HomeMy WebLinkAboutBuilding Permit #960-15 - 315 TURNPIKE STREET 5/22/2015BUILDING PERMIT
TOWN OF NORTH ANDOVER
ION FOR PLAN EXAMINATION
J 6?
Permit No#: --7 6 1 Date Received
Date Issued: 2,77, J 1 1;
E%PORTANI: Applicant mu�t pomplete all items on this page
LOCATION LA� PIUkl
Prir�t
er
PROPERTY OWNER C—
Print 100 Year Structure yes no
MAP PARCEL: ZONING DISTRICT: Historic District yes
Machine Shop Village yes . 6
TYPE OF IMPROVEMENT
PROPOSED USE
Residential
Non- Residential
0 New Building
El One family
El Addition
0 Two or more family
11 Industrial
0 Alteration
No. of units:
El Commercial
El Repair, replacement
El Assessory Bldg
11 Others:
S(Demolition
El Other
--IN - - --- 7
R -e p N, I L_!,_n, "o -0�
'1656 t 9VIV I I
AN
-1 t
ID. -ft
7MWbdrdle if I is ris
-
MR,
ni;=_qrR1PTinN nF wnRK TO BE PERFORMED:
Identification - Please
OWNER: Name: A;
AfAdrace-
or Print Clearly
F
7
Contractor NameC'11Af?1),r Phone: gy. 1390
2 7 -
Email:
Address: �_-.'751-1 ZX9 0/707Z
Supervisor's Construction License: Exp.- Date: 0/— 00/ �7'
Home Improvement License: E. -p. Date:
ARCHITECTIENGI NEER Phone:
Address:
Reg. No.
FEE SCHEDULE. BULDING PERMIT. $1200 PER $1000.00 OF THE TOTAL ESTIMATED COST BASED T$125.00 PER S.F.
Total Project Cost: FEE: $
Check No.:— Receipt No.:
NOTE: Persons contracting with unregistered contractors do not have access to the guarantyfund
Plans Subrnitted [I Plans Waived r] Certified Plot Plan [I Stamped Plans 11
TYPE OF SEWERAGE DISPOSAL
Pubffc Sewer
Tamhag[Massage/Body Art F1
Swimming Pools El
well
Tobacco Sales El
Food Packaging/Sales 11
Private (septic tank, etc. El
Permanent Dumpster on Site F1
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF - U FORM
PLANNING & DEVELOPMENT Reviewed On Signature'
COMMENTS
CONSERVATION Reviewed on Sicinature
COMMENTS
HEARTH
COMMENTS,
Reviewed on
nature
Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes_
Planning Board Decision:
Comments -
Conservation Decision: Comments
Water & Sewer Connedlon
]DPW Town Engineer: Signature:
Located 384 USgood btreet
r6p b�,bnssi p-,j.qyq
;�;;F PIR4 -t-Wo-
a . �0�irs
t �l:,
fp4qe
4P r
Fi4ri. "' 6- C
. .. .... . ! Qi d ra f -Tr -4�
a
%4
.6 �4
.OM
N
Dimension
Number of Stories: Total square feet of floor area, based on Exterior dimensions.
Total land area, sq. ft.:.
ELECTRICAL: Movement of Meter location, mast or service drop requires approval of
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes
MGL Chapter 166 Section 21A—F and G min.$10041000 fine
NOTFS:ind DATA — (For deDartment use)
0j
h (je
Q Notified for pickup Call Email
Date Time Contact Name
Doc,Building Peniait Revised 2014
M
Building Department
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
Building Permit Application
Workers Comp Affidavit
Photo Copy Of H.I.C. And/Or C.S.L. Licenses
Copy of Contract
Floor Plan Or Proposed Interior Work
Engineering Affidavits for Engineered products
IOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition Or Decks
Building Permit Application
Certified Surveyed Plot Plan
Workers Comp Affidavit
Photo Copy of H.I.C. And C.S.L. Licenses
�6 Copy Of Contract
4. Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
4. Mass check Energy Compliance Report (If Applicable)
,+� Engineering Affidavits for Engineered products
OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
New Construction (Single and Two Family)
�6 Building Permit Application
Certified Proposed Plot Plan
Photo of H.I.C. And C.S.L. Licenses
Workers Comp Affidavit
rwo Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations (if Applicable)
Copy'of Contract
2012 IECC Energy code
Engineering Affidavits for Engineered products
IOTE: Ail dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
must be submitted with the building application
Doe: Building Permit Revised 2014
'Location
No. Date
51c
Check #
2 -3 tu 17
TOWN OF NORTH ANDOVER
Certificate of Occupancy 5
Building/Frame Permit Fee
Foundation Permit Fee
Other Permit Fee
TOTAL $
Building Inspector
Enter construction cost for fee cal -
North Andover Fee Calculation
Construction Cost
34,000.00
m
-$
$ -
$
408.00
Plumbing Fee
$
51.00
Gas Fee 100 comm.
$
100.00
Electrical Fee
$
51.00
Total fees collected
$
610.00
315 Turnpike - Merrimack
960-15 on 5/22/15
Demo Locker Rooms - Volpe
U)
10
CD
0 z
roolL
CD 0
CL
=r
CL
> to
0
00
CD
CL
Cr
CD 0
ca Im
CD
CL 0
S' =
CO CD
CD
0
rmipk
0
7
F
91)
0
0
CA
0
c
U)
-0
@7
0
CD
0
CD
CD
a
U)
CD
CO)
0
z
0
CD
a
0
CD
R0
V
-7�
Z�
:-7-
_ZZ
,Z)
alp
a
z
m
CO)
Cl)
0
0
z
Cl)
Cl)
Q:
Z
cn:
a
m
0
0
-V
m
m
X
a
To
m
Cl)
z
0
z
0
0
N
03
S.
CD
co
r-
0
U)
0
(D
0 0 10 -*L -q
0 --j 0
0 r
.r U)
:5. CD -0
CD CL 0
(D 0
CD C-)
0 CL C.) M
= r
0 .0
= FD- ::F'
0 0 CL 0 MR
C—) - CD 0)
U)
Q CD '0 -
CD CD
CD
0 0
(0 CL
U) 'MIL
03
0
0
CD CD
CD
0 0
< to
0 cn
z CD
o 0
a
> CD U)
0
.L 0
0 CL U)
< CD
CD U)
CD
CD
r -L
W
eg lon
CD
:3 - WAW&
7�j L(D
CD
(D
CD
U)
0
0
> CD
(D
0
SU
CL
mmi -
0
fD
(D
z
0
-n
2L
o
c
-n
V)
rD
(D
0
c
aq
-n
2L
0
c
-n
5'
2L
r)
:r
(D
:io
0
c
-n
0
C
0
vi
(D
Ln
<
-n
0
0
ES
m
m
"a
>
m
z
m
0
m
f-
m
>
z
(A
V
m
0
r-
c
z
(A
m
0
-W
C:
2
z
C)
V
m
0
(D
3
(D
0
May 15, 2015
Page 1 of 8
Letter of Intent/Limited Notice -to -Proceed Agreement — Construction
Management Services, MAC Locker Room Project
Property: Campus of Merrimack College
Andover/North Andover, MA 0 1810
Project: Renovations to the existing Hockey Locker Room
facilities
Owner: Merrimack College
315 Turnpike Street
North Andover, MA 01845
Owner's Project Manager:
Trident Project Advantage Group
155 N Broadway, 2nd Floor
Salem, New Hampshire 03079
Architect of Record:
DSK Architects & Planners
30 Monument Square
Concord, MA 0 1742
Construction Manager:
Primary Contacts:
Channel Building Company,
355 Middlesex Ave
Wilmington, MA 01887
Owner:
Mr. Jeff Doggett, Chief Operating Officer or in his
absence, Mr. Felipe Schwarz, Assistant Vice President,
External Affairs
Owner's Pro'ect Mana-ger:
Mr. Gino J. Baroni or in his absence, Mr. Marc Lehoullier
Construction Manager:
Jerry Diorio, Senior Vice President
Channel Building Company.
0 2014 Trident Building, U.0
Salem, New Hampshire — All Rights Reserved
sAmerrimack 2015 cip projects\i. lockersTinal-owner-cm loi-Intp mac locker reno- 5-15-15 mjl (nim edits 5-18-15).doc
July 11, 2014
Page 2 of 8
Architect of Record:
Michelle Ouellette, Project Manager
DSK Architects & Planners
Intent: It is the intent of the Owner & Construction Manager
above to enter into a Construction Management Contract
in an amount to be agreed upon. The overall
construction budget is approximately $500,000. The
negotiated amount shall be Cost plus a fee of 6% with a
Guaranteed Maximum Price, delivered in an open book
manner. An Initial Guaranteed Maximum Price ("IGMP")
has been delivered to the Owner in the amount of
$477,156.00 based upon Schematic Design documents
by DSK Architects, dated 4/28/2015, and RFS MEP
Schematic Narrative dated April 24, 2015. The Final
Guaranteed Maximum Price ("FGMP") shall be delivered
to the Owner upon completion (on or about June 1, 2015)
of Construction Documents. All savings, if any shall
revert to the Owner. A CM contingency shall be
maintained by the Construction Manager in an amount
not to exceed 5% of the Cost of the Work within the
Guaranteed Maximum Price. The CM Fee for this work
shall not exceed 6% of the Cost of the Work.
The contract shall be based upon AIA A107, v. 2004.
The language of the contract may be modified by the
Owner and is subject to agreement between the parties.
The material language shall be in substantial
conformance to the previously agreed upon Construction
Contract signed by both parties on April 6, 2015, for the
Volpe Roof Repair project , except that this will be
delivered at Cost plus a Fee with a Guaranteed
Maximum Price. Owner's counsel is currently preparing
the contract form. Until such time as the agreed upon
Contract is executed by both parties, this Agreement
shall include, by reference, those Terms and Conditions
of the previously agreed upon Construction Contract
executed on April 6, 2015.
It is the Intent of the Parties to expeditiously execute a
Construction Management Contract within thirty (30)
days of this Letter of Intent and Limited Notice to
Proceed Agreement, subject to proper due diligence by
C 2015 Trident Building, LLC
Salern, New Hampshire — All Rights Reserved
July 11, 2014
Page 3 of 8
Scope of Services:
the Parties, and agreement on a Guaranteed Maximum
Price.
The Construction Manager shall provide Construction
Management services (the "Services") as detailed in
Exhibit A (Construction Manager's proposal, dated May
8, 2015, attached herewith and made a part hereof. In
the event of any conflict between the provisions of the
Exhibit A and the Terms and Conditions herein or other
Exhibits attached hereto, the provisions of the April 6
2015 Agreement's Terms & Conditions and/or other
Exhibits shall control.
Destan Build Mechankal, Electrical & Plumbing
LMEP):
It is acknowledged by the Parties, that the design of MEP
systems shall be as a Design -Build subcontract. The
individual subcontractors will include the design and
certification costs within their proposals to the
Construction Manager. As the procurer of MEP/FP
design services, the Responsibility for Code Compliance,
basis of design narrative, and coordination of the
MEP/FP designs shall remain with the Construction
Manager.
[Continued on Next Page]
0 2015 Trident Building, LLC
Salem, New Hampshire — All Rights Reserved
July 11, 2014
Page 4 of 8
Terms and Conditions
Form
Of Compensation —
Cost plus a Fee:
Services are to be provided on a Cost plus a fee of 6% of
the Cost of the Work basis. The total amount of
compensation due to the Construction Manager in
consideration of the full performance of Services by the
Construction Manager is the amount(s) set forth set forth
above, released by each fully executed Individual Work
Package Authorization(s), until the final Agreement is
fully executed. The Owner shall pay the Construction
Manager as Services are performed by the Construction
Manager based upon the portion of Services properly
completed, delivered, and accepted by the Owner.
Retainer: None
Design Services Reimbursable Expenses:
None
Billing Terms & Schedule:
All billing by the Construction Manager shall be in a form
acceptable to the Owner. No more than one billing shall
be made in any calendar month and in accordance with
the billing schedule established by the Owner. Each
billing shall set forth all items for which the Construction
Manager is to be paid and include all detail and back-up
as requested by the Owner substantiating the
Construction Managers billing. Payment shall be due
within thirty (30) days after the Owner receives a proper
monthly bill. Other than for the actual non-payment of
any amounts properly due and owing, in no event shall
the Owner be liable for interest, penalties, expenses or
attorneys fees. All billing shall be sent to the Owner at
the address stated in this Agreement to the attention of
Mr. Jeff Doggett, Chief Operating Officer, with a
simultaneous copy emailed to Mr. Marc Lehoullier, Sr.
Project Manager at Trident Building, LLC,
Marc. Lehoulliere-Tridentgri).com.
0 2015 Trident Building, LLC
Salem, New Hampshire — All Rights Reserved
July 11, 2014
Page 5 of 8
Budget & Schedule Understanding:
Owner and Construction Manager herein acknowledge
and agree to work diligently toward meeting the Owner's
budget and schedule requirements for the Project.
Insurance — Minimum Limits:
General Liability: $ 2,000,000.
Professional Liability: $ N/A
Worker's Compensation
and Employee Liability: $ (As required by law)
Excess Umbrella $4,000,000.
The Construction Manager agrees that Merrimack
College will be named as an additional insured and a
certificate holder of said policies.
Authorization To Proceed:
The Construction Manager will commence and/or
continue to proceed to provide Services in a continuous
manner and may be authorized to proceed on additional
work pursuant to execution by the Owner and the
Construction Manager of Individual Work Package
Authorization(s).
Work Product:
When the Construction Manager has been paid for the
Services and/or work product performed by it hereunder,
all reports, drawings, and other material either furnished
or required to be provided under this Agreement to the
Owner shall become the Owner's property and may be
used by the Owner thereafter in such manner and for
such purposes as the Owner may deem advisable for the
intent of this project, without further employment of or
additional compensation to the Construction Manager.
Other than in the normal course of business
requirements with its Construction Managers to perform
its Services on the Project, the Construction Manager
shall not release or disclose to any third party any
reports, drawings, or other materials produced for the
Owner on this Project without obtaining the Owner's prior
written consent.
Limited Liability:
0 2015 Trident Building, LLC
Salem, New Hampshire — All Rights Reserved
July 11, 2014
Page 6 of 8
No General or Limited Partner, Member, Manager,
stockholder, officer, director, joint venture, beneficiary,
trustee, employee, or other principals, agents,
contractors or representatives (whether disclosed or
undisclosed) of the Owner, Architect or the Owner's
Project Manager shall be personally liable to the
Construction Manager hereunder, for the Owners
payment obligations or otherwise. The Construction
Manager hereby agrees to look solely to the assets of the
Owner for the satisfaction of any liability of the Owner
hereunder.
Indemnification by Construction Manager:
To the maximum extent permitted by law, the
Construction Manager agrees to defend, pay, indemnify
and save harmless the Owner, Architect and the Owner's
Project Manager, their trustees, employees, or other
principals, agents, Construction Managers or
representatives (whether disclosed or undisclosed) from
all suits, actions, claims, demands, damages or losses,
expenses and/or costs of every kind and description on
this Project to which the Owner or the Owner's project
Manager may be subjected or put by reason of injury
(including death) to persons or property resulting from, in
connection with, or growing out of any act or commission
or omission of the Construction Manager, its agents,
servants, employees, visitors, guests or any person or
corporation dealing with the Construction Manager.
No Relationship:
The Construction Manager acknowledges and agrees
that the Architect and Owner's Project Manager are not a
party to this Agreement and there exists no relationship,
contractual or otherwise, between the Construction
Manager, Architect or the Owner's Project Manager.
Construction Manager Representations:
The Construction Manager represents and warrants to
the Owner that it is experienced and able to perform the
Scope defined hereunder and future work contemplated
in this Agreement and that it has the financial and
bonding (if required) capacity and commitment to perform
the Scope of Work, subject to proper reimbursement
from the Owner.
0 2015 Trident Building, LLC
Salem, New Hampshire — All Rights Reserved
July 11, 2014
Page 7 of 8
Termination:
If the Owner terminates the Construction Manager for
any reason, including but not limited to the failure to
execute the final Owner -Construction Manager
agreement or to meet the Owner's budget and schedule
requirements for the Project, under this Agreement, the
Owner shall pay to the Construction Manager a sum
equal to (i) all proper Cost if the Work expenses incurred
to the effective date of termination, plus (ii) all proper
costs to the effective date of termination of Services
performed as directed under Individual Work Package
Authorization(s).
Publicity and Releases:
The Construction Manager shall not use or release any
information about this Project without first providing a
written draft of any such materials for the Owner's review
and then receipt of written approval to so release. Such
approval shall be at the sole discretion of the Owner.
Final Agreement:
Jurisdiction:
Waiver:
It is specifically understood that the Owner and
Construction Manager agree to work diligently,
reasonably and in a timely manner to prepare and
execute the final Owner -Construction Management
Agreement for the proposed Project. It is the Intent of
the Parties to expeditiously execute said Owner modified
Al 07 Construction Management Contract within 30 days
of this Letter of Intent and Limited Notice to Proceed,
subject to proper due diligence by the Parties.
This Agreement shall be governed by the laws of the
Commonwealth of Massachusetts.
The partial or complete invalidity of any one or more
provisions of this Agreement shall not affect the validity
or continuing and effect of any other provision.
0 2015 Trident Building, LLJC
Salem, New Hampshire —All Rights Reserved
July 11, 2014
Page 8 of 8
AGREED AND ACCEPTED:
OWNER:
Merrimack College
Title: 50 P
Hereunto Duly Tu—thodzed
Date: Jr- Z 2 - /s -
0 2015 Trident Building, LLC
Salon, New Hampshire —All Rights Reserved
CONSTRUCTION MANAGE1
Channel BuildingAmpany
By:
_Tif" j 72 c at) o
Printed
Title: j/p
Hereunto OLAy Authorized
Date: 5-- 70-1-5'
INDIVIDUAL WORK PACKAGE AUTHORIZATION
Number One (1)
Pursuant to the terms and conditions of the Letter of Intent Agreement dated
May 15, 2015, the Owner hereby directs the Construction Manager to perform
the following work package for the Project.
1) See Exhibit A, Channel Building Company Estimate for Merrimack
College- Volpe Locker Rooms (6 pages), dated 5-8-15 and
Construction Scope of Work pages 1-6
2) The Owner hereby releases the following Services:
• General Conditions:
$40,000
• Demolition:
$34,000
• Miscellaneous Carpentry
$20,000
• Doors & Hardware
$11,700
• Flooring
$31,000
• Fire Protection
$ 8,600
• Mechanical
$50,000
• Electrical
$25,000
Subtotal: $220,300
Fee @ 6% $13,218
Total Authorization: $233,300
(Page 1 of 2)
0 20 15 Trident Building, LLC
Salem, New Hampshire — All Rights Reserved
INDIVIDUAL WORK PACKAGE AUTHORIZATION
Number One (1)
The budget value of this Individual Work Package No.1 is stated to be Two
Hundred Thirty Three Thousand Three Hundred ($233,300) Dollars
Acknowledged and Agreed
OWNER:
Merrimack College
P 0.1 ®R 05;0
Printed
Title:
Date:
Hereunto Duly Authorized
Acknowledged and Agreed
CONSTRUCTION MANAGER:
Channel Buildin ompany.
By:
f 17A.1b
Printed
Title: Ile
Hereunto Duly Authorized
Date: r- 70 -1-r—
(Page 2 of 2)
0 2015 Trident Building, LLC
Salem, New Hampshire — All Rights Reserved
Date: 5.8.2015
EXHIBIT A- PROPOSAL
Prepared By:
0 i k i I
' rt-JEOT
Channel Building Company
355 Middlesex Afenue
Wilmington, MA 01887-2163
Project:
Merrimack College - Volpe Locker Rooms
Division
Cost
Cost/SF
GENERAL CONDITIONS
87,018
11.60
DEMOLITION
34,000
4.53
SITEWORK
0
0.00
CONCRETE
3,900
0.52
MASONRY
18,500
2.47
STEEL & MISC IRON
1,750
0.23
ROUGH CARPENTRY
3,150
0.42
FINISH CARPENTRY
37,000
4.93
MOISTURE PROTECTION
0
0.00
ROOFING
2,500
0.33
METAL SIDING
0
0.00
DOORS & HARDWARE
11,700
1.56
OVERHEAD DOORS
0
0.00
WINDOWS & STOREFRONT
0
0.00
DRYWALL
33,900
4.52
EIFS
0
0.00
ACOUSTICAL
14,500
1.93
TILE & FLOORING
31,000
4.13
PAINTING
12,500
1.67
SPECIALITIES
2,900
0.39
EQUIPMENT
0
0.00
SPRINKLER
8,600
1.15
PLUMBING
22,925
3.06
HVAC
53,227
7.10
ELECTRICAL
50,800
6.77
Sub Total Trades
429,870
57.32
Sub Total 429,870
Overhead & roe 25,792 6.00%
Contingency 21,493 6.00%
Project Total 477,156 63.62
Total Square Footage 7500
DIV. I
Item
Unit
Quantity
Unit Price
Subtotal Subcontractor
GENERAL CONDITIONS
Site Design & Engineering
Is
1
0.00
0
Architectural
Is
1
0.00
0
Structural Engineering
inc
1
0.00
0
Sprinkler Engineering
inc
0
1.00
0
Plumbing Engineering
inc
0
1.00
0
H.V.A.C. Engineering
n/a
0
1.00
0
Electrical Engineering
inc
0
1.00
0
Survey
1
0.00
0
Project Management
wk
4.5
4,600.00
20,700
Project Coordinator
wk
3.0
1,900.00
5,700
Supervision
wk
10
4,000.00
40,000
Carpentry
wk
0
1,800.00
0
Laborer
wk
2
2,000.00
4,000
Testing services
0
Temp office/storage trailer
mo
0
250.00
0
Temp telephone
mo
0
225.00
0
Temp water
nic
0
250.00
0
Temp. Electric
mo
0
500.00
0
First aid equipment
Is
0
250.00
0
Temp Toilet
mo
3
150.00
450
Uitlity company fees
nic
0
nic
0
Sewer linkage fee
Is
1
0.00
0
Winter conditions
nic
0
nic
0
Dumpsters
ea
3
8.00
24
Small tools & fastners
mo
3
250.00
750
Safety & Protection
Is
3
750.00
2,250
Punch List
Is
1
1,500.00
1,500
Final cleaning
Is
1
2,500.00
2,500
$-uildrnb;,P,-e7
16L
4-� These pull from top
insurance.
-4,031 These pull from top
Subtotal
87,018
Item
Unit
Quantity
Unit Price
Subtotal Subcontractor
DIV. 2
DEMOLITION
Demolition
sub
1
29,500.00
29,500 Diversified
Trenching
sub
1
4,500.00
4,500 Diversified
0
1.00
0
Subtotal
34,000
Item
Unit
Quantity
Unit Price
Subtotal Subcontractor
DIV.2
SITEWORK
Excatate & backfill stair
sub
1
0.00
0
0
1.00
0
In Demo
0
1.00
0
1
0.00
0
1
0.00
0
Subtotal
0
Item
Unit
Quantity
Unit Price
Subtotal Subcontractor
DIV.3
CONCRETE
Form -Work Sub Bid
sub
0
0.00
0
Flat -Work Sub Bid
sub
0
0.00
0
Ready Mix Sub Bid
vndr
0
1.00
0
Rebar/Slab Pinning
Is
0
0.00
0
WWW -MESH 6X6 2.9 x 2.9
sf
0
0.05
0
Misc. Forrn-Work & Material L&M
I&m
0
1.00
0
Formwork -Stair
hr
0
60.00
0
Formwork-inte(ior piers
ea
0
1.00
0
Formwork/Pour-slab/Trench
hr
40
60.00
2,400
Formwork -tie footings
if
0
1.00
0
Tie rebar
tn
0
60.00
0
Formwork-misc materials
Is
0
1.00
0
Place & finish slab on grade
sf
0
0.45
0
Place &finish slab on deck
sf
0
1.00
0
Grout base plates
EA
0
35.00
0
Equipment pits
allow
0
1.00
0
Rebar & mesh
vndr
0
1.00
0
Ready mix -footings
cy
0
90.00
0
Ready mix -walls
cy
0
90.00
0
Ready mix duct bank 700'3'x2.5'
cy
0
90.00
0
Ready mix -tie walls
cy
0
1.00
0
Ready mix -piers
CY
0
1.00
0
Ready mix -tie footings
cy
0
1.00
0
Ready mix-5"sog
cy
10
150.00
1,500
Ready mix-4"sog
cy
0
1.00
0
Ready mix -transformer pad 8' x 8'
cy
0
90.00
0
Form and pour trans -pad
sfca
0
1.00
0
Ready mix -stair
cy
0
130.00
0
Form & pour stair pads
sf
0
1.00
0
Pre Cast Stairs 6 risers
ea
0
0.00
0
Concrete pump
day
0
1.00
0
Vapor barrier
sf
0
0.02
0
Joint filler strips
if
0
0.29
0
Slab stop
if
0
1.00
0
Subtotal
3,900
Item
Unit
Quantity
Unit Price
Subtotal Subcontractor
DIVA MASONRY
EnNIF/t"bo-Difin-
s-ub------
_1771f�,go:,d�d_
�O01
sf
0
0.00
_�8:,
0
0
1.00
0
Subtotal
18,500
Item
Unit
Quantity
Unit Price
Subtotal Subcontractor
DIV.5 STEEL & MISC IRON
Misc iron
1
0.00
0
Lintels
1
1,250.00
1,250
Rebar/Slab Pinning
1
500.00
500
Stair nosings
0
1.00
0
Railings
1
0.00
0
0
1.00
0
0
1.00
0
Subtotal
1,750
Item
Unit
Quantity
Unit Price
Subtotal Subcontractor
DIV.6 ROUGH CARPENTRY
FR Blocking
ea
1
750.00
750
Labor
wk
1
2,400.00
2,400
PT Blocking
if
0
0.00
0
Misc Material
Is
0
0.00
0
0
0.00
0
Subtotal
3,150
Item Unit Quantity Unit Price Subtotal Subcontractor
DIV.6 FINISH CARPENTRY
0 1.00 0
sub 1 28,000.00 28,000 Trickett
0 1.00 0 Valliant Industries $30,500
Locker Install wk 3 3,000.00 9,000
0 1.00 0
Subtotal 37,000
Item Unit Quantity Unit Price Subtotal Subcontractor
DIV.7 MOISTURE PROTECTION
Subtotal
1.00 0
1.00 0
1.00 0
0
Item Unit Quantity Unit Price Subtotal Subcontractor
DIV.7 ROOFING
sub 0
0.00
0
Skate Sharpening Ventelation sub 1
2,500.00
2,500
ea 0
0.00
0
0
1.00
0
0
1.00
0
Subtotal
Is
2,500
Item Unit Quantity Unit Price Subtotal Subcontractor
DIV.7 METAL PANELS
Subtotal
1.00 0
1.00 0
1.00 0
0
Item
Unit
Quantity
Unit Price
Subtotal Subcontractor
DIV.8 DOORS & HARDWARE
VENDOR BID
vndr
1
6,200.00
6,200 Quarters
Misc
Is
1
2,500.00
2,500
0
1.00
0
INSTALLATION
labor
40
75.00
3,000
Subtotal
11,700
Item Unit Quantity Unit Price Subtotal Subcontractor
DIV.8 OVERHEAD DOORS
0 1.00 0
0 1.00 0
Subtotal 0
Item Unit Quantity Unit Price Subtotal Subcontractor
DIV.8 WINDOWS & STOREFRONT
0 1.00 0
ea 0 0.00 0
0 1.00 0
0 1.00 0
Subtotal 0
Item Unit Quantity Unit Price Subtotal Subcontractor
DIV.9 DRYWALL
SS&GWB sub 1 33,900.00 33,900
0 1.00 0
0 1.00 0 Metro Walls $33,895
0 1.00 0 Levco
0 1.00 0
Subtotal 33,900
Item Unit Quanfity Unit Price Subtotal Subcontractor
DIV.9 EIFS
Subtotal
1.00 0
1.00 0
1.00 0
0
Item Unit Quantity Unit Price Subtotal Subcontractor
DIVA ACOUSTICAL
0 1.00 0
ACT Grid & Tile sub 1 14,500.00 14,500 All -Bright Systems
0 1.00 0
0 1.00 0 GSA - $14,750
0 1.00 0
0 1.00 0
Subtotal 14,500
Item Unit Quantity Unit Price Subtotal Subcontractor
DIVA TILE & FLOORING
0
1.00
0
Skate Tile/Carpet Tile/Vinyl Base
Sub
1
26,000.00
26,000 Kingdom
Patch cerarnic tile
sub
1
2,000.00
2,000
Floor Prep
sub
1
3,000.00
3,000 Aflowance
0
1.00
0
0
1.00
0
0
1.00
0
Subtotal
31,000
Item
Unit
Quantity
Unit Price
Subtotal Subcontractor
DIV.9
PAINTING
0
1.00
0
Painting
sub
1
12,500.00
12,500 King
0
1.00
0 Noonan $14,740
0
1.00
0
0
1.00
0
0
1.00
0
Subtotal
12,500
Item
Unit
Quantity
Unit Price
Subtotal Subcontractor
DIV.10
SPECIALITIES
VENDOR BID
vndr
0
1.00
0
Misc Accessories repair/replace/reuse
Is
1
500.00
500
0
1.00
0
INSTALL ACCESSORIES
labor
40
60.00
2,400
a
1.00
0
0
1.00
0
0
1.00
0
Subtotal
2,900
Item
Unit
Quantity
Unit Price
Subtotal Subcontractor
DIVA I
EQUIPMENT
SUB BID
sub
0
1.00
0
0
1.00
0
0
1.00
0
0
1.00
0
Subtotal
0
Item
Unit
Quantity
Unit Price
Subtotal Subcontractor
DIV.15
SPRINKLER
Is
1
0.00
0
Superior - $1,700 engineering
sub
1
6,900.00
6,900 included
0
1.00
0
Engineering
sub
1
1,700.00
1,700 Tri-State $8,600
0
1.00
0
Subtotal
8,600
Item
Unit
Quantity
Unit Price
Subtotal Subcontractor
DIV.15
PLUMBING
sub
1
20,425.00
20,425 Palmer & Sicard
0
1.00
0
Engineering
sub
1
2,500.00
2,500
0
1.00
0
0
1.00
0
0
1.00
0
0
1.00
0
0
1.00
0
0
1.00
0
0
1.00
0
Subtotal
22,925
Item
Unit
Quantity
Unit Price
Subtotal Subcontractor
DIV.15
HVAC
sub
1
50,727.00
50,727 Palmer & Sicard
0
1.00
0
Engineering sub 1
2,500.00
2,500
0
1.00
0
0
1.00
0
0
1.00
0
0
1.00
0
0
1.00
0
0
1.00
0
Subtotal
Emergency Lighting
53,227
Item Unit Quantity Unit Price Subtotal Subcontractor
DIV.16 ELECTRICAL
1
0.00
0
Engineering
sub
1
1,500.00
1,500 Amore - $54,375
Permit
sub
1
0.00
0
Fire Alarm
sub
1
0.00
0 Gate City - $49,300 + 1,500
Lighting
sub
1
0.00
0
Emergency Lighting
sub
1
0.00
0
0
1.00
0
General
sub
1
49,300.00
49,300
0
1.00
0
0
1.00
0
0
1.00
0
0
1.00
0
Subtotal
50,800
CHANNEL
UU11"NO COMMA114"
A Full -Service Construction Company
DIVISION I —GENERAL CONDITIONS
I . Full time, on-site construction supervision.
2. General labor.
3. Project administration by Project Manager based at Channel office.
4. Weekly construction meetings at the site with the Project Manager, Architect
and Owner or his agent present. Construction schedule and progress, and
information or actions required by the Owner, Architect and Contractor shall
be reviewed. The Contractor shall up -date construction schedule monthly.
Contractor shall prepare meeting minutes.
S. Cost of building permit.
6. Dumpster to be located on site. Location to be chosen by owner.
7. Jobsite computer with connectivity to Channel office.
8. Lifts and staging as required.
9. Reprographics.
10. Small tools and equipment, including rentals.
11. Materials testing of soils, concrete and steel as required by code per Allowance
(see Allowances).
12. Clean up and dumpster fees.
13. Final cleaning.
14. Submittals shall be reviewed in accordance with requirements of the Agreement.
Copies shall be submitted for Owner review and approval. Required submittals
include information relating to major building components and equipment, such
as samples, product data and shop drawings.
15. Site safety including third party inspections.
16. Cutting and patching.
17. One (1) year material and labor warranty for all work.
18. General Liability Insurance.
19. Closeout documents shall include maintenance procedures for all installed
materials and equipment, warranties, subcontractor list, shop drawings and
product data, and as -built drawings.
20. Testing by Owner.
DIVISION 2A — DEMOLITION
1. Demolish and remove all existing masonry walls per drawings.
2. Demolish and remove interior partitions, doors (save for reuse as required) and
windows as noted.
3. Demolish and remove all existing flooring, ceiling and finishes.
355 Middlesex Avenue a Wilmington, MA o1887-2163 * 978.657-73oo 0 Fax 978.657,7788
www.channelbuilding.com
PAGE I
CHANNEL
MAUNNOCOMPM"
A Full -Service Construction Company
4. Demolish and remove all Plumbing, HVAC and Electrical/Low Voltage Equipment
as per drawings, upon completion of make safe by associated MEP trades.
5. Saw cut concrete slab, remove concrete for underground plumbing.
DIVISION 3 — CONCRETE
F&I concrete patching at utility trenching at interior. Trench infill includes poly
vapor barrier 6 mil thick, welded wire mesh and dowels to existing slab.
DIVISION 4 — MASONRY
1. Infill existing openings at CMU walls as noted per drawings.
2. Install a lintel as required to support CMU at new masonry openings.
DIVISION 5 — METALS
Supply lintels at new masonry openings.
DIVISION 6 — WOOD AND PLASTICS
I . Wood blocking as required.
2. Men's mud room and Women's dressing to have approx. 16" wide cubbies.
Maple veneer plywood with high impact resistant PVC 3mm edges, all lockers
are open and will have 3 internal shelves (fixed).
3. Common Hall, Plam cabinets with Plam Top
4. Men's and Women's Lounge, Plam cabinets with Plam top
5. Stick Cutting, Open Maple base cabinets with Maple "Butcher Block" type tops
6. Men's Locker Rm, 5 Tier ADJ wall shelves
7. Fire retardant treated wood
a. For mounting of mechanical and electrical equipment, if required.
DIVISION 6 — ROOFING
1. Provide flashing for roof penetration for ventilation for Skate Sharpening System
355 Middlesex Avenue w Wilmington, MAo1887-2163 a' 978.657-7300 w Fax978.657.7788
www.channelbuilding.com
PAGE 2
A Full -Service Construction Company
DIVISION 8 — DOORS AND WINDOWS I GLASS AND GLAZING
2. Wood Doors
All wood doors are rotary natural birch, Flush with particleboard core,
and are unfinished for field priming & painting (by others)
Qnty Description:
1 4070 Prep'd for hinges & Rim Exit Device
1 3070 Flush Dutch Door, Prep'd for hinges & Cylindrical Lock
1 3070 Prep'd for hinges only (Push/Pull)
1 2068 Prep'd for hinges & Cylindrical Lock
1 3070 Pair — Equal 1'6" Leafs, Prep'd for hinges only (Pulls/Mag Catches)
3. Aluminum Frames
All aluminum frames are knockdown 487 Series with 2" snap on Type 2
trim , and are Mill Finish for field painting (by others)
Qnty Description:
1 4070 Prep'd for hinges & Rim reinforced
1 3070 Dutch Door frame, Prep'd for hinges & strike
1 3070 Prep'd for hinges only (Push/Pull)
1 2068 Prep'd for hinges & strike
1 3070 Pair — Equal 1'6" Leafs, Prep'd for hinges only (Pulls/Mag Catches)
3 3070 Prep'd for hinges & strike
3 3070 Prep'd for hinges, & rim type electric strike,
8040 Borrowed Lite Frame (no mullions)
4. Hardware
Qnty: Description x Finish:
19 Hinges x US26D
I Schlage AL Series Cylindrical Locksets x US26D
I Schlage AL Series Cylindrical Passage x US26D
I Rim Exit Device x US26D
2 Electric Strikes x 32D
2 Closer x sp. Alum
3 Pull Plates x US26D
I Push Plate x US26D
I Mag Catch x US26D
355 Middlesex Avenue a Wilmington, MA01887-2163 & 978.657-7300 a Fax978.657.7788
www.channelbuilding.com
PAGE 3
CHANNEL
ouil"rm compar"
A Full -Service Construction Company
I Dutch Door Bolt x US26D
2 Kickplate x US32D
DIVISION 9 — FINISHES
I . Provide 5/8" type X drywall as indicated on plans.
2. Provide a level 4 drywall finish at exposed areas
3. Provided acoustical caulk at base of all new partitions.
4. Provide GWB patching at demolished partition locations per demo plan.
5. Provide patching allowance of 16hrs for existing GWB ceilings.
6. Provide 20 ga ProStud interior framing at new partitions as indicated on plans.
7. All painted surfaces (i.e. GWB, door frames, and doors requiring paint) shall
receive one (1) coat primer appropriate for surface type and two (2) coats pre -
cat epoxy finish paint.
8. F&I Acoustical Ceiling — Armstrong Angled Tegular Cortega #704A, 2' x 2'
reveal -edge tile; with Armstrong Prelude XL grid, 15/16", White..
9. Supply and install interlocking crumb rubber skate resistant floor tiles, Glue
Down, -- 3/8" thick with 10% color flecking in areas indicated on Finish Schedule.
10. Supply and install carpet tile based on $38 per square yard allowance (material
and labor) in areas indicated on Finish Schedule.
11. Patch ceramic tile at restrooms as required.
12. Supply and install vinyl wall base in areas indicated on Finish Schedule.
13. $3,000.00 Allowance provided for floor prep.
DIVISION 10— SPECIALTIES
$500.00 included to repair/replace/reuse accessories as required.
DIVISION I I — EQUIPMENT
No work included
DIVISION 12 — FURNISHINGS
No work included
355 Middlesex Avenue a Wilmington, MAol887-2163 a 978.657-7300 s Fax978.657-7788
www.channelbuilding.com
PAGE 4
CHANNEL
uun"rm comnar"
A Full -Service Construction Company
DIVISION 13 —SPECIAL CONSTRUCTION
No work included
DIVISION 14 —CONVEYING SYSTEMS
No work included.
Division IS & 16 Trades are Design Build and include fully Engineered and
stamped drawings
DIVISION I SA —PLUMBING
I Provide three Elkay PSR22193 S.S. Sinks with 4205.000 CP American standard
Faucets.
2. Provide one Clarion AN6436BF34 Shower stall with Symmons S96 -300-1330-1-4-
X
3. Provide one A/S White wall 1.28 gallon flush commercial grade toilet with open
front seat and Sloan G2-8111-1.28 flush valve.
4. Provide one A/S commercial grade white wall hung sink with Sloan EBF-85-4CP
faucet and grid strainer.
5. Remove existing master mixing valve in the woman's coaches' office and replace
with new resized unit.
6. Remove existing water piping to commercial washing machine. Cap and make
safe.
7. Remove existing gas pipe to commercial dryer back to main cap and make safe.
8. Connect new sanitary waste and vent piping to existing piping in immediate area.
9. Connect new water piping to existing piping in immediate area.
DIVISION 1513 —FIRE PROTECTION
I . Drawings to be approved by the N. Andover Fire Department
2. Relocating existing sprinkler outlets to cover new layout to code.
3. Adding new sprinkler outlets off existing mains or lines to cover new layout to
code.
4. Chrome semi recessed pendant heads in areas with ceilings.
5. Pendant heads to be centered in ceiling tiles.
355 Middlesex Avenue w Wilmington, MA o1887-2163 8 978.657-730o a Fax 978.657-7788
www.channelbuilding.com
PAGE 5
CHANNEL
mmmrmcmmmmy
A Full -Service Construction Company
DIVISION I 5C-1HVAC
I . Provide pre demolition air survey
2. Provide survey of the interior condition of the existing duct trunk lines
3. Provide demolition of all existing supply and exhaust BRANCH lines
4. Demolition is considered drop to floor for removal by others
5. Provide and install new galvanized steel supply and exhaust branch lines To serve
new room configuration
6. Provide ventilation for Skate Sharpening System.
7. Provide and install approximately forty (40) new RGD's
8. Provide post construction balancing services
DIVISION 16 —ELECTRICAL
I . Disconnect and make -safe power to all existing electrical fixtures, electrical &
HVAC equipment.
2. Provide temporary power and lighting as required.
3. Provide and install receptacles as required.
4. Provide and install power to TVs as shown on the drawings.
S. Provide and install room switches and occupancy sensors as required.
6. Provide and install light fixtures as shown on the drawings.
7. Provide and install EBU's and Exit signs as required.
8. Provide and install Fire Alarm Devices as stated and required.
9. Provide and install boxes and sleeves for Tel/Data cables in the office area
(Cables FBO).
10. Demo as shown on the drawings.
355 Middlesex Avenue w Wilmington, MA 01887-2163 a 978.657-7300 a Fax 978.657-7788
www.channelbuilding.com