Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Building Permit #620-13 - 16 MEADOW LANE 3/26/2013
TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO: t Date Received Date Issued: IMPORTANT: Applicant must complete all items on this page LOCATION l (S� �[//,Pc� ►� Print PROPERTY OWNER Print 100 Year Old Structure yesno MAP NO: PARCEL: ZONING DISTRICT: Historic District yes no Machine Shop Village yes no TYPE OF IMPROVEMENT PROPOSED USE Resid tial Non- Residential ❑ New Building ne family l ❑Aoition ❑Two or more family ❑ Industrial Iteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other 0 Septic ❑Well ❑ Floodplain ❑Wetlands ❑ Watershed District D Water/Sewer DESCRIPTION OF WORK TO BE PERFOR ED: SD o-- I el-5 2 Identification Please Type or Print Clearly) OWNER: Name: -k/.'►- , 6rs4 Phone: Address: /(o CONTRACTOR Name: ?6&6 D'4 f C A,t 5 6olk„ Phone: W t-6-7e!-(o to-t( Address: Supervisor's Construction License: �('3 �/ Exp. Date: Home Improvement License: /70 2 7 0 Exp. Date: ARCHITECT/ENGINEER Pe 4r-S,4, Phone: 7-3z 7 3D- (76.3 Address: nH � L T�� ��/� 67731 Reg. No. 3 FEE SCHEDULE:BOLDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ 3% zoo FEE: $ o Check No.: �� �S Receipt No. c�- ZZS NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund Signature of Agent/Ov Signature of contra Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ li TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ .. Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc, ❑ permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature Q COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes-. - Planning es - Planning Board Decision: Comments Conservation Decision: Comments I Water & Sewer Connection/Signature& Date Driveway Permit DPW Tow,- Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT - Temp Dumpster on site yes no Located at-124 Maim Street Fire Departiner t-signature/date ` x COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Motor location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— (For department use U Notified for pickup - Date Doe.Building Permit Revised 2010 I Building Department The foliawing is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits i ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan o Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report o Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the app:al period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submAted with the building application Doc: Doc.Bui?ding Permit Revised 2012 Location//,1 No. '1 J Date ?(� e • ,_ TOWN OF NORTH ANDOVER 0 o Certificate of Occupancy 4 Building/Frame Permit Fee $ C `7 Foundation Permit Fee $ el Other Permit Fee $ TOTAL $ Check#02!5,e!�/ TID 26225 Building Inspector ROOF REPAIR ROOF REPLACE SOLAR Now BuBding QSmarter R(D(Dfs 2010 Roofing Contractor of the Year agnostics Roof'Eiagnostcs ins;,�• 89F WashingtonAAve Net ckMA 01760:? Ph 5085450989 Fx 508-545 1141 '. joew@roofdr is rt +Cit9�ts. '' Cell: 401-5741-6684 Enter construction cost for fee cal- North Andover Fee Calculation Construction Cost $ 39,200.00 m $ - $ 470.40 Plumbing Fee $ 58.80 Gas Fee 100 comm. $ 100.00 Electrical Fee $ 58.80 Total fees collected $ 688.00 16 Meadow Lane 620-13 on 3/26/13 Install 40 PV Solar Panels on Roof Sunrun EXHIBITA SOLAR FACILITY ADDENDUM CONTRACT PII3ARN3KVNNA THIS SOLAR FACILITY ADDENDUM CONTRACT("Addendum")is made by and between Sunrun,Inc.("Sunrun")and Roof Diagnostics Inc("Contractor")for the design,engineering,procurement,installation,and construction of the Solar Facility described herein.This Addendum hereby incorporates, in total, the terms and conditions set forth in the Customer Origination Agreement("Contract"),and all schedules and exhibits thereto,executed by Sunrun and Roof Diagnostics Inc in March 10,2011.Capitalized terms contained herein have the meanings set forth in the Contract. SOLAR FACILITY TOTAL SOLAR CUSTOM Contract Price:$39,200.00 Host Customer:Kim Cesati Street Address:16 Meadow Ln,North Andover,MA,01845 Rebate Level:$0.20 per watt Utility:_National Grid TECHNICAL SPECIFICATIONS System Size Description Rating Standard Test Condition Direct Current(STC DC kVA 9.800 CEC Alternating Current(CEC AC kW) 8.559 Generation Equipment Photovoltaic collectors Manufacturer Model number STC DC rating Quantity Array 1 Trina Solar TSM-245PA05 245 W 40 Inverters Manufacturer Model number Efficiency Quantity Array 1 Power-One PVI-4.2-OUTD-S-US(240 V) 0.96 1 Total Number of Panels: 40 Total Number of Inverters: 2 09/27/2012 PI13ARN3KVNNA-H(Custom PPA Fixed) Page 1 of 2 sun rn EXHIBITA SOLAR FACILITY ADDENDUM CONTRACT SOLAR FACILITY DESIGN DIAGRAMS Attach the single-line diagram and aerial-view module layout for the Solar Facility to this document. ASSIGNMENT When transfer of the title to the Work occurs pursuant to the Contract,title to the Work shall be transferred to the Person("Assignee")designated in Exhibit A-1. MISCELLANEOUS Neither this Addendum,nor the Contract,creates any employment,agency,partnership,joint venture or other joint relationship between the Parties. Should a conflict arise between the terms of this Addendum and the terms of the Contract that cannot be reconciled,the terms of this Addendum shall govern; roP vided•however,agreement on a conflicting term in this Addendum shall not operate to modify the conflicting term in the Contract for future addenda executed between the Parties.This Addendum may be executed in counterparts,each of which will be deemed an original,but all of which taken together will constitute but one and the same instrument. SUNRUN,INC. ROOF DIAGNOSTICS INC Signature Alicia Egan Signature Sunrun Operations Name Name Title Title 10/5/2012 Date Date 09/27/2012 PI13ARN3KVNNA-H(Custom PPA Fixed) Page 2 of 2 sunrun Sunrun TotaL Solar `- - • � Solar Power Service Agreement Summary Kim Cesati 16 Meadow Ln, North Andover, MA, 01845 ESTIMATED SOLAR ENERGY OUTPUT TO BE DELIVERED YEAR 1: 10,638 kilowatt-hours(kWhs) INITIAL TERM: 202,167 kWhs ESTIMATED ANNUAL ENERGY SOURCES FROM UTILITY 20,000 kWhs 9,362 kWhs FROM SUNRUN 0 kWhs 10,638 kWhs Actual results may vary. This estimate assumes:1)your use of electricity remains constant,and 2)the Solar Facility produces as projected. CUSTOMER PAYMENT TERMS Non-refundable Deposit(due today) $500 Initial Payment(due at installation) $500 Monthly billt Year 1 $112.59(plus taxes, if applicable) Annual increase 1.5% Cost per kWh,Year 1 $0.127,excluding Upfront Payment(if any) Average cost per kWh,Initial Term $0.159, including Upfront Payment and annual increase(if any) t Monthly payments shown include a$5 discount for paying through ACH withdrawal from your checking or savings account.If you do not elect automatic payment through ACH withdrawal from your checking or savings account you will not receive this discount and each monthly payment will be$5 greater. Your initials indicate that you have read,understand and accept the explanation of estimated energy output,energy sources and payment terms.You understand that Sunrun has the right to check your credit and you agree that Sunrun will make final determination of customer eligibility. SPc THE SOLAR FACILITY IS OWNED BY SUNRUN INC.AND/OR ITS AFFILIATES. SUNRUN INC. 145 Fremont Street,32nd Floor,San Francisco,CA 94105 415-982-9000 09/27/2012 PII3ARN3KVNNA-H(Custom PPA Fixed) Page 1 of 17 Agreement Overview Sunrun Is Serious About Providing you Quality Service for the Life of your Contract. SOLAR PEACE OF MIND Sunrun offers a Performance Guarantee.If your system does not produce the power output guaranteed in this agreement,we'll refund you for lost power. If your system overperforms you keep the excess power free of charge. Sunrun's customer care team is available by phone and email to respond promptly to any questions or concerns you may have. When we arrange for installation of a system,Sunrun owns the panels,and we monitor them constantly.Sunrun will insure,maintain,and repair the Solar Facility at no additional cost to you including inverter replacement. Sunrun only works with insured partners who have all required licenses to perform the work necessary to install and maintain your system. AGREEMENT OVERVIEW Sunrun wants you to be confident in choosing us as your solar power service provider for the next 20 years.While its still necessary to read your entire Agreement,there are a few important points to be aware of: • After going solar you will continue to receive a bill from your Utility. Based on the information you provided Sunrun about your previous year's power consumption of 20,000 kWhs,your system is sized to offset 53%of.the power you currently purchase from your Utility. e This Agreement becomes effective when both you and Sunrun have signed the Agreement and continues in effect for 20 years following the date your Utility grants permission to operate the Solar Facility. a Your first year monthly payment amount is$112.59.This amount will increase by 1.5%annually for the term of the Agreement.This amount includes a $5 discount per month for automatic payment through ACH withdrawal from your checking or savings account. o Sunrun offers a 100%Performance Guarantee.If your system underperforms,Sunrun will refund you for lost power at the rates shown in Exhibit A.If your system overperforms,you keep the excess power at no extra charge. Q You are responsible for payments during the full term of this Agreement.If you sell your house,you have two options: 1)Transfer the Agreement to the new homeowner,2)Purchase the system.You may prepay the remainder of the payments due under the Agreement to make the transfer even more attractive to the new homeowner. Whichever option you choose,Sunrun will guide you through the process. o Your request for a pricing plan change must be submitted within 21 days of signing this Agreement, but before installation has begun.If installation begins within 21 days of signing this Agreement,the start of installation will mark the date after which you can no longer change your pricing plan. o You may only purchase the Solar System at certain specific times during the term of this Agreement.Those times are listed in section 10. e Your options at the end of this Agreement's 20 year Initial Term are: 1)At your request,Sunrun will remove the Solar Facility at no cost to you,2)Purchase the Solar Facility at its then fair market value,3)Renew the agreement per the terms specified in Exhibit A. SPC Your initials indicate that you have read,understand and accept the information listed above. 09/27/2012 P113ARN3KVNNA-H(Custom PPA Fixed) Page 2 of 17 SUNRUN SOLAR POWER SERVICE AGREEMENT THIS DOCUMENT DESCRIBES THE TERMS AND CONDITIONS OF YOUR RECEIPT OF AND PAYMENT FOR ELECTRIC ENERGY TO BE SUPPLIED BY A SOLAR PHOTOVOLTAIC SYSTEM THAT WILL BE INSTALLED AT YOUR PROPERTY AND OWNED AND MAINTAINED BY SUNRUN INC. 1.Introduction (a)You are entering into this Sunrun Solar Power Service Agreement("Agreement)with Sunrun Inc.,together with its successors and Assignees, ("Sunrun').You represent that you are at least eighteen(18)years of age,that you are the owner of the property located at 16 Meadow Ln,North Andover, Massachusetts,01845("Property'),and that your current utility is National Grid,You further represent that every person or entity with an ownership interest in the Property has agreed to be bound by this Agreement. Accepted by(Initials): —— SPC (b)Sunrun is a Delaware Corporation.You may contact Sunrun by mall at 45 Fremont Street,32nd Floor,San Francisco,CA 94105,by telephone at(415) 982-9000,or over the Internet at www.sunrunhome.com,Sunrun will arrange for the design,permitting,construction,installation,testing,and activation of a solar photovoltaic system("So/arracility')to be located on the roof of your house and/or grounds of the Property. (c)You agree to allow Sunrun to install and maintain the Solar Facility on the grounds and/or roof of the Property at a specific location to be approved by Sunrun.You further agree to purchase all electric energy generated by the Solar Facility at the price specified in this Agreement. 2.Solar Facility (a)Sunrun will arrange for the design,permitting,construction,installation and testing of the Solar Facility on the roof or grounds,as applicable,of the Property in material accordance with a system design that you will have approved.Thereafter,Sunrun will operate and maintain the Solar Facility so as to generate electric energy for use at the Property. Sunrun will perform these obligations("Sunrun s Obligations')during the Initial Term of this Agreement. During any Renewal Terms Sunrun will perform Sunrun's Obligations for as long as the Solar Facility remains economically viable. (b)You acknowledge and agree that: (i)The Solar Facility will be removable equipment and will not be a fixture or otherwise part of the Property. (ii)Sunrun will own the Solar Facility and you will have no ownership interest in the Solar Facility. (iii)The Solar Facility will not be subject to any lien,security interest,claim,mortgage or deed of trust that may be imposed on or assessed against your interest in the Property,or any other property belonging to you.You will have no right to sell,give away,transfer,pledge,remove,relocate,alter or tamper with the Solar Facility at any time.As such,Sunrun will not apply a lien to your title for the Property. (iv)The Solar Facility will be used primarily for household purposes but not to heat a swimming pool. (c)Sunrun will be responsible for all costs and expenses related to performing Sunrun's Obligations.You agree that Sunrun has the authority and discretion to use contractors or agents to perform or assist Sunrun in performing Sunrun's Obligations. (d)Sunrun estimates that the Solar Facility will be capable of generating 10,638 kilowatt-hours("Initial Year One Production Estimate")of electric energy during its first year of operation,but due to several reasons,including natural variation in weather,actual production will vary.Due to expected panel degradation,Sunrun estimates that the Solar Facility will be capable of generating 19.0042 times this amount of kilowatt-hours("kWh")during the Initial Term("Estimated Output').As set forth in Section 8,Sunrun will issue a refund to you if your system does not perform as expected.Sunrun makes no other representation,warranty or guarantee of any kind regarding the Solar Facility's actual or expected output or performance. (e)You agree that Sunrun,at its own expense,will install,maintain,and periodically test a meter at the Property that will measure all electric energy delivered to you from the Solar Facility.If the meter breaks or is found to be Inaccurate,Sunrun will adjust the bill as applicable in the next billing cycle by applying a credit for any overcharges or applying an additional charge for any under-charges.You agree not to tamper with,damage or modify the meter In any way.You will be responsible for any damage or inaccuracies In the meter that are caused by you or any other person unrelated to Sunrun who may come onto the Property with your knowledge or permission. 3.Desien and Installation (a)The design for the Solar Facility will be presented to you prior to Installation.You will have five(5)business days following this presentation to request a change or cancel this Agreement pursuant to Section 12(e).Otherwise,you will be deemed to have approved the Solar Facility design.With your written, deemed,or verbal approval,Solar Facility installation may begin at any time. (b)If you wish to change the design or installation process,Sunrun will use commercially reasonable efforts to accommodate your request. (c)If an obligation excluded from this Agreement In Section 20 must be performed in order to properly effect the installation of the Solar Facility,you agree to contract separately,and at your own expense,with a contractor who has been designated by or approved by Sunrun to perform such obligation. In this instance,Sunrun will not unreasonably withhold such approval. (d)You agree to cooperate with Sunrun and assist Sunrun in obtaining any permits needed,including the NEM Service application in Section 5(a).You agree to complete and return to Sunrun and/or its representatives,as appropriate,all applicable rebate documentation and,where applicable,Renewable Energy Credit documentation,upon request and following the In-Service Date.If you do not return the rebate or Renewable Energy Credit documentation, 09/27/2012 P113ARN3KVNNA-H(Custom PPA Fixed) Page 3 of 17 Sunrun may Invoice you for the Final Rebate amount(as defined in Section 4(a)(10)), (e)For the Initial Term and any Renewal Terms you agree to maintain the Property,at your expense,such that the Solar Facility retains shading conditions present at the time of installation, (f)Sunrun requires its contractors to employ licensed personnel whenever required by applicable law,regulation or code. (g)Sunrun,its contractors and agents shall at the end of each business day keep the Property reasonably free from waste materials or rubbish caused by their operations.Prior to the in-Service Date,Sunrun and Its agents shall remove all of their tools,construction/installation equipment machinery,waste materials and rubbish from and around the Property. (h)Subject to the exclusions set forth In Section 20,Sunrun will return your Property to a condition similar to Its original condition,provided that you notify Sunrun in writing or by e-mail of any deficiencies in restoration within five(5)business days of the municipal building inspector approval of the Solar Facility. 4.Changes to the Apr m n (a)Prior to installation,the following conditions may change the expected costs and benefits of the Solar Facility to both you and Sunrun: (1)Change to the design of your Solar Facility. (ii)Change in the system's annual energy production estimate,expressed In kWh,provided by the National Renewable Energy Laboratory PVWatts Ca lculator(I PVWatts cakulatoe')("Final Year One Production Estimate+'). (iii)Change in the final rebate amount associated with installing the Solar Facility("Final RebatLn. (iv)The availability of cellular service at the Property. if any of these conditions occur,Sunrun may choose to modify the terms of this Agreement or cancel the Agreement If Sunrun chooses to modify the terms,Sunrun will notify you in writing and you will have five(5)business days to accept the modified terms or cancel this Agreement pursuant to Section 12(e).If you do not respond to Sunrun within five(5)business days,Sunrun may deem you to have cancelled the Agreement (b)You may choose to accept changes under this Section 4 In writing or by electronic mail.If a change pursuant to this Section 4 increases the Upfront Payment after you have already paid it to Sunrun,you agree to immediately pay Sunrun the increase in the Upfront Payment Sunrun may suspend installation until this payment is received. (c)If for a period of one hundred eighty(180)days Sunrun falls to perform its obligations required to commence installation of the Solar Facility and you have fulfilled all of your obligations under this Agreement,you may cancel this Agreement,in which case Sunrun will refund to you the Upfront Payment set forth in Exhibit A,provided that your Property was accessible and in a state fully ready to permitthe installation of the Solar Facility,Likewise,If you cause the installation of the Solar Facility to be delayed in excess of one hundred eighty(180)days.Sunrun may cancel this Agreement. (d)Your request for a pricing plan change must be submitted within 21 days of signing the Agreement but before installation has begun.Once Installation has begun,you can no longer change your pricing plan,If installation begins within 21 days of signing the Agreement,the start of installation will mark the date after which you can no longer change your pricing plan. 5.Purchase and Sale of Electricity (a)As of the In-Service Date,you must be taking service from the Standard Net Metering Service("IVEMServlce')from your local utility("W1110.You agree that you will continue to take NEM Service for as long as this Agreement is in effect,You agree to use the NEM Service currently in effect for this Utility or, In the event that the NEM Service Is no longer in effect,you agree to use a substitute metering program as chosen by Sunrun.You agree to execute all documentation associated with NEM Service,or any substitute metering service,and any refund,credit,or rebate program promptly at the request of Sunrun,its affiliates,and/or the Utility. (b)Sunrun agrees to sell to you,and you agree to purchase from Sunrun,all electric energy produced by the Solar Facility.All electric energy produced by the Solar Facility will be made available to you for use at the Property. (c)If at any time you need more electric energy than is being produced by the Solar Facility("Supplemental Energy'),you will be solely responsible for purchasing that electric energy from another supplier,such as your Utility.During the term of this Agreement you should expect to purchase Supplemental Energy from your Utility.Depending on the terms of your NEM Services,the Utility will bill you either annually or monthly,Sunrun will not be in default of this Agreement and will not be responsible for any Supplemental Energy you purchase to complement the electric energy produced by the Solar Facility. (d)You agree that for all electric energy you purchase from Sunrun under this Agreement you will pay Sunrun the prices set forth in Exhibit A. (e)The price specified in subpart(d)above does not include taxes.If any taxes are assessed on the sale of electric energy,the Property,or on your purchase of the Solar Facility from Sunrun under this Agreement,and such taxes are paid by Sunrun rather than you,you agree to pay or reimburse Sunrun for all such taxes,except to the extent that you are prohibited from doing so by applicable laws. (0 You agree that title to and risk of loss for the electric energy purchased under this Agreement shall pass from Sunrun to you at the time when the 09/27/2012 PII3ARN3KVNNA-H(Custom PPA Fixed) Page 4 of 17 electric energy reaches the point of interconnection,i.e.,at the point where the Solar Facility connects to the Property's connection to your utility. (g)You agree that Sunrun alone will receive any credit rebate,environmental attribute,or other payment or offset that may be attributable to the Solar Facility and all Incentives will be sole property of and transferable by Sunrun. Notwithstanding the foregoing,if you purchase the Solar Facility from Sunrun,you will own,and be entitled to proceeds from the sales of,solar renewable energy credit and renewable energy credit earned after the date you purchase the solar facility from Sunrun. 6.6011ingand Payment (a)For each billing cycle(generally every thirty(30)days during the period that the Agreement Is In effect),Sunrun will prepare a written or electronic invoice and charge your account for the Monthly Payment as set forth in Exhibit A. (b)Sunrun will mall or a-mall you an Invoice no later than ten(10)days after the end of each billing cycle.You agree to pay the amount specified In each invoice by the due dale specified in such invoice(which shall be no earlier than twenty(20)days after the date of the invoice).If Sunrun does not receive your payment by the due date on the invoice,Sunrun may charge you the lesser of an administrative late fee of(I)one and a half(1.5%)percent per month on the portion of your balance that is more than thirty(30)days past due,or(ii)the maximum amount permitted under and subject to applicable law.This late fee is not an interest charge,finance charge,time price differential or other such charge or payment of a similar nature. (c)Monthly payments shown include a$5 discount for paying through Automated Clearing House(ACH)withdrawal.if you do not elect automatic payment through ACH withdrawal from your checking or savings account you will not receive this discount and each monthly payment will be$5 greater. (d)You may pay Sunrun with a check drawn on a United States bank account mailed to Sunrun's main office or you may agree to authorize Sunrun to deduct the invoice amount directly from your bank account each month. 7.PreRayments for Electric Enerev (a)At any time,you may prepay all of the expected amounts you will owe Sunrun during the remaining portion of the Initial Term("Prepayment')by contacting Sunrun. (b)The Prepayment shall equal the remaining monthly payments for the current year,plus the discounted value of each successive year's expected annual payment.Future years expected payments will be calculated by multiplying the Estimated Output for thatyear by the price per kWh rate as set forth in Exhiblt A.The future years payments will be discounted at the lesser of(x)the prime rate(as published by the Wall Street Journal)plus 100 basis points or (y)5.0%. (c)If you make a Prepayment,Sunrun will continue to guarantee the output of your Solar Facility and will issue refunds as described In Section B. (d)If you decide to make a Prepayment,the Solar Facility will remain at your Property and Sunrun will maintain it for the remainder of the Initial Term. B.Guaranteed Output and Refunds (a)Sunrun guarantees that the Solar Facility will generate one-hundred percent(100%)of the Estimated Output during the Initial Term of this Agreement (the"Guaranteed Output)or Sunrun will Issue you a refund as described below.For the purposes of this Agreement,"Actual Output,shall mean the amount of electric energy created by the Solar Facility to date plus any kWh for which you have previously received a refund. (b)If you purchase the Solar Facility from Sunrun pursuant to Section 10,and at the time of purchase the Actual Output is less than the Guaranteed Output,Sunrun will apply a credit towards the purchase price for the Solar Facility.This credit vrill be calculated by subtracting the Actual Output from the Guaranteed Output and then multiplying the result by the refund per kWh set forth on Exhibit A for the anniversary date that precedes the date of purchase. (c)On the second anniversary of the in-Service Date and on every anniversary thereafter,Sunrun will issue you a credit If the Actual Output is less than the Guaranteed Output for that anniversary date set forth on Exhibit A.This credit will be calculated by subtracting the Actual Output for that anniversary date from the Guaranteed Output for that anniversary date,and multiplying the result by the refund per kWh for that anniversary date set forth in Exhibit A. (d)If Actual Output is greater than Guaranteed Output per Exhibit A,you will not be charged any additional amount for this overproduction.Sunrun may use this overproduction amount(kWhs)to offset future underproduction should Actual Output be less than Guaranteed Output. (e)For the purposes of the prior calculations,Actual Output shall include any kWh of electricity that would have likely been produced during any day that a grid failure disabled the Solar Facility or any day that you caused or requested the system to be shut down or to generate significantly less electric energy. For the avoidance of doubt,Guaranteed Output will be reduced if Sunrun notifies you that a tree or other obstruction Is reducing electric energy production and you do not remedy,or cause to be remedied,such reduced energy production. 9.Substitute Payments (a)You agree that if,through no fault of Sunrun,you cause or request the Solar Facility to be shut down,or if you cause an event that significantly reduces the production of electric energy by the Solar Facility,you will pay Sunrun a fee during each month that the Solar Facility is shut down or experiencing reduced production("Substitute Payments').However,Sunrun will not charge you Substitute Payments for the first seven(7)days during the Initial Term that the Solar Facility has been shut down or is experiencing reduced output. 09/27/2012 PIi3ARN3KVNNA-H(Custom PPA Fixed) Page 5 of 17 (b)For each billing cycle during the first year that this Agreement is in effect the Substitute Payment will equal(i)the current price per kWh established in Exhibit A,multiplied by(ii)the estimated daily generation implied in Section 2(d),as well as the number of days for which Substitute Payments are due, minus(iii)any payment due for any kWh that are produced by the Solar Facility during the current billing cycle.Substitute Payments shall be In addition to other payments otherwise due under this Agreement. (c)For each billing cycle after the first year that this Agreement Is in effect the Substitute Payment will equal(1)the current price per kWh established in Exhibit A,multiplied by(il)the kWh produced by the Solar Facility during the corresponding billing cycle in the previous year,minus(iii)any payment due for any kWh that are produced by the Solar Facility during the current billing cycle.Substitute Payments shall be in addition to other payments otherwise due under this Agreement (d)You will not be charged Substitute Payments for times when a grid failure results in the Solar Facility being deactivated. 10.Options to Purchase (a)You have the option to purchase the Solar Facility at the following times during the Initial Term: (i)upon the fifth anniversary of the In-Service Date (ii)At the end of the Initial Term of this Agreement (iii)Should you sell your Property during the Initial Term (iv)Should Sunrun fail to perform Sunrun's Obligations(In accordance with Section 18) (b)To purchase the Solar Facility pursuant to Section 10(a),you must deliver a written notice to Sunrun of your intent to purchase within sixty(60)days of. the applicable date and deliver payment to Sunrun within thirty(30)days of receiving an invoice from Sunrun for the purchase price. (c)The purchase price will be the greater of(i)fair market value,as determined at the time("FMV")and(ii)the minimum price set forth in Exhibit A. Annually,Sunrun will determine FMV by hiring an independent appraiser to estimate the value of a nameplate kilowatt in your state of an in-service solar facility. Should the option to purchase be exercised,Sunrun will apply the value per kilowatt to the nameplate kilowatt size of your system to determine the FNIV of your Solar Facility. (d)Sunrun will credit the purchase price by any refund due to you pursuant to Section 8(b),provided however,that in no case shall such a credit result In a net purchase price that is less than the minimum purchase price set forth on Exhibit A. (e)At other times,please contact Sunrun at(415)982-9000 to discuss the possibility of purchasing the Solar Facility. (f)If you purchase the Solar Facility,Sunrun will continue to monitor the Solar Facility for as long as the meter continues to function,or until the twentieth anniversary of this Agreement,whichever is sooner.However,Sunrun will not provide any maintenance or repair unless you enter Into a separate agreement with Sunrun,at your expense,to perform these services.If possible,Sunrun will assign to you any product and/or workmanship warranties still In effect for the Solar Facility, 11.Sale of Prgne y and Assignment (a)if you sell the Propertyyou may assign this Agreement to the new owner,provided that the new owner meets Sunrun's reasonable credit requirements and first agrees In writing to be bound by all of the terms and conditions set forth herein.Please contact Sunrun or visit www.sunrunhome.com to obtain an assignment agreement. (b)During the Initial Term,within sixty(60)days of entering into a contract to sell the Property you will have the option to purchase the Solar Facility in accordance with Section 10. (c)If you sell or otherwise transfer your interest in the Property without either purchasing the Solar Facility or assigning this Agreement to the new owner In accordance with the terms of this Agreement,or if the new owner refuses to take asslgnment,then you will be deemed to have terminated this Agreement. (d)Sunrun may assign,(ease,sublease,or transfer the Solar Facility and this Agreement along with all rights and obligations hereunder to any third party (each,an"Assignee"),without first giving notice to you or obtaining your consent for any purpose,Including,without limitation,collection of unpaid amounts,financing of the Solar Facility s installation,or in the event of an acquisition,corporate reorganization,merger or sale of substantially all of its assets to another entity.If Sunrun or its Assignee chooses to transfer the Solar Facility or this Agreement to another party,you agree to treat this other party as your counterparty under this Agreement.Otherwise,the terms of this Agreement will not change if this Agreement or the Solar Facility is assigned,leased,or transferred by Sunrun or its Assignee,and the Assignee will not be able to interfere with your rights to the Solar Facility as long as you are fulfilling your obligations under this Agreement,if Sunrun transfers the Solar Facility or this Agreement to an Assignee,Sunrun will continue to operate and maintain the Solar Facility until you receive written notice otherwise. 12.Term and Termination (a)You agree that this Agreement will become effective when both you and Sunrun have signed the Agreement. 09/27/2012 PI13ARN3KVNNA•H(Custom PPA Fixed) Page 6 of 17 (b)This Agreement will continue in effect for twenty(20)years following the date Sunrun receives notice from the Utility that the Solar Facility is approved for operation("In-Service Date").This period shall be called the"Initial Term." (c)At the end of the Initial Term,this Agreement will be automatically renewed for an additional one-year term("Renewal Terrrl'),unless either you or Sunrun gives the other party to this Agreement a termination notice at least thirty(30)days prior to the expiration of the Initial Term.At the end of any Renewal Term,this Agreement shall be automatically renewed for an additional Renewal Term,unless either you or Sunrun gives the other party to this Agreement a termination notice at least thirty(30)days prior to the expiration of the Renewal Term then in effect. (d)If,at the end of the term of this Agreement,you do not wish to renew it,Sunrun will remove the Solar Facility at no cost to you.Sunrun agrees to.leave your Property in the same general condition that existed immediately prior to removal of the Solar Facility. (e)If you cancel this Agreement pursuant to Section 3,you will not be refunded your Deposit,and you will not owe Sunrun any further payments.If Sunrun modifies your Agreement pursuant to any of the factors listed in Section 4(a)such that there is a decrease in the annual energy production estimate,or if the payment terms increase,or if it is determined that you must pay for any site improvements to accommodate a solar system,then you may cancel this Agreement and your Deposit will be refunded. (f)Sunrun will make a good faith effort to notify you between 30 and 60 days before the end of the Initial Term to(i)remind you of your end of term options and(ii)advise you of the rate for electric energy in the first Renewal Term. 13.Access.Maintenance and Repair (a)You agree to grant Sunrun or its contractors access to your Property for the purpose of designing,installing,operating,maintaining and testing the Solar Facility and performing Sunrun's Obligations.Sunrun agrees to give you reasonable notice when Sunrun needs to access your Property for any of the foregoing purposes and will endeavor to restrict such access to normal business hours. (b)When possible you agree to allow Sunrun and construction professionals(an engineer,architect,or licensed contractor or their representative)hired by Sunrun to access your Property to inspect any buildings and,if applicable,roofs prior to the installation of the Solar Facility to ensure that your Property can accommodate the Solar Facility. (c)If parts fail during the term of this Agreement,Sunrun will use commercially reasonable efforts to replace them with like equipment;however,you acknowledge that due to parts availability and other factors,this may not be possible.Sunrun agrees that any change in equipment will not reduce the Guaranteed Output set forth in Section 8. (d)If you plan to move or temporarily disconnect the Solar Facility to allow for maintenance of and/or repair to the Property,you agree,at your expense, either(i)to hire Sunrun to perform this work or(ii)to obtain Sunrun's approval of your contractor,who you agree must carry commercial general liability policy in an amount not less than one million($1,000,000)dollars per occurrence and name Sunrun,and its successor or assigns,as additional insured. Sunrun will'only be responsible for any damage to the roof of the Property that may result from performance of Sunrun's Obligations. (e)You agree to make reasonable best efforts to provide a safe and secure work environment at your Property during the course of the Solar Facility installation and maintenance. 14.Insurance (a)Sunrun agrees to carry insurance that covers all damage to and theft of Sunrun's Solar Facility.You will not be responsible for insuring the Solar Facility. Sunrun agrees to provide you evidence of Sunrun's insurance policy for the Solar Facility upon request.If Sunrun does not maintain insurance that covers damage to Sunrun's Solar Facility,it will be responsible for the consequences of not maintaining such insurance. (b)You agree to carry insurance that covers all damage to your Property during the term of this Agreement,including damage resulting from the Solar Facility,provided such damage was not caused by the gross negligence of Sunrun.It is your responsibility to determine if the installation of the Solar Facility will impact your existing coverage.If additional insurance is required to maintain your existing coverage,you will be responsible for either(i) procuring and maintaining such insurance or(ii)the consequences of not procuring and maintaining such insurance. (c)Sunrun requires its contractors performing the Solar Facility installation to maintain insurance coverage as follows:workers compensation,subject to statutory limits;Employers liability,with a minimum of one million(41,000,000)dollars each occurrence;commercial general liability,in an amount not less than one million($1,000,000)dollars per occurrence and two million(82,000,000)dollars annual aggregate;commercial automobile liability,in an amount not less than a combined bodily Injury and property damage limit of one million(81,000,000)dollars per accident;excess liability insurance with a limit of one million($1,000,000)dollars per occurrence and in the annual aggregate in excess of the limits of insurance provided above;and any other insurance required by applicable laws or regulations. Your initials indicate that you have read,and understand and accept the limitations and obligations set forth in this Section 14. Accepted by(Initials): _SP _�..—___._ 15.limitations of Liability 09/27/2012 PII3ARN3KVNNA-H(Custom PPA Fixed) Page 7 of 17 (a)5UNRUN WILL BE LIABLE TO YOU AND ANY OTHER PERSON FOR DAMAGES OR L055ES DIRECTLY ATTRIBUTABLE TO ITS NEGLIGENCE OR WILLFUL MISCONDUCT,TOTAL LIABILITY FOR SUCH DIRECT DAMAGES OR LOSSES WILL IN NO EVENT EXCEED ONE MILLION DOLLARS.THIS WILL BE YOUR SOLE AND EXCLUSIVE REMEDY AND ALL OTHER REMEDIES OR DAMAGES AT LAW OR EQUITY ARE WANED,EVEN IF YOU HAVE GREATER RIGHTS UNDER MASSACHUSETTS'S LAWS,WHICH YOU SHOULD CONSULT.SUNRUN IS NOT RESPONSIBLE FOR ANY CONSEQUENTIAL,INCIDENTAL,PUNITIVE,EXEMPLARY OR INDIRECT DAMAGES,LOST PROFITS OR LOSSES RELATING TO THIS AGREEMENT,IN TORT OR CONTRACT,INCLUDING ANY NEGLIGENCE OR OTHERWISE. (b)EXCEPT AS EXPRESSLY PROVIDED HEREIN,5UNRUN MAKES NO WARRANTY OR REPRESENTATION,EITHER EXPRESS OR IMPLIED,REGARDING ITS OBLIGATIONS OR THE SOLAR FACILITY.THERE 15 NO WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE,AND ANY AND ALL IMPLIED WARRANTIES ARE DISCLAIMED, 16.Resolutiony of Disputes (a)You agree that to expedite the resolution of and to control the costs of disputes,resolution of any dispute relating to this Agreement("Disputer),will be resolved according to the procedure set forth In this Seaton 16. (b)Unless otherwise agreed in writing,Sunrun and you agree to continue to perform each partys respective obligations under this Agreement during the course of the resolution of the Dispute. (c)You and Sunrun agree to first try to resolve informally and in good faith any Dispute.Accordingly,you agree to send a written notice of Dispute to the address on the first page of this Agreement,and Sunrun will send a written notice of Dispute to your billing address.If you and Sunrun do not reach an informal agreement to resolve the Dispute within 45 days after the notice of Dispute is received,you or Sunrun may commence a formal proceeding as detailed below.All applicable statutes of limitation and defenses based upon the passage of time shall be tolled for the 45 days during which the parties try to Informally resolve any Dispute. (d)If Sunrun and you cannot resolve the Dispute Informally,the Dispute will be resolved by binding arbitration.This agreement to arbitrate Disputes is governed by the Federal Arbitration Act("FAA").The arbitration will be conducted under the rules of JAMS that are in effect at the time the arbltration is initiated("JWSRules")and under the rules set forth in this Agreement.If there is a conflict between the JAMS Rules and this Agreement,this Agreement will govern. (e)CLASS ACTION WAIVER.ARBITRATION MEANS THAT YOU WANE YOUR RIGHT TO A JURY TRIAL,AND ARBITRATION MUST BE ON AN INDIVIDUAL BASIS. AS A RESULT,NEITHER YOU NOR 5UNRUN MAYJOIN OR CONSOLIDATE CLAIMS IN ARBITRATION BY OR AGAINST OTHER CUSTOMERS,OR LITIGATE IN COURT OR ARBITRATE ANY CLAIMS AS A REPRESENTATIVE OR MEMBER OF A CLASS OR IN A PRIVATE ATTORNEY GENERAL CAPACITY. (f)You may,In arbitration,seek all remedies available to you under this Agreement as interpreted under California law.If you decide to initiate arbitration against Sunrun,you will be required to paythe costs for initiating the arbitration proceedings.If Sunrun decides to initiate arbitration,Sunrun will be required to pay the costs associated with Initiating the arbitration proceeding.Sunrun also agrees to pay the costs of initiating the arbitration proceeding if the arbitrator rinds in your favor.Other fees,such as attorneys'fees and expenses of travel to the arbitration,will be paid In accordance with JAMS Rules. The arbitration hearing will take place in the federal judicial district of the Northern District of California,unless you and Sunrun agree to another location in writing.In order to initiate arbitration proceedings,you or Sunrun must take the following actions: (i)Write a demand for arbitration.The demand must include a description of the Dispute and the amount of damages you are seeking,The form of Demand for Arbitration can be found under ADR Forms at www.jamsadr.com. (Ii)Send three copies of the demand for arbitration to the current JAMSlocatlon In San Francisco,California. (III)Send one copy of the demand for arbitration to the other party. (g)In accordance with the FAA and the JAMS Rules,the arbitrator's decision will be final and binding,Any right to appeal Is likewise governed by the FAA and JAMS Rules.Any arbitration award may be enforced in any court with jurisdiction. (h)You and Sunrun agree to receive service of process of the arbitration demand by registered or certified mail,return receipt requested,at your billing address and Sunrun's principal executive office,as applicable. 17.Force Maleure (a)Neither you nor Sunrun will be in default of this Agreement for any delay or fal lure in the performance under this Agreement(including any obligation to deliver or accept the electric energy output of the Solar Facility)if the delay or failure is due to Force Majeure.Force Majeure Includes acts of God such as storms,fires,floods,lightning and earthquakes,sabotage or destruction by a third party of the Solar Facilities,war,riot,acts of a public enemy or other civil disturbance,or a strike,walkout,lockout or other significant labor dispute.Force Majeure does not include economic hardship of either you or Sunrun,a power grid failure(except if caused directly by a Force Majeure event),a failure or delay in the granting of permits,or Insufficiency, unavailability,failure,or diminishment of solar resources,except as a result of an event that would otherwise qualify as a Force Majeure. (b)Force Majeure cannot be attributable to fault or negligence on the part of the party claiming Force Majeure and must be caused by things beyond that party's reasonable control.Additionally,you or Sunrun must have taken all reasonable technical and commercial precautions to prevent the event. (c)In order to claim Force Majeure as a reason for non-performance,you or Sunrun must give notice to the other party of the Force Majeure within fourteen(14)days of the occurrence of the Force Majeure and estimate how long it will last and what the potential impact is on the Agreement,The party 09/27/2012 P113ARN3KVNNA-H(Custom PPA Fixed) Page 8 of 17 claiming Force Majeure must(1)make reasonable attempts to continue to perform under the Agreement,(ii)quickly take action to correct the problem caused by the Force Majeure,and(iii)make reasonable efforts to limit damage to the other party.Finally,the party claiming Force Majeure must notify the other party when the Force Majeure event ends and performance will resume as contemplated In this Agreement. (d)if you or Sunrun Is prevented from performing under this Agreement for a period of either(i)three hundred sixty-five(365)consecutive days or more, or(ii)seven hundred thirty(730)non-consecutive days or more(whether full or partial days),the other party may terminate this Agreement,without liability of either party to the other,upon thirty(30)days written notice at any time during the Force Majeure. 1 B.Your Remedies (a)If(i)Sunrun makes a general assignment for the benefit of creditors,files a petition in bankruptcy,appoints a trustee or receiver,or has all or substantially all of its assets subject to attachment,execution or other judicial seizure,or(ii)Sunrun fails to perform an obligation under the Agreement and such failure continues beyond a period of ninety(90)days(provided,in each case,this Agreement Is otherwise in full force and effect prior to such event),you will have the option to purchase the Solar Facility. 19.Sunrun's Remedies (a)If you terminate this Agreement under Section 11(c),you will be required within thirty(30)days either(i)to pay Sunrun a termination payment equal to the Pre-payment of all future estimated energy to be produced during the Initial Term("Make Whole''),as calculated in Section 7(b)or(ii)to purchase the Solar Facility pursuant to Section 10(b). (b)If you fail to perform a material obligation under the Agreement,and you do not correct the failure within one hundred twenty(120)days,if such failure continues beyond a period of one hundred twenty(120)days,then Sunrun can require you to pay Sunrun a Make Whole payment. (c)If you make a general assignment for the benefit of creditors,file a petition in bankruptcy,appoint a trustee or receiver,or have all or substantially all of your assets subject to attachment,execution or other judicial seizure,or you become insolvent or unable to pay your debts,or vacate or abandon the Property,then Sunrun can require you to pay Sunrun a Make Whale payment. (d)If you(i)are required to make a Make Whole payment and do not make the payment,(ii)terminate this Agreement without also purchasing the Solar Facility,or(iii)do not make any other payment or payments as contemplated and required under this Agreement,Sunrun shall,subject to any cure rights provided herein,have the right to disconnect your Solar Facility and/or enter your Property and remove the Solar Facility. (e)If as a result of your default Sunrun removes the Solar Facility,then in addition to the Make Whole payment,you will be obligated to pay Sunrun an amount equal to the value of any federal,state and local incentives that Sunrun must return as a result of such removal. 20.Fxchidnnc (a)This Agreement does not Include an obligation by Sunrun to:remove or dispose of any hazardous substances that currently exist on the Property; Improve the construction of the roof or the Property to support the Solar Facility;remove or replace existing rot,rust,or insect infested structures;provide structural framing for any part of the Property;pay for or correct construction errors,omissions and deficiencies by you or your contractors;pay for, remove or remediate mold,fungus,mildew,or organic pathogens;upgrade your existing electrical service;install any smoke detectors,sprinklers or life safety equipment required by municipal code or inspectors as a result of the Solar Facility installation;pay for the removal or re-location of equipment, obstacles or vegetation in the vicinity of the Solar Facility;pay for any costs associated with municipal design or architectural review,or other specialty permits(this includes cost to attend any public hearings,notification of neighbors,or additional drawings required);paint electrical boxes or conduit at the Property;and move items unassociated with the Solar Facility around the Property, 21.Miscellaneous (a)You agree that this Agreement constitutes the entire agreement between you and Sunrun.If any provision is declared to be invalid,that provision will be deleted or modified,and the rest of the Agreement will remain enforceable.The terms of this Agreement that expressly or by thelr nature survive termination shall continue thereafter until fully performed,which shall include,without limitation,the obligation to make payments hereunder, (b)This Agreement shall be interpreted in accordance with and governed by the laws of the State of New York,without regard to the conflict of laws principles thereof. (c)You agree that Sunrun has the rightto periodically check your consumer credit report. (d)You agree that 5unrun has the right to use graphical representations or photography of the Solar Facility and the Property in its marketing and promotional materials. (e)This Agreement supersedes any prior understandings,agreements,or representations by or between the parties,written or oral,to the extent they related in any way to the subject matter hereof. (f)Any notice or other communication to be made hereunder,even if otherwise required to be in writing under other provisions of this Consent or any other documents or agreements that have been provided to you in connection with this Consent,may alternatively be made in an electronic record transmitted electronically to the electronic addresses provided byyou.Any notice or other communication made in electronic form will have the same legal effect and enforceability as if made in non-electronic form. 09/27/2012 P113ARN3KVNNA-H(Custom PPA Fixed) Page 9 of 17 (g)This Agreement Is binding upon,and Inures to the benefit of,the parties and their respective heirs,executors,administrators,legal representatives, successors and assigns. 22.NOTICE OF RIGHT TO CANCEL YOU MAY CANCEL THIS TRANSACTION AT ANY TIME PRIOR TO MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE DATE OF THIS TRANSACTION AND ANY OEPOSIT PAID WILL BE REFUNDED. [Remainder of Page Intentionally Left Blank] 09/27/2012 PII3ARN3KVNNA-H(Custom PPA Fixed) Page 10 of 17 SUNRUN INC. CUSTOMER Date: _ 10/5/241 Date: Signature: a�Wf- �, Primary Account Holder Alicia Egan Print Name: Sunrun Operations Signature; SSQ *tel P CAI%eA amuol P Cationta(Oct 2,2017.) Title: Print Name; Samuel P--Galiento-- Account email address*: *This email address ivill be used by Sunrun for oNrct al correspondence,such as sending monthly bills or other invoices.5unrun will neper share or sell your email address to any third partles. SALES CONSULTANT By signing below Iacknowledgethat IamSunrun accredited that Account phone number: I presented this agreement according to"The Right Stuff"and the Sunrun Code of Conduct and that I obtained the homeowner's signature on this agreement. Secondary Account Holder(WOW Signature:L—/"41 (s Kimberly Cesal(Oct 3 2012) Name: Rick Bingham [Print Name] Print Name: Kimberly CeSati Signature; Sunrun ID#.- 7270162341 [10-digit numberyou received from Sunrun] 09/27/2012 PII3ARN3KVNNA-H(Custom PAA Fixed) Page 11 of 17 EXHIBIT A:SUNRUN ELECTRICITY PRICING At the signing of this Agreement,you will pay Sunrun a non-refundable Deposit("Deposit')of$500.At the start of installation of the Solar Facility,you will pay Sunrun an Initial Payment("Initial Payment')of$500.Together,these payments comprise the Upfront Payment("Upfront Payment'). Electricity Payments:In addition to the Upfront Payment,you agree that for all electric energy you purchase From Sunrun during the Initial Term of this Agreement,you will pay a price per kWh in the form of monthly payments("Monthly Payments")as shown below.The Monthly Payments shall increase by 1.5%on each anniversary of the In-service Date during the Initial Term of this Agreement. Performance Guarantee Prepay Option Purchase Option End of Yearly Price Monthly Guaranteed kWh Refund/kWh If Guaranteed Estimated Price to Prepay Balance of Minimum Cash Year Per kWh Payment Output to Date Output Not Met Initial Term* Purchase Price - N/A N/A NIA N/A $20,346 N/A 1 $0.127 $112.59 N/A WA $19,859 N/A 2 $0.130 $114.27 21,174 $0.135 $19,332 $35,208 3 $0.132 $115.99 31,681 $0.138 $18,762 $29,346 4 $0.135 $117.73 42,136 $0.140 $18,146 $23,436 5 $0.138 $119.49 52,537 $0.143 $17,484 $17,484 6 $0.140 $121.29 62,884 $0.146 $16,771 $16,771 7 $0.143 $123.11 73,179 $0.149 $16,007 $16,007 8 $0.146 $124.95 83,420 $0.152 $15,188 $15,188 9 $0.149 $126.83 93,6D8 $0.155 $14,311 $14,311 10 $0.152 $128.73 1D3,743 $0.159 $13,375 $13,375 11 $0.155 $130.66 113,825 $0.162 $12,375 $12,375 12 $0.158 $132.62 123,854 $0,165 $11,310 $11,310 13 $0,161 $134.61 133,829 $0.169 $10,175 $10,175 14 $0.164 $136.63 143,751 $0.172 $6,968 $8,968 15 $0.168 $138.68 153,620 $0.176 $7,685 $7,685 16 $0.171 $140.76 163,436 $0.179 $6,322 $6,322 17 $0.175 $142.87 173,199 $0.183 $4,877 $4,877 18 $0.178 $145.01 182,908 $0.187 $3,344 $3,344 19 $0.182 $147.19 192,564 $0.191 $1,720 $1,720 20 $0.185 $149.40 202,167 $0.194 $0 $0 Pursuant to Section 7,you may prepay the balance of your estimated obligatlons under this Agreement.Any prepayments you make to Sunrun will increase the refunds for which you are eligible. After the Initial Term,Sunrun shall on each anniversary of the In-Service Date establish a new price per kWh that Is equal to ten percent(10%)less than the baseline rate for electric energy,as established by your utility or its successor,at the Property for a customer.If there is no baseline rate,the lowest rate for peak energy charged to a customer at the Property by your Utility,or its successor,shall apply. Notwithstanding the foregoing,in no event shall this price per kWh be less than$0.010 per kWh. Pursuant to Section 10,if you purchase the Solar Facility before the Guaranteed Output has been achieved,Sunrun will issue you a refund.The estimates In this column assume the Solar Facility achieves Its Estimated Output and that you make the final Initial Payment upon the first anniversary. 09/27/2012 PII3ARN3KVNNA-H(Custom PPA Fixed) Page 12 of 17 EXHIBIT B [Intentionally left blank] 09/27/2012 P113ARN3KVNNA-H(Custom PPA Fixed) Page 13 of 17 EXHIBif C [Intentfonally left blank] 09/27/2012 PII3ARN3KVNNA-H{Custom PPA Fixed) Page 14 of 17 ATTACHMENT E:LAND OWNER'S CONSENT PREMISES:16 Meadow Ln,North Andover,MA 01845 HOST CUSTOMER OWNER:Kim Cesati,a N/A corporation. FOR VALUABLE CONSIDERATION,the undersigned(the"Owner"),being the owner of the above-described premises(the"Premised,hereby agrees as follows: 1. Owner agrees to interpose no objections to the entry by the Massachusetts Clean Energy Technology Center('MassCEC),its successors,designees, and assigns,upon said Premises for the purpose of conducting an audit on the solar energy production system located therein,provided that said entry is made during normal business hours with prior written notice to Owner. 2. Owner acknowledges that there are currently no uncured defaults related to the Premises that operate or could reasonably operate to prevent Owner from fully possessing and using the Premises. The Owner agrees to give MassCEC a copy of any notice of default given to the Owner and of any notice terminating the rights of the Owner thereunder.All notices to MassCEC under this Consent shall be made in writing and delivered to MassCEC at the following address: Massachusetts Clean Energy Technology Center 55 Summer St,9th Floor Boston,MA 02110 (617)-315-9355(phone) Attn:Roberto Ramirez,Chief Financial Officer(rramirez@MassCEC.com) With a copy of all legal notices to Eric Macaux;Deputy General Counsel.(emacauxRMassCEC.coml 3. Execution of this Consent constitutes a representation by the signatory hereto that such person is authorized to execute the Consent on behalf of Owner.This Consent shall inure to the benefit of the MassCEC,its successors and assigns,and shall be binding upon Owner,its heirs,assigns, representatives,and successors and shall take effect as a sealed instrument. 4. This Consent and all actions arising out of or in connection herewith shall be governed by and construed in accordance with the laws of The Commonwealth of Massachusetts,without regard to the conflicts of law provisions thereof,or of any other state.This Consent may not be amended or modified except by a written agreement duly executed by the Owner and MassCEC. SIGNED on behalf of the successors and assigns of the undersigned this day of 20_ Kim Cesati Samuel P Calientn(ON 2 2012) Name: Title: 09/27/2012 P113ARN3KVNNA-H(Custom PPA Fixed) Page 15 of 17 NOTICE OF CANCELLATION DATE: (Enter date of transactlon) YOU MAY CANCEL THIS TRANSACTION,WITHOUT ANY PENALTY OR OBLIGATION,WITHIN THREE BUSINESS DAYS FROM THE ABOVE DATE. IF YOU CANCEL,ANY PROPERTY TRADED IN,ANY PAYMENT MADE BYYOU UNDER THE CONTRACT OR SALE,AND ANY NEGOTIABLE INSTRUMENT EXECUTED BY YOU WILL BE RETURNED WITHIN 10 BUSINESS DAYS FOLLOWING RECEIPT BY THE SELLER OF YOUR CANCELLATION NOTICE AND ANY SECURITY INTEREST ARISING OUT OF THE TRANSACTION WILL BE CANCELLED. IF YOU CANCEL YOU MUST MAKE AVAILABLE TO THE SELLER ATYOUR RESIDENCE,IN SUBSTANTIALLY AS GOOD CONDITION AS WHEN RECEIVED,ANY GOODS DELIVERED TO YOU UNDER THIS CONTRACT OR SALE;OR YOU MAY,IF YOU WISH,COMPLY WITH THE INSTRUCTIONS OF THE SELLER REGARDING THE RETURN SHIPMENT OF THE GOODS AT THE SELLER'S EXPENSE AND RISK. IF YOU DO MAKE THE GOODS AVAILABLE TO THE SELLER AND THE SELLER DOES NOT PICK THEM UP WITHIN 20 DAYS OF THE DATE OF YOUR NOTICE OF CANCELLATION,YOU MAY RETAIN OR DISPOSE OF THE GOODS WITHOUT ANY FURTHER OBLIGATION. IF YOU FAIL TO MAKE THE GOODS AVAILABLE TO THE SELLER,OR IF YOU AGREE TO RETURN THE GOODS TO THE SELLER AND FAIL TO DO 50,THEN YOU REMAIN LIABLE FOR PERFORMANCE OF ALL OBLIGATIONS UNDER THE CONTRACT. TO CANCELTHIS TRANSACTION,MAIL OR DELIVER A SIGNED AND DATED COPY OF THIS CANCELLATION NOTICE OR ANY OTHER WRITTEN NOTICE,OR SEND A TELEGRAM TO SUNRUN,INC.,45 FREMONT STREET,32ND FLOOR,SAN FRANCISCO,CA 94105 NOT LATERTHAN MIDNIGHT OF (DATE) I HEREBY CANCEL THIS TRANSACTION. DATE: CUSTOMER SIGNATURE: NOTICE OF CANCELLATION MAY BE SENT TO SUNRUN AT THE ADDRESS NOTED ON THE FIRST PAGE OF THIS CONTRACT. 09/27/2012 PII3ARN3KVNNA•H(Custom PPA Fixed) Page 16 of 17 EXHIBIT E:SUN RUN DEPOSIT FORM If you are paying your deposit by check,please enclose this document with your payment and include your Sunrun Proposal ID reference in the memo line of your check. Name: Kim Cesati Address: 16 Meadow Ln,North Andover,MA 01845 ProposalID: P113ARN3KVNNA DepositAmount $500 Please send payments to: Sunrun Inc. P.O.Box 511612 Los Angeles,CA 90051-8167 Thank you for choosing Sunrun! 09/27/2012 P113ARN3KVNNA-H(Custom PPA Fixed) Page 17 of 17 Roof Mounted PV Arra —8.330 kW DC TOTALS:Modules 34 Trina 245w PV System Specifications Trina Solar Panels: Inverter 1—pone 60000 NEC 690.53 Maximum power at STC:245 3 Strings of 8—VDC 301.6 Rated Operating Current:34.72A MPP voltage:29.8 Inverter 2—pone 3.0 Rated Operating Voltage:240 V MPP current:8.23 To Utility p Max.System Voltage:453.6 Open circuit voltage:37.0 National Grid 1 Strings of 10—VDC 377 Rated Short-Circuit current:35 A Short circuit current:8.67 Exterior Interior Vmp:30.1 Polarity of Grounded Conductor:Negative Module efficiency: 15.2 Im 7.8 A Maximums stem voltage:600 V 4#8 THHN Pp� Max Voltage:300V y g 2 Hot/1 Neutral lequip Utility (String of 10)VOC:452.4 Maximum series fuse rating:20 A Power tolerance:0—+3% ground Meter In 3/4"PVC 3#6 THHN 2 Hot/1 Neutral+1 3#8 THHN #6 equip ground Nema 3R 1 hot 1 neutral combiner Box 1 equip ground in 4#8 THHN In I"PVC 4 strings fused '�PVC DC Disconnect 2 Hob 1 Neutral n15A 40 amp 600V 1 equip ground 3KW-HR located on In'/. PVC Centron GPRS 1 Inverter Smartmeter Supply Side 125A Commection DC Inverter � 50 A fused 24 trim 245 disconnect Pone 6000 AC W modules disconnect 3 Strings of YAC 125A main 8 ------- ----- -I lug I - 1 x 30A --- ------- -_ _ `---_-J 1X20A breaker 10 trim 245 Inverter I Exterior W modules DC Pone 3.0 I Disconnect —— 1 String ofl0 disconnect I I ZAC I I Existing I I Main I Building distribution — I Grounding panel Electrode Main:100 A —————DC grounding electrode conductor=#6 THHN—— ------------------------------------------ 5# -------- ------J 5#8 THHN 1 hot 1 neutral 1 equip ground in%PVC NEC 690.7— Based on-12'F.the correction factor is 1.20 x 37.2 VOC x 12=453.6VOC<600 VOC max NEC 690.8 Continuous=125% Ambient Temp=83+40=123°F factor of.76 Drawing: RD-SK-211 Series Ise=8.31Ax 125%=10.4A/.76=13.7 Roof Diagnostics, Inc Name: Kim Cesati Using#8 THHN(194°F) Address: 16 Meadow Ln All work to comply with NEC2011. One Line Diagram All equipment is UL listed for use. 1 11 North Andover MA�1845 Conduit for DC will be PVC outside and Metal inside wherever necessary. Solar Installation Phone: 978 361 6720 Ambient record low:-12 degrees F. Ambient record low high:83 degrees F 25'-2" ELL LLLL LLL LLL LLLI LLLLLI LLL LLLLL ll` LL LL �1, L-LLLLL—LU LLLLL LLLLL LLLLL LLLLL .lI LN III LL'L'L L ��.1" LL LL LLL LLL -LLLLL.LLLLL LLLLL i.`:�. , O LlL LLl Ill -- LLLLLLL tILLL` LLLLL LLLLL LLLLL P .LLLLL.LLLLLI LLLLLI LLLLIL LLLLL LLL -_ _ - � � LLLLL LLLLL LLLLL LLLLL �� t. LLLLL LLLL LLLLL LLLLL H1 - --EL:LLL LLLLL L LLLLL LLLLL L LLLLLj LLL Lll.`LI LLIIL LLLLL LLLLL-LLLLLLLL 'ILL, I-LILLLLLLLL LLII L LLL LLLLL L -LLL L L L LLLLL LLLL LL LLLLL LLLLL Pictoonetry LLL LLLLL LLLLL LLLLL �N N\ I` Aft-ft±L-ftt ELL - LLLLLL LLL LLLLL LLLLL LLLLL S L ` .LLL LLILI Lllll LLLLL LLLLL I . P r adv+,`an ♦. �! s .,tl�+r,+� LI ;" . INVERTER: I TNA 245 • ✓✓✓_-�� """ "'` PONE 0000 3'-3" 30 PANELS 1 j 3 STRING OF a ROOF DIAGNOSTICS ean..154.iBDaprae o INVERTER: 2 SOLAR r AND ELECTRIC, LLC TRINA 245 In SITE MAP PONE 3.0 BY,:nC _' C 10 PANELS KIM CE5,4TI RevieioN f STRING OF TSM-295A05 I6 MEADOW LN PANELS-295w NORTH ANDOVER MA 01885 rY DATE:24,OCTOBER, 2012 OWG NO.: 2.211 Tom Petersen Architects Planners Mr.Gerald Brown,Inspector of Buildings October 25,2012 Town of North Andover Building Department 1600 Osgood.Street North Andover,MA 01810 Re: Solar Panel Installation Cesati Residence 16 Meadow Lane North Andover,MA 01810 Hi Gerald, I've reviewed the proposed solar panel installation at this location to evaluate the existing roof structure and the connection of the panels to the roof. Criteria: Applicable codes: 8"'Edition Residential Code(2009 International Residential Code with Massachusetts Amendments) 2001 Wood Frame Construction Manual Design roof load: 40 psf live load, 15 psf dead load, 55 psf total load Design wind load: 110 mph, 35 psf My findings are as follows. 1. The new solar panels will imply an additional dead load of 3 psf. The existing roof structure (2x8 rafters @ 16"o.c.,with 2x6 ridge,+/- 18'-0" span)is overspanned and not sufficient to bear this additional load. In order to supplement the existing structure we will sister new 2x8 rafters alongside every other existing rafter on the roof plane receiving solar panels. 2. The solar panels are attached to the roof with the SolarMount-1 rack system by UNIRAC. The rack system,roof connections and connection spacing are rated for 11.0 mph. This project requires the larger Solar Mount 1-2.5 beam(2.5"high)and spacing of flange foot connection to roof at 48"o.c. maximum. Flange footing connections to the rail are not required to be staggered. The flange foot connections to the roof are 3/8"diameter x 4" long lag bolts. I therefore certify that this installation complies with the applicable codes and design loads mentioned above and is acceptable for approval. Please let me know if you have any questions on this information. Thanks! RED AR Sinc rel c YYours, g ti i OU, •► a No.31621 z 9 HOWELL 3 Tom Peterseny 0 NJ � 4�TH OF MASS Cc: Kelcy Pegler,Roof Diagnostics 6 Country Lane•Howell,New Jersey 07731•Telephone 732-730-1763,Fax 732-730-1783 The Commonwealth of Massachusetts i Department of Industrial Accidents Office of Investigations -' 600 Washington Street Boston,MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Roof Diagnostics Solar of MA LLC Address: 89 F Washington Ave City/State/Zip: Natick,MA 01760 Phone#: 508-545-0989 Are you an employer?Check the appropriate bog: Type of project(required): 1.[D am a employer with 3,0 4. ❑ I am a general contractor and I employees(full and/or part-time).* have hired the sub-contractors 6. ❑New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition working for me in any capacity, employees and have workers' 9. ❑ Building addition [No workers' comp. insurance comp. insurance. required.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 13.E14ther �e�k✓- comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. *Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:The Hamilton Group/Continental Indem.Co. Policy#or Self-ins. Lic.#: 468185310103 Expiration Date: 10/5/13 Job Site Address: � i�f�l psv (� City/State/Zip:N .AGl'&,-" Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under he ains and penalties of perjury that the information provided above is true and correct. Si aip (e: Date: Phone#:508-545-0989 Official use only. Do not write in this area,to be completed by city or town officiaL City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector 6.Other Contact Person: Phone#: DATE(MM/DD/YYYY) ® A�o CERTIFICATE OF LIABILITY INSURANCE 9,27,2012 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: The Hamilton Group, LLC PHONE FAX 3 Wing Drive A/c No Ext:973-292-2292 A/C,No:973-292-2443 Cedar Knolls NJ 07927 ADDRESS: PRODUCER CUSTOMER ID#:ROOFD-3 INSURER(S)AFFORDING COVERAGE NAIC# INSURED INSURER A:Selective Way InS I Roof Diagnostics Solar of INSURER B:Slective Ins Co of the S. East Mass LLC 89F Washington Avenue INSURER C:Continental Indemnity Com an Natick MA 01760 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:1470020863 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ILTR TYPE OF INSURANCE R WVD POLICY NUMBER ADDLISLIBRI MMI�D/YYriY POLICY LIMITS A GENERAL LIABILITY 52000721-00 10/3/2012 10/3/2013 1,000,000 EACH OCCURRENCE $ X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED 100,000 PREMISES Ea occurrence $ CLAIMS-MADE aOCCUR MED EXP(Any One person) $10,000 PERSONAL&ADV INJURY $1,000,000 GENERAL AGGREGATE $3,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $3,000,000 POLICY PRO LOC $ jECT B AUTOMOBILE LIABILITY A9093006 10/25/2012 10/3/2013 COMBINED SINGLE LIMIT $1,000,000 (Ea accident) X ANY AUTO BODILY INJURY(Per person) $ ALL OWNED AUTOS BODILY INJURY(Par accident) $ SCHEDULED AUTOS PROPERTY DAMAGE $ HIRED AUTOS (Per accident) NON-OWNED AUTOS $ A X UMBRELLA LIAB X OCCUR S2000721-00 10/3/2012 10/3/2013 EACH OCCURRENCE $1,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $1,000,000 DEDUCTIBLE $ RETENTION $ $ C WORKERS COMPENSATION 468165310103 10/5/2012 10/5/2013 WC STATU. OTH- AND EMPLOYERS'LIABILITY Y/N TORYLIMITS ER ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBER EXCLUDED? ❑ N/A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(Attach ACORD 101,Additional Remarks Schedule,if more space is required) This certificate does not afford coverage for additional insureds. The certificate is only evidence of insurance coverage for the named insured. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Commonwealth of Massachusetts PO Box 7010 Boston IIP. 02204 AUTHORIZED REPRESENTATIVE ©1988-2009 ACORD CORPORATION. All rights reserved. ACORD 25(2009109) The ACORD name and logo are registered marks of ACORD Board of Buildim, Rr,ulations and Standards Construction Supervisor License License: CS 93115 JOSEfi M WYLDCHIRICO ` 39 DRAPER WAY ATTLEBORO, MA 02703 Expiration: 5/14/2013 ( nntni.�ivarr Tr#: 10770 U�fe Poamvnom�oeal�a�',.1�.aaaac/raaelto �. UVI Office ofConsumer Affairs&Business RegulationOME IMPROVEMENT CONTRACTOR Registration:.170279 Type Expiration: 10/5/2013 Supplement ` ROOF DIAGNOSTICS SOLAR OF MASS,LLC. I JOSEPH WYLD-CHIRICQ.: 89 WASHINGTON AVE. NATICK,MA 01760 Undersecretary I I 1 S{T Ot,aMIN,YI 1 1L 1 w w.w.- I 7 j This card acwww%dges that the rer�pent has s messfutty compTeteo a 30-hour Occupational Safety and Health Training Course in Corstruction Safety and Health l JOSE=PH WYLD-CHIRICO Michael Millsap 4/22/2011 L(Trainer mune-pant or type) (Course end date) TSM - PC05 r.` The Universal Solution OModule can bear snow loads up to 5400Pa and wind loads up to 2400Pa T` Guaranteed power output(0—+3%) IF; i a High performance under low light conditions (Cloudy days,mornings and evenings) Independently certified by international certification bodies" Currently Trina Solar's most popular panel.Versatile and adaptable,with power output ranging from ISO Manufactured according to International 220 to 240wp,theTSM-PC05 is perfectfor large- Quality and Environment Management System scale installations,particularly ground-mounted and (ISO9001,ISO14001) commercial rooftop systems,Using reliable and carefully selected components that are tested at theTrina Solar Center of Excellence,this panel comes with a 25-year performance guarantee of 80%power production. Trina Solar, the best $!GcWh value under the sun Trina Solar Limited Founded in 1997,Trina Solar is a vertically integrated PV manufacturer,producing everything No.2Trina Road,Trina PV from ingots to modules,using both mono and multicrystalline technologies.At the end of Industrial Park,New District, 2011,the company had a nameplate module capacity of 1.7GV+LTr1na Solar's wide range Changzhou,Jiangsu,213031, China of products are used in residential,commercial,industrial and public utility applications throughout the world. T +9651985482008 Only by matching an efficient cost-structure with proven performance will we,as an industry, F +86 519 6517 6021 achieve grid parity.And at Trina Sola,we have both. E sales@trinasolaccom Hmsolar The power behind the panel IE-C61215,teC61730,ut1703,Tw safety Class 6,CE Y TSM-PC05 The Universal Solution 941 mm 9ECK ° 3oF..U.HrAC NNCT4IN 6. •r:r:ra.-r � xvrumt sy 9.1i C, INSTFLLINGFnI' s 1°�- - E o� E Oo 0^ o.R 2c" 30." 40." 0 2{7,3WJA LING NRF 3 Voltage(V) Efficiency up to 14.7% E Wattage J = up to 240W I c Years warranty 25 38�m 492mm 5'51 1 BackVieW A-A AN �-p f PV`v6LE t. Peak Power Watts-P,,,,,,(WP) 220 225 230 235 240 Power Output Tolerance-P„,,(%) 0/+3 0/+3 0/+3 0/+3 0/+3 Maximum Power Voltage-V,"(V) 29.0 29.4 29.8 30.1 30.4 Maximum Power Current-I,,;F,(A) 7.60 7.66 7.72 7.81 7.89 Open Circuit Voltage V,(V) 36.8 36.9 37.0 37.1 37.2 Short Circuit Current-Ix lA) 8.15 8.20 8.26 8.31 8.37 Module Efficiency n,.,(%) 13A 13.7 14.1 14.4 14.7 Values at Standard Test Conditions STC(Air Mas AM1.5,Irradiance 1000'1%/rn,Cell Temperature 25°C) Solar cells Multicrystalline 156 x 156mm(6 inches) Nominal Operating Cell 47°C(±2°C) Cells orientation 60 cells(6x10) Temperature(NOCT) Module dimension 1650 x 992 x 46mm(64.95 x 39.05 x 1.81 inches) Temperature Coefficient of P,,;Fr 0.45%/°C Weight 19.5kg(43.01b) Temperature Coefficient ofVcc 0.35%/`C Glass Hlgh transperancy solar glass 3.2mm(0.13 inches) Temperature Coefficient of Ix 0.05%/`C Frame Anodized aluminium alloy J-Box IP 65 rated Cables/Connector Photovoltaic Technology cable 4.0mmZ(0.006inches�, I 1000mm(39Ainche5),MtC4 I Operational Temperature -40-+8S'C 5 years workmartsh=p warranty Maximum System Voltage 1000VDC 10 years warranty,90%power output Max Series Fuse Rating 14A 25 years warranty,80%power output o't Modules per box 20 pcs u, Modules per 40"container 520 pcs w1 t2 a" CAUTION:FEAD 5AFETY AM11JS.AUjT1i1!�114STFAK WWS BEF.F..E 91147 EFR XXXT. T k""`--'SOlar 0 J--i 2,11176-Saar L,naed All rlghur.m .j Snx'i a:',rvn;rdu4M'r..hN Auasireet a,,;,;hj-.m dung,v;.:hru;i- Vvv4vv.t 1111a so I a r.com ® AURORA Photovoltaic Inverter WChanging the Shape of Power 't 0 4� General Specifications Outdoor Models PVI-5000-OUTD-US PVI.6000-OUTD-US s High-Efficiency, 5kW to bkW Inverters Installer friendly Aurora°grid-tie transformerless inverters offer a unique combination of •Reverse-polarity protection minimizes potential damage caused by ultra-high efficiencies,Installer-friendly designs, long service fife,and miswiring during installation. competitive initial acquisition costs;significantly increasing return on •Front-panel mounted LCD display provides real-time updates for all investment in solar-power installations. critical operating parameters. •RS-485 and USB communications interfaces. Industry-Leading Features and Performance •Integrated DC switch available in compliance with NEC Standard, •High efficiencies deliver more energy—up to 97°x6(96,5 CEC). Article 690"Solar Photovoltaic System"(USA) •Two inputs with independent MPPTs, optimize power from multiple •Anti-islanding protection arrays oriented in different directions. Compact size and high power density:600OW max o1 output power in MW Oji •, a box just 38 5/8"x 1213/16 x 711116' PVI-5000-DUFD 5kW Unmatched Applications Flexibility PVI-6000-OUTD QW •Full-rated power available up to 50'C ambient temperature. r f •Dual input sections with parallel option,with Independent high-speed Aurora Communicator software simplifies monitoring via PC. MPPTs,optimize energy harvesting from multiple arrays oriented in Aurora Easy Control datalogger is available for remote control 1 different directions. via Internet,modem or GSM •Wide MPPT operating range:90 to 58OVDC - — -r Field-Proven Reliability •IP65(NEMA 4)rated enclosure withstands the harshest environmental condit'ons. •Front-mounted heat sink resists contamination,enhancing cooling and increasing reliability and long-term efficiency. •Grid-connected operation according to international standards, UL17411IEEE1547 8 CSA-C22.2 N.107.1-01 •Ten-year warranty,optionally extendable to fifteen and twenty years. AU RO RA W(hanging the Shape of Power Photovoltaic Inverter High Efficiencies Across a Broad _ 10096 97 Range of Operating Conditions PVI-5000 and PVl•6000inverters provide 20812401277 / 96,8 Vac selectable outputs,at up to 97%efficiency(CEG m© 96,5 96.5).The graph to the right demonstrates the high t 75% 96.2 efficiencies, across a continuous range of input voltages and load conditions,for the PVt-6000. i 95.9 The graphs below depict the industry-leading 95,6 performance of all models at three discrete 50% v 953 MPPT-voltage reference points, and a continuous ? m« 95 range of load conditions. 5 IL o F__7 94,7 30% 94,4 94.1 93.8 -20% 93.5 !1.93.2 92.9 95 92.6 4 10% 250 300 345 400 480 DC Voltage(V) 100 -------•-------------_ .......... -----•- ....... ....................... 95 ; 'u 85 .... ..... ---------------------------- ..- 80 - -- 70 0 6.1 6.2 0,3 0;4 0,5 0,6 0,7 0,8 0,9 1 %of Rated Output Power ® AURORA ANA SWA011e Photovoltaic Inverter Changing the Shape of Poway INPUT PARAMETERS IDC Side) Nontina DC Power 6.3 R—5.1156.18 otaJ Max.Recommended DC Power(kW) (.-_— 5.3 6.4.4 ti MDPT npul Voltage R ] 90 to rK(:60 nomino fult Power MPPT Ran -` 140.530 7 _ 170-530 Max.I Volta 600 t)on Volta - - 200 nominal(adustabie Within 120.350 —�f 'NO 011nde tMPPTTrackers — _ 2 - l Max.InM Power Each MPPT W �4 4 I No.Of DC In 2(1 each MPPT) 2(1 each MPPT) Max.DC Current Each MPPT A I82( 2 short circuit) 18 22 short circu' ermal Protected DC Side Varistor 4 2 Far each MPPTj DC Switch Int ted(Rating:600Vdc/25A1 4(2 POSITIVE,2 NEGATIVE) DC Connections SCREW TERMINAL BLOCK 3 KNOCK-OUTS:Gt&I or G I'(using ring reduction) OUTPUT PARAMETERS(AC Side CONDUCTOR CROSS SECTION.,MAX AWG4 Nominal AC Power IK - - -5000 - 6000 Max.AC Power c _ 5000 6000 _— AC Grid Connection single phase%split phase Nominal AC Voltage Range Default:240V V!it.phatiogal:208 or 277 single phase settin m uirod) Maxhmum AC Volta _Rangg M 187.2.224.6 i 216-259.2;249.3-299.2_ Nominal AC Freauency[HIzi60 'Max.AC Line Current(A1 .-24;P-A18 130 sfhart circuit} 29.25;21. .(30 short cira,it) — AC Side Varistor 2(Uve-Neutral/Live-PE SCREW TERMINAL BLOCK AC Connection 3 KNOCK-OUTS:G1&112'or G1'(using ring reduction) CONDUCTOR CROSS SECTION: AWG4/8 Line Power Factor AC Current Distortion HID <2%at rated power with sine wave voltage 4Emax�Efflciency97% EfficiencyT T— 96.5% _ Feed In Power Threshold[WI 20 dight` Time Consumption �-—_ -— c 2 — iso�ation Transformer4ess U9Ut(IRMEIRAL PARAMETERS _ Cools _ Natural cooling _-!—- trent Temp.Range MI -25,1+60Aoutput power derating above 50"C]l Operating Altitude ft _ 6.000 cousticai Noise dBA _ _ — _._— <50 @ 1mt _ Environmental IP Ra- _ IP65 _ RelativeHumidity _ _ 0.100%condensinA - MECHAN(CAL __ Dimensions(HxWxD)(Inches],+— _ 38 5/8'x 12 13116'x 71_t_/16' W40-tt-lbjs -- - — -- 66 — - - — ,OTHER - ---— - - Otspiey YES Alphanumeric 2 Iines1T RS485(Spring terminal block-Conductor cross section:0.08.1,5mma/AWG28-16) Communication USB connection(Service) 'Aurora Easy-Control'system for remote control(Optional) Standards and Codes Aurora inverters comp.y with standards set for did-tied operation,safety,and electromagnetic compabb1ty inc;uding UL1741/IEEE1547&CSA-C22.2 N 107.1-01, VDE0126,CEI 11-20,OK5940,CE164-8,IEC 61683,IEC 61727,EN50081,EN50082,EN61000,CE certificat on,El Real Decreto RD166312000 de Espana. AURORA AN��irQrO�Pi® Photovoltaic Inverter �/Changing the Shape ofPower Block Diagram and Operating Configurations ,i EM DC LIM ' all PLV AC GFCI i Fb FM GM ti I � Invaner �, w" VW6D0vMMti�i.����a■ 60*WtAW t1fvtvaim vM"$60v Mkmpmcessorsystan Wn ft LIQ PE Inverter electrical block diagram ----------------------------- --...._------------ ec c.mN + MyW12 HPPT 1 RMPW12 — AC .wMPn:.t —+-�--14-1 Output ' MPPT 2 MAC PYMyW21 ——✓ tnr S 1 I t PVI400H UTD-S J PVW0MUTO-S i nov.1.1 June,%Zoe➢ Power-One Inc. 740 Calle Plano Camarillo,Californla-93012-8583 aesales-us(tower-one.00m www. pow er-one.cam GREENFASTEN"' PRODUCT GUIDE - GF-I , GF1-L q A ♦t+� v v v * ! o F : QL0 , i LO OD OD i -, f /�reladea 14� +; o SECTION A-A w t ! O EcoFasrer,5alar®NJ content protected under copyright All rights reserved.03181!! See•4-1 � r GREENFASTENT' PRODUCT GUIDE — GF-I GFI-L 812 8.000± .005 — R.38t— .032 i 0.88t-01 u5 12.00- .125 — 0.30±.O 1 o I a 3.00± .125 o ' .. 0 4.00±}.125 .26 i.0 I — -- .05 V" _ C, Ln h co n L Finish Options C BLK= Matte Black BRZ= Medium Bronze L2 MLL= Mill Finish ti o +� w Q EcoFasten Sotand AY content protected under copyright.All Fk4ns reserved. 0318111 $ec.4-2 GREENFASTEN" PRODUCT GUIDE — GF-I 1 Bracket Options CP Round f A t � 0 .377*006.002 7HRU ALL .31 0 .875±.010 X 82° c 'r w } a — - -- - 1.75 2 ifa LO ~ b LO W 1r 1 co /() f_M 4 O C rte' i W Q Fcohisten S*rV AN content protected under copyrox All rights reserved.0318111 See.4-3 i GREENFASTENT" PRODUCT GUIDE — GF—I Bracket Options- CP-SQ. .375--.008 2.000--.025 f LS k N ct 2.000 i.025 —l— r C? co 0.377 .010 THRU \/ .875 a.010 X 82' NEAR SIDE C i u Compression Plate 2" X 2" Mill Aluminum LU 0 EcoFnsten SA-,re AU content protected under copyrighL AA rights M4erwd 0318111 Sec 4-4 f GREENFASTENT" PRODUCT GUIDE - GF-1 Bracket Options -F-I I I f' -� 2.25 2.04 2X R .06 1.00 1.00 88 r a � .38 �----�. Unless Otherwise Noted all R .02 ' 0 2.25 1.13 1 0 .377+:002 THRU ALL 1x1 m m Im INI in In Int. ` 0 1xl m m un 4 XI n 1nl V .875±.010 X 82°, NEAP, SIDE IXI In In IIx' h' 1,00 Iln m in �nn H IMI IN II nll . J; ml m I mom/ Iin -w ml m m w1 Ixl m m ml p IXI In III 1111 1i 1X1—Mx— III IIII •"" J, � 2.0o ml m -� w ml . w 1x1 m ut nu 1Xf III m x1 IN ul xl nu � un oI w uu �i uu XI o uu mI Iu 1n xu U Im III Innn nll n1 1n nn r r ` Im Iu m nn 1111III 111 IIII. r•1 01 y V'1 11 IC9 • `kr I� 9 / L f 0 '! w ©EcoFmterl Solcie AC content protected under copyright Ail rights reserved.0318111 Sec.4-5 - \ . I ~` GREENFASTENi" PRODUCT GUIDE — GF-I Bracket Options - L-101-3" r A R,06 ,25 .41 3.00 _ + �-' - 2.25 R,13 1,65 v 17 �5 N .31 -------; -------------- if J Ix 4_ R.19 � ct • " N ----- +.006 0 '377-,002 THRU ALL 0 .875±.010 X826, NEAR SIDE II �-• f M I- � I I 0? I I 1 I I I 00 1 i 1 i � t •.� ` A .� O C 75 0 ^.� W Q Ecofasten Soler0 All content protected under copyright Ad rights reserved 0318111 Sec.4-6 GREENFASTENr" PRODUCT GUIDE - GF-1 Bracket Options- L-102-3" ..r ' 2X .38 A X + r� v � i Lit I M v c — 2X .941.88 t•. a1.13 �.38THRU - v 0.88 X 82' ` r r NEAR SIDE M 01 W h ` co •V`� N c: _ � r O W ©Ecofasien SolcrG Alf content protected under copyright.All rights reserved.-03/8/11 Sec.4-7 ar ~ ' GREENFASTEN'" PRODUCT GUIDE — GF-I 1 Bracket Options - L-102-6" .41 t f a 6.00 + – 5.25 r 3.65 S + 3.09 .38 1.49 } -- 3.00 —� --F 2.00 o �1.50 +.006 .377_.002 THRtJ ALL 1.00 I ��/ 0 •875±.010) X 820, NEAR SIDE f v LM 1, w IV i I w h 0 EcoFasten$Diann All Cantcnt protected under copyright All rights reserved.0318111 Sec.4-8 e GREENFASTENr" PRODUCT GUIDE — GF-I Bracket Options-Z-101 63 �-+— A ' 1 i 1 � i y1 , I O.38 I � I � I I � 1 I —� .41 1.25 19 - .19 1 t v to N 4X R.10 3 4l N 2.75 1 Qr 0 s ---- . .31 • v' � o -�— 1.50 0 .377+'006 THRU ALL -.002 0 .875+.010 X 82°, NEAR SIDE 17 , 1 1 LM 11. I , I co 1 1.50 -1- � .75 g 7 d- r w 5 0 Ecoklsten Sokre AA contort protected undertopynght AH rights reserved.0318111 Sec.4-9 FLANGE NUT END CLAMP OP MOUNTING FLANGE NUT CLAMP T--BOLT MID CLAMP UGC-1 CLIP T-BOLT SOLAR MOUNT RAIL � T-BOLT UGC-1 CLIP -.- RAIL 0 00000 00 Installation Detail ©2008 UNIRAC, INC. 1411 BROADWAY BEND NE SolarMount Rail ALBUQUERQUE, NII 87102 USA Top Mounting Clamp PHONE $05.242.6411 UNIRAC.COM Universal Grounding Clips URASSY-0006 S:` -JtC;;Od Ce:oil _ibrorr`C-D` ��SSY—]D.c_Solar lA_int RCil—uGC-7 :lip—Top (dour: CICr-p.dvc, 5122/2J:?8 9:47:z3 44 { I C Smart niche y thintelligence company` CENTRQN® GPRS SmartMeter SmartSynch's AMUntetiigenceTO metering solution features a communications module that is integrated into the"ran CENTRON electricity meter.The CENTRON SmartMeter communicates with a server running SmortSynch's Transaction Management SysfemTM"(TMS)and complies with ANSI C 12.19 protocols for data storage and transmission. i This solution delivers actionable intelligence(critical usage and rate data)over secure public wireless networks(such as AT&T and Rogers Wireless) and the Internet-in lieu of cumbersome and expensive private networks.This makes mass deployments quicker,easier,and more scalable,providing a significantly greater Return on Resources(RoR)for utilities. a p UnCke proprietary,closed-architecture solutions,the CENTRON SmartMeter is essentially a ! future-proof investment in technology.Its standards-based IP connectivity makes it adaptable and field-upgradable to support today's sensoring and communications needs.as wen as tomorrow's opportunities,better than any alternative. Functions & Features Wireless Networks Hardware Components •GPRS • Radio Control Module Board(RCM) • Capacitor Storage Bank(CSB) Advanced Metering functionality • GSM/GPRS Modem • Flexible Two-Way Data Retrieval • Internal Antenna •Scheduled and On-Demand Reads •Tilt Detector •Interval Reads(5, 15,30,60 minutes) • Temperature Sensor • Real-Time Interval Reads •Automated Register,Self-Read&TOU Retrieval Operating Ranges • Demand Resets Temperature I • Real-Time Meter Event and Alarm Retrieval .Operating:[-40°C,+85°C] • Real-Time Power Outage and Power Restoration •Service Diagnostics and Tamper Detection ' Transmission(GPRS):[-40°C.+851C) •Tilt Detection Humidity •Meter Clock Synchronization • 0%to 95%non-condensing •SmartMeter Status Display Accuracy 1 •Automated Meter Registration • Meets ANSI 12.20 for accuracy class 0.5`7• •Secure and Encrypted Data Transmissions • Bi-Directional Metering Regulatory& Industry Specifications •Over-The-Air SmartMeter Module Firmware • FCC Part 15 Class B i Upgrade •ANSI C37.90.1-1989:(SWC) Supported Meter Forms • ANSI C12.20(Class 0.5)-1998 •Class 20:31S,45 • PTCRB Certified • Class 100: IS • Network Carrier Certified SmartSynch,Inc. • Class 200:2S, 125,25S • Measurement Canada Certified 4400 Old Canton Road • Class 320:2S Jackson,Mississippi 39211 1-888-362-1780 4Nwa smorsynch corn i 777 Hardware Specifications Smart $ neha y Hardware Component Description Radio Control Module Board(RCM) 32-bit ARM processor,256K RAM,512K Bash Capacitor Storage Bank(CSB) Supplies peak power for data transmissions and at functions during power outages-no batteries required GSWGPRS Modem GSM modem communicates with head-end using GPRS and SMS services { Interna)Antenna Flexible dual frequency GSM antenna for the modem Tilt Detector Detects unduthorised movement or removal of the device Temperature Sensor Monitors all temperatures to ensure correct radio operation Temperoture Ranges Supported Meter Forms ` Operating:[-40°C,+85°C] Class 20:3S,4S Transmission(wireless):[-40°C,+85°C] Class 100: 1S i Class 200:2S, 12S,25S Humidity Range Class 320:2S 0%to 95%non-condensing Regulatory 8.Industry Certifications FCC Part 15 Class B Accuracy ANSI C37.90.1—1969:Surge Withstand Capability(SWC) Meets ANSI 12.20 for accuracy class 0.57. ANSI C12.20(Class 0.5)—1998 i PTCRB Certified Measurement Canada Certified Network Carrier Certified Input/Output Signal or Interface Definition/Values Module Power Input Voltage 120 VAC Meter Serial Interface 3.3V/TTL compatible asynchronous {� Integration The SmartMeter module is a fully integrated,under-the-cover option inside the CENTRON meter.The CENTRON GPRS SmartMeter is shipped as one complete unit,ready for field deployment. Version and Compatibility Information iCENTRON Meter Hardware: Supported meter forms,classes,and types,equipped with battery CENTRON Meter Firmware: TBD SmarlModule: CENTRON GPRS SmartMeter Module SmartSynch TMS: Version 7.20 or higher About SmortSynch:Headquartered in Jackson,Miss.,SmartSynch has been developing successful Smart Grid intelligence i solutions for the utility industry since 2000.The company's clean-tech innovations in the two-way delivery of real-time energy usage data over public wireless networks(AT&T,Rogers,etc.),in lieu of private network build-outs,have to date simplified SmodMeter ideployments for 100 major North American util-t'es,while enabling green-energy initiatives and delivering significantly higher Returns on Resources. # h Unlike proprietary,closed-orchitecture solutions,SmortSynch's SmortMeters represent future-proof investments in technology.The slandards-bosed IP connectivity enabled in every SmartMeter deployed makes them adoptable and remotely upgradable to support today's sensor and communcations needs,as well as tomorrow's opportunities,better than any alternative. Copyright 2009,Smarts nch Inc..all riahts ieserved. `�'� uround 832 screw Starwashers Carlot x-nansion Fittin S or PVC Ri�id Conduit � Male Terminal All construction materials expand and contract Adapter'End with fluctuations in temperature.These temperature changes affect polyvinyl chloride (PVC) more than traditional materials such as aluminum and steel. For example,the coefficient of thermal expansion for PVC (3.38 x 105 in./in./°F) is almost three times as high as for aluminum and six times as high as for steel. Thermal expansion and contraction have a significant effect on long straight runs of conduit. For this application,expansion fittings are used to accommodate changes in length.This prevents potentially harmful thermal stresses in the conduit itself or in any supporting structures. Coupling End The National Electrical Code Requirements Section 352.44 of the National Electric Code@ requires that in accordance with Table 352.44 of the NEC,in a straight run expansion fittings be installed for rigid nonmetallic conduit to between securely mounted items.Securely mounted items are compensate for thermal expansion and contraction where the boxes,cabinets,elbows,or other conduit terminations. length change is anticipated to be 0.25 in.(6.36mm)or greater, When are expansion fittings used? The importance of knowing when to use an expansion fitting is as Expansion fittings are usually used where the straight run length is important as knowing how to use an expansion fitting. Expansion greater than 25 feet and expected temperature change is greater fittings are used in aboveground installations where temperature than 60°F. Rigid PVC conduit has a coefficient of expansion of changes are anticipated to exceed 25°F(14°C). 3.38 x 10-5 in./in.rF. A 10 foot length will change in length about 3/8" with a change in temperature of 100°F. This equates to more than 4 inches over a 100 foot run. Piston Mid-Point Indicator Barrel When are expansion fittings used? (continued) Changes in conduit temperature outdoors can exceed 140°F conduit bowing,distorted boxes,or broken couplings or fittings. considering the heat of summer and cold of winter.This means a The anticipated expansion and contraction for various lengths of 100 foot run of conduit could change approximately 6 inches in runs and temperature changes is given in Table 352.44 of the length between summer and winter.If not compensated for with National Electric Code®.(See Table below) expansion fittings,this change in length can cause unsightly 0 IJI��Ul�lS O 0 . i�p B ( LIOkuke Length Length Length Length Change in Change in Change in Change in Temperature Inches per Temperature Inches per Temperature Inches per Temperature Inches per Change in 100 ft.Of Change in 100 ft.of Change in 100 ft.of Change in 100 ft.of Degrees F PVC Conduit Degrees F PVC Conduit Degrees F PVC Conduit Degrees F PVC Conduit 5 0.2 55 2.2 105 4.2 155 6.3 10 0.4 60 2.4 110 4.5 160 6.5 15 0.6 65 2.6 115 4.7 165 6.7 20 0.8 70 2.8 120 4.9 170 6.9 25 1.0 75 3.0 125 5.1 175 7.1 30 1.2 80 3.2 130 5.3 180 7.3 35 1.4 85 3.4 135 5.5 185 7.5 40 1.6 90 3.6 140 5.7 190 7.7 45 1.8 95 3.8 145 5.9 195 7.9 50 1.8 100 4.1 150 6.1 200 8.1 For conduit installed outdoors, the maximum and minimum air temperature expected can be used to Expansion fittings should be installed to allow for the calculate the range of expansion and contraction.Conduit installed out- anticipated temperature change.For direct sunlight doors in direct sunlight will be considerably hotter than air temperature exposure,add 30°F to ambient air temperature change. during the day because of the absorption of the sun's heat. There installed inside buildings, the conduit temperature is the ambient air temperature plus the heat widely varying temperatures.Attics of buildings are areas contributed by the conductors inside the conduit.Generally,expansion where temperature swings exceeding 1001 are common fittings are not required inside unless conduit is located in an area of and expansion fittings are required. www.carIon.com Length Inches of Expansion Allowance Needed of Run for Temperature Changes of: (Feet) 60°F 80°F 100°F 120°F 140°F 25 5/8 3/4 1 11/4 13/8 50 11/4 1 5/8 2 23/8 23/4 75 13/4 23/8 3 31/2 41/8 100 23/8 31/8 4 43/4 51/2 125 3 4 5 6 7 Add 30°f to temperature 150 35/8 43/4 6 71/8 81/4 change for direct sunlight exposure. Proper Position Expansion fittings are usually installed in a Solvent weld Mid-point Solvent weld horizontal position.However, if they must be put in a vertical application,the open 0 end should be securely fastened in the p down position.The expansion fitting must be installed close to the top of the run with the barrel pointing down,so thato rain water does not enter into the opening. G �� —�� The lower end of the conduit run should Pipe strap Piston opening Pipe strap be secured at the bottom.This will result should be anchored mounted loosely in an upward movement due to the length tightly to barrel to allow movement change caused by temperature variations. Setting Position of Piston If an expansion fitting was installed completely closed with halfway between maximum and minimum;for example, the piston bottomed on a cool day,there would be no travel installation at 65°F with an anticipated maximum temperature available when the conduit warmed up and expanded.If it of 125°F and a minimum of 5°F.In this case,the expansion was installed in a maximum open position on a hot day,the fitting would be installed or set with the inner piston halfway expansion fitting would pull apart when cooled.Thus,"setting" out.Expansion fittings are marked with a mid-point.If it was the expansion fitting is very important. a colder day,for example 35°F with the same expected In addition to the proper number and sizes of expansion fittings temperature change range,the inner piston would be set with chosen,they must also be installed so they can accommodate 1/4 of its maximum travel out.If the temperature was hot the expected length change.This requires proper"setting"of (950F),it would be set with the inner piston only 3/4 way out. the expansion fitting.Most will be installed at a temperature www.carIon.com I Setting Expansion Fitting for Temperature A. For medium temperature (65°- 75°F)set piston - - 1/4 1/2 3/4 MAXa 1/2 way in barrel. 3/4 1/2 1/4 B. For cold temperature (ZO°'30°F)set piston 1/4 1/2 3/4 MAX 1/4 way in barrel. 3/4 1/2 1/4 C. For hot temperature (95°- 105°F)set piston - - ,/a 1/2 3/4 MAX 3/4 way in barrel. 3/4 1/2 1/4 When a more precise calculation for expansion is needed, it can be calculated as follows: Example 1: Example 2: 1. You must determine the maximum temperature range. 1. You must determine the maximum temperature range. This is done by subtracting the lowest temperature you This is done by subtracting the lowest temperature you anticipate from the highest temperature you anticipate. anticipate from the highest temperature you anticipate. Example:Let's say in winter,we expect the temperature Example: Let's say in winter,we expect the temperature to get down to-10°F and in the summer,we expect the to get down to 201 and in the summer,we expect the temperature to get as high as 1101. The maximum temperature to get as high as 100°F. The maximum temperature range is 110—(-10)= 120°F. temperature range is 100—20=80°F. 2. The length of run between fixed points must be determined. 2. The length of run between fixed points must be determined. Let's assume 90 feet for this example. Let's assume 90 feet for this example. 3. The total expansion change can be calculated as follows: 3. The total expansion change can be calculated as follows: Total expansion change in inches= (coefficient of thermal Total expansion change in inches= (coefficient of thermal expansion)x(maximum temperature range)x(length of expansion)x(maximum temperature range)x(length of run in inches). run in inches). Example:Total expansion change= (3.38 x 10-5 in./in./°F)x Example:Total expansion change=(3.38 x 10-5 in./inPF)x (120°F)x(90ft x 12in./ft)=4.38 in. (80°F)x(90ft x 12in./ft)=2.92 in. Thus,travel can be covered with one expansion fitting in Thus,travel can be covered with one expansion fitting. Carlon trade sizes 2" through 6",which have an 8" travel, 4. The "set position" can be determined from the following or two expansion fittings in Carlon trade sizes 1/2" through example. 1-1/2",which have a travel of 4". Example:If the temperature at installation was 65°F,the 4. The"set position"can be determined from the following difference from maximum is 100°F—65°F=35°F. example. Use ratio:(difference from maximum)/(Total expected Example:If the temperature at installation was 65°F,the range)=35/80=.4375 in. difference from maximum is 110°F—65°F=45°F. Use (.4375)x 4 inch travel= 1.75 in.or(.4375 x 8 inch travel) ratio:(difference from maximum)/(Total expected range)_ =3.5 inches 45/120= .375 in. The piston at 65°F would retract 1.75 inches for Carlon (0.375)x 8 inch travel=3 in. trade sizes 1/2" through 1-1/2" or 3.5 inches for Carlon The piston at 65°F would retract 3 inches. trade sizes 2" through 6. www.carIon.com Installation 1.The expansion fitting should be mounted so that the piston 3.Nonmetallic conduit straps suitable for this purpose,must be can travel in a straight line within the barrel.If alignment is used to allow the conduit to move freely during expansion not straight,the piston will bind and prevent the fitting from and contraction while properly securing it. working properly. 2.The expansion fitting barrel must be clamped securely where- as the conduit is mounted loosely so that it can slide freely during expansion and contraction. One Expansion Fitting Run conduit through loose support BOX BOX 1 — ———— ----------— ——— 2 Expansion fitting barrel fixed rigid Two Expansion Fittings Run conduit through loose support BOX BOX — -- -- 2 Both expansion fitting barrels fixed rigid Location Proper placement and installation of expansion fittings and the conduit must be fixed so as to properly proportion expansion conduit allow for correct functioning of the expansion fittings. or contraction between the two fittings.Otherwise,the expansion For example,if one expansion fitting is needed between two or contraction would only occur at the free fitting,while the boxes,the barrel of the fitting must be securely fastened close tighter fitting would not move. to one box.The conduit must be fastened loosely so as to allow In a very long run,two or more fittings should be placed in for movement during expansion and contraction. series with one another.The barrels of each expansion fitting If there is more than one expansion fitting used,then fittings must be anchored so as to allow each length of conduit to are installed at the boxes with the center of the conduit run expand or contract freely.Each section acts independently. rigidly fixed.With two expansion fittings utilized,the center of Use of Expansion Fittings Where Concrete Encased or Direct Buried In normal circumstances,expansion fittings are not needed with In direct burial situations,expansion fittings are not needed concrete encased nonmetallic conduit since the movement of because the ground has relatively constant temperatures. the conduit will coincide with the expansion and contraction of In cold areas,buried lines must be below the frost line to prevent the concrete.The only place where an expansion fitting would buckling during freezing and thawing cycles.In warmer areas, be utilized is where the concrete itself has an expansion joint. the depth of cover protects against temperature extremes. Most Common Mistake !Aire inside the Conduit The most common error is not using enough expansion fittings. The coefficient of expansion for the wire inside the conduit is When in doubt, use an additional expansion fitting.It is much much lower than the nonmetallic conduit,therefore its length more difficult and costly to insert an expansion fitting once change due to expansion and contraction is very little.If the wiring has been set up and in service. expansion fittings are mounted correctly,there should be little concern as to its effect on the wires inside. www.carIon.com Carlon Expansion Fittings usho Coupling Male Terminal Travel 133447 End Adapter End Std. Length Part No. Part No. Size Ctn.Qty. (in.) E945D E945DX 112 20 4" E945E E945EX 3/4 15 4" E945F E945FX 1 10 4" E945G E945GX 11/4 5 4" E945H E945HX 11/2 5 4" E945J E945JX 2 15 8" E945K E945KX 2112 10 8" E945L E945LX 3 10 8" E945 E945MX 3112 5 8" E945N E945NX 4 5 W. E945 E945PX 5 1 8" E945R E945RX 6 1 8" Male Terminal Coupling End Adapter End LAmsoN&SFSsloNs In USA,contact: In Canada,contact: 25701 Science Park Drive a Cleveland,Ohio 44122 c/o Multimodal Logistics 1-800-3-CARLON(1-800-322-7566)c In Ohio,(216) 464-3400 415 Traders Boulevard East Fax: (216)766-6444 Mississauga,Ontario c Canada L4Z 1P2 TDD/Hearing Impaired Access (216) 831-5918 (905)755-1262 a (888) 269-9902 www.carlon.com Fax: (905)755-1265 0 (888)229-8622 ISEXPIT OM 7/04 SP 0 Lamson&Sessions 2004 SOLARMOVNT Top Mounting UniRac Grounding Clips and WEEBLugs - 225.6 UGC-1 TO mounting Clamps Lid wn. i Module I p ON T-boli Nib CusFigure 26.Slide UGC-1 grounding e—La 1 UGC- �a I I clip into top mounting slot of rail Intertek h i_ Torque modules in place on top of Conforms to '-- -- clip.Nibs will penetrate rail anod- UL Standard 167 izadon and create grounding path through rail(see Fig.3,reverse side). SolorMounta roil(any type) Figure 27.Insert a bolt in the W E E B Lu g aluminum rail or through the clearance hole in the stainless steel flat washer.Place the stainless steel flat washer on the bok oriented yy- so the dimples will contact the aluminum rail Place the lugportion on the bolt and stainless steelflat 1 washer.Install stainless steelflat washer,lock washer and nut WEEBLug Tighten the nut until the dimples are �- completely embedded into the rail r1 and lug.The embedded dimples make _ Stainless Steel Flat agar-tight mechanical connection Washer(WEEB) and ensure good electrical connection between the aluminum rail and the ,'•� Clips and lugs are sold separately. lug through the WEEB. ountS rail L�*�s (any type) Figure 28.UGC-1 layout for even and odd number of modules in row. "X"denotes places to install UGC-1. Even Number of Modules in row Odd Number of Modules in row •:: pub 2011 U N I RAC Junene 2011 � .. 0 2011 by Unirac,Inc. A HILTI GROUP COMPANY All right's reserved. I U N I RAC histallation Sheet 225.6 Unirac Grounding Clips and WEEBLugs 10 year limited Product Warranty See httpJ/www.unirac.com for current warranty documents and information. 1411■■o U N I RAC Albuquerque N Boulevard NE Albu uer ue NM 87102-1545 USA v.gc 2 Wiley Electronics LLC Washer, Electrical Equipment Bonding and Lug (WEEBLug) The WEEBLug is a device for bonding a solar array. The WEEBLug consists of two parts: a stainless steel washer(weeb-6.7)and a tin-plated copper lug. The washer is designed to provide a reliable gas-tight electrical connection with anodized aluminum pieces. The lug allows the lay-in connection of an electrical equipment grounding conductor. The WEEBLug may be attached to the top of a mounting rail with a captive bolt, or fastened to any aluminum piece after drilling a suitable size clearance hole(see part number list below). a Figure 1.WEEBLug Usage: Insert a bolt in the aluminum rail or through the clearance hole in the aluminum piece. Place the washer portion on the bolt, oriented so that the dimples will contact the aluminum piece. Place the lug portion on the bolt and washer portion. Install stainless steel washer and nut. Tighten the nut until the dimples are completely embedded and the lug and aluminum piece are flat against the body of the WEEB. The embedded dimples will make a gas-tight mechanical connection and thus ensure good electrical connection between the aluminum and the lug. copyright 2006 Wiley Electronics LLC 1� Figure 2.WEEBLug mounted on rail. • Material: 304 stainless steel, tin-plated copper • Listed to UL467 by ETL • Torque to 10 ft-Ib using general purpose anti-seize • Maximum electrical equipment ground conductor size: 6 AWG • Use with '/" hardware (included) • Outdoor rated Part number: WEEBL-6.7 for use with '/ inch mounting hardware WEEBL-8.0 for use with 5/16 inch mounting hardware WEEBL-8.2 for use with 8 mm mounting hardware copyright 2006 Wiley Electronics LLC NORTH own of � _ 1,' An.dove' r No. � t - y % "µ, h ver, Mass, COC ra KICKl WICK TIE 1) I5 S U BOARD OF HEALTH Food/Kitchen PERMIT T LD Septic System . C THIS CERTIFIES THAT i.. "I !^... .......................................... BUILDING INSPECTOR .............. ... ........................... `has permission to erect ....... buildings on � :c Q 1q.kc- . Foundation Rough to be occupied as �� A ......................................... Chimney ........... �. -:........... ... ........ .......�L provided that the person accepting this permit shall in a respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTION §IART Rough Service ......................... ..................................................... Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner .Street No. Smoke Det. SEE REVERSE SIDE L-- -- - NORTH oven of '� _ Andover O 0 No. Mp yM t• h y ver, Mass, ra(a coc�icNew�c� y1' p°R•�rE V S V BOARD OF HEALTH Food/Kitchen PERMIT T LD Septic System THIS CERTIFIES THAT ..................................................................... BUILDING INSPECTOR 1 Foundation 'has permission to erect .......................... buildings on ....L� .......mmAQ— J......1 -.................... n Rough to be occupied as ........... v. .!'.4-:.......!`0..�. . .........Y"a h*l-- '............ Chimney provided that the person accepting this permit shall in a respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTION RT Rough Service ......................... ..................................................... Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Buildinz Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner .Street No. Smoke Det. SEE REVERSE SIDE