Loading...
HomeMy WebLinkAboutBuilding Permit #210 - 30 BRUIN HILL ROAD 9/26/2008 BUILDING PERMIT 0* pOvIORT/i TOWN OF NORTH ANDOVER c? APPLICATION FOR PLAN EXAMINATION 1• Permit NO: 0 Date Received �9"°gwreo•�`cy -d('e. aK "SSACHU`��� Date Issued: VV IMPORTANT:Applicant must complete all items on this page LOCATION - KU i fJ _ 'Ph PRDPERTYOVNNEI :: Print MAP NO 1 PARCEL:Ot1 ZONING DISTRICT ")-i�stotic DISM ct yes 77 eK Machine ShopJVillage ryes no TYPE OF IMPROVEMENT PROPOSED USE Resj Non- Residential New Building One famil Addition Two or more family Industrial eratio No. of units: Commercial e air, re lace Assessory Bldg Others: Demolition Other r: Septi IllleI Floodplain Wetlands 1JVatersl3ed D strrct Water/Sewr DE.4RIPTION OF WORK TO BE PREFORMED: L Identification Please Type or Print Clearly) OWNER: Name: t_ t=ee.,ll n Phone&&-J) Address: x - CONTRACTOR Namee` � "`.-.m .;�- Phone: 3 Add ress: tijte. r S - r Supervisor's Construction License: b53 � Hotne lmprovement'Lucense. VID I <V 2 Exp Date.-'- ARCH ITECT/EN60tff;[-.-R ates ARCHITECT/E Sa-� ,,..� ��s Phone: \l Address: I-Qb %�_= Reg. No. — FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ r-2, D U U FEE: $ L`,�-c,u Check No.: � % Receipt No.: NOTE: Persons contracting with unre isteYed contractors do not have access to the guaranty fund signature of Agent/Owner Signature of contractor Location ,3DB No. Dated ' i. &O*Tot TOWN OF NORTH ANDOVER 3? OL f 9 • ; : Certificate of Occupancy $ ;�ss�c wsEt Building/Frame Permit Fee $ � Foundation Permit Fee $ Other Permit Fee $ TOTAL $ y Check 936,v 2c5v4 Building Inspector (;Plans SubMi tted Plans Waived Certs t Plan Stamped Plans YPE ERAGE DISPOSAL Public Sewer Tanning/Massage/Body Art Swimming Pools Well Tobacco Sales Food Packaging/Sales Private(sept7cnk,etc. Permanent Dumpster on Site THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT COMMENTS DATE REJECTED DATE APPROVED CONSERVATION COMMENTS DATE REJECTED DATE APPROVED HEALTH COMMENTS „a Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Con nection/Sig nature &Date Driveway Permit Located at 384 Osgood Street FiRE'DEPARTM;ENT ;-`Temp Dumpster_on site, yes,` no . Located.at X124 = MainStreet' Fire:Departure"rat Signature/date k 5 OOMMEN.T S Dimension � t Number of Stories: Z— Total square feet of floor area, based on Exterior dimensions. IZv Total land area, sq. ft.: A r 6-..- ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No X DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA- For department use ❑ Notified for pickup - Date Doc.Building Permit Revised 2007 i i Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits o Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses L3 Copy of Contract ❑ Floor Plan Or Proposed Interior Work o Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks o Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses o Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (if Applicable) o Copy of Contract o Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:INSPECTIONAL SERVICES DEPARTMENT:BPFORM07 Revised 2.2007 LAWRENCE H. OGDEN,P.E. 198 EAST MAIN STREET GEORGETOWN,MA 01833 978-352-8318 fax 978—352-2858 cell: 978-502-5921 October 16, 2008 Mr. Kevin Murphy 169 Boxford Street North Andover MA. 01845 RE: Ferruolo Residence, 30 Bruin Hill Road, North Andover,MA. 01845 Dear Mr. Murphy As you requested I visited thb above site October 16, 2008 to review the LVL beam used in the construction of the above project. This consist of 2-1.75" * 7.25"LVLs supporting the front roof of the entrance area as shown on the Typical Cross Section sheet prepared by Steve Foster dated 8/8/08. These plans indicate 2 additional LVLs on the Typical Cross Section sheet. There are actually existing wood beams at these locations consisting of 2-2*1Os with 1/2" plywood with a 2*12 new wood rim board above. Theses are sufficient to support the loads and therefore these LVLs are not required. As we discussed ssed in the field a 2 4 on the � flat should be added to the right rear post to insure proper support of the wood beam. Based on this site visits I can certify that to the best of my knowledge the LVL members and the wood beams mentioned above are acceptable and meet the loading conditions required by the 7t'Edition of the Massachusetts State Building Code. Should you have any questions please do not hesitate to call. Yours truly, OF sy O� LAWREN g Lawrence H. O d G en,P.E. Structural 27765 .� OLD DEN y �F 27 O O, GT EPS Q(c. �SS�D[VAL oawfiftw "I'Al "o a n ar s 3onstruction Supervisor License License: CS 53099 Birthdate.:,-,,6/29/1967 E�p�,i tion 6/29/2009 Tr# 14120 Res1<i�a on; 00 KEVIN W MURPHY �t a 169BOXFORD ST , . r•F N ANDOVER,MA 01845 ;...,t Commissioner anar�ds qp d Sta e$ulatio ON?RACIOR dofBn►ldingR TC Boa PROVENIEN HOME IM,Pll. 101874 ? 267315 ° Regrstr�; on g12010 rrekan 6�2 f.^ Iduai EkP a tnd�� KE M pH �' Wait t + Murphy 1.,,�`ti « 1 � Adrninistr ator Kev 169 Boxford Si 01845 N.Rndover,MA R NORTH own oAndover , VIM No. o dover, Mass., O GOC HICHE WICK ORATED i'PG,`�y BOARD OF HEALTH Food/Kitchen PERMIT T D Septic System BUILDING INSPECTOR THIS CERTIFIES THAT...... �_� V/0 ........................................... .............�.............. ... ,.. .. ............... ••••�••••••••••••• •'•••"" Foundation has permission to erect........................................ buildings on ' Q..... V ...... .. ...1.../.... .: Rough to be occupied 'm �: .1� ..... lZ .p ?!.1.1 .�...�. .. �h' ney provided that the person accepting this permit shall in every repect conform to the terms of A applica it'1; n on file in, Final this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRU O ARTS Rough .. ..........................................:............................................. Service BUILDING INSPECTOR Final Occupancy Permit Required to Occupy Building GAS INSPECTOR Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. SEE REVERSE SIDE Smoke Det. r AWNING WINPOW5. 6' 1-U[3 - "KOHt-M,' "SUNWAP'Pil CF-NTI`I: ON TUD WITH TILS 5urmouw OUTLINE OF GAt'.AGr� < 13E�LOW>� f7p, 2 -i" X _4" LVL 3' MIN. F-XI5T1NG "Wr_t WALL" A ING WINI2OW t-4 pT I I O PgMOVE� F-XI5TIN6 6A3Lt� F-NP WALL PPWVIP7 HPP,.: 2 - Ii" X 7j" LVL WALK-IN CLOsrt ............... + t(1 F-XHAU5t SAN N CL HARP PUCTtP t0 i✓XT-PIOI? HAL s' VANITY ........... ALLOW SOIP, 42" 1 1.AAW'1 GIJ NEW E W�W�QA�LGLS 5WItCNF-5 NCO-ANGLE 5HOWF-I: NrW AWNING WINPOW5 -— ---___- __==_=___-_ __ MAS p �I:ONt WALL OF _-___ ���p OM I'.EMOV� EXISTING WALLS �XI5TING GAp.AG� SHOWN POtT>;n) t�XI5T1NG CNIMNE.:Y, Vr�I:IFY FL-UF- LOCATION, I:�LOCAT>; AS I?�QUII?�f7 0 a ................................... .............................. KING SfZ� 13�n NF-W f200F 5LOpE-:17 CF- LING PIANS FOR F S�CONn ��00� PLAN F�ppuo�o P\15MNC� 30 XlUIN NU PIOAn NOP,TH ANPOVFF, MA 5rA. :L/4°-1'-0" PATF:8/8106 1't;Of'05�1� AI�I�MON F-X1511N6 CHIMNEY -- - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ----- - - - - - - - - - - - - - ---- _ - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - AWNINGWINI�OWS. - - - - - - - - - - - - - - - - - - - - - - - - - - -- -_- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - -- - - - - - - - - - - - - - 'ANPM5�N' AW251 SHOWN - - ------------ -- - - — -------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- -- - - - — - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -_- - - - - - - - - - - - - - - - -_- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1'O -_--- - --- --- - - --- - - - --- - - _-------- - ----- - - - - - - - - - - -- - - - - - - - - - - 51121N6 _ - MA1"CH - - - —-- -- - ----- - - - - -- - - - ------ ---- ---_----- - -- - -- ---- _- - - - - - - - - - - - - - - - - -_ - - - - - -_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I;XI5nN --—- - -- - - --- ---- --— - - - - - - - - - - - - - - - - - - - - - - - -- - - - - ----— FF - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - FE - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Eg - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - IV I - - - - - - - - - - - - - - - - - — - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ------------------- - - - - - - d1171 - - - - - - - - - - ------------------ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ----------- ------- - - - - - - - -- - - - - - - - - - - - - ----- - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -u - - - -- --------------- -- - - - - - - - - - --- - - - - - - - ----- - - - - - - - - �- - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - M-J J-1 Oil LLUiLO NF-W POOP 5VLJCI M, 7� A1'13MFZrWAY F-NTRANCr FLANS FOR FEW\uo�o P�5MNC� F P\� ONf VAfl 0 N 30 MUIN NII. pOAP NOP\TH MPOM\, MA SUJ.E:I/4"- '-0" DATE:B/B/08 ALT�f:NAT�; PPOP05F-12 Al2I2ITION P:NVGE� OF AI212ITION 51-IGHT[-Y LOWF-r EX1511N6 CHIMNEY THAN PEAK OF GARAGE - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _-_____-_-_-_- -_- - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _- - - - - - - - _ AWNINGWINPOW5. - - - - - - - - - - - - - - - - - - - - - - - - - _-_-_-- __e=_- - - - -_- -_- - - - _ - - - - - - - - _- - - - - - - - - - -_ _- - - - - - - - - - ANI��I:S�N' AW251 SHOWN - _ - -- ------- _- --- -------- - _ --_-_--_-_-_ -____'- - - - - - - - - - - - - - - - - o ----- - - - _ - -.— -- 51PINGTO —_- - - -_- - - - - -- -- - -- ---- - - - - _ - --_ _ ---- -- --- - - - ------ -- - -- - - — - - - - - - -- MATCH ----- - - -- _ -_ _ —_ -_ - - -`-- ---- -- -- -- --- --- -- -- -- - -- - - -- -- ------ --- - - -_-_- - - -_ EXI511N _ _ --- -- - _--- ---- - - - - -— --------------- ------ --— _ ---- - - - - - - - - -- --- --- - - - - - --- - - - - - - - - - - - - - - - - - --------- -------- ------ --- -- - -—-- ----------- ------- -- -- 0 � 00 NF-W Boor- 5TP.Uclrukr- AT IWE��ZF-WAY �NTI2ANC� PLAN5 FG2 F�PPU0L0v 110 \ 3C INUIN HILI. I?OAb NOFTH ANPOM\, MA CALT�I?NAT�� 5CAe:1/4"-I,a, VA9:6iai06 F-XI511N6 CHIMNEY MATCH E 45TIN6 PF-AP, MAX, I:II�G� HT. NOT TO I200� SLOp� CFF-n GAPAGF MAK ---------- ---- -- NFW AWNING WINPOW5. ----------- -- --- -------- - - ---- - ----------------------------------------- ------ 'ANPF,P,51�N' AW251 5HOWNe-- ___ -___ -________=-__- --__ _---__ ________-= __- MATCH E�XI511N6 SInING FIN15H 2Nn FIr001P, PPOF05F-n 2Nn R-0012 _ APPITION LUJ E�Xt'G, OPEN 131W'Y AiMA-4 I FIN15H IST r-[-OOP, r r F�PTIUOLO pF51PFNCF 30 RUIN HU POAP NOFfH ANPOMt?, MA 5C.W.E:1/9"-1'-0" GIME:B/B/OS 1/ 2" 6WI3 ON PI17GE� VENT MAXIMUM IJ17GF- E�LF-VA910N I X 3 5Tf2Al'f ING NOT TO F�XCff�I2 PF-AK OF GA2AGZ�, P,-38 IN5ULATION 2 X 12 P,117GF- ASPNALT 2 X 8 AFTER & 01-6, J015T SNINGLr::S At 16" O.C. -,----MATCH F-XI5TIN6 POOF CONI1NUOU5 170UI3Lr; TOP PLATS 5tOPF- FPONt MAIN 1-101-15E� 5/ 8" C17X P1-YWOOP 12 ROOF 5N�ATNING N�AI7�1?, 2 - 2 X 8 TYPICAL 12 I.'APTI;I? TO TDP P1-AT� UNLF-55 NOTt 1P OTNI;f:W15� FRAMING CONNE�CTOP, TYPICAL rXTF-12101: WALL; -�'� TYPICAL F-AVI%5 PE�TAIL, SIt71NG TO MATCH EXISTING FA5CIA & 50FFIT TO MATCH F-XI5TING 13UIL171NG WP.AP � -' � CONTINUOUS SOFFIT VENT nOU13LF- TOP PLAT>< 1/ 2" C17X PLYW0017 5Nr�ATNING NF-W POOP, OPENING z Mr-TAL PIZIO F-17Gr- 2 X 4 AT 16" O.C. Z ICF-/ WATrI: 5NIF-L17 t;-f3 I%lPF-P61.,A5 IN5ULATION 2 X 8 LF-126rW. 130Lt TO WALL FP2AMING POLY VAPOI: 13AP.1?IE�I? = U5F- TAMING CONN�CTOI? AT PAr-Tr 112" GWI3 I j �LASN 2 X 6 AT 16" O.C. I � FINISN 2Ni7 FLOOp NF-APE�P,: 2 - Ii" X 7i" LVL — — MICPPOLAM LVL 6F-* I FRONT GAP.AGr- WALL- 4'' ALL4" t & G pLYWOOP PECKING NAIL & GLUT TO FkAMING FOAMr�b "IN PLACE" IN5U1-ATION,, WOOF OILING FILL, JOIST CAVITY 501-117 2XI0ATI6" O.C. MIN. P --58 2 X 4 AT 16" O.C. N0Tt�; FIN151-1 IST ROOF, PULPrW PPOVI17r NF-CF-55APY MICFOLAM LVL l SAM Mr-A51-112�5 t0 PI?rVtNT PIPF- �p��ZING fYPICAV CP\055 5�CVON F.AN5 FOP MIKU0L0 F�51PMF 30 MUIN HU I;OAP NOPM ANPOM, MA 5CXL d/4"-1'-O" PAS:B/B/00 rX15TIN6 GAP.AGr F-X15TIN6 PWF-LLING NF-W LVL 13f AM. "CUT 13ACK" & ATTACH F-X15TIN6 GARAGE CFILING JOIST. NEW LVL (3tAM U II U - 2 X 10 Lr-nGrP?, (30LT TO E-:45TNG Ff?AMING J0I5T HAN6�P2 FFAMING CONNF-CTOp5 N 4X4P05T TYPICAL AT f3rAM 5UPPOPT5 NSW LVL I3 AM PPOP05Fn PVt2lTION XISTING GAP.AGF- F12AMIN6 I'I.M15 FGP. ��FFU0L0 F�51PFNCF �0 MUIN HILL I?OAn NOP,TH ANPOV�P,, MA 5CA,. :l/4''=I'-O" PATE:8/ai 08 5�CONb FL00F FPAMING FSM Tide Ofte of wo*W*Aww, lr1 &M*M MA 02111 � �C��ltllro taw�opr AAMIw�— v� Deft �rf��N�lar�IMi ►111di�t�iwh:,� �t.. � II Fr4o N,�,df�,Ktar�etaR.■�*or wi,,, ,_ 4. Qrssw ctw slowvo imov � NM*W*0 $prapri�lrte orprNto>N• Ihoea an Mfe e11 1111 dam. :w how no � F� (No 40M$6 13 on pm and k4 mwiktj 3•❑ 1 an t Asnwer�nnr aft+d!ww* +hew o.13 tMeof •�fititiere, _ �t Of"W"pfis t 1w� LL �-' iia or �)*+ v� e. l S1„lt(4L aid we to ws.. mors a w/if m psilf .' 120rs �nwrrwe 1At alwanow fv lwM4ei► �� fMww��Ir�rIM/w�owio„e� n,u e�rlir hww�aC�r�e� � �orirai��l�1AiM+M1► �..+.... •�!�MNr w.lro�' ileo*•�,�„��plowf��:'-•�k.:.A _.. .._.. . .�. o iC4 Floftniswin III ,, r fWld+Nl*Sftlial2SA tW&K .c. lg2 as Iffed +fools ll.�elsor/lwrerof r if�r> �I.r+roMara PwW it to do �ole S'T" / 1 Pawkim of. ��tw�inr��q�A Arlt�w ft M.e.�Off�11r. ,��,b'���!u tMMw.Nc r wriiiaaot+a►. ON tffm of lAe � J��I�f11Mr�/�!�►+f1r�MMfrf�oo Um �M"�o4rMi��ewr�r eow abawmob dodo mior/irrr�yA�,,,��rieR cw or rmm he�Mrt,r.�o 'S.trwr i WAIW##M WMM J.4�'�Crri t �1Melrr s ���uhfff� Looe f�: 07/09/2009 10:02 PAX 19760833147 X.P.ROBRRTB INSURANCE VIVV X002 fi x. CERTIFICATE OF UABIUTY INSURANCE cow2401' va emmup CA_m a_so=M A 1 OR aF R K' 4MT M H_P, >Q� �C! ZOIC COLT AND COMPM ND JIM-1d M CO TIS =UWMm HOLUM 1050 **good etr0st tt Im f 972 a0® AMID, NXIW = Vaeft load Vet, 1A 01845 19721 • AFFOPWRO GOVIMM "No/ mmum nmozm t Knomnum M1+1MNRk el/11111R� 161 momaim "gram r1Nu1N1 AMOCA 6L, M 01845 • � LIM '►�Aot�e a99ruwvenE tNIXDa�to9r MIIbO aleEle�ewieD+�a t?IE 4JeMM1�1MMEDAei1VE Fwe TIS MiA,OCY PeIrOD III ANI►HOWNPIONW."m an 4DgI101OM OF AW CQe1WWT ON MMM OQOu ff WAYN a=WI TO WHM IM=ITi'lA7N MY W me=OR MEM TW OONVOM Aft!Ytt IME OLMON NORMS OLMAWT 7O AU TMEW E� T 1OLttWW AMD OONOff �OF NXM 90tftl /EMALlN�llOpelYPM/iCLA11M uwm 9Nii4M4.0JInGM 7- a JAL A CpDo0fim" 11/23/07 11/32/08 a ammi 1 pWinee LMT 4 gftm 0m volocum.OO M'AM + PMCYM LM 500,008 AWMM SONFAMOWN e O taino�•taos 7M6217013"s i/23/os 14123/08 rLv w•rr Narow�nw �etat�e + owtuM.rry Auraanr_uAavuoeNr e 4W AM 0� 711�Ir eta + AItT00N�r. Am a amu►•wluYr RAW F . e 0=0 �MArtuNAM M#0Mi1M �_ f s I now AW oepuetru! • f e s!•r►Chitw LYreavfY —�^"' ea tp141glteelt D " - ; = 11011013513 7/1/08 7/1/0+9 aLOM MIS- • so gait is t Amer trOign►ruoY�iweli '1W or Moto ,1111Jp vyl, !AA a�cw�as+Mrct�a�t aoaa�■ea�aseMticae�uaoin enema 1408 asoom H' ? arra tm+rm yo orm NOMM W"><+re"=TO tue,n— rm 11AI m 1AOI�It Ate, wh 01845 MoleYo+A&wm rug b+c� warmro�rieu�r,nnf �aoaanrw 900+1•w OMAOr Ow at LWAIUW 01"MV FOIA WIN trte INAW,m AMIN 001 sru+ee. ArOd11l21l9q geed N I' ORTH ANDOVER BUILDING DEPARTMENT Tel: 978-688-9545 DEBRIS DISPOSAL FORM In accordance with the provision of MGL c 40 S 54, a condition of Building Permit at: �-�. 1,,. t.,l is that the debris resulting from this work shall be disposed of in a properly licensed solid waste disposal facility as defined by N(GL . 11, S 150 A. Also, note Permits are required under Fire Prevention taws Chapter 149 Section I OA. The debris will be disposed of in: Location of Facil ty) Sign o Permit Applicant Fire Department Sign off,. to U Dumpster Permit Date A o 169 Boxford Street Q • North Andover,MA 01845 ` . PH:978-688-5336 Building Contractor FAX:978-688-7207 Proposal To: Al&Paula Ferrullo 30 Bruinhill road All Home improvement Contractors and Subcontractors engaged in home improvement contracting,unless North Andover, Ma 01845 specifically exempt from registration by Provisions of Chapter 142A of the general laws,must be registered with the Commonwealth of Massachusetts.Inquiries about registration and Status should be made to the Director,Home Improvement Contract Registration,One Ashburton Place, Ronin Kevin Murphy Room 1301,Boston,MA 02108.(617)-727 8598 CC: Date: 8/28/2008 .lob: Dormer/Bath addition/renovation 1 Deck renovation Date of plans: 8/08 Architect: 8/08 Location: Same i Section 1-Work Schedule Contractor will begin the work or order the materials before the third day following the signing of this agreement, unless specified here in writing contractor will begin work on or about 11/1/08. Barring Delay caused by circumstances beyond Contactors control,the work will be completed by 12/24/08.The owner hereby acknowledges and agrees that the scheduling dates are approximate and that such delays that are not avoidable by the Contractor shall no be considered as violations of this agreement. Section 11-Wanan tY The Contractor warrants that the work furnished hereunder shall be free from defects in materials and workmanship for a period of 1 year following completion and shall comply with the requirements of this Agreement. In the event any defect in workmanship or materials, or damage caused by the Contractor, his subcontractors, employees or agents, is discovered within one year after completion of any job, including cleanup,the Contractor shall,at his own expense,forthwith remedy,repair correct,replace,or cause to be remedied repaired,or Y replaced, such damage or such defect in materials or workmanship.The foregoing warranties shall survive any inspection performed in connection with the agreed-upon work. Section III Scope Of Work I 'I a MeV/IIm Mmuphy Page 2 of 4 Building Contractor 169 Boxford street North Andover,MA 01845 PH:978- 5335 FAX:978-668-)000( General Proposal is to build dormer over existing breezeway for new master closet, renovate / expand existing masterbath, and replace decking and railings on existing deck. No allowance has been made to change footprint of existing deck. Building permit wit be provided by contractor. No allowances have been made for any title v inspections,variances, or conservation approvals if required by town. Plans to be provided by owner. Building All frame, roof, and siding materials will be supplied to match existing / meet code. Exterior walls will be 2x4, floor joists and roof rafters will be sized to meet code. All floor, wall, and roof sheathing will be fir plywood ( 3/4 on floor, 1/2 on walls, 5/8 on roof) . Ice&water sheild will be installed at all roof edges, roof shingles to match existing. Siding will be pre-primed cedar clapboards over Tyvek or equivalent. Anderson windows will be supplied as shown on plan. Decking will be a standard Trex color, or equivalent. Railings will be Endurance white vinyl) . Plumbing Plumbing required to add five fixture master bath will be provided.An allowance of$2000 has been included for plumbing fixtures. Electrical Electrical work required to wire master bath and closet area to meet code will be provided. Fan/light unit will be supplied. Surface mounted fixtures to be provided by owner(vanity light). Heating/Air Conditioning Existing zone of heat on second floor, will be extended to properly heat added closet area. No allowance has been made for any air conditioning. Insulation All added/renovated areas will be insulated to meet or exceed code. Floors and ceilings will be R-30, exterior walls will be R-13. Plaster Added / renovated areas will be blueboarded and skimcoat plastered. Walls will be smooth, ceilings to match existing. Interior Trim/Doors Interior trim will be supplied and installed to match existing.Two new interior doors have been included. Painting Interior and exterior painting will be provided. One coat of primer, and two coats of finish will be applied. No allowance has been made for any wallpapering. f II$evaan MMB?Ilny Page 3 of 4 BuBding Contractor 159 Boxford street Nath Andover,MA 01845 PH:97868853.'15 FAX:978688-XXXX Flooring Tile floor will be provided in new bath area. An allowance of$4 per square foot has been included for materials. Carpet will be provided in newly renovated closet area.An allowance of$30 per square yard has been included to supply and install carpet. Other Allowances An allowance of$1200 has been included for bath vanity and countertop. Waste Removal i All demolition/construction debris will be disposed of by contractor. Items Not Included There have been no allowances made to supply or install any shower doors. i i a A Hgevfim R%mvp1ty Page 4 of 4 ButUding Contractor 169 Boxford Street North Andover,MA 01845 PH:978-688-5.335 FAX 978688-XX00C Section IV-Price Schedule We hereby propose to fumish material and labor—complete in Accordance with above specifications for the sum of...... ... ... ... ... ... ... ...... ... ....$ 52,000 Payment to be made as follows: Percentage/Item Description Amount 1 Permit obtained $3000 2 Roof complete $12,000 3 Siding /window installed $8000 4 Deck complete $12,000 5 Plastering complete $10,000 6 Flooring / painting complete $5000 7 Job100% complete $2000 Total 6 $52,000.00 `"Notice:No agreement for Home improvement contracting work shall require a down payment(advance deposit)of more that oneahinf of the total contract price of the total amount of all deposits or payments which the contractor must make,in advance,to order and/or otherwise obtain delivery of special order materials and equipment,whidrever is greater Contractor: Kevin Murphy 169 Boxford Street No.Andover, MA 01845 Registration No: 101874 Section V—Acceptance Acceptance of Proposal—I have read this document and accept the prices, specifications,and conditions stated. I understand that upon signing,this proposal becomes a binding contract.You are authorized to do the work as specified. Payment will be made as outlined above. You the buyer may cancel this transaction at any time prior to midnight on the third business day after the date of this transaction cancellation must be done in writing DO NOT SIGN THIS CONTRACT IF THERE ARE ANY BLANK SPACES SignaturC J1.4 - Date 1) Signature Date i