Loading...
HomeMy WebLinkAboutBuilding Permit #77-11 - 32 PALOMINO DRIVE 7/20/2010Permit NO: BUILDING PERMIT TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Date Received µORT01 o tet, �D "6 ORATED �S.. U TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential New Building YOne family Addition K Two or more family Industrial Alteration No. of units: Commercial Others: Repair, replacement Demolition Assessory Bldg - Other e tic ' 1Nell � r µ r,.—�- Ab/Vater/Sewers ' —,- lod,o .,ershnplainatDistricts t �:-�. . ,=t WW OWNER: Name: AddrPG-q- vr-at.0mir I iurr ur, Wumn 1 u tst VMtt-URMED: Please Type or Print Clearly) a one: 3-76Zf ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE. BULDING PERMIT. $12.00 PER $1000.00 OF THE TOTAL ESTIMATED COST BASED ON $125.00 PER S Total ProjectjCost: $ l FEE: $ Check No.: 1 Receipt No.: NOTE: Persons contracting with unregistered contractors do not have acc y,s� r my fund L Plans Submitted Plans Waived Certified Plot Plan Stamped Plans TYPE OF SEWERAGE DISPOSAL 'Public Sewer Tanning/Massage/Body Art Swimming Pools Well Tobacco Sales Food Packaging/Sales Private (septic tank, etc. Permanent Dumpster on Site THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM PLANNING & DEVELOPMENT COMMENTS CONSERVATION COMMENTS HEALTH COMMENTS DATE REJECTED DATE APPROVED Reviewed on // d0 /) V w) A 16 D Reviewed on Siqnature (�J6'1 Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature & Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street _ FARE DEPARTMENT Temp.Dumpster on sife:.yes. no - Located at --124 Main Street' = Fire Departrhent signature/date - _ Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA — (For department use) Q ` C®V!5-lZt POS c �- 0 Notified for pickup - Date Doc.Building Permit Revised 2010 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ -Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered- products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ .Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc: Building Permit Revised 2008 Location 2 i' G C. D m ivt.� v .v n✓ No. _=—t�-i Date7G NORTH TOWN OF NORTH ANDOVER low Certificate of Occupancy $ Building/Frame Permit Fee $ � Foundation Permit Fee $ Other Permit Fee $ TOTAL $ Check # 23"i 4 Building Inspector • Rl W W sr_" x O w cn aAi Cl) O a C7 C Cli O w O w v G U C w a U w U a p a: G w � w w W p w y cn C "4 o H GO to O c� G w W W w m z cn Q cn 3 10 Q1 U O O i..l a 2 O W O L O O c 0 Z O.. c cs y O ' � H - L O E c 0 CDm v V 3� 0 CL.) 0 ; Qc Mcc 0 o m z o CL Ca � o o V J "O CO) E a O R co CF C..2 CL C42 c C Com. :..CD v 0 Ci H N O � o -- Mu rn :E m Clic c L ®m CL . y�m3 m y Z_m 'y c Cos O c O ie: y m. X_ aCjL m m m ycm w � C 'O U3 c c Is � m O'C m Rcm �' ♦: c O CL c_ F" ® �� y m c •c = m mr=.o N ~ s0+ y m~ m y ev = m w .y az`� c ac �E w o .3 .yuj Z O_ C.3 m p m� C F' A 40 Nip = =0CLm� 3 10 Q1 U O O i..l a 2 O W O L O O v Z O.. O � y O co cm C C H p� O E 0 CDm 3� 0 CL.) 0 CD 0 o m oma„ CL Ca o � c V J "O .FL O R CD C..2 CL C42 c C Com. CL U) W W 19 W U) M Dussault Carpentry 990JohvLsovu St North AvOover, Mit 01845 Lj!1-8�58-5114 Name /Address Maryam Yamin 32 Palomino Dr. North Andover, MA 01845 Estimate Date Estimate # 7/16/2010 69 Description Cost Total Plans & Permits 350.00 350.00 Site Work: Install new big foot footing, Strip existing deck 0.00 0.00 boards and add new deck framing beyond kitchen window. frame up shed roof to cover decking area w/ plastic trim boards and siding to match house. Roof shingles to match existing on house. Electrical & Lighting; Install 4 new recessed lights and wire 0.00 0.00 for ceiling fan (Fixtures not included) Site Work: Install new composite decking onto deck frame. 0.00 0.00 Site Work: Railings, trim and ceiling material TBD for 0.00 0.00 screened in porch Not included in this estimate. Estimate Total 10,900.00 10,900.00 Site Work: Any additional work will be billed accordingly 0.00 0.00 with Home owners consent. We look forward to working with you, any questions feel free to call Total me. Thank You, Dan Dussault Page 1 Dussault Carpentry 990Johwsow St North AKdover, MA ozg45 781-858-5134 Name /Address Maryam Yamin 32 Palomino Dr. North Andover, MA 01845 Estimate Date Estimate # 7/16/2010 69 Description Cost Total Acceptance: Your signature on this estimate and returned to us will make this a legal contract. By signing this estimate, you agree to all terms and conditions, and authorize Dussault Carpentry to do the work specified. We look forward to working with you, any questions feel free to call Total me. Thank You, Dan Dussault $11,250.00 Ue-'5V6. 04 Page 2 N08'27'53"E 71.75' PROPOSED 20'X 10' ROOFED & 50.6' ENCLOSED DECK L, EXISTING 10' X 12' -, UNROOFED DECK 9R q• 41 g0ao a o, m cp Go o, 16.2' w O O N Olt 54 M o 17.0' STEPHEN M. MELESCIUC No. 39049 ASSESSORS MAP 108.0 PARCEL 102 DEED REFERENCE BOOK 6177 PAGE 28 PLAN REFERENCE: PLAN #13761 LOT 4A 27 11813 S.F. 0.27 Ac. 30 R�3'15.0� R�vE P A`pM,Np O ZONE = VILLAGE RESIDENCE DISTRICT SETBACKS FRONT YARD= 25 FEET SIDE YARD= 15 FEET REAR YARD= 30 FEET PROPOSED ADDITION LOT 4A FOREST VIEW ESTATES MARCHIONDA & ASSOC.,L.P. NORTH ANDOVER, MA ENGINEERING AND PLANNING CONSULTANTS PREPARED FOR 62 MONTVALE AVE. SUITE I MARYAM SALEHI-ALA YAMIN STONEHAM, MA. 02180 32 PALOMINO DRIVE (781) 438-6121 NORTH ANDOVER, MASSACHUSETTS SCALE:1 "=30' DATE: 7/15/10