Loading...
HomeMy WebLinkAboutBuilding Permit #135-15 - 226 STEVENS STREET 8/7/2014 � r10RT►1 N BUILDING PERMIT TOWN OF NORTH ANDOVER �� APPLICATION FOR PLAN EXAMINATION Permit NO: c Date Received roo Date Issued: �4SSac►+us IMP RTANT:A licant must complete all items on this page k. TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building N One family N Addition ❑Two or more family ❑ Industrial ❑Alteration No. of units: ❑Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other y lm. � ^FnNu F W- u ...s..�`w - - 5.88 kW Solar array to be installed on the roof of the Middelsteadt residence Identification Please Type or Print Clearly) OWNER: Name: Kurt Mittelstaedt Phone: 978-457-6167 Address: 226 Stevens Street r ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE.BOLDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. 1 Total Project Cost: $ 22.062.00 FEE: $ 264.00 Check No.: lof 96 Receipt No.: NOTE: Persons contracting with unregistered contractors do not have acc ss to the gu ran fund cs-DB L0 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:Building Permit Revised 2014 A Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM PLANNING & DEVELOPMENT Reviewed On Signature_ COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature i COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature& Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT - Temp Dumpster on site .yes no Located at 124 Main Street Fire Department signature/date COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of li Electrical inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— (For department use) I ❑ Notified forp ickup Call Email Date Time Contact Name Doc.Building Permit Revised 2014 Location 1 _ ..� No. � Date j ! 1 • - TOWN OF NORTH ANDOVFI e >` Certificate of Occupancy $ Building/Frame Permit Fee $ Foundation Permit Fee $ Other Permit Fee $ t7'r TOTAL $ Check# 2786 Building Inspector j 18 Temple Street Newburyport,MA 01950 Woods, Phone:978-985-6129 Kenneth A. Fax:978-255-3555 August 6, 2014 George Horrocks Harmony Energy Works Inc. 10 Gale Road Hampton NH 03842 Re: Mittelstaedt Residence, 226 Stevens Street, North Andover, MA-roof load capacity George, At your request we analyzed the roof framing of the existing building referenced above to determine if the structure could accommodate an additional load of 3 PSF for rack mounted solar panels. This letter is written to certify that the existing roof structure has sufficient capacity to carry the additional 3 PSF and satisfies the structural load requirements of the Massachusetts State Building Code. If you need any additional information please contact this office at your earliest convenience. Sincerely, OF C o fCENNEIIH yG o WOODS c.� STS �SrC�NAI EAG Kenneth Woods President NORTH Town of 11, Andover O - 1 No. - C, h ver, Mass, COC NICNl WICK y1. fJ BOARD OF HEALTH Food/Kitchen PERMI LD Septic System TTHIS CERTIFIES THAT ............K.Vft............. . ...��....',*.�,......... BUILDING INSPECTOR .. has.permission to erect .......................... buildings on �� .......... . ...... ....... Foundation Rough to be occupied as ....16.A..'Rb....PIP.......S.P.`.rAr.r..... a.. I'D^...... ....... - Chimney provided that the person accepting this permit shall in every respect conform to the terms of-the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTr S TS Rough Service ........... . .... ........................................................ Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. 1 , TOWN OF NORTH ANDOVER AFFIDAVIT Home Improvement Contractor Law Supplement to Permit Application MGL c. 142 A requires that the"reconstruction, alteration, renovation, repair, modernization, conversion, improvement, removal, demolition,or construction of an addition to any pre-existing owner occupied building containing at least one but not more than four dwelling units...or to structures which are adjacent to such residence or building" be done by registered contractors, with certain exception, along with other requirements. Type of Work: 5.88kW Roof-Mounted Solar Array Installation Est. Cost 22,062 Address of Work 226 Stevens Street Owner Name: Kurt Muttelstaedt Date of Permit Application: 7/28/2014 hereby certify that: Registration is not required for the following reason(s): For office Use Only Work excluded by law Permit No. Job under$1,000 Date Building not owner-occupied Owner pulling own permit Other (specify) Notice is hereby given that: OWNERS PULLING THEIR OWN PERMIT OR DEALING WITH UNREGISTERED CONTRACTORS FOR APPLICABLE HOME IMPROVEMENT WORK DO NOT HAVE ACCESS TO THE ARBITRATION PROGRAM OR GUARANTY FIND UNER MGL c. 142A. Signed under penalties of perjury: I hereby apply for a permit as the agent a owner: 7/25/2014 Harmony Energy Works Incorporated 179360 Date Contractor Name Registration No. OR: Notwithstanding the above notice, I hereby apply for a permit as the owner of the above property: Date Owner Name 16'-0" 14'-0" N0 D. .❑ ❑. o D. 5 M 14'-( 16'-0" s 1 16'-11" I I 1 ( I I I I I I I ( 1 16'-11" 0 M o p. I I I I I I I I I I I North io 1 I6'-11'' I I I I I I I I I I I I Is'-1i" I Roof M ih 1 1 1 1 1 1 1 1 1 1 1 1 1 I I I I I 1 1 1 1 1 1 13'-9" 14'-0" •o o. 12'-9" N mmrmmT�F0Tmmr I I I I I _L__11 2,9„ I I I I I I I I 114'-0" I I I I M 1 I I1 s I I ( 1 1 I I 1 1 1 1 I 1 I I I I I I I I I I I 1 11 I 1 I 1 I I I 1 I I I I I I I I I South 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Roof N X `38-EcoFasten Quik-Foot Iron Ridge XRS Rail 1qo" Roof Pitch=220 16" 2-192"(16') 8-168"(14') (-,1HKu rt Atte stae t PV ARRAY 16-End Clamp ENERRGGY WORRKS� 226 Stevens Street North Andover MA 34—Mid-Clamp Manuf/Model SOLAR WORLD SW280 10 Gale Rd,Hampton,NH Roof-Mounted Solar Array 2x6 Roof Rafter,16"Center Module Rating(W) 280 603-926-3366 Splice Bar(4)&Bonding Jumper Dimensions 39.41"x 65.94" harmonyenergyworks.com 5.88 KW DC UvvU NU © WEEB 6.7 Ground Lug #of Modules 13+8=21 DRAWN BY H SARGEANT #6 Bare Co er Equipment DC Output(KW) 5.88 KW DC A A '�' PpAPPROVED BY GHORROCKS scuF 3/16"=1�� �T 1 OF 1 MODULE Power(W) Voc(Vdc) Vmp(Vdc) Isc(Adc) Imp(Adc TC(%rC) Max Fuse SW280 280 39.5 31.2 9.71 9.07 -.30 15 3/4"EMT, 0 o a o o a o 0 0 0 0 0 0 3-#10 AWG 1-#8 GND Northern Roof String SolaAeek +- +- +- AC Combiner (MLO) GR 30 A BLACK-Ll RED-LZ p 20A BLUE-NEUFRAL ' ------------------------- Southern ---------------------• •Southern Roof String ^° 10A +_ +_ +_ +_ +_ +_ +. +_ _ Sola-0eek ti ti ti ti ti ti ti ti BLACK-L1 RED-L2 3/4"EMT, BLUE-NEUTRAL 3-#10 AWG 1-#8 GND ---------------------------- TO UTILI TE VICE Utility Meter Main Service PV Revenue Panel Grade AC 200A Production Disconnect Meter 240/30 BLACK-Li r1 BLUE-NEUTRAL M L2 O GRE N-GND Back- Fed Breaker 30/2 3/4"EMT, 3-#8 AWG Load-side Tie-In 1-#8 GND LA INVERTER RATINGS MANUFACTURER ENPHASE MODEL# M250 Kurt Mittelstaedt MAX DC VOLTAGE 48 VDC Harmony MAX POWER@40C 250 WA c L=�-7 ENERGY WORKS 226 Stevens Street North Andover MA OCPD(Rear Roof String)=13 x 1 x 1.25=16.25(20A) 10 Gale Rd,Hampton,NH DC INPUT RANGE 240 VAC DC OCPD(Front Roof String)=8 x 1 x 1.25=10(10A) 603-926-3366 Roof Mounted Solar Array—3-Line NOMINAL AC VOLTAGE 240 VA MAX AC CURRENT 156 harmonyenerU.orkscom 5.88 kW MAX OCPD RATING 40A AC SIZE FSCM NO DWG NO REV DRAWN BY H SARGEANT A APPROVED BY G HORROCKS -- N/A sxa=r 1 OF 1 Revenue Grade PV ARRAY Utility Meter Manuf/Model SOLAR WORLD SW280 (On North Side) Production Meter Module Rating(W) 280 (In Basement Dimensions 39.41"x 65.94" Adjacent to Main #of Modules 13+8=21 DC Output(KW) 5.88 KW DC Panel) Northern Roof String Main Panel _ (In Basement) Micro-inverters are located directly I! beneath each module r Southern Roof String Roof Pitch=220 N FT 7 Harmony Kurt Mittelstaedt A2lmuth:110° L:C::_1 ENERGY WORKS 226 Stevens Street North Andover,MA 10 Gale Rd,Hampton,NH Roof-Mounted Solar Array 603-926-3366 harmonyeneroworkxcom 5.88 KW DC SIZE FSCM NO DWG NO REV DRAWN BY HSARGEANT A ti A APPROVED BY G HORROCKS SME N/A saffr 1 OF 1 Project Report Ans, IRON RIDGE Solar Mounting Made Simple Project Details Name Mittelstaedt-Northern Roof i Date 2014-08-04 Module Solarworld:Plus SW 280 mono Total Modules 13 Dimensions 39.4"x65.9" x 1.2" Total Watts 3,640 Tilt 220 Attachment Pts 24 Load Assumptions Building Details Wind Exposure B Building Height:30' Wind Speed 100 mph Roof Slope 22° Ground Snow Load 60psf Risk Category i Attachment Spacing 4.0 ft Engine a ring Validation RAILS XR10 XR100 XR1000 O CO) O TOTAL PROJECT COST $1,184 MAX SPAN [portrait] Zone 1 3' 4511 51911 Zone 2 3' 4'S" 5'9" Zone 3 3' 415" 5-911 MAX CANTILEVER [portrait] Zone 1 1'2" 1191, 2'4" Zone 2 1'2" 119.0 2'4't Zone 3 1'2" 1191, 2'4" LOADS ZONES(portrait) DOWN [ (lbs) UPLIFT T (lbs) LATERAL H(lbs) Zone 1 396.0 -89.0 144.0 Zone 2 396.0 -156.0 144.0 Zone 3 396.0 -248.0 144.0 SubArray Information Columns Rows Orientation Required Rail Provided Rail Attach Pts Clamps Splices 9 1 Portrait 30' 1 set of 31.0' 16 4 End Clamps 2 [1 x 1T, 1 x 14'] 16 Mid Clamps 2 1 Portrait 6101, 1 set of 11.0' 4 4 End Clamps 0 [1 x I1'] 2 Mid Clamps 2 1 Portrait 6101, 1 set of 11.0' 4 4 End Clamps 0 [1 x 11'] 2 Mid Clamps Weight Details Total Weight Weight/Attachment Distributed Weight 736 lbs 30.7 lbs 3.1 psf I Project Report AeEd IRONRIDGE Solar Mounting Made Simple Project Details Name Mittelstaedt-Southern Roof Date 2014-08-04 Module Solarworld:Plus SW 280 mono Total Modules 8 Dimensions 39.4"x65.9" x 1.2" Total Watts 2,240 Tilt 220 Attachment Pts 14 Load Assumptions Building Details Wind Exposure B Building Height:30' Wind Speed 100 mph Roof Slope 22° Ground Snow Load 60 psf Risk Category I Attachment Spacing 4.0 ft Engineering Validation RAILS XR10 XR100 XR1000 O C) O TOTAL PROJECT COST $755 MAX SPAN [portrait] Zone 1 3' 415" 5'9" Zone 2 3' 415-1 5'9" Zone 3 3' 415" 5'9" MAX CANTILEVER [portrait] Zone 1 1'2" 1191, 2'4" Zone 2 1'2" 11911 2'4" Zone 3 1'2" 11911 2'4" LOADS ZONES(portrait) DOWN 1 (lbs) UPLIFT T (lbs) LATERAL< >(lbs) Zone 1 396.0 -89.0 144.0 Zone 2 396.0 -156.0 144.0 Zone 3 396.0 -248.0 144.0 SubArray Information Columns Rows Orientation Required Rail Provided Rail Attach Pts Clamps Splices 1 set of 28.0' 4 End Clamps 8 l Portrait 26'8" [2 x 14'] 14 14 Mid Clamps 2 Weight Details I� Total Weight Weight/Attachment Distributed Weight 458 lbs 32.8 lbs 3.1 psf Ii The Commonwealth of Massachusetts Print Form .f Department o De artIndustrial Accidents P Office of Investigations 1nrCo ess Street, Suite 100 g Boston, MA 02114-2017 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Harmony Energy Works Incorporated Address:10 Gale Road City/State/Zip:Hampton, NH 03842 Phone #:603-926-3366 Are you an employer? Check the appropriate box: Type of project(required): 1.0 I am a employer with 3 4. ❑ I am a general contractor and I employees(full and/or part-time).* have hired the sub-contractors 6. E] New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have g, ❑ Demolition working for me in any capacity. employees and have workers' 9. ❑ Building addition [No workers' comp. insurance comp. insurance.+ required.] 5. ❑ We are a corporation and its 10.E] Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4), and we have no employees. [No workers' 13.2 Other Solar Installation comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. if the sub-contractors have employees,they must provide their workers'coinp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Core Benefits Group Inc Policy#or Self-ins. Lic.#:04WECCL7364 Expiration Date:1/11/2015 Job Site Address:226 Stevens Road City/State/Zip:North Andover, MA Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby cern r the pains and pen 'es o er'u that the in ormation provided above is true and correct. Si nature: -- ----------- --�Date:7/28/2014 Phone#:603-926-336 Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6. Other Contact Person: Phone#: Dimension i Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA—(For department use) rW Y�- r ❑ Notified for pickup - Date Doc.Building Permit Revised 2012 Massachusetts -Department of Public Safety Board of Building Regulations and Standards Construction Supervisor License: CS-08940.1 ```.r:Inti FRANK L CROW `JR 49 GARY AVE a Haverhill MA 01$30 Expiration Commissioner 04/17/2016 �%eao�z��za�rraenlf/:a� rs�{ccicreltf License or registration valid for individul use only Office of Consumer Affairs&Business Regulation expiration date. If found return to: ME IMPROVEMENT CONTRACTOR before the p Office of Consumer Affairs and Business Regulation krkep-gstration: 179360 Type: 10 Park Plaza-Suite 5170 iration: 7/24/2016 Corporation Boston,MA 02116 z HARMONY ENERGY WORKS INCORPORATED GEORGEHORROCKS 10 GALE RD HAMPTON;NH 03842 Undersecretary valid without signature . III 18 Temple Street Newburyport,MA 01950 Phone:978-985-6129 Kenneth A. Woods, P.E. Fax:978-255-3555 August 6, 2014 George Horrocks Harmony Energy Works Inc. 10 Gale Road Hampton NH 03842 Re: Mittelstaedt Residence, 226 Stevens Street North Andover MA-roof load capacity p tY i George, At your request we analyzed the roof framing of the existing building referenced above to determine if the structure could accommodate an additional load of 3 PSF for rack mounted solar panels. This letter is written to certify that the existing;roof structure has sufficient capacity to carry the additional 3 PSF and satisfies the structural load requirements of the Massachusetts State Building Code. If you need any additional information please contact this office at your earliest convenience. Sincerely, Kenneth Woods President