Loading...
HomeMy WebLinkAboutBuilding Permit #565-2017 - 1636 Osgood Street 5/1/2018 E NORTH U166ING PERMIT `�,��e:r���.''6'°tiooL OW OF NORTH ANDOVER o APPLICATION FOR PLAN EXAMINATION h Permit NO: �2fil Date Received * °9 • �<� �J� -v`"''' 1 kooosej �4SSACHU5 Date Issued: --' IMPORTANT:Applicant must complete all items on this page LOCATION 1636 Osgood Street Print PROPERTY OWNER Michael Heiman Print MAP NO: PARCEL: ZONING DISTRICT: Historic District yes no Machine Shop Village yes no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family ❑Addition ❑Two or more family ❑ Industrial XAlteration No. of units: XCommercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other ❑Septic ❑Well ❑ Floodplain ❑Wetlands ❑ Watershed District ❑Water/Sewer To install a NFPA 13 dry fire sprinkler system Identification Please Type or Print Clearly) OWNER: Name: Michael Heiman Phone: 508 662 0993 Address: 1636 Osgood Street North Andover MA. 01845 CONTRACTOR Name: Phone: 978-655-7002 Front-Line Fire Protection,LLC(Charlie Rodgers) cell 978-8449026 Address: 1820 Turnpike street suite 209 North Andover,MA.01845 Supervisor's Construction License: Exp. Date: SC-210048 1-15-2018 Home Improvement License: Exp. Dater ARCHITECT/ENGINEER Jensen Hughes Phone: 781-270-5200 Address: 1600 Osgood Street Suite 2082 North ANdover MA.01845 Reg. No. FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ $10,900.00 FEE: $ i ?S`0 ---' Check No.: 1010 Receipt No.: 31 Z_-** NOTE: Persons contracting with unre tered ontractors do not have access to the guar my nd �Sig� nature of Agent/Owne � nature of contract — - ->- ■ Plans Submitted ❑ Plans Waived El Certified Plot Plan ❑ Stamped Plans ❑ TYPE"bF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank, etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM PLANNING & DEVELOPMENT Reviewed On Signature_ COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature& Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT- - Temp Dumpster on site yes no Locatedvat 124.Main Street Fire.Department signature/date COMMENTS - G limension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: I i ELECTRICAL: Movement of Meter location, mast or service drop.requires approval of Electrical Inspector Yes No ®ANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— (For department use) E ❑ Notified for pickup Call Email ate Time Contact Name Doc.Building Pennit Revised 2014 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. r , Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products 40TE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:Building Permit Revised 2014 1 Location `,/, �� e:5;r_�, 7r No. Date i • TOWN OF NORTH ANDOVER Certificate of Occupancy $ Building/Frame Permit Fee $1 Foundation Permit Fee $ " Other Permit Fee $ 1 TOTAL $ I I Check# 49,16 `-1 ' Building Inspector Z . w. .. . , _ Tc . . ve" **. . No. -� h ver, Mass, ?ia ' zal 6 cocNicHew�c.c A' �.95 R�+re� ►�Pa,�gS U BOARD OF HEALTH Food/Kitchen PERMIT T LD Septic System THIS CERTIFIES THAT .N&�A►r(..#4.0A1� ............................ BUILDING INSPECTOR has permission to erect .......... ..... buildings on ..$ .,4� ..sFoundation Rough to be occupied as ................ .. .. ......0� qprwtw...... chimney provided that the person accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONS ION S Rough vice . .. .. . . ............. Final Final BUILDING INSPECT 7 GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. The Commonweafth of Massachusefts Department of Five Services • `�'- _ a Office of the State Fire Marshal 1 V P.Q.Box 1025 State Road,Stow,MA 01775 . �JP APPLICATION FOR PERMIT Date: Permit No (City or Town) (If Applicable) Dig Safe Number In accordance with the provisions of M.G.L. Chapter as provided in Sectiolnapp�ca*on' hereby made Start Date by �/O/z `.rL -OX (Full name of person,Firm or Corporal(on) , J, /j y State clearly Address /YZ D �iw 5 �� /vii Ai eldx_ Vl0 W purpose for / �/ ((Street or P.O.Bo City or Town) which permit For permission to yi1 S 7-r G/ is requested Comments: at /6 Y/ &9 'F; (Give location by street and no. or describe' ch anner as to provied adequate identification of location) Name of competent operator �l/� d Cert.No. (If Applicable) Date Issued-rejected By (Signature dApplicant) Date of expiration Fee$ Paid Due __---------__-------------------------------------—------------------—cut-------------—-------------------—-------------------------_--_- -------- The Commonwealth of Massachusetts Department of Fire Services Office of the State Fire Marshal P.O.Box 1025 State Road,Stow,MA 01775 PERMIT Date: Permit NO Dig Safe Number (City of Town) (If Applicable) . In accordance with the provisions of M.G.L. Chapter as provided in section Start Date This Perot is granted to: Full name of person,Firm or Corporation Permission to Comments: Restrictions: at (Give location by street and no.,or describe in such manner as to provied adequate identification of location) Fee Paid$ This Permit will expire (Signature of offical granting permit) Offical granting permit (Title) MEN001' TWI_C PERMIT MI ICT FSP l`-nh1CPiri inn ICI V P[9CT9=n I IWW TWI= PRRMiCFC 4� 1 -- FRONT-LINE FIRE pR Fire Sprinkler S TE A' ystemSa/es,RrOTECTIONr, LLC' pections&Installation f Charlie ••• GeneralgerY • 1820 7",nPike02 •02 NorthAndover26 �• f. :I • ,• 1 JENSEN HUGHES 1600 Osgood Street I Suite 2082 North Andover,MA 01845 USA jensenhughes.com +1781-270-5200 Fax:+1781-229-2922 NARRATIVE REPORT AND HYDRAULIC CALCULATIONS FOR NEW DRY PIPE FIRE SPRINKLER SYSTEM H 0 rig � � S K- J. 0 COX -4 FIRE PROTECTION No.50253 90,c fig Pk` FSS�OtVAI EAG\ Prepared For Ruff n'Tumble Playcare 1636 Osgood Street North Andover, Massachusetts November 7, 2016 Project#: 1 KJC00014.000 JENSEN HUGHES 1636 Osgood Street—Dry Pipe Sprinkler Design PAGE 1 1. INTRODUCTION This report is being provided in accordance with the Massachusetts State Building Code, Eighth Edition (MSBC), as part of the documentation for the new dry pipe fire sprinkler system for the existing Building#49 located at 1636 Osgood Street in North Andover, Massachusetts. 2. APPLICABLE LAWS, REGULATIONS AND STANDARDS The documents listed below represent the basis for the design of the new fire sprinkler system: • 780 CMR—Massachusetts State Building Code (MSBC)—81h Edition • 527 CMR-The Massachusetts Comprehensive Fire Safety Code • NFPA 13—Standard for the Installation of Sprinkler Systems—2013 Edition 3. FIRE SPRINKLER SYSTEM DESCRIPTION The new fire sprinkler system will be supplied by the existing underground yard hydrant system. A hydrant flow test was conducted on November 2, 2016 by JENSEN HUGHES. The results of the hydrant flow test were: Static Pressure: 141 PSI Residual Pressure: 103 PSI Flow Rate: 1029 GPM Building 49 is a single story built on a slab. It will be used as a dog day care facility. The building is of noncombustible construction. The floor area of the building is approximately 3,500 SF and it is attached to the adjacent building. The new dry pipe sprinkler system has been designed per NFPA 13—2013 in accordance with the MSBC. There is an existing dry pipe system in Building 49. It is our understanding that the dry pipe sprinkler system for Building 49 was disconnected in 2012 due to numerous leaks, and is not salvageable. The existing system will be removed and replaced in its entirety. The news stem has been designed to utilize the existing underground supply to the building and Y 9 9 9 pp Y 9 the existing sprinkler valve room. All sprinkler piping is galvanized schedule 40 steel. A new 3- inch dry pipe valve and an air compressor will be provided in the sprinkler valve room. Sprinkler coverage will be provided in all occupiable areas in accordance with NFPA 13. The layout of the sprinkler system has be designed for a light hazard occupancy and such that the sprinkler spacing does not exceed 15 feet. The new sprinkler system has been hydraulically designed per NFPA 13 using a design density of 0.10gpm/sf over the most remote 1,500 sf. The demand area is based upon a 30% increase for dry pipe sprinkler systems, and a 31% decrease based on quick response sprinklers. The sprinklers used for the design calculations is a 5.6 K-factor. The results of the hydraulic calculations indicate that the system requires a total pressure of 34 PSI while flowing 228 GPM. A 100 GPM hose stream allowance has also been included. The water supply in the area is adequate based on the flow data collected, and does not include the use of the fire pumps for the yard system, only the municipal water supply. JENSEN HUGHES 1636 Osgood Street—Dry Pipe Sprinkler Design PAGE 2 SEQUENCE OF OPERATIONS Upon operation of the sprinkler system's water flow switch, the building's fire alarm system shall activate. Upon closing a sprinkler control valve the fire alarm system shall send a supervisory signal to the building's fire alarm system via a tamper switch. The sprinkler system shall activate when sufficient heat from a fire causes the sprinkler bulb to fuse. Upon fusing, the sprinkler valve will open which will discharge water to the fire area. Water flow will continue until a control valve is manually closed. The water flow switch attached to that system will operate activating the building fire alarm system. FIRE SPRINKLER SYSTEM TEST AND APPROVAL The fire sprinkler system will be tested in compliance with NFPA 13 and NFPA 25. The contractor will provide installation material and test certificates to the engineer and the fire department prior to final testing and inspection. The contractor will notify the engineer and the fire department in writing when the system is ready for testing. When the system has been completely tested by the contractor and it is operating as required by the code, a test will be scheduled with the Fire Department for them to witness. JENSEN HUGHES �111,[ yarauiic Overview Job Number:1 Report Description:Fire Water Demands Job Job Number Design Engineer 1 CLG Job Name: Phone FAX Ruff'n Tumble 781-270-5200 Address 1 State CMificetioruanse Number 1636 Osgood Street Address 2 AHJ North Andover,MA 01845 Address 3 Job Site/Building System Density Area of Application 0.100gpm/ft2 1500.00ft2(Actual 1679.37ft2) Most Demanding Sprinkler Data Hae Streams 5.6 K-Factor 15.00 at 7.175 100.00 Coverage Per SprinMer Number Of Sprinklers Calculated 150.00ft2 12 System Pressure Demand System n—Demand 33.991 227.94 Total Demand Pressure Result 327.94 @ 33.991 +102.427(75.1%) Supplies Check Point Gauges Node Name Flow m Hose Flow(gr)ml Static(psi Residual(Dsil Iden iter Pressure(osil K-Factor(Kl Flow m 4 Water Supply 1029.00 100.00 141.000 103.000 RuffnTumble.cad Water Supply at Node 4 1029.00, 100.00, 141.000, 103.000 150 tatic Pressure 141.000 135 120 1029.00 @ 103.000 90 CL 75 _ •y« N 60 a. o•- r � -n 227.94 @ 33.991 ° — — - — _ (- 0 30 ystem demand curve 15 0 40 22%f%00 800 1000 1200 1400 1600 1800 2000 Water flow,gpm (l ©M.E.P.CAD,Inc. AutoSPRINKO 12 02.0.42.0 11/4/2016 1:36:58PM Page 1 [Hydraulic Analysis Job Number: 1 Report Description:Fire Water Demands Pipe Type Diameter Flow Velocity HWC Friction Loss Length Pressure Downstream Elevation Discharge K-Factor Pt Pn Fittings Eq.Length Summary Upstream Total Len th v•••••Route 1 ••••• BL 1.0490 15.00 5.57 100 0.107085 12'-6 Pf 1.339 101 15-0 15.00 5.6 7.175 Sprinkler Pe 0.000 102 15-0 8.513 12'-6 Pv BL _ 1.0490 31.34 11.63 100 0.418534 12'-6 Pf 5.232 102 15-0 16.34 5.6 8.513 Sprinkler Pe 103 15'-0 13.745 12'-6 Pv BL 1.3800 52.10 _ 11.18 100 0.281899 12'-6 1 Pf 3.524 103 15-0 20.76 5.6 13.745 Sprinkler Pe 0.000 104 15-0 17.269 12'-6 Pv BL 1.6100 75.37 11.88 100 0.263473 6'-2'/. Pf 3.885 104 15-0 23.27 5.6 17.269 Sprinkler, 8'-6% Pe 0.867 1 13'-0 22.021 E(2'-10'/.),PO(5-81/2) 14'-9 Pv FR 3.2600__ 151.97 5.84 100 0.031046 10'-8 Pf 0.331 1 13'-0 76.59 22.021 Flow(q)from Route 3 Pe 2 13'-0 22.352 10'-8 Pv FR 3.2600 227.94 8.76 100 0.065729 65-4Y< Pf 5.714 2 13'-0 75.98 22.352 Flow(q)from Route 2 13'-5 Pe 5.636 3 0'-0 33.702 2E(6'-8'/z),DPV(-0.537) 78'-9y, Pv UG 6.2800 227.94 2.36 140 0.001448 134'-0 Pf 0.290 3 0'-0 33.702 66'-21/• Pe 4 0'-0 33.991 3E(22'-03/+),S 200'-21/< Pv 100.00 Hose Allowance At Source 4 327.94 �•••••Route 2••••• BL _ 1.0490 15.12 5.61 100 0.108733 1 12'-6 Pf 1.359 105 15'-0 15.12 5.6 7.294 Sprinkler Pe 0.000 106 15'-0 8.653 12'-6 Pv BL _1.0490 31.60 11.73 100 0.424933 12'-6 P 5.312 106 15'-0 16.47 5.6 8.653 Sprinkler Pe 107 15'-0 13.965 12'-6 Pv BL 1.3800 52.52 11.27 100 0.286153 12'-6 Pf 3.577 107 15'-0 20.93 5.6 13.965 Sprinkler Pe 0.000 108 15-0 17.542 12'-6 iPv BL 1.6100 75.98 11.97 100 0.267412 6-2'/<IPf 3.943 108 15'-0 23.45 5.6 17.542 Sprinkler, 8'-63/.i Pe 0.867 2 13'-0 22.352 E(2'-10%),PO(5'-81/2) 14'-9 Pv �•••••Route 3••••• BL 1.0490 15.25 5.66 100 0.110413 _ ___ 12'-6Pf 1.380 109 15'-0 15.25 5.6 7.416 Sprinkler Pe 0.000 110 15'-0 8.796 12'-6 Pv BL 1.0490 31.86 11.83 _ 100 0.431460 12'-6 Pf 5.393 110 15-0 16.61 5.6 8.796 Sprinkler Pe 111 15'-0 14.190 12'-6 Pv BL1.3800 52.95 11.36 100 0.290492 1 12'-6 Pf 3.631 11-1 15-0 21.09 5.6 14.190 Sprinkler Pe 0.000 112 15'-0 17.821 12'-6 Pv BL __ 1.6100 76.59 12.07 100 0.271428 6'-2'/<lPf 3.228 112 15'-0 23.64 5.6 17.821 Sprinkler, 5'-81/2 Pe 0.867 5 13'-0 21.916 2E(2'-10%) 11'-10% Pv FR 3.2600 76.59 _ 2.94 100 0.008740 12'-0 Pf 0.105 5 13'-0 21.916 Pe 1 13'-0 22.021 12'-0 Pv Equivalent Pipe Lengths of Valves and Fittings(C=120 only) C Value Multiplier Actual Inside Diameter 4.87 Value Of C 100 130 140 150 ( Schedule 40 Steel Pipe Inside Diameter ) =Factor Multiplying Factor 0.713 1.16 1.33 1.51 ©M.E.P.CAD, Inc. AutoSPRINK®12 v12.0.42.0 11/4/2016 1:37:04PM Page 4 � �('"gVia l c Analysis Joe : � Report Description:Fire Water DemanDemandss Pipe Type Diameter Flow Velocity HWC Friction Loss Length Pressure Downstream Elevation Discharge K-Factor Pt Pn Fittings Eq.Length Summary Upstream Total Length Pipe Type Legend Units Legend Fittings Legend AO Arm-Over Diameter Inch ALV Alarm Valve BL Branch Line Elevation Foot AngV Angle Valve CM Cross Main Flow gpm b Bushing DN Drain Discharge gpm BaIV Ball Valve DR Drop Velocity fps BFP Backflow Preventer DY Dynamic Pressure psi BV Butterfly Valve FM Feed Main Length Foot C Cross Flow Tum 90° FR Feed Riser Friction Loss psi/Foot cplg Coupling MS Miscellaneous HWC Hazen-Williams Constant Cr Cross Run OR Outrigger Pt Total pressure at a point in a pipe CV Check Valve RN Riser Nipple Pn Normal pressure at a point in a pipe DeIV Deluge Valve SP Sprig Pf Pressure loss due to friction between points DPV Dry Pipe Valve ST Stand Pipe E 90°Elbow Pe Pressure due to elevation difference between indicated points UG Underground Pv Velocity pressure at a point in a pipe EE 45°Elbow Eel 11%*Elbow Eel 22'/z Elbow f Flow Device fd Flex Drop FDC Fire Department Connection fE 90°FireLock(TM)Elbow fEE 45°FireLock(TM)Elbow fIg Flange FN Floating Node fT FireLock(TM)Tee g Gauge GloV Globe Valve GV Gate Valve Ho Hose Hose Hose HV Hose Valve Hyd Hydrant LtE Long Turn Elbow mecT Mechanical Tee Noz Nozzle P1 Pump In P2 Pump Out PIV Post Indicating Valve PO Pipe Outlet PRV Pressure Reducing Valve PrV Pressure Relief Valve red Reducer/Adapter S Supply sCV Swing Check Valve Spr Sprinkler St Strainer T Tee Flow Turn 90° Tr Tee Run U Union WirF Wirsbo WMV Water Meter Valve Z Cap ( ©M.E.P.CAD,Inc. AutoSPRINK®12 v12.0.42.0 11/4/2016 1:37:04PM Page 5 I� raulicZaraph -� Job Number: 1 jjjjHyd t Report Description:Fire Water Demands Water Supply at Node 4 150 Static Pressure 141.000 135 120 105 1029.00 @ 103.000 90 .N CIL 75 N N N o_ 60 45 227.94 @ 33.991 • i I 30 327.94 with hose streams System demand curve 15 0 x100 400 600 800 1000 1200 1400 1600 1800 2000 Water flow,gpm Hydraulic Graph Water Supply at Node 4 Static:Pressure 141.000 Residual:Pressure 103.000 @ 1029.00 Available Pressure at Time of Test 136.418 @ 327.94 system Demand 33.991 @ 227.94 System DemaM(Including Hose Allowance at source) 33.991 @ 327.94 2,@ M.E.P.CAD,Inc. fill AutoSPRINKO 12 02.0.42.0 11/4/2016 1:37:OOPM Page 2 INode Analysis ' Job Number: 1 Report Description:Fire Water Demands Node Elevation Foot Fittings Pressure(psi) Dischar e m 4 0'-0 S 33.991 227.94 101 15'-0 Spr-7.175 7.175 15.00 102 15'-0 S r-8.513 8.513 16.34 103 15'-0 S r-13.745 13.745 20.76 104 15'-0 S r-17.269 17.269 23.27 105 15'-0 S r-7.294 7.294 15.12 106 15-0 S r-8.653 8.653 16.47 107 15'-0 S r-13.965 13.965 20.93 108 15'-0 S r-17.542 17.542 23.45 109 15'-0 S -7.416 7.416 15.25 110 15'-0 Spr(-8.796) 8.796 16.61 111 15'-0 S r(-14.190) 14.190 21.09 112 15'-0 Spr(-17.821) 17.821 23.64 1 13'-0 PO 5-8% 22.021 2 13'-0 PO(5'-81/2) 22.352 3 0'-0 33.702 5 13'-0 E(2'-10%) 21.916 (v� ©M.E.P.CAD,Inc. AutoSPRINK®12 v12.0.42.0 11/4/2016 1:37:02PM Page 3 C JENSEN HUGHES 1600 Osgood Street I Suite 2082 North Andover,MA 01845 USA jensenhughes.com Phone:+1 781.270-5200 Fax:+1781-229-2922 CHANGE OF OCCUPANCY SPRINKLER SYSTEM REQUIREMENTS 1636 OSGOOD STREET, BUILDING 48149 Mq VIN J. rt, o COX -4 FIRE PROTECTION y 9 No.50253 a F � G /ONAL E� Prepared For Ruff n Tumble Playcare 1636 Osgood Street North Andover, Massachusetts October 5, 2016 Project#: 1 KJC00009.000 JENSEN HUGHES Ruff'n Tumble Playcare—Building 48/49—Change of Occupancy Sprinkler Requirements PAGE 1 1. INTRODUCTION This report is being provided at the request of Ruff'n Tumble Playcare in order to determine the fire sprinkler requirements for their building located at 1636 Osgood Street, in North Andover, Massachusetts. Ruff'n Tumble Playcare will be leasing Building 48/49 which is located towards the northwest corner of the property and has been vacant for several years. The Massachusetts State Existing Building Code, Chapter 34, Section 102.2.1.3 requires that the sprinklers in existing buildings, or portions thereof, in which there is a change in occupancy classification, commodity classification, or storage arrangement, as defined by NFPA 13, be evaluated for compliance with NFPA 13 and NFPA 25. This evaluation must consist of a comparison of the capabilities of the sprinkler system to the future occupancy use that is being proposed. The intent of this report is to compare the capabilities of the existing sprinkler systems in Building 48/49 to the fresprinkler requirements for the new occupancy. 2. APPLICABLE LAWS, REGULATIONS AND STANDARDS • 780 CMR—Massachusetts State Building Code (MSBC)—8th Edition • Existing Building Code of Massachusetts—8th Edition • 527 CMR-The Massachusetts Comprehensive Fire Code • NFPA 13—Standard for the Installation of Sprinkler Systems—2013 Edition • NFPA 25—Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems—2011 Edition 3. BUILDING AND OCCUPANCY DESCRIPTION Buildings 48 and 49 share a common wall and are connected to form a single building. The building as a whole is a single story built on a slab. The building is of non- combustible construction, consisting of concrete block and sheet metal walls, with a steel frame and a metal roof. The Building 49 portion is approximately 3,500 square feet in area, and it is open to the loading dock on the south side. As a result, Building 49 is open to ambient air and not heated. Building 49 is equipped with a dry pipe sprinkler system that is in disrepair and will need to be repaired or replaced. The Building 48 portion is enclosed, heated year round, and equipped with a wet pipe sprinkler system. Building 48 has a total floor area of approximately 15,000 square feet. JENSEN HUGHES Ruff'n Tumble Playcare—Building 48/49—Change of Occupancy Sprinkler Requirements PAGE 2 b o = OZZY PROPERTIES I. i 7,,; -� As we understand, the entire building is currently vacant and has been vacant since at least 2012. Ruff'n Tumble Playcare will now be leasing the portions of the building outlined in the diagram above. Ruff'n Tumble Playcare is a dog sitting service. The occupancy use most closely resembles a Group B Business occupancy, which includes Animal Hospitals, Kennels and Pounds, as described by the Massachusetts State Building Code (MSBC)8th Edition, Section 304. 4. EXISTING FIRE SPRINKLER SYSTEM DESCRIPTIONS Building 48 Portion, Existing Wet-Pipe Sprinkler System The existing fire sprinkler system in the Building 48 portion consists of a single wet riser that enters the building through the floor on the East side of the building. The water supply diameter is 6-inches when it enters the building through the floor, which is immediately reduced to 4- inches. There is an exterior PIV adjacent to the building and a water flow switch inside on the 4- inch section of the riser. JENSEN HUGHES Ruff'n Tumble Playcare—Building 48/49—Change of Occupancy Sprinkler Requirements PAGE 3 Based on the hydraulic design placard, the existing wet pipe sprinkler system in Building 48 was designed to provide a water flow 0.25 GPM/Sq Ft over the most remote 1,749 square feet of building area. Building 49 Portion Existing Dry-Pipe Sprinkler System The existing fire sprinkler system in Building 49 consists of a single dry sprinkler riser that enters the building through the floor on the South side of the building. The water supply diameter is 6- inches when it enters the building through the floor. The dry pipe sprinkler system is equipped with a 6-inch Star Model-A Dry Valve. The dry valve is located in a small sprinkler control room adjacent to Building 49, which is actually within the footprint of Building 48. JENSEN HUGHES Ruff n Tumble Playcare—Building 48/49—Change of Occupancy Sprinkler Requirements PAGE 4 is C ZZ 1 � r �i IF The dry pipe sprinkler system in Building 49 is supplied by a single 6-inch sprinkler cross main, which travels along the front of the building at the ceiling level and then crosses the center of the single open room. Sprinkler protection is provided via this dry pipe system throughout the covered exterior area that makes up Building 49. The exterior loading dock that covers the entire side of the building is not provided with existing sprinkler coverage. The original design capabilities of the dry pipe sprinkler system for Building 49 are not known. In order to determine specific capabilities hydraulic modeling and analysis would be required. It is our understanding that the dry pipe sprinkler system for Building 49 is currently disconnected and no longer in service. The system was disabled in 2012 due to numerous leaks. As we understand, the existing system will require substantial repairs or replacement in order to be put back into service. 5. NEW OCCUPANCY SPRINKLER REQUIREMENTS It is our understanding that the Building will be used as an animal day care facility. NFPA 13 takes into account the use of the building to determine occupancy classifications, not its construction type. The entire area of Building 48/49 that is intended to be used by Ruff`n Tumble Playcare most closely resemble a Light Hazard Occupancy as defined by NFPA 13. The sprinkler system for such an occupancy would be required to be capable of providing Light Hazard sprinkler coverage as defined by NFPA 13, throughout all areas that are to be used for animal day care. Light Hazard sprinkler coverage requires a sprinkler density of 0.10 GPM/SgFt over the most remote 1,500 SgFt. JENSEN HUGHES . , P Ruff'n Tumble Playcare—Building 48/49—Change of Occupancy Sprinkler Requirements PAGE 5 The exterior loading dock/walkway is not required to be provided with sprinkler protection. NFPA 13, Section 8.15.7.2 allows sprinklers to be omitted from spaces under exterior projections as long as it is constructed entirely of materials that are noncombustible, limited-combustible, or fire retardant-treated wood as defined by NFPA 703. It is our understanding that the roof above the load dock area is entirely noncombustible construction. 6. CONCLUSIONS Based on the proposed use of the building as a dog daycare, it will be required to be provided with Light Hazard Occupancy fire sprinkler protection in all occupiable areas in accordance with NFPA 13. Based on the information provided on the riser tag, the existing wet pipe sprinkler system throughout the Building 48 portion is capable of providing adequate coverage for the new occupancy in that area. Based on the physical conditions of the existing dry pipe sprinkler system in the Building 49 portion, it will need to be replaced in its' entirety. A new dry pipe sprinkler system must be designed and installed that is capable of providing sprinkler protection for a Light Hazard Occupancy (0.10 GPM/SgFt)over the most remote 1,500 SgFt of Building 49. The new dry pipe system must provide coverage in all occupiable areas of Building 49 in accordance with NFPA 13. JENSEN HUGHES Initial Construction Control Document a To be submitted with the building permit application by a Registered Design Professional for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Ruff n' Tumble Playcare—Sprinkler System Date:1 1/8/16 Property Address: 1636 Osgood Street,North Andover,Massachusetts 01845 Project: Check(x)one or both as applicable:_New construction X Existing Construction Project description: Demolition of existing dry pipe sprinkler system. Installation of new dry pipe sprinkler system throughout Building 49. I Kevin J.Cox MA Registration Number: 50253 Expiration date: 06/30/2018 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning': Architectural Structural Mechanical X Fire Protection Electrical Other: for the above named project and that to the best of my knowledge,information,and belief such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR),and accepted engineering practices for the proposed project. I understand and agree that I(or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a`Final Construction Control Document'. Enter in the space to the right a wet or electronic signature and seal: IN J. a Cox r FIRE PRorECTION 140.50253 Phone number: 781-270-5200 Email: kcox@jensenhughes.com NAL Building Official Use Only Building Official Name:_ Permit No.: Date: Note 1.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised.If`other'is chosen, provide a description. Version 06 11 2013 1 A�H CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DDNYYY) 11/21/2016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Chris Gregory Gregory Insurance Agency, Ltd vc NNo Extl: (978)356-0491 FAX No): (978) 356-5227 Po Box 625 E-MAIL ADDRESS: chris@gregoryinsurance.com INSURER(S)AFFORDING COVERAGE NAIC# Ipswich MA 01938 INSURERA: CITATION INSURANCE COMPANY 40274 INSURED INSURER B: First Mercury Insurance Company FRONTLINE FIRE PROTECTION INSURER C: Liberty Mutual 1820 Turnpike Street#209 INSURER D: INSURER E: North Andover MA 01845-6483 INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR I ADDL SUBR LICY EXP LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER MM DDY/YYYY MEFF M/DY /YYYY LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1000000 CLAIMS-MADE ❑X OCCUR DAMAGE TO RENTED PREMISES Ea occurrence $ 50000 X waiver of subrogation MED EXP(Any one person) $ 5000 B X additional insured SE-CGL-0000061346-01 01/17/2016 01/17/2017 PERSONAL&ADV INJURY $ 1000000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2000000 POLICY �X JE POLICY LOC PRODUCTS-COMP/OP AGG $ 2000000 X OTHER: $ AUTOMOBILE LIABILITY Oa accident)SINGLE LIMIT E $ 1000000 X ANY AUTO BODILY INJURY(Per person) $ A ALL OWNED SCHEDULED AUTOS X AUTOS BBQC41 09/25/2016 09/25/2017 BODILY INJURY(Per accident) $ X HIRED AUTOS X NON-OWNED PROPERTY DAMAGE AUTOS Per accident $ UMBRELLA LIAB OCCUR EACH OCCURRENCE $ 4,000,000 B X EXCESS LIAB CLAIMS-MADE SE-EX-0000061348-01 01/15/2016 01/15/2017 AGGREGATE $ 4,000,000 DED I I RETENTION$ $ WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY Y/N STATUTE I ER ANY PROPRIETOR/PARTNER/EXC OFFICER/MEM ER EXCLUDED?ECUTIVE E.L.EACH ACCIDENT $ 1000000 ❑ N/A 804579-01 03/02/2016 03/02/2017 (Mandatory in NH) If yes,describe under E.L.DISEASE-EA EMPLOYEE $ 1000000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT 1 $ 1000000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Sprinkler System Installation: Ruff n Tumble Playcare 1636 Osgood Street North Andover MA 01845 CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Town of North Andover ACCORDANCE WITH THE POLICY PROVISIONS. North Andover MA 01845 AUTHORIZED REPRESENTATIVE © 1988-2014 ACORD CORPORATION.All rights reserved. ACORD 25 (2014/01) The ACORD name and logo are registered marks of ACORD Commonwealth of Massachusetts Department of Public Safety License: SC-210048 Sprinkler Contractor CHARLIE RODGERS 4 ALDERSGATE V11AY NORTH READING MA 8 Expiration: t Commissioner 01/15/2018 limension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: . . ELECTRICAL: Movement of Meter location, mast or service drop,requires approval of Electrical Inspector Yes No ®ANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— (For department use) Njw I I J Notified for pickup Call Email ate Time Contact Name Doc.Building Permit Revised 2014 ;,