HomeMy WebLinkAboutBuilding Permit #176 - 21 HIGH STREET 9/9/2008 pORTH
BUILDING PERMIT �`
TOWN OF NORTH ANDOVER 0
APPLICATION FOR PLAN EXAMINATION -
�
Permit NO: b Date Received �9sSgcHus��c
Date Issued: T --'— '-
IMPORTANT: App licant,xfiust complete all items o this-page
IN
� g.%,(O.I��P.,z� h EJ11 �� Aw
,,NP
, PR�!
P x�aE'r£�' � ��'�P d ® s�.� � - � .'.-dIwI3'iT. � : �' :•s�y-a���'"
k �
TYPE OF IMPROVEMENT PROPOSED USE
Residential Non- Residential
❑ New Building ❑ One family
❑ Addition ❑ Two or more family ❑ Industrial
Alteration No. of units: o Commercial
❑ Repair, replacement [IAssessory Bldg ❑ Others:
[IDemolition ❑ Other
IMW ;. s.r,
DESCRIPTION OF WORK TO BE PREFORMED:
uAk Nb`1 �
L (57taP Y L.9 tSZ-- J c_ r J K ►�1 G
Identification Please Type or Print Clearly) -b Z�- 8� i
OWNER: Name: Phone:
Address
t �- v f ct cid ®2 I01
`-t-
RV
IRK
�yy"^;,�,�,, _ s^'tE
[ L v �lan. � �y.
777
Address
'
MIS L
ARCHITECT/ENGINEER +� ��'� l ` , Phone: L3
CJ 2`1-t V
Address: `
C91 d'6V'`f Reg. No. l C) Q a
FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 R S.F.
Total Project Cost: $ 0 0 Q
FEE: $ AN
�—'
Check No.: Receipt No.:
NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund
5lgrrattare tl �e owner .� ,�.. -58 b tore o co c or
. .�. — R.
y
J
Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑
TYPE OF SEWERAGE DISPOSAL
Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑
Well ❑ Tobacco Sales ❑
Food Packaging/Sales ❑
Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF - U FORM
DATE REJECTED DATE APPROVED
PLANNING &.-DEVELOPMENT ❑ ❑
COMMENTS
DATE REJECTED DATE APPROVED
CONSERVATION ❑ ❑
COMMENTS
DATE REJECTED DATE APPROVED
HEALTH ❑ ❑
COMMENTS
Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision: Comments
Conservation Decision: Comments
Water& Sewer Connection/signature& Date
Located at 384 Osgood Street - Driveway Permit
:a F3 c x
Whp pe or� syep � q7a
apc,��
L
r•.mow a. �„
Dimension
Number of Stories: Total square feet of floor area, based on Exterior dimensions.
Total land area, sq. ft.:
ELECTRICAL: Movement of Meter location, mast or service drop requires approval of
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes
MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NO
NOTES and DATA— For department use
f
I
❑ Notified for pickup - Date
.................... ........................................................................................................................................... ..................................................................................... ...................................................................... ....................................
Doc.Building Permit Revised 2007
Building Department
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
❑ Building Permit Application
❑ Workers Comp Affidavit
❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses a
❑ Copy of Contract
❑ Floor Plan Or Proposed Interior Work
❑ Engineering Affidavits for Engineered products
i
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition Or Decks
❑ Building Permit Application
❑ Certified Surveyed Plot Plan
❑ Workers Comp Affidavit
❑ Photo Copy of H.I.C. And C.S.L. Licenses
❑ Copy Of Contract
❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Mass check Energy Compliance Report (If Applicable)
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
New Construction (Single and Two Family)
❑ Building Permit Application
❑ Certified Proposed Plot Plan
❑ Photo of H.I.C. And C.S.L. Licenses
❑ Workers Comp Affidavit
❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Copy of Contract
o Mass check Energy Compliance Report
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
that the appeal period is over. The applicant must-then get this recorded at the Registry of Deeds. One copy and proof of recording
must be submitted with the building application
Doc:INSPECTIONAL SERVICES DEPARTMENT:BPFORM07
Revised 2.2007
{
Location
No. 1716 ! Date
�oRT� TOWN OF NORTH ANDOVER
' Certificate of Occupancy $
s'••�°'E<� Building/Frame Permit Fee $
s�cMus
Foundation Permit Fee $
Other Permit Fee $
TOTAL $
Check # 0A 7 f O
1 490 /Building Inspector
Location
No. /76 Date P41 1p
TOWN OF NORTH ANDOVER
t�RTM
pf•"•O ,•,yC
• i a
Certificate of Occupancy $ /d U
Building/Frame Permit Fee $
SACNUSE
Foundation Permit Fee $
Other Permit Fee $
TOTAL $
Check # 0 0 756
233 , 4
Building Inspector
. NQ
SSACHUS
CERTIFICATE OF USE & OCCUPANCY
TOWN OF NORTH ANDOVER
Building Permit Number 176 Date: August 31, 2010
THIS CERTIFIES THAT
THE BUILDING LOCATED ON 21 High Street, North Andover, MA
MAY BE OCCUPIED AS Leap Year Publishing IN ACCORDANCE WITH THE
PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER
REGULATIONS AS MAY APPLY.
Certificate
Issued to: RCG N.A. Mills, LLC
21 High Street,North Andover,MA 01845
Building Inspector
Fee: $100.00
Receipt. 23302
N
OR fl �1���'P1 f�'1
Vercod
o 0 o
No.
l A K o over, Mass.,
COCHICHEWICK y1.
SRATED PP��.(�
BOARD OF HEALTH
PERMIT T D Food/Kitchen
Septic System
f BUILDING.INSPECTOR
THIS CERTIFIES THAT........... . .........
.. �. <.���s......
Foundation
/� un ation
has permission to erect....... ................................ buildings on-4f.4.41 1��....... ......................... ...................... Rough
to be occupied as .....�5 ';' t �� �, �/' �/�/•� < AAly �Y Chimney
?. ...... ........... . '�Z... .................. ......
provided that the person accepting this permit shall In every respect�bnform to the terms of thea lication on file in Final
this office, and to the provisions of the Codes and By-Laws relating to the Inspection Alteration and Construction of
Buildings in the Town of North Andover. ��/' �� PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
PERMIT EXPIRES IN 0 MONTHS Final
ELECTRICAL INSPECTOR
UNLESS CONSTRUCTION STARTS Rough
ti... � .. .. service
................... ........
BUILDING INSPECTOR
Final
Ur i.�pctrl y Permit Required to Oca4py Building GAS INSPECTOR
Rough
Display ., onlouu Place on the Premises — Do Not Remove Final
0, �►thing or Dry Wall To Be Done FIRE DEPARTMENT
until Ins,0ected and Approved by the Building Inspector. Burner
Street No.
SEE REVERSE SIDE Smoke Det.
BURT , H ILL
October 31, 2008
Mr. Gerald Brown
Inspector of Buildings
Town of North Andover
1600 Osgood Street
North Andover, MA 01845
Re: LeapYear Publishing Tenant Fit-out
East Mills, North Andover
Burt Hill Project 07804.10
Dear Mr. Brown:
The tenant improvements for LeapYear Publishing on the second floor of Building One, at East Mills in
North Andover, MA, were to the best of my knowledge, belief, and understanding, constructed in
conformance with the construction documents issued for building permit dated September 9, 2008
Permit# 176 in accordance with 780 CMR Commonwealth of Massachusetts building code. During
the course of construction, representatives of our office made periodic visits to the site to observe the
progress of the work.
Sincerely,
BURT HILL
S-,EFtED AFC
� F
Linda S. Smiley,AIA NEWBU1gvp0R-r C/3y MASS.
Senior Associate oy ,J5
r
G
Phone: 617.654.6003 OF MpSgP
cc: Ken Shea
Skip Rose
David Steinberg
Architecture Engineering Interior Design Landscape Master Planning
303 Congress Street 6"Floor Boston MA 02210-1012
tel: 617.423.4252 fax: 617.423.4333 www.burthill.com
VhORTH
Town over
4: 10
No.
dover, Mass.
C%
4( 0
'� y, a�
3 r
C0CHjCHEWjC! 3%.
\
0RATED C
BOARD OF HEALTH
Food/Kitchen
i
PERMIT T D Septic System
BUILDING INSPECTOR
THIS CERTIFIES THAT ............ .............................................. ...... ...
..... Foundation
has permission to erect
........ ........................ buildings on -d'I.A�.WlAt
............................... ................. Rough
Chimney
to be occupied as....... .........................
....... ...vq!� ........... A
provided that the person accepting this permit shall in every respect abnform to the terms of the a0lication on file in Final
this office, and to the provisions of the Codes and By-Laws relating to the Inspection Alteration and Construction of
Buildings in the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRES IN MONTHS ELECTRICAL INSPECTOR
UNLESS CONSTRUCTION STARTS
Rough
............
Service
BUILDING INSPECTOR Final
Occupancy Permit Required to Occupy Building GAS INSPECTOR
Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry;Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved, b' the Building Inspector. Burner
Street No.
SEE REVERSE SIDE Smoke Det.
_ Y
NOTICE NOTICE
TOTO
EMPLOYEES EMPLOYEES
of MassachusettsThe Commonwealth .
DEPARTMENT OF INDUSTRIA., ACCIDENTS
6W washington Street,Boston,Massachusetts 02111
617-7274900
As required by Massachusetts General Law,Chapter 152, Sections 21,12-& 30, tills will give you
notice that I(we)have provided for payment to our injured employees under the above mentioned
chapter by insuring with:
ASSOCIATED EMPLOYERS INSURANCE COMPANY
NAME OF INSURANCE COMPANY
54 THIRD AVENUE P.O.BOX 4070 BURLINGTON,MA 01803-0970
ADDRESS OF INSURANCE COMPANY
woo 5005531412005 05/10/2008 - 05/10/2009
POLICY NUMBER EFFECTIVE DATES
24 Federal Street 4th Floor
Boston Insurance Brokerage Inc Boston,MAA 02110 (617)W-7000
NAME OF INSURANCE AGENT ADDRESS PHONE
RCC Builders LLC 17 Ivaloo Street-Suite 100 Somerville, MA 02143
EMPLOYER ADDRESS
03/10/2008
EMPLOYERS WORKERS COMPENSATIO OFFICER
FFI E AN
(W Y) DATE
ME'
The above named insurer is required is canes of personal injuries arising out of and in the course of employment to fornith
adequate and reasonable bo*W and medical services in accordance with the provisions of the Workers Compensation Act.
A copy of the First Report of Injury must be given to the igju;ed employee. The employee may select his or her own physician.
The reasonable cost of the services provided by the treating physician will be paid by tl►e-insurer,if the treatment 6 necessary
and reasonably connected to the work related hdary. In cases requiring hospital attesttlan,employees are hereby notiW Nut
the hmmr has unma ed for such attention at the
NEAREST AND BEST MEDICAL FACILITY
NAME OF HOSPITAL ADDRESS
TO BE POSTED BY EMPLOYER
NQ, FD 5932 Dae
GF NOpTH,�
TOWN OF NORTH ANDOVER
RECEIPT
This certifies
has paid......
for.0. .--�, T f.G.... f .............................
Received
.................
Department ....... ................................I............... .........
WHITE. Applicant CANARY:Department PINK:Treasurer
BUILDERS
Leapyear
21 High Street
North Andover, MA
SCHEDULE OF VALUES
03-Sep-08
Spec Section Description Estimated Amount
06400 Millwork $2,000.00
08080 Doors and Windows $4,000.00
09250 Gypsum board $10,000.00
09650 Resilient flooring $1,500.00
09680 Carpet $16,000.00
09900 Painting $7,000.00
10800 Toilet and Bath Accessories $50.00
11400 Food Service Equipment $450.00
12500 Furniture&Accessories $50,000.00
15300 Fire Protection $2,000.00
15400 Plumbing $1,000.00
15500 HVAC $5,000.00
16160 Electrical $12,000.00
TOTAL PROJECT VALUE: $111,000.00
Permit Rate: 1.2% PERMIT FEE: $1,332.00
y.�
BUILDER'S
Standard Form of Agreement between Owner and
RCG Builders LLC where the basis of payment is
the Cost of the Work Plus a Fee without a
Guaranteed Maximum Price
Date: rt
Owner:
!j l 3 t F¢'E
�.
XMA
C
Contractor: r : s
:a arae 77
..5
Architect: ,^ I � � '� '�
t
3
ti��218 1 kf ^P€'fxY3'ia,t
H-
4 ✓ s^�� .�54. �. "� nom,N...•:,:: ��
Project Name: pY ;°apceaRiQVte
The Owner and Contractor agree to the terms stated by this contract. This contract
supersedes any prior agreements, representations, or negotiations, oral or written. No
liquidated damages shall apply to this agreement. This contract consists of the following
documents:
1. Obligations of the Parties
2. Contract Sum
3. Project Schedule
4. Signatures
Exhibits
Exhibit A: Estimated Cost of Work
Exhibit B: Project Schedule
Exhibit C: Drawings
Page 1 of 7
f �
BUILDERS
1. Obligations of the Parties
Obligations of the Contractor:
The Contractor accepts the relationship of trust and confidence established by this Agreement and
covenants with the Owner to cooperate with the Architect and exercise the Contractor's skill and
judgment in furthering the interests of the Owner; to furnish efficient business administration and
supervision; to furnish at all times an adequate supply of workers and materials; and to perform
the Work in an expeditious and economical manner consistent with the Owner's interests and in
compliance with all applicable governmental codes and regulations.
The Contractor shall keep full and detailed accounts and exercise such controls as may be
necessary for proper financial management under this Contract.
The Contractor shall keep full and detailed records of all books, records, permits, licenses,
correspondence, receipts, instructions, data, and drawings associated with the Project including all
Subcontractor contracts, invoices, vouchers, insurances, lien waivers, and other correspondence.
The Owner and Owner's Accountants shall have access to review, audit, and copy all Contractor
documentation. The Contractor shall retain these documents for a period of three years after final
payment.
ment.
The Contractor shall maintain insurance at the following levels with the Owner listed as a co-
insured:
Type of Insurance Limit of Liability
0 er 4a , WWAli Qt I t t1 ,=M 5 E r ,
"� { q
..F �.
Upon request, and at the cost of the Owner, the Contractor shall obtain a performance bond up to
the total Cost of Work. Such costs shall be added to the Construction Volume.
The Contractor understands that the Project will be financed by a construction lender and, then, by
a permanent lender. The Owner may assign any of its rights under this Contract to the construction
lender and the Contractor hereby consents to any such transfer provided no such assignment shall
relieve the Owner of any of its obligations under this Contract, unless agreed to in writing by the
Contractor. The Contractor shall execute any certificates, lien waivers, releases, receipts, and other
documents as may be reasonably required by the construction lender or permanent lender including
a subordination of its mechanic's lien rights to the construction lender's and permanent lender's
mortgage or deed of trust. The construction lender for the Project will be:
Obligations of the Owner:
The Owner agrees to furnish or approve, in a timely manner, information required by the
Contractor and to make payments to the Contractor in accordance with the requirements of this
Agreement.
Dispute Resolution:
Claims, disputes or other matters in question between the parties to this Agreement shall be
resolved by mediation or by arbitration. Prior to arbitration, the parties shall endeavor to reach
settlement by mediation.
Page 2 of 7
t
BUILDERS
2. Contract Sum
Cost of Work:
The Contractor shall provide a detailed estimated Cost of Work to the Owner(see Exhibit A). The
sum of these costs, including the fee is as shown below:
SM .'X
yy
Change Orders:
The Contractor does not guarantee the Contract Sum in any form. In the event of changes to the
Contract Sum, the Contractor will present written changes to the owner for costs that exceed the
Contract Sum in the form of a Change Order. The Contractor will review all Subcontractor Change
Orders before submittal to the Owner and Architect and make a recommendation for payment or
non-payment. The Contractor's Fee will be calculated including any approved Change Orders.
The Owner, Architect and Contractor will negotiate disputed Change Orders in good faith.
Contractor's Fee:
15%of total construction volume up to$1 million, and 10%of construction volume over$1
million. This includes pre-construction and project management services, and field personnel and
associated management overhead. The fee is based on actual costs incurred, with final true up,
and is booked monthly in arrears. Specifically,
1. The cost of pre-construction and construction management services provided by RCG
personnel is booked monthly in arrears based on the hours reported by each employee.
2. Hours are billed at the standard hourly billing rate established from time-to-time for each
employee. The hourly billing rates effective 1/1/2007 are shown below.
3. The cost of pre-construction and construction management services provided by
independent contractors is booked when invoiced and carried within the fee.
4. RCG Builders personnel functioning as tradesmen outside their management duties will
be charged according to their hourly billing rate.
5. If a project is terminated or suspended by the Owner prior to completion, RCG Builders
LLC is compensated for the actual cost of services provided prior to receipt of notice of
termination or suspension from the Owner.
6. Total Construction Volume includes all construction trades, general requirements,
insurance, bonds and miscellaneous costs deemed necessary to perform the
construction of the project, but excludes permits and fees. Permits and Fees shall be
paid directly by the Owner.
7. Construction management labor, standard tools and equipment, and labor-related
overhead are covered "within the fee". Specialty tools or equipment, trade labor supplied
by Builders personnel and approved transportation and meals costs shall be charged
directly to the Owner without a fee.
Employee Rate
David Steinber h $125/hr
Skip Rose $125/hr
Mike Bernier $125/hr
Kieran Whelan $125/hr
Ken Shea $100/hr
Jason Downing $50/hr
Page 3 of 7
I
BUILDERS
Subcontractors:
The Contractor plans to hire Subcontractors to perform the majority of construction associated with
this project. The Contractor shall provide the Owner and Architect information on all of the bids
received by Subcontractors and the names of the Subcontractors selected. Owner shall have the
right to reject a proposed Subcontractor; however, in the event that this leads to a higher Cost of
Work, the Owner shall pay for the difference. The Contractor reserves the right to reject any
Subcontractor, even if it is the lowest bid, and to dismiss Subcontractors from the job that have
been previously approved by the Owner.
Payments:
The Owner shall make progress payments on the Contract Sum according to the Requisition
process described below.
The Contractor shall, at the conclusion of each calendar month on the project, present to the
Owner an application for payment(Requisition)for costs incurred during that month. The
Requisition shall include all invoices, vouchers, partial releases of liens, expense reports, and any
other evidence to support the validity of the Requisition amount. The Contractor may requisition
for completed, but unpaid work based on an expectation of payment upon receipt of funds. The
Owner, the Architect, or their representatives shall be afforded five (5) business days to review
such application and question the Contractor about its contents. In the event there are no
disputes, the Owner shall pay the Contractor within 10 business days of receipt of the Requisition.
Payment by the Owner does not represent that the Owner or Architect have made a detailed
examination of the documentation, inspection of the work, or verification of the accounting.
At the completion of the project, the Owner shall make a final payment to the Contractor based on
a final Cost of Work with a truing up of fees. If further corrections to work are required that are not
covered under warranties with Subcontractors, or that are not the outcome of negligence or poor
workmanship by the Contractor, the Owner shall pay the Contractor for any work associated with
performing the corrections based on the hourly rate agreed to in this contract.
Retainage:
The Owner shall not hold back any fees to the Contractor to ensure completion of the work. The
Contractor will be expected to hold back fees from Subcontractors to ensure their performance
based on the terms below:
r0% f billeos uniestF ase,a ..r►ed3�i# ew,nxk..:.3. . . .,,f ;
Termination of Contract:
The Owner shall reserve the right to terminate or suspend the Contract at its sole discretion.
Within 15 days of termination or suspension, the Contractor shall present an accounting of all its
costs incurred for reimbursement by the Owner. If the Owner elects to proceed with the project
without the Contractor, the Owner shall have the right to assume the Subcontracts and
agreements related to the Project.
Working Capital:
ital:
RCG Builders shall not bear the costs of Working Capital for the project. If the Owner would like
the Contractor to gain beneficial pricing on its behalf by paying subcontractors ahead of the
Requisition schedule, the Owner shall either(1) put on deposit with the Contractor a sufficient
amount of Working Capital for the Contractor to pay these Subcontractors, or(2) make immediate
payment upon request from the Contractor outside of the normal Requisition process. Provision of
Working Capital shall entitle the provider to all discounts and savings associated with that capital.
Page 4 of 7
BUILDERS
3. Project Schedule
Date of Commencement:
The Contract Time shall be measured from the date of commencement. The date of
commencement of the Work shall be the date of this Agreement, unless a different date is stated
below or provision is made for the date to be fixed in a notice to proceed issued by the Owner.
Contract Time:
The Contractor shall provide to the Owner a Project Schedule (see Exhibit B). This Schedule is
based on assumptions reached prior to the signing of this contract, which assumptions the
Contractor shall attempt to clarify in the Schedule. However, the Schedule always assumes the
Owner and the Architect respond promptly to requests for information and do not request any
significant changes to the construction program. In the event that the Owner or Architect find any
discrepancies with the Schedule or its Assumptions, they will promptly notify the Contractor, who
shall make adjustments to the Schedule as necessary.
According to the attached Schedule, the Contractor shall achieve Substantial Completion of the
entire Work as follows:
The Contractor does not guarantee the date of completion. However, the Contractor shall not be
entitled to additional fees based on delays in the project unless those delays can be shown to
incur extra costs for the Contractor and were caused by-the actions or requests of the Owner or
Architect.
The Contractor shall present an updated Project Schedule to the Owner and Architect on a weekly
basis for their review.
Page 5 of 7
BUILDERS
4. Signatures
The Owner's representative is:
flad � lana
RCC
5,70" -MIG
x I11s
N
§ 14.4 The Contractor's representative is:
Er0 tt�se� �cle
47
This agreement is entered into as of the day and year first written above and is executed in at
least thre original copies, one for the Owner, one for the Contractor, and one for the Architect.
Owner Cpplractor n
Siggnat re s / Signature ry
Panted Name and Title 1 Printed Name and Title 1
Page 6 of 7
Exhibits BUILDERS
Exhibit A: Estimated Cost of Work
Exhibit B: Drawing
Page 7 of 7
f �i4c�oazr�saouv�al�1 o ,Jl�aaaa�a� lld
Board of SuiWing ftulsNon's and Standards
Construction Supervisor Uasnss
r Uaenss: CS 68334
i Bhthdats: 9/26/1966
Exptradon: 9/26/2009 Tro 3980
ReWotion: 00
KIERAN T WHELAN
31 RICHMOND ST' "'�
WEYMOUTH,MA 02188 Commissioner
Permit Affidavit
Project Number: Lea ear Publishin Inc. 27300
Project Title: Lea ear Publishing Inc
Project Location: North Andover
Name of Building: 21 High Street,North Andover
Nature of Project: Commercial Tenant Fitout
In accordance with section 116.0 of the Massachusetts State Building Code, I Alfred M. Marzullo
Registration No.A01a6e6 being a Registered Professional Engineer/Architect hereby certify that I
will prepare or directly supervise the preparation of all design plans, computations and specifications
concerning:
Entire Project HVAC-X Plumbing_X
Fire Protection X Electrical X Other(Specify)
For the above named project and that, to the best of my knowledge, such plans computations and
specifications meet the applicable provisions of the Massachusetts State Building Code, all
acceptable engineering practices and applicable laws and ordinances for the proposed use and
occupancy.
I further certify that I shall perform the necessary professional services and be present on the
construction site on a regular and periodic basis to determine that the work is proceeding in
accordance with the documents approved for the building permit and shall be responsible for the
following as specified in section 116.2.2:
1. Review of shop drawings, samples and other submittals of the contractor as required by the
construction contract documents as submitted for building permit, and approval for conformance to
the design concept.
2. Review and approval of the quality control procedures for all code required controlled materials.
3. Special architectural or engineering professional inspection of critical construction components
requiring controlled materials or construction specified in the accepted engineering practice standard
listed in Appendix B.
Pursuant to section 116.2,3 1 shall submit periodically, a progress report together with pertinent
comments to the North Andover Building Inspector.
Upon completion of the work, I shall submit a final report as to the satisfactory completion and
readiness of the project for occupancy. _
A
ALFRED M,
o MARZULLO O
iso.4066OF
Siggature and V6p ,o Date
,�,tt , �
On this day of SfQ�P�20 0� Me ' * dersigned notary public, personally
appeared V (name o ocument signer),p oved to me through
IE satisfactory evidence of identification, which were to be the person whose
name is signed on the preceding or attached document, and acknowledged to me that he/she signed it
voluntarily for its' stated purpose.
Sara E.Addie,
Notary Public
Commonwealth of Mossochusets
My Commission bores
My commission expiresoctober 27,2011
ARY P B C
OFFICE OF BUILDING INSPECTOR
TOWN OF NORTH ANDOVER
CONSTRUCTION CONTROL
PROJECT NUMBER: 07804.02
SECT TITLE:Leapyear 2nd Floor
PROJECT LOCATION-High Street, North Andover, MA
NAME OF BUILDING: East Mill, North Andover
NATURE OF PROJECT: Leapyear 2nd Floor
IN ACCORDANCE WITH ARTICLE 116 OF THE MASSACHUSETTS STATE BUILDING CODE,
I, Linda Smiley REGISTRATION NO. 10080
BEING A REGISTERED PROFESSIONAL ENGINEERIARCHITECH HEREBY CERTIFY THAT I
HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS,
COMPUTATIONS AND SPECIFICATIONS CONCERNING:
ENTIRE PROJECT ❑ ARCHITECTURAL ® STRUCTURAL ❑ MECHANICAL ❑
FIRE PROTECTION ❑ ELECTRICAL ❑ OTHER(SPECIFY)
FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEGE,SUCH PLANS, i
COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISION OF THE MASSACHUSETTS
STATE BUILDING CODE,ALL ACCEPTABLE ENGINEERING PRATICES.
AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY.
I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND B
EPRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT
THE WORK IS PROCEEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING
PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.0
1. Review,for conformance to the design concept,shop drawings,samples and other submittals
which are submitted by the contractor in accordance with the requirements of the construction
documents.
2. Review and approval of the quality control procedures for all code-required controlled materials.
3. Be present at intervals appropriate to the stage of construction to become,generally familiar
with6the progress and quality of the wont and to determine, in general, if the work is being
performed in a manner consistent with the construction documents.
PURSUANT TO SECTION 118.2 .2 1 SHALL SUBMIT WEEKLY, A PROGRESS REPORT
TOGETHER WITH PERTINENT COMMENTS TO THE NORTH ANDOVER BUILDING INSPECTOR.
UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE
SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR OCC ANCY-
SUBSCRIBED AND SWORN TO BEFORE ME THIS DAY OF S GrrARE-jr- 72t
NOTARY LIC MY COMMISSION EXPIRES / /"5 AW