HomeMy WebLinkAboutBuilding Permit #867-15 - 136 OLD FARM ROAD 5/1/2015 I
BUILDING PERMIT %AORTH
TOWN OF NORTH ANDOVER �,r h� •6 0
APPLICATION FOR PLAN EXAMINATION
h
Permit No#: Date Received "
�•9 A°Rwreo�Pa,�(y
SSACH►1`-+�
Date Issued: I
MPORTANT: Applicant must complete all items on this page
LOCATION
Print " f
PROPERTY OWNER {��v Civ'��
{ MAP t] / W� Print 100 Year Structure yesOno PARCEL: ZONINGDISTRICT: Historic District yesMachine Shop Village yes
TYPE OF IMPROVEMENT PROPOSED USE
Residential Non- Residential r
❑ New Building ne family
❑Addition ❑Two or more family ❑ Industrial
❑Alteration No. of units: ❑ Commercial
❑ Repair, replacement ❑Assessory Bldg ❑ Others:
❑ Demolition ❑ Other
❑ Septic ❑Well ❑ Floodplain ❑Wetlands D 'Watershed District
❑Water/Sewer
rr t, DESCRIPT N OF WORK TO BE PERFORMED:
Identification- Pleas Type or Print Clearly
OWNER: Name: Phone:o3`S"9L
Address: �� `� T0C1P_Vy\.
Contractor Name: :y % � Phone:
Email: i° 1
Address:
Supervisor's Construction License: Exp. Date: 511011c
Home Improvement License: /��/44 Exp. Date: 47
ARCHITECT/ENGINEER Phone:
Address: Reg. No.
FEE SCHEDULE.BULDING PERMIT.$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F.
Total Project Cost: $ C(BEQ04 FEE: $
Check No.: Receipt No.:
NOTE: Persons contracting with unregistered co tractors do not have ccess to the guaran and
tt
Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑
TYPE OF SEWERAGE DISPOSAL
Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑
Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑
Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF o U FORM
PLANNING & DEVELOPMENT Reviewed On Signature_
COMMENTS
CONSERVATION Reviewed on Signature
COMMENTS
HEALTH Reviewed on Siqnature
COMMENTS
I
Zoning Board of Appeals:Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision: Comments
Conservation Decision: Comments
Water& Sewer Connection/Signature& Date Driveway Permit
DPW Town Engineer: Signature:
_ Located 384
FIRE DERTM N@Y�=�T rnp ® �ps ron site ,, w
sgoo treet
urn ` �Y
Lo tt dat1.4 Mai Sr e,
Dem " �- O
mem�ignat ff&
Dimension
Number of Stories: Total square feet of floor area, based on Exterior dimensions.
Total land area, sq. ft.:
ELECTRICAL: Movement of Meter location, mast or service drop requires approval of
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes No
MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine
NOTES and DATA— (For department use)
❑ Notified for pickup Call Email
Date Time Contact Name
-........._....
_--
Doc.Building Permit Revised 2014
Building Department
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
Building Permit Application
Workers Comp Affidavit
.� Photo Copy Of H.I.C. And/Or C.S.L. Licenses
Copy of Contract
Floor Plan Or Proposed Interior Work
Engineering Affidavits for Engineered products
OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition Or Decks
Building Permit Application
Certified Surveyed Plot Plan
�. Workers Comp Affidavit
Photo Copy of H.I.C. And C.S.L. Licenses
Copy Of Contract
Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
Mass check Energy Compliance Report (If Applicable)
Engineering Affidavits for Engineered products
OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
New Construction (Single and Two Family)
Building Permit Application
Certified Proposed Plot Plan
Photo of H.I.C. And C.S.L. Licenses
Workers Comp Affidavit
Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations (If Applicable)
Copy of Contract
2012 IECC Energy code
Engineering Affidavits for Engineered products
OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
must be submitted with the building application
Doc:Building Permit Revised 2014
� � �
I �;�v��.
i
'^ � � e
Y�.�
�1��.�
��
NORTH
Town of t E 71., Andover
No. -
�` h ver Mass
DLAKE
coc"Ic Ml WKK y1.
RATED
U BOARD OF HEALTH
Food/Kitchen
PERT_. LD Septic System
1w�THIS CERTIFIES THAT ....... .w... C..� �. BUILDING INSPECTOR
....... .............. ...........
. . ........ .. ........ .
ks
ow.vAr Foundation
has permission to erect.......................... buildings on ... . .... ......................�..........
Rough
to be occupied as .......... /l�L�. ........... ... ..................................................................... Chimney
provided that the person accepting this permit shall in every respect conform to the terms of the application Final
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and
Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRESIN NTHS ELECTRICAL INSPECTOR
UNLESS CONST U TI AR Rough
Service
........ ...................................................................... Final
BUILDING INSPECTOR
GAS INSPECTOR
Occupancy Permit Required to Occupy Building Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
Smoke Det.
Baystate Roofers,Inc. Proposal
P.O. Box 189
North Reading,MA 01864
Date Estimate#
Tel. 978-664-0668
Fax 978-664-4333 4/3/2015 15848
Name/Address HIC # 137193
Summit Design Build CSSL# 99895
29 Eames St.
North Rerading,MA.01864
Lay State Roofers IIIc proposes:
Remove approximately 2500 square feet of the existing asphalt shingle roof down to the wood decking.
Install new ice and water shield along the 6' roof edge,valleys and around all the roof penetrations.
Install new 1-51b FFek page thfa,,gho t reef••. G lT-�-- ,/" Arww P-C,,
Install new white aluminum drip edge along the roof perimeter.
A new Lifetime GAF Architectural asphalt shingle will be installed over the prepared substrate.
A new ridge vent will be installed to ensure the proper roof ventilation.
All roof penetrations and flashing will be installed according to manufacturers recommendation, specification
and details.
Install new pipe flanges.
Bay State Roofers will properly dispose of all roof debris in our own waste containers.
Any wood decking that needs replacement will be an additional $2.50 per lineal foot.
A go over on the shed roof is included in this proposal.The job site is 136 Old Farm Rd.N.Andover,Ma.
New Shingle Roof
Authorized Signature:
Total
$8,820.00
ILL
Waste containers supplied by Bay State Roofers, Inc. are for sole purpose of roof debris.
Under no circumstance is the homeowner to use these containers for personal use.
10 Year Workmanship Warranty on all roofs. (Except Repair Jobs)
CONTRACT ACCEPTANCE
The specifications,prices,payment schedule are satisfactory and hereby accepted. Date:
BAY STATE ROOFERS,INC.is authorized to perform work as specified.
Payment will be made as previously outlined. Signature
All bills over 30 days are subject to 1 1/2%finance charge per month(18% 1
annual). Color �� C
PROVISIONS OF THE AGREEMENT
I.PROJECT PROVISIONS e. Damage to Project: Contractor will not be responsible for any
a.Guideline:The Project will be constructed in strict conformance damage caused by the Owner. or other causes beyond the control of
to the plans and specifications which have been examined and the Contractor.Owner will pay for any restoration work.
approved by the Owner. IV.CONTRACTOR'S RIGHTS AND RESPONSIBILITIES
b.Compliance:The Project will be completed in strict compliance
with all laws, ordinances, rules and regulations of the applicable a. Delay: Contractor will be excused for any delay beyond his
government authorities. reasonable control. These delays may include, but are not limited to
c.Control:The Agreement plans and specifications are intended Acts of God,labor disputes,inclement weather,acts of public authority,
to supplement each other. In case of conflict,the plans will control the acts of the Owner.or other unforeseen contingencies.
specifications and the Agreement provisions will control both. b. Right to Stop Work: If any payment under this Agreement is
d.Charge Orders:As directed by the Owner,construction lender, not made when due,the Contractor may suspend work on the job until
public body or inspector,any alteration or deviation from the specifications such time as all payments due have been made.Any failure to make
that involves extra cost(subcontract, labor, materials)will be executed payment is subject to a claim enforced against the property in
only upon the parties entering into a written change order. Expense accordance with the applicable lien laws.
incurred because of unusual or unanticipated conditions will be paid for c.Substitution of Materials:Contractor may substitute materials
by the Owner. without notice to the Owner in order to allow work to proceed, provided
e. Allowances: If the Agreement price includes allowances, and that the substituted materials are of no lesser quality than those listed
the cost of performing the work is greater or less than this allowance, in the specifications.
then the Agreement price will be adjusted accordingly. d.Salvage:All salvage resulting from work under this Agreement
II.FINANCIAL RIGHTS AND RESPONSIBILITIES is to be retained by the Contractor unless other agreements are
contained in the written specifications.
a. Labor and Material: Contractor will provide and pay for all e. Insurance: Contractor will maintain workers' disability
labor and materials necessary to complete the Project. Contractor is compensation insurance for his employees and comprehensive public
released from this obligation for expenses incurred when the Owner is liability insurance policies.
in arrears in making progress payments.
b.Permits:Contractor will obtain andPaY for all required building
V.COMPLETION OF PROJECT
q
permits and licenses. a. Notice: Owner agrees to sign a Notice of Completion within 5
c.Taxes,Assessments and Charges:Taxes.special assessments days after completion of the project. If project passes final inspection
of all descriptions, and charges required by public bodies and utilities and the Owner does not sign the Notice,the Contractor may act as the
will be paid for by the Owner. Owner's agent and sign the Notice.
d. Deposit of Payments: Contractor is required to deposit all b. Clean-up: Contractor is responsible for removing debris and
payments received prior to completion in an escrow account. In lieu of surplus material from the property, and leaving the property in a neat
such a deposit,the Contractor may post a bond or contract of indemnity and orderly condition.
with the Owner guaranteeing the return or proper application of such VI.CONFLICT PROVISIONS
payments to the purposes of the contract. All advanced funds will be a. Arbitration: Any controversy or claim arising out of this
deposited as indicated under Special Provisions. Monies used in
P P Agreement th t cannot be resolved is subject to arbitration with
a � ,
escrow become the property of the Contractor when they are applied an arbitrator of mutual agreement, and all parties (including
according to the Agreement payment schedule, when a breach of Owner, Contractor, Architect and Sub-Contractors) are bound to
contract by the Owner occurs, or when the Agreement has been this arbitration, If any party does not appear at arbitration
substantially performed. proceedings, the arbitrator is empowered to decide the controversy
e. Bankruptcy: It either party becomes bankrupt.the other party in accordance with whatever evidence is presented by the
has the right to cancel this Agreement. party(ies)that do participate.
III.OWNER'S RIGHTS AND RESPONSIBILITIES b. Attorney Fees: If either party becomes involved in litigation
a. Cancellation: Owner has an unconditional right to cancel the arising out of Agreement, the Court shall award costs/expenses
Agreement, without penalty or obligation, until midnight of the third including attorney fees to the parry justly entitled to them.
business day after the Agreement was signed. Cancellation must be c. Limitations: No action related to this Project may be made
done in writing. Upon cancellation, any property traded in, any by either party against the other more than 2 years after the
payments made under this Agreement, and any negotiated instrument completion of work.
executed will be returned within 10 business days following receipt by VII.GENERAL PROVISIONS
the Contractor of cancellation notice.
b. Property Lines: Owner shall locate and point out property a. Notice:Any notice required or permitted under this Agreement
may given by certified or registered mail at the addresses contained
in the
lines to the Contractor.Contractor may,at his option,require the Owner A A reement.
to provide a licensed land surveyor's map of the property. g
c. Liens: Failure to pay persons supplying materials or services b. Prohibition Assignment: Neither party may assign this
according to the terms of this Agreement may result in the filing of Agreement or paymenntt due under this Agreement without the written
consent of the otherart .
mechanic's liens on the affected property. Owner has the right to ask P Y
the Contractor for lien waivers from all persons supplying these c.Qualification:This document constitutes the entire agreement
materials or services. In the event any mechanic's lien is filed through of the parties. No other agreements exist. This Agreement can be
no fault of the Owner, then the Contractor agrees to take all steps modified only by written agreement signed by both parties.
necessary for the release and discharge of such lien.
d.Insurance:Owner will maintain property damage insurance at d.Governance:This Agreement shall be construed in accordance
least equal to the Agreement price. with and governed by, the laws of the state in which the Project is
located.
ti
t Mass
acfiuse#ts -Department
Board'of B partmo of Public Safety
Building Re u
' Y
9 atio
Construction Su nS and Standards
License: Supervisor
t CS-083853
NII ``s ��� r
J CHAEL S.CpU�� �,.
29 Eames Street �'iJV
North Readin �
g NA 01864
� rf;
r
Cornmissioner Expi ration
05/20/2016
pR-Ce ore W-1-1.1
Consumer Affairs&Business Re
OME IMP u� r
istra 'IMPROVEMENT CONT gulation
9 tion: RACTOR
w166.149
i,. owl,
piration-,,___4/29/2016. Type:
:. SUMMIT DESIGN BUILD' Wit__- Private Corporatic
c
MICHAEL
t COUGF{LIN .{.
!, 29 EAMES ST
NORTH
READING,MA 01'864 " 4
Undersecretary
Location
No. �� (� Date {
. - TOWN OF NORTH ANDOVER
Certificate of Occupancy $ n
Building/Frame Permit Fee $
'Foundation Permit Fee $
Other Permit Fee $
TOTAL $
Check#�Y