Loading...
HomeMy WebLinkAboutBuilding Permit #444-13 - 373 SALEM STREET 12/4/2012 TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO: `7 3 Date Received Date Issued: 2 �7°/11�1 IMPORTANT:Applicant must complete all items on this page .LOCATION) — Prmt_i i FROPERTY�OWNER� Prmtr 10mYearyOldlSt ur cture yes; MAPhNOy PARCEL ZONINGDIS'TRICT - HistoncrDistnct" yes } _ - MachinejShopVillage yes) TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building X One family WAddition ❑Two or more family ❑ Industrial ❑Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other S.e;gtie1 .OcWe,ll ❑ Floodplani ❑1%;Vetlands WatershediDisfnct DESCRIPTION OF WORK TO BE PERFORMED: Identification Please Type or Print Clearly) OWNER: Name:71�cwNA5 ��s,4-� &�� `h�- Phone: Address: ? C.QNTRACT®Rb Name: - �.% -- r_ -- _ .- -_. ._ - ,Add`r,`ess 3 KI _ems§ - � T � l CSC�t�S�c7 .a Slu -is sConstrucfion L'Icense n_.._ W Expo Date 3- �3 ly I;lome,lmp�rovement L►Icense Y Date i�f Owe- .t.� ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE:BULDING PERMIT.$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ s/�herlc'� FEE: $ /1?0' Check No.: /7 Receipt No.: 2,6007 NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund �SignatureofAgent/Owrie ignature of contractor;+ . L - Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ i Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑ i THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMMENTS CONSERVATION Reviewed on t I a Signature COMMENTS `U 6'1 j (3 ri P2 n.K 0� . HEALTH Reviewed on d - I Signature t COMMENTS. w, Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature& Date Driveway Permit DPW Town]Engineer: Signature: Located 384 Os ood Street FIRE DEPARTMENT = Temp Durnpster on site yes no Located aH4 Main Street. Fire ®epai#MenVsignature/date .. .COMMENTS Ii I Dimension s Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.. II ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No � MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— (For department use NO suru i El Notified for pickup - Date Doc.Building Permit Revised 2010 I Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits o Building Permit Application ❑ Workers Comp Affidavit . o Photo Copy Of H.I.C. And/Or C.S.L. Licenses o Copy of Contract o Floor Plan Or Proposed Interior Work o Engineering Affidavits for Engineered products (VOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks Li Building Permit Application Li Certified Surveyed Plot Plan Li Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses o Copy Of Contract o Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) o Mass check Energy Compliance Report (If Applicable) 1 ❑ Engineering Affidavits for Engineered products i NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) o Building Permit Application Li Certified Proposed Plot Plan o Photo of H.I.C. And C.S.L. Licenses o Workers Comp Affidavit o Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract o Mass check Energy Compliance Report o Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off.from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc: Doc.Building Permit Revised 2012 i I C I Location No. Date \ � � \ TOWN OF NORTH ANDOVER \ \ � ? - w Certificate of Occupancy $ / Building/Frame Permit Fee $ /6— � \ � 2 �d FunalonPermit Fee $ 3 Other Permit Fee $ 2 , a . e TOTAL $ Check» 7-3�F 26007 �/BdUnlmpd7 \ , \ Enter construction cost for fee cal- North Andover Fee Calculation Construction Cost $ i ,�JJOOO.©0 m $ - $ 180.00 Plumbing Fee $ 22.50 Gas Fee 100 comm. $ 1100:00 Electrical Fee $ 22.50 Total fees collected $ 325.00 373 Salem Street 444-13 on 12/4/2012 10x12 Addition, Bathroom, at rear i of house NORT11 Town of z 1, 6Andover 0 No. h ver, Mass, COC NIC Nl WICM �� ATED I.rP�,�y s U BOARD OF HEALTH PERMIT T LD Food/Kitchen Septic System THIS CERTIFIES THAT ........�_deq....�a C!::.:? Fa. ... ........ BUILDING INSPECTOR has permission to erect buildingso Foundation Rough to be occupied as .............L. .... ..1... ..... .x ": J �l. ............................. Chimney provided that the person accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTION STARTS Rough % Service, ............... ..... Gy i . ... ,. Final ELM G INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. IE SEE REVERSE SIDE 9 Massachusetts -Department of Public Safety i- Board of Building Regulations and Standards Cmva tructiml super%isu License- CS-065674 WILLIAM J FERRIS , 28 BACK RIVERA D AMESBIJRY MA'01913 c-� xPiravon 03/2312014 Commissioner /M as MN 40 I Ag 60,cf- T Q 9 c� v St �������"• � ���I�JL/G.L LG s HOF s N L S .� l . 13972 � ��p y Awoo Slaws ava Aw low i✓rdv.► ex�sfinq.c�w�Grs�i<�s, Qnd-/., :, Fss%o Q SHO SUR `�e� Qr irmvs a/ic�y eslbf/�s.Sea! 1`�z'� �Z)�f i 2 r �r dnrisiav� o�cxisttin9 k/ _ w*}/S p!C 9fiPstrn. s p✓v� can�vrrris �v hi.ru DATE(MM/DD/YYYY) .aLc v® CERTIFICATE OF LIABILITY INSURANCE 9/6/2012 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: M P Roberts Insurance Agency IncPHONE g78-683-8073 FAx 1060 Osgood Street E C�No Ext: (FA/XIL , ):978-683-3147 North Andover Ma 01845 ADDREss:paula@mprobertsinsurance.com INSURER(S) AFFORDING COVERAGE NAIC# INSURER A:MERCHANTS INSURANCE GROUP INSURED BACKRIVER DEVELOPMENT, LLC. INSURER B:MERCHANTS INSURANCE GROUP INSURER C: 231 NORTH END BLVD INSURER D:CHARTIS INSURANCE SALISBURY, MA 01952 INSURER E (978)804-9383 INSURERF: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUER POLICY EFF POLICY EXP LTR TYPE OF INSURANCE INSR WVD POLICY NUMBER MWDD/YYYY MM/DD/YYYY LIMITS GENERAL LIABILITY EACH OCCURRENCE $$1,000,000 X COMMERCIAL GENERAL LIABILITY PREMISES Ea occurrence $ $100,000 CLAIMS-MADE CI OCCUR MED EXP(Any one person) $ $5,000 A X PRIMARY S NONCONTRIBUTORYY BOPI056701 04/28/12 04/28/13 PERSONAL BADV INJURY $$1f000,000 GENERAL AGGREGATE s$2,000,000 GE N'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OPAGG $$2,000,000 F;rPOLICY X PRO jECT F-1 LOC $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT Ea accident $ 1f000,000 ANYAUTO 04/28/12 04/28/13 BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BOPI056701 B AUTOS AUTOS BODILY INJURY(Per accident) $ X HIRED AUTOS X NON-OWNED PROPERTY DAMAGE $ AUTOS Per accident $ UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION$ $ WORKERS COMPENSATIONX WCSTATU- OTH- AND EMPLOYERS'LIABILITY Y/N TORY LIMITS ER ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ 500,000 D OFFICER/MEMBER EXCLUDED? ❑ NIA 08/15/12 08/15/13 (Mandatory in NH) WC 051-757-101 E.L.DISEASE-EA EMPLOYEE$ 500,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 500,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required) JOB: TOM ABERNACHY 373 SALEM ST NORTH ANDOVER MA CERTIFICATE HOLDER CANCELLATION TOWN OF NORTH ANDOVER SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 1600 OSGOOD STREET THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN NORTH ANDOVER MA 01845 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD25(2010/05) The ACORD name and logo are registered marks of ACORD REScheck Software Version 4.4.3 Compliance Certificate Project Title: ADDITION-ABERNATHY RESIDENCE Energy Code: 2012 IECC Location: North Andover,Massachusetts Construction Type: Single Family Project Type: Addition/Alteration Heating Degree Days: 6322 Climate Zone: $ Construction Site: Owner/Agent: Designer/Contractor: 383 SALEM ST BUILT TO LAST NORTH ANDOVER,MA • Compliance:1.4%Better Than Code Maximum UA:71 Your UA:70 The%Better or Worse Than Code index reflects how close to compliance the house is based on code tradeoff rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. am 'UiiCs1.4S:/I Wall 1:Wood Frame,16"o.c. 284 21.0 0.0 16 Window 1:Wood Frame:Double Pane with Low-E 11 0.300 3 Ceiling 1:Flat Ceiling or Scissor Truss 114 38.0 0.0 3 Floor 1:Slab-On-Grade:Unheated 62 10.8 48 Insulation depth:2.0' Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2012 IECC requirements in REScheck Version 4.4.3 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title Signature Date Project Title:ADDITION-ABERNATHY RESIDENCE Report date: 10/31/12 Data filename:C:\Users\Steve\Documents\REScheck\BUILT TO LAST.rck Page 1 of 5 r4REScheck Software Version 4.4.3 Inspection Checklist Energy Code: 2012 IECC Location: North Andover,Massachusetts Construction Type: Single Family Project Type: Addition/Alteration Heating Degree Days: 6322 Climate Zone: 5 Ceilings: ❑ Ceiling 1:Flat Ceiling or Scissor Truss,R-38.0 cavity insulation Comments: Where air permeable insulafion exists in vented attics,a baffle(of solid material)is installed adjacent to soffit and eave vents.Baffles maintain an opening equal or greater than the size of the vent.The baffle extends over the top of the attic insulation. Above-Grade Walls: ❑ Wall 1:Wood Frame,16"o.c.,R-21.0 cavity insulation Comments: Windows: ❑ Window 1:Wood Frame:Double Pane with Low-E,U-factor:0.300 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes—No Comments: Floors: ❑ Floor 1:Slab-On-Grade:Unheated,2.0'insulation depth,R-10.8 continuous insulation Comments: Slab insulation extends down from the top of the slab to at least 2.0 ft.OR down to at least the bottom of the slab then horizontally for a total distance of 2.0 ft. Air Leakage: ❑ Building envelope air tightness complies by a post rough-in blower door test result of less than 3 ACH at 50 pascals. ❑ Automatic or gravity dampers are installed on all outdoor air intakes and exhausts. ❑ Wood-buming fireplaces shall have tight-fitting flue dampers and outdoor combustion air. Air Barrier,Sealing,and Insulation Installation Criteria: ❑ A continuous air barrier is installed in the building envelope including rim joists and exposed edges of insulation.Breaks or joints in the air barrier are sealed.Air permeable insulation is not used as a sealing material. ❑ Junction of foundation and wall sill plates,wall top plate and top of wall,sill plate and rim-band,and rim band and subfloor are sealed. Corners,headers,and rim joists making up the thermal envelope are insulated. ❑ Insulation in floors(including above garage and cantilevered floors)is installed to maintain permanent contact with underside of subfloor decking.Exterior insulation for framed walls is in substantial contact and continuous alignment with the air barrier.Crawl space wall insulation installed in lieu of floor insulation is permanently attached to crawlspace walls.Inspection of log walls is in accordance with the provisions of ICC-400. ❑ Spaces between fenestration jambs and framing and skylights and framing are sealed.Batts in narrow cavities are cut to fit;or narrow cavities are filled with insulation that readily fills the available cavity space. ❑ Exposed earth in unvented crawl spaces is covered with Class I vapor retarder with overlapping joints taped. ❑ Air sealing is installed between the garage and conditioned spaces. ❑ Exterior walls adjacent to showers and tubs are insulated and have air barrier separating the wall from the shower and tubs. ❑ Access openings,drop down stairs or knee wall doors to unconditioned attic spaces are insulated and sealed. ❑ Recessed light fixtures installed in the building thermal envelope are IC rated,airtight labeled at air leakage rate—2.0 cfm,and sealed to the drywall with gasket or caulk. ❑ Duct shafts,utility penetrations,and flue shafts opening to exterior or unconditioned space are air sealed. Project Title:ADDITION-ABERNATHY RESIDENCE Report date: 10/31/12 Data filename:C:\Users\Steve\Documents\REScheck\BUILT TO LAST.rck Page 2 of 5 Plumbing and Wiring:Insulation is placed between the exterior of the wall assembly and pipes.Batt insulation is cut and fitted around wiring and plumbing,or for insulation that on installation readily conforms to available space such insulation shall fill all space between wall and piping/wiring. Air barrier extends behind electrical or communication boxes or,air sealed type boxes are installed. HVAC register boots that penetrate building thermal envelope are sealed to subfloor or drywall. Fireplace walls have air barrier and closure doors are gasketed. Sunrooms: Sunrooms that are NOT thermally isolated from the building envelope meet the requirements applicable to the building envelope. Materials Identification and Installation: Materials and equipment are installed in accordance with the manufacturer's installation instructions. Materials and equipment are identified so that compliance can be determined. Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. Insulation R-values and glazing LI-factors are clearly marked on the building plans or specifications. Duct Insulation: Supply ducts in attics are insulated to a minimum of R-8.All other ducts in unconditioned spaces or outside the building envelope are insulated to at least R-6. Duct Construction and Testing: Building framing cavities are not used as ducts or plenums. All joints and seams of air ducts,air handlers,and filter boxes are substantially airtight by means of tapes,mastics,liquid sealants, gasketing or other approved closure systems.Tapes,mastics,and fasteners are rated UL 181A or UL 181 B and are labeled according to the duct construction.Metal duct connections with equipment and/or fittings are mechanically fastened.Crimp joints for round metal ducts have a contact lap of at least 1 1/2 inches and are fastened with a minimum of three equally spaced sheet-metal screws. Exceptions: Joint and seams covered with air-impermeable spray foam. Where a partially inaccessible duct connection exists,mechanical fasteners can be equally spaced on the exposed portion of the joint so as to prevent a hinge effect. Continuously welded and locking-type longitudinal joints and seams on ducts operating at less than 2 in.w.g.(500 Pa). Air handlers have a manufacturer's designation of air leakage of no more than 2 percent of design flow rate. Duct tightness test has been performed and meets one of the following test criteria: (1)Postconstruction total leakage test(including air handler enclosure):Less than or equal to 4 cfm per 100 ft2 of conditioned floor area. (2)Rough-in total leakage test with air handler installed:Less than or equal to 4 cfm per 100 ft2 of conditioned floor area. (3)Rough-in total leakage test without air handler installed:Less than or equal to 3 cfm per 100 ft2 of conditioned floor area. Temperature Controls: !] Where the primary heating system is a forced air-fumace,at least one programmable thermostat is installed to control the primary heating system and has set-points initialized at 70 degree F for the heating cycle and 78 degree F for the cooling cycle. Heat pumps having supplementary electric-resistance heat have controls that prevent supplemental heat operation when the compressor can meet the heating load. Heating and Cooling Equipment Sizing: Equipment is sized in accordance with ACCA Manual S based on building loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies. For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2012 IECC Commercial Building Mechanical and/or Service Water Heating(Sections C403 and C404). Circulating Service Hot Water Systems: Lj Systems include an automatic or accessible manual switch to tum off the circulating pump when the system is not in use. Pipes are insulated to R-3 when any one of the following apply: (a)piping serves more than one dwelling unit, (b)piping between water heater and kitchen or water heater and distribution manifold, (c)piping outside conditioned space,buried,or located under a floor slab, (d)supply and return piping in recirculation systems other than demand recirculation systems, (e)piping is>3/4 inch nominal diameter, (f) piping runs>30 feet having 3/8 inch max diameter, Project Title:ADDITION-ABERNATHY RESIDENCE Report date: 10/31/12 Data filename:C:\Users\Steve\Documents\REScheck\BUILT TO LAST.rck Page 3 of 5 (9)piping runs>20 feet having 1/2 inch max diameter, (h)piping runs>10 feet having 3/4 inch max diameter, (i) piping runs>5 feet having max diameter within the run>3/4 inch. Heating and Cooling Piping Insulation: HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-3. HVAC piping insulation exposed to outdoor elements is protected from damage and shielded from solar radiation. Ventilation: Ventilation fans satisfy the following efficacy criteria: (1)Range hoods and in-line fan:2.8 cfm/watt. (2)Bath-/utility room with rated cfm>=10>and<90:1.4 cfm/watt. (3)Bath-/utility room with rated minimum cfm—90:2.8 cfm/watt. Swimming Pools and In-ground Spas: Heaters have an readily accessible on-off switch. F1 Heaters operating on natural gas or LPG have an electronic pilot light. Schedule-capable automatic on-off timer switches are installed on heaters and pumps. Exceptions: Where public health standards require continuous pump operation. Where pumps operate within solar-and/or waste-heat-recovery systems. ❑ Heated pools and spas have a vapor retardant cover. Exceptions: Covers are not required when 70%of the heating energy is from site-recovered energy or solar energy source. Lighting Requirements: Within permanently installed fixtures,75 percent contain only lamps that can be categorized as one of the following.Or,a minimum of 75 percent of all lamps within permanent fixtures can be categorized as one of the following: (a)Compact fluorescent (b)T-8 or smaller diameter linear fluorescent (c)40 lumens per watt for lamp wattage<=15 (d)50 lumens per watt for lamp wattage>15 and<=40 (e)60 lumens per watt for lamp wattage>40 Exceptions: Low voltage lighting systems. LI Fuel gas lighting systems have electronic pilot lights. Other Requirements: Snow-and ice-melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting off the system when a)the pavement temperature is above 50 degrees F,b)no precipitation is falling,and c)the outdoor temperature is above 40 degrees F(a manual shutoff control is also permitted to satisfy requirement'c'). Certificate: ❑ A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values;window U-factors;type and efficiency of space-conditioning and water heating equipment;and results from any required duct system and building envelope air leakage testing.The certificate#does not cover or obstruct the visibility of the circuit directory label,service disconnect label or other required labels. NOTES TO FIELD:(Building Department Use Only) Project Title:ADDITION-ABERNATHY RESIDENCE Report date: 10/31/12 Data filename:C:\Users\Steve\Documents\REScheck\BUILT TO LAST.rck Page 4 of 5 2012 IECC [energy [efficiency certificate Fw—im—mwmw mean Ceiling I Roof 38.00 Wall 21.00 Floor/Foundation 10.80 Ductwork(unconditioned spaces): {� •. MOM? am Window 0.30 Door Heating System: Cooling System: Water Heater: Building Air Leakage Test Results Name of Air Leakage Tester Duct Tightness Test Results Name of Duct Tester Name: Date: Comments: , PROJECTED TIME SCHEDULE The following is an estimated time schedule for informational purposes only. This schedule may be adjusted as needed to address unforeseen circumstances, including but not limited to hidden obstacles,bad weather, sub-contractor scheduling conflicts,etc. It is our goal to complete the work in a timely fashion. Week 1 Demolition, layout,excavation, and foundation Week 2 Framing, siding,roofing of addition Week 3 Rough plumbing electrical,and inspections Week 4 Insulation/inspection Week 5 Blue board and plaster Week 6 Painting and flooring Terms and Conditions 1. Contractor agrees to furnish all necessary labor, materials, tools and equipment to complete the work outlined in the scope of services. 2. Contract is labor and specified materials only. Homeowner is responsible for any and all materials necessary to complete scope of services. 3. Contractor shall provide copies of a valid builder's license and proof of liability and workers' compensation insurance prior to commencement of any work. 4. Contractor agrees to complete the Scope of Services in a timely, professional manner in accordance with the specifications set forth by the architect and engineers, and in compliance with state and local building regulations. 5. Contractor agrees to clean all debris from construction only and to keep job site in a clean and workable condition at all times 6. Homeowner shall be responsible for any costs occurring from engineering or architectural plans and site work and any costs incurred from permitting, zoning board of appeals, planning or DEP. 7. Any costs incurred from hazardous materials found during construction are the responsibility of the homeowner 8. Homeowner is responsible for contacting utility companies for disconnect and new hook ups, cable,telephone,gas and electric and any costs that results from these services. 9. Manufacturers' warranties will be turned over to the homeowner and become the homeowner's responsibility to file and pursue any defects or problems that may occur. 10. Any materials, products, or labor not specifically mentioned in scope of services is not covered under contract and will be paid for out of allowance fund or billed to homeowner 11. Homeowner is responsible for any price increase in materials prior to signing of contract 1.2. Homeowner (not lender) is ultimately responsible for payment upon completion of services and receipt of invoices r. Back River Development 231 North End Boulevard Salisbury, MA 01952 (978) 852-3733 William J. Ferris, Contractor CONTRACT To: Tom Abernathy Date: November 1, 2012 Re: Renovations of Residence 373 Salem St.N. Andover, MA Scope of services Back River Development will be responsible for the following: - Foundation o A 10' xl2'frost wall and slab will be poured on rear of existing house - Framing o Construction of 120 square foot master bathroom on rear of residence 0 2x6 exterior wall framing, 2x8 ceiling and roof framing, I/2" OSB plywood on walls, '/2"CDX plywood on roof exterior o New opening between bedroom and bathroom - Windows and doors o 2 TW2846 Harvey Vicon double hung windows - Siding and Roofing o All to match existing - Electrical o No electrical is included in this estimate - Plumbing o No plumbing is included in this estimate - Blue board and plaster o 1/2"Blue board and skim coat plaster will be applied to addition and tie in areas ( smooth finish on walls and textured finish on ceiling) TOTAL COST $ 15,000.00 r-. PAYMENT SCHEDULE The payment for the contract will be as follows 30%upon commencement of project 4500.00 30%upon completion of exterior shell framing 4500.00 30%upon completion blue board and plaster 4500.00 10%upon completion of project 1500.00 Tom Abernathy, Homeov er., William��// J. gerris, Back River Development ACTION-KING ENTERPRISES,INC. SUBSURFACE SEWAGE DISPOSAL SYS'T'EM INSPECTION FORM PART C SYSTEM INFORMATION(CONTINUED) PROPERTY ADDRESS: 373 SALEM STREET NO. OVER MA 01845 AND OWNER:ERIC SANTULLO i DATE OF INSPECTION: 5-23-96 ;I SKETCH OF SEWAGE DISPOSAL SYSTEM: INCLUDE TIES TO AT LEAST TWO PERMANENT REFERENCES LANDMARKS OR BENCHMARKS COAT ALL WELLS'PVITHIN 100 ' I I SALEM ST�,�ET I µ.. t PUMP 22' TANK CHAMBER DEPTH TO GROUNDWATER DEPTH TO GROUNDWATER,- METHOD ROUNDWATER:_METHOD OF DETERMINATION OR APPROXIMATION BROOK RUNNING APPROXIMATELY 500 FEET AWAY FROM LEACH FIELDA A PAGE 9 48'-0" OFFICE DINING L)p KITCHEN/LIVING o cn EXISTING MASTER HOUSE BEDROOM uu 1, BATHROOM BEDROOM BEDROOM .................................. ® O PROPOSED _ __--2"X 10"s ROOM 0 12'-0" 11 x 6"s SLAB ABERNATHY RESIDENCE 333 SALEM STREET NORTH ANDOVER, MA