Loading...
HomeMy WebLinkAboutBuilding Permit #107 - 125 Main Street 8/7/2008 BUILDING PERMIT Ot NORT►1 '(TLeD TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO: Date Received 8 5- 4q ��SSACHUS Date Issued: 4?- / d U IMPORTANT:Applicant must complete all items on this page LOCATION A5«�Y ��-► � G1�6 � 1� ? PROPERTY OWNER Z44 8;�- klt) 7zaSr- Print MAP N049 PARCEL: ZONING DISTRICT: Historic District yes no Machine Shop Village yes no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential New Building One family Addif Two or more family Industrial eratio No. of units: e replacement Assessory Bldg ers: Demolition Other Septic Well Floodplain Wetlands Watershed District Water/Sewer DESCRIPTION OF WORK TO BE PREFO ED: Identification PleVaseT eo'r n�tClearl "t) Phone: ?76�OWNER: Name: Address: 1(:nI A414) S7' /V• AJDOM4 m1k CONTRACTOR Name: -; CJ�tt.�- Phone: Address: Supervisor's Construction License: g Exp. Date- l- 0-- ' Home Improvement License: Exp. Date: ARCHITECT/ENGINEER (1L/ 1,,(Q = Phone: ?116 Address: Reg. No. S FEE SCHEDULE:BULDING PERMIT.$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ ��/ O0 ✓ FEE: $ 9 ' t No.: Check No.: 745�7 Receipt � ? 9� NOTE: Persons contracting w'th nre istered contractors do not have access to the guaranty d Signature of Agent/Owner _ , ignaturg of contract LL Plans Submitted Plans Waived Certified Plot Plan Stamped Plans TYPE OF SEWERAGE DISPOSAL Public Sewer Tanning/Massage/Body Art Swimming Pools Well Tobacco Sales Food Packaging/Sales Private(septic tank,etc. Permanent Dumpster on Site THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT r COMMENTS Per F P/C-Ziq ///CA " ,�9 CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature& Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT - Temp Dumpster on si#e yes. no, Located at 924 Main Street s - Fire Department signature/date COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— For department use ❑ Notified for pickup - Date Doc.Building Permit Revised 2008 r Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:INSPECTIONAL SERVICES DEPARTMENT:13PFORM07 Revised 2.2008 is Location No. Date t? 7 f1 MORTIy TOWN OF NORTH ANDOVER 3? � BOOL Certificate of Occupancy $ Building/Frame Permit Fee $ ` �cMus ..— Foundation Permit Fee $ Other Permit Fee $ TOTAL $ - 0 Check # _7,5— 2 S9U �/ `Building Inspec ,tACiRTH Andover T0VVn of No. ape 0 dover, Mass., 0 4t- LA GOC MIC HEWICK RATED P"' BOARD OF HEALTH Food/Kitchen PERMIT T D Septic System BUILDING INSPECTOR THIS CERTIFIES THAT ... ... . ........ ...... .................................. Foundation has permission to erect........................................ buildings on ..4014 ........ . . ....... Rough tobe occupied as.......... ......... .................................................................... Chimney provided that the person accepting this permit shall in every respect conform to the terms of the application on file in Final this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS UNLESS CONSTRUCTION S ELECTRICAL INSPECTOR Rough ................................... Service BUILDING INSPECTOR Final Occupancy Permit Required to Occupy Building GAS INSPECTOR vI Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. SEE REVERSE SIDEl Smoke Det. OFFICE OF BUILDING INSPECTOR TOWN OF NORTH ANDOVER `• ti"�` ..r► CONSTRUCTION CONTROL PROJECT NUMBER: V0 • OC%�✓ PROJECT TITLE: Y_!iA2e;W: PROJECT LOCATION:-log ' Ime L 41M 44ft4 . NAME OF BUILDING: 60 NATURE OF PROJECT: ` IN RDANCE WITH TICLE 116 OF THE MASSACHUSETTS STATE BUIL,DV4G CO E, REGISTRATION NO. BEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECH HEREBY CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ENTIRE PROJECT ARCHITECTURAL 0 STRUCTURAL 0 MECHANICAL 0 FIRE PROTECTION 0 ELECTRICAL 0 OTHER(SPECIFY) FOR THE ABOVE NAMED PROJECT AND THAT,TO THE BEST OF MY KNOWLEGE, SUCH PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISION OF THE MASSACHUSETTS STATE BUILDING CODE,ALL ACCEPTABLE ENGINEERING PRATICES. AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND B EPRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.0 1. Review,for conformance to the design concept, shop drawings, samples and other submittals which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become, generally familiar with6the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. PURSUANT TO SECTION 116.2 .2 1 SHALL SUBMIT WEEKLY, A PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO.THE NORTH ANDOVER BUILDING INSPECTOR. UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR OCCUP SIG TU \SUBSCRIBED AND SWORN TO BEFORE ME THIS. DAY OF �gaCx��s JC�r �Qo� �• C.� �_� NOTARY PUBLIC MY COMMISSION EXPIRES jo '3 �� - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -, I I ; ; I I I I I I I s I h , Q3 N O I � n '+ (a ❑ 3 ; g I L - N m N r fl' � o , N � D 1+ � o m_ F - - - -- -- -- -- - - - - - ; I , I 1 ; ; I , , 1 I ' - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 roc job• H.H. Morant & Co., Inc. a wc o8-00E ArchitectsMessina'sSho in Center 10 13 123 Mainp treet o� P.O. ox 4 485 North Andover, MA 04/23/oa 221 Washington Street o MSalem 9 Massachusetts 01 70 c N a Building B - First Floor Scale Unit 52 - Scheme #IAAA 1/8' = 1'-011 978 744-5354 �978� 740-9161 fax