Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Building Permit #136-13 - 315 TURNPIKE STREET 8/16/2012
TOWN OF NORTH ANDOVER APPLICATI,�►`'aV-FUR PLAN EXAMINATION Permit N0: ro Date Received Date Issued: Li4o!�3RTANT: Applicant must complete all items on this age LOCATION .31� I r n n, Ci 11�+) 0 c'�-�i� c�Id- 0(3e'f cmC� 1�3� Prin PROPERTY OWNER �E? r r, % lk Unit# Print MAP NO: PARCEL: ZONING DISTRICT: Historic District yes no Machine Shop Village yes no 100 year-old structure yes no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑New Building ❑ One family D(Addition [I Two or more family ❑ Industrial 11 Alteration No. of units: Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑Demolition CKOther Ce- R r OFlood laih 'q�VJetlands O Wateri d�District O Septic 'MWell .0,Wate_r/S ewer DESCRIPTIONOF WORK TO BE PERFORMED: ck(Idice- (Identification entification Please Type or Print Clearly) OWNER: Name: rrt mci nk1e G Phone: - Address: .�15 i rnol 4rea CONTRACTOR Name: c- n 63—/4Phone:�(no ) o3/ 6.23-ft l Address: -, A ���D r�' 9�'S�E'f' 111/q Q3/11 Supervisor's Construction License: �� e, �Exp. Date: le Home Improvement License: �� Exp. Date: I d ARCHITECT/ENGINEER f-5 Phone:,f(&3�1c�a3� 11 13591166-ce &aeel ase , r�H o ita6 Address: � o�C ��3D { /�lQn �s�Pr� Al l l3/ Reg. No. FEE SCHEDULE.BULDING PERMIT.$92.00 PER$9000.00 OF THE TOTAL ESTIMATED COST BASED ON$925.00 PER S.F. Total Project Cost: $ T FEE: Check No.: Receipt No.: 2r6-;2 2- N E: Persons contracting with unregistered contractors do not have access to the guaranty fund -Signatia.re of confi�acfo :. . &griature.of:.Agent/.. :-ne.r,,.►. . . ��,� Plans Submitted Plans Waived Certified Plot'Plan Stamped Plans TYPE OF SEWERAGE DISPOSAL Public Sewer Tanning/Massage/Body Art Swimming Pools Well Tobacco Sales Food Packaging/Sales Private(septic tank,etc. Permanent Dumpster on Site THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT COMMENTS e CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals:Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments - T Conservation Decision: Comments Water& Sewer Connection/signature&Date Driveway Permit 3 DPW Town Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT Temp Dumpster on site yes no. .- Located at 124*Main Street - Fire Depattirient'signatureldate COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— (For department use) LJ Notified for pickup - Date c � Doc.Building Permit Revised 2008 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or. Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) © Engineering Affidavits for Engineered products JOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:INSPECTIONAL SERVICES DEPARTMENT:BPFORM07 Revised 2.2008 Location No. / Date /6 /2► • - TOWN OF NORTH ANDOVER Certificate of Occupancy $ Building/Frame Permit Fee $ Foundation Permit Fee $ fav' Other Permit Fee ----- TOTAL D2•Ud � f Check#fl6 l7/ 25622 / building Inspector PRO CON�� / PO BOX 4430 INCORPORATED MANCHESTER,NH 03108 PFt:(603)'J3-8811 Design and Construction Management � �j � u_-'Jr Letter of Transmittal P To: Gerald"Gerry'A. Brown, CBOT Transmittal#: 67 �UA Town of North Andover, MA Date: 3/26/2013 1600 Osgood Street Job: 40-1346 Merrimack College Ice Rink Building 20, Suite 2-36 (Inspector of Buildings) Hours 8:30-10:00& 1:00-2:00 North Andover, MA 01845 Ph:978-688-9545 x5 Fax:978-688-9542 Subject: Volpe Athletic Center Expansion WE ARE SENDING YOU r Attached r Under separate cover via None the following items: Ei Shop drawings ❑ Prints r Plans ❑ Samples r Copy of letter r Change order r Specifications r Hand deliver Document Type Copies Date No. Description Certified Foundation As-Bi 3 3/26/13 Volpe Athletic Center Certified Foundation As-Built THESE ARE TRANSMITTED as checked below: r For approval r Approved as submitted r i Resubmit_copies for approval r For your use r7 Approved as noted r-i Submit_copies for distribution P-, As requested r Returned for corrections rJ Return_corrected prints rJ For review and comment ❑ Other r FOR BIDS DUE ra PRINTS RETURNED AFTER LOAN TO US Remarks: Copy To: Todd Hooper(Pro Con Inc.), Ken Hadley(Pro Con Inc.), Lynn Kramer(Pro Con Inc.), File(Pro Con Inc.) From: Lynn Kramer(Pro Con Inc.) Signature: If enclosures are not as noted,kindly notify us at once. Page 1 of 1 Enter construction cost for fee cal- North Andover Fee Cakulafion Construction Cost $ 11708,461 .00 m $ - $ 20,501.53 Plumbing Fee $ 2,562.69 Gas Fee 100 comm. $ 100.00 Electrical Fee $ 2,562.69 Total fees collected $ 25,726.92 315 Turnpike Street 136-13 on 8/16/12 Volpe Athletic Center �- 2-w 2 .c�� r 1 V NORTOI �. .c . ..,. ver 0 No. —13 IL��yy t � Z b o LAK, h ver, Mass, w coc�u«ew,cw �. L9S�R�TED APp`��y V PERMIT T D BOARD OF HEALTH Food/Kitchen Septic System HIS CERTIFIES THAT ....)l........................................................... BUILDING INSPECTOR has permission to erect .......................... buildings , �Ul'��fE S Foundation Rough to be occupied as ................................................... .. .............. ........... provided that the person accepting this permit shall in every. respect. conform to the terms of theapp lication Chimney on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Final Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTION TARTS Rough ................................... Service BUILDING INSPECTOR Final Occupancv Permit Required to Occupy Building Rough GAS INSPECTOR Display in a Conspicuous Place on the Premises - Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. �SEEVERSE SIDE Smoke Det. PRO CON�� INCORPORATED Design and Construction Management August 9, 2012 Town of North Andover Building Dept. Attn: Mr. Gerald Brown 1600 Osgood St. North Andover, MA 01845 Re: Volpe Athletic Center Expansion @ Merrimack College—315 Turnpike Street Architectural Design Affidavit Dear Mr. Brown, In accordance with 780 CMR,the Massachusetts States Building Code 8th Edition and the 2009 International Building Code, I, James A. Loft , Mass. Registration No. 10833 ,being a registered architect herby certify that I have prepared or directly supervised the preparation of all design plans, computations and specifications for the above named project and that,to the best of my knowledge, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code. Sincerel RSC James A. Loft, AIA DAR \yeti Senior Vice President-Pro Con Inc Q�� � s A.t Fc'� No.10833 cc: Lance Bennett HOPKIP�TON, Todd Hooper NH. TN OF WIN �t Design Professionals Seal PRO Corr,INC.A Stebbins Company P.O.Box 4430 Manchester,NH 03108 603.623.8811 Fax 603.623.7250 www.proconinc.com PRO CON, INCORPORATED Design and Construction Management March 6, 2012 Town of North Andover Building Dept. Attn: Mr. Gerald Brown 1600 Osgood St. North Andover,MA 01845 Re: Volpe Athletic Center Expansion @ Merrimack Collge —315 Turnpike Street Structural Design Affidavit Dear Mr. Brown, In accordance with 780 CMR,the Massachusetts States Building Code 8th Edition and the 2009 International Building Code, I, Matthew LaBrecque, Mass. Registration No. 43104 ,being a registered professional engineer herby certify that I have prepared or directly supervised the preparation of all structural design plans, structural computations and structural specifications for the above named project and that,to the best of my knowledge, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code. Sincerel4Mattw queOF M Professional Engineer—Structural �N Assgo MATTHEW J. yG cc: Jim Loft, Lance Bennett, � LA6RE STRUCTURATURA CDL 'a Todd Hooper U No.43104 Apo RF GISTE�'`������� S8S/0NAL EAG Design Professionals Seal PRO CON,INC.A Stebbins Company i P.O.Box 4430 Manchester,NH 03108 603.623.8811 Fax 603.623.7250 www.proconinc.com Transportation Land Development Environmental e Services • imagination innovatron energy Creating results for our clients and benefits for our communities August 10,2012 Van rise &y/gP& Br16S&n, &c Town of North Andover Building Department Attn:Mr.Gerald Brown 1600 Osgood St. North Andover,MA 01845 Re: Volpe Athletic Center Expansion Q Merrimack College-315 Turnpike Street Site/Civil Design Affidavit Dear Mr.Brown, In accordance with 780 CMR,the Massachusetts State Building Code 8th Edition,I,Christopher M. Lovett,MA PE Registration#40726,being a registered PE hereby certify that I have prepared or directly supervised the preparation of all civil site plans and relative computations and specifications for the above named project and that,to the best of my knowledge,such plans,computations, specifications meet the applicable provisions of the Massachusetts State Building Code. Very truly yours, VANNASE HANGEN BRUSTLIN,Inc 1 Christopher .L e ,PE,LEED AP Senior Proj ct anager - ? iWIT -1 E' 40"723 ?L 101 Walnut Street, P.O. Box 9151 Watertown, Massachusetts 02471-9151 617.924.1770■FAX 617.924.2286 email:info@vhb.com www.vhb.com WIHANICA:CONSUJING d"--_W -r H'JAC/fIIJFr E.'NG SYSTEM CES!Gt. E N C+ Ii N E E R i N G, I N C_ DESIGN/BUILD PARTNERSHIPS August 14, 2012 Mr. Gerald A. Brown, Inspector of Buildings Town of North Andover, MA 1600 Osgood Street, Building 20, Suite 2-36 North Andover, MA 01845 RE: MERRIMACK COLLEGE VOLPE CENTER EXPANSION —NORTH ANDOVER, MA Dear Mr. Brown: In accordance with 780 CMR 916.0 of the Massachusetts State Building Code, I Douglas R. McGill Registration No. 38893 being a registered professional engineer hereby certify that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning plumbing and mechanical systems for the referenced project. To the best of my knowledge, information and belief, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices, applicable laws and ordinances for the proposed use and occupancy. Please contact me with any questions and/or if you require additional information. Sincerely, "P Douglas R. McGill, P.E. President, Project Engineer MA Reg #38893 ►sly. i � III Isr �°G,�w� ��6NAt . *= N1>assachusetts - Departnncnt of Pulili Sal'et> a Board of Building Re�-ulations ant! Standards Construct;on Supervisor License License: CS 50393 DALE E CHASE 17 TOBEY HILL RD WEARS, NH 03281 ` �J Expiration: '11/612012 ('ununissi nca Tr?#: 7501 The Commonwealth of Massachusetts - Department of Industrial Accidents Office of Investigations ' d 600 Washington Street Boston, MA 02111 www.mass.gov/dia Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name(Business/Organization/Individual): . An Address: City/State/Zip: ( Iq(- Phone.#: 603 6) Are you an employer?Check the appropriate box: Type of project(required):. I.❑ I atn a employer with 4. I am a general contractor and I employees(full and/or part-time).* have hired the sub-contractors 6. New construction 2.❑ I am:a sole.proprietor or partner- listed on the attached sheet. 7. E]Remodeling ship and have no employees These sub-contractors have 8. E]Demolition working for mem any capacity. employees and have workers' 9. Buildingaddition [No workers'comp. insurance comp.insurance.$ required.] 5. E] We are a corporation and its 10.0 Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.0 Plumbing repairs or additions myself. [No workers'comp. right of exemption per MGL 12.❑Roof repairs insurance required.]t c. 152, §1(4),and we have no employees.[No workers' 13.0 Other Comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees Below is the policy and job site information. ]) _ Insurance Company Name: / Policy#or Self-ins.Lic.#: t V 6 Expiration Date: 113 Job Site Address: City/State/Zip:/v(�(�1'� 0 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure.to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition-of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification I do hereby certify er the pain penalties of perjury that the information provided above is true arid correct: Date: Si ature: ///� n Phone Official use only. Do not write in this area,to be completed by.city or town officiaL City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector 6.Other Contact Person: Phone#: A6Z® DATE(MM/DDIYYYY) � CERTIFICATE OF LIABILITY INSURANCE 8/9/2012 PRODUCER (603)224-2562 FAX: (603)224-8012 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION THE ROWLEY AGENCY INC. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 139 Loudon Road ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P.O. Box 511 Concord NH 03302-0511 INSURERS AFFORDING COVERAGE NAIC# INSURED INSURER A:National Union Fire/Chartis Pro Con, Incorporated INSURER B: 1359 Hooksett Road INSURER C: INSURER D: .HooksettiNH 03106 INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS 05UCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADD'L POLICY EFFECTIVE POLICY EXPIRATION LIE NSRD TYPE OFI NC POLICYNUMBER DA /DD/ DATE M/DD/YYYY LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 2,000,000 DAMAGE X COMMERCIAL GENERAL LIABILITY PREM SESOEa occuE ence $ 300,000 A CLAIMS MADE F% OCCUR GL 6988567 4/1/2012 4/1/2013 MED EXP(Any one person) $ 5,000 PERSONAL BADV INJURY $ 2,000,000 GENERAL AGGREGATE $ 4,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OPAGG $ 4,000,000 POLICY -X] PRO X LOC JECT AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT X ANY AUTO (Ea accident) $ 1,000,000 A ALL OWNED AUTOS CA 1707511 4/1/2012 4/1/2013 BODILY INJURY SCHEDULED AUTOS (Per person) $ X HIRED AUTOS BODILY INJURY $ X NON-OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS UMBRELLA LIABILITY EACH OCCURRENCE $ 10,000,000 X OCCUR CLAIMS MADE AGGREGATE $ 10,000,000 $ A DEDUCTIBLE BE 15808812 4/1/2012 4/1/2013 $ X RETENTION $ 10,000 TATU $ A WORKERS COMPENSATION C 021417796 4/1/2012 4/1/2013 X WCSLIMIT OTH- AND EMPLOYERS'LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE Y/N A States: NH, CT, MA E.L.EACH ACCIDENT $ 1,000,000 OFFICER/MEMBER EXCLUDED? (Mandatory In NH) RI, NY, ME E.L.DISEASE-EA EMPLOYEE,$ 1,000,000 If yes,describe under SPECIAL PROVISIONS below E.L.DISEASE-POLICY LIMIT 1$ 1,000,000 OTHER DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS Volpe Athletic Center Expansion, Merrimack College. *Except 10 days for nonpayment of premium. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30* DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL Commonwealth of Massachusetts Department of Industrial Accidents IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR 600 Washington Street REPRESENTATIVES. Boston, MA 02111 AUTHORIZED REPRESENTATIVE Danielle Rice/DJR ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. INS025(200901).01 The ACORD name and logo are registered marks of ACORD ACO ® � A DATE(MMIDDYYMCERTIFICATE OF LIABILITY INSURNCE 8/9/2012 PRODUCER (603)224-2562 FAX: (603)224-8012 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION THE ROWLEY AGENCY INC. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 139 Loudon Road ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P.O. Box 511 Concord NH 03302-0511 INSURERS AFFORDING COVERAGE NAIC# INSURED INSURER A:National Union Fire/Chartis Pro Con, Incorporated INSURER B: 1359 Hooksett Road INSURER C: INSURER D: Hookset NH 03106 INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OFSUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADD'L POLICY NUMBER POLICYEFFECTIVE POLICY EXPIRATION LIMITS LTR R F INSURANCE DA M I D DATE M IDDI YY GENERAL LIABILITY EACH OCCURRENCE $ 2,000,000 DAMAGE TO RENTED X COMMERCIAL GENERAL LIABILITY PREMISES Ea occurrence $ 300,000 A CLAIMS MADE ❑% OCCUR GL 6988567 4/1/2012 4/1/2013 MED EXP(Any one person) $ 5,000 PERSONAL&ADV INJURY $ 2,000,000 GENERAL AGGREGATE $ 4,000 000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 4,000,000 POLICY -X] JECT PRO X LOC AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT X ANY AUTO (Ea accident) $ 1,000,000 A ALL OWNED AUTOS CA 1707511 4/1/2012 4/1/2013 BODILY INJURY $ SCHEDULED AUTOS (Per person) X HIRED AUTOS BODILY INJURY $ (Per accident) X NON-OWNED AUTOS PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILITY EACH OCCURRENCE $ 10,000,000 X OCCUR F—I CLAIMS MADE AGGREGATE $ 10,000,000 $ A DEDUCTIBLE BE 15808812 4/1/2012 4/1/2013 $ X RETENTION $ 10,000 $ A WORKERS COMPENSATION C 021417796 4/1/2012 4/1/2013 }( OR LATU- OEH- AND EMPLOYERS'LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE YIN 3A States: NH, CT, MA E.L.EACH ACCIDENT $ 1,000,000 OFFICERIMEMBER EXCLUDED? (Mandatory in NH) 2, NY, ME E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under SPECIAL PROVISIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,000 OTHER DESCRIPTION OF OPERATIONS/LOCATIONS I VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS Volpe Athletic Center Expansion, Merrimack College. *Except 10 days for nonpayment of premium. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30* DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL Town of North Andover 120 Main Street IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR North Andover, MA 01845 REPRESENTATIVES. AUTHORIZED REPRESENTATIVE Danielle Rice/DJR ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. INS025(200901).01 The ACORD name and logo are registered marks of ACORD r I PRO CON,�, ' INCORPORATED Design and Construction Management Volpe Center Expansion GMP Proposal 8/1/12 ` Budget Summary Report Date 6/13/2011 {P�'(l'� �y y�hr O-}�1L\�iy�+ d l M C O R A O.I,�t'y�l B IJS{� C�� �� �J� pq� q" �C 1�Ca ptc ve5t'*mbutl C�+ttalriitfitr"mfMagorifir4 Ja�z� S{�s� ceQ e• 'e, seo 0 4 tic4 ti� Notes Volpe Center Expansion Original G1VIP 2/14/12 $8,435,475 $8,435,475 2/14/12 Prapased Altenrntims Building 1 Veiwing boxes over Concession including design $399,284 2/27/12 $399,284 H H 2/27/12 2 PA System allowance $12,000 2/27/12 $12,000 H H 2/27/12 3 Te/data cabling allowance $27,000 2/27/12 $27,000 H H 2/27/12 4 Sprinkler remaining building $140,000 2/27/12 $140,000 H H 2/27/12 S Electric service upgrade $33,200 2/27/12 $33,200 H H 2/27/12 6 Flooring changes per REV 6/7/12 GMP Summary $112,511 2/27/12 $112,511 H H 2/27/12 7 Aluminum roll-up grille with locks at concession $6,784 2/27/12 $6,784 H H 2/27/12 _ 8 Electric operator for roll-up grille $1,417 2/27/12 $1,417 H H 2/27/12 9 Windows in viewing boxes 215&216 $6,468 2/27/12 $6,468 H H 2/27/12 10 Second scoreboard $10,000 2/27/12 $10,000 H H 2/27/12 2/27/12 11 Plunge pools $106,492 2/27/12 $106,492 H H 12 Delete exhaust hood allowance (515,000) 2/27112 ($15,000) H H 2/27/12 13 Wall to wall Low-E ceiling $9,290 2/27/12 $9,290 H H 2/27/12 14 Melt pit $44,500 6/7112 $44,500 H H 6/11/12 10'x 10',Budget H H X 6/11/12 66'x 16'brick with block back-tip,Budget IS Zantboniscreettwall $62,500 6/7/12 16 Brick Scheme 92 design $35,000 6111/12 $35,000 H H 6/11/12 16a Brick Scheme#2 construction $750,000 5/30/12 5750,000 H H 6/4/12 Up to 15,000sf,Budget 17 Medical office wing design $28,500 6/11/12 $28,500 H H 6/11/12 17a Medical office wing construction shell only $800,000 6/11112 $800,000 H H 6/11/12 Budget 19 Dasher board revisions: 18a Dasher board glass inventory $3,000 6/11112 H H X Budget 18b Dasher board glass S.high $14,470 6/21/12 H H X 18c Aluminum frame system 57,878 6/11/12 H H X 18d Polyethlenc ice retainer-1"thick $10,384 6/11112 H H X He Polyethleme ice retainer-1-112"thick $14,294 6/11112 H H X 18f Acrylic shielding ends and comers(6 high) $18,975 6/11112 H H X 19g Acrylic slvelding entire rink(4'and 6 high) $36,396 6/11112H H X 7 gh NHL formed acrylic safety comers $17,064 6/11112 H H X 19 Subcontractor in-/rouse mechanical control installtion ($15,000) 6/11112 H H X 20 Use California painiwherepossible 510,000 6/11112 H H X Budget 21 Dual level lighting $19,799 6/11112 H H X Budget 22 Altmtinurn conductors in lieu of copper ($19,849) 6/11112 H H X (59,290) 6/11112 H H X Keep over rink only 23 Delete waIl-to-wsll Low-Emembrane - Budget 24 Veiewingbox#5 $56,000 6/23412 H H X 25 Existing rinkboards and lighting $196,875 6/23112 H H X 26 Existing rink dehumidification alloemnce 5100,000 6/23112 H H X Budget 27 Therapy poolsescalalion $3,183 6/23112 53,193 H H 6!23112 28 Overtime bodge(to gain two weeks $235,000 6/23112 H L X Budget Site 1 National Grid switchgear requirements BUDGET 550,000 6/23!12 $50,000 H H 6/23/12 Budget Miscellaneous 227/12 1 Archilcchual rrimbmsment Iw 512,760 2/27112 512,760 H H �b11A)7OD) ?127172 (WOOD) H H 2/27112 2 Civil engineering by Owner 221112 3 Gcoteclurical engineering by Owner (3 10;000) 2/27112 'J$1a;bDM H H 4 Competitive1idsavings (332,6139) 2127112 (832,aa) H H 227/12 5 Weather conditions allowea2d 00% 227112 ($33;1/01!) L L 2/27/12 ereductian 2127112 6 Contingency reduction (113D,'DOD) ?127112 On 10,M) L L 7 Performance and paymcnlbonds 585,000 611112 $96,131 L L 6x1/12 P&P cost determined by final construction cost Total Proposed Adds To Date $3,530,814 Total Proposed Deducts To Date (5385,810) Total Vahre Charges To Date $3,144,994 TotalAccepted Charges To Data 52,341,839 L=Lav impncl 2erised Budget m Date Si0,777,314 H.Nigh impact Y1`kl %—kj1Nd Volpe Center GMP cnsiluiL 4.ulriri ` INCORPORATED • 3ksigu mrd Constntctron,S4nrvgewrn! ' r Project name Volpe Center GMP North.Andover MA Architect PCIA Estimator Dan Dal Pra/Mark Belter Job size 82095 sqft Bid date 8/1/2012 Notes This estimate includes the MOB shell addition, brick veneer and support work.for National Grid JL 4 Volpe CenterGMP rsiaicv�c v:acrw, INCORPORATED 14- pi and constmctton 41fti{gcntent Total Description Quantity Amount 00000 PROFESSIONAL SERVICES 00105 Reprographics 7,500 00130 Preconstruction Services 16,294 PROFESSIONAL SERVICES 23,794 240.00 Labor hours 01000 GENERAL CONDITIONS 01005 Field Superintendent 181,723 01010 Assistant Superintendent 140,610 01019 Project Executive 57,783 01022 Project Manager 181,723 01023 Assistant Project Manager 140,610 01025 Travel Expenses 35,640 01026 Project Coordinator 48,000 01040 Project Telephone Charges 10,300 01045 Temporary Field Office 7,058 01050 Temporary Power 12,000 01065 Temporary Facilities 5,460 01070 Office Supplies 3,000 GENERAL CONDITIONS 823,907 10,144.00 Labor hours 01600 PROJECT MAINTENANCE 01605 Daily Cleanup 35,360 01610 Waste Removal General Purpose 7,200 01615 Post Construction Cleanup 10,555 01620 Punchlist 8,040 PROJECT MAINTENANCE 61,155 952.00 Labor hours 01950 DEMOLMON&ABATEMENT 01955 Selective Demolition 50,260 DEMOLITION&ABATEMENT 50,260 240.00 Labor hours 240.00 Equipment hours 02000 SITE WORK 02020 General Sitework 990,000 02821 Fencing and Guardrail 20,759 02900 Landscape and Hardscape 50,153 02920 Miscellaneous Site Items 3,580 02980 Layout,QC and Certified Plans 34,317 SITE WORK 1,098,809 300.00 Labor hours 03000 CONCRETE 03005 Foundation Concrete 674.00 73,021 03010 Slab Concrete 759.00 77,386 03015 Exterior Concrete 211.50 17,967 03090 Concrete Additives 9,095 03100 Concrete Formwork 152,073 03105 Concrete Forming Misc. 15,045 PRO CON+ an Volpe Center GMP 8/8/2092 4:52 PM INCORPORATED Dair and Caxstniction Asa+rugairent Total Description Quantity Amount 03110 Slabwork&Flatwork 166,990 03200 Concrete Reinforcement 39,489 03205 Concrete Reinf.-WWM 10,055 03250 Concrete Accessories 7,009 03290 Misc.Concrete Work 30,040 03295 Concrete Equipment 1,275 03350 Concrete Finishes 10,207 CONCRETE 609,652 811.40 Labor hours 04000 MASONRY 04200 Unit Masonry 523,700 04210 Misc Masonry Work 19,160 MASONRY 542,860 05000 METALS 05100 Structural Steel Framing 1,051,703 05500 Metal Fabrications 131,789 05800 Expansion Control 27,200 METALS 1,210,692 601.50 Labor hours 06000 WOOD&PLASTICS 06005 General Tools&Equipment 12,245 06103 Pressure Treated Carp. 3,966 06105 Framing Equipment 42,070 06106 Plywoods 4,184 06125 Miscellaneous Carpentry 20,700 06400 Architectural Woodwork 61,328 WOOD&PLASTICS 144,492 502.653 Labor hours 2,640.00 Equipment hours 07000 THERMAL MOISTURE 07100 Waterproofing 8,340 07150 Dampproofing 6,500 07210 Rigid Insulation 70,101 07312 Air Infiltration Barriers 59,593 07400 Metal Roofing&Siding 259,610 07500 Membrane Roofing 416,887 07900 Caulking and Sealants 19,963 THERMAL&MOISTURE 840,994 969.041 Labor hours 08000 DOORS& WINDOWS 08050 Doors And Hardware 102,461 08350 Overhead&Coiling Doors 25,146 08800 Glazing 211,200 DOORS&WINDOWS 338,807 09000 FINISHES 09050 Finishes Supervision 27,649 09250 Gypsum Wallboard 478,291 JL L<V w1 M-W, Volpetumid vinr INCORPORATED Uesigrn nerd constnrction,Management Total Description Quantity Amount 09540 Ceiling Suspension System 35,195 09660 Floorcovering Subcontractor 211,379 09900 Painting 104,990 FINISHES 857,504 480.00 Labor hours 10000 SPECL`><L77ES 10160 Toilet&Shower Partitions 18,978 10400 Identifying Devices 455 10500 Lockers 20,000 10522 Fire Extinguishers 3,810 10650 Operable Partitions 6,600 10800 Toilet&Bath Accessories 15,805 SPECIALTIES 65,648 18.00 Labor hours 11000 EQUIPMENT 11482 Scoreboard 16,525 11500 Athletic Equipment 96,074 11901 Owner Furnished Equipment 11950 Hoists and Cranes 340 EQUIPMENT 112,939 32.00 Labor hours 13000 SPECLAL CONSTRUCTION 13001 Ice Rink Refrigeration 539,625 13150 Swimming Pools 59,190 13164 Dasher Boards 157,240 SPECIAL CONSTRUCTION 756,055 15000 MECHANICAL 15100 MEP Coordination 32,449 607,500 15400 Plumbing 15500 Fire Protection 102,300 ion &Air Conditioning 15501 Heat Ventilation, 9 593,876 MECHANICAL 1,336,125 16000 ELECTRICAL 16010 Electrical Provisions 571,214 16015 Site Electrical 21,159 ELECTRICAL 592,373 I JL JL w.L `t+, voipeuenreruiv,r INCORPORATED Vaigrt HIM ComMICH011 manageJacirt Estimate Totals Description Amount Totals Rate Mass Sales Tax Excluded Mass Tax Exempt Fee on Equip 3,344 6.248% OSHA&Safety 33,131 0.350% Insurance/General/Umbrella 61,767 0.650% Building Permit NIC Weather Conditions Allowance 150,000 Perf&Paymnt Bond 84,842 Const.Management Fee 391,966 4.000% 725,049 10,191,115 Contingency 100,000 Sprinkle Remaining Building 140,000 Architectural Design Fee 337,000 Architectural Reimbersables 12,760 MOB Design 29,640 Brick Veneer Design(NTE) 36,400 Civil Engineering BY Owner Geotech Fee By Owner Total 10,846,915 132.126/sgft PR® C®N�� INCORPORATED Design and Construction MmiagenMMf PRECONSTRUCTION SERVICES Merrimack College Volpe Center Expansion Clarifications 8/1/12 GENERAL: 1. Prevailing wages rates have not been used for the basis of establishing labor costs. 2. We have assumed this project is tax exempt. 3. Owner is responsible for all survey and civil engineering. 4. Bid documents include structural and architectural:plans dated 7/17/12,project specifications date 1/30/12, and MEP plans date 1/30/12. SITE: 1. The removal and replacement of ledge is not included. 2. The excavation, removal,and replacement of hazardous materials are not included. 3. Wetland flagging is not included: . 4. Additional erosion controls required by.the Conservation'Commission, not shown on the plan, are not included. 5. The Storm Water Pollution Prevention Plan is by the Owner. 6. Plant &lawn main_tenance._is by the Owner. 7. The Owner will;provide'building baselines and;temporaiy bench marks. 8. We will provide red-lined record drawings .'�14ectronic(AutoCad) "as-built" or"as-builts" prepared by a Professional Eri91ne er or Land Surveyor are not included. 9. Adjustments to the-existing septic components/floats/controls are not included. 10. The testing or repair of existing sewers-is not included. 11. Existing pavement repairs,are'limited to sawcut and patching in the work areas,with limits as sliown on the plans. No overlays are included." 12. We assume that the light poles adjacent to the ball fields can remain in place during replacement of the drainage to the outfall. 13. The groundwater is assumed to be`clean and not require discharge permitting, frac tanks, or treatment: 14. The groundwater.is assumed to be controlled by the use of filtered sumps and pumps. Well points are not included. 15. The over excavation of the existing organic fill soils is limited to the building footprints only. 16. We assume that recycled concrete or asphalt is acceptable for use on the project. 17. All inspection and monitoring work required by the Town of North Andover and the Town of Andover is by Owner. This includes work by a Professional Engineer, a Professional Land Surveyor, and a Wetland Scientist. 18. Bonds required by the Towns are by Owner. A Stebbins Compnn� P.O.Box 4430 Manchester,NH 03108 603.623.8811 Fax 603.518.2195 www.proconinc.com 1of5 PRO CONS INCORPORATED Design and ConstmetionManagernent PRECONSTRUCTION SERVICES 19. Any additional work required by utility companies or Town agencies that are not shown on the plans is not included. 20. Utility company impact fees/backcharges are by the Owner. 21. Water meters are by Owner. 22. We do not guarantee the survival of existing trees that are to remain. Reasonable precautions will be taken but excavations may damage trees beyond their ability,to recover. In addition, some trees labeled to remain may have to be removed to allow safe:-hhd practical construction of the building. METALS: 1. Architectural finish on exposed steel has not b6en included. FINISHES: 1. All work within rooms 108' (Retail), 114 (Pro Shop), and 191 (MOB), including electrical, mechanical distribution,plumbing, gypsum wallboard and all other finishes, is excluded. 2. New flooring in room 202 to mimic.location of new ceiling system. 3. No wall tile is included in the plunge pool. ROOFING: 1. Roof-top equipment screening is not'included.' 2. We have carried a white TPO roof system.. SPECIALTIES: 1. All signage (except that requitedby code)to be furnished and installed by the Owner. 2. Low-E-reflectivesystem to be applied.on furring to the underside of the roof deck to eliminate the-need to lower or add sprinkler heads:' . ATHLETIC EQUIPMENT: PLUMBING. HVAC: tin-the lune poolroom om is an alternate to that specified. 1. The dehumidificationunit„ p g p ELECTRICAL: 1. Any requirements by National Grid not clearly identified in the bid documents or these clarifications, are not included. A Stebbins Company P.O.Box 4430 Manchester,NH 03108 603.623.8811 Fax 603.518.2195 www.proconinc.com 2ofS PRO CON# INCORPORATED Design and Constntc&n Management PRECONSTRUCTION SERVICES ALLOWANCES: 1. Furnish, install and finish all locker room benches and lockers - $20,000 2. Furnish and install (2) scoreboards - $16,125 3. Furnish and erect the dasher board systems and netting per Becker Arena Products proposal dated 8/6/12- $153,245 4. Furnish and install a cable hoist for the melt pit- $340 5. Weight room floor finishes per the Owner - $54,426 6. Brick material -$550/1,000 7. Electric vault- $2,500 8. Weather conditions - $150,000 9. Skate tile - $36,670 10. Viewing Benches - $8,024 11. Relocate existing scoreboard- $1,500 12. Dehumidification unit in plunge pool - $34,650 EXCLUSIONS: 1. Signage (interior and exterior) 2. Security/surveillance system 3. Building permit 4. Testing 5. Utility company back{charges 6. Appliances/vending machines- 7. Furniture 8. Message boards/displays at lobby 9. Energy and property manageinent systems 10. Dasher board glass inventory I I /-Owner Contingency ` , 12.Concession area equipment, design, and installation 13. Lighting in the existing rink 14. Any existing lobby upgrades or the academic room that was once discussed 15. Additional Iice rink painting(logos) 16. Builder's Risk Insurance 17. Tel/Data systerns'(rough cable by PCI) 18. Weight room equipment' 19.Impact fees (if required) 20. Planning/con-com fees 21. Existing rink.dasher boards 22.Viewing box#5 23. All items not in the"Accepted" column in the PCI Budget Report Summary dated 6/22/12 24. State sales tax A Stebbins Company P.O.Box 4430 Manchester,NH 03108 603.623.8811 Fax 603.518.2195 www.proconinc.com 3 of 5 PR® C®N INCORPORATED Design and Constniction Management PRECONSTRUCTION SERVICES 25. Rink goal nets 26. Roof-top screening 27. Concrete Locker Bases 28. Concrete dehydration additives 29. Melt pit mist system 30. Relocation of existing tel/data wiring or systems. 31. Electronic"as-built" drawings i A Stebbins Company P.O.Box 4430 Manchester,NH 03108 603.623.8811 Fax 603.518.2195 www.proconinc.com 4of5 PRO CON# INCORPORATED Dcsign and constrnrctionmr;nageinent PRECONSTRUCTION SERVICES Merrimack College Volpe Center Addition 8/1/12 Proposed Management Staffing Field Supervision: • One full time Project Superintendent • One full time Assistant Superintendent • One full time worldng Foreman Project Management: • One full time Project Manager • One full time Assistant Project Manager F • f A Stebbins Compnn� P.O.Box 4430 Manchester,NH 03108 603.623.8811 Fax 603.518.2195 www.proconinc.com 5of5 Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑. Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DAT€-APPRO ED PLANNING & DEVELOPMENT ❑ ❑ `� �� COMMENTS. i 6� � CONSERVATION Reviewed on signature COMMENTS 4 HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals:Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Wafer& Sewer Connection/Signature& Date Driveway Permit DPW Town Engineer: Signature:. Located 384 Osgood Street FIRE DEPARTMENT -Temp Dumpster on site yes no Located at 124 Main Street Fire Department signature/date