HomeMy WebLinkAboutBuilding Permit #405-13 - 15 Longwood Avenue 12/15/2012 TOWN OF NORTH ANDOVER
APPLICATION FOR PLAN EXAMINATION
Permit NO: Date Received
Date Issued: %� /f- //—
IMPORTANT:Applicant must complete all items on this page
LQCATION
Print,
PROPERTY-OWNER
'Print =100 Year Old Structure yes t
MAP NO _=PARCEL: ZONING DISTRICT tHistoric°District 'yes
•_- Machine?Shop Village yes no
TYPE OF IMPROVEMENT PROPOSED USE
Residential Non- Residential
❑ New Building §16ne,family
I!IrAddition ❑ Two or more family ❑ Industrial
❑Alteration No. of units: ❑ Commercial
❑ Repair, replacement ❑Assessory Bldg ❑ Others:
❑ Demolition ❑ Other
Septic ❑Well IE) Floodplain, N Wetlands 11 Watershed District
ater/Sewer _..
DESCRIPTION OF WORK TO BE PERFORMED:
Ald A rLo{ F-(oo r I-- M( (�7 goo rn TO e—'x G
ellrf Identification Please Type or Print Clearly)
OWNER: N e: ( i2r Phone:
Address:
CONTRACTOR, _ -�, —'Phone-
,Name: .
.Address:
.r .
Supervisor s Construction License Exp. ,Date _
Home�lmprovemenf License Exp: Date; .
Y ,
yvt,A i'r [d--- 5
ARCHITECT/ENGINEER 04 A � C Phone:
Address: Reg. No.
FEE SCHEDULE:BULDING PERMIT.$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F.
Total Project Cost: $ G, 0Ov FEE: $
Check No.: / � Receipt No.:
NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund
Signature of Aabh -, wner G Signature of contractor. `.
Plans Submitted Plans Waived ❑ Certified Plot Plan ❑ w Stamped Plans ❑
Building Department
The fohowing is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
❑ Building Permit Application
❑ Workers Comp Affidavit
❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses
❑ Copy of Contract
❑ Floor Plan Or Proposed Interior Work
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition Or Decks
❑ Building Permit Application
❑ Certified Surveyed Plot Plan
❑ Workers Comp Affidavit
❑ Photo Copy of H.I.C. And C.S.L. Licenses
❑ Copy Of Contract
❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (if Applicable)
❑ Mass check Energy Compliance Report (If Applicable)
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
New Construction (Single and Two Family)
o Building Permit Application
❑ Certified Proposed Plot Plan
❑ Photo of H.I.C. And C.S.L. Licenses
❑ Workers Comp Affidavit
❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations (If Applicable)
o Copy of Contract
o Mass check Energy Compliance Report
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
must be submitted with the building application
Doc: Doc.Building Permit Revised 2012
Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑
TYPE OF SEWERAGE DISPOSAL
Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑
Well ❑ ❑
Tobacco Sales Food Packaging/Sales ❑
Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF - U FORM
DATE REJECTED DATE APPROVED
PLANNING & DEVELOPMENT ❑ ❑
COMMENTS
of
CONSERVATION Reviewed on i j 2 Si nature ' ' I L)L=..:::
COMMENTS
HEALTH Reviewed on Signature
I
COMMENTS
Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision: Comments
Conservation Decision: Comments
Water & Sewer Connection/Signature& Date Driveway Permit
DPW Town Engineer: Signature:
Located 384 Osgood Street
FIRE DEPARTMENT -Temp Dumpster on site yes no +
Located at 124.Main Street:
Fire Depa rtmenf•sigriature/date It
COMMENTS
Dimension
Number of Stories: Total square feet of floor area, based on Exterior dimensions.
Total land area, sq. ft.:
ELECTRICAL: Movement of Dieter location, roast or service drop requires approval of
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes No
MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine
NOTES and DATA— (For department use
® Notified for pickup - Date
� f _
Doc.Building Permit Revised 2010
Location
No. �� �3 Date.T//t
• • TOWN OF NORTH ANDOVER
• C'VIAPD Irya` e
` ` rt Certificate of Occupancy $
Building/Frame Permit Fee —
t
� ~' f Foundation Permit Fee $
..
Other Permit Fee $
TOTAL $
Check#
25955 Building Inspector
Location 't5 Lo'2 p N" e, '"
No. L�~ Date. �3
,0
. - TOWN OF NORTH ANDOVER
Certificate of-occupancy $
Building/Frame Permit Fee $
�71 77
Foundation Permit Fee $
Other Permit Fee �° $
' TOTAL $
Check#Z'OO f
27024 / Building Inspector
N1RTH
of a°„apo
r y+a n•:i�... �L
+A t a
�SSACM15Ei
CERTIFICATE OF USE & OCCUPANCY
TOWN OF NORTH ANDOVER
Building Permit Number 405-13 on 12/15/2012 Date: October 21, 2013
THIS CERTIFIES THAT
THE BUILDING LOCATED ON 15 Lorraine Avenue
MAY BE OCCUPIED AS a Single Family Home IN ACCORDANCE WITH THE
PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER
REGULATIONS AS MAY APPLY.
Certificate Issued to: Breenmore Realty
95 Lawrence Road
Boxford, MA 01921
Building Inspector
Fee: $100.00
j Receipt: 27024
Check : 2100
µORTH
o�vn
of E ndover
O � '
. ver, Mass, ...
LANE
COG NIC NlWKN V
��AERATED I.P���S
S U
BOARD OF HEALTH
Food/Kitchen
PERM :IT T
Septic System;
THIS CERTIFIES THAT .......... .......................... ......................................................................... 1�LDI INSPECTOR
4 . 6/ 211
oundation
has permission to erect .......................... buildings on .................. ............ ................................... - f
tobe occupied as .........� ... . ....... ' ...............: ...............:....... �........:.......:.......: %° .� .............. Ch mney
provided that the person accepting this permit shall in every respect conform to the terms of the application F nal
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and
Construction of Buildings in the Town of North Andover. LUMBING INSPECTOR, .
Rough
VIOLATION of the Zoning or Building Regulations Voids this Permit.
y�•;�;
Final ,
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
UNLESS CONSTRUCTION STARTS R gh - "na2, - ;d
Service
BUILDING INSPECTOR
GAS INSPECTOR
Occupancy Permit Required to Occupy Building RaUgh ` s.
- J
Display in a Conspicuous Place on the Premises — Do Not Remove Final As- 111.g `_-�
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No)'
Smoke Det.
SEE REVERSE SIDE 1 CD
NORTH
own of ndover
O
No.
h ver, Mass, 4, --
COCHICKlWlCK
s u
BOARD OF HEALTH
Food/Kitchen
PERMIT T LD Septic System
S �
THIS CERTIFIES THAT ...............................
..........:.......... ....... , ............................ .. ..................... �I�uILDIN rINSP%ESC/TOR
.P' i' y ,,,dation "
has permission to erect .......................... buildings on ..... .. .. i... r ............................... = ``
'.. "chi ney.. ... ........ ..occuled as ........................... .::.to be
provided that the person accepting this permit shall in every respect conform to the terms of the application F nal
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and
Construction of Buildings in the Town of North Andover. LUMBING INSPECTOR .
f •` 1. i,.I ^�IYJ
Rough .
VIOLATION of the Zoning or Building Regulations Voids this Permit.
Final
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
UNLESS CONSTRUCTION STARTS " Rn = _1
` Service pl:
.... BUILDING INSPECTOR
GAS INSPECTOR
Occupancy Permit Required to Occupy Building Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final Ate. ,11 f3
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.7`
Smoke Det.
SEE REVERSE SIDE I CD - t5 -t3
NOR7y
O�'ttlE° f6q~O
0 p
APPLICATION FOR CERTIFICATE OF OCCUPANCY/INSPECTION
�9 s"r`°•^pe�y
HUS BUILDING PERIVHT #
s ac �
ADDRESS/LOCATION OF PROPERTY:_ LO�� r, AQ_ N va_
Map C—Parcel– l Lot Number
SUBDIVISION:_ O r11.4 r Ave
DATE REQUESTED FILED/READY FOR INSPECTION:
CLOSING DATE ON PROPERTY:
FIVE (5)DAYS NOTICE PRIOR TO CLOSING DATE IS REQUIRED
ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A
REINSPECTION FEE OF TWENTY DOLLARS ($20.00)WILL BE CHARGED IF THE-STRUCTURE
DOES NOT MEET ALL APPLICABLE CODES.
APPLICANT SIGNATURE
Permit Issued to:
Address:
ROUTING
T/OWN ENGINEER SITE PLAN J –
DWVE-WAY REVIEW ❑
CONSERVATIONV/P
LANNING ❑
�PW-WATER METER ❑ O u/
SEWER CONNECTION ❑ pfd "7r:TIA/
DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO
SUBMITTAL OF THE OCCUPANCYANSPECTION REQUEST
DPW
SIGNATURE
File:Application for OC form revised Jan 2007/2011
Enter construction cost for fee cal- North Andover Fee Calculation
Construction cost
$ 90,000.00 m
$ - $ 1,080.00
Plumbing Fee $ 135.00
Gas Fee 100 comm. $ 100.00
Electrical Fee $ 135.00
Total fees collected $ 1,450.00
15 Lorraine Ave
405-13 on 12/15/2012
Second Floor Added and family room
NORT#1
Town of 6 ndover
No. 1/0���_ 4 t 04 -WWII-
LAME h ver, Mass, / /� l2
coc Ic„EWKM
p�J 'ArEOD
S V
BOARD OF HEALTH
PERM T Food/Kitchen
Septic System
THIS CERTIFIES THAT BUILDING INSPECTOR
��,C, � Foundation
has permission to erect.......................... buildings on ..�
......�.....t�..`�:¢.. ..14 ...............................
,q ® Rough
to be occupied as /.f7"��i,,.-�. �I� `Qe1�;.. 4 . � �1�... �'a% ^ „� �••� c`' 6 Chimney
provided that the person accepting,this permit shall in every respect conform to the terms of the application Final
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and
Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
UNLESS CONSTRUCTION STARTS Rough
Service
.............. Final
..... . ..............�.......................................
BUILDING INSPECTOR
t GAS INSPECTOR ”
Occupancy Permit Required to Occupy Building Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
Smoke Det.
` IF
SEE REVERSE SIDE
Enter construction cost for fee cal- North Andover Fee Calculation
Construction Cost
$ - $ 1,080.00
Plumbing Fee $ 135.00
Gas Fee 100 comm. $ 100.00
Electrical Fee $ 135.00
Total fees collected $ 1,450.00
i
15 Lorraine Road
405-13 on 11/15/2012
Add second floor and family room
to existing house
I
f
REScheck Software Version 4.4.3
Compliance Certificate
Energy Code: 2009 IECC
Location: North Andover, Massachusetts
Construction Type: Single Family
Glazing Area Percentage: 13%
Heating Degree Days: 6322
Climate Zone: 5
Construction Site: Owner/Agent: Designer/Contractor:
15 Lorraine Ave.
North Andover,MA
Compliance:7.6%Better Than Code Maximum UA:370 Your UA:342
The%Better or Worse Than Code index reflects how close to compliance the house is based on code tradeoff rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
AssemblyGross Cavity Cont. Glazing UA
or or D••
Perimeter U-Factor
Ceiling 1:Flat Ceiling or Scissor Truss 1376 38.0 0.0 41
Wall 1:Wood Frame, 16".o.c. 2816 21.0 0.0 137
Window 1:Vinyl Frame:Double Pane with Low-E 321 0.300 96
Door 1:Solid 60 0.190 11
Door 2:Glass 40 0.300 12
Floor 1:All-Wood Joist/Truss:Over Unconditioned Space 1376 30.0 0.0 45
Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in
REScheck Version 4.4.3 and to comply with the mandatory requirements list din the REScheck Inspe Checklist. a
A -`A L r C� 4
V
Name-Title Signature Date
Project Title: Report date: 11/01/12
Data filename: Untitled.rck Page 1 of 4
REScheck Software Version 4.4.3
Inspection Checklist
Energy Code: 20091ECC
Location: North Andover, Massachusetts
Construction Type: Single Family
Glazing Area Percentage: 13%
Heating Degree Days: 6322
Climate Zone: 5
Ceilings:
❑ Ceiling 1:Flat Ceiling or Scissor Truss,R-38.0 cavity insulation
Comments:
Above-Grade Walls:
❑ Wall 1:Wood Frame, 16"o.c.,R-21.0 cavity insulation
Comments:
Windows:
❑ Window 1:Vinyl Frame:Double Pane with Low-E,U-factor:0.300
For windows without labeled U-factors,describe features:
#Panes Frame Type Thermal Break? Yes No
Comments:
Doors:
❑ Door 1:Solid,U-factor:0.190
Comments:
❑ Door 2:Glass,U-factor:0.300
Comments:
Floors:
❑ Floor 1:All-Wood Joist/Truss:Over Unconditioned Space,R-30.0 cavity insulation
Comments:
Floor insulation is installed in permanent contact with the underside of the subfloor decking.
Air Leakage:
❑ Joints(including rim joist junctions),attic access openings,penetrations,and all other such openings in the building envelope that are
sources of air leakage are sealed with caulk,gasketed,weatherstripped or otherwise sealed with an air barrier material,suitable film or
solid material.
❑ Air barrier and sealing exists on common walls between dwelling units,on exterior walls behind tubs/showers,and in openings between
window/doorjambs and framing.
❑ Recessed lights in the building thermal envelope are 1)type IC rated and ASTM E283 labeled and 2)sealed with a gasket or caulk
between the housing and the interior wall or ceiling covering.
❑ Access doors separating conditioned from unconditioned space are weather-stripped and insulated(without insulation compression or
damage)to at least the level of insulation on the surrounding surfaces.Where loose fill insulation exists,a baffle or retainer is installed
to maintain insulation application.
❑ Wood-burning fireplaces have gasketed doors and outdoor combustion air.
❑ Automatic or gravity dampers are installed on all outdoor air intakes and exhausts.
Air Sealing and Insulation:
❑ Building envelope air tightness and insulation installation complies by either 1)a post rough-in blower door test result of less than 7
ACH at 50 pascals OR 2)the following items have been satisfied:
(a)Air barriers and thermal barrier:Installed on outside of air-permeable insulation and breaks or joints in the air barrier are filled or
repaired.
Project Title: Report date: 11/01/12
Data filename: Untitled.rck Page 2 of 4
(b)Ceiling/attic:Air barrier in any dropped ceiling/soffit is substantially aligned with insulation and any gaps are sealed.
(c)Above-grade walls: Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier.
(d)Floors:Air barrier is installed at any exposed edge of insulation.
(e)Plumbing and wiring: Insulation is placed between outside and pipes.Batt insulation is cut to fit around wiring and plumbing,or
sprayed/blown insulation extends behind piping and wiring.
M Corners,headers,narrow framing cavities,and rim joists are insulated.
(9)Shower/tub on exterior wall: Insulation exists between showers/tubs and exterior wall.
Sunrooms:
Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum
skylight LI-factor of 0.75.New windows and doors separating the sunroom from conditioned space meet the building thermal envelope
requirements.
Materials Identification and Installation:
Materials and equipment are installed in accordance with the manufacturer's installation instructions.
F1 Materials and equipment are identified so that compliance can be determined.
j r-i Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided.
0 Insulation R-values and glazing LI-factors are clearly marked on the building plans or specifications.
Duct Insulation:
Supply ducts in attics are insulated to a minimum of R-8.All other ducts in unconditioned spaces or outside the building envelope are
insulated to at least R-6.
Duct Construction and Testing:
Building framing cavities are not used as supply ducts.
F1 All joints and seams of air ducts,air handlers,filter boxes,and building cavities used as return ducts are substantially airtight by means
of tapes,mastics,liquid sealants,gasketing or other approved closure systems.Tapes,mastics,and fasteners are rated UL 181A or
UL 181 B and are labeled according to the duct construction.Metal duct connections with equipment and/or fittings are mechanically
fastened.Crimp joints for round metal ducts have a contact lap of at least 1 1/2 inches and are fastened with a minimum of three
equally spaced sheet-metal screws.
Exceptions:
Joint and seams covered with spray polyurethane foam.
Where a partially inaccessible duct connection exists,mechanical fasteners can be equally spaced on the exposed portion of the
joint so as to prevent a hinge effect.
Continuously welded and locking-type longitudinal joints and seams on ducts operating at less than 2 in.w.g.(500 Pa).
Duct tightness test has been performed and meets one of the following test criteria:
(1)Postconstruction leakage to outdoors test:Less than or equal to 204.8 cfm(8 cfm per 100 ft2 of conditioned floor area).
(2)Postconstruction total leakage test(including air handler enclosure):Less than or equal to 307.2 cfm(12 cfm per 100 ft2 of
conditioned floor area).
(3)Rough-in total leakage test with air handler installed:Less than or equal to 153.6 cfm(6 cfm per 100 ft2 of conditioned floor area).
(4)Rough-in total leakage test without air handler installed:Less than or equal to 102.4 cfm(4 cfm per 100 ft2 of conditioned floor area).
Temperature Controls:
Where the primary heating system is a forced air-furnace,at least one programmable thermostat is installed to control the primary
heating system and has set-points initialized at 70 degree F for the heating cycle and 78 degree F for the cooling cycle.
Heat pumps having supplementary electric-resistance heat have controls that prevent supplemental heat operation when the
compressor can meet the heating load.
Heating and Cooling Equipment Sizing:
Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code.
For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial
Building Mechanical and/or Service Water Heating(Sections 503 and 504).
Circulating Service Hot Water Systems:
F1 Circulating service hot water pipes are insulated to R-2.
Circulating service hot water systems include an automatic or accessible manual switch to tum off the circulating pump when the
system is not in use.
Heating and Cooling Piping Insulation:
Project Title: Report date: 11/01/12
Data filename: Untitled.rck Page 3 of 4
HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-3.
Swimming Pools:
Heated swimming pools have an on/off heater switch.
Pool heaters operating on natural gas or LPG have an electronic pilot light.
Timer switches on pool heaters and pumps are present.
Exceptions:
Where public health standards require continuous pump operation.
Where pumps operate within solar-and/or waste-heat-recovery systems.
Heated swimming pools have a cover on or at the water surface.For pools heated over 90 degrees F(32 degrees C)the cover has a
minimum insulation value of R-12.
Exceptions:
Covers are not required when 60%of the heating energy is from site-recovered energy or solar energy source.
Lighting Requirements:
F-1 A minimum of 50 percent of the lamps in permanently installed lighting fixtures can be categorized as one of the following:
(a)Compact fluorescent
(b)T-8 or smaller diameter linear fluorescent
(c)40 lumens per watt for lamp wattage—15
(d)50 lumens per watt for lamp wattage>15 and—40
(e)60 lumens per watt for lamp wattage>40
Other Requirements:
F-1 Snow-and ice-melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting
off the system when a)the pavement temperature is above 50 degrees F,b)no precipitation is falling,and c)the outdoor temperature is
above 40 degrees F(a manual shutoff control is also permitted to satisfy requirement's').
Certificate:
A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values;window
U-factors;type and efficiency of space-conditioning and water heating equipment.The certificate does not cover or obstruct the visibility
of the circuit directory label,service disconnect label or other required labels.
NOTES TO FIELD:(Building Department Use Only)
I
i
Project Title: Report date: 11/01/12
Data filename: Untitled.rck Page 4 of 4
P�
I
2009 CC Energy
Efficiency Certificate
Ceiling/Roof 38.00
Wall
21.00
Floor/Foundation 30.00
Ductwork(unconditioned spaces):
Window 0.30 0.70
Door 0.19 0.70
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments:
I
I
Gelinas 5hdural �ngineerinq LLC Phone 978.465.6436
Daniel L. Gelinas, P.E. Fax 978.465.5160
579A North End Blvd.
Salisbury, MA 01952-1738 email danl elig nas(cr�comcast.net
Fax and Transmittal # pages l �p1 I
October 22, 2012 _
TO: ro r—
Peter Breen Excavating, Inc fax 978.689.8740 O
770 Boxford Street phone 687.7774
North Andover, MA 01845-3240
Cell 978.265.7580
SUBJECT: Framing and Foundations, 15 Lorraine Ave
Peter:
1. This package in Tuesday's mail
2. same emailed to Staples North Andover if you want to go there now and color print 11 x 17 for your
original submittals
Staples Copy Center #1555 Phone 978-685-6518
73 Turnpike Street
North Andover MA, 01845 Email ccl555@staplescopycenter.com
3. Give these notes to framer
4. House is wide, thus:
a. Basement/First Floor:
i. Two locations Tube Steel Column HSS 4x4x3/16 thick required with steel plates 11/2 x
10 x 10 welded, see drawing
ii. Same two locations footing 4 foot x 4 ft by 15"thick with reinf. steel ... see drawings
iii. 6 places double 3 %2 diameter Lally columns required,
iv. Only two locations single 3 t/2 Lally columns
v. Lally Columns use %2 x 6 x 8 spring field plates
vi. These Lally Columns footing needed 2'-9"x 2'9"x 12"thick with reinforcing steel ...
see drawings
vii. Kitchen and ....., double 2x10 at 16 o.c. floor joist required, see drawing
viii. Add anchor bolts if there are none, t/2" diameter, 6 feet o.c., see drawings
5. 2"d floor and Attic framing plans:
a. See drawings SG2, SG3 and see sections A, B, & C drawings SG7 & SG8
b. Two end walls see sections/drawings SG 5 & SG6
6. Roof Framing: 4
a. See plan SG 4,note double 16" LVL Ridge Beam required
b. Note Partial Eave Blocking required per Section SG9, this is a new code requirement
Very truly yours; o ,
Daniel L. Gelinas P.E. e, J
Fax Peter Breen 12138 '
J ST ',J`.�j1tUi.SAL i
X13.
33919A-