HomeMy WebLinkAboutBuilding Permit #302-13 - 26 MAIN STREET 10/15/2012 TOWN OF NORTH ANDOVER
APPLICATION FOR PLAN EXAMINATION
Permit NO: 1 ! Date Received
Date Issued: b I r/
IMPORTANT:Applicant must complete all items on this page
LOCATION i(4S
rPr nC
PROPERTY OWNER lJ �'lJ
�i
Print 100 Year Old Structure yesno.
MAP NO: �y PARCEL: 1. ZONING DISTRICT: Historic District yes
Machine Shop Village yes no
TYPE OF IMPROVEMENT PROPOSED USE
Residential Non- Residential
E�New Building ❑ One family
Addition Two or more family 11 Industrial
❑Alteration No. of units: ❑ Commercial
❑ Repair, replacement ❑Assessory Bldg ❑ Others:
❑ Demolition ❑ Other
❑ Septic 0 Well 0 Floodplain ❑Wetlands ❑ Watershed District
Water/Sewer
DESCRIPTION OF WORK TO BE PERFORMED:
CdMAU(
Identification Please Type or Print Clearly) \ (7l y 1
OWNER: Name: c 0 Phone: C- l k J
Address: —77 / 68W S-� - kAOG -P fIV t)q-
CONTRACTOR Name: ► hone:
Address: ( lCl -t �. tiAAA
Supervisor's Construction License: S �� 0 Exp. Date: c
Home Improvement License: Exp. Date: `J
ARCHITECT/ENGINEER OU`-�ues f Piss Phone:
Address: 1�1 � � � 5 ` W Reg. No.
FEE SCHEDULE:BOLDING PERMIT.$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON 125.00 PER S.F.
Total Project Cost: $ �1'l lVn FEE: $ 't
Check No.: ��� Receipt No.:
NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund
Sgnature�of Agent/Owner Signature of contractor
Plans Submitted ❑ Plans aived ❑ Certified Plot Plan ❑ Stamped Plans 0
Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑
TYPE OF SEWERAGE DISP\O,S�AL
Public Sewer1 Tanning/Massage/Body Art ❑ Swimming Pools ❑
Well [[[❑ Tobacco Sales ❑
Food Packaging/Sales ❑
Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF - U FORM
DATE REJECTED DATE APPROVED
PLANNING & DEVELOPMENT ❑ ❑
COMMENTS
CONSERVATION Reviewed on Signature
COMMENTS
HEALTH Reviewed on Signature
COMMENTS
J Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision: Comments
Conservation Decision: Comments
Water & Sewer Connection/ Driveway Permit
DPW'Thum Engineer: Signature:
Located 384 Osgood Street
FIRE DEPARTMENT , Temp Dumpster on site yes no
Located at;124,Main'.Street.:
Fire Department 619nature7date .;
r
COMMENTS 4 ,
Dimension
Number of Stories: Total square feet of floor area, based on Exterior dimensions.
Total land area, sq. ft.:
ELECTRICAL: Movement of Meter location, mast or service drop requires approval of
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes No
MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine
NOTES and DATA— For department use
® Notified for pickup - Date
E
Doe.Building Permit Revised 2010
Building Department
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
❑ Building Permit Application
❑ Workers Comp Affidavit
❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses
❑ Copy of Contract
❑ Floor Plan Or Proposed Interior Work
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition Or Decks
❑ Building Permit Application.
❑ Certified Surveyed Plot Plan
❑ Workers Comp Affidavit
❑ Photo Copy of H.I.C. And C.S.L. Licenses
❑ Copy Of Contract
❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Mass check Energy Compliance Report (If Applicable)
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
New Construction (Single and Two Family)
❑ Building Permit Application
❑ Certified Proposed Plot Plan
❑ Photo of H.I.C. And C.S.L. Licenses
o Workers Comp Affidavit
❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Copy of Contract
❑ Mass check Energy Compliance Report
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
must be submitted with the building application
Doc: Doc.Building Permit Revised 2012
Location 2- H�
No. 0�2 Date S t
• • TOWN OF NORTH ANDOVER
SY 'Tl,l r;
•
, u Certificate of Occupancy $ Y
� Building/Frame Permit Fee $Z
' Foundation Permit Fee
� Other Permit Fee $
TOTAL $ Z440
Check#
25827 / Building Inspector
FEB-21-2013 13:01 PAUL DAVIES ASSOCIATES 978 654.5 1 135P.01/01
hL h.LYY.i L.i.Ci:efl!W.4.a..__..i.�..aa..x....v. c ._.....�..n..a.......m e—..`....._..__...�. ......_.�.�.—....._. ... .
Pali ariiie s A$Rw—,,AP cf #eL^ft
February 14, 2013
Mr. Gerald Brown,Inspector of Buildings
1600 Osgood St. -
North Andover,MA 01845
t,.
Re: Project 3127
Jeffco,Inc
Eight Unit Condominium
26 Main St.
North Andover,MA
Dear Mr. Brown;
5
The developer of the above referenced project would like to relocate the second
means of egress of each unit from the second level deck to a rear 2'-8" door.
This complies with the 81h Edition of the Massachusetts State Building Code,
Section R311 Means of Egress.
If you have any questions please call
.. ......_..-.. .. ..._.. _.. p
Pad L Dav im AIA �
MA Regsbadm 3280 -�
A-15 PnryPrc .Cf I Init A 1 nwP11. MA 01852 978-459-2154
TOTAL P.01
Phase Construction Control Document
r To be submitted at completion of required site reviews of phase construction
d for work per the 8th edition of the
Massachusetts State Building Code, 780 CMR, Section 107.6.2.2
Y
Project Title: Eight-Unit Condominium#2,5,7 &8 Date: February 6,2013 Permit No.
Property Address: 26 Main Street,North Andover,MA (Units 2,5,7 &8 Only)
I,Paul L.Davies,MA Registration Number: 3280 Expiration date: August 31,2013
am a registered design professional and I hereby certify,to the best of my.information, knowledge and belief, that I or
my designee have observed the following work, and that the work has been performed in a manner consistent with the
approved plans and specifications for the following phase of construction as indicated:
Required Site Review and Documentation for Phase Construction
to be performed b thea rti riate re iistered design rofessIiona(or his/herdesi nee or M.G.L.c 112§8IR contractor
Site Review and Documentation R I Site Review and Documentation R
Soil condition and analysis Energy efficiency
Footing and Foundation,including Reinforcement and Fire Alarm Installation
Foundation attachment
Concrete Floor and Under Floor Fire Suppression Installation'
Lowest Floor Flood Elevation Field Reports'
Structural Frame—wall/floor/roof X Carbon Monoxide Detection S stem
Lath and Plaster/Gypsum I Seismic reinforcement
Fire Resistant Wall/Partitions framing Smoke Control Systems
Fire Resistant Wall/Partitions finish attachments Smoke and Heat Vents
Above Ceiling inspection Accessibility 521 CMR)
Fire Blocking/Stopping System Other:
Emergency Lighting/Exit Signage
Means of Egress Com onenets Special Inspections(Section 1704):
Roofing,coping/System
Venting Systems kitchen chemical fume
Mechanical Systems
1.Indicate with an^x'the work you reviewed for compliance with the approved plans and specifications and describe in detail below.
2.Include NFPA 72 test and acceptance documentation
3.Include applicable NFPA 13, 13R,13D, 14, 15,17,20,241,etc.-test and acceptance documentation
4.Include NFPA 720 Record of Completion and Inspection and Test Form
5.Include field reports and related documentation t
6.Nothing contained within construction control shall have the effect of waiving or limiting the building official's authority to enforce this
code with respect to examination of the contract documents,including plans,computations and specifications,and field inspections.
Work Descriptiona:The Units 2,5,7& 8 are rough framed and weather tight.
a.Describe in s autTcient detail the work(.e.foundation steel reinforcing,kitchen vent system,etc.)and the location on the project site,and list if applicable,the submittal documents that pertain to the work which was
inspected. iki i t(a 1
0 i
Enter in the space to the right a"wet"or ;,�;Q�`'.••"...... •.'� �f
electronic signature and seal:
Phone number:(978)459-2154
Email:pdavies@pdaviesarchitects.coin
�,���•.......•��rF off y°`
Building Official Use Only
Building Official Name: Date:
1 Trial Vercinn 10 09 2019.
NORTH
own -o t _ 1, Andover
O
No. S
Q P h ver, Mass )(A1 ,511
COC NICK!WICK
AORATED
S U
BOARD OF HEALTH
Food/Kitchen
.PERMIT T LD Septic System
THIS CERTIFIES THAT ..�: "0 �V� BUILDING INSPECTOR
................. ........... ....................................................... .......................
a
has permission to erect.......................... buildings on MA �✓�'
Foundation
R o u j h k'0M,..r-y[
.aw!�. �
v
tobe occupied as ........................ .�V................................................................................... �Fal
imney
provided that the person accepting this permit shall in every respect conform to the terms of the application
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and
Construction of Buildings in the Town of North Andover. PLUMBING INSPECTO,�
(dal
Rough V
✓� i� 1/�a
VIOLATION of the Zoning or Building Regulations Voids this Permit.
Final
PERMIT EXPIRES IN 6 MONTHS
• ELECTRICAL INSPECTOR
e
UNLESS CONSTRUCTION S RTS i3a,
/ Service
..................... ........................................................
BUILDING INSPECTOR nal" t4
GAS INSPECTOF a
Occupanci)-Permit Required to Occupy Building Rough >i
Display in a Conspicuous Place on the Premises Do Not Remove Fina' 2-5
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
Smoke Det"D,L— �� 13
SEE REVERSE SIDE ;L„” :
oNO.i �h
. O
0
��'SACHUSES
CERTIFICATE OF USE & OCCUPANCY
TOWN OF NORTH ANDOVER
Building Permit Number 299-13 on 10/15/2012 Date: April 29, 2013
THIS CERTIFIES THAT
THE BUILDING LOCATED ON 26 Main Street Unit # 8
MAY BE OCCUPIED AS a single family home IN ACCORDANCE WITH THE
PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER
REGULATIONS AS MAY APPLY.
Certificate Issued to: Jeffco,Inc.
77 Main Street
Andover,MA
Buiging Inspec r
Fee: Pre Paid
Receipt: 25827
Check : 13856
NORTy
O��tce eA'b
p APPLICATION FOR CERTIFICATE OF OCCUPANCYANSPECTION
z�clri
q�H �`y BUILDING PERIVHT#
US
ADDRESS/LOCATION OF PROPERTY: /AA UA,,
Map ZK Parcel J Lot Number
SUBDIVISION:
DATE REQUESTED FILED/READY FOR INSPECTION: Z�
CLOSING DATE ON PROPERTY:
FIVE (5)DAYS NOTICE PRIOR TO CLOSING DATE IS REQUIRED
ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A
REINSPECTION FEE OF TWENTY DOLLARS ($20.00)WILL BE CHARGED IF THE STRUCTURE
DOES NOT MEET ALL APPLICABLE CODES.
APPLICANT SIGNATURE
e
Permit Issued to: ��p
Address: `7
ROUTING /
TOWN ENGINEER, SITE PLAN--PRIVE-WAY REVIEW
CONSERVATION
PLANNING 11a 9/J3
DPW-WATER METER
SEWER CONNECTION C�
DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO
SUBMITTAL OF THE OCCUPANCY/INSPECTION REQUEST
DPW�I�`Ir� A Ll v` 1-6-9 /13
SIGNATURE
File:Application for OC form revised Jan 2007/2011
NORry
APPLICATION FOR CERTIFICATE OF OCCUPANCYANSPECTION
n ayb � 9
l
0 Arno�pa'�y BUILDING PERNIIT #
�SS•4CHus
ADDRESS/LOCATION OF PROPERTY: �� �� Vti I
Map 2—V Parcel 3 Lot Number
SUBDIVISION:
DATE REQUESTED FILED/READY FOR INSPECTION: 2
CLOSING DATE ON PROPERTY:
FIVE(5)DAYS NOTICE PRIOR TO CLOSING DATE IS REQUIRED
ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A
REINSPECTION FEE OF TWENTY DOLLARS ($20.00)WILL BE CHARGED IF THE STRUCTURE
DOES NOT MEET ALL APPLICABLE CODES.
APPLICANT SIGNATURE
Permit Issued to:
Address:
� � � �►
ROUTING /
TOWN ENGINEER, SITE PLAN RIVE-WAY REVIEW
L4D`'I i3
CONSERVATION
PLANNING
DPW-WATER METER
SEWER CONNECTION
DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO
SUBMITTAL OF THE OCCUPANCY/INSPECTION REQUEST
DPW— � Q �ti 3
SIGNATURE
File:Application for OC form revised Jan 2007/2011
� NORry q
O it•[D f6 ti
Ht•: •.a, Y6 0
APPLICATION FOR CERTIFICATE OF OCCUPANCY/INSPECTION
A°Rreo pPyiy BUILDING PERMIT it
ADDRESS/LOCATION OF PROPERTY: �Mpo'u _<�t UA k
Map 2 Lz, Parcel_ Lot Number
SUBDIVISION:
DATE REQUESTED FILED/READY FOR INSPECTION: �-
CLOSING DATE ON PROPERTY:
FIVE(5)DAYS NOTICE PRIOR TO CLOSING DATE IS REQUIRED_
ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A
REINSPECTION FEE OF TWENTY DOLLARS ($20.00)WILL BE CHARGED IF THE-STRUCTURE
DOES NOT MEET ALL APPLICABLE CODES.
APPLICANT SIGNATURE
Permit Issued to: `� lje
Address:
ROUTING /
TOWN ENGINEER, SITE PLAN—_�RIVE-WAY REVIEW
CONSERVATION
PLANNING4W
DPW-WATER METER IJ
I-3
SEWER CONNECTION
DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO
SUBMITTAL OF THE OCCUPANCY/INSPECTION REQUEST
DPW— i. (h
SIGNATURE
File:Application for OC form revised Jan 2007/2011
� NORI'1i '9
p tco e ti
APPLICATION FOR CERTIFICATE OF OCCUPANCYANSPECTION
i0<wK�WKw 10 T
�44oRA7eo I,pP .cy BUILDING PERMIT #2-99- 13
SSS C:Aus��
ADDRESS/LOCATION OF PROPERTY: a& M U Uti l `
Map 2'� Parcel_L+3 Lot Number
SUBDIVISION:
DATE REQUESTED FILED/READY FOR INSPECTION:
CLOSING DATE ON PROPERTY: _
FIVE(5)DAYS NOTICE PRIOR TO CLOSING DATE IS REQUIRED
ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A
REINSPECTION FEE OF TWENTY DOLLARS ($20.00)WILL BE CHARGED IF THE-STRUCTURE
DOES NOT MEET ALL APPLICABLE CODES.
APPLICANT SIGNATURE
Permit Issued to: .e 1dj
Address: 40-.4-_� ��, 0 _�
ROUTING
TOWN ENGINEER, SITE
PLAN—
RIVE-WAY REVIEW
y i"`I13 a
CONSERVATION
PLANNING �y /J
DPW-WATER METER
SEWER CONNECTION
DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO
SUBMITTAL OF THE OCCUPANCY/INSPECTION REQUEST
DPW (A 1 Lll.�- 9 l 3
SIGNATURE
File:Application for OC form revised Jan 2007/2011
Enter construction cost for fee cal- North Andover Fee Calculation
Construction Cost
$ 195,000.00 m
$ - $ 2,340.00
Plumbing Fee $ 292.50
Gas Fee 100 comm. $ 100.00
Electrical Fee $ 292.50
Total fees collected $ 3,025.00
26 Main Street Unit 8
302-13 on 10/15/12
Unit 8 of 8 New Townhouses
OOORTH
oven o psAndover
- to
C,, h ver, Mass, )U 1 S I
C O[MhCNtwICK
S U
BOARD OF HEALTH
PERMIT T L D Food/Kitchen
Septic System
C�'� BUILDING INSPECTOR
THISCERTIFIES THAT ...................L- .......................C:..................................... .......................
S� UJ1rt� Foundation
has permission to erect .......................... buildings on ....... ... !.............. .............................
Rough
�o.w.&?�1 ov
to be occupied as ........................ . . . ..... ........................................................................................... Chimney
provided that the person accepting this permit shall in every respect conform to the terms of the application Final
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and
Construction of Buildings in the Town of North Andover. _ PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
UNLESS CONSTRUCTION STARTS Rough
Service
..................... ............. ........................................... Final
BUILDING INSPECTOR
GAS INSPECTOR
Occupancy Permit Required to Occupy Building Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
Smoke Det.
SEE REVERSE SIDE
NORTH
oven of � s ndover
O - 0
No. * _
0 h ver, Mass, 011 ,5
LAKGI
coc"Ic"awic"
�•9 q°RAreo #I*' (5
S U
BOARD OF HEALTH
Food/Kitchen
PERMIT T LD Septic System
THIS CERTIFIES THAT �c--�c'o ��C-- BUILDING INSPECTOR
................... .......................................................................... .......................
SV � �� Foundation
has permission to erect .......................... buildings on ........Y..4...s !.............. .............................
)t ' I/� .�/� C� Rough
�41.Y4�/v! ?; ........................................................................... Chimney
to be occupied as ........................ . . . ...... ...UV v
provided that the person accepting this permit shall in every respect conform to the terms of the application Final
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and
Construction of Buildings in the Town of North Andover. _ PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
UNLESS CONSTRUCTION STARTS Rough
Service
..................... ..' .....'t. --1......................
Final
BUILDING INSPECTOR
GAS INSPECTOR
Occupancy Permit Required to Occupy Building Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
Smoke Det.
SEE REVERSE SIDE
I.
Massachusetts- Department of Public Safetri
Boavil'of Buildin=—Reaulations and Standard!
Construction Supervisor License
License: CS 31830
DOUGLAS J AHERN 111
PO-BOX 802: . '
ANDOVER, MA 01810
Expiration: 9/21/2013
('inimis�iirier Tr#: 1609
e G
J
l
1'
t
CONSTRUCTION CONTROL
PROJECT TITLE: Eight Unit Residential Condominium
PROJECT LOCATION: 26 Main St., North Andover, MA
OWNER: Jeffco, Inc
PROJECT DESCRIPTION: 20' x 28, 3 story, townhouse condominium
IN ACCORDANCE WITH SECTION 116.0 OF THE MASSACHUSETTS STATE BUILDING CODE,
I Paul L. Davies, REGISTRATION NO. 3280 BEING A REGISTERED ARCHITECT HEREBY
CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION
OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING:
ENTIRE PROJECT ARCHITECTURAL X STRUCTURAL X
MECHANICAL FIRE PROTECTION ELECTRICAL
OTHER:
FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEDGE, SUCH
PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS
OF THE MASSACHUSETTS STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING
PRACTICES AND ALL APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED
USE AND OCCUPANCY.
I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL
SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A PERIODIC BASIS TO
DETERMINE GENERALLY, THAT THE WORK IS PROCEEDING IN ACCORDANCE
WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE
RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.2.2
1. Review for conformance to the design concept, shop drawings, samples and other
submittals, which are submitted by the contractor in accordance with the requirements
of the construction documents
2. Review and approval of the quality control procedures for all code-
required controlled materials.
3. Be present at intervals appropriate to the stage of construction to become, generally, familiar
with the progress and quality of the work and to determine, in general, if the
work is being performed in a manner consistent with the construction documents
�f
r :` Com`���/I ��✓ � January 10, 2012
Paul�,: Davies, #h80 c DATE