Loading...
HomeMy WebLinkAboutBuilding Permit #789-14 - 175 MAIN STREET 5/5/2014TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO:)PS _ Date Received Date Issued: M ORTANT: Applicant must complete all items on this page LOCATION r. PROPERTY OWNER I(- 6�,e-x Print 100 Year Old Structure yes no MAP NO: PARCEL: ZONING DISTRICT: Historic District yes no Machine Shop Village yes no .TYPE OF IMPROVEMENT PROPOSED USE S7Dt2/44A1\, /4- del Residential Non- Residential ❑ New Building ❑ One family ❑ Addition ❑ Two or more family ❑ Industrial ❑ Alteration No. of units: ❑ Commercial XRepair, replacement ❑ Assessory Bldg ❑ Others: ❑ Demolition ❑ Other ❑ Septic ❑ Well ❑ Floodplain ❑ Wetlands ❑ Watershed District ❑ Water/Sewer DESCRIPTION OF WORK TO BE PERFORMED: Identification Please Type or Print Clearly) OWNER: Name: Phone: Address: CONTRACTOR Name: V Address: 0757-67nI�tlsE � 2Er'7— S7Dt2/44A1\, /4- del Supervisor's Construction License: U ! 5 a Exp. Date: �" �P Gov Ll Home Improvement License:_ ARCHITECT/ENGINEER Address: WTOMl Reg. No r g0 FEE SCHEDULE: BOLDING PERMIT: $12.00 PER $1000.00 OF THE TOTAL ESTIMATED COST BASED ON $125.00 PER S.F. Total Project Cost: $ A, a FEE: Check No.: o� v 3 Receipt No.: 3 NOTE: Persons contracting with unre istered contractors deo notbrave access to the uaranty fund Signature of Agent/Ovvne ure of contractor Plans Submitted Li. ansaived ❑ Certified Plot Plan ❑ Stamped Plans ❑ Plans -Submitted ❑ Plans -Waived ❑ r -Certified Plot Plan ❑ Stamped Plans ❑ TYPE -OP S) WERAGEDISP.OSAL Public Sewer ❑ Tanning/MassageBodyArt ❑ .. _Swimming Pools ❑ Well ❑ Tobacco.Sales --Food Packaging/Sales ❑ -Private (septic tank, etc- Permanent D' nmpster on -Site ❑ THE_FOLLOWING SECTIONS FOR -OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE. REJECTED DATE APPROVED PLANNING & DEVELOPMENT- ❑ ❑ COMMENTS -CONSERVATION Reviewed on Signature COMMENTS HEALTH COMMENTS Reviewed on Signature Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes . Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection%Signature & Date Driveway Permit DPW To`r-: Engineer: Signature: Located 384 Osgood Street _FIRE DEPARTMIENT - Temp Dumps#er on site yes no Located -at 124 Mair; Street - Fire Departinel it sighatu"r`eldate"- COMMENTS ` Dimension - Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area; sq. ft.: -ELECTRICAL: Movement of. Meter location; n ast-or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: =Yes No MGL-.Chapter166.Section 21A -F and G min.$100-$1000:fine NU 1 is anti UA I A — p -or aepartment use I ® Notified for pickup - Date Doe.Building Permit Revised 2010 Building Department The following is'a list of:the r0uired.forms to be filled out for the appropriate permit to .be obtained. Roofiig, Siding, Interior Rehabilitation Permits Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Gr C.S.L Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster..permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (if Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the apodal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submJted with the building application Doc: Doc.Building Permit Revised 2012 Location �� AA Ill Date TOWN OF NORTH ANDOVER Certificate of Occupancy $ it Building/Frame Permit Fee $,2 ---'— Foundation Permit Fee $ Other Permit Fee $ TOTAL $ Check # Iq O ' V3"t Q 7 s� 4 Building Inspector LL D Q m C Nm a O LL OJ T N O- N p LU 0. z Q z = C '2 7 LL cr U LL O z Z C J d :3 LL' LL z Q U W W � W U i N C LL W z Q -C 7 K C LL z = ►u W LL L CCl O v N (U o Y 0 N n m O Q �^ a IE # c r �r `j'.` �► E a d d h r= p .r <v W ��.r O V r �� VQh c c o¢�P N o ,Np l CJ y p "rlu N J i iCD L a m > _ t moi+ O = d ' N — o0 > _ �a = .tt _O "j,"O O a c ? cn O O d c � 0)> N4B: mss m cc 0 o�=c = Q L ;n cc C O U) V m O co W = •a w O O w LL c/) = O ••� O W i 0 (D O � • C)CL �lFE cc mN •Q •o �•' = OJ 0 O. 0 U > 2 Z CD Z W a w H W CL V, v v 'f I W O O O 0 O Z N W Q •� m m CL I-- c O �1 w o o m O CL CL CL CF)a o _ Cc V_ J .Q O .a+ Z 4) O CL CLN CONTRACTOR/CONSTRUCTION CONTRACT THIS AGREEMENT, by and between DeviwNuzzi DrAn & Builders PONTRACT0% and _Larcdurnont Malt LLC with an address of 78 Lardhmont Road, M&M MA 02176 (OWNER). PRELIMINARY STATEMENT The CONTRACTOR has responsibility for wcxlc at the "OvAng described P OpedY. Property Name: Sturixidae Arms Street Address: 175 Main Shed Unit 5 CityfStaw Noon Ardyw MAA OWNER desires to lure CONTRACTOR to supply certain servicers with respeet to the lgperty aril the CONTRACTOR desim ID provide said services for the consideration Mein expressed: tt is agreed that CONTRACTOR shan perionn the neceSsay to =Mqft the WA de9cot8d hos 90 fespect ID the Property, all in accordance with the condiftions contained herein, incl ding the 0whed gerneral wdftrk, 0wh One CONTRACTOR ackncnedges that ft has read and with which is agrees to cx ►. THE WORK: CONTRACTOR agrees to famish all IaW and equipment do perform the g wok P X In a =xdaroe with the provisions of Exhibit A - Scope of SerAces, Exhibit B —Genual Cotnd66ars, E—Tads Completed and Payment Scinedule. X As described hereirn: TIME: CONTRACTOR agrees to begin worts on or about May 1, 2014„ and to conlPkie the Vftk on or before Jule 1. 2M4 as such date may be adeunded by the number of days CONTRACTOR is delayed from complebm of the Work tr weasons try beyond the control of CONTRACTOR. if CONTRACTOR does not complete the Work wam such time, any l;s ffwmd by OWNER resulting therefrom will be charged to CONTRACTOR and deducted from final payment. Purnch I'd its sb i be completed by CONTRACTOR within ten (10) days after the scheduled completion date. TIME IS OF THE ESSENCE IN THE PERFORMANCE OF THIS AGREEMENT PAYMENT: OWNER small pay CONTRACTOR for the performance of the Work the sun of $ 851400 as modifived by 1t changes approved in writing by the OWNER subseguent.to this Agreement; payable in 1 payment FK4L PAYMENT sha0 be made within ttrlrty (30) days after the OWNER cerbiies substantial impletion and acceptance of the mak shall be coriffuned upon compllarice with the provisbm of this cornual and CONTRACTOR twfthing a release of lien, in a ton awepWe to OWNER for itself, the GENERAL CONTRACTOR and its subcontractors and SuppLIM CONTRACTOR: By: ADDRESS: S7aA&W4r( /h4 O?JP OWNER: � �� � �1�"rl LL --C. ADDRESS: n,e�Sjo-- Vr\ ca t� Exhibit A SCOPE OF WORK Contractor to provide labor for the items specified herein as Exhibit A and agrees to provide this labor for a total contract price of o -•n 1, �+ arpri P2�vmeirts Material cost born by the Contractor will be paid by the Owner at a rate of cost plus 2004 All, material receipts must be provided with the material payment submitted. 2. tabor 1e:�ts Payments for labor will be made weekly according to the flowing procedure. Each Saturday Contractor will provide owner with a listing of completed work and related hours for work in place in a form as shown in ExhibitContractor for whw&er indicate if ork submitted on the labor provided for the tasks completed is within budget. Payment Saturday will be paid the following Wednesday. 3. mineral Conditions Contractor is responsible for the following general conditions as described below as they relate to this project, a. Obtain permits for work described herein if required. b. Work with electrician and plumber to complete project as described herein c. Patching & Painting: contractor is responsible for patching and painting of walls, ceilings, floors, as they are required to accommodate the plumber and electrician. d. Deliveries: owner will notify contractor of all deliveries and contractor will be available to receive those deliveries during the term of this contract Owner will provide 24 hours notice of all deliveries with a 2-4 hour delivery time window. 4, DISgos.l of Materials All construction debris is to be broken down and removed by contractor. 1. remove and dispose of carpet in living room and hall way 2. remove linoleum floor in kitchen 3. level the floor with floor leveler 4. install Allure flooring product in living room, hallway and kitchen S. install 2 door jams in entrance to each bedroom 6. remove and dispose of existing kitchen cabinetry and kitchen sink 7. install new kitchen cabinetry according to floor plan B. remove all existing closet doors - 5 doors total 9. hang new closet doors and install door knobs -, 5 doors total 10. install new lock set in main front door 11. install crown molding in the living room, kitchen and bath areas 12. remove and dispose of all wall tile and window frame in the bathroom 13. install new tile in the bath area only, frame in the window 12x24 vertical 14. install granite slab to window sill area 15, remove and dispose of existing vanity and medicine cabinet in the bathroom 16. prepare bath wail for paint 17. install new bath vanity with top and r back and side splash 18. install new flush mounted medicine cabinet 19. install a new the floor over existing bath floor -12x12 diagonal 20. install new file base molding in bath 21. install new bath door jam if necessary due to floor height 22. assist with installation of kitchen appliances if required 23. install file backsplash from kitchen countertop to bottom of cabinets -6 -diagonal 24. install new shower rod 25. install all kitchen and bath hardware as supplied by the owner 26. install closet systems in both bedrooms as supplied by owner 27. assist with coordination of kitchen countertop installer as required HL PIVEAM 1. Coordinate with and assist plumber as required to install existing disposal, install new fad in kitchen and bath, install new shower control in bath, replace toilet metal tubing and install new dishwasher. 1. Coordinate with and assist electrician as required to remove and install new kitchen, bedroom and bath lights. Move outlet in bath. Place kitchen light on a timer. install new kitchen appliances - stove. microwave and dishwasher. Install new outlets and some under cabinet lighting. 1. paint living room walls, ceiling, trim, crown molding and interior of main door 2. paint kitchen walls above the cabinets, side wall, ceiling and crown molding 3. paint both bedroom walls, ceiling, closet doors and woodwork 4. paint bathroom walls, ceiling, crown molding, woodwork and closet door S. paint all closets - 4 total - this includes the shelving in the bath linen closet 6. stain and polyurethane (3 coats) the 2 door jams entering bedrooms 1. Price of painting to include all prep work required, caulking, patching, sanding, cleaning priming as required. 2. All paint and stain is supplied by home owner 3. Painting price is for one coat of paint. Wali that need touch up after the first coat will be done on a time and :materials basis as instructed by owner. 4. All flooring and or new material are to be protected by contractor during painting. S. Any unforeseen work will be at a rate of $30.04 per hours with home owner approval. 6. Unit will left clean upon completion of project. This includes windows, sills, woodwork, countertops, tub and floors. Floors should be Swiffer dean or equivalent. Total Carpentry cost? $7,110 Total Painting cost: $1,400 Total Price $81510 Contract issues• 1. Payments made emery week on a Wednesday providing the week's labor completed. 2. Change Orders must be approved in writing by Owner before work t proceed. 3. Work submitted every Saturday - Contractor to submit weekly requisitions with work completed based on cost breakdown in scope of work above withWednesday- owner to review with Contractor the following Monday and payment to be made by ch h list's completed to owner 4. Holdback - a 10% holdback will be retained by the Owner U- i the Pune satisfaction. S. Contractor not responsible for electrical or plumbing work. CO form nee of Work All material, work and construction means and methods to be in confoOance with the Mass tate Building Code, 2013 edition. GRUMMAll work performed by Contractor and/or its subcontractors t actors be guaranteed for a period o one year from the date all punch items are completed an P by the Owner- Annr+avai of Work owner must approve all work Contractor may make a request for payment at the end of each week. in each case less a retainage of 10% of the contract amount will be held by the Owner. Retainage will be released when all punch list items are completed and accepted by Owner, Architect and Building Inspector as evidenced by a Certificate of occupancy. kJI site No product shall be installed unless it meets manufacturer's specifications or air temperature, conditions or ventilation requirements including but not limited to any type of caulking, joint compound, sealants, paint, polyurethane, vinyl flooring and carpet. EXHIBIT B THE FOLLOWING GENERAL CONDITIONS APPLY: tawr► tlAichaet Hoffman (� ag+� to defend, indemnify 1. IDEMNIFICATION and HOLD HARMLESS: TO the extent } �,ageft � � �, and against any and and hold harmless Lachmont Mamagermhent LI-C(awnerj including 3� fees and casts Wag in Wo* or in pari all claims, suits, liens, judgments. damages, lasses and expenses ' performance of any wok by � ^ its and in any mariner from acts, omissions, breach or defa<dt of oontracW, in connection *film pe offices, directors, agents employees and subnontractors• . bfe for the wood and emery Part ftnereof, and al Wok of 2. 1'tESPONSIBifITY OF CONTRACTOR: GQNTRACTOR sh�l be r+esPons+ m cx ri sA� whether by CONTRACTOR, its employees, subcontract ate• every description done or used in connection herewith or injury u from � cause � y or person used spwlc* and dsbnmfflly assume and does so assume ail risks of damage j rY ore or from die t property or peons used a any"adon or or employed on or in connection with the work, arid all damage or injutY wherever iodated, resufting from in connection with the Work and of all damage or injury to any Pew of property t tett and defend ARCHITECT and operation under this Contract or in connection with the Work, and undertake aero pmviori, protect fees, on Mme t of any such OWNER from and against all claims, Ides and expenses, � without lknitadion, aorrneys damage or It". CONTRACTOR will be held resporisiblB for C0mPM9 tte Work in accordanoe with the few, � �° harge, all kicider" RM any drawings whand ol ich may have been connection herewith.�, good reason for ming th the use d required as a pact of the Work even though not particularly speedt OWNER and any ma tedai, appliance or method of diction as stho wn or steed, it shall make teport of such vbj + obtair proper written adpsbrment before the Contract Is made. 3. MATERIALS AND WORMANSHIP: Unless otherwise speed, all materials shall be new, and CONTRACTOR sM provide arc pay for all labor, royalties and all tools and a quirpment, scaffolding and q0ances necessary to do the Work. Ail materials am workmanship shad be of good quafrty commensurate with the type and class of construction, and in keeping wrTh 90 intended uses and shah be at all tines subject t approval or moctiorn fa' W cause by OWNER and ARCHITECT. Whenever equo nent o materials are specified as definite "or equal" substifntions for the afire spndtetf must have the wmlften approval of ft OWNER. 4. ORDINANCES, LAWS AND PERMITS: AN pits and floes necessary far the PMMM" of the Work Shan be seed and pail for by the CONTRACTOR and reimbursed by OWNER, unless otherwise specified in 9. CONTRACTOR shall give all notices and comply with ail lawns, ordinances, nties aero re901110M bearing on the conduct of the Work as dawn and specn6ed. ff Contract perfomrns any Work knowing it to be contrary to any of such ins, ordin , uncles and re � � made um►IaT the notice,Contractor otdin bear all costs and damages arising therefrom or in connection therewith. Final payment a Certificate of Occupancy from the Town of North Andover, MA Ruiidirng lnspecW' 5. ROYALTIES AND PATENTS: CONTRACTOR shall pay all royalties and lige fees. It shad defend all suds or claims R infringement of any patent rights and shaft save the OWNER, harmless from loss on account thereof. S. INSPECTIONS AND ACCEPTANCE OF WORK: OWNER or ARCHITECT and its fePM ntallm sia at all limes have access t the Work wherever ft is in preparation or progress and the CONTRACTOR shall provide facilities for such aces and Inspection. A materials and workmanship shaft be subject to inspection and acceptance by OWNER or ARCHITECT. Upon reques CONTRACTOR shalt furnish OWNER or ARCHiTef T with a fist of the Materials to be used and the maWW homm from WIMM'th materials for the Work mentioned in this Contract tare been purchased, and no payment will be made on acoount of the Work don until after Inspectim and acceptance of the Watt done. Should CONTRACTOR fait to cant out any part of this Contract or if th Work is not done to OWNER or ARCHrrECrs satisfaction, or any work requited for payment is not completed or h cormclive a* by the co ntractor is not made in a timely fashion or corrections made, owner may deduct the cost thereof from the amount awed t the CONTRACTOR hereunder or otherwise 7. CORRECTION OF WORK AFTER FINAL PAYMENT: Nettfter final Payment nor any other PtO4siOn In the CMVWshad retie~ CONTRACTOR of responsb1ity for faulty materials or workman* and, unless othenwie specIlled, it shah remedy any defects dt thereto and pay for any damage to other work resuitirig therefrom, which shall appear within a period of one year fmm the date final completion, as evidenced by Final payment of retainage. OWNER or ARCHITECT shad give node of observed dekft hwi reasonable promptness. Mwvied In for c orders will be allowed only when work is by OWNER filled � aEra e � �N g EE 13igs hangs by the OWNER before work commences. Ail extra work outside the scope of aan sur to be and ntbish shall be g. RESTORATION OF THE PREMISES: Before teavinq the 6 as completed, all surplus materials. core removed from the premises and the house shag be left clean and ready for occuPMstr be free iron herein, CONTRACTOR guar that a# Work m be 1l}. GUARANTEE: Unless clti�erwise sperm without east � OWNER, or their' � defects and workmanship fora with the delle of cyear and such hi be P� 0 � Ma Paynient Of any MMkW and assigns. The one year will snag be undertaken by owWs funds. At owners' option, any defect in work not covered by within 3Q days notice selected contractor and billed to contractor. or d of 1. TITLE: CONTRACTOR shall ensure that OWNER shall have to tree and clear f � p completed 1 to and stored at said lab site which Wads at the job site and to all materlats delivered st worts and covered by this Contract. 12. TAXES: CONTRACTOR shall pay all sales, use and other taxes of every kind, appkJ* to the peffionnairoe of this order: 13. ASSIGNMENT: CONTRACTOR shall not assign this Contract or any monies to became due hereunder WMW the pd" written consent of GENERAL CONTRACTOR. 14. TERMINATION: This Contract may be terminated by OWNER without notice upon non-perfon by CONTRACTOR, wit" reason, or by giving contractor twenty four (24) hours notxe in writing or email in which event all rights, tables and, ObI41111" t "Mparties hereto shag fofty i �, and CONTRACTOR shag his fo&with removie any and all of equipment and premises and shag thereafter have no further right to enter upon ft Prop * wfilrout permission of owner- in addition, this COMM is automatically cancelled upon sale of the Property. 15. EXHIBITS OR ATTACHMENTS: 9 the provisions of any Exhibit or Attachment to this Contract are in conW with the WASIM the pians and specifications, the provisions of this contract shall prevall. 16. SUBCONTRACTS: CONTRACTOR, as soon as practicable atter the award of this Contract, shag famish to Owner in t names of all subcontractors to be used. CONTRACTOR shall not employ any ntractor to whom OWNER has made a time) objection. AN subcontracts shy tie subioct to this Contract. 17. OTHER WORK: OWNER reserves the right to perform other Work on the Pmperhl by itsel or by othe+< oaf 18. LIEN RELEASE: CONTRACTOR to execute a final wanner of lien upon mutual acc9ptarlm of final payment and retease of retamagto the undersigned, the completion of all punch list &MFurihemmore, for aril in consideration of PAID IN FULL paid whereof is hereby aikro+uledged, the undersigned does Y n � for tabor' amdMlem and �mater€a€, gerre:ai nquish any and � of ��tlorr � whk the undersigned may now have upon the premises above alteration and/or otherwise. 19. REQUIiTIONS AND ACCEPTANCE OF WORK: requisitions for paymenls must be provided to the owner on no Weir than Saturd: at 5:00pm for the week of work proc:eedimrg that Saturday. Work in place will be Inspected on the blowing Monday Owner withhold payment on any worts not to owners' satisfaction or if in the owners opinion the work being billed In the r+equrisition is not place. 20. SCHEDULING: CONTRACTOR to provide a schedule which deur when the scope of work Indentifiet! in paragraphs, it and III exhibit A (scope of work). 29 . REtIAOVAL OF WASTE: Contractor will remove all waste by using a 'p truek or O#w vehicle in a timely fashion. 22. PAINTING. CONTRACTOR to make best effort to avoid getting paint on new materials andlor final finishes, CAxilracfar is responsil for removal of aR paint from any final finished surface It is not intended for. Arry finish material that meds to be replaced as a r+esull paint stains will be at contractors' sole expense. 23. ON SITE PRESENCE: CONTRACTOR (Michael Hoffman) pledges to be on site 75% of the time during the life of ft =#a% i . ,_m........,..w...,.,^�.vvwa f w nil wArk oral f;wm rzmaleted by veople in his employee 0 subc0rM3CM Or agents paid dimly Contract AINSMS payments made every week on a Wednesday � g* s f 1 •in writing by Owner before work to proceed used on oast l clown 2, Change Orders —must 6e approvedG� to summit fly with Monday � � � be made 3. W0fk submitted every SaEturdaY-the following in scope Of wodC above with �� ��. �M � review � Cantra�r by check on Wednesday. completed to �staetion. 4. Holdback — A 100% holdback will be retained by the until the punch lSt is comp 5. Conte notresponsible for electrical or plumbing Conformaooe of VNorkState Bulling Code, 24!13 materials, wank and �n means and methods to be in c onfo mom' the ��sa�huseds All mat Ethilon. Guaranteendlor its subcontractors vnll be guxxbed for a period of one year from the date all punch list AN work � by Contractor items are completed and accepted by the Omer. AooM of Work Owner must approve of all work. p and Retainage In each case less a retainage of 10% of the �r may make a request for payment atm be � when all punch first items are completed and as by , amount will be held by the Owner., Architect and Building inspector as evidence by a Cer"cate of OccupancY. Adherence to oroduci manufacture MIS s WWkakons or air temperature, site ca4W or ve 4a*m 14o product shall be installed unless it caulking, joint end, wants, paint, polyurethane, vinyl tb xft, and requirements including but not limited to any type Of carpet. 1 Massachusetts - Department of Public Safety Board of Building Regulations and Standards Construction Supervisor License: CS 101958`,/ KENNETH J DEVJTCE _ 88 CONVERSE STREET n s STONEHAM Mk 02180 R' Expiration Commissioner 07/06f,2014 CJ/ce `�ori�,��zcvr�,coea�/� o�'C'�lcc�s�ir�u�c<(/r Office of Consumer Affairs & Business Regulation _jOME IMPROVEMENT CONTRACTOR ? = Type: eegistration: 174822 xpiration: 3/20/2015 LLC DEVIN-NUZZI DESIGN &`BUILDERS, LLC. KENNETH DEVINVENT 88 CONVERSE STREET STONEHAM, MA 02180 Undersecretary The Commonwealth of MassachusettsSLX - _Department of XndlusMa1 Accid&ts 40 Office offnvesiigafions 600 Washington Street Poston, ltfA 02111 www.massgov/dia Workers' Compensation Insurance Affidavit: Builders/Cont°actors/.Elec£xxczansfPliunbers Applieant Information Please Print Lem 'Na]be(Businesslorganizationitndividual): 7:gNgUZ21 CNSrfzVCTlonl Address: IS: ('nZsT 11Awr&J be q City/State/Zip: �3.,,z1,�c� ;oma, A o �o Phone #: Are you an. employer? Check the appropriate box: Type of project (required): 1. [( I am a employer with 4. ❑ I am a general contractor and I 6• r] New construction. employees (M and/or pax- time) * 2. �� I am a sole proprietor or paitnex have Hired the sub -contractors listed on the attached sheet. 7• ❑ Remodeling '§hip and'have no -employees These sub -contractors have 8. [(Demolition working for mein any capacity. workers' comp. insurance. g• Building addition [No workers' comp. insurance 5. ❑ We area corporation and its ME] Electrical repairs or additions required.] 3. [( I am a homeowner doing all work officers have exexcised.their right of exemption per MGL - 11. ❑ Plumbing repairs or additions myself: [No workers' comp. c. 152, §1(4), andwe have no 12.0Roofrepairs insurancerequixed.] i employees. [No workers' 13.[] Other comp. insurance required.] Mny applicantthat checks box#f must also fill out the section below showingtheir workers' compensationpolicy information. T'Homeowners who submit this affidavit indicaiingthey kdoing all work and then hire outside contractors must submit anew affidavit indicating such. TContractors that checkthis box must attached an additional sheet showingthe name ofthe sub -contractors and their workers' comp. policy information. I am an employer that is providing workers' compensation insurance for my employees Below is thepolley andjob site information. Insurance Company Policy /# or Sell Ins. Lic. #: Expiration Date: lob Site .A-ddress: 05- 5- M N ! Tf�-F J W IT City/State/Zip: DO UL Attach a copy of the workers' compensaiionpolley declaration page (showing the policy number and expiration date). Failure to secure coverage as requiredunder Section 25A ofMGL o.152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well .as civil. penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA. for insurance coverage verification. Mo HerebyQQder Mepains and fenalties ofperjury Mat Me information provided above is true and correct. Signature: 77ALAJ� C Date: 3-I l / / -4 Phone#• I %F— V-5- Official S Official use only. Do not write in this area, to be completed by city or town official. City or Town: Permialcense # Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other - Contact Pers Phone #: