Loading...
HomeMy WebLinkAboutBuilding Permit #1029-15 - 14 MARTIN AVENUE 6/9/2015 f pORT11 BUILDING PERMIT u W TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO Z't t✓ Date Received < � Date Issued: y cHus IMPORTANT: Applicant must complete all items on this page LOCATION /'/ /C 111n Atel,,� ADI 6 I S/ I i Print PROPERTY OWNER �tP; NORTH BUILDING PERMIT TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION y� T tl K 1. Permit No#: Date Received �gssgcHus���� Date Issued: IMPORTANT: Applicant must complete all items on this page LOCATION Print PROPERTY OWNER Print 100 Year Structure yes no MAP PARCEL: ZONING DISTRICT: Historic District yes no Machine Shop Village yes no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family ❑Addition ❑Two or more family ❑ Industrial ❑Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other Septrc 0`1Nelll 0. ti, '0 1Nater lied�Distnct - DESCRIPTION OF WORK TO BE PERFORMED: Identification- Please Type or Print Clearly OWNER: Name: Phone: Address: Contractor Name: Phone: Email: Address: Supervisor's Construction License: Exp. Date: Home Improvement License: Exp. Date: ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE:BULDING PERMIT.$12.00 PER$9000.00 OF THE TOTAL ESTIMATED COST BASED ON$925.00 PER S.F. Total Project Cost: $ FEE: $ Check No.: Receipt No.: NOTE: Persons contracting with unregistered contractors do not have access to the=g laranty fund Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits 4. Building Permit Application 4. Workers Comp Affidavit Photo Copy Of H.I.C. And/Or C.S.L. Licenses Copy of Contract Floor Plan Or Proposed Interior Work Engineering Affidavits for Engineered products OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks 4. Building Permit Application Certified Surveyed Plot Plan Workers Comp Affidavit Photo Copy of H.I.C. And. C.S.L. Licenses Copy Of Contract Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) Mass check Energy Compliance Report (If Applicable) Engineering Affidavits for Engineered products OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) Building Permit Application Certified Proposed Plot Plan Photo of H.I.C. And C.S.L. Licenses Workers Comp Affidavit Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) Copy of Contract 2012 I ECC Energy code Engineering Affidavits for Engineered products OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:Building Permit Revised 2014 Plans Submitted �`l `�! Plans Waived ❑ Certified Plot Plan ❑R Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Pennauent Dempster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF m U FORM PLANNING & DEVELOPMENT Reviewed On Signature_ COMMENTS CONSERVATION Reviewed on Signature C0 ,-MENTS P HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/signature&Date Driveway Permit DPW Town)Engineer: Signature: FIRE DEPAR�TMENiT,' 1"Tem'� ®' '"` �'' Located X84 Osgood Street T�o -- °�; p}tom umpster��on s e .y�esv s:�a,; sIa a r ated at�}12*4 MainStreet{ P e. fa r 4 N t`" r .� , e� r%^`'a.,.,,.-�..sow-'P` .�� �f� .,e�.,_r' '-4�'~cE' S ., .. q�Depa risen+signature/date lies 7.S�.tr .'� f r!� w{s� # rS� ''i �` 3 j 3 )1 COMMEI'VTS�at T M ., , lra °+ +.r A. `k r.� � 4� `7 t�k • `�` � >! Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$100o fine NOTES and DATA,— (For department use) LI Notified for pickup Call Email Date Time Contact Name Doc.Building Permit Revised 2014 Location �. .. No. Date . - TOWN OF NORTH ANDOVER j Certificate of Occupancy $ Building/Frame Permit Fee $ Foundation Permit Fee $ ^� Other Permit Fee $ TOTAL $ Check# 28 8�. Building Inspector Enter construction cost for fee cal- North Andover Fee Calculation Construction Cost $ 643308.00 m $ - $ 771.70 Plumbing Fee $ 96.46 Gas Fee 100 comm. $ 100.00 Electrical Fee $ 96.46 Total fees collected $ 1,064.62 14 Martin Avenue 1029-15 on 6/9/15 Kitchen and Bath Remodel r- 1 t4ORTH ve. ... 0 ail No. /OC;2 _®T h h ver, Mass, COC NIC Nl WICK -It. ADRA E D 0"IF �y S U BOARD OF HEALTH Food/Kitchen PER .MIT T LD j� Septic System THIS CERTIFIES THAT L/.!!Irl6. &. &X. rii/41wo.o........... . BUILDING INSPECTOR has permission to erect .......................... buildings on ..1. ..........� ./' ....... ...... Foundation 4VOM0 to be occupied as .... P1111, .......�.......' !.��.... 04A...... ............ ... ... .... � himney Rough provided that the person accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final Ion PERMIT EXPIRES IN C6NTH§ ELECTRICAL INSPECTOR UNLESS CONSTRUCT S Rough Service .............. ....... .................................... Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. 'Massachusetts Home Home Improvement Sample Contract 1 This form satisfies all basic requirements of the state's Home Improvement Contractor Law(MGL chapter 142A),but does not include standard language to protect homeowners. Seek legal advice if necessary. Any person planning home improvements should first obtain a copy of"a Massachusetts consumer guide to home improvement"before agreeing to any work on your residence.You may obtain a free copy by calling the Office of Consumer Affairs and Business Regulation's Consumer Information Hotline at 617-973-8787 or 1-888-283-3757. Homeowner Information Contractor Information Name pant Name De a Mo rte./ La—r t� CaA4� ! S � �6 ZZ 7 Street Address(do not use Post Off Box address) o actor/Salesperson/Owner Name 1 Ci o 1 f StaleZip C1ode�{ t Addr/�(must include a street access) //7�t r)JGO O l0 t", S P`�t/ �e'f v C, t 0 e Daytime Phone Evening Phone ity/fown Stat oDdc- !� 9- 3`16 Z J V l ` Mailing Address(It different from above) us ederal Employer ID or S.S.Number Luc mgnias that mdst Mme i.- Hame pmremem CoottnctorReg.Number)Expimticm date / mcetttmt«mtmctors Ince n "fid repstntion timber The Contractor agrees to do the following work for the Homeo ner: wescritie in detan ttie worK to c pee,specifying me type,brana,ancrgrade or ma en s To us s to r c .l tt y � a�L vw2� "t PrS Required Permits-The following building permits are required Proposed Start and Completion Schedule-The following schedule will and will be secured by the contractor as the homeowner's agent, be adhered to unless circumsta beyond the contractors control arise permits will be l (Owners who secure their own p .,., "�+ ZO ✓- excluded from the Guaranty Fund provisions of Date�contract ill begin contracted work. MGL chapter 142A.) � �(�� O) Z C'FWCS1te when contracted work will be substantially completed. Total Contract Price and Payment Schedule The Contractor agrees to perform the work,famish the material and laborcapecified above for the tootaall sum of: r �ov (') jaymFnntsr made according to the following schedule: i)� L� �Y1,,p�`� (p,L�'"" 1;i at� , _I 37 ,upon signing contract(not to exceed 1/3 of the total contract price or the cost of special order items,whichever is greater) c $ _� � by / /T or upon completion of �LL $ '6r by _/ /_or upon completion of 4.,k $ _upon completion of the contract. (Law forbids demanding full paym{e�ntp til contract is completed to both party's satisfaction) The following material/equipment must be special to be ordered before the contracted work begins in order $ to be paid for to meet the completion schedule.(**) NOTES:(*)Including all finance charges(")Law requires that any deposit or down-payment required by the contractor before work begins may not exceed the greater of(a)one-third of the total contract price or(b)the actual cost of any special equipment or custom made material which must be special ordered in advance to meet the completion schedule. Exo-gas Warranty big express warranty hers Drovi}lyd by the contractor? No Yes tall terms of the warranty must he attached to the contract) Subcontractors-The contractor agrees to be solely responsible for completion of the work described regardless of the actions of any third party/subcontractor utilized by the contractor. The contractor further agrees to be solely responsible for all payments to all subcontractors for materials and labor under this agreement Contract Acceptance-Upon signing,this document becomes a binding contract under law. Unless otherwise noted within this document,the contract shall not imply that any lien or other security interest has been placed on the residence. Review the following cautions and notices carefully before signing this contract. • Don't be pressured into signing the contract.Take time to read and fully understand it. Ask questions if something is unclear. • _Make sane the contractor has a valid Home Improvement Contractor Re6stiation. The law requires most home improvement contractors and subcontractors to be registered with the Director of Home Improvement Contractor Registration. You may inquire about contractor registration by writing to the Director at One Ashburton Place,Room 1301,Boston,MA 02108 or by calling 617-727-3200 or 1-800-223-0933: • Does the contractor have insurance? Check to see that your contractor is properly insured. • Know your rights and responsibilities..Read the Important Information on the reverse side of this form and get a copy of the Consumer Guide to the Home Improvement Contractor Law. You may cancel this agreement if it has been signed at a place other than the contractors normal place of business,provided you notify the contractor in writing at his/her main office or branch office by ordinary mail posted,by telegram sent or by delivery,not later than midnight of the third business day following the signing of this agreement. Seethe attached notice of cancellation form for an explanation of this right. DO NOT SIGN THIS CONTRACT IF THEREARE BLANK SPACES!!! Two ideaticel�ofthc :be tpmpltxod and signed.ODe copy should go to the .The other copy should be kept by the eoatreclor. WV,Ou Homeowner's Signature Co tor's Sigoature 1) a Date + Contractor Arbitration The Home Improvement Contractor Law provides homeowners with the right to initiate an arbitration action(as an alternative to court action)if they have a dispute with a contractor. The same right is not automatically afforded to a 'r contractor,however. The contractor would have to resolve any dispute he/she has with a homeowner in court unless both parties agree to the optional clause provided below. This clause would give the contractor the same right to arbitration as is afforded to the homeowner by the Home improvement Contractor Law. The contractor and the homeowner hereby mutually agree in advance that in the event the contractor has a dispute concerning this contract,the contractor may submit the dispute to a private arbitration firm which has been approved by the Secretary of the Executive Office of Consumer Affairs and Business Regulation and the consumer shall be required to submit such arbitration as provided I Massachusetts General Laws,cha er 142A. Homeowner's Signature on ctor's Signature NOTICE:The signatures of the parties above apply only to the agreement of the parties to alternative dispute resolution initiated by the contractor. The homeowner may initiate alternative dispute resolution even where this section is not separately signed by the parties. Homeowner's Rights A homeowner's rights under the Home Improvement Contractor Law(MGL chapter 142A)and other consumer protection laws(i.e.MGL chapter 93A)may not be waived in any way,even by agreement. However,homeowners may be excluded from certain rights if the contractor they choose is not properly registered as prescribed by law. Homeowners who secure their own building permits are automatically excluded from all Guaranty Fund provisions of the Home Improvement Contractor Law. The contractor is responsible for completing the work as described,in a timely and workmanlike manner. Homeowners maybe entitled to other specific legal rights if the contractor guarantees or provides an express warranty for workmanship or materials. In addition to guarantees or warranties provided by the contractor,all goods sold in Massachusetts carry an implied warranty of merchantability and fitness for a particular purpose. An enumeration of other matters on which the homeowner and contractor lawfully agree may be added to the terms of the contract as long as they do not restrict a homeowner's basic consumer rights. If you have questions about your consumer/homeowner rights,contact the Consumer Information Hotline(listed below). Execution of Contract The contract must be executed in duplicate and should not be signed until a copy of all exhibits and referenced documents have been attached. Parties arc also advised not to sign the document until all blank sections have been filled in or marked as void,deleted,or not applicable. One original signed copy of the contract with attachments is to be given to the owner and the other kept by the contractor. Any modification to the original contract must be in writing and agreed to by both parties.Contracted work may not begin until both parties have received a fully executed copy of the contract,and the three day rescission period has expired. Accelerated Payments A contractor may not demand payments in advance of the dates specified on the payment schedule in cases where the homeowner deems him/herself to be financially insecure. However,in instances where a contractor deems him/herself to be financially insecure,the contractor may require that the balance of funds not yet due be placed in a joint escrow account as a prerequisite to continuing the contracted work. Withdrawal of funds from said account would require the signatures of both parties. Additional Information If you have general questions or need additional information about the Home Improvement Contractor Law or other consumer rights,or if you wish to obtain a free copy of "A Massachusetts Consumer Guide to Home Improvement" contact: Consumer Information Hotline Office of Consumer Affairs and Business Regulation 10 Park Plaza,Room 5170,Boston,MA 02116 617-973-8787,888-283-3757 or visit the OCABR website at If you want to verify the registration of a contractor or if you have questions or need additional information specifically about the contractor registration component of the Home Improvement Contractor Law,contact: Director of Home Improvement Contractor Registration Office of Consumer Affairs and Business Regulation 10 Park Plaza,Room 5170,Boston,MA 02116 617-973-8787,888-283-3757 or visit the HIC website at Go online to view the status of a Home Improvement Contractor's Registration: For assistance with informal mediation of disputes or to register formal complaints against a business,call: Consumer Complaint Section Office of the Attorney General 617-727-8400 AND/OR `A Page I of 5 00700 GENERAL CONDITIONS OF THE CONSTRUCTION AGREEMENT 1. General 1.1 The Work of the contract shall consist of all construction materials,labor,equipment and services required by the Contract Documents,or as reasonably inferable from any or all of the Construction Documents. The Work shall be for the whole or part of the project as described in the Construction Agreement. 1.2 The Contractor and all home improvement contractors and subcontractors shall be registered. Any inquiries about registration should be directed to: Director,Home Improvement Contractor Registration One Ashburton Place,Room 1301 Boston,MA 02108 Phone#617.727.8598 1.3 The Work of the project shall comply in all respects with applicable federal,state,county and/or city regulations, laws and codes. All required building and other permits shall be obtained before beginning construction.The work shall require a building permit,as well as some or all of the following permits as applicable: electrical,plumbing,gas fitting. The contractor is obliged to obtain the above referenced permits as the Owner's Agent. Owners who secure their own construction related permits or deal with unregistered contractors shall be excluded from access to the Guaranty Fund. The Guaranty Fund is a fund out of which an owner,aggrieved by a registrant,may be paid part or all of their damages under rules and regulations promulgated by the secretary of Executive Office of Consumer Affairs and Business Regulation. 1.4 All materials and workmanship shall be done in a professional and workmanlike manner and shall be to the reasonable satisfaction of the Owner,and in accordance with,and to the extent applicable,to the current standards of the American Society of Mechanical Engineers,American Society of Testing Materials,the American Water Works Association,the American Institute of Electrical Engineers,the National Board of Fire Underwriters and the American Society of Heating and Ventilating Engineers that apply. The Contractor warrants all materials and workmanship against defect for a period of one(1)year after substantial completion.Additional manufacturers warrantees for installed equipment,as applicable,will be provided to the Owner upon completion of the Work. 1.5 Substitution of items will not be permitted unless specifically approved by the Owner. 2. Responsibilities of Owner 2.1 The Owner shall furnish the Contractor with a survey of the project site if required. 2.2 The Owner shall obtain and pay for the necessary approvals,easements and/or variances required for the construction of the project.The Owner shall be wholly responsible for obtaining approvals from the Conservation Commission,and the federal and state Environmental Protection Agencies,if applicable. The Owner shall hold the Contractor harmless for any violations of zoning by-laws and all federal and state environmental regulations. The Owner may be charged by the Contractor for damages due to fines or lost time on the job due to zoning or environmental violations. Owner represents and warrants that they shall obtain any and all zoning and environmental permits prior to the construction work so that Contractor's work shall not be delayed or otherwise impaired by Owner's failure to obtain same. 2.3 If the Contractor fails to complete the Work,or part of the Work of the Agreement in accordance with the Construction Documents,through no fault of Owner,and fails to correct such discrepancies,the Owner may,by written order,stop work on all or part of the project until the cause has been corrected 2.4 The Owner reserves the right to occupy the building space,or such portions thereof as may be desired,at any time without in any way invalidating this Agreement. An additional fee may be charged to the Owner by the Contractor if the Owner's occupancy interferes in any way with the progress of.the project. Additional time for completion of the project may also be required if the Owner's occupancy hampers the Contractor in any way.. I 4 Page 2 of 5 2.5 Unless otherwise set forth in this contract specifically,the Owner shall be responsible for(i)all costs associated with the drilling and blasting of ledge,or any other existing undiscovered condition or conditions not set forth in the scope of work attached hereto,(ii)any design plans submitted to Contractor,and(iii)all costs associated with clean-up work or removal of hazardous waste or materials found on the site which were not disclosed and not set forth in the scope of work attached hereto. All extra work as a result of same constitutes Change Orders that may require extra costs for labor and materials if Contractor agrees to do same at its sole discretion. 3. Responsibilities of Contractor 3.1 The Contractor shall be responsible for the Work described in the Construction Agreement. Unless otherwise provided by,or on behalf of,Owner or its agents Contractor shall have complete control over construction methods, techniques and procedures and shall supervise such work with his best skill and attention. 3.2 The Contractor shall pay for all labor,equipment,materials,and services required to complete the Work as described in the Construction Agreement as well as building permits,licenses,and inspections necessary for the proper completion of the Work,and be compensated for said Work as described in the Construction Agreement. 3.3 All contractors and subcontractors shall be properly licensed and will coordinate their work with that of other contractors so that all work will be in harmony with the other contractors on the project. 3.4 The Contractor wan-ants to the Owner that all materials and installed equipment required to complete the work on the project will be of good quality and new,unless otherwise specified and/or approved. . 3.5 The Contractor shall take care in working near existing areas to protect them from damage. If the Contractor neglects to do so,the Contractor shall be responsible for any damage to existing areas and will repair such damage,at his expense,to the Owner's reasonable satisfaction. 3.6 The Contractor shall keep the project site and surrounding area free from waste materials and rubbish which results from their work on the project. Removal,hauling and disposal of rubbish and waste materials shall be the responsibility of the Contractor and shall be compensated for these costs as described in the Construction Agreement. 3.7 The Contractor shall hold harmless the Owner from and against all claims,damages,losses,expenses,legal fees or other costs resulting from the Contractor's performance of the Work of the Construction Agreement if through no fault of Owner.Contractor shall be liable for direct damages only resulting from negligent acts by Contractor in its performance of work hereunder. Contractor shall not be liable for any special,incidental,or consequential damages,nor for any dam ges which exceed the value of the contract price hereunder. 3.8 The Contractor shall provide the Owner reasonable access to the Work 4. subcontractors 4.1 The Contractor shall select the subcontractors,except that he shall not use subcontractors to whom the Owner has a reasonable'objection. The Contractor shall not be required to use a subcontractor to whom he has a reasonable objection. S. Disputes 5.1 The Contractor and the Owner hereby mutually agree in advance that in the event the Contractor has a dispute concerning this contract,the procedure is as follows: a. The parties shall engage in good faith negotiations to resolve the dispute. If initial negotiations are unsuccessful at resolving the dispute within fifteen(15)days of the initial request by any Parry,then the Parties agree that the matter shall be referred to non-binding mediation. b. In the event that a disputed matter is referred to mediation,the mediation shall be conducted according to the Commercial Mediation Rules of the American Arbitration Association then in effect. The Parties agree to participate in good faith in any and all mediation relating to this Agreement. Page 3 of 5 c. The Parties agree that they will engage in mediation for 30 days from the date a mediator is named but in no event more than 60 days total from the referral date. If,and only if,the mediation is not successful by the end . of the 30 day mediation period,the Parties can pursue whatever other available legal and/or equitable remedies. d. After said mediation,Contractor may submit such dispute to a private arbitration service which has been approved by the Secretary of the Office of Consumer Affairs and Business Regulations and the Owner shall be required to submit to such arbitration as provided in M.G.L.c.142A,§3. 63 Owner c'1dr Notice: The signatures of the parties above apply only to the agreement of the parties to alternative dispute settlement initiated by the Contractor. The Owner may initiate alternative dispute resolution.even where this section is not separately signal by the parties. 6. Work by Other Contractor(s) 6.1 All contractors and subcontractors shall cooperate with others on the project and shall provide the Owner and other subcontractors reasonable opportunity for the storage of materials and equipment. 7. Changes 7.1 Changes,modifications,additions and/or deletions to the Scope of Work under this agreement will only be made by written Change Order signed by both the Owners and the Contractor. Any such changes will not invalidate this Agreemept. The time for project completion and the project cost will be adjusted accordingly. In the event of a conflict between this Agreement and the terms of an executed Change Order,the Change Order shall govern. 8. . Time 8.1 If at any time the Contractor is delayed in performing the work under this agreement by Owner requested changes, labor disputes,fire or other circumstances over which the Contractor has no control,the Contract time shall be extended by the same amount of time as was caused by the delay. r 9. Payments 9.1 Payments will be made by the Owner to the Contractor in accordance with the payment schedule as set forth in the Construction Agreement. 9.2 Payments,on a pro rata basis as determined by the amount and value of the disputed work,may be withheld because of any of the following conditions: a. Defective work not corrected. b. Failure of the Contractor to make payments to subcontractors or for materials,labor,equipment or services. c. Continued failure to perform the work in accordance with the terms and conditions set forth in this Agreement. d. Legal or other claims by third parties relating to the work performed under the Agreement. 93 Final payment shall become due when the Work of the Agreement is completed in accordance with the Construction Documents. 10. Insurance 10.1 The Contractor shall upon request furnish the Owner with the following certificates of insurance in the amounts indicated or other amounts as required by law,whichever is greater. a. Workmen's Compensation Insurance in the amount of$100,000 each occurrence. Page 4 of 5 10.2 The Owner shall maintain property insurance for the project to its full insurable value. This insurance shall include the interests of the bank,or other mortgage holder,if any,and the Owner shall insure against"all risks"of physical loss or damage._ 11. Work Safety, 11.1 The Contractor is responsible for establishing,supervising and maintaining all safety precautions in connection with work performed under this contract. 11.2 The Contractor shall comply with all federal,state and local laws and regulations applicable to the safety of persons and property and their protection from damage,injury or loss. 12. Correction of Deficiencies 12.1 The Contractor shall promptly correct any deficiencies in the work,any work not in accordance with the Construction Documents and/or any work reasonably rejected by the Owner. 12.2 The Contractor and subcontractors shall provide Owner guarantees of workmanship for at least one(1)year from the time of completion of their work under the Agreement. 13. Termination of the Agreement 13.1 If the Owner fails to make payment under the terms of the Agreement,through no fault of the Contractor,the Contractor may,upon seven(7)days written notice to the Owner,terminate the contract. The Owner shall pay for work completed and any proven loss with respect to materials,equipment and machinery and reasonable profit applicable to the work under this Agreement. 13.2 If the Contractor fails to carry out the work in accordance with the Agreement and other Construction Documents, the Owner may,upon seven(7)days written notice to the Contractor,terminate the contract,and finish the work by whatever method the Owner determines. 14. Miscellaneous 14.1 Terms of this Agreement which are of a continuing nature shall survive termination hereof. 14.2 if any term or provision of this Agreement should be declared invalid by a court of competent jurisdiction,the remaining terms and provisions of this Agreement shall be unimpaired. 14.3 Failure by either party at any time to require performance by the other or to claim a breach of this Agreement will not be construed as a waiver of any right under this Agreement. 14A No modification,waiver or amendment of any term or condition of this Agreement shall be effective unless in writing and signed by both of the parties hereto. 14.5 All notices and other communications hereunder shall be in writing,except as herein specifically provided,and shall be deemed to have been given when either received in person,or mailed by first class mail postage prepaid,or e- mailed and confirmation sent to sender,to the intended recipient hereof at its address shown above. 14.6 This Agreement,together with all exhibits attached hereto,constitutes the entire Agreement between the parties with respect to the subject matter hereof and supersedes in all respects all prior proposals,negotiations,conversations, discussions,and agreements between the parties concerning such subject matter. 14.7 This Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors and permitted assigns. Page 5 of 5 14.8 This Agreement shall be governed by,and construed in accordance with,the laws of the Commonwealth of Massachusetts. 14.9 The parties agree(i)to fiunish upon request to each other such further information,(ii)to execute and deliver to each other such other documents,and(iii)to do such other acts and things,all as the other party may reasonably request for the purpose of carrying out the intent of this Agreement and the documents referred to in this Agreement. 14.10 Neither party may assign any of its rights under this Agreement without the prior consent of the other party. - 14.11 The headings of Articles and Sections in this Agreement are provided for convenience only and.will not affect its construction or interpretation. 14.12 This Agreement may be executed in one or more counterparts,each of which will be deemed to be an original copy of this Agreement and all of which,when taken together,will be deemed to constitute one and the same agreement. 15. Other Provisions: None DO NOT SIGN THIS CONTRACT IF THERE ARE ANY BLANK SPACES. This agreement entered into this eighth day(= day of �� � Owner Contractor Customer Homesmith Remodeling/Roy Rigordaeva Deb and Daryl Messier 63R Church St. 14 Martin Ave Merrimac, Ma. 01860 North Andover, Ma. March 1, 2015 Estimate Kitchen area/eating area Lremove existing cabinetry and install new per design specifications and in communication with Kitchen Designer. 2.partial removal of wall next to refrigerator. 3.demo ceiling, floor,trim 4.re-frame as needed for new window 5.remove existing appliances and install new consistent with kitchen designer and manufacturers specifications and plans. 6.set up temp kitchen 7.install new kitchen window over sink 8.rip/replace and repair drywall and sub floors as needed 9.electrical work install new wall unit and electrical access,move t stat 10.electrical work: 5 circ breakers, 220 amp circuit, gfci, 4 under cabs , 2 recess leds 2 pendants and 4 dimmers (est$2800) bar hutch outlet/phone (est$125) 4 led bulbs and led trim kits (est$500) add 1 alarm to second, 2 co upstairs, 2 co downstairs ($350) Lighting—pendant over sink, 2 or 3 pendants over island, light over kitchen table in addition to recessed lights discussed. I l.plumbing removal of old and installation of new supplied fixtures,vent hood/range ($2900) 12.electrical and plumbing inspection construction labor- $7300 , construction materials— $1550 ,electrical/plumbing- $6675 Family room oom Lremoval of wall ac and installation of two accent windows on either side of fireplace. 2.enclose brick over fireplace and build fireplace surround/mantle and panels above fireplace per design to be provided. 3.trim first floor(baseboard and window/door trim to be provided by contractor) 4.clean up/finish work construction labor-$3200 , construction materials - $1800 ?fp surround? First floor floors Linstall 12 x 12 tile in entry 100 sq ft floor is 6x18 slate at front door and rear entry 2.install 12 x 12 tile in rear entry 42sq ft 3.install hardwood flooring per manufacturers specifications in family room. From where slate ends at rear entry through kitchen and familyroom ALL flooring to be ONE level—removing of subflooring etc as previously discussed construction labor-$3000 ,construction materials$365 1 of 3 First floor powder room l.remove and install new toilet, sink, faucet, cabinet,mirror, ceiling light and fan combo (NO) 2.new ceramic tile install. Tear out sub floor and replace 3.fix and paint metal baseboard heater as needed we do not want these having paint applied as a fix. If not installing NEW baseboard then omit this. 3.rip and replace ceiling (NO) 4.repair wallboard as needed 5.replace wall sconces 6.cleanup/finish 7.electric arc fault breaker ($400) construction labor-$1545 construction material$500 electric$400 Main second floor bathroom l.remove and install new toilet, sink,exhaust fan faucet, cabinet, mirror,light over mirror. 2.maintain current and add missing tiles as needed (NO, existing floor will remain as is) 3.fix and paint metal baseboard heater as needed we do not want these having paint applied as a fix. If not installing NEW baseboard then omit this. 4.repair wallboard as needed 5.cleanup/finish 6.electric arc fault breaker($400) construction labor-$1000 construction material $300 electric $400 Upstairs master bath l.demo floor and sub floor 2.install new sub floor 3.demo shower tub unit 4.install shower pan/tile floor and surround'NO—will be doing tile or stone walls, no tile or stone on floor—pan only 5.install natural stone floor, new toilet, sinks, exhaust fan, faucets, cabinet,mirrors, lights over mirrors. 6.electrical are fault breaker($400) construction labor-$3700 construction materials a s$2800 electrical$400 Total labor x 30% $25,668.50 adjusted estimate number Total materials $7315 Total electrical $4975 Total plumbing $2900 Total job cost$41108.5 Permit $250 *homeowner to supply all cabinetry, windows, kitchen appliances, flooring, electrical, lighting, and plumbing fixtures. Contractor: Roy Rigordaeva Estimate good thru April 29, 2015 Customer: 2of3 I� I -dividers - . vi - ---- --- ---i I ; I in deep section - - akin ane ; asenisusan�s on shelves j I i I above ovens h '�G`�-. urood I, I I j p g p iri base corner cabirfet f`r b � I s, - - - I 1 muffin tiry' etc 1 183ft wC333Q-9LR r ------- .... I , SSCUM OCC3384B 4 t7E -24,DISHW.^' { k I ------------------ ---------- - --- sud Bl'rKII'dG I I � ; I Z-atlo'irt silverware in,top! _- sink(be Ind_ q - ------d� - -each dolor)- I A: - - AREA- awer I , - 1 prep sinka�p ost Inserts scoop to I i ' ;i ----- --wit -rollout--p ' 1� m^beep dravrers,---- -- -- -+r----- j for plates�bovrls SQ at �cooking utenaits ; baking I- - arrd baking .. . .__..� trash. uts�._.� Z _ below for p Ing a or coakinLg pans 40wideI ov 3DB F L5►A! O KIP , ea ARIA i spices w�� c oking spices _.. .-.� I I baking s I , ` :I clan go.to top _ _ C7 ;,, h, m' can-go -';- - Sw .I k e shallow drawer j, 8FH1 f in top drawer66 :� I nfapkins bind mds - _.. tebie Wins in--.i__ '� tin To etc' ( extra sltorage l l av I deep drawers -BAR 1 FuijC-- 0,JAL--HUTCH -- . -- - - -- _ _ 4 i area to store) -- ' I 1 I --. ' ------ ---- - -- small-sppiiances; —y._ -- ---- , � � k i _ u - ` r 'Qu 1 i �.I .. �(e��,?p'ens,cfia�geri4!e�Gi ' I ° cab et._ - . ... - _ `- I _.. f Jc• . S 188 old.L _UCS R W2424V3303 ry 4 traa�rr s� gi tto rs pan I ; t cabinet1 ; j dabinet II fn• glias acre -------- h win cube below sp lid doors for li JUGr, i VERIFY LOCgTION p I i c ffee,etc OF�LOSET _...__ t.. .__ �!t6 .. 1•.. iuG(j I ._ .. ._. I I. ; The Commonwealth of Massachusetts Department oflndustrialAccidents I Congress Street,Suite 100 Boston,MA 02114-2017 www massgov/dia Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FMED WITS THE PERMUTING AUTHORITY. Apolicant Information c� / Please Print Ledbl Name(Business/orgm&ation/Individual): ,plc--,r 0`L r1lto� Address: S�Lf &llPc d ', City/State/Zip: .,,,°�� o3�i 9 Phone#: Are you an employer'?Check the appropriate box: Type of project(required): LE]I am a employer with employees(full and/or part time).• 7. ❑New construction 2.�I am a sole proprietor or partnership and have no employees working for me in 8. Remodeling any capacity.[No workers'comp.insurance required.] In I am a homeowner doing all work myself[Ido workers'comp.insurance required.]t 9. tr1 Demolition [] 4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. I will 10 Building addition ensure that all contractors either have workers'compensation insurance or are sole I Ln Electrical repairs or additions proprietors with no employees. 12.[J Plumbing repairs or additions 5.E]I am a general contractor and I have hired the sub-contractors listed on the attached sheet 13.[]Roof repairs These sub-contractors have employees and have workers'comp.insurance.$ 6.[]We are a corporation and its officers have exercised their right of exemption per MGL C. 14.Q Other 152,§1(4),and we have no employees.[No workers'comp.insurance required.] 'Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. =Contractors that check this box must attached an additional sheet showing the name of the subcontractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that Is providing workers'compensation Insurance for my employees Below is the pollcy and job site information. Insurance Company Name: Policy#or Self-ins.Lic.#: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c.152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby cer under the pains andpenalties ofperjury that the information provided above is true and correct Si ature: ate' Phone#: X603 , `���y 5`y I Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector b.Other Contact Person: Phone M 6 6/9/2015 9:39 AM FROM: Journeay Insurance Journeay Insurance Agency TO: 1-978-688-9592 PAGE: 002 OF 002 AC"MY CERTIFICATE OF LIABILITY INSURANCE DATE (M06/09//20152015 YY) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(es) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s). PRODUCER Phone: 978-346-8761 Fax: 978-346-9620 CONTACT Journeay Insurance Agency Inc JOURNEAY INSURANCE AGENCY INC 8 WEST MAIN STREET PHONE Eat: 978-346-8761 a No: 978-346-9620 E-MAIL MERRIMAC MA 01860 ADDRESS: INSURER(S) AFFORDING COVERAGE NAIC# INSURER : National Grange Mutual Insurance Co 14788 INSURED SPENCER O'CONNOR INSURER B 54 BOULDER DRIVE INSURER DANVILLE NH 03819 INSURER D: INSURER E INSURER F COVERAGES CERTIFICATE NUMBER: 10819 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALLTHE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADD'L SUBR POLICY EFF POLICY EXP LTR INSR WVD POLICY NUMBER MM/DD/YYYY MM/DD/YYYY LIMITS A GENERAL LIABILITY MPT3459S 06/08/15 06/08/16 EACH OCCURRENCE $ 500,000 X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED $ 500,000 PREMISES Ea occurence) CLAIMS-MADE F x�OCCUR MED.EXP(Any one person) $ 10,000 PERSONAL&ADV INJURY $ 500,000 GENERAL AGGREGATE $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 1,000,000 POLICY PEa LOC $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT (Ea accident) $ ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY Per accident $ AUTOS AUTOS ( ) NON-OWNED PROPERTY DAMAGE HIRED AUTOS AUTOS per accident) $ UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED I RETENTION$ $ WORKERS COMPENSATION WC STATU- OTH AND EMPLOYERS' LIABILITY To LIMITS ER $ ANY PROPRIETOR/PARTNER/EXECUTIVE Y/N E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? (Mandatory In NH) N/A E.L.DISEASE-EA EMPLOYEE $ If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(Attach ACORD 101,Additional Remarks Schedule,if more space is required) CERTIFICATE HOLDER CANCELLATION North Andover Building Department SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Town Hall THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN North Andover,Ma.01845 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE Attention: Derek Journeay ACORD 25(2010/05) ©1988-2010 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD 619!2015 Office of Consumer Affairs&Business Regulation-Mass.Gov The Official Website of the Office of Consumer Affairs&Business Regulation(OCABR) QD Consumer Affairs and Business Regulation Home Consumer Rights and Resources Home Improvement Contracting Home Improvement Contractor Registration Lookup To search by registration number, enter the registration number in the textbox below and click the 'Search' button. Search by Registration Number 1182187 Searchf To search by other fields, enter the search criteria in the fields below and click the 'Search Registrants' button. For the State field, use the two character state abbreviation such as "MA "for Massachusetts and "RI" for Rhode Island. All search fields allow partial text so the search will look for any values that begin with what was entered. For example, if you enter"Fr" in the City/Town field and "MA" in the State field then the search will return records for Framingham, Franklin, and Freetown which all begin with "Fr" and are located in Massachusetts. To return less information enter in more criteria. For instance, entering in a state of "MA" will return a large number of records but entering in a state of "MA" and a city/town of "Medford" will lower the results. Search by Registrant's company's name Search by Registrant's last -- name City/Town State F Zip �- code Search Registrants Click on the registration number to view complaint history. You can also view arbitration and Guaranty Fund history. The list is current as of Monday, June 8, 2015. Search Results REGISTRANT RESPONSIBLE REGISTRATION EXPIRATION NAME INDIVIDUAL NUMBER ADDRESS DATE STATUS SPENCER O'CONNOR 182187 54 BOULDER DRIVE 06/03/2017 Current DANVILLE, NH 03819 ©2012 Commonwealth of Massachusetts. Mass.GovO is a registered service mark of the Commonwealth of Massachusetts. Massachusetts-Department of 06blic Safety goasd of Bui!diug,Reastfaticrrisnnd standards, ;. Construction Sup'eh i;rir 5, i_lcense:'CS-106229 :.' SPENCER OTONWOR---7'= ' 5.3 BOULDER DRNE' Danville NH 0381 g., Expira #,. Commissioner 03129/2016