Loading...
HomeMy WebLinkAboutBuilding Permit #Exception - 273 GREENE STREET 5/1/2018 BUILDING PERMIT F TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION ; Permit NO: Date Received �9SSACHU`����y Date Issued: IMPORTANT: Applicant must complete all items on this page LOCATION--2 73 C7,e6rW -5-7- Print PROPERTY OWNER J6 h�U S.4 VA S7AA f Print MAP NO: PARCEL: & O� ZONING DISTRICT: R4 Historic District yes no Machine Shop Village yes TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family L Addition iso or more family ❑ Industrial ❑Alteration No. of units: 2 ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other ❑ Septic ❑Well ❑ Floodplain ❑ Wetlands ❑ Watershed District 21Nater/Sewer Identification Please Type or Print Clearly) P G r OWNER: Name: jw"4 ��vm--�� Phone: Address: CONTRACTOR Name: Phone: Address: Supervisor's Construction License: Exp. Date: Home Improvement License: Exp. Date: ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE:BOLDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ FEE: $ Check No.: Receipt No.: NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund Signature of Agent/Owner Signature of contractor a a /1—• A E- Plans Submitted L�' Plans Waived ❑ Certified Plot Plan E7 Stamped Plans 2-- TYPE OF SEWERAGE DISPOSAL Public Sewer Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMENTS CONSERVATION ❑ ❑ COMMENTS DATE REJECTED DATE APPROVED HEALTH ❑ ❑ COMMENTS i Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature& Date Driveway Permit Located at 384 Osgood Street FIRE DEPARTMENT - Temp Dumpster on site yes no Located at 124 Main Street Fire Department signature/date COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— (For department use) ❑ Notified for pickup Call Email Date Time Contact Name Doc.Building Permit Revised 2014 1 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits Building Permit Application Workers Comp Affidavit Photo Copy Of H.I.C. And/Or C.S.L. Licenses Copy of Contract .� Floor Plan Or Proposed Interior Work Engineering Affidavits for Engineered products OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks :rE Building Permit Application Certified Surveyed Plot Plan Workers Comp Affidavit Photo Copy of H.I.C. And C.S.L. Licenses Copy Of Contract Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) Mass check Energy Compliance Report (If Applicable) Engineering Affidavits for Engineered products OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) Building Permit Application Certified Proposed Plot Plan Photo of H.I.C. And C.S.L. Licenses Workers Comp Affidavit Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) .rF Copy of Contract 2012 IECC Energy code Engineering Affidavits for Engineered products OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doe:Building Permit Revised 2014 gSNouobcOddHanNf) :a3111Mj I SNOI10n408dVOn:H00930Vj NO Sn NIO(' 969L'999'8L6 :1132 I [NOD•SNouonaoddVGA VZ17L'8Z9'LL9 :xj I 17£ '1x3OOZL'9Z9'1L9 :wd tA £VLZO VA '31]IA83WOS I 'Oa 1139 d3NNI £9 SNOuonGOdd VGA W00'SN0110f100ddVaA�5_)NHOf :lIVW3 t a30VNVW SNOIIV63do ONVISVAVIS NHO(`