Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Building Permit #538 - 244 DALE STREET 2/7/2007
TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION _ L Permit NO: Date Received Date Issued: IMPORTANT: must complete all items on this ` LOCATION � Pring I c �„ PROPERTY OWNER Print MAP NO.: PARCEL: ZONING DISTRICT: TYPE AND USE OF BUILDING HISTORIC DISTRICT YES ❑ TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential 0 New Building 0 Addition Kbnc family 0 Two or more'family ❑ Industrial 0 Alteration No. of units: ❑ Repair, replacement 0 Assessory Bldg ❑Commercial 0 Demolition ❑ Moving relocation 0 Other 0 mem: ❑ Foundation only DESCRIPTION QF WORK TO BE PREFORMED Identification Please Type or Print Clearly) I N I_ CV -7, C�� ,J OWNER: N 7 CONTRACTOR Supervisor's Construction z Date: Home Improvement License: Exp. Date: ARCHITECUENGINEER Name: Phone: Address: Reg. No. FEE SCHEDULE. BOLDING PERMIT. $11.00 PER $1000.00 OF THE TOTAL ESTIMATED COST BASED ON $125.00 PER SF. Total Project Cost :$ •� `l � O() FEE:$'317 Check No.: 03 Receipt No.: Pop W4 Location � l / '.ice/� �1�� No. Date �� v hpRTq TOWN OF NORTH ANDOVER 3� p' �„• D • ,hOpt 0 9 Certificate Occupancy $ C of 'as�cHust Building/Frame Permit Fee $ Foundation Permit Fee $ Other Permit Fee $ s TOTAL $ �J Check # C 19977 V Building Inspector TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art E]Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Permanent Dempster on Site ElPrivate (septic tank, etc. ❑ Electric Meter location to project NOTE: Persons contrad Ing wi unr istered ntraetors do not have access to the guaranty fund Signature of Agent/Own \ f ignature of contractor Plans Submitted ❑ lans Waived Certified Plot Plan ❑ Stamped Plans ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF- U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMMENTS DATE REJECTED DATE APPROVED CONSERVATION ❑ ❑ COMMENTS HEALTH COMMENTS DATE REJECTED DATE APPROVED ❑ ❑ FIRS, DEPARTMENT - Temp Dumpster on site yes no Fire_Department signature/date COMMENTS c.unmg ounm of Appeals: variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Siansture Date Driveway Permit Building Setback ft. Front Yard Side Yard Rear Yard Required Provided Required Provides Required Provided Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits o Building Permit Application ❑ Workers Comp Affidavit o Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work Addition Or Decks ❑ Building Permit Application ❑ Surveyed Plot Plan o Workers Comp Affidavit o Photo Copy of H.I.C. And C.S.L. Licenses Q Copy Of Contract o Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) o Mass check Energy Compliance Report (If Applicable) New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan o Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) o Copy of Contract o Mass check Energy Compliance Report In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period Is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Dee: INSPECTIONAL SERVICES DEPARTMENT:BPFORMOS Page 4 of 4 J m M M x m M 0 y d C •C Cos CO3 O CD a Z H CL n� C CZ H a� 0 d o p CD CDCL O CD CD o C CD Nig av y CD I � v CO) Cl CD oCD C CD z r m � c y?� O 01 = a s -am44 d0my O�& •'00 C7 z m w?m o y eo .♦ o • d' o > o•o 4 m 1 O COD C ? CA CL a o m; 4 iT1 > C co o CD • m � CL fOA . O m CA N dcr _ h vai m ` ~ e CA 0 �m y 7 m 0 w n fDrON m O O m cn XF H CD 0 .. : oCD dd o c � O'00e rt.*. r v Cn (/]0: C `d ni ow x �r r til x r n O Sz "17 C) "r9 a n O u i ` ry ZC Kit - Large Pellet Insert TRAVIS INDUSTRIES (99200149) NOUSa Or rIRf Insert Preparation and Placement • Place the extending hopper into its highest position (see the manual for details). This increases the pellet capacity of the heater. • Install the surround panels onto the insert and slide it into place. The surround panels must maintain a 3/8" gap from the enclosure opening (the stand-offs on the surround panels provide the 3/8" spacing). • After the insert is in place, attach the vent starter section to the insert (it is attached with a latch — make sure the gasket is correctly positioned). • The leveling bolts may be used to level the insert. • We recommend the use of the Insert Wiring Kit when installing this kit (SKU 97200315). This kit allows for the power cord to be hard -wired behind the walls, eliminating the need for a visible power cord. (used only on inserts venting directly to the rear - note how it is slid back until it contacts the wall thimble) I ,_ ' Minimum -0. MINN House Shield (prevents soot discoloration) HIGHLY RECOMMENDED Vent Clearances (make sure all vent maintains 3" clearance to any combustible) Outside Air Connection \ Wall Thimble (note 3" clearance between Vent Latch (used to connect and (recommended) vent and combustibles) disconnect the vent ) Page 8 of 8 7/14/06 ©Travis Industries, Inc. Enclosure Height (measure from top of floor protection) Floor Protection Outside Air Connection \ Wall Thimble (note 3" clearance between Vent Latch (used to connect and (recommended) vent and combustibles) disconnect the vent ) Page 8 of 8 7/14/06 ©Travis Industries, Inc. �t- ZC Kit — Large Pellet Insert TRAVIS INDUSTRIES (99200149) NOUSI or FIRE ZC Can Placement • Place the zc can inside the enclosure. The zc can must be placed so the front edge of the mounting flanges are flush with the enclosure opening. Secure the enclosure to the floor protection (and sub -floor) with screws. • When venting horizontally the rear vent shield must be installed over the top of the zc can. When installed, the rear vent shield should contact the thimble (it acts as a heat shield above the vent. Secure the zc can b floor protection (anc floor) with scr 2-1/2" 1 (both sic When in must ern Page 7 of 8 7/14/06 ©Travis Industries, Inc. A 1 ry ZC Kit - Large Pellet Insert TRAVIS INDUSTRIES (99200149) HOUSE OF FIRE ZC Can Construction Construct the zc can as shown below. WARNING: The sheet metal edges are sharp. Use gloves when handling the zc can. Knock -out for top vent applications Bend the top stand-off as shown and secure it to the zc can with the included screws. t Rear Vent Shield (not required for top -vent applications) t' A knock -out is provided on the rear panel for rear vent applications. t t Bend the mounting flange as shown. Use the included screws to t secure the zc can sides and top to the zc can rear panel. Page 6 of 8 7/14/06 ©Travis Industries, Inc. �t- TRAVIS INDUSTRIES MOUSE Or IF Ins Minimum Floor Protection ZC Kit - Large Pellet Insert (99200149) • The insert must be placed on a non-combustible floor protector (cement board, sheet metal, etc.) a minimum .018" thick (26 gauge). This floor protection must extend the full width and depth of the enclosure and must protrude 6" in front of the door opening (12" from the enclosure opening) and the full width of the surround panels (43" min. width). • HEARTH NOTE: If you wish to install a hearth greater than 1/2" thick, you will need to raise the insert and enclosure height the equivalent amount. The leveling bolts may be used on the insert for adjustments. re Height from top of action) Protection Place the stove on top of the floor protection and measure the center of the flue. This will determine the location of the wall thimble. Page 5 of 8 7/14/06 0 Travis Industries, Inc. L y TRAVIS INDUSTRIES NOUSa OF SIRE Minimum Enclosure Dimensions ZC Kit - Large Pellet Insert (99200149) " The enclosure height must be raised the same amount as the floor protection (e.g. if you are using 1" floor protection, the min. height is 30" above the sub -floor). * The maximum height is determined by the surround panel size (the surround panels are 32" tall). When determining depth, include the facing material (drywall, tile, etc.) — see the illustration below. '** When venting vertically, there is no maximum depth. When determining the position of the insert, consider Ceiling the position of the framing behind the insert relative to the vent - see the illustration below. : The enclosure may be raised. The minimum distance from the base of the enclosure to the ceiling is 72" Depth' Height � Width ' When determining the depth, include the facing material (drywall, tile, etc.). 7.5" i TOP VIEW l Pellet vent requires 3" clearance to combustibles. Page 4 of 8 7/14/06 0 Travis Industries, Inc. Min. Max. Recommended 29" 31" *' 30" Eeh 36" 43" "` 40" 18" 22„ ••*` 20" " The enclosure height must be raised the same amount as the floor protection (e.g. if you are using 1" floor protection, the min. height is 30" above the sub -floor). * The maximum height is determined by the surround panel size (the surround panels are 32" tall). When determining depth, include the facing material (drywall, tile, etc.) — see the illustration below. '** When venting vertically, there is no maximum depth. When determining the position of the insert, consider Ceiling the position of the framing behind the insert relative to the vent - see the illustration below. : The enclosure may be raised. The minimum distance from the base of the enclosure to the ceiling is 72" Depth' Height � Width ' When determining the depth, include the facing material (drywall, tile, etc.). 7.5" i TOP VIEW l Pellet vent requires 3" clearance to combustibles. Page 4 of 8 7/14/06 0 Travis Industries, Inc. �9- TRAVIS INDUSTRIES Maus I ausI or IFIRE ZC Kit - Large Pellet Insert (99200149) Vent Termination Requirements (See the illustration below) • Must have an approved cap (to prevent water from entering) or a 450 downturn. • If the termination is located on a windy side of the house, an approved house shield is recommended to prevent soot from building up on the side of the house. • Must not be located where it will become plugged by snow or other material. • Horizontal terminations must protrude 12" from the wall, vertical terminations require 24". --- NVTE: Measure clearances to the nearest edge of the exhaust hood. A Minimum 4' clearance below or beside any door or window that opens B Minimum 1' clearance above any door or window that opens C Minimum 2' clearance from any adjacent building D Minimum 7' clearance above any grade when adjacent to public walkways NOTE: Vent may not terminate in covered walkway or breezeway. E Minimum 2' clearance above any grass, plants, or other combustible materials F Minimum 3' clearance from any forced air intake of any other appliance G Minimum 2' clearance below eaves or overhangs H Minimum 1' clearance horizontally from combustible wall X Must be a minimum of 2' above the roof Page 3 of 8 7/14/06 ©Travis Industries, Inc. TM ZC Kit - Large Pellet Insert TRAVIS INDUSTRIES (99200149) No11SE Or rIRE Vent Requirements • Must be 4" diameter Type "L" (except for masonry fireplace installations) - or - connect the vent to a factory built type "A" chimney. All vent joints (including adapters, elbows, etc...) must be sealed with 500° F. RTV silicone. • Pellet vent must maintain a minimum 3" clearance to any combustible (install vent at clearances specified by the vent manufacturer). • Do not connect the pellet vent to a vent serving any other appliance or stove. • The maximum venting distance is — 33 Feet (max.) shown in the illustration to the right. • Do not install a flue damper in the — 30 Feet exhaust venting system of this unit. • Use an approved wall thimble when The vent height and run — passing the vent through walls and a Feet must not exceed the —25 ceiling support/fire stop spacer when distance shown in the — passing the vent through ceilings— shaded region shown to the ( make sure to maintain 3" clearance to right. « — J any combustibles.e t2 — — 20 Feet • No more than 1800 of elbows (two 900 Venting into this shaded — elbows, one 900 and two 450 elbows, area may require restrictor — etc.). adjustments. See the - • Pellet vent connections must be section "Restrictor - 15 Feet sealed airtight with 500° F. RTV Adjustment" for details. — silicone and screwed together with at — least three sheet metal screws. Seal each vent section (including NOTE: To achieve optimum —10 Feet — P� adapters, elbows, etc...) by performance, we ��° injecting a liberal amount of 5000 recommend keeping the — — F. RTV silicone into the gap between sections. vent as short as possible P — (horizontal run especially). — 5 Feet • Vent must have a support bracket — every 5' of pellet vent when exterior of _ structure — 0 Feet • Horizontal sections must have a 1/4" rise every 12" of travel. U- o ID I L LL Ln oe Page 2 of 8 7/14/06 © Travis Industries, Inc. �t- TRAVIS INDUSTRIES NOUSE or LIRE Compatibility • Astoria Bay Pellet Insert • Yankee Bay Pellet Insert Overview ZC Kit - Large Pellet Insert (99200149) Packing List • ZC Can Rear Panel • ZC Can Top/Side Panel • ZC Can Rear Vent Shield • (26) # 8 x 3/8" Type A Screws This kit allows an installer to build the above pellet heaters into the framing of a home. Installation Overview /A The minimum framing dimensions and clearances listed in this instruction sheet must be maintained. Failure to follow all of the instructions in this instruction sheet, and in the manual, will void the listing and warranty of the pellet heater, and may create a serious fire hazard. 1 Determine the vent configuration (see "Vent Requirements" and "Vent Termination Requirements") 2 Prepare the enclosure (see "Minimum Enclosure Dimensions"). 3 Install the floor protection and hearth (see "Minimum Floor Protection"). If venting to the rear (most common) Place the 900 onto the insert starter collar and measure the height of the center of the vent. This will determine the center height of the wall thimble installed behind the insert in the wall. NOTE: The vent is located 7.5 left of center of the appliance. Install the thimble into the wall, making sure the 3" clearance to combpstibles is met (refer the directions included with the thimble for additional details). Remove the starter collar from the pellet heater and install it onto the elbow (seal with silicone). Determine the correct length for the horizontal section of vent (the center of the starter collar is 11.25' behind the enclosure opening) and attach it to the elbow (seal with silicone). Place this flue section aside until after the zc can is installed. Then insert the flue section through the can and thimble. Once the insert is in place, attach the starter section to the insert (it is attached with a latch — make sure the gasket is correctly positioned). Attach the additional vent components to finalize the vent installation (termination, elbow, etc.). If venting upwards When installing with vertical vent, the area above the insert must be accessible after the zc can and insert have been installed (note: the vent is located 11.25" behind the enclosure opening, 7.5" left of center). Remove the starter collar from the pellet heater and install it onto the vent (seal with silicone). Insert this vent through the zc can and attach the starter section to the insert (it is attached with a latch — make sure the gasket is correctly positioned). Attach the additional vent components to finalize the vent installation (additional vent lengths, elbows, terminations, etc.). 3 Construct and Install the ZC Can (see "ZC Can Construction and Placement') 4 Prepare the insert in place it into the ZC Can (see "Insert Preparation and Placement') Page 1 of 8 7/14/06 C Travis Industries, Inc.