Permit NO:—C Date Received
Date Issued: J/Lf/?� O'
TYPE OF IMPROVEMENT
PROPOSED USE
Residential
Non- Residential
New Building
One family
Addition
Two or more family
X Industrial
Alteration
No. of units:
Commercial
Repair, replacement
Assessory Bldg
Others:
Demolition
Other
Septic Well Floodplain Wetlands Watershed District
Water./Sewer
u (;KIF I IUNF W RK TO BE PREFORM D:
1p- dPCA (4/6tge- 60A l U A I I �,,�'" ® �
Identification Ple se ype or Print Clearly)
�
OWNER: Name:MK®v R�AJ\t,1 It pa 71.2. \
Address: )►\b HD 1i- R
Aj, AvA®ue-,-- -, Aeva e
hone: q'll�, 1-21"ADAL
I
w£!.3 i,UeLlI. I4C3 Uwa
Address: LIZ V.ee.-x:, Dt"W .5v,fie e eh -Ad" ti O'6. 01.34L, Reg. No. L091-1
FEE SCHEDULE: BOLDING PERMIT: $12.00 PER $1000.00 OF THE TOTAL ESTIMATED COST BASED ON $125.00 PER S.F.
Total Project 60st: $ FEE: $17,Y y %
Check No.: �` �� % /; Receipt No.: d �6,F
NOTE: Persons contracting with unregistered contractors do not have access to the guaranty f d
Signature of Agent/Owner_jj�,�awl. Signature of contract
�4/01-14,1
Location ��
No. - Date. 3X/Ad
"ORTN TOWN OF NORTH ANDOVER
L
1
Certificate of Occupancy $
Building/Frame Permit Fee $
��cHust
Foundation Permit Fee $
Other Permit Fee $
TOTAL $
Check #
20969
building Inspector
Permit NO:
nate Icsuart
BUILDING PERMIT
TOWN OF NORTH ANDOVER
APPLICATION FOR PLAN EXAMINATION
Date Received
a WN;
imad -4,
1ti
Q.M.- _Ii)
S
TYPE OF IMPROVEMENT
PROPOSED USE
Residential
Non -Residential
New Building
'One family
Addition
Two, or more family
Industrial
Alteration
No. of units:
Commercial
Repair, replacement
'Assessor'y Bldg
Others:
Demolition.
Other
oof
e
ek
4
4%
INZ
DESCRIPTION OF WORK TO BE PREFORMED:
Identification'' Please Type -or-Print Clearly)
OWNER: Name: Phone:
Address:
M
pt
fi�
U
mz
sg�
A
twig
N
C n _T
R
4
L F
34
?04n
5
. W4 z Nlr
1W
ARCHITECT/ENGINEER Phone:
Address: Reg. No.
FEE SCHEDULE. BULDING PERMIT: $12.00 PER $1000.00 OF THE TOTAL ESTIMATED COST BASED ON $125.00 PER S.F.
Total Project cost: $ FEE: $
Check No.: Receipt No.:
NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund
si
Building Department
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
Q Building Permit Application
❑ Workers Comp Affidavit
❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses
❑ Copy of Contract
❑ Floor Plan Or Proposed. Interior Work
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition Or Decks
❑ . Building Permit Application
❑ Certified Surveyed Plot Plan
❑ ' Workers Comp Affidavit
a Photo Copy of H.I.C. And C.S.L. Licenses.
❑ Copy Of Contract
❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan. And
Hydraulic Calculations (If Applicable)
❑ Mass check Energy Compliance Report (If Applicable)
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
New Construction (Single and Two Family)
❑ Building Permit Application
❑ Certified Proposed Plot Plan
❑ Photo of H.I.C. And C.S.L. Licenses
❑ Workers Comp Affidavit
❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations (if Applicable)
❑ Copy of Contract
❑ Mass check Energy Compliance Report
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
must be submitted with the building application
Doc: INSPECTIONAL SERVICES DEPARTMENT:BPFORM07
Revised 2.2007
Plans Submitted Plans Waived Certified Plot*Plank -Stamped Plans
TYPE OF SEWERAGE DISPOSAL
Public Sewer
Tanning/Massage/Body Art
Swimming Pools
Well
Tobacco Sales
Food Packaging/Sales
Private (septic tank, etc.
Permanent Dumpster on Site
4 THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
41 INTERDEPARTMENTAL SIGN OFF - U FORM
DATE REJECTED DATE APPROVED
PLANNING & DEVELOPMENT T _fbtio7 c-r� 3 ywv
COMMENTS Ca- ✓ A J
DATE REJECTED DATE APPROVED
CONSERVATION 20 -��
COMMENTS
DATE REJECTED DATE APPRO
HEALTH
COMMENTS is r,� ��-- �' s i ��,� -4'
• _ a
4.
tee. L
Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision:
Comments
Conservation Decision: Comments
Water &Sewer Connection/Signature & Date Driveway Permit
Located at 3:54 Osgood Street
r
Dimension
Number of Stories: Total square feet of floor area, based on Exterior dimensions.
Total land area, sq. ft.:
ELECTRICAL: Movement of Meter location, mast or service drop requires approval of
Electrical Inspector . Yes No
DANGER ZONE LITERATURE: Yes No
MGL Chapter 166 Section 21A —F and G min.$100-$1000 fine
NUI t5 and UA I A — wor department use
❑ Notified for pickup - Date
Doc.Building Permit Revised 2007
P (978) 688-9535
F (978) 688-9542
Town of North Andover
Office of the Planning Department
Community Development and Services Division
Osgood Landing
1600 Osgood Street
Building #20, Suite 2-36
North Andover, Massachusetts 01845
William Thompson
TBI, Inc.
210 Holt Road
North Andover, MA 01.845
January 6, 2009
Dear Mr. Thompson,
As we discussed on the phone today, the Site Plan Review Decision for 210 Holt Road dated October 3,
2007, does state that prior to the issuance of a certificate of occupancy, the applicant will provide either a
letter stating that the landscaping complies with the approved plans or alternatively, that the applicant
provide a bond to cover the full amount of the landscaping materials and installation, if weather
conditions do not permit the completion of the landscaping prior to the use of the parking area.
During my site visit on Friday December 5h, we confirmed that the landscaping had not been completed
and subsequent to that meeting, you did provide me with a estimate from Viking Tree, Inc. for the
completion of the landscaping. That estimate is $23,785. The current balance in your Planning Board
cash -bond account is $15,000. In order for the Planning Office to approve a certificate of occupancy,
you will need to provide an additional $8,785 for the cash -bond account.
I reviewed the landscaping on the approved plan, and the majority of the landscaping is in front of the
parking area. The plans are very specific as to the number and types of trees and plants to be installed. If
you have any questions, please feel free to contact me.
Regards,
Judith Tymon, AICP
Town Planner
cc: Mary Ippolito, Planning Office
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
GENERAL BUILDING NOTES/CHECKLIST- NOT LIMITED TO ITEMS BELOW
POST ALL LOT NUMBERS, ADDRESS, AND PERMIT (COPY 0K)..or no inspections
INSPECTIONS: (Minimum) Excavation, Footing, Foundation, Frame; Insulation, Final.
FOOTINGS: Continuous Full 2x4 Keyway
Continuous strip footings for interior columns
FOUNDATION: Rebar as required
Anchor bolts or straps
Damproofing
Foundation drain - pipe/stone/fabric filter/cover and outlet connection.
FRAME: Fireblock - over girts/plates between floor joist
Penetrations for.plumbing, heat, elec, etc.
Walls at stair stringers.
Windbrace corners and center bearing partitions.
Size ridge to ,provide full bearing at rafter cuts.
Hip and Valley rafters - watch bearing at walls.
Ridge & Hip - Provide proper connections.
Cathedral roof rafters provide proper connections and use "Hurricane Clips" tie to plate.
Stair stringers _ watch cuts and heal support.
Joist hangers fully nailed w/ hanger nails.
Sill plates 2-2X6 (I PT) w/sill seal.
Girls - solid brick or steel plate bearing at foundations
air space at sides in foundation pockets.
Lateral bracing at ends.
;r Certified calculations. required for Beams/LVL's Trusses.
Solid bearing support for :Headers/Beams etc.
Check headroom clearances - stairways, under beams
Attic Access. (min. 22x30 w/3' headroom above).
Crawl space access. (min. 98x24).
,. Bath exhaust fans to have metal duct to exterior (not in soffit).
Firecode S/R wood frame of "0" clearance fireplaces & stoves
Window Schedule or Every Habitable Room Must Have:
Natural light equal to 8% of floor area.
of required glazing shall be openable.
Bedrooms required min. 20x24 egress window or door.
Vent attic spaces - "proper vent", soffit and required ridge vents.
Firecode under stairs if used for storage
FIREPLACES: Separate permit required.G.
Inspections .at Footing - Smoke Chamber - Finish L-,
Smooth parging, clean joints, 8" solid @ combust.
DECKS: Lag to house, provide flashing. —�
Rails min. 36 " high, Baluster max space 5" on center.
Over 8' above grade, use 6x6 posts w/lateral bracing /��
.` Lag all posts and rails. #v/�4 44 / L _.
Pier footings down 48", Conc. pad at stair base.
FINISH: Handrails returned to wall/newall post. f
Guardrails required alongside open cellar stairs.
Exterior grading complete.
Certificate or occupancy required prior to occupying structure.
Temporary Stairs required for inspection.
Re -inspection fee - $30.00 (Be Ready).
Certificate of occupancy required prior to occupying structure.
I;z--,
Ly Ocr y =
i ® CA
�CCD2 C
7 0 Elm.
C=CS
..«
-Icm� o W
y
� o ;
CD
a y ® •�
O
C VJ n
NCD
rr0
0 m y
n -o
O o
d y
m c
QD
E' �
Z
CA a
CD
CD :�
9'O y
O O
i
tC w \
O C9 {
CD
Wad
7N
y CD
CD
CD
a cn
a 'C
d'fl
Cc),
a c
d Olt
�
6V
c)
\.•/
z
cn
a • • tow
0
d
0
CD
nto
E�
b
hh��
r• o� A
H
D
CD
�
a
CL
�
3
o -n
m Z
"
3 O
m
(
m o
m
3
�•
-o n
CDC Z
N O
m
CD
~ :3 ]p
CD
CD
CD $
a
69
69
69
69 69
7
tD
N
O
' m
I;z--,
Ly Ocr y =
i ® CA
�CCD2 C
7 0 Elm.
C=CS
..«
-Icm� o W
y
� o ;
CD
a y ® •�
O
C VJ n
NCD
rr0
0 m y
n -o
O o
d y
m c
QD
E' �
Z
CA a
CD
CD :�
9'O y
O O
i
tC w \
O C9 {
CD
Wad
7N
y CD
CD
CD
a cn
a 'C
d'fl
Cc),
a c
z
O
•
o�
a
tv
M
d Olt
�
\.•/
z
cn
(1
ro
0
d
0
H
nto
E�
b
hh��
z
O
•
o�
a
tv
M
Saltonstall :Architects
RE: FINAL AFFIDAVIT — ARCHITECTURAL CERTIFICATION
December 18, 2008
RE: 07-16 TBI Inc. — Recycling Center & Solid Waste Transfer Station
210 Holt Road North Andover, MA. Building Permit # 553 (03/28/08)
Gerald A. Brown, Building Official
Town of North Andover
Building Department
Dear Mr. Brown
I have been present at the site at intervals appropriate to the stage of construction during the
construction period, and became familiar with the progress and quality of the work. I have
determined, to the best of my knowledge and belief, that the work was performed in a manner
consistent with the construction documents, the applicable provisions of the Mass. Building
Code -780 CMR and good construction practices. I have made the usual and normal field
observations for the purposes of evaluating the referenced building construction, and, based
upon my findings, it is my opinion that the building structure is sufficiently sound and adequate
to accommodate the proposed use and occupancy, and that no hazard to the public safety will
result. It is my determination that the project has been satisfactorily completed and the building
is ready for the intended occupancy.
Sincerely,
Saltonstall Architects
IM"" C�=
William W. Saltonstall, AIA
Architect of Record
!2" 16
,v8
380 Wareham St. Marion, MA 02738 p 508.748.1043 f 508.748.2330
www.saltonstallarchitects.com
Giffith sZ Vary, Inc
Consufting Engineers
12 Kendrick Road
Wareham, MA. 02571
(508)295-0050
Fax: (508) 295-0003
RE: FINAL AFFIDAVIT — ELECTRICAL CERTIFICATION
December 24, 2008
RE: 07-16 TBI Inc. — Recycling Center & Solid Waste Transfer Station
210 Holt Road North Andover, MA. Building Permit # 553 (03/28/08)
Gerald A. Brown, Building Official
Town of North Andover
Building Department
Dear Mr. Brown
I or my designated representative have been present at the site at intervals appropriate to the
stage of construction during the construction period, and became familiar with the progress
and quality of the work. We have determined, to the best of our knowledge and belief, that
the work was performed in a manner consistent with the construction documents, the
applicable provisions of the Mass. Building Code -780 CMR and good construction practices.
I or my designated representative have made the usual and normal field observations for the
purposes of evaluating the referenced building construction, and, based upon our findings, it
is our opinion that the electrical systems are sufficiently sound and adequate to accommodate
the proposed use and occupancy, and that no hazard to the public safety will result. It is our
determination that the project has been satisfactorily completed and the building is ready for
the intended occupancy.
Sincerely,
R Sd 1.9
Griffith &Vary, Inc.
01N OF
o
G
/^�,� O FRANCIS ��a
U ,. v)
� TOMAS?YCKI
Frank J. Tom szycki, P.E. 9 NO. 2056
c f`Q Q
w\y
�`S'`?16 AL
Electrical Engineer on Record
Griffith cs� Vary, Ine
Consulting Engineers
12 Kendrick Road
Wareham, MA. 02571
(508)295-0050
Fax: (508) 295-0003
RE: FINAL AFFIDAVIT — MECHANICAL CERTIFICATION
December 24, 2008
RE: 07-16 TBI Inc. — Recycling Center & Solid Waste Transfer Station
210 Holt Road North Andover, MA. Building Permit # 553 (03/28/08)
Gerald A. Brown, Building Official
Town of North Andover
Building Department
Dear Mr. Brown
I or my designated representative have been present at the site at intervals appropriate to the
stage of construction during the construction period, and became familiar with the progress
and quality of the work. We have determined, to the best of our knowledge and belief, that
the work was performed in a manner consistent with the construction documents, the
applicable provisions of the Mass. Building Code -780 CMR and good construction practices.
I or my designated representative have made the usual and normal field observations for the
purposes of evaluating the referenced building construction, and, based upon our findings, it
is our opinion that the mechanical systems are sufficiently sound and adequate to
accommodate the proposed use and occupancy, and that no hazard to the public safety will
result. It is our determination that the project has been satisfactorily completed and the
building is ready for the intended occupancy.
Sincerely,H ®�
Griffith & Vary,Inc. �o� WAYNE E.'S
NATTSON
/ MECHANICAL
No. 41546
Wayne E. Mattson, P.E.
Mechanical Engineer on Record