Loading...
HomeMy WebLinkAboutBuilding Permit #778 - 148 MAIN STREET 5/29/2007 NORTH BUILDING PERMIT °`<t-S° #6 6 TOWN OF NORTH ANDOVER F i • . A APPLICATION FOR PLAN EXAMINATION , Permit NO: Date Received Ao TED �y Date Issued: " IMPORTANT Applicant must complete all items on this page 'L LOCA�IfJ !' Zt I x v 3 PRQI'ERTY31lVIV ; r 3 _. 1VAP NQw .. PARCELS L.3JINC®ISTRI�T toric Iistrc yes MPP , AAachine �I -Vince„ yes .. no .: TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family 11 Addition [I Two or more family F1 Industrial ❑ Alteration No. of units: e'(5ommercial ❑ Repair, replacement ❑ Assessory Bldg ❑ Others: ❑ Demolition ❑ Other • eptic ❑;Weil _ p l looclplam pWetl ds ❑•-,Watershed Di r Wates/Seer DESCRIPTION OF WORK TO BE PREFORMED: ,e- vc.'� Lo11—dy 1114 Identification Please Type or Print Clearly) OWNER: Name: Phone: Address: M P>ane , /- 3 •' GOi I"F ACT0JR, INarne: �.e � n f r - , f f Address. ¢1, A +,Y, •� sy fx E x �i/ �Y eJ ' r #� D. C'x Sup ervisor-s'OobstfUd n;License V '�'' . „ . : om: l'r�nprovrcr�t Lrense y Exp s ARCHITECT/ENGINEER / MX /V02,fn-_s — - Phone: Address: ZJ LWe�s S A / Dti C�X/�"Reg. No. FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. ¢' 9 $ �� Total Project Cost: 4004 FEE: $ ��, Check No.: 4wi—L Receipt No.: NOTE: Persons contracting with unregistered contractors do not have access to theViara ty d ed. �.._, a M Signature ofAgent(Qwner Signature of,contract, r Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMMENTS DATE REJECTED DATE APPROVED CONSERVATION ❑ ❑ COMMENTS DATE REJECTED DATE APPROVED HEALTH ❑ ❑ COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/signature&Date Drive Permit Located at 384 Osgood Street FIRE= D>5A 'MINT -Tem ' _' Da "Located 8 1?4 Mam'CJ}re74 C et Fire be6artranent signatdWdate. - s K e .COATS h e Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— For department use OA Q ❑ Notified for pickup - Date ................................................................................................................................................................................................................................................................................................................................................................................................................ ......................................................................... Doc.Building Permit Revised 2007 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:INSPECTIONAL SERVICES DEPARTMENT:BPFORM07 Revised 2.2007 Location �� T"'� i���� COnw-o -,- " No. Date NORTH TOWN OF NORTH ANDOVER 3: � • Ot a s Certificate of Occupancy $ E<� Building/Frame Permit Fee $ " ncMus Foundation Permit Fee $ Other Permit Fee $ TOTAL $ Check # to 202 1. 1 Building Inspector Inspector i rauolss►urwoD 'ONb13n0210 3NVi.lIIOH i �. . l�if10 =1 73vHDIW —74 L90£l #J1 600Z/9 /l+ uoe�l�1 9961/9E/fi a e L£L6L SD est+eal� esuaall Joslnjedng sP P uol;ons;sugD M1 1 at 0su i upllnujo p.reot ✓tie �arr�rrzo�eatCtC � �l�,tta Regulations and Standards License or registration valid for individul use'only Board of Building before the expiration date. If found return to: HOME IM.pROVEMEiCONTRACTOR Board of Building Regulations and Standards Registration. 136893 One Ashburton Place RM 1301 Expiration 911.0!2008 Trtl 128996 Boston,Ma.02108 Type. Individual MICHAEL F.CURLEY MICHAEL CURLEY, :\ , Not valid without signature 1 HOLLY LN. MA 01902 Administrator — ---- GROVELAND, ---- AORTH Town of .I 19Andover No. AIL o = L A dover, Mass., trod2 'COC MICKEWICK V ��ADRATED PPS\ IT BOARD OF HEALTH PERMIT T D Food/Kitchen Septic System BUILDING INSPECTOR THIS CERTIFIES THAT .A-A......... s........ ...v..................................................... Foundation has permission to erect........................................ buildings on.............. ... . .j...k......5..r.....0............................. Rough to be occupied as.........S4.00-6.......� ...R....I�I.r�- it ....�.... 7-ohn.1 Chimney provided that the person accepting this perm�all in every respect conform to the terms of the application on file in Final this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Q� 1 PERMIT EXPIRES IN 6 MO S Final ELECTRICAL INSPECTOR UNLESS CONSTRU S TS Rough ... ............. .. Service . .. ... .. .. .. . ...... BUILDING INSPECTOR Final Occupancy Permit Required to Occupy Building GAS INSPECTOR Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. SEE REVERSE SIDE Smoke Det. CONTRACT This agreement is made as of. May 28,2007 Between the Owner: Sutton Pond Condominium Trust C/o Shawmut Property Management 733 Turnpike Street, Suite#221 North Andover,Massachusetts 01845 and the Contractor: Circle C Construction 1 Holly Lane Groveland,Massachusetts 01834 The Project is: Window Bay Sealant[Vent Louver Installation/ Roof Parapet Flashing Joint Cover Plates and Sealant and Associated Work Sutton Pond Condominium 148 Main Street North Andover, Massachusetts The Engineer is: RMX Northeast,Inc. 21'3 West Street Milford,MA 01757 The Owner and Contractor agree as set forth below: ARTICLE 1 CONTRACT DOCUMENTS The Contract Documents consist of this agreement,AIA General Conditions(1997), Drawings, Specifications,Addenda,and Bid Form issued prior to the execution of this Contract,and are as fully a part of this Contract as if attached to this Agreement or repeated herein. ARTICLE 2 SCOPE OF WORK The Contractor agrees to perform all of the work necessary for the completion of the project. The Work shall include the Window Bay Sealant and Associated Work, as described on the Project Specification-Work Scope Summary bearing the title`Project Specification-Work Scope Summary for Sutton Pond Condominium 148 Main Street, North Andover,Massachusetts", prepared by the Designer. T •�I a nnc_t oo_o.c_r vu a I =3raJ_Jcu_1 au Waac :4. 1 nna +.P Rew 5.3 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.4 The amount of each progress payment shall be the approved percentage of completion (less previous payments)less 10%retainage. Payments shall be made within 30 days from the date of approval of the Application for Payment. ARTICLE 6 FINAL PAYMENT Final Payment,constituting the entire unpaid balance of the Contract Sum,shall be made by the Owner to the Contractor when(1)the Contract has been fully performed by the Contractor including the submission of all warranty related paperwork,(2)a final Application for Payment has been submitted and approved and(3)Release of Liens forms from all suppliers have been submitted. ARTICLE 7 TERMINATION OR SUSPENSION The Contract may be terminated or suspended by the Owner or Contractor as provided for in the General Conditions. This Agreement is entered into as of the day and year first written above and is executed in at least three original copies of which one is to be delivered to the Contractor,one to the Designer for use in administration of the Contract and the remainder to the Owner. OWNER CONTRACTOR (Sign ) (Printed Name and Title) ( tinted Name and Title) NC` E 'd bnn6—T R9—R/.R—t SeW 4 1 ar`X-4AJ1'_1—.1N `•••••' = a1r ARTICLE 3 DATE OF COMMENCEMENT AND FINAL COMPLETION 3.1 The date of commencement shall be the date of this Agreement, as first written above, unless a different date is stated below or provision is made for the date to be fixed in a Notice to Proceed issued by the Owner. 3.2 The Contractor shall achieve Final Completion within a period agreed upon by the Owner. 3.3 For every Calendar Day after the agreed upon date,a liquidated damages penalty shall be assessed at the rate of$150.00 per day until the project is 100%complete. Extensions will be given for unusual weather patterns and inclement weather that cause delays in the project. ARTICLE 4 CONTRACT SUM 4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum of Seventeen Thousand,Nine Hundred Dollars, ($17,900.00),subject to additions and deductions as provided in the Contract Documents. 4.2 Unit Prices are as follows: Description Contract Qty Unit Price SEALANT(JOINT)REPLACEMENT $7.00 per 1. f. HOURLY RATE FOR LABOR(including OH) $45.00 per hour MARK-UP FOR MATERIALS,ETC. 15% ARTICLE 5 PROGRESS PAYMENTS 5.1 Based upon Applications for Payment submitted to the Designer(for review and approval)on AIA for G702&G703,and forwarded to the Owner,the Owner shall make progress payments on the account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. 5.2 Each Application for Payment shall be based upon the Schedule of Values submitted by the Contractor in accordance with the Contract Documents. The Schedule of Values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Designer may require. z 'd *,006-169-8G6-i Xkid 13r'83SUI dH Wd6E :* L002 bZ ReW