Loading...
HomeMy WebLinkAboutBuilding Permit #119 - 188 CHESTNUT STREET 8/15/2006 TOWN OF NORTH ANDOVER %►ORTF/ APPLICATION FOR PLAN EXAMINATION o�s�`Eo o p Permit NO: Date Received SA Date Issued: CHUs�� s � IMPORTANT: Applicant must complete all items on this page LOCATION b 14 Z StV U7 <T Print PROPERTY OWNER :J- IV A{SS.4/e'- Print MAP NO.: PARCEL: ZONING DISTRICT: TYPE AND USE OF BUILDING HISTORIC DISTRICT YES ❑ TYPE OF IMPROVEMENT PROPOSED USE Residential Non-Residential ❑New Building Q?One family ❑ Addition ❑Two or more family ❑Industrial ❑Alteration No. of units: 4 Repair, replacement ❑Assessory Bldg ❑Commercial ❑Demolition ❑Moving(relocation) ❑Other ❑ Others: ❑Foundation only DESCRIPTION OF WORK TO BE PREFORMED ST R.l P a,-4c R( ISLL , Id A,+c-/<- P o k(,ff w 7* Identification Please Type or Print Clearly) OWNER: Name: /11 Phone: 92g' .2-S M Address: C N es /� U— S'fi YO CONTRACTOR Name: ,�o c: �-1 Ind E S-/ /�-�. 5 � Phone-�I �' 6i�S'YSO Y I)j-'3 ( 6 ,p �14/� Address: w• 4 CIV-7 A u.-r (� ,n'rn A a c a g y Supervisor's Construction License: C-5 06595 Exp. Date: ?L-X5- JoU Home Improvement License: l 2.1, 1 t Exp. Date: ARCHITECT/ENGINEER Name: Phone: Address: Reg. No. FEE SCHEDULE:BULDING PERMIT.$10.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost :$ Is C"o D X1.8.60=FEE:$ Check No.: J S q Receipt No.: 3 5 Page I of 4 Location l SF-- e HzR TiJV) No. Date W. I o 61 MORT1TOWN OF NORTH ANDOVER 1 Certificate of Occupancy $ 19 i Building/Frame Permit Fee $ �cMus Foundation Permit Fee $ Other Permit Fee $ TOTAL $ Check # �� s Building Inspector TYPE OF SEWARGE DISPOSAL Swimming Pools 11e� Tanning/Massage/Body Art ❑ g Public Sewer ❑ Tobacco Sales Food Packaging/Sales ❑ Well ❑ ❑ Permanent Dumpster on Site Private(septic tank,etc. ❑ Electric Meter location to proj ect NOTE: Persons contracting with unregistered contractors do not have access to the aranty fund Signature of Agent/Owner Signature of contractor Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ tamped Plans ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF-U FORM DATE REJECTED DATE APPROVED PLANNING& DEVELOPMENT ❑ ❑ []Water Shed Special Permit ❑ Site Plan Special Permit ❑ Other COMMENTS E REJEC D DATE APPROVED � V CONSERVATION 99 l K COMMENTS f DATE REJECTED DATE APPROVED HEALTH ❑ ❑ COMMENTS Zoning Board of Appeals: Variance,Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water&Sewer connection/Sianature&Date Driveway Permit Temp Dumpster on site yes no)� Fire Department signature/date Building Setback (ft.) Front Yard Side Yard Rear Yard Required E Provided Require Provides Required Provided Dimension Number of Stories: Total square feet of floor area,based on Exterior dimensions. Total land area,sq. ft.: NOTES and DATA—(For department use) r. Page 3 of 4 Doc:INSPECTIONAL SERVICES DEPARTMENT:BPFORM05 Created 1MC.Jan.2006 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work Addition Or Decks ❑ Building Permit Application ❑ Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:INSPECTIONAL SERVICES DEPARTMENT:BPFORM05 Pa-e 4 44 f 8 0° Cy ,5-7-x/vT s� �t/• ,�fe/DO r/c,C. Soo 5 F i, Oxy fyr i s J LAuv►'��, � i �a r Jor r yao� 1 1 � J N wFv m OD ,, `* 2y� s NJ ti I HEREBY CNRTIFY TIO I= rRU MSUROR AND PL 0 T PLAN TO WE BANK THAT THE DULLWG IS LOCATTD ON IN THS LOT As ssonv AND THAr IT DOES CONFORM N� ,,q�✓.Oa vE�' /j'�,q, VVH T711��4-�Qli'.✓,�,�oo�E�e80N1NG RROUTArIONS REGARDING SETBACKS PROM STRRRTS & LOT LWRS." " I FURTHER CERTIFY THAT THIS DVILLWO IS NOT DRAW FOR LOCATED IN THR PRDER�R�IL FLOOD HAZARD ARRA AS SHOWN ON PRMA CP, �xY PANRL z soo 98 ooa co e SrRPH 3rlStlP KI, R.L.S. DATR THIS PLAN RPOSES - NOT FOR MRMMACK RYGIMRRRING SERVICES BOuxDARY BOUNDARY INFORMATION gs PARK STRREr rAxSx FROM R CORDS. ANDOVER, MASSACHUSBrVIS 01810 a 1T`• r -- 1' x:,� `moi (1 LI IAORTH Town of Andover No. f i ower, �f• oto !S O t-- C A E d , Mass., Y COC HICHEwICK ^ ADRATE D S BOARD OF HEALTH PERMIT T D Food/Kitchen Septic System BUILDING INSPECTOR THIS CERTIFIES THAT........... .a . ...................................................................................................... Foundation has permission to erect... ............. buildings on ......1.�. ,W.......C,. !� ..... ............... Rough to be occupied as............ .... ..�1R. .I. b*-co-tv.....�. ;!.C.:h... .................. Chimney provided that the person accepting this permit shall in every respect conform to the terms of the application on file in Final this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRU ARTS Rough ....z ...... ......................................................... Service BUILDING INSPECTOR Final Occupancy Permit Required to Ocmpy Building GAS INSPECTOR Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To BeDone FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. SEE REVERSE SIDE Smoke Det. J. Sirois Woodworking and Construction Invoice No. PO Box 246 Methuen, MA 01844 Tel. 978-685-4504/Cell 978-360-8448 INVOICE Customer Misc -7 Name Mr&MRS H J Nassar Date Address 188 Chesnut ST Order No. City No Andover State Ma ZIP 01845 Rep Phone 978-258-6995 FOB Qty Description Unit Price TOTAL 1 Strip old porch and rebuild new deck in back of house with pressure 1 treated and trex.Railing with weatherbest system. 1 Material and labor $15,900.00 $ 15,900.00 1 Down payment i SubTotal $ 15,900.00 Shipping Payment Select One... Tax Rate(s) Comments TOTAL $ 15,900.00 Name CC# Office Use Only Expires Insert Fine Print Here G_ /15� ' l) Insert Farewell Statement Here BOARD OF BUILDING REGULATIONS License: CONSTRUCTION SUPERVISOR Number: CS 065857 Birthdate: 12/29/1952 Expires: 12/29/2006 Tr.no: 5449.0 Restricted: 00 JOCELYNE SIROIS PO BOX 246 G- METHUEN, MA 01844 Commissioner �„\ �fze tam�noozusea�l�. �'✓��i,�:fure�u.6e� _ Board of Building Regulations and Standards p� HOME IMPROVEMENT CONTRACTOR la - - - ` Registration: 126398 Expiration: 5/26/2008 Type: Individual Jocelyne Sirois Jocelyne Sirois 77 Elm St Methuen, MA 01844 Deputy Administrator f TTH F `� T. � • '' r r � } i yy ° rT ��m � E } • e NORTH Of,�T>.eD r8q ti „ . O y C p 1s 9 SSAGHUS� CONSERVATION DEPARTMENT Community Development Division August 3, 2006 Mr. &Mrs. H J Nassar 188 Chestnut Street North Andover,MA 01845 RE: REJECTED BUILDING PERMIT APPLICATION: 188 Chestnut Street,North Andover,MA Dear Mr. &Mrs. Nassar, As you are aware, the North Andover Conservation Department conducted a site inspection at the above-referenced property relative to a building permit application. It is my understanding that you are proposing to demolish the existing deck in order to construct a new deck. Based on the information given in the building permit application,the deck will be built slightly larger than what exists. Furthermore,your contractor will be utilizing the existing sonotubes and install a few more to support the larger deck. As previously discussed, there is a jurisdictional Bordering Vegetated Wetlands (BVW) that traverses beyond the fence / rear property line. Measurements were taken from the approximate edge of the wetland resource area the location of the proposed deck. It was determined to be approximately 80-feet from the edge of the BVW at its closest point. As such,the Conservation Department had REJECT your building permit application as work is being proposed within the jurisdictional 100-foot Buffer Zone. Furthermore,you will be required to file under our`Small Projects Review'with the North Andover Conservation Department and Commission. Please be aware that the Building Department will not issue you a building permit until you have obtained all applicable departments. You will be required to submit a written scope of work (prepared by you or your contractor), including a plot plan with the proposed work and the approximate location of the wetland and its distance from the proposed deck.This plan must be drawn to scale. In addition, there is a $25.00 filing fee that shall be made payable to the Town of North Andover. Once the Conservation Department is in receipt of this proposal,either you or your contractor shall contact the undersigned to schedule a pre-construction meeting to go over the project. Based on the information given at the meeting, this department will prepare a letter of approval,which has to be ratified by the Conservation Commission within 4 weeks from the submission date. The Conservation Commission will be meeting on August 9th and 23`d. If we receive the above-mentioned information 1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845 Phone 978.688.9530 Fox 978.688.9542 Web www.http://www.townofnorthundover.corn/conserve1.htm by 12 noon Tuesday,August 8, 2006 it may be possible to schedule a pre-construction meeting and have the Conservation Commission ratify the project at the August 9`h meeting. Should you have any questions regarding the filing process,please do not hesitate to contact the undersigned at your earliest convenience.Thanking you in advance for your anticipated cooperation with this matter. Respectfully, NORTH ANDOVER CONSERVATION DEPARTMENT PP�� e� Merrill Conservation Associate Cc: Gerry Brown, Inspector of Buildings Alison McKay,Conservation Administrator Jocelyne Sirois,J. Sirois Woodworking and Construction File 1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845 Phone 978.688.9530 fax 978.688.9542 Web www.http://www.townof northandover.(om/con serve Lhtm