Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Building Permit #043-2016 - 16 HARWOOD STREET 7/9/2015
TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO: "�' Date Received Date Issued: IMPORTANT: Applicant must complete all items on this page LOCATION 16 Harwood Street W� rl rinfPROPERTY OWNER �.��•1���o Print 100 Year Old Structure yes no MAP NO: PARCEL ZONING DISTRICT: Historic District ye no Machine Shop Village ye no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential D New Building 6J One family ❑Addition ❑Two or more family ❑ Industrial ®Alteration No. of units: ❑ Commercial ❑ Repair, replacement 0 Assessory Bldg ❑ Others: ❑ Demolition 0 Other ❑ Septic ❑Well ❑ Floodplain ❑Wetlands 0 Watershed District 0 Water/Sewer DESCRIPTION OF WORK TO BE PERFORMED: Installation of a 4.68 kw(18 panels) rooftop solar array Identification Please Type or Print Clearly) OWNER: Name: Fernando Herrera Phone: 978-681-9890 Address: 16 Harwood Street CONTRACTOR Name: Romain Strecker Phone: 781-462-8702 Address: 10 Churchill Place, Lynn MA 01902 A&WI &YZ;P7 Supervisor's Construction License: 096385 _ Exp. Date: 10/8/2015 Home Improvement License: 169698 Exp. Date: 7/27/2015 ARCH ITECT/ENGINEER_ _Tames A Adams Phone: Address: 775 Fiero Lane, San Luis Obispo CA Reg. No. 49748 FEE SCHEDULE:BULDING PERMIT:$12.00 PER$!000.00 OF THE TOTAL ESTIMATED COST BASED ON$925.00 PER S.F. Total Project Cost: $ 16,217 FEE: $ SCI Check No.: lJt Receipt No.: i NOTE: Persons contracting with unregistered contractors do not have access to theguarantyf �dF�_, / Signature of Agent/Owner Signature of contractor Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF:SEWERAGE DISPOSAL" Public Sewer ❑ Tanning/MassageBody Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ - Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT' ❑ ❑ COMMENTS .CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Pianning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature& Date Driveway Permit DPW Tow;! Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT -_Temp Dumpster on site yes. no Located'at 124 Mair. Street Fire Department signatureldate COMMENTS i -Dili erasion Number of Stories: Total square feet of floor area, based on Exterior dimensions._ .Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A=F and G min.$100-$1000 fine NOTES and DATA— (For department use 01 rz--dd �✓�,,.e_ C dt► K et/ o , a vi UV'-' �_ ci 1-)4 115 6P / Q Notified for pickup - Date i Doc.Building Permit Revised 2010 Building Department l The fol:owing isa list of the required forms to be filled out for the appropriate permit to be obtained. Roofivg, Siding, Interior Rehabilitation Permits a Building Permit Application o Workers Comp Affidavit 4 o Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ! o Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks o Building Permit Application ❑ Certified Surveyed Plot Plan a Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses o Copy Of Contract ci Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) o Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New ConstructionSin le and Two Family) � g Y) o Building Permit Application o Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses a Workers Comp Affidavit o Two Sets of BuildingPlans One To Be Returned to Include ( Sprinkler Plan And Hydraulic Calculations (If Applicable) o Copy of Contract o Mass check Energy Compliance Report a Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all csscs if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the apu-�al period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be subm.tted with the building application f� i Doc: Doc.Buiirling permit Revised 2012 f M I - Location �^ No. t� ��^ 01 Date • TOWN OF NORTH ANDOVER SLED j, ' Certificate of Occupancy $ Building/Frame Permit Fee Foundation Permit Fee $ Other Permit Fee $ Tt TOTAL $ Check# Wt � VZ, ~ k Building Inspector NORTH Town o t EAndover jo F No. too, Zo LA»E h ti ver, Mass, coc»�c»ew�c« -1• ORATED s U BOARD OF HEALTH Food/Kitchen PERMIT T LD Septic System THIS CERTIFIES THAT �� Q'r>r� BUILDING INSPECTOR ..............................1�1!� ... ............ .................. ...... . .......... . has permission to erect .......................... buildings on .� ............ V`.,.��. ... ef!', .., Foundation Rough to be occupied as .....1.9....... ..... t,..e .... ............................ Chimney provided that the person accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN'6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTI ST Rough igloo Service ..... ..................................................... Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. DocuSio{r Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 sunrun Sunrun BrightSave y - Solar Power Service Agreement Summary Fernando Herrera 16 Harwood St, North Andover, MA, 01845 ESTIMATED SOLAR ENERGY OUTPUT TO BE DELIVERED YEAR 1: 4,802 kilowatt-hours(kWhs) INITIAL TERM: 91,612 kWhs CONTRACT PRICE Non-refundable Electricity Deposit(due today) $0 Initial Electricity Payment(due at start of installation) $0 Monthly billt Year 1 $52.02(plus taxes, if applicable) Annual increase 2.9% Cost per kWh,Year 1 $0.130, excluding Upfront Payment(if any) t Monthly payments shown include a$15.00 discount for paying through ACH withdrawal from your checking or savings account.If you do not elect automatic payment through ACH withdrawal from your checking or savings account you will not receive this discount and each monthly payment will be$15.00 greater. Your initials indicate that you have read, understand and accept the explanation of estimated energy output, energy sources and payment terms.You understand that Sunrun has the right to check your credit and you agree that Sunrun will make final determination of customer eligibility. Ds THE SOLAR FACILITY IS OWNED BY SUNRUN INC.AND/OR ITS AFFILIATES. SUNRUN INC. 1595 Market Street,29th Floor,San Francisco,CA 94105 1 1-855-478-6786 MA HIC Registration No. 168515 05/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Page 1 of 18 DocuSign Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 Agreement Overview r Sunrun Is Serious About Providing you Quality Service for the Life of your Contract. SOLAR PEACE OF MIND Sunrun offers a Performance Guarantee.If your system does not produce the power output guaranteed in this agreement,we'll refund you for lost power. If your system overperforms you keep the excess power free of charge. Sunrun's customer care team is available by phone and email to respond promptly to any questions or concerns you may have. When we arrange for installation of a system, Sunrun owns the panels, and we monitor them constantly.Sunrun will insure, maintain, and repair the Solar Facility at no additional cost to you including inverter replacement. Sunrun only works with insured partners who have all required licenses to perform the work necessary to install and maintain your system. AGREEMENT OVERVIEW Sunrun wants you to be confident in choosing us as your solar power service provider for the next 20 years.While it's still necessary to read your entire Agreement,there are a few important points to be aware of: o After going solar you will continue to receive a bill from your Utility. Based on the information you provided Sunrun about your previous year's power consumption of 4,971 kWhs,your system is sized to offset 97%of the power you currently purchase from your Utility. o This Agreement becomes effective when both you and Sunrun have signed the Agreement and continues in effect for 20 years following the date your Utility grants permission to operate the Solar Facility. e Your first year monthly payment amount is$52.02.This amount will increase by 2.9%annually for the term of the Agreement.This amount includes a $15.00 discount per month for automatic payment through ACH withdrawal from your checking or savings account. • Sunrun offers a 100% Performance Guarantee.If your system underperforms, Sunrun will refund you for lost power at the rates shown in Exhibit A.If your system overperforms,you keep the excess power at no extra charge.Sunrun warrants that roof penetrations will be weather-tight for a period of ten(10)years after installation. ® You are responsible for payments during the full term of this Agreement.If you sell your house,you have two options: 1)Transfer the Agreement to the new homeowner, 2) Purchase the system.You may prepay the remainder of the payments due under the Agreement to make the transfer even more attractive to the new homeowner. Whichever option you choose, Sunrun will guide you through the process. o Your request for a pricing plan change must be submitted within 21 days of signing this Agreement, but before installation has begun.If installation begins within 21 days of signing this Agreement,the start of installation will mark the date after which you can no longer change your pricing plan. o You may only purchase the Solar System at certain specific times during the term of this Agreement.Those times are listed in section 10. o At the end of this Agreement's 20 year Initial Term: 1)Sunrun will remove the Solar Facility at no cost to you, unless you 2) Purchase the Solar Facility at its then fair market value, or unless 3)This Agreement is automatically renewed per the terms specified in Section 12 aUP Exhibit A. A Your initials indicate that you have read, understand and accept the information listed above. 05/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Page 2 of 18 DocuSigh Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 SUNRUN SOLAR POWER SERVICE AGREEMENT THIS DOCUMENT DESCRIBES THE TERMS AND CONDITIONS OF YOUR RECEIPT OF AND PAYMENT FOR ELECTRIC ENERGY TO BE SUPPLIED BY A SOLAR PHOTOVOLTAIC SYSTEM THAT WILL BE INSTALLED AT YOUR PROPERTY AND OWNED AND MAINTAINED BY SUNRUN INC. 1.Introduction (a)You are entering into this Sunrun Solar Power Service Agreement("Agreement')with Sunrun Inc.,together with its successors and Assignees, ("Sunrud').You represent that you are at least eighteen(18)years of age,that you are the owner of the property located at 16 Harwood St,North Andover, Massachusetts,01845("Property'),and that your current utility is National Grid.You further represent that every person or entity with an ownership interest in the Property has a re��o be bound by this Agreement. ... _ _ ,Accepted by(Initials): (b)Sunrun is a Delaware Corporation.You may contact Sunrun by mail at 595 Market Street,29th Floor,San Francisco,CA 94105,by telephone at 1-855-478-6786,or over the Internet at www.sunrun.com.Sunrun will arrange for the design,permitting,construction,installation,testing,and activation of a solar photovoltaic system("Solar Facility')to be located on the roof of your house and/or grounds of the Property. (c)You agree to allow Sunrun to install and maintain the Solar Facility on the grounds and/or roof of the Property at a specific location to be approved by Sunrun.You further agree to purchase all electric energy generated by the Solar Facility at the price specified in this Agreement. 2.Solar Facility (a)Sunrun will arrange for the design,permitting,construction,installation and testing of the Solar Facility on the roof or grounds,as applicable,of the Property in material accordance with a system design that you will have approved.Thereafter,Sunrun will operate and maintain the Solar Facility so as to generate electric energy for use at the Property. Sunrun will perform these obligations("Sunruns Obligations')during the Initial Term of this Agreement. During any Renewal Terms Sunrun will perform Sunrun's Obligations for as long as the Solar Facility remains economically viable,and will make a good faith effort to notify you if this is not the case per Section 12(f). (b)You acknowledge and agree that: (i)The Solar Facility will be removable equipment and will not be a fixture or otherwise part of the Property. (ii)Sunrun will own the Solar Facility and you will have no ownership interest in the Solar Facility. (iii)The Solar Facility will not be subject to any lien,security interest,claim,mortgage or deed of trust that may be imposed on or assessed against your interest in the Property,or any other property belonging to you.You will have no right to sell,give away,transfer,pledge,remove,relocate,alter or tamper with the Solar Facility at any time.As such,Sunrun will not apply a lien to your title for the Property. (iv)The Solar Facility will be used primarily for household purposes but not to heat a swimming pool. (v)You agree that Sunrun or a Sunrun affiliate may file any UCC-1 financing statement that confirms our or our affiliate's ownership of the Solar Facility. (c)Sunrun will be responsible for all costs and expenses related to performing Sunrun's Obligations.You agree that Sunrun has the authority and discretion to use contractors or agents to perform or assist Sunrun in performing Sunrun's Obligations. (d)Sunrun estimates that the Solar Facility will be capable of generating 4,802 kilowatt-hours("Initial Year One Production Estimate")of electric energy during its first year of operation,but due to several reasons,including natural variation in weather,actual production will vary.Due to expected panel degradation,Sunrun estimates that the Solar Facility will be capable of generating 19.0779 times this amount of kilowatt-hours('41WN')during the Initial Term("Estimated Output').As set forth in Section 8,Sunrun will issue a refund to you if your system does not perform as expected.Sunrun makes no other representation,warranty or guarantee of any kind regarding the Solar Facility's actual or expected output or performance. (e)You agree that Sunrun,at its own expense,will install,maintain,and periodically test a meter at the Property that will measure all electric energy delivered to you from the Solar Facility.If the meter breaks or is found to be inaccurate,Sunrun will adjust the bill as applicable in the next billing cycle by applying a credit for any overcharges or applying an additional charge for any under-charges.You agree not to tamper with,damage or modify the meter in any way.You will be responsible for any damage or inaccuracies in the meter that are caused by you or any other person unrelated to Sunrun who may come onto the Propertywith your knowledge or permission. )5/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Page 3 of 18 DocuSign Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 3.Design and Installation (a)The design for the Solar Facility will be presented to you prior to installation.You will have five(5)business days following this presentation to request a change or cancel this Agreement pursuant to Section 12(e).Otherwise,you will be deemed to have approved the Solar Facility design.With your written, deemed,or verbal approval,Solar Facility installation may begin at any time. (b)If you wish to change the design or installation process,Sunrun will use commercially reasonable efforts to accommodate your request. (c)If an obligation excluded from this Agreement in Section 20 must be performed in order to properly effect the installation of the Solar Facility,you agree to contract separately,and at your own expense,with a contractor who has been designated by or approved by Sunrun to perform such obligation. In this instance,Sunrun will not unreasonably withhold such approval. (d)You agree to cooperate with Sunrun and assist Sunrun in obtaining any permits needed,including the NEM Service application in Section 5(a).You agree to complete and return to Sunrun and/or its representatives,as appropriate,all applicable rebate documentation and,where applicable,Renewable Energy Credit documentation,upon request and following the In-Service Date.If you do not return the rebate or Renewable Energy Credit documentation, Sunrun may invoice you for the Final Rebate amount(as defined in Section 4(a)(iii)). (e)For the Initial Term and any Renewal Terms you agree to maintain the Property,at your expense,such that the Solar Facility retains shading conditions present at the time of Installation. (f)Sunrun requires its contractors to employ licensed personnel whenever required by applicable law,regulation or code. (g)Sunrun,its contractors and agents shall at the end of each business day keep the Property reasonably free from waste materials or rubbish caused by their operations.Prior to the In-Service Date,Sunrun and its agents shall remove all of their tools,construction/installation equipment,machinery,waste materials and rubbish from and around the Property. (h)Subject to the exclusions set forth in Section 20,Sunrun will return your Property to a condition similar to its original condition,provided that you notify Sunrun in writing or by e-mail of any deficiencies in restoration within five(5)business days of the municipal building inspector approval of the Solar Facility. 4.Changes to the Agreement (a)Prior to installation,the following conditions may change the expected costs and benefits of the Solar Facility to both you and Sunrun: (i)Change to the design of your Solar Facility. (ii)Change in the system's annual energy production estimate,expressed in kWh,provided by the National Renewable Energy Laboratory PVWatts Calculator("PVWatts calculator')("Fina/Year One Production Estimate'). (iii)Change in the final rebate amount associated with installing the Solar Facility("FinaiRebatefj. (iv)The availability of cellular service at the Property. If any of these conditions occur,Sunrun may choose to modify the terms of this Agreement or cancel the Agreement.If Sunrun chooses to modify the terms,Sunrun will notify you in writing and you will have five(5)business days to accept the modified terms or cancel this Agreement pursuant to Section 12(e).If you do not respond to Sunrun within five(5)business days,Sunrun may deem you to have cancelled the Agreement. (b)You may choose to accept changes under this Section 4 in writing or by electronic mail.If a change pursuant to this Section 4 increases the Upfront Payment after you have already paid it to Sunrun,you agree to immediately pay Sunrun the increase in the Upfront Payment.Sunrun may suspend installation until this payment is received. (c)If for a period of one hundred eighty(180)days Sunrun fails to perform its obligations required to commence installation of the Solar Facility and you have fulfilled all of your obligations under this Agreement,you may cancel this Agreement,in which case Sunrun will refund to you the Upfront Payment set forth in Exhibit A,provided that your Property was accessible and in a state fully ready to permit the installation of the Solar Facility.Likewise,if you cause the installation of the Solar Facility to be delayed in excess of one hundred eighty(180)days,Sunrun may cancel this Agreement. (d)Your request for a pricing plan change must be submitted within 21 days of signing the Agreement,but before installation has begun.Once installation has begun,you can no longer change your pricing plan.If installation begins within 21 days of signing the Agreement,the start of installation will mark the date after which you can no longer change your pricing plan. 05/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Pal DocuSigo Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 5.Purchase and Sale of Electricity (a)As of the In-Service Date,you must be taking service from the Standard Net Metering Service("NEMService')from your local utility("Utility').You agree that you will continue to take NEM Service for as long as this Agreement is in effect.You agree to use the NEM Service currently in effect for this Utility or, in the event that the NEM Service is no longer in effect,you agree to use a substitute metering program as chosen by Sunrun.You agree to execute all documentation associated with NEM Service,or any substitute metering service,and any refund,credit,or rebate program promptly at the request of Sunrun,its affiliates,and/or the Utility. (b)Sunrun agrees to sell to you,and you agree to purchase from Sunrun,all electric energy produced by the Solar Facility.All electric energy produced by the Solar Facility will be made available to you for use at the Property. (c)If at any time you need more electric energy than is being produced by the Solar Facility("Supplemental Energy'),you will be solely responsible for purchasing that electric energy from another supplier,such as your Utility.During the term of this Agreement you should expect to purchase Supplemental Energy from your Utility.Depending on the terms of your NEM Services,the Utility will bill you either annually or monthly.Sunrun will not be in default of this Agreement and will not be responsible for any Supplemental Energy you purchase to complement the electric energy produced by the Solar Facility. (d)You agree that for all electric energy you purchase from Sunrun under this Agreement you will pay Sunrun the prices set forth in Exhibit A. (e)The price specified in subpart(d)above does not include taxes.If any taxes are assessed on the sale of electric energy,the Property,or on your purchase of the Solar Facility from Sunrun under this Agreement,and such taxes are paid by Sunrun rather than you,you agree to pay or reimburse Sunrun for all such taxes,except to the extent that you are prohibited from doing so by applicable laws. (f)You agree that title to and risk of loss for the electric energy purchased under this Agreement shall pass from Sunrun to you at the time when the electric energy reaches the point of interconnection,i.e.,at the point where the Solar Facility connects to the Property's connection to your Utility. (g)You agree that Sunrun alone will receive any credit,rebate,environmental attribute,or other payment or offset that may be attributable to the Solar Facility and all incentives will be sole property of and transferable by Sunrun. Notwithstanding the foregoing,if you purchase the Solar Facility from Sunrun,you will own,and be entitled to proceeds from the sales of,solar renewable energy credit and renewable energy credit earned after the date you purchase the solar facility from Sunrun. 6.Billing and Payment (a)For each billing cycle,Sunrun will prepare a written or electronic invoice and charge your account for the Monthly Payment as set forth in Exhibit A. Your billing cycle begins on the In-Service Date,and subsequent billing cycles will begin on the same date each month(the"Billing Cycle Day'J.You will be billed on a monthly basis.You will receive this invoice within 10 days of the conclusion of the billing cycle and your payment will be due the day before the next Billing Cycle Day.Sunrun reserves the right to update its billing systems from time to time and will notify you if your payment due date changes.In no event will Sunrun decrease the amount of time you have to pay your invoices. (b)Sunrun will mail or e-mail you an invoice no later than ten(10)days after the end of each billing cycle.You agree to pay the amount specified in each invoice by the due date specified in such invoice.If Sunrun does not receive your payment by the due date on the invoice,Sunrun may charge you the lesser of an administrative late fee of(i)one and a half(1.5%)percent per month on the portion of your balance that is more than thirty(30)days past due,or(ii)the maximum amount permitted under and subject to applicable law.This late fee is not an interest charge,finance charge,time price differential or other such charge or payment of a similar nature. (c)Monthly payments shown include a$15.00 discount for paying through Automated Clearing House(ACH)withdrawal.If you do not elect automatic payment through ACH withdrawal from your checking or savings account you will not receive this discount and each monthly payment will be$15.00 greater. (d)Deposit and Initial Payment payable with credit card,money order or a check drawn on a United States bank account.Monthly payments are payable with a check drawn on a United States bank account or you may agree to authorize Sunrun to deduct the invoice amount directly from your bank account each month(subject to subsection(c)above). 05/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Page 5 of 18 DocuSign Envelope ID:F9B6E265-9C3A-475D-B768-C93D193C84D9 7.Prepayments for Electric Enerev (a)At anytime,you may prepay all of the expected amounts you will owe Sunrun during the remaining portion of the Initial Term("Prepayment')by contacting Sunrun. (b)The Prepayment shall equal the remaining monthly payments for the current year,plus the discounted value of each successive year's expected annual payment.Future year's expected payments will be calculated by multiplying the Estimated Output for that year by the price per kWh rate as set forth in Exhibit A.The future years'payments will be discounted at the lesser of(x)the prime rate(as published by the Wall Street Journal)plus 100 basis points or (y)5.0%. (c)If you make a Prepayment,Sunrun will continue to guarantee the output of your Solar Facility and will issue refunds as described in Section 8. (d)If you decide to make a Prepayment,the Solar Facility will remain at your Property and Sunrun will maintain it for the remainder of the Initial Term. 8.Guaranteed Output and Refunds (a)Sunrun guarantees that the Solar Facility will generate one-hundred percent(100%)of the Estimated Output during the Initial Term of this Agreement (the"Guaranteed Output')or Sunrun will issue you a refund as described below.For the purposes of this Agreement,"Actual Output'shall mean the amount of electric energy created by the Solar Facility to date plus any kWh for which you have previously received a refund. (b)If you purchase the Solar Facility from Sunrun pursuant to Section 10,and at the time of purchase the Actual Output is less than the Guaranteed Output,Sunrun will apply a credit towards the purchase price for the Solar Facility.This credit will be calculated by subtracting the Actual Output from the Guaranteed Output and then multiplying the result by the refund per kWh set forth on Exhibit A for the anniversary date that precedes the date of purchase. (c)On the anniversary of the In-Service Date and on every anniversary thereafter,Sunrun will issue you a credit if the Actual Output is less than the Guaranteed Output for that anniversary date set forth on Exhibit A.This credit will be calculated by subtracting the Actual Output for that anniversary date from the Guaranteed Output for that anniversary date,and multiplying the result by the refund per kWh for that anniversary date set forth in Exhibit A. (d)If Actual Output is greater than Guaranteed Output per Exhibit A,you will not be charged any additional amount for this overproduction.Sunrun may use this overproduction amount(kWhs)to offset future underproduction should Actual Output be less than Guaranteed Output. (e)For the purposes of the prior calculations,Actual Output shall include any kWh of electricity that would have likely been produced during any day that a grid failure disabled the Solar Facility or any day that you caused or requested the system to be shut down or to generate significantly less electric energy. For the avoidance of doubt,Guaranteed Output will be reduced if Sunrun notifies you that a tree or other obstruction is reducing electric energy production and you do not remedy,or cause to be remedied,such reduced energy production within 30 days. 9.Substitute Payments (a)You agree that if,through no fault of Sunrun,you cause or request the Solar Facility to be shut down,or if you cause an event that significantly reduces the production of electric energy by the Solar Facility,you will pay Sunrun a fee during each month that the Solar Facility is shut down or experiencing reduced production("Substitute Payments").However,Sunrun will not charge you Substitute Payments for the first seven(7)days during the Initial Term that the Solar Facility has been shut down or is experiencing reduced output. (b)For each billing cycle during the first year that this Agreement is in effect,the Substitute Payment will equal(i)the current price per kWh established in Exhibit A,multiplied by(ii)the estimated daily generation implied in Section 2(d),as well as the number of days for which Substitute Payments are due, minus(iii)any payment due for any kWh that are produced by the Solar Facility during the current billing cycle.Substitute Payments shall be in addition to other payments otherwise due under this Agreement. (c)For each billing cycle after the first year that this Agreement is in effect,the Substitute Payment will equal(i)the current price per kWh established in Exhibit A,multiplied by(ii)the kWh produced by the Solar Facility during the corresponding billing cycle in the previous year,minus(iii)any payment due for any kWh that are produced by the Solar Facility during the current billing cycle.Substitute Payments shall be in addition to other payments otherwise due under this Agreement. (d)You will not be charged Substitute Payments for times when a grid failure results in the Solar Facility being deactivated. 05/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Page 6 of 18 DocuSign Envelope ID:F9B6E265-9C3A-475D-B768-C93D193C84D9 10.Options to Purchase (a)You have the option to purchase the Solar Facility at the following times during the Initial Term: (i)Upon the fifth anniversary of the In-Service Date (ii)At the end of the Initial Term of this Agreement (iii)Should you sell your Property during the Initial Term (iv)Should Sunrun fail to perform Sunrun's Obligations(in accordance with Section 18) (b)To purchase the Solar Facility pursuant to Section 10(a),you must deliver a written notice to Sunrun of your intent to purchase within sixty(60)days of the applicable date and deliver payment to Sunrun within thirty(30)days of receiving an invoice from Sunrun for the purchase price. (c)The purchase price will be the greater of(i)fair market value,as determined at the time("FMV")and(ii)the minimum price set forth in Exhibit A. Annually,Sunrun will determine the FMV of the Solar Facility by hiring an independent appraiser to estimate the value of a comparable in-service solar facility in your state and utility service area.This valuation will take into account the Solar Facility's age;location;size;and other market characteristics such as equipment type and equipment operating,maintenance and service costs,value of electricity in your area,and any applicable solar incentives. (d)Sunrun will credit the purchase price by any refund due to you pursuant to Section 8(b),provided however,that in no case shall such a credit result in a net purchase price that is less than the minimum purchase price set forth on Exhibit A. (e)At other times,please contact Sunrun at(855)478-6786 to discuss the possibility of purchasing the Solar Facility. (f)If you purchase the Solar Facility,Sunrun will continue to monitor the Solar Facility for as long as the meter continues to function,or until the twentieth anniversary of this Agreement,whichever is sooner.However,Sunrun will not provide any maintenance or repair unless you enter into a separate agreement with Sunrun,at your expense,to perform these services.If possible,Sunrun will assign to you any product and/or workmanship warranties still in effect for the Solar Facility. 11.Sale of Proper and Assignment (a)If you sell the Property you may assign this Agreement to the new owner,provided that the new owner meets Sunrun's reasonable credit requirements and first agrees in writing to be bound by all of the terms and conditions set forth herein.Please contact Sunrun or visit www.sunrun.com to obtain an assignment agreement. (b)During the Initial Term,within sixty(60)days of entering into a contract to sell the Property you will have the option to purchase the Solar Facility in accordance with Section 10. (c)If you sell or otherwise transfer your interest in the Property without either purchasing the Solar Facility or assigning this Agreement to the new owner in accordance with the terms of this Agreement,or if the new owner refuses to take assignment,then you will be deemed to have terminated this Agreement,and Sunrun may exercise its rights under Section 19(a). (d)Sunrun may assign,lease,sublease,or transfer the Solar Facility and this Agreement along with all rights and obligations hereunder to any third party (each,an"Assignee"),without first giving notice to you or obtaining your consent,for any purpose,including,without limitation,collection of unpaid amounts,financing of the Solar Facility's installation,or in the event of an acquisition,corporate reorganization,merger or sale of substantially all of its assets to another entity.If Sunrun or its Assignee chooses to transfer the Solar Facility or this Agreement to another parry,you agree to treat this other parry as your counterparty under this Agreement.Otherwise,the terms of this Agreement will not change if this Agreement or the Solar Facility is assigned,leased,or transferred by Sunrun or its Assignee,and the Assignee will not be able to interfere with your rights to the Solar Facility as long as you are fulfilling your obligations under this Agreement.If Sunrun transfers the Solar Facility or this Agreement to an Assignee,Sunrun will continue to operate and maintain the Solar Facility until you receive written notice otherwise. 05/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Page 7 of 18 DocuSign Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 12.Term and Termination (a)You agree that this Agreement will become effective only when both you and Sunrun have signed the Agreement. (b)This Agreement will continue in effect for twenty(20)years following the date Sunrun receives notice from the Utility that the Solar Facility is approved for operation("In-Service Date').This period shall be called the"Initial Term." (c)At the end of the Initial Term,this Agreement will be automatically renewed for an additional one-year term("Renewal Term"),unless you have purchased the Solar Facility or unless either you or Sunrun gives the other party to this Agreement a termination notice at least thirty(30)days prior to the expiration of the Initial Term.At the end of any Renewal Term,this Agreement shall be automatically renewed for an additional Renewal Term,unless either you or Sunrun gives the other party to this Agreement a termination notice at least thirty(30)days prior to the expiration of the Renewal Term then in effect. (d)At the end of the term of this Agreement,if either you or Sunrun do not wish to renew it,Sunrun will remove the Solar Facility at no cost to you(unless you purchase the Solar Facility at the end of the Initial Term,or unless the term of this Agreement is automatically renewed).Sunrun agrees to leave your Property in the same general condition that existed immediately prior to removal of the Solar Facility. (e)If you cancel this Agreement pursuant to Section 3,you will not be refunded your Deposit,and you will not owe Sunrun any further payments.If Sunrun modifies your Agreement pursuant to any of the factors listed in Section 4(a)such that there is a decrease in the annual energy production estimate,or if the payment terms increase,or if it is determined that you must pay for any site improvements to accommodate a solar system,then you may cancel this Agreement and your Deposit will be refunded. (f)Sunrun will make a good faith effort to notify you between 30 and 60 days before the end of the Initial Term about(i)your end of term options and(ii) the rate for electric energy in the first Renewal Term(if applicable). Sunrun will make a good faith effort to notify you between 30 and 60 days before the end of any Renewal Term about(i)your end of term options and(ii)the rate for electric energy in the next scheduled Renewal Term(if applicable). 13.Access.Maintenance and Repair (a)You agree to grant Sunrun or its contractors access to your Property for the purpose of designing,installing,operating,maintaining and testing the Solar Facility and performing Sunrun's Obligations.Sunrun agrees to give you reasonable notice when Sunrun needs to access your Property for any of the foregoing purposes and will endeavor to restrict such access to normal business hours. (b)When possible you agree to allow Sunrun and construction professionals(an engineer,architect,or licensed contractor or their representative)hired by Sunrun to access your Property to inspect any buildings and,if applicable,roofs prior to the installation of the Solar Facility to ensure that your Property can accommodate the Solar Facility. (c)If parts fail during the term of this Agreement,Sunrun will use commercially reasonable efforts to replace them with like equipment;however,you acknowledge that due to parts availability and other factors,this may not be possible.Sunrun agrees that any change in equipment will not reduce the Guaranteed Output set forth in Section 8. (d)If you plan to move or temporarily disconnect the Solar Facility to allow for maintenance of and/or repair to the Property,you agree,at your expense, either(i)to hire Sunrun to perform this work or(ii)to obtain Sunrun's approval of your contractor,who you agree must carry commercial general liability policy in an amount not less than one million($1,000,000)dollars per occurrence and name Sunrun,and its successor or assigns,as additional insured. (e)Sunrun warrants that roof penetrations will be weather-tight for a period of ten(10)years after installation. (f)You agree to make best efforts to provide a safe and secure work environment at your Property during the course of the Solar Facility installation and maintenance. 05/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Page 8 of 18 DocuSign Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 14.Insurance (a)Sunrun agrees to carry insurance that covers all damage to and theft of Sunrun's Solar Facility.You will not be responsible for insuring the Solar Facility. Sunrun agrees to provide you evidence of Sunrun's insurance policy for the Solar Facility upon request.If Sunrun does not maintain insurance that covers damage to Sunrun's Solar Facility,it will be responsible for the consequences of not maintaining such insurance. (b)You agree to carry insurance that covers all damage to your Property during the term of this Agreement,including damage resulting from the Solar Facility,provided such damage was not caused by the gross negligence of Sunrun.It is your responsibility to determine if the installation of the Solar Facility will impact your existing coverage.If additional insurance is required to maintain your existing coverage,you will be responsible for either(i) procuring and maintaining such insurance or(ii)the consequences of not procuring and maintaining such insurance. (c)Sunrun requires its contractors performing the Solar Facility installation to maintain insurance coverage as follows:workers compensation,subject to statutory limits;Employers liability,with a minimum of one million($1,000,000)dollars each occurrence;commercial general liability,in an amount not less than one million($1,000,000)dollars per occurrence and two million($2,000,000)dollars annual aggregate;commercial automobile liability,in an amount not less than a combined bodily injury and property damage limit of one million($1,000,000)dollars per accident;excess liability insurance with a limit of one million($1,000,000)dollars per occurrence and in the annual aggregate in excess of the limits of insurance provided above;and any other insurance required by applicable laws or regulations. DS Your initials indicate that you ha a rM and understand and accept the limitations and obligations set forth in this Section 14. r- i Accepted by(Initials): 15.Limitations of Liability (a)SUNRUN WILL BE LIABLE TO YOU AND ANY OTHER PERSON FOR DAMAGES OR LOSSES DIRECTLY ATTRIBUTABLE TO ITS NEGLIGENCE OR WILLFUL MISCONDUCT.TOTAL LIABILITY FOR SUCH DIRECT DAMAGES OR LOSSES WILL IN NO EVENT EXCEED ONE MILLION DOLLARS.THIS WILL BE YOUR SOLE AND EXCLUSIVE REMEDY AND ALL OTHER REMEDIES OR DAMAGES AT LAW OR EQUITY ARE WANED,EVEN IF YOU HAVE GREATER RIGHTS UNDER MASSACHUSETTS'S LAWS,WHICH YOU SHOULD CONSULT.SUNRUN IS NOT RESPONSIBLE FOR ANY CONSEQUENTIAL,INCIDENTAL,PUNITIVE,EXEMPLARY OR INDIRECT DAMAGES,LOST PROFITS OR LOSSES RELATING TO THIS AGREEMENT,IN TORT OR CONTRACT,INCLUDING ANY NEGLIGENCE OR OTHERWISE. (b)EXCEPT AS EXPRESSLY PROVIDED HEREIN,SUNRUN MAKES NO WARRANTY OR REPRESENTATION,EITHER EXPRESS OR IMPLIED,REGARDING ITS OBLIGATIONS OR THE SOLAR FACILITY.THERE IS NO WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE,AND ANY AND ALL IMPLIED WARRANTIES ARE DISCLAIMED. 05/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Page 9 of 18 DocuSign Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 16.Resolution of Disputes (a)You agree that to expedite the resolution of and to control the costs of disputes,resolution of any dispute relating to this Agreement("Dispute%will be resolved according to the procedure set forth in this Section 16. (b)Unless otherwise agreed in writing,Sunrun and you agree to continue to perform each party's respective obligations under this Agreement during the course of the resolution of the Dispute. (c)You and Sunrun agree to first try to resolve informally and in good faith any Dispute.Accordingly,you agree to send a written notice of Dispute to the address on the first page of this Agreement,and Sunrun will send a written notice of Dispute to your billing address.If you and Sunrun do not reach an informal agreement to resolve the Dispute within 45 days after the notice of Dispute is received,you or Sunrun may commence a formal proceeding as detailed below.All applicable statutes of limitation and defenses based upon the passage of time shall be tolled for the 45 days during which the parties try to informally resolve any Dispute. (d)If Sunrun and you cannot resolve the Dispute informally,the Dispute will be resolved by binding arbitration.ARBITRATION MEANS YOU WANE YOUR RIGHT TO A JURY TRIAL AND ALL DISPUTES SHALL BE DECIDED BY AN ARBITRATOR.This agreement to arbitrate Disputes is governed by the Federal Arbitration Act("FAA'1.The arbitration will be conducted under the rules of JAMS that are in effect at the time the arbitration is initiated("JAMSRui&')and under the rules set forth in this Agreement.If there is a conflict between the JAMS Rules and this Agreement,this Agreement will govern. (e)CLASS ACTION WAIVER.ARBITRATION MUST BE ON AN INDMDUAL BASIS.AS A RESULT,NEITHER YOU NOR SUNRUN MAY JOIN OR CONSOLIDATE CLAIMS IN ARBITRATION BY OR AGAINST OTHER CUSTOMERS,OR LITIGATE IN COURT OR ARBITRATE ANY CLAIMS AS A REPRESENTATIVE OR MEMBER OF A CLASS OR IN A PRIVATE ATTORNEY GENERAL CAPACITY. (f)You may,in arbitration,seek all remedies available to you under this Agreement as interpreted under California law.If you decide to initiate arbitration against Sunrun,Sunrun will pay the costs for initiating the arbitration proceedings.If Sunrun decides to initiate arbitration,Sunrun will be required to pay the costs associated with initiating the arbitration proceeding.Sunrun also agrees to pay the costs of initiating the arbitration proceeding if the arbitrator finds in your favor.Other fees,such as attorneys'fees and expenses of travel to the arbitration,will be paid in accordance with JAMS Rules.If the arbitrator finds in your favor,Sunrun will pay your attorneys fees and expenses of travel to the arbitration.The arbitration hearing will take place in the federal judicial district of your residence,unless you and Sunrun agree to another location in writing.In order to initiate arbitration proceedings,you or Sunrun must take the following actions: (i)Write a demand for arbitration.The demand must include a description of the Dispute and the amount of damages you are seeking.The form of Demand for Arbitration can be found under ADR Forms at www.jamsadr.com. (ii)Send three copies of the demand for arbitration to the current JAMSlocation in San Francisco,California. (iii)Send one copy of the demand for arbitration to the other party. (g)In accordance with the FAA and the JAMS Rules,the arbitrator's decision will be final and binding.Any right to appeal is likewise governed by the FAA and JAMS Rules.Any arbitration award may be enforced in any court with jurisdiction. (h)You and Sunrun agree to receive service of process of the arbitration demand by registered or certified mail,return receipt requested,at your billing address and Sunrun's principal executive office,as applicable. 17.Force Majeure (a)Neither you nor Sunrun will be in default of this Agreement for any delay or failure in the performance under this Agreement(including any obligation to deliver or accept the electric energy output of the Solar Facility)if the delay or failure is due to Force Majeure.Force Majeure includes acts of God such as storms,fires,floods,lightning and earthquakes,sabotage or destruction by a third party of the Solar Facilities,war,riot,acts of a public enemy or other civil disturbance,or a strike,walkout,lockout or other significant labor dispute.Force Majeure does not include economic hardship of either you or Sunrun,a power grid failure(except if caused directly by a Force Majeure event),a failure or delay in the granting of permits,or insufficiency, unavailability,failure,or diminishment of solar resources,except as a result of an event that would otherwise qualify as a Force Majeure. (b)Force Majeure cannot be attributable to fault or negligence on the part of the party claiming Force Majeure and must be caused by things beyond that party's reasonable control.Additionally,you or Sunrun must have taken all reasonable technical and commercial precautions to prevent the event. (c)In order to claim Force Majeure as a reason for non-performance,you or Sunrun must give notice to the other party of the Force Majeure within fourteen(14)days of the occurrence of the Force Majeure and estimate how long it will last and what the potential impact is on the Agreement.The party claiming Force Majeure must(i)make reasonable attempts to continue to perform under the Agreement,(ii)quickly take action to correct the problem caused by the Force Majeure,and(iii)make reasonable efforts to limit damage to the other party.Finally,the party claiming Force Majeure must notify the other party when the Force Majeure event ends and performance will resume as contemplated in this Agreement. (d)If you or Sunrun is prevented from performing under this Agreement for a period of either(i)three hundred sixty-five(365)consecutive days or more, or(ii)seven hundred thirty(730)non-consecutive days or more(whether full or partial days),the other parry may terminate this Agreement,without liability of either party to the other,upon thirty(30)days written notice at any time during the Force Majeure. 05/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Page 10 of 18 DocuSign Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 18.Your Remedies (a)In addition to any other remedies you have under this Agreement,if Sunrun(i)makes a general assignment for the benefit of creditors,files a petition in bankruptcy,appoints a trustee or receiver,or has all or substantially all of its assets subject to attachment,execution or other judicial seizure,or(ii)fails to perform an obligation under the Agreement and such failure continues beyond a period of ninety(90)days(provided,in each case,this Agreement is otherwise in full force and effect prior to such event),you will have the option to purchase the Solar Facility as set forth in Section 10(a)(iv). 19.Sunrun's Remedies (a)If you terminate this Agreement under Section 11(c),you will be required within thirty(30)days either(i)to pay Sunrun a termination payment equal to the Pre-payment of all future estimated energy to be produced during the Initial Term("Make Whole'),as calculated in Section 7(b)or(ii)to purchase the Solar Facility pursuant to Section 10(b). (b)If you fail to perform a material obligation under the Agreement,and you do not correct the failure within one hundred twenty(120)days,if such failure continues beyond a period of one hundred twenty(120)days,then Sunrun can require you to pay Sunrun a Make Whole payment. (c)If you make a general assignment for the benefit of creditors,file a petition in bankruptcy,appoint a trustee or receiver,or have all or substantially all of your assets subject to attachment,execution or otherjudicial seizure,or you become insolvent or unable to pay your debts,or vacate or abandon the Property,then Sunrun can require you to pay Sunrun a Make Whole payment. (d)If you(i)are required to make a Make Whole payment and do not make the payment,(ii)terminate this Agreement without also purchasing the Solar Facility,or(iii)do not make any other payment or payments as contemplated and required under this Agreement,Sunrun shall,subject to any cure rights provided herein,have the right to disconnect your Solar Facility and/or enter your Property and remove the Solar Facility. (e)If as a result of your default Sunrun removes the Solar Facility,then in addition to the Make Whole payment,you will be obligated to pay Sunrun an amount equal to the value of any federal,state and local incentives that Sunrun must return as a result of such removal. 20.Exclusions (a)This Agreement does not include an obligation by Sunrun to:remove or dispose of any hazardous substances that currently exist on the Property; improve the construction of the roof or the Property to support the Solar Facility;remove or replace existing rot,rust,or insect infested structures;provide structural framing for any part of the Property;pay for or correct construction errors,omissions and deficiencies by you or your contractors;pay for, remove or remediate mold,fungus,mildew,or organic pathogens;upgrade your existing electrical service;install any smoke detectors,sprinklers or life safety equipment required by municipal code or inspectors as a result of the Solar Facility installation;pay for the removal or re-location of equipment, obstacles or vegetation in the vicinity of the Solar Facility;pay for any costs associated with municipal design or architectural review,or other specialty permits(this includes cost to attend any public hearings,notification of neighbors,or additional drawings required);paint electrical boxes or conduit at the Property;and move items unassociated with the Solar Facility around the Property. 21.Miscellaneous (a)You agree that this Agreement constitutes the entire agreement between you and Sunrun.If any provision is declared to be invalid,that provision will be deleted or modified,and the rest of the Agreement will remain enforceable.The terms of this Agreement that expressly or by their nature survive termination shall continue thereafter until fully performed,which shall include,without limitation,the obligation to make payments hereunder. (b)This Agreement shall be interpreted in accordance with and governed by the laws of the State of New York,without regard to the conflict of laws principles thereof. (c)You agree that Sunrun has the right to periodically check your consumer credit report. (d)You agree that Sunrun has the right to obtain photographic images of the Solar Facility and the Property,and to use such photographic images for internal and quality control purposes.Sunrun will not use photographic images of the Solar Facility or the Property in its marketing and promotional materials without first obtaining your express written approval. (e)This Agreement supersedes any prior understandings,agreements,or representations by or between the parties,written or oral,to the extent they related in any way to the subject matter hereof. (f)Any notice or other communication to be made hereunder,even if otherwise required to be in writing under other provisions of this Consent or any other documents or agreements that have been provided to you in connection with this Consent,may alternatively be made in an electronic record transmitted electronically to the electronic addresses provided by you.Any notice or other communication made in electronic form will have the same legal effect and enforceability as if made in non-electronic form. (g)This Agreement is binding upon,and inures to the benefit of,the parties and their respective heirs,executors,administrators,legal representatives, successors and assigns. [Remainder of Page Intentionally Left Bank] 05/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Page 11 of 18 DocuSign Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 22. NOTICE OF RIGHT TO CANCEL YOU MAY CANCEL THIS TRANSACTION AT ANYTIME PRIOR TO MIDNIGHT OF THE 10TH CALENDAR DAY AFTER YOU SIGN THIS AGREEMENT AND ANY DEPOSIT PAID WILL BE REFUNDED.SEE THE ATTACHED NOTICE OF CANCELLATION FORM FOR AN EXPLANATION OF THIS RIGHT. By initialing below,you expressly acknowledge that you have been advised on your right to cancel this Agreement and have received duplicate copies of the Notice of Cancellation. Ds Accepted by(Initials): SUNRUN INC. CUSTOMER 5/18/2015 Date: cig e EdwmyAccount Holder lbliG S104 t. [Date: 5/8/2015 1 2:43 PM PT [_- Signature: Doeusigoea by, Print Name: Eric Simon Signature:' - - -- Fernando Herrera order Management Title: Account email address*: f er *This email address will be used bySunrun for official correspondence,such assending monthly bills or other invoices.Sunrun will never share or sell your email address to any SALES CONSULTANT thirdparties. By signing below I acknowledge that I am Sunrun accredited,that Ipresentedthis agreement according to"The Right Stuff'and the Account phone number: Sunrun Code of Conduct,and that obtained the homeowners signature on this agreement. SecondarvAaountRolder[options/1 Justin Senia Name: D000$13nsKWtame] Signature: A&S{Itn, Swua Signature: 711i — Print Name: Sunrun ID#. (32369461 Fit [10-digit number you received from Sunrun] 05/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Page 12 of 18 DocuSign Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 EXHIBIT A:SUNRUN ELECTRICITY PRICING At the signing of this Agreement,you will pay Sunrun a non-refundable Deposit("Deposit')of$0.At the start of installation of the Solar Facility,you will pay Sunrun an Initial Payment("Initial Payment')of$0.Together,these payments comprise the Upfront Payment("Upfront Payment'). Electricity Payments:In addition to the Upfront Payment,you agree that for all electric energy you purchase from Sunrun during the Initial Term of this Agreement,you will pay a price per kWh in the form of monthly payments("Monthly Payments')as shown below.The Monthly Payments shall increase by 2.9%annually during the Initial Term of this Agreement,effective as of the Monthly Payment that covers any calendar month that includes an anniversary of the In-Service Date(and such increase would not apply to any part of a Monthly Payment that covers the days in a calendar month leading up to an anniversary of the In-Service Date). The payments shown below are before any applicable taxes and include a$15.00 discount for paying through Automated Clearing House(ACH)withdrawal. If you do not elect automatic payment through ACH withdrawal from your checking or savings account,you will not receive this discount and each monthly payment will be$15.00 greater.(As described in Section 6(a),the table below also is based on the assumption,for convenience purposes,that the In-Service Date will be the 1 st day of the month.) Performance Guarantee __ _ Prepay_Option _ Purchase Option End of Yearly Price Monthly Guaranteed kWh Refund/kWh If Guaranteed Estimated Price to Prepay Balance Minimum Year ! Per kWh Payment Output to Date Output Not Met Y P P Initial Term* Purchase Price tN/A I N/A N/A N/A $10,611 N/A 1 $0.130 $52.02 4,802 $0.130 1$10,438 N/A 12 $0.134 t$53.53 9,580 — - - $0.134 - 1 $17,546 r- - — — ----- 1. - -- -- -- - ---- - $10,-.239 --- i 3 $0.139 $55.08 14,334 %$0.139 $10,013 $14,885 4 $9,759 $12,194 $0.144 $56.68 19,064 $0.144 � — 5 $0.149 i$58.32 23,771 $0.149 $9,474 :$9,474 6 $0.154 560.01 128,454 t$0.154 $9,156 $9,156 - ----�- - + _- ---- -� --- _ - - - -- - - -a i 7 $0.159 1$61.75 33,114 $0.159 $8,804 $8,804 8 $0.164 $63.54 37,750 $0.165 $8,416 $8,416 — 9 $0.170 $65.39 142,364 $0.170 t$7,989 $7,989 10 $0.176 $67.28 46,954 $0.176 -— — _ $7,521 --- - $7,521 I 11 $0.182 $69.23 51,521 $0.182 $7,010 - - $-7,01--0 �$ .18 $ 412 $0.188 71.24 56,065 08 6,453 $6, 53 t- --- -- - - . - - - - - - -- - ---- - - - �' 113 $0.195 $73.31 60,587 $0.195 $5,847 $5,847 14 $0.201 $75.43 65,086 $0.201 T$5,191 $5,191 15 $0.208 $77.62 69,563 $0.208 $4,480 $4,480 16 $0.215 t$79.87 74,017 $0.215 $3,712 t$3,712 17 $0.223 $82.19 78,449 $0.223 1$2,883 1$2,883 [18- 1$0.230 $84.57 82,859 $0.230 $1,991 $1,991 19 $0.238 t$87.03 87,246 $0.238 $1,031 $1,031 f i r20 1$0.246 1$89.55 191,612 $0.246 $0 $0 -- "Pursuant to Section 7,you may prepay the balance of your estimated obligations under this Agreement.Any prepayments you make to Sunrun will increase the refunds for which you are eligible. After the Initial Term,SunRun shall on each anniversary of the In-Service Date establish a new price per kWh that is equal to ten percent(10%)less than the"Average cost of electric energy'as established by your Utility or its successor."Average cost of electric energy'shall be the price you would otherwise pay for electric energy to your Utility or its successor for the 12 months preceding the start of each Renewal Term. Notwithstanding the foregoing,in no event shall this price per kWh be less than$0.140 per kWh. Pursuant to Section 10,if you purchase the Solar Facility before the Guaranteed Output has been achieved,Sunrun will issue you a refund.The estimates in this column assume the Solar Facility achieves its Estimated Output and that you make the final Initial Payment upon the first anniversary. 05/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Page 13 of 18 DocuSign Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 SUNRUN MONTHLY AUTOMATIC ELECTRONIC PAYMENTS As a Sunrun customer,you agree to pay your monthly bill with automatic electronic payments.If you do not choose to select automatic payment as a form of payment,then you will lose the discount in Section 6 and be expected to pay your monthly Sunrun bill by-check payments.Regardless,you will receive all Sunrun bills via email unless you contact Sunrun directly to request invoices to be sent through the US mail. Terms and Conditions for Recurring Payments: BY ACCEPTING THE TERMS AND CONDITIONS AND ENROLLING IN THE AUTOMATIC ELECTRONIC PAYMENT OPTION,YOU ARE AUTHORIZING SUNRUN TO AUTOMATICALLY DEDUCT YOUR MONTHLY INVOICE AMOUNT FROM THE BANK ACCOUNT YOU HAVE DESIGNATED.SUNRUN WILL ADVISE YOU BY MONTHLY INVOICE OF THE AMOUNT AND DATE OF THE PAYMENT THAT WILL BE AUTOMATICALLY DEBITED. 1.Sunrun will provide you with a monthly electronic statement of your account.You agree to review each invoice you receive for any errors.Under federal law,you have the right to hold up or stop an electronic funds transfer provided you give your financial institution or credit card issuer notice of at least three business days before the scheduled transfer date.If you inform Sunrun that an error exists on your statement,Sunrun will attempt to correct that error prior to your next statement to the extent permitted by law.Sunrun shall bear no liability or responsibility for any losses of any kind that you may incur as a result of an erroneous statement or due to any delay in the actual date on which your account is debited. 2.If any changes occur in the information on your application,you must immediately notify Sunrun in writing of such changes.If Sunrun incurs charge- back fees as a result of inaccurate information you provide,then Sunrun shall bill you for those fees. 3.If you either do not notify Sunrun in writing of such changes or do so in an untimely fashion,Sunrun shall bear no liability or responsibility for any losses incurred to the extent permitted by law.Sunrun's sole liability to you shall be Sunrun's obligation to make any appropriate changes once in receipt of your written notification.The actual settlement date(or date the ACH transaction occurs against your checking or savings account or is charged to your check or credit card)will be no earlier than three(3)days before the invoice due date. 4.You agree to ensure that there are sufficient funds in your designated account on the settlement date to pay the amount of the debit.If Sunrun incurs charge-back fees as a result of insufficient funds in your designated account,then Sunrun shall bill you for those fees. 5.Sunrun reserves the right to change these conditions at any time.Notice may be given on or with your bill or by other methods.Either parry may terminate this arrangement at any time by giving the other party written notice reasonably in advance of the date of termination or any scheduled settlement date.You may also terminate this arrangement by calling Sunrun Customer Care at 1-855-478-6786 or by changing your billing preference in the Sunrun Customer Portal.Termination shall not prevent a debit transaction authorized before any notice of termination. 6.You agree to be bound by any rules your financial institution requires for pre-authorized electronic funds transfer or credit card issuer requires for pre- authorized credit card charges. 7.Check with your financial institution to see if there are any fees associated with the pre-authorized payment option.You will be responsible for all such fees. I authorize automatic electronic payments and accept these Terms and Conditions.You will receive a separate electronic request to securely enter your bank account information. CUSTOMER Date: 5/8/2015 1 2:43 PM PT DmuSigned by: �tvvt,av�,�.e tkwrc,ra Signature: Fernando Herrera 05/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Page 14 of 18 DocuSion Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 EXHIBIT C [Intentionally left blank] 05/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Page 15 of 18 DocuSign Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 t NOTICE OF CANCELLATION DATE: (Enter date of transaction) YOU MAY CANCEL THIS TRANSACTION,WITHOUT ANY PENALTY OR OBLIGATION,WITHIN TEN CALENDAR DAYS FROM THE ABOVE DATE. IF YOU CANCEL,ANY PROPERTY TRADED IN,ANY PAYMENT MADE BY YOU UNDER THE CONTRACT OR SALE,AND ANY NEGOTIABLE INSTRUMENT EXECUTED BY YOU WILL BE RETURNED WITHIN 10 CALENDAR DAYS FOLLOWING RECEIPT BY THE SELLER OF YOUR CANCELLATION NOTICE AND ANY SECURITY INTEREST ARISING OUT OF THE TRANSACTION WILL BE CANCELLED. IF YOU CANCEL YOU MUST MAKE AVAILABLE TO THE SELLER AT YOUR RESIDENCE,IN SUBSTANTIALLY AS GOOD CONDITION AS WHEN RECEIVED,ANY GOODS DELIVERED TO YOU UNDER THIS CONTRACT OR SALE; OR YOU MAY,IF YOU WISH,COMPLY WITH THE INSTRUCTIONS OF THE SELLER REGARDING THE RETURN SHIPMENT OF THE GOODS AT THE SELLER'S EXPENSE AND RISK. IF YOU DO MAKE THE GOODS AVAILABLE TO THE SELLER AND THE SELLER DOES NOT PICK THEM UP WITHIN 20 DAYS OF THE DATE OF YOUR NOTICE OF CANCELLATION,YOU MAY RETAIN OR DISPOSE OF THE GOODS WITHOUT ANY FURTHER OBLIGATION. IF YOU FAIL TO MAKE THE GOODS AVAILABLE TO THE SELLER, OR IF YOU AGREE TO RETURN THE GOODS TO THE SELLER AND FAIL TO DO SO,THEN YOU REMAIN LIABLE FOR PERFORMANCE OF ALL OBLIGATIONS UNDER THE CONTRACT. TO CANCEL THIS TRANSACTION, MAIL OR DELIVER A SIGNED AND DATED COPY OF THIS CANCELLATION NOTICE OR ANY OTHER WRITTEN NOTICE TO SUNRUN INC.,595 MARKET STREET,29TH FLOOR, SAN FRANCISCO, CA 94105 NOT LATER THAN MIDNIGHT OF (DATE) I HEREBY CANCEL THIS TRANSACTION. DATE: CUSTOMER SIGNATURE: NOTICE OF CANCELLATION MAY BE SENT TO SUNRUN AT THE ADDRESS NOTED ON THE FIRST PAGE OF THIS CONTRACT. 05/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Page 16 of 18 DocuSicgn Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 DUPLICATE COPY NOTICE OF CANCELLATION DATE: (Enter date of transaction) YOU MAY CANCEL THIS TRANSACTION,WITHOUT ANY PENALTY OR OBLIGATION,WITHIN TEN CALENDAR DAYS FROM THE ABOVE DATE. IF YOU CANCEL,ANY PROPERTY TRADED IN,ANY PAYMENT MADE BY YOU UNDER THE CONTRACT OR SALE,AND ANY NEGOTIABLE INSTRUMENT EXECUTED BY YOU WILL BE RETURNED WITHIN 10 CALENDAR DAYS FOLLOWING RECEIPT BY THE SELLER OF YOUR CANCELLATION NOTICE AND ANY SECURITY INTEREST ARISING OUT OF THE TRANSACTION WILL BE CANCELLED. IF YOU CANCEL YOU MUST MAKE AVAILABLE TO THE SELLER AT YOUR RESIDENCE,IN SUBSTANTIALLY AS GOOD CONDITION AS WHEN RECEIVED,ANY GOODS DELIVERED TO YOU UNDER THIS CONTRACT OR SALE;OR YOU MAY,IF YOU WISH,COMPLY WITH THE INSTRUCTIONS OF THE SELLER REGARDING THE RETURN SHIPMENT OF THE GOODS AT THE SELLER'S EXPENSE AND RISK. IF YOU DO MAKE THE GOODS AVAILABLE TO THE SELLER AND THE SELLER DOES NOT PICK THEM UP WITHIN 20 DAYS OF THE DATE OF YOUR NOTICE OF CANCELLATION,YOU MAY RETAIN OR DISPOSE OF THE GOODS WITHOUT ANY FURTHER OBLIGATION. IF YOU FAIL TO MAKE THE GOODS AVAILABLE TO THE SELLER,OR IF YOU AGREE TO RETURN THE GOODS TO THE SELLER AND FAIL TO DO SO,THEN YOU REMAIN LIABLE FOR PERFORMANCE OF ALL OBLIGATIONS UNDER THE CONTRACT. TO CANCEL THIS TRANSACTION, MAIL OR DELIVER A SIGNED AND DATED COPY OF THIS CANCELLATION NOTICE OR ANY OTHER WRITTEN NOTICE TO SUNRUN INC., 595 MARKET STREET,29TH FLOOR,SAN FRANCISCO, CA 94105 NOT LATER THAN MIDNIGHT OF (DATE) I HEREBY CANCEL THIS TRANSACTION. DATE: CUSTOMER SIGNATURE: NOTICE OF CANCELLATION MAY BE SENT TO SUNRUN AT THE ADDRESS NOTED ON THE FIRST PAGE OF THIS CONTRACT. 8/2015 PK1374ZDR3FK-H(Custom PPA Fixed) Page 17 of 18 DocuSign Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 EXHIBIT E:SUNRUN DEPOSIT FORM If you are paying your deposit by check,please enclose this document with your payment and include your Sunrun Proposal ID reference in the memo line of your check. Name: Fernando Herrera Address: 16 Harwood St,North Andover,MA 01845 Proposal ID: PK1374ZDR3FK Deposit Amount: $0 Please send payments to: Sunrun Inc. P.O.Box 511612 Los Angeles,CA 90051-8167 Thank you for choosing Sunrun! 05/08/2015 PK1374ZDR3FK-H(Custom PPA Fixed) OS/( e DoQSign brivelope ID:07A62812-C476-465F-822E-67B371F45C18 STRUCTURAL CALCULATONS for RV INSTALLATION ri f Sunrun 775 Fiero Lane , Suite#200 San Luis Obispo CA, 93401 805-528-9705 USER: Michael Paradis COMPANY NAME: Sunrun SRC JOB ID: 6575 { JOB REPORT DATE: 2015-05-27/Rev B 1 JOB NUMBER: 221 R-016HERR ' JOB NAME: Fernando Herrera Residenc JOB ADDRESS: 16 Harwood St North Andover, MA 01845 OF 144S JAMES A. ADAMS 0 STRUCTURAL NO. 49748 9 C) 101ST '�� SSipNAL . Ex.Pir. 1- 120115 Digitally Signed by James A.Adams, S.E. Date: 2015.05.27 08:26:14-0700 Program Version: 2015-05-23:7 DocuSign Envelope ID:07A62812-C476-465F-822E-67B371 F45C1 8 �S Hage 2 of 9 LOAD COMBINATIONS: ASCE 7-05, IBC 2009 (NOT APPLICABLE IN CA) e LOADING COMB. #1: 'WIND UPLIFT - 0.6DL SOLAR AT STA"DOFF (CD=1.6) ZONE 2 e LOADING COMB. #2: DL RF + DL SOLAR +RF LL (Co=1.25). e LOADING COMB. #3: DL RF + DL SOLAR + WIND DOWN (CD=1.6). ZONE 1. e LOADING COMB. #4: DL RF + DL SOLAR + SNOW (CD=1.15). e LOADING COMB. #5: DL RF + DL SOLAR +.75WIND +.75Snow (CD=1.6) ZONE 1. e LOADING COMB. #6: CHECK SEISMIC FOR 'SECT. 3404.4 ALTERATIONS. e LOADING COMB. #7: (0.6)(DL RF + DL SOLAR) + WIND UP (CD=1.6). ZONE 1 LOAD COMBINATIoNs: ASCE 7-10, 18C 2012 CALiFORwx^, CBC 2013 e LOADING COMB. #1: (0.6)WIND UPLIFT - 0.61DL SOLAR AT STANDOFF (CD=1.6) ZONE 2 0 LOADING COMB. #2: DL RF + DL SOLAR +RF LL (CD=1.25). e LOADING COMB. #3; DL RF + DL SOLAR + (0.6)WIND DOWN (CD-1.6) ZONE I e LOADING 'COMB. #4;: DL RF + DL SOLAR + SNOW (CD=1.15) e LOADING COMB. #5: DL RF + DL SOLAR +.75(0.6)WIND +_75SNow (CD-1.6) ZONE 1 e LOADING COMB. *6: CHECK SEISMIC FOR SECT. 3404.4 ALTERATIONS e LOADING COMB. #7': (0.6)WIND UP-0.6(DL RF + DL 'SOLAR) (CD=1.6) ZONE 1 REFERENCES: NJ, NDS LATEST EDrr3oH Duration Factors Section Modules Size Forms Factor Cdwind := 1.6 S2X2 .= 0.563 S4X4 .- 7.150 Cf7x2 1.5 Cf4x4 1.5 Cds,mw := 1.1.5 S2X4 := 3.063 S4X6 := 17.650 U2.4 := 1.5 Cf4x6 1.3 CdDL 0.9 S2x6 := 7.563 S4xs := 30.660 Cf2x6 := 1.3 Cf4xs 1.3 Cd LL 1.25 Szxs := 13.14 S4x1lo:= 49.900 Cf2xs 1.2 Cf4xlo := 1.2 S2XIO:= 21.39 S4xu:= 73.800 Cf2xzQ := 1.1 Cf4x,2 := 1.1 Fb :=1000.00 psi S2XIz 31.64 Cfzxiz := 1.0 Doc4&gn Envelope ID:07A62812-C476-465F-822E-676371 F45C18 t Page 3 of 8 Melt Inmr: 1. Ceiling Type: 1/2 gyp. Bd. 2. Collar Tie Space: 32 3. Coverage %: 20 4. Frame Size: 2x6@16 5. Ground Snow (psf): 50 6. Sloped Roof Snow Load (psf): 50 7. Lag Screw Diameter (in): 5/16 8. Lag Screw Embedment (in): 2.5 9. Overall Span (ft): 30 10. PV Weight (psf): 3 11. Rafter Sloped Span (ft): 12.5 12. Roofing Type: 2-layers Asphalt Shingles 13. Roof Mean Height (ft): 15 14. Roof Slope (degrees): 17 15. Roof Type: CollarTies 16. Sloped Ceiling?: No 17. Standoff Max. Horz. Space (ft): 2.67 18. Standoff Max. Vert. Space (ft): 2.75 19. Standoff Staggered?: Yes 20. Wind Exposure: B 21. Wind Speed (mph): 100 22. wr = Weight of RoofType (psf): 4.00 23. wra = Weight of Rafter (psf): 1.50 24. we = Weight of CeilingType: 2.20 25. wcj = Weight of Ceiling Joists (psf): 0.65 26. s = Rafter spacing (ft.): 1.33 27. PV Orientation: Portrait NOTE: 0= 14. Roof Slope (degrees) DocuSign Envelope ID:07A62812-C476-465F-822E-678371F45C18 s Page 4 of SwPED/VoRuLTED CEILING — CARR'IED BY THE 'TOP CHDRD/RAFrw: DL.t, Deadload Top Chord (Rafter) DLbc := Deadload Bottom Chord (Ceiling) FLAT CEILING — CARRIED BY THE CEILING 30ISTS: DLtc := Deadload Top Chord (Rafter) DLbc := Deadload Bottom Chord(Ceiling) N%,DLtc = DLtc x s (p1O 10.67 -,,,DLbc _= DLbc ;:s (Fit) 4.47 TA = Horizontal spacing x Vertical spacing (sf) 7.34 Topographic Factor Assume hoof is not on top of a hill, bluff, or mountain ridge. 1.0 Sect. 6.5.7.2, pg. 26 CLS 2.00 CoraP4hfENTlS AND CLADDING: ASCE 7-05: Zone 1: Net Wind Pressure - See Figure 6-3, pg. 42 16.00 Zone 2: Net Wind Pressure See Figure 6-3, pg 42 26.40 Adjustment Factor for Height and Exposure - see Figure 6-3, pg. 44 1.00 ASCE 7-10: Zone 1: Net Wind Pressure - See Figure 30.5-1 NA Zone 2: Net Wind Pressure - See Figure 30.5-1, NA Adjustment (Factor for Height and Exposure - See Figure 30.5-1, NA pZoneSl up = Net Wind Pressure x Adj. Factor (psf) = 16.00 pZone:up = Net Wind Pressure x Adj. Factor (psf) = 26.40 P Zone 1 art = Net Wind Pressure x Adj. Factor (psf) = 10.00 DocuSign Envelope ID:07A62812-C476-465F-822E-67B371F45C18 Pago E of 0 Note; For ASCE 7-10 the wind forces have been multiplied by 0.6 ComermATzoN *2: DL RF + DL SOLAR +RF LL (Co=1.25) with LLQ 20.00 psf w:=LL x s plf (pit):- 26.67 P = TA x DLsolar 22.03 c•_ (L -5.5) (ft; = 3.50 BVI L7 L Z nt- ;z-DLtc x — -1?$ >: - x eos(8) 297.85 S p a LLz ��— For Spans 10.0 ft 1-1-i- - 1(W x 3 x (2 x L -3 x cos(e) MLL = ' x L) NA 2xw 2 LL � _ 1.» [1,1,x c x(2 x L - For Spans=-10.0 ft ,j�_r-' x cos(e) L _ 2.x L 156.20 Y LL 2xw 11.46 M: -MDL+Mu flb-rt; :— 454.05 �� =3f x Fb x Cd LL x Cf.x Cr.x CLS St Qfo.= Sx 100 CC IF EQUAL TO OR MORE THAN 100% CooE COMPLIANT, 'OKI 518.59 f CortarwiATroN #3t ZoVIE I DL RF + DL SOLAR + WIND DOWN (CD=1.6) P;-= TA (pdn + DLSOlar.x cos(e) 94.49 u3 :_ vDLtc'X $ ( ^.ccr-1«?x dee} —P.3-Y; a 641.60 1? Sr:=Aii� 1.61 Fb m Cd-Wind- C'tx w; Cr "; CLS Sl x 100 % CC Sr IF EQUAL TO OR MORE THAN 100% CODE COMPLIANT, OKI 469.75 Comer IATION #4: DL RF + DL SOLAR + SNOW (CD=1..15) S = Sloped Roof Snow Load (psf) 50.00 P3 .=TA x(S+DL Solar] 389.15 mMtc x S + P4 x L x cos(e) 1941.50 a 12 Sr:= IM. x 6.78 FbxCdSnowxCfxrCrxCLS Sx x 100 o,o CC IF EQUAL TO OR MORE THAN 100% CODE COMPLIANT, O'KI 111.58 Sr DocuSign Envelope ID:07A62812-C476-465F-822E-676371 F45C18 Page 5 of 8 Note: For ASCE 7-10 the wind forces have been multiplied by 0.6 LowoIwc CofmimATIoN 91: WIND UPLIFT CONNECTION TO RAFTER - ZONE 2 P, TA x (Pup -6 x lei Solar x MR(A) uplift 181.20 d= Diam.lag screws User Input 5/16 t= lb/inch Withdrawal NDS 2012 - Tab. 11.2A, pg 75 235.00 e= Threaded embedment Into wood User Input 2.50 W= Total withdrawal capacity W CdWind x t x e 940.00 ZN'x 100 518.76 Pt If equal to or more than 100x!✓° Code Compliant, OKI Table 3 represents the maximum Moment (M = PL/a) resulting from point loads (standoffs), for any spans (L,' listed. a= 2.67 Table 3 (The Moment Factor"a"for a 2 Rail system) Table 3(The Moment Factor`a'for Zep or similar system; Staggered U nstagge re d Staggered U nstagge re d Length Portrait Landscape Portrait Landscape Length Portrait Landscape Portrait Landscape L=4' 4.00 4.00 4.00 2.91 L=4' 5.00 5.00 5.00 5.00 L=5' 4.00 3.50 3.72 2.50 L=5' 5.00 5.00 5.00 5.00 L=6' 4.00 3.00 3.43 2.04 1 L=6' 5.00 5.00 5.00 5.00 L=7' 3.60 2.84 2.95 1.83 L=7' 4.50 4.50 4.50 4.19 L-8' 3.20 2.G7 2.40 1.5G L=8' 4.00 4.00 4.00 3.37 L=9' 3.03 2.59 2.34 1.44 L=9' 4.00 4.00 4.00 3.12 L=10' 2.86 2.50 2.22 1.31 L=10' 4.00 4.00 4.00 2.86 L=11' 2.77 2.25 2.04 1.19 L=11' 4.00 4.00 3.70 2.48 L=12' 2.67 2.00 1.85 1.07 L=12' 4.00 4.00 3.34 2.09 L=13' 2.61 1.88 1.74 0.90 L:=13' 4.00 3.87 3.35 1.98 L= 14' 2.55 1.75 1.62 0.92 L=14' 4.00 3.73 3.30 1.87 L=15' 2.51 1.68 1.50 0.86 L=15' 4.00 3.32 2.88 1.78 L=16' 2.46 1.60 1.38 0.81 L=16' 4.00 2.90 2-46 1.68 L=17' 2.43 1.45 1.31 0.76 L=17' 4.00 2.74 2.36 1.57 L=18' 2.40 1.29 1.23 0.72 L=19' 4.00 2.57 2.25 1.45 L=19' 2.38 1.24 1.17 0.68 L=1'4' 4.00 2.46 2.18 1.38 L=20' 2.35 1.18 1.11 0.65 L=20' 4.00 2.35 2.11 1.30 L=21' 2.22 1.14 1.06 0.62 L=21' 4.00 2.28 2.06 1.25 L-22' 2.09 1.10 1.00 0.59 L=22' 4.00 2.20 2..00 1.20 DocuSign Envelope ID:07A62812-C476-465F-822E-67B371 F45C1 8 Page 7 of E Note: For ASCE 7-10 the wind forces have been multiplied by 0.6 LoAoIN6 CroMBxn 1TIoN *5: ZONE 1. DL RF + DL SOLAR +.75Wiwo +.75SNow (Co=1.6) S - Sloped Roof Snow Load (psf) 50.00 P�'= TA 3' ,?5 x S+ DLSolar) x c'osl�d) +( TA x _7-5 k pd J � � 339.45 \13 �NvDLtc x 8 +Pj x a l >. cos(L) 1788.40 12 f 4.49 SN x 100 00 Sr « IF EQUAL TO 4R MORE THAN 100% CovE COMpuANT, OKI 168.53 LOADING COMBINATION #6: CHECK SEISMIC LOAoimw ExistingDL DL f + NN alis Wal ,= 3-;psf 16.85 ProposedDL .= ExistingDL+ DLSo1,-,x C 17.45 Seisnuclncrease := lOQ s:(ProposedDL � — 100 3.56 Existi=DL 4< IF EQUAL TO OR LES THAN 10% CooE CompuAN1T, OKI SEISMIC 'SUMMARY Sect. 3404.3 Alterations (See Exception), The addition of the Solar Panels, meets the following; The design strength of existing elements required to resist seismic Forces is not reduced, The seismic force to required existing structural elements is not substantially increased. No new structural elements are being added. New nonstructural elements are being connected to existing structure per Chapter 16. Alterations do not create structural irregularities. DocuSign Envelope ID:07A62812-C476-465F-822E-67B371F45C18 Page a of Note: For ASCE 7-10 the wind forces have been multiplied by 0.6 Lowoxtm Ca"B%K 1Txom *7: ZONE 1 (0.6)(DL RF + DL SOLAR) + WIND UP (Co=1.6) P-, = TAY PUP 0.6 DLSolar ` cos((1)) 104.84 L' L= m, .= I P-7 — —",DLtc y —.x core. 371.29 l a , S . a=t�1 -' 12 0.93 I 7Fb x Cf lwittd x CfS x C-1 x CL,S Sh x l OCA a :_ < G IF EQUAL TO OR MORE THAN 100% CODE COMPLIANT, OKI 811.74 Sr Lrmus OF SCOPIE OF WORK^mo LiAaxl_m Existing deficiencies which may be readily observable, and conditions which may not be code compliant, or may be in need of repair, or are concealed in any way that is not observable at the time of any inspections, are not included in this scope of work, There is no imlpfication that any visualinspections, by the Solar Company or the Engi- neer of Record, are intended to be technically exhaustive, or that such inspections indicate that every aspect of every component was analyzed,, or that every conceiv- able deficiency was reported. The calculations do not include an analysis of the over- all structural stability, and code compliance of an existing buliding, nor prediction of satisfactory performance or life expectancy of any existing building. DocuSign Envelope ID:F9B6E265-9C3A-475D-8768-C93D193C84D9 My Custom Solar Design Prepared by Justin Senia, 05/08/2015 My Information Fernando Herrera A- 16 Harwood St North Andover, MA 01845 System Size 16 Modules I 4.16 kWp 1,154 kWh/kWp r year-1 Production 4,802 kWh Modules 16 x REC Solar REC260PE(BLK) Inverters <. ;' 1 x SolarEdge Technologies SE3800 (240V)w/-ER-US or A-US Approval I have reviewed My Custom Solar Design and approve of the placement of solar panels identified above.I understand that the actual number of panels and their precise placement may vary based on engineering, installation, and solar energy production considerations, including roof type, shade,and other factors. EDocuS(gned by: 5/8/2015 I 2:43 PM PT 7ECBC6FED71�... Customer Signature Date t= � F .. DocuSi-n Envelope ID:07A62812-C476-465F-822E-678371F45CI8 �VU UU �U U OWNER'S AUTHORIZATION FORM For Permit Application(s) The sole purpose of this form is to provide Sun Run Inc with the Necessary permission from the Owner to file Permit Application(s) for such Project work as agreed upon between the Owner and the Owner's Authorized Company and its designated subcontractors. Owner's Name: Kim Herrera Solar Projs: 16 Harwood St North Andover, Ma 01845 Signature' (k�a 77ECBMFED71406... Owner's Authorized Company: Sun Run Inc. Company's Address: 595 Market St 29th Floor, San Francisco, CA 94105 Affiliation: Contractor Applicable License: State: MA CSLB#96991S.NJ#13VH0702030J DocuSign Envelope ID:07A62812-C476-465F-822E-67B371F45C18 V AREA SITE PLAN-SCALE=1/16"=1•-0" HAIII ITCH AZIM AZIM UE MAG P(SOFT) ® 17° 124° 110° 319.7 �MP SE SM Q INV R (E)RESIDENCE (N)ARRAY AR-01 OO 4r sunrun \ LICENSE N0.750184 )1�FOREST STREET pi00,NARLBOROUGI�NA 01)52 q� R PIICNE 6!6.65/.652) FiUt605.526.6)Ot \ CUSTOMER RESIDENCE: FERNANDO HERRERA 16 HARWOOD ST, \ N.ANDOVER,MA USA 01845 TE Q✓ TEL(B78)661A890 APN is e11.0-0604 PROJECT NUMBER: A� 221R-016HERR DESIGNER: M.PARADIS DRAFTER: DI SHEET SITE PLAN REV:A 5/22/2015 PAGE PV-2.0 DowSign Envelope ID:07A62812-C4764651-622E678371F45C18 SCOPE OF WORK GENERAL NOTES LEGEND AND ABBREVIATIONS TABLE OF CONTENTS PAGE# DESCRIPTION • SYSTEM SIZE:4680W DC,3800W AC • ALL WORK SHALL COMPLY WITH 2014 NEC,2009 IBC,MUNICIPAL CODE,AND ALLSERVICE ENTRANCE SOLAR MODULES PV-1.0 COVER SHEET SE • MODULES:(18)REC SOLAR:REC260PE(BLK) MANUFACTURERS'LISTINGS AND INSTALLATION INSTRUCTIONS. RAIL PV-2.0 SITE PLAN • INVERTER(S): • PHOTOVOLTAIC SYSTEM WILL COMPLY WITH 2014 NEC. (1)SOLAREDGE TECHNOLOGIES:SE3800(240V)W/-ER-US • ELECTRICAL SYSTEM GROUNDING WILL COMPLY WITH 2014 NEC. Mp MAIN PANEL PV-3.0 LAYOUT OR A-US • PHOTOVOLTAIC SYSTEM IS UNGROUNDED.NO CONDUCTORS ARE SOLIDLY PV-4.0 ELECTRICAL • RACKING:SNAPNRACK SERIES 100 UL;FLASHED L FOOT. GROUNDED IN THE INVERTER.SYSTEM COMPLIES WITH 690.35. SEE PEN D01. • MODULES CONFORM TO AND ARE LISTED UNDER UL 1703. SP SUB-PANEL STANDOFFS& PV-5.0 SIGNAGE • INVERTER CONFORMS TO AND IS LISTED UNDER UL 1741. FOOTINGS • RACKING CONFORMS TO AND IS LISTED UNDER UL 2703. • SOLAREDGE RAPID SHUTDOWN KIT REQUIRED CONSTRUCTION FOREMAN TO PLACE CONDUIT RUN PER 690.31(E)AND 2012 LC PV LOAD CENTER IFC 605.11.2. CHIMNEY • ARRAY DC CONDUCTORS ARE SIZED FOR DERATED CURRENT. • 9.01 AMPS MODULE SHORT CIRCUIT CURRENT. SM SUNRUN METER Q ATTIC VENT • 14.07 AMPS DERATED SHORT CIRCUIT CIRCUIT(690.8(a)&690.8(b)). FLUSH ATTIC VENT PM DEDICATED PV METER o PVC PIPE VENT • DESIGN CRITERIA:SNOW LOAD=50 PSF AND WIND=100 MPH. INVERTER(S)WITH INTEGRATED DC ® METAL PIPE VENT • STAGGER PENETRATIONS. INV DISCONNECT AND AFCI ® T-VENT AC AC DISCONNECT(S) EEH SATELLITE DISH DC I DC DISCONNECT(S) ® FIRE SETBACKS 0 CB 0 COMBINER BOX HARDSCAPE F--I INTERIOR EQUIPMENT —PL— PROPERTY LINE L J s u n r u n SHOWN AS DASHED SCALE:NTS A AMPERE AC ALTERNATING CURRENT AFCI ARC FAULT CIRCUIT INTERRUPTER LICENSE NO.750184 AZIM AZIMUTH VICINITYMAP COMP COMPOSITION ]DIFORESrS REE 418,MRRBORdX'l1,MA01]52 DC DIRECT CURRENT PQE�88.64].852] ;. (E) EXISTING fAXe 5.5M.8]8 EXT EXTERIOR CUSTOMER RESIDENCE: Nnlnsck St FIRM FRAMING FERNANDO HERRERA INT INTERIOR `""5' 1� A� Win• No ih LBW LOAD BEARING WALL 16 N.ANDOVER, ST, ,t �S1 14gh MAG MAGNETIC MA USA 01845 s1 North MSP MAIN SERVICE PANEL TEL(978)8816890 APNt:011.00004 _.� Andover (N) NEW ti NTS NOT TO SCALE PROJECT NUMBER: OC ON CENTER 221R-016HERR v PRE-FAB PRE-FABRICATED DESIGNER: 4+� g. PSF POUNDS PER SQUARE FOOT a b . mePV PHOTOVOLTAIC • M.PARADIS s� f- sr, f TL TRANSFORMERLESS Lenrence'High Sc mal �s4Dn TYP TYPICAL DRAFTER: V VOLTS W WATTS n SHEET ,Anuv"vr REV NAME DATE COMMENTS COVER SHEET M� A lierilage Grern• S^r/,r�• REV:A 5/22/2015 Coadomin,=5 I PAGE PV-'I.O DowSign Envelope ID:07A62812-C476-465F-822E-67B371F45C16 ROOF TYPE ATTACHMENT ROOF HEIGHT ROOF FRAME FRAME TYPE FRAME MAX FRAME OC ROOF EDGE MAX RAIL MAX RAIL DESIGN CRITERIA EXPOSURE MATERIAL SIZE SPAN SPACING ZONE SPAN OVERHANG MODULES: AR-01 COMP SHINGLE FLASHED L FOOT. SEE PEN D01. SINGLE STORY ATTIC WOOD RAFTER 2 X 6 8'-0" 16" NO 2'-8" 0'-10" REC SOLAR:REC260PE(BLK) MODULE DIMS: D1-AR-01-SCALE:1l4"=1'-0" 65.55"x 39.02"x 1.5" PITCH:17° MAX DISTRIBUTED LOAD:3 PSF AZIM:124' SNOW LOAD:50 PSF ® WIND SPEED: 100 MPH 3-SEC GUST. LAG SCREWS: 5/16"x4.0":2.5"MIN EMBEDMENT 6" PENETRATION SPACING: 61-123' 14'-11" 6'-7" - STAGGERED T 6" __e- -e - -o- -e — { 2'-8"TYP -O t- _e- - - -O 0-- 101-11" e- O-- - -e 8- &-- - G -0- -O sunrun LICENSE NO.750184 O --E-STREET X000,MARLBOROL .MA 01752 4'-3" Pf10lIE fifiB.fi57.fi537 F0.`clW.SZB.870t CUSTOMER RESIDENCE: FERNANDO HERRERA 16 HARWOOD ST, N.ANDOVER,MA USA 01845 TEL(978)6814890 APN 0:011.0-0004 PROJECT NUMBER: 221R-016HERR DESIGNER: M.PARADIS DRAFTER: DI SHEET LAYOUT REV:A 5/22/2015 PAGE PV-3.0 DocuSign Envelope ID:07A62812•C476465FA22E-67B371 F45C78 120/240 VAC SINGLE PHASE SERVICE OMETER#: M NATIONAL GRID 12830079 UTILITY GRID 1 EXISTING 1 OOA MAIN BREAKER T (END FED) EXISTING 200A MAIN (N)LOCKABLE SOLAREDGE TECHNOLOGIES: FACILITY PANEL (N)SUN RUN BLADE TYPE SE3800(240V)W/-ER-US OR A-US METER AC DISCONNECT 3800 WATT INVERTER PV MODULES LOADS 3 REC SOLAR:REC260PE(BLK) 3 2 1 O Dec 3 — D + f� (18)MODULES OPTIMIZERS WIRED IN(1)SERIES OF(18)OPTIMIZERS F,wuTr JUNCTION BOX 20A PV GROUND 250V METER SOCKET SQUARE D LOAD RATED DC MIN RATED NEMA3R SOLAREDGE POWER OPTIMIZER BREAKER AT 125A CONTINUOUS& DU221 RB DISCONNECT&AFCI P300 OPPOSITE END 240V METER 3R,30A,2P OF BUSBAR 200A,FORM 2S 120/240VAC CONDUIT SCHEDULE NOTES TO INSTALLER: 1. 18 VDC EXPECTED OPEN CIRCUIT STRING VOLTAGE. # CONDUIT CONDUCTOR NEUTRAL GROUND 2. ADD 20 AMP PV BREAKER TO MAIN PANEL. S u n ru n 1 NONE (2)10 AWG PV WIRE NONE (1)10 AWG BARE COPPER 2 3/4"EMT OR EQU IV. (2)10 AWG THHN/THWN-2 NONE (1)10 AWG THHN/THWN-2 3 3/4"EMT OR EQUIV. (2)10 AWG THHN/THWN-2 (1)10 AWG THHN/THWN-2 (1)8 AWG THHNrrHWN-2 LICENSE NO.750184 TSI FOREST STREET W .MNiLeOROUGH,1M51i52 FHONE 888.852.852] FAC 805.528.9201 MODULE CHARACTERISTICS OPTIMIZER CHARACTERISTICS CUSTOMER RESIDENCE: FERNANDO HERRERA REC SOLAR:REC260PE(BLK) 260 W MIN INPUT VOLTAGE 8 VDC 16 HARWOOD ST, OPEN CIRCUIT VOLTAGE 37.8 V MAX INPUT VOLTAGE 48 VDC N.ANDOVER,MA USA 01845 MAX POWER VOLTAGE 30.7 V MAX INPUT ISC 10 ADC TEL(978)681.0890 APNO:011.0,DW4 SHORT CIRCUIT CURRENT 9.01 A MAX OUTPUT CURRENT 15 ADC PROJECT NUMBER: 221 R-016HERR SYSTEM CHARACTERISTICS-INVERTER 1 DESIGNER: SYSTEM SIZE 4680 W M.PARADIS SYSTEM OPEN CIRCUIT VOLTAGE 18 V DRAFTER: DI SYSTEM OPERATING VOLTAGE 350 V MAX ALLOWABLE DC VOLTAGE 500 V SHEET ELECTRICAL SYSTEM OPERATING CURRENT 13.4 A SYSTEM SHORT CIRCUIT CURRENT 15A REV:A 5/22/2015 PER CODE:690.52 PAGE PV-4.0 V/w•O DocuSig,Emelope ID:07,162812-1476465F-822E-67B371 F45C18 • • • • LABEL LOCATION: PER A WARNING •'• • PER CODE:NEC690.13.G.3 8 NEC LABEL LOCATION: 690.13.G.4 (AC)(POI) THIS EQUIPMENT FED BY MULTIPLE SOURCE PER CODE:705.12 D 2 PER CODE:NEC690.13.8 TOTAL RATING OF OVER CURRENT ( H) DEVICES,EXCLUDING MAIN SUPPLY a • OVERCUR RENT DEVICE SHALL NOT EXCEED -`• •ry AMPACITY OF BUSBAR • • • PER CODE:NEC690.56(C) • • • ' LABEL LOCATION: • • } •• • .,-. (UNDER ROOFING MATERIAL) PER CODE:NEC690.13.G.1 A WARNING LABEL LOCATION: LABEL LOCATION: THE DC CONDUCTORS OF THIS ELECTRIC SHOCK HAZARD (DC)(INV) (DC)(INV) 77% dFID� "'t4 'I" "yIV"' LABEL LOCATION: PER CODE:NEC 690.35(F)708E USED PER CODE:NEC690.13.B •». ,• •� ON POWERONE INVERTER PHOTOVOLTAIC SYSTEM ARE WHEN INVERTER IS UNGROUNDED PER CODE:NEC 690.15 AND NEC 690.13(8) UNGROUNDED AND MAY BE ENERGIZED CAUTION:SOLAR ELECTRIC LABEL LOCATION: I SYSTEM CONNECTED A WARNING (AC)(POI) - -- --— — - -- ' . PER CODE:NEC690.13.8 LABEL LOCATION: LABEL LOCATIONTURN OFF PHOTOVOLTAIC (D)(AC)(CB) •• • •' • ••• : (AC)(POI) AC DISCONNECT PRIOR TO PER CODE:NEC 110.27(C) PER CODE:NEC690.16.8 WORKING INSIDE PANEL • • • • • • •• • • • • LABEL LOCATION: LABEL LOCATION: (AC) aI• (POI) •'• PER CODE:NEC690.33.E.2 PER A WARN I N G PER CODE:NEC690.54 ELECTRIC SHOCK HAZARD LABEL LOCATION: (AC)(POI) s u n r u n ACAUTION LABEL LOCATION: DO NOT TOUCH TERMINALS PER CODE:NEC 690.17.E PHOTOVOLTAIC SYSTEM CIRCUIT IS BACKFED (INDIVIDUAL BREAKERS) TERMINALS ON BOTH LINE AND PER CODE:NEC705.12.D.3.4 LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION •• DC VOLTAGE IS ALWAYS PRESET •• LABEL LOCATION: WHEN SOLAR MODULES RE TO SUNLIGHT LICENSE NO.750184 PER CODE:NEC690.53 � � � LABEL LOCATION: (DC)(INV) 7J1 FOREST S7REEr•A90,M—BOR—K MR01752 • • PER CODE:IFC.60.11.3IFC 605.11.1.4 NEC 690.15,NEC 680.13(B)8 NEC A WARNING F ^s5m esio 527 690.14C.2. INVERTER OUTPUT CONNECTION LABEL LOCATION: CUSTOMER RESIDENCE: • (ERI) DO NOT RELOCATE THIS CODE:NEC 705.12.D.2 FERNANDO HERRERA OVERCURRENT DEVICE 16 HARWOOD ST, N.ANDOVER,MA USA 01845 TEL.(978)6816890 APN 0:011.0-0004 • • • LABEL LOCATION: A WA R N I N G LEGEND (AC)PER CODE:690.13.6 PROJECT NUMBER: 221R-016HERR ELECTRIC SHOCK HAZARD LABEL LOCATION: (AC):AC Disconnect NALS (AC)(PO0 (C):Conduit TERMIINALSOT OON BOTH LIUCH TE IN AND PER CODE:NEC 690.17.E DESIGNER: (CB)Combiner Box LOAD SIDES MAY BE ENERGIZED M.PARADIS (D)Distribution Panel DISCONNECTAC IN THE OPEN POSITION DRAFTER: (DC):DC Disconnect DI (IC):Interior Run Conduit SHEET (INV):Inverter with integrated DC disconnect SIGNAGE (LC):Load Center (M):Utility Meter REV:A 5/22/2015 (POI):Point of interconnection PAGE PV-5.0 DocuSign Envelope ID:07A62812-C476-465F-822E-67B371F45C18 SCOPE OF WORK GENERAL NOTES LEGEND AND ABBREVIATIONS TABLE OF CONTENTS PAGE# DESCRIPTION • SYSTEM SIZE:468OW DC,380OW AC • ALL WORK SHALL COMPLY WITH 2014 NEC,2009 IBC,MUNICIPAL CODE,AND ALLSERVICE ENTRANCE SOLAR MODULES PV-1.0 COVER SHEET SE • MODULES:(18)REC SOLAR:REC260PE(BLK) MANUFACTURERS'LISTINGS AND INSTALLATION INSTRUCTIONS. RAIL PV-2.0 SITE PLAN • INVERTER(S): • PHOTOVOLTAIC SYSTEM WILL COMPLY WITH 2014 NEC. (1)SOLAREDGE TECHNOLOGIES:SE3800(240V)W/-ER-US • ELECTRICAL SYSTEM GROUNDING WILL COMPLY WITH 2014 NEC. Mp MAIN PANELrm PV-3.0 LAYOUT OR A-US • PHOTOVOLTAIC SYSTEM IS UNGROUNDED.NO CONDUCTORS ARE SOLIDLY PV-4.0 ELECTRICAL RACKING:SNAPNRACK SERIES 100 UL;FLASHED L FOOT. GROUNDED IN THE INVERTER.SYSTEM COMPLIES WITH 690.35. SEE PEN D01. • MODULES CONFORM TO AND ARE LISTED UNDER UL 1703. SP SUB-PANEL STANDOFFS& PV-5.0 SIGNAGE • INVERTER CONFORMS TO AND IS LISTED UNDER UL 1741. FOOTINGS • RACKING CONFORMS TO AND IS LISTED UNDER UL 2703. • SOLAREDGE RAPID SHUTDOWN KIT REQUIRED • CONSTRUCTION FOREMAN TO PLACE CONDUIT RUN PER 690.31(E)AND 2012 LC PV LOAD CENTER IFC 605.11.2. CHIMNEY • ARRAY DC CONDUCTORS ARE SIZED FOR DERATED CURRENT. • 9.01 AMPS MODULE SHORT CIRCUIT CURRENT. SM SUNRUN METER Q ATTIC VENT • 14.07 AMPS DERATED SHORT CIRCUIT CIRCUIT(690.8(a)&690.8(b)). Q FLUSH ATTIC VENT PM DEDICATED PV METER o PVC PIPE VENT • DESIGN CRITERIA:SNOW LOAD=50 PSF AND WIND=100 MPH. INVERTER(S)WITH INTEGRATED DC ® METAL PIPE VENT • STAGGER PENETRATIONS. INV DISCONNECT AND AFCI ® T-VENT ACI AC DISCONNECT(S) EEU SATELLITE DISH DC DC DISCONNECT(S) FIRE SETBACKS E CBA BOX HARDSCAPE F--I INTERIOR EQUIPMENT —PL— PROPERTY LINE L s u n ru n J SHOWN AS DASHED SCALE:NTS A AMPERE AC ALTERNATING CURRENT AFCI ARC FAULT CIRCUIT INTERRUPTER LICENSE NO.750184 VICINITY MAP AZIM AZIMUTH COMP COMPOSITION ]NiORESi srneer aa66,MfAlBOROUGH,AU 01]52 DC DIRECT CURRENT PHONE 888.65r.65�i (E) EXISTING n s` S• G.,eov. t EXT EXTERIOR CUSTOMER RESIDENCE: �mmackSt a (� FRM FRAMING FERNANDO HERRERA µsLel St �. North INT INTERIOR 16 HARWOOD ST, cAs Wo;ry li h LBW LOAD BEARING WALL 1 W MAG MAGNETIC N.ANDOVER,MA USA 01845 � -- NQrth ° MSP MAIN SERVICE PANEL TEL(978)681-8M APN:011.0-0004 Andover .S, etnf (N) NEW NTS NOT TO SCALE PROJECT NUMBER: 1-� r ,. - s+ 221R-016HERR / � y 034as 131 OC ON CENTER \ U• G G PRE-FAB PRE-FABRICATED tae PSF POUNDS PER SQUARE FOOT DESIGNER: PV PHOTOVOLTAIC M.PARADIS TL TRANSFORMERLESS L6wrence'High 5cFigd 'R s40e V P VOTS TYPICAL VOLTS FTER: a of W WATTS SHEET REV NAME DATE COMMENTS COVER SHEET Heritage Green• �kl ", i A REV:A 5/22/2015 • Condomini ns $ PAGE PV-1.0 DocuSign Envelope ID:07A62812-C476465F-ME-67B371F45C18 TRUE MAG PV AREA SITE PLAN-SCALE=1/16"=1'-0' PITCH AZIM AZIM (SOFT) ® AR-01 17' 124' 110° 319.7 SMP SE SM O INV (E)RESIDENCE (N)ARRAY AR-01 � n( y� Q �O sunrun \ LICENSE NO.750184 )JC FOREST STREET M .MARLBOROUGH,NAOtT52 PHONE Mb.s57.552) 4r FP%505.528.9T91 \ CUSTOMER RESIDENCE: FERNANDO HERRERA 16 HARWOOD ST, N.ANDOVER,MA USA 01845 \ 7E1.(9/!)eS1d890 APN 1:077.0-0000 Q PROJECT NUMBER: a� 221 R-016HERR DESIGNER: M.PARADIS DRAFTER: DI SHEET SITE PLAN REV:A 5/22/2015 PAGE PV-2.0 i DocuSign Envelope III:07A62812-C476465F-822E-67B371F45C18 ROOF TYPE ATTACHMENT ROOF HEIGHT ROOF FRAME FRAME TYPE FRAME MAX FRAME OC ROOF EDGE MAX RAIL MAX RAIL DESIGN CRITERIA EXPOSURE MATERIAL SIZE SPAN SPACING ZONE SPAN OVERHANG MODULES: AR-01 COMP SHINGLE FLASHED L FOOT. SEE PEN D01. SINGLE STORY ATTIC WOOD RAFTER 2 X 6 8'-0" 16" NO 2'-B" 0'-10" REC SOLAR:REC260PE(BLK) MODULE DIMS: D1-AR-01-SCALE:1/4"=1'-0" 65.55"x 39.02"x 1.5" PITCH:17° MAX DISTRIBUTED LOAD:3 PSF AZIM:124° SNOW LOAD:50 PSF ® WIND SPEED: 100 MPH 3-SEC GUST. LAG SCREWS: 5/16"x4.0":2.5"MIN EMBEDMENT 6" PENETRATION SPACING: 6^_ 23' 14'-11" 6'-7" - STAGGERED r 6„ T2'-8"TYP — - — —e 0— 10'-11" —e e- G— —� sunrun O LICENSE NO.750184 751 FOREST SRiEEf MI00,MARLBOROIFH,MA 01]52 4'-3" F1gNE eee.us7.esn FA%305.52B.B7lM CUSTOMER RESIDENCE: FERNANDO HERRERA 16 HARWOOD ST, N.ANDOVER,MA USA 01845 TEL.(978)681.M APN 9:011.0,000/ PROJECT NUMBER: 221 R-016HERR DESIGNER: M.PARADIS DRAFTER: DI SHEET LAYOUT REV:A 5/22/2015 PAGE PV-3.0 Do'Sign Envelope ID:07A62812-C476-465F-822E-67B37/F45C18 120/240 VAC SINGLE PHASE SERVICE OMETER#: M NATIONAL GRID 12830079 UTILITY GRID 1 EXISTING 100A MAIN BREAKER (END FED) EXISTING 200A MAIN (N)LOCKABLE SOLAREDGE TECHNOLOGIES: FACILITY PANEL (N)SUN RUN BLADE TYPE SE3800(240V)W/-ER-US OR A-US METER AC DISCONNECT 3800 WATT INVERTER PV MODULES LOADS 3 3 2 REC SOLAR:REC260PE(BLK) O 3 - - 1 (18)MODULES IVI Ej L � OPTIMIZERS WIRED IN(1)SERIES OF(18)OPTIMIZERS Enaurr JUNCTION BOX 20A PV °RO NO 250V METER SOCKET SQUARED LOAD RATED DC MIN RATED NEMA3R SOLAREDGE POWER OPTIMIZER BREAKER AT 125A CONTINUOUS& DU221 RB DISCONNECT&AFCI P300 OPPOSITE END 240V METER 3R,30A,2P OF BUSBAR 200A,FORM 2S 120/240VAC CONDUIT SCHEDULE NOTES TO INSTALLER: 1. 18 VDC EXPECTED OPEN CIRCUIT STRING VOLTAGE. # CONDUIT CONDUCTOR NEUTRAL GROUND 2. ADD 20 AMP PV BREAKER TO MAIN PANEL. S u n r u n 1 NONE (2)10 AWG PV WIRE NONE (1)10 AWG BARE COPPER 2 3/4"EMT OR EQUIV. (2)10 AWG THHN/THWN-2 NONE (1)10 AWG THHN/THWN-2 3 3/4"EMT OR EQUIV. (2)10 AWG THHN/THWN-2 (1)10 AWG THHN/THWN-2 (1)8 AWG THHN/THWN-2 LICENSE NO.750184 --ES-EET-o,MAHLBOo-.Mrl-2 PIIQIE B6Afi5).6527 PX 665.536.9201 MODULE CHARACTERISTICS OPTIMIZER CHARACTERISTICS CUSTOMER RESIDENCE: FERNANDO HERRERA REC SOLAR:REC260PE(BLK) 260 W MIN INPUT VOLTAGE 8 VDC 16 HARWOOD ST, OPEN CIRCUIT VOLTAGE 37.8 V MAX INPUT VOLTAGE 48 VDC N.ANDOVER,MA USA 01845 MAX POWER VOLTAGE 30.7 V MAX INPUT ISC 10 ADC TEL.(978)WI4890 APNf:011.00004 SHORT CIRCUIT CURRENT 9.01 A MAX OUTPUT CURRENT 15 ADC PROJECT NUMBER: 221 R-016HERR SYSTEM CHARACTERISTICS-INVERTER 1 DESIGNER: SYSTEM SIZE 4680 W M.PARADIS DRAFTER: SYSTEM OPEN CIRCUIT VOLTAGE 18 V DI SYSTEM OPERATING VOLTAGE 350 V SHEET MAX ALLOWABLE DC VOLTAGE 500 V ELECTRICAL SYSTEM OPERATING CURRENT 13.4 A REV:A 5/22/2015 SYSTEM SHORT CIRCUIT CURRENT 15A PAGE PV-4.0 PER CODE:690.52 DocuSign Envelope ID:07A62812-C476465F-822E-67B371F45C18 • • • • LABEL LOCATION: (CXCB) A WARNING •• • PER CODE:NEC690.13.G.3 S NEC • LABEL LOCATION: 690.13.G.4 ,• (AC)(POI) THIS EQUIPMENT FED BY MULTIPLE SOURCE • PER CODE:705.12(D)(2) PER CODE:NEC690.13.B TOTAL RATING OF OVER CURRENT 111 •_ , • DEVICES,EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE SHALL NOT EXCEED • • • AMPACITY OF BUSBAR • • PER CODE:NEC690.56(C) ;.., _ .•.• . • ::';.. • • • • `-" LABEL LOCATION: 'T,a. •• • ^ PER CODE:NE0690.13.G.1 A WARNING .. LABEL LOCATION: LABEL LOCATION: ELECTRIC SHOCK HAZARD (DC)(INV) FS" (DC)(INV) + _ LABEL LOCATION: THE DC CONDUCTORS OF THIS PER CODE:NEC 690.35(F)TO BE USED ka PER CODE:NEC690.13.B • s• • ON POWERONE INVERTER PHOTOVOLTAIC SYSTEM ARE WHEN INVERTER IS UNGROUNDED PER CODE:NEC 690.15 AND NEC 690.13(B) UNGROUNDED AND MAY BE ENERGIZED CAUTION:SOLAR ELECT A WARNING • "°' uBEL LOCATION: SYSTEM CONNECTED PER CODE:NEC690.13.B LABEL LOCATION: LABEL LOCATION: TURN OFF PHOTOVOLTAIC (D)(AC)ICE) •• • •• • • • (AC)(POI) AC DISCONNECT PRIOR TO PER CODE:NEC110.27(C) PER CODE:NEC690.16.B WORKING INSIDE PANEL 1 • • • • • •• • • • • LABEL LOCATION: LABEL LOCATION: (AC) (POI) ••• PER CODE:NEC690.33.E.2 PER A WARNING *,I,��.I•' PER CODE:NEC890.54 s• •' • ELECTRIC SHOCK HAZARD LABEL LOCATION: LABEL LOCATION: DO NOT TOUCH TERMINALS PER IAC) ACAUTION (POI) s u n r u n CODE:NEC 690.17.E (INDIVIDUAL BREAKERS) TERMINALS ON BOTH LINE AND PHOTOVOLTAIC SYSTEM CRCWTRi BACKFED PER CODE:NEC705.12.D.3.4 LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION .•• DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE • LABEL LOCATION: EXPOSED TO SUNLIGHT LICENSE NO.750184 ••• • (DC)(INV) PER CODE:NEC690.53 • • LALOCATION: (DCI)(INV)(INV) 1J0 FORE5l BntEET•CW,NAFLBOROI1G11,NRO1753 • • PER CODE:I71.3 IFC 605.11.1.4 A WARNING P110NE6l5.5A.55]) NEC 6 NEC 690.15,NEC 690.13(8)8 NEC --9701690.14C.2. INVERTER OUTPUT CONNECTION LABEL LOCATION:(PoCUSTOMER RESIDENCE: DC'DISCDO NOT RELOCATE THIS • PER I)CODE:NEC 705.12.D.2 FERNANDO HERRERA OVERCURRENT DEVICE 16 HARWOOD ST, N.ANDOVER,MA USA 01845 TEL(976)6576&90 APN k 011.0004 • . • LABEL LOCATION A WARNING (AC)PER CODE:690.13.6 PROJECT NUMBER: LEGEND 221 R-016HERR (AC):AC Disconnect ELECTRIC SHOCK HAZARD (AC)(POI) ION: (C):Conduit TERMDO INALSOT OUCH ON BOTH LINE AND PER CODE:NEC 690.17.E DMS ARADIS (CB)Combiner Box LOAD SIDES MAY BE ENERGIZED — (D)Distribution Panel 1N THE OPEN POSITION DRAFTER: (DC):DC Disconnect DI (IC):Interior Run Conduit SHEET (INV):Inverter with integrated DC disconnect SIGNAGE (LC):Load Center (M):Utility Meter REV:A 5/22/2015 (POA:Point of interconnection PAGE PV-5.0 HIGH PERFORMANCE i SOLAR PANELS REC PEAK ENERGY BLK REC Peak Energy BLK Series panels are the perfect choice for building solar F systems that combine long lasting product quality with reliable power output. REC combines high quality design and manufacturing standards to produce high- performance solar panels with uncompromising quality. t MOREPOWER ROBUSTAND PER FT= DURABLE DESIGN C l ENERGY PAYBACK EASYTO TIMEOFONEYEAR INSTALL I i '3 ��K A 1< 65.5510.1 35.43 15.06 ii O ------- - -- - - EFFICIENCY YEAR PRODUCT WARRANTY YEAR LINEAR i POWER OUTPUT WARRANTY of v I� m; I 0 o OVrY* US IMPORT DUTY FREE «M FRF 0.43 3 0.08 Mounting holes f ITEMPERATURE RATINGS -J, I Nominal Operating Cell Temperature(NOCT) 45.7°C(±2°C) II I t Io 4 Temperature Coefficient of PMPP -0.40/o/°C f Temperature Coefficient ofVOC -0.27%/°C Temperature Coefficient of 15C 0.024%/°C All measurements in inches Nominal Power P (W 240 245 250 255 260 265 Cell Type: 60RECPEmulti-crystalline MPP P) 3 strings of 20 cells with bypass diodes Watt Class Sorting-(W) 0/+5 0/+5 0/+5 0/+5 0/+5 0/+5 Glass: 1/8"mm solar glass with anti-reflection Nominal Power Voltage-VMPP(V) 29.7 30.1 30.2 30.5 30.7 30.9 surface treatment Nominal Power Current-IMPP(A) 8.17 8.23 8.30 8.42 8.50 8.58 Back Sheet: Double layer highly resistant polyester Open Circuit Voltage-VIC(V) 36.8 37.1 37.4 37.6 37.8 38.1 Frame: Anodized aluminum(black) ShortCircuit Current- Junction Box: IP67 rated ISC(A) 8.75 8.80 8.86 8.95 9.01 9.08 4MM2 solar cable,35"+47" Pane(Efficiency(%') 14.5 14.8 15.1 15.5 15.8 16.1 Connectors: Multi-Contact MC4(4 mmz) Analysed data demonstrates that 99.7%of panels produced have current and voltage tolerance of±3%from nominal values. Values at standard test conditions STC(airmass AM I.S.irradiance 1000 W/m',cell temperature 25°C). Origin: Made in Singapore At low irradiance of 200 W/m'(AM 1.5 and cell temperature 25'C)at least 97%of the STC panel efficiency will be achieved. ELECTRICAL DATA @ NOCT REC240PE1 1• 4 Nominal Power-PMPP(WP) 183 187 189 193 197 202 Operational Temperature: -40...+85`C Nominal Power Voltage-VMPP(V) 27.7 28.1 28.3 28.5 29.0 29.4 Maximum System Voltage: 600 V I Design Load: 75.21bs/ft2(3600 Pa)* Nominal Power Current-IMPP(A) 6.58 6.64 6.68 6.77 6.81 6.90 33.41bs/ft2(1600Pa)* Open Circuit Voltage-Voc(V) 34.4 34.7 35.0 35.3 35.7 36.0 *Refer to installation manual Short Circuit Current-Is,(A) 7.03 7.08 7.12 7.21 7.24 7.30 Max Series Fuse Rating: 15A Nominal operating cell temperature NOCT(800 W/m',AM 1.5,windspeed 1 m/s,ambient temperature 20'C). Max Reverse Current: 15A CERTIFICATION MECHANICAL DATA N 10year product warranty. Dimensions: 651/2 x 39xl 112 in o% C �L USa 25 year linear power output warranty Area: 1776ft2 o LISTED (max.degression in performance of0.7%p.a.). o 9 Weight: 3 .6lbs UL 1703,IEC 62716(ammonia resistance)&I EC 61701 Wei g Q i (salt mist corrosion-severity level 6). i NotelAll given specifications are provisional data only Z and subject to cha nge without notice at any time. REC is a leadinggtobal provider ofsola r energy solutions.With more than 15 years ofexperience,we offer sustainable,high performing �\ �� products,services and investments for the solar industry.Together with our partners,we create value by providing solutions that R better meet the world's growing energy needs.Founded in Norway,REC is listed on the Oslo Stock Exchange(ticker:RECSOL)and headquartered in Singapore.Ourl,500 employees worldwide generated revenues of NOK 4.1 billion in 2012. www.recgroup.com SERIES 100 ROOF MOUNT SYSTEM SnapNrack Solar Mounting Solutions The SnapNrack line of solar mounting solutions is designed to reduce total installation costs. The system's technical innovations have been proven to drive down costs and improve installation quality on more than 350 MW of solar installations. Pitched Roof Arrays Simplified a The SnapNrack Series 100 UL Roof Mount System is an efficient, visually appealing, photovoltaic(PV) ; module installation system. Series 100 UL is Listed to the UL Standard 2703 for Bonding, meaning that all system components have been Certified by UL for Roof System in 4 Simple Steps: electrical continuity, eliminating the need for additional 1) Go to the online Series 100 Configuration grounding hardware. The System's components provide Tool (configure.snapnrack.com) and select an adequate bonding path which has eliminated the "Yes" for UL 2703 Listed need for grounding lugs and washers at each module, and bonding jumpers between splices. The UL 2703 2) Identify Site Conditions (Array Tilt, Building Listing ensures that SnapNrack partners can provide Height, Roof Type, Wind and Snow Loads) the best in class installations in quality, safety, and 3) Build array in the online Configuration efficiency. Tool and automatically generate a Bill of Materials. • All bonding hardware is fully integrated into the components 4) Place order with your distributor. Purchase material for a single project or order in bulk • No grounding lugs required for modules for additional savings • Rail splices bond rails together, no rail jumpers required • Proprietary SnapNrack grounding lug snaps in the rail channel, no drilling of rail or reaching for other tools required (One Lug per individual row of modules) U • Class A Fire Rating Type 1 and 2 modules ®` LISTED PV Mounting System Patent Pending 2703 42Sn.pNricwk ainless Bolt with Stainless Steel SnapNrack Standard Rail SnapNrack Bondinglit-Lock asherLott with Split SpliceInsert Lock Washer Bonding SnapNrack Adjustable End SnapNrack Splice Clamp Top Bonding Base Mid Clamp SnapNrack SnapNrack Bonding Bonding SnapNrack Adjustable End Stainless Channel Nut Clamp Bottom Bonding Stainless Hardware with Bolt with Channel Nut Split Lock SnapNrack Bonding Split-Lock Washers Washer Adjustable End Clamp SnapNrack Bonding SnapNrack Bonding Mid Clamp Standard Rail Splice SnapNrack Ground Lug 10-6 AWG Copper Wire SnapNrack Ground Lug Assembly (ONE REQUIRED PER ROW OF MODULES) SnapNrack Bonding Universal End Clamp(UEC)Wave !��UEC----------------- UECao with Flat Washer SnapNrack Bonding Universal End Clamp SnapNrack Bonding Standoff Clamp Assembly SnapNrack Serrated Stainless SnapNrack SnapNrack Bonding Rubber Steel Flange Nut Bonding Channel Nut Channel Stainless Rain Collar Serrated Stainless Nut Flange Nut Steel Flange Bolt SnapNrack Stainless SnapNrack 92 Degree Flange Mill Finish L Foot Bolt Standoff a SnapNrack SnapNrack All Purpose Mill Finish L Foot Standoff SnapNrack Base(1-Hole SnapNrack Base Shown) SnapNrack L Foot Metal Roof Mill Finish Flashing Base Assembly L Foot Base SnapNrack Bonding SnapNrack Bonding SnapNrack witai Roof Base with Standoff Assembly L Foot Base with Flashing Bonding L Foot Patent Pending SnapNrack Series 100 UL Technical Data Materials • 6000 Series aluminum • Stainless steel • Galvanized Steel and Aluminum Flashing Material Finish •Clear and black anodized aluminum • Mill Finish on select components Installation •Quick and efficient mounting •Adjustable hardware to ensure clean and level finish •All components bonded to ground with integrated bonding features Calcs.&Certifications • Listed to UL Standard 2703 for Grounding/Bonding and Fire Classification • Class A Fire Rating Type 1 and Type 2 Modules • Stamped Structural Engineering Reports for all 50 States Grounding • SnapNrack.Grounding Lug (One Lug per individual row of modules) Warranty • 10 Year material and worksmanship (download full details at snapnrack.com) Snap'-'\\ rack- Solar Mounting Solutions (877) 732-2860 www.SnapNrack.com is Printed on recycled paper using soy based inks. ©2015 by SnapNrack PV Mounting System.All rights reserved. =ee soIar " • • Single Phase Inverters for North America solar ° `x SE3000A-US/SE3800A-US/SE5000A-US/SE6000A-US/ µu,x SE7600A-US/SE10000A-US/SE11400A-US _ I SE3000A-USSE3800A-VS SE5000_A-US SE6000A-US SE7600A-VS SE10000A-US SE11400A-US OUTPUT SolarEdge Single Phase InvertersNominalAC Power Output 3000 1 3800 5000 6000 1 7600 999800@2 11400 VA . Max. C Power Output 3300 4150 @ 08V I 6000 8350 1090 @240V 12000 I VA For North America5�� 5450 240V ___. ......._ ACOutput Voltag Min.-Nom.-Max J SE3000A US/SE3800A US/SE5000A US/SE6000A US/ �,„�n�h g3 zps-229ya c. _j ♦t_Y R iAm{N "" 7 ACOutput V..lt.aB MI N M- r SE760OA-US/SE10000A-US/SE1140OA-US 211 240 264 Vac n M ' t J. ..J. 60J-_6_ J / 60 60.5).,ACF 9 e.yMl N 59 3 051 th Hl country tting 57 Max.ContinuousOutput Current 125 16 24 @ 208V 25 32 48 @-J,-2 08V 4J7. 5 ' HAz .. .. .... 1@2 , ... .....- 42 .240y. 21@240V @ . i. y.,. :. ....... .. .. Utility Mon for ng d ng Protection Country C nfigurable Th esholds Yes _ —Yes tarty r 'x i+ IRecommended NDUT d dM DC P0 4750 r 00 W • ^�•� "y:,'F. p a .�,.k ..(STC). ...... -. .... ...... ........ 12. ... T f U g d d... ..... ...... 75566 .5 .. .. .. ... ...... .. ... .. i W2iflttl'tl� M I Put Voltage ....... .... � 9500 ... .... ....... Vdc T +A, 3 ,zk, '° `i'. Nom DC Input Voltage,.,....... ...... ..I........... 0 325 @ 208V/350 @ 24DV... ....... Vdc...- 3750 625 12400 1 2 0 1 ., .. I.. .165@268V .... ... ...... .33@208V .... Max. C M 9.5 13 I I8 23 Ad,,5 @ 240v 30.5,@ 240V 34.5 Ad.. 15Ye G urrent Raverse Ftlst It IPtit hort Circuit Detection 1 -.. 6lx)k Sensitivity5 .. Ad-... ,° §+ m Invert Effi cy., _ I 97.7 I 98.2, i 98.3 i 983 98_. 98 K' M Tr f 97.5(6 20i1 fI... 9... I .......... .. 97..5.. 97.5.-@.@....2..4 0 VCEC Weighted Efficiency 1. 7.5 98 97.5 I ... 97.5 7.5 .% qg@.4y Power Fti^ 25 <42 ADqITIONAL FEATURES faces RS48SRS232 Ethe net g8 (optional)supported!C ti ter RGrace D Option 50R pd Shutdown NEC 014612 uncti lily,enabledwhenSolarEdg spdsh,,td—kt .... ......... s'nstalled" STANDARD COMPLIANCE — 4�fi k.d ,�y�c.. } •' r"Y„ 'pdc'' as 'y1y5" Sfty, _UL3741 UL16998,UL1996.CSA 22.2 ....... ........ Grid Cction Standards ,.IEEE1547 , Emisll.ns FCC partl5 class B y_. t '.,. = °•y. 'T a,} h�" _INSTALLATION SPECIFICATIONS _ S" AC tPt d t /AWG ng 3/4 /1.6.6.A..WG .... DC input conduit /p fstrings 0 � 3/4 minimum t gs/166AWG .3/.4.".-minimum 3/4 /.1.-u2m s t/8n-g3sA/W.14G6—AyWGr -..-- .p z ` r tYaM xya AM/Grange .. Dimensions wthSfty Switch 305 125x7/ 30.5 125z 7.5/ x10.5/775 n/ • } 3 A11 W D),, ,.... .,775 315x172„ 775 315.191,., __ 125 315 mm, 30 5 260 O 1 1-yeight with Safely5 itch. ,.. ..__...512/23.2, 547/24.7 88 4/401 Ib/kg, CoolingNatural Convection F (ser replaceable) .......... ...... .... ...... ... ..... ..... . Nose <25 <50 dBA M Max.OperatigTemperature 13to+140/-25to+60(40to+60v rslona 'I bl�'�I -F/'C The best choice for SolarEdge enabled systems PRange notecdo Ronne ..- NEMA3R - Integrated arc fault protection(Type 1)for NEC 2011 690.13 compliance -- -- -- - - 2r�°na asa ae<,°ovon. Superior efficiency(98%) Small,lightweight and easy to install on provided bracket : "Acer ue 8raa ,v/N;Sc Built-in module-level monitoring °..� roiNSr—MD51 dpven°n v/N:SEsmnUs000NNVo Internet connection through Ethernet or Wireless Outdoor and indoor installation Fixed voltage inverter,DC/AC conversion only Pre-assembled Safety Switch for faster installation Optional—revenue grade data,ANSI C12.1 f sunscec .. # ✓ ''�, r'} -- USA-GERMANY-ITALY-FRANCE-JAPAN-CHINA-AUSTRALIA-TH E N ETHE R LAN DS-ISRAEL WWw,SOlaredge.Us ® 3933 US Route I Cortland,NY 13045 Telephone:(607)) 753E711 Facsirnle: (607)756-9891 —intertek.— SolarEdge Technologies Ltd Letter Report 101703554CRT-001 June 20,2014 Letter Report No.101703554CRT-001 June 20"',2014 Project No.G101703554 • 3-ph Inverters: Mr.Meir Adest Ph:+972.9.957.6620 o SE9K1JS/SESOKUS/SE20KUS when the SolarEdge rapid shutdown cable labeled"MCI-CB-xxxxx- SolarEdge Technologies Ltd email:meir.a@solaredge.com 6 Ha'Harash St. x"which is part of kit SE3000-RSD-xx is installed in the inverter Safety Switch where xxxxx-xx is HOD HASHARON,ISRAEL any number;inverter part number may be followed by a suffix Subject: ETL Evaluation of SolarEdge Products to NEC Rapid Shutdown Requirements This letter report completes this portion of the evaluation covered by Intertek Project No.G101703554. Dear Mr.Meir Adest, If there are any questions regarding the results contained in this report,or any of the other services offered by This letter represents the testing results of the below listed products to the requirements contained in the following Intertek,please do not hesitate to contact the undersigned. standards: Please note,this Letter Report does not represent authorization for the use of any Intertek certification marks. National Electric Code,2014,Section 690.12 requirement for rapid shutdown. Completed by: Radhe Patel Reviewed by: Howard Liu This investigation was authorized by signed Quote 500534459 dated 06/10/2014.Rapid shutdown test were Title: Engineering Team Lead Title: �Staff Engineer perform at SolarEdge Technologies Ltd,6 Ha'Harash St HOD HASHARON,ISRAEL and witness by Intertek pj' p personal on 06/17/2014. Signature: �`J Signature The evaluation covers installations consisting of optimizers and inverters with part numbers listed below. Date June 20 ,2014 Date: June 20 ,2014 The testing done has verified that controlled conductors are limited to not more than 30 volts and 240 volt- amperes within 10 seconds of rapid shutdown initiation. Applicable products: • Power optimizers: o PBxxx-yyy-zzzz;where xxx is any number,0-9,up to a maximum value where xxx=350;yyy could be AOB or TFI;and zzzz is any combination of four letters and numbers. o OP-XXX-LV,OP-XXX-MV,OP-XXX-IV,OP-XXX-EV;where xxx is any number,0-9. o Paaa,Pbbb,Pccc,Pddd,Peee;where aaa,bbb,ccc,ddd,eee is any number,0-9 to a maximum upto aaa=300,bbb=350 ccc-500,ddd=600,eee=700. o Pxxx,Pyyy,Pzzz,Pmmm,Pnnn and P000;where xxx,yyy,zzz is any number,0-9 to a maximum up to xxx=300,yyy=350,zzz=500;where mmm,nnn,000 is any number,0-9 to a maximum up to mmm=405,nnn=300,000=350 • 1-ph Inverters: o SE3000A-US/SE3800A-US/SESODOA-US/SE6000A-US/SE7600A-US/SE10000A-US/ SE11400A-US when the SolarEdge rapid shutdown cable labeled"MCI-CB-xxxxx-1C which is part of kit SE100D-RSD-xx is installed in the inverter Safety Switch where xxxxx-xx is any number; inverter part number may be followed by a suffix Page 1 of 2 T,,,nspon is ler pu aackNr.use d IreMeKs GhY arY Is one Isd nssuee Is the eyrcerr•Y heta en hdedek anti ra Gsnl Iniwhk's responsib•ty ertl gwgy an amend re e•tensa aM mrcgtlom e1 Me aw«mer/.IYertek assumes m 11.1,411yreerry Wdy.ogwrd•n te the,M.In ac --x111,the agrs.—st,forairy bas.espemeor damage eceesic-dby-use eI this repoh 0Yy a•Cf..h ndlw4ed te Amit wpfrq or dbMbuaen Y ais npod ab 1Mn oAy in His erMrYy.Any u«ei-I..k rem,or ons of Its narks for Na vie er vdwNeen•m o11M hstetl metedY,proAict a«Mw must flrY be appresed h xYgng bylMrMk TM oWemtlom ab test re..+.M tlis report an Mevere oYy tlw samq.tezhb Tlis repod by Ihea does M Irryy Matthe me 1.productor senke bot Iws ever beenarch,an 1-1,uraresti Pegram. OO FW>. 9 ® wt" I--as Page2of2 IntMek intercek It7 ek Intertek Intertek Intertek Intertek Testing Services NA,Inc. So 12.1.2(11/1110)Informative Intertek Testing Services NX Inc. So 12.1.2(11/11/10)Informative s solar=@@ solar= SolarEdge Power Optimizer Module Add-On for North America P300 / P400 / P405 SolarEdge Power Optimizer P300 P400 P4U5 (for 60-cell modules (tor]2&96-cell modules) (tor thin film module) Module Add-On For North America INPUT K' r� R t d p t DC P were I x .. t ge ..... .......300... ...... .........400 ....... _....... 405 ... I W Absolute Maximum Put Vol ...... I P300 / P400 / P405 " (V tl st, pe , t 48 BD 125 Vdc %` MPPT OP tigR ge ...... .. ...... 8"48. ..... .........8-80.......,. ...125 105...... I Vd. .. Maximunn.ShortC ult Current(Isc) ... ........ 10 .. .. ......._. .......__. I...Adc...,.. Maximum OC Input Current I ..... . 12.5...... ... ............ .............. Adc .aa . Maximum Eficie cy ....... ...,..I ...... ..... ...... .99 5 .....,....... ......... ..._... i' W ghted,Efkcie cY ....i 988 ....... ......._ �... Overvolta aCate cryII OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING INVERTER) Maxi mumOutput Current 15 f Maxim u m Imum Outp t voltago 60 85 Vdc OUTPUT DURING STANDBY(POWER OPTIMIZER_DISCONNECTED FROM INVERTER OR INVERTER OFF) ® 5 fety Output Voltage per Power Optimizer i. 1 Vd STANDARD COMPLIANCE EMC FCC Part15 Class B,IEC61000-6-2,IEC61000 6-3 5fety I IEC621091(cla II safety), UL1741 5 R HS Yes INSTALLATION SPECIFICATIONS M xlmurrAllowed System Voltage 1000 Vd< P:: 2 es 141 212 40.5/555x834 159 I D (W L H) ._I 128 x 152 x 275/ I 128x152 35/ 1 128x 1s2 48/ Pz 5 es s 97 1 5 97 1 3 5 97 1 819, /n 5 08 I Sx x 7 Sx r ... P -2 sea 950/21 j f I W ght( cl ding hl ) Pxxx5se 770/17 I 930/205 I 930/205 gr In .F"ittyxe'`" In Put Coato .... ...I .... .. MC4 Compatible ... ..... ''� ; 't3`" <ha'2q^+ OutputW TVP /C n ect D bl Insulated A phen I .... .I _.. I ... .... .. Output WLength, 0.95/30 12/39 �}�,'k t ;p,' °rr.✓'x,=� "r 'zt` 5t�5� z�4"`'S V Operating Tmpe t Ragge I .... .0 +85/40 +18S.. C/•F... Px x2se lP65/NEMA4 g/Ib, a Protection Rating ._ krPf. i'�"-i�an 'uL, Pz 5 s .. Ip68,/NEMA6P... ..... .. gr/Ib.. R lanve Hum di[Y .. .. .... .0 100. . .. .... .. ., %..... PV SYSTEM DESIGN USING SINGLE PHASE THREE PHASE 208V THREE PHASE 480V -. .. A SOLAREDGE INVERTERu_I Minimum String Length l 8 10 18 (Power Optimizers). ....... .. .........................I....-... ..... ... .. ...... .. .. .., .. .. ... PV power optimization at the module-level Maximum String Length I 25 25 so Up to 25%more energy ,(Po Opnmlze ) .. ... Maxi um Powe p String 5250 6000 12750 _W.. ._...._. ..... .......... ... ....... ......... .... Superior efficiency(99.5%) Parallel Strings of Different Lengths Yes Mitigates all types of module mismatch losses,from manufacturing tolerance to partial shading oOrientations _.... .. .. ............ ......... ..__.._........ ... .......... L..... .._. rt ola�aamm,aoswmP3mrv3sorwoorvsmivroo-�e�..nne. — Flexible system design for maximum space utilization Fast installation with a single bolt Next generation maintenance with module-level monitoring — Module-level voltage shutdown for installer and firefighter safety - � ,�,"" '"� i t USA GERMANY ITALY FRANCE - JAPAN - CHINA - ISRAEL - AUSTRALIA www.solaredge.us Office of Consumer Affairs&Business Regulation License or registration valid for individul use only WE�� OVEMENT CONTRACTOR before the expiration date. 1f found return to:169698 Type: Office of Consumer Affairs and Business Regulation 7127/2015 LLC 10 Park Plaza-Suite 5170 Boston,MA 02116 THE BOSTON SOLAR COMPANY LLC 10 CHURCHILL PLACE LYNN,MA 01902 Undersecretary Not valid without signature Massachusetts -Department of Public Safety i Board of Building Regulations and Standards CUntiiruttion Sulscii i+ur License: CS-096385 ROMAIN D STRE T� 10 CHURCHILL P� LYNN MA 0190f v' Expiration Corrwnissioner 10/0812016 The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations ' I Congress Street,Suite 100 Boston,MA 02114-2017 www mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electficians/Plumbers Applicant Information Please Print Legibly Name(Business/Organization/Individual): The Boston Solar Company Address: 10 Churchill Place City/State/Zip:Lynn, MA 01902 Phone#:617-858-1645 Are you an employer? Check the appropriate box: Type of project(required): 1.0 I am a employer with 20 4. ❑ I am a general contractor and I employees(full and/or part-time).* have hired the sub-contractors 6. F]New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition working for me in any capacity. employees and have workers' [No workers' comp. insurance comp. insurance.x 9, E]Building addition required.] 5. ❑ We are a corporation and its 10.❑Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 13.E Other solar comp. insurance required.] *Any applicant that checks box 41 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. =Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. lam an employer that isproviding workers'compensation insurance for my employees Below is the policy and job site information. Insurance Company Name:HDI-Gerling America Insurance Company Policy#or Self-ins. Lic. #:EWGCC000153815 Expiration Date:1/14/2016 Job Site Address: 16 Harwood Street City/State/Zip:North Andover,MA 01845 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby cer7ify under t" ains and penalties of perjury that the information provided above is true and correct: Si ature: Dat e: 7/l/2015 Phone#: 6178581645 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4. Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: Client#:103109 BOSSO DATE(MMIDDIYYYY) ACORD. CERTIFICATE OF LIABILITY INSURANCE 1/13/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT:If the certificate holder Is an ADDITIONAL INSURED,the policy(les)must be endorsed.If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER NAME CT Peggy J.Merati People's United Ins.Agency CTac°NNt,860 524-7624 arc No): 844 702-8075 One Goodwin Square ADDRESS: peggy.merati@peoples.com Hartford,CT 06103 INSURER(S)AFFORDING COVERAGE NAIC# 860 524-7600 INSURER A:HDI-Gerling America Insurance C 41343 INSURED INSURER B:Merchants Mutual Insurance Co 23329 The Boston Solar Company,LLC INSURER C 55 Sixth Road,Suite 1 INSURERD: Woburn,MA 01801 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL UB POLICY EFF POLICY EXP TYPE OF INSURANCE LTR INS WVD POLICY NUMBER MMIDD/YYM (MMIDDIYYYYl LIMITS A GENERAL LIABILITY EGGCC000153814 0/03/2014 01/01/201 -EACH OCCURRENCE $110001000 X COMMERCIAL GENERAL LIABILITY PREMISES Ea ortence $100,000 CLAIMS-MADE F—R OCCUR MED EXP(Any one person) $ PERSONAL&ADV INJURY $1,000,000 GENERAL AGGREGATE $2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMPIOP AGG $2,000,000 POLICY 1 ^1 PRO-JECT LOC $ A AUTOMOBILE LIABILITY EAGCC000153814 10/03/2014 01/01/201 COMBINED n SINGLE LIMIT 1,000,000 A X ANY AUTO EAGCC000153914 10/03/2014 01J01/2016 BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS NON OWNED PROPERTY DAMAGE $ X HIRED AUTOSX AUTOS Per accident B X UMBRELLA LIAB X OCCUR CUP0001367 0/03/2014 01101/2011 EACH OCCURRENCE s5,000,000 EXCESS LIAR CLAIMS-MADE AGGREGATE $5,000,000 DED I X RETENTION$10.000 $ A WORKERS COMPENSATION EWGCC000153815 1/14/2015 01/141201 X WC STATU- ER OTH- AND EMPLOYERS'LIABILITY OFFICRF�EFTORMBER PAR EXCNERIE ECUTIVEF NIA E.L.EACH ACCIDENT $1,000,000 (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 I(yS,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(Attach ACORD 101,Additional Remarks Schedule,If more space Is required) RE:Permit Work Certificate Holder is included as Additional Insured per the terms,conditions and exclusions of the referenced general liability and umbrella policies,if required by written contract or agreement. CERTIFICATE HOLDER CANCELLATION Town of North Andover SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 1600 Osgood Street ACCORDANCE WITH THE POLICY PROVISIONS. North Andover,MA 01845 AUTHORIZED REPRESENTATIVE IDWAO oA*d QARAa ©1988-2010 ACORD CORPORATION.All rights reserved. ACORD 25(2010/05) 1 of 1 The ACORD name and logo are registered marks of ACORD #S565647/M565467 SMGCT 1 l DocuSign Envelope ID:07A62812-C476465F-822E-6713371 F45C18 Installers to verity rafter size,spacing and sloped spans,and notify E.O.R.of any discrepancies before proceeding. RIDGE 6 it SCOP MAX VERAGE — - — — — — — - — --- -- — --------- � COLLAR TIES I.I ROOF SUPPORTS WHERE APPLIES 114 LL SLOPE (NO BEARING WALL BELOW) 1/2 X II I�INTERIOR WALLS 1/4 1 I (LOCATION MAY VARY) TYP RAIL SEE® OVERALL SPAN RAFTERfrRUSS CHORD SEE PORTRAIT ROOF STRUCTURAL INFO FIRE SS SEEARCHDETAIL02 ROOF TYPE-COLLAR TIES DETAIL 1 STAGGERED ATTACHMENTS LAYOUT 4 STRUCTURAL INFORMATION SRC Job Id: 6575 Ceiling Type: 1/2 gyp.Bd. ROOF TR CRTU MRUEu�Rs Collar Tie Space: 32 �ZH OF 1,fgs Coverage%: 20 �tcP Sfc Frame Size: 2x6@16 S Ground Snow s 50 JAMES ADAMS Ger", Sloped Roof Snow Load(psf): 50 STRUCTURAL y Lag Screw Diameter(in): 5/16 No.49748 Lag Screw Embedment(In): 2.5 HORIZONTAL OISTANOE A9 9l� p\�C �Q Overall Span(ft): 30 BETWEEN STANDOFFS 4ERTICJ�L DLSTANCE 0.(• G/STE `ate STANDOFF-ARE BOLTED INTO ROOF BETWEEN STANDOFFS �SS/QNAL G PV Orientation: Portrait RAFTERSORSrRIKT IIAEMBER �•= u'�+L"�- PV (P �� Weight s 3 9 TYPICAL 2-RAIL SYSTEM Evplr. 12D15 Rafter Sloped Span(ft): 12.5 Digitally Signed by Roofing Type: 2-layers Asphalt Shingle RAIL STANDOFF James A.Adams,S.E. Roof Mean Height(ft): 15 PV MODULE RAIL ROOF SHTG. Date:2015.05.27 08:26:42-0700 Roof Slope(degrees): 17 ROOF SHTG. Roof Type: CollarTies RAFT- Sloped Gelling?: No / Standoff Max.Horz.Space(ft): 2.67 MAX AVERAGE_. Standoff Max.Vert.Space(ft): 2.75 SPC\NG HORIZ.SPACING Standoff Staggered?: Yes 2.75 Ft. 2.67 Ft. Wind Exposure: B Wind Speed(mph): 100 DETAIL Q3 FLUSHMOUNT This sheet not to be used without permission from SOLAR-ROOF-CHEC K.CO M SUf1rUf1. Sunn.m DESIGNER: SRC PROIECTNW ER MMECTNAMESADDRESS Fernando Herrera Residenc SHEET: DATE: 775 Flero Lane 16 Harwood St STRUCTURAL San Luis Obispo,CA 93401 DRAFTER: SRC 221 R-016HERR North Andover MA 01845 DETAILS S-� 05-27-2015 .i } s r SUAR-18OF-CHECKIM A 1hoRota5 1MoAD mysi7 146 Sara Jose Court,SM taus Obsipo.CA 934M 0 Ph:80-m 5'8665 r. Flt 8©5-'J44-086<i DATE: 05-27-2015/Rev B FOR: Sunrun JOB: Fernando Herrera Residenc 775 Fiero Lane Suite#200 16 Harwood St San Luis Obispo, CA 93401 North Andover, MA 01845 To Whom It May Concern This letter is to certify that we have performed a structural analysis of the existing roof members that are to support photovoltaic panels, as shown on the attached report.The calculations were performed in accordance with the latest editions of IBC, NDS, ASCE/SEI, CBC, and IRC, and the 8th edition 2009 Massachusetts building code. Our analysis was based on the following design criteria: Ground Snow(psf) 50 psf Sloped Snow(psf), reduced per ASCE, Sect. 7.4 50 psf Basic Wind Speed (mph): 100 mph ASCE Code: 7-05 The PV module orientation: Portrait The maximum horizontal roof mount spacing: 2.67 ft. The maximum vertical roof mount spacing: 2.75 ft. Staggered roof mounts required? Yes Based on this analysis,we can certify to the best of our knowledge; that the individual existing roof framing members that support the PV panels; along with strengthening of those roof members if indicated; and the individual roof members as described in the attached report; are adequate to support the design loads as required by the various codes. This includes Dead Loads (including the weight of the PV panels), Live Loads, Snow Loads, and Wind Loads, on the roof members that support the PV panels, combined as required in the codes. If you have any questions on this or need further clarification, please contact us at your convenience. Sincerely James A. Adams, S.E. OFA JAMES A. - ADMS ', o u STAUCTURAL G�ST� Expil r QSf O/2016 Digitally Signed by James A.Adams,S.E. Date:2015.09.24 20:27:10-0700 ty„ ROOF STRUCTURAL ASSESSMENT REPORT Date of Report: 05-27-2015/Rev B Job Name: Fernando Herrera Residenc Data Input by: Michael Paradis Job Number: 221 R-016HERR Contact E-mail: michael.paradis@sunrunhome.com Job Address: 16 Harwood St Contact Phone: 877-764-5019 North Andover, MA 01845 Prepared for Sunrun 775 Fiero Lane Suite#200 San Luis Obispo, CA 93401 Phone: 805-528-9705 Fax: ASCE Code: 7-05 Version: 2015-05-23 Background Calculations Platform created by James A.Adams, S.E. k 0 OUTPUT SUMMAR■ Date of Report: 05-27-2015/Rev B Job Name: Fernando Herrera Residenc Data Input by: Michael Paradis Job Number: 221 R-016HERR Contact E-mail: michael.paradis@sunrunhome.com Job Address: 16 Harwood St Contact Phone: 877-764-5019 North Andover, MA 01845 CALCULATIONS COMPUTANCY TEST RESULTS -Loading Combination#1: (% of Code Compliancy=518.8 %) PASS Wind Uplift on standoff-0.6 DL Solar -Loading Combination#2: (%of Code Compliancy=518.6 %) PASS DL Rf+ DL Solar+ Roof Live Load Loading Combination#3: (%of Code Compliancy=469.8 %) PASS DL Rf+ DL Solar+Wind Down Loading Combination#4: (% of Code Compliancy=111.6 %) PASS DL Rf+ DL Solar+ Snow Loading Combination#5: (%of Code Compliancy=168.5 %) PASS DL Rf+ DL Solar+ .75 Wind + .75 Snow: Loading Combination#6: (% Increase of Seismic Load=3.6 %) PASS Check Additional Seismic Load Loading Combination#7: %/o of Code Compliancy=811.7 PASS Wind Up-0.6(DL Rf+ DL Solar) This Report is based on Code required Engineering Calculations using the data which has been input by the User. This Report indicates the Code compliance or Code non-compliance of the Solar Panels proposed for the Selected Roof Type. Note: For ASCE 7-10, wind includes (0.6)factor, in loading combinations. a� Date of Report: 05-27-2015/Rev B Job Name: Fernando Herrera Residenc Data Input by: Michael Paradis Job Number: 221R-016HERR Contact E-mail: michael.paradis@sunrunhome.com Job Address: 16 Harwood St Contact Phone: 877-764-5019 North Andover, MA 01845 ABSTRACT Job Information This Report is based on Engineering calculations Data Input By: Michael Paradis using the input data supplied by the User, listed Job Number: 221 R-016HERR above. The User's input has not been Job Name: Fernando Herrera Residenc independently reviewed by a licensed Job Address: 16 Harwood St Professional Engineer for appropriateness or City, State: North Andover, MA 01845 accuracy. This Report indicates Compliance/Non- Compliance with the reference Codes listed below. Current Input Data The following items have been checked for Code Compliance: Payment Method Invoice Roof Type CollarTies - Load Combination#1: Ceiling Type 1/2 gyp. Bd. Wind Uplift on the Standoff attachment to Collar Tie Space 32 the Roof Framing members: Wind Uplift- Coverage % 20 0.6DL Solar Frame Size 2x6@16 Ground Snow(psf) 50 -Load Combination#2: Sloped Roof Snow Load (psf) 50 Supporting Rafter Strength with: DL Rf+ Lag Screw Diam. (in) 5/16 DL Solar+ Roof Live Load Lag Screw Embed. (in) 2.5 Overall Span (ft) 30 -Load Combination#3: PV Weight(psf) 3 Supporting Rafter Strength with: DL Rf+ PV Module Orientation Portrait DL Solar+Wind Down Rafter Span (ft) 12.5 Rail System 2Rail -Load Combination#4: Supporting Rafter Roof Mean Height(ft) 15 Strength with: DL Rf+ DL Solar+ Snow Roof Slope (degrees) 17 Roofing Type 2-layers Asphalt Shingles -Load Combination#5: Sloped Ceiling No Supporting Rafter Strength with: DL Rf+ Max. Horizontal Roof Mount(ft) 2.67 DL Solar+ .75Wind + .75Snow Max. Vertical Roof Mounts (ft) 2.75 Standoff Staggered Yes -Load Combination#6: Check Additional Wind Exposure B Seismic Load Wind Speed (mph) 100 -Load Combination#7: Supporting Rafter Strength with: Wind Up-0.6(DL Rf+ DL Solar) Reference Codes International Building Code (IBC latest edition) American Society of Civil Engineers (ASCE/SEI 7-05, 7-10)National Design Spec. for Wood Constr. (NDS latest edition)CBC and NJ Edition Note: For ASCE 7-10, wind includes (0.6)factor, in loading combinations.