Loading...
HomeMy WebLinkAboutBuilding Permit #561 - 267 CHICKERING ROAD 2/26/2007 L�� TOWN OF NORTH O ER TIy APPLICATION FOR PLAN EXAMINATION of NOR0OR Az —A tio 4 Permit NO: Date Received Date Issued: s "T'"P1 s�C U IMPORTANT:Applicant must complete all items on this page LOCATION 7—CU91 C n PrihtJ PROPERTY OWNER "\� Print MAP NO.: PARCEL: ZONING DISTRICT: TYPE AND USE OF BUILDING HISTORIC DISTRICT YES ❑ TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑New Building ❑One family ❑ Addition ❑Two or more'family 0 Industrial $Alteration No. of units: N Repair, replacement ❑Assessory Bldg ;K Commercial ❑ Demolition 0 Moving(relocation) 0 Other ❑ Others: ❑ Foundation only DESCRIPTION OF WORK TO BE PREFORMED 'v" p4j.,-,t, tQ ems} 644Z' - 'k A/e K) Wood Y-e� �i�� ( ��r;i��, n�2�c1 .lb,2s►ae.�.., n9e;� f��- 3(an�5�.��,adc.��.,,« s�,�\ Identification Please Type or Print Clearly) i OWNER: Name: `"1-\ �`.s� ��(LA�'�7rt' Phone:b 699.9, Address: \lD0 v1,-,Mo-1 A bzwE t,^bbL2,) a Mrd . 0180 CONTRACTOR Name: L)\\C(1 (Soa-� �I Phone: L-AXI) 733'8�-33 n Address: 3�� c.,A �1� 5'1 , Kt 1d P M4 ,, Cil l k6 Supervisor's Construction License: 0919S8 Exp. Date: U -08-Z306 Home Improvement License: Exp. Date: ARCHITECT/ENGINEER ASSa-'ialSName: Phone: I'q'18"45(G(.090 Address: 2—OLo PSjem T lZA., AA.24AIZL , NQReg. No. FEE SCHEDULE.BULDING PERMIT.•$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost :$_IQ jam ® FEE:$ lei(&() I /' Check No.: l �� ttJ Receipt No.: Page I of 4 Location No. S�� Date NORT1y TOWN OF NORTH ANDOVER O�••� o r�,ti F 9 Certificate of Occupancy $ Building/Frame Permit Fee $ SAC Mus Foundation Permit Fee $ Other Permit Fee $ , TOTAL $ Check # Building Inspector TYPE OF SEWERAGE DISPOSAL Swimming Pools ❑ ❑ Tanning/Massage/Body Art ❑ Public Sewer Tobacco Sales Food Packaging/Sales 11❑ F1Well ❑ Permanent Dumpster on Site Private(septic tank,etc. ❑ Electric Meter location to project NOTE: Persons contracting wit unregistered ntractors do not have access to the guarani fund Signature of Agent/Owner Signature of contractor_.4L g Plans Submitted ❑ ans Waived ❑ Certified Plot Plan ❑ S ped Plans ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF-U FORM DATE REJECTED DATE APPROVED LANNING & DEVELOPMENT F1 Q O 6, 6?v,�-�, c`� COMMENTS ±:Zn � � 7 DATE REJECTED DATE APPROVED CONSERVATION ❑ ❑ COMMENTS DATE REJECTED DATE APPROVED HEALTH ❑ ❑ /C'� ' �C� COMMENTS 99t �- FIRE DEPARTMENT - Temp Dumpster on site yes no Fire Department signature/date COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water& Sewer Connection/Signature&Date Driveway Permit + Building Setback( Front Yard Side Yard Rear Yard Required Provided Required Provides Required Provided Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: NOTES and DATA– For department use �./'� ��,Z'v+�l 1 �b r� h�1"h G ►'�-�. �+� ��Y` �— C.G. v .ems\ �►�- 7 t � �.S � �' �✓�'Z_ ��' � � r.-fir---. I ' I Page 3 of 4 Doc:INSPECTIONAL SERVICES DEPARTMENT:BPFORMOS 1 Created JMC.Jan2006 1 1 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits d' Building Permit Application d Workers Comp Affidavit Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ;/Floor Plan Or Proposed Interior Work Addition Or Decks ❑ Building Permit Application ❑ Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:INSPECTIONAL SERVICES DEPARTMENT:BPFORM05 Page 4 of 4 Feb 01 07 04: 41p Real Estate 781 -376-4863 p. z r 02-01-2007 13:10 FROM-ALLEN AND BURKE CONSTRUCTION +4137337153 T-373 Pi;002/002 F-370 — I Allen & Burke Construction L.L.C. January 31,2007 Mr. Tom Wilburn Ninety Nine Restaurant&Pub 160 Olympia Avenue Woburn,MA 01081 Please find below the specifications for work to be done at the Ninety Nine Restaurant& Pub located in North Andover,MA. We propose to furnish all labor,material and equipment for the sum of 5105,000.00. I 1. Replace bar top(there will be no changes in the seating layout) 2. New barstools to be installed(no seats to be added) 3. New windows in the vestibule 4. Interior siding to be added—hardy plank and thin brick S. Existing ceiling tiles to be replaced;ceiling grid to be painted 6. Paint 7. New carpet to be installed 8. New bead board to be installed If you have any questions or need additional information,please feel free to call my office ar(413)733-8233 or my ( )cell 413 374-4010. To accept this contract,please sign and date below and fax back to(413)733-7153. i Tom Wilb - 9 Restaurant b Date 7 John EVi :7—Allen jBQe Construction L.L.C. to I 37 Warehouse Street# Springfield,MA 01118 (413) 733-8233 • (888)792-5688 *Fax(413)733-7153 www.allcnandburke.com I I I I OFFICE OF BUILDING INSPECTOR TOWN OF NORTH ANDOVER '•titi CONSTRUCTION CONTROL PROJECT NUMBER: A-06100 PROJECT TITLE: Ninety Nine Restaurant PROJECT LOCATION: Chickering Road NAME OF BUILDING: Ninety Nine Restaurant NATURE OF PROJECT: Remodel of existing restaurant IN ACCORDANCE WITH ARTICLE 116 OF THE MASSACHUSETTS STATE BUILDING CODE, ISteven A. Moeser REGISTRATION NO. 5379 BEING A REGISTERED PROFESSIONAL ENGINEER%ARCHITECH HEREBY CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ENTIRE PROJECT 0 ARCHITECTURAL ID STRUCTURAL 0 MECHANICAL 0 FIRE PROTECTION 0 ELECTRICAL 0 OTHER(SPECIFY) FOR THE ABOVE NAMED PROJECT AND THAT,TO THE BEST OF MY KNOWLEGE, SUCH PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISION OF THE MASSACHUSETTS STATE BUILDING CODE,ALL ACCEPTABLE ENGINEERING PRATICES. AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND B EPRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.0 1. Review, for conformance to the design concept, shop drawings, samples and other submittals which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approval of thequality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become, generally familiar with6the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. PURSUANT TO SECTION 116.2 .2 1 SHALL SUBMIT WEEKLY , A PROGRESS REPORT •,"� TOGETHER WITH PERTINENT COMMENTS TO THE NORTH ANDOVER BUILDING ( J=c rf t UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR No. 5.379 v 'Harvard � 4, y v S SCRIBED AND SWO TO BEFORE ME THIS 1 s t DAY OF F e b r u a r 7 I Ofwu I LAA�A — I O RY PUBLIC Laura Ann leury MY COMMISSION EXPIRES 10 24 08 TOWN OF NORTH ANDOVER, ' MASSACHUSETTS L•:11. ' f NORTH 0.4,'.a I- Any appeal shall be filed Within (20) days after the ACMUStt4y date of filing oi' this Notice In the Office c y' the Town NOTICE OF DECISION Ck Date. . JanuarT. 13: .1992 . . . . . . . . . . . Date of Hearing . January. 9, 1992. Petition of . . . . Family.Trust .(99 Restaurant) . . • , • • • . • • • . • . • • • • •i . • . . • . • • • • . • • Premises affected . , , 267. Chickering Road . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Referring to the above petition for a special permit from the requirements North Andover Zoning Bylaw - Section 8.3 - Site Plan Review of the . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . SO as to permit .the construction,of .a �6,650 sq.ft. restaurant and associated . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . facilities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . After a public hearing given on the above date, the Planning Board voted CONDITIONALLY to . APPROVE . .the SITE PLAN REVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . cc: Director of Public Works based upon the following conditions: Highway Surveyor Conservation Commission Building Inspector Board of Health Signed Pz Assessors Police Chief George D. Perna, Chairperson Fire Chief . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Applicant John Simons, Clerk Engineer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Interested Parties John Draper File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Richard Nardella . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Richard Rowen ` KAREN H.P.NELSON TOWN Of 120 Main Street, 01845 D"e``°' NORTH ANDOVER (508) 682-6483 BUILDING CONSERVATION DIVISION OF PLANNING PLANNING & COMMUNITY DEVELOPMENT January 13, 1992 Mr. Daniel Long, Town Clerk 120 Main Street North Andover, MA 01845 Re: Doe Family Trust Ninety Nine Restaurant-Site Plan Review Dear Mr. Long: The North Andover Planning Board held a public hearing on Thursday evening, January 9, 1992,upon the application of the Doe Family Trust, 267 Chickering Road, North Andover, MA., requesting Site Plan Approval through the Special Permit Process under Section 8.3 of the North Andover Zoning Bylaw. The following members were present and voting: George Perna, Chairperson,John Simons,Clerk,John Draper, Richard Nardella and Richard Rowen. Joseph Mahoney was absent. The public hearing was duly advertised in the North Andover Citizen on December 18 and December 24, 1991 and all parties of interest were properly notified. The petitioner is seeking Site Plan Approval for the construction of a 6,650 sq.ft. restaurant and associated facilities. The premise affected is located at 267 Chickering Road, in a General Business (GB) and Business-2 (B2) Zoning Districts. John Simons read the legal notice to open the public hearing. Christian Huntress stated that the Planning Board has seen the plans before. The applicant went to Town Meeting to rezone a portion of the property to a Business Zone. The applicant has gone before the Zoning Board of Appeals and has received a variance for the minimum width of the travel lane. George Perna stated that during the public hearing for the variance, abutters expressed concerns with lights from the traffic coming into their homes. In the order of conditions from the ZBA, specifics were placed as to what type of screening was to be used. Christian Huntress stated that in the variance a four foot earthen berm was required around the perimeter of the property, causing water problems with adjacent properties. George Perna stated that if a variances would be neededon any further application on a Site Plan, the petitioner will have to come before the Planning Board first for Site Plan Approval and will be conditioned to go before the'ZBA for the variance, eliminating site issue on a variance. Page 2: Doe Family Trust David Lanzoni, representing the Doe Family Trust, was present. Dana Doe was also present. Mr.Lanzoni presented the Board with plans of construction,referring to the back third of the building being constructed first,allowing for the operation of the restaurant during that time. The Building Inspector,Robert Nicetta,stated that he will dictate the public safety in the Building Permit process. John Simons asked that it be incorporated in the decision. Abutters expressed concerns with traffic leaving,the "99 Restaurant" and going into adjacent property. George Perna stated that the abutters could ask the applicant to put up a stockade fence. Mr. Lanzoni was asked by an abutter if he would be willing to pay for a stockade fence. Mr. Lanzoni said that he would consider it and would speak to the abutters after the meeting. Christian Huntress told the abutters that under Site Plan Review the Board cannot condition off site improvements. The ZBA, in their variance said, "no fence" on the "99 Restaurant property". Christian Huntress gave the Board a draft decision. Lighting on the property will be down cast. A Landscape Plan was presented to the Board. Drainage calculations were supplied and Bill Hmurciak,of D.P.W.,has reviewed them and made recommendations. Those recommendations have been incorporated into the plans before the Board. The discussion went back to fencing the property. The abutters want fences around the perimeter of the property. The Board does not have jurisdiction on off site improvements. Mr. Lanzoni expressed his willingness to put fences on a portion of the abutters property,but could. not fence their property totally. A living fence has been required from the ZBA. The expense of doing both, fencing around the abutters property and placing a living fence on the "99" property would be costly. Mr. Lanzoni said he would do a portion, but not all. The type of fence and the contractor will be determined by Mr. Lanzoni. George Perna to see the handicapped parking and ramps. Mr. Perna asked about the facade. Mr. Lanzoni said that the building will be of barn board, as are all other "99 restaurants", with the exception of the one in Boston, which is brick. Signage was discussed. The sign will be 10 feet front the roadway, as requiredby the State. Christian Huntress stated that the applicant has been before the State and that all issues have been satisfactorily addressed. Page 3: Doe Family Trust George Perna asked the abutters and the applicant to come to some kind of agreement before the Board took their vote. George Perna re-irritated that the Board could not dictated any off site work,only that which is on site. The ZBA has already stated what is to be on the property. The Board will not change from the ZBA decision, because the applicant would then have to go back to the ZBA. The Planning Board is not going to change the required buffer from the ZBA decision. George Perna stated that he was convinced that the lighting issue had been addressed. A motion was made by John Draper to close the public hearing. The motion was seconded by John Simons and voted unanimously by those present. The applicant and the abutters left the room to discuss the fence matter. The Board later asked Mr. Lanzoni if an agreement had been reached with the abutters. Mr. Lanzoni stated that Dana Doe signed a pre-draft agreement with the abutters attorney. Part of the agreement was that the fence would be continued from the existing fence along the north side of the properly and that the abutter would maintain it. John Draper asked about conditions from the Conservation Commission. Christian Huntress stated that Conservation has filed a negative determination, as there are no wetlands on the site. A motion was made by John Draper to approve the Site Plan Review for Doe Family Trust, 267 Chickering Road, as drafted and amended, by the construction scheduling. The motion was seconded by Richard Rowen and voted unanimously by those present. Attached are those conditions approved of by the Board. Sincerely, PLANNING BOARD .m. i°.. � eorge Perna, Chairperson attachment cc: Director of Public Works Highway Surveyor Building Inspector Conservation Commission Board of Health Assessors Police Chief Fire Chief Applicant Engineer File � f DOE FAMILY TRUST NINETY NINE RESTAURANT 267 CHICKERING ROAD I SITE PLAN REVIEW APPROVAL, SECTION 8.3 OF THE NORTH ANDOVER ZONING BYLAW. FINDINGS OF FACT: The Planning Board makes the following findings regarding this Site Plan Review application as required by section 8.3 of the Zoning Bylaws: 1. The proposed use and site design for this lot are appropriate, due to it's location in Town. 2. Adequate vehicular and pedestrian access into the surrounding site has been provided. 3. The landscaping plan as shown and revised, meets the requirements of section 8.4 of the Zoning Bylaws. 4. The site drainage system is designed in accordance with the Town Bylaw requirements. 5. The applicant has met the requirements of the Town for Site Plan Review as stated in Section 8. 3 of the Zoning Bylaw. 6. Adequate and appropriate facilities will be provided for the proper operation of the proposed use. Finally, the Planning Board finds that this proposal generally complies with the Town of North Andover Zoning Bylaw requirements as listed in section 8.35 but requires conditions in order to be fully in compliance. Therefore, in order to fully comply with the approval necessary to construct the facility as specified in the Site Plan Review application before us, the Planning Board hereby grants a approval to the applicant provided the following conditions are met: CONDITIONS OF APPROVAL: 1. An as-built plan and profile proposed drainage system shall be submitted to the Planning Department and the Division of Public Works prior to the issuance of co. 2 . The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 3 . Gas, Telephone, Cable and Electric utilities shall be installed as specified by the respective utility companies. 4. All catch basins shall be protected and maintained with hay bales to prevent siltation into the drain lines during construction. 5. No open burning shall be done except as is permitted during burning season under the Fire Department regulations. 6. No underground fuel storage shall be installed except as may be allowed by Town Regulations. 7. Prior to the Building Permit being issued for the structure the following items shall be addressed to the satisfaction of the Planning Board: A. This decision shall be recorded at the Northern Essex Registry of Deeds and a recorded copy delivered to the Planning Office. B. All necessary permits shall be obtained through the Massachusetts Department of Public Works, District 5. C. A construction sequence and phasing schedule shall be submitted to Planning Board Staff for approval. This schedule should include appropriate measures for isolating construction activity from the operations and parking of the restaurant facility. 8. Prior to a Certificate of Occupancy being issued for any structures, the following items shall be addressed to the satisfaction of the Planning Board: A. This site shall have received all necessary permits and approvals from the North Andover Board of Health. B. The site shall be reviewed by the Planning Board. Any screening as may be reasonably required shall be added at the owners expense. C. The drainage structures, parking areas, access and fire lanes shall be constructed and clearly delineated. D. The dumpster area shall be secured with a solid wooden picket fence at least 6' in height, or other alternative as approved by the Planning Staff. E. All buildings shall have commercial fire sprinklers installed, per order NAFD. 9. Any Plants, Trees or Shrubs that have been incorporated into the Landscape Plan approved in this decision, that die within one year from time of planting shall be replaced at the owners expense. 10. The provisions of this settlement shall apply to and be binding upon the applicant, it's employees and all successors and assigns in interest or control. '.11. All lighting found within the site shall be down cast and shall not project into adjacent properties. Planning Board Staff shall approve lighting details prior to the issuance of za Permit to Build. 112. All signs within the project shall be of wood, with uniform 's lettering and design. The signs shall in no way be interior ,illuminated. (Neon or other means) The applicant shall 'required to otherwise comply with the sign regulations found, in Section 6 of the Zoning bylaw. 13. Any mechanical devices (ie: HVAC, vents, etc. . . ) placed on the roof shall not be visible from any surrounding roadways. cc: Director of Public Works Board of Public Works Highway Surveyor Building Inspector Board of Health Assessors Conservation Commission Police Chief Fire Chief Applicant Engineer File NORTH Town of � _ 4 over 0 No. - I LA dover, Mass., COCMICMEWICK V �d A04ATED 7S BOARD OF HEALTH PERMIT T Food/Kitchen Septic System BUILDING INSPECTOR THIS CERTIFIES THAT.... ............. .. .. ....... ........ ...w............................................................................................... Foundation has permission to erect.............................. ........ buildings on .0.0. .......�: �.tr. . .... ....... �........ Rough • t0 be Occupied BS .... + ... . h.t.... OhT �! Chimney . . . .. . . . . . . .. . . .. . . . provided that the person accepting this permit shall in every respect conform to the terms of the application on file in Final this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. N O • PLUMBING INSPECTOR C VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough ' Z&O ' Final PEPdv T EXPIRES IN 6 MONTHS UNLESS CONSTRU S TS ELECTRICAL INSPECTOR Rough ..... .. Service . ... ... .... .. .. .. . ...... ....................... SPECTOR Final Occupancy Permit Required to Ocmpy Building GAS INSPECTOR Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. SEE REVERSE SIDE Smoke Det. 02-26-2007 17:40 MGI 9784541503 MGE:1 IIIW!dght-Pierce BUILDING INSPECTOR 99 Main Street,Topsham,Maine USA 04086 REPORT Tel: 207-725-8721 Fax: 207-729-8414 TO: North Andover Building Department ATTN. Gerald A. Brown,Inspector of Buildings FAX NUMBER: 978-688-9542 PROJECT NAME: (TREATER LAWRFNCF. SANITARY DISTRICT WWTP IMPROVEMENT FOR CSO ABATE=MENT-CONTRACT l FROM: CHRISTOPHF,R J. WHITE REPORT NO.: 76 for the Week Ending 02-23-07 DATE: 02-26-07 COMMENTS: Methuen Conatractioe: • The Contractor continued installing the davit crane supports at the aerated grit tank room. • Contractor unloaded the stainless steel piping for the blower room and the aerated pmt tank room. Started installing the stainless steel aeration piping between the aerated grit tanks at the aerated Frit facility. • Started removing ices and snow from the secondary bypass chlorine contact tank and the secondary bypass structure. • Started removing the existing steel barrier wall and support system from elevation 15.00 to elevation 43.00 at the outfall structure. • Riverside Pump Station: The Contractor continued dewatering wet well 02 in order to start installing the new gate operators on the existing sluice gates. The Contractor removed cleaning equipment from wet well k2. Subcontractors: Annese Electric• • Continued installing conduit for equipment in the chemical room, blower room and the aerated grit tank room at the aerated grit facility. Overhead Door: • Completed most of the installation of the overheard door for the grit garage at the aerated grit facility. Quinn Brothers: ■ Started installing the mono rail support system in the ganige area of the aerated grit facility. Completed the installation of most of the side mounted railing at the inlet structure of the aerated grit facility. Completed the installation of most of the diamond plate on the inlet structure of the aerated grit facility. L.CS Controls: • Adjusting the program at the operations building for the operation of the blowers for the aeration tanks. Johnson Controls: � • Continued installing motors for the dampers for the exhaust fans in the aerated grit facility. l ChristopCer J htte RPR 1 MILLER ENGINEERING & TESTING INC. TRANSMITTAL LETTER TO: FRANK QUIGLEY DATE: 2/16/2007 MARK INVESTMENTS, INC. JOB NO: 06.267.NH C/O FD QUIGLEY&ASSOC. 10 OLD FARM ROAD PROJECT: WALGREEN'S/PETCO,WILBRAHAM, MA 01095-1445 N. ANDOVER NORTH ANDOVER, MA. Enclosed we are sending the following reports: COPIES: DATE: DESCRIPTION: 0 02/16/2007 GROUT TEST RESULT 0 02/12/2007 REINFORCING STEEL OBSERVATION REPORT . Remarks: COPIES TO: 1-AI Mckinnon, Heritage Consulting, LLC Thank You, 1-Gerald A. Brown, Town of North Andover Inspector of Buildings 1-Ron Laprie, DF Pray MILLER ENGINEERING &TESTING, INC. 1-Michael Cassavoy, Edwards & Kelcey Peter Schwotzer EMAIL ONLY: 1-Frank Quigley,-Mark Investments. Inc. CORPORATE OFFICE. 100 Sheffield Road-PO BOX 4776-Manchester,NH 03108-TEL:(603)668-6016-FAX:(603)668-8641 SATELLITE OFFICES. 130 East Main St.-P.O.BOX 11 -Northborough,MA 01532-TEL:(508)393-2607-FAX:(508)393-8490 474 Dorchester Ave.-Boston,MA 02127—TEL:(617)269-8829-FAX:(617)269-8837 REPORT OF GROUT TEST Miller Engineering &Testing, Inc. Report Date: 2/16/0 7 Project Number: o6.267.NH Report Number: G5 A-C Project: WALGREEN'S/PETCO, N. ANDOVER Client: MARK INVESTMENTS INC. Address: Attn: FIELD TEST CONDITIONS AND RESULTS (ASTM G31) Date Placed: 2/7/2007 Time Sampled: 11 :35 AM Time Placed: Location of Sample: Wall on 5, A.2-C.5 Supplier:AGGREGATE INDUSTRIES Truck Number: 1770 Ticket Number: 806410 Mix Number: Design Strength: 3000 Time Batched: Batch Size: 9 Slump: Fluid Air Content: (ASTM c 172) Grout Temp: 70 (ASTM c 1064) Ambient Temp: 35 Water Added: Curing and Handling Notes: Type of Masonry Units Used to Mold Specimens: Number of Units Used: Technician: D. Loughlin LABORATORY TEST RESULTS (ASTM C 39) Test Percent of Specimen Date Age Load Side 1 Side 2 Height Area Strength Design G5 A 2/14/2007 7 38420 3 .40 3 .70 6.80 12 .58 13050 102% G5 B 3/7/2007 28 G5 C 3/7/2007 28 Average Strength: Remarks: Copies to: Reported by: Donald Pollard Director of Operations MILLER ENGINEERING & TESTING INC. MANCHESTER,NH(603)668-6016 NORTHBORO,MA(508)393-2607 BOSTON,MA(617)269-8829 ' FAX:(603)668-8641 FAX:(508)393-8490 FAX:(0 17)269-8837 PROJECT: WALGREEN'S/PETCO,N.ANDOVER PROJECT NO: 06.267.NH NORTH ANDOVER,MA - — CONTRACTOR: D.F.PRAY CLIENT: MARK INVESTMENTS,INC. WEATHER: PARTLY SUNNY/COLD DATE: 02-12-07 REINFORCING STEEL OBSERVATION REPORT LOCATIONS CHECKED THIS DATE: Walgreen's; CMU Line-1, A/C.6; courses 1-11 Results of Referenced From Remarks/Deviation From Inspection Detail/Sheet Plans and Specifications FORMWORK INSPECTION Is the Formwork Constructed with Proper Clearances/Widths? N/A S3.0/OS-01-06 m Is the Formwork Clean/In Good Condition? N/A S3.0/05-01-06 REINFORCING STEEL INSPECTIONS Are Blocking/Chairs Installed to Support the Reinforcing Steel? N/A S3.0/05-01-06 What type of Blocks/Chairs are Used? N/A S3.0/05-01-06 Is the Reinforcing Steel Adequately Supported Above the Subgrade? Yes S3.0/05-01-06 Are the Reinforcing Bars Properly Aligned? Yes S3.0/05-01-06 Are the Reinforcing Bars Installed with Proper Clearances From the Formwork/Concrete? Yes S3.0/05-01-06 Are the Correct Reinforcing Bar Sizes Installed? Yes S3.0/05-01-06 Are the Correct Number of Reinforcing Bars Installed? Yes S3.0/05-01-06 Are the Reinforcing Bars Installed with the Correct Spacing? Yes S3.01/05-01-06 Are the Reinforcing Bars Correctly Spliced? Yes S3.0/05-01-06 Are the Reinforcing Bars Adequately Secured? Yes S3.0/05-01-06 Are the Reinforcing Bars Clean and Free of Rust/Debris/Etc.? Yes S3.0/05-01-06 ARE APPROVED DRAWINGS AVAILABLE FOR REVIEW? Yes WAS THE REINFORCEMENT ACCESSIBLE? Yes DISCREPANCIES: None noted. ITEMS ABOVE APPEAR TO MEET SPECIFICATIONS UNLESS OTHERWISE NOTED. PREPARED BY: Kevin Keenan i MILLER ENGINEERING & TESTING INC. TRANSMITTAL LETTER TO: FRANK QUIGLEY DATE: 2/20/2007 MARK INVESTMENTS, INC. JOB NO: 06.267.NH C/O FD QUIGLEY&ASSOC. PROJECT: WALGREEN'S/PETCO, 10 OLD FARM ROAD N. ANDOVER WILBRAHAM, MA 01095-1445 LOCATION: NORTH ANDOVER, MA Enclosed we are sending the following reports: COPIES: DATE: DESCRIPTION: 0 02/20/2007 CONCRETE CYLINDER TEST RESULT Remarks: COPIES TO: 1-AI Mckinnon, Heritage Consulting, LLC Thank You; 1-Gerald A. Brown, Town of North Andover Inspector of Buildings 1-Ron Laprie, DF Pray MILLER ENGINEERING &TESTING, INC. 1-Michael Cassavoy, Edwards& Kelcey Peter Schwotzer EMAIL ONLY: - 1-Frank Quigley, Mark Investments. Inc. CORPORATE OFFICE. 100 Sheffield Road-PO BOX 4776-Manchester,NH 03108-TEL:(603)668-6016-FAX:(603)668-8641 SATELLITE OFFICES. 130 East Main St.-P.O.BOX 11 -Northborough,MA 01532-TEL:(508)393-2607-FAX:�508)393-8490 474 Dorchester Ave.-Boston,MA 02127—TEL:(617)269-8829-FAX:(617)269-8837 t REPORT OF CONCRETE CYLINDER TEST Miller Engineering & Testing, Inc. Report Date: 2/2 0/0 7 Project Number: 06.267 .NH Report Number: 10 A-D Project: WALGREEN' S/PETCO, N. ANDOVER Client: MARK INVESTMENTS INC. Address: Attn: FIELD TEST CONDITIONS AND RESULTS (ASTM C31) Date Placed: 12/22/2006 Time Sampled: 9:50 AM Location of Sample: Northwest sidewalk Supplier: KINGSTONE RED-T-MIX Truck Number: 0124 Ticket Number: 4755 Mix Number: Design Strength: 3000 Time Batched: Time Placed: Batch Size: 60 Slump: 6.0 (ASTM C 143) Air Content: 6.5 (ASTM C 231) Concrete Temp: 60 (ASTM C 1064) Ambient Temp: 42 11 Water Added: Technician: P. Nickerson LABORATORY TEST RESULTS (ASTM C 293) Test Percent of Type of Specimen Date Age Load Diameter Area Strength Design Fracture 10 A 12/29/2006 7 41850 6.00 28 .27 1480 49% 5 10 B 1/19/2007 28 76830 6.00 28 .27 2720 91% 3 10 C 2/16/2007 56 86090 6 .00 28 .27 3040 101% 5 10 D 2/16/2007 56 87910 6 .00 28 .27 3110 104% 5 Remarks: Al McKinnon & Frank Quigley notified of 28—Day TYPES OF FRACTURE fff���TTT���111. test results on 01-19-07 Type 1 Type 2 Type 3 Copies to: Type 4 ' Type 5 Type 6 Reported by: Donald Pollard Director Of Operations i REPORT OF CONCRETE CYLINDER TEST Miller Engineering & Testing, Inc. Report Date: 2/2 0/0 7 Project Number: 06.267 .NH ReportNumber: 10 E-H Project: WALGREEN'S/PETCO, N. ANDOVER Client: MARK INVESTMENTS INC. Address: Attn: FIELD TEST CONDITIONS AND RESULTS (ASTM C31) Date Placed: 12/22/2006 Time Sampled: 1 : 00 PM Location of Sample: North sidewalk Supplier: KINGSTONE RED-T-MIX Truck Number: 01136 Ticket Number: 4777 Mix Number: Design Strength: 3000 Time Batched: Time Placed: Batch Size: 60 Slump: 5 .25 (ASTM C 143) Air Content: 6.4 (ASTM C 231) Concrete Temp: 62 (ASTM C 1064) Ambient Temp: 44 Water Added: Technician: P. Nickerson LABORATORY TEST RESULTS (ASTM C 293) Test Percent of Type of Specimen Date Age Load Diameter Area Strength Design Fracture 10 E 12/29/2006 7 53630 6.00 28 .27 1900 63% 5 10 F 1/19/2007 28 82390 6.00 28 .27 2910 97% 3 10 G 2/16/2007 56 91980 6.00 28 .27 3250 108% 5 10 H 2/16/2007 56 91720 6.00 28 .27 3240 108°% 5 Remarks: Al McKinnon & Frank Quigley notified of 28-Day TYPES OF FRACTURE test results on 01-19-07. Type 1 Type 2 Type 3 Copies to: 0 0 Type 4 Type 5 Type 6 Reported by: Donald Pollard Director Of Operations t MILLER ENGINEERING & TESTING INC. TRANSMITTAL LETTER TO: FRANK QUIGLEY DATE: 2/22/2007 MARK INVESTMENTS, INC. JOB NO: 06.267.NH C/O FD QUIGLEY&ASSOC. PROJECT: WALGREEN'S/PETCO, 10 OLD FARM ROAD N. ANDOVER WILBRAHAM, MA 01095-1445 LOCATION: NORTH ANDOVER, MA Enclosed we are sending the following reports: COPIES: DATE: DESCRIPTION: 0 02/22/2007 CONCRETE CYLINDER TEST RESULT 0 02/22/2007- GROUT TEST RESULT 0 02/22/2007 MORTAR CUBE TEST RESULT Remarks: COPIES TO: 1-AI Mckinnon, Heritage Consulting, LLC Thank You, 1-Gerald A. Brown, Town of North Andover Inspector of Buildings 1-Ron Laprie, DF Pray MILLER ENGINEERING &TESTING, INC. 1-Michael Cassavoy, Edwards & Kelcey Peter Schwotzer EMAIL ONLY: 1-Frank Quigley, Mark Investments. Inc. CORPORATE OFFICE. 100 Sheffield Road-PO BOX 4776-Manchester,NH 03108-TEL:(603)668-6016-FAX:(603)668-8641 SATELLITE OFFICES. 130 East Main St.-P.O.BOX 11 -Northborough,MA 01532-TEL:(608)393-2607-FAX:(508)393-8490 474 Dorchester Ave.-Boston,MA 02127—TEL:(617)269-8829-FAX:(617)269-8837 REPORT OF CONCRETE CYLINDER TEST Miller Engineering & Testing, Inc. Report Date: 2/22/07 Project Number: 06.267 .NH ReportNumber: 13 A-D Project: WALGREEN'S/PETCO, N. ANDOVER Client: MARK INVESTMENTS INC. Address: i Attn: FIELD TEST CONDITIONS AND RESULTS (ASTM C31) ,Date Placed: 1/22/2007 Time Sampled: 7:45 AM Location of Sample:Walgreen' s slab on grade, 8-9, A-B Supplier: KINGSTON REDIMIX Truck Number: 0129 Ticket Number: 5485 Mix Number: 3/4" Design Strength: 4000 Time Batched: Time Placed: Batch Size: 210 Slump: 5. 0 (ASTM C 143) Air Content: 3 .2 (ASTM C 231) Concrete Temp: 68 (ASTM C 1064) Ambient Temp: 56 Water Added: Technician: R. Smith LABORATORY TEST RESULTS (ASTM C 293) Test Percent of Type of Specimen Date Age Load Diameter Area Strength Design Fracture 13 A 1/29/2007 7 95870 6.00 28 .27 3390 85% 4 13 B 2/1.9/2007 28 128540 6 .00 28.27 4550 114% 4 13 C 2/19/2007 28 121560 6. 00 28 .27 4300 108% 4 13 D Hold 6. 00 28 .27 Remarks: Cylinders were surrounded with hat, then covered TYPES OF FRACTURE with blankets. Type t Type 2 Type 3 Copies to: a Type 4 Type 5 Type 6 Reported by: Donald Pollard Director Of Operations REPORT OF CONCRETE CYLINDER TEST 1 Miller Engineering & Testing, Inc. Report Date: 2/22/07 Project Number: 06.267.NH Report Number: 13 E-x Project: WALGREEN'S/PETCO, N. ANDOVER Client: MARK INVESTMENTS INC. Address: Attn: FIELD TEST CONDITIONS AND RESULTS (ASTM C31) Date Placed: 1/22/2007 Time Sampled: 8 :4 5 AM Location of Sample: Walgreen's slab on grade, 7.5-8, B-C Supplier: KINGSTON REDIMIX Truck Number: 0103 Ticket Number: 5492 Mix Number: 3/4" Design Strength: 4000 Time Batched: Time Placed: Batch Size: 210 Slump: 5.25 (ASTM C 143) Air Content: 2.5 (ASTM C 231) Concrete Temp: 64 (ASTM C 1064) Ambient Temp: 5 0 Water Added: Technician: R. Smith LABORATORY TEST RESULTS (ASTM C 293) Test Percent of Type of Specimen Date Age Load Diameter Area Strength Design Fracture 13 E 1/29/2007 7 69970 6.00 28 .27 2470 62% 5 13 F 2/19/2007 28 131660 6.00 28 .27 4660 117% 5 13 G 2/19/2007 28 129040 6 .00 28 .27 4560 114% 4 13 H Hold 6.00 28 .27 Remarks: Cylinders were surrounded with hat, then covered TYPES OF FRACTURE with blankets. Type 1 Type 2 Type 3 Copies to: a - - - Type 4 Type 5 Type 6 Reported by: Donald Pollard Director Of Operations REPORT OF CONCRETE CYLINDER TEST Miller Engineering & Testing, Inc. 1 Report Date: 2/22/07 Project Number: 06.267 .NH ReportNumber: 13 I-L Project: WALGREEN'S/PETCO, N. ANDOVER Client: MARK INVESTMENTS INC. Address: Attn: FIELD TEST CONDITIONS AND RESULTS (ASTM C31) Date Placed: 1/22/2007 Time Sampled: 9:35 AM Location of Sample: Walgreen's slab on grade, 6.4-7, C-C.6 Supplier: KINGSTON REDIMIX Truck Number: 0129 Ticket Number: 5497 Mix Number: 3/4° Design Strength: 4000 Time Batched: Time Placed: Batch Size: 210 SIUmp: 4 .5 (ASTM C 143) Air Content: 2 .9 (ASTM C 231) Concrete Temp: 59 (ASTM C 1064) Ambient Temp: 5o Water Added: Technician: R. Smith LABORATORY TEST RESULTS (ASTM C 293) Test Percent of Type of Specimen Date Age Load Diameter Area Strength Design Fracture 13 I 1/29/2007 7 88790 6.00 28 .27 3140 79% 5 13 J 2/19/2007 .28 114020 6.00 28 .27 4030 101% 4 13 K 2/19/2007 28 113780 6. 00 28 .27 4020 101% 5 13 L Hold 6.00 28 .27 Remarks: Cylinders were surrounded with hat, then covered TYPES OF FRACTURE with blankets. ®n IV�I Type 1 Type 2 Type 3 Copies to: Type 4 Type 5 Type 6 Reported by: Donald Pollard Director Of Operations REPORT OF CONCRETE CYLINDER TEST Miller Engineering & Testing, Inc. Report Date: 2/22/07 Project Number: 06.267.NH Report Number: 13 M-P Project: WALGREEN'S/PETCO, N. ANDOVER Client: MARK INVESTMENTS INC. Address: Attn: FIELD TEST CONDITIONS AND RESULTS (ASTM C31) Date Placed: 1/22/2007 Time Sampled: 10:30 AM Location of Sample: Walgreen' s slab on grade, C.6-D, 7.5-8 Supplier: KINGSTON REDIMIX Truck Number: 0134 Ticket Number: 5504 Mix Number: 3/4 Design Strength: 4000 Time Batched: Time Placed: Batch Size: 210 Slump: 4 .0 (ASTM C 143) Air Content: 2.9 (ASTM C 231) Concrete Temp: 60 (ASTM C 1064) Ambient Temp: 54 Water Added: Technician: R. Smith LABORATORY TEST RESULTS (ASTM C 293) Test Percent of Type of Specimen Date Age Load Diameter Area Strength Design Fracture 13 M 1/29/2007 7 93420 6.00 28 .27 3300 83% 3 13 N 2/19/2007 28 114420 6.00 28 .27 4050 101% 5 13 O 2/19/2007 28 117780 6.00 28 .27 4170 104% 5 13 P Hold 6.00 28 .27 I Remarks: Cylinders were surrounded with hat, then covered TYPES OF FRACTURE with blankets. S Type 1 Type 2 Type 3 Copies to: II] F1 Type 4 Type 5 Type 6 Reported by: Donald Pollard Director Of Operations REPORT OF CONCRETE CYLINDER TEST Miller Engineering & Testing, Inc. Report Date: 2/22/07 Project Number: 06.267.NH ReportNumber: 13 Q-T Project: WALGREEN'S/PETCO, N. ANDOVER Client: MARK INVESTMENTS INC. Address: Attn: FIELD TEST CONDITIONS AND RESULTS (ASTM C31) Date Placed: 1/22/2007 Time Sampled: 11:20 AM Location of Sample: Walgreen's slab on grade, 7.5-8, D.3-E Supplier: KINGSTON REDIMIX Truck Number: 1121 Ticket Number: 5512 Mix Number: 3/4° Design Strength: 4000 Time Batched: Time Placed: Batch Size: 210 Slump: 4 .0 (ASTM C 143) Air Content: 2.7 (ASTM C 231) Concrete Temp: 57 (ASTM C 1064) Ambient Temp: 52 Water Added: Technician: R. Smith LABORATORY TEST RESULTS (_ASTM C 293) Test Percent of Type of Specimen Date Age Load Diameter Area Strength Design Fracture 13 Q 1/29/2007 7 76790 6.00 28 .27 2720 68% 5 13 R 2/19/2007 28 114320 6.00 28 .27 4040 101% 5 13 S . 2/19/2007 28 114040 6. 00 28 .27 4030 101% 5 13 T Hold 6. 00 28.27 Remarks: Cylinders were surrounded with hat, then covered TYPES OF FRACTURE with blankets. Type 1 Type 2 Type 3 Copies to: Type 4 Type 5 Type 6 Reported by: Donald Pollard Director of Operations REPORT OF GROUT TEST Miller Engineering &Testing, Inc. Report Date: 2/22/07 Project Number: 06.267.NH ReportNumber: G6 A-C Project: WALGREEN'S/PETCO, N. ANDOVER Client: MARK INVESTMENTS INC. Address: Attn: FIELD TEST CONDITIONS AND RESULTS ASTM C 31) Date Placed: 2/12/2007 Time Sampled: 10:25 AM Time Placed: Location of Sample:Walgreen's Line-1 at B, course 1-11 Supplier: AGGREGATE INDUSTRIES Truck Number: Ticket Number: Mix Number: Design Strength: 3000 Time Batched: Batch Size: 5 Slump: Flowable Air Content: (ASTM c 172) Grout Temp: 57 (ASTM c 1064) Ambient Temp: 30 Water Added: Curing and Handling Notes: Type of Masonry Units Used to Mold Specimens: Number of Units Used: Technician: K. Keenan LABORATORY TEST RESULTS (ASTM C 39) Test Percent of Specimen Date Age Load Side 1 Side 2 Height Area Strength Design G6 A 2/19/2007 7 17250 3 .00 3 .10 6.00 9.30 1850 62% G6 B 3/12/2007 28 G6 C 3/12/2007 28 Average Strength: Remarks: Copies to: Reported by: Donald Pollard Director of Operations I - REPORT OF 2x2 MORTAR CUBE TEST Miller Engineering & Testing, Inc. Report Date: 2/22/07 Project Number: 06.267 .NH Report Number: M4 A-C Project: WALGREEN'S/PETCO, N. ANDOVER Client: MARK INVESTMENTS INC. Address: i Attn: FIELD TEST CONDITIONS AND RESULTS (ASTM C31) Date Placed: 2/12/2007 Time Sampled: 11:o AM Location of Sample: Walgreen's Line-D at 2/3; Courses 1-3 Supplier: ON-SITE MIX Truck Number: Ticket Number: Mix Number: Design Strength: Time Batched: Time Placed: Batch Size: Flow: AirContent: (ASTM c 172) Mortar Temp: s 6 (ASTM c 1064) Ambient Temp: 3 0 Water Content: Technician: K. Keenan LABORATORY TEST RESULTS (ASTM C 293) Test Percent of Type of Specimen Date Age Load Side 1 Side 2 Area Strength Design Fracture M4 A 2/19/2007 7 7760 2.00 2.00 4 .00 1940 M4 B 3/12/2007 28 2.00 2.00 4 .00 M4 C 3/12/2007 28 2.00 2 .00 4 .00 Remarks: Copies to: Reported by: Donald Pollard Director of Operations