Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Building Permit #186-13 - 21 HIGH STREET 9/5/2012
BUILDING PERMIT NORTti ���q.EO TOWN OF NORTH ANDOVER o ; APPLICATION FOR PLAN EXAMINATION _F �V M b Permit N�: Date Received '�gp�R�TE• 1SSACHUS�� Date Issued: /2 IMPORTANT:Applicant must complete all items on this page LOCATION� PROPERTY°OWNERS _ Pring , 100iYear Stn�cture yes.i no MAP'210 , PARCEL: t3' ZONING+DISTRICT:_ Historic0s- trict+ (0� no: MachinejShop:Village es no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family ❑Addition ❑Two or more family ❑ Industrial Alteration No. of units: .Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑Demolition ❑ Other El Septic. UVell 0_,MOodplain N-W6iiantls. p Watershed:District ❑Water/Sewer - DESCRIPTION OF WORK TO BE PREFORMED: Identific tion Please Type or Print Clearly) OWNER: Name:.�yr'0 TKIYASzo-"Cr-A , Phone: 1 (� IIll Address: I l �+0� I,�U d �/ CONTRACTOR Name:' \� r `^� Rhone:. .. . 'L 1 Address"I C K\1N Y.J. (a� 3 3 ExPI Date:. S.iapervisor's Construction Li cense:_ Home Improvement License:_ Exp;. Dater_ ARCHITECT/ENGINEER S_Vvgr "r Q& C-- Phone: ID tib- Lt-1-1-1 Address: o �-c1k t �� 9411- -- V-1:0 OReg. No. 0 J f r FEE SCHEDULE:BULDING PERMIT:$12.00 PER$9000.00 OF THE TOTAL ESTIMATED COS T44BASED ON$925.00 PER S.F. Total Project Cost: $ b b FEE: $ —1 Check No.: \° I — Receipt No.:, NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund Signature.of Agent/Owner gnature of coritractorg Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments WAter $c Sewer Connection/Signature& Date Driveway Permit DPW'Town Engineer: Signature: Located 384 OsggcLd Street FIREDEPARTMENT Temp'Dbmpster on site yes, no . Located at"l241Maih4Sti:eet; , Fire Departmentisignature/d'a`te COMMENTS, ;. _ Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— For department use ® Notified for pickup - Date E Doc.Building Permit Revised 2010 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks o Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract Li Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products MOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products 10TE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:Building Permit Revised 2008 Location e2l / ' �i 17 SJ- No. _ �-3 Date�c. • • TOWN OF NORTH ANDOVER xf,rtv'rxga Certificate of Occupancy $ Building/Frame Permit Fee $ o * Foundation Permit Fee $ Other Permit Fee $ a�h.t�r TOTAL $ Check#Alf—l- • 25683 Building Inspector Location No. Date--�7L� L • - TOWN OF NORTH ANDOVER s ..�... Certificate of Occupancy $--Z�— Building/Frame Permit Fee $ Foundation Permit Fee Other Permit Fee $ TOTAL $ � Check# /b�& 25718 t13661cl g Inspector NORTM 3a.•e. '•. oc �t•o r i ,SSICRU`'E4 CERTIFICATE OF USE & OCCUPANCY TOWN OF NORTH ANDOVER Building Permit Number 086-13 on 9/5/2012 Date: September 18, 2012 THIS CERTIFIES THAT Dowslake - Suite 208A THE BUILDING LOCATED ON 21 High Street, North Andover MA MAY BE OCCUPIED AS tenant build out - office space IN ACCORDANCE WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY APPLY. Certificate Issued to: RCG N.A. Mills LLC 21 High Street North Andover,MA�01845 Bui ding Inspector Fee: $100.00 Receipt: 25718 Check : 1056 NoRTN ownAndover o :_ - 0 - � No. /� �` � � h ver, Mass, ' �A-O� COC MIC IwIC/c y1� 7 pDRAT E D 9S U BOARD OF HEALTH PERMIT T LD Food/Kitchen Septic System BUILDING INSPECTOR �� ................................................ ................. THIS CERTIFIES THAT •••••••••••• ..••• ,•• [;�ndation ................................... has permission to erect .......................... buildings on gql..f.�I..!�fi..�2... .............. to be occupied as ......... ........:............. Za ion provided that the person accepting this permit shall in every respect conform to the terms of thAltepaton andon file in this ofhce, and to the provisions of the Codes and By-Laws relating to the Inspection, BI INSPECTOR Construction of Buildings in the Town of North Andover. Rough VIOLATION of the Zoning or Building Regulations Voids this Permit. Final ELECTRICAL INSPECTOR PERMIT EXPIRES IN 6 MONTHS UNLESS CONSTRUC I N STARTS Rg� ............ Service' ........ ............................... Fin BUILDING INSPECTOR GAS INSPECTOR O�ccupancy Permit Required to Occupy Building Rough Fin Display in a Conspicuous Place on the Premises - Do Not Remove FIRE DEPARTMENT No Lathing or Dry Wall To Be Done Burner Until Inspected and Approved by the Building Inspector. Street No. Smoke Det. SEE REVERSE SIDE a SUITE 208A EAST MILL Sheet List Sheet Number Sheet Name A-000 SUITE 2085A.-.p,, E-R SHEET A-001 SUITE 208A GENERAL NOTES A-200 SUITE 208A - PARTITION PLAN A-400 SUITE 208A - ELEVATIONS, SECTIONS & DETAILS SITE PLAN SUITE 208A (3N RED q STANTEC ARCHITECTURE& ENGINEERING, P.C. �����pAs.SMi�F�FDrawing Number 303 Congress Street,6th Floor SUITE 208A-COVER SHEET Project Issued 8/29/2012 Na.tooso A-000 Boston,MA 02210 C-.1 NEWSURYPORT TEL:617 423 4252 2ND FLR B-2 Sheet Issued 08/23/10 jMASS. Project No. FAX:617 423 4333 Stantec www.stantec.com RCG,LLC-EAST MILL Scale 1/8"=1'0" 218410072 0 vv GENERAL NOTES PARTITION NOTES FINISH NOTES 1. ALL WORK PERFORMED ON THIS BUILDING SHALL BE IN COMPLIANCE WITH 1. ALL STUD PARTITIONS SHALL HAVE DOUBLE STUDS AT ALL DOOR JAMBS,OPENINGS, 1. REPAIR EXISTING DRYWALL AS REQUIRED TO RECEIVE NEW PAINTED ALL`PERTINENT CODES,RULES, ORDINANCES,AND REGULATIONS OF THE AND CORNERS. FINISH.PAINT WITH ONE(1)FINISH COAT OF BENJAMIN MOORE REGAL LOCAL,STATE, AND FEDERAL GOVERNING AUTHORITIES. AQUAVELVET EGGSHELL#319.COLOR TO BE SELECTED BY TENANT. 2.ALL PARTITION DIMENSIONS ARE TO FACE OF GYP.UNLESS OTHERWISE NOTED. 2. CONTRACTOR SHALL NOTIFY THE ARCHITECT,IN WRITING,OF 2. ALL NEW DRYWALL TO BE TAPED,SPACKLED AND PAINTED WITH ONE(1) DISCREPANCIES FOUND ON THE DRAWINGS. 3. ALL JOINTS IN GYPSUM BOARD ARE TO BE TAPED AND JOINTS TREATED OVER THE PRIME COAT AND TWO(2)FINISH COATS OF BENJAMIN MOORE REGAL FULL HEIGHT OF THE PARTITION. AQUAVELVET EGGSHELL#319.COLOR TO BE SELECTED BY TENANT. 3. THE CONTRACTOR SHALL FIELD-VERIFY ALL DIMENSIONS AND JOB CONDITIONS,AND WILL NOTIFY THE ARCHITECT,IN WRITING,OF ANY 4. AT ALL PARTITIONS WHICH INCLUDE SOUND INSULATION,CAULK W/CONTINUOUS BEAD 3. ALL NEW AND EXISTING HOLLOW METAL FRAMES TO BE PAINTED WITH CONFLICTS OR DEVIATIONS FROM THE DRAWINGS. OF USG ACOUSTICAL SEALANT(NO SUBSTITUTIONS)UNDER THE TRACK AND UNDER THE TWO(2)COATS OF BENJAMIN MOORE SATIN IMPERVO C235 ALKYD ENAMEL. EDGE OF EACH BASE LAYER OF GWB,AND AT ALL INTERSECTIONS,PERIMETERS,AND COLOR TO BE SELECTED BY TENANT. 4. ALL WORK PERFORMED UNDER AND IN CONNECTION WITH THESE PENETRATIONS. CAULKING PROCEDURE SHALL BE TO PLACE A HEAVY FILLET BEAD OF DRAWINGS SHALL BE IN STRICT COMPLIANCE WITH THE LATEST O.S.H.A.SAFETY CAULKING ADJACENT TO THE RUNNER PRIOR TO THE INSTALLATION OF THE GWB SUCH *ALL FINISHES TO BE COORDINATED BETWEEN TENANT AND OWNER AND HEALTH STANDARDS. THAT WHEN THE BOARD IS SUBSEQUENTLY INSTALLED IT COMPRESSES THE BEAD COMPLETELY FILLING THE GAP OF EACH GYPSUM BOARD LAYER.SEE PARTITION 5. ALL CUTTING,DEMOLITION,AND PATCHING OF NEW CONSTRUCTION,WHICH SCHEDULE FOR ADDITIONAL REQUIREMENTS. IS NECESSARY FOR THE INSTALLATION OF NEW CONSTRUCTION OR EQUIPMENT,SHALL BE PERFORMED BY THE CONTRACTOR WHO IS TO SUPPLY 5. ALL PARTITIONS SHALL BE SECURELY FASTENED WITH APPROVED FASTENERS. AND INSTALL THE NEW CONSTRUCTION OR EQUIPMENT,UNLESS NOTED SYMBOLS OTHERWISE. INSTALL LINTELS WHERE REQUIRED. MAINTAIN FIRE RATINGS AS 6. PROVIDE ADDITIONAL BRACING AT PARTITIONS AS REQUIRED,TO ASSURE ADEQUATE REQUIRED BY APPLICABLE CODES AND AS INDICATED ON THE DRAWINGS AND LATERAL RIGIDITY. SPECIFICATIONS. 7. ALL GYPSUM BOARD SHALL BE 5/8"THICKNESS,UNLESS NOTED OTHERWISE. 6. THE CONTRACTOR SHALL PROVIDE ACCESS PANELS AS REQUIRED FOR NEW DOOR ACCESS TO MECHANICAL CONTROL DEVICES. CONTRACTOR SHALL 8. PROVIDE FULL HEIGHT VERTICAL CONTROL JOINTS AT ALL GYPSUM BOARD COORDINATE REQUIREMENT FOR FIRE RATED ACCESS WITH PARTITION PARTITIONS. SPACE CONTROL JOINTS AT A 30'-0".MAXIMUM OF HORIZONTAL RUN. RATING. ALL ACCESS PANELS IN RATED PARTITIONS MUST MEET OR EXCEED PROVIDE CONTROL JOINTS AT ONE SIDE OF DOOR FRAME FROM DOOR HEAD TO CEILING CODE REQUIREMENTS. THE CONTRACTOR SHALL COORDINATE INSTALLATION IF POSSIBLE. PROVIDE CONTROL JOINTS AT COLUMN CENTER-LINES OR AS CLOSE TO OF ACCESS PANELS WITH ALL FINISH WORK. COLUMN CENTER-LINE AS POSSIBLE. — EXISTING DOOR TO REMAIN 7. CONTRACTOR SHALL PROVIDE F.R.T.WOOD OR STEEL STRIP BLOCKING 9.INFILL ALL VOIDS WHERE THE TOP OF PARTITIONS AND STRUCTURAL DECKS JOIN WITH BETWEEN STUDS FOR WALL-MOUNTED EQUIPMENT. APPROVED FIRESTOPPING MATERIAL. NEW PARTITION 8. CONTRACTOR SHALL COORDINATE LOCATION OF BLOCKING FOR WALL- 10.CO-ORDINATE LOCATIONS OF SPECIAL DOOR HARDWARE REQUIRING MOUNTED ELECTRICAL EQUIPMENT WITH ELECTRICAL REQUIREMENTS AND REINFORCEMENT OF PARTITIONS. EXISTING PARTITION TO REMAIN FOR OTHER WALL-MOUNTED EQUIPMENT WITH APPROPRIATE REQUIREMENTS. 11.MINIMUM STUD GAUGE TO BE STE-25.PROVIDE HEAVIER GAUGE WHERE INDICATED OR EXISTING BRICK WALL TO REMAIN 9. ALL SURFACES SHALL BE PUT INTO PROPER CONDITION TO RECEIVE PAINT WHERE REQUIRED BY HEIGHT OF PARTITION. AND OTHER FINISHES. CONTRACTOR IS RESPONSIBLE FOR DEFECTIVE WORK FIRE EXTINGUISHER CABINET FROM ANY CAUSE, INCLUDING UNSUITABLE AND IMPROPERLY PREPARED 12. EXISTING GWB WHICH IS INDICATED TO REMAIN&IS NOT BEING COVERED BY NEW FEX SURFACES. FOLLOW MANUFACTURER'S RECOMMENDATIONS. GWB SHALL BE PATCHED/REPAIRED AS REQUIRED TO PROVIDE A LIKE NEW CONDITION IN ALL FINISHED SPACES. ROOM NAME ROOM NAME 13.JANITOR'S CLOSET OR OTHER WET AREAS SHALL BE WATER RESISTANT GWB. 101 ROOM NUMBER PROVIDE WATER RESISTANT FIRERATED GWB WHERE RATED PARTITION SURROUNDS A WET AREA. a PARTITION TAG OKEYNOTE f_ STANTEC ARCHITECTURE & ENGINEERING, P.C. 5� AS, Cy�TF Drawing Number j 303 Congress Street,6th FloorProject Issued 8/29/2012 A-001 / Boston,MA 02210 SUITE 208A- GENERAL NOTES � No.10®Sb TEL:617 423 4252 2ND FLR B-2 Sheet Issued 08/28/08 NEWBURYFCRT y Project No. FAX:617 423 4333 Staff tec www.stantec.com RCG,LLC-EAST MILL Scale As indicated 218410072 OORTH own of ndover O. y. No. h ver, Mass, 5� Y 0 Nl2W coc .cm 1. ORATED PPp`�'�5 S V BOARD OF HEALTH PERMIT T D Food/Kitchen Septic System 0 � BUILDING INSPECTOR THIS CERTIFIES THAT ` //��• has permission to erect .......................... buildings on ....... .. ...•••••••• .................................... Foundation Rough Ste. .. to be occupied as .........�[ ` ``4L F ?` ••••• •••�• /; .�•;�• •E ••• Chimney ........ .... provided that the person accepting this permit shall in every respect conform to the terms of the applica ion Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR Rough VIOLATION of the Zoning or Building Regulations Voids this Permit. Final PERMIT EXPIRES IN &,MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUC ,I N STARTS Rough Service ......... . ...................................... Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. SEE REVERSE SIDE ILL IMM INN 3.00 3.PP 3.QQ EXPLANATION OF SCOPE: ALL EXISTING PARTITIONS TO REMAIN.THERE IS NO DEMOLITION AS PART OF THIS SCOPE.SCOPE INCLUDES ADDITION OF NEW DEMISING PARTITION AND NEW PANTRY. I I ELEC I I I I I I OFFICE OFFICE 2-208A-3 I 2-208A� 2-208A-5 I I ELEC STRUCTURE ABOVE 2-208A-2 I I I I � I I ' I ACOUSTIC JOINT BOTH SIDES I 0I I I I METAL STUD RUNNER I 3 5/8"METAL STUDS Z FEX � QI OPEN OFFICE I I Al i 2-208A-1 i i 5/8"GWB BOTH SIDES SOUND ATTENUATION I I I I I I I I INSULATION,NOM.THICKNESS TO MATCH FRAMING DEPTH I I I I I I I I I 11 A-400 I I I I METAL STUD RUNNER ACOUSTIC JOINT BOTH SIDES TYPE Al FLOOR STRUCTURE COINIMON CORRIDOR I I SCOPE OF I 62.200 I I WORK LINE I I 1 Suite 2O8A-Floor Plan 1/8" = 1'-0" . STANTEC ARCHITECTURE & ENGINEERING, P.C. �cc��\ap,,s.s,��� >F�� Drawing Number 303 Congress Street,6th Floor SUITE 208A-PARTITION PLAN Project Issued 8/29/2012 No.IOM A-200 r Boston,MA 02210 c NENURypa{J TEL:617 423 4252 Sheet Issued 8/27/2012 Project No. FAX:617 423 4333 2ND FLR B-2 � MAS Scale As indicated 218410072 S#.antec www.stantec.com RCG,LLC-EAST MILL / 3/4"PLYWD.BLOCKING, ATTACHED TO STUDS BEYOND,TYP. CONCEALED HINGE / CUSHION CLOSE CABINET STOPS ON ALL CABINET DOORS,AND DRAWERS,TYP. o ° CABINATE DOOR FRONTS, MATERIAL&FINISH,TBD M / a a o (2)ADJUSTABLE SHELVES 3 0 LIGHT FIXTURE 10'-0" _o 1/2' 4"BACKSPLASH 2'- 1" COUNTERTOP M / COUNTERTOP MATERIAL TBD III 4., CD ———————————————— DRAWER ONMTL. LO ———————————————— SLIDE FRONT PANEL 2 / — a' o FINISH,TBD BLOCKING,TYP. Q ° ° / �, ADA S.S.SINK 0 0 / ° ° / REMOVABLE PANEL, Q N CUSHION CLOSE 04z FINISHE TO MATCH o ° CABINET STOPS iv ADJACENT CABINET ON ALL CABINET DOOR FRONTS, DOORS,AND / ——— SIDE PANEL,FINISH T.B.D / DRAWERS,TYP. FINISH FLOOR FINISH FLOOR 3'-6" 3'-0" 3'-6" SECTO'�/@(BA ESC/4B ilr4EN // / SUITE 208A — PANTRY ELEVATION DRAWER BLOCKING,TYP. SECTION ACCESSIBLE SINK 1 1/2" = 1'-0" 2 1" = 1'-0" 3 r STANTEC ARCHITECTURE &ENGINEERING, P.C. � , , '��c� Drawing Number ttt Project Issued 8/29/2012 303 Congress Street,6th Floor SUITE 208A-ELEVATIONS,SECTIONS&DETAILS � sem. A-400 Boston,MA 02210 Sheet Issued 09/08/09 9PT Project No. TEL:617 423 4252 2ND FLR B-2 MASS. FAX:617 423 4333 SUntec www.stantec.com RCG,LLC-EAST MILL Scale As indicated `� 218410072 �lussachusctts- Dcpartntent of Public Safet% 1 Board of Building' Reu,ulation; andtandard� j4 Construction Supervisor License i t y License: CS 66334 KIERAN T WHELAN 31 RICHMOND ST ' WEYMOUTH, MA 02188 Expiration: 9/26/2013 Tr#: 6168 ( unuiiisiuncr " II I Standard Form of Agreement between Owner and Contractor where the basis of payment is the Cost of the Work Plus a Fee without a Guaranteed Maximum Price Date: -August 30;��20'12 - ' Owner: RCGNorth.Andover Mllls LLC C/o RCG LLC . 17 Ivaloo Street,Suite 100 Somerville, MA 02.1-43: Contractor: JK4Coft"ractingLLC 3I.Ri hmond Street Weymouth,.MA,02188 Architect: Stantec Project Name: Dowsiako Suite 208 The Owner and Contractor agree to the terms stated by this contract. This contract supersedes any prior agreements,representations,or negotiations,oral or written. No liquidated damages shall apply to this agreement. This contract consists of the following documents: 1. Obligations of the Parties 2. Contract Sum 3. Project Schedule 4. Signatures Exhibits Exhibit A: Estimated Cost of Work Exhibit B: Project Schedule Exhibit C: Drawings Pagel of 4 I 1. Obligations of the Parties Obligations of the Contractor: The Contractor accepts the relationship of trust and confidence established by this Agreement and covenants with the Owner to cooperate with the Architect and exercise the Contractor's skill and judgment in furthering the interests of the Owner; to furnish efficient business administration and supervision; to furnish at all times an adequate supply of workers and materials;and to perform the Work in an expeditious and economical manner consistent with the Owner's interests and in compliance with all applicable governmental codes and regulations. The Contractor shall keep full and detailed accounts and exercise such controls as may be necessary for proper financial management under this Contract. The Contractor shall keep full and detailed records of all books, records, permits, licenses, correspondence,receipts, instructions, data, and drawings associated with the Project including all Subcontractor contracts, invoices,vouchers, insurances, lien waivers, and other correspondence. The Owner and Owner's Accountants shall have access to review, audit, and copy all Contractor documentation. The Contractor shall retain these documents for a period of three years after final payment. The Contractor.shall maintain insurance at the following levels with the Owner listed as a co- insured: Type of Insurance Limit of Liabili Commercial General,Liabili $[,OOO;OQOOh Upon request, and at the cost of the Owner,the Contractor shall obtain a performance bond up to the total Cost of Work. Such costs shall be added to the Construction Volume. The Contractor understands that the Project may be financed by a construction lender and, then, by a permanent lender. The Owner may assign any of its rights under this Contract to the construction lender and the Contractor hereby consents to any such transfer provided no such assignment shall relieve the Owner of any of its obligations under this Contract, unless agreed to in writing by the Contractor. The Contractor shall execute any certificates, lien waivers, releases, receipts, and other documents as may be reasonably required by the construction lender or permanent lender including a subordination of its mechanic's lien rights to the construction lender's and permanent lender's mortgage or deed of trust.The construction lender for the Project will be: Obligations of the Owner: The Owner agrees to furnish or approve, in a timely manner,information required by the Contractor and to make payments to the Contractor in accordance with the requirements of this Agreement. Dispute Resolution: Claims,disputes or other matters in question between the parties to this Agreement shall be resolved by mediation or by arbitration. Prior to arbitration,the parties shall endeavor to reach settlement by mediation. Page 2 of 4 i 2. Contract Sum Cost of Work: The Contractor shall provide a detailed estimated Cost of Work to the Owner(see Exhibit A).The sum of these costs, including the fee is as shown below: Contractor's Fee: 10%of Total Construction Volume. Total Construction Volume includes all construction trades, general requirements, insurance, bonds and miscellaneous costs deemed necessary to perform the construction of the project, but excludes permits and fees. Permits and Fees shall be paid directly by the Owner. Construction management labor, standard tools and equipment, and labor-related overhead are covered"within the fee". Subcontractors: The Contractor plans to hire Subcontractors to perform the majority of construction associated with this project. The Contractor shall provide the Owner and Architect information on all of the bids received by Subcontractors and the names of the Subcontractors selected. Owner shall have the right to reject a proposed Subcontractor; however, in the event that this leads to a higher Cost of Work, the Owner shall pay for the difference. The Contractor reserves the right to reject any Subcontractor, even if it is the lowest bid, and to dismiss Subcontractors from the job that have been previously approved by the Owner. Payments: The Owner shall make progress payments on the Contract Sum according to the Requisition process described below. The Contractor shall, at the conclusion of each calendar week on the project, present to the Owner an application for payment(Requisition)for costs incurred during that month. The Requisition shall include all invoices, vouchers, partial releases of liens, expense reports, and any other evidence to support the validity of the Requisition amount. The Contractor may requisition for completed, but unpaid work based on an expectation of payment upon receipt of funds. The Owner, the Architect, or their representatives shall be afforded five(5) business days to review such application and question the Contractor about its contents. In the event there are no disputes, the Owner shall pay the Contractor within 10 business days of receipt of the Requisition, Payment by the Owner does not represent that the Owner or Architect have made a detailed examination.of the documentation, inspection of the work, or verification of the accounting. At the completion of the project,the Owner shall make a final payment to the Contractor based on a final Cost of Work with a truing up of fees. If further corrections to work are required that are not covered under warranties with Subcontractors, or that are not the outcome of negligence or poor workmanship by the Contractor,the Owner shall pay the Contractor for any work associated with performing the corrections based on the hourly rate agreed to in this contract. Retainage: The Owner shall not hold back any fees to the Contractor to ensure completion of the work. The Contractor will be expected to hold back fees from Subcontractors to ensure their performance based on the terms below: Non` Page 3 of 4 P Termination of Contract: The Owner shall reserve the right to terminate or suspend the Contract at its sole discretion. Within 15 days of termination or suspension, the Contractor shall present an accounting of all its costs incurred for reimbursement by the Owner. If the Owner elects to proceed with the project without the Contractor, the Owner shall have the right to assume the Subcontracts and agreements related to the Project. 3. Project Schedule Date of Commencement: The Contract Time shall be measured from the date of commencement.The date of commencement of the Work shall be the date of this Agreement, unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. Se ternber 1,2Q1!2 or such time that Notification to Proceed is qivehbyOwner' Contract Time: The Contractor shall provide to the Owner a Project Schedule(see Exhibit B), This Schedule is based on assumptions reached prior to the signing of this contract,which assumptions the Contractor shall attempt to clarify in the Schedule. However, the Schedule always assumes the Owner and the Architect respond promptly to requests for information and do not request any significant changes to the construction program. In the event that the Owner or Architect find any discrepancies with the Schedule or its Assumptions, they will promptly notify the Contractor,who shall make adjustments to the Schedule as necessary. According to the attached Schedule,the Contractor shall achieve Substantial Completion of the entire Work as follows: Date of Substantial Com° letion,to be no later than September 30 2012. 4. Signatures The Owner's representative is: David Stenbergt Manager RCG North Andover Mills LLC 171valoo Street;Suite-1'00 Somerville;MA 02143 §14.4 The Contractor's representative is: Kieran Whelan JK`ContractIng LLC 31 Richmond Street Weymouth,,MA 02188 Owner Contractor Si nature Signature .� ra ( J 6C rinted Name and Title Printed Name and Title (_L- �— Page 4 of 4 R 1 Dowslake Suite 208 Estimated Cost Schedule of Values 8130/2012 General Conditions $ 500.00 Demolition $ - Carpentry-Frame wall and install cabinets $ 1,000.00 Drywall&tape $ 600.00 Prime and Paint $ 600.00 Materials: Framing, Drywall and Glass $ 600.00 Flooring Custom Woodwork $ - Cabinetry&Countertops $ - Plumbing $ 1,500.00 Sprinkler Work $ Electrical $ 650.00 HVAC $ Cleaning&dumpsters $ 550.00 Sub-total $ 6,000.00 JK Contracting flee $ 600.00 Total $ 6,600.00 Plus Building Permit $ 84.00 The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street Boston,MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Cr- Address: 3 1 C n n�vL rQ City/State/Zip: �'ls Yy , � ��1 phone#: Are you an employer?Check the appropriate box: Type of project(required): 1.❑ I am a employer with 4. 0 I am a general contractor and 1 6. ❑New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet. ®Remodeling ship and have no employees These sub-contractors have 8. ❑Demolition working for me in any capacity. workers' comp.insurance. 9. ❑Building addition [No workers' comp.insurance 5. ❑ We are a corporation and its required.] officers have exercised their 10.❑Electrical repairs or additions 3.❑ 1 am a homeowner doing all work right of exemption per MGL 11.0 Plumbing repairs or additions myself. [No workers' comp. c. 152, §1(4),and we have no 12.❑Roof repairs insurance required.] employees. [No workers' comp.insurance required.] 1311 Other *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information. 1 am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site Information. //��//�� 1 Insurance Company Name: L i n cyt q- 1'1 l}7-m a- l Policy#or Self-ins.Lic.#:_W C CL, kZ 0 Q-1,& Expiration Date: fob Site Address: ti ( ��1 ( , q 6 City/State/Zip: V 4�-/y Y0'p-,_ kttach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a [tne up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine )f up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of nvestigations of the DIA for insurance coverage verification. !do hereby cer,ify under the pains and penalties of perjury that the information provided bove is rite and correct ii nature: Date: 'hone Ane#, J Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit[License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: Information and Instructions Massachusetts General Laws chapter 152 requires all employers to provide workers' compensation for their employees. Pursuant to this statute,an employee is defined as"...every person in the service of another under any contract of hire, express or implied,oral or written." An employer is defined as"an individual,partnership,association,corporation or other legal entity,or any two or more of the foregoing engaged in a joint enterprise,and including the legal representatives of a deceased employer,or the receiver or trustee of an individual,partnership,association or other legal entity,employing employees. However the owner of a dwelling house having not more than three apartments and who resides therein,or the occupant of the dwelling house of another who employs persons to do maintenance,construction or repair work on such dwelling house or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer." MGL chapter 152, §25C(6)also states that"every state or local licensing agency shall withhold the issuance or renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant who has not produced acceptable evidence of compliance with the insurance coverage required." Additionally,MGL chapter 152,§25C(7)states"Neither the commonwealth nor any of its political subdivisions shall enter into any contract for the performance of public work until acceptable evidence of compliance with the insurance requirements of this chapter have been presented to the contracting authority." Applicants Please fill out the workers' compensation affidavit completely,by checking the boxes that apply to your situation and,if necessary,supply sub-contractor(s)name(s),address(es)and phone number(s)along with their certificate(s)of insurance. Limited Liability Companies(LLC)or Limited Liability Partnerships(LLP)with no employees other than the members or partners,are not required to carry workers' compensation insurance. If an LLC or LLP does have employees,a policy is required. Be advised that this affidavit may be submitted to the Department of Industrial Accidents for confirmation of insurance coverage. Also be sure to sign and date the affidavit. The affidavit should be returned to the city or town that the application for the permit or license is being requested,not the Department of Industrial Accidents. Should you have any questions regarding the law or if you are required to obtain a workers' compensation policy,please call the Department at the number listed below. Self-insured companies should enter their self-insurance license number on the appropriate line. City or Town Officials Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant. Please be sure to fill in the permit/license number which will be used as a reference number. In addition,an applicant that must submit multiple permit/license applications in any given year,need only submit one affidavit indicating current policy information(if necessary)and under"Job Site Address"the applicant should write"all locations in (city or town)."A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the applicant as proof that a valid affidavit is on file for future permits or licenses. A new affidavit must be filled out each year.Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture (i.e.a dog license or permit to burn leaves etc.)said person is NOT required to complete this affidavit. The Office of Investigations would like to thank you in advance for your cooperation and should you have any questions, please do not hesitate to give us a call. The Department's address,telephone and fax number: The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street Boston,MA 02111 Tel. #617-727-4900 ext 406 or 1-877-MASSAFE revised 5-26-05 Fax#617-727-7749 www,mass.gov/dia NORTH_ OFFICE OF BUILDING INSPECTOR 3? TOWN OF NORTH ANDOVER CONSTRUCTION CONTROL +SS•KN11S PROJECT NUMBER: 218410072 PROJECT TITLE: SHIT 208&_ DEMISING PROJECT LOCATION: East Mills, Water Street, N. Andover NAME OF BUILDING: Building 2, 2nd Floor NATURE OF PROJECT: Corporate Fit Out 1N ACCORDANCE WITH ARTICLE 116 OF THE MASSACHUSETTS STATE BUILDING CODE, I, Linda S. Smiled REGISTRATION NO. 1(1Q8Q BEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECH HEREBY CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ENTIRE PROJECT ❑ ARCHITECTURAL © STRUCTURAL ❑ MECHANICAL ❑ FIRE PROTECTION ❑ ELECTRICAL ❑ OTHER(SPECIFY) FOR THE ABOVE NAMED PROJECT AND THAT,TO THE BEST OF MY KNOWLEGE, SUCH PLANS, o COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISION OF THE MASSACHUSETTS STATE BUILDING CODE,ALL ACCEPTABLE ENGINEERING PRATICES. AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND B EPRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.0 1. Review, for conformance to the design concept,shop drawings, samples and other submittals which are submitted by the contractor in accordance with the requirements of the construction documents.. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become,generally familiar with6the progress and quality of the work and to determine, in general, if the work is being �ERED ARc performed in a manner consistent with the Construction documents. PURSUANT TO SECTION 118.2.2 1 SHALL SUBMIT WEEKLY, A PROGRESS REPOR No.10000 TOGETHER WITH PERTINENT COMMENTS TO THE NORTH ANDOVER BUILDING INS Q ihSURWGRT MASS. e� UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR OCC U ANCY. IGNATu SUBSCRIBED AND SWORN TO BEFORE ME THIS�__DAY OF {$ 07 NOTARY PUBL C MY COMMISSION EXPIRES`��� �