HomeMy WebLinkAboutBuilding Permit #379-13 - 34 EMPIRE DRIVE 11/7/2012 NORTH
BUILDING PERMIT o`
TOWN OF NORTH ANDOVER . -.
APPLICATION FOR PLAN EXAMINATION
Permit NO: Date Received
• 9SSACHUS���
Date Issued:
IM ORTANT:Applicant must complete all items on this page
?
An
PRO.PERTI 0WNf=R" ZIM
MAP:NOARCELI� ONINGDISTRICT istoric District yes n
Machin Shap V�Ilage, .yes rto
TYPE OF IMPROVEMENT PROPOSED USE
Resi ntial Non- Residential
ew Building betne family
❑ Addition El Two or more family ❑ Industrial
❑Alteration No. of units: Q Commercial
❑ Repair, replacement ❑Assessory Bldg ❑ Others:
❑ Demolition ❑ Other
❑S ptEc ❑1nTelt Floodpla�ri` I Wetlands t 7 Watersl ed`District y x
DESCRIPTION OF WORK TO BE PREFORMED:
S G4P- 64M(L� Dwel h NG -3 - C>6�DRoOm-S
oyz (34gA6r- __ MuNsCIPAL UJA�.
sn'L:2
Identification Please T e or Print Clearly)
OWNER: Name:(�i['a4_k0 �� AGe GLG Phoneg. 79-�/-3)!F6
Address• 77 SN ��— re U(f MA , 01934
CONTRACTOR larn 'lJ Phone: ,'""
1
Address
Su ernsir's Construction'L�canse Exp Date` x�� '1
P x
r
3
j
Horne ImprovemwLacenseate
ARCHITECT/ENGINEE4�_4 t E Phone:729 3S2
Address Reg. No.-�- 2-7
FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COS-rBASED ON$125.00 PER S.F.
Total Project Cost: $ FEE: $ // 7
Check No.: Receipt No.: -2��-?-2
NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund
Signature of Agent/Owner ` Signature of contractarY .
Building Department
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
❑ Building Permit Application
❑ Workers Comp Affidavit
❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses
❑ Copy of Contract -
❑ Floor Plan Or Proposed Interior Work
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition Or Decks
❑ Building Permit Application
❑ Certified Surveyed Plot Plan
❑ Workers Comp Affidavit
❑ Photo Copy of H.I.C. And C.S.L. Licenses
❑ Copy Of Contract
❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Mass check Energy Compliance Report (If Applicable)
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
New Construction (Single and Two Family)
❑ Building Permit Application
❑ Certified Proposed Plot Plan
❑ Photo of H.I.C. And C.S.L. Licenses
❑ Workers Comp Affidavit
❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Copy of Contract
❑ Mass check Energy Compliance Report
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
must be submitted with the building application
Doc:INSPECTIONAL SERVICES DEPARTMENT:BPFORM07
Revised 2.2007
1
Location-
No. ?/j-�3 Date
• ' TOWN OF NORTH ANDOVER
•- Certificate of Occupancy $
Building/Frame Permit Fee
p, Foundation Permit Fee $
"'� Other Permit Fee $
-1 cb .f
TOTAL �d
Check# oe
�� a
25922 � ilding Inspector
4
NORTH 1
ti `•`t ` • Lp
co 1
Y I
4 �a
CERTIFICATE OF USE & OCCUPANCY
TOWN OF NORTH ANDOVER
Building Permit Number 379-13 on 1 l/7/2012 Date: February 14, 2013
THIS CERTIFIES THAT
Orchard Village LLC
THE BUILDING LOCATED ON 34 Empire Drive
MAY BE OCCUPIED AS a single family home IN ACCORDANCE WITH THE
PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER
REGULATIONS AS MAY APPLY.
Certificate Issued to: Orchard Village LLQ
277 Washington Street
Groveland,MA 01834
Building Inspector
Fee: Pre Paid
Receipt: 25922
Check : 3265
o w
r io i
4 �J
�'4SACXUSE4
CERTIFICATE OF USE & OCCUPANCY
TOWN OF NORTH ANDOVER
Building Permit Number 379-13 on 11/7/2012 Date: February 14, 2013
THIS CERTIFIES THAT
Orchard Village LLC
THE BUILDING LOCATED ON 34 Empire Drive
MAY BE OCCUPIED AS a single family home IN ACCORDANCE WITH THE
PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER
REGULATIONS AS MAY APPLY.
Certificate Issued to: Orchard Village LLC
277 Washington Street
Groveland,MA 01834
Building Inspector
Fee: Pre Paid
Receipt: 25922
Check : 3265
NORTf� s
E ic ve" *
O -
No. _ _T -
o *.-.- h ver, Mass,
COCNICHl WIC" y1.
A04ATED lk 40
S U
BOARD OF HEALTH .
Food/Kitchen
Septic Syst
THIS CERTIFIES THAT ..........C.l.!.'.�!.1�.. !:` f BUILDING INSPECTOR
i ✓'� O'/ rpt=
has permission to erect .......................... buildings on ..., �Y.1.5. �c?... : ... ........... .. .. . ........ .... 6�
ou
....................................
to be occupied as .............. ..�:�?.�.�F.........�?�???.c'l.. ..................................... Chi m ey
provided that the person accepting t�iis permit shall in,94ery respect conform to the terms of the application �`'�r
mal
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and
Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR
g u�
Rouz//,v,
,/l , .��- t
VIOLATION of the Zoning or Building Regulations Voids this Permit. 1,2 /�J
Final
PERMIT EXPIRES IN 6 MONTHS ELE RICALINSPECTOR
u
UNLESS CONSTRUCTION ST R TS P g O�
Service
.... :':`:.`:` :.................... .
.......
BUILDING INSPECTOR. , 31
>B
GAS INSPECTOR
Occupancy Permit Required to Occupy Buildin Rough'
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No. x
Smoke Det. 2_5
SEE REVERSE SIDE
I .
NAndover
ov
of
0 .
No. -
L dover, Mass., lot I Lime
0 LAKE
COCMIC EWICK y1.
A0RATED P?��,�5
S V ` BOARD OF HEALTH
Food/Kitchen
PERMIT T D
BUILDING INSPECTOR
THIS CERTIFIES THAT.......... / L ................ .....................0............ , Foundation
has permission to erect...... .:.:........................... buildings o I. .. .. ... .... .�.�!. Rough
....................
-_!i1
to be occupied ate........ ....... . i .p.d6w%....... ....................4�............................. ...............................
Chimney
provided that the person accepting this permit shall in everyrespect conform to the terms of the application on file in Final
this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of
Buildings in the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
10b PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
UNLESS CONSTRUCT
TS Rough
.................... Service
BUILDING INSPECTOR
Final
Occupancy Permit Required to Occupy Building GAS INSPECTOR
Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE-DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
- Street No.
SEE REVERSE SIDE smoke Det. .
34
LAWRENCE H.OGDEN,P.E.
198 EAST MAIN STREET
978-352-8318 fax 978—352-2858
cell: 978-502-5921
December 5,2012
Mr. Robert Messina
Orchard Village LLC.
277 Washington Street
Groveland,Ma 01834
RE: THE WALLOW GB#6213
Lot 6 Empire Drive,North Andover,Ma. 01845
Dear Mr. Messina
As you requested I visited the site 12/5/12 to review the installation of the
Engineered Materials consisting of LVLs and Engineered Joist utilized in the framing
of the above project. These are shown on plans prepared by G.J. Bruno and Associates A-
1 to A-5 Dated 7/30/09 with the framing sheets certified by me 6/15/10,and sketch SK-1
dated 2/15/11.
Based on the above site visit and based on what I could visibly see i can certify
that to the best of my knowledge the LVLs members and Engineered Joist utilized in the
framing as shownon the drawings are installed properly and meet the loading conditions
of the7th Edition of the Massachusetts State Building Code for 1&2 Family Residences.
All other framing requirements of the drawings and code, including but not limited to
materials,nailing schedules,blocking,connections and other details are the responsibility
of the licensed construction supervisor responsible for the project.
Should you have any questions please do not hesitate to call.
&awlre, nce
s``t//ruly,
lY�
H. Ogden P.E. Structural 27765 N OF
LAWRENCE
H"bw
�
oca r Z.1511 L
ti 7765 p
~ 441 STF-0;
�SS��NAL ENG��
LAWRENCE H.OGDEN,P.E.
198 EAST FAIN STREET
978-352-8318 fax 978 352-2858
cell: 978-502-5921
December 5,2012
Mr.Robert Messina
Orchard Village LLC.
277 Washington Street
Grovel
and,Ma 01834
RE: THE WILLOW GB#6213
Lot 6 Empire Drive,North Andover,Ma. 01845
Dear Mr. Messina
As you requested I visited the site 12/5/12 to review the installation of the
Engineered Materials consisting of LVLs and Engineered Joist utilized in the framing
of the above project. These are shown on plans prepared by G.J. Bruno and Associates A-
I to A-5 Dated 7/30/09 with the framing sheets certified by me 6/15/10,and sketch SK-1
dated 2/15/11.
Based on the above site visit and based on what I could visibly see I can certify
that to the best of my knowledge the LVLs members and Engineered Joist utilized in the
framing as shown on the drawings are installed properly and meet the loading conditions
of the7th Edition of the Massachusetts State Building Code for 1&2 Family Residences.
All other framing requirements of the drawings and code,including but not limited to
materials,nailing schedules,blocking,connections and other details are the responsibility
of the licensed construction supervisor responsible for the project.
Should you have any questions please do not hesitate to call.
Yo s truly,
IY�/
awrencYe H. Ogden P.E. Structural 27765 ��p�t0 or ua
�c�wR
HAROLD
y 17-1511 L
17765 p
�Sr�OVAI ENG��
NORTH
�0��•tLEO r6 6~O .
OL
APPLICATION FOR CERTIFICATE OF OCCUPANCYANSPECTION
�4AORA 01 �y* BUILDING PERMIT #
�SSAC Ht15��
ADDRESS/LOCATION OF PROPERTY:-*3 7 Em Pl P iop r U E' K4e-- *�J
Map A97C Parcel Z Lot Number
SUBDIVISION: 0/ec#igAD (A L L/ICE:
DATE REQUESTED FILED/READY FOR INSPECTION: 2-/ -
CLOSING DATE ON PROPERTY: -z)x 113
FIVE (5) DAYS NOTICE PRIOR TO CLOSING DATE IS REOUIRED
ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A
REINSPECTION FEE OF TWENTY DOLLARS ($20.00) WILL BE CHARGED IF THE STRUCTURE
DOES NOT MEET ALL APPLICABLE CODES.
APPLICANT SIGNATURE
Permit Issued to: a e!/,gP_0 O i L L A G c �L
Address ASVI IUN Ske--_� G&LG4alio m A-
ROUTING
TOWN ENGINEER, SITE PLA — E-WAY REVIEW
CONSERVATION
PLANNING /
DPW-WATER METER ql,3 3
SEWER CONNECTION LI
DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO
SUBMITTAL OF THE OCCUPANCY/INSPECTION REQUEST
DPW
SIGgAftfRE
File:Application for OC form revised Jan 2007/2011
Enter construction cost for fee cal- North Andover Fee Calculation
Construction Cost
$ 268,125.00 m
$ - $ 3,217.50
Plumbing Fee $ 402.19
Gas Fee 100 comm. $ 100.00
Electrical Fee $ 402.19
Total fees collected $ 4,121.88
34 Empire Drive
379-13 on 11/7/12
Single Family Home
OR
r -I
NT1�
_ _ ve" 'o
�A'
No. . D
o LAK, h ver, Mass,
c oc Nic Hl w�[w �1'
�•9 q°R�rEn �P�,��(5
S U
BOARD OF HEALTH
PERMIT T LD Food/Kitchen
Septic System
THIS CERTIFIES THAT ..........C..�.//��!.'.l-%`''..4:1_1a BUILDING INSPECTOR
... .y .......................................................................
G f �,���r Foundation
haspermission to erect .......................... buildings on ..., �`..�,:=.. .. /l .......................
Rough
tobe occupied as .............. c'1.......................................................................... Chimney
provided that the person accepting this permit shall inry respect conform to the terms of the application Final
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and
Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
UNLESS CONSTRUCTION ST TS Rough
Service
................ .... r ..........r':`.............................. Final
BUILDING INSPECTOR
GAS INSPECTOR
Occupancy permit Required to Occupy Building Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
Smoke Det.
IF SEE REVERSE SIDE
O _
660• _ _ - - - - - - - - - - - -
- - - - EASEMENT 117.1
64'
If -
v
-�-- - -
EXIST. FND.
TOF=263.2' I LOT 6
� I
� I
� I
I
14' I EASEMENT
I
I
�Nj N OF A,tq I
S
2� MICHAEL
J. N �S
SERGI 1
V
No.33191
Q�OFESSloNPy
P
��SURV 0 O
FOUNDATION LOCA TION THIS DRAWING SHALL NOTBE USED BYTHECLIENTFORANY
PURPOSE OTHER THAN THAT OUTLINED ABOVE,EXCEPT WITH
THE WRITTEN PERMISSION OF CHRISTIANSEN&SERGI INC.
CLIENT. ORCHARD VILLAGE, LLC FURTHERMORE THIS DRAWING IS THE COPYRIGHTED PROPERTY
OF CHRISTIANSEN&SERGI INC.AND ANY UNAUTHORIZED USE IS
THIS CERTIFICATION IS MADE AND LIMITED TO THEABOVE CLIENT PROHIBITED.CHRISTIANSEN&SERGI TAKES NO RESPONSIBILITY
FOR THE UNAUTHORIZED USE OF THIS DRAWING OR ANY
LOCATION:34 EMPIRE DR. NOR THANDOVER,MA. INFORMATION CONTAINED HEREON
.
DATE-5/1/12 SCALE)"=30' BASED ON SCALED DATA ONLY THEPRIMARYSTRUCTURE
SHOWN IS NOT LOCATED IN A FLOOD HAZARD ZONE AS SHOWN
ON FEMA FLOOD INSURANCE RATE MAP.COMMUN/TY NO.:250098
0008C DATEBl2/1MZONE X
PROFESSIONAL ENGINEERS& LAND SURVEYORS
CHRIS T/ANSEN & SERGI INC.
160 SUMMER STREET, HAVERHILL, MASSACHUSETTS 01830
WWW.CSI-ENGR.COM TEL. 978-373-0310 FAX 978-372-3960
D WG.NO.:06029.001.047
i
The Commonwealth of Massachusetts
Department of Industrial Accidents
Office of Investigations
UT. 600 Washington Street
Boston,MA 02111
www.mass.gov/dia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information i Please Print Legibly
Name (Business/Organization/Individual): OPC14 l utg �� L L A� L Z_C�
Address-,q:-777"» 1 Cto /2C��'
City/State/ZipQ V&� ���j Phone#: q�r -���� —, � Q A
1�
Are you an employer?Check the appropriate box: Type of project(required):
1. ElI am a employer with ,.r 4. ❑ I am a general contractor and I
6. New construction
`o mployees(full and/or part-time).* have hired the sub-contractors
2. I am a sole proprietor or partner- listed on the attached sheet. t 7. ❑Remodeling
ship and have no employees These sub-contractors have 8. ❑Demolition
working for me in any capacity. workers' comp. insurance. 9. ❑Building addition
[No workers' comp.insurance 5. ❑ We are a corporation and its
required.] officers have exercised their 10.❑Electrical repairs or additions
3.❑ I am a homeowner doing all work right of exemption per MGL 11.❑Plumbing repairs or additions
myself. [No workers' comp. c. 152, §1(4),and we have no 12.❑Roof repairs
insurance required.] t employees. [No workers' 13.0 Other
comp.insurance required.]
*Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information.
t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
#Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name:
Policy#or Self-ins.Lic.#: Expiration Date:
Job Site Address: City/State/Zip:
Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereby cern y under the pains and penalties of perjury that the information provided above is true and correct.
Sian ree,: rdoj Date: 7
/I y -1
Phone#: % 7�����"31 q6
Official use only. Do not write in this area,to be completed by city or town official.
City or Town: Permit/License#
issuing Authority(circle one):
1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector
6.Other
iI r,
�� Contact Person: 7,` Phone#: _
I
N(IREScheck Software Version 4.4.3
Compliance Certificate
Project Title: Orchard Village
Energy Code: 2009 IECC
Location: North Andover,Massachusetts
Construction Type: Single Family
Building Orientation: Bldg.orientation unspecified
Glazing Area Percentage: 7%
Heating Degree Days: 6322
Climate Zone: 5
Construction Site: Owner/Agent: Designer/Contractor:
lot 6#34 Empire Drive Robert Messina
N.Andover,MA 01845 Messina Development Co.Inc.
Compliance:
Compliance:13.5%Better Than Code Maximum UA:297 Your UA:257
The%Better or Worse Than Code index reflects how close to compliance the house is based on code trade-oft rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Gross •
Assemblyor or D••
Perimeter •
Ceiling 1:Flat Ceiling or Scissor Truss 1258 0.0 38.0 31
Wall 1:Wood Frame,16"o.c. 2115 0.0 21.0 74
Orientation:Unspecified
Window 1:Vinyl Frame:Double Pane with Low-E 140 0.350 49
SHGC:0.00
Orientation:Unspecified
Door 1:Solid 79 0.350 28
Orientation:Unspecified
Basement Wall 1:Solid Concrete or Masonry 1258 0.0 30.0 75
Orientation:Unspecified
Wall height:8.0'
Depth below grade:7.0'
Insulation depth:4.0'
Compliance Statement. The proposed building design described here is consistent with the building plans,specifications,and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in
REScheck Version 4.4.3 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Name-Title Signature Date
Project Title: Orchard Village Report date: 11/07/12
Data filename: C:\MASCHECK\Willowlot6.rck Page 1 of 4
CREScheck Software Version 4.4.3
NJ/ Inspection Checklist
Energy Code: 2009 IECC
Location: North Andover,Massachusetts
Construction Type: Single Family
Building Orientation: Bldg.orientation unspecified
Glazing Area Percentage: 7%
Heating Degree Days: 6322
Climate Zone: 5
Ceilings:
❑ Ceiling 1: Flat Ceiling or Scissor Truss,R-38.0 continuous insulation
Comments:
Above-Grade Walls:
❑ Wall 1:Wood Frame, 16"o.c.,R-21.0 continuous insulation
Comments:
Basement Walls:
❑ Basement Wall 1:Solid Concrete or Masonry,8.0'ht/7.0'bg/4.0'insul,R-30.0 continuous insulation
Comments:
Windows:
❑ Window 1:Vinyl Frame:Double Pane with Low-E,U-factor:0.350
For windows without labeled U-factors,describe features:
#Panes Frame Type Thermal Break? Yes No
Comments:
Doors:
❑ Door 1:Solid,U-factor:0.350
Comments:
Air Leakage:
❑ Joints(including rim joist junctions),attic access openings,penetrations,and all other such openings in the building envelope that are
sources of air leakage are sealed'with caulk,gasketed,weatherstripped or otherwise sealed with an air barrier material,suitable film or
solid material.
❑ Air barrier and sealing exists on common walls between dwelling units,on exterior walls behind tubs/showers,and in openings between
window/doorjambs and framing.
❑ Recessed lights in the building thermal envelope are 1)type IC rated and ASTM E283 labeled and 2)sealed with a gasket or caulk
between the housing and the interior wall or ceiling covering.
❑ Access doors separating conditioned from unconditioned space are weather-stripped and insulated(without insulation compression or
damage)to at least the level of insulation on the surrounding surfaces.Where loose fill insulation exists,a baffle or retainer is installed
to maintain insulation application.
❑ Wood-burning fireplaces have gasketed doors and outdoor combustion air.
❑ Automatic or gravity dampers are installed on all outdoor air intakes and exhausts.
Air Sealing and Insulation:
❑ Building envelope air tightness and insulation installation complies by either 1)a post rough-in blower door test result of less than 7
ACH at 50 pascals OR 2)the following items have been satisfied:
(a)Air barriers and thermal barrier:Installed on outside of air-permeable insulation and breaks or joints in the air barrier are filled or
repaired.
(b)Ceiling/attic:Air barrier in any dropped ceiling/soffit is substantially aligned with insulation and any gaps are sealed.
(c)Above-grade walls: Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier.
Project Title: Orchard Village Report date: 11/07/12
Data filename: C:\MASCHECK\Willowlot6.rck Page 2 of 4
(d)Floors:Air barrier is installed at any exposed edge of insulation.
(e)Plumbing and wiring:Insulation is placed between outside and pipes.Batt insulation is cut to fit around wiring and plumbing,or
sprayed/blown insulation extends behind piping and wiring.
M Comers,headers,narrow framing cavities,and rim joists are insulated.
(9)Shower/tub on exterior wall:Insulation exists between showers/tubs and exterior wall.
Sunrooms:
Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum
skylight U-factor of 0.75.New windows and doors separating the sunroom from conditioned space meet the building thermal envelope
requirements.
Materials Identification and Installation:
Lj Materials and equipment are installed in accordance with the manufacturer's installation instructions.
❑ Materials and equipment are identified so that compliance can be determined.
Li Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided.
F-1 Insulation R-values and glazing U-factors are clearly marked on the building plans or specifications.
Duct Insulation:
r-1 Supply ducts in attics are insulated to a minimum of R-8.All other ducts in unconditioned spaces or outside the building envelope are
insulated to at least R-6.
Duct Construction and Testing:
❑ Building framing cavities are not used as supply ducts.
Lj All joints and seams of air ducts,air handlers,filter boxes,and building cavities used as return ducts are substantially airtight by means
of tapes,mastics,liquid sealants,gasketing or other approved closure systems.Tapes,mastics,and fasteners are rated UL 181 A or
UL 181 B and are labeled according to the duct construction.Metal duct connections with equipment and/or fittings are mechanically
fastened.Crimp joints for round metal ducts have a contact la of at least 1 1/2 inches and are fastened with a minimum of three
1 P
equally spaced sheet-metal screws.
Exceptions:
Joint and seams covered with spray polyurethane foam.
Where a partially inaccessible duct connection exists,mechanical fasteners can be equally spaced on the exposed portion of the
joint so as to prevent a hinge effect.
Continuously welded and locking-type longitudinal joints and seams on ducts operating at less than 2 in.w.g.(500 Pa).
❑ Duct tightness test has been performed and meets one of the following test criteria:
(1)Postconstruction leakage to outdoors test:Less than or equal to 100.6 cfm(8 cfm per 100 ft2 of conditioned floor area).
(2)Postconstruction total leakage test(including air handler enclosure):Less than or equal to 151.0 cfm(12 cfm per 100 ft2 of
conditioned floor area).
i
(3)Rough-in total leakage test with air handler installed:Less than or equal to 75.5 cfm(6 cfm per 100 ft2 of conditioned floor area).
(4)Rough-in total leakage test without air handler installed:Less than or equal to 50.3 cfm(4 cfm per 100 ft2 of conditioned floor area).
Temperature Controls:
Cj Where the primary heating system is a forced air-fumace,at least one programmable thermostat is installed to control the primary
heating system and has set-points initialized at 70 degree F for the heating cycle and 78 degree F for the cooling cycle.
0 Heat pumps having supplementary electric-resistance heat have controls that prevent supplemental heat operation when the
compressor can meet the heating load.
Heating and Cooling Equipment Sizing:
F-1 Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code.
FI For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial
Building Mechanical and/or Service Water Heating(Sections 503 and 504).
Circulating Service Hot Water Systems:
F1 Circulating service hot water pipes are insulated to R-2.
Lj Circulating service hot water systems include an automatic or accessible manual switch to tum off the circulating pump when the
system is not in use.
Heating and Cooling Piping Insulation:
Lj HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-3.
Swimming Pools:
Project Title: Orchard Village Report date: 11/07/12
Data filename: C:\MASCHECK\Willowlot6.rck Page 3 of 4
F1 Heated swimming pools have an on/off heater switch.
L3 Pool heaters operating on natural gas or LPG have an electronic pilot light.
F1 Timer switches on pool heaters and pumps are present.
Exceptions:
Where public health standards require continuous pump operation.
Where pumps operate within solar-and/or waste-heat-recovery systems.
Heated swimming pools have a cover on or at the water surface.For pools heated over 90 degrees F(32 degrees C)the cover has a
minimum insulation value of R-12.
Exceptions:
Covers are not required when 60%of the heating energy is from site-recovered energy or solar energy source.
Lighting Requirements:
❑ A minimum of 50 percent of the lamps in permanently installed lighting fixtures can be categorized as one of the following:
(a)Compact fluorescent
(b)T-8 or smaller diameter linear fluorescent
(c)40 lumens per watt for lamp wattage<=15
(d)50 lumens per watt for lamp wattage>15 and<=40
(e)60 lumens per watt for lamp wattage>40
Other Requirements:
o Snow-and ice-melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting
off the system when a)the pavement temperature is above 50 degrees F,b)no precipitation is falling,and c)the outdoor temperature is
above 40 degrees F(a manual shutoff control is also permitted to satisfy requirement'c').
Certificate:
F-1 A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values;window
U-factors;type and efficiency of space-conditioning and water heating equipment.The certificate does not cover or obstruct the visibility
of the circuit directory label,service disconnect label or other required labels.
NOTES TO FIELD:(Building Department Use Only)
Project Title: Orchard Village Report date: 11/07/12
Data filename: C:\MASCHECK\Willowlot6.rck Page 4 of 4
2009 IECC Energy
LVJ Efficiency Certificate
Insulation Rating R-Value
Ceiling/Roof 38.00
Wall 21.00
Floor/Foundation 30.00
Ductwork(unconditioned spaces):
Glass&Door Rating U-Factor SHGC
Window 0.35
Door 0.35 NA
Heating Cooling
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments: