Loading...
HomeMy WebLinkAboutBuilding Permit #302-13 - 26 MAIN STREET 10/15/2012 TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO: 1 ! Date Received Date Issued: b I r/ IMPORTANT:Applicant must complete all items on this page LOCATION i(4S rPr nC PROPERTY OWNER lJ �'lJ �i Print 100 Year Old Structure yesno. MAP NO: �y PARCEL: 1. ZONING DISTRICT: Historic District yes Machine Shop Village yes no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential E�New Building ❑ One family Addition Two or more family 11 Industrial ❑Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other ❑ Septic 0 Well 0 Floodplain ❑Wetlands ❑ Watershed District Water/Sewer DESCRIPTION OF WORK TO BE PERFORMED: CdMAU( Identification Please Type or Print Clearly) \ (7l y 1 OWNER: Name: c 0 Phone: C- l k J Address: —77 / 68W S-� - kAOG -P fIV t)q- CONTRACTOR Name: ► hone: Address: ( lCl -t �. tiAAA Supervisor's Construction License: S �� 0 Exp. Date: c Home Improvement License: Exp. Date: `J ARCHITECT/ENGINEER OU`-�ues f Piss Phone: Address: 1�1 � � � 5 ` W Reg. No. FEE SCHEDULE:BOLDING PERMIT.$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON 125.00 PER S.F. Total Project Cost: $ �1'l lVn FEE: $ 't Check No.: ��� Receipt No.: NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund Sgnature�of Agent/Owner Signature of contractor Plans Submitted ❑ Plans aived ❑ Certified Plot Plan ❑ Stamped Plans 0 Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISP\O,S�AL Public Sewer1 Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well [[[❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature COMMENTS J Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/ Driveway Permit DPW'Thum Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT , Temp Dumpster on site yes no Located at;124,Main'.Street.: Fire Department 619nature7date .; r COMMENTS 4 , Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— For department use ® Notified for pickup - Date E Doe.Building Permit Revised 2010 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application. ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses o Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc: Doc.Building Permit Revised 2012 Location 2- H� No. 0�2 Date S t • • TOWN OF NORTH ANDOVER SY 'Tl,l r; • , u Certificate of Occupancy $ Y � Building/Frame Permit Fee $Z ' Foundation Permit Fee � Other Permit Fee $ TOTAL $ Z440 Check# 25827 / Building Inspector FEB-21-2013 13:01 PAUL DAVIES ASSOCIATES 978 654.5 1 135P.01/01 hL h.LYY.i L.i.Ci:efl!W.4.a..__..i.�..aa..x....v. c ._.....�..n..a.......m e—..`....._..__...�. ......_.�.�.—....._. ... . Pali ariiie s A$Rw—,,AP cf #eL^ft February 14, 2013 Mr. Gerald Brown,Inspector of Buildings 1600 Osgood St. - North Andover,MA 01845 t,. Re: Project 3127 Jeffco,Inc Eight Unit Condominium 26 Main St. North Andover,MA Dear Mr. Brown; 5 The developer of the above referenced project would like to relocate the second means of egress of each unit from the second level deck to a rear 2'-8" door. This complies with the 81h Edition of the Massachusetts State Building Code, Section R311 Means of Egress. If you have any questions please call .. ......_..-.. .. ..._.. _.. p Pad L Dav im AIA � MA Regsbadm 3280 -� A-15 PnryPrc .Cf I Init A 1 nwP11. MA 01852 978-459-2154 TOTAL P.01 Phase Construction Control Document r To be submitted at completion of required site reviews of phase construction d for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107.6.2.2 Y Project Title: Eight-Unit Condominium#2,5,7 &8 Date: February 6,2013 Permit No. Property Address: 26 Main Street,North Andover,MA (Units 2,5,7 &8 Only) I,Paul L.Davies,MA Registration Number: 3280 Expiration date: August 31,2013 am a registered design professional and I hereby certify,to the best of my.information, knowledge and belief, that I or my designee have observed the following work, and that the work has been performed in a manner consistent with the approved plans and specifications for the following phase of construction as indicated: Required Site Review and Documentation for Phase Construction to be performed b thea rti riate re iistered design rofessIiona(or his/herdesi nee or M.G.L.c 112§8IR contractor Site Review and Documentation R I Site Review and Documentation R Soil condition and analysis Energy efficiency Footing and Foundation,including Reinforcement and Fire Alarm Installation Foundation attachment Concrete Floor and Under Floor Fire Suppression Installation' Lowest Floor Flood Elevation Field Reports' Structural Frame—wall/floor/roof X Carbon Monoxide Detection S stem Lath and Plaster/Gypsum I Seismic reinforcement Fire Resistant Wall/Partitions framing Smoke Control Systems Fire Resistant Wall/Partitions finish attachments Smoke and Heat Vents Above Ceiling inspection Accessibility 521 CMR) Fire Blocking/Stopping System Other: Emergency Lighting/Exit Signage Means of Egress Com onenets Special Inspections(Section 1704): Roofing,coping/System Venting Systems kitchen chemical fume Mechanical Systems 1.Indicate with an^x'the work you reviewed for compliance with the approved plans and specifications and describe in detail below. 2.Include NFPA 72 test and acceptance documentation 3.Include applicable NFPA 13, 13R,13D, 14, 15,17,20,241,etc.-test and acceptance documentation 4.Include NFPA 720 Record of Completion and Inspection and Test Form 5.Include field reports and related documentation t 6.Nothing contained within construction control shall have the effect of waiving or limiting the building official's authority to enforce this code with respect to examination of the contract documents,including plans,computations and specifications,and field inspections. Work Descriptiona:The Units 2,5,7& 8 are rough framed and weather tight. a.Describe in s autTcient detail the work(.e.foundation steel reinforcing,kitchen vent system,etc.)and the location on the project site,and list if applicable,the submittal documents that pertain to the work which was inspected. iki i t(a 1 0 i Enter in the space to the right a"wet"or ;,�;Q�`'.••"...... •.'� �f electronic signature and seal: Phone number:(978)459-2154 Email:pdavies@pdaviesarchitects.coin �,���•.......•��rF off y°` Building Official Use Only Building Official Name: Date: 1 Trial Vercinn 10 09 2019. NORTH own -o t _ 1, Andover O No. S Q P h ver, Mass )(A1 ,511 COC NICK!WICK AORATED S U BOARD OF HEALTH Food/Kitchen .PERMIT T LD Septic System THIS CERTIFIES THAT ..�: "0 �V� BUILDING INSPECTOR ................. ........... ....................................................... ....................... a has permission to erect.......................... buildings on MA �✓�' Foundation R o u j h k'0M,..r-y[ .aw!�. � v tobe occupied as ........................ .�V................................................................................... �Fal imney provided that the person accepting this permit shall in every respect conform to the terms of the application on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTO,� (dal Rough V ✓� i� 1/�a VIOLATION of the Zoning or Building Regulations Voids this Permit. Final PERMIT EXPIRES IN 6 MONTHS • ELECTRICAL INSPECTOR e UNLESS CONSTRUCTION S RTS i3a, / Service ..................... ........................................................ BUILDING INSPECTOR nal" t4 GAS INSPECTOF a Occupanci)-Permit Required to Occupy Building Rough >i Display in a Conspicuous Place on the Premises Do Not Remove Fina' 2-5 No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det"D,L— �� 13 SEE REVERSE SIDE ;L„” : oNO.i �h . O 0 ��'SACHUSES CERTIFICATE OF USE & OCCUPANCY TOWN OF NORTH ANDOVER Building Permit Number 299-13 on 10/15/2012 Date: April 29, 2013 THIS CERTIFIES THAT THE BUILDING LOCATED ON 26 Main Street Unit # 8 MAY BE OCCUPIED AS a single family home IN ACCORDANCE WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY APPLY. Certificate Issued to: Jeffco,Inc. 77 Main Street Andover,MA Buiging Inspec r Fee: Pre Paid Receipt: 25827 Check : 13856 NORTy O��tce eA'b p APPLICATION FOR CERTIFICATE OF OCCUPANCYANSPECTION z�clri q�H �`y BUILDING PERIVHT# US ADDRESS/LOCATION OF PROPERTY: /AA UA,, Map ZK Parcel J Lot Number SUBDIVISION: DATE REQUESTED FILED/READY FOR INSPECTION: Z� CLOSING DATE ON PROPERTY: FIVE (5)DAYS NOTICE PRIOR TO CLOSING DATE IS REQUIRED ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A REINSPECTION FEE OF TWENTY DOLLARS ($20.00)WILL BE CHARGED IF THE STRUCTURE DOES NOT MEET ALL APPLICABLE CODES. APPLICANT SIGNATURE e Permit Issued to: ��p Address: `7 ROUTING / TOWN ENGINEER, SITE PLAN--PRIVE-WAY REVIEW CONSERVATION PLANNING 11a 9/J3 DPW-WATER METER SEWER CONNECTION C� DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO SUBMITTAL OF THE OCCUPANCY/INSPECTION REQUEST DPW�I�`Ir� A Ll v` 1-6-9 /13 SIGNATURE File:Application for OC form revised Jan 2007/2011 NORry APPLICATION FOR CERTIFICATE OF OCCUPANCYANSPECTION n ayb � 9 l 0 Arno�pa'�y BUILDING PERNIIT # �SS•4CHus ADDRESS/LOCATION OF PROPERTY: �� �� Vti I Map 2—V Parcel 3 Lot Number SUBDIVISION: DATE REQUESTED FILED/READY FOR INSPECTION: 2 CLOSING DATE ON PROPERTY: FIVE(5)DAYS NOTICE PRIOR TO CLOSING DATE IS REQUIRED ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A REINSPECTION FEE OF TWENTY DOLLARS ($20.00)WILL BE CHARGED IF THE STRUCTURE DOES NOT MEET ALL APPLICABLE CODES. APPLICANT SIGNATURE Permit Issued to: Address: � � � �► ROUTING / TOWN ENGINEER, SITE PLAN RIVE-WAY REVIEW L4D`'I i3 CONSERVATION PLANNING DPW-WATER METER SEWER CONNECTION DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO SUBMITTAL OF THE OCCUPANCY/INSPECTION REQUEST DPW— � Q �ti 3 SIGNATURE File:Application for OC form revised Jan 2007/2011 � NORry q O it•[D f6 ti Ht•: •.a, Y6 0 APPLICATION FOR CERTIFICATE OF OCCUPANCY/INSPECTION A°Rreo pPyiy BUILDING PERMIT it ADDRESS/LOCATION OF PROPERTY: �Mpo'u _<�t UA k Map 2 Lz, Parcel_ Lot Number SUBDIVISION: DATE REQUESTED FILED/READY FOR INSPECTION: �- CLOSING DATE ON PROPERTY: FIVE(5)DAYS NOTICE PRIOR TO CLOSING DATE IS REQUIRED_ ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A REINSPECTION FEE OF TWENTY DOLLARS ($20.00)WILL BE CHARGED IF THE-STRUCTURE DOES NOT MEET ALL APPLICABLE CODES. APPLICANT SIGNATURE Permit Issued to: `� lje Address: ROUTING / TOWN ENGINEER, SITE PLAN—_�RIVE-WAY REVIEW CONSERVATION PLANNING4W DPW-WATER METER IJ I-3 SEWER CONNECTION DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO SUBMITTAL OF THE OCCUPANCY/INSPECTION REQUEST DPW— i. (h SIGNATURE File:Application for OC form revised Jan 2007/2011 � NORI'1i '9 p tco e ti APPLICATION FOR CERTIFICATE OF OCCUPANCYANSPECTION i0<wK�WKw 10 T �44oRA7eo I,pP .cy BUILDING PERMIT #2-99- 13 SSS C:Aus�� ADDRESS/LOCATION OF PROPERTY: a& M U Uti l ` Map 2'� Parcel_L+3 Lot Number SUBDIVISION: DATE REQUESTED FILED/READY FOR INSPECTION: CLOSING DATE ON PROPERTY: _ FIVE(5)DAYS NOTICE PRIOR TO CLOSING DATE IS REQUIRED ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A REINSPECTION FEE OF TWENTY DOLLARS ($20.00)WILL BE CHARGED IF THE-STRUCTURE DOES NOT MEET ALL APPLICABLE CODES. APPLICANT SIGNATURE Permit Issued to: .e 1dj Address: 40-.4-_� ��, 0 _� ROUTING TOWN ENGINEER, SITE PLAN— RIVE-WAY REVIEW y i"`I13 a CONSERVATION PLANNING �y /J DPW-WATER METER SEWER CONNECTION DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO SUBMITTAL OF THE OCCUPANCY/INSPECTION REQUEST DPW (A 1 Lll.�- 9 l 3 SIGNATURE File:Application for OC form revised Jan 2007/2011 Enter construction cost for fee cal- North Andover Fee Calculation Construction Cost $ 195,000.00 m $ - $ 2,340.00 Plumbing Fee $ 292.50 Gas Fee 100 comm. $ 100.00 Electrical Fee $ 292.50 Total fees collected $ 3,025.00 26 Main Street Unit 8 302-13 on 10/15/12 Unit 8 of 8 New Townhouses OOORTH oven o psAndover - to C,, h ver, Mass, )U 1 S I C O[MhCNtwICK S U BOARD OF HEALTH PERMIT T L D Food/Kitchen Septic System C�'� BUILDING INSPECTOR THISCERTIFIES THAT ...................L- .......................C:..................................... ....................... S� UJ1rt� Foundation has permission to erect .......................... buildings on ....... ... !.............. ............................. Rough �o.w.&?�1 ov to be occupied as ........................ . . . ..... ........................................................................................... Chimney provided that the person accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. _ PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTION STARTS Rough Service ..................... ............. ........................................... Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. SEE REVERSE SIDE NORTH oven of � s ndover O - 0 No. * _ 0 h ver, Mass, 011 ,5 LAKGI coc"Ic"awic" �•9 q°RAreo #I*' (5 S U BOARD OF HEALTH Food/Kitchen PERMIT T LD Septic System THIS CERTIFIES THAT �c--�c'o ��C-- BUILDING INSPECTOR ................... .......................................................................... ....................... SV � �� Foundation has permission to erect .......................... buildings on ........Y..4...s !.............. ............................. )t ' I/� .�/� C� Rough �41.Y4�/v! ?; ........................................................................... Chimney to be occupied as ........................ . . . ...... ...UV v provided that the person accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. _ PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTION STARTS Rough Service ..................... ..' .....'t. --1...................... Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. SEE REVERSE SIDE I. Massachusetts- Department of Public Safetri Boavil'of Buildin=—Reaulations and Standard! Construction Supervisor License License: CS 31830 DOUGLAS J AHERN 111 PO-BOX 802: . ' ANDOVER, MA 01810 Expiration: 9/21/2013 ('inimis�iirier Tr#: 1609 e G J l 1' t CONSTRUCTION CONTROL PROJECT TITLE: Eight Unit Residential Condominium PROJECT LOCATION: 26 Main St., North Andover, MA OWNER: Jeffco, Inc PROJECT DESCRIPTION: 20' x 28, 3 story, townhouse condominium IN ACCORDANCE WITH SECTION 116.0 OF THE MASSACHUSETTS STATE BUILDING CODE, I Paul L. Davies, REGISTRATION NO. 3280 BEING A REGISTERED ARCHITECT HEREBY CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ENTIRE PROJECT ARCHITECTURAL X STRUCTURAL X MECHANICAL FIRE PROTECTION ELECTRICAL OTHER: FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEDGE, SUCH PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A PERIODIC BASIS TO DETERMINE GENERALLY, THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.2.2 1. Review for conformance to the design concept, shop drawings, samples and other submittals, which are submitted by the contractor in accordance with the requirements of the construction documents 2. Review and approval of the quality control procedures for all code- required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become, generally, familiar with the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents �f r :` Com`���/I ��✓ � January 10, 2012 Paul�,: Davies, #h80 c DATE �1E