapter
9, we respectfully submit for your review this narrative on the proposed new fire
protection systems at the new Dormitory building located at the Brooks Academy campus
in North Andover, Massachusetts.
SECTION 1 —BUILDING DESCRIPTION
1. Building use group is R-2 (Dormitories) and R-3 (Apartments).
a. Basement floor area=6,072 square feet
b. First floor area=6,072 square feet
c. Second floor area=5,900 square feet
d. Attic floor area=unfinished attic
2. Type of Occupancy Within Building-Residential.
3. Building is 40'-11"from lowest level slab to high point of sloping roof.
4. Construction type is 5b.
5. Hazardous Material Storage—not applicable
6. High Piles Storage Over 12 Feet—not applicable
7. Vehicles can access the site via Service Rd.,to the building's entrance.
Page 1 of 7
i
FIRE PROTECTION NARRATIVE
Brook Academy
New Dormitory
North Andover, Massachusetts
SECTION 2—APPLICABLE LAWS,REGULATIONS AND STANDARDS
1. 780 CMR THE MASSACHUSETTS STATE BUILDING CODE, 8"' edition
2. 780 CMR CHAPTER 9, "FIRE PROTECTION SYSTEMS"
3. NFPA 13 "STANDARD FOR THE INSTALLATION OF SPRINKLER
SYSTEMS" 1999 edition
4. NFPA 25 "STANDARD FOR THE INSPECTION,TESTING, AND
MAINTENANCE OF WATER-BASED FIRE PROTECTION
SYSTEMS" 1998 edition
5. M.G.L. 148 MASSACHUSETTS GENERAL LAW CHAPTER 148 "FIRE
PREVENTION"(as applicable)
6. 527 CMR FIRE PREVENTION REGULATIONS (as applicable)
7. NFPA 14 "STANDARD FOR STANDPIPE AND HOSE SYSTEMS"
8. NFPA 24 "STANDARD FOR PRIVATE SERVICE MAINS"
9. All applicable regulations and criteria of the local fire department and the owners
insurance authority.
10. All applicable sections and regulations of OSHA and ADA.
11. NFPA 70 NATIONAL ELECTRIC CODE
12. NFPA 72 NATIONAL FIRE ALARM CODE
13. Town of Newton—Fire Department Rules and Regulations for Fire Alarm and
Sprinkler Systems.
SECTION 3—DESIGN RESPONSIBILITY FOR FIRE PROTECTION SYSTEMS
1. The sprinkler contractor shall provide a registered professional engineer(PE)who
shall produce a complete set of hydraulically calculated sprinkler and standpipe
systems drawings as required by NFPA-13, NFPA-14 and NFPA-24 latest
accepted editions. The sprinkler contractor's registered engineer shall make the
drawings complete in every respect and shall show all piping runs, lengths,
dimensions, fittings, elevations call-outs, sprinkler head locations, pipe sizing,
hangers, seismic bracing, equipment layouts, hydraulic calculation nodes and all
appropriate details. The sprinkler contractor's registered engineer shall provide
all hydraulic calculations to verify the pipe sizing of the sprinkler and standpipe
systems. The sprinkler contractor's registered engineer shall stamp all sprinkler
drawings and hydraulic calculations and shall submit these to the fire department
and owner's insurance authority for approval and permit. No fire protection work
shall begin until the sprinkler contractor has obtained approval for all sprinkler
and standpipe systems from the fire department and the owner's insurance
authority. The sprinkler contractor will conduct a new hydrant flow test at the site
in order to obtain current flow and pressure data and shall use this newly obtained
Page 2 of 7
FIRE PROTECTION NARRATIVE
Brook Academy
New Dormitory
North Andover, Massachusetts
data to perform the hydraulic calculations for the fire protection system shop
drawings.
SECTION 4—FIRE PROTECTION SYSTEMS TO BE INSTALLED
The new sprinkler systems will be automatic, wet pipe sprinkler and standpipe systems
for the building interior spaces. The building sprinkler systems will be designed in
accordance with NFPA-13. Due to the construction of the building and in accordance
with NFPA-13, concealed spaces above ceilings will not be provided with sprinkler
coverage. All sprinkler heads used shall be listed residential type in dwelling spaces and
listed quick response type for all areas outside of dwelling spaces. Temperature ratings
for all sprinkler heads shall be in accordance with NFPA-13. Standpipe systems shall be
provided in accordance with NFPA-14 and the Massachusetts State Building 8"'p g Code 8
edition.
The new fire sprinkler systems systems in the building will be supplied via a new
underground fire service main connected to the site water main. The new underground
fire service main will be brought up into the sprinkler room within the new building. The
new fire service main will be provided with a new double check valve backflow preventer
at the point of entry into the sprinkler room. A new single wet system alarm check valve
will be located on the sprinkler system side of the backflow preventer. This wet system
alarm check valve and riser will supply all of the sprinkler / standpipe systems in the
building. A fire department connection will be located on the outside of the building and
ata point of vehicle access. The fire department connection piping will be provided with
a check valve in accordance with NFPA-13. An electric alarm bell will be provided on
the outside of the building adjacent to the fire department connection. A master water
flow switch will be provided on the sprinkler riser in the sprinkler room. The fire
department connection will have the ability to charge all of the sprinkler and standpipe
systems in the building.
The sprinkler systems in the new building will be supplied via sprinkler riser that will be
located in a main egress stairway of the building. Each floor will be on a separate
sprinkler zone and an isolation zone valve, check valve, flow switch and pressure gauge
will be provided on the sprinkler main serving the sprinkler systems of each floor of the
building. An inspectors test and drain valve will be provided at each floor zone station.
A drain riser will be provided and will collect the test and drain valves on each floor and
will discharge to outside the building. All sprinkler risers will be provided with isolation
valves at the base of each riser for separate isolation.
Page 3 of 7
FIRE PROTECTION NARRATIVE
Brook Academy
New Dormitory
North Andover, Massachusetts
The sprinkler systems throughout the building will be automatic wet pipe. All sprinkler
systems will be designed and installed in accordance with NFPA-13. General use areas
and assembly areas will be hydraulically calculated per NFPA-13 at a light hazard
occupancy, with a design density of .10 gpm per the most remote 1500 square feet. A
100 gpm hose stream allowance will be provided. Mechanical rooms will be
hydraulically calculated per NFPA-13 at an ordinary hazard occupancy group 2, with a
design density of.20 gpm per the most remote 1500 square feet and will be provided with
a 250 gpm hose stream allowance. The residential areas in the building will be calculated
using the compartment method and the area / density method in accordance with NFPA-
13. All residential sprinkler heads will be supplied with flows and pressures in
accordance with the sprinkler head manufacturer's listings and NFPA-13. All standpipe
systems will be hydraulically calculated in accordance with NFPA-14 and the
Massachusetts State Building Code 8th edition.
All control valves will be electrically supervised. All sprinkler systems shall be UL listed
and / or FM approved for fire service use. All sprinkler systems and equipment shall be
rated at 175 psi working pressure. The fire department connection will have the ability to
charge all of the new sprinkler and standpipe systems in the building. A new hydrant flow
test will be conducted by the sprinkler contractor in order to obtain current flow and
pressure data. This flow data will be used to hydraulically calculate the new sprinkler
systems for the fire protection system shop drawings.
All sprinkler and standpipe systems will be designed, tested and installed in accordance
with the applicable sections of the Massachusetts State Building Code 8th edition and
NFPA-13 and NFPA-14 latest accepted editions as well as the regulations and guidelines
of the local authority. All sprinkler systems will be seismically braced in accordance with
the Massachusetts State Building Code 8th edition and NFPA-13. All sprinkler systems
will be designed, tested and installed by a sprinkler contractor licensed and experienced
in Massachusetts for fire sprinkler systems.
SECTION 5—FEATURES USED IN THE DESIGN METHODOLOGY
FIRE ALARM SYSTEM
1. The fire alarm system shall be an addressable system that meets UL, the requirements
for NFPA and the North Andover Fire Department Bylaws. The devices shall be
installed in accordance with the floor plan layouts. The main fire alarm control panel
shall be located in the main electrical room with an annunciator located in the main
Page 4 of 7
FIRE PROTECTION NARRATIVE
Brook Academy ,
New Dormitory
North Andover, Massachusetts
lobby. The remainder of the building will be provided with required pull stations,
speaker strobes and strobe only units as required by NFPA, ADA and Massachusetts
State Building Code.
2. New Audio/visual alarms shall be utilized throughout the facility and the coverage
shall meet the requirements of NFPA and ADA. Visual alarms shall be utilized in
small areas such as bathrooms and corridors were ample audio alarm is present.
3. Non-system combination smoke/carbon monoxide detectors will be provided in each
dorm room. Smoke detectors shall be located in the corridors connecting the dorm
rooms. Accessible units shall be provided with Strobes to meet the requirements of
ADA.
4. A radio-controlled master box and antenna will be provided as required by the North
Andover Fire Department as well as a key box and beacon.
5. Batteries shall provide for 24 hours of operation followed by a 10-minute ring down.
Battery calculations shall be submitted by the EC with the cut sheets and drawings to
the fire department for review and approved.
6. Emergency lighting shall be provided throughout the facility and consists of LED exit
signs and egress lighting via battery ballasts within normal fixture lighting.
7. Tamper, flow and pressure switches shall be provided to accommodate the sprinkler
system being installed. The tamper and flow switches shall be connected to the Fire
Alarm Control Panel via addressable modules.
I� SECTION 6—TESTING CRITERIA
1. All Testing of the new underground fire service main and the building interior
sprinkler and standpipe systems devices, piping, heads and valves, shall be
performed by a licensed sprinkler contractor, experienced in the installation and
testing of fire sprinkler and standpipe systems in the state of Massachusetts. This
sprinkler contractor shall provide all coordination of the sprinkler tests with the
fire department. All sprinkler and standpipe systems tests shall be witnessed by
the fire department, owner's representative and owner's insurance authorized
personnel. Sprinkler contractor shall give notification to the local fire department,
owners representative, owners insurance authority and all other authorities, prior
to the conducting of any sprinkler and standpipe tests.
2. All sprinkler systems testing shall be performed in strict accordance with NFPA-
13,NFPA-24 and NFPA-25, latest accepted editions.
3. The sprinkler contractor shall provide all equipment, water, pumps, labor, etc.,
necessary to conduct all testing required by NFPA 13, 24 and 25, and shall obtain
all required approvals from the fire department, building code official, owner's
insurance authority, and all other authorities upon completion of the sprinkler
Page 5 of 7
FIRE PROTECTION NARRATIVE
Brook Academy
New Dormitory
North Andover, Massachusetts
systems testing. All dates and times of the sprinkler systems testing shall be
coordinated by the sprinkler contractor with the fire department, owner's
representative, and the owner's insurance.authority.
4. The sprinkler contractor shall be responsible for the supervision of all installation,
testing and flushing of the new underground fire service main for the building up
to and including the final connection to the existing site water main. The
sprinkler contractor shall fill out testing and flushing reports for all of the
underground fire service piping and all of the s rinkler and standpipe systems
piping within the building in accordance with NFPA-13 and NFPA-24.
SECTION 7—EQUIPMENT AND TOOLS
1. The sprinkler contractor shall have at the site, at the time of sprinkler installation
and testing, and readily available for use and inspections, all .tools, equipment,
permits, hoists, scaffolding, piping, fittings, valves and all required tools and
equipment necessary for the complete installation of all fire protection systems.
2. The sprinkler contractor shall provide all gauges, valves, hoses, smoke, etc.,
required for an operational test of the installed fire sprinkler system. Remote test
and drain stations shall be provided for system performance testing.
3. The sprinkler contractor shall have, at the site, the manufacturers instructions and
nameplate data for all fire sprinkler equipment, and devices being used in the
sprinkler systems installation.
SECTION 8—APPROVAL REQUIREMENTS
1. Upon successful inspection and testing of all fire sprinkler systems, the sprinkler
contractor shall obtain written approval of the completed fire sprinkler system
from the fire department, owners insurance authority, and all other code officials.
Copies of all written approvals shall be turned over to the owner representative.
2. If a code official should find cause to reject any portion of the fire sprinkler
system installation or testing, the sprinkler contractor shall be responsible for
correcting the problem in a timely manner. Upon completion of all corrective
measures undertaken by the sprinkler contractor, a new test and inspection shall
be again coordinated by the sprinkler contractor, and witnessed by the fire
department and all other authorities as previously stated.
3. The sprinkler contractor shall submit stamped and signed sprinkler design
drawings and hydraulic calculations and obtain all required permits prior to the
installation of any fire sprinkler systems. The sprinkler plans shall be in
accordance with the Massachusetts State Building Code, 8"' edition, chapter 9, as
well as the requirements in NFPA-13 latest accepted edition.
Page 6 of 7
FIRE PROTECTION NARRATIVE
Brook Academy
New Dormitory
North Andover, Massachusetts
4. The sprinkler contractor shall obtain all document of acceptance as required by the
Massachusetts State Building Code, 8th edition, chapter 903.4, and shall submit all
such documents as required, to the owners representative and building code
officials.
I�
it
I
II
I
Page 7 of 7
I