Loading...
HomeMy WebLinkAboutBuilding Permit #234-13 - 272 BRIDGES LANE 9/21/2012 NORTH BUILDING PERMIT of t�Eo 6�ti TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO: Date Received �q ATEo SSACHU`�� Date Issued:—1[v f v IMPORTANT:Applicant must complete all items on this page LOCATION o�7a �c�cl4es Cane_ Print PROPERTY°OWNER, S1xasn F4nr� P�inf 100>Year Structure' yes' no MAP'210 PARCEL:�Z ZONING,DISTRICT:_ HistoricDi'strict{ yes no Machine..Shop,Village yes no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family ❑Addition ❑Two or more family ❑ Industrial MAlteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition 90ther Solax �am1S ❑ Septic O Well q.Floodplain D Wetlands, D Watershed:District D Water/Sewer DESCRIPTION OF WORK TO BE PREFORMED: 3 8 30lac- Panels nnLo cac' avt ,Qxinka(kQ \r�,Pcic neriecl. wi+-k B c Innwie`s elect tical System. Identification Please Type or Print Clearly) OWNER: Name: 6zn k;nr; Phone:(GQ)777-/Q9Y Address: a Bridgpus Lang- CONTRACTOR Name: Le5�_ec E. t,rJ.Lt: 7S,t Phone: (So j3)s To- La r.9 Address: [b P\(k c C:c�cle 6-fAe`woLAI, KA 0;),lcLn • 1 k Supervisor's Construction License:- q-),597 Exp. Date: V,,13 Home Improvement-License.: A ;?,5'2a Exp. Dater 3Ib'/j3 ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE.BULDING PERMIT.•$1200 PER$9000.00 OF THE TOTAL ESTIMATED COST BASEDON$925.00 PER S.F. Total Project Cost: $ 2 0/, 000 FEE: Check No.: Receipt No.: NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund Signature of Agent/Owner. Signature of contractor r Location� D�b�rA No. Date " Z-I . I L- • = TOWN OF NORTH ANDOVER � ���TCI.►t�p liq�` • Certificate of Occupancy $ Building/Frame Permit Fee $ � Foundation Permit Fee $ Other Permit Fee $ TOTAL 02 Check# 25739 Building Inspector Plans Submitted Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans L� TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank, etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature COMMENTS z Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature& Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT =Temp Dumpster on site yes rio Located at 124;Main Street Fire Departinent,signatbreldate r COMMENTS: L Dimension I Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: I 1 ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine I NOTES and DATA— For department use i i� 1 I I I ® Notified for pickup - Date Doc.Building Permit Revised 2010 J 1 Building Department I The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan o Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses o Copy Of Contract o Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products VOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report o Engineering Affidavits for Engineered products TOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:Building Permit Revised 2008 NORTH own -o s E 1. Andover No. - h ver, Mass, Ott, ALAKI '. �A COC MI C.@..CK Z1,9 °R�reo ►`P�,��CS ` S t1 BOARD OF HEALTH Food/Kitchen PERMIT T LD Septic System THIS CERTIFIES THAT SKOUP1...........�A.r�1�........... ............................ BUILDING INSPECTOR . - Foundation has permission to erect ...... buildings on . ` ... .�..:.... . ..� .................... ...... ... .................. Rough tobe occupied as 0........ ... r....:.... .... ....................... ............................................... Chimney provided that the person accepting this permit shall i e_very respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. _ PLUMBING INSPECTOR Rough VIOLATION of the Zoning or Building Regulations Voids this Permit. Final PERMIT EXPIRES eINNTASELECTRICAL INSPECTOR 011 UNLESS CONSTRU S Rough Service ........ ..... .............................................. Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Buildinz Rough Display in a Conspicuous Place on the Premises - Do Not Remove Final No-Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. SEE REVERSE SIDE print Form �gassacittisetts +ealtit of eats - Conrtnon" trial Accid The �Ittdets mons Dei'a O f ice 0� Irrvesti quite IQ0 ti eetIhers 1 Congress A 02114-2017 tricia°,,,j Uj $ostoii, ov/dia , UtractorstEie�iease print L e Ibl ' www.rnass•g , derst rake pffldavit'guy ensatiO� Ws orKers� Cain Corporation W t I�for�ation golarC►1Y � A lican individual): SQ g63.5,IOQ tion ). Name lgusinesslOrgan�a Type of Pro (reAuired W aY phone#'S CIeaN1eW New construction 3055 CP 84402 tractor and 1 6. Address: riatebox: Remodeling Mateo, con clots telZ�P:San ek the approp 4. ❑1 am a g eta�e sub-c°rit eel 'I ❑ Demolition Ci ,�$ta loyer� Cuecu have h►r attached sl $. ❑ addition Axe you an eR►k er with� )* listed on tile,ontractors have Budding arts or additions Ax a employ art-ttm sub- workers 9• ❑ cal rep 1 1 am full and/Oro net_ These and Have w Elect Bing repairs or additions employees( rietor pad employees ce i 10❑ 2•❑1 am a sole ptOp erope noloyecs 110 plum ti�ran or and its airs ship and fo n►e n any capacity We are a corp excised Heir R°hecelar Installaflon ri comp insurance 5.0 of ers lave ex er MCL 12❑ g Naorkers in ri tt of ex 4 pand We have no 13 0�t L er doing all work C.152,§1( ) , reAuired�meOwn oworkers tion. ting such• 3 ❑ 1 al"a 1 orkers' comp• emP ees• infofine vit in have ed toy ante regniC tion Pohcy t a pew a{fj t entities my$elf.IMO aired)t comp,inset ers'cornpepsa mfigt subV er of not those the Wofk etaa smote�vheth outside�pptfa insurance reA beWw sh°win8 °��e sub•�Optractots ab Site and thenlofe °liey and flit out the section all Wofk pumbcr.• #1 must also they are doing the nan+e policy plow is theP box ect show 2, wo*Cts comp S t that checks affidavit I"ned an additional sh vide th°ir empl°y�' ,Any apptican who submit this ttached they must p{O must a insurance far my thisbox ccs, I H°meoNvnerthat check tors have employ rkers'compensad lcoatracto' sub-cOntcac g(Q112p13 cCs. if the roviding rV0 date: p f 8y� emrl°y employer that is P Insurance Co�tpanY Expiration I ans an eman date). inf°rmati°�t. Zurich Am telZivjl t►on s COOP Name- Cg6734g7Q cityfSe obey uumbe{cr� a►penalf,nd 'ne 1 InsuranceW the p R Pay, (sb0�r►g osition° # l� to the imp WORK cOf #or pelf-ins Lie' anon D can lead form of a fa ded to the Office of J? - oWS declar c.152 in the eu ae�se tion 25A ll as civ Pe,"' Statement job Site Address: rkere rW con►p well as civil p crit maybe a c©py the 0vo a as required t as of this statem carred. of re a copy is true and Attach coverage ear imprtsonmadvised that above I secure cO or one"y lator. Be catiot}. ros' y .a a I Failure to 00 aridf vio verifiOrmatian P m � 1500. the coverage t the in fine UP 25�.D0 a day again insurance er'nr1'tha pate �¢ °f up atioris of the DIA encdties° Investtg - the ams a cert' .+under - I do herebyriciaL Si 11atu►e= 69 tete'6} city or tow, ° 774'22 •� comF Phone g' 6-Q not write in this area to be pern�itfl'icease# 5,Plumbi°g Inspector Only. DO inspector p�cial nSe A,Electrical !tv or Town. ircle one)' artment 3'MrrovW Clerk #. C Authority (� phone ► and t.Health 2•Building Issu g 1 Bo Of 6 Other ------------ Contact person ------------- -------------- - ` - r_v i �'� CERTIFICATE OF LIABILITY INSURANCE -DAU os/22/ao12 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER, THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s). PRODUCER 0726293 1-415-546-9300 CONTACT Brendan Quinlan Arthur J. Gallagher & Co. PHONE FAX Insurance Brokers of California, Inc., License #0726293 Alter No_w- 415-536-4020 I(AM,No): One Market Plaza, Spear Tower EMAIL breadan i Suite 200 CRESS: qu nlanoajg.com San Francisco, CA 94105 INSURERS AFFORDING COVERAGE NAIC# INSURER A; ZURICH AMBR INS CO_ 16535 INSURED tNSURERB: SolarCity Corporation INSURER C: 3055 Clearview Way INSURERD: San Mateo , CA 94402 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: 28781052 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES,LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUOR POLICY EFF POLICY EXP LTR TYPE OF INSURANCElux POLICY NUMBER M MMIDDIYYYY LIMITS A GENERAL LIABILITY OL0967364404 09/01/1 09/01/13 EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY PREMISES IEa occurrence) ' $ 1,000,000 CLAIMS-MADE IJ OCCUR MED EXP(Any one person) S 10,000 X Deductible: $25,000 -PERSONAL&ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GENL AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,000 X POLICY PRO- LOC $ A AUTOMOBILE LIABILITY RAP982931702 09/01/1; 09/01/13 COMBINED SINGLE LIMIT ec' ent 1,000,000 X ANY AUTO BODILY INJURY(Per person) S AUUTTSCHEDULED AUTOS BODILY INJURY(Per accidenl) $ X HIRED AUTOS Ex NON-OWNED PROPERTY DAMAGE AUTOS Peraccident $ UMBRELLA LIAe OCCUR EACH OCCURRENCE $ EXCESS UAB CLAIMS-MADE AGGREGATE $ DED RETENTION$ $ A WORKERS COMPENSATION WC967346704 WCSTATU- OTH- AND EMPLOYERS!LIABILITY YIN 09/01/1 09/01/13 XI ER ANY PROPRIETORIPARTNERIEXECUTIVEN NIA A E.L.EACH ACCIDENT S 1,000,000 OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (Attach ACORD 101,Additional Remarks Schedule,N more space Is required) Proof Of Insurance. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Evidence of Insurance Only THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE , 4---t ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010105) The ACORD name and logo are registered marks of ACORD Namitasf `4' t1 l01It ll et Ile e'rf'i'A0l (I � if 41.1.1�1'r le(4 .1fAJ ,r Office of Consumer Atfah , and Business Regulation 10 Park Plaza - Suite 5170 Boston, Massachusetts 02116 Home.Improvemcnt Contractor Registration Registration: 166572 Type: Supplement Card SOLARCITY CORPORATION Expiration: 3/812013 NOLAN RICHARDSON -----.-.___.__.__._- --.--------.--.__ __-- 24 ST. MARTIN STREET BLD 2 UNIT 11 ----- ----------- MARLBOROUGH, MA 01752 Update Address and return card.Mark reason for change. ❑ Address 0 Renewal [] Employment n Lost Card gyp. r . , ., .,,ir .� ,- • ., Wee of Consumer Affairs&Business Regulation License or registration valid for Individul use only t HOME IMPROVEMENT CONTRACTOR before the expiration date. If found return to: Office of Consumer Affairs and Business Regulation " Registration: '166572 Type: 10 Park Plaza-Suite 5170 Explr'ation: 3/8/2013 Supplement Card Boston,MA 02116 SOLARCITY CORPORA•t'ION NOLAN RICHARDSON 24 ST MARTIN STREET BLD20141 "hLBOROUGH,MA101762 Undersecretary Not valid without signature /Y A$$AYCiH�. SF I�7 RICHARD ON Int:,ItawV KUR Nlassachuse(1% 1) palln►cnt fiti'irl►fic `.tfct� RAV.d A hoard of Ituitdint, tic�4al.uion%and �t.Ifldards fiAYkNlt'�.1•A +x+7a7.1[)i ConstruCiron hulww ivit.nr I tt►•ni.r• i.icensc: cs 92597 c"•!1�ii;i�rr (ti3O+ ?Air ►p.,,i, ► LESTER E WILT JR 10 RANGER CIRCLE 80 WEYMOUTH,MA 02180 T t-xImat►on. 11/6/2013 Ufa r .,nnnir.f.mi 1►II 7422 Apex September 7, 2012 Englneerfng 56 Bradford Lane Andrew Oesterreicher Rochester,MA 02770 Ph1Fx:(508)763-2752 Solar City www.apexengineedngllc.com 3055 Clearview Way San Mateo, CA 94402 RE: Finn Residence 272 Bridges Lane North Andover, MA Apex Job # 12.062 Dear Mr. Oesterreicher: This letter certifies the modifications to the existing roof framing at 55 Whittier Street are capable of supporting the applicable dead, live, snow, and wind loads per 780 CMR, edition 8, as well as a dead load of 2.5 pounds per square foot which is specified, along with the modifications and mounting locations, on the drawing entitled "Finn Residence 7.14 kW Roof Mount PV System"from SolarCity dated July 26, 2012. Should you have any questions about this letter, please do not hesitate to contact this office. Respectfully, t�OF s Apex Englneerin icy SCOTT � R. Gott Digitally signed by Scott RLOW Orlowski,PE SKS N DN:cn=Scott Orlowski,PE, o No•47072 rlowski, c=US,o=Apex Engineering Scott R. Orlowski, P.E. 4 �Date:2012.09.07 20:04:54 President °���GISTE���� ` E -04'00' ss�ONAL ANG 12-062.Solar City(Finn)-Str rpt-01.docx Enclosure: Finn Residence 7.14 kW Roof Mount PV System rx: File 12-062 r 9 Apex September 7, 2012 Engfneerfng 56 Bradford Lane Andrew Oesterreicher Rochester,AAA 02770 Ph/Fx:(508)763-2752 Solar City www.apexengineeringlic.com 3055 Clearview Way San Mateo, CA 94402 RE: Finn Residence 272 Bridges Lane North Andover, MA Apex Job# 12-062 Dear Mr. Oesterreicher: This letter certifies the modifications to the existing roof framing at 55 Whittier Street are capable of supporting the applicable dead, live, snow, and wind loads per 780 CMR, edition 8, as well as a dead load of 2.5 pounds per square foot which is specified, along with the modifications and mounting locations, on the drawing entitled "Finn Residence 7.14 kW Roof Mount PV System"from SolarCity dated July 26, 2012. Should you have any questions about this letter, please do not hesitate to contact this office. Respectfully, � t OF*ssq ,apex Zngfneerin � scow °yam R. Cott I Digitally signed by Scott Orlowski,PE RLOMKI N DN:cn=Scott Orlowski,PE, Scott R. Orlowski, P.E. No.47072 rlowski, c=US,o=Apex Engineering T fi O q Date:2012.09.18 13:41:10 President °.� �0 STFF ' � E f 0400 ONAL EAG 12-062.Solar City(Finn)-Str rpt-01.docx Enclosure: Finn Residence 7.14 kW Roof Mount Pv System oc: File 12-062 oo°a4o a. 114-1*SolarCity. SolarPPATM Homeowner Name and Address Co-Owner Name (If Installation Location Contractor License i Shaun Finn Any) 272 Bridges Lane MA HiC 168572 272 Bridges Lane North Andover, MA North Andover, MA 01845 01845 ! 1. Introduction. "Interconnection Date" is the date that This Power Purchase Agreement (this the System is turned on and generating power. SolarCity will notify you by "Power Purchase Agreement" or "PPA") is the agreement between you and SolarCity email when your System is ready to be Corporation (together with its turned on. successors and assigns, "SolarCity" or 3. Intentionally Left Blank. "we") , covering the sale to you of the power produced by the solar panel system (the "System") described below. 4. Power Purchase Agreement Payments'; SolarCity agrees to sell to you, and you Amounts. agree to buy from SolarCity, all of the power produced by the System on the terms and conditions described in this (a) Power Price. You are purchasing the power the System produces. The Power purchase Agreement. The System price of that power is set forth on will be installed by SolarCity at the the value statement attached as address you listed above. This Power Schedule A. Purchase Agreement will refer to this address as the "Property" or your (b) Payments. Schedule A details, "Home." This Power Purchase Agreement among other things, (i) the price is twelve (12) pages long and has up to per kWh you will be charged; (ii) three (3) Exhibits depending on the the annual percentage price state where you live. SolarCity increase (if any) ; (iii) provides you with a Limited Warranty SolarCity's estimate of the amount (the "Limited Warranty") . The Limited of power that is expected to be Warranty is attached as Exhibit 2. This produced by the System in the first is a legally binding agreement with year of the Term; (iv) SolarCity's disclosures required by law, so please estimate of the amount of power read everything carefully. If you have that is expected to be produced by any questions regarding this Power Purchase Agreement, please ask your the System over the entire Initial Term; (v) your monthly payments for SolarCity sales consultant. the first year (or your 2. Term. prepayment) ; and (vi) your guaranteed power production and SolarCity agrees to sell you the power repayment price for generated by the System for 20 years underproduction. Your estimated (240 months) , plus, if the monthly payments are the product of Interconnection Date is not on the first (A) the price per kWh multiplied by day of a calendar month, the number of (B) the estimated annual kWh output days left in that partial calendar divided by (C) twelve (12) month. We refer to this period of time ("Monthly Payments") . You will pay as the "Term." The Term begins on the no Monthly Payments if you are Interconnection Date. The fully prepaying this PPA. Monthly Power Purchase Agreement (Residential) April 10, 2012 Copyright 0 2009-2012 SolarCity Corporation. All Rights Reserved. Payments are due on the first of actual production for purposes of the month for the previous calendar this paragraph. You will not be month. Because these are calendar charged for the System being off Monthly Payments (billed after the line due to SolarCity's fault, or calendar month is over) based on if it's due to grid failure or estimated production, the amount power outages caused by someone you actually pay for .each month may other than you. be more or less than the estimated amount based on the System's actual production in each calendar month. 5. Power Purchase Agreement Obligations. Monthly Payments may change if your price per kWh changes over the-Term (a) System, Home and Property of this PPA. Any, such changes are Maintenance set forth in Schedule A. Within 45 You agree to: days of the end of each calendar year, SolarCity will compare the (i) only have the System repaired System's actual production and the pursuant to the Limited estimated production and if the Warranty and reasonably . actual production is less than the cooperate when repairs are estimated production, SolarCity being made; will send you a refund for any overpayments you made. We will not (ii) keep trees, bushes and hedges charge you for the extra power the trimmed so that the System System produced. You will have receives as much sunlight as regular access to the System's it did when SolarCity production via your SolarCity installed it; online account. Actual production will vary from estimated production (iii) not modify your Home in a way due to weather and other that shades the System; conditions, but SolarCity guarantees you will not pay for (iv) be responsible for any power the System does not actually conditions at your Home that produce. See Schedule A for affect the installation details. Payments due upon (e.g. , blocking access to the installation are due immediately roof, or removing a tree that prior to commencement of is in the way) ; installation. (v) not remove any markings or (c) Payment Reconciliation. If (i) the identification tags on the System is off line for more than System; seven (7) full twenty-four (24) hour days cumulatively during the (vi) permit SolarCity, after we Term (for example, you remove the give you reasonable notice, System to do renovations to your to inspect the System for Home) ; or (ii) you take some action proper operation as we that significantly reduces the reasonably determine output of the System; or (iii) you necessary; don't trim your bushes or trees to their appearance when you signed (vii) use the System primarily for this PPA to avoid foliage growth personal, family or household from shading the System, then purposes, but not to heat a SolarCity will reasonably estimate swimming pool; the amount of power that would have been delivered to you during such (viii) not do anything, permit or outages or reduced production allow .to exist any condition periods and shall consider that as or circumstance that would cause the System not to Power Purchase Agreement 2 operate as intended at the (xvii) clean up after ourselves Property; during the construction of the System; (ix) notify SolarCity if you think the System is damaged or (xviii) insure the System against all appears unsafe; if the System damage or loss unless (A) is stolen; and prior to that damage or loss is caused changing your power supplier; by your gross negligence; or (B) you intentionally damage (x) have anyone who has an the System; ownership interest in your Home sign this Power Purchase (xix) repair the System pursuant to Agreement; the Limited Warranty and reasonably cooperate with you (xi) return any documents we send when scheduling repairs; you for signature (like incentive claim forms) within (xx) create a priority stream of . seven (7) days of receiving operation and maintenance them; and payments to provide enough cash flow in our financing (xii) maintain and make available, transactions to pay for the at your cost, a functioning Limited Warranty obligations indoor Internet connection and the repair and with one available wired maintenance of the System in Ethernet port and standard AC accordance with this PPA even power outlet within eighty if SolarCity ceases to (80) feet of the System's operate; and AC/DC inverter(s) . See section 2(c) of the Limited (xxi) not put a lien on your Home Warranty for details. or Property. (b) System Construction, Repair, (c) Home Renovations or Repairs Insurance and SolarCity's obligations: If you want to make any repairs or improvements to the Property that could interfere with the System (such as repairing the roof where SolarCity agrees to: the System is located) , you may only remove and replace the System (xiii) schedule the installation of pursuant to the Limited Warranty. the System at a mutually (d) Automatic Payment, Fees; Late convenient date and time; Charges In addition to the other amounts (xiv) construct the System you agree to pay in this Power according to written plans Purchase Agreement, you agree t g , Y g o you review; pay the following: Payment Automatic (xv) provide you with a web- (i) Discount: enabled meter to accurately All prices include a $15 measure the amount of power monthly discount for using the System delivers to you; automatic payment. You will not receive a $15 monthly (xvi) notify you if the System discount if you do not make design has to be materially automatic Monthly Payments changed so that you can through your checking or review any such changes; savings account; Power Purchase Agreement 3 (ii) Returned Check Fee: $25 (or (i) You grant to SolarCity and such lower amount as required its employees, agents and by law) for any check or contractors the right to withdrawal right that is reasonably access all of the returned or refused by your Property as necessary for the bank; purposes of (A) installing, constructing, operating, (iii) Late Payments: accrue owning, repairing, removing interest at the lesser of and replacing the System or twelve percent (12%) annually making any additions to the or the maximum allowable by System or installing applicable law; and complementary technologies on or about the location of the (iv) Product Change Fee: if after System; (B) enforcing you sign this Power Purchase SolarCity's rights as to this Agreement, but before we Power Purchase Agreement and begin installation, you the System; (C) installing, decide you would prefer an using and maintaining alternative SolarCity product electric lines and inverters (a SolarLease, or a prepaid and meters, necessary to PPA, etc. ) you will pay a interconnect the System to $250 change fee. your electric system at the Property and/or to the (e) Estimated Taxes utility's electric distribution system; or (D) You agree to pay any applicable taking any other action sales or use taxes on the Monthly reasonably necessary in Payments (or prepayment, as connection with the applicable) due under this PPA. If construction, installation, this PPA contains a purchase option operation, maintenance, at the end of the Term, you agree removal or repair of the to pay any applicable tax on the System. This access right purchase price for the System. shall continue for up to You also agree to pay as invoiced ninety (90) days after this any applicable personal property Power Purchase Agreement taxes on the System that your local expires to provide SolarCity jurisdiction may levy. The total with time to remove the , estimated amount you will pay for System at the end of the taxes over the Term is $0.00. Power Purchase Agreement. SolarCity shall provide you (f) No Alterations with reasonable notice of its need to access the Property You agree that you will not make whenever commercially any modifications, improvements, reasonable. revisions or additions to the System or take any other action (ii) During the time that that could void the Limited SolarCity. has access rights .Warranty on the System without you shall ensure that its Y SolarCity's prior written consent. access rights are preserved If you make any modifications, and shall not interfere with improvements, revisions or or permit any third party to additions to the System, they will interfere with such rights or become part of the System and shall access. You agree that the be SolarCity's property. System is not a fixture, but SolarCity has the right to (g) Access to the System file any UCC-1 financing statement or fixture filing Power Purchase Agreement 4 that confirms its interest in 6. Conditions Prior to Installation of the the System. System; Change Orders. (h) Indemnity (a) SolarCity's obligation to install the System and sell you the power To the fullest extent permitted by it produces is conditioned on the law, you shall indemnify, defend, following items having been protect, save and hold harmless completed to its reasonable SolarCity, its employees, officers, satisfaction: directors, agents, successors and assigns from any and all third (i) completion of (A) the party claims, actions, costs, engineering site audit (a expenses (including reasonable thorough physical inspection attorneys' fees and expenses) , of the Property, including, damages, liabilities, penalties, if applicable, geotechnical losses, obligations, injuries, work) , (B) the final System demands and liens of any kind or design, and (C) real estate nature arising out of, connected due diligence to confirm the with, relating to or resulting from suitability of the Property your negligence or willful for the construction, misconduct; provided, that nothing installation and operation of herein shall require you to the System; indemnify SolarCity for its own negligence or willful misconduct. (ii) approval of this Power The provisions of this paragraph Purchase Agreement by one of shall survive termination or SolarCity's financing expiration of this Power Purchase parties; Agreement. (iii) confirmation of rebate, tax (i) Payments credit and renewable energy credit payment availability Schedule A describes your payment in the amount used to obligations under this PPA. calculate the Monthly SUBJECT TO SECTION 4 (b) ABOVE, YOU Payments set forth in this AGREE THAT THE OBLIGATION TO PAY Power Purchase Agreement; ALL PAYMENTS AND ALL OTHER AMOUNTS DUE UNDER THIS PPA SHALL BE (iv) confirmation that SolarCity .ABSOLUTE AND UNCONDITIONAL UNDER will obtain all applicable ALL CIRCUMSTANCES AND SHALL NOT BE benefits referred to in SUBJECT TO ANY ABATEMENT, DEFENSE, Section 9; COUNTERCLAIM, SETOFF, RECOUPMENT OR REDUCTION FOR ANY REASON (v) receipt of all necessary WHATSOEVER, IT BEING THE EXPRESS zoning, land use and building INTENT OF THE PARTIES THAT ALL permits; and AMOUNTS PAYABLE BY YOU HEREUNDER SHALL BE, AND CONTINUE TO BE, (vi) completion of any PAYABLE IN ALL EVENTS INCLUDING BY renovations, improvements or YOUR HEIRS AND ESTATE AND, EXCEPT changes reasonably required AS SET FORTH BELOW IN SECTIONS 6, at your Home or on the 23 AND 24, YOU HEREBY WAIVE ALL Property RIGHTS YOU MAY HAVE TO REJECT OR p y (e. removal of a tree or necessary roof CANCEL THIS PPA, TO REVOKE repairs to enable us to ACCEPTANCE OF THE SYSTEM, OR TO safely install the System) . GRANT A SECURITY INTEREST IN THE SYSTEM. SolarCity may terminate this Power Purchase Agreement without Power Purchase Agreement 5 liability if, in its reasonable assign this PPA to .one of its financing judgment, any of the above listed parties. Thus, to finance your System, conditions (i) through (vi) will you agree that SolarCity may assign, not be satisfied for reasons beyond sell or transfer the System and this its reasonable control. Once Power Purchase Agreement, or any part of SolarCity starts installation, this Power Purchase Agreement or the however, it may not terminate this exhibits, without your consent. Power Purchase Agreement for your Assignment, sale or transfer generally failure to satisfy conditions (i) means that SolarCity would transfer through (vi) above. certain of its rights and certain of its obligations under this Power Purchase (b) Amendments, Your Right to Terminate Agreement to another party. This- for Material Changes. assignment does not change SolarCity's obligation to maintain and repair your Both parties will have the right to System as set forth in the Warranty. terminate this PPA, without penalty g. Ownership of the System; Tax Credits and or fee, if SolarCity determines Rebates. after the engineering site audit of your Home that it has misestimated You agree that the System is SolarCity's by more than ten percent (10%) the personal property under the Uniform System's annual production. Such Commercial Code. You understand and termination right will expire at agree that this PPA is not a contract to the earlier of (i) one (1) week sell or lease the System to you. prior to the scheduled System SolarCity owns the System for all installation date and (ii) one (1) purposes, including any data generated month after we inform you in from the System. You shall at all times writing of the revised production keep the System free and clear of all estimate. If neither party liens, claims, levies and legal exercises their right to terminate processes not created by SolarCity, and this PPA following a ten percent shall at your expense protect and defend (lot) change in the System's SolarCity against the same. production, then any changes to the System will be documented in an YOU UNDERSTAND AND AGREE THAT ANY AND amendment to this PPA. You ALL TAX CREDITS, INCENTIVES, RENEWABLE authorize SolarCity to make ENERGY CREDITS, GREEN TAGS, CARBON corrections to the utility OFFSET CREDITS, UTILITY REBATES OR ANY paperwork to conform to this PPA or OTHER NON-POWER ATTRIBUTES OF THE SYSTEM any amendments to this PPA we both ARE THE PROPERTY OF AND FOR THE BENEFIT sign. OF SOLARCITY, USABLE AT ITS SOLE DISCRETION. SOLARCITY SHALL HAVE THE 7. Warranty. EXCLUSIVE RIGHT TO ENJOY AND USE ALL YOU UNDERSTAND THAT THE SYSTEM IS SUCH BENEFITS, WHETHER SUCH BENEFITS WARRANTED SOLELY UNDER THE LIMITED EXIST NOW OR IN THE FUTURE. YOU AGREE H TO REFRAIN FROM ENTERING INTO ANY WARRANTY ATTACHED ED AS EXHIBIT 2, AND THAT AGREEMENT WITH YOUR UTILITY THAT WOULD THERE ARE NO OTHER REPRESENTATIONS OR ENTITLE YOUR UTILITY TO CLAIM ANY SUCH WARRANTIES, EXPRESS OR IMPLIED, AS TO BENEFITS. YOU AGREE TO REASONABLY THE MERCHANTABILITY, FITNESS FOR ANY COOPERATE WITH SOLARCITY SO THAT IT MAY PURPOSE, CONDITION, DESIGN, CAPACITY, CLAIM ANY TAX CREDITS, RENEWABLE ENERGY SUITABILITY OR PERFORMANCE OF THE SYSTEM CREDITS, REBATES, CARBON OFFSET CREDITS OR ITS INSTALLATION. OR ANY OTHER BENEFITS FROM THE SYSTEM. 8. Transfer. THIS MAY INCLUDE TO THE EXTENT ALLOWABLE BY LAW, ENTERING INTO NET METERING SolarCity works with banks, large AGREEMENTS, INTERCONNECTION AGREEMENTS, companies and other p e significant AND FILING RENEWABLE ENERGY/CARBON financing parties to finance your OFFSET CREDIT REGISTRATIONS AND/OR System. As a result, SolarCity will APPLICATIONS FOR REBATES FROM THE Power Purchase Agreement 6 Power Purchase Agreement 7 connection with the substitute shall continue to timely make all premises. Monthly Payments and pay all other (b) You agree to give SolarCity at amounts due under the PPA and, least fifteen (15) days but not cooperate with SolarCity, at more than three (3) months' prior SolarCity's sole cost and expense, written notice if you want someone to have the System repaired to assume your PPA obligations. In pursuant to the Limited Warranty. connection with this assumption, you, your buyer and SolarCity shall 14. Limitation of Liability. execute a written transfer of this PPA. Unless we have released you (a) No Consequential Damages from your obligations in writing, you are still responsible for SOLARCITY'S LIABILITY TO YOU UNDER performing under this PPA. If your THIS POWER PURCHASE AGREEMENT SHALL buyer defaults on this PPA and we BE LIMITED TO DIRECT, ACTUAL have not yet signed the transfer DAMAGES ONLY. YOU AGREE THAT IN NO agreement, you will be responsible EVENT SHALL EITHER PARTY BE LIABLE for their default. We will release TO THE OTHER FOR CONSEQUENTIAL, you from your obligations under INCIDENTAL, PUNITIVE, EXEMPLARY, this PPA in writing once we have a SPECIAL OR INDIRECT DAMAGES. signed transfer agreement with the person buying your Home. (b) Actual Damages (c) If you sell your Home and can't EXCEPT FOR CLAIMS UNDER SECTION comply with any of the options in 5(I) , NEITHER PARTY'S LIABILITY TO subsection (a) above, you will be THE OTHER WILL EXCEED AN AMOUNT in default under this PPA. Section EQUAL TO THE MAXIMUM AMOUNT THAT 12 (a) includes a Home sale by your COULD BE PAYABLE BY YOU UNDER estate or heirs. SECTION 16 (F) . DAMAGES TO YOUR (d) EXCEPT AS SET FORTH IN THIS HOME, BELONGINGS OR PROPERTY SECTION, YOU WILL NOT ASSIGN, SELL, RESULTING FROM THE INSTALLATION OR PLEDGE OR IN ANY OTHER WAY TRANSFER OPERATION OF THE SYSTEM ARE COVERED YOUR INTEREST IN THE SYSTEM OR THIS IN SECTION 6(C) OF THE LIMITED PPA WITHOUT OUR PRIOR WRITTEN WARRANTY. CONSENT, WHICH SHALL NOT BE UNREASONABLY WITHHELD. 15. Default. You will be in default under this Power 13. Loss or Damage. Purchase Agreement if any one of the following occurs: (a) Unless you are grossly negligent or (a) you fail to make any payment when you intentionally damage the it is due and such failure System, SolarCity will bear all of continues for a period of ten (10) the risk of loss, damage, theft, destruction or similar occurrence days; to any or all of the System. Exce P t as ex ressl rovided in (b) you fail to perform any material P y P this PPA, no loss, damage, theft or obligation that you have undertaken destruction will excuse you from in this PPA (which includes doing your obligations under this PPA something you have agreed not to i including Monthly Payments. do, like alter the System) and such failure continues for a period of (b) If there is loss, damage, theft, fourteen (14) days after written destruction or a similar occurrence notice; affecting the System, and you are not in default of this PPA, you Power Purchase Agreement 8 (c) you or your guarantor have provided price set both as forth in Schedule any false or misleading financial A plus (ii) all taxes, late or other information to obtain this charges, penalties, interest and Power Purchase Agreement; all or any other sums then accrued or due and owing; or (d) you assign, transfer, encumber, sublet or sell this PPA or any part (g) use any other remedy available to of the System without SolarCity's us in this PPA or by law. prior written consent; or You agree to repay us for any reasonable (e) you or any guarantor makes an amounts we pay to correct or cover your assignment for the benefit of default. You also agree to reimburse us creditors, admits in writing its for any costs and expenses we incur insolvency, files or there is filed relating to the System's return against you or it a voluntary resulting from early termination. By petition in bankruptcy, is choosing any one or more of these adjudicated bankrupt or insolvent remedies, SolarCity does not give up its or undertakes or experiences any right to use another remedy. By deciding substantially similar activity. not to use any remedy should this Power Purchase Agreement be in default, 16. Remedies in Case of Default. SolarCity does not give up our right to use that remedy in case of a subsequent If this Power Purchase Agreement is in default. default, we may take any one or more of the following actions. If the law 17. Returning the System at the End or requires us to do so, we will give you Upoa Termination of this Power Purchase notice and wait any period of time Agreement; Early Termination. required before taking any of these If you don't renew this Power Purchase actions. We may: Agreement, then there are three (3) possibilities with respect to returning (a) terminate this PPA; or keeping the System at the end or (b) take any reasonable action to termination of this PPA: correct your default or to prevent (i) If at the end or termination of our loss; any amount we pay will be this PPA you have not added to the amount you owe us and defaulted, and you have not will be immediately due; exercised your purchase option (c) require you, at your expense, to (if any) , then within ninety return the System or make it (90) days: available to us in a reasonable manner; (A) SolarCity may at its choosing, remove the (d) proceed, by appropriate court System from your Home at action, to enforce performance of no cost to you; or this PPA and to recover damages for (B) if SolarCity does not tell your breach; you that it wants to remove the System and you (e) turn off or take back the System by want to have the System legal process or self-help, but we removed from your Home at may not disturb the peace or no cost to you, you must tell us to remove it and violate the law; we will do so pursuant to (f) recover from you (i) a payment the Limited Warranty. equal to the higher of (A) the (ii) If at the end or termination of prepay price and (B) the purchase this PPA you are in default, Power Purchase Agreement 9 and SolarCity chooses to remove convenient to your Home. If a JAMS the System from your Home then office does not exist in the county you agree to pay SolarCity the where you live, then we will use another reasonable expense of removing the System from your Home. accredited arbitration provider with offices close to your Home. (iii) If at the end or termination of this PPA If you initiate the arbitration, you SolarCity chooses not to remove will be required to pay the first $125 the System and you do not of any filing fee. We will pay any request removal within 90 days filing fees in excess of $125 and we pursuant to the Limited will pay all of the arbitration fees and Warranty, then you will be costs. If we initiate the arbitration, considered to be the new owner of the System and it will we will pay all of the filing fees and automatically be conveyed to all of the arbitration fees and costs. j you as is. We will each bear all of our own attorney's fees and costs except that 18. Applicable Law; Arbitration. you are entitled to recover your PLEASE READ THIS SECTION CAREFULLY. attorney' s fees and costs if you prevail ARBITRATION REPLACES THE RIGHT TO GO TO in the arbitration and the award you COURT, INCLUDING THE RIGHT TO A JURY AND receive from the arbitrator is higher THE RIGHT TO PARTICIPATE IN A CLASS than SolarCity's last written settlement ACTION OR SIMILAR PROCEEDING. IN offer. When determining whether your ARBITRATION, A DISPUTE IS RESOLVED BY AN award is higher than SolarCity's last ARBITRATOR INSTEAD OF A JUDGE OR JURY. written settlement offer your attorney's The laws of the state where your Home is fees and costs will not be included., located shall govern this PPA without Only Disputes involving you and giving effect t conflict g g e o co f ct of laws SolarCity may be addressed in the principles. We agree that any dispute, arbitration. Disputes must be brought in claim or disagreement between us (a the name of an individual person or "Dispute") shall be resolved exclusively entity and must proceed on an individual b arbitration. y (non-class, non-representative) basis. The arbitration, including the selecting The arbitrator will not award relief for of the arbitrator, will be administered or against anyone who is not a party. If by JAMS, under its Streamlined either of us arbitrates a Dispute, Arbitration Rules (the "Rules") by a neither of us, nor any other person, may single neutral arbitrator agreed on by pursue the Dispute in arbitration as a the parties within thirty (30) days of class action, class arbitration, private the commencement of the arbitration. attorney general action or other The arbitration will be governed by the representative action, nor may any such . Federal Arbitration Act (Title 9 of the Dispute be pursued on your or our behalf U.S. Code) . Either party may initiate in any litigation in any court. Claims the arbitration process by filing the regarding any Dispute and remedies necessary forms with JAMS. To learn more sought as part of a class action, class about arbitration, you can call any JAMS arbitration, private attorney general or office or review the materials at other representative action are subject www.jamsadr.com. The arbitration shall to arbitration on an individual (non- be held in the location that is most class, non-representative) basis, and Power Purchase Agreement 10 the arbitrator may award relief only on require performance by the other party an individual (non-class, non- of any of the provisions of this PPA, representative) basis. This means that shall not be construed to (i) be a the arbitration may not address disputes waiver of such provisions or a party'sright to enforce that provision; or (ii) involving other persons with disputes affect the validity of this PPA. similar to the Disputes between you and SolarCity. 20. Notices. All notices under this PPA shall be in The arbitrator shall have the authority writing and shall be by personal to award any legal or equitable remedy delivery, facsimile transmission, or relief that a court could order or electronic mail, overnight courier, or grant under this agreement. The certified or registered mail, return receipt requested, and deemed received arbitrator, however, is not authorized upon personal delivery, acknowledgment to change or alter the terms of this of receipt of electronic transmission, agreement or to make any award that the promised delivery date after deposit would extend to any transaction other with overnight courier, or five (5) days thanyours. All statutes of limitations after deposit in the mail. Notices shall be sent to the person identified that are applicable to any dispute shall in this PPA at the addresses set forth apply to any arbitration between us. in this PPA or such other address as The Arbitrator will issue a decision or either party may specify in writing. award in writing, briefly stating the Each party shall deem a document faxed essential findings of fact and to it as an original document. conclusions of law. 21. Entire Agreement; Changes. BECAUSE YOU AND WE HAVE AGREED TO This PPA contains the parties' entire ARBITRATE ALL DISPUTES, NEITHER OF USagreement regarding the sale and purchase of power generated by the WILL HAVE THE RIGHT TO LITIGATE THAT System. There are no other agreements DISPUTE IN COURT, OR TO HAVE A JURY regarding this PPA, either written or TRIAL ON THAT DISPUTE, OR ENGAGE IN oral. Any change to this PPA must be in DISCOVERY EXCEPT AS PROVIDED FOR IN THE writing and signed by both parties. If RULES. FURTHER, YOU WILL NOT HAVE THE any portion of this PPA is determined to be unenforceable, the remaining RIGHT TO PARTICIPATE AS A REPRESENTATIVE provisions shall be enforced in OR MEMBER OF ANY CLASS PERTAINING TO ANY accordance with their terms or shall be DISPUTE. THE ARBITRATOR'S DECISION WILL interpreted or re-written so as to make BE FINAL AND BINDING ON THE PARTIES AND them enforceable. MAY BE ENTERED AND ENFORCED IN ANY COURT 22. Publicity. HAVING JURISDICTION, EXCEPT TO THE EXTENT IT IS SUBJECT TO REVIEW IN SolarCity will not publicly use or ACCORDANCE WITH APPLICABLE LAW GOVERNING display any images of the System unlessyou initial the space below. If you ARBITRATION AWARDS. OTHER RIGHTS THAT initial the space below, you give us YOU OR WE WOULD HAVE IN COURT MAY ALSO permission to take pictures of the NOT BE AVAILABLE IN ARBITRATION. System as installed on your Home to show to other customers or display on our website. 19. Waiver. Customer Init_ia_lsl Any delay or failure of a party to Ek4 enforce any of the provisions of this PPA, including but not limited to any remedies listed in this PPA, or to Power Purchase Agreement �t 23. NOTICE OF RIGHT TO CANCEL. YOU MAY CANCEL THIS CONTRACT AT ANY TIME PRIOR TO MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE DATE YOU SIGN THIS CONTRACT. SEE EXHIBIT 1, THE ATTACHED NOTICE OF CANCELLATION FORM FOR AN EXPLANATION OF THIS RIGHT. 24. ADDITIONAL RIGHTS TO CANCEL. i IN ADDITION TO ANY RIGHTS YOU MAY HAVE TO CANCEL THIS PPA UNDER SECTIONS 6 AND 23, YOU MAY ALSO CANCEL THIS PPA AT NO COST AT ANY TIME PRIOR TO 5 P.M. OF THE 14TH CALENDAR DAY AFTER YOU SIGN THIS PPA. i Power Purchase Agreement 12 SOLARCITY CORPORATION POWER PURCHASE AGREEMENT I have read this Power Purchase Agreement and the Exhibits in their entirety and I acknowledge that I have received a complete copy of this Power Purchase Agreement. Owner's Name: Shaun Finn "Signature: Date Co-Owner's Name (if any) .. Signature:' Date: SOLARC ITY APPROVED LYN00N RIVE.CEO [Sol arc i ty(*Alpd,k#murameAgreement SOlarcity.. Date:. Solar Power Purchase Agreement ABBREVIATIONS ELECTRICAL NOTES INDEX LEGEND LICENSE A AMPERE 1. WHERE ALL TERMINALS OF THE DISCONNECTING PV1 COVER SHEET AC ALTERNATING CURRENT MEANS MAY BE ENERGIZED IN THE OPEN PV2 SITE PLAN Q (E) UTILITY METER & WARNING LABEL (6)* BLDG BUILDING POSITION, A SIGN WILL BE PROVIDED WARNING PV3 STRUCTURAL VIEWS – MP1 CONC CONCRETE OF THE HAZARDS PER ART. 690.17. PV4 UPLIFT CALCULATIONS Ing INVERTER W/ INTEGRATED DC DISCO C COMBINER BOX 2. EACH UNGROUNDED CONDUCTOR OF THE PV5 SINGLE LINE & WARNING LABELS (3),(4),(5),(6) D DISTRIBUTION PANEL MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED PV6 ELECTRICAL CALCULATIONS DC DIRECT CURRENT BY PHASE AND SYSTEM PER ART. 210.5. ®❑ DC DISCONNECT & WARNING LABELS (4),(5) EGC EQUIPMENT GROUNDING CONDUCTOR 3. A NATIONALLY–RECOGNIZED TESTING (E) EXISTING LABORATORY SHALL LIST ALL EQUIPMENT INF–AC-1 AC DISCONNECT & WARNING LABELS EMT ELECTRICAL METALLIC TUBING COMPLIANCE WITH ART. 110.3. EH (3),(4),(5),(6) G SOLAR GUARD METER 4. CIRCUITS OVER 250V TO GROUND SHALL GALV GALVANIZED COMPLY WITH ART. 250.97, 250.92(B) CUTSHEETS ATTACHED Q JUNCTION BOX JURISDICTION NOTES GEC GROUNDING ELECTRODE CONDUCTOR 5. DC CONDUCTORS EITHER DO NOT ENTER GND GROUND BUILDING OR ARE RUN IN METALLIC RACEWAYSO DC COMBINER BOX & WARNING HDG HOT DIPPED GALVANIZED OR ENCLOSURES TO THE FIRST ACCESSIBLE DC GENERAL NOTES LABELS (7),(9) — ALL WORK SHALL I CURRENT DISCONNECTING MEANS PER ART. 690.31(E). DISTRIBUTION PANEL & WARNING COMPLY WITH THE Imp CURRENT AT MAX POWER 6. ALL WIRES SHALL BE PROVIDED WITH STRAIN 1. THIS SYSTEM IS GRID–INTERTIED VIA A OD LABELS (1),(2) MASSACHUSETTS STAT E INVS INVERTERS RELIEF AT ALL ENTRY INTO BOXES AS UL–LISTED POWER–CONDITIONING INVERTER. Isc SHORT CIRCUIT CURRENT REQUIRED BY UL LISTING. 2. THIS SYSTEM HAS NO BATTERIES, NO UPS. LOAD CENTER & WARNING LABELS BUILDING CODE, kVA KILOVOLT AMPERE 7. MODULE FRAMES SHALL BE GROUNDED AT THE 3. ALL INVERTERS AND ARRAYS ARE NEGATIVELY � (3),(4),(5),(6) — ALL ELECTRICAL WORK kW KILOWATT UL–LISTED LOCATION PROVIDED BY THE GROUNDED. LBW LOAD BEARING WALL MANUFACTURER USING UL LISTED GROUNDING 4. SOLAR MOUNTING FRAMES ARE TO BE GROUNDED O DEDICATED PV SYSTEM METER SHALL COMPLY WITH T H E MIN MINIMUM HARDWARE. 5. ALL ELECTRICAL WORK SHALL COMPLY WITH THE CONDUIT RUN ON EXTERIOR 2011 NEC. (N) NEW 8. ALL EXPOSED METAL PARTS (MODULE FRAMES, 2011 NATIONAL ELECTRIC CODE. --- CONDUIT RUN ON INTERIOR NEC NATIONAL ELECTRIC CODE RAIL, BOXES, ETC.) SHALL BE GROUNDED USING 6. WORK TO BE DONE TO THE 8TH EDITION OF MA — GATE NIC NOT IN CONTRACT UL LISTED LAY–IN LUGS LISTED FOR THE STATE BUILDING CODE. ––– INTERIOR EQUIPMENT NTS NOT TO SCALE PURPOSE. POSTS SHALL BE MADE OC ON CENTER ELECTRICALLY CONTINUOUS WITH ATTACHED ( ) NUMBERS REFER TO LABELS P PANEL BOARD RAIL. ON CUTSHEET PAGE PL PROPERTY LINES 9. MODULE FRAMES, RAIL, AND POSTS SHALL BE PV PHOTOVOLTAIC BONDED WITH EQUIPMENT GROUND CONDUCTORS PVC POLYVINYL CHLORIDE AND GROUNDED AT THE MAIN ELECTRIC PANEL. S SUBPANEL 10. THE DC GROUNDING ELECTRODE CONDUCTOR SCH SCHEDULE SHALL BE SIZED ACCORDING TO ART. VICINITY MAP SS STAINLESS STEEL 250.166(B) & 690.47. %/ `� – .,.� �•. SSD SEE STRUCTURAL DRAWINGS """ °5` p ^wC,e" e STC STANDARD TESTING CONDITIONS 1% SWH SOLAR WATER HEATER �� i' Nom, tl ep s""° Anawe TYP TYPICAL ^I UON UNLESS OTHERWISE NOTED "" � s �•« UPS UNINTERRUPTIBLE POWER SUPPLY d d V VOLT Vmp VOLTAGE AT MAX POWER Voc VOLTAGE AT OPEN CIRCUIT �`p1/" C W WATT �� 6 3R NEMA 3R, RAINTIGHT JL AM—MN NdNA 4 common $ y,.--, o 7•"b6 REV BY DATE COMMENTS H.w ae* rnwny ,b \ �� 4 REV= • s7R�s s Herr,. A �•. 6 �•my, �,s CONFIDENTIAL— THE INFORMATION HEREIN JOB NUMBER g_018112 OO PREMISE OWNER AHJ: North Andover DESCRIPTION: MSGN: BENEFIT O SHALL NOT E USED FOR THE MaDu�s FINN RESIDENCE BENEFli OF ANYONE EXCEPT sOLARCITY INC., MARKET. FINN, SHAUN AJAYARAMAN 272 BRIDGES LANE .' '50����� NOR SHALL IT BE DISCLOSED IN WHOLE OR IN REST 38 EVERGREEN ES–A-210–FA3 7.98 kW DC PV Array 1� PART TO OTHERS OUTSIDE THE RECIPIENTS PROJECT MANAGER: ORGANIZATION,EXCEPT IN CONNECTION WITH MOUNTING SYSTEM NORTH ANDOVER, MA 01845 THE SALE AND USE OF THE RESPECTIVE SC YETI LAG WITH RAIL – UPSLOPE SOLARCITY EQUIPMENT, 3055 Cleaview Way San Mateo,CA 94402 WITHOUT THE WRITTEN r5ENT TYPE INVERTER: PAGE NAME PERMISSION OF SOLARgTY INC 6177771 084 SHEET: REV: DAIS: T:(650)638-1028 F:(650)638-1029 PPA (1) SMA # SUNNY BOY 7000–US COVER SHEET PV 1 7/26/2012 (888)-SOL-CITY(765-2489)www.solarcity.com I - Roof Mounted SEE 1 DETAILS L45 to PL MPI PITCH: 45 ARRAY PITCH:45 -- AZIMUTH: 198 ARRAY AZIMUTH: 198 MATERIAL: Comp Shingle Roof STORY: Two Stori OF 44,7 LEGEND mss° SCOTT �cy� B o cn Q (E) UTILITY METER & WARNING LABEL (6)* v ORLOWSKIV3 Iny INVERTER W/ INTEGRATED DC DISCO No.47072 & WARNING LABELS (3),(4),(5),(6) F MPI ®e <A e IDC DISCONNECT & WARNING LABELS (4),(5) ac AC DISCONNECT & WARNING LABELS I Digitally signed by Scott ® (3),(4),(5),(6) Scott " Orlowski,PE ❑ +DN:cn=Scott Orlowski,PE, A JUNCTION BOX PEDate: o=Apex Engineering Orlowski V3 Date:2012.09.1813:41:44 O DC COMBINER BOX & WARNING 04'00' n LABELS (7),(9) D DISTRIBUTION PANEL & WARNING LABELS (1),(2) Lc LOAD CENTER & WARNING LABELS (3),(4),(5),(6) AC O © Front Of House DEDICATED PV SYSTEM METER CONDUIT RUN ON EXTERIOR O CONDUIT RUN ON INTERIOR _ GATE r' Inv, D�t I r' �t --- INTERIOR EQUIPMENT I� I + , L_��__J *( ) NUMBERS REFER TO LABELS ON CUTSHEET PAGE q2T�toJPL SITE PLAN N Scale: 3/32" = V E W S sstoPL 01l 10' 21' CONFIDENTIAL— THE INFORMATION HEREIN p8 NUMEIER: PREMISE OWNER AH k North Andover OfSCPoPTION: DESIGN:CONTAINED SHALL NOT BE USED FOR THE JB-018112 00 FINN SHAUN NOR FITSH OF ANYONE EXCEPT IN VMO E INC., MARKET. MaoulEs FINN RESIDENCE AJAYARAMAN 24.49•x01 NOR SHALL IT BE DISCLOSED IN WHOLE RECIPIENT'S IN REST 38 EVERGREEN ES-A-210-FA3 272 BRIDGES LANE la PART TO OTHERS E T51IN ON ECTIONWT 7.98 k W DC PV Arra ORGANIZATION, EXCEPT IN CONNECTION WITH PROJECT MANAGER- MOUNTING SYSTEM NORTH ANDOVER, MA 01845 y O ity. THE SALE AND USE OF THE RESPECTIVE SOLARSC YETI LAG WITH RAIL - UPSLOPE gTY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF saARCITY INC. PAYMENT TYPE INVERTER. PAGE NAME 3055 cleaview Way San Mateo,64 94402 PPA (1) SMA # SUNNY BOY 7000-US 6177771084 SHAT. REV. DATE: SITE PLAN PV 2 7/26/2012 (888)-S(650)OL-CITY(765-2489) 638-10295www solarrdty.com -jH OF�SS9 4' BETWEEN C FOOTINGS o SCOTT yGtn (STAGGERED) o R. ORL.:OWSKI N0.47072 pp 'SSF O ` Digitally signed by Scott S Co L}L} Orlowski, PE DN:cn=Scott Orlowski,PE, 1'-4 TYP Orlowski c=US,o=Apex Engineering (E) 2x10 RAFTERS , PE Date:2012.09.1813:42:08 0 16" SPACING izi -04'00' i B FRONT VIEW OF MOUNTING PLANE 1 (N) SIMPSON LS90 CLIP W/ Scale: 1/2" = 1'-0" (8) 8d (0.131 x1.5") NAILS (E) 2x12 GLU LAM RIDGE BOARD C STAN DOFF 2x8 COLLAR TIE SOLAR PANEL NOTE: RAIL TO BE PLACED IN THE UPHILL DIRECTION INSTALLATION ORDER ATTACHED WITH MODULE CLAMPS, J"-16 BOLTS, LOCATE RAFTER, MARK HOLE AND j" NUT (1) LOCATION, AND DRILL PILOT HOLE. SOLARCITY SOLAR RAIL BOLT — — — — (4) (2) SEAL PILOT HOLE WITH POLYURETHANE SEALANT. (E) 2x10 RAFTER YETI (3) ® 16" O.C. (E) COMP. SHINGLE (1) (3) INSERT ECOFASTEN FLASHING. 2x4 STRUT (4) PLACE THE LEVELING FOOT. ECOFASTEN FLASHING (2) (5) INSTALL LAG WITH SEALING (E) ROOF DECKING WASHER. A" DIA LAG BOLT (E) 2x12 CEILING 1 4'-6" 8'_6" JOIST 0 16" O.C. (2-r EMBED, MIN) (5) (E) RAFTER (E) LBW RAFTER: 2x1O SIDE VIEW OF MP1 SUPPORT: 2x10, 2x12, 2x8, 2x4 A MAX SPAN: 8'-5" CONFIDENTIAL— THE INFORMATION HEREIN JOB NUMBER: PREMISE OWNER: AHd North Andover CONTAINED SHALL NOT BE USED FOR THE DESCRIPTION:JB-01 8112 00 FINN, SHAUN LDE%ftBENEFIT of ANYONE ExcEPr solaRarY INc., MARKET. MODULES FINN RESIDENCE RAMAN ���'•�� NOR SHALL IT BE DISCLOSED IN WHOLE OR IN REST 272 BRIDGES LANE • PART OTHERS OUTSIDE THE RECIPIENT'S 38 EVERGREEN ES-A-210-FA3 .98 kW DC PV Array ���' S01� ORGANIZATION, EXCEPT IN CONNECTION WITH FRo,�CT MANAGER 7.98 SYSTEM: NORTH ANDOVER, MA 01845 7 THE SALE AND USE OF THE RESPECTIVE STI YETI LAG WITH RAIL - UPSLOPE t . SOLARCTY EQUIPMENT, WITHOUT THE WRITTEN [PAYMENT TYPEPERMISSION OF SOLARgTY INC. IN TER: PAGE NAME 3055 Cleav ew way San Mateo,c/a 94402 PPA (i SMA # SUNNY BOY 7000-US 6177771084 REV-. DATE: T:(650)638-1028 F:(650)638-1029 STRUCTURAL VIEWS - M P 1 I PV 3 7/26/2012 (888)-SOL-CITY(765-2489)www.solarcity.com UPLIFr CALCULATIONS INPUT VARIABLES CA L CULA TIONS A ND VALUES Required Variab/es Design wind pressures based upon: Mean Roof Height: 26 ASCE 7-05 Chapter 6 Wind Loading Exposure Category: C Equation 6.5.13.3: Component and Cladding Elements Basic wind speed (or city in the future): 100 Wind pressure P=qh*Cn*G Importance factor(1 for residential): 1 6.5.10:Velocity pressure qh=0.00256*Kz*Kzt*Kd*V^2*1 Roof shape: I pitched From Table 6-3: Roof Angle(degrees): 45 Kz=0.95 Roof zone: 3 Contiguous sq.feet of array: 176 From Figure 6-4: -St OF 50 ,4fgSS� Least width of the building: Kzt=1.00 Obstructed wind flow? TRUE From Table 6-4: �S SCOTT cyN Local Topographical Features Kd=0.85 ORLOV1/ KI y (choose "standard"or refer to pictures right, and be/ow) From figure 6-1: No.47072 V= 100 Type of hill: none ,� F Hill height(h)(ft): From table 6-1: F Slope of hill(degrees): I=1 Horizontal distance from hilltop to house(x): SDigitally signed by Scott Scott From Velocity Pressure Equation , Orlowski, PE Height from bottom of hill to mean roof height(z): qh=20.63 DN:cn=Scott Orlowski, Design Wind Pressure Orlowski PE,c=US,o=Apex P(lbs.per sq.ft.)=qh*Cn*G From Figure 6-19B Engineering Cn (uplift)_-1.20 PE Date:2012.09.18 Pd(downforce pressure)= 8,77 Cn(down)=0.50 �', 13:42:36-04'00' Pu(uplift pressure)= 21.04 From 6.5.8.1 G=0.85 _Max Tr/butaryArea Feet Inches Individual Rows in Portrait X(E-W distance between standoffs)= 2 8 Yingli YL235 P-29b Y(N-S distance between standoffs)= 2 9 Amax(sq,ft.)=0.5*L*X Staggered Penetrations= Yes L(length of panel in ft. perpendicular to rail) r Module Rail Max. Span/Cantilever(in)= 35 14 X=Y= Max Uplift Force on a Single StandoffL= Pmax(lbs.)=Amax*PuAmax= , 3 152 Dead Load Calculations Factor of safety-;FI*D*NI/Pmax DL(lbs/sq.ft.)_(Mm+Mh)/(L*UIQ 5/16 x 4 in. = Lag size and length L(length of modules) 5.42 984 =Capacity(Ibs)of 1 lag(NDS) 1 =NI(number of lags per standoff) W(width of modules)3.25 6.47 =Factor of safety Mm(weight of modules)43.70 Point Load Ca/cu/ations Mh(weight of hardware per module)= 9.63 PL(Ibs)=Amax*DL DL=3.03 22 CONFIDENTIAL— THE INFORMATION HERON JOB NUMBEDJB-01 8112 00 PREMISE O"M• AH1 North Andover CONTAINED SHALL NOT BE USED FOR THE FINN, SHAUN DESCRIPTION: DESIGN: NO SHFIT OF ANYONE EXCEPT IN WHOLE INC., MARNEL MODULES- FINN RESIDENCE A�AYARAMAN �`,�••�� NOR SHALL IT BE DISCLOSED IN WHOLE OR IN RESI 272 BRIDGES LANE PART ORGANIZATION,OTHERS C PT IN THE RECIPIENT'S 38 EVERGREEN ES—A-210—FA3 7.98 kW DC PV ArraylarCi-I THESALEAND EXCEPT IN CONNECTION WtrH PROJECT MaNaCFIE MOUNTING SYSTEM: NORTH ANDOVER, MA 01845 THE SALE AND USE T, THE RESPECTIVE SC YETI LAG WITH RAIL — UPSLOPE o SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. PAYMENT TYPE INVERTER: PAGE NAME PPA (1) SMA # SUNNY BOY 7000—US 6177771084 UPLIFT CALCULATIONS SHEET. REV: DATE: 3055 Cleav ew way San Mateo,G4 94402 T:(650)638-1028 F:(650)638-1029 PV 4 7/26/2012 (888)-SOL-Crry(765-2489)www.solarcity.com GROUND SPECS MAIN PANEL SPECS GENERAL NOTES INVERTER SPECS MODULE SPECS BOND (N) #8 GEC TO (N) GROUND ROD �EE� 125A MAIN SERVICE PANEL Inv 1: DC Negatively Grounded g _ LICENSE AT PANEL WITH IRREVERSIBLE CRIMP 100/2P MAIN CIRCUIT BREAKER INV 1 —(I)Slnve S tote)Y7000W,U27/240/208V, 96R/969./95.59. PSV Modue —0111;22 o1NA 9oW PTC, Bladc Frame anel Number:C-3644 INV 2 Voc: 22.g Meter Number:12852176 Vpma 2.8.3 INV 3 "MODULE CURRENT RATINGS ARE SHOWN AS Isc AND Imp IN THE DC STRINGS IDENTIFIER OF THE SINGLE LINE DIAGRAM. MAIN SERVICE PANEL Use Combined Terminal (E) WIRING SOLARGUARD Inverter 1 METER CUTLER—HAMMER 10OA/2P Disconnect DC- 3 SMA (E) LOADS B I SUNNY BOY 7000—US C • Ll z.ov HOFFMAN • Lz Enclosure 1 4OA/2P GFP/GFCI A DC+ I N I --- GND __-- GND --- 2 DC- - — —— —EGC! __ r —— A —— GEC I DC+ B DC- Z String(s)Of 19 On MP 1 I L_--- ------ E.G —— ------------------ _ EGC ---------- — — --------------------- I N 1 I EGC/GEC j' Z Z I --- GEC _— y TO 120/240V I SINGLE PHASE 1 UTILITY SERVICE i I 1 I I I i POI (1)HURRAY/MP 4o PV BACKFEED BREAKER (1)AWG #10, THWN-2, Black(5FT) WIRES FOR SOLARGUARD METER Breaker d; 78 2 spaces B Q r Q DC —(1)Ground Plod; 8 x 8, Copper —(1)AWG #10, THWN-2, Red (5FT) , `v ^ (I) OFFMANN #NEMA 3R —( su 2)Multi–Cable Connector, 3 Port —(I)AWG X110, THWN-2, Green(5FT) /J4–N14 AWG, Some side Insulated —(1)SOLARgTY#4qSG��ppMETER —(1)HOF�F % ,j'AWI!9 ent 208/240 2–wire Enclosure; NEMA 31? —(2)Multi–Cable Connector, 3 Port "14 AWG, Same side, Insulated C (1)CU scone HAMMER i 4OVac RB 1 AWG�{8, THWN-2 Black N8, THWN-2, Black Vo���7 Isc =24.22 ADC t4)AWG 10, USE-2 HW-2, Black Voc =433.2 VDC Isc =12.11 ADC Disconnect 60A, 240Vac Non–Fusible, NEMA 3R a �1 AWG —(1)CUTLER–HAMMER #OGIO&B 3 (I)AWG 1B, TMWN-2, Red O (1)AWG^ THWN-2, Mite VImp=22.96 ADC � Ground eutral Kit; 60–t00A, General Duty(DG) (1)AWG#10, THWN-2, White NEUTRAL Vmp =240 VAC Imp=29,17 AAC i. p O (1)AWG 10, Solid Bare Copper EGC Vmp =347.7 VDC Imp=11.48 ADC —(1 AWG 7HWN-2.Greeq EGC GEC — 1 Conduit Kit; 3 4" EMT ��)A .X10, 1HWN-2, Green EGC — EMT .) . . .#e... . .. . . ... . . .. . . . . .. . . .... .. . . ... . . . . . .. . . .. . . .. . . .. . . .. .. .. . . .. . . CONFlDENTIAL– THE INFORMATION HERON doe NUMBER: g_018112 O O PREMISE OMNER: AHd North Andover oEsaaPnoN: DESIGN: BENEFIT O SHALL NOT E USED FOR THE FINN, SHAUN BENEFlT OF ANYONE EXCEPT saARCITY INC., MART: MODutFs FINN RESIDENCE AJAYARAMAN NOR SHALL IT BE DISCLOSED IN WHOLE OR IN REST 272 BRIDGES LANEORG7.98 kW DC PV Array �r�' SD�a PART TO OTHERS OUTSIDE THE EC71ONN T 38 EVERGREEN ES-A-210-FA3 THE SALE ANDION, EXCEPT IN coESPECTN NTH PRo�cr MANacER MouNnec SYStEM: NORTH ANDOVER, MA 01845 0 THE RALE AND USE T, THE RESPECTIVE SC YETI LAG WITH RAIL - UPSLOPE PERMISSOLARSION IIY EQUIPMENT, WITHOUT THE WRITTEN PAYMENT TYPE INVERTER: PAGE NAME: 3055 Cleaview way San Mateo,CA 94402 PERMISSION OF SOLARg1Y INC. SHEET: REV: DALE: PPA (1) SMA # SUNNY BOY 7000-US 6177771084 SINGLE LINE T:(650)638-1028 F:(650)638-1029 P V 5 7/26/2012 (888)-SOLCrry(765-2489)www.solarcity.com I. Conductor Sizing per Art a. Conductor must have 30 deg. C ampacity >= 125% of continuous current per Art 215.2(A)(1). ELECTRICAL CALCULATIONS Module: 38 Ever reen ES-A-210-fa3 b. Conductor must have (after corrections for conditions of use) >= Inverter 1: 1 190 Inv Power WPTC SMA SB-7000US 240V 0.96 7000 Voltage Drop Calculations � continuous current per Table 310.15(6)(16). Module: 6931.2 Vdrop= ft!3) 2*Len th * Resistance / Vmp) Version 5_8.0 Inverter 2: IM A Max.Len th ft Wire c. Evaluate conductor temperature at terminations per 110.14(C). Module: String: 11.48 50 AWG-10 at Max Ave Hi:93 deg F Ampacity of wire derated for conditions of termination must be >= Inverter 3: Vdrop= 11.48 100 0.00124ohms) / 347.7 0.45 --continuous current*1.25. All string terminations are rated at 90' C. Module: Branch: i 22.96 5o AWG $ ________ Vdrop= (22.96 � 100 at Max Ave Hi:93 deg F Inverter 4: 0- . /,Ohms) / 347.7 0.57 Total volta a dro in DC conductors= 2. OCP Sizing ner Art 690 8(6)(1) inverter: zz.96 20 AWG_8 l.oz Total: 38 Modules Vdro = (22.96 a. Round up to next size per Art 240.4(8) Total Inv Pwr. 7000 6931.2 PTC p 40 Photovoltaic Module Electrical S ifications: -_ - - Total ST-C: 7980 Combined: 0 0.000780hms / 240 V V 0.29848 --- -------- Voc: 22.8 V Vdrop (0 0 Ohms) / 240 V 0 3. Conductor Sizin er Art 690.8 B 1 deg F deg C _2 at240V a. Conductor must have 30 deg. C ampacity >= 125% of continuous Vmp: 18.3 V Record Low Tem Isc: 12.11 A p' current per Art 215.2(A)(1). 0 Max Average Hi Temp: g9 32 Total voltage drop in AC conductors= .3 Imp: 11.48 A Record Hi Temp: 93 34 Total voltage drop in AC and DC conductors= .32 Tvoc: -0.07068 V/deg C 1 b. Conductor must have (after corrections for conditions of use) >= Tisc: 6.055 mA/deg c continuous current per Table 310.15(B)(16). Strin- Type A and 2 Combined Strings Tvpea Voc Correction Method: Manuf Tvoc data TYPE_A-INV Voc Correction Factor: Branch Circuit Tvpe A 19 modules per series string c. Evaluate conductor temperature at terminations per Art 110.14(C). 19 Evergreen ES-A-210- 3 Inverter Min Vdc Input: 265 2 strings per branch Ampacity of wire derated for conditions of termination must be >= Voc= 433.2 Min Vmp at Max Temp: 314.32 1 way wire length: 50 continuous current*1.25. All branch terminations are rated at 75' C Vmp- 347'7 Max Voc at Min Temp: 490,95 Voc= 433.2 V --min- Isc= 12.11 Inverter Max Vdc Input: 600 Vmp= 347.7 V -------------- Imp= 11,48 Max String Size: 23 Isc= 24.22 A --------------- 4. OCP Sizing ------- Icont= 15.14 Art 690.8(A 1) 1-way wire length: $0 Imp= 22.96 A a. Round up to next size per Art 240.4(B) - 1.a Try AWG_10 USE-2/RHW-2 at 90 deg C:Table 310.16 (cont= 30.28 A __ Art 690.8 A)1 -------------------- _____ 3.a Try AWG-8 THWN-2/USE-2 at 90 deg C:Table 310.16 --- Icont*1.25=(Amps) 18.92 Icont*1.25=(Amps) 37.84 5. Conductor Sizin per Art 690.8(8)(1) a. Conductor must have 30 deg. C ampacity >= 125% of continuous 30 deg C ampacity,= 40 30 deg C ampacity= 55 1.b Icont=(Amps) 3.b Icont=(Amps) current per Art 215.2(A)(1). 15.14 30.28 Start ampacity 40 Start ampacity 55 Temperature derate(%=F) 0.71 Temperature derate(%=F) 0.96 b. Conductor must have (after corrections for conditions of use) >= Conduit fill derate(%=#) 1 Conduit fill derate(%=#) 1 continuous current per Table 310.15(3)(16). Derated ampacity28.4 Derated ampacity 52.8 1.c 3.c Term 1 Term 2 c. Evaluate conductor temperature at terminations per Art 110.14(C). Icont*1.25=(Amps) 18 92 Temp table 75degC 75degC Ampacity of wire derated for conditions of termination must be >= Ampacity 40 Icont*1.25=(Amps) 37.84 3784 continuous current*1.25. All inverter output terminations are rated at 2 (cont*1.25=(Amps) Ampacity, so 50 75' C. 1s.92 OCP Size= 20 3.d OCP Size= 40 --------------- ___ Inverter Type A Output Combined Inverter Ou ut ----------------- 6. OCP Si Ina ------- Service Voltage= SMA SB-700 US(240V) a. Round up to next size per Art 240.4(8) Icont= 29,17 A 1 way wire length: 10 ft Total Inverter Power= Art 690.8(A)(1) 'cont=#of inverters*max inverter current 1 way wire length= 0 4 Icont*1.25=(Amps) 36.46 Icont=(Amps) Art 690.8(A)(1) 7. Conductor Sizing per Art 690.8(B)(1) OCP Size= Art 690.8(B)(1) 6 Icont*1.25=(Amps) 40 Art 240.6 A Art 690.8(B)(1) a. Conductor must have 30 deg. C ampacity >= 125% of continuous 5 a Try AWG THWN-2 at 90 deg C:Table 310.16 OCP size= Art 240.6(A) current per Art 215.2(A)(1). Icont*1.25=(Amps) 36.46 7'a Try THWN-2 at 90 deg C:Table 310.16 30 deg C ampacity,= 55 Icont* 1.25=(Amps) b. Conductor must have (after corrections for conditions of use) >= 5'b Icont=(Amps) 29 17 30 deg C ampacity= Start ampacity 55 7•b lcont=(Amps) continuous current per Table 310.15(8)(16). Temperature derate(%=F) 0,91 Start ampacity, Conduit fill derate(%=#) 1 Temperature derate(%=F) c. Evaluate conductor temperature at terminations per Art 110.14(C). Derated ampacity 50.05 Conduit fill derate Ampacity of wire derated for conditions of termination must be >= 5° (cont*1.25=(Amps) 36.46 Derated ampacity continuous current*1.25. All inverter output terminations are rated at Ampacity 5o 7•a 'cont*1.25=(Amps) 75' C min. Ampacity, CONFIDENTIAL- THE INFORMATION HEREIN JOB NUMBER JB-01 8112 0 0 CCONTAINEDDSHALL NOT BE USED FOR THEpgpryg pYMER- BENEFIT OF ANYONE EXCEPT SOLARCITY INC., FINN, SHAUN AM North Andover DESCRIPTION: NOR SHALL IT BE DISCLOSED IN WHOLE OR IN MOEEERGREE PART TO OTHERS OUTSIDE THE RECIPIENTS RESI N ES-A-210-FA3 272 BRIDGES LANE FINN RESIDENCE LMAAYARAMAN �*be*beer THEORGANIZATION,AND EXCEPT IN CONNECnoN WITH PROJECiMANA( R: 7.98 kW DC PV Array �.,,,• THE SALE AND USE T, THE UT TH WR MOUNTING NORTH ANDOVER, MA 01845PERMSSOLARCITY EQUIPMENT, YAIHOU7 THE WRITTEN WITH RAIL - UPSLOPE 09 Solattit . PERI�SSION OF SOLARaIY INC. PAYMENT TYPE PPA IN SMA # SUNNY BOY 7000-US 6177771084 P"�NAME ELECTRICAL CALCULATIONS "EV. DATE 3055CleaviewWaySan Mateo,CA94402 T:(650)638-1028 F:(650)638-1029 6 7/26/2012 (888)-SOL-CrrY(765-2489)www.solarcity.com PHOTOVOLTAIC DC DISCONNECT Label • • PHOTOVOLTAIC POINT OF INTERCONNECTION '•" • • WARNING! ELECTRIC SHOCK HAZARD! WARNING! ELECTRIC SHOCK HAZARD! • DO NOT TOUCFI TERMINALS.TERMINALS ON BQ,�TH THE VOc V 690.53 LINE AND LOAD SIDE MAY BE ENERGIZED Vm V PV POWER SOURC '��' Isc A MAXIMUM AC CIRCUIT OUTPUT q OPERATING CURRENT Im A OPERATING AC VOLTAGE :-�� ����SolarCity (888)SOL-CITU �•,••, SOLARCITY.COM ����SolarCity. (888)SOL-CITY SOLARCITY.COM Label • • Label • • Solar Disconnect ••- PV COMBINER BOX CEC ''' WARNING: WARNING- Electric Shock Hazard ELECTRIC SHOCK HAZARD Label Location: m11 DO NOT TOUCW TERMINALS Terminals on both line and Load sides may be energized in the Open Position ARNIN=mgaI40-Ia1 UTPUT CONNHIS OVERCU Label . - WARNING - Dual Power Sources Second source is photovoltaic systemLabel Locati PHOTOVOLTAIC AC DISCONNECT ' A D WARNING! ELECTRIC SHOCK HAZARD! Per Code: Label Location: OPERATING AC VOLTAGE V WARNING - Electric Shock Hazard MAXIMUM OPERATING CURRENT ` A No user serviceable parts inside /'� Contact authorized servicer for assistance :'��'_� -��SolarCity. (888)SOL-CITY SOLARCITY.COM Label • • DC DISCONNECT Location: WARNING Electric S oh ck Hazard CAUTION: SOLAR CIRCUIT DO NOT TOUCH TERMINALS Terminals on both line and Load sides may be energ�d in the Open Position DC VOLTAGE IS ALWAYS PRESENT WHEN • AC Disconnect SOLARMLei all]LES ARE EXPOSED TO SUNLIGHTConduit Combiner Box (D): Distribution Panel Interior(DC): DC Disconnect • . (INV): Inverter With egrated DC Disconnect •.• Center (M): Utility Meter '• Point of • • CONFIDENTIAL THE INF it VEY111 QlAJ4111171)!U41 Ii a . � ,:, •a Cleaview Way abels San Mateo,CA 9' T:(650)638-1028 F:(650)638-1029 . . • / ES-A SERIES ELECTRICAL characteristics MECHANICAL specifications PANEL D LABEL photovoltaic panelsever-greensolaro ,aD �2.2 -49 2 0 0 2 0 5 & 210 W mP2 200 205 210 w T• ------------------- - JUNCTION BOX Made in the USA Role,_ -0/+4.99 -0/+4.99 -0/+4.99 W (IP65) - ax PANEL GROUNDING (-0/+2.5) (-0/+2.5) (-0/+2.5) (%) SERIAL NUMBER HOLES - Pp.max 204.99 209.99 214.99 W ° n - W _,1 °Pp200.00 205.00 210.00 MOREelectricitY LESSim act PPI-11 180.6 185.2 189.8 W CABQAWG. L PV-W RE)nmn 12.7 13.1 13.4 % Our ES-A series panels have the best power tolerance in the String Ribbon'"panels have the smallest carbon footprint V p 18.1 18.2 18.3 V p industry (-0/+5 W) and consistently deliver more electricity and fastest energy payback of any silicon-based solar panel Imp 11.05 11.27 11.48 A o o _ ° 0.26 than competitors in field tests. ever made. V o 22.6 22.7 22.8 V PANEL MNTING DHOLES fee 11.80 11.93 12.11 A I ABEL FOR A'BOLT GUARANTEED POWER' SMALLEST CARBON FOOTPRINTMC-LOCKABLE Our String Ribbon wafers are made with 5 • - Operating O The minimum guaranteed power is the nameplateTemperature • • • • CONNECTORS 0-1 so you never get less power than you paid for. r o (TYPE 4; a fraction of the emissions that result from T 45.4 45.4 45.4 °C LOCKING 11 PROVIDED) making conventional silicon panels. NOT Noor Pmax 146.4 150.1 153.8 W L BLAC�.-O,-R.'Z.E-E INDEPENDENTLY VERIFIED POWER' Vm 16.5 - 16.6 16.7 V 4 ALUM12x FRAME DRAINAGE HOLES P m T (NOT TO BE USED Four Independent test labs regularly check panel Irr 8.87 9.04 9.21 A + ' FORMOUNTING) 12-MONTH ENERGY PAYBACKS P power so you gel the power we promise. r- Our panels begin generating truly clean V 20.8 21.0 21.1 V p •DRAINAGE HOLES oMOUNTING HOLES }GROUNDING HOLES electricity faster than any other silicon-based l8C 9.44 9.57 9.76 A panel On the market. '--'- -- -- - - _ ALL DIMENSIONS IN INCHES;PANEL WEIGHT 41 LBS(18.6 KG) ANTI-REFLECTIVE GLASS L I Low -- ---= The above drawing is a graphical representation of the product;for engineering quality drawings please Delivering 2-3`Yo more electricity compared contact Evergreen Solar.MCO is a registered trademark of Multi-Contact AG.Product constructed with 114 to panels with standard glass. 100%CARDBOARD-FREE the typical relative reduction of panel efficiency at an multl-crystalline silicon String Ribbon-solar cells,anti-reflective tempered solar glass,EVA encapsulant, REUSABLE PACKAGING irradiance of 200 W/ml both at 25°C cell temperature polymer back-skin and a black anodized double-walled aluminum frame. Reduces disposal costs and On-site manpower and Spectrum AM 1.5 is 0%. Product packaged 28 per pallet and tested to International Safe Transit Association(ISTA)Standard 2B.All specifications In this product information sheet conform to EN 50380.See the Evergreen Solar Safety, while eliminating tons Of landfill. TEMPERATURE RATINGS OVER 9003 Installation and Operation Manual,Mounting Guide and Inverter Selection Guide far further information on Temperature -_ - _- - approved installation and use of this product. Maintaining up to 4%higher output than most other crystalline silicon panels under hot conditions. %/•C Due to continuous innovation.research and product improvement,the specifications in this product information 7 P P -0.43_ _ sheet are subject to change without notice.No rights can be derived from this product information sheet and LEAD-FREE SOLAR CELLS R V -0.40 %/'C g liability g y Evergreen Solar assumes no liabili whatsoever connected to or resulting from the use of an Information Our panels make clean electricity and P - ' contained herein. the way we make them is clean too. _a Imp 0.03 %/"C HIGH RANKINGS IN FIELD TESTIS' ------------ ---_------ �3 V°P -0.31 %/.0 � •. Long-term Photon and TUV field tests prove Evergreen panels produce more electricity(kWh/kW). a lay +0.05 %/C { System Design t 1 Guaranteed upon Initial delivery of the panel to the customer,maximum power 5 Evaluation completed by the Energy Research Foundation of the Netherlands Series Fuse Rating 20 A up to 4,99 W above nameplate rating;2 Evergreen power testers calibrated by (ECN),May 2009 taking the straight average of test data from NREL,TUV Rheinland PTL,TUV Maximum DC System Voltage(UL) 600 V Rheinland Cologne and Fraunhofer ISE;3 Based on compering PTC/STC ratings of - l - - - - - ------ - --' major competing multi-crystalline silicon panel brands published by the California Maximum Combined Wind and Snow Load' 60 lbs/ft' ' Energy Commission in May 2009;4 2008 Module Tests conducted by Photon and published in Photon International February 2009,TOV Rheinland tests run from f 1000 W/m;25°C ce/temperalue,Ann 1.5 spectrum;2 Man'mum pawn pant or sled April to September 2008 never,3 At PV USA fear CondA'or s-1000 We.20°C amtsent sam,x arure,1 Ws­J spear;4 800 IMMY 20°0 mnbicw ten"tuM 1""w'd speed AM 1.5 Vacs-, 5 Hben the panel s-ted-g hf-Uny Method A(offset s wns tt)with rats 1310(±1 in) 1mm each short sde o/the pane as desorbed h tlia Mamthg Gofie la Ws proWG:*1-hair d, a-low vaTMje.3-matt bUe damxedl rxAs old hlacl<anodzad home.. STRING • B O "SOLAR PANELS OFFER-ING • PERFORMANCE • ELECTRICAL EQUIPMENT �'NMENTAL ' SHORT ,RE i CHECK WITH YOUR INSTALLER ES-A_200_205_210_fa3_US_010609;effective June N 2009 ENVIELECTRICITY AND LESS IMPACT. All Evergreen panels comevith a 5 year workmanship and 25 year limited poiver tvarranty.Forfull details see the WORLDWIDE •• CUSTOMER SERVICE Americas and Asia Evergreen Solar Limited Warranty available upon • - • F­rgre­Solar 1, r 30 Class A.FSEC and KTL standards.String Ribbon is a 13813;ntf,,ttSt,��t 4 trademark of Evergreen Solar.Inc Evergreen Solar's ivaler manufacturing technology is patented in the United S T�I E08.3b 1.2-1 F-1.508.229,07J,' T-1-,08."5/.222l F IEC States and other countries,Copyright(c)Evergreen Solar,Inc 009 Technical data Sunny Boy 5000-US Sunny Boy 6000-US Sunny Boy 7000-US Sunny Boy 8000-US 2OBVAC 240VAC 277VAC 208VAC 240VAC 277VAC 20BVAC 240VAC 277VAC 240VAC 277VAC SUNNY BOY 5000-US / 6000-US/ 7000-US / 8000-US ® Input(DQ Max.recommended PV power(0 module STC) 6250W 7500 W 8750W 10000 W Max.DC power(®cos T-1 I 5300 W 6350 W 7400 W 8600 W Max.DC voltage 600 V 600 V 600 V 600 V DC nominal voltage 310V 310V 310V 345 V MPP voltage range 250 V-480 V 250 V-480 V 250 V-480 V 300 V-480 V Min.DC voltage/start voltage 250V/300V 250 V/300 V 250 V/300 V 300 V/365 V ';xt'. Max.input current/per string(at DC disconnect) 21 A/20 A 25A/20A 30 A/20 A 30A/20A 36 A @combined terminal 36 A 0 combined terminal 36 A®combined terminal 36 A combined terminal Number of MPP trackers/ r f fused strings per MPP tracker I/4(DC disconnect) Output AC x tp 1 1 F .a AC nominal power 5000 W 6000 W 7000 W 7660 W 8000 W Max.AC apparent power 5000 VA 6000 VA 7000 VA 8000 VA ; •1. Nominal AC voltage/adjustable 208V/• 240V/• 277V/0 208V/0 240V/• 277V/• 208V/0 24OV/• 277V/• 240V/• 277V/• •+; ... ,,,r , AC voltage range 183-229V 211-264V 244-305V183-229V 211-264V 244-305V 183-229V 211-264V 244-305V 211-264V 244-305V LL AC grid frequency;range 60 Hz;59.3-60.5 Hz 60 Hz;59.3-60.5 Hz 60 Hz;59.3-60.5 Hz 60 Hz;59.3-60.5 Hz Max.output current 24 A 21 A 18A 29A 25A 22A 34A 29A 25A 32A Power factor(cos rp) 1 1 1 1 Phase conductors/connection phases 1/2 1/2 1/1 1/2 1/2 1/1 1/2 1/2 1/1 1/2 1/1 Harmonics <4% <4% <41 <A% R W Efficient _ -.a ..,. -.s.M.. i�'an�m^ Y Max.efficiency 96.7% 96.8% 96.8% 96.9% 96.8% 97.0% 97.1% 96.9% 97.0% 96.3% 96.5% CEC efficiency 95.5% 95.5% 95.5% 95.5% 95.5% 96.0% 95.5% 96.0% 96,0% 96.0% 96.0% Protection devices ~r DC reversepolarity protection 0 0 15, AC short circuit protection Galvanically isolated/all-pole sensitive monitoring unit •/- •/- �/_ �/_ $ " Protection class/overvoltage category 1/III I/III I/III I/III General data d Dimensions(W/H/D)in mm(in) 470/615/240 (18.5/24/9) 1 / / I (' 1 / I ( / / 1 ' 9�¢1 DC Disconnect dimensions W H Dinmm m 187 297 190 7 12 7.5 s5rak 'x Packing dimensions(W/H/D)in mm(in) 390/580/800 (16/23/31.5) :a gv '' DC Disconnect parking dimensions(W/H/D)in mm(in) 370/240/280 115/9/11) 1r` Weight/DC Disconnect weight 64 kg (141 Ib)/35 kg (8 Ib) 66 kg (145161/3.5 kg (8 Ib) s Packing weight/DC Disconnect packing weight 671,9 (14716)/4 kg (9 I6) 69 kg(152 Ib)/4 kg(9 Ib) Operating temperature range(full power) -25 1C...+45°C (-13 IF...+1 13°F) Noise emission(typical) 44 dB(A) 45 dB(A) 46 dB(A) 49 dB(A) Internal consumption at night 0.1 W 0.1 W 0.1 W 0.1 W Topology LF transformer LF transformer LF transformer LF transformer Ax14", .a "".a Cooling concept Opticool Opticool OPHCool Opticool > 4r Electronics protection rating/connection area NEMA 3R/NEMA 3R NEMA 3R/NEMA 31? NEMA 3R/NEMA 3R NEMA 3R/NEMA 3R .y Features Display:text line/graphic -• r1- �• �� - Interfaces:RS485/Bluetooth o/o o/o o/o o/o - UL C+afihvd EffieiQntWarranty:10/15/20 years •/o/o •/o/O •/o/o •/o/O Safr $+rnpla Certificates and permits(more available on request) UL1741,UL]998,IEEE 1547,FCC Part 15(Class A&B).CSA C22.2 No.107.1-2001 • "'"' ' - � - 1 r. i NOTE:US inverters ship with gray lids. re IE Data at nominal conditions ' +'�' r' •Inn 3n.,.i:' ,,. - f, •Standard features o Optional features -Notavoilable a Type designation SB 5000US SB 6000US SB 7000US SB 8000US - F •---------------------------!Efficiency curve SUNNY BOY 700005? Accessories b a 98 C Q S115in *�I,ueraorh••8iggy BackSUNNY BOY 5000-US / 6000-U / 7000-US / 8000-US 96 :._ -, _ b Versatile performer v/:ffl U1 ceftification 94 ' s; i 8! 0 92 i 90 - - i eombiswtd Coml nermx DC dnconrncl dPV s,mprrywring rot odded The Sunny Boy 5000-US,6000-US,7000-US and 8000-US inverters are UL certified and feature excellent efficiency Gradi r ` ,,, orraycombiner6ox ■fit] �,n.enien<eendrere Vn'250 V DC ated power classes provide flexibility in system design.Automatic grid voltage detection"and an integrated DC disconnect se --• v -3iov0c COMBOSWITCH SBCBb3R or SBCBbd "' V„-aB3 zso switch simplify installation,ensuring safety as well as saving time.These models feature galvanic isolation and can be used86 OVDC ! with 011 types of modules-uyst011ine as well as thin film. t000 2000 3000 4000 s000 6000 7000 z� Pc<_.-..... - ----------- ------------ --- - - ... - _P�- W z Toll Free+1 888 4 SMA USA 'US Patent US7352549B I www.SMA-Americo.com SMA America, LLC Yeti with Eco-Fasten GreenFasten Flashing Yeti with Eco-FastenFlashing The SolarCity Yeti with Eco-Fasten GreenFasten flashing optimizes strength,performance and aesthetics while structurally attaching solar panels to composition shingle roofs. This engineered connection uses 0.378 RMU ALL PRIOR T Eco-Fasten's patented, IAPMO-certified "green fasten"technology to achieve a watertight seal. 6000 COUNTERSSIINK series aluminum offers superb structural and fatigue strength,which in conjunction with anodization offers excellent corrosion resistance even in coastal environments. 1.92 • IAPMO-ES-certified for waterproofing—Tested to ICC ac286 • Tested in accordance with UL 441—Waterproofing for rooftop penetrations • Anodized for long term corrosion resistance and best aesthetics • No shingle cutting required 2.53 • Fast and error-proof installation reduces overall impact on roof 3.7s • Compatible with SolarCity Canopy Rail • Rail is attached using Stainless Steel Fasteners .300±.010 Components Installation Instructions A. 5/16"Lag Screw 1. Drill pilot hole in rafter B. Stainless Steel+EPDM Sealing Washer 2. Seal pilot hole with roofing sealant 1.94 C. Yeti(L-foot) 3. Insert Eco-Fasten flashing under upper layer of D. Eco-Fasten GreenFasten Flashing shingle 3.00 4. Place SolarCity Yeti 5. Install lag with sealing washer 1 ' A � B D 1 ;-SolarCity. SolarCity.