Loading...
HomeMy WebLinkAboutBuilding Permit #246 - 29 MAPLE AVENUE 10/7/2008 pORTH BUILDING PERMIT 0 ,%.,D 16 A TOWN OF NORTH ANDOVER O p APPLICATION FOR PLAN EXAMINATION * ,� nn D > x Permit NO: vL Date Received ATED rPa` cy gSSACHU`+�� Date Issued: IMPORTANT:Applicant must complete all items on this page LOCATION 7-'z 1 IvIolv- Ave- rint PROPERTY OWNER far`It Ct 1� /�.� � Print MAP NO: 4 Z PARCEL: ZONING DISTRICT: Historic District yes iQ Cat Machine Shop Village yes TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential New Building One family AdditionTwo or morefamil Industrial Alteratio No. of uni s: 2 Commercial Repair, replacement Assessory Bldg Others: Demolition Other Septic Well Floodplain Wetlands Watershed District Water/Sewer P DESCRIPTION OF W05K TO BE PREFORMED: 2 OvJ + S+e1ira K 0( ate w I A `o egz e -� Pe Mu4frva(S jh 4t �r©h+ o4 n6+45e-, Identificationlease Type or Print Clearly) OWNER: Name: M 46-e ii Eao Phone: Address: �? `2g I� Ave. CONTRACTOR Name: C�at Phone: if 7 F-;7i-7.Z0,3 III Address: O L05C70001 � ✓` a �r�DU r� �, 6/8�y- Supervisor's Construction License:. C-5 1 lg� Exp. Date: /G y _ P Home Improvement License: Exp. Date: ,-121110` ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE:BOLDING PERMIT.$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ FEE: $ 3Z� Check No.: �[� Receipt No.: ���f NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund ignature of Agent/Owner ' ,•�` 1'Signature of contractor Plans Submitted Plans Waived Certified Plot Plan Stamped Plans TYPE OF SEWERAGE DISPOSAL Public Sewer Tanning/Massage/Body Art Swimming Pools Well Tobacco Sales Food Packaging/Sales Private(septic tank,etc. Permanent Dumpster on Site THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature COMMENTS a 7-�oning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature&Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street ,FIRE DEPARTMENT -Temp Dumpster on site yes no Located at 1.24 Main Street Fire Department;Mgnatureldate _. COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— For department use ❑ Notified for pickup - Date L__.._......................._._................._......_.._._..___ -._.......---.................................._........ Doc.Building Permit Revised 2008 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And .Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE:, All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application i ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:INSPECTIONAL SERVICES DEPARTMENTMFORM07 Revised 2.2008 NORTH. Tovm of Andover 0 . ....... No. zq4 A1. over, ass. 0 . 0 LM ,— ,,, A/ O -S� CCHICHEWIP A?A'rE D C7 BOARD OF HEALTH Food/Kitchen PERMIT T D Septic System A17BUILDING.INSPECTOR THIS CERTIFIES THAT cej ...... ...................................................................................................... . . . . Foundation has permission to erect.................................. ..... buildings an ..................... C. .... ................. Rough Chimney to be occupied as............................ .... . ........ ......................... .............*****"*"**'**........ provided that the person accepting this permit shall in every respect conform to the terms of the application on file in Final this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough PERMIT EXPIRES IN 6 MONTHS Final UNLESS CONSTRUCTION STARTS ELECTRICAL INSPECTOR Rough ....... Service ........................ ..................BUILDING INSPECTOR Final Occupancy Permit Required to Occupy Building GAS INSPECTOR Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. SEE REVERSE SIDE j Smoke Det. The Commonwealth of Massachusetts Department of Industrial Accidents 11i Office of Investigations 600 Washington Street 11 1111 t . Boston MA 02111 t j www.niass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information 64" Please Print Legibly Name (Business/Organization/in dividual):_ Address: Vp O,yc'o�� S City/State/Zip: �UG, IIJO,t°r lmq. '�/F` Phone#: /77' 3-/U -'2oqD3 Are you an employer?Check the appropriate box: Type of project(required): 1.❑ I am a employer with 4. ❑ I am a general contractor and I 2employees(full and/or part-time).* have hired the sub-contractors .6. ❑ New construction lam a sole proprietor or partner- listed on the attached sheet. # ?• [rRemodeiing ship and have no employees These sub-contractors have 8. ❑ Demolition working for me in any capacity. workers' comp.insurance. 9. ❑ Building addition [No workers'comp. insurance 5. ❑ We area corporation and its required.] officers have exercised.their 10:❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work right of exemption per MGL 1 I.❑ Plumbing repairs or additions myself. [No workers' comp. C. 1.52, §1(4),and we have no 12.❑ Roof repairs insurance required.] t employees. [No workers' comp. insurance required.] 13.❑ Other *Any applicant that checks box 41 must also fill out the section below showing their woikeis'compensation policy information. t Homeowners who submit.this aeeidavit indicating they arc doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers comp.policy information. p p y 1 am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins. Lic.#: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). .Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certif u err the p,$ns and penalties of perjury that the information provided above is true and correct Sianature: " Date7 P? Phone#: 9 �� �>—X020 3 F cial use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2. Building Department 3.City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6.Other Contact Person: Phone#: Information and Instructions Massachusetts General Laws chapter 152 requires all employers to provide workers' compensation for their employees. Pursuant to this statute,an employee is defined as"...every person in the service of another under any contract of hire, express or implied, oral or written." An employer is defined as"an individual,partnership,association,corporation or other legal entity,or any two or more of the foregoing engaged in a joint enterprise,and including the legal representatives of a deceased employer,or the receiver or trustee of an individual,partnership,association or other legal entity,employing employees. However the owner of a dwelling house having not more than three apartments and who resides therein,or the occupant of the dwelling house of another who employs persons to do maintenance,construction or repair work on such dwelling house or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer." MGL chapter 152, §25C(6)also states that"every state or local licensing agency shall withhold the issuance or renewal of a license or permit-to operate a business or to construct buildings in the commonwealth for any applicant who has not produced acceptable evidence of compliance with the insurance coverage required." Additionally, MGL chapter 152, §25C(7) states"Neither the commonwealth nor any of its political subdivisions shall enter into any contract for the performance of public work until acceptable evidence of compliance with the insurance requirements of this chapter have been presented to the contracting authority." Applicants Please fill out the workers' compensation affidavit completely,by checking the boxes that apply to your situation and, if necessary,supply sub-contractor(s)name(s), address(es) and phone number(s)along with their certificate(s)of insurance. Limited Liability Companies(LLC)or Limited Liability Partnerships(LLP)with no employees other than the members or partners,are not required to cant'workers' compensation insurance. If an LLC or LLP does have .. employees,a policy is required. Be advised that this affidavit may be submitted to the Department of Industrial Accidents for confirmation of insurance coverage. Also be sure to sign and date the affidavit. The affidavit should be returned to the city or town that the application for the permit or license is being requested,not the Department of Industrial Accidents. Should you have any questions regarding the law or if you are required to obtain a workers' compensation policy,please call the Department at the number.listed below. Self-insured companies should enter their self-insurance license number on the appropriate line. City or Town Officials Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant. Please be sure to fill in the permit/license number which will be used as a reference number. In addition,an applicant that must submit multiple permitthcense applications in any given year,need only submit one affidavit indicating current policy information(if necessary)and under"Job Site Address"the applicant should write"all locations in (city or town)."A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the applicant as proof that a valid affidavit is on file for future permits or licenses. A new affidavit must be filled out each year. Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture (i.e. a dog license or permit to burn leaves etc.)said person is NOT required to complete this affidavit. The Office of Investigations would like to.thank you in advance for your cooperation and should you have any questions, please do not hesitate to give us a call. The Department's address,telephone and fax number: The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street Boston, MA 02111 Tel. 4 617-727-4900 ext 406 or 1-877-MASSAFE Fax 4 617-727-7749 Revised 5-26=05. www.mass.gov/dia j �. GTfae -Pomnaoniveal!/z a��zaacicltc rY, 1 -<LIX Board,of Building Regulations,and Standards HOME IMPROVEMENT CONTRACTOR fez Registrat Wi► 143164 E piratR 6'1/2010 Tr# 2691,10 5' 'v T e DEiA I j RYAN BUILDERS ti E<;} MICHAEL RYAN 880 OSGOOD ST ;f S. ' �'' NtANbOUER MA U1;845`��� Adrtun�stta'tor ' .0 y � Boa�d of Building Regulaf�ofig and Stand"ards Con'itruction Supervisor Licenffislf se 7214,6 Bi rtlitlat0k 10/2-9i1011, E�tpiirat+ 10/29/2009 Tr# 7060 - �Restnction Oa MICHAEL P RYA r a 880 OSGOOD ST N ANDOVER,MA 09845 Commisstone 1 Ryan Builders 880 Osgood Street North Andover, MA 01845 ,(978)590-7203 10/06/08 Marie Daw 27-29 Maple Ave North Andover, MA 01845 RE: Construction Estimate/Contract Job Estimate/Contract Demolition of stairway and replace with maintenance free stairway system: $2,800.00 I Michael Ryan—Ryan Builders D e ccul` a G 16o6 Mn Daw—Homeowner Dat This is a legally binding contract.Any changes or additions to the above job description could result in an increase in job cost amount. If any rot or insect damage is discovered during the building process additional charges will apply to correct any damage.No additional work will be completed without the authorization and understanding of increased cost by the homeowner.Any requested additional work will also increase the above estimate cost. NORTH ANDOVER BUILDING DEPARTMENT Tel: 978-688-9545 DEBRIS DISPOSAL FORM In accordance with the provision of MGL c 40 S 54, a condition of Building Permit at: ,27-.29 M � ke, is that the debris resulting from this work shall be disposed of in a&operly licensed solid waste disposal facility as defined by MGL c 11, S 150 A. Also, note Permits are required under Fire Prevention laws Chapter 148 Section I 0A. The debris will be disposed of in: p O S t in CPo r-.4,_6 �6w (Location of acility) Signature o Permit Applicant /4/0 O e Date i Location Date NOR, TOWN OF NORTH ANDOVER �? �. • Ow 9 i Certificate of Occupancy $ s„CHU5Building/Frame Permit Fee $ Foundation Permit Fee $ Other Permit Fee $ TOTAL $ Check # 6 Z A �t f3uilding Inspector